IR 05000528/2021404: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:September 23, 2021
 
==SUBJECT:==
PALO VERDE NUCLEAR GENERATING STATION UNITS 1, 2 AND 3 -
INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 05000528/2021404, 05000529/2021404, 05000530/2021404 AND 07200044/2021401
 
==Dear Ms. Lacal:==
On August 26, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palo Verde Nuclear Generating Station Units 1, 2 and 3 and discussed the results of this inspection with Mr. Mike McLaughlin, Vice President, Site Services, and other members of your staff.
 
The NRC inspector documented one NRC identified Severity Level IV violation. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.
 
If you contest the violation or significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; and the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
 
If Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
 
Sincerely, Signed by Kellar, Ray on 09/23/21 Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 05000530 05000529 05000528 07200044 Enclosure:
As stated cc w/ encl: Distribution via LISTSERV PALO VERDE NUCLEAR GENERATING STATION UNITS 1, 2 AND 3 -
INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 05000528/2021404, 05000529/2021404, 05000530/2021404 AND 07200044/2021401-DATED SEPTEMBER 23, 2021 DISTRIBUTION:
SMorris, RA JMonninger, DRA AVegel, DRP MHay DRP RLantz, DRS GMiller, DRS DCylkowski, RC AMcCraw, RIV/OEDO VDricks, ORA LWilkins, OCA SLingam, NRR AMoreno, RIV/OCA BMaier, RSLO AAgrawal, IPAT JDixon, DRP ASanchez, DRP RWilliams, DRP JFreeman, DRP LMerker, DRP NCuevas, DRP ELantz, DRP YDubay, DRP BCorrell, IPAT LFlores, IPAT FRamirez, IPAT MMuessle, DNMS LHowell, DNMS GWarnick, DNMS EWharton, NSIR NSimonian, NSIR DGarner, NSIR TKeene, NSIR DJohnson, NSIR JJustice, NSIR FSullivan, NSIR FBower, RI JWorosilo, RII SOrth, RIII DRS R4Enforcement ML21259A239 SUNSI  Non-Sensitive  Publicly Available
 
Review  Sensitive  Non-Publicly Available OFFICE PSB1 PSB1 C: PSB1 C: DRPD C: PSB1 NAME DHolman AMeyen RKellar AAgrawal RKellar DATE 09/16/2021 09/17/2021 09/17/2021 09/21/2021 09/23/2021
}}
}}

Revision as of 13:34, 11 October 2021

NRC Security Inspection Report 05000528/2021404, 05000529/2021404, 05000530/2021404 and 07200044/2021401
ML21265A322
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/23/2021
From: Ray Kellar
Plant Support Branch-1
To: Lacal M
Arizona Public Service Co
References
IR 2021401, IR 2021404
Download: ML21265A322 (4)


Text

September 23, 2021

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION UNITS 1, 2 AND 3 -

INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 05000528/2021404, 05000529/2021404, 05000530/2021404 AND 07200044/2021401

Dear Ms. Lacal:

On August 26, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palo Verde Nuclear Generating Station Units 1, 2 and 3 and discussed the results of this inspection with Mr. Mike McLaughlin, Vice President, Site Services, and other members of your staff.

The NRC inspector documented one NRC identified Severity Level IV violation. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; and the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

If Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely, Signed by Kellar, Ray on 09/23/21 Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 05000530 05000529 05000528 07200044 Enclosure:

As stated cc w/ encl: Distribution via LISTSERV PALO VERDE NUCLEAR GENERATING STATION UNITS 1, 2 AND 3 -

INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 05000528/2021404, 05000529/2021404, 05000530/2021404 AND 07200044/2021401-DATED SEPTEMBER 23, 2021 DISTRIBUTION:

SMorris, RA JMonninger, DRA AVegel, DRP MHay DRP RLantz, DRS GMiller, DRS DCylkowski, RC AMcCraw, RIV/OEDO VDricks, ORA LWilkins, OCA SLingam, NRR AMoreno, RIV/OCA BMaier, RSLO AAgrawal, IPAT JDixon, DRP ASanchez, DRP RWilliams, DRP JFreeman, DRP LMerker, DRP NCuevas, DRP ELantz, DRP YDubay, DRP BCorrell, IPAT LFlores, IPAT FRamirez, IPAT MMuessle, DNMS LHowell, DNMS GWarnick, DNMS EWharton, NSIR NSimonian, NSIR DGarner, NSIR TKeene, NSIR DJohnson, NSIR JJustice, NSIR FSullivan, NSIR FBower, RI JWorosilo, RII SOrth, RIII DRS R4Enforcement ML21259A239 SUNSI Non-Sensitive Publicly Available

Review Sensitive Non-Publicly Available OFFICE PSB1 PSB1 C: PSB1 C: DRPD C: PSB1 NAME DHolman AMeyen RKellar AAgrawal RKellar DATE 09/16/2021 09/17/2021 09/17/2021 09/21/2021 09/23/2021