|
|
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:August 21, 2002 |
| | Paul D. Hinnenkamp, Vice President - Operations |
| | River Bend Station |
| | Entergy Operations, Inc. |
| | P.O. Box 220 |
| | St. Francisville, Louisiana 70775 |
| | SUBJECT: RIVER BEND STATION - NRC INITIAL EXAMINATION REPORT 50-458/03-301 |
| | Dear Mr. Hinnenkamp: |
| | In a telephone conversation on August 19, 2002, between Messrs. Mike Wagner, Supervisor, |
| | Operations Training, and Michael Murphy, Chief Examiner, arrangements were made for the |
| | administration of licensing examinations at River Bend Station, during the week of February 10, |
| | 2003. |
| | As agreed during the telephone conversation, your staff will prepare the examinations based on |
| | the guidelines in Revision 8, Supplement 1, of NUREG-1021, "Operator Licensing Examination |
| | Standards for Power Reactors." The NRC regional office will discuss with your staff any |
| | changes that might be necessary before the examinations are administered. |
| | To meet the above schedule, it will be necessary for your staff to furnish the examination |
| | outlines by October 13, 2002. The written examinations, operating tests, and the supporting |
| | reference materials identified in Attachment 2 of ES-201 and as discussed with the chief |
| | examiner, will be due by December 12, 2002. Any delay in receiving the required examination |
| | and reference materials, or the submittal of inadequate or incomplete materials, may cause the |
| | examinations to be rescheduled. A validation of the final examination material will be |
| | conducted at your facility the week of January 20, 2003. |
| | In order to conduct the requested written examinations and operating tests, it will be necessary |
| | for your staff to provide adequate space and accommodations in accordance with ES-402, and |
| | to make the simulation facility available on the dates noted above. In accordance with ES-302, |
| | your staff should retain the original simulator performance data (e.g., system pressures, |
| | temperatures, and levels) generated during the dynamic operating tests until the examination |
| | results are final. |
| | Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in |
| | effect while the written examinations and operating tests are being administered. |
| | To permit timely NRC review and evaluation, your staff should submit preliminary reactor |
| | operator and senior reactor operator license applications (Office of Management and Budget |
| | (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), |
| | and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first |
| | |
| | Entergy Operations, Inc. -2- |
| | examination date. If the applications are not received at least 30 days before the examination |
| | date, a postponement may be necessary. Signed applications certifying that all training has |
| | been completed should be submitted at least 14 days before the first examination date. |
| | This letter contains information collections that are subject to the Paperwork Reduction Act of |
| | 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of |
| | Management and Budget, approval number 3150-0018, which expires on April 30, 2003. |
| | The public reporting burden for this collection of information is estimated to average 500 hours |
| | per response, including the time for reviewing instructions, gathering and maintaining the data |
| | needed, writing the examinations, and completing and reviewing the collection of information. |
| | Send comments on any aspect of this collection of information, including suggestions for |
| | reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. |
| | Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at |
| | BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, |
| | NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. |
| | The NRC may not conduct or sponsor, and a person is not required to respond to, a collection |
| | of information unless it displays a currently valid OMB control number. |
| | In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter, its |
| | enclosure(s), and your response will be made available electronically for public inspection in the |
| | NRC Public Document Room or from the Publicly Available Records (PARS) component of |
| | NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at |
| | http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | Thank you for your cooperation in this matter. Mr. Wagner has been advised of the policies |
| | and guidelines referenced in this letter. If you have any questions regarding the NRC's |
| | examination procedures and guidelines, please contact Mr. Michael Murphy at 817-860-8152, |
| | or Mr. Anthony T. Gody at 817-860-8159. |
| | Sincerely, |
| | /RA/ |
| | Anthony T. Gody, Chief |
| | Operations Branch |
| | Division of Reactor Safety |
| | Docket No.: 50-458 |
| | License No.:NPF-47 |
| | cc: |
| | Executive Vice President and |
| | Chief Operating Officer |
| | Entergy Operations, Inc. |
| | P.O. Box 31995 |
| | Jackson, Mississippi 39286-1995 |
| | |
| | Entergy Operations, Inc. -3- |
| | Vice President |
| | Operations Support |
| | Entergy Operations, Inc. |
| | P.O. Box 31995 |
| | Jackson, Mississippi 39286-1995 |
| | General Manager |
| | Plant Operations |
| | River Bend Station |
| | Entergy Operations, Inc. |
| | P.O. Box 220 |
| | St. Francisville, Louisiana 70775 |
| | Director - Nuclear Safety |
| | River Bend Station |
| | Entergy Operations, Inc. |
| | P.O. Box 220 |
| | St. Francisville, Louisiana 70775 |
| | Wise, Carter, Child & Caraway |
| | P.O. Box 651 |
| | Jackson, Mississippi 39205 |
| | Mark J. Wetterhahn, Esq. |
| | Winston & Strawn |
| | 1401 L Street, N.W. |
| | Washington, DC 20005-3502 |
| | Manager - Licensing |
| | River Bend Station |
| | Entergy Operations, Inc. |
| | P.O. Box 220 |
| | St. Francisville, Louisiana 70775 |
| | The Honorable Richard P. Ieyoub |
| | Attorney General |
| | Department of Justice |
| | State of Louisiana |
| | P.O. Box 94005 |
| | Baton Rouge, Louisiana 70804-9005 |
| | H. Anne Plettinger |
| | 3456 Villa Rose Drive |
| | Baton Rouge, Louisiana 70806 |
| | President |
| | West Feliciana Parish Police Jury |
| | P.O. Box 1921 |
| | St. Francisville, Louisiana 70775 |
| | |
| | Entergy Operations, Inc. -4- |
| | Michael E. Henry, State Liaison Officer |
| | Department of Environmental Quality |
| | P.O. Box 82135 |
| | Baton Rouge, Louisiana 70884-2135 |
| | Brian Almon |
| | Public Utility Commission |
| | William B. Travis Building |
| | P.O. Box 13326 |
| | 1701 North Congress Avenue |
| | Austin, Texas 78701-3326 |
| | |
| | Entergy Operations, Inc. -5- |
| | Electronic distribution by RIV: |
| | Regional Administrator (EWM) |
| | DRP Director (KEB) |
| | DRS Director (EEC) |
| | Senior Resident Inspector (PJA) |
| | Branch Chief, DRP/B (DNG) |
| | Senior Project Engineer, DRP/B (RAK1) |
| | Staff Chief, DRP/TSS (PHH) |
| | RITS Coordinator (NBH) |
| | R:_RB\2003\rb3301lt-mem.wpd |
| | SOE:OB C:OB |
| | MEMurphy/lmb ATGody |
| | /RA/ /RA/ |
| | 08/21/02 08/21/02 |
| | OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARIR 05000458/20213012024-11-14014 November 2024 NRC Initial Operator Licensing Examination Approval 05000458/2021301 ML24289A0312024-11-0808 November 2024 – Issuance of Amendments Related to the Removal of License Condition 2.F as Part of the Consolidated Line-Item Improvement Process (CLIIP) IR 05000458/20240102024-10-31031 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2024010 IR 05000458/20240032024-10-31031 October 2024 Integrated Inspection Report 05000458/2024003 RBG-48306, Report of Changes and Errors to 10CFR50.462024-09-24024 September 2024 Report of Changes and Errors to 10CFR50.46 RBG-48315, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement2024-09-24024 September 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24255A1192024-09-16016 September 2024 Notification of NRC Follow Up Inspection for One Severity Level (SL) III and Two SL IV or Three or More SL IV Violations and Request for Additional Information RBG-48311, Reply to a Notice of Violation, NRC Inspection Report 05000458/20240022024-08-28028 August 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002 IR 05000458/20240052024-08-22022 August 2024 Updated Inspection Plan for River Bend Station (Report 05000458/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24214A2752024-08-0202 August 2024 Acknowledgement of Readiness for Supplemental Inspection RBG-48308, Notification of Readiness for Supplemental Inspection2024-07-31031 July 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20240022024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation ML24164A0862024-06-12012 June 2024 Notification of Commercial Grade Dedication Inspection (05000458/2024010) and Request for Information 05000458/LER-2023-005-01, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-06-0404 June 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24081A0072024-05-16016 May 2024 Issuance of Amendment No. 213 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors IR 05000458/20240012024-05-14014 May 2024 Integrated Inspection Report 05000458/2024001 ML24102A2842024-05-0707 May 2024 Summary of Regulatory Audit in Support of LARs to Revise Technical Specifications to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions RBG-48276, 2023 Annual Radioactive Effluent Release Report2024-04-23023 April 2024 2023 Annual Radioactive Effluent Release Report RBG-48288, Louisiana Pollutant Discharge Elimination System Permit Renewal2024-04-15015 April 2024 Louisiana Pollutant Discharge Elimination System Permit Renewal IR 05000458/20244022024-04-15015 April 2024 Security Baseline Inspection Report 05000458/2024402 (Full Report) ML24106A0432024-04-11011 April 2024 June 2024 Emergency Preparedness Exercise Inspection Request for Information RBG-48277, 2023 Annual Radiological Environmental Operating Report2024-04-10010 April 2024 2023 Annual Radiological Environmental Operating Report ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000458/20240402024-03-15015 March 2024 – 95001 Supplemental Inspection Report 05000458/2024040 and Follow-Up Assessment ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24066A1802024-03-0707 March 2024 Notification of NRC Follow-Up Inspection for Any Severity Level I or II Traditional Enforcement Violation IR 05000458/20230062024-02-28028 February 2024 Annual Assessment Letter for River Bend Station - Report 05000458/2023006 RBG-48278, 2023 Spent Fuel Storage Radioactive Effluent Release Report2024-02-27027 February 2024 2023 Spent Fuel Storage Radioactive Effluent Release Report RBG-48286, Revision to Owners Activity Report Form (OAR) for Cycle 222024-02-27027 February 2024 Revision to Owners Activity Report Form (OAR) for Cycle 22 ML24031A0042024-02-21021 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0052 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000458/LER-2023-006, Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard2024-02-0808 February 2024 Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard RBG-48274, Notification of Readiness for Supplemental Inspection2024-02-0505 February 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20230042024-01-30030 January 2024 Integrated Inspection Report 05000458/2023004 IR 05000458/20230402024-01-18018 January 2024 – 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter 05000458/LER-2023-005, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-01-16016 January 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) 05000458/LER-2023-004, Drywall Post Accident Radiation Monitor Inoperable Due to Unrecognized Surveillance Failure2023-12-28028 December 2023 Drywall Post Accident Radiation Monitor Inoperable Due to Unrecognized Surveillance Failure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting 2024-09-24
[Table view] Category:License-Operator
MONTHYEARIR 05000458/20213012024-11-14014 November 2024 NRC Initial Operator Licensing Examination Approval 05000458/2021301 IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22354A2582022-12-15015 December 2022 10_RBS-2022-12 Post-Exam Comments ML23004A1922022-12-14014 December 2022 11_RBS-2022-12 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000458/20223012021-11-30030 November 2021 Notification of NRC Initial Operator Licensing Examination 05000458/2022301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations 2CAN042102, 10 AN2-2021-03 Post-Exam Comments2021-04-16016 April 2021 10_AN2-2021-03 Post-Exam Comments ML21096A0252021-02-19019 February 2021 RB-2021-02 Draft Written Exam Comments ML21096A0242021-02-19019 February 2021 RB-2021-02 Draft Outlines ML21096A0272021-02-19019 February 2021 RB-2021-02 Final Outlines ML21096A0232021-02-19019 February 2021 RB-2021-02 Draft Outline Comments ML21095A0532021-02-19019 February 2021 RB-2021-02 Final Op Test ML21096A0282021-02-19019 February 2021 RB-2021-02 Final Written Exam ML21096A0322021-02-19019 February 2021 RB-2021-02 Post Exam Comments ML21111A1472021-02-19019 February 2021 RB-2021-02 Public Forms ML21096A0212021-02-19019 February 2021 RB-2021-02 Draft Operating Test Comments ML21096A0262021-02-19019 February 2021 RB-2021-02 Draft Written Exam ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20006C6592019-11-26026 November 2019 2019-11-Post Exam Comments ML20015A4712019-11-26026 November 2019 2019-11-Public Forms ML19312B5852019-11-0808 November 2019 NRC Initial Operator Licensing Examination Approval 05000458/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18340A0892018-12-0606 December 2018 Notification of NRC Initial Operator Licensing Examination 05000458/2019301 ML18198A2172018-07-16016 July 2018 NRC Initial Operator Licensing Examination Approval 05000458/2018301 ML18135A0672018-05-14014 May 2018 Response to Regulatory Issue Summary 2018-02 ML18086B0842018-02-16016 February 2018 Facility Cover Letter - Riv - March 2018 - GFE ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17361A0422017-12-26026 December 2017 Notification of NRC Initial Operator Licensing Examination 05000458/2018301 ML17048A3562017-02-17017 February 2017 Generic Fundamentals Examination Results ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16280A4602016-09-30030 September 2016 2016-09 Draft Outlines ML16285A0172016-09-30030 September 2016 2016-09 Public Forms ML16280A4652016-09-30030 September 2016 2016-09 Final Outlines ML16280A4642016-09-30030 September 2016 2016-09 Draft Written Exam ML16280A4492016-09-30030 September 2016 2016-09-Written Handouts Package ML16280A4352016-09-30030 September 2016 2016-09 Final Written Exam ML16280A4622016-09-30030 September 2016 2016-09 Draft Written Comments ML16280A4592016-09-30030 September 2016 2016-09 Draft Outline Comments ML16280A4562016-09-30030 September 2016 2016-09 Draft Op Test ML16280A4532016-09-30030 September 2016 2016-09 Draft Op Test Comments ML16280A4372016-09-12012 September 2016 2016-09 Final Op Test ML16246A0012016-09-0101 September 2016 NRC Initial Operator Licensing Examination Approval 05000458/2016301 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15180A0512015-06-29029 June 2015 Generic Fundamentals Examination Results June 2015 ML16043A0022015-06-19019 June 2015 May 2015 Draft Written Initial License Retake Exam, Reactor Operator ML16043A0012015-06-19019 June 2015 2015-05-DRAFT Outline 2024-04-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000458/20213012024-11-14014 November 2024 NRC Initial Operator Licensing Examination Approval 05000458/2021301 IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22354A2582022-12-15015 December 2022 10_RBS-2022-12 Post-Exam Comments ML23004A1922022-12-14014 December 2022 11_RBS-2022-12 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000458/20223012021-11-30030 November 2021 Notification of NRC Initial Operator Licensing Examination 05000458/2022301 2CAN042102, 10 AN2-2021-03 Post-Exam Comments2021-04-16016 April 2021 10_AN2-2021-03 Post-Exam Comments ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21096A0212021-02-19019 February 2021 RB-2021-02 Draft Operating Test Comments ML21096A0262021-02-19019 February 2021 RB-2021-02 Draft Written Exam ML21096A0232021-02-19019 February 2021 RB-2021-02 Draft Outline Comments ML21096A0252021-02-19019 February 2021 RB-2021-02 Draft Written Exam Comments ML21096A0282021-02-19019 February 2021 RB-2021-02 Final Written Exam ML21111A1472021-02-19019 February 2021 RB-2021-02 Public Forms ML21095A0532021-02-19019 February 2021 RB-2021-02 Final Op Test ML21096A0322021-02-19019 February 2021 RB-2021-02 Post Exam Comments ML21096A0272021-02-19019 February 2021 RB-2021-02 Final Outlines ML21096A0242021-02-19019 February 2021 RB-2021-02 Draft Outlines ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20015A4712019-11-26026 November 2019 2019-11-Public Forms ML20006C6592019-11-26026 November 2019 2019-11-Post Exam Comments ML19312B5852019-11-0808 November 2019 NRC Initial Operator Licensing Examination Approval 05000458/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18340A0892018-12-0606 December 2018 Notification of NRC Initial Operator Licensing Examination 05000458/2019301 ML18198A2172018-07-16016 July 2018 NRC Initial Operator Licensing Examination Approval 05000458/2018301 ML18135A0672018-05-14014 May 2018 Response to Regulatory Issue Summary 2018-02 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17361A0422017-12-26026 December 2017 Notification of NRC Initial Operator Licensing Examination 05000458/2018301 ML17048A3562017-02-17017 February 2017 Generic Fundamentals Examination Results ML16280A4622016-09-30030 September 2016 2016-09 Draft Written Comments ML16280A4642016-09-30030 September 2016 2016-09 Draft Written Exam ML16280A4602016-09-30030 September 2016 2016-09 Draft Outlines ML16280A4352016-09-30030 September 2016 2016-09 Final Written Exam ML16280A4532016-09-30030 September 2016 2016-09 Draft Op Test Comments ML16285A0172016-09-30030 September 2016 2016-09 Public Forms ML16280A4592016-09-30030 September 2016 2016-09 Draft Outline Comments ML16280A4652016-09-30030 September 2016 2016-09 Final Outlines ML16280A4562016-09-30030 September 2016 2016-09 Draft Op Test ML16280A4492016-09-30030 September 2016 2016-09-Written Handouts Package ML16280A4372016-09-12012 September 2016 2016-09 Final Op Test ML16246A0012016-09-0101 September 2016 NRC Initial Operator Licensing Examination Approval 05000458/2016301 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15180A0512015-06-29029 June 2015 Generic Fundamentals Examination Results June 2015 ML15220A1382015-06-19019 June 2015 2015-05-POST-EXAM Comments Analysis ML15220A1392015-06-19019 June 2015 June 2015 Initial License Retake Exam, Reactor Operator, with Answer Key ML16043A0002015-06-19019 June 2015 2015-05 - Draft Outline Comments ML16043A0012015-06-19019 June 2015 2015-05-DRAFT Outline ML16043A0022015-06-19019 June 2015 May 2015 Draft Written Initial License Retake Exam, Reactor Operator 2024-04-02
[Table view] |
See also: IR 05000458/2003301
Text
August 21, 2002
Paul D. Hinnenkamp, Vice President - Operations
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
SUBJECT: RIVER BEND STATION - NRC INITIAL EXAMINATION REPORT 50-458/03-301
Dear Mr. Hinnenkamp:
In a telephone conversation on August 19, 2002, between Messrs. Mike Wagner, Supervisor,
Operations Training, and Michael Murphy, Chief Examiner, arrangements were made for the
administration of licensing examinations at River Bend Station, during the week of February 10,
2003.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in Revision 8, Supplement 1, of NUREG-1021, "Operator Licensing Examination
Standards for Power Reactors." The NRC regional office will discuss with your staff any
changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by October 13, 2002. The written examinations, operating tests, and the supporting
reference materials identified in Attachment 2 of ES-201 and as discussed with the chief
examiner, will be due by December 12, 2002. Any delay in receiving the required examination
and reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled. A validation of the final examination material will be
conducted at your facility the week of January 20, 2003.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
Entergy Operations, Inc. -2-
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number 3150-0018, which expires on April 30, 2003.
The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />
per response, including the time for reviewing instructions, gathering and maintaining the data
needed, writing the examinations, and completing and reviewing the collection of information.
Send comments on any aspect of this collection of information, including suggestions for
reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at
BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs,
NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter, its
enclosure(s), and your response will be made available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Wagner has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Michael Murphy at 817-860-8152,
or Mr. Anthony T. Gody at 817-860-8159.
Sincerely,
/RA/
Anthony T. Gody, Chief
Operations Branch
Division of Reactor Safety
Docket No.: 50-458
License No.:NPF-47
cc:
Executive Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Entergy Operations, Inc. -3-
Vice President
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
General Manager
Plant Operations
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
Director - Nuclear Safety
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, Mississippi 39205
Mark J. Wetterhahn, Esq.
Winston & Strawn
1401 L Street, N.W.
Washington, DC 20005-3502
Manager - Licensing
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
The Honorable Richard P. Ieyoub
Attorney General
Department of Justice
State of Louisiana
P.O. Box 94005
Baton Rouge, Louisiana 70804-9005
H. Anne Plettinger
3456 Villa Rose Drive
Baton Rouge, Louisiana 70806
President
West Feliciana Parish Police Jury
P.O. Box 1921
St. Francisville, Louisiana 70775
Entergy Operations, Inc. -4-
Michael E. Henry, State Liaison Officer
Department of Environmental Quality
P.O. Box 82135
Baton Rouge, Louisiana 70884-2135
Brian Almon
Public Utility Commission
William B. Travis Building
P.O. Box 13326
1701 North Congress Avenue
Austin, Texas 78701-3326
Entergy Operations, Inc. -5-
Electronic distribution by RIV:
Regional Administrator (EWM)
DRP Director (KEB)
DRS Director (EEC)
Senior Resident Inspector (PJA)
Branch Chief, DRP/B (DNG)
Senior Project Engineer, DRP/B (RAK1)
Staff Chief, DRP/TSS (PHH)
RITS Coordinator (NBH)
R:_RB\2003\rb3301lt-mem.wpd
SOE:OB C:OB
MEMurphy/lmb ATGody
/RA/ /RA/
08/21/02 08/21/02
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax