Letter Sequence Draft RAI |
|---|
TAC:ME8160, Eliminate Use of Term Core Alterations in Actions and Notes (Withdrawn, Closed) TAC:ME8161, Eliminate Use of Term Core Alterations in Actions and Notes (Withdrawn, Closed) TAC:ME8162, Eliminate Use of Term Core Alterations in Actions and Notes (Withdrawn, Closed) |
|
MONTHYEARML12076A0452012-03-0808 March 2012 Request for Amendment to Eliminate the Use of the Term Core Alteration in the Technical Specifications Project stage: Request ML1213103802012-05-10010 May 2012 Acceptance Review Email, License Amendment Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Revision 3 Project stage: Acceptance Review ML12248A1502012-09-0404 September 2012 E-mail Draft Request for Additional Information, Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Revision 3 Project stage: Draft RAI ML12250A7202012-09-11011 September 2012 Request for Additional Information, Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Revision 3 Project stage: RAI ML12286A3302012-10-11011 October 2012 Response to Request for Additional Information Regarding License Amendment Request to Eliminate the Use of the Term Core Alteration in the Technical Specifications Project stage: Response to RAI ML12341A1292012-12-0505 December 2012 E-mail, Draft Request for Additional Information, Round 2, Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev. 3 (TAC ME8160/ME8162) Project stage: Draft RAI ML12347A0402012-12-19019 December 2012 Request for Additional Information, Round 2, Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev. 3 (TAC ME8160-ME8162) Project stage: RAI NUREG-1432, Request for Additional Information, Round 3, Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev. 3 (TAC ME8160-ME8162)2013-01-0303 January 2013 Request for Additional Information, Round 3, Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev. 3 (TAC ME8160-ME8162) Project stage: RAI ML13039A0132013-01-31031 January 2013 Response to Request for Additional Information Regarding License Amendment Request to Eliminate the Use of the Term Core Alteration in the Technical Specifications Project stage: Response to RAI ML13072A1822013-03-13013 March 2013 Email, Draft Request for Additional Information, Round 4, Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev. 3 (TAC ME8160-ME8162) Project stage: Draft RAI ML13127A2432013-05-0808 May 2013 5/29/13 Meeting Via Conference Call with Arizona Public Service Company to Discuss Palo Verde Request to Revise Technical Specifications; Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev 3 (TAC ME8160-ME81 Project stage: Meeting ML13150A0812013-06-0303 June 2013 Request for Additional Information, Round 4, Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev. 3 Project stage: RAI ML13154A4502013-06-26026 June 2013 Summary of Meeting Via Conference Call with Arizona Public Service Co. to Discuss Palo Verde Request to Revise Technical Specifications; Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev 3 (TAC ME8160-ME816 Project stage: Meeting ML13210A2382013-07-25025 July 2013 Response to Request for Additional Information Regarding License Amendment Request to Eliminate the Use of the Term Core Alteration in the Technical Specifications Project stage: Response to RAI ML14051A1032014-02-13013 February 2014 Withdrawal of Request for Amendment to Eliminate the Use of the Term Core Aleration in the Technical Specifications Project stage: Request NUREG-1432, FRN - Withdrawal of License Amendment Request to Revise Technical Specifications; Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev 32014-03-0707 March 2014 FRN - Withdrawal of License Amendment Request to Revise Technical Specifications; Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev 3 Project stage: Withdrawal ML14059A1782014-03-0707 March 2014 Withdrawal of License Amendment Request to Revise Technical Specifications; Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev 3 Project stage: Withdrawal 2013-01-03
[Table View] |
Text
From: Gibson, Lauren To: Robert.Roehler@aps.com
Subject:
Draft Request for Additional Information Re: License Amendment Request to eliminate the use of the term CORE ALTERATIONS (TAC Nos. ME8160, ME8161, and ME8162)
Date: Tuesday, September 04, 2012 11:03:00 AM Attachments: draft RAI.docx
- Rob, By a letter dated March 8, 2012, Arizona Public Service Co. (APS, the licensee) submitted a license amendment (LAR) for Palo Verde Nuclear Generating Station (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12076A045).
The proposed amendment would eliminate the use of the term CORE ALTERATION from the technical specifications.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information provided by the licensee and determined that the additional information identified in the attachment is needed in order for the NRC staff to complete its review.
Please contact me if you would like to have a clarifying conference call.
Thank you, Lauren Lauren K. Gibson Project Manager Columbia Generating Station Palo Verde Nuclear Generating Station Division of Operating Reactor Licensing U.S. Nuclear Regulatory Commission (301) 415-1056
DRAFT REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST TO ELIMINATE THE USE OF THE TERM CORE ALTERATION IN THE TECHNICAL SPECIFICATIONS ARIZONA PUBLIC SERVICE, ET AL PALO VERDE NUCLEAR GENERATING STATION DOCKET NUMBERS 50-528, 50-529, AND 50-530 By a letter dated March 8, 2012 (Agencywide Document Acess and Management System (ADAMS) Accession No. ML12076A045), Arizona Public Service Co. (APS, the licensee) submitted a license amendment (LAR) for Palo Verde Nuclear Generating Station. The proposed amendment would eliminate the use of the term CORE ALTERATION in the Technical Specifications.
The NRC staff has reviewed the submitted information and determined that the information below is needed for the staff to complete its evaluation.
- 1. The proposed REQUIRED ACTION A.1 of TS 3.9.2 states that with one SRM inoperable, the operator is required to suspend positive reactivity additions. This REQUIRED ACTION is inconsistent with guidance in TS 3.9.2 of NUREG-1432, Combustion Engineering Standard Technical Specifications. For Condition A of TS 3.9.2 of NUREG-1432 (Rev 4), the REQUIRED ACTION states that if one required SRM is inoperable, the operators are required to suspend: (A.1) positive reactivity additions, and (A.2) introduction of coolant into the RCS with boron concentration less than required to meet the minimum boron concentration of LCO 3.9.1 must be suspended immediately.
The proposed TS 3.9.2 does not adopt REQUIRED ACTION A.2 stated above.
Suspending introduction of coolant inventory from sources that have a boron concentration less than that what would be required in the RCS for minimum refueling boron concentration could prevent the boron dilution event from occurring.
Address the acceptability of the proposed TS 3.9.2 without inclusion of the REQUIRED ACTION A.2 specified in STS 3.9.2 of NUREG-1432 (Rev. 4). In particular, please explain what is captured by suspend positive reactivity additions for Palo Verde.