|
|
(2 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML093380095 | | | number = ML093380095 |
| | issue date = 12/03/2009 | | | issue date = 12/03/2009 |
| | title = TSTF-511 LAR Acceptance Review (TAC Nos. ME2439 and ME2440) | | | title = TSTF-511 LAR Acceptance Review |
| | author name = Lamb J G | | | author name = Lamb J |
| | author affiliation = NRC/NRR/DORL/LPWB | | | author affiliation = NRC/NRR/DORL/LPWB |
| | addressee name = Casey K E, Mashburn F C | | | addressee name = Casey K, Mashburn F |
| | addressee affiliation = Tennessee Valley Authority | | | addressee affiliation = Tennessee Valley Authority |
| | docket = 05000327, 05000328 | | | docket = 05000327, 05000328 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:ADAMS Accession No. ML093380095 | | {{#Wiki_filter:ADAMS Accession No. ML093380095 From: Lamb, John Sent: Thursday, December 03, 2009 1:17 PM To: Mashburn, Fredrick C Jr; Casey, Kevin E Cc: Raghavan, Rags; Milano, Patrick; Boyce, Tom (NRR); Lingam, Siva; Feintuch, Karl |
| | |
| From: Lamb, John Sent: Thursday, December 03, 2009 1:17 PM To: Mashburn, Fredrick C Jr; Casey, Kevin E Cc: Raghavan, Rags; Milano, Patrick; Boyce, Tom (NRR); Lingam, Siva; Feintuch, Karl | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| FYI - Acceptance Review - SQN 1 & 2 - TSTF-511 (TAC Nos. ME2439 and ME2440) Fred, By letter dated October 20, 2009 (ML092960438), Tennessee Valley Authority (TVA) submitted a license amendment for Sequoyah Nuclear Plant (SQN), Units 1 and 2. The proposed amendment would eliminate working hour restrictions from Technical Specification (TS) 6.2.2 to support compliance with Title 10 of the Code of Federal Regulations (10 CFR) Part 26. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | | FYI - Acceptance Review - SQN 1 & 2 - TSTF-511 (TAC Nos. ME2439 and ME2440) |
| | : Fred, By letter dated October 20, 2009 (ML092960438), Tennessee Valley Authority (TVA) submitted a license amendment for Sequoyah Nuclear Plant (SQN), Units 1 and 2. The proposed amendment would eliminate working hour restrictions from Technical Specification (TS) 6.2.2 to support compliance with Title 10 of the Code of Federal Regulations (10 CFR) Part 26. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. |
| Consistent with Section 50.90 of 10 CFR, an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. | | Consistent with Section 50.90 of 10 CFR, an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. |
| The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence. | | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence. |
| If you have any questions, please contact me at (301) 415-3100. | | If you have any questions, please contact me at (301) 415-3100. |
| | Sincerely, John G. Lamb, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-327 and 50-328 E-mail Properties |
|
| |
|
| Sincerely, John G. Lamb, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-327 and 50-328 E-mail Properties Mail Envelope Properties (BE1CC4A72435624D84F8699734202B3E157A9F89BC)
| | Mail Envelope Properties (BE1CC4A72435624D84F8699734202B3E157A9F89BC) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| FYI - Acceptance Review - SQN 1 & 2 - TSTF-511 (TAC Nos. ME2439 and | | FYI - Acceptance Review - SQN 1 & 2 - TSTF-511 (TAC Nos. ME2439 and ME2440) |
| | | Sent Date: 12/3/2009 1:16:55 PM Received Date: 12/3/2009 1:16:55 PM From: Lamb, John Created By: John.Lamb@nrc.gov Recipients: |
| ME2440) | |
| Sent Date: 12/3/2009 1:16:55 PM Received Date: 12/3/2009 1:16:55 PM From: Lamb, John | |
| | |
| Created By: John.Lamb@nrc.gov | |
| | |
| Recipients: | |
| fcmashburn@tva.gov (Mashburn, Fredrick C Jr) | | fcmashburn@tva.gov (Mashburn, Fredrick C Jr) |
| Tracking Status: None kecasey@tva.gov (Casey, Kevin E) | | Tracking Status: None kecasey@tva.gov (Casey, Kevin E) |
| Tracking Status: None Rags.Raghavan@nrc.gov (Raghavan, Rags) | | Tracking Status: None Rags.Raghavan@nrc.gov (Raghavan, Rags) |
| Tracking Status: None | | Tracking Status: None Patrick.Milano@nrc.gov (Milano, Patrick) |
| | | Tracking Status: None Tom.Boyce@nrc.gov (Boyce, Tom (NRR)) |
| Patrick.Milano@nrc.gov (Milano, Patrick) Tracking Status: None Tom.Boyce@nrc.gov (Boyce, Tom (NRR)) | |
| Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva) | | Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva) |
| Tracking Status: None | | Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl) |
| | | Tracking Status: None Post Office: |
| Karl.Feintuch@nrc.gov (Feintuch, Karl) Tracking Status: None | | HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 19798 12/3/2009 Options Expiration Date: |
| | | Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received:}} |
| Post Office: | |
| HQCLSTR01.nrc.gov | |
| | |
| Files Size Date & Time | |
| | |
| MESSAGE 19798 12/3/2009 | |
| | |
| Options Expiration Date: | |
| Priority: olImportanceNormal ReplyRequested: False Return Notification: False | |
| | |
| Sensitivity: olNormal Recipients received:}} | |
Letter Sequence Acceptance Review |
---|
TAC:ME2439, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) TAC:ME2440, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) |
|
MONTHYEARML0929503402009-10-20020 October 2009 License Amendment Request for Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 - Browns Ferry TS Change 469; Sequoyah Change 09-04; and Watts Change 09-19 Project stage: Request ML0933800952009-12-0303 December 2009 TSTF-511 LAR Acceptance Review Project stage: Acceptance Review ML0931600842010-02-0202 February 2010 Issuance of Amendments 327 and 320, Regarding Adoption of TSTF- 511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.1 to Support Compliance with 10CFR Part 26 (Tac Nos. ME2439 and ME2440) Project stage: Approval 2009-12-03
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24177A1412024-06-11011 June 2024 NRR E-mail Capture - Audit Plan Related to Review of the Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, LAR to Revise Technical Specification Table 3.3.2-1 Function 5 ML24152A1542024-05-31031 May 2024 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-03 ML24128A1802024-05-0707 May 2024 NRR E-mail Capture - Acceptance Review for Sequoyah License Amendment Request to Modify TS 3.8.1 and TS 3.8.2 (L-2024-LLA-0047) ML24123A0882024-05-0202 May 2024 NRR E-mail Capture - Correction Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24122B4872024-04-30030 April 2024 NRR E-mail Capture - Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24074A4252024-03-14014 March 2024 NRR E-mail Capture - Sequoyah Hydrologic Analysis License Amendment Request - Notification of Change to Estimated Completion and Hours ML24059A4052024-02-28028 February 2024 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-02 ML24053A0302024-02-21021 February 2024 NRR E-mail Capture - Request for Steam Generator (SG) Tube Inspection Call for Sequoyah, Unit 1 ML24047A2792024-02-15015 February 2024 RAI Related to the Exemption Request for 10 CFR 37.11 ML24045A1002024-02-13013 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Sequoyah Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML24036A0132024-01-23023 January 2024 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar Nuclear Plants, License Amendment Request to Revise TS Table 3.3.2-1, Function 5, Turbine Trip and Feedwater Isolation ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23275A0272023-09-29029 September 2023 Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23165A2862023-06-14014 June 2023 Tennessee Multi-Sector Permit (Tmsp), 2023 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, SW-17, SW-18, SW-19, and SW-21 ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23062A5952023-02-27027 February 2023 Staff follow-up Questions to Tva'S 12/19/2022 Response of the Staff'S Rsi Regarding 08/04/2022 SQN Exemption Request ML23058A1312023-02-27027 February 2023 FW: TVA Intentions on EA-22-129 ML23052A0792023-02-21021 February 2023 NRR E-mail Capture - Acceptance Review for Browns Ferry and Sequoyah License Amendment Request to Adopt TSTF-541 ML23046A3552023-02-15015 February 2023 Annual Water Withdrawal Report 2022 ML23019A3442023-01-19019 January 2023 Tennessee Multi-Sector Permit (Tmsp), 2022 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, and SW-19 ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML23026A0282023-01-12012 January 2023 001 Radiation Safety Baseline Inspection Information Request ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22348A0432022-11-28028 November 2022 NRR E-mail Capture - State Consultation - Sequoyah Nuclear Plant, Units 1 and 2, License Amendment Request to Modify the Approved 10 CFR 50.69 Categorization Process (L-2022-LLA-0033) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22214A1582022-08-0202 August 2022 NRR E-mail Capture - Request for Additional Information for Sequoyah Units 1 and 2 License Amendment Request for Fire and Seismic PRA Modification to 10 CFR 50.69 (L-2022-LLA-0033) ML22196A0732022-07-15015 July 2022 NRR E-mail Capture - (External_Sender) State Notification for Sequoyah Units 1 and 2 Amendment Issuance - TSTF-505 RICT (L-2021-LLA-0145) ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22173A0332022-06-17017 June 2022 NRR E-mail Capture - (External_Sender) State Notification for Sequoyah Units 1 and 2 Amendment Issuance - Reactor Trip System Instrumentation (L-2021-LLA-0200) ML22166A4292022-06-0606 June 2022 NRR E-mail Capture - LAR to Adopt TSTF-577 ML22151A0102022-05-27027 May 2022 NRR E-mail Capture - Revised Request for Additional Information Re Sequoyah Nuclear Plant Alternative Request RV-02 ML22146A3322022-05-26026 May 2022 NRR E-mail Capture - Request for Additional Information Related to Sequoyah Nuclear Plant'S LAR to Adopt TSTF-505 ML22151A0092022-05-26026 May 2022 NRR E-mail Capture - Request for Additional Information Re Sequoyah Nuclear Plant Alternative Request RV-02 ML22146A3342022-05-25025 May 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Relief Requests (EPID L-2022-LLR-0045 - 0047) ML22137A2692022-05-17017 May 2022 Notice of Termination, TNR192066, Gravel Lot Restoration Project ML22136A0182022-05-16016 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, Alternative Request RP-11 and Watts Bar Nuclear Plant, Units 1 and 2, Alternative Request IST-RR-9 ML22132A1762022-05-12012 May 2022 Tennessee Multi-Sector Permit (Tmsp), 2021 Annual Discharge Monitoring Report for Outfalls SW-2, SW-3, SW-4, SW-6, SW-8, SW-9, and SW-13 ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Revised the TVA Plants' Radiological Emergency Plans ML22123A1812022-05-0303 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-577 ML22095A0182022-04-0404 April 2022 NRR E-mail Capture - Sequoyah Nuclear Plant - Acceptance of Request for Alternative - Pressure Isolation Valve Leakage ISTC-3630 (L-2022-LLR-0034) 2024-06-11
[Table view] |
Text
ADAMS Accession No. ML093380095 From: Lamb, John Sent: Thursday, December 03, 2009 1:17 PM To: Mashburn, Fredrick C Jr; Casey, Kevin E Cc: Raghavan, Rags; Milano, Patrick; Boyce, Tom (NRR); Lingam, Siva; Feintuch, Karl
Subject:
FYI - Acceptance Review - SQN 1 & 2 - TSTF-511 (TAC Nos. ME2439 and ME2440)
- Fred, By letter dated October 20, 2009 (ML092960438), Tennessee Valley Authority (TVA) submitted a license amendment for Sequoyah Nuclear Plant (SQN), Units 1 and 2. The proposed amendment would eliminate working hour restrictions from Technical Specification (TS) 6.2.2 to support compliance with Title 10 of the Code of Federal Regulations (10 CFR) Part 26. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of 10 CFR, an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-3100.
Sincerely, John G. Lamb, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-327 and 50-328 E-mail Properties
Mail Envelope Properties (BE1CC4A72435624D84F8699734202B3E157A9F89BC)
Subject:
FYI - Acceptance Review - SQN 1 & 2 - TSTF-511 (TAC Nos. ME2439 and ME2440)
Sent Date: 12/3/2009 1:16:55 PM Received Date: 12/3/2009 1:16:55 PM From: Lamb, John Created By: John.Lamb@nrc.gov Recipients:
fcmashburn@tva.gov (Mashburn, Fredrick C Jr)
Tracking Status: None kecasey@tva.gov (Casey, Kevin E)
Tracking Status: None Rags.Raghavan@nrc.gov (Raghavan, Rags)
Tracking Status: None Patrick.Milano@nrc.gov (Milano, Patrick)
Tracking Status: None Tom.Boyce@nrc.gov (Boyce, Tom (NRR))
Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva)
Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl)
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 19798 12/3/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: