| {{#Wiki_filter:Britt T. McKinney Sr. Vice President | | {{#Wiki_filter:Britt T. McKinney PPL Susquehanna, LLC Sr. Vice President & Chief Nuclear Officer 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 btmckinney @pplweb.com DEC 2 6 2006 Proprietary Information Enclosed ppJ U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OPI-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED LICENSE AMENDMENT NO. 285 FOR UNIT 1 OPERATING LICENSE NO. NPF-14 AND PROPOSED LICENSE AMENDMENT NO. 253 FOR UNIT 2 OPERATING LICENSE NO. NPF-22 CONSTANT PRESSURE POWER UPRATE - |
| & Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 btmckinney | | SUPPLEMENT Docket Nos. 50-387 PLA-6146 and 50-388 |
| @pplweb.com DEC 2 6 2006 Proprietary Information Enclosed ppJ U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OPI-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED LICENSE AMENDMENT NO. 285 FOR UNIT 1 OPERATING LICENSE NO. NPF-14 AND PROPOSED LICENSE AMENDMENT NO. 253 FOR UNIT 2 OPERATING LICENSE NO. NPF-22 CONSTANT PRESSURE POWER UPRATE -SUPPLEMENT PLA-6146 Docket Nos. 50-387 and 50-388 | |
|
| |
|
| ==References:== | | ==References:== |
| | : 1) PPL Letter PLA -6076, B. T. McKinney (PPL) to USNRC, "ProposedLicense Amendment Numbers 285 for Unit 1 Operating License No. NPF-14 and 253 for Unit 2 Operating License No. NPF-22 Constant Pressure Power Uprate," dated October 11, 2006. |
| | : 2) NRC Letter to B. T. McKinney, "Susquehanna Steam Electric Station, Units 1 and 2 - Extended Power Uprate (EPU) Acceptance Review TAC NOS MD 3309 and MD 3310), " dated November 21, 2006. |
| | : 3) PPL Letter PLA -6138, B. T. McKinney (PPL) to USNRC, "ProposedLicense Amendment Numbers 285 for Unit 1 Operating License No. NPF-14 and 253 for Unit 2 OperatingLicense No. NPF-22 Constant Pressure Power Uprate - Supplement, " dated December 4, 2006. |
| | : 4) PPL Letter PLA -6128, B. T. McKinney (PPL) to USNRC "Supplement to Proposed License Amendment Numbers 285 for Unit 1 Operating License No. NPF-14 and 253 for Unit 2 OperatingLicense No. NPF-22: Constant PressurePower Uprate," dated October 25, 2006. |
| | Pursuant to 10 CFR 50.90, PPL Susquehanna LLC (PPL) requested in Reference 1 approval of amendments to the Susquehanna Steam Electric Station (SSES) Unit 1 and Unit 2 Operating Licenses (OLs) and Technical Specifications (TS) to increase the maximum power level authorized from 3489 megawatts thermal (MWt) to 3952 MWt, an approximate 13% increase in thermal power. The proposed Constant Pressure Power Uprate (CPPU) represents an increase of approximately 20% above the Original Licensed Thermal Power (OLTP). |
|
| |
|
| 1)PPL Letter PLA -6076, B. T. McKinney (PPL) to USNRC,"Proposed License Amendment Numbers 285 for Unit 1 Operating License No. NPF-14 and 253 for Unit 2 Operating License No. NPF-22 Constant Pressure Power Uprate, " dated October 11, 2006.2) NRC Letter to B. T. McKinney, "Susquehanna Steam Electric Station, Units 1 and 2 -Extended Power Uprate (EPU) Acceptance Review TAC NOS MD 3309 and MD 3310), " dated November 21, 2006.3) PPL Letter PLA -6138, B. T. McKinney (PPL) to USNRC,"Proposed License Amendment Numbers 285 for Unit 1 Operating License No. NPF-14 and 253 for Unit 2 Operating License No. NPF-22 Constant Pressure Power Up rate -Supplement, " dated December 4, 2006.4) PPL Letter PLA -6128, B. T. McKinney (PPL) to USNRC"Supplement to Proposed License Amendment Numbers 285 for Unit 1 Operating License No. NPF-14 and 253 for Unit 2 Operating License No. NPF-22: Constant Pressure Power Uprate, " dated October 25, 2006.Pursuant to 10 CFR 50.90, PPL Susquehanna LLC (PPL) requested in Reference 1 approval of amendments to the Susquehanna Steam Electric Station (SSES) Unit 1 and Unit 2 Operating Licenses (OLs) and Technical Specifications (TS) to increase the maximum power level authorized from 3489 megawatts thermal (MWt) to 3952 MWt, an approximate 13% increase in thermal power. The proposed Constant Pressure Power Uprate (CPPU) represents an increase of approximately 20% above the Original Licensed Thermal Power (OLTP). Document Control Desk PLA-6146 In Reference 2, NRC identified areas of the Reference 1 application that required additional information in order for NRC to complete their acceptance review.Reference 3 provided the additional information NRC requested.
