Category:LICENSEE EVENT REPORT (SEE ALSO AO RO)
MONTHYEAR05000322/LER-1989-0051990-05-16016 May 1990 LER 89-005-01:on 890321,results of Local Leak Rate Test of Core Spray Suction Valve a Determined That Leakage,When Combined W/All Type B & C Penetration Leakages,Exceeded Tech Spec Limit.Caused by Normal Valve Degradation 05000322/LER-1989-0031990-05-16016 May 1990 LER 89-003-01:on 890310,emergency Diesel Generator (EDG) 102 Manually Shutdown During 18-month Surveillance Test Due to Failure of EDG Output Breaker.Cause Not Determined. Replacement Breaker Installed in Cubicle 102-8 05000322/LER-1988-0171990-05-16016 May 1990 LER 88-017-01:on 881025,discovered That Seismic Monitoring Instrumentation Returned to Svc Prior to Verifying Sys Operability & Special Rept Not Written.Caused by Personnel Error.Surveillance Engineer Reassigned 05000322/LER-1988-0151990-05-16016 May 1990 LER 88-015-02:on 880916,seismic Monitoring Instrumentation, Including Peak Acceleration Recorders,Removed from Svc for More than 30 Days Due to Corrosion on Scratch Plates.Cover Gasket Replaced & Thermal Barrier Mount to Be Installed 05000322/LER-1988-0031990-05-16016 May 1990 LER 88-003-01:on 880322,unplanned Automatic Initiation of Reactor Bldg Standby Ventilation Sys Side a Occurred During Deenergization of Relay.Caused by Close Placement of Relay Terminals.Wiring Inside Electrical Panels Reworked 05000322/LER-1987-0351990-05-16016 May 1990 LER 87-035-02:on 871221,880106 & 0330,high Energy Line Break Logic Isolations of RWCU & Main Steam Line Drain Valves Occurred.Caused by Problems W/Temp Monitoring Units. Grounding Scheme Changed & Transformers Rewired 05000322/LER-1987-0221990-05-16016 May 1990 LER 87-022-01:on 870604,HPCI Test Valve to Condensate Storage Tank,Globe Valve & Hpci/Rcic Test Valve to Condensate Storage Tank Failed to Close Against Sys Operating Pressure.Disc of motor-operated Valve 37 Modified 05000322/LER-1987-0121990-05-16016 May 1990 LER 87-012-01:on 870504,uplanned Actuation of ESF Occurred. Caused by Technician Loosing Footing & Accidently Hitting Outside Cover of Level Switch.Permanent Ladders & Platforms Installed at Head Tank Level Switches 05000322/LER-1986-0391990-05-16016 May 1990 LER 86-039-01:on 861006,unplanned Initiation of Reactor Bldg Standby Ventilation Sys Occurred W/All Rods Inserted in Core.Caused by Faulty Design of Retaining Device.Warning Signs Attached to Valve Actuator & Valve Mod Initiated 05000322/LER-1986-0321990-05-16016 May 1990 LER 86-032-01:on 860728,RWCU Isolated on High Differential Flow Sensed by Steam Leak Detection Sys While Placing Filter Demineralizers in Operation.Cause Not Determined. Operating Procedures Revised to Monitor RWCU Sys 05000322/LER-1986-0141990-05-16016 May 1990 LER 86-014-01:on 860305,full Reactor Trip Occurred Due to Momentary False Low Vessel Level Signal,Causing Hydraulic Pressure Spike in Ref Leg A.Bourton Tube Type Pressure Transmitter Replaced W/Rosemount Model 1153 05000322/LER-1985-0591990-05-16016 May 1990 LER 85-059-01:on 851219,half Reactor Trip,Full NSSS Shutoff Sys Isolation & Reactor Bldg Standby Ventilation Sys Initiation Occurred Due to Loss of Power to Reactor Protection Sys Bus B.Assembly Breaker Reset 05000322/LER-1987-0091990-05-16016 May 1990 LER 87-009-01:on 870203,full Reactor Trip Occurred Due to Perturbation in Ref Leg.Caused by Spurious Low Level Reactor Pressure Vessel Water Level Signal.Existing Level & Pressure Transmitters Replaced W/Newer Models 1990-05-16
