ML12353A054: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML12353A054
| number = ML12353A054
| issue date = 11/19/2012
| issue date = 11/19/2012
| title = Unacceptable with Opportunity to Supplement, Email, License Amendment Request to Revise TS 3.8.1, AC Sources - Operation, for Two 14-Day Completions for Offsite Circuits (TAC Nos. ME9724 and ME9725)
| title = Unacceptable with Opportunity to Supplement, Email, License Amendment Request to Revise TS 3.8.1, AC Sources - Operation, for Two 14-Day Completions for Offsite Circuits
| author name = Kalyanam N
| author name = Kalyanam N
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1 Burkhardt, Janet From: Kalyanam, Kaly Sent: Monday, November 19, 2012 2:46 PM To:Ervin-Walker, Tamera Cc: Singal, Balwant
{{#Wiki_filter:Burkhardt, Janet From:                       Kalyanam, Kaly Sent:                       Monday, November 19, 2012 2:46 PM To:                         Ervin-Walker, Tamera Cc:                         Singal, Balwant


==Subject:==
==Subject:==
Acceptance Review Result : Unaccept able with an Opportunity to Supplement Tamera, The NRC staff has reviewed your application and concluded that the information delineated below is necessary to enable the staff to make an independent asse ssment regarding the a cceptability of the proposed relief request in terms of regulatory requirements and the pr otection of public health and safety and the environment.
Acceptance Review Result : Unacceptable with an Opportunity to Supplement
We request that Luminant review the information requested and let the NRC staff know if it can be sent within 10 days from the receipt of the formal email/letter from t he NRC staff. Subsequent to that the formal email/letter will be sent. Thanks Kaly N. Kalyanam Backup PM, Comanche Peak ACCEPTANCE REVIEW RECOMMENDATION: UNACCEPTABLE WITH OPPORTUNITY TO SUPPLEMENT The staff has performed an acceptance review using the guidance of LI C-109, Revision 1, "Acceptance Review Procedures.The licensee's reliance on fire risk analysis approaches of 1994 and earlier does not reflect current fire risk analyses approaches, and consequently fire risk issues from the latest methods. Based on applications using the latest fire PRA methods, fire risk is a significant contributor to plant to tal CDF and can have a significant im pact on the electrical distribution system. The licensee has not demonstrated that fire risk is an insi gnificant contributor for this application. Thus, the staff conc ludes that the analyses performed to support this LAR is inadequate to justify that fire risks are insign ificant to the application, either in total risk or change in risk. In particular, the fire risk model app lied by CPNPP can lead to incorre ct quantification of those fire scenarios identified as import ant to the analysis, as well as omission of important fire scenarios. In order to address this shortcoming, the licensee must provide an analysis cons istent with current fire risk analysis methods, meeting the necessary quality for the application and peer review expectations as identified by RG 1.200 Revision 2, and t he endorsed ASME/ANS PRA St andard, RA-Sa-2009.}}
: Tamera, The NRC staff has reviewed your application and concluded that the information delineated below is necessary to enable the staff to make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment.
We request that Luminant review the information requested and let the NRC staff know if it can be sent within 10 days from the receipt of the formal email/letter from the NRC staff. Subsequent to that the formal email/letter will be sent.
Thanks Kaly N. Kalyanam Backup PM, Comanche Peak ACCEPTANCE REVIEW RECOMMENDATION: UNACCEPTABLE WITH OPPORTUNITY TO SUPPLEMENT The staff has performed an acceptance review using the guidance of LIC-109, Revision 1, Acceptance Review Procedures. The licensees reliance on fire risk analysis approaches of 1994 and earlier does not reflect current fire risk analyses approaches, and consequently fire risk issues from the latest methods. Based on applications using the latest fire PRA methods, fire risk is a significant contributor to plant total CDF and can have a significant impact on the electrical distribution system. The licensee has not demonstrated that fire risk is an insignificant contributor for this application. Thus, the staff concludes that the analyses performed to support this LAR is inadequate to justify that fire risks are insignificant to the application, either in total risk or change in risk. In particular, the fire risk model applied by CPNPP can lead to incorrect quantification of those fire scenarios identified as important to the analysis, as well as omission of important fire scenarios. In order to address this shortcoming, the licensee must provide an analysis consistent with current fire risk analysis methods, meeting the necessary quality for the application and peer review expectations as identified by RG 1.200 Revision 2, and the endorsed ASME/ANS PRA Standard, RA-Sa-2009.
1}}

Latest revision as of 10:37, 20 March 2020

Unacceptable with Opportunity to Supplement, Email, License Amendment Request to Revise TS 3.8.1, AC Sources - Operation, for Two 14-Day Completions for Offsite Circuits
ML12353A054
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/19/2012
From: Kalyanam N
Plant Licensing Branch IV
To: Ervin-Walker T
Luminant Generation Co
Singal B
References
TAC ME9724, TAC ME9725
Download: ML12353A054 (1)


Text

Burkhardt, Janet From: Kalyanam, Kaly Sent: Monday, November 19, 2012 2:46 PM To: Ervin-Walker, Tamera Cc: Singal, Balwant

Subject:

Acceptance Review Result : Unacceptable with an Opportunity to Supplement

Tamera, The NRC staff has reviewed your application and concluded that the information delineated below is necessary to enable the staff to make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment.

We request that Luminant review the information requested and let the NRC staff know if it can be sent within 10 days from the receipt of the formal email/letter from the NRC staff. Subsequent to that the formal email/letter will be sent.

Thanks Kaly N. Kalyanam Backup PM, Comanche Peak ACCEPTANCE REVIEW RECOMMENDATION: UNACCEPTABLE WITH OPPORTUNITY TO SUPPLEMENT The staff has performed an acceptance review using the guidance of LIC-109, Revision 1, Acceptance Review Procedures. The licensees reliance on fire risk analysis approaches of 1994 and earlier does not reflect current fire risk analyses approaches, and consequently fire risk issues from the latest methods. Based on applications using the latest fire PRA methods, fire risk is a significant contributor to plant total CDF and can have a significant impact on the electrical distribution system. The licensee has not demonstrated that fire risk is an insignificant contributor for this application. Thus, the staff concludes that the analyses performed to support this LAR is inadequate to justify that fire risks are insignificant to the application, either in total risk or change in risk. In particular, the fire risk model applied by CPNPP can lead to incorrect quantification of those fire scenarios identified as important to the analysis, as well as omission of important fire scenarios. In order to address this shortcoming, the licensee must provide an analysis consistent with current fire risk analysis methods, meeting the necessary quality for the application and peer review expectations as identified by RG 1.200 Revision 2, and the endorsed ASME/ANS PRA Standard, RA-Sa-2009.