PNO-III-89-058B, on 890922,licensee Took Initial Steps to Restart UF6 Conversion Process Shutdown Since 890829.Util Upgraded Safety of Conversion Process,Including Usage of Vital Equipment Repair Statusboard.New Stack Sys Designed: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 1: | Line 1: | ||
{{Adams | |||
| number = ML20248C126 | |||
| issue date = 09/22/1989 | |||
| title = PNO-III-89-058B:on 890922,licensee Took Initial Steps to Restart UF6 Conversion Process Shutdown Since 890829.Util Upgraded Safety of Conversion Process,Including Usage of Vital Equipment Repair Statusboard.New Stack Sys Designed | |||
| author name = Mallett B, Sreniawski D | |||
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) | |||
| addressee name = | |||
| addressee affiliation = | |||
| docket = 07000036 | |||
| license number = | |||
| contact person = | |||
| document report number = PNO-III-89-058B, PNO-III-89-58B, NUDOCS 8910030373 | |||
| document type = PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO,, TEXT-INSPECTION & AUDIT & I&E CIRCULARS | |||
| page count = 2 | |||
}} | |||
{{#Wiki_filter:( - ._ .. - - - - _ - _ _ _ - - _ _ - - - - - | |||
PRELIMINARY NOTIFICATION''0F EVENT OR UNUSUAL OCCURRENCE PHO-III-58B Date Stptember 22,.1989 | |||
.c . | |||
B This preliminary notification constitutes EARLY. notice of events of POSSIBLE. | |||
'p i safcty or public interest significance. The information is as initially received d without' verification or evaluation, and is. basically all that is known by the Region''III staff on this date. | |||
Fccility: Combustion Engineering, Inc. Licensee Emergency CE Hematite:- Classification: | |||
liematite, Missouri Unusual Event -l Alert i | |||
' Docket No. 7 M036 Site Area Emergency _! | |||
L General Emergency 1 X Not' Applicable | |||
] | |||
Subjecti POTENTIAL UF6 RELEASE-(SECOND UPDATE) l l | |||
On September 22,-1989, the licensee took the latt1a1 steps to restart its i uranium-hexafluoride (UF6) conversion process, which has.been shut down since | |||
: August 29,:1989, as the result of an unplanned UF6 stack release on | |||
. August 28,.1989. (See PNO-III-89-58A) A Region III (Chicago) fuel facility j | |||
-inspector is on site monitoring the restart. ; | |||
During the downtime, the licensee upgraded the safety of the conversion process, including usage of a vital equipment repair status board for all citems which are required to be operational. The board item must be reviewed and signed off by'the shift supervisor before start-up of the system. On_1y the shift supervisor has the key to unlock the control for start-up.. | |||
The nitrogen feed control-valve, whost failure resulted'in the release, ~' | |||
J has been interlocked to the UF6-feed line so that the conversion process cannot;takel place unless the valve.is operational. A position indicator | |||
. light has been instelled on-the control panel to show the_ status of each' of the nitrogen valves, j i | |||
1A new, improved stack monitoring system also has been designed, installed | |||
, and tested. The NRC inspector verified that all these systems and procedures were in place as of 1:00 p.m. (CDT), September 22, 1989. | |||
,:The State"of Missouri will be notified. | |||
This information is current as of 3:30 p.m. (CDT), September 22, 1989. | |||
c 4 0 %.k D. i If%.S.Mallett i | |||
CONTACT:' reniawski FTS 388-5611 FTS 388-5612 ef / ' | |||
1 o \ ; | |||
i -! | |||
i 8910030373 890922 | |||
.PDR 18cE | |||
, .PNO-III-05BB PNU .-. . | |||
3 | |||
PR ARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-III-58B Date Septcmber 27, 1989 | |||
/ _,_ | |||
. DISTRIBUTION: | |||
HEAD 00ARTERS OFFICES Ehairman Carr tlilRC1718/CARRPN) NM55 (TNRC0506 & | |||
Comm. Roberts (lNRC1718/ WRIGHT) 1NRC0304/NRRPN) | |||
Comm. Rogers (lNRC1718/ VAN CISE) GPA: SLIP (lNRC0304/SLIPN) i l | |||
Comm. Curtiss (lNRC1718/CURTISPN) GPA:PA (1NRC02/0PAPN) | |||
ED0 (1NRC1718/ED0PN) AEOD (NRCRH/AE0DPN) i G:n.' Counsel (lNRC1516/0GCPN) *01G (NRCRMP/0IGDV) | |||
NRR (lNRC1112/NRRPN) *ASLAP (NRCRMP/ASLAPDW) | |||
GPA:CA (lNRC1718/0CAPN) Research (NRCRES/RESPN) 1NRC1718/GRIGGS) ! | |||
Enforcement (lNRC0708/0EPN) | |||
REGIONS MAIL T0: FAX T0: | |||
~ | |||
: R gion I (NRCRI/RIPN) DCS (Orig.) INP0 R:gion II (NRCRII/RIIPN) DOT (Trans. NSAC - | |||
R;gion III (NRCRIII/RIIIPN) Only) LIC - | |||
Region ~IV (NRCRIV/RIVPN) NRC OPS CTR WO3 Region V (NRCRV/RVPN) PDR (8/634-3R3 T 4/1 0 I cDenotes a Displaywriter/PC not an IBM 5520 Terminal. ' | |||
Rev. 07/20/89 I | |||
( 1 I | |||
_ - - _ _ _ _ _}} | |||
{{PNO-Nav|region=III}} |
Latest revision as of 13:15, 18 March 2021
ML20248C126 | |
Person / Time | |
---|---|
Site: | 07000036 |
Issue date: | 09/22/1989 |
From: | Mallett B, Sreniawski D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
To: | |
References | |
PNO-III-89-058B, PNO-III-89-58B, NUDOCS 8910030373 | |
Download: ML20248C126 (2) | |
( - ._ .. - - - - _ - _ _ _ - - _ _ - - - - -
PRELIMINARY NOTIFICATION0F EVENT OR UNUSUAL OCCURRENCE PHO-III-58B Date Stptember 22,.1989
.c .
B This preliminary notification constitutes EARLY. notice of events of POSSIBLE.
'p i safcty or public interest significance. The information is as initially received d without' verification or evaluation, and is. basically all that is known by the RegionIII staff on this date.
Fccility: Combustion Engineering, Inc. Licensee Emergency CE Hematite:- Classification:
liematite, Missouri Unusual Event -l Alert i
' Docket No. 7 M036 Site Area Emergency _!
L General Emergency 1 X Not' Applicable
]
Subjecti POTENTIAL UF6 RELEASE-(SECOND UPDATE) l l
On September 22,-1989, the licensee took the latt1a1 steps to restart its i uranium-hexafluoride (UF6) conversion process, which has.been shut down since
- August 29,:1989, as the result of an unplanned UF6 stack release on
. August 28,.1989. (See PNO-III-89-58A) A Region III (Chicago) fuel facility j
-inspector is on site monitoring the restart. ;
During the downtime, the licensee upgraded the safety of the conversion process, including usage of a vital equipment repair status board for all citems which are required to be operational. The board item must be reviewed and signed off by'the shift supervisor before start-up of the system. On_1y the shift supervisor has the key to unlock the control for start-up..
The nitrogen feed control-valve, whost failure resulted'in the release, ~'
J has been interlocked to the UF6-feed line so that the conversion process cannot;takel place unless the valve.is operational. A position indicator
. light has been instelled on-the control panel to show the_ status of each' of the nitrogen valves, j i
1A new, improved stack monitoring system also has been designed, installed
, and tested. The NRC inspector verified that all these systems and procedures were in place as of 1:00 p.m. (CDT), September 22, 1989.
,:The State"of Missouri will be notified.
This information is current as of 3:30 p.m. (CDT), September 22, 1989.
c 4 0 %.k D. i If%.S.Mallett i
CONTACT:' reniawski FTS 388-5611 FTS 388-5612 ef / '
1 o \ ;
i -!
i 8910030373 890922
.PDR 18cE
, .PNO-III-05BB PNU .-. .
3
PR ARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-III-58B Date Septcmber 27, 1989
/ _,_
. DISTRIBUTION:
HEAD 00ARTERS OFFICES Ehairman Carr tlilRC1718/CARRPN) NM55 (TNRC0506 &
Comm. Roberts (lNRC1718/ WRIGHT) 1NRC0304/NRRPN)
Comm. Rogers (lNRC1718/ VAN CISE) GPA: SLIP (lNRC0304/SLIPN) i l
Comm. Curtiss (lNRC1718/CURTISPN) GPA:PA (1NRC02/0PAPN)
ED0 (1NRC1718/ED0PN) AEOD (NRCRH/AE0DPN) i G:n.' Counsel (lNRC1516/0GCPN) *01G (NRCRMP/0IGDV)
NRR (lNRC1112/NRRPN) *ASLAP (NRCRMP/ASLAPDW)
GPA:CA (lNRC1718/0CAPN) Research (NRCRES/RESPN) 1NRC1718/GRIGGS) !
Enforcement (lNRC0708/0EPN)
REGIONS MAIL T0: FAX T0:
~
R;gion III (NRCRIII/RIIIPN) Only) LIC -
Region ~IV (NRCRIV/RIVPN) NRC OPS CTR WO3 Region V (NRCRV/RVPN) PDR (8/634-3R3 T 4/1 0 I cDenotes a Displaywriter/PC not an IBM 5520 Terminal. '
Rev. 07/20/89 I
( 1 I
_ - - _ _ _ _ _