{{#Wiki_filter:November 2, 2021
{{#Wiki_filter:
 
==SUBJECT:==
WATTS BAR NUCLEAR STATION - SECURITY BASELINE INSPECTION REPORT 05000390/2021402 AND 05000391/2021402
 
==Dear Mr. Barstow:==
On October 15, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Watts Bar Nuclear Station. On October 19, 2021, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
 
No findings or violations of more than minor significance were identified during this inspection.
 
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
Sincerely,
/RA/
Jannette G. Worosilo, Chief Plant Support Branch Division or Reactor Safety Docket Nos. 05000390 and 05000391 License Nos. NPF-90 and NPF-96
 
===Enclosure:===
As stated
 
==Inspection Report==
Docket Numbers: 05000390 and 05000391 License Numbers: NPF-90 and NPF-96 Report Numbers: 05000390/2021402 and 05000391/2021402 Enterprise Identifier: I-2021-402-0071 Licensee: Tennessee Valley Authority Facility: Watts Bar Nuclear Station Location: Spring City, TN Inspection Dates: October 12, 2021 to October 19, 2021 Inspectors: J. Wallo, Senior Physical Security Inspector J. Tornow, Physical Security Inspector Approved By: Jannette G. Worosilo, Chief Plant Support Branch Division or Reactor Safety Enclosure
 
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Watts Bar Nuclear Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
 
===List of Findings and Violations===
 
No findings or violations of more than minor significance were identified.
 
===Additional Tracking Items===
None.
 
=INSPECTION SCOPES=
 
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
 
==SAFEGUARDS==
==71130.05 - Protective Strategy Evaluation==
 
The inspectors evaluated the licensee's protective strategy through completion of the following
 
===procedure elements: Protective Strategy Evaluation===
{{IP sample|IP=IP 71130.05|count=2}}
: (1) Tier I: All Requirements Tier II: 14 Requirements (02.05 a, 02.06 a, d, f, g, h, i, j, m, n, 02.07 a, b, c, and e)
: (2) Tier III: 4 Requirements (02.08, 02.09 a, b and 02.11 a)
 
==INSPECTION RESULTS==
No findings were identified.
 
==EXIT MEETINGS AND DEBRIEFS==
The inspectors verified no proprietary information was retained or documented in this report.
* On October 19, 2021, the inspectors presented the security baseline inspection results to James Barstow and other members of the licensee staff.
 
=DOCUMENTS REVIEWED=
 
Inspection Type              Designation Description or Title                                  Revision or
Procedure                                                                                      Date
71130.05  Corrective Action 1727881    Protective Strategy Details                          10/14/2021
Documents
71130.05  Corrective Action 1728142    Lessons Learned from the WBN Security Tabletop drills 10/14/2021
Documents
71130.05  Corrective Action 1729105    Checklist Not Used                                    10/14/2021
Documents
71130.05  Corrective Action 1729098    Simulated Bridge Phone / Cyber Security              10/14/2021
Documents
Resulting from
Inspection
71130.05  Procedures                    Watts Bar Physical Security Plan                      26
71130.05  Procedures        NSDP-27    Conduct of Security Drills and Exercises/Performance  17
Evaluation Program
71130.05  Procedures        NSDP-27.3  TVA Nuclear Composite Adversary Force                0
71130.05  Procedures        NSDP-7.4    TVA Nuclear Security Law Enforcement Plan            0
4
}}
}}

Revision as of 17:59, 16 January 2022

Security Baseline Inspection Report 05000390/2021402 and 05000391/2021402
ML21306A079
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 11/02/2021
From: Jannette Worosilo
Division of Reactor Safety II
To: Jim Barstow
Tennessee Valley Authority
References
IR 2021402
Download: ML21306A079 (6)


Text