July 14, 2021

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION - DESIGN BASIS ASSURANCE INSPECTION (PROGRAMS) INSPECTION REPORT 05000528/2021014 AND 05000529/2021014 AND 05000530/2021014

Dear Ms. M. Lacal:

On June 9, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palo Verde Nuclear Generating Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, David L. Digitally signed by David L. Proulx Proulx Date: 2021.07.14 10:53:14 -05'00'

David Proulx, Acting Branch Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 05000528 and 05000529 and 05000530 License Nos. NPF-41 and NPF-51 and NPF-74

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000528, 05000529 and 05000530 License Numbers: NPF-41, NPF-51 and NPF-74 Report Numbers: 05000528/2021014, 05000529/2021014 and 05000530/2021014 Enterprise Identifier: I-2021-014-0000 Licensee: Arizona Public Service Company Facility: Palo Verde Nuclear Generating Station Location: Tonopah, AZ Inspection Dates: May 10, 2021 to May 28, 2021 Inspectors: J. Braisted, Reactor Inspector W. Cullum, Reactor Inspector R. Kopriva, Senior Reactor Inspector Approved By: David Proulx, Acting Branch Chief Engineering Branch 1 Division of Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a design basis assurance inspection (programs) inspection at Palo Verde Nuclear Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.21N.02 - Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements POV Review (IP Section 03)

The inspectors:

a. Determined whether the sampled POVs are being tested and maintained in accordance with NRC regulations along with the licensees commitments and/or licensing bases.

b. Determined whether the sampled POVs are capable of performing their design-basis functions.

c. Determined whether testing of the sampled POVs is adequate to demonstrate the capability of the POVs to perform their safety functions under design-basis conditions.

d. Evaluated maintenance activities including a walkdown of the sampled POVs (if accessible).

(1) Unit 1 Motor-Driven Auxiliary Feedwater Pump to Steam Generator 1 Flow Control Valve 1JAFBHV0030
(2) Unit 1 Nuclear Cooling Water Supply to Reactor Coolant Pump Cooler Outboard Containment Isolation Valve 1JNCAUV0402
(3) Unit 1 Steam Generator 1 Steam Supply to Auxiliary Feed Pump Turbine Isolation Valve (Penetration 2) 1JSGAUV0134
(4) Unit 2 Chemical Volume and Control System Letdown from Regenerative Heat Exchanger Outboard Containment Isolation Valve (Penetration 40) 2JCHBUV0523
(5) Unit 2 Refueling Water Tank Outlet Isolation Valve 2JCHBHV0530
(6) Unit 2 Safety Injection System Containment Sump to Safety Injection Pump Suction Inboard Containment Isolation Valve (Penetration 24) 2JSIBUV0675
(7) Unit 3 Auxiliary Feedwater Turbine Driven Auxiliary Feedwater Pump to Steam Generator 1 Isolation Valve (Penetration 75) 3JAFCUV0036
(8) Unit 3 Motor-Driven Auxiliary Feedwater Pump to Steam Generator 2 Isolation Valve 3JAFBUV0035
(9) Unit 1 Main Steam, Steam Generator 2, Economizer Feedwater Downstream Isolation Valve (Penetration 10) 1JSGBUV0137
(10) Unit 2 Chemical Volume and Control System Auxiliary Pressurizer Spray Valve 2JCHAHV0205
(11) Unit 2 Auxiliary Feedwater Steam Generator 2 Steam Supply to Auxiliary Feed Pump Turbine Isolation Valve (Penetration 3) 2JSGAUV0138
(12) Unit 3 Safety Injection Containment Spray Control Valve and Outboard Containment Isolation Valve (Penetration 21) 3JSIAUV0672

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On June 9, 2021, the inspectors presented the Exit Meeting inspection results to Ms. M.

Lacal, Vice President / Chief Nuclear Officer and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.21N.02 Calculations 01-EC-MA-0221 AC Distribution 14

01-EC-PK-0207 DC Battery Sizing and Minimum Voltage 9

01-J-ZZI-0004 Controlled Motor Operator Database 33

2-EC-MA-0221 AC Distribution 14

2-J-ZZI-0006 Controlled - Air Operated Valve Setpoint Database 15

03-EC-MA-0221 AC Distribution 12

03-EC-PK-0207 DC Battery Sizing and Minimum Voltage 8

03-J-ZZI-0004 Controlled Motor Operator Data Base 33

13-JC-CH-0102 Air Operated Valve (AOV) Setting Calculation for Letdown 000

to Regen HX Isolation Valves and Regenerative

Heat Exchanger Outlet Isolation Valves

13-JC-ZZ-0300 Motor Operated Valve Thrust and Torque Calculation for 1

13JAFBUV0034 and 13JAFBUV0035

13-JC-ZZ-0301 Motor Operated Valve Thrust and Torque Calculation for 2

13JAFCUV0036 and

13JAFAUV0037

13-JC-ZZ-0304 Motor Operated Valve Thrust and Torque Calculation for 1

13JCHBHV0530 and 13JCHBHV0531

13-JC-ZZ-0306 Motor Operated Valve Thrust and Torque Calculation for 0

13JSGAUV0134 and 13JSGAUV0138

13-JC-ZZ-0311 Motor Operated Valve Thrust and Torque Calculation for 3

13JSIBUV0671 and 13JSIAUV0672

13-JC-ZZ-0400 Motor Operated Valve Thrust and Torque Calculation for 1

13JAFBHV0030 and 13JAFBHV0031

13-JC-ZZ-0503 Motor Operated Valve Torque Calculation for 1

13JNCBUV0401, 13JNCAUV0402 and 13JNCBUV0403

13-JS-A41 Technical Study to Support G.L. 89-10 MOV Program 04/20/2007

13-MC-AF-0401 AFW System - MOV Maximum Differential Pressure 5

13-MC-AF-0800 Auxiliary Feedwater ESF Function Response Times 8

13-MC-CH-0604 Maximum Differential Pressure Calculation for Chemical 0

Volume Control System Air-

Operated Valves (AOVs) 13JCHAUV0506,

Inspection Type Designation Description or Title Revision or

Procedure Date

13JCHAUV0516, 13JCHBUV0505,

13JCHBUV0515, and 13JCHBUV0523

13-MC-CH-0604 Maximum Differential Pressure Calculation for Chemical 0

Volume Control System Air-

Operated Valves (AOVs) 13JCHAUV0506,

13JCHAUV0516, 13JCHBUV0505,

13JCHBUV0515, and 13JCHBUV0523.

13-MC-CH-326 Stress Evaluation of Air-Operated Valves 1

13-MC-NC-301 MOV Program Support - Valves UV-401, UV-402, and UV- 4

403

13-MC-SG-0811 Maximum Differential Pressure Across MOVs SG-134/138 3

and AF-54

13-MC-SG-0811 Maximum Differential Pressure Across MOVs SG-134/138 3

and AF-54

13-MC-XM-0500 MOV Bolt Torque Calculation 11

13-MC-ZZ-0216 Air Operated Valve Bench Set Calculation 7

13-MC-ZZ-0217 Gate Valve Open Thrust Required During Potential 7

Pressure Locking Conditions

13-MS-B007 Evaluation of Dynamic Performance Parameters for 11/12/2010

Generic Letter GL 89-10

13-MS-B075 Motor Operated Valve (MOV) Valve Factors 0

13-MS-B076 Motor Operated Valve (MOV) Rate of Loading 0

13-VTD-A391- Anchor Darling FWIV and MSIV Accumulator Minimum 1

20 and Maximum Nitrogen Precharge Pressures Based on

Accumulator Temperature

J601A-00246 CCI MOV Weak-Link and Thrust Analysis 3

J605-00106 Stress Report for 10" NXL W/SMB0005-H1BC 5

J605-00201 Engineering Analysis of Torque Requirements for Butterfly 3

Valves

M234A-00157 Stress Analysis End Load Calculations for Gate Valve 0

N001-0701- A Maximum Line/DP Cases for CVCS 3

00174

N001-2101- Thrust, Torque and Limiting Component Report, Carbon 10

00094 Steel & Stainless Steel Motor Operated Gate & Globe

Inspection Type Designation Description or Title Revision or

Procedure Date

Valves

P221B-00609 Valve Data Sheets and Maximum Thrust Analysis for 6

Anchor/Darling Valves

P221B-00609 Valve Data Sheets and Maximum Thrust Analysis 6

P221B-00657 Analysis of Retrofit Trim 3

P221B-00657 Anchor Darling Analysis of Retrofit Trim (Weak link) B

Corrective Action Condition Report 21-02176, 16-04430, 17-04425, 18-07812, 18-17231, 19-

Documents (CR) 05506, 20-08224, 20-14853, 21-02537, 20-04719,

21,03579, 18-03063, 18-05620, 16-16105, 19-06087

Corrective Action Condition Report 21-06133, 21-06365, 21-06625

Documents (CR)

Resulting from

Inspection

Drawings 01-M-AFP-001 Auxiliary-Feedwater System 45

01-M-AFP-001 P & I Diagram, Auxiliary - Feedwater System 45

01-M-NCP-003 Nuclear Cooling Water System 13

01-M-SGP-001 P & I Diagram - Main Steam System 72

01-N001-1104- 24 Inch Class 150 Wafer Valve Assembly SI-673, 675 V- 10

282 CE-16690 30JN82

01-N001-1104- 24" CLASS 150 WAFER 10

282 VALVE ASSY SI-673,675

V-CE-16690 30JN82

2-M-CHP-001 P & I Diagram - Chemical and Volume Control System 38

2-M-SIP-001 P & I Diagram - Safety Injection & Shutdown Cooling 55

System

2-N001-1104- 24 inch Class 150 Wafer Valve Assembly SI-UV-673 and 8

274 675

2-N001-1104- 24" CLASS 150 WAFER VLV ASSY. SI-UV-673 &675 8

274

03-M-AFP-001 P & I Diagram - Auxiliary-Feedwater System 31

03-N001-1104- 24 Inch Class 150 Wafer Valve Assembly SI-UV-673 and 8

275 675

08-E-CHB-029 RWT to Train Safety Injection System Valve 2J-CHA-HV- 3

531

Inspection Type Designation Description or Title Revision or

Procedure Date

13-10407- 6 inch - 900 pound, Gate Valve, Pressure Seal-Butt Wled N

P221B-137 Ends, Double Packing- SMB-1 Motor Operator

13-M234A-00047 Feed Water Isolation Valve With A/DV Hydraulic Actuator 16

13-N001-1104- 2 BODY 60 ACTUATOR 667 DBQ DIAPHRAGM 12

00006 ACTUATED CONTROL VALVE

M234A-00156 Flowserve Corporation Anchor Darling Hydraulic Manifold 0

Assembly Exploded View

P221B-00137 6 inch 900 pound Gate Valve Cast Stain Steel M

P221B-00137 6 Inch 900 Pound Gate Valve - Cast Stain Steel N

Engineering 2005-00965 The Purpose of This EDC Is to Provide New Setpoint 10/10/2008

Changes Limits for the MOV Actuator Open Torque Switch Bypass

Limit Switch for MOV 1JAFBHV0030

2006-01122 Update Documents to Reflect the Rewiring of the Actuator 03/08/2007

to Disconnect the Torque Switch on Valve 1JNCAUV0402

2009-01216 Modify Duration of Close Torque Switch Bypass to 12/17/2010

Approximately 98% Of the Stroke for 1JSIAHV0698

2009-01225 Modify duration of close torque switch bypass to 3

approximately 98% of the stroke for valves

1/2/3JAFBUV0034,

1/2/3JAFBUV0035, 1/2/3JAFCUV0036,

1/2/3JAFAUV0037, 1/2/3JSIAHV0698, 1/2/3JSIBHV0699,

1/2/3JCHNUV0501

2011-00261 Modification to Prevent Pressure Locking of High Risk Unit 04/20/2012

AF Motor Operated Valves (AF-35)

2011-00522 MOV Thrust, Torque, and Actuator Sizing Calculation 13- 2

JC-ZZ-0201 was replaced with a series of calculations

known as the

MIDAS Calculations as defined in EDC 2011-00139, and

13-JC-ZZ-0201 is referenced in various AF, CT, and WC

Calculations. ACTs 3637913, 3637878, and 3638195 track

the impact to update the references associated with the

AF, CT, and

WC Calculations, respectively. This PO EDC implements

the updates to these calculations.

Inspection Type Designation Description or Title Revision or

Procedure Date

2012-00390 The Purpose of This Paper Only Change Is to Address 06/15/2012

CRDR 4030986 and CRAI 4030988

2012-00390 In CRDR 4030986, the original intent of the pressure 06/15/2012

locking calculation, 13-MC-ZZ-0217, was to control the

required opening force by limiting the peak cracking value

for pressure locking susceptible valves

2017-00382 Update Calculation 13-JC-ZZ-0503 to Incorporate 1

Voltages From 13-EC-MA-0221 per AI 09-00197-068 and

EWR 17-04348-001

Miscellaneous 13-J-083-080 Valve Data Sheet 0

13-JN021-A043- A-C/D-C Motor Performance Curves 04/22/1991

13-N001-2101- Project Specification for Solenoid Operated Valves 5

34-10

13-VTD-L200- Limitorque Maintenance Update on Nuclear Qualified Limit 0

20-1 and Torque Switches

13-VTD-P340- Pratt Valves Application Procedure Forrust-Veto MP 0

0003-1 [PUB.# A-691_3].

13-VTD-P340- Pratt Valves Rubber Seat Butterfly Vales, Valve Shaft 2

O01 6-2 Packing Instructions.

3-VTD-R165- Lubrication of Anti-Friction Bearings in Reliance Electric 2

0016-2 Motors [PUS. # A-381 I-7].

AF STM System Training Manual, Volume 21, Auxiliary Feedwater 7

System (AF)

AF STM System Training Manual, Volume 21, Auxiliary Feedwater 7

System (AF)

CH DBM Chemical and Volume Control System Design Basis 26

Manual

CH STM System Training Manual, Volume 41, Chemical and 7

Volume Control System (CH)

D2014-0017 Removal of EQ Equipment in Zone ME from the EQL 06/11/2014

EEQ-L200-001 Electrical Equipment Qualification Data File, Reliance 27

Class H/RH & Class F Type LR AC Motors and Limitorque

SB/SMB/SMC Series Valve Actuators

Inspection Type Designation Description or Title Revision or

Procedure Date

EEQ-L200-001 Electrical Equipment Qualification Data File - Reliance 27

Class H/RH & Class F Type LR AC Motors and Limitorque

SB/SMB/SMC Series Valve Actuators

EEQ-L200-002 Electrical Equipment Qualification Data File - Peerless 18

Class RH 125 VDC Motor used on SB and

SMB Actuators

EEQ-L200-003 Electrical Equipment Qualification Data File - Class B, AC 16

Reliance, Electric Apparatus or Paramount Motors used

with SMB/SB or SMC-04 Valve Actuators

EEQ-T020-002 Electrical Equipment Qualification Data File - Solenoid 15

Operated Valve (SOV), 82EE-001 & 76HH Series with Soft

Seats and 98F-002 with

Hard Seats

JN021-A00043-1 A-C and D-C Motor Performance Curves. 04/19/1991

MIDAS-APS VER MIDAS-APS Verification and Validation Plan Results 1

2009.29 VVTR

NC DBM Design Basis Manual, Nuclear Cooling Water System 21

SG STM System Training Manual, Volume 9, Main Steam System 3

(SG)

SI STM System Training Manual, Volume 40, Safety Injection 4

System (SI)

VTD-A381-00004 Spare Parts Ordering Instructions for Anchor darling 2 1/2 12/28/1992

Inch and Larger Valves

VTD-A391-00003 Vendor Document: Anchor/Darling Operation- 8

Maintenance Instruction for 2 1/2" and Larger Nuclear

Service Valves [PUB. # 4162-1].

