| | title = Comanche Peak, Units 1 and 2 - Unacceptable with Opportunity to Supplement, Email, License Amendment Request to Revise TS 3.8.1, AC Sources - Operation, for Two 14-Day Completions for Offsite Circuits (TAC Nos. ME9724 and ME9725) | | | title = Unacceptable with Opportunity to Supplement, Email, License Amendment Request to Revise TS 3.8.1, AC Sources - Operation, for Two 14-Day Completions for Offsite Circuits |
| | author name = Kalyanam N K | | | author name = Kalyanam N |
| | author affiliation = NRC/NRR/DORL/LPLIV | | | author affiliation = NRC/NRR/DORL/LPLIV |
| | addressee name = Ervin-Walker T | | | addressee name = Ervin-Walker T |
Line 9: |
Line 9: |
| | docket = 05000445, 05000446 | | | docket = 05000445, 05000446 |
| | license number = NPF-087, NPF-089 | | | license number = NPF-087, NPF-089 |
| | contact person = Singal B K | | | contact person = Singal B |
| | case reference number = TAC ME9724, TAC ME9725 | | | case reference number = TAC ME9724, TAC ME9725 |
| | document type = E-Mail | | | document type = E-Mail |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1Burkhardt, JanetFrom:Kalyanam, KalySent:Monday, November 19, 2012 2:46 PMTo:Ervin-Walker, TameraCc:Singal, Balwant | | {{#Wiki_filter:Burkhardt, Janet From: Kalyanam, Kaly Sent: Monday, November 19, 2012 2:46 PM To: Ervin-Walker, Tamera Cc: Singal, Balwant |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Acceptance Review Result : Unacceptable with an Opportunity to SupplementTamera, The NRC staff has reviewed your application and concluded that the information delineated below is necessary to enable the staff to make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. We request that Luminant review the information requested and let the NRC staff know if it can be sent within 10 days from the receipt of the formal email/letter from the NRC staff. Subsequent to that the formal email/letter will be sent. Thanks Kaly N. Kalyanam Backup PM, Comanche Peak ACCEPTANCE REVIEW RECOMMENDATION: UNACCEPTABLE WITH OPPORTUNITY TO SUPPLEMENT The staff has performed an acceptance review using the guidance of LIC-109, Revision 1, "Acceptance Review Procedures." The licensee's reliance on fire risk analysis approaches of 1994 and earlier does not reflect current fire risk analyses approaches, and consequently fire risk issues from the latest methods. Based on applications using the latest fire PRA methods, fire risk is a significant contributor to plant total CDF and can have a significant impact on the electrical distribution system. The licensee has not demonstrated that fire risk is an insignificant contributor for this application. Thus, the staff concludes that the analyses performed to support this LAR is inadequate to justify that fire risks are insignificant to the application, either in total risk or change in risk. In particular, the fire risk model applied by CPNPP can lead to incorrect quantification of those fire scenarios identified as important to the analysis, as well as omission of important fire scenarios. In order to address this shortcoming, the licensee must provide an analysis consistent with current fire risk analysis methods, meeting the necessary quality for the application and peer review expectations as identified by RG 1.200 Revision 2, and the endorsed ASME/ANS PRA Standard, RA-Sa-2009. | | Acceptance Review Result : Unacceptable with an Opportunity to Supplement |
| }} | | : Tamera, The NRC staff has reviewed your application and concluded that the information delineated below is necessary to enable the staff to make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. |
| | We request that Luminant review the information requested and let the NRC staff know if it can be sent within 10 days from the receipt of the formal email/letter from the NRC staff. Subsequent to that the formal email/letter will be sent. |
| | Thanks Kaly N. Kalyanam Backup PM, Comanche Peak ACCEPTANCE REVIEW RECOMMENDATION: UNACCEPTABLE WITH OPPORTUNITY TO SUPPLEMENT The staff has performed an acceptance review using the guidance of LIC-109, Revision 1, Acceptance Review Procedures. The licensees reliance on fire risk analysis approaches of 1994 and earlier does not reflect current fire risk analyses approaches, and consequently fire risk issues from the latest methods. Based on applications using the latest fire PRA methods, fire risk is a significant contributor to plant total CDF and can have a significant impact on the electrical distribution system. The licensee has not demonstrated that fire risk is an insignificant contributor for this application. Thus, the staff concludes that the analyses performed to support this LAR is inadequate to justify that fire risks are insignificant to the application, either in total risk or change in risk. In particular, the fire risk model applied by CPNPP can lead to incorrect quantification of those fire scenarios identified as important to the analysis, as well as omission of important fire scenarios. In order to address this shortcoming, the licensee must provide an analysis consistent with current fire risk analysis methods, meeting the necessary quality for the application and peer review expectations as identified by RG 1.200 Revision 2, and the endorsed ASME/ANS PRA Standard, RA-Sa-2009. |
| | 1}} |
Letter Sequence Other |
---|
|
|
MONTHYEARML12353A0542012-11-19019 November 2012 Unacceptable with Opportunity to Supplement, Email, License Amendment Request to Revise TS 3.8.1, AC Sources - Operation, for Two 14-Day Completions for Offsite Circuits Project stage: Other 2012-11-19
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24025A0172024-01-22022 January 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Comanche Peak License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment ML24019A0742024-01-19019 January 2024 NRR E-mail Capture - Comanche Peak - Draft Request for Additional Information - License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator ML24008A2492023-12-18018 December 2023 Texas Shpo Response for Comanche Peak Deis Review and Comment ML23311A2202023-11-20020 November 2023 NRC to Fws, NRC Request for Concurrence with Endangered Species Act Determinations for Comanche Peak License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2023 ML23255A2882023-09-12012 September 2023 NRR E-mail Capture - Comanche Peak - Acceptance of Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule ML23256A1492023-09-11011 September 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Additional Information - Set 4 ML23226A0072023-08-11011 August 2023 NRR E-mail Capture - Comanche Peak 1 and 2 Audit Plan - License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23188A0442023-07-0707 July 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Additional Information - Set 3 ML23181A0722023-06-29029 June 2023 NRR E-mail Capture - Comanche Peak - Acceptance of License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23181A0202023-06-29029 June 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Additional Information - Set 2 ML23172A0152023-06-20020 June 2023 NRR E-mail Capture - Re Comanche Peak - Acceptance of License Amendment Request Regarding General Design Criterion 5 of Appendix a to 10 CFR Part 50 and Regulatory Guide 1.81 ML23167A0222023-06-14014 June 2023 Email: Request for Additional Information (RAI) Letter for the Review of the Comanche Peak Initial License Renewal Application, Set 1 ML23145A2332023-05-25025 May 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Confirmation of Information - Set 2 ML23143A1382023-05-23023 May 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Confirmation of Information - Set 1 ML23139A0802023-05-18018 May 2023 NRR E-mail Capture - Comanche Peak Draft Supplemental Information Request - License Amendment Request Regarding General Design Criterion 5 of Appendix a to 10 CFR Part 50 and Regulatory Guide 1.81 ML23138A1522023-05-18018 May 2023 Lr Docs - (External_Sender) Comanche Peak Nuclear Power Plants ML23135A9132023-05-15015 May 2023 NRR E-mail Capture - Comanche Peak - Draft Supplemental Information Request - License Amendment Request to 10 CFR 50.69 ML23131A2932023-05-11011 May 2023 Lr Docs - License Renewal for Comanche Peak Nuclear Power Plant, Units 1 and 2 ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23110A7122023-04-20020 April 2023 NRR E-mail Capture - Comanche Peak - Verbal Authorization of Proposed Alternative RV-1 (L-2023-LLR-0019) ML23103A4682023-04-11011 April 2023 NRR E-mail Capture - Comanche Peak Request for Additional Information - License Amendment Request to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model ML23086B9852023-03-27027 March 2023 NRR E-mail Capture - Comanche Peak Draft Request for Additional Information - Request to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model ML23061A1612023-03-0202 March 2023 E-mail from David Griggs Regarding Submission to NRC Electronic Information Exchange on 03/01/2023 for Citizens for Fair Utility Regulation in Comanche Peak Proceeding ML23032A3842023-02-0101 February 2023 LRA On-Site Audit Needs List ML23214A0192023-01-30030 January 2023 (External_Sender) Request to Broaden Extended Deadline to the General Public (with Attachments) - C3 ML23214A0202023-01-29029 January 2023 (External_Sender) Requesting a Deadline Extension on NRC-2002-0183, Comanche Peak License Renewal - C2 ML23214A0182023-01-26026 January 2023 (External Sender) NRC-2022-0183-0003 (with Attachment) - C6 ML23214A0162023-01-24024 January 2023 (External Sender) EPA Scoping Comment Letter for the Comanche Peak Nuclear Power Plant License Renewal (with Attachment) - C8 ML23214A0142023-01-23023 January 2023 (External Sender) Docket NRC-2022-0183 Comanche Peak Nuclear Power Plant Renewal (with Attachment) - C1 ML23214A0172023-01-17017 January 2023 (External Sender) NRC License Extension? No! ML23214A0132023-01-17017 January 2023 (External Sender) Docket Id NRC-2022-0183, Request for Extension of License for Comanche Peak, Comment for Environmental Scoping - C9 ML23214A0122023-01-13013 January 2023 (External Sender) Correction to Comment Submitted 01-13-23 - C11 ML22362A0992022-12-28028 December 2022 NRR E-mail Capture - Comanche Peak - Acceptance of License Amendment Request to Apply Westinghouse Fsloca Evaluation Model ML22362A0972022-12-28028 December 2022 NRR E-mail Capture - Comanche Peak - Acceptance of License Amendment Request to Adopt WCAP-17661-P-A, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications, ML22325A2742022-11-21021 November 2022 NRR E-mail Capture - Comanche Peak - Request for Additional Information - Proposed Alternative P-1 Regarding IST of Safeguards Building Sump Pumps ML22318A3102022-11-10010 November 2022 NRR E-mail Capture - Comanche Peak - Draft Request for Additional Information - Proposed Alternative P-1 Regarding IST of Safeguards Building Sump Pumps ML22237A2842022-08-25025 August 2022 CPNPP 2022 EP Program Inspection RFI Hjs 08252022 ML22230B1092022-08-17017 August 2022 NRR E-mail Capture - Comanche Peak Unit 2 - Request for Additional Information - 2RE19 Inspection Summary Report for Steam Generator Tubing ML22229A0792022-08-17017 August 2022 NRR E-mail Capture - Comanche Peak - Acceptance of Requested Licensing Action - Proposed Alternative P-1 Regarding IST of Safeguards Building Sump Pumps ML22220A1942022-08-0808 August 2022 NRR E-mail Capture - Comanche Peak Unit 2 - Draft Request for Additional Information - 2RE19 Inspection Summary Report for Steam Generator Tubing ML22133A0472022-05-13013 May 2022 July 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22083A0262022-03-23023 March 2022 NRR E-mail Capture - Comanche Peak - Request for Additional Information - Request to Adopt TSTF 505 Revision 2 ML22031A2122022-01-31031 January 2022 NRR E-mail Capture - Comanche Peak - Acceptance of Requested Licensing Action - Proposed Alternative to Extend the Snubber Inservice Program Third Interval ML21300A1342021-10-27027 October 2021 NRR E-mail Capture - Comanche Peak Units 1 and 2 - License Amendment Request to Adopt TSTF-505 - Audit Plan Update and Audit Questions (L-2021-LLA-0085) ML21286A7912021-10-13013 October 2021 NRR E-mail Capture - Comanche Peak - Request for Additional Information - Request to Adopt TSTF-577 Revision 1 ML21272A2002021-09-29029 September 2021 NRR E-mail Capture - Comanche Peak Unit 2 - Upcoming Steam Generator Tube Inservice Inspection (L-2021-NFO-0013) ML21270A1632021-09-27027 September 2021 NRR E-mail Capture - Comanche Peak - Acceptance of Quality Assurance Program Change Request Regarding Internal Audit Frequency ML21253A2242021-09-0909 September 2021 Request for Information Occupational Radiation Safety Inspection (71124.01, 71124.02, and 71151) from 10/18-22/2021 ML21252A0062021-08-26026 August 2021 NRR E-mail Capture - Comanche Peak - Acceptance of License Amendment Request Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections 2024-01-22
[Table view] |
Text
Burkhardt, Janet From: Kalyanam, Kaly Sent: Monday, November 19, 2012 2:46 PM To: Ervin-Walker, Tamera Cc: Singal, Balwant
Subject:
Acceptance Review Result : Unacceptable with an Opportunity to Supplement
- Tamera, The NRC staff has reviewed your application and concluded that the information delineated below is necessary to enable the staff to make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment.
We request that Luminant review the information requested and let the NRC staff know if it can be sent within 10 days from the receipt of the formal email/letter from the NRC staff. Subsequent to that the formal email/letter will be sent.
Thanks Kaly N. Kalyanam Backup PM, Comanche Peak ACCEPTANCE REVIEW RECOMMENDATION: UNACCEPTABLE WITH OPPORTUNITY TO SUPPLEMENT The staff has performed an acceptance review using the guidance of LIC-109, Revision 1, Acceptance Review Procedures. The licensees reliance on fire risk analysis approaches of 1994 and earlier does not reflect current fire risk analyses approaches, and consequently fire risk issues from the latest methods. Based on applications using the latest fire PRA methods, fire risk is a significant contributor to plant total CDF and can have a significant impact on the electrical distribution system. The licensee has not demonstrated that fire risk is an insignificant contributor for this application. Thus, the staff concludes that the analyses performed to support this LAR is inadequate to justify that fire risks are insignificant to the application, either in total risk or change in risk. In particular, the fire risk model applied by CPNPP can lead to incorrect quantification of those fire scenarios identified as important to the analysis, as well as omission of important fire scenarios. In order to address this shortcoming, the licensee must provide an analysis consistent with current fire risk analysis methods, meeting the necessary quality for the application and peer review expectations as identified by RG 1.200 Revision 2, and the endorsed ASME/ANS PRA Standard, RA-Sa-2009.