ML12248A150: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML12248A150
| number = ML12248A150
| issue date = 09/04/2012
| issue date = 09/04/2012
| title = E-mail Draft Request for Additional Information, Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Revision 3 (TAC Nos. ME8160, ME8161, and ME8162)
| title = E-mail Draft Request for Additional Information, Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Revision 3
| author name = Gibson L K
| author name = Gibson L
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name = Robert R
| addressee name = Robert R
Line 9: Line 9:
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
| license number = NPF-041, NPF-051, NPF-074
| license number = NPF-041, NPF-051, NPF-074
| contact person = Gibson L K
| contact person = Gibson L
| case reference number = TAC ME8160, TAC ME8161, TAC ME8162
| case reference number = TAC ME8160, TAC ME8161, TAC ME8162
| document type = E-Mail
| document type = E-Mail
| page count = 2
| page count = 2
| project = TAC:ME8160, TAC:ME8161, TAC:ME8162
| project = TAC:ME8160, TAC:ME8161, TAC:ME8162
| stage = Other
| stage = Draft RAI
}}
}}


=Text=
=Text=
{{#Wiki_filter:From:Gibson, LaurenTo:Robert.Roehler@aps.comSubject:Draft Request for Additional Information Re: License Amendment Request to eliminate the use of the termCORE ALTERATIONS (TAC Nos. ME8160, ME8161, and ME8162)Date:Tuesday, September 04, 2012 11:03:00 AMAttachments:draft RAI.docxRob,
{{#Wiki_filter:From:             Gibson, Lauren To:               Robert.Roehler@aps.com


By a letter dated March 8, 2012, Arizona Public Service Co. (APS, the licensee) submitteda license amendment (LAR) for Palo Verde Nuclear Generating Station (AgencywideDocuments Access and Management System (ADAMS) Accession No. ML12076A045). The proposed amendment would eliminate the use of the term CORE ALTERATION fromthe technical specifications.
==Subject:==
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the informationprovided by the licensee and determined that the additional information identified in theattachment is needed in order for the NRC staff to complete its review.
Draft Request for Additional Information Re: License Amendment Request to eliminate the use of the term CORE ALTERATIONS (TAC Nos. ME8160, ME8161, and ME8162)
Date:              Tuesday, September 04, 2012 11:03:00 AM Attachments:      draft RAI.docx
: Rob, By a letter dated March 8, 2012, Arizona Public Service Co. (APS, the licensee) submitted a license amendment (LAR) for Palo Verde Nuclear Generating Station (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12076A045).
The proposed amendment would eliminate the use of the term CORE ALTERATION from the technical specifications.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information provided by the licensee and determined that the additional information identified in the attachment is needed in order for the NRC staff to complete its review.
Please contact me if you would like to have a clarifying conference call.
Please contact me if you would like to have a clarifying conference call.
Thank you, Lauren
Thank you, Lauren Lauren K. Gibson Project Manager Columbia Generating Station Palo Verde Nuclear Generating Station Division of Operating Reactor Licensing U.S. Nuclear Regulatory Commission (301) 415-1056


Lauren K. GibsonProject ManagerColumbia Generating StationPalo Verde Nuclear Generating StationDivision of Operating Reactor LicensingU.S. Nuclear Regulatory Commission(301) 415-1056
DRAFT REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST TO ELIMINATE THE USE OF THE TERM CORE ALTERATION IN THE TECHNICAL SPECIFICATIONS ARIZONA PUBLIC SERVICE, ET AL PALO VERDE NUCLEAR GENERATING STATION DOCKET NUMBERS 50-528, 50-529, AND 50-530 By a letter dated March 8, 2012 (Agencywide Document Acess and Management System (ADAMS) Accession No. ML12076A045), Arizona Public Service Co. (APS, the licensee) submitted a license amendment (LAR) for Palo Verde Nuclear Generating Station. The proposed amendment would eliminate the use of the term CORE ALTERATION in the Technical Specifications.
 
The NRC staff has reviewed the submitted information and determined that the information below is needed for the staff to complete its evaluation.
DRAFT REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST TO ELIMINATE THE USE OF THE TERM CORE ALTERATION IN THE TECHNICAL SPECIFICATIONS ARIZONA PUBLIC SERVICE, ET AL PALO VERDE NUCLEAR GENERATING STATION DOCKET NUMBERS 50-528, 50-529, AND 50-530 By a letter dated March 8, 2012 (Agencywide Document Acess and Management System (ADAMS) Accession No. ML12076A045), Arizona Public Service Co. (APS, the licensee) submitted a license amendment (LAR) for Palo Verde Nuclear Generating Station. The proposed amendment would eliminate the use of the term CORE ALTERATION in the Technical Specifications.
: 1. The proposed REQUIRED ACTION A.1 of TS 3.9.2 states that with one SRM inoperable, the operator is required to suspend positive reactivity additions. This REQUIRED ACTION is inconsistent with guidance in TS 3.9.2 of NUREG-1432, Combustion Engineering Standard Technical Specifications. For Condition A of TS 3.9.2 of NUREG-1432 (Rev 4), the REQUIRED ACTION states that if one required SRM is inoperable, the operators are required to suspend: (A.1) positive reactivity additions, and (A.2) introduction of coolant into the RCS with boron concentration less than required to meet the minimum boron concentration of LCO 3.9.1 must be suspended immediately.
The NRC staff has reviewed the submitted information and determined that the information below is needed for the staff to complete its evaluation. 1. The proposed REQUIRED ACTION A.1 of TS 3.9.2 states that with one SRM inoperable, the operator is required to suspend positive reactivity additions. This REQUIRED ACTION is inconsistent with guidance in TS 3.9.2 of NUREG-1432, Combustion Engineering Standard Technical Specifications. For Condition A of TS 3.9.2 of NUREG-1432 (Rev 4), the REQUIRED ACTION states that if one required SRM is inoperable, the operators are required to suspend: (A.1) positive reactivity additions, and (A.2) introduction of coolant into the RCS with boron concentration less than required to meet the minimum boron concentration of LCO 3.9.1 must be suspended immediately. The proposed TS 3.9.2 does not adopt REQUIRED ACTION A.2 stated above. Suspending introduction of coolant inventory from sources that have a boron concentration less than that what would be required in the RCS for minimum refueling boron concentration could prevent the boron dilution event from occurring. Address the acceptability of the proposed TS 3.9.2 without inclusion of the REQUIRED ACTION A.2 specified in STS 3.9.2 of NUREG-1432 (Rev. 4). In particular, please explain what is captured by "suspend positive reactivity additions" for Palo Verde.  
The proposed TS 3.9.2 does not adopt REQUIRED ACTION A.2 stated above.
}}
Suspending introduction of coolant inventory from sources that have a boron concentration less than that what would be required in the RCS for minimum refueling boron concentration could prevent the boron dilution event from occurring.
Address the acceptability of the proposed TS 3.9.2 without inclusion of the REQUIRED ACTION A.2 specified in STS 3.9.2 of NUREG-1432 (Rev. 4). In particular, please explain what is captured by suspend positive reactivity additions for Palo Verde.}}

Latest revision as of 13:51, 20 March 2020

E-mail Draft Request for Additional Information, Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Revision 3
ML12248A150
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/04/2012
From: Lauren Gibson
Plant Licensing Branch IV
To: Robert R
Arizona Public Service Co
Gibson L
References
TAC ME8160, TAC ME8161, TAC ME8162
Download: ML12248A150 (2)


Text

From: Gibson, Lauren To: Robert.Roehler@aps.com

Subject:

Draft Request for Additional Information Re: License Amendment Request to eliminate the use of the term CORE ALTERATIONS (TAC Nos. ME8160, ME8161, and ME8162)

Date: Tuesday, September 04, 2012 11:03:00 AM Attachments: draft RAI.docx

Rob, By a letter dated March 8, 2012, Arizona Public Service Co. (APS, the licensee) submitted a license amendment (LAR) for Palo Verde Nuclear Generating Station (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12076A045).

The proposed amendment would eliminate the use of the term CORE ALTERATION from the technical specifications.

The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information provided by the licensee and determined that the additional information identified in the attachment is needed in order for the NRC staff to complete its review.

Please contact me if you would like to have a clarifying conference call.

Thank you, Lauren Lauren K. Gibson Project Manager Columbia Generating Station Palo Verde Nuclear Generating Station Division of Operating Reactor Licensing U.S. Nuclear Regulatory Commission (301) 415-1056

DRAFT REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST TO ELIMINATE THE USE OF THE TERM CORE ALTERATION IN THE TECHNICAL SPECIFICATIONS ARIZONA PUBLIC SERVICE, ET AL PALO VERDE NUCLEAR GENERATING STATION DOCKET NUMBERS 50-528, 50-529, AND 50-530 By a letter dated March 8, 2012 (Agencywide Document Acess and Management System (ADAMS) Accession No. ML12076A045), Arizona Public Service Co. (APS, the licensee) submitted a license amendment (LAR) for Palo Verde Nuclear Generating Station. The proposed amendment would eliminate the use of the term CORE ALTERATION in the Technical Specifications.

The NRC staff has reviewed the submitted information and determined that the information below is needed for the staff to complete its evaluation.

1. The proposed REQUIRED ACTION A.1 of TS 3.9.2 states that with one SRM inoperable, the operator is required to suspend positive reactivity additions. This REQUIRED ACTION is inconsistent with guidance in TS 3.9.2 of NUREG-1432, Combustion Engineering Standard Technical Specifications. For Condition A of TS 3.9.2 of NUREG-1432 (Rev 4), the REQUIRED ACTION states that if one required SRM is inoperable, the operators are required to suspend: (A.1) positive reactivity additions, and (A.2) introduction of coolant into the RCS with boron concentration less than required to meet the minimum boron concentration of LCO 3.9.1 must be suspended immediately.

The proposed TS 3.9.2 does not adopt REQUIRED ACTION A.2 stated above.

Suspending introduction of coolant inventory from sources that have a boron concentration less than that what would be required in the RCS for minimum refueling boron concentration could prevent the boron dilution event from occurring.

Address the acceptability of the proposed TS 3.9.2 without inclusion of the REQUIRED ACTION A.2 specified in STS 3.9.2 of NUREG-1432 (Rev. 4). In particular, please explain what is captured by suspend positive reactivity additions for Palo Verde.