| number = ML061870512
| number = ML061870512
| issue date = 07/19/2006
| issue date = 07/19/2006
| title = Arkansas Nuclear One, Unit 2 and James A. Fitzpatrick Nuclear Power Plant - Letter and Safety Evaluation to Entergy Operations, Inc. - Application to Use Effective Dose Equivalent Weighting Factors for External Exposure
| title = Letter and Safety Evaluation to Entergy Operations, Inc. - Application to Use Effective Dose Equivalent Weighting Factors for External Exposure
| author name = Terao D
| author name = Terao D
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV
| addressee name = Buford F G
| addressee name = Buford F
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
| docket = 05000333, 05000368
| docket = 05000333, 05000368
| license number = DPR-059, NPF-006
| license number = DPR-059, NPF-006
| contact person = Vaidya B K, NRR/DORL/LP4, 415-3308
| contact person = Vaidya B, NRR/DORL/LP4, 415-3308
| case reference number = TAC MD1737, TAC MD1738
| case reference number = TAC MD1737, TAC MD1738
| document type = Letter, Safety Evaluation
| document type = Letter, Safety Evaluation
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:July 19, 2006Mr. F. G. BurfordActing Director Nuclear Safety and Licensing Entergy Operations, Inc.
{{#Wiki_filter:July 19, 2006 Mr. F. G. Burford Acting Director Nuclear Safety and Licensing Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213-8298
1340 Echelon Parkway Jackson, MS 39213-8298


==SUBJECT:==
==SUBJECT:==
ARKANSAS NUCLEAR ONE, UNIT 2, AND JAMES A. FITZPATRICK NUCLEARPOWER PLANT - APPLICATION TO USE EFFECTIVE DOSE EQUIVALENT WEIGHTING FACTORS FOR EXTERNAL EXPOSURE (TAC NOS. MD1737 AND MD1738)
ARKANSAS NUCLEAR ONE, UNIT 2, AND JAMES A. FITZPATRICK NUCLEAR POWER PLANT - APPLICATION TO USE EFFECTIVE DOSE EQUIVALENT WEIGHTING FACTORS FOR EXTERNAL EXPOSURE (TAC NOS. MD1737 AND MD1738)


==Dear Mr. Burford:==
==Dear Mr. Burford:==


By letter dated May 16, 2006, Entergy Operations, Inc. and Entergy Nuclear Operating, Inc.(Entergy or the licensee) requested the U.S. Nuclear Regulatory Commission's (NRC's)approval for the use of the weighting factors provided in the American National Standard Institute (ANSI) HPS N13.41-1997 (the standard) for external radiation exposures when demonstrating compliance with total effective dose equivalent (TEDE), based on requirements in Part 20 of Title 10 to the Code of Federal Regulations (10 CFR) for Arkansas Nuclear One,Unit 2 (ANO-2), and James A. Fitzpatrick Nuclear Power Plant (JAF).The NRC staff has completed its review. Enclosed is the NRC staff's related Safety Evaluationthat concludes that your request for the use of the weighting factors provided in the standard forexternal radiation exposures when demonstrating compliance with TEDE, based on requirements in 10 CFR Part 20 for ANO-2 and JAF is acceptable.
By letter dated May 16, 2006, Entergy Operations, Inc. and Entergy Nuclear Operating, Inc.
F. G. Burford                                                 Please contact me at (301) 415-1302 or Bhalchandra K. Vaidya at (301) 415-3308, if you haveany questions on this matter. Sincerely,
(Entergy or the licensee) requested the U.S. Nuclear Regulatory Commission's (NRC's) approval for the use of the weighting factors provided in the American National Standard Institute (ANSI) HPS N13.41-1997 (the standard) for external radiation exposures when demonstrating compliance with total effective dose equivalent (TEDE), based on requirements in Part 20 of Title 10 to the Code of Federal Regulations (10 CFR) for Arkansas Nuclear One, Unit 2 (ANO-2), and James A. Fitzpatrick Nuclear Power Plant (JAF).
/RA/
The NRC staff has completed its review. Enclosed is the NRC staffs related Safety Evaluation that concludes that your request for the use of the weighting factors provided in the standard for external radiation exposures when demonstrating compliance with TEDE, based on requirements in 10 CFR Part 20 for ANO-2 and JAF is acceptable.
David Terao, ChiefPlant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-368 and 50-333
 
F. G. Burford                             Please contact me at (301) 415-1302 or Bhalchandra K. Vaidya at (301) 415-3308, if you have any questions on this matter.
Sincerely,
                                        /RA/
David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-368 and 50-333


==Enclosure:==
==Enclosure:==
Safety Evaluation cc w/encl: See next page F. G. Burford                                                 Please contact me at (301) 415-1302 or Bhalchandra K. Vaidya at (301) 415-3308, if you haveany questions on this matter. Sincerely,
Safety Evaluation cc w/encl: See next page
/RA/
 
David Terao, ChiefPlant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-368 and 50-333
F. G. Burford                                 Please contact me at (301) 415-1302 or Bhalchandra K. Vaidya at (301) 415-3308, if you have any questions on this matter.
Sincerely,
                                              /RA/
David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-368 and 50-333


