IR 05000280/2010004: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML110450732
| number = ML110450732
| issue date = 02/11/2011
| issue date = 02/11/2011
| title = IR 05000280-10-004, 05000281-10-004, 05000280-10-501, and 05000281-10-501, on 10/29/10, Surry Power Station - ERRATA
| title = IR 05000280-10-004, 05000281-10-004, 05000280-10-501, and 05000281-10-501, on 10/29/10, Surry Power Station - Errata
| author name = McCoy G J
| author name = McCoy G J
| author affiliation = NRC/RGN-II/DRP/RPB5
| author affiliation = NRC/RGN-II/DRP/RPB5

Revision as of 01:11, 19 February 2018

IR 05000280-10-004, 05000281-10-004, 05000280-10-501, and 05000281-10-501, on 10/29/10, Surry Power Station - Errata
ML110450732
Person / Time
Site: Surry  Dominion icon.png
Issue date: 02/11/2011
From: McCoy G J
NRC/RGN-II/DRP/RPB5
To: Heacock D A
Virginia Electric & Power Co (VEPCO)
References
IR-10-004, IR-10-501
Download: ML110450732 (5)


Text

February 11, 2011

Mr. David President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT: SURRY POWER STATION - NRC INTEGRATED INSPECTION REPORT 05000280/2010004, 05000281/2010004, 05000280/2010501 and 05000281/2010501 ERRATA

Dear Mr. Heacock:

On October 29, 2010, the United States Nuclear Regulatory Commission (NRC) issued the subject NRC Integrated Inspection Report 05000280/2010004, 05000281/2010004, 05000280/2010501 and 05000281/2010501 for Surry Power Station, Units 1 and 2, ADAMS ML103020186. In reviewing this report it was noted that in Section 4OA7, the reported time period of reduced staffing for mechanical maintenance and electrical maintenance personnel between December 2006, and January 2010, was incorrect. The correct reported time period was between October 2009, and January 2010. Accordingly, we are providing a revised version of the inspection report that includes the correct time period. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37