| | Document Control Desk PLA-6146 In Reference 2, NRC identified areas of the Reference 1 application that required additional information in order for NRC to complete their acceptance review. |
| In a teleconference held December 14, 2006, the NRC staff indicated that a final stress analysis report for the new SSES dryers would be needed for NRC to complete the acceptance review.Enclosure 1 provides a proprietary version of the dryer stress analysis report for the new SSES dryers. Enclosure 2 provides a non-proprietary version of this stress analysis report.There are no new regulatory commitments associated with the additional information provided herein. Reference 4, however, identified four (4) Regulatory Commitments applicable to the Reference 1 license amendment request. The first two (2) were met by the PPL responses provided in Reference | | Reference 3 provided the additional information NRC requested. In a teleconference held December 14, 2006, the NRC staff indicated that a final stress analysis report for the new SSES dryers would be needed for NRC to complete the acceptance review. provides a proprietary version of the dryer stress analysis report for the new SSES dryers. Enclosure 2 provides a non-proprietary version of this stress analysis report. |
| : 3. Regulatory Commitments 3 and 4 are met by the supplemental information provided herein. Specifically, the ASME load combination tables based on 120% OLTP conditions (Commitment
| | There are no new regulatory commitments associated with the additional information provided herein. Reference 4, however, identified four (4) Regulatory Commitments applicable to the Reference 1 license amendment request. The first two (2) were met by the PPL responses provided in Reference 3. Regulatory Commitments 3 and 4 are met by the supplemental information provided herein. Specifically, the ASME load combination tables based on 120% OLTP conditions (Commitment 3) are provided in Section 8 of . The description of the steam dryer power ascension test plan (Commitment 4) is provided in Enclosure 4. (proprietary version) summarily describes how each of the PPL Reference 4 commitments have been satisfied. Enclosure 5 provides a non-proprietary version. With the supplemental information provided herein, PPL considers all the commitments made in Reference 4 to be met. |
| : 3) are provided in Section 8 of Enclosure
| | PPL has reviewed the "No Significant Hazards Consideration" and the "Environmental Consideration" submitted with Reference 1 relative to this supplemental information. |
| : 1. The description of the steam dryer power ascension test plan (Commitment
| |
| : 4) is provided in Enclosure 4.Enclosure 4 (proprietary version) summarily describes how each of the PPL Reference 4 commitments have been satisfied.
| |
| Enclosure 5 provides a non-proprietary version. With the supplemental information provided herein, PPL considers all the commitments made in Reference 4 to be met.PPL has reviewed the "No Significant Hazards Consideration" and the "Environmental Consideration" submitted with Reference 1 relative to this supplemental information. | |
| We have determined that there are no changes required to either of these documents. | | We have determined that there are no changes required to either of these documents. |
| The supplemental information contained herein is considered by General Electric Company to be proprietary. | | The supplemental information contained herein is considered by General Electric Company to be proprietary. General Electric Company requests that the proprietary information be withheld from public disclosure in accordance with 10 CFR 2.390 (a) 4 and 9.17 (a) 4. An Affidavit supporting this request is provided in Enclosure 3. |
| General Electric Company requests that the proprietary information be withheld from public disclosure in accordance with 10 CFR 2.390 (a) 4 and 9.17 (a) 4. An Affidavit supporting this request is provided in Enclosure 3.Reference I requested NRC to approve the proposed changes by October 15, 2007. As noted in Reference 3, PPL will be replacing the existing steam dryers prior to implementing the uprate. Implementation of the first step of the uprate (approximate 7%increase) is planned to be completed upon startup (entry into Mode 2) from the Spring 2008 Unit 1 refueling outage and subsequently on Unit 2 once all required modifications have been installed. | | Reference I requested NRC to approve the proposed changes by October 15, 2007. As noted in Reference 3, PPL will be replacing the existing steam dryers prior to implementing the uprate. Implementation of the first step of the uprate (approximate 7% |
| As a result, NRC approval of this application is requested by January 30, 2008. | | increase) is planned to be completed upon startup (entry into Mode 2) from the Spring 2008 Unit 1 refueling outage and subsequently on Unit 2 once all required modifications have been installed. As a result, NRC approval of this application is requested by January 30, 2008. |
| FAX NO. :5708686562 FROM :McKinney DEC-26-2006 TUE 11:44 AM CONCUR Dec. 26 2006 02:O0PM P4 FAX NO. 818687558795 P. 05 Document Control Desk PLA-6146 If you have any questions or require additional information, please contact Mr. Michael H. Crowthers at (610) 774-7766.I declare under penalty of perjury that the foregoing is true and correct.Executed on:____ _____B. T. McKinney Enclosure 1: Enclosure 2: Enclosure 3: Enclosure 4: Enclosure 5:-Proprietary Version of General Electric Company Nuclear Energy Report# GE-NE-O000-0061-0595-P-RO, "~Susquehanna Replacement Steamn Dryer Fatigue Analysis" Non-Proprietary Version of General Electric Company Nuclear Energy Repott # GE-NE-O0OO-061-0595.NP-RO, "Susquehanna Replacement Steam Dryer Fatigue Analysis" General Electric Company Affidavit Description of PPL Conunitment Closure (Proprietary Version)Deacription of PPL Commitment Closure (Non Proprietary Version)Copy: NRC Region I Mr. A. J. Blawnys NRC Sr. Resident Imspactor Mr. R. V. Guzman, NRC Project Manager Mr. R. R. Janati, DEP/HRP ENCLOSURE 2 GE-SSES-AEP-3 14.5 NE-GE-OOOO-0061-059X-NP-RO | | |
| -Non-Proprietary Non-Proprietary Notice This is a non-proprietary version of the Enclosure 1 of GE-SSES-AEP-314, which has the proprietary information removed. Portions of the document that have been removed are indicated by an open and closed bracket as shown here [[I I].}} | | Dec. 26 2006 02:O0PM P4 FAX NO. :5708686562 FROM :McKinney P.05 DEC-26-2006 TUE 11:44 AM CONCUR FAX NO. 818687558795 Document Control Desk PLA-6146 If you have any questions or require additional information, please contact Mr. Michael H. Crowthers at (610) 774-7766. |
| | I declare under penalty of perjury that the foregoing is true and correct. |
| | Executed on:____ _____ |
| | B. T. McKinney Enclosure 1: Proprietary Version of General Electric Company Nuclear Energy Report |
| | # GE-NE-O000-0061-0595-P-RO, "~Susquehanna Replacement Steamn Dryer Fatigue Analysis" Enclosure 2: Non-Proprietary Version of General Electric Company Nuclear Energy Repott # GE-NE-O0OO-061-0595.NP-RO, "Susquehanna Replacement Steam Dryer Fatigue Analysis" Enclosure 3: General Electric Company Affidavit Enclosure 4: Description of PPL Conunitment Closure (Proprietary Version) |
| | Enclosure 5:- Deacription of PPL Commitment Closure (Non Proprietary Version) |
| | Copy: NRC Region I Mr. A. J. Blawnys NRC Sr. Resident Imspactor Mr. R. V. Guzman, NRC Project Manager Mr. R. R. Janati, DEP/HRP |
| | |
| | ENCLOSURE 2 GE-SSES-AEP-3 14 |
| | .5 NE-GE-OOOO-0061-059X-NP-RO - Non-Proprietary Non-Proprietary Notice This is a non-proprietary version of the Enclosure 1 of GE-SSES-AEP-314, which has the proprietary information removed. Portions of the document that have been removed are indicated by an open and closed bracket as shown here ((I I].}} |
Letter Sequence Supplement |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML071620334, ML073320383, ML073390289, ML073390306, ML081000038, PLA-6187, Response for Additional Information Requested in Regard to Proposed License Amendment No. 285, Constant Pressure Power Uprate Environmental, PLA-6255, Proposed License Amendments 285 and 253, Constant Pressure Power Uprate Application Regarding Steam Dryer Flow Effects Verbal and Confirmatory Requests for Additional Information Responses, PLA-6266, Proposed License Amendment No. 285 for Unit 1, License No. NPF-14 & Proposed License Amendment No. 253 for Unit 2, License No. NPF-22, Extended Power Uprate Application Regarding Change to Technical Specification SR 3.7.1 - RHRSW and UHS, PLA-6370, License Renewal Application, Amendment to Section 4.2.2, PLA-6633, Providing Notice That the License Conditions 2.C.(36)(a)3, 2.C.(36(b)7 & 2.C.(36)(f) Have Been Met, PLA-6876, Th Rio Steam Dryer Visual Inspection Report, PLA-7047, Th Rio Steam Dryer Visual Inspection Report
|
MONTHYEARML0716203342006-01-24024 January 2006 GE Ne 0000-0038-8052 Susq-EPU-T506-MSLHiFlo-Calc-2006, Revision 0, Instrument Limits Calculation, PPL Susquehanna, LLC Susquehanna Steam Electric Station Units 1 and 2, Main Steam Line High Flow MSIV Isolation. Project stage: Other ML0632500922006-11-21021 November 2006 Extended Power Uprate Acceptance Review Project stage: Acceptance Review PLA-6138, Proposed License Amendments 285 & 253, Constant Pressure Power Uprate - Supplement2006-12-0404 December 2006 Proposed License Amendments 285 & 253, Constant Pressure Power Uprate - Supplement Project stage: Supplement ML0710400302006-12-12012 December 2006 Pennsylvania Fish and Boat Commission Threatened and Endangered Species Project stage: Request PLA-6146, Proposed License Amendment No. 285 for Unit 1 Operating License No. NPF-14 and Proposed License Amendment No. 253 for Unit 2 Operating License No. NPF-22 Re Constant Pressure Power Uprate -Supplement2006-12-26026 December 2006 Proposed License Amendment No. 285 for Unit 1 Operating License No. NPF-14 and Proposed License Amendment No. 253 for Unit 2 Operating License No. NPF-22 Re Constant Pressure Power Uprate -Supplement Project stage: Supplement ML0700800322007-01-0505 January 2007 Extended Power Uprate (EPU) Acceptance Review Results Project stage: Acceptance Review ML0703201532007-02-0808 February 2007 PPL Susquehanna, LLC - Request for Withholding of Proprietary Information from Public Disclosure for Susquehanna Steam Electric Station, Units 1 and 2 Project stage: Withholding Request Acceptance ML0703201762007-02-0808 February 2007 PPL Susquehanna, LLC - Request for Withholding of Proprietary Information from Public Disclosure for Susquehanna Steam Electric Station, Units 1 and 2 Project stage: Withholding Request Acceptance PLA-6155, Proposed License Amendment Nos. 285 and 253, Constant Pressure Power Uprate Supplement2007-02-13013 February 2007 Proposed License Amendment Nos. 285 and 253, Constant Pressure Power Uprate Supplement Project stage: Supplement ML0704301392007-03-0101 March 2007 PPL Susquehanna, LLC-Request for Withholding Information from Public Disclosure for Susquehanna Steam Electric Station, Units 1 and 2 (TAC Nos. MD3309 and MD3310) Project stage: Withholding Request Acceptance PLA-6163, Proposed License Amendment Re Constant Pressure Power Uprate - Supplement2007-03-14014 March 2007 Proposed License Amendment Re Constant Pressure Power Uprate - Supplement Project stage: Supplement ML0707304972007-03-15015 March 2007 Request for Additional Information - Extended Power Uprated Application Regarding Turbine Generator Review Project stage: RAI ML0707303892007-03-19019 March 2007 Request for Additional Information (RAI) - Susquehanna, Units 1 and 2 - Extended Power Uprate Application Project stage: RAI ML0707305682007-03-20020 March 2007 (SSES 1 and 2), Request for Additional Information (RAI) - Extended Power Uprate Application Regarding Steam Dryer and Flow Effects Project stage: RAI PLA-6172, Proposed License Amendment for Constant Pressure Power Uprate - Supplement PLA-61722007-03-22022 March 2007 Proposed License Amendment for Constant Pressure Power Uprate - Supplement PLA-6172 Project stage: Supplement ML0708608662007-03-29029 March 2007 RAI, Extended Power Uprate Application; Vessels and Internals Technical Review (TAC Nos. MD3309 and Md3310) Project stage: RAI ML0710001412007-04-10010 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Piping and Nondestructive Examination Technical Review Project stage: RAI ML0710001262007-04-12012 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Operator Licensing and Human Performance Technical Review (TAC Nos. MD3309 and MD3310) Project stage: RAI ML0710300402007-04-12012 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Electrical Engineering Technical Review (TAC Nos. MD3309 and MD3310) Project stage: RAI ML0710300312007-04-12012 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Materials and Chemical Engineering Technical Review Project stage: RAI ML0710202982007-04-12012 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Health Physics Technical Review Project stage: RAI ML0710400322007-04-12012 April 2007 Pennsylvania Fish and Boat Commission Threatened and Endangered Species Project stage: Request ML0710400252007-04-12012 April 2007 Pennsylvania Efacts Project stage: Request ML0710400222007-04-12012 April 2007 PA Dcnr Wild Resource Conservation Program - Regal Fritillary Project stage: Request ML0710400262007-04-12012 April 2007 EPA Envirofacts Project stage: Request PLA-6174, Constant Pressure Power Uprate - PLA-61742007-04-13013 April 2007 Constant Pressure Power Uprate - PLA-6174 Project stage: Request ML0710203152007-04-16016 April 2007 (SSES 1 and 2), Request for Additional Information (Rai), - Extended Power Uprate Application Balance-of-Plant Physics Technical Review Project stage: RAI ML0710601352007-04-18018 April 2007 Request for Additional Information, Extended Power Uprate Application Safety-Related Pumps and Valves and Mechanical Equipment Environmental Qualification Project stage: RAI PLA-6187, Response for Additional Information Requested in Regard to Proposed License Amendment No. 285, Constant Pressure Power Uprate Environmental2007-04-23023 April 2007 Response for Additional Information Requested in Regard to Proposed License Amendment No. 285, Constant Pressure Power Uprate Environmental Project stage: Other PLA-6186, Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Extended Power Uprate Application Vessels and Internals Technical Review Request for Additional Information Responses2007-04-26026 April 2007 Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Extended Power Uprate Application Vessels and Internals Technical Review Request for Additional Information Responses Project stage: Request ML0711600672007-04-27027 April 2007 Request for Additional Information (RAI) Extended Power Uprate Application Probabilistic Risk Assessment Licensing Review Project stage: RAI ML0711504712007-04-27027 April 2007 Request for Additional Information (Rai), Extended Power Uprate Application Containment and Ventilation Technical Review Project stage: RAI ML0711403432007-04-27027 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2) - Extended Power Uprate Application Instrumentation and Controls Technical Review Project stage: RAI ML0711604062007-04-30030 April 2007 Request for Additional Information (Rai), Extended Power Uprate Application Vessels and Internals Integrity Technical Review Project stage: RAI ML0710900722007-04-30030 April 2007 Request for Additional Information (Rai), Extended Power Uprate Application Mechanical and Civil Engineering Technical Review Project stage: RAI PLA-6191, Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Piping and Nondestructive Examination Technical Review Request for Additional Information Responses2007-05-0303 May 2007 Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Piping and Nondestructive Examination Technical Review Request for Additional Information Responses Project stage: Request PLA-6194, Proposed License Amendments 285 and 253, Extended Power Uprate Application Health Physics Technical Review, Request for Additional Information Responses2007-05-0909 May 2007 Proposed License Amendments 285 and 253, Extended Power Uprate Application Health Physics Technical Review, Request for Additional Information Responses Project stage: Request PLA-6195, Extended Power Uprate Application Electrical Engineering Technical Review Request for Additional Information Responses2007-05-0909 May 2007 Extended Power Uprate Application Electrical Engineering Technical Review Request for Additional Information Responses Project stage: Request ML0712906522007-05-14014 May 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Reactor Systems Technical Review Project stage: RAI PLA-6198, Proposed License Amendments 285 and 253, Extended Power Uprate Application Balance-of-Plant Safety Systems Request for Additional Information Responses2007-05-14014 May 2007 Proposed License Amendments 285 and 253, Extended Power Uprate Application Balance-of-Plant Safety Systems Request for Additional Information Responses Project stage: Request PLA-6210, Extended Power Uprate Application Vessels and Internals Integrity Technical Review Request for Additional Information Responses2007-05-21021 May 2007 Extended Power Uprate Application Vessels and Internals Integrity Technical Review Request for Additional Information Responses Project stage: Request PLA-6196, Proposed License Amendments 285 and 253, Extended Power Uprate Application Safety Related Pumps and Valves and Mechanical Equipment Environmental Qualification Review Request for Additional Information Responses2007-06-0101 June 2007 Proposed License Amendments 285 and 253, Extended Power Uprate Application Safety Related Pumps and Valves and Mechanical Equipment Environmental Qualification Review Request for Additional Information Responses Project stage: Request PLA-6200, Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Mechanical and Civil Engineering Technical Review Request for Additional Information Responses2007-06-0101 June 2007 Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Mechanical and Civil Engineering Technical Review Request for Additional Information Responses Project stage: Request PLA-6204, Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Instrumentation and Controls Technical Review Request for Additional Information Responses2007-06-0101 June 2007 Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Instrumentation and Controls Technical Review Request for Additional Information Responses Project stage: Request PLA-6212, Extended Power Uprate Application Materials and Chemical Engineering Technical Review Request for Additional Information Responses2007-06-0101 June 2007 Extended Power Uprate Application Materials and Chemical Engineering Technical Review Request for Additional Information Responses Project stage: Request PLA-6203, Proposed License Amendment Extended Power Uprate Application Containment and Ventilation Technical Review Request for Additional Information Responses, PLA-62032007-06-0404 June 2007 Proposed License Amendment Extended Power Uprate Application Containment and Ventilation Technical Review Request for Additional Information Responses, PLA-6203 Project stage: Request PLA-6225, Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Supplement to Request for Additional Information Responses2007-06-0808 June 2007 Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Supplement to Request for Additional Information Responses Project stage: Supplement PLA-6231, Proposed License Amendment No. 285 for Unit 1 and Proposed License Amendment No. 253 for Unit 2, Extended Power Uprate Application Electrical Engineering Technical Review Request for Additional Information Response Supplement, PLA-62312007-06-20020 June 2007 Proposed License Amendment