ML20195C844: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 1: | Line 1: | ||
{{Adams | |||
| number = ML20195C844 | |||
| issue date = 10/26/1988 | |||
| title = App to SALP Repts 50-295/88-01 & 50-304/88-01 for Dec 1986 - May 1988 | |||
| author name = | |||
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) | |||
| addressee name = | |||
| addressee affiliation = | |||
| docket = 05000295, 05000304 | |||
| license number = | |||
| contact person = | |||
| document report number = 50-295-88-01, 50-295-88-1, 50-304-88-01, 50-304-88-1, NUDOCS 8811040009 | |||
| package number = ML20195C841 | |||
| document type = SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE, TEXT-INSPECTION & AUDIT & I&E CIRCULARS | |||
| page count = 3 | |||
}} | |||
See also: [[see also::IR 05000295/1988001]] | |||
=Text= | |||
{{#Wiki_filter:. | |||
. . | |||
. | |||
. | |||
, | |||
' | |||
Enclosure 1 | |||
SALP 7 | |||
APPENDIX | |||
- | |||
SALP BOARD REPORT | |||
V. S. NUCLEAR REGULATORY COMMIS$10N | |||
REGION !!! | |||
SYSTERATIC ASSESSMENT OF LICENSEE PERFORMANCE i | |||
50-293/88001; 50-304/88001 | |||
Inspection Report No. | |||
! | |||
Commonwealth Edison Company ; | |||
' | |||
Name of Licensee | |||
' | |||
, | |||
Zion Station | |||
Name of Facility ; | |||
l | |||
i | |||
December 1, 1986 through May 31, 1988 | |||
Assessment Period | |||
l | |||
, | |||
L | |||
lk * | |||
O ! | |||
! | |||
- _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ . | |||
, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ . | |||
,, | |||
* . | |||
. | |||
. | |||
,. | |||
Enclosure 1 | |||
Zion Station | |||
A. Sunenary of Meeting with Coninonwealth Edison Company on September 7,1988 | |||
The findings and conclusions of the SALP Board are documented in | |||
. Report No. 50-295/88001; 50-304/88001 and were discussed with the licensee on | |||
September 7,1988, at the Emergency Operations Facility at. Zion Station. | |||
While the meeting was primarily a discussion between the licensee | |||
and NRC, it was open to members of the public as observers. | |||
The following licensee and NRC personnel were in attendance, as well | |||
as the noted observers. | |||
Consnonwealth Edison Company | |||
B. L. Thomas, President | |||
Cordell Reed, Senior Vice President | |||
T. J. Maiman, Vice Presdient, PWR Operations | |||
K. L. Graesser, General Manager, PWR Operations | |||
L. O. De1 George, Assistant Vice President | |||
G. J. P11mel, Zion Station Manager | |||
G. E. Trzyna, Nuclear Licensing Administrator | |||
R. F. Crawford, Olstrict Manager, Waukegan | |||
Jack Bitel, Manager, Nuclear Safety | |||
T. L. VanDeVoort, Quality Assurance Superintendent | |||
H. P. Studtmann Director of Quality Assurance | |||
E. A. Broccolo, Operating Department | |||
B. R. Sheetan, PWRE Manager | |||
R. E. Mika, Assistant Tech Staff Supervisor | |||
F. C. Lentine, PWR Licensing Supervisor | |||
D. M. Outcalt. PWR Operating Staff | |||
Willy Stone, Regulatory Assurance Supervisor | |||
E. J. Fuerst, Superintendent of Production | |||
D. B. Wozniak, PWRE Project Engineer | |||
M. F. Pietraszewski, PWRE Section Engineer | |||
J. C. Golden. Emergency Planning Supervisor | |||
J. P. Leider Production Services | |||
T. A. Rieck, Services Superintendent | |||
R. N. Cascarano, Technical Staff Supervisor | |||
. | |||
.._____--____-____-__ _ ._. | |||
- | |||
. . | |||
. | |||
. | |||
. | |||
e. d | |||
- | |||
Nuclear Regulatory Comission | |||
C. J. Paperiello, Deputy Regional Administrator | |||
W. L. Forney, Deputy Division Director, DRP | |||
J. M. Hinds, Jr., Chief Reactor Projects Section 1A | |||
M. M. Holzmer, Senior Resident Inspector | |||
P. L. Eng, Resident inspector | |||
Pamela Longmire Technical Intern | |||
G. A. Van Sickle, Project Inspector, Section 1A | |||
Zian Swatison, Resident Clerical Aide | |||
J. A. Norris, Licensing Project Manager | |||
: | |||
Other | |||
Westinghouse | |||
W. C. Widen. Dean, Westinghouse Training Center | |||
G. W. Scholand, Manager, Westinghouse Training Center | |||
K. M. Rueter, Westinghouse Technical Tr61ning l | |||
0. M. Scheef, Westinghouse Computer Services l | |||
Illinois Department of Nuclear Safety : | |||
R. D. Schulz, Section Chief I | |||
J. L. Roman, Reactor Engineer [ | |||
B. Coments Received from Licensee f : | |||
l | |||
Comonwealth Edison Corepany's response to the Zion Station SALP 7 Board l* | |||
Report dated October 19, 1988, had no comments addressirig the specific | |||
content of the report. Because there are no coments, this Appendix ! | |||
contains no changes to the SALP Report. [ | |||
i | |||
C. Regional Administrator's Conclusions Based on Consideration of Licensee f | |||
' | |||
Coments , | |||
r | |||
I have concluded that the overall ratings in the affected areas have not l | |||
changed. [ | |||
i | |||
( | |||
; | |||
! | |||
! | |||
! | |||
! | |||
I | |||
I | |||
I | |||
_ _ _ _ _ , _ _ _ _ _ _ . _ _ _ _ . _ _ . | |||
}} |
Latest revision as of 12:21, 2 January 2021
ML20195C844 | |
Person / Time | |
---|---|
Site: | Zion File:ZionSolutions icon.png |
Issue date: | 10/26/1988 |
From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
To: | |
Shared Package | |
ML20195C841 | List: |
References | |
50-295-88-01, 50-295-88-1, 50-304-88-01, 50-304-88-1, NUDOCS 8811040009 | |
Download: ML20195C844 (3) | |
See also: IR 05000295/1988001
Text
.
. .
.
.
,
'
Enclosure 1
SALP 7
APPENDIX
-
SALP BOARD REPORT
V. S. NUCLEAR REGULATORY COMMIS$10N
REGION !!!
SYSTERATIC ASSESSMENT OF LICENSEE PERFORMANCE i
50-293/88001; 50-304/88001
Inspection Report No.
!
Commonwealth Edison Company ;
'
Name of Licensee
'
,
Zion Station
Name of Facility ;
l
i
December 1, 1986 through May 31, 1988
Assessment Period
l
,
L
lk *
O !
!
- _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ .
, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ .
,,
- .
.
.
,.
Enclosure 1
Zion Station
A. Sunenary of Meeting with Coninonwealth Edison Company on September 7,1988
The findings and conclusions of the SALP Board are documented in
. Report No. 50-295/88001; 50-304/88001 and were discussed with the licensee on
September 7,1988, at the Emergency Operations Facility at. Zion Station.
While the meeting was primarily a discussion between the licensee
and NRC, it was open to members of the public as observers.
The following licensee and NRC personnel were in attendance, as well
as the noted observers.
Consnonwealth Edison Company
B. L. Thomas, President
Cordell Reed, Senior Vice President
T. J. Maiman, Vice Presdient, PWR Operations
K. L. Graesser, General Manager, PWR Operations
L. O. De1 George, Assistant Vice President
G. J. P11mel, Zion Station Manager
G. E. Trzyna, Nuclear Licensing Administrator
R. F. Crawford, Olstrict Manager, Waukegan
Jack Bitel, Manager, Nuclear Safety
T. L. VanDeVoort, Quality Assurance Superintendent
H. P. Studtmann Director of Quality Assurance
E. A. Broccolo, Operating Department
B. R. Sheetan, PWRE Manager
R. E. Mika, Assistant Tech Staff Supervisor
F. C. Lentine, PWR Licensing Supervisor
D. M. Outcalt. PWR Operating Staff
Willy Stone, Regulatory Assurance Supervisor
E. J. Fuerst, Superintendent of Production
D. B. Wozniak, PWRE Project Engineer
M. F. Pietraszewski, PWRE Section Engineer
J. C. Golden. Emergency Planning Supervisor
J. P. Leider Production Services
T. A. Rieck, Services Superintendent
R. N. Cascarano, Technical Staff Supervisor
.
.._____--____-____-__ _ ._.
-
. .
.
.
.
e. d
-
Nuclear Regulatory Comission
C. J. Paperiello, Deputy Regional Administrator
W. L. Forney, Deputy Division Director, DRP
J. M. Hinds, Jr., Chief Reactor Projects Section 1A
M. M. Holzmer, Senior Resident Inspector
P. L. Eng, Resident inspector
Pamela Longmire Technical Intern
G. A. Van Sickle, Project Inspector, Section 1A
Zian Swatison, Resident Clerical Aide
J. A. Norris, Licensing Project Manager
Other
Westinghouse
W. C. Widen. Dean, Westinghouse Training Center
G. W. Scholand, Manager, Westinghouse Training Center
K. M. Rueter, Westinghouse Technical Tr61ning l
0. M. Scheef, Westinghouse Computer Services l
Illinois Department of Nuclear Safety :
R. D. Schulz, Section Chief I
J. L. Roman, Reactor Engineer [
B. Coments Received from Licensee f :
l
Comonwealth Edison Corepany's response to the Zion Station SALP 7 Board l*
Report dated October 19, 1988, had no comments addressirig the specific
content of the report. Because there are no coments, this Appendix !
contains no changes to the SALP Report. [
i
C. Regional Administrator's Conclusions Based on Consideration of Licensee f
'
Coments ,
r
I have concluded that the overall ratings in the affected areas have not l
changed. [
i
(
!
!
!
!
I
I
I
_ _ _ _ _ , _ _ _ _ _ _ . _ _ _ _ . _ _ .