Triennial Fire Protection Inspection Report 05000528/2021012, 05000529/2021012 and 05000530/2021012
ML21123A163
Person / Time
Site: Palo Verde  
Issue date: 05/04/2021
From: Nick Taylor
NRC Region 4
To: Lacal M
Arizona Public Service Co
References
IR 2021012
Download: ML21123A163 (12)


Text

May 4, 2021

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000528/2021012, 05000529/2021012 AND 05000530/2021012

Dear Ms. Lacal:

On April 16, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palo Verde Nuclear Generating Station. The NRC inspectors discussed the results of this inspection with Mr. Todd Horton, Senior Vice President, Site Operations and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Nicholas H. Taylor, Chief Engineering Branch 2 Division of Reactor Safety

Docket Nos. 05000528, 05000529 and 05000530 License Nos. NPF-41, NPF-51 and NPF-74

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000528, 05000529 and 05000530

License Numbers:

NPF-41, NPF-51 and NPF-74

Report Numbers:

05000528/2021012, 05000529/2021012 and 05000530/2021012

Enterprise Identifier: I-2021-012-0000

Licensee:

Arizona Public Service Company

Facility:

Palo Verde Nuclear Generating Station

Location:

Tonopah, AZ

Inspection Dates:

March 29, 2021, to April 16, 2021

Inspectors:

G. Pick, Senior Reactor Inspector

S. Makor, Reactor Inspector

J. Mateychick, Senior Reactor Inspector

Approved By:

Nicholas H. Taylor, Chief

Engineering Branch 2

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at Palo Verde Nuclear Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures in effect at the beginning of the inspection unless otherwise noted. Currently approved inspection procedures with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident and regional inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, resident and regional baseline inspections were evaluated to determine if all or portions of the objectives and requirements stated in the inspection procedure could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable inspection procedure. In some cases, portions of an inspection procedure were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the inspection procedure.

REACTOR SAFETY

===71111.21N.05 - Fire Protection Team Inspection (FPTI)

Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)===

The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis or safe shutdown analysis.

(1) Verified that operator actions can be accomplished as assumed in the fire probabilistic risk assessment analysis and safe shutdown analysis.
(2) Walked down the fire water system components including the fire water tank and fire pumps to inspect for deficient conditions.
(3) Evaluated readiness of the carbon dioxide fire suppression system protecting the essential switchgear rooms (Fire Areas 5A and 5B) in Unit 2.
(4) Ensured that post maintenance and surveillance activities for the selected fire areas and fire water systems were performed as scheduled.

Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)

The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the fire protection program contains adequate procedures to implement the selected administrative control.

Verify that the selected administrative control meets the requirements of all committed industry standards.

(1) Reviewed administrative controls of hot work, transient combustibles, and fire impairments.
(2) Ensured that the fire brigade training program met requirements and readiness of the licensee to combat fires.

Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)

The inspectors evaluated the licensee's procedures controlling modifications and procedure revisions for adequacy in reviewing potential impacts to the fire protection program.

(1) Reviewed fire protection configuration review requests associated with plant modifications.
(2) Reviewed fire protection change review requests associated with procedure changes.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 16, 2021, the inspectors presented the triennial fire protection inspection results to Mr. Todd Horton, Senior Vice President, Site Operations and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.21N.05 Calculations

13-MC-FP-0316

CFR 50, Appendix R, Manual Action Feasibility

13-MC-FP-0317

CFR 50, Appendix R, Operational Considerations

13-MC-FP-0318

CFR 50, Appendix R, III.G/III.L Compliance

Assessment

13-MC-FP-0320

CFR 50, Appendix R, Multiple Spurious Operations

Analysis

13-NS-F001

Fire Probabilistic Risk Assessment - Plant Boundary

Definition and Partitioning

13-NS-F002

Fire Probabilistic Risk Assessment - Equipment Selection

13-NS-F004

Fire Probabilistic Risk Assessment - Quantification and

Screenings

13-NS-F006

Fire Probabilistic Risk Assessment - Ignition Frequencies

Analysis

13-NS-F007

Fire Probabilistic Risk Assessment - Zone of Influence

(ZOI)

13-NS-F009

Fire Probabilistic Risk Assessment - Fire Scenario

Selection and Seismic-Fire Interactions (FSS/SF)

13-NS-F010

Fire Probabilistic Risk Assessment - Post-Fire Human

Reliability Analysis (HRA)

NN345-A00021

Evaluation of the Development and Timing of Hot Gas

Layer Conditions in Generic Palo Verde Fire

Compartments with Secondary Combustibles (0001-0014-

2-002, R1)

TA-13-C00-2000-

004

CENTS Computer Code Analysis of the 10 CFR 50,

Appendix R, Fire Protection Scenarios

Corrective Action

Documents

19-05839, 19-09863, 19-09864, 19-09865, 19-09878

Corrective Action

Documents

Resulting from

Inspection

21-03715, 21-03723, 21-03739, 21-03740, 21-04029

Drawings

Chemical Volume Control System Overview

04/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

01-M-FPP-002,

Sheet 1

P & I Diagram - Fire Protection System

01-M-FPP-003

P & I Diagram - Fire Protection System

01-M-FPP-006

P & I Diagram - Fire Protection System

2-M-AFP-001,

Sheet 1 of 2

P & I Diagram - Auxiliary Feedwater System

2-M-AFP-001,

Sheet 2 of 2

P & I Diagram - Auxiliary Feedwater System

2-M-EWP-001

P & I Diagram - Essential Cooling Water System

2-M-FPP-002,

Sheet 1

P & I Diagram - Fire Protection System

2-M-FPP-003

P & I Diagram - Fire Protection System

2-M-FPP-004

P & I Diagram - Fire Protection System (CO2 System)

2-M-FPP-006

P & I Diagram - Fire Protection System

2-M-NCP-001

P & I Diagram - Nuclear Cooling Water System

2-M-NCP-002

P & I Diagram - Nuclear Cooling Water System

2-M-NCP-003

P & I Diagram - Nuclear Cooling Water System

2-M-SIP-001

P & I Diagram Safety Injection & Shutdown Cooling

System

2-W-HJP-001

P & I Diagram - Control Building Heating, Ventilation, and

Air Conditioning

03-M-FPP-002

P & I Diagram - Fire Protection System

03-M-FPP-003

P & I Diagram - Fire Protection System

03-M-FPP-006

P & I Diagram - Fire Protection System

13-A-ZYD-029,

Sheet 2

Fire Protection Control Building Floor Plan at Elevation

100' - 0", Level 1

13-E-MAA-001

Main Single Line Diagram

AO-M-FPP-001

P & I Diagram - Fire Protection System

Engineering

Changes

07-00110-004

Strategic Modernization Program Ovation Distributed

Control System Infrastructure and Cyber Security System

19-00424-002

The TCCP# 5048813 in U1 Fuel Building that's being use

for L-Insert Spent Fuel Pool (SFP) PC-1678 modification

(DMWO 4887256)

01/29/19

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

20-00424

13-MC-FP-0803

EDC 2019-00674

Fire Protection Change Regulatory Review

Engineering

Evaluations

18-10070-003

EWR to Further Evaluate Penetration Seal

07/24/18

20-07630-003

Review Technical Issue Notifications for the Fire

Protection EST3 and Fireworks System

06/09/2020

20-14739-001

NRC Information Notice (IN) 2020-03, Recall of

Mechanical Rate of Rise and Fixed Temperature Heat

Detectors

11/10/2020

20-16734-001

NRC Information Notice (IN) 2020-04, Operating

Experience Related to Failure of Buried Fire Protection

Main Yard Piping

2/28/2020

EE 17-15769-001

Fire Protection Change Regulatory Review (FPCRR)

EE 18-08959-002

Fire Protection Change Regulatory Review (FPCRR)

EE 19-01360-056

Fire Protection Change Regulatory Review (FPCRR)

Miscellaneous

Fire Protection Design Basis Manual

List of Modifications Associated with Fire Protection

Licensing Alternatives for Resolution of Operator Manual

Actions (OMAs) for Multiple Spurious Operations (MSOs)

05/12/2012

Top 10 risk significant systems from the Fire Probabilistic

Risk Assessment based on contribution to core damage

frequency and on contribution to large early release

frequency

01/21/2021

Description of fire modeling key inputs and associated

studies related to essential switchgear room Train A and

the turbine-driven auxiliary feedwater pump

24831

CAFTA - Fault Tree Analysis System, Version 6.0

2/2021

13-LS-A112

PVNGS Aging Management Program Evaluation Report -

Fire Protection-B.2.1.12, NUGEG 1801 Program XI.M26

13-LS-A113

PVNGS Aging Management Program Evaluation Report-

Fire Water System-B2.1.13, NUREG 1801 Program

XI.M27

13-LS-A116

PVNGS Aging Management Program Evaluation Report-

One Time Inspection -B2.1.16, NUREG 1801 Program

XI.M32

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

13-LS-A117

PVNGS Aging Management Program Evaluation Report-

Selective Leaching of Materials-B2.1.17, NUREG

Program XI.M33

13-LS-A118

PVNGS Aging Management Program Evaluation Report-

Buried Piping and Tanks Inspection-B2.1.18, NUREG 1801 Program XI.M34

13-MS-A83

NFPA Code Applicability and Conformance Review

3002010659

FRANX Software Manual, Version 4.4

07/2017

NLR20S010402

Licensed Operator Continuing Training Simulator

Scenario

01/16/2020

NLR21S020400

Licensed Operator Continuing Training Simulator

Scenario

2/23/2021

NNR20C050600

Non-Licensed Operator Continuing Training Simulator

Scenario

08/12/2020

NUREG/CR-

6850, v1

EPRI/NRC-RES Fire PRA Methodology for Nuclear Power

Facilities, Volume 1: Summary & Overview

09/2005

NUREG/CR-

6850, v2

EPRI/NRC-RES Fire PRA Methodology for Nuclear Power

Facilities, Volume 2: Detailed Methodology

09/2005

PR-0904

Fire Protection Program Requirement Description

Supplement 1 to

NUREG/CR-6850

Fire Probabilistic Risk Assessment Methods

Enhancements

2/2009

Technical

Requirements

Manual Section

T3.11

Fire Protection

Procedures

14DP-0FP01

Firewatch Requirements

14DP-0FP01

Firewatch Requirements

14DP-0FP02

Fire System Impairments and Notifications

14DP-0FP02

Fire Systems Impairments and Notifications

14DP-0FP13

Fire Protection System Status Control

14DP-0FP33

Control of Transient Combustibles

14DP-0FP36

Hot Work Permit

14DP-0FP43

Fire Protection Program Responsibilities, Authorities, and

Management Expectations

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

14DP-0FP44

Fire Protection Test Program Requirement

14DP-0FP46

Fire Protection Impact Screening

14DP-0TR01

Fire Department Training Program Description

14DP-0TR02

Fire Department Training Program Administration

14FT-0FP04

Annual Fire Water Loop Test

14FT-0FP05

Monthly Diesel Driven Fire Pump Start and Run

14FT-0FP34

Fire Hydrant Street Key Flush & Post Indicator Valve

Operational Testing Water Reclamation Facility

14FT-1FP02

Motor Driven Fire Pump Start and Run

14FT-2FP03

Fire Water Valve Verification

14FT-2FP04

Fire Protection Valve Cycling

14FT-2FP05

Unit 2 Wet Pipe, Deluge and Pre-Action System

Inspection

14FT-2FP34

Fire Hydrant Street Key Flush & Post Indicator Valve

Operational Testing Unit 2

14FT-9FP04

Annual Fire Pump Test

14FT-9FP08

CO2 Fire Suppression System Functional Test

& 21

14FT-9FP28

FPN-Spray and/or Sprinkler System Functional Test

14FT-9FP29

CO2 Fire Suppression System Valve and Test Switch

Position Verification

14FT-9FP65

Appendix R/FTS Fire Barrier Surveillance (for Walls,

Floors/Ceilings and Raceways)

1DP-0FP38

Fire Protection Test Program

2DP-0AC03

Digital Assessments

33FT-9FP01

Appendix R and Technical Requirements Manual Fire

Damper Surveillance

38FT-9QK14

Fire Detection/Protection System Supervised Circuits Test

and Functional Test - Carbon Dioxide Panels

3FT-9FP04

Appendix A Fire Damper Surveillance Test

40AO-9ZZ19

Control Room Fire

40DP--9ZZ04

Time Critical Action (TCA) Program

40DP-9ZZ17

Control of Doors, Hatches and Floor Plugs

73DP-9EE05

One-Time Inspection Program

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

73DP-9EE06

One-Time Inspection for Selective Leaching Degradation

of Components

73DP-9EE07

Internal Surfaces Inspection

81DP-0DC17

Temporary Configuration Changes

81DP-0EE02

Design Change Request

81DP-0EE10

Design Change Process

81DP-0ZZ01

Civil System, Structure, and Component Monitoring

Program

83DP-0AP01

Buried Piping and Tanks Program

IP-ENG-001

Standard Design Process Overview

PR-0904

Program Requirement Description - Fire Protection

STP M-65

Sprinkler/Deluge System Visual Verifications

Work Orders

2765970, 4443275, 4580980, 4946829, 4946860,

4973747, 4973749, 4981416, 5007899, 5007900,

5030240, 5048552, 5065781, 5071664, 5072404,

5073224, 5074929, 5091039, 5152582, 5156565,

5164350, 5164555, 5167697, 5169459, 5173126,

5178911, 5179302, 5180651, 5182685, 5183112,

5189568, 5264169, 5317536, 5319595