SUBJECT:

SURRY POWER STATION - SECURITY INSPECTION 05000280/2009201 AND 05000281/2009201

Dear Mr. Christian:

On March 27, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the Surry Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on March 27, 2009, with Mr. Gerald Bischof, Site Vice President, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. This report documents one finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site. However, because of the very low security significance and because it is entered into your corrective action program, the NRC is treating the violation as a non-cited violation (NCV) consistent with Section VI.A1 of the NRC Enforcement Policy. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.:

Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region II; Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector a the Surry Power Station.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agency-wide Documents Access and Management System (ADAMS), accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Enclosure contains Safeguards Information. Upon removal, this letter is decontrolled. contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Should you have any questions concerning this letter, please contact us. Your cooperation is appreciated.

Sincerely,

/RA/

Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37 Enclosure: NRC Inspection Report No. 05000280/2009201, 05000281/2009201 (SGI)

cc w/encl: Mr. Curtis G. Luffman Manager Nuclear Protection Services Virginia Electric & Power Company Surry Power Station 5570 Hog Island Road Surry, VA 23883-0315 Mr. Gerald T. Bischof Site Vice President Surry Power Station Virginia Electric and Power Company 5570 Hog Island Road Surry, VA 23883-0315 Mr. Barry Garber Supervisor Nuclear Engineering Virginia Electric and Power Company Surry Power Station 5570 Hog Island Road Surry, VA 23883-0315 Ms. Leslie N. Hartz Vice President - Nuclear Support Services Dominion Resources Services, Inc.

5000 Dominion Boulevard Glen Allen, VA 23061