| | number = ML15336A407 | | | number = ML15336A407 |
| | issue date = 12/09/2015 | | | issue date = 12/09/2015 |
| | title = McGuire Nuclear Station, Units 1 and 2: Request for Additional Information Regarding Request for Exemption from Title 10 of the Code of Federal Regulations (10 CFR) Part 74.19 (C) (CAC Nos. MF6693 and MF6694) | | | title = Request for Additional Information Regarding Request for Exemption from Title 10 of the Code of Federal Regulations (10 CFR) Part 74.19 (C) |
| | author name = Miller G E | | | author name = Miller G |
| | author affiliation = NRC/NRR/DORL/LPLII-1 | | | author affiliation = NRC/NRR/DORL/LPLII-1 |
| | addressee name = Capps S D | | | addressee name = Capps S |
| | addressee affiliation = Duke Energy Carolinas, LLC | | | addressee affiliation = Duke Energy Carolinas, LLC |
| | docket = 05000360, 05000370 | | | docket = 05000360, 05000370 |
| | license number = NPF-009, NPF-017 | | | license number = NPF-009, NPF-017 |
| | contact person = Miller G E | | | contact person = Miller G |
| | case reference number = CAC MF6693, CAC MF6694 | | | case reference number = CAC MF6693, CAC MF6694 |
| | document type = Letter, Request for Additional Information (RAI) | | | document type = Letter, Request for Additional Information (RAI) |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Steven D. Capps Vice President McGuire Nuclear Station Duke Energy Carolinas, LLC 12700 Hagers Ferry Road Huntersville, NC 28078-8985 December 9, 2015 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 9, 2015 Mr. Steven D. Capps Vice President McGuire Nuclear Station Duke Energy Carolinas, LLC 12700 Hagers Ferry Road Huntersville, NC 28078-8985 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| MCGUIRE NUCLEAR STATION, UNITS 1 AND 2: REQUEST FOR ADDITIONAL INFORMATION REGARDING RE!JUEST FOR EXEMPTION FROM TITLE 10 OF THE CODE OF FEDERAL REGULATIONS (10 CFR) PART 74.19(C) (CAC NOS. MF6693 AND MF6694) | | MCGUIRE NUCLEAR STATION, UNITS 1 AND 2: REQUEST FOR ADDITIONAL INFORMATION REGARDING RE!JUEST FOR EXEMPTION FROM TITLE 10 OF THE CODE OF FEDERAL REGULATIONS (10 CFR) |
| | PART 74.19(C) (CAC NOS. MF6693 AND MF6694) |
|
| |
|
| ==Dear Mr. Capps:== | | ==Dear Mr. Capps:== |
| By letter dated August 17, 2015, as supplemented by letter October 6, 2015, Duke Energy Carolinas, LLC (Duke), submitted a letter requesting an exemption from 10 CFR Part 74.19(c) for the McGuire Nuclear Station, Units 1and2. The exemption would allow.an alternative to the physical inventory requirements for movable incore detectors. The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the licensee's submittal, and based on this review, determined that additional information is required to complete the . assessment of the exemption. The enclosed document describes this request for additional information (RAI). The draft questions were sent to Kay Crane to ensure that they were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. Please respond to the enclosure within 60 days of the date of this letter. If you have any questions, please call me at 301-415-2481 or by e-mail at Ed.Miller@nrc.gov. Docket Nos. 50-369 and 50-370 | | |
| | By letter dated August 17, 2015, as supplemented by letter dat~d October 6, 2015, Duke Energy Carolinas, LLC (Duke), submitted a letter requesting an exemption from 10 CFR Part 74.19(c) for the McGuire Nuclear Station, Units 1and2. The exemption would allow.an alternative to the physical inventory requirements for movable incore detectors. |
| | The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the licensee's submittal, and based on this review, determined that additional information is required to complete the |
| | . assessment of the exemption. The enclosed document describes this request for additional information (RAI). The draft questions were sent to Kay Crane to ensure that they were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. Please respond to the enclosure within 60 days of the date of this letter. |
| | If you have any questions, please call me at 301-415-2481 or by e-mail at Ed.Miller@nrc.gov. |
| | Sin;~ ,) |
| | l_:3l>,,f; ('"1 G .. Edward Miller, Proje~*Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing . |
| | Office of Nuclear Reactor Regulation Docket Nos. 50-369 and 50-370 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| As stated cc w/encl: Distribution via Listserv ,) l_:3l>,,f; ('"1 G .. Edward Miller, Plant Licensing Branch 11-1 Division of Operating Reactor Licensing . Office of Nuclear Reactor Regulation REQUEST FOR ADDITIONAL INFORMATION OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO REQUEST FOR EXEMPTION FROM TITLE 10 OF THE CODE OF FEDERAL REGULATIONS PART 74.19(C) . DUKE ENERGY CAROLINAS, LLC MCGUIRE NUCLEAR STATION, UNITS {AND 2 DOCKET NOS. 50-369.1N0: 50-376'. . ' . By letter dated August 17, 2015, as supplemented by letter dated b,ctober 6, 2015 (Agencywide Documents Access and Management System (ADAMS) Accessi.on Nos ML 152398240 and ML 15300A282, respectively)1, Duke Energy Carolinas, LLC requested the U.S. Nuclear Regulatory Commission (NRC) to authorize exemption from the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 74.19(c) forthe McGuire Nuclear Station, Units 1 and 2. The exemption would allow an alternative to the physical inventory requirements for movable incore detectors. The regulations in 10 CFR 74.19 specify recordkeeping requirements applicable to special nuclear material (SNM). In addition, the regulatory requirement in 10 CFR 74.19(c) stipulates that the licensee must conduct a physical inventory of all SNM in its possession under license at intervals not to exceed 12 months. The NRC staff has reviewed the request and has determined that the following additional information is necessary to enable the NRC staff to make an independent assessment regarding its technical review. RAI 1 Provide a completion date for modifications to the incore storage sleeves to make the incore detectors within the storage sleeves inaccessible .. RAI 2 . . Provide an implementation date for modifications to ensure the incore detectors meet the requirements of inaccessibility. RAI 3 Provide administrative procedures and controls to be established so that verification of the storage pipes shall be performed during refueling outages and that records concerning the location and unique identity of incore detectors are accurate RAl4 Confirm that the acronym "2EOC23" used in the exemption request IT!eans Unit 2, end of cycle 23 and the ac*ronym "1 EOC24" means Unit 1, end of cycle 24. . ; 1 These documents are non-public because they contain security related information. Enclosure Mr. Steven D. Capps Vice President McGujre Nuclear Station Duke Energy Carolinas, LLC 1270Q Hagers Ferry Road Huntersville, NC 28078-8985 December 9, 2015 | | As stated cc w/encl: Distribution via Listserv |
| | |
| | REQUEST FOR ADDITIONAL INFORMATION OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO REQUEST FOR EXEMPTION FROM TITLE 10 OF THE CODE OF FEDERAL REGULATIONS PART 74.19(C) |
| | . DUKE ENERGY CAROLINAS, LLC MCGUIRE NUCLEAR STATION, UNITS {AND 2 DOCKET NOS. 50-369.1N0: 50-376'. |
| | By letter dated August 17, 2015, as supplemented by letter dated b,ctober 6, 2015 (Agencywide Documents Access and Management System (ADAMS) Accessi.on Nos ML152398240 and ML15300A282, respectively) 1 , Duke Energy Carolinas, LLC (Duk~). requested the U.S. Nuclear Regulatory Commission (NRC) to authorize exemption from the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 74.19(c) forthe McGuire Nuclear Station, Units 1 and 2. The exemption would allow an alternative to the physical inventory requirements for movable incore detectors. |
| | The regulations in 10 CFR 74.19 specify recordkeeping requirements applicable to special nuclear material (SNM). In addition, the regulatory requirement in 10 CFR 74.19(c) stipulates that the licensee must conduct a physical inventory of all SNM in its possession under license at intervals not to exceed 12 months. The NRC staff has reviewed the request and has determined that the following additional information is necessary to enable the NRC staff to make an independent assessment regarding its technical review. |
| | |
| | ===RAI 1=== |
| | Provide a completion date for modifications to the incore storage sleeves to make the incore detectors within the storage sleeves inaccessible .. |
|
| |
|
| ==SUBJECT:== | | ===RAI 2=== |
| MCGUIRE NUCLEAR STATION, UNITS 1 AND 2: REQUEST FOR ADDITIONAL INFORMATION REGARDING REQUEST FOR EXEMPTION FROM TITLE 10 OF THE CODE OF FEDERAL REGULATIONS (10 CFR) PART 74.19(C) (CAC NOS. MF6693 AND MF6694)
| | Provide an implementation date for modifications to ensure the incore detectors meet the requirements of inaccessibility. |
|
| |
|
| ==Dear Mr. Capps:== | | ===RAI 3=== |
| By letter dated August 17, 2015, as supplemented by letter dated October 6, 2015, Duke Energy Carolinas, LLC (Duke), submitted a letter requesting an exemption from 10 CFR Part 74.19(c) for the McGuire Nuclear Station, Units 1 and 2. The exemption would allow an alternative to the physical inventory requirements for movable incore detectors. The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the licensee's submittal, and based on this review, determined that additional information is required to complete the assessment of the exemption. The enclosed document describes this request for additional information (RAI). The draft questions were sent to Kay Crane to ensure that they were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. Please respond to the enclosure within 60 days of the date of this letter. If you have any questions, please call me at 301-415-2481 or by e-mail at Ed.Miller@nrc.gov. I Docket Nos. 50-369 and 50-370
| | Provide administrative procedures and controls to be established so that verification of the storage pipes shall be performed during refueling outages and that records concerning the location and unique identity of incore detectors are accurate RAl4 Confirm that the acronym "2EOC23" used in the exemption request IT!eans Unit 2, end of cycle 23 and the ac*ronym "1 EOC24" means Unit 1, end of cycle 24. |
| | 1 These documents are non-public because they contain security related information. |
| | Enclosure |
|
| |
|
| ==Enclosure:==
| | ML15336A407 NRR-004 OFFICE NRR/LPL 1-2/PM NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/DLR/RERB NMSS/FCSE/MC.AB NRR/LPL2-1 /BC NAME THood GE Miller SFigueroa DWrona PHabighorst' MMarkley DATE 12/01/15 12/07/15 12/03/15 12/07/15 12/08/15 12/09/15}} |
| As stated cc w/encl: Distribution via Listserv DISTRIBUTION: Sincerely, /RA/ G. Edward Miller, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation PUBLIC LPL2-1 R/F RidsNrrDorllpl2-1 Resource RidsNrrLASFigueroa Resource RidsNrrPMMcGuire Resource RidsNrrDorlDpr Resource RidsNrrDlrRerb Resource RidsNrrDssSrxb Resource RidsRgn2MailCenter Resource PHabighorst, NMSS \ ADAMS Accession No.: ML15336A407 NRR-004 OFFICE NRR/LPL 1-2/PM NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/DLR/RERB NMSS/FCSE/MC.AB NRR/LPL2-1 /BC NAME THood GE Miller SFigueroa DWrona PHabighorst' MMarkley DATE 12/01/15 12/07/15 12/03/15 12/07/15 12/08/15 12/09/15 OFFICIAL RECORD COPY
| |
| }} | |
|
---|
Category:Letter
MONTHYEARIR 05000369/20240032024-11-0404 November 2024 Integrated Inspection Report 05000369/2024003 and 05000370/2024003 ML24303A4212024-10-30030 October 2024 Mcguire Nuclear Station, Units 1 & 2, Notification of an NRC Fire Protection Team Inspection FPTI NRC 05000369/2025010, 05000370/2025010 and Request for Information RFI IR 05000369/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000369/2024402 05000370/2024402 IR 05000369/20240052024-08-26026 August 2024 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2, (Report 05000369-2024005 and 05000370-2024005) IR 05000369/20244042024-08-0101 August 2024 Cover Letter Security Baseline Inspection Report 05000369/2024404 and 05000370/2024404 IR 05000369/20253012024-07-29029 July 2024 Notification of Licensed Operator Initial Examination 05000369/2025301 and 05000370/2025301 IR 05000369/20244032024-07-25025 July 2024 – Cyber Security Inspection Report 05000369/2024403 and 05000370/2024403 Rev IR 05000369/20240022024-07-24024 July 2024 Integrated Inspection Report 05000369/2024002 and 05000370/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000369/20244012024-07-0303 July 2024 – Security Baseline Inspection Report 05000369/2024401 and 05000370/2024401 ML24176A2802024-06-26026 June 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000369-2024404 and 05000370-2024404) IR 05000369/20240112024-06-0404 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000369/2024011 and 05000370/2024011 ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) IR 05000369/20240012024-05-0808 May 2024 Integrated Inspection Report 05000369-2024001 and 05000370-2024001 and 07200038-2024001 ML24110A0382024-04-30030 April 2024 – Correction to Issuance of Amendment Nos. 330 and 309, Regarding Implementation of Technical Specifications Task Force (TSTF) Traveler TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf ML24100A8742024-04-10010 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000369/2024403; and 05000370/2024403 ML24052A3062024-04-0808 April 2024 Issuance of Amendment Nos. 331 & 310, Regarding Adoption of Title 10 of Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML24031A5402024-03-26026 March 2024 Issuance of Amendment Nos. 330 and 309 Regarding Implementation of TSTF 505,Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML24085A2402024-03-21021 March 2024 Requalification Program Inspection - McGuire Nuclear Station IR 05000369/20230062024-02-28028 February 2024 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2023006 and 05000370/2023006 ML24024A2182024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 – Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 05000369/LER-1923-001, Automatic Actuation of the 1A Motor Driven Auxiliary Feedwater Pump Due to Human Error2023-12-13013 December 2023 Automatic Actuation of the 1A Motor Driven Auxiliary Feedwater Pump Due to Human Error ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20240102023-10-13013 October 2023 Notification of McGuire Nuclear Station Comprehensive Engineering Team Inspection – U.S. Nuclear Regulatory Commission Inspection Report 05000369, 370/2024010 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20234012023-08-0404 August 2023 – Security Baseline Inspection Report 05000369/2023401 and 05000370/2023401 (OUO-SRI) Cover IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 ML23206A0092023-07-24024 July 2023 William B. McGuire Nuclear Station – Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301 IR 05000369/20234202023-07-24024 July 2023 – Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23124A0862023-05-0303 May 2023 Cycle 29, Revision 1, Core Operating Limits Report (COLR) ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 ML23094A1832023-04-18018 April 2023 Audit Plan TSTF-505, Rev. 2, RITSTF Initiative 4B & 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors (EPIDs L-2023-LLA-0021 & L-2023-LLA-0022) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility 2024-08-26
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24197A1702024-07-15015 July 2024 Request for Additional Information Two Proposed Alternatives (RA-23-0242) for the Inspection of Reactor Vessel Closure Head Penetrations ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23030B9032023-01-30030 January 2023 Formal Release of RAIs for McGuire Unit 1, Relief Request Impractical RPV Rx Coolant System Welds, Due March 1, 2023 (Email) ML23017A2232023-01-13013 January 2023 Request for Additional Information (RAI) Issuance for McGuire Unit 1 Steam Generator Tube Inspection Report (Email) ML22175A0162022-06-24024 June 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22102A2962022-04-13013 April 2022 Request for Withholding Information from Public Disclosure Response to Request for Additional Information ML22063B1782022-03-0909 March 2022 Request for Additional Information Regarding LAR for Revision to the Conditional Exemption of the End of Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) NON-PROPRIETARY ML22010A0732022-01-0606 January 2022 50.59 Inspection Information Request ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21267A2782021-09-23023 September 2021 50.59 Inspection Information Request ML21252A0532021-09-0808 September 2021 NRR E-mail Capture - Formal Release of Rais, 30 Day Response, Mcguire Relief Request, Ref: Later Edition Addenda ASME Code, Section XI, 50.55a(g)(4)(iv) ML21103A0542021-04-13013 April 2021 NRR E-mail Capture - Extension to Request for Additional Information AMS Topical Report AMS-TR-0720R1 ML21067A6742021-03-0505 March 2021 NRR E-mail Capture - Final Request for Additional Information AMS Topical Report AMS-TR-0720R1 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21020A0682021-01-20020 January 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000369/2021011 and 05000370/2021011) and Request for Information (RFI) ML20346A0212020-12-10010 December 2020 NRR E-mail Capture - Formal Release of RAIs - License Amendment to Change TS 3.8.1 Due Jan. 29, 2021 ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20216A3512020-08-0303 August 2020 Mcquire U-1 ISI RFI ML20101L3132020-04-10010 April 2020 Notification of Inspection and Request for Information ML20071D0962020-03-0505 March 2020 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station Unit 1 Delay in Update of the Code of Record for in Service Inspections ML20050D3382020-02-21021 February 2020 Letter RAI 1 MAGNASTOR-Catawba and McGuire Exemptions with Enclosure ML19354B6372020-01-0707 January 2020 Exemption Request for NAC Magnastor Cask Loaded to Incorrect Helium Backfill Density Request for Additional Information ML19011A1372019-01-10010 January 2019 NRR E-mail Capture - Duke Energy Fleet RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML19007A3422018-12-21021 December 2018 NRR E-mail Capture - Duke Energy Fleet Draft RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML18352A8052018-12-18018 December 2018 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - MRP-227 Review ML18306A9372018-11-0202 November 2018 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - Esps LAR ML18285A0812018-10-11011 October 2018 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - TORMIS LAR RA-18-0011, Response to Request for Supplemental Information Regarding Duke Energy'S Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Duke Energy'S Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools ML18138A4662018-05-18018 May 2018 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - TORMIS LAR ML18088B2822018-03-29029 March 2018 Requalification Program Inspection - McGuire Nuclear Station ML18057A2182018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to A. Zaremba Request for Additional Information for Review of Duke Energy'S Decommissioning Funding Plan Update) ML17331B1492017-11-21021 November 2017 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - Nsws One-Time LAR (CACs MG0242 and MG0243, EPID L-2017-LLA-0299) ML17317B0932017-11-13013 November 2017 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - Irlt (CACs MF9020 and MF9021; EPID L-2016-LLA-0032) ML17230A1512017-08-15015 August 2017 Notification of Inspection of Inspection and Request for Information ML17192A4842017-07-11011 July 2017 NRR E-mail Capture - Duke Energy Fleet RAIs Alternative for Reactor Pressure Vessel Flange Threads Examination (MF9513 to MF9521) ML17135A0322017-05-12012 May 2017 NRR E-mail Capture - Request for Additional Information - McGuire TSTF-197 ML17114A4992017-04-17017 April 2017 Emergency Preparedness Inspection and Request for Information ML16302A1122016-11-0404 November 2016 Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program (CAC Nos. MF2934 and MF2935) MNS-16-077, Responding to Request for Additional Information Related to License Amendment Request to Implement a Risk-informed Performance-Based Fire Protection Program2016-09-29029 September 2016 Responding to Request for Additional Information Related to License Amendment Request to Implement a Risk-informed Performance-Based Fire Protection Program ML16228A2612016-08-15015 August 2016 Email - McGuire Unit No. 1: Request for Additional Informati- Relief Request 16-MN-003 Alternative to Defect Removal Prior to Performing Temporary Repair Activities on Three-Inch-Diameter Nuclear Service Water System Piping. ML16175A0222016-07-12012 July 2016 Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program ML16194A2862016-07-12012 July 2016 E-Mail - Mcguirai Ice Condenser Door Position Alternate Verification, (ML16089A228) CAC Nos. MF7526 and MF7527 ML16014A6882016-01-20020 January 2016 Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Scheme ML15348A2602015-12-17017 December 2015 Request for Additional Information Regarding License Amendment Request to Use an Alternative Fission Gas Gap Release Fraction ML15336A4072015-12-0909 December 2015 Request for Additional Information Regarding Request for Exemption from Title 10 of the Code of Federal Regulations (10 CFR) Part 74.19 (C) ML15320A3862015-11-19019 November 2015 RAI LAR to Adopt TSTF-523 ML15314A3562015-11-10010 November 2015 E-mail from J. Whited to A. Zaremba Duke Energy Draft RAIs License Amendment Request to Adopt TSTF-523 (CAC Nos. MF6413-MF6422) ML15314A3592015-11-10010 November 2015 Duke Energy Draft RAIs Request to Adopt TSTF-523 (CAC Nos. MF6413-MF6422) 2024-07-15
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 9, 2015 Mr. Steven D. Capps Vice President McGuire Nuclear Station Duke Energy Carolinas, LLC 12700 Hagers Ferry Road Huntersville, NC 28078-8985
SUBJECT:
MCGUIRE NUCLEAR STATION, UNITS 1 AND 2: REQUEST FOR ADDITIONAL INFORMATION REGARDING RE!JUEST FOR EXEMPTION FROM TITLE 10 OF THE CODE OF FEDERAL REGULATIONS (10 CFR)
PART 74.19(C) (CAC NOS. MF6693 AND MF6694)
Dear Mr. Capps:
By letter dated August 17, 2015, as supplemented by letter dat~d October 6, 2015, Duke Energy Carolinas, LLC (Duke), submitted a letter requesting an exemption from 10 CFR Part 74.19(c) for the McGuire Nuclear Station, Units 1and2. The exemption would allow.an alternative to the physical inventory requirements for movable incore detectors.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the licensee's submittal, and based on this review, determined that additional information is required to complete the
. assessment of the exemption. The enclosed document describes this request for additional information (RAI). The draft questions were sent to Kay Crane to ensure that they were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. Please respond to the enclosure within 60 days of the date of this letter.
If you have any questions, please call me at 301-415-2481 or by e-mail at Ed.Miller@nrc.gov.
Sin;~ ,)
l_:3l>,,f; ('"1 G .. Edward Miller, Proje~*Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing .
Office of Nuclear Reactor Regulation Docket Nos. 50-369 and 50-370
Enclosure:
As stated cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO REQUEST FOR EXEMPTION FROM TITLE 10 OF THE CODE OF FEDERAL REGULATIONS PART 74.19(C)
. DUKE ENERGY CAROLINAS, LLC MCGUIRE NUCLEAR STATION, UNITS {AND 2 DOCKET NOS. 50-369.1N0: 50-376'.
By letter dated August 17, 2015, as supplemented by letter dated b,ctober 6, 2015 (Agencywide Documents Access and Management System (ADAMS) Accessi.on Nos ML152398240 and ML15300A282, respectively) 1 , Duke Energy Carolinas, LLC (Duk~). requested the U.S. Nuclear Regulatory Commission (NRC) to authorize exemption from the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 74.19(c) forthe McGuire Nuclear Station, Units 1 and 2. The exemption would allow an alternative to the physical inventory requirements for movable incore detectors.
The regulations in 10 CFR 74.19 specify recordkeeping requirements applicable to special nuclear material (SNM). In addition, the regulatory requirement in 10 CFR 74.19(c) stipulates that the licensee must conduct a physical inventory of all SNM in its possession under license at intervals not to exceed 12 months. The NRC staff has reviewed the request and has determined that the following additional information is necessary to enable the NRC staff to make an independent assessment regarding its technical review.
RAI 1
Provide a completion date for modifications to the incore storage sleeves to make the incore detectors within the storage sleeves inaccessible ..
RAI 2
Provide an implementation date for modifications to ensure the incore detectors meet the requirements of inaccessibility.
RAI 3
Provide administrative procedures and controls to be established so that verification of the storage pipes shall be performed during refueling outages and that records concerning the location and unique identity of incore detectors are accurate RAl4 Confirm that the acronym "2EOC23" used in the exemption request IT!eans Unit 2, end of cycle 23 and the ac*ronym "1 EOC24" means Unit 1, end of cycle 24.
1 These documents are non-public because they contain security related information.
Enclosure
ML15336A407 NRR-004 OFFICE NRR/LPL 1-2/PM NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/DLR/RERB NMSS/FCSE/MC.AB NRR/LPL2-1 /BC NAME THood GE Miller SFigueroa DWrona PHabighorst' MMarkley DATE 12/01/15 12/07/15 12/03/15 12/07/15 12/08/15 12/09/15