==Enclosure:==
==Enclosure:==
Safety Evaluation cc w/encl: See next pageDISTRIBUTION
Safety Evaluation cc w/encl: See next page DISTRIBUTION:
:PUBLICRidsAcrsAcnwMailCenterRidsNrrDorlLpl1-1 (RLaufer)
PUBLIC                        RidsAcrsAcnwMailCenter                RidsNrrDorlLpl1-1 (RLaufer)
LPLIV r/fLPLI-1 r/fRPedersen, DIRS RidsNrrDorlLpl4 (DTerao)RidsNrrLALFeizollahiRidsNrrLASLittle RidsNrrPMBVaidyaRidsNrrPMDHollandRidsNrrPMJBoska RidsDorlDprJLamb (RIV)BSosa (RI)
LPLIV r/f                    LPLI-1 r/f                            RPedersen, DIRS RidsNrrDorlLpl4 (DTerao)     RidsNrrLALFeizollahi                  RidsNrrLASLittle RidsNrrPMBVaidya              RidsNrrPMDHolland                    RidsNrrPMJBoska RidsDorlDpr                  JLamb (RIV)                           BSosa (RI)
RidsRgn4MailCenter (DGraves) RidsOgcRpRidsRgn1MailCenter (ECobey)SBernal, DIRSACCESSION NO: ML061870512NRR-106 OFFICENRR/LPL4/PMNRR/LPL4/LANRR/IHPB/BC OGCNRR/LPL4/BCNAMEBVaidyaLFeizollahi   TFreyMLemoncelliDTeraoDATE07/13/0607/13/0606/23/0607/17/0607/19/06OFFICIAL RECORD COPY SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATIONRELATED TO THE APPROVAL TO USE WEIGHTING FACTORSFOR EXTERNAL RADIATION EXPOSURES ENTERGY OPERATIONS, INC. AND ENTERGY NUCLEAR OPERATING, INC.ARKANSAS NUCLEAR ONE, UNIT 2, ANDJAMES A. FITZPATRICK NUCLEAR POWER PLANTDOCKET NOS. 50-368 AND 50-33
RidsRgn4MailCenter (DGraves)                                       RidsOgcRp RidsRgn1MailCenter (ECobey)                                         SBernal, DIRS ACCESSION NO: ML061870512                            NRR-106 OFFICE      NRR/LPL4/PM      NRR/LPL4/LA          NRR/IHPB/BC     OGC            NRR/LPL4/BC NAME        BVaidya          LFeizollahi            TFrey        MLemoncelli   DTerao DATE        07/13/06        07/13/06            06/23/06        07/17/06      07/19/06 OFFICIAL RECORD COPY
 
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO THE APPROVAL TO USE WEIGHTING FACTORS FOR EXTERNAL RADIATION EXPOSURES ENTERGY OPERATIONS, INC. AND ENTERGY NUCLEAR OPERATING, INC.
ARKANSAS NUCLEAR ONE, UNIT 2, AND JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET NOS. 50-368 AND 50-333
 
==1.0      INTRODUCTION==


==31.0 INTRODUCTION==
By letter dated May 16, 2006 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML061430359), Entergy Operations, Inc. and Entergy Nuclear Operating, Inc. (Entergy or the licensee) requested the U.S. Nuclear Regulatory Commission's (NRC's) approval for the use of the weighting factors provided in the American National Standard Institute (ANSI) HPS N13.41-1997 (the standard) for external radiation exposures when demonstrating compliance with total effective dose equivalent (TEDE), based on requirements in Part 20 to Title 10 of the Code of Federal Regulations (10 CFR) for Arkansas Nuclear One, Unit 2 (ANO-2), and James A. Fitzpatrick Nuclear Power Plant (JAF). The effect of granting this request would be to allow the licensee the option to control TEDE using the weighted external exposure measurements in those cases where it is a more accurate predictor of the risk from occupational radiation exposure.
By letter dated May 16, 2006 (Agencywide Documents Access and Management System(ADAMS) Accession No. ML061430359), Entergy Operations, Inc. and Entergy Nuclear Operating, Inc. (Entergy or the licensee) requested the U.S. Nuclear Regulatory Commission's(NRC's) approval for the use of the weighting factors provided in the American NationalStandard Institute (ANSI) HPS N13.41-1997 (the standard) for external radiation exposures when demonstrating compliance with total effective dose equivalent (TEDE), based on requirements in Part 20 to Title 10 of the Code of Federal Regulations (10 CFR) for ArkansasNuclear One, Unit 2 (ANO-2), and James A. Fitzpatrick Nuclear Power Plant (JAF). The effect of granting this request would be to allow the licensee the option to control TEDE using the weighted external exposure measurements in those cases where it is a more accurate predictor of the risk from occupational radiation exposure.