No. 285 for Unit 1 and Proposed License Amendment No. 253 for Unit 2, Extended Power Uprate Application Electrical Engineering Technical Review Request for Additional Information Response Supplement, PLA-6231 Project stage: Supplement PLA-6230, Proposed License Amendment for Units 1 and 2, Extended Power Uprate Application & Supplement to Request for Additional Information Responses2007-06-27027 June 2007 Proposed License Amendment for Units 1 and 2, Extended Power Uprate Application & Supplement to Request for Additional Information Responses Project stage: Supplement PLA-6232, Proposed License Amendments 285 & 253, Extended Power Uprate Application Supplement to Operator Licensing & Human Performance, Health Physics & Piping and Nondestructive Examination Request for Additional Information Responses2007-06-27027 June 2007 Proposed License Amendments 285 & 253, Extended Power Uprate Application Supplement to Operator Licensing & Human Performance, Health Physics & Piping and Nondestructive Examination Request for Additional Information Responses Project stage: Supplement 2007-04-12
[Table View] |
|
---|
Category:Letter type:PLA
MONTHYEARPLA-8141, Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-81412024-09-18018 September 2024 Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-8141 PLA-8142, Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-81422024-09-18018 September 2024 Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-8142 PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) PLA-8123, Main Steam Isolation Valve Leakage2024-05-23023 May 2024 Main Steam Isolation Valve Leakage PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) PLA-8088, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088)2023-12-0505 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088) PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums PLA-8048, Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence2023-01-14014 January 2023 Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8039, Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information2022-12-22022 December 2022 Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information PLA-8038, Notification of Petition for Bankruptcy (PLA-8038)2022-12-14014 December 2022 Notification of Petition for Bankruptcy (PLA-8038) PLA-8036, Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-80362022-11-30030 November 2022 Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-8036 PLA-8035, Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-80352022-11-0808 November 2022 Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-8035 PLA-8031, Emergency Plan Revision 66 (PLA-8031)2022-11-0707 November 2022 Emergency Plan Revision 66 (PLA-8031) 2024-09-18
[Table view] |
Text
Britt T. McKinney PPL Susquehanna, LLC Sr. Vice President & Chief Nuclear Officer 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 btmckinney @pplweb.com DEC 2 6 2006 Proprietary Information Enclosed ppJ U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OPI-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED LICENSE AMENDMENT NO. 285 FOR UNIT 1 OPERATING LICENSE NO. NPF-14 AND PROPOSED LICENSE AMENDMENT NO. 253 FOR UNIT 2 OPERATING LICENSE NO. NPF-22 CONSTANT PRESSURE POWER UPRATE -
SUPPLEMENT Docket Nos. 50-387 PLA-6146 and 50-388
References:
- 1) PPL Letter PLA -6076, B. T. McKinney (PPL) to USNRC, "ProposedLicense Amendment Numbers 285 for Unit 1 Operating License No. NPF-14 and 253 for Unit 2 Operating License No. NPF-22 Constant Pressure Power Uprate," dated October 11, 2006.
- 2) NRC Letter to B. T. McKinney, "Susquehanna Steam Electric Station, Units 1 and 2 - Extended Power Uprate (EPU) Acceptance Review TAC NOS MD 3309 and MD 3310), " dated November 21, 2006.
- 3) PPL Letter PLA -6138, B. T. McKinney (PPL) to USNRC, "ProposedLicense Amendment Numbers 285 for Unit 1 Operating License No. NPF-14 and 253 for Unit 2 OperatingLicense No. NPF-22 Constant Pressure Power Uprate - Supplement, " dated December 4, 2006.
- 4) PPL Letter PLA -6128, B. T. McKinney (PPL) to USNRC "Supplement to Proposed License Amendment Numbers 285 for Unit 1 Operating License No. NPF-14 and 253 for Unit 2 OperatingLicense No. NPF-22: Constant PressurePower Uprate," dated October 25, 2006.
