ML070530672: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML070530672
| number = ML070530672
| issue date = 02/22/2007
| issue date = 02/22/2007
| title = 1 and 2 - E-Mail to F. Madden, Txu Power, Re Request for Additional Information - Comanche Peak 1/18/2007 Request to Extend Allowed Outage Time for Offsite Circuits to 30 Days (TAC MD4068 and MD4069)
| title = 1 and 2 - E-Mail to F. Madden, Txu Power, Re Request for Additional Information - Comanche Peak 1/18/2007 Request to Extend Allowed Outage Time for Offsite Circuits to 30 Days
| author name = Thadani M
| author name = Thadani M
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV

Latest revision as of 22:13, 22 March 2020

1 and 2 - E-Mail to F. Madden, Txu Power, Re Request for Additional Information - Comanche Peak 1/18/2007 Request to Extend Allowed Outage Time for Offsite Circuits to 30 Days
ML070530672
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/22/2007
From: Thadani M
NRC/NRR/ADRO/DORL/LPLIV
To: Madden F
TXU Power
Thadani, M C, NRR/DORL/LP4, 415-1476
References
TAC MD4068, TAC MD4069
Download: ML070530672 (2)


Text

TAC Nos. MD4068 and MD4069 Docket 50-445 and 50-446 From: Mohan Thadani To: Internet:fred.madden@txu.com Date: 2/22/2007 9:43:08 AM

Subject:

Re: COMANCHE PEAK 01/18, 2007 REQUEST TO EXTEND AOT FOR OFFSITE CIRCUITS TO 30 DAYS Fred:

While performing an acceptance review of the revised LAR 06-007, the NRC review staff noted in FSAR Section 8.2.1 that CPSES has a SPARE STARTUP TRANSFORMER, which can be placed into service by operation of a single switch. This was not discussed in LAR 06-007.

Instead, TXU stated that to do transformer maintenance required a dual unit outage of 30 days.

The NRC staff has a question. Why can't this transformer be used during the 10-year maintenance?

Your response will be appreciated.

Thanks.

Mohan CC: Howe, Andrew; Rubin, Mark; Terao, David; Wilson, George Mail Envelope Properties (45DDABFC.961 : 23 : 35106)

Subject:

Re: COMANCHE PEAK 01/18, 2007 REQUEST TO EXTEND AOT FOR OFFSITE CIRCUITS TO 30 DAYS Creation Date 2/22/2007 9:43:08 AM From: Mohan Thadani Created By: MCT@nrc.gov Recipients fred madden (Internet:fred.madden@txu.com) nrc.gov OWGWPO04.HQGWDO01 AJH1 CC (Andrew Howe) nrc.gov TWGWPO02.HQGWDO01 DXT CC (David Terao) nrc.gov TWGWPO03.HQGWDO01 MPR CC (Mark Rubin) nrc.gov TWGWPO04.HQGWDO01 GAW1 CC (George Wilson)

Post Office Route fred Internet:txu.com OWGWPO04.HQGWDO01 nrc.gov TWGWPO02.HQGWDO01 nrc.gov TWGWPO03.HQGWDO01 nrc.gov TWGWPO04.HQGWDO01 nrc.gov Files Size Date & Time MESSAGE 1625 2/22/2007 9:43:08 AM Options Expiration Date: None Priority: Standard ReplyRequested: No Return Notification: None Concealed

Subject: