Letter Sequence Request |
---|
TAC:ME8160, Eliminate Use of Term Core Alterations in Actions and Notes (Withdrawn, Closed) |
|
MONTHYEARML12076A0452012-03-0808 March 2012 Request for Amendment to Eliminate the Use of the Term Core Alteration in the Technical Specifications Project stage: Request ML1213103802012-05-10010 May 2012 Acceptance Review Email, License Amendment Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Revision 3 Project stage: Acceptance Review ML12248A1502012-09-0404 September 2012 E-mail Draft Request for Additional Information, Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Revision 3 Project stage: Draft RAI ML12250A7202012-09-11011 September 2012 Request for Additional Information, Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Revision 3 Project stage: RAI ML12286A3302012-10-11011 October 2012 Response to Request for Additional Information Regarding License Amendment Request to Eliminate the Use of the Term Core Alteration in the Technical Specifications Project stage: Response to RAI ML12341A1292012-12-0505 December 2012 E-mail, Draft Request for Additional Information, Round 2, Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev. 3 (TAC ME8160/ME8162) Project stage: Draft RAI ML12347A0402012-12-19019 December 2012 Request for Additional Information, Round 2, Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev. 3 (TAC ME8160-ME8162) Project stage: RAI ML12362A2922013-01-0303 January 2013 Request for Additional Information, Round 3, Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev. 3 (TAC ME8160-ME8162) Project stage: RAI ML13039A0132013-01-31031 January 2013 Response to Request for Additional Information Regarding License Amendment Request to Eliminate the Use of the Term Core Alteration in the Technical Specifications Project stage: Response to RAI ML13072A1822013-03-13013 March 2013 Email, Draft Request for Additional Information, Round 4, Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev. 3 (TAC ME8160-ME8162) Project stage: Draft RAI ML13127A2432013-05-0808 May 2013 5/29/13 Meeting Via Conference Call with Arizona Public Service Company to Discuss Palo Verde Request to Revise Technical Specifications; Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev 3 (TAC ME8160-ME81 Project stage: Meeting ML13150A0812013-06-0303 June 2013 Request for Additional Information, Round 4, Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev. 3 Project stage: RAI ML13154A4502013-06-26026 June 2013 Summary of Meeting Via Conference Call with Arizona Public Service Co. to Discuss Palo Verde Request to Revise Technical Specifications; Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev 3 (TAC ME8160-ME816 Project stage: Meeting ML13210A2382013-07-25025 July 2013 Response to Request for Additional Information Regarding License Amendment Request to Eliminate the Use of the Term Core Alteration in the Technical Specifications Project stage: Response to RAI ML14051A1032014-02-13013 February 2014 Withdrawal of Request for Amendment to Eliminate the Use of the Term Core Aleration in the Technical Specifications Project stage: Request ML14059A1782014-03-0707 March 2014 Withdrawal of License Amendment Request to Revise Technical Specifications; Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev 3 Project stage: Withdrawal ML14059A1812014-03-0707 March 2014 FRN - Withdrawal of License Amendment Request to Revise Technical Specifications; Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev 3 Project stage: Withdrawal 2013-01-03
[Table View] |
|
---|
Category:Letter
MONTHYEARML24295A0362024-10-23023 October 2024 Regulatory Audit Plan in Support of Relief Request No. 71; Resubmittal of Relief Request-30 IR 05000528/20244022024-10-22022 October 2024 Security Baseline Inspection Report 05000528/2024402 and 05000529/2024402 and 05000530/2024402 ML24296B2142024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 02: Alternative Request Allowing Normally Closed Valves with a Safety Function to Close to Be Exercise Tested Once Per Refueling Cycle ML24296B2152024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 03: Alternative Request Allowing Removal of the Lower Acceptance Criteria Threshold from Solenoid-Operated Valves ML24296B2172024-10-18018 October 2024 Submittal of Unit 1 Core Operating Limits Report, Revision 34, Unit 2 Core Operating Limits Report, Revision 26, and Unit 3 Core Operating Limits Report, Revision 3 ML24292A2192024-10-18018 October 2024 Core Operating Limits Report Revision 34, 26 and 33 ML24292A0322024-10-17017 October 2024 Th Refueling Outage Steam Generator Tube Inspection Report ML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) 05000530/LER-2024-002, Invalid Specified System Actuation of Train B Emergency Diesel Generator2024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A 05000530/LER-2024-001, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium 05000529/LER-2024-001, Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater2024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24129A1482024-05-0707 May 2024 And Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML24032A1542024-04-0303 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) 2024-09-27
[Table view] |
Text
f 10 CFR 50.90 Qaps DWIGHT C. MIMS Senior Vice President, Nuclear Regulatory & Oversight Palo Verde Nuclear Generating Station P.O. Box 52034 102-06835-DCM/DHK February 13, 2014 Phoenix, AZ 85072 Mail Station 7605 Tel 623 393 5403 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528, 50-529, and 50-530 Withdrawal of Request for Amendment to Eliminate the Use of the Term CORE ALERATION in the Technical Specifications By letter number 102-06486, dated March 8, 2012 [Agencywide Documents Access and Management System (ADAMS) Accession No. ML12076A045], Arizona Public Service Company (APS) submitted a license amendment request (LAR) for Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2, and 3. The proposed amendment would have eliminated the use of the term CORE ALTERATION throughout the Technical Specifications (TS) consistent with Technical Specification Task Force (TSTF) Traveler 471-A, Revision 1, Eliminate use of the term CORE ALTERATION in ACTIONS and Notes.
APS provided formal responses to NRC staff requests for additional information by letters dated: October 11, 2012 (letter number 102-06604), January 31, 2013 (letter number 102-06655), and July 25, 2013 (letter number 102-06729); ADAMS Accession Nos. ML12286A330, ML13039A013 and ML13210A238, respectively. The NRC staff has indicated that generic reservations exist with regard to the advisability of this TSTF. There is an effort by the TSTF to resolve the NRC staff reservations generically, but these efforts have not yet been completed.
Based on the NRC staff reservations, as discussed with Mr. Michael T. Markley, Chief of Plant Licensing Branch IV, Division of Operating Reactor Licensing, on Monday, February 10, 2014, APS is withdrawing the LAR. Prior to submittal of any future LAR on this subject, APS will request a pre-submittal meeting with the NRC to discuss the submittal. Such a submittal will either be a site specific application or a new submittal based upon a future revision of TSTF-471 that reflects the resolution of the staff reservations.
A member of the STARS (Strategic Teaming and Resource Sharing)
Callaway
- Comanche Peak 0 Alliance Diablo Canyon 0 Palo Verde
- ATTN: Document Control Desk U.S. Nuclear Regulatory Commission
Subject:
Withdrawal of Request for Amendment to Eliminate the Use of the Term CORE ALTERATION in the Technical Specifications Page 2 Should you need further information regarding this LAR withdrawal, please contact David H. Kelsey, Licensing Section Leader, at (623) 393-5730.
Sincerely, DCM/DHK/CJS/hsc cc: M. L. Dapas NRC Region IV Regional Administrator M. T. Markley Branch Chief, Plant-Licensing Branch IV J. K. Rankin NRC NRR Project Manager (electronic & hard copy)
A. E. George NRC NRR Project Manager (electronic & hard copy)
M. A. Brown NRC Senior Resident Inspector for PVNGS A. V. Godwin Arizona Radiation Regulatory Agency (ARRA)
T. Morales Arizona Radiation Regulatory Agency (ARRA)