Response to Non-Compliance Item Reported in IE Inspection Reports 50/280/77-20 & 50/281/77-20, & Determined No Proprietary Information Is Contained
ML19095A523
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/02/1977
From: Stallings C
Virginia Electric & Power Co (VEPCO)
To: O'Reilly J
NRC/RGN-II
References
Serial No. 354/081277 IR 1977020
Download: ML19095A523 (3)


Text

e VIRGINIA. ELECTRIC A.ND POWER COMP.ANY RIOHMOND,VlRGINIA 23261 September 2,. 1977-.

jtegulato~,L Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Region II - Suite.818 230 Peachtree Street, Northwest Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Serial No. 354/081277 PO&M/TAP: das Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 This is in response to your.letter of August 12, 1977, in reference to the inspection conducted at Surry Power Station on July 25-28, 1977 and reported in IE Inspection Reports 50/280/77-20 and 50-:-281/77-20.

We have.reviewed your letter and the enclosed inspection.report.

Our re-sponse to the specific non-compliance item is contained in. the attachment to this letter.

We. have determined that no proprietary information is contained in the re-ports.

Accordingly, the Virginia Electric and Power Company interposes no ob-jection to these inspection reports being made a matter of.public disclosure.

Attachment cc:

Mr. Robert.W. Reid Very truly yours,

~- ->>7. 0'7&~r C. M. Stallings Vice President-Power Supply and Production Operations

Attachment e

RESPONSE TO NON-COMPLIANCE ITEM REPORTED IN IE INSPECTION REPORT NO. 50-280/77-20 AND 50-281/77-20 NRC CoIIIlilent Technical Specification Table 3.1.D-l, item 4. (b) requires primary coolant to be analyzed for "Iodine including 1-131, I-133 and I-135...

between 2 and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> following a thermal power change exceeding 15 per-cent of the rated thermal power within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period."*

Contrary to the above _Iodine analy_sis was not per!=o_rm~d as specifie.<l _on

_ July 9, 1977, during power ascension frow 43% to 70% rated powe~ on Unit 1 or during a shutdown of Unit 2 on July 11, 1977.

Response

The deficiency is correct as stated.

The orders for modification of license for-. the two units include an add-ition to our Technical Specification 3.1.D which is stated above.

The change in power on July 9, 1977, was not accompanied by an Iodine analysis as it was overlooked.

The changes in power on July 11, 1977 were for the purpose of taking the unit to cold shutdown and the iodine analyses were not performed as our interpretation of the modified order is that it does not intend for the analyses to be performed then.

Specifically, pursuant to section 2.201 of the NRC's "Rules of Practice",

Part -2, Title 10, Code of Federal Regulations, the following information is submitted:

1.

Corrective steps taken and the results-achieved:

The operations department and the chemistry department have been re-instructed to clarify the requirements for radio-iodine analyses; especially with reference to the new, modified orders of license.

2.

Corrective steps taken to avoid further non-compliance:

The above stated instructions will be sufficient.

3.

Date when-full compliance will be achieved:

Full compliance has been achieved.