IR 05000338/2013405: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML13190A062
| number = ML13190A062
| issue date = 07/08/2013
| issue date = 07/08/2013
| title = IR 05000338-13-405 & 05000339-13-405, 6/30/2013, North Anna Power Station - NRC Material Control and Accounting Inspection Report - Cover Letter
| title = IR 05000338-13-405 & 05000339-13-405, 6/30/2013, North Anna Power Station - NRC Material Control and Accounting Inspection Report - Cover Letter
| author name = McCoy G J
| author name = McCoy G J
| author affiliation = NRC/RGN-II/DRP/RPB5
| author affiliation = NRC/RGN-II/DRP/RPB5

Revision as of 22:54, 18 February 2018

IR 05000338-13-405 & 05000339-13-405, 6/30/2013, North Anna Power Station - NRC Material Control and Accounting Inspection Report - Cover Letter
ML13190A062
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 07/08/2013
From: McCoy G J
NRC/RGN-II/DRP/RPB5
To: Heacock D A
Virginia Electric & Power Co (VEPCO)
References
IR-13-405
Download: ML13190A062 (5)


Text

Enclosure transmitted herewith contain SUNSI material, when separated from the enclosure this transmittal document is decontrolled. July 8, 2013 Mr. David President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060

SUBJECT: NORTH ANNA POWER STATION - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000338/2013405 and 05000339/2013405

Dear Mr. Heacock:

On June 30, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a material control and accounting inspection at your North Anna Power Station. The enclosed inspection report documents the inspection results, which were discussed on July 3, 2013, with Mr. P.

Kemp and other members of your staff. The inspection examined activities conducted under your license as they related to safety and compliance with the Commission's rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS.

If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).

Sincerely,/RA/

Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Projects

Docket Nos. 50-338, 50-339 License Nos. NPF-4, NPF-7

Enclosure:

NORTH ANNA POWER STATION-NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000338/2013405 and 05000339/2013405

w/Attachment: