Category:LICENSEE EVENT REPORT (SEE ALSO AO RO)
MONTHYEAR05000322/LER-1989-0051990-05-16016 May 1990 LER 89-005-01:on 890321,results of Local Leak Rate Test of Core Spray Suction Valve a Determined That Leakage,When Combined W/All Type B & C Penetration Leakages,Exceeded Tech Spec Limit.Caused by Normal Valve Degradation 05000322/LER-1989-0031990-05-16016 May 1990 LER 89-003-01:on 890310,emergency Diesel Generator (EDG) 102 Manually Shutdown During 18-month Surveillance Test Due to Failure of EDG Output Breaker.Cause Not Determined. Replacement Breaker Installed in Cubicle 102-8 05000322/LER-1988-0171990-05-16016 May 1990 LER 88-017-01:on 881025,discovered That Seismic Monitoring Instrumentation Returned to Svc Prior to Verifying Sys Operability & Special Rept Not Written.Caused by Personnel Error.Surveillance Engineer Reassigned 05000322/LER-1988-0151990-05-16016 May 1990 LER 88-015-02:on 880916,seismic Monitoring Instrumentation, Including Peak Acceleration Recorders,Removed from Svc for More than 30 Days Due to Corrosion on Scratch Plates.Cover Gasket Replaced & Thermal Barrier Mount to Be Installed 05000322/LER-1988-0031990-05-16016 May 1990 LER 88-003-01:on 880322,unplanned Automatic Initiation of Reactor Bldg Standby Ventilation Sys Side a Occurred During Deenergization of Relay.Caused by Close Placement of Relay Terminals.Wiring Inside Electrical Panels Reworked 05000322/LER-1987-0351990-05-16016 May 1990 LER 87-035-02:on 871221,880106 & 0330,high Energy Line Break Logic Isolations of RWCU & Main Steam Line Drain Valves Occurred.Caused by Problems W/Temp Monitoring Units. Grounding Scheme Changed & Transformers Rewired 05000322/LER-1987-0221990-05-16016 May 1990 LER 87-022-01:on 870604,HPCI Test Valve to Condensate Storage Tank,Globe Valve & Hpci/Rcic Test Valve to Condensate Storage Tank Failed to Close Against Sys Operating Pressure.Disc of motor-operated Valve 37 Modified 05000322/LER-1987-0121990-05-16016 May 1990 LER 87-012-01:on 870504,uplanned Actuation of ESF Occurred. Caused by Technician Loosing Footing & Accidently Hitting Outside Cover of Level Switch.Permanent Ladders & Platforms Installed at Head Tank Level Switches 05000322/LER-1986-0391990-05-16016 May 1990 LER 86-039-01:on 861006,unplanned Initiation of Reactor Bldg Standby Ventilation Sys Occurred W/All Rods Inserted in Core.Caused by Faulty Design of Retaining Device.Warning Signs Attached to Valve Actuator & Valve Mod Initiated 05000322/LER-1986-0321990-05-16016 May 1990 LER 86-032-01:on 860728,RWCU Isolated on High Differential Flow Sensed by Steam Leak Detection Sys While Placing Filter Demineralizers in Operation.Cause Not Determined. Operating Procedures Revised to Monitor RWCU Sys 05000322/LER-1986-0141990-05-16016 May 1990 LER 86-014-01:on 860305,full Reactor Trip Occurred Due to Momentary False Low Vessel Level Signal,Causing Hydraulic Pressure Spike in Ref Leg A.Bourton Tube Type Pressure Transmitter Replaced W/Rosemount Model 1153 05000322/LER-1985-0591990-05-16016 May 1990 LER 85-059-01:on 851219,half Reactor Trip,Full NSSS Shutoff Sys Isolation & Reactor Bldg Standby Ventilation Sys Initiation Occurred Due to Loss of Power to Reactor Protection Sys Bus B.Assembly Breaker Reset 05000322/LER-1987-0091990-05-16016 May 1990 LER 87-009-01:on 870203,full Reactor Trip Occurred Due to Perturbation in Ref Leg.Caused by Spurious Low Level Reactor Pressure Vessel Water Level Signal.Existing Level & Pressure Transmitters Replaced W/Newer Models 1990-05-16
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20140G4481997-05-0101 May 1997 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby Diesel Generator Sys.Recommends That Springs Be Inspected on Periodic Basis,Such as During Refueling Outages ML20135D8011996-11-26026 November 1996 Part 21 Rept Re Two Safety Related Valves Supplied by Velan Valve Corp Were Not in Compliance W/Originally Supplied QA Documentation.Returned Valves to Velan in May 1996 & on 961120 Velan Advised That Valves Had Been Misplaced ML20080G4691995-01-26026 January 1995 Record of Telcon W/Nrc & Licensees 950126 to Clarify Position Re Dispositioning of Exempt Sources Listed in Section 6.3.3 of Shoreham Termination Survey Final Rept Dtd Oct 1994 ML20069F0001994-01-24024 January 1994 Vols 1-4 to Shoreham Decommissioning Project Termination Survey Final Rept ML20058K3841993-12-0909 December 1993 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby DG Sys,Regarding Potential Problem W/ Subcover Assembled Atop Power Head ML20057F2261993-09-30030 September 1993 Safety Evaluation Supporting Exemption Request from Requirements of 10CFR50.54(q) for License NPF-82 ML20056C7181993-07-14014 July 1993 SE Supporting Amend 10 to License NPF-82 ML20045B3551993-06-11011 June 1993 LER 93-001-00:on 930429,refueling Jib Crane Moved in Vicinity of Spent Fuel Pool Using vendor-supplied Lifting Eye in Violation of NUREG-0612.Caused by Failure to Identify Crane as Heavy Load.Meetings held.W/930611 Ltr ML20045C8881993-06-0808 June 1993 Vols 1 & 2 to Refueling Jib Crane 1T31-CRN-008A Incident Root Cause Analysis. W/One Oversize Encl ML20044C1181993-02-28028 February 1993 Shoreham Nuclear Power Station Updated Decommissioning Plan. ML20128P6451993-02-28028 February 1993 Snps Decommissioning Project Termination Survey Final Rept for Steam Turbine Sys (N31) ML20128P7431993-02-19019 February 1993 Rev 3 to 93X027, Nuclear QA Surveillance Rept ML20127H2301993-01-15015 January 1993 Part 21 Rept Re Potential Defeat in Component of Dsrv & Dsr Enterprise Standby DG Sys.Starting Air Distributor Housing Assemblies Installed as Replacement Parts at Listed Sites ML20126B0421992-12-17017 December 1992 Final Part 21 Rept Re Potential Problem W/Steel Cylinder Heads.Initially Reported on 921125.Caused by Inadequate Cast Wall Thickness at 3/4-inch-10 Bolt Hole.Stud at Location Indicated on Encl Sketch Should Be Removed ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20128B9641992-10-31031 October 1992 Rev 0 to Shoreham Decommissioning Project Termination Survey Plan ML20118B4391992-09-11011 September 1992 Part 21 Rept Re Degradation in Abb Type 27N Undervoltage Relays Used in Electrical Switchgear.Recommends That Users Review Applications Requiring Exposures Greater than 1E03 Rads TID W/Time Delay Function Option ML20099H5781992-07-31031 July 1992 Rev 4 to Shoreham Defueled Sar ML20114A6311992-07-28028 July 1992 Shoreham Decommissioning Plan ML20101K5791992-06-25025 June 1992 Long Island Power Authority Shoreham Decommissioning Project,Shoreham Nuclear Power Station,Technical Rept on Water Processing & Water Mgt Activities for Reactor Pressure Vessel & Wet Cutting Station ML20094L1271992-03-13013 March 1992 Amend 1 to Part 21 Rept 159 Re Potential Defect in Power Cylinder Liner.Initially Reported on 920115.Caused by Liner/ Block Fit & Localized Matl Microstructure.All Drawings & Specs Revised to Address Matl Design Requirements ML20082M5081991-08-26026 August 1991 Rev 3 to Shoreham Defueled Sar PM-91-125, Monthly Operating Rept for Jul 1991 for Shoreham Nuclear Power Station1991-07-31031 July 1991 Monthly Operating Rept for Jul 1991 for Shoreham Nuclear Power Station PM-91-112, Monthly Operating Rept for Jun 1991 for Shoreham Nuclear Power Station1991-06-30030 June 1991 Monthly Operating Rept for Jun 1991 for Shoreham Nuclear Power Station PM-91-075, Monthly Operating Rept for Apr 1991 for Shoreham Nuclear Power Station1991-04-30030 April 1991 Monthly Operating Rept for Apr 1991 for Shoreham Nuclear Power Station ML20024G7171991-04-22022 April 1991 LER 91-001-00:on 910324,RB Normal Ventilation Sys (Rbnvs) Outboard Exhaust Valve Closed for No Apparent Reason.Cause Inconclusive.Sys Restored to Normal Lineup & Rbnvs Outboard Valve Will Be Stroked on Routine basis.W/910422 Ltr SNRC-1806, Revised Pages 2 & 6 to Encl a of 10CFR50.59 Annual Rept for 19901991-04-15015 April 1991 Revised Pages 2 & 6 to Encl a of 10CFR50.59 Annual Rept for 1990 PM-91-058, Monthly Operating Rept for Mar 1991 for Shoreham Nuclear Power Station1991-03-31031 March 1991 Monthly Operating Rept for Mar 1991 for Shoreham Nuclear Power Station PM-91-037, Monthly Operating Rept for Feb 1991 for Shoreham Nuclear Power Station1991-02-28028 February 1991 Monthly Operating Rept for Feb 1991 for Shoreham Nuclear Power Station PM-91-016, Monthly Operating Rept for Jan 1991 for Shoreham Nuclear Power Station1991-01-31031 January 1991 Monthly Operating Rept for Jan 1991 for Shoreham Nuclear Power Station SNRC-1797, 10CFR 50.59 Annual Rept of Facility Changes,Procedure Changes,Tests & Experiments for Jan-Dec 19901990-12-31031 December 1990 10CFR 50.59 Annual Rept of Facility Changes,Procedure Changes,Tests & Experiments for Jan-Dec 1990 SNRC-1794, Shoreham Nuclear Power Station Annual Operating Rept,19901990-12-31031 December 1990 Shoreham Nuclear Power Station Annual Operating Rept,1990 SNRC-1799, Lilco 1990 Annual Rept1990-12-31031 December 1990 Lilco 1990 Annual Rept ML20069Q3901990-12-31031 December 1990 Shoreham Nuclear Power Station Decommissioning Plan. (Filed in Category P) ML20028H0231990-09-28028 September 1990 LER 90-007-00:on 900907,unplanned Actuation of ESF Sys Occurred During I&C Surveillance Test.Caused by Inadequate procedure.SP44.650.16 Revised to Require That Leads Lifted & Individually separated.W/900928 Ltr ML20056A2001990-07-31031 July 1990 Safety Evaluation Supporting Amend 6 to License NPF-82 PM-90-097, Monthly Operating Rept for June 1990 for Shoreham Nuclear Power Station1990-06-30030 June 1990 Monthly Operating Rept for June 1990 for Shoreham Nuclear Power Station ML20055E3911990-06-25025 June 1990 Safety Evaluation Supporting Amend 5 to License NPF-82 PM-90-083, Monthly Operating Rept for May 1990 for Shoreham Nuclear Power Station1990-05-31031 May 1990 Monthly Operating Rept for May 1990 for Shoreham Nuclear Power Station 05000322/LER-1987-0351990-05-16016 May 1990 LER 87-035-02:on 871221,880106 & 0330,high Energy Line Break Logic Isolations of RWCU & Main Steam Line Drain Valves Occurred.Caused by Problems W/Temp Monitoring Units. Grounding Scheme Changed & Transformers Rewired 05000322/LER-1986-0321990-05-16016 May 1990 LER 86-032-01:on 860728,RWCU Isolated on High Differential Flow Sensed by Steam Leak Detection Sys While Placing Filter Demineralizers in Operation.Cause Not Determined. Operating Procedures Revised to Monitor RWCU Sys 05000322/LER-1987-0091990-05-16016 May 1990 LER 87-009-01:on 870203,full Reactor Trip Occurred Due to Perturbation in Ref Leg.Caused by Spurious Low Level Reactor Pressure Vessel Water Level Signal.Existing Level & Pressure Transmitters Replaced W/Newer Models 05000322/LER-1989-0031990-05-16016 May 1990 LER 89-003-01:on 890310,emergency Diesel Generator (EDG) 102 Manually Shutdown During 18-month Surveillance Test Due to Failure of EDG Output Breaker.Cause Not Determined. Replacement Breaker Installed in Cubicle 102-8 05000322/LER-1985-0591990-05-16016 May 1990 LER 85-059-01:on 851219,half Reactor Trip,Full NSSS Shutoff Sys Isolation & Reactor Bldg Standby Ventilation Sys Initiation Occurred Due to Loss of Power to Reactor Protection Sys Bus B.Assembly Breaker Reset 05000322/LER-1988-0151990-05-16016 May 1990 LER 88-015-02:on 880916,seismic Monitoring Instrumentation, Including Peak Acceleration Recorders,Removed from Svc for More than 30 Days Due to Corrosion on Scratch Plates.Cover Gasket Replaced & Thermal Barrier Mount to Be Installed 05000322/LER-1988-0031990-05-16016 May 1990 LER 88-003-01:on 880322,unplanned Automatic Initiation of Reactor Bldg Standby Ventilation Sys Side a Occurred During Deenergization of Relay.Caused by Close Placement of Relay Terminals.Wiring Inside Electrical Panels Reworked 05000322/LER-1986-0141990-05-16016 May 1990 LER 86-014-01:on 860305,full Reactor Trip Occurred Due to Momentary False Low Vessel Level Signal,Causing Hydraulic Pressure Spike in Ref Leg A.Bourton Tube Type Pressure Transmitter Replaced W/Rosemount Model 1153 05000322/LER-1987-0121990-05-16016 May 1990 LER 87-012-01:on 870504,uplanned Actuation of ESF Occurred. Caused by Technician Loosing Footing & Accidently Hitting Outside Cover of Level Switch.Permanent Ladders & Platforms Installed at Head Tank Level Switches 05000322/LER-1988-0171990-05-16016 May 1990 LER 88-017-01:on 881025,discovered That Seismic Monitoring Instrumentation Returned to Svc Prior to Verifying Sys Operability & Special Rept Not Written.Caused by Personnel Error.Surveillance Engineer Reassigned 1997-05-01
[Table view] |
LER-2088-015, |
Event date: |
|
---|
Report date: |
|
---|
3222088015R00 - NRC Website |
|
text
% ,. C,,, 0.. .
- v. toCa Aunvmo., Co .,0N
,,,, c,,, , o,, ,, , , , 0, (KPIKl& 470'C2 S$tiMATED liU8tDIN t'8 3184t$PONst to COMPL Y M'TH TMit Cc'J"7,',','L'..,'n'$'.*v*,a',
f,'!,'vaVi , , t A"C%"oi I
LlCENSEE EVENT REPORT (LERI
' ' "' #,iM,'~"S'nH',."Di L'.E.,M'"
'Mv"te'e".!C !
DMAa*iu' "
A4ffar,.';fa?Rn*Af!" I
. ACan, NA.,ii m -00c tv Now in m *=oi + l Shoreham Nuclear Power Station Unit 1 015 ] o l0 l 0 h l ;l9.1 loFln I t I tita le j Seismic Monitorino Instiventation I!DP For More than 30 thvs I tv8WT DAf t 451 List NUM8th 161 REPORT DATE Of OfMtm f AciLttit$ .NVOLVt0 001 MONtM pay vtam vtam 64g'% ','k y,Q y0NtM pay v g ap, f acegit v n,awan Docast Nuwdtm:$i o16101010 1 1 I
- ~
) l9 1l 6 88 8l8 0l1 l 5 0l2 nl e, 3lc o jo 0 1 61 0 ioio 1 I ,
TMit htPont is svewitilD PumsuANT 70 TML mhoulAEMENTS 08 to Cf A 6 fChece eae e' me>e e' #8'e tenew as' H18 0*t h ATIIs0 08006 m 4 30 40216l 70 406tel to 736eil2Het 73 71(H eo.in 0 asisin Ho 60 mi.im a v3NH H.i vanisi 10 njo b 20 406 te Ht H66} 60 361sHti 60 73teH24vid Otut h (3setdr da d6mset 30 estieH1Hdu to 73isittlu) to 78teHIHvieillAl J64A1
, . . sin HM, n,..enen. 13.e ne n..n.,
70 405 tell1Hel 30 736:l(211:4l to 73tett2 Hat LICINSit CONT ACT 90m TMis 4t h Atti NiMt TE LtPMONE NUMDin anta COD 4 George D. Schnaars, Operational Comoliance Engineer 51116 C 12l01 l 8131310 '
COMPLt?I ONI LINI 90a ( ACM COMe0NINT 8 A4 Uni Ot&CEIDED IN TMis atPom? Ital CAVSt Sv$f tv Cou'ONENT "'*d y $C To 0"N,'n'[g" CAust sy sit u covPONENT "(,'g$C "','n$,T,'y '
I l ! I I I I i i f i l i l 1 I I I I I I I I I I I I I SUPPLIMINT AL REPORT G RPICitD Het MON 1H Day vtam su. .. 0%
vtI tot vee reesse,e iKPLCTlO Sucuiss10% DATRI ko l l l Amt ut <t ,~. ., w e,e, . . . e,,e. , a,,eea e. , e e,e ,,,,,, ,,e, e.e., n . ,
During the performance of SP 44.655.03, Seismic Monitoring Instrumentation Calibration and Functional Test, the following Peak Acceleration Recorders were removed from service for calibration on 9/16/88: 294-ZR006A (Drywell - el. 67') and Z94-ZR006B (Main Steam Line, Reactor Bldg. - el. 131'). During calibration of Z94-ZR006A, new parts were required but were unavailable. New parts were obtained but the calibration could not be completed within the 30 day period. The ZR006B recorder was found to be inoperable. The scratch plates located in the recorder were found to have a white coarse powdery finish instead of a smooth metallic finish. This corrosion of the scratch plates was caused by moisture intrusion through a gasket that became deteriorated due to high temperatures.
This instrurHent is located on a main steam line to satisfy the requirement as committed to in Reg. Guide 1.12, Section C. This instrument is not safety related nor is it required to be Environmentally Qualified. This supplemental report is being submitted to identify the cause of the inoperability of the ZR006B recorder and the status of corrective actions taken. l 9005240086 900516 FDR ADOCK 05000322 S PDC NaC Feem 3t4 (64191
g, , u. uca.....ut .... - N
,,,,,,,,,,,,,,,,,,,, -3
UCENSEE EVENT REPORT (LER) 5,54",t'gaug,g%a53?,'g$1,'o,lfTAv w fgt ',Q[
TEXT CCNTINUATlON 1*JT,fo*415,iggggl'"f,'j3R Ly g,ag l MTA,'S"Joat*f$'SioN E!E*<8l0E'$?ici !
. Of MANAGtME NT AND DVDGET, n A$HiNG10N. DC 70bO3. f P ACI4 liv hAWL tti DOCftli 88V.Itth (2) Lt h NUMSt R ist PA06 (31 nsn "ht2:s **@
Shoreham Nuclear power Station Unit 1
. 0 151010101312 12 819 _p lils -
012 0 12 0' nb !
miu - . m . ,
DESCR EILQH_QE_IHE_EYESI During the performance of SP 44.655.03, Seismic Monitoring !
Instrumentation Calibration and Functional Test, the following Peak Acceleration Recorders were removed from service for calibration on t 9/16/88: 294-ZR006A (Drywell - el. 67') and Z94-ZR006B (Main Steam Line, Reactor Bldg. - el. 131'). During calibration of Z94-ZR006A, new parts were required but were unavailable. New parts were obtained but the calibration could not be completed within the 30 day period. The ZR006B recorder was found to be inoperable. The i scratch plates located in the recorder were found to have a white j
coarse powdery finish instead of a smooth metallic finish. This 3 corrosion of the scratch plates was caused by moisture intrusion through a gasket that became deteriorated due to high temperatures.
This instrument is located on a main steam line to satisfy the
- requirement as committed to in Reg. Guide 1.12, Section C. This instrument is not safety related nor is it required to be Environmentally Qualified. This supplemental report is being submitted to identify the cause of the inoperability of the ZR006B recorder and corrective action.
CAUSE_QE_IHE EVENI The ZR006B recorder is physically mounted on a Main Steam Line.
This caused the cover gasket to be exposed to high temperatures -
during the periods that the plant operated at low power. Since the gasket is only rated for a maximum of 250 degrees F this caused the l gasket to deteriorate. When the gasket was removed it was hard and brittle and broke into pieces.
l Due to the deterioration of the cover gasket, moisture intrusion i I
occurred and caused the scratch plates to corrode. These plates, which are made of gold plated aluminum, should have had a smooth l 1
metallic finish but at the time of this event they had a coarse, gray, powdery finish and were beyond the point of being functional. !
Moisture intrusion is also indicated by the condition of the i desiccant which was pink and fused into larger pieces.
l l l CORRECTIVE ACTIONS l
- 1. The cover gasket was replaced with a similar model. Since the plant is shutdown and defueled, the gathet will not be exposed to excessive temperatures. ,
l l
1 j
i l ... . u.i
3 - _ __ _ _ _
exmas 42ac: l UCENSEE EVENT REPORT (LER) [,~,'ft'Nlo'.fiS' MQ,$'El',,'%cf7A' ,T."2"'s ?
TEXT C^NTINUATION !*a',*,1,'#,Wfa,iSt@',%1L'c'$'!J! .',".' OEf"El ,
to ',?.",W~.i i=1 TJJtT.~a*R.A'Re.?.M,~o"io~.
o.cocit y oc mn
....,,,..n, m.c . . , ~-i . . , , , . . . . . . , .... . ,
'saa "!'Mt' UTGE l Shoreham Nuclear power Station Unit 1 o l5 l0 l01o l3 l 212 818 -
0 l1 l5 -
0l2 0p of 0l3 >
,ex, u- . c % m.w on
- 2. Engineering Change Report, ECR H-1133, has been written to request the installation of a thermal barrier mount. This would protect the seismic recorder from the high temperature of the main steam line. Implementation of this ECR has been deferred indefinetely due to the New York State - LILCO Shoreham Settlement Agreement.
- 3. Station Procedure SP 44.655.03 has been replaced with five smaller surveillance procedures. This will allow the testing required by Technical Specification 4.3.7.2.1 to be performed ,
in stages and will minimize the chance of a seismic monitoring instrumuut, being inoperable for more than 30 days.
MDITIONAL_lHEQRtiAllOB
- a. Manufacturer and model number of failed component:
Manufacturer - Engdahl Enterprises Model No. - PAR 400 l
- b. LER numbers of previous similar events:
86-016,87-002, 88-004,88-013, 88-037 ,
NRC F.mi W.1640s
~
|
---|
|
|
| | Reporting criterion |
---|
05000322/LER-1988-003 | LER 88-003-01:on 880322,unplanned Automatic Initiation of Reactor Bldg Standby Ventilation Sys Side a Occurred During Deenergization of Relay.Caused by Close Placement of Relay Terminals.Wiring Inside Electrical Panels Reworked | | 05000322/LER-1988-015 | LER 88-015-02:on 880916,seismic Monitoring Instrumentation, Including Peak Acceleration Recorders,Removed from Svc for More than 30 Days Due to Corrosion on Scratch Plates.Cover Gasket Replaced & Thermal Barrier Mount to Be Installed | | 05000322/LER-1988-017 | LER 88-017-01:on 881025,discovered That Seismic Monitoring Instrumentation Returned to Svc Prior to Verifying Sys Operability & Special Rept Not Written.Caused by Personnel Error.Surveillance Engineer Reassigned | |
|