==2.0REGULATORY EVALUATION==
==2.0      REGULATORY EVALUATION==
The radiation protection approach and dose limits contained in 10 CFR Part 20 are based onthe recommendations of the International Commission on Radiation Protection (ICRP) in their1977 Publication No. 26 (ICRP 26). For stochastic effects, the ICRP's recommended dose limitation is based on the principle that the risk should be equal, whether the whole body isirradiated uniformly or there is non-uniform irradiation (such as when radioactive materials are taken into the body and, depending on their physical and chemical properties, concentrate in certain tissues and organs). Therefore, the ICRP 26 recommendations are based on controlling the sum of the risk weighted doses to selected organs. Effective dose equivalent (EDE or E) is defined in 10 CFR 20.1003 as "the sum of the productsof the dose equivalent to the organ or tissue (T) and the weighting factors (W T) applicable toeach of the body organs or tissues that are irradiated (E = W TT )."  For the purposes of implementing workplace controls, and due to the difference in dosimetry,10 CFR Part 20 breaks this EDE into two components:  (1) dose resulting from radioactive sources internal to the body, and (2) dose resulting from sources external to the body. Dose limits and other requirements in Part 20 are based on the sum of these external and internal exposures. For radioactive material taken into the body, the occupational dose limit is based on the resulting dose equivalent integrated over 50 years, or committed effective dose equivalent(CEDE) defined in 10 CFR 20.1003 as W TT , 50.The TEDE is defined in 10 CFR 20.1003 as the "sum of the deep-dose equivalent (DDE) (forexternal exposures) and the committed effective dose equivalent (for internal exposures)."TEDE = DDE + CEDEThe organ weighting factors (W T) are the proportion of the risk of stochastic effects resultingfrom the dose to that organ or tissue to the total risk of stochastic effects when the whole body is irradiated uniformly. The weighting factors are applicable to the organs and tissues whether the dose results from radiation sources internal or external to the body. However, measuring the dose to the various organs and tissues with a dosimeter worn outside the body, presents some practical difficulties. If the body is irradiated uniformly, the external component of TEDE can be determined with a single DDE measurement on any part of the whole body. However, if the body is not irradiated uniformly, a single-dose measurement cannot determine the dose tothe various organs and tissues for an accurate determination of the external EDE (EDE ex). Toensure a conservative determination of TEDE, 10 CFR 20.1201(c) requires that the DDE component be determined from the part of the whole body receiving the highest exposure.Authority to permit use of other weighting factors is found in footnote 2 to the table of organweighting factors in 10 CFR 20.1003 states, "[f]or the purpose of weighting the external wholebody dose (for adding to the internal dose), a single weighting factor, of W T = 1.0, has beenspecified. The use of other weighting factors for external exposure will be approved on a  case- by-case basis until such time as specific guidance is issued."  This approach to determining TEDE can be overly conservative for extremely non-uniformirradiations (i.e., when only a small portion of the whole body is irradiated). As discussed in the


NRC Regulatory Issue Summaries 2002-06, 2003-04, and 2004-01, the NRC has approvedseveral methods for determining EDE ex, and has encouraged the use of EDE ex in place of DDEfor demonstrating compliance with the TEDE requirements in 10 CFR Part 20.
The radiation protection approach and dose limits contained in 10 CFR Part 20 are based on the recommendations of the International Commission on Radiation Protection (ICRP) in their 1977 Publication No. 26 (ICRP 26). For stochastic effects, the ICRPs recommended dose limitation is based on the principle that the risk should be equal, whether the whole body is irradiated uniformly or there is non-uniform irradiation (such as when radioactive materials are taken into the body and, depending on their physical and chemical properties, concentrate in certain tissues and organs). Therefore, the ICRP 26 recommendations are based on controlling the sum of the risk weighted doses to selected organs.
Effective dose equivalent (EDE or E) is defined in 10 CFR 20.1003 as the sum of the products of the dose equivalent to the organ or tissue (T) and the weighting factors (W T) applicable to each of the body organs or tissues that are irradiated (E = W TT ).