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20140G4481997-05-0101 May 1997 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby Diesel Generator Sys.Recommends That Springs Be Inspected on Periodic Basis,Such as During Refueling Outages ML20135D8011996-11-26026 November 1996 Part 21 Rept Re Two Safety Related Valves Supplied by Velan Valve Corp Were Not in Compliance W/Originally Supplied QA Documentation.Returned Valves to Velan in May 1996 & on 961120 Velan Advised That Valves Had Been Misplaced ML20080G4691995-01-26026 January 1995 Record of Telcon W/Nrc & Licensees 950126 to Clarify Position Re Dispositioning of Exempt Sources Listed in Section 6.3.3 of Shoreham Termination Survey Final Rept Dtd Oct 1994 ML20069F0001994-01-24024 January 1994 Vols 1-4 to Shoreham Decommissioning Project Termination Survey Final Rept ML20058K3841993-12-0909 December 1993 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby DG Sys,Regarding Potential Problem W/ Subcover Assembled Atop Power Head ML20057F2261993-09-30030 September 1993 Safety Evaluation Supporting Exemption Request from Requirements of 10CFR50.54(q) for License NPF-82 ML20056C7181993-07-14014 July 1993 SE Supporting Amend 10 to License NPF-82 ML20045B3551993-06-11011 June 1993 LER 93-001-00:on 930429,refueling Jib Crane Moved in Vicinity of Spent Fuel Pool Using vendor-supplied Lifting Eye in Violation of NUREG-0612.Caused by Failure to Identify Crane as Heavy Load.Meetings held.W/930611 Ltr ML20045C8881993-06-0808 June 1993 Vols 1 & 2 to Refueling Jib Crane 1T31-CRN-008A Incident Root Cause Analysis. W/One Oversize Encl ML20044C1181993-02-28028 February 1993 Shoreham Nuclear Power Station Updated Decommissioning Plan. ML20128P6451993-02-28028 February 1993 Snps Decommissioning Project Termination Survey Final Rept for Steam Turbine Sys (N31) ML20128P7431993-02-19019 February 1993 Rev 3 to 93X027, Nuclear QA Surveillance Rept ML20127H2301993-01-15015 January 1993 Part 21 Rept Re Potential Defeat in Component of Dsrv & Dsr Enterprise Standby DG Sys.Starting Air Distributor Housing Assemblies Installed as Replacement Parts at Listed Sites ML20126B0421992-12-17017 December 1992 Final Part 21 Rept Re Potential Problem W/Steel Cylinder Heads.Initially Reported on 921125.Caused by Inadequate Cast Wall Thickness at 3/4-inch-10 Bolt Hole.Stud at Location Indicated on Encl Sketch Should Be Removed ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20128B9641992-10-31031 October 1992 Rev 0 to Shoreham Decommissioning Project Termination Survey Plan ML20118B4391992-09-11011 September 1992 Part 21 Rept Re Degradation in Abb Type 27N Undervoltage Relays Used in Electrical Switchgear.Recommends That Users Review Applications Requiring Exposures Greater than 1E03 Rads TID W/Time Delay Function Option ML20099H5781992-07-31031 July 1992 Rev 4 to Shoreham Defueled Sar ML20114A6311992-07-28028 July 1992 Shoreham Decommissioning Plan ML20101K5791992-06-25025 June 1992 Long Island Power Authority Shoreham Decommissioning Project,Shoreham Nuclear Power Station,Technical Rept on Water Processing & Water Mgt Activities for Reactor Pressure Vessel & Wet Cutting Station ML20094L1271992-03-13013 March 1992 Amend 1 to Part 21 Rept 159 Re Potential Defect in Power Cylinder Liner.Initially Reported on 920115.Caused by Liner/ Block Fit & Localized Matl Microstructure.All Drawings & Specs Revised to Address Matl Design Requirements ML20082M5081991-08-26026 August 1991 Rev 3 to Shoreham Defueled Sar PM-91-125, Monthly Operating Rept for Jul 1991 for Shoreham Nuclear Power Station1991-07-31031 July 1991 Monthly Operating Rept for Jul 1991 for Shoreham Nuclear Power Station PM-91-112, Monthly Operating Rept for Jun 1991 for Shoreham Nuclear Power Station1991-06-30030 June 1991 Monthly Operating Rept for Jun 1991 for Shoreham Nuclear Power Station PM-91-075, Monthly Operating Rept for Apr 1991 for Shoreham Nuclear Power Station1991-04-30030 April 1991 Monthly Operating Rept for Apr 1991 for Shoreham Nuclear Power Station ML20024G7171991-04-22022 April 1991 LER 91-001-00:on 910324,RB Normal Ventilation Sys (Rbnvs) Outboard Exhaust Valve Closed for No Apparent Reason.Cause Inconclusive.Sys Restored to Normal Lineup & Rbnvs Outboard Valve Will Be Stroked on Routine basis.W/910422 Ltr SNRC-1806, Revised Pages 2 & 6 to Encl a of 10CFR50.59 Annual Rept for 19901991-04-15015 April 1991 Revised Pages 2 & 6 to Encl a of 10CFR50.59 Annual Rept for 1990 PM-91-058, Monthly Operating Rept for Mar 1991 for Shoreham Nuclear Power Station1991-03-31031 March 1991 Monthly Operating Rept for Mar 1991 for Shoreham Nuclear Power Station PM-91-037, Monthly Operating Rept for Feb 1991 for Shoreham Nuclear Power Station1991-02-28028 February 1991 Monthly Operating Rept for Feb 1991 for Shoreham Nuclear Power Station PM-91-016, Monthly Operating Rept for Jan 1991 for Shoreham Nuclear Power Station1991-01-31031 January 1991 Monthly Operating Rept for Jan 1991 for Shoreham Nuclear Power Station SNRC-1797, 10CFR 50.59 Annual Rept of Facility Changes,Procedure Changes,Tests & Experiments for Jan-Dec 19901990-12-31031 December 1990 10CFR 50.59 Annual Rept of Facility Changes,Procedure Changes,Tests & Experiments for Jan-Dec 1990 SNRC-1794, Shoreham Nuclear Power Station Annual Operating Rept,19901990-12-31031 December 1990 Shoreham Nuclear Power Station Annual Operating Rept,1990 SNRC-1799, Lilco 1990 Annual Rept1990-12-31031 December 1990 Lilco 1990 Annual Rept ML20069Q3901990-12-31031 December 1990 Shoreham Nuclear Power Station Decommissioning Plan. (Filed in Category P) ML20028H0231990-09-28028 September 1990 LER 90-007-00:on 900907,unplanned Actuation of ESF Sys Occurred During I&C Surveillance Test.Caused by Inadequate procedure.SP44.650.16 Revised to Require That Leads Lifted & Individually separated.W/900928 Ltr ML20056A2001990-07-31031 July 1990 Safety Evaluation Supporting Amend 6 to License NPF-82 PM-90-097, Monthly Operating Rept for June 1990 for Shoreham Nuclear Power Station1990-06-30030 June 1990 Monthly Operating Rept for June 1990 for Shoreham Nuclear Power Station ML20055E3911990-06-25025 June 1990 Safety Evaluation Supporting Amend 5 to License NPF-82 PM-90-083, Monthly Operating Rept for May 1990 for Shoreham Nuclear Power Station1990-05-31031 May 1990 Monthly Operating Rept for May 1990 for Shoreham Nuclear Power Station 05000322/LER-1988-0151990-05-16016 May 1990 LER 88-015-02:on 880916,seismic Monitoring Instrumentation, Including Peak Acceleration Recorders,Removed from Svc for More than 30 Days Due to Corrosion on Scratch Plates.Cover Gasket Replaced & Thermal Barrier Mount to Be Installed 05000322/LER-1986-0391990-05-16016 May 1990 LER 86-039-01:on 861006,unplanned Initiation of Reactor Bldg Standby Ventilation Sys Occurred W/All Rods Inserted in Core.Caused by Faulty Design of Retaining Device.Warning Signs Attached to Valve Actuator & Valve Mod Initiated 05000322/LER-1986-0321990-05-16016 May 1990 LER 86-032-01:on 860728,RWCU Isolated on High Differential Flow Sensed by Steam Leak Detection Sys While Placing Filter Demineralizers in Operation.Cause Not Determined. Operating Procedures Revised to Monitor RWCU Sys 05000322/LER-1987-0091990-05-16016 May 1990 LER 87-009-01:on 870203,full Reactor Trip Occurred Due to Perturbation in Ref Leg.Caused by Spurious Low Level Reactor Pressure Vessel Water Level Signal.Existing Level & Pressure Transmitters Replaced W/Newer Models 05000322/LER-1987-0221990-05-16016 May 1990 LER 87-022-01:on 870604,HPCI Test Valve to Condensate Storage Tank,Globe Valve & Hpci/Rcic Test Valve to Condensate Storage Tank Failed to Close Against Sys Operating Pressure.Disc of motor-operated Valve 37 Modified 05000322/LER-1989-0051990-05-16016 May 1990 LER 89-005-01:on 890321,results of Local Leak Rate Test of Core Spray Suction Valve a Determined That Leakage,When Combined W/All Type B & C Penetration Leakages,Exceeded Tech Spec Limit.Caused by Normal Valve Degradation 05000322/LER-1989-0031990-05-16016 May 1990 LER 89-003-01:on 890310,emergency Diesel Generator (EDG) 102 Manually Shutdown During 18-month Surveillance Test Due to Failure of EDG Output Breaker.Cause Not Determined. Replacement Breaker Installed in Cubicle 102-8 05000322/LER-1985-0591990-05-16016 May 1990 LER 85-059-01:on 851219,half Reactor Trip,Full NSSS Shutoff Sys Isolation & Reactor Bldg Standby Ventilation Sys Initiation Occurred Due to Loss of Power to Reactor Protection Sys Bus B.Assembly Breaker Reset 05000322/LER-1987-0351990-05-16016 May 1990 LER 87-035-02:on 871221,880106 & 0330,high Energy Line Break Logic Isolations of RWCU & Main Steam Line Drain Valves Occurred.Caused by Problems W/Temp Monitoring Units. Grounding Scheme Changed & Transformers Rewired 05000322/LER-1988-0031990-05-16016 May 1990 LER 88-003-01:on 880322,unplanned Automatic Initiation of Reactor Bldg Standby Ventilation Sys Side a Occurred During Deenergization of Relay.Caused by Close Placement of Relay Terminals.Wiring Inside Electrical Panels Reworked 1997-05-01
[Table view] |
LER-2089-003, |
Event date: |
|
---|
Report date: |
|
---|
3222089003R00 - NRC Website |
|
text
_ _ _ __ - .
, u..NUCLim 0VuTomoMMoloN ,,,,,,,,,, , ,,,,,,,, ,
MR,CgOaM=
EXP4RE$ 4/30'92 15TIMATED SURDEN PER f;tSPONat TO COMPLY WTH TH13 1 LICENSEE EVENT REPORT (LER) ENME#'Mo*&D'iNo'ORDIN $1'iL#$ io"Tiit RtC'l'a"Di
' O!ULJa?Cca'.',n"A"l%'"*c"Ts'lfHJ'
"' "^ ..""
MA AG M N AND UDG E T. tN H GT C t>03 00 Cati NUMet R (21 PAGE f3' PiCILITY HAMS (18 Shoreham Nuclear Pcwer Station Unit 1 0 l5 l0 ]O l0l 3l2 2 1 1lorl0l3 f tTLt ses EDG 102 Test Failure Due to the EDG Output Breaker Failure to Close IVENT DAf t ($1 L4R NUMeth (Si REPORT DAf t til OTHER 9 ACILITit8 INVOLVED ISI MONTH DAY vtAR vtAR Nj$ $jg MONTw Day vtAR 'AciiftNAMas 00calT NUMetRts?
c f 1
0l5l010]0l l l
- ~
0 l3 1l0 89 8l9 0l0l3 0l1 O!5 1l6 QIO O 1 5l0 t o s o n l 1 THit REPORT 88 BUSMITTED PUR$UANT TO THE RkOUIRIMtNTS OF 10 CFR I (Cnece one er me.e et ,*e reno . ass (114
. OPERATING M006 m 4 30 402161 20 acetst to 13tsit2 Hevi 73 71168
, R to 40steH1 Hit 50 asteHit Pe.73 aH3H,1 73.71 tst n., O i OiO M .0 4.Hin.I Mw.n ) _
0 ,3teH, nun 2 =;,,;y,P,;.g,z,,,
M 406(eH1Hutt 90.734eH2Hil 90.736eH2llve44H Al J66Al
{ _
M 4084sH1 Hivl 90.73teH2 Heil 90.73tsH2Hvit4Hti gg M 406tsH1 Het 90.736sil2Hein 50 734eHRHal LICEN$tt CONT ACT FOR THl4 LER 1131
(
N)Mt TELEPHONE NUM6tm ARE A CODE Geortte D. Schnaars, Orerational ccranlinnm r nmi nm,. 5l1l6 9l2l 9l-18 1 3l 010 COMPLEf t ONE LINE poR E ACM COMPONENT P Altunt DESCRISED IN TMil RIPORT (13i
" " C' " ' ' CauSE 8v8 TEM COMPONENT C- R ORiAgl pp CJ.U$ t Sv$7tM COMPONENT TO PR 5 Mf l I l 1 1 1 1 I i 1 l l l l l l l l l l 1 I I I I I I I SUPPLEMENT AL REPORT t kPECTED 1141 MONTH Day vtAR SU9uis$ ION vit II9 res eenvete LJr9tCTIO Sv0 Acts 5 ION DA tt! No l l l Aut i. ACT a -, ,, mo .,e<e.. , e . ,,...,,,,,e, ,,nes. ..,, < e ... ne ..,o n e i On March 10, 1989 at 2104, Emergency Diesel Generator (EDG) 102 was manually shutdown during an 18 month surveillance test due to the failure of the EDG output breaker (1R43-ACB-102-8) to close.
EDG 102 had just completed its 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> run to satisfy Tech. Spec.
requirement 4.8.1.1.2.8. The next step of the procedure required.a hot-restart of the engine within 5 minutes S Bus 102 was
.deenergized, starting EDG 102. The engine satisfactorily achieved its required frequency and voltage, but the output breaker did not close as' expected. Additional attempts to close the breaker were unsuccessful. The EDG was shut down approximately 2 minutes and 43 seconds after the engine was started. An immediate investigation ensued to determine the cause for the failure of the breaker to close. Operators inspected the cubicle where the breaker (102-8) was located. No unusual conditions were found. The breaker was removed from service and inspected and tested with acceptable results. The diesel test was performed three more times with a replacement breaker, without incident. EDG 102 was returned to service. A multi-disciplined review was conducted to determine the root cause of the failure of the breaker to close after receiving an EDG start signal.
9005240095 900516 PDR ADOCK 05000322 5 PDC m.....-,m.m ..,....s...
NRC Perm 366 (6491
E g..- -A oumim.oum. MM. ion , , , , , , , , , , _
le , ERPC.E8 4!30/92.-
LICENSEE EVENT REP 3RT (LER) =
TEXT CONTINUATION:
l,$",E'AAUR,74l'Eg'!/%cf'l'TX f,7',VAat$,^M ag!" n'C'*W2 'u'i',MMn $Un'8
, M, Q
MANAQtM$NT AND SUDGET. WASHINGTON.DC f AC64lTY NAMs og DOCKET NUM$th (2) Llh NUMSGR tGI PA05 431 -
viaa "E!@,^ 6 "'4*.8 Shoreham Nuclear power Station Unit 1 nlo O' 0 l6 l0 l0 l0 h lo l 9 pl a -
n I nl 2 -
nl i e!3-Text ,,= .. . =,w. wM w me w mm mi
-This is a Supplemental.to a Special Report submitted pursuant to l Technical Specification 6.9.2 to comply with Technical Specification 4.8.1.1.3.
.On March 10, 1989 at 2104, Emergency Diesel Generator (EDG) 102 was
- manually shutdown during an 18 month surveillance test due to the failure of the EDG' output breaker (1R43-ACB-102-B)-to close.
Operators had just completed a portion of SP 24.307.02 (TDI DG Emergency AC Power Load Sequencing Tests) to satisfy Tech. Spec.
requirement =4.8.1.1.2.8 (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> EDG run) for EDG 102. The next, step of the procedure required a hot-restart of the engine within 5
- minutes. The RSST breaker was placed in " Pull to Lock". Then the NSST breaker was placed in " Pull to Lock" deenergizing Bus 102. The.
engine started and satisfactorily achieved its required generator
. frequency and voltage, but the. output breaker did not close as-expected.
,^ .At;this-time, it was observed that the green indicator light (for breaker position and control. power availability) had dimmed for a moment and then returned to its normal brightness. The red light 6 (closed indication) did not come on. The Watch Engineer instructed
$ l me NASO (Nuclear Assistant Station Operator) to give the engine
- d h n+,ther start signal. The output breaker would not close. He then f I c Aiccessfully attempted to manually close the breaker in the.
) Control' Room. The EDG was shut down approximately 2 minutes-and 43
{ m onds after the engine had started. An immediate. investigation j onsued to determine the cause for the fallure of the breaker to close.
OperatorsweredispatchedtotheEmkrgencySwitchgearRoom102
'(Control. Bldg. Elev. 25') to check the cubicle 102-8 relays (where the 4KV EDG. Output Breaker 102-8 is located) for trips and targets.
S None were found. The cubicle door was opened and no unusual conditions.wpre found. The'4KV Breaker was open, the aprings were charged and the' fuse holders were in place. The NSST and RSST
- supply cubicle relays were checked for trips and targets and none Jwere found. At this time, the operators placed the 4KV 102 bus back into service.
The following morning a visual inspection of the 102-8 breaker was Performed. No abnormal conditions were found. The breaker was cycled 6 times, with satisfactory results. In addition, a voltage was applied to the closing coil and the breaker closed at 50 V DC.
. Resistance readings were taken across the fuses in the circuit with acceptable results. The fuse holder tabs were inspected identifying no abnormal conditions. The tabs were cleaned and regreased with conductive greasc.
l
. leRC Fenn 30AA (649)
y,ega ci ceu.uumun ====.N ,,,,,,,,,,,,,.,,,,,,,,- a
~I I aPC E8' 4/3012 LICENSEE EVENT REPORT (LER)- ',8's,E',iAug",No&5llt$yo.coTV TA' "M'8 {
TEXY CONTINUATION. M 7 ,fo8 &l*J $ $ M P'," ni'"f,'5 3 u7 '".' @ # - ,
PAPtn O RE u 160 IJ! (3 60 IC OF MANAGtMENT AND Dv0Gtt.wASMtNGTON, DC 20603.,
FACILITY Naut 06 DOCKli NUMOLR (28 ggn Nugsgm (si - P&Of (3) u*a " t.t 'J.'. '
TJ.?:
Shoreham Nuclear Power Station Unit 1 o l6 l0 l 0 l 0 l 3l2 l 2,819 -
0 l Ol 3 -
011 ol3 0F n Ii twa- . w 4me r.-amunn n
4 '- !
[6fwasrepeated.x,f1notherbreakerwasinstalledincubicle102-8 f The output breaker closed without incident. The test be ;was succerd ully performed two more times. EDG 102 was returned to cervice'on March 11, 1989 at 2150.
e 'A Aulti-disciplined review was conducted to determine the root cau'se of the failure of the breaker to close after receiving an EDG start :
aignal. This involved reviewing the plant process computer logs, y plant-personnel statements, Control Room logs and associated electrical circuit-diagrams. However, a definitive cause could not be determined.
Further investigation to. determine the root-cause of the failure of the breaker to close has been deferred indefinitely due to the New '
York State - LILCO Shoreham Settlement Agreement.
The following provides the information required by Regulatory
-Position C 3 b of Regulatory Guide 1.108;
- 1) -The unit involved was Emergency Diesel Generator 102.
- 2) This test failure is the first valid test failure in the past 100 y EDG. tests. ;
- 3) .The cause of the failure could not be determined.
- 4) The EDG breaker was replaced with a spare.
L 5) EDG 102.was unavailable for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and 46 minutes.
O . .
- 6) The current surveillance test interval is monthly.
-7 ) . -The current monthly test interval conforms to the schedule of Regulatory Position C.2.d of Regulatory Guide 1.108.
l!
i
)
!' . tcc tem assA (649)
.. . , .
|
---|
|
|
| | Reporting criterion |
---|
05000322/LER-1989-003 | LER 89-003-01:on 890310,emergency Diesel Generator (EDG) 102 Manually Shutdown During 18-month Surveillance Test Due to Failure of EDG Output Breaker.Cause Not Determined. Replacement Breaker Installed in Cubicle 102-8 | | 05000322/LER-1989-005 | LER 89-005-01:on 890321,results of Local Leak Rate Test of Core Spray Suction Valve a Determined That Leakage,When Combined W/All Type B & C Penetration Leakages,Exceeded Tech Spec Limit.Caused by Normal Valve Degradation | |
|