| | number = ML13051A965 | | | number = ML13051A965 |
| | issue date = 02/26/2013 | | | issue date = 02/26/2013 |
| | title = North Anna Power Station, Unit Nos. 1 and 2 - Request for Withholding Information from Public Disclosure (TAC Nos. ME8727 and ME8728) | | | title = Request for Withholding Information from Public Disclosure |
| | author name = Sreenivas V | | | author name = Sreenivas V |
| | author affiliation = NRC/NRR/DORL/LPLII-1 | | | author affiliation = NRC/NRR/DORL/LPLII-1 |
| | addressee name = Heacock D A | | | addressee name = Heacock D |
| | addressee affiliation = Virginia Electric & Power Co (VEPCO) | | | addressee affiliation = Virginia Electric & Power Co (VEPCO) |
| | docket = 05000338, 05000339 | | | docket = 05000338, 05000339 |
Line 13: |
Line 13: |
| | document type = Letter, Proprietary Information Review | | | document type = Letter, Proprietary Information Review |
| | page count = 4 | | | page count = 4 |
| | | project = TAC:ME8727, TAC:ME8728 |
| | | stage = Withholding Request Acceptance |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 26, 2013 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 |
| | |
| | ==SUBJECT:== |
| | NORTH ANNA POWER STATION, UNITS 1 AND 2 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NOS. ME8727 AND ME8728) |
| | |
| | ==Dear Mr. Heacock:== |
| | |
| | By letter dated December 10, 2012, you submitted an affidavit dated November 30, 2012, executed by J. A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: |
| | * LTR-L1S-12-622 P-Attachment, "Westinghouse Suggested Response to NRC Request for Additional Information (RAI) Regarding the Fuel Thermal Conductivity Degradation (TCD) Evaluations for North Anna Units 1 and 2" (Proprietary). |
| | * CD containing Attachment 3, "Electronic Data Tables Supporting the Westinghouse Suggested Response to Fuel Thermal Conductivity Degradation (TCD) Evaluations for North Anna Units 1 and 2" (Proprietary). |
| | The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: |
| | |
| | D. Heacock -2 (a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies. |
| | (b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability. |
| | (c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality or licensing a similar product. |
| | (d) It reveals cost or price information, production capacities, budget levels, or cornmercial strategies of Westinghouse, its customers or suppliers. |
| | (e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse. |
| | (f) It contains patentable ideas, for which patent protection may be desirable. |
| | We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. |
| | Therefore, the version marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. |
| | Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have Signed the appropriate agreements for handling proprietary information. |
| | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the U.S. Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. |
| | |
| | D. Heacock - 3 If you have any questions regarding this matter, I may be reached at 301-415-2597. |
| | Sincerely, |
| | : r. V. Sreenivas, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-338 and 50-339 cc: J.A. Gresham, Manager Regulatory Compliance Westinghouse Electric Company, LLC 1000 Westinghouse Drive, Suite 248 Cranberry Township, PA 16066 Additional Distribution via Listserv |
| | |
| | ~M~L~1~30;;.;5;.;.1A;.;.9;;.;6;";;;5===r.~:-::-:::;;=::=-'=:;=,;",",,,_=_~~'::=!~:::-:::-=_ _""'r.:=-::=::'~:=::::':-:""""_ _= - j 1/PM NRR/LPL2-1/LA NRRlLPL2-1/BC NRRlLPL2-1/PM SFigueroa RPascarelii Sreenivas 02/21113 02/26/13 02/26/13}} |
Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARML12143A1492012-05-16016 May 2012 Day Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 Project stage: Request ML12292A0432012-10-12012 October 2012 NRR E-mail Capture - RAI North Anna Units 1 and 2 - 30-Day Report Regarding Thermal Conductivity Degradation in the Westinghouse Furnished Realistic Emergency Core Cooling Evaluation Project stage: RAI ML12356A3002012-12-10010 December 2012 Response to Request for Additional Information, 30-Day Report of Emergency Core Cooling System (ECCS) Model Changes, Pursuant to Requirements of 10CFR50.46 Project stage: Response to RAI ML13051A9652013-02-26026 February 2013 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML13135A3412013-05-17017 May 2013 Closure Evaluation for Report Pursuant to 10 Cfr 50.46(A)(3) Concerning Significant Emergency Core Cooling System Evaluation Model Error Related to Nuclear Fuel Thermal Conductivity Degradation Project stage: Other 2012-05-16
