| issue date = 01/15/2010
| issue date = 01/15/2010
| title = Actual Handouts to Applications (Folder 3)
| title = Actual Handouts to Applications (Folder 3)
| author name = D'Antonio J M
| author name = D'Antonio J
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name =  
| addressee name =  
Line 20: Line 20:


=Text=
=Text=
{{#Wiki_filter:RE-G-03 Page 1 of 1 MP2-20-01 Rapid Down Power Reactivity Plans RWST -1 pump RWST -2 pump BAST -1 %/min 90% 0 RE-G-04 SA 880 gals SA flow 44 gpm CEA pos -180 steps RE-G-05 SA 880 gals SA flow 88 gpm CEA pos -180 steps RE-G-06 SA 204 gals SA flow 20 gpm C EA pos -180 steps Time -20 min. Time -10 min. Time -10 min. Rate -30%/hr Rate -60%/hr Rate -60%/hr 70% (No CEAs) I RE-G-07 SA 2458 gals SA flow 44 gpm CEA pos -180 steps RE-G-08 SA 2640 gals SA flow 88 gpm CEA pos -180 steps RE-G-09 SA 606 gals SA flow 20 gpm C EA pos -180 steps Time -56 min. Time -30 min. Time -30 min. Rate -32%/hr Rate -60%/hr Rate -60%/hr I 55% I* 15% 0 RE-G-10 SA 3080 gals SA flow 44 gpm CEA pos -154 steps RE-G-11 SA 3315 gals SA flow 88 gpm C EA pos -154 steps RE-G-12 SA 720 gals SA flow 18 gpm CEA pos -154 steps Time -70 min. Time -38 min. Tinle -40 min. Rate -39%/hr RE-G-13 SA 4400 gals SA flow 44 gpm CEA pos -140 steps Rate -71%/hr RE-G-14 SA 5120 gals SA flow 88 gpm CEA pos -140 steps Rate -68%/hr RE-G-15 SA 1100 gals SA flow 16 gpm C EA pos -140 steps Time -100 min. Time -58 min. Time -80 min. Rate -51 %/hr Rate -88%/hr Rate -64%/hr 90% 0 70% I (No CEAs) I I 55%
{{#Wiki_filter:RE-G-03                                 Page 1 of 1 MP2-20-01 Rapid Down Power Reactivity Plans RWST -1       pump     RWST -2 pump         BAST -     1 %/min RE-G-04                 RE-G-05            RE-G-06 SA vol-vol 880 gals      SA vol-vol 880 gals   SA vol-vol 204 gals 90%    SA flow - 44 gpm      SA flow - 88 gpm    SA flow - 20 gpm CEA pos - 180 steps   CEA pos - 180 steps  C EA pos - 180 steps Time - 20 min.         Time - 10 min.       Time - 10 min.
* 15% 0 RE-G-03 MP2-20-01 Rapid Down Power Reactivity Plans RWST -1 pump RWST -2 pump RE-G-04 RE-G-05 SA vol-880 gals SA vol-880 gals SA flow -44 gpm SA flow -88 gpm CEA pos -180 steps CEA pos -180 steps Time -20 min. Time -10 min. Rate -30%/hr Rate -60%/hr RE-G-07 RE-G-08 SA vol-2458 gals SA vol-2640 gals SA flow -44 gpm SA flow -88 gpm CEA pos -180 steps CEA pos -180 steps Time -56 min. Time -30 min. Rate -32%/hr Rate -60%/hr RE-G-10 RE-G-11 SA vol-3080 gals SA vol-3315 gals SA flow -44 gpm SA flow -88 gpm CEA pos -154 steps C EA pos -154 steps Time -70 min. Time -38 min. Rate -39%/hr Rate -71 %/hr RE-G-13 RE-G-14 SA vol-4400 gals SA vol-5120 gals SA flow -44 gpm SA flow -88 gpm CEA pos -140 steps CEA pos -140 steps Time -100 min. Time -58 min. Rate -51 %/hr Rate -88%/hr Page 1 of 1 BAST -1 %/min RE-G-06 SA vol-204 gals SA flow -20 gpm C EA pos -180 steps Time -10 min. Rate -60%/hr RE-G-09 SA vol-606 gals SA flow -20 gpm C EA pos -180 steps Time -30 min. Rate -60%/hr RE-G-12 SA vol-720 gals SA flow -18 gpm CEA pos -154 steps Tinle -40 min. Rate -68%/hr RE-G-15 SA vol-1100 gals SA flow -16 gpm C EA pos -140 steps Time -80 min. Rate -64%/hr 8/6/08 MILLSTONE UNIT 2 EMERGENCY ACTION LEVELS APPROVAL EFFECTIVE DATE SITE AREA EMERGENCY GENERAL EMERGENCY ALPHA CHARLIE-TWO o ALERT CHARLIE-ONE o UNUSUAL EVENT DELTA-TWO D UNUSUAL EVENT DELTA-ONE BARRIER I LOSS OF COLD S I D FUNCTION I I Mode 5, 6 Loss of Shutdown Cooling> 15 Minutes Refuel Water Level < 35 Ft., 61nUncontrolled RCS Temperature Increase>
0 Rate - 30%/hr           Rate - 60%/hr       Rate - 60%/hr RE-G-07                 RE-G-08            RE-G-09 70%    SA vol-vol 2458 gals      SA vol-vol 2640 gals  SA vol-vol 606 gals SA flow - 44 gpm      SA flow - 88 gpm  SA flow - 20 gpm I (No CEAs) CEA pos - 180 steps   CEA pos - 180 steps  C EA pos - 180 steps I
IO' F RCS Boron Concentration
Time - 56 min.         Time - 30 min.       Time - 30 min.
< Minimum Required r EU; I IREFUEUSPENT FUEL POOL LEVELl ""--M-od-e-6-,-0--'
Rate - 32%/hr           Rate - 60%/hr       Rate - 60%/hr I
1Uncontrolled Spent Fuel Pool Water Level Decrease Loss of Cooling Suction Uncontrolled Refuel Pool Water Level Decrease Containment Evacuation 81'ill All Spent Fuel Assemblies in Storage I LOSS OF I Mode 1,2,3,4 Loss of Most (75%) MCB Annunciators>
RE-G-10                 RE-G-11           RE-G-12 SA vol-vol 3080 gals      SA vol-vol 3315 gals  SA vol-vol 720 gals 55%    SA flow - 44 gpm      SA flow - 88 gpm  SA flow - 18 gpm CEA pos - 154 steps   C EA pos - 154 steps CEA pos - 154 steps I
15 Minutes /lli.Q SPDS ICC Instrumentation I LOSS OF COMMUNICATIONS I I Mode ALL ,. Loss of ALL Onsite Electronic Communications Methods 2Loss of ALL Electronic Communications Methods Government I SHUTDOWN LCO EXCEEDED I I Mode 1, 2, 3, 4 I NOTE: When two or more EALs apply, always choose the EAl of the highest incident classification; also always read fr o m top to bottom in each category Unit NOT Brought To Required Mode Within Applicable LCO Statement Time fur > ""."'. . . '. """ , *'V*...III ..... *
Time - 70 min.         Time - 38 min.       Tinle - 40 min.
' SO'mJiVhr .. I I Mode ALL OFFSITE DOSE 1MP2 Kaman Vent M onitor (RM-8 Isa) Reading 0.02 f'Cl/cc for> 15 Minute s 2MP2 WRGM Site Stack Effluent Activity (R M-8169) Read2.. 1 f'Ci/cc for> 15 M in3MSL Mon itor (RM-4299NB
Rate - 39%/hr                     71 %/hr Rate - 71%/hr      Rate - 68%/hr RE-G-13                  RE-G-14            RE-G-15 SA vol-vol 4400 gals       SA vol-vol 5120 gals  SA vol-vol    1100 gals 15%    SA flow - 44 gpm      SA flow - 88 gpm  SA flow - 16 gpm CEA pos - 140 steps    CEA pos - 140 steps C EA pos - 140 steps 0    Time - 100 min. min. Time - 58 min.         Time - 80 min.
/C) Read ing 0.03 R lfor> 15 M i4M easured Plume Dose Rate Onsite 5 for> 15 M5Rad Assessmenl Determines Integrated Dose L 0.005 Rem TEDE OR 2.. 0.025 Rem CDE EfIIuentMonltCirs In*AllrmORUnDIeMed.
Rate - 51 %/hr         Rate - 88%/hr                  64 % /hr Rate - 64%/hr
UnmonIIored or  
 
