PNO-III-89-058B, on 890922,licensee Took Initial Steps to Restart UF6 Conversion Process Shutdown Since 890829.Util Upgraded Safety of Conversion Process,Including Usage of Vital Equipment Repair Statusboard.New Stack Sys Designed

From kanterella
(Redirected from PNO-III-89-058B)
Jump to navigation Jump to search
PNO-III-89-058B:on 890922,licensee Took Initial Steps to Restart UF6 Conversion Process Shutdown Since 890829.Util Upgraded Safety of Conversion Process,Including Usage of Vital Equipment Repair Statusboard.New Stack Sys Designed
ML20248C126
Person / Time
Site: 07000036
Issue date: 09/22/1989
From: Mallett B, Sreniawski D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNO-III-89-058B, PNO-III-89-58B, NUDOCS 8910030373
Download: ML20248C126 (2)


( - ._ .. - - - - _ - _ _ _ - - _ _ - - - - -

PRELIMINARY NOTIFICATION0F EVENT OR UNUSUAL OCCURRENCE PHO-III-58B Date Stptember 22,.1989

.c .

B This preliminary notification constitutes EARLY. notice of events of POSSIBLE.

'p i safcty or public interest significance. The information is as initially received d without' verification or evaluation, and is. basically all that is known by the RegionIII staff on this date.

Fccility: Combustion Engineering, Inc. Licensee Emergency CE Hematite:- Classification:

liematite, Missouri Unusual Event -l Alert i

' Docket No. 7 M036 Site Area Emergency _!

L General Emergency 1 X Not' Applicable

]

Subjecti POTENTIAL UF6 RELEASE-(SECOND UPDATE) l l

On September 22,-1989, the licensee took the latt1a1 steps to restart its i uranium-hexafluoride (UF6) conversion process, which has.been shut down since

August 29,:1989, as the result of an unplanned UF6 stack release on

. August 28,.1989. (See PNO-III-89-58A) A Region III (Chicago) fuel facility j

-inspector is on site monitoring the restart.  ;

During the downtime, the licensee upgraded the safety of the conversion process, including usage of a vital equipment repair status board for all citems which are required to be operational. The board item must be reviewed and signed off by'the shift supervisor before start-up of the system. On_1y the shift supervisor has the key to unlock the control for start-up..

The nitrogen feed control-valve, whost failure resulted'in the release, ~'

J has been interlocked to the UF6-feed line so that the conversion process cannot;takel place unless the valve.is operational. A position indicator

. light has been instelled on-the control panel to show the_ status of each' of the nitrogen valves, j i

1A new, improved stack monitoring system also has been designed, installed

, and tested. The NRC inspector verified that all these systems and procedures were in place as of 1:00 p.m. (CDT), September 22, 1989.

,:The State"of Missouri will be notified.

This information is current as of 3:30 p.m. (CDT), September 22, 1989.

c 4 0 %.k D. i If%.S.Mallett i

CONTACT:' reniawski FTS 388-5611 FTS 388-5612 ef / '

1 o \  ;

i -!

i 8910030373 890922

.PDR 18cE

, .PNO-III-05BB PNU .-. .

3

PR ARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-III-58B Date Septcmber 27, 1989

/ _,_

. DISTRIBUTION:

HEAD 00ARTERS OFFICES Ehairman Carr tlilRC1718/CARRPN) NM55 (TNRC0506 &

Comm. Roberts (lNRC1718/ WRIGHT) 1NRC0304/NRRPN)

Comm. Rogers (lNRC1718/ VAN CISE) GPA: SLIP (lNRC0304/SLIPN) i l

Comm. Curtiss (lNRC1718/CURTISPN) GPA:PA (1NRC02/0PAPN)

ED0 (1NRC1718/ED0PN) AEOD (NRCRH/AE0DPN) i G:n.' Counsel (lNRC1516/0GCPN) *01G (NRCRMP/0IGDV)

NRR (lNRC1112/NRRPN) *ASLAP (NRCRMP/ASLAPDW)

GPA:CA (lNRC1718/0CAPN) Research (NRCRES/RESPN) 1NRC1718/GRIGGS)  !

Enforcement (lNRC0708/0EPN)

REGIONS MAIL T0: FAX T0:

~

R gion I (NRCRI/RIPN) DCS (Orig.) INP0 R:gion II (NRCRII/RIIPN) DOT (Trans. NSAC -

R;gion III (NRCRIII/RIIIPN) Only) LIC -

Region ~IV (NRCRIV/RIVPN) NRC OPS CTR WO3 Region V (NRCRV/RVPN) PDR (8/634-3R3 T 4/1 0 I cDenotes a Displaywriter/PC not an IBM 5520 Terminal. '

Rev. 07/20/89 I

( 1 I

_ - - _ _ _ _ _