App to SALP Repts 50-295/88-01 & 50-304/88-01 for Dec 1986 - May 1988
ML20195C844
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 10/26/1988
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20195C841 List:
References
50-295-88-01, 50-295-88-1, 50-304-88-01, 50-304-88-1, NUDOCS 8811040009
Download: ML20195C844 (3)


See also: IR 05000295/1988001

Text

.

. .

.

.

,

'

Enclosure 1

SALP 7

APPENDIX

-

SALP BOARD REPORT

V. S. NUCLEAR REGULATORY COMMIS$10N

REGION !!!

SYSTERATIC ASSESSMENT OF LICENSEE PERFORMANCE i

50-293/88001; 50-304/88001

Inspection Report No.

!

Commonwealth Edison Company  ;

'

Name of Licensee

'

,

Zion Station

Name of Facility  ;

l

i

December 1, 1986 through May 31, 1988

Assessment Period

l

,

L

lk *

O  !

!

- _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ .

, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ .

,,

  • .

.

.

,.

Enclosure 1

Zion Station

A. Sunenary of Meeting with Coninonwealth Edison Company on September 7,1988

The findings and conclusions of the SALP Board are documented in

. Report No. 50-295/88001; 50-304/88001 and were discussed with the licensee on

September 7,1988, at the Emergency Operations Facility at. Zion Station.

While the meeting was primarily a discussion between the licensee

and NRC, it was open to members of the public as observers.

The following licensee and NRC personnel were in attendance, as well

as the noted observers.

Consnonwealth Edison Company

B. L. Thomas, President

Cordell Reed, Senior Vice President

T. J. Maiman, Vice Presdient, PWR Operations

K. L. Graesser, General Manager, PWR Operations

L. O. De1 George, Assistant Vice President

G. J. P11mel, Zion Station Manager

G. E. Trzyna, Nuclear Licensing Administrator

R. F. Crawford, Olstrict Manager, Waukegan

Jack Bitel, Manager, Nuclear Safety

T. L. VanDeVoort, Quality Assurance Superintendent

H. P. Studtmann Director of Quality Assurance

E. A. Broccolo, Operating Department

B. R. Sheetan, PWRE Manager

R. E. Mika, Assistant Tech Staff Supervisor

F. C. Lentine, PWR Licensing Supervisor

D. M. Outcalt. PWR Operating Staff

Willy Stone, Regulatory Assurance Supervisor

E. J. Fuerst, Superintendent of Production

D. B. Wozniak, PWRE Project Engineer

M. F. Pietraszewski, PWRE Section Engineer

J. C. Golden. Emergency Planning Supervisor

J. P. Leider Production Services

T. A. Rieck, Services Superintendent

R. N. Cascarano, Technical Staff Supervisor

.

.._____--____-____-__ _ ._.

-

. .

.

.

.

e. d

-

Nuclear Regulatory Comission

C. J. Paperiello, Deputy Regional Administrator

W. L. Forney, Deputy Division Director, DRP

J. M. Hinds, Jr., Chief Reactor Projects Section 1A

M. M. Holzmer, Senior Resident Inspector

P. L. Eng, Resident inspector

Pamela Longmire Technical Intern

G. A. Van Sickle, Project Inspector, Section 1A

Zian Swatison, Resident Clerical Aide

J. A. Norris, Licensing Project Manager

Other

Westinghouse

W. C. Widen. Dean, Westinghouse Training Center

G. W. Scholand, Manager, Westinghouse Training Center

K. M. Rueter, Westinghouse Technical Tr61ning l

0. M. Scheef, Westinghouse Computer Services l

Illinois Department of Nuclear Safety  :

R. D. Schulz, Section Chief I

J. L. Roman, Reactor Engineer [

B. Coments Received from Licensee f  :

l

Comonwealth Edison Corepany's response to the Zion Station SALP 7 Board l*

Report dated October 19, 1988, had no comments addressirig the specific

content of the report. Because there are no coments, this Appendix  !

contains no changes to the SALP Report. [

i

C. Regional Administrator's Conclusions Based on Consideration of Licensee f

'

Coments ,

r

I have concluded that the overall ratings in the affected areas have not l

changed. [