...ANDDELTMWO PolItulilCoc:fe Urn'" as Datetm/ned from EP I-fOAP06, PAfIs." IaHIad .
7/29/08                                                                                                      8/6/08 MILLSTONE UNIT 2 EMERGENCY ACTION LEVELS                                                                                                                                                                                                                                        APPROVAL DATE                                                                                                EFFECTIVE DATE GENERAL EMERGENCY ALPHA SITE AREA EMERGENCY CHARLIE-TWO                                      o ALERT CHARLIE-ONE                                o UNUSUAL EVENT DELTA-TWO                                                  D UNUSUAL EVENT DELTA-ONE BARRIER FAILURE fur >
ALERT CHARLIE-ONE Events are in process or have occurred wh i ch Involve an actua l or potential substantial degradation of Ihe level of safety of the plant or a secur i ty event t hat i nvolves probable Hfe threatening risk to site personnel o r damage to site equipment because of Intentional malicious dedicated efforts of a hosUie act. Any releases are expected to be limited to small fractions of the E PA Protective Action Guideline exposure leve ls. UNUSUAL EVENT " DELTA-TWO Events are in process or have occurred which i ndicate a potential degradation of the level of safety of the plant or indicate a security threat to facility protection. No releases of radioactive material requiring offsite response or monitoring are expected unless further degradation of safety systems occurs.
_~_~-nilu-81ai)~
MP-26-EPI-FAP06-002 Revision 006 Page 1 of 3 I FUEL CLAD OR RCS BARRIER I I Mode 1, 2, 3, 4 See Bar r i er Fa ilure Reference Table I BA2 II STEAM LINE BREAK II Mode 1, 2, 3, 4 U nisolable Steam U ne Bre ak O utside CTMT Mode 1, 2, 3, 4 LOU GtVa!llP on l DC 1i.Ai8a201A.AIiIlmtB
Mode 1, 2, 3, 4                                                                                                ' O~fOt. Ji,'t5*JiIIffiiIIS ~~..,              " "."' .  . . '.
>' 15 Min" STATION BLACKOUT Mode 5, 6, 0 I I Loss of Voltage on Bu ses 24C AND 24D > 15 Min utes I PA2 I I SINGLE AC POWER SOURCE I I Mode 1, 2,AD On l y One AC Power Source A vailable to Supply Bus es 24C 24D > 15 M i nute s Su ch That L oss of Th at P ow er Sourc e W o uld R esult in a Sta tio n Blackout (U nit 3 Buses 34NB CANNOT be C redited unless already aligned to U nit 2 Bus 24C I or 24D) I AUTOMATIC RX TRIP FAILURE I I Mode 1, 2 Fa il ure of Automatic Reactor Trip Manual Trip Was Success f ul I INABILITY TO MAINTAIN COLD SID I I Mode 5, 6 1Un controlled R C S Tem pe rature Increase > 10'F That Resu lts in RCS Temperat ure > 200' F 2. Inadve rtent Cr iticality boss OF ANNUNC-IA-T-O-R-SIT-RA-N-S-IE-N'i Mode 1, 2, 3, 4 Lo ss of Most (75%) MCB A n n unciato r s> 15 Minutes 8t1Q EITHER of the Following:
LOU GtVa!llP onlDC 1i.Ai8a201A.AIiIlmtB >' 15 Min"                                                                                                                                                                  ~9!e~~,~a~'
Significant Transient in LOSS of SP DS AN.O.ICC InstrumentatioII CTMT BARRIER Mode 1, 2, 3, 4 See Barrier Failure Reference Table I RCS LEAKAGE I I Mode 1, 2, 3, 4 1 Pressure Boundary Leakage> 10 GPM Unidentified Leakage> 10 GPM Identified Leakage> 25 GPM Primary to Secondary Leakage > 25 GPM &sect;] I FUEL CLAD DEGRADATION I I Mode ALL 1 RCS Activity>
                                                                                                                                                                                                                                                                                                                  """ , *'V*... III
60 I1Ci/gm 1-131 DEQ Dose Rate at One Foot from Un pressurized Sample .2:. 2 mRlhr l LOSS OF OFFSITE POWER I I Mode ALL Loss of all OFFSITE power to buses 24C AND 24D for > 15 Minutes. jPU2l LOSS OF DC I I Mode 5, 6 Loss of Voltage on DC Buses 201 A AND 201 B > 15 Minutes MILLSTONE UNIT 2 EMERGENCY ACTION LEVELS 7/29/08 APPROVAL DATE GENERAL EMERGENCY ALPHA BARRIER FAILURE I FUEL CLAD OR RCS BARRIER I 1 Mode 1 , 2, 3, 4 See Bar r i e r F ailure Reference T able 1 BA2 1 ,-I __ S_TE_A_M_Ll_NE_B_REA_K_----'11 Mode 1 , 2 , 3, 4 U nis o lable Ste am U ne Br eak O ut s ide CTMT 1-1 ___ C_T_M_T_B_A_R_RI_E_R
                                                                                                                                                                                                                                                                                                                                                                                ~
__ --'II Mode 1 , 2 , 3, 4 See Barrier Failure Reference Table [&sect;J 1-1 ___ R_C;.,.S;.,.L_EA_KA_G_E
                                                                                                                                                                                                                                                                                                                  *~.\JrJ.Q~,AaIe:on.ne ' SO'mJiVhr
__ ----II I Mode 1 , 2, 3, 4 1 . Pressure Boundary Leakage> 10 GPM 2. Unidentified Leakage> 10 GPM 3. Identified Leakage> 25 GPM 4. Primary to Secondary Leakage >25 GPM 1 FUEL CLAD DEGRADATION 1 1,--_M_Od_e_A_L_L_-,. 1. RCS Activity> 60 I-lC i/gm 1-131 DEQ 2. Dose Rate at One Foot from Un pressurized RCS Sample .2:. 2 mR/hr/ml SITE AREA EMERGENCY CHARLIE-TWO o ALERT CHARLIE-ONE 1-1 _--=-ST.:.,:.A.:.,:.T.:.,:IO:..:.N;..;B;;.:LA:....:..;:,C.:..:KO;;:..U;;:..T:.-----II I Mode 5, 6 , 0 Loss o f V ol ta ge o n B u s es 2 4 C 240 >15 M i n u te s I PA2 I I SINGLE AC POWER SOURCE I 1 Mode 1, 2, 3, 4 O n ly O n e AC P o w er Source A va ilable to S uppl y Bu s e s 24C M!!UQ.B 24 0> 15 M i n u te s Su ch Th at L o ss of T hat P o w e r Sourc e W o uld R e s ult in a St atio n Blac ko ut (U nit 3 Buses 3 4 N B CANN O T be C r edi t e d un l es s already align ed to U nit 2 Bus 2 4C I or 240) I LOSS OF OFFSITE POWER 1 1 Mode ALL Loss of all OFFSITE power to buses 24C AND 240 for > 15 Minutes. fPu2lLI ___ LO_S_S_O_F_D_C
                                                                                                                                                                                                                                                                                                                  ~ ,,1j~~- '.                                  ~
__ ---'I 1 Mode 5 , 6 Loss of Voltage on DC Buses 201 A AND 201 B > 15 Minutes I AUTOMATIC RX TRIP FAILURE 1 1 Mode 1 , 2 Fa il ure of Aulomatic Reactor Trip 8NQ M anual Trip W as Suocess f ul 1 INABILITY TO MAINTAIN COLD S I D I 1 Mode 5, 6 1 , Un contro ll e d R C S Tem pe rature Increase> 10' F That Res u lt s in R C STemperat ure > 200'F 2. I na d vertent C r iticalit y OF ANNUNCIATORSfTRANSIEN]
                                                                                                                                                                                                                                                                                                              .s;  NlA*~,~_fanld_Qffaft8
Mode 1 , 2 , 3 , 4 Lo ss of M ost (75%) M C B Ann u n ciato r s> 1 5 M inutes EITHE R of the Follow i n g: Significan t Transien t in P rogress L OSS of S PDS AMl I CC Instrumentati o n 1 LOSS OF COLD S I D FUNCTION I Mode 5, 6 1. Loss of Shutdown Cooling> 15 Minutes Illi.Q Refuel Pool Water Level < 35 Ft., 6 tn. 2. Uncontrolled RCS Temperature I ncrease> 10" F 3. RCS Boro n Concentration
                                                                                                                                                                                                                                                                                                                . ~ ~.~~_EOR~'Uiefiem'COI!~
< Minimum Required IREFUEUSPENT FUEL POOL LEVELl r-1-M-od-e ,-0--' 1. Uncontrolled Spent Fuel Pool Water Level Decrease Causing Loss of Cooling Suction Flow 2. Uncontrolled Refuel Pool Water Level Decrease Requiring Containment Evacuation 81iQ All Spent Fuet Assemblies in Safe Storage Locations
~I        I FUEL CLAD OR RCS BARRIER I I1                    Mode 1, 2, 3, 4                ~                          STATION BLACKOUT                                                        II 1-1_--=-ST.:.,:.A.:.,:.T.:.,:IO:..:.N;..;B;;.:LA:....:..;:,C.:..:KO;;:..U;;:..T:.-----II  I            6, 0 Mode 5, 6,        ~        I AUTOMATIC RX TRIP FAILURE I1 I1                    Mode 1, 2      ~            I                OFFSITE DOSE                      II  Mode ALL                            ALERT Automatic Reactor Trip 8NQ Failure of Aulomatic                  ~ Manual Trip Was Suocessful Successful      1. MP2 Kaman Vent Monitor (RM-8Isa)    (RM - 8168) Reading ~ 0.02 f'Cl/cc
-I LOSS OF ANNUNCIATORS I I Mode 1,2,3,4 1 Loss of Most (75%) MCB Ann u nciators> 15 Minutes /lli.Q SPDS Q8 ICC Instrumentation Available I LOSS OF COMMUNICATIONS 1 1 Mode ALL 1. Loss of ALL Onsite Electronic Communications Methods 2. Loss of ALL Electron i c Communications Methods With Government Agencies NOTE: When two or more EALs apply, always choose the EAL o f the highest in ci d e nt cla s sification; also always read fr o m top to bottom i n each categ o ry. 1 SHUTDOWN LCO EXCEEDED 1 I Mode 1, 2, 3, 4 I Un i t NOT Brought To Requ i red Mode Within Applicable LCO Action Statement Time Limits o UNUSUAL EVENT DELTA-TWO Mode ALL 1. M P2 Kaman Vent M on i tor (RM-8 1 68) Re a d i ng 0.02 for> 15 M i nutes 2. M P2 WR G M Site Stack Effluent Act i v i ty (R M-8169) R eading 2..1 for> 15 M i nu t es 3. M Sl M on i tor (RM-4299N B/C) Read i ng 0.03 R/hr 10( > 15 M i nu t es 4. M eas ur ed P l ume Dos e R a te Ons i le 5 mR/hr fo r > 15 M inutes 5. Rad Assessm en t Determines tntegrated D ose Offs i te 2.. 0.005 Rem T EDE OR 2.. 0.025 Re m CDE Thyro i d L..-......;U;.,.N_P_LA_N_N_E_D_R_EL
                                                                                                                                                                                                                                                                                                                                                                                    ~C l/cc                    CHARLIE - ONE CHARLIE-See Barrier Failure Reference Table                                                          Loss ofo f Voltage on      o n Bu  Buses  ses 24C ~            AND 240      24D > 15 Minutes                                                                                                                      for>
_E_A..;.S_E_
for  > 15 Minutes                                                          Events are in process or have occurred which
..... 1 I Mode ALL 8/6/08 EFFECTIVE DATE D UNUSUAL EVENT DELTA-ONE CHARLIE-ONE Eve n ts are in process or have occur r ed wh i ch involve an aClua l 0( poten ti al substantial degradation of the l evel of safety of the plant or a secur it y event t hat i nvolves probab l e life threaten ng r i sk to s i te personnel o r damage to site equ i pment because of I ntent i onal malicious ded i cated efforts o f a hosWe act. Any re l eases are expected to be lim i ted 10 smalilractions o f the EPA PrOlective Act i on Guideline exposure levels. UNUSUAL EVENT DELTA-TWO OR DELTA-ONE Events are in process or have occurred which i ndicate a potential degradation of the level of safety of the plant or indicate a se c urity threat to facility protection. No releases of radioactive material requiring offsite response or monitoring are expected untess funher degradation of safety systems occurs. 2 Millstone MP-26-EPI-FAP06-002 Revision 006 Page 1 of 3 '.
                                                                                                                                                                                                                            ~          I INABILITY TO MAINTAIN COLD SID 1                                      SID 1II      Mode 5, 6        2. MP2 WRGM Site Stack Effluent Activity (RM- 8169) Reading                  Involve involve an actuaaClua l 0(or potential substantial II PA2 I I SINGLE AC POWER SOURCE II I1 Mode 1, 2,AD                                                                2, 3, 4      1.
MILLSTONE UNIT 2 EMERGENCY ACTION LEVELS SITE AREA EMERGENCY GENERAL EMERGENCY ALPHA CHARLIE-TWO D ALERT CHARLIE-ONE o UNUSUAL EVENT DELTA-TWO UNUSUAL EVENT DELTA-ONE
1,  Uncontrolled RCS Temperature Increase > 10'        10' F That Resu Results lts                ~Ci/cc for 2.. 11 f'Ci/cc    for>  > 15 Minutes                                      degradation of Ihe the level of safety of the plant or a security event that involves probable Hfe          life I1 BA2 II1  , - I_ _  STEAM LINE BREAK S_TE_A_M_Ll_NE_B_REA_K_----'11    II  Mode 1, 2, 3, 4                O nly On
=**I SPENT FUEL ASSEMBLY DAMAGE I I Mode ALL 1Spent Fuel is Exposed from O pen Ve ss el , C avit y , or SF AND Spent Fuel Has D e c ayed L 3 0 Day2Fuel Handling A CCident C ausing D amage 10 S pent Fuel , Ind ica ted by Fuel Building O R Containmen t Radiation M onito r s Increasing I RA2 1 1 PLANT RADIATION 1 1 Mode ALL 1Ra dia t ion R eadings> 1 5 mR/hr in C ontrol Room O R Central Al a rm S tatio n QB Secondary Alarm S t ation 2R adiation R eading> 5 R/hr in Areas Requir in g Access Safe ShRAD MONITORS I 1 Mode ALL 1Uncontrolled Refuel Pool Water Level Decrease AND Rad Levels Require Evacuation o f CTMT or Spent Fuel Pool Area 2Unexpected Area Rad Monitor Reading Offscale High > 1000 Times Normal A'n ..I I 1 SECURITY EVENT Mode ALL Security Events as determined for Station Safeguards Contingency Plan and reponed by Security Shift Supervis i on , (Addresses events that I nvolve A ctual or Potential Substantial degradation 10 the level of safety 01 the p l ant) 2A noti ficat ion from t he site security force that an armed attackexptosr-e attack , airliner I mpact, or other HOSTILE A CT10N occurring or has occurred w i thin the OCA3A vaHdated notification from the N RC of an airliner attack threat le ss Ihan 30 minutes a w ay. I TA2 1 1 DESTRUCTIVE PHENOMENA 1 1 Mode ALL 1. Seismic E ven t > 0.09g ZPA 2, Onslte Sustained Windspeed
                                                                                              ~ 24D M!!UQ.B On e AC Pow ly One          Power      er Source Available to Supply Buses 24C 240 > 15 Minutes Such That Loss of That Power                                                                    2.
> 90 MPH 3 , V isible D amage to Structures o r Equipmenl AtiQ A ffecting Safe Shutdown Vessel or Vehicle Collision 8NQ Affecting Safe Shutdow n 5Missiles Affecting Safe Shutdown 6Flooding Affecting Safe Shutdow n 1 SECURITY EVENT 1 1 Mode ALL 1Security Eve n ts as delermined for Stat i on Safeguards Cont i ngency P l an and reported by Security Shift Superv i sion. (Addresses events that involve Potential degradat i on in the le v el of safety of Ihe plan!.) A credible s i te specific s'ecur i ty thre a t notific*alion. A validated notificat i on from the NRC providing information of aircraft 1 DESTRUCTIVE PHENOMENA 1 " Mode ALL 1Seismic Activity Detected Per AOP-2562, Eanhquake 2Report by Plant Personnel of Tornado Striking Within Prote ct ed Area 3Visible Damage to Structures or Equipment Within the Protected Area I CONTROL ROOM EVACUATION I Mode ALL C ont rol Room Evacuation I nitiated 1 GA2 1 I FIRE/EXPLOSION 1 1 Fi r e or Explosion Affecting Safe S h utdown A rea 8tiQ Damage to S tru ctures QB E quipment In dicated I GA3 1 1 TOXIC/FLAMMABLE GASES I I Mode ALL Ufe T hreaten in g T oxic G as es QB Rammable G a s Concentrations a s Id entified in C-OP 2 00.5 , " O il , Hazardous M aterial. H azardous W aste and M i xed Waste C onti ngency P lan" Aff ecting A reas for S afe Shutdow n I FIRE 1 I Mode ALL Fire in Bui l ding OR Areas Adjacenl to Areas Needed for Shutdown NOT Extinguished Within 15 M i nutes of Notificalion Verifica t ion of Control Room 2Fire-Affecting a Loaded ISFSI-eonfinement Boundary NOT Ex1 i nguished Within 15 Minutes of Not i fication , 1 GU2 1 1 TOXIC/FLAMMABLE GASES 1 1 Mode ALL t Life Threatening Toxic Gases QB Flammable Gas Concenlrat i ons Identified in C-OP 200.5 , " Oil , Hazardous Malerial, Hazardous and Mi x ed Waste Contingency Plan " AffeCling Normal Notification 0 1 a N ea r*Si te Release That May-Require Evacuation I 1 JUDGEMENT Mode ALL Any Condit ion F or Which J udgement Indicates T ha t Safety Systems M a y Be Degraded 8MQ Wh ich Requires Emergency Response Organizat i on Staffing I I JUDGEMENT Mode ALL Any Condition For Which Judgement Indicates Degradation in the Level of Safety of the ALERT -I CHARLIE-ONE Events are In prooess or have occurred which i nvolve an a.otual or potenlia l substantial degradation of the leve l 01 safety of th e plant or a secur i ty event that In volves probable Ilfe threatening risk to s i le personnel or damage to site equipment because of I ntentiona l malicious dedicate d effons of a host ile act. Any releases are expecled to be l i mited to small fractions of Ihe EPA Protective Action GUideline exposure levels. UNUSUAL EVENT I' D ELT A-TWO OR DELTA-ONE Events are in process or have occurred which indicate a potential degrad a tion of the le v el of safety of the plant or indicale a security threal to facility prole c ti o n. No releases of rad i oactive mater i al requiring offsite response or monitoring are expected unless further degradatio n of safety systems occurs , Onsrte Sustained Winds peed > 75 MPH 5ExplOSion Within the Protected Area Turbine Failure Caus i ng Observable Casing Damage Vessel or Vehicle Collision With Structures OR Equipment Required AREAS OF CONCERN FOR SAFE SHUTDOWN Control Room Cable Vaults Turbine Building Penetration Areas RBCCW Rooms Diesel Generator Room Charging Pump Cubicles Switchyard Switchgear Rooms Intake Structure Switchgear Area Coolant Tanks Area Containment DC Equipment and Battery Rooms Safety Injection Pump 2 for Safe Shutd o wn or a loaded ISFSI Confinement Boundary 8 , Flood Level > 19 Feet Mean Sea Level 9Flooding in Areas Containing Safe Shutdown Equipment Millstone MP-26-EPI-FAP06-002 Revision 006 Page 2 of 3 MILLSTONE UNIT 2 EMERGENCY ACTION LEVELS GENERAL EMERGENCY ALPHA I SPENT FUEL ASSEMBLY DAMAGE I I Mode ALL 1. Spen t Fu el is Exposed fro m O pen V e s s el , C a v i t y , o r SF Pool AN D Spent Fuel H as D e c a yed L 3 0 Da ys 2. Fuel H andl i n g A CCident C ausing D amage to S pent F ue l , I nd i cate d by Fuel B ui l ding O R C o nt ainmen t Radiation M o n ito r s I ncrea s in g I RA2 I .... 1 __
in RCS RCSTemperature Temperature > 200 ' F Inadvertent Criticality
I Mode ALL 1 , R a di a t ion R eadin g s> 1 5 m R/h r in C on t rol Room O R C e nt ral Al a rm S tat i o n QB S eco n d ary Al arm S t ation 2. R adiation R ead i ng> 5 R/hr i n Areas R equiring A ccess f o r Safe S hutdo w n ,-I ___ R_A_D_M_O_N_IT_O_R_S
: 3. MSl Monitor (RM-4299NB/C) Reading ~ 0.03 R/hr MSL for>
__ --'I I Mode ALL 1. Uncontrolled Refuel Pool Water Level Decrease AND Rad Levels Require Evacuation of CTMT or Spent Fuel Pool Area 2. Unexpected Area Rad Monitor Reading Offscale High OR > 1000 Times Normal Reading SITE AREA EMERGENCY CHARLIE-TWO D ALERT CHARLIE-ONE IL....-__
10( > 15 Minutes Rlhr          threaten ng risk to site personnel or damage to site threatening equipment because of Intentional malicious Uniso lable Steam U ne Break O utside CTMT Unisolable                                                                                  Source Would Result in a Station Blackout (Unit 3 Buses 34NB CANNOT be Credite or 240) 24D)
I Mode ALL Security Events a s determ i ned l or Station Sa f eguards Cont i nge n cy Plan and reported by Se c urity Shift Supervis i on. (Addresses events that I nvo l ve A o t ual o r Potent i a l Subs t an t i al degradat i o n t o t h e lev el o f safely of th e p l ant ,) 2. A notificat i o n from t he s i te s e c u r i ty for ce that an a rmed an ack , exp l osive anack , a i rliner I mpact , or other H OSTILE A C TI O N Is occurr i ng or has occurred with i n the OCA. 3. A validated nOlificat i on from th e N RC or an air li ner attac k th re at le ss than 30 m i nute s a w ay_ I TA2 I I DESTRUCTIVE PHENOMENA I I Mode ALL 1. Seismic E ven t > 0.0 9 g ZPA 2. On sile S ustained W in ds p ee d > 90 MPH 3. V isible D amage to S tr uctures o r E q u i p me n t A ff ecting Sa f e S h utdo wn 4. Vesse l or Vehicle ColliSio n flliQ Affecting Sa f e Shutdo w n 5. Missi l es Aff ecting Sa f e Shu t down 6. Flooding Affecting Sa f e Shutdow n .... __ S_E;....C_U_R_ITY_E_V;...E_NT