VTD-C600-0005 Vendor Document: Control Components Inc. Main 2

Feedwater Bypass Valves Maintenance Manual

VTD-F130-00017 Vendor Document: Fisher Instruction Manual For Design 3

DBQ and DBAQ Control Valves [PUB. # 1799].

VTD-F130-00070 Vender Document: Fisher Instruction Manual for Type 667 10

Diaphragm Actuator Sizes 30-76 & 87 [PUB. # 1203]

VTD-F130-00073 Vendor Document: Fisher Instruction Manual for Type 667 03

Diaphragm Actuator Sizes 80 & 100 [PUB.# 1432]

Inspection Type Designation Description or Title Revision or

Procedure Date

VTD-L200-00003 instruction and Maintenance Manual for Limitorque Type 4

SMB Valve Operators (PUB. #SMBI-82D).

VTD-L200-002I Maintenance Update on Hydraulic Lock of Limitorque 0

Valve Actuators [PUB. # 88-2].

VTD-L200-0036 Limitorque Technical Update Concerning Kalsi 0

Engineering Document # 1707-C

VTD-L200-0039 Limitorque Technical Update 92-02, Recommended 0

Spring Pack Replacement for SMB Actuators

VTD-P340-O005- Pratt Valves Bonded Seat Valves Application Procedure 0

Chemglaze Z-306 [PUB. # A-6217].

VTD-R165-0010 Vendor Document: Instruction Manual for Fractional 0

Horsepower Duty Master A-C Motors

VTD-R165-0016 Vendor Document: Lubrication of Anti-Friction Bearings in 2

Reliance Electric Motors

Procedures 39MT-9ZZ02 PM or EQ Inspection of the Limitorque SMB/SB/SMC 34

Motor Operated Valve Actuators

73DP-9XI01 Pump and Valve Inservice Testing Program 40

73DP-9ZZ12 Motor Operated Valve (MOV) Program 20

73DP-9ZZ13 Motor Operated Valve - Thrust and Torque Calculations 5

73DP-9ZZ18 Motor Operated Valve - Post Test Evaluations 7

73DP-9ZZ20 Air Operated Valve Program 14

73DP-9ZZ20-01 Air Operated Valve Thrust and Torque Calculation 0

73DP-9ZZ20-03 Air Operated Valves - Post Test Evaluations 1

73DP-9ZZ23 Final JOG MOV Verification Program Implementation 2

73ST-9AF02 Aux Feedpump AFA-P01 Trip and Throttle Valve 09/30/2020

73ST-9X134-1 Steam Supply Valves Inservice Test (AFA-P01) 12/04/2012

73ST-9XI16 Economizer FWIVs - Inservice Test 39

73ST9XI411 Stroke Timing SGAUV134/134A/138/138A in Unit 1 04/06/2019

Self- 20-16281-002 Power Operated Valve Self-Assessment 02/26/2021

Assessments 4608114 USA/STARS MOV Engineering Program Self-Assessment 03/06/2015

Work Orders Work Order (WO- 5122472, 5152588, 5182251, 4289107, 5070140,

) 4718303, 3799194, 4731181, 3084385, 4434578,

4962760, 4965375, 2855334, 4789076, 4969579,

5152723, 2840636, 5161715, 5135177, 5059533,

Inspection Type Designation Description or Title Revision or

Procedure Date

3588553, 3197094, 5151546, 4795821, 4965371,

5086895, 4732562, 4911657, 5139359, 5166757,

5197994, 4732939, 4877254, 5054804, 4866084,

4912257, 5087908, 4371624, 4965354, 3082998,

3799194, 4731181, 3289898, 3460729, 4538355,

23339, 3989910, 4648818, 4965354, 4371624,

2