==3.0 TECHNICAL EVALUATION==
For the purposes of implementing workplace controls, and due to the difference in dosimetry, 10 CFR Part 20 breaks this EDE into two components: (1) dose resulting from radioactive sources internal to the body, and (2) dose resulting from sources external to the body. Dose limits and other requirements in Part 20 are based on the sum of these external and internal exposures. For radioactive material taken into the body, the occupational dose limit is based on the resulting dose equivalent integrated over 50 years, or committed effective dose equivalent (CEDE) defined in 10 CFR 20.1003 as W TT,50.
3.1EvaluationThe NRC staff has reviewed the technical approach for estimating EDEex  provided in thestandard. This multiple dosimetry method divides the whole body into seven separate compartments. Each compartment, or composite compartment (since the standard allows combining adjacent compartments), is monitored separately. The results of the dose measurement for each compartment are weighted with an associated "compartment factor." The resulting weighted doses are then summed to determine the EDE ex for the whole body.The compartment factors are listed in Table 1 of the standard. The factor for each compartment was developed by summing the stochastic weighting factors given in ICRP 26 (Part 20 organ weighting factors) for all the organs located within that compartment. For each tissue that resides in more than one compartment (e.g., red bone marrow), the weighting factor was apportioned between the compartments based on the fraction of the total mass of the tissue residing in each, using the information in ICRP 23.The ANSI/HPS 13.41 multiple dosimeter method of determining EDE ex is based on theassumptions that (1) the average dose to the tissues in each compartment can be reasonably measured (with one or more dosimeters), and (2) that the dose distribution across the compartment is sufficiently constant so that this average dose can be applied to each tissue in the compartment. The compartments defined in the standard are small enough so that under most normal exposure situations these assumptions are met and a single determination of DDE in each compartment is sufficient. However, this may not be the case in those unusual situations where a significant dose gradient exists across one or more compartments (particularly the thorax and abdomen compartments). In these cases, the number and placement of dosimeters in each compartment become critical to ensuring that the EDE ex is notunderestimated.To ensure that the estimates of EDEex  are conservative, the licensee has committed tomeasuring the dose to each compartment (or composite compartment) by locating the dosimeter, calibrated to DDE, at the highest exposed portion of that compartment. The dosimeter location for each compartment will be subject to the same criteria currently used for demonstrating compliance with 10 CFR 20.1201(c).The licensee has stated that in most normal exposure situations they intend to provide onedosimeter for a combined thorax-abdomen composite compartment, consistent with the standard and their current multi-badging practice. 3.2Regulatory CommitmentsThe following table identifies the regulatory commitments made by Entergy. List of Regulatory Commitments COMMITMENTTYPE(Check one)SCHEDULEDCOMPLETIONDATE (IfRequired)ONE-TIMEACTIONCONTINUINGCOMPLIANCEEntergy will monitor the part of the whole bodywithin each compartment (and/or composite compartment) that receives the highest dose.
The TEDE is defined in 10 CFR 20.1003 as the sum of the deep-dose equivalent (DDE) (for external exposures) and the committed effective dose equivalent (for internal exposures).
Entergy is developing a fleet wide Nuclear Management Manual procedure EN-RP-204, "Special Monitoring Requirements," for determining dosimeter selection and placement. This procedure guidance will beconsistent with that found in NRC InspectionProcedure 71121.01, issue date 03/06/02.
TEDE = DDE + CEDE The organ weighting factors (W T) are the proportion of the risk of stochastic effects resulting from the dose to that organ or tissue to the total risk of stochastic effects when the whole body is irradiated uniformly. The weighting factors are applicable to the organs and tissues whether the dose results from radiation sources internal or external to the body. However, measuring the dose to the various organs and tissues with a dosimeter worn outside the body, presents some practical difficulties. If the body is irradiated uniformly, the external component of TEDE can be determined with a single DDE measurement on any part of the whole body. However, if the body is not irradiated uniformly, a single-dose measurement cannot determine the dose to the various organs and tissues for an accurate determination of the external EDE (EDEex). To ensure a conservative determination of TEDE, 10 CFR 20.1201(c) requires that the DDE component be determined from the part of the whole body receiving the highest exposure.
xBased on the NRC's approval of this request,Entergy will account for dose consistent withthe guidance of the standard as follows:The DDE for each compartment will bedetermined from dosimeters worn at that location. When no dosimeter is worn at a particular compartment, the DDE will be determined from the dosimeter positioned where the exposure is judged to be similar.
Authority to permit use of other weighting factors is found in footnote 2 to the table of organ weighting factors in 10 CFR 20.1003 states, [f]or the purpose of weighting the external whole body dose (for adding to the internal dose), a single weighting factor, of W T = 1.0, has been specified. The use of other weighting factors for external exposure will be approved on a case- by-case basis until such time as specific guidance is issued.
The assigned EDE will be the sum of eachDDE measurement multiplied by its appropriate compartment factor.The assigned lens dose equivalent (LDE) willbe the higher of the head or chest dosimeters.
This approach to determining TEDE can be overly conservative for extremely non-uniform irradiations (i.e., when only a small portion of the whole body is irradiated). As discussed in the NRC Regulatory Issue Summaries 2002-06, 2003-04, and 2004-01, the NRC has approved several methods for determining EDEex, and has encouraged the use of EDEex in place of DDE for demonstrating compliance with the TEDE requirements in 10 CFR Part 20.
The assigned shallow dose equivalent (SDE) will be the highest of any whole bodydosimeter.
xThe NRC staff finds that reasonable controls for the implementation and for subsequentevaluation of proposed changes pertaining to the above regulatory commitments are provided by the licensee's administrative processes, including its commitment management program.
Should the licensee choose to incorporate a regulatory commitment into the emergency plan, Updated Final Safety Analysis Report, or other documents with established regulatory controls,  the associated regulations would define the appropriate change-control and reportingrequirements. The NRC staff has determined that the commitments do not warrant the creationof regulatory requirements, which would require prior NRC approval of subsequent changes. The NRC staff has agreed that Nuclear Energy Institute 99-04, Revision 0, "Guidelines forManaging NRC Commitment Changes," provides reasonable guidance for the control ofregulatory commitments made to the NRC staff (see Regulatory Issue Summary 2000-17,"Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff,"dated September 21, 2000). The commitments should be controlled in accordance with industry guidance or comparable criteria employed by a specific licensee. The NRC staff maychoose to verify the implementation and maintenance of these commitments in a future inspection or audit.


==4.0 CONCLUSION==
==3.0     TECHNICAL EVALUATION==
SThe NRC staff concludes that calculating TEDE using EDE ex in place of DDE provides a moreaccurate estimate of the risk associated with the radiation exposures experienced by radiation workers at a nuclear power plant. The NRC staff finds that limiting TEDE such thatEDE ex + CEDE < 5 remis consistent with the basis for the dose limits, and footnote 2 to the "Organ Dose WeightingFactors" table in 10 CFR Part 20.1003.Additionally, the NRC staff concludes that the multiple dosimetry method to estimate EDE exusing the weighting factors listed in Table 1 of the standard, as proposed by the licensee, istechnically sound and is acceptable for the purposes of demonstrating compliance with the TEDE-based requirements in 10 CFR Part 20.Therefore, based on the above discussion and the information provided by Entergy in itssubmittal, the NRC staff approves the use of the weighting factors provided in the ANSI HPSN13.41-1997 (the standard) for external radiation exposures when demonstrating compliance with total effective dose equivalent (TEDE), based on requirements in 10 CFR Part 20 for ANO-2 and JAF.Principal Contributor:  R. Pedersen Date:  July 19, 2006


September 2005Arkansas Nuclear One cc: Senior Vice President  & Chief Operating Officer Entergy Operations, Inc.
3.1      Evaluation The NRC staff has reviewed the technical approach for estimating EDEex provided in the standard. This multiple dosimetry method divides the whole body into seven separate compartments. Each compartment, or composite compartment (since the standard allows combining adjacent compartments), is monitored separately. The results of the dose measurement for each compartment are weighted with an associated compartment factor.
P. O. Box 31995 Jackson, MS  39286-1995Director, Division of Radiation  Control and Emergency Management Arkansas Department of Health 4815 West Markham Street, Slot 30 Little Rock, AR  72205-3867Winston & Strawn1700 K Street, N.W.
The resulting weighted doses are then summed to determine the EDEex for the whole body.
Washington, DC  20006-3817Senior Resident InspectorU.S. Nuclear Regulatory Commission
The compartment factors are listed in Table 1 of the standard. The factor for each compartment was developed by summing the stochastic weighting factors given in ICRP 26 (Part 20 organ weighting factors) for all the organs located within that compartment. For each tissue that resides in more than one compartment (e.g., red bone marrow), the weighting factor was apportioned between the compartments based on the fraction of the total mass of the tissue residing in each, using the information in ICRP 23.
The ANSI/HPS 13.41 multiple dosimeter method of determining EDEex is based on the assumptions that (1) the average dose to the tissues in each compartment can be reasonably measured (with one or more dosimeters), and (2) that the dose distribution across the compartment is sufficiently constant so that this average dose can be applied to each tissue in the compartment. The compartments defined in the standard are small enough so that under most normal exposure situations these assumptions are met and a single determination of DDE in each compartment is sufficient. However, this may not be the case in those unusual situations where a significant dose gradient exists across one or more compartments (particularly the thorax and abdomen compartments). In these cases, the number and placement of dosimeters in each compartment become critical to ensuring that the EDEex is not underestimated.
To ensure that the estimates of EDEex are conservative, the licensee has committed to measuring the dose to each compartment (or composite compartment) by locating the dosimeter, calibrated to DDE, at the highest exposed portion of that compartment. The dosimeter location for each compartment will be subject to the same criteria currently used for demonstrating compliance with 10 CFR 20.1201(c).
The licensee has stated that in most normal exposure situations they intend to provide one dosimeter for a combined thorax-abdomen composite compartment, consistent with the standard and their current multi-badging practice.


P. O. Box 310 London, AR  72847Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX  76011-8064County Judge of Pope County Pope County Courthouse Russellville, AR 72801Vice President, Operations SupportEntergy Operations, Inc.
3.2    Regulatory Commitments The following table identifies the regulatory commitments made by Entergy.
P. O. Box 31995 Jackson, MS  39286-1995Wise, Carter, Child & Caraway P. O. Box 651 Jackson, MS  39205Mr. Jeffrey S. ForbesSite Vice President Arkansas Nuclear One Entergy Operations, Inc.
List of Regulatory Commitments TYPE (Check one)        SCHEDULED COMPLETION ONE-     CONTINUING COMMITMENT                                                    DATE (If TIME      COMPLIANCE Required)
1448 S. R. 333 Russellville, AR 72801 FitzPatrick Nuclear Power Plant cc:
ACTION Entergy will monitor the part of the whole body within each compartment (and/or composite compartment) that receives the highest dose.
Mr. Gary J. TaylorChief Executive Officer Entergy Operations, Inc.
Entergy is developing a fleet wide Nuclear Management Manual procedure EN-RP-204, x
1340 Echelon Parkway Jackson, MS 39213Mr. John T. HerronSr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.
Special Monitoring Requirements, for determining dosimeter selection and placement. This procedure guidance will be consistent with that found in NRC Inspection Procedure 71121.01, issue date 03/06/02.
440 Hamilton Avenue White Plains, NY 10601Mr. Peter T. DietrichSite Vice President Entergy Nuclear Operations, Inc.
Based on the NRCs approval of this request, Entergy will account for dose consistent with the guidance of the standard as follows:
James A. FitzPatrick Nuclear Power Plant
The DDE for each compartment will be determined from dosimeters worn at that location. When no dosimeter is worn at a particular compartment, the DDE will be determined from the dosimeter positioned where the exposure is judged to be similar.                         x The assigned EDE will be the sum of each DDE measurement multiplied by its appropriate compartment factor.
The assigned lens dose equivalent (LDE) will be the higher of the head or chest dosimeters.
The assigned shallow dose equivalent (SDE) will be the highest of any whole body dosimeter.
The NRC staff finds that reasonable controls for the implementation and for subsequent evaluation of proposed changes pertaining to the above regulatory commitments are provided by the licensees administrative processes, including its commitment management program.
Should the licensee choose to incorporate a regulatory commitment into the emergency plan, Updated Final Safety Analysis Report, or other documents with established regulatory controls,


P.O. Box 110 Lycoming, NY 13093Mr. Kevin J. MulliganGeneral Manager, Plant Operations Entergy Nuclear Operations, Inc.
the associated regulations would define the appropriate change-control and reporting requirements. The NRC staff has determined that the commitments do not warrant the creation of regulatory requirements, which would require prior NRC approval of subsequent changes.
James A. FitzPatrick Nuclear Power Plant
The NRC staff has agreed that Nuclear Energy Institute 99-04, Revision 0, Guidelines for Managing NRC Commitment Changes, provides reasonable guidance for the control of regulatory commitments made to the NRC staff (see Regulatory Issue Summary 2000-17, Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff, dated September 21, 2000). The commitments should be controlled in accordance with industry guidance or comparable criteria employed by a specific licensee. The NRC staff may choose to verify the implementation and maintenance of these commitments in a future inspection or audit.


P.O. Box 110 Lycoming, NY 13093Mr. Oscar LimpiasVice President Engineering Entergy Nuclear Operations, Inc.
==4.0    CONCLUSION==
440 Hamilton Avenue White Plains, NY  10601Mr. Christopher SchwarzVice President, Operations Support Entergy Nuclear Operations, Inc.
S The NRC staff concludes that calculating TEDE using EDEex in place of DDE provides a more accurate estimate of the risk associated with the radiation exposures experienced by radiation workers at a nuclear power plant. The NRC staff finds that limiting TEDE such that EDEex + CEDE < 5 rem is consistent with the basis for the dose limits, and footnote 2 to the Organ Dose Weighting Factors table in 10 CFR Part 20.1003.
440 Hamilton Avenue White Plains, NY 10601Mr. John F. McCannDirector, Licensing Entergy Nuclear Operations, Inc.
Additionally, the NRC staff concludes that the multiple dosimetry method to estimate EDEex using the weighting factors listed in Table 1 of the standard, as proposed by the licensee, is technically sound and is acceptable for the purposes of demonstrating compliance with the TEDE-based requirements in 10 CFR Part 20.
440 Hamilton Avenue White Plains, NY 10601Ms. Charlene D. FaisonManager, Licensing Entergy Nuclear Operations, Inc.
Therefore, based on the above discussion and the information provided by Entergy in its submittal, the NRC staff approves the use of the weighting factors provided in the ANSI HPS N13.41-1997 (the standard) for external radiation exposures when demonstrating compliance with total effective dose equivalent (TEDE), based on requirements in 10 CFR Part 20 for ANO-2 and JAF.
440 Hamilton Avenue White Plains, NY  10601Mr. Michael J. ColombDirector of Oversight Entergy Nuclear Operations, Inc.
Principal Contributor: R. Pedersen Date: July 19, 2006
440 Hamilton Avenue White Plains, NY 10601Mr. David WallaceDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant


P.O. Box 110 Lycoming, NY 13093Mr. James CostedioManager, Regulatory Compliance Entergy Nuclear Operations, Inc.
Arkansas Nuclear One cc:
James A. FitzPatrick Nuclear Power Plant
Senior Vice President              Vice President, Operations Support
& Chief Operating Officer        Entergy Operations, Inc.
Entergy Operations, Inc.          P. O. Box 31995 P. O. Box 31995                    Jackson, MS 39286-1995 Jackson, MS 39286-1995 Wise, Carter, Child & Caraway Director, Division of Radiation    P. O. Box 651 Control and Emergency Management  Jackson, MS 39205 Arkansas Department of Health 4815 West Markham Street, Slot 30  Mr. Jeffrey S. Forbes Little Rock, AR 72205-3867        Site Vice President Arkansas Nuclear One Winston & Strawn                  Entergy Operations, Inc.
1700 K Street, N.W.                1448 S. R. 333 Washington, DC 20006-3817          Russellville, AR 72801 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 310 London, AR 72847 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 County Judge of Pope County Pope County Courthouse Russellville, AR 72801 September 2005


P.O. Box 110 Lycoming, NY 13093Assistant General CounselEntergy Nuclear Operations, Inc.
FitzPatrick Nuclear Power Plant cc:
440 Hamilton Avenue White Plains, NY 10601Regional Administrator, Region IU.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406Resident Inspector's OfficeJames A. FitzPatrick Nuclear Power Plant U. S. Nuclear Regulatory Commission
Mr. Gary J. Taylor                      Ms. Charlene D. Faison Chief Executive Officer                  Manager, Licensing Entergy Operations, Inc.                Entergy Nuclear Operations, Inc.
1340 Echelon Parkway                    440 Hamilton Avenue Jackson, MS 39213                        White Plains, NY 10601 Mr. John T. Herron                      Mr. Michael J. Colomb Sr. VP and Chief Operating Officer      Director of Oversight Entergy Nuclear Operations, Inc.        Entergy Nuclear Operations, Inc.
440 Hamilton Avenue                      440 Hamilton Avenue White Plains, NY 10601                  White Plains, NY 10601 Mr. Peter T. Dietrich                    Mr. David Wallace Site Vice President                      Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.        Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant James A. FitzPatrick Nuclear Power Plant P.O. Box 110                            P.O. Box 110 Lycoming, NY 13093                      Lycoming, NY 13093 Mr. Kevin J. Mulligan                    Mr. James Costedio General Manager, Plant Operations        Manager, Regulatory Compliance Entergy Nuclear Operations, Inc.        Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant James A. FitzPatrick Nuclear Power Plant P.O. Box 110                             P.O. Box 110 Lycoming, NY 13093                      Lycoming, NY 13093 Mr. Oscar Limpias                        Assistant General Counsel Vice President Engineering              Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc.        440 Hamilton Avenue 440 Hamilton Avenue                      White Plains, NY 10601 White Plains, NY 10601 Regional Administrator, Region I Mr. Christopher Schwarz                  U.S. Nuclear Regulatory Commission Vice President, Operations Support      475 Allendale Road Entergy Nuclear Operations, Inc.        King of Prussia, PA 19406 440 Hamilton Avenue White Plains, NY 10601                  Resident Inspector's Office James A. FitzPatrick Nuclear Power Plant Mr. John F. McCann                      U. S. Nuclear Regulatory Commission Director, Licensing                      P.O. Box 136 Entergy Nuclear Operations, Inc.        Lycoming, NY 13093 440 Hamilton Avenue White Plains, NY 10601


P.O. Box 136 Lycoming, NY  13093  FitzPatrick Nuclear Power Plant cc:
FitzPatrick Nuclear Power Plant cc:
Mr. Charles Donaldson, EsquireAssistant Attorney General New York Department of Law 120 Broadway New York, NY 10271Mr. Peter R. Smith, PresidentNew York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399Mr. Paul EddyNew York State Dept. of Public Service 3 Empire State Plaza Albany, NY 12223-1350Oswego County Administrator Mr. Steven Lyman 46 East Bridge Street Oswego, NY 13126SupervisorTown of Scriba Route 8, Box 382 Oswego, NY 13126Mr. James H. SniezekBWR SRC Consultant 5486 Nithsdale Drive Salisbury, MD 21801-2490Mr. Michael D. LysterBWR SRC Consultant 5931 Barclay Lane Naples, FL 34110-7306Mr. Garrett D. Edwards814 Waverly Road Kennett Square, PA 19348Mr. Michael KanslerPresident Entergy Nuclear Operations, Inc.
Mr. Charles Donaldson, Esquire            Mr. Garrett D. Edwards Assistant Attorney General                 814 Waverly Road New York Department of Law                 Kennett Square, PA 19348 120 Broadway New York, NY 10271                        Mr. Michael Kansler President Mr. Peter R. Smith, President              Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY  10601}}
New York State Energy, Research,           440 Hamilton Avenue and Development Authority                 White Plains, NY 10601 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy New York State Dept. of Public Service 3 Empire State Plaza Albany, NY 12223-1350 Oswego County Administrator Mr. Steven Lyman 46 East Bridge Street Oswego, NY 13126 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. James H. Sniezek BWR SRC Consultant 5486 Nithsdale Drive Salisbury, MD 21801-2490 Mr. Michael D. Lyster BWR SRC Consultant 5931 Barclay Lane Naples, FL 34110-7306}}

Latest revision as of 02:59, 14 March 2020

Letter and Safety Evaluation to Entergy Operations, Inc. - Application to Use Effective Dose Equivalent Weighting Factors for External Exposure
ML061870512
Person / Time
Site: Arkansas Nuclear, FitzPatrick  Constellation icon.png
Issue date: 07/19/2006
From: Terao D
NRC/NRR/ADRO/DORL/LPLIV
To: Buford F
Entergy Operations
Vaidya B, NRR/DORL/LP4, 415-3308
References
TAC MD1737, TAC MD1738
Download: ML061870512 (11)


Text

July 19, 2006 Mr. F. G. Burford Acting Director Nuclear Safety and Licensing Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213-8298

SUBJECT:

ARKANSAS NUCLEAR ONE, UNIT 2, AND JAMES A. FITZPATRICK NUCLEAR POWER PLANT - APPLICATION TO USE EFFECTIVE DOSE EQUIVALENT WEIGHTING FACTORS FOR EXTERNAL EXPOSURE (TAC NOS. MD1737 AND MD1738)

Dear Mr. Burford:

By letter dated May 16, 2006, Entergy Operations, Inc. and Entergy Nuclear Operating, Inc.

(Entergy or the licensee) requested the U.S. Nuclear Regulatory Commission's (NRC's) approval for the use of the weighting factors provided in the American National Standard Institute (ANSI) HPS N13.41-1997 (the standard) for external radiation exposures when demonstrating compliance with total effective dose equivalent (TEDE), based on requirements in Part 20 of Title 10 to the Code of Federal Regulations (10 CFR) for Arkansas Nuclear One, Unit 2 (ANO-2), and James A. Fitzpatrick Nuclear Power Plant (JAF).

The NRC staff has completed its review. Enclosed is the NRC staffs related Safety Evaluation that concludes that your request for the use of the weighting factors provided in the standard for external radiation exposures when demonstrating compliance with TEDE, based on requirements in 10 CFR Part 20 for ANO-2 and JAF is acceptable.

F. G. Burford Please contact me at (301) 415-1302 or Bhalchandra K. Vaidya at (301) 415-3308, if you have any questions on this matter.

Sincerely,

/RA/

David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-368 and 50-333

Enclosure:

Safety Evaluation cc w/encl: See next page

F. G. Burford Please contact me at (301) 415-1302 or Bhalchandra K. Vaidya at (301) 415-3308, if you have any questions on this matter.

Sincerely,

/RA/

David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-368 and 50-333

Enclosure:

Safety Evaluation cc w/encl: See next page DISTRIBUTION:

PUBLIC RidsAcrsAcnwMailCenter RidsNrrDorlLpl1-1 (RLaufer)

LPLIV r/f LPLI-1 r/f RPedersen, DIRS RidsNrrDorlLpl4 (DTerao) RidsNrrLALFeizollahi RidsNrrLASLittle RidsNrrPMBVaidya RidsNrrPMDHolland RidsNrrPMJBoska RidsDorlDpr JLamb (RIV) BSosa (RI)

RidsRgn4MailCenter (DGraves) RidsOgcRp RidsRgn1MailCenter (ECobey) SBernal, DIRS ACCESSION NO: ML061870512 NRR-106 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/IHPB/BC OGC NRR/LPL4/BC NAME BVaidya LFeizollahi TFrey MLemoncelli DTerao DATE 07/13/06 07/13/06 06/23/06 07/17/06 07/19/06 OFFICIAL RECORD COPY

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO THE APPROVAL TO USE WEIGHTING FACTORS FOR EXTERNAL RADIATION EXPOSURES ENTERGY OPERATIONS, INC. AND ENTERGY NUCLEAR OPERATING, INC.

ARKANSAS NUCLEAR ONE, UNIT 2, AND JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET NOS. 50-368 AND 50-333

1.0 INTRODUCTION

By letter dated May 16, 2006 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML061430359), Entergy Operations, Inc. and Entergy Nuclear Operating, Inc. (Entergy or the licensee) requested the U.S. Nuclear Regulatory Commission's (NRC's) approval for the use of the weighting factors provided in the American National Standard Institute (ANSI) HPS N13.41-1997 (the standard) for external radiation exposures when demonstrating compliance with total effective dose equivalent (TEDE), based on requirements in Part 20 to Title 10 of the Code of Federal Regulations (10 CFR) for Arkansas Nuclear One, Unit 2 (ANO-2), and James A. Fitzpatrick Nuclear Power Plant (JAF). The effect of granting this request would be to allow the licensee the option to control TEDE using the weighted external exposure measurements in those cases where it is a more accurate predictor of the risk from occupational radiation exposure.

2.0 REGULATORY EVALUATION

The radiation protection approach and dose limits contained in 10 CFR Part 20 are based on the recommendations of the International Commission on Radiation Protection (ICRP) in their 1977 Publication No. 26 (ICRP 26). For stochastic effects, the ICRPs recommended dose limitation is based on the principle that the risk should be equal, whether the whole body is irradiated uniformly or there is non-uniform irradiation (such as when radioactive materials are taken into the body and, depending on their physical and chemical properties, concentrate in certain tissues and organs). Therefore, the ICRP 26 recommendations are based on controlling the sum of the risk weighted doses to selected organs.

Effective dose equivalent (EDE or E) is defined in 10 CFR 20.1003 as the sum of the products of the dose equivalent to the organ or tissue (T) and the weighting factors (W T) applicable to each of the body organs or tissues that are irradiated (E = W TT ).

For the purposes of implementing workplace controls, and due to the difference in dosimetry, 10 CFR Part 20 breaks this EDE into two components: (1) dose resulting from radioactive sources internal to the body, and (2) dose resulting from sources external to the body. Dose limits and other requirements in Part 20 are based on the sum of these external and internal exposures. For radioactive material taken into the body, the occupational dose limit is based on the resulting dose equivalent integrated over 50 years, or committed effective dose equivalent (CEDE) defined in 10 CFR 20.1003 as W TT,50.

The TEDE is defined in 10 CFR 20.1003 as the sum of the deep-dose equivalent (DDE) (for external exposures) and the committed effective dose equivalent (for internal exposures).

TEDE = DDE + CEDE The organ weighting factors (W T) are the proportion of the risk of stochastic effects resulting from the dose to that organ or tissue to the total risk of stochastic effects when the whole body is irradiated uniformly. The weighting factors are applicable to the organs and tissues whether the dose results from radiation sources internal or external to the body. However, measuring the dose to the various organs and tissues with a dosimeter worn outside the body, presents some practical difficulties. If the body is irradiated uniformly, the external component of TEDE can be determined with a single DDE measurement on any part of the whole body. However, if the body is not irradiated uniformly, a single-dose measurement cannot determine the dose to the various organs and tissues for an accurate determination of the external EDE (EDEex). To ensure a conservative determination of TEDE, 10 CFR 20.1201(c) requires that the DDE component be determined from the part of the whole body receiving the highest exposure.

Authority to permit use of other weighting factors is found in footnote 2 to the table of organ weighting factors in 10 CFR 20.1003 states, [f]or the purpose of weighting the external whole body dose (for adding to the internal dose), a single weighting factor, of W T = 1.0, has been specified. The use of other weighting factors for external exposure will be approved on a case- by-case basis until such time as specific guidance is issued.

This approach to determining TEDE can be overly conservative for extremely non-uniform irradiations (i.e., when only a small portion of the whole body is irradiated). As discussed in the NRC Regulatory Issue Summaries 2002-06, 2003-04, and 2004-01, the NRC has approved several methods for determining EDEex, and has encouraged the use of EDEex in place of DDE for demonstrating compliance with the TEDE requirements in 10 CFR Part 20.

3.0 TECHNICAL EVALUATION

3.1 Evaluation The NRC staff has reviewed the technical approach for estimating EDEex provided in the standard. This multiple dosimetry method divides the whole body into seven separate compartments. Each compartment, or composite compartment (since the standard allows combining adjacent compartments), is monitored separately. The results of the dose measurement for each compartment are weighted with an associated compartment factor.

The resulting weighted doses are then summed to determine the EDEex for the whole body.

The compartment factors are listed in Table 1 of the standard. The factor for each compartment was developed by summing the stochastic weighting factors given in ICRP 26 (Part 20 organ weighting factors) for all the organs located within that compartment. For each tissue that resides in more than one compartment (e.g., red bone marrow), the weighting factor was apportioned between the compartments based on the fraction of the total mass of the tissue residing in each, using the information in ICRP 23.

The ANSI/HPS 13.41 multiple dosimeter method of determining