Credited          d unless already aligned to Unit 2 Bus 24C 34N B I  ~ ~OSS
__ --JI I Mode ALL 1. Security Events as determined for Stat i on Safeguards Cont i ngency Plan and reported by Se c urity Shift Superv i sion. (Addresse s events that involve Potentia l degradation in the le v el of safety of the plant.) 2. A cre di ble site specifi c s'ecurily t hre a t notific*ation. 3. A val i dated notificat i on from the NRC pr o viding information of an aircraft threat. I DESTRUCTIVE PHENOMENA II Mode ALL 1. Seismi c Activity Detected P e r AOP*2562. Eanhquake
                                                                                                                                                                                                                            ~          boss OF OF ANNUNCIATORSfTRANSIEN]
: 2. Repon by P l a n t Personnel of Tornado Striking Within Prot e c t ed Area 3. Visible Damage to Stru c tures or Equipment Within the Protected Area 4. Onsile Sustained Winds peed > 75 MPH FIRE/GASES GS1 CONTRO L ROOM EVACUATION Mode ALL U,m: from P*fttt Co10 OF N1 NOt W1tI1In is Min,,* After CQfIQ'Ql Room I CONTROL ROOM EVACUATION I Mode ALL C on t rol Roo m Evac u ation I n i t iated I GA2 I .... 1 ___
ANNUNC-IA-T-O-R-SIT-RA-N-S-IE-N'i Loss of Most (75%) MCB Annunciators Annunciators>
I Mode ALL Fir e or Explosion A ffectin g Safe S h utdown A rea 8tfQ D amage to S t r u c t ures QB E qu i p m e nt In dicated I GA3 I I TOXIC/FLAMMABLE GASES I I Mode ALL Uf e T hr eat en i n g T o x ic G as es QB Ramm ab l e G a s Con ce nt r atio n s a s Id en ti fi ed i n C-OP 2 0 0.5 , *O il , Hazardous M ate r ial. H aza r dous W ast e and M i x ed Was t e C onti ngency P l a n" A ff ec t i ng A reas f o r S a f e S hu t do w n ________
Mode 1, Mode   1, 2, 2, 3,
______
                                                                                                                                                                                                                                                                            > 15 Minutes 8t1Q EITHER of 3, 44  4. Measured Plume Dose Rate Onsile for>
: 1. Fire in Bui l ding OR Areas Ad j acent to Area s Needed for Safe Shutdown NOT Extinguished W i thin 15 Minutes of Notification QB Verifica t ion of Control Room Alarms 2;-Fire AtteC1ing a Loaded ISFSI-eontinement Boundary NOT Ext i nguished Within 15 Minutes of Not i fication. I GU2 I I TOXIC/FLAMMABLE GASES I I Mode ALL 1. Life Threatening Toxic Gases QB Flammable Gas Concentrat i ons as Identified in C-OP 200.5. " Oil , Hazardou s Material.
for > 15 Minutes Onsite ~ 5 mR/hr mAthr                  dedicated efforts of a hosWe hosUie act. Any releases are expected to be limited 10to smalilractions small fractions of the EPA Protective Action Guideline exposure levels.
Hazardous Waste and Mixed Waste Contingency Plan" Affecting Normal Operat i on 2. Notification of a N ear-S ite Release That May-Require Evacuation o UNUSUAL EVENT DELTA-TWO D UNUSUAL EVENT DELTA-ONE JUDGEMENT IL....-__ J:....:U;....;;D;....;;G-=E;...M;.::E;.,..N;...T
PrOlective the Following:
__ --JI I Mode ALL A ny C ondit i on F or Whic h J udgement I ndica te s T hat S afety Systems M a y Be D egraded 8NQ W h i ch Require s E m e rg ency Resp o n se Org a n izat i o n Staffing .... 1 ___
Following :                                                                  5. Rad Assessment Assessmenl Determines Integrated tntegrated Dose Offsite 2.. 0.005 Rem TEDE OR 2.. 0.025 Rem CDE Thyroid L
__ --'I I Mode ALL Any Condition For Which Judgement Indicates Potential Degradation in the Level of Safety of the Plant ALERT CHARLIE-ONE Eve n ts are I n process or ha ve occurred which I nvo l v e an a.otua l or potent i a l substant i al d egr ad a t i on o f the l e v el o f sa fe ty of t he plant or a secur i ty event that In volves probab l e li f e threaten i ng ri sk to s i te p e rsonnel or damage to site eqU i pment because of I ntentiona l malic i ous ded i cate d e f forts of a hos til e ac t. Any r eleases are expected to be l i m i ted 10 small fractions o f Ihe EPA Protective Act/on Gu i deline expos u re l ev el s. UNUSUAL EVENT DELTA-TWO OR DELTA-ONE Events are in process or have occurred which indicate a potential degradation of the le v el of safety of the pl a nt or indicate a security threat to facility protect i on. No releases of rad io active mater i al requiring offsite response or m o nitoring are expected unless further degradati o n of safety systems occurs. 5. ExplOSion Within the Protected Area AREAS OF CONCERN FOR SAFE SHUTDOWN 2 6. Turbine Failure Caus i ng Observable Casing Damage 7. Vess e l or Vehicle Collision With Structures OR Equipmen t Required for Safe Shutd o wn or a loaded ISFSI Confinement Boundary 8. Flood Level> 19 Feet Mean Sea Le v el 9. Flooding in Areas Containing Safe Shutdown Equipment Control Room Cable Vaults Turbine Building Penetration Areas RBCCW Rooms Diesel Generator Room Charging Pump Cubicles Switchyard Switchgear Rooms Intake Structure Switchgear Area Coolant Tanks Area Containment DC Equipment and Battery Rooms Safety Injection Pump Rooms Millstone MP-26-EPI-FAP06-002 Revision 006 Page 2 of 3 MILLSTONE 2 EMERGENCY ACTION LEVELS BARRIER FAILURE REFERENCE TABLE IMMINENT -No Turnaround in Safety System Performance is Expected AND Escalation to General Emergency Conditions Will Occur Within 2 Hours INDICATORS FUEL CLAD BARRIER RCSBARRIER CTMT BARRIER SAFETY FUNCTION STATUS/ FUNCTIONAL RECOVERY I FCB1 I I LOSS I Not Applicable I POTENTIAL LOSS I 0 No RCS Heat Remo v al Via Steam Generators Alli2 Once Through Cooling NOT Effective AND Shutdown Cooling System Is NOT In Service I RCB1 I I LOSS I Not Applicable I POTENTIAL LOSS I 0 Uncontrolled RCS Cooldown AND RCS Pressure-Temperature To the Left Of the PTS Limit 200&deg;F Subcooling Maximum Curve 0 No RCS Heat Removal Via Steam Generators Alli2 Once Through Cooling NOT Effecti v e AND Shutdown Cooling System Is NOT In Service CORE EXITTC TEMPERATURES I FCB2 I I LOSS I Core Exit Thermocouple Readings > 1300 O F I POTENTIAL LOSS I 0 Core Exit Thermocouple Readings > 800 OF I RCB2 I I LOSS I RCS Subcooling
Significant Transient in Progress LOSS of SPDS AMl AN.O.ICC ICC Instrumentation
< 30&deg;F I POTENTIAL LOSS I Not Applicable I CNB1 I I LOSS I Not Applicable I POTENTIAL LOSS I Core Exit TC Temperature Readings > 1300&deg;F Alli2 Do NOT Decrease Within 15 Minutes PRESSURE I RCB3 I I LOSS I Not Applicable I POTENTIAL LOSS I 0 Uncontrolled RCS Pressure Decrease and Increasing Containment Radiation Monitors I CNB2 I I LOSS I [iJ Rapid Unexplained CTMT Pressure Decrease L Following Initial Increase [iJ No CTMT Pressure Increase When Expectation Exists I POTENTIAL LOSS I o CTMT Pressure > 10 PSIG Increasing AND No Containment Spray Pump o CTMT H2 Concentration 4% COOLANT LEAKAGE I RCB4 I I LOSS I [iJ Reactor Coolant Leak > CVCS Capacity AND Entry Into EOP-2534, Steam Generator Tube Rupture or EOP 2540, Functional Recovery , to Address Steam Generator Tube Rupture I POTENTIAL LOSS I 0 Reactor Coolant Leak> CVCS Capacity AND Entry Into EOP-2525, Standard Post Trip Actions 0 Reactor Coolant Leak Rate CVCS Capacity At::ill EITHER of the following: . Entry Into EOP 2534, Steam Generator Tube Rupture . Entry Into EOP 2540, Functional Recovery , to Address Steam Generator Tube Rupture I C NB3 1 I LOSS I Primary to Secondary
~          I1-1_ _ _CTMT              BARRIER _ _--'II C_T_M_T_B_A_R_RI_E_R            II  Mode 1, 2, 3, 4                ~            I     LOSS OF OFFSITE POWER                                                          1 I 1I  Mode ALL         ~        I1 LOSS OF COLD SID FUNCTION I I                      Mode 5, 6                                                                        1I L..-......;U;.,.N_P_LA_N_N_E_D_R_EL_E_A..;.S_E_..... Mode ALL                      UNUSUAL EVENT
> Tech Spec Limits and EITHER exists:
: 1. Loss of Shutdown Cooling> 15 Minutes Illi.Q  ~ Refuel Pool                                                                                                                                                          "'.
* Nonisolable Steam Release from Affected S/G to environment. . Prolonged Release From Affected S/G to Environment When Used for Cooldown. (see basis for description of prolonged release) Failure of BOTH Isolation Valves AND a Pathway to the Environment Exists I POTENTIAL LOSS I o Entry Into EOP-2532 , Loss of Primary Coolant, AND Leakage Exists Outside CTMT Requiring Local Isolation RADIATION I FCB3 I I LOSS I RM -8240/8241 Reading > 300 R/hr RM -8240/8241 Reading> 5 R/hr Without RCS Release InsideCTMT At Least 5% Fuel Clad Damage As Determined By Core Damage Estimate [JJ Dose Rate at One Foot from Unpressurized RCS Sample 28 mR/hr/ml I POTENTIAL LOSS I Not Applicable I RCB5 I I LOSS I [iJ RM-8240/8241 Reading > 5 R/hr Without Fuel Clad Barrier Loss I POTENTIAL LOSS I Not Applicable I CNB4 I I LOSS I Offsite Dose Plume Rate 10-6 Times RM-8240/8241 Reading if Release is to CTMT I POTENTIAL LOSS I o RM-8240/8241 Reading> 1 , 200 R/hr o At-beast *20% Fllel Clad Damage As Determined By Core Damage Estimate WATER LEVEL I FCB4 I I LOSS I Not Applicable I POTENTIAL LOSS I 0 RVLMS Reading = 0% with OPERABLE #8 string (NA if no OPERABLE #8 strinq) --I CNB51 I LOSS I No CTMT Sump Level Increase When Expectation Exists -I P9TENTIAL LOSS I Not Applicable JUDGEMENT , I FCB5 I Any Condition For Which Judgement Indicates Loss or Potential Loss of Fuel Clad Barrier Due to: . Imminent Barrier Degradation Based On Current Safety System Performance . Degraded Fission Barrier Monitoring Capability Making Barrier Status Indeterminate
See Barrier Failure Reference Table                                                          Loss of all OFFSITE power to buses 24C AND 240                                                        24D for                    Water Level < 35 Ft., 661n.
-I RCB6 I Any Condition For Which Judgement Indicates Loss or Potential Loss of RCS Barrier Due to: . Imminent Barrier Degradation Based On Current Safety System Performance . Degraded Fission Barrier Monitoring Capability Making Barrier Status Indeterminate I CNB61 Any Condition For Which Judgement Indicates Loss or Potential Loss of CTMT Barrier Due to: . Imminent Barrier Degradation Based On Current Safety . System Performance Degraded Fission Barrier Monitoring Capability Making Barrier Status Indeterminate MORE THAN THREE BARRIERS ONE BARRIER AFFECTED 3/3 YES TWO BARRIERS ONLY ONE BARRIER AFFECTED ALERT ONE CLAD RCS CTMT 2 UNUSUAL EVENT DELTA-ONE MP-26-EPI-FAP06-002 Revision 006 Page 3 of 3 Millstone 2/3 MILLSTONE 2 EMERGENCY ACTION LEVELS BARRIER FAILURE REFERENCE TABLE IMMINENT -No TUrnaround in Safety System Performance is Expected AND Escalation to General Emergency Conditions Will Occur Within 2 Hours INDICATORS FUEL CLAD BARRIER RCSBARRIER I FCB1 I I LOSS I I RCB1 I I LOSS I SAFETY FUNCTION Not Applicable Not Applicable STATUS/ I POTENTIAL LOSS I I I FUNCTIONAL POTENTIAL LOSS 0 Uncontrolled RCS Cooldown AND RCS Pressure-Temperature To RECOVERY the Left Of the PTS Limit 200&deg;F Sub c ooling Maximum CUNe 0 No RCS Heat Remo v al Via Steam Generators 8NQ Once Through Cooling NOT Effective AND Shutdown Cooling 0 No RCS Heat Removal Via Steam Generators 8NQ Once Through System Is NOT In SeNice Cooling NOT Effecti v e AND Shutdown Cooling System Is NOT In SeNice I FCB2 I I LOSS I I RCB2 I I LOSS I CORE EXITTC [I] Core Exit Thermocouple Readings> 1300 O F [I] RCS Subcooling
tn .                                             EfIIuentMonltCirs In*AllrmORUnDIeMed. UnmonIIored or                                                   DELTA- TWO DELTA-TWO
< 30&deg;F TEMPERATURES I POTENTIAL LOSS I I POTENTIAL LOSS I 0 Core Exit Thermocouple Readings> 800 OF Not Applicable I RCB3 I I LOSS I Not Applicable I POTENTIAL LOSS I PRESSURE 0 Uncontrolled RCS Pressure Decrease and Increasing Containment Radiation Monitors I RCB4 I I LOSS I [iJ Reactor Coolant Leak> CVCS Capacity AND Entry Into EOP-2534, Steam Generator Tube Rupture or EOP 2540, Functional Recovery , to Address Steam Generator Tube Rupture COOLANT I POTENTIAL LOSS I LEAKAGE 0 Reactor Coolant Leak> CVCS Capacity AND Entry Into EOP-2525, Standard Post Trip Actions 0 Reactor Coolant Leak Rate CVCS Capacity N[l EITHER of the following: . Entry Into EOP 2534, Steam Generator Tube Rupture . Entry Into EOP 2540, Functional Recovery , to Address Steam Generator Tube Rupture I FCB3 I I LOSS I I RCB5 I I LOSS I [I] RM-8240/8241 Reading> 300 R/hr [iJ RM-8240/8241 Reading> 5 R/hr Without Fuel Clad [I] RM-8240/8241 Reading> 5 R/hrWithout RCS Release Barrier Loss InsideCTMT
                                                                                                > 15 Minutes Minutes..                                                                                                             2.
--[I] At Least 5% Fuel Clad Damage As Determined By Core RADIATION Damage Estimate I POTENTIAL LOSS I [I] Dose Rate at One Foot from Unpressurized RCS Sample 28 mR/hr/ml Not Applicable I POTENTIAL LOSS I Not Applicable I FCB4 I I LOSS I WATER Not Applicable I I LEVEL POTENTIAL LOSS 0 RVLMS Reading = 0% with OPERABLE #8 string (NA if no OPERABLE #8 strinq) I FCB5 I I RCB6 I Any Condition For Which Judgement Indicates Loss or Potential Any Condition For Which Judgement Indicates Loss or Potential Loss of Fuel Clad Barrier Due to: Loss of RCS Barrier Due to: JUDGEMENT . Imminent Barrier Degradation Based On Current Safety . Imminent Barrier Degradation Based On Current Safety System Performance System Performance . Degraded Fission Barrier Monitoring Capability Making . Degraded Fission Barrier Monitoring Capability Making Barrier Status Indeterminate Barrier Status Indeterminate CTMT BARRIER I CNB1 I I LOSS I Not Applicable I POTENTIAL LOSS I Core Exit TC Temperature Readings >1300&deg;F 8NQ Do NOT Decrease Within 15 Minutes I CNB2 I I LOSS I [iJ Rapid Unexplained CTMT Pressure Decrease Following Initial Increase [iJ No CTMT Pressure Increase When Expectation Exists I POTENTIAL LOSS I o CTMT Pressure> 10 PSIG 6NQ Increasing AND No Containment Spray Pump o CTMT H2 Concentration 4% I C NB3 1 I LOSS I [I] Primary to Secondary> Tech Spec Limits and EITHER exists:
: 2. Uncontrolled RCS Temperature Increase> 10"    IO' F                      ~Qffallaa. . . ANDDELTMWO PolItulilCoc:fe Urn'"
* Nonisolable Steam Release from Affected S/G to environment. . Prolonged Release From Affected S/G to Environment When Used for Cooldown. (see basis for description of prolonged release) [I] Failure of BOTH Isolation Valves AND a Pathway to the Environment Exists I POTENTIAL LOSS I o Entry Into EOP-2532 , Loss of Primary Coolant, AND Leakage Exists Outside CTMT Requiring Local Isolation I CNB4 I I LOSS I [I] Offsite Dose Plume Rate 10-6 Times RM-8240/8241 Reading if Release is to CTMT I POTENTIAL LOSS I o RM-8240/8241 Reading> 1,200 R/hr o At-beast -20% Fuel Clad Damage As DetefRlined By Core Damage Estimate I CNB5 I I LOSS I [I] No CTMT Sump Level Increase When Expectation Exists I POTENTIAL LOSS I Not Applicable I CNB6 I Any Condition For Which Judgement Indicates Loss or Potential Loss of CTMT Barrier Due to: . Imminent Barrier Degradation Based On Current Safety . System Performance Degraded Fission Barrier Monitoring Capability Making Barrier Status Indeterminate 1-THREE BARRIERS 3/3 YES TWO BARRIERS 2/3 MORE THAN ONE BARRIER AFFECTED ONLY ONE BARRIER AFFECTED CLAD RCS 2 Millstone ALERT ONE UNUSUAL EVENT DELTA-ONE MP-26-EPI-FAP06-002 Revision 006 Page 3 of 3}}
~
[&sect;J        I1-1_ _ _RCS                          _ _----III I                                                                                                                                                                3.
: 3. RCS Boron Concentration < Minimum Required                                as Datetm/ned from EPI-fOAP06, "~and PAfIs."
IaHIad                                         .                                                              OR 1.
R_C;.,.S;.,.L_EA_KA_G_E LEAKAGE Pressure Boundary Leakage> 10 GPM Mode 1, 2, 3, 4 jPU2l fPu2lLI_ _ _                            LOSS LO_S_S_O_F_D_C  OF DC_ _---'I                                I I1  Mode 5,5, 6      r
[~J EU;  I IREFUEUSPENT FUEL POOL LEVELl                    ""--M-od-e-6-,-0--'
r-1-M-od-e ,-0--'
Nota:  e.,aitUlonlto,.bIIoaIa . ReII8te~SeIpoInt DELTA-ONE Events are in process or have occurred which
: 2. Unidentified Leakage> 10 GPM                                                            Loss of Voltage on DC Buses 201 A AND 201 B > 15 Minutes                                                                      1. Uncontrolled Spent Fuel Pool Water Level Decrease Causing                        ~_ ~.eo~""AlHiatIlJ1iIIIh .~                                                indicate a potential degradation of the level of safety
: 3. Identified Leakage> 25 GPM                                                                                                                                                                                                  Loss of Cooling Suction Flow                                                      NDT~                                                                      of the plant or indicate a security threat to facility
: 2. Uncontrolled Refuel Pool Water Level Decrease Requiring                                                                                                      protection. No releases of radioactive material
: 4. Primary to Secondary Leakage >25            > 25 GPM                                                                                                                                                                                                                                                                                                                                    requiring offsite response or monitoring are Containment Evacuation 81iQ81'ill All Spent Fuel Fuet Assemblies in Safe
&sect;~    ]    I1    FUEL CLAD DEGRADATION                    I I 1,--_M_Od_e_A_L_L_-,.
1        Mode ALL Storage Locations                                                                                                                                            expected untess unless funher systems occurs.
further degradation of safety
                                                                                                                                                                                                                          - ~ II                      ANNUNCIATO~I LOSS OF ANNUNCIATORS                      I Mode 1,2,3,4 1 2
1..
1                                I1Ci/gm 1-131 DEQ Activity > 60 I-lCi/gm RCS Activity>
: 2. Dose Rate at One Foot from Un pressurized RCS                                                                                                                                                                          Loss of Most (75%) MCB Annunciators Annunciators>    > 15 Minutes /lli.Q SPDS Q8 ICC Instrumentation Available Sample .2:. 2 mRlhrl mR/hr/ml    ml
                                                                                                                                                                                                                            ~        I LOSS OF COMMUNICATIONS I1 I1                        Mode ALL Millstone 1.
                                                                                                                                                                                                                              ,. Loss of ALL Onsite Electronic Communications Methods 2.
: 2. Loss of ALL Electronic Communications Methods With Government Agencies
                                                                                                                                                                                                                            ~        1 I SHUTDOWN LCO EXCEEDED                      I1 I Mode 1, 2, 3, 4 II                                                                                          MP-26-EPI-FAP06-002 Revision 006 NOTE: When two or more EALs apply, always choose the EAL  EAl of the highest inci dent classification; also always read from top to bottom in each category incident                                                                                                  categ ory.                         Unit NOT Brought To Requ Required ired Mode Within Applicable LCO Action Statement Time Limits                                                                                                                                                  Page 1 of 3
 
MILLSTONE UNIT 2 EMERGENCY ACTION LEVELS GENERAL EMERGENCY ALPHA SITE AREA EMERGENCY CHARLIE-TWO                                              D ALERT                                  CHARLIE-ONE                        o UNUSUAL EVENT DELTA-TWO                                                              D UNUSUAL EVENT DELTA-ONE FIRE/GASES                                                                                  JUDGEMENT
=**                        ~t;mrt'Sp'rf,~t'lY~; ~:eQ1H
          ~penn~w'HjS ~1(!~:$OJ)a,.
A'n. ._~*~,~.t8.o~~tbtt*~"*~
                                                                                                                  ~~;=:cr.rm:~u.=.~QN1t GS1            CONTROL ROOM EVACUATION U,m: C~ from HO~$hUt(lOWr\ P*fttt Co10 OF N1 NOt ~nshed W1tI1In is Min,,* After CQfIQ'Ql Room
                                                                                                                                                                                                                                      ~
Mode ALL Q1r~" ~,, Eiti6lritled
~          II SPENT FUEL ASSEMBLY DAMAGE II II                                          Mode ALL          ~              IIL....-_ _SECURITY                  EVENT                          I S:;.;E:;.;C;....;;U_R;...ITY--=E;...V..::.EN;...T~_--II    1I    Mode ALL                ~            II CONTROL ROOM EVACUATION II                                                      Mode ALL    ~        IIL....-_ _JUDGEMENT J:....:U;....;;D;....;;G-=E;...M;.::E;.,..N;...T_ _--JI I 1 I Mode ALL                            ALERT                - I Security Events as determined for                lor Station Safeguards Contingency 1.
1,   Spent Fu  el is Exposed from Open Vessel, Fuel                                                Vessel , Cav      ity, or SF Pool Cavity,                                                                                                                                       Cont rol Room Evacuation In Control                                              itiated Initiated                                              Any Condition For Which Judgement              J udgement Indicates That Safety                                CHARLIE-ONE Plan and reported reponed by Security Shift Supervision. Supervision , (Addresses events AN D Spent Fuel Has Decayed AND                              De cayed L 30 Days                                                                            Aotual or Potential Substantial degradation 10 that Involve Actual                                                                    to the level of                                                                                                                  Systems May Be Degraded 8NQ                            8MQ Which Requires Em        ergency Emergency Events are In prooess process or have occurred which
: 2. Fuel Handling Handl in g ACCident Causing Damage 10                                 to Spent Fuel, 2.
safely safety of 01 the plant,)
plant)
A notification from the site security force that an armed attack,                      anack, 1I GA2 1I 1....            FI;....R.;;;;;E/-=E..XP;....L:....:O.....;.S;....IO;...N~_--II I _ _ _FIRE/EXPLOSION            . ;.                                  1 1I      ModeALL~
Mode   ALL Respo n se Organizatio Response        Organization          n Staffing                                            Involve an a.otual or potential involve degradation of the level of potenlial substantial 01 safety of the plant or a Indicated by Fuel Building OR Containment Radiation Mo                                        nitors Monitors Increasing                                                                                                    explosive exptosr-e anackattack,, airliner Impact, or other HOSTILE ACTI                          ON Is ACT10N                                                                                                                                                                                                                            security event that Involves probable Ilfe            life occurring or has occurred within the OCA.                                                                    Fi re or Explosion Affecting Safe Shutdown Area 8tfQ Fire                                                                                        8tiQ Damage                                                                                                threatening risk to sile site personnel or damage to site II RA2 1I 11...._ _PLANT P_LA:....;;".N_T_RADIATION R_
AD;.,..I;.,..AT;.,..I..;;,.O;.,..N_----'1 1I  Mode ALL              3.      vaHdated notification A validated      nOlification from the NRC or than 30 minutes away.
Ihan                    away_
of an airliner attack threat less Struc tures QB Equipm to Structures            Equipment            ent In dicated                                                                                                                                          eqUipment because of Intentional malicious equipment efforts of a hostile act. Any releases are dedicated effons 1,   Radiation Reading Readings>      s > 15 m          R/h r in Control Room OR C mR/hr                                          entral Central II TA2 1   I 1 I DESTRUCTIVE PHENOMENA                                            1I 1I      Mode ALL II GA3 1     I 1 I   TOXIC/FLAMMABLE GASES                                              II II    Mode ALL                                                                                                expected expecled to be limited 10 Protective Action to small fractions of Ihe EPA Act/on GUideline Guideline exposure levels.
Alarm Stat  ion Statio n QB Secondary Alarm Station Ufe Threatening Toxic Gases QB Rammable                        Rammabl e Gas Concentrations 2 ., Radiation Reading> 5 R/              R/hr hr in Areas Requirin g Access fo                forr          1. Seismic Event > 0.09g ZPA                                                                                    as Id  entified in C - OP 200.5 , *"Oil, Identified                                          Oil, Hazardous Material. Hazardous Safe Shutdown                                                                                           2,
: 2. Onsile Sustained Windspeed Onslte                    Winds peed > 90 MPH                                                                Waste and Mixed  M ixed Waste Conti ngency Plan" Affecting Areas for 33,. Visible Damage to Structures or Equipmenl              Eq uipment AtiQ Affecting Safe                                Shutdow n Safe Shutdown Shutdown 44.. Vessel or Vehicle ColliSionCollision 8NQ    flliQ Affecting Safe Shutdown
: 5. Missiles Affecting Safe Shutdown
: 6. Flooding Affecting Safe Shutdown
~          ,-I_ _ _R                MONITORS_ _--'II
_A_D_M_O_N_IT_O_R_S RAD                                                        I1  Mode ALL          ~ 1...._ _SECURITY
                                                                                                            ~I                           S_E;....C_U_R_ITY_E_V;...E_NT EVENT      _ _--JI1 1             I     Mode ALL           ~ I~I________FIRE                              F_IR~E______~I1 I1L-_M_o_de_A_L_L~                  Mode ALL      ~                      J_U_D.....;.G_E_M~E_N_T_ _--'II I I1...._ _ _JUDGEMENT                                                    Mode ALL                   UNUSUAL EVENT 1.
1,    Security Events Eve nts as determined delermined for Station Safeguards Contingency                                  1.      Fire in Bui lding OR Areas Adjacent        Adjacenl to Areas    Areas Needed for Safe                  Any Condition For Which Judgement Indicates Potential
: 1. Uncontrolled Refuel Pool Water Level Decrease AND Rad                                                        Plan and reported by Security Shift Supervision. (Addresses                      (Addresses events                Shutdown NOT Extinguished Within 15 Minutes of Notification                            Notificalion QB  Degradation in the Level of Safety of the Plant                                                  I'            DELTA-TWO Levels Require Evacuation of CTMT or Spent Fuel Pool Area                                                    that involve Potential degradation in the level of safety of Ihe                          the plan!.)
plant.)              Verification of Control Room Alarms 2;- Fire 2:-            AtteC1ing a Loaded ISFSI-eontinement Fire-Affecting                        ISFSI-eonfinement Boundary NOT                                                                                                                                                          OR
: 2. A credible site specific s'ecurity s'ecurily threat notific*ation.        lion.
: 2. Unexpected Area Rad Monitor Reading Offscale High OR                                                                                                                                                                             Extinguished Ex1inguished Within 15 Minutes of Notification .,                                                                                                                                                                      DELTA-ONE
        > 1000 Times Normal Reading                                                                          3.
3,     A val  idated notification from the NRC providing information of an validated aircraft threat.
1I GU2 1 1I  I        TOXIC/FLAMMABLE GASES                                              I1 1I    Mode ALL Events are in process or have occurred which indicate a potential degradation of the level of safety
                                                                                                            ~ 1I                  DESTRUCTIVE PHENOMENA                                        1I I  "      Mode ALL 1.
t,      Life Threatening Toxic Gases QB Flammable Gas Concentrations                        Concenlrations as indicate a security threal of the plant or indicale                threat to facility protect ion . No releases of rad ioactive material prolection.
1.
1,    Seismic Activity Detected Per AOP*2562.        AOP-2562, Eanhquake                                                  Identified in C-OP C- OP 200.5.200.5, "Oil, Hazardous Material.              Malerial, Hazardous Waste                                                                                                requiring offsite response or monitoring are
: 2. Repon by Plant Personnel of Tornado Striking Within Protected Area Report                                                                                                              and Mixed Waste Contingency Plan " Affecting                  AffeCling Normal Operation expected unless further degradation of safety
: 3. Visible Damage to Structures or Equipment Within the Protected Area                                        2.     Notification 01 of a Near-Site Near*Site Release That May-Require Evacuation                                                                                                                                  systems occurs.
occurs, 2
: 4. Onsrte Sustained Winds peed > 75 MPH Onsile
: 5. ExplOSion Within the Protected Area                                                                                                                                                                    AREAS OF CONCERN FOR SAFE SHUTDOWN
: 6. Turbine Failure Caus ing Observable Casing Damage Control Room                                          Switchgear Rooms
: 7. Vessel or Vehicle Collision With Structures OR Equipment Required                                                                                                    Cable Vaults for Safe Shutdown or a loaded ISFSI Confinement Boundary                                                                                                                                                                    Intake Structure Millstone Turbine Building                                      Switchgear Area 8.
8,     Flood Level > 19 Feet Mean Sea Level                                                                                                                                  Penetration Areas                                      Coolant Tanks Area 9.
: 9. Flooding in Areas Containing Safe Shutdown Equipment                                                                                                                  RBCCW Rooms                                            Containment Diesel Generator Room                                  DC Equipment and Battery Rooms Charging Pump Cubicles                                                                                                                                MP-26-EPI-FAP06-002 Safety Injection Pump Rooms Switchyard                                                                                                                                            Revision 006 Page 2 of 3
 
