PNO-III-89-058A, on 890830,augmented Insp Team Began Review of 890828 Release of UF6 as Result of Incomplete Processing of UF6 in Processing Vessel.Approx 20 Kg U Recovered from Reaction Offgas Sys & Scrubber.Environ Samples Collected

From kanterella
Jump to navigation Jump to search
PNO-III-89-058A:on 890830,augmented Insp Team Began Review of 890828 Release of UF6 as Result of Incomplete Processing of UF6 in Processing Vessel.Approx 20 Kg U Recovered from Reaction Offgas Sys & Scrubber.Environ Samples Collected
ML20246Q083
Person / Time
Site: 07000036
Issue date: 09/01/1989
From: Mallett B, Sreniawski D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNO-III-89-058A, PNO-III-89-58A, NUDOCS 8909110337
Download: ML20246Q083 (2)


_---

Ri? 2)CJ SELIMMIARYi NOTIFICATION: 0F EVENT OR UNUSUAL OCCURRENCE PNO-III-89-58A Date September 1,1989 .

bis preliminary' notification constitutes EARLY. notice of events of POSSIBLE safety or public Gterest significance. The -information is as-initially received without' verification or daluation, and is basically all that is known by the Region-III staff on this'date.

bcility: . Combustion Engineering, Inc. Licensee. Emergency

'CE Hematite Classification:

Hematite, Missouri Unusual Event Alert Docket No. 70-0036 Site Area Emergency General Emergency q X Not Applicable ~

$bget: POTENTIAL UF . RELEASE-----(UPDATE) 6 m August 30, an Augmented Inspection' Team (AIT) began its review of the uranium release

' rom the licensee's uranium processing facility.

Osed on~ an effluent sample from' the plant offgas stack, the licensee has estimated that 24 grams.(about 10 ounces) of uranium was released from the stack. Soil, water, vegetation,-

Gd. air ' samples, collected-in downwind areas both on and off the site, have shown no widence of uranium deposition. Bioassay samples of plant workers showed no significant Panium uptake.

he'lictnsee's investigation'of the release has determined.that the release occurred on Egust 28, 1989, as a result of incomplete processing of uranium hexaflouride (UF ) in the riccessing: vessel. Avalveinanitrogenlineremainedopen,allowingthenitrogbntodilute Re stcam which is injected into the vessel to convert the UF to another uranium compound.

Re dilution reduced the rate of conversien and, as a result,6 unconverted UF entered the Pfgas system from the vessel.- Although the gas passed through two filters akd a limestone Grubber, because of the excessive quantity of UF, in the cas, higher than normal quantities-(f uranfum were released frem the plant. The fil?ers did not fail as earlier believed.

Rout 20 kilograms of uranium were recovered from the reaction offgas system and the >

erubber, hsplant operated for approximately two hours with the valve open on August 20, 1989. The r0trogen velve was optn.due to a problem with its solenoid control system. Personnel

'perating the vsssel en August 28, 1989 were not awars the valve was open.

he NRC is continuing to monitor the licensee's investigation and environmental monitoring 8tivities. The team has collected independent environmental s,amples for analysis.

0Dere has been extensive area news media interest in the release.

he.. State of Missouri has been kept informed of the AIT's findings.

[ Dis updated information is current as of 2:30 p.m., September 1, 1989.

@NTACT:

Whf D. J. Sreniawski'

&lk B. S. Mallett FTS 388-5611 FTS 388-5612 gV)5 U \

l 8909110337 890901 PDR ILE PNO-III-89458A PDC l

1tELI 1ARY NOTIFICATION OF. EVENT OR UNUSUAL OCCURRENCE PNO-III-89-58A Date S ptember 1, 1989

) DISTRIBUTION:

HEADQUARTERS OFFICES

hairman Carr (INRC1718/CARRPN) NMSS -(1NRC0506 &
omm. Roberts (INRC1718/ WRIGHT) INRC0304/NRRPN)
omm. Rogers.(INRC1718/VANCISE) GPA: SLIP (1NRC0304/SLIPN)
omm. Curtiss (INRC1718/CURTISPN) GPA:PA (1NRC02/0PAPN)
D0 - (INRC1718/ED0PN) AEOD jNRCRM/AEODPN)-

FA:CA (1NRC1718/0CAPN) *ASLAP sNRCRMP/ASLAPDW)

On. Crunsel (INRC1516/0GCPN). *0lG (NRCRMP/0IGDW)

ISR (INRC1112/NRRPN) *Inv. (liRCRMP/01DW)

' forcement G (INRC0708/0EPN) Research (NRCRES/RESPN)

REGIONS MAIL T0: FAX T0:

Ggion 1 (NRCRI/RIPN) DCS (Orig.). INP0 -

egion II (NRCRII/RIIPN) DOT (Trans. NSAC -

Ggien III (NRCRIII/RIIIPN) Only) LIC 4.uS egion IV- (NRCRIV/RIVPN) 14RC OPS CTR d'.4b, Ggion V (NRCRV/RVPN) PDR (8/634-3343) Q:y 8 D nous a Displaywriter/PC not an IBM 5520 Terminal.

Rev. 07/20;e9

--.m_..._ _