Pursuant to 10 CFR 50.90, PPL Susquehanna LLC (PPL) requested in Reference 1 approval of amendments to the Susquehanna Steam Electric Station (SSES) Unit 1 and Unit 2 Operating Licenses (OLs) and Technical Specifications (TS) to increase the maximum power level authorized from 3489 megawatts thermal (MWt) to 3952 MWt, an approximate 13% increase in thermal power. The proposed Constant Pressure Power Uprate (CPPU) represents an increase of approximately 20% above the Original Licensed Thermal Power (OLTP).
Document Control Desk PLA-6146 In Reference 2, NRC identified areas of the Reference 1 application that required additional information in order for NRC to complete their acceptance review.
Reference 3 provided the additional information NRC requested. In a teleconference held December 14, 2006, the NRC staff indicated that a final stress analysis report for the new SSES dryers would be needed for NRC to complete the acceptance review. provides a proprietary version of the dryer stress analysis report for the new SSES dryers. Enclosure 2 provides a non-proprietary version of this stress analysis report.
There are no new regulatory commitments associated with the additional information provided herein. Reference 4, however, identified four (4) Regulatory Commitments applicable to the Reference 1 license amendment request. The first two (2) were met by the PPL responses provided in Reference 3. Regulatory Commitments 3 and 4 are met by the supplemental information provided herein. Specifically, the ASME load combination tables based on 120% OLTP conditions (Commitment 3) are provided in Section 8 of . The description of the steam dryer power ascension test plan (Commitment 4) is provided in Enclosure 4. (proprietary version) summarily describes how each of the PPL Reference 4 commitments have been satisfied. Enclosure 5 provides a non-proprietary version. With the supplemental information provided herein, PPL considers all the commitments made in Reference 4 to be met.
PPL has reviewed the "No Significant Hazards Consideration" and the "Environmental Consideration" submitted with Reference 1 relative to this supplemental information.
We have determined that there are no changes required to either of these documents.
The supplemental information contained herein is considered by General Electric Company to be proprietary. General Electric Company requests that the proprietary information be withheld from public disclosure in accordance with 10 CFR 2.390 (a) 4 and 9.17 (a) 4. An Affidavit supporting this request is provided in Enclosure 3.
Reference I requested NRC to approve the proposed changes by October 15, 2007. As noted in Reference 3, PPL will be replacing the existing steam dryers prior to implementing the uprate. Implementation of the first step of the uprate (approximate 7%
increase) is planned to be completed upon startup (entry into Mode 2) from the Spring 2008 Unit 1 refueling outage and subsequently on Unit 2 once all required modifications have been installed. As a result, NRC approval of this application is requested by January 30, 2008.
Dec. 26 2006 02:O0PM P4 FAX NO. :5708686562 FROM :McKinney P.05 DEC-26-2006 TUE 11:44 AM CONCUR FAX NO. 818687558795 Document Control Desk PLA-6146 If you have any questions or require additional information, please contact Mr. Michael H. Crowthers at (610) 774-7766.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on:____ _____
B. T. McKinney Enclosure 1: Proprietary Version of General Electric Company Nuclear Energy Report
- GE-NE-O000-0061-0595-P-RO, "~Susquehanna Replacement Steamn Dryer Fatigue Analysis" Enclosure 2: Non-Proprietary Version of General Electric Company Nuclear Energy Repott # GE-NE-O0OO-061-0595.NP-RO, "Susquehanna Replacement Steam Dryer Fatigue Analysis" Enclosure 3: General Electric Company Affidavit Enclosure 4: Description of PPL Conunitment Closure (Proprietary Version)
Enclosure 5:- Deacription of PPL Commitment Closure (Non Proprietary Version)
Copy: NRC Region I Mr. A. J. Blawnys NRC Sr. Resident Imspactor Mr. R. V. Guzman, NRC Project Manager Mr. R. R. Janati, DEP/HRP
ENCLOSURE 2 GE-SSES-AEP-3 14
.5 NE-GE-OOOO-0061-059X-NP-RO - Non-Proprietary Non-Proprietary Notice This is a non-proprietary version of the Enclosure 1 of GE-SSES-AEP-314, which has the proprietary information removed. Portions of the document that have been removed are indicated by an open and closed bracket as shown here ((I I].