MILLSTONE 2 EMERGENCY ACTION LEVELS BARRIER FAILURE REFERENCE TABLE IMMINENT - No TUrnaround Turnaround in Safety System Performance is Expected AND Escalation to General Emergency Conditions Will Occur Within 2 Hours r---------------------------~
I~----------------~
INDICATORS                  FUEL CLAD BARRIER                                                              RCSBARRIER                                                      CTMT BARRIER                                              THREE BARRIERS MORE THAN I FCB1 I                      I  LOSS    I                  I RCB1 I                    I  LOSS    I                                                                                                                                  ONE BARRIER SAFETY FUNCTION                              Not Applicable                                              Not Applicable                                                                                                                                  AFFECTED STATUS/                                                                                                I POTENTIAL LOSS I FUNCTIONAL                              II POTENTIAL LOSS I                            Uncontrolled RCS Cooldown AND RCS Pressure-Temperature To RECOVERY                                                                        0      the Left Of the PTS Limit 200&deg; F Subcooling Maximum Curve CUNe 0    No RCS Heat Removal Via Steam Generators 8NQ  Alli2 Once Through Cooling NOT Effective AND Shutdown Cooling                No RCS Heat Removal Via Steam Generators 8NQ Alli2 Once Through System Is NOT In SeNice Service                                0      Cooling NOT Effective AND Shutdown Cooling System Is NOT In Service SeNice I FCB2 I                      I  LOSS    I                    I RCB2 I                    I  LOSS    I                              I CNB1 I                     I LOSS    I                                         3/3 CORE EXITTC                                                                                                                                                                        Not Applicable
                  ~
Core Exit Thermocouple Readings > 1300 OF TEMPERATURES    [I]                                                            ~
[I]    RCS Subcooling < 30 &deg; F I POTENTIAL LOSS I I POTENTIAL LOSS I                                            I POTENTIAL LOSS I                              ~ Core Exit TC Temperature Readings > 1300&deg;F 8NQ    Alli2 Do 0    Core Exit Thermocouple Readings > 800 OF                                            Not Applicable                                    NOT Decrease Within 15 Minutes II RCB3 I                    I LOSS I                              I CNB2 I                    I LOSS I Not Applicable                              [iJ Rapid Unexplained CTMT Pressure Decrease                                                    YES L  Following Initial Increase PRESSURE I POTENTIAL LOSS I                              [iJ No CTMT Pressure Increase When Expectation Exists I POTENTIAL LOSS I 0      Uncontrolled RCS Pressure Decrease and Increasing Containment Radiation Monitors                                  o    CTMT Pressure > 10 PSIG 6NQ AND No Containment Spray Pump
                                                                                                                                                                                            ~ Increasing o    CTMT H2 Concentration      ~ 4%                                          TWO BARRIERS I RCB4 I                    I  LOSS    I                              I C NB3 1 1                 I  LOSS I
[iJ      Reactor Coolant Leak > CVCS Capacity AND Entry Into            [I]
                                                                                                                                                          ~ Primary to Secondary > Tech Spec Limits and EITHER exists:
EOP-2534, Steam Generator Tube Rupture or EOP 2540,
* Nonisolable Steam Release from Affected S/G to environment.
Functional Recovery, to Address Steam Generator Tube Rupture I POTENTIAL LOSS I                                   .      Prolonged Release From Affected S/G to Environment When Used for Cooldown . (see basis for description of COOLANT prolonged release)
LEAKAGE 0      Reactor Coolant Leak> CVCS Capacity AND Entry Into EOP-2525, Standard Post Trip Actions                            [I] Failure of BOTH Isolation Valves AND a Pathway to the
                                                                                                                                                          ~
Environment Exists 0      Reactor Coolant Leak Rate ~ CVCS Capacity At::ill of the following:
N[l EITHER I POTENTIAL LOSS I
                                                                                        .. Entry Into EOP 2534, Steam Generator Tube Rupture Entry Into EOP 2540, Functional Recovery, to Address Steam Generator Tube Rupture o    Entry Into EOP-2532, Loss of Primary Coolant, AND Leakage Exists Outside CTMT Requiring Local Isolation 2/3 I FCB3 I                      I  LOSS I                  I RCB5 I                    I LOSS I                                    I CNB4 I                    I LOSS I
                  ~
[I]  RM -8240/8241 Reading > 300 R/hr
[iJ      RM-8240/8241 Reading > 5 R/hr Without Fuel Clad                [I]
                                                                                                                                                          ~ Offsite Dose Plume Rate ~ 10- 6 Times RM-8240/8241
                  ~
[I]  RM-8240/8241 RM -8240/8241 Reading> 5 R/hrWithout R/hr Without RCS Release          Barrier Loss                                                        Reading if Release is to CTMT                                    ONLY ONE BARRIER AFFECTED InsideCTMT                                                                                                            --
                  ~
[I]  At Least 5% Fuel Clad Damage As Determined By Core I POTENTIAL LOSS I RADIATION
[JJ Damage Estimate I POTENTIAL LOSS I                                                                          ALERT
[I]  Dose Rate at One Foot from Unpressurized RCS Sample
                        ~ 28 mR/hr/ml                                                                        Not Applicable                              o    RM-8240/8241 Reading>
Reading > 1,200 R/hr II POTENTIAL LOSS I                                                                                          o   At-beast -20%
                                                                                                                                                                        *20% Fllel Damage Estimate Fuel Clad Damage As Determined DetefRlined By Core                                                  CHARUE-CHARUE Not Applicable ONE I FCB4 I                        I LOSS I Not Applicable CNB51I I CNB5                      I LOSS I                                  CLAD      RCS    CTMT WATER                                                                                                                                                  [I]
                                                                                                                                                          ~ No CTMT Sump Level Increase When Expectation Exists LEVEL                                    I POTENTIAL LOSS I                                                                                                                    POTENTIAL LOSS I I P9TENTIAL 0
2
                                                                                                        - -                                                                                                                1-UNUSUAL RVLMS Reading = 0% with OPERABLE #8 string (NA if no OPERABLE #8 strinq)                                                                                                                                          Not Applicable EVENT I FCB5 I                                                       I RCB6 I                                                                 IAny CNB61I CNB6 Any Condition For Which Judgement Indicates Loss or Potential    Any Condition For Which Judgement Indicates Loss or Potential              Condition For Which Judgement Indicates Loss or Potential                                                DELTA-ONE JUDGEMENT        .
Loss of Fuel Clad Barrier Due to:
to :
Loss of RCS Barrier Due to :
Loss of CTMT Barrier Due to:
Millstone Imminent Barrier Degradation Based On Current Safety            Imminent Barrier Degradation Based On Current Safety                  Imminent Barrier Degradation Based On Current Safety
                  . System Performance Degraded Fission Barrier Monitoring Capability Making Barrier Status Indeterminate
                                                                                    . System Performance Degraded Fission Barrier Monitoring Capability Making Barrier Status Indeterminate
                                                                                                                                                          . System Performance Degraded Fission Barrier Monitoring Capability Making Barrier Status Indeterminate MP EPI-FAP06-002 Revision 006 Page 3 of 3
,      -                                                 -}}

Latest revision as of 19:27, 21 March 2020

Actual Handouts to Applications (Folder 3)
ML100670507
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/15/2010
From: D'Antonio J
Operations Branch I
To:
Dominion Nuclear Connecticut
Hansell S
Shared Package
ML092400035 List:
References
50-336/10-301, TAC U01799, FOIA/PA-2011-0115 50-336/10-301
Download: ML100670507 (4)


Text

RE-G-03 Page 1 of 1 MP2-20-01 Rapid Down Power Reactivity Plans RWST -1 pump RWST -2 pump BAST - 1 %/min RE-G-04 RE-G-05 RE-G-06 SA vol-vol 880 gals SA vol-vol 880 gals SA vol-vol 204 gals 90% SA flow - 44 gpm SA flow - 88 gpm SA flow - 20 gpm CEA pos - 180 steps CEA pos - 180 steps C EA pos - 180 steps Time - 20 min. Time - 10 min. Time - 10 min.

0 Rate - 30%/hr Rate - 60%/hr Rate - 60%/hr RE-G-07 RE-G-08 RE-G-09 70% SA vol-vol 2458 gals SA vol-vol 2640 gals SA vol-vol 606 gals SA flow - 44 gpm SA flow - 88 gpm SA flow - 20 gpm I (No CEAs) CEA pos - 180 steps CEA pos - 180 steps C EA pos - 180 steps I

Time - 56 min. Time - 30 min. Time - 30 min.

I Rate - 32%/hr Rate - 60%/hr Rate - 60%/hr I

RE-G-10 RE-G-11 RE-G-12 SA vol-vol 3080 gals SA vol-vol 3315 gals SA vol-vol 720 gals 55% SA flow - 44 gpm SA flow - 88 gpm SA flow - 18 gpm CEA pos - 154 steps C EA pos - 154 steps CEA pos - 154 steps I

Time - 70 min. Time - 38 min. Tinle - 40 min.

Rate - 39%/hr 71 %/hr Rate - 71%/hr Rate - 68%/hr RE-G-13 RE-G-14 RE-G-15 SA vol-vol 4400 gals SA vol-vol 5120 gals SA vol-vol 1100 gals 15% SA flow - 44 gpm SA flow - 88 gpm SA flow - 16 gpm CEA pos - 140 steps CEA pos - 140 steps C EA pos - 140 steps 0 Time - 100 min. min. Time - 58 min. Time - 80 min.

Rate - 51 %/hr Rate - 88%/hr 64 % /hr Rate - 64%/hr

7/29/08 8/6/08 MILLSTONE UNIT 2 EMERGENCY ACTION LEVELS APPROVAL DATE EFFECTIVE DATE GENERAL EMERGENCY ALPHA SITE AREA EMERGENCY CHARLIE-TWO o ALERT CHARLIE-ONE o UNUSUAL EVENT DELTA-TWO D UNUSUAL EVENT DELTA-ONE BARRIER FAILURE fur >

_~_~-nilu-81ai)~

Mode 1, 2, 3, 4 ' O~fOt. Ji,'t5*JiIIffiiIIS ~~.., " "."' . . . '.

LOU GtVa!llP onlDC 1i.Ai8a201A.AIiIlmtB >' 15 Min" ~9!e~~,~a~'

""" , *'V*... III

~

  • ~.\JrJ.Q~,AaIe:on.ne ' SO'mJiVhr

~ ,,1j~~- '. ~

.s; NlA*~,~_fanld_Qffaft8

. ~ ~.~~_EOR~'Uiefiem'COI!~

~I I FUEL CLAD OR RCS BARRIER I I1 Mode 1, 2, 3, 4 ~ STATION BLACKOUT II 1-1_--=-ST.:.,:.A.:.,:.T.:.,:IO:..:.N;..;B;;.:LA:....:..;:,C.:..:KO;;:..U;;:..T:.-----II I 6, 0 Mode 5, 6, ~ I AUTOMATIC RX TRIP FAILURE I1 I1 Mode 1, 2 ~ I OFFSITE DOSE II Mode ALL ALERT Automatic Reactor Trip 8NQ Failure of Aulomatic ~ Manual Trip Was Suocessful Successful 1. MP2 Kaman Vent Monitor (RM-8Isa) (RM - 8168) Reading ~ 0.02 f'Cl/cc

~C l/cc CHARLIE - ONE CHARLIE-See Barrier Failure Reference Table Loss ofo f Voltage on o n Bu Buses ses 24C ~ AND 240 24D > 15 Minutes for>

for > 15 Minutes Events are in process or have occurred which

~ I INABILITY TO MAINTAIN COLD SID 1 SID 1II Mode 5, 6 2. MP2 WRGM Site Stack Effluent Activity (RM- 8169) Reading Involve involve an actuaaClua l 0(or potential substantial II PA2 I I SINGLE AC POWER SOURCE II I1 Mode 1, 2,AD 2, 3, 4 1.

1, Uncontrolled RCS Temperature Increase > 10' 10' F That Resu Results lts ~Ci/cc for 2.. 11 f'Ci/cc for> > 15 Minutes degradation of Ihe the level of safety of the plant or a security event that involves probable Hfe life I1 BA2 II1 , - I_ _ STEAM LINE BREAK S_TE_A_M_Ll_NE_B_REA_K_----'11 II Mode 1, 2, 3, 4 O nly On

~ 24D M!!UQ.B On e AC Pow ly One Power er Source Available to Supply Buses 24C 240 > 15 Minutes Such That Loss of That Power 2.

in RCS RCSTemperature Temperature > 200 ' F Inadvertent Criticality

3. MSl Monitor (RM-4299NB/C) Reading ~ 0.03 R/hr MSL for>

10( > 15 Minutes Rlhr threaten ng risk to site personnel or damage to site threatening equipment because of Intentional malicious Uniso lable Steam U ne Break O utside CTMT Unisolable Source Would Result in a Station Blackout (Unit 3 Buses 34NB CANNOT be Credite or 240) 24D)

Credited d unless already aligned to Unit 2 Bus 24C 34N B I ~ ~OSS

~ boss OF OF ANNUNCIATORSfTRANSIEN]

ANNUNC-IA-T-O-R-SIT-RA-N-S-IE-N'i Loss of Most (75%) MCB Annunciators Annunciators>

Mode 1, Mode 1, 2, 2, 3,

> 15 Minutes 8t1Q EITHER of 3, 44 4. Measured Plume Dose Rate Onsile for>

for > 15 Minutes Onsite ~ 5 mR/hr mAthr dedicated efforts of a hosWe hosUie act. Any releases are expected to be limited 10to smalilractions small fractions of the EPA Protective Action Guideline exposure levels.

PrOlective the Following:

Following : 5. Rad Assessment Assessmenl Determines Integrated tntegrated Dose Offsite 2.. 0.005 Rem TEDE OR 2.. 0.025 Rem CDE Thyroid L

Significant Transient in Progress LOSS of SPDS AMl AN.O.ICC ICC Instrumentation

~ I1-1_ _ _CTMT BARRIER _ _--'II C_T_M_T_B_A_R_RI_E_R II Mode 1, 2, 3, 4 ~ I LOSS OF OFFSITE POWER 1 I 1I Mode ALL ~ I1 LOSS OF COLD SID FUNCTION I I Mode 5, 6 1I L..-......;U;.,.N_P_LA_N_N_E_D_R_EL_E_A..;.S_E_..... Mode ALL UNUSUAL EVENT

1. Loss of Shutdown Cooling> 15 Minutes Illi.Q ~ Refuel Pool "'.

See Barrier Failure Reference Table Loss of all OFFSITE power to buses 24C AND 240 24D for Water Level < 35 Ft., 661n.

tn . EfIIuentMonltCirs In*AllrmORUnDIeMed. UnmonIIored or DELTA- TWO DELTA-TWO

> 15 Minutes Minutes.. 2.

2. Uncontrolled RCS Temperature Increase> 10" IO' F ~Qffallaa. . . ANDDELTMWO PolItulilCoc:fe Urn'"

~

[§J I1-1_ _ _RCS _ _----III I 3.

3. RCS Boron Concentration < Minimum Required as Datetm/ned from EPI-fOAP06, "~and PAfIs."

IaHIad . OR 1.

R_C;.,.S;.,.L_EA_KA_G_E LEAKAGE Pressure Boundary Leakage> 10 GPM Mode 1, 2, 3, 4 jPU2l fPu2lLI_ _ _ LOSS LO_S_S_O_F_D_C OF DC_ _---'I I I1 Mode 5,5, 6 r

[~J EU; I IREFUEUSPENT FUEL POOL LEVELl ""--M-od-e-6-,-0--'

r-1-M-od-e ,-0--'

Nota: e.,aitUlonlto,.bIIoaIa . ReII8te~SeIpoInt DELTA-ONE Events are in process or have occurred which

2. Unidentified Leakage> 10 GPM Loss of Voltage on DC Buses 201 A AND 201 B > 15 Minutes 1. Uncontrolled Spent Fuel Pool Water Level Decrease Causing ~_ ~.eo~""AlHiatIlJ1iIIIh .~ indicate a potential degradation of the level of safety
3. Identified Leakage> 25 GPM Loss of Cooling Suction Flow NDT~ of the plant or indicate a security threat to facility
2. Uncontrolled Refuel Pool Water Level Decrease Requiring protection. No releases of radioactive material
4. Primary to Secondary Leakage >25 > 25 GPM requiring offsite response or monitoring are Containment Evacuation 81iQ81'ill All Spent Fuel Fuet Assemblies in Safe

§~ ] I1 FUEL CLAD DEGRADATION I I 1,--_M_Od_e_A_L_L_-,.

1 Mode ALL Storage Locations expected untess unless funher systems occurs.

further degradation of safety

- ~ II ANNUNCIATO~I LOSS OF ANNUNCIATORS I Mode 1,2,3,4 1 2

1..

1 I1Ci/gm 1-131 DEQ Activity > 60 I-lCi/gm RCS Activity>

2. Dose Rate at One Foot from Un pressurized RCS Loss of Most (75%) MCB Annunciators Annunciators> > 15 Minutes /lli.Q SPDS Q8 ICC Instrumentation Available Sample .2:. 2 mRlhrl mR/hr/ml ml

~ I LOSS OF COMMUNICATIONS I1 I1 Mode ALL Millstone 1.

,. Loss of ALL Onsite Electronic Communications Methods 2.

2. Loss of ALL Electronic Communications Methods With Government Agencies

~ 1 I SHUTDOWN LCO EXCEEDED I1 I Mode 1, 2, 3, 4 II MP-26-EPI-FAP06-002 Revision 006 NOTE: When two or more EALs apply, always choose the EAL EAl of the highest inci dent classification; also always read from top to bottom in each category incident categ ory. Unit NOT Brought To Requ Required ired Mode Within Applicable LCO Action Statement Time Limits Page 1 of 3

MILLSTONE UNIT 2 EMERGENCY ACTION LEVELS GENERAL EMERGENCY ALPHA SITE AREA EMERGENCY CHARLIE-TWO D ALERT CHARLIE-ONE o UNUSUAL EVENT DELTA-TWO D UNUSUAL EVENT DELTA-ONE FIRE/GASES JUDGEMENT

=** ~t;mrt'Sp'rf,~t'lY~; ~:eQ1H

~penn~w'HjS ~1(!~:$OJ)a,.

A'n. ._~*~,~.t8.o~~tbtt*~"*~

~~;=:cr.rm:~u.=.~QN1t GS1 CONTROL ROOM EVACUATION U,m: C~ from HO~$hUt(lOWr\ P*fttt Co10 OF N1 NOt ~nshed W1tI1In is Min,,* After CQfIQ'Ql Room

~

Mode ALL Q1r~" ~,, Eiti6lritled

~ II SPENT FUEL ASSEMBLY DAMAGE II II Mode ALL ~ IIL....-_ _SECURITY EVENT I S:;.;E:;.;C;....;;U_R;...ITY--=E;...V..::.EN;...T~_--II 1I Mode ALL ~ II CONTROL ROOM EVACUATION II Mode ALL ~ IIL....-_ _JUDGEMENT J:....:U;....;;D;....;;G-=E;...M;.::E;.,..N;...T_ _--JI I 1 I Mode ALL ALERT - I Security Events as determined for lor Station Safeguards Contingency 1.

1, Spent Fu el is Exposed from Open Vessel, Fuel Vessel , Cav ity, or SF Pool Cavity, Cont rol Room Evacuation In Control itiated Initiated Any Condition For Which Judgement J udgement Indicates That Safety CHARLIE-ONE Plan and reported reponed by Security Shift Supervision. Supervision , (Addresses events AN D Spent Fuel Has Decayed AND De cayed L 30 Days Aotual or Potential Substantial degradation 10 that Involve Actual to the level of Systems May Be Degraded 8NQ 8MQ Which Requires Em ergency Emergency Events are In prooess process or have occurred which

2. Fuel Handling Handl in g ACCident Causing Damage 10 to Spent Fuel, 2.

safely safety of 01 the plant,)

plant)

A notification from the site security force that an armed attack, anack, 1I GA2 1I 1.... FI;....R.;;;;;E/-=E..XP;....L:....:O.....;.S;....IO;...N~_--II I _ _ _FIRE/EXPLOSION . ;. 1 1I ModeALL~

Mode ALL Respo n se Organizatio Response Organization n Staffing Involve an a.otual or potential involve degradation of the level of potenlial substantial 01 safety of the plant or a Indicated by Fuel Building OR Containment Radiation Mo nitors Monitors Increasing explosive exptosr-e anackattack,, airliner Impact, or other HOSTILE ACTI ON Is ACT10N security event that Involves probable Ilfe life occurring or has occurred within the OCA. Fi re or Explosion Affecting Safe Shutdown Area 8tfQ Fire 8tiQ Damage threatening risk to sile site personnel or damage to site II RA2 1I 11...._ _PLANT P_LA:....;;".N_T_RADIATION R_

AD;.,..I;.,..AT;.,..I..;;,.O;.,..N_----'1 1I Mode ALL 3. vaHdated notification A validated nOlification from the NRC or than 30 minutes away.

Ihan away_

of an airliner attack threat less Struc tures QB Equipm to Structures Equipment ent In dicated eqUipment because of Intentional malicious equipment efforts of a hostile act. Any releases are dedicated effons 1, Radiation Reading Readings> s > 15 m R/h r in Control Room OR C mR/hr entral Central II TA2 1 I 1 I DESTRUCTIVE PHENOMENA 1I 1I Mode ALL II GA3 1 I 1 I TOXIC/FLAMMABLE GASES II II Mode ALL expected expecled to be limited 10 Protective Action to small fractions of Ihe EPA Act/on GUideline Guideline exposure levels.

Alarm Stat ion Statio n QB Secondary Alarm Station Ufe Threatening Toxic Gases QB Rammable Rammabl e Gas Concentrations 2 ., Radiation Reading> 5 R/ R/hr hr in Areas Requirin g Access fo forr 1. Seismic Event > 0.09g ZPA as Id entified in C - OP 200.5 , *"Oil, Identified Oil, Hazardous Material. Hazardous Safe Shutdown 2,

2. Onsile Sustained Windspeed Onslte Winds peed > 90 MPH Waste and Mixed M ixed Waste Conti ngency Plan" Affecting Areas for 33,. Visible Damage to Structures or Equipmenl Eq uipment AtiQ Affecting Safe Shutdow n Safe Shutdown Shutdown 44.. Vessel or Vehicle ColliSionCollision 8NQ flliQ Affecting Safe Shutdown
5. Missiles Affecting Safe Shutdown
6. Flooding Affecting Safe Shutdown

~ ,-I_ _ _R MONITORS_ _--'II

_A_D_M_O_N_IT_O_R_S RAD I1 Mode ALL ~ 1...._ _SECURITY

~I S_E;....C_U_R_ITY_E_V;...E_NT EVENT _ _--JI1 1 I Mode ALL ~ I~I________FIRE F_IR~E______~I1 I1L-_M_o_de_A_L_L~ Mode ALL ~ J_U_D.....;.G_E_M~E_N_T_ _--'II I I1...._ _ _JUDGEMENT Mode ALL UNUSUAL EVENT 1.

1, Security Events Eve nts as determined delermined for Station Safeguards Contingency 1. Fire in Bui lding OR Areas Adjacent Adjacenl to Areas Areas Needed for Safe Any Condition For Which Judgement Indicates Potential

1. Uncontrolled Refuel Pool Water Level Decrease AND Rad Plan and reported by Security Shift Supervision. (Addresses (Addresses events Shutdown NOT Extinguished Within 15 Minutes of Notification Notificalion QB Degradation in the Level of Safety of the Plant I' DELTA-TWO Levels Require Evacuation of CTMT or Spent Fuel Pool Area that involve Potential degradation in the level of safety of Ihe the plan!.)

plant.) Verification of Control Room Alarms 2;- Fire 2:- AtteC1ing a Loaded ISFSI-eontinement Fire-Affecting ISFSI-eonfinement Boundary NOT OR

2. A credible site specific s'ecurity s'ecurily threat notific*ation. lion.
2. Unexpected Area Rad Monitor Reading Offscale High OR Extinguished Ex1inguished Within 15 Minutes of Notification ., DELTA-ONE

> 1000 Times Normal Reading 3.

3, A val idated notification from the NRC providing information of an validated aircraft threat.

1I GU2 1 1I I TOXIC/FLAMMABLE GASES I1 1I Mode ALL Events are in process or have occurred which indicate a potential degradation of the level of safety

~ 1I DESTRUCTIVE PHENOMENA 1I I " Mode ALL 1.

t, Life Threatening Toxic Gases QB Flammable Gas Concentrations Concenlrations as indicate a security threal of the plant or indicale threat to facility protect ion . No releases of rad ioactive material prolection.

1.

1, Seismic Activity Detected Per AOP*2562. AOP-2562, Eanhquake Identified in C-OP C- OP 200.5.200.5, "Oil, Hazardous Material. Malerial, Hazardous Waste requiring offsite response or monitoring are

2. Repon by Plant Personnel of Tornado Striking Within Protected Area Report and Mixed Waste Contingency Plan " Affecting AffeCling Normal Operation expected unless further degradation of safety
3. Visible Damage to Structures or Equipment Within the Protected Area 2. Notification 01 of a Near-Site Near*Site Release That May-Require Evacuation systems occurs.

occurs, 2

4. Onsrte Sustained Winds peed > 75 MPH Onsile
5. ExplOSion Within the Protected Area AREAS OF CONCERN FOR SAFE SHUTDOWN
6. Turbine Failure Caus ing Observable Casing Damage Control Room Switchgear Rooms
7. Vessel or Vehicle Collision With Structures OR Equipment Required Cable Vaults for Safe Shutdown or a loaded ISFSI Confinement Boundary Intake Structure Millstone Turbine Building Switchgear Area 8.

8, Flood Level > 19 Feet Mean Sea Level Penetration Areas Coolant Tanks Area 9.

9. Flooding in Areas Containing Safe Shutdown Equipment RBCCW Rooms Containment Diesel Generator Room DC Equipment and Battery Rooms Charging Pump Cubicles MP-26-EPI-FAP06-002 Safety Injection Pump Rooms Switchyard Revision 006 Page 2 of 3

MILLSTONE 2 EMERGENCY ACTION LEVELS BARRIER FAILURE REFERENCE TABLE IMMINENT - No TUrnaround Turnaround in Safety System Performance is Expected AND Escalation to General Emergency Conditions Will Occur Within 2 Hours r---------------------------~

I~----------------~

INDICATORS FUEL CLAD BARRIER RCSBARRIER CTMT BARRIER THREE BARRIERS MORE THAN I FCB1 I I LOSS I I RCB1 I I LOSS I ONE BARRIER SAFETY FUNCTION Not Applicable Not Applicable AFFECTED STATUS/ I POTENTIAL LOSS I FUNCTIONAL II POTENTIAL LOSS I Uncontrolled RCS Cooldown AND RCS Pressure-Temperature To RECOVERY 0 the Left Of the PTS Limit 200° F Subcooling Maximum Curve CUNe 0 No RCS Heat Removal Via Steam Generators 8NQ Alli2 Once Through Cooling NOT Effective AND Shutdown Cooling No RCS Heat Removal Via Steam Generators 8NQ Alli2 Once Through System Is NOT In SeNice Service 0 Cooling NOT Effective AND Shutdown Cooling System Is NOT In Service SeNice I FCB2 I I LOSS I I RCB2 I I LOSS I I CNB1 I I LOSS I 3/3 CORE EXITTC Not Applicable

~

Core Exit Thermocouple Readings > 1300 OF TEMPERATURES [I] ~

[I] RCS Subcooling < 30 ° F I POTENTIAL LOSS I I POTENTIAL LOSS I I POTENTIAL LOSS I ~ Core Exit TC Temperature Readings > 1300°F 8NQ Alli2 Do 0 Core Exit Thermocouple Readings > 800 OF Not Applicable NOT Decrease Within 15 Minutes II RCB3 I I LOSS I I CNB2 I I LOSS I Not Applicable [iJ Rapid Unexplained CTMT Pressure Decrease YES L Following Initial Increase PRESSURE I POTENTIAL LOSS I [iJ No CTMT Pressure Increase When Expectation Exists I POTENTIAL LOSS I 0 Uncontrolled RCS Pressure Decrease and Increasing Containment Radiation Monitors o CTMT Pressure > 10 PSIG 6NQ AND No Containment Spray Pump

~ Increasing o CTMT H2 Concentration ~ 4% TWO BARRIERS I RCB4 I I LOSS I I C NB3 1 1 I LOSS I

[iJ Reactor Coolant Leak > CVCS Capacity AND Entry Into [I]

~ Primary to Secondary > Tech Spec Limits and EITHER exists:

EOP-2534, Steam Generator Tube Rupture or EOP 2540,

  • Nonisolable Steam Release from Affected S/G to environment.

Functional Recovery, to Address Steam Generator Tube Rupture I POTENTIAL LOSS I . Prolonged Release From Affected S/G to Environment When Used for Cooldown . (see basis for description of COOLANT prolonged release)

LEAKAGE 0 Reactor Coolant Leak> CVCS Capacity AND Entry Into EOP-2525, Standard Post Trip Actions [I] Failure of BOTH Isolation Valves AND a Pathway to the

~

Environment Exists 0 Reactor Coolant Leak Rate ~ CVCS Capacity At::ill of the following:

N[l EITHER I POTENTIAL LOSS I

.. Entry Into EOP 2534, Steam Generator Tube Rupture Entry Into EOP 2540, Functional Recovery, to Address Steam Generator Tube Rupture o Entry Into EOP-2532, Loss of Primary Coolant, AND Leakage Exists Outside CTMT Requiring Local Isolation 2/3 I FCB3 I I LOSS I I RCB5 I I LOSS I I CNB4 I I LOSS I

~

[I] RM -8240/8241 Reading > 300 R/hr

[iJ RM-8240/8241 Reading > 5 R/hr Without Fuel Clad [I]

~ Offsite Dose Plume Rate ~ 10- 6 Times RM-8240/8241

~

[I] RM-8240/8241 RM -8240/8241 Reading> 5 R/hrWithout R/hr Without RCS Release Barrier Loss Reading if Release is to CTMT ONLY ONE BARRIER AFFECTED InsideCTMT --

~

[I] At Least 5% Fuel Clad Damage As Determined By Core I POTENTIAL LOSS I RADIATION

[JJ Damage Estimate I POTENTIAL LOSS I ALERT

[I] Dose Rate at One Foot from Unpressurized RCS Sample

~ 28 mR/hr/ml Not Applicable o RM-8240/8241 Reading>

Reading > 1,200 R/hr II POTENTIAL LOSS I o At-beast -20%

  • 20% Fllel Damage Estimate Fuel Clad Damage As Determined DetefRlined By Core CHARUE-CHARUE Not Applicable ONE I FCB4 I I LOSS I Not Applicable CNB51I I CNB5 I LOSS I CLAD RCS CTMT WATER [I]

~ No CTMT Sump Level Increase When Expectation Exists LEVEL I POTENTIAL LOSS I POTENTIAL LOSS I I P9TENTIAL 0

2

- - 1-UNUSUAL RVLMS Reading = 0% with OPERABLE #8 string (NA if no OPERABLE #8 strinq) Not Applicable EVENT I FCB5 I I RCB6 I IAny CNB61I CNB6 Any Condition For Which Judgement Indicates Loss or Potential Any Condition For Which Judgement Indicates Loss or Potential Condition For Which Judgement Indicates Loss or Potential DELTA-ONE JUDGEMENT .

Loss of Fuel Clad Barrier Due to:

to :

Loss of RCS Barrier Due to :

Loss of CTMT Barrier Due to:

Millstone Imminent Barrier Degradation Based On Current Safety Imminent Barrier Degradation Based On Current Safety Imminent Barrier Degradation Based On Current Safety

. System Performance Degraded Fission Barrier Monitoring Capability Making Barrier Status Indeterminate