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000338/20240032024-10-28028 October 2024 – Integrated Inspection Report 05000338-2024003 and 05000339-2024003 ML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML24281A1372024-10-0707 October 2024 ISFSI - Submittal of Cask Registration for Spent Fuel Storage 05000338/LER-2024-001-01, Automatic Reactor Trip Due to Prni High Negative Rate2024-09-24024 September 2024 Automatic Reactor Trip Due to Prni High Negative Rate IR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter ML24243A0872024-09-20020 September 2024 Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2 IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 ML24215A2622024-08-28028 August 2024 Transmittal Letter for Subsequent Renewed License IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) 05000339/LER-2024-001-01, Loss of Generator Field for 2J Eog During 2-PT-82.282024-08-20020 August 2024 Loss of Generator Field for 2J Eog During 2-PT-82.28 ML24234A0742024-08-15015 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements ML24221A1932024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Upper Mattaponi Tribe ML24206A0052024-08-0808 August 2024 SLR Final EIS Letter to Achp ML24221A1882024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Monacan Indian Nation ML24221A1842024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Nation, Oklahoma ML24221A1922024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Tuscarora Nation of New York ML24221A1912024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Rappahannock Tribe, Inc ML24221A1942024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-United Keetoowah Band of Cherokee Indians in Oklahoma ML24221A1852024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Tribe of Indians ML24221A1832024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Chickahominy Indian Tribe-Eastern Division ML24206A0062024-08-0808 August 2024 Notice of Availability of the Final Environmental Impact Statement for the North Anna Nuclear Power Station Unit Numbers 1 and 2 Subsequent License Renewal (Docket Numbers: 50-338 and 50-339) ML24163A3002024-08-0808 August 2024 Request for Relief Request N1-I5-NDE-007 Inservice Inspection Alternative ML24208A0142024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-Absentee-Shawnee Tribe of Indians of Oklahoma ML24221A1872024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Shawnee Tribe of Oklahoma ML24221A1862024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Band of Cherokee Indians ML24221A1902024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Pamunkey Indian Tribe ML24221A1812024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Catawba Indian Nation ML24221A1822024-08-0808 August 2024 Tribal Section 106 Letters - North Anna - Chickahominy Indian Tribe ML24221A1892024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Nansemond Indian Nation ML24241A0692024-08-0606 August 2024 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000338/20240022024-08-0202 August 2024 Integrated Inspection Report 05000338/2024002 and 05000339/2024002 ML24206A0432024-07-26026 July 2024 Feis - Letter to the Applicant 05000338/LER-2024-001, Automatic Reactor Trip Due to Prni High Negative Rate2024-07-25025 July 2024 Automatic Reactor Trip Due to Prni High Negative Rate ML24206A0902024-07-24024 July 2024 Owners Activity Report ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code 05000339/LER-2024-001, Loss of Generator Field for 2J EDG During 2-PT-82.282024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 ML24165A1462024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 IR 05000338/20240102024-05-24024 May 2024 NRC Fire Protection Team Inspection (FPTI) Report 05000338/2024010 and 05000339/2024010 IR 05000338/20240012024-05-10010 May 2024 Integrated Inspection Report 05000338/2024001 and 05000339/2024001 IR 05000338/20244032024-04-30030 April 2024 – Security Baseline Inspection Report 05000338-2024403 and 05000339-2024403 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24110A1462024-04-18018 April 2024 Independent Spent Fuel Storage Installation (Sfsi) - Annual Radiological Environmental Operating Report ML24110A1502024-04-18018 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24110A1392024-04-18018 April 2024 Annual Environmental Operating Report ML24087A0572024-04-16016 April 2024 Correction to Issuance of Amendment Nos. 296 and 279 ML24088A2692024-03-27027 March 2024 Core Operating Limits Report Cycle 31 Pattern Sos Revision 0 ML24086A4292024-03-25025 March 2024 Response to Request for Additional Information Associated with Alternative Request N1-I5-NDE-007 Request to Deter Additional Required Reactor Coolant Pump Casing Inspection 2024-09-24
[Table view] Category:Proprietary Information Review
MONTHYEARML23101A0422023-05-0303 May 2023 Request for Withholding Information from Public Disclosure for North Anna Power Station Units 1 & 2, Surry Units 1 & 2 and Millstone Units 2 & 3, Request for Withholding, Appendix F of Fleet Report DOM-NAF-2-P ML22355A1832023-03-0101 March 2023 Request for Withholding Information from Public Disclosure for North Anna Station, Units 1 & 2, Surry Station, Units 1 & 2, and Millstone Station, Units 2 & 3 - Request for Withholding Appendix F of Fleet Report DOM-NAF-2 ML22335A4142022-12-21021 December 2022 Request for Withholding Information from Public Disclosure for Dominion Fleet Response to Request for Additional Information Regarding NRC Generic Letter 2004-02 ML21148A1502021-06-0808 June 2021 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 & 2, Surry Power Station, Units 1 & 2, and Millstone Power Station, Units 2 & 3, Request for Withholding Response to NRC Request for Additional ML21097A0272021-04-14014 April 2021 Request for Withholding from Public Disclosure Regarding Subsequent License Renewal Application ML21075A2592021-03-18018 March 2021 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Request for Withholding, Appendix E of Fleet Report Dom- ML20178A3212020-07-16016 July 2020 Request for Withholding Information from Public Disclosure for North Anna Power Station, Unit 1, Proposed Inservice Inspection Interval Alternative N1 I5 NDE-002 ML19043A7452019-02-14014 February 2019 Request for Withholding Information from Public Disclosure for North Anna Power Station, Unit 2, Related to Inservice Inspection Alternative Request N2-I4-NDE-007 ML18024A2732018-01-24024 January 2018 Letter to D. G. Stoddard U.S. NRC Approval of Virginia Electric and Power Company Request for Withholding Information from Public Disclosure for North Anna Power Station ISFSI (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008 ML13053A3612013-03-0707 March 2013 Request for Withholding Information from Public Disclosure for DNC, DEK, Virginia Kewaunee Unit 1, Millstone Power Station, Units 1, 2 & 3, North Anna Units 1 & 2, Surry Units 1 & 2 Information Pertaining to Foreign Interests ML13051A9652013-02-26026 February 2013 Request for Withholding Information from Public Disclosure ML12172A0532012-06-26026 June 2012 Request for Withholding Information from Public Disclosure ML1025601852010-09-28028 September 2010 ME4600 (Dominion Fleet) Proprietary Determination Ltr 2010-09-13 ML0934504082009-12-23023 December 2009 Millstone Power Station, Units 2 & 3, North Anna Power Station, Units 1 &2, Surry Power Station Units 1 & 2 - Withholding of Information Determined to Be Proprietary ML0913207042009-06-0909 June 2009 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 & 2 Regarding Measurement Uncertainty Recapture Power Uprate - Cameron Supporting Documents (TAC ME0965 & ME0966) ML0732400982007-11-29029 November 2007 Request for Withholding Information from Public for Surry Power Station, Units 1 and 2, North Anna Power Station, Units 1 and 2, and Millstone Power Station and Kewaunee Power Station (TAC Nos. MD6144, MD6145, MD6146, MD6147, MD6148, MD6149 ML0715000152007-06-26026 June 2007 Request for Withholding Information from Public Disclosure ML0621903542006-08-0707 August 2006 Withholding Information from Public Disclosure. ML0618004712006-07-18018 July 2006 Units 2 & 3, Withholding from Public Disclosure, CD-ROM Containing Electronic Gothic Input & Output Files from Benchmark Cases in Sections 4.3, 4.4, 4.5, & 4.6 of TR DOM-NAF-3, Gothic Methodology for Analyzing. ML0316204982003-06-11011 June 2003 Framatome Anp Request for Withholding Information from Public Disclosure ML0316106732003-06-10010 June 2003 Withholding from Public Disclosure, Document Response to Request for Additional Information and Revised Pages for March 2002 Evaluation Report - Framatome Fuel Transition Program Technical Specification Change ML0302402942003-01-24024 January 2003 Withholding from Public Disclosure, Equipment Specifications 676413, Rev. 1, General Reactor Vessel Specification & 953069, Rev. 0, Addendum to Equipment Specification 676433, Rev. 1 ML0235801542002-12-24024 December 2002 Request for Withholding Information from Public Disclosure, TAC Nos. MB5435, MB5436, MB5433, MB5434 ML0213606382002-05-13013 May 2002 Request for Withholding Information from Public Disclosure by Letter Dated 02/11/2002 2023-05-03
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 26, 2013 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
NORTH ANNA POWER STATION, UNITS 1 AND 2 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NOS. ME8727 AND ME8728)
Dear Mr. Heacock:
By letter dated December 10, 2012, you submitted an affidavit dated November 30, 2012, executed by J. A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
- LTR-L1S-12-622 P-Attachment, "Westinghouse Suggested Response to NRC Request for Additional Information (RAI) Regarding the Fuel Thermal Conductivity Degradation (TCD) Evaluations for North Anna Units 1 and 2" (Proprietary).
- CD containing Attachment 3, "Electronic Data Tables Supporting the Westinghouse Suggested Response to Fuel Thermal Conductivity Degradation (TCD) Evaluations for North Anna Units 1 and 2" (Proprietary).
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
D. Heacock -2 (a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality or licensing a similar product.
(d) It reveals cost or price information, production capacities, budget levels, or cornmercial strategies of Westinghouse, its customers or suppliers.
(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.
(f) It contains patentable ideas, for which patent protection may be desirable.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have Signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the U.S. Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
D. Heacock - 3 If you have any questions regarding this matter, I may be reached at 301-415-2597.
Sincerely,
- r. V. Sreenivas, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-338 and 50-339 cc: J.A. Gresham, Manager Regulatory Compliance Westinghouse Electric Company, LLC 1000 Westinghouse Drive, Suite 248 Cranberry Township, PA 16066 Additional Distribution via Listserv
~M~L~1~30;;.;5;.;.1A;.;.9;;.;6;";;;5===r.~:-::-:::;;=::=-'=:;=,;",",,,_=_~~'::=!~:::-:::-=_ _""'r.:=-::=::'~:=::::':-:""""_ _= - j 1/PM NRR/LPL2-1/LA NRRlLPL2-1/BC NRRlLPL2-1/PM SFigueroa RPascarelii Sreenivas 02/21113 02/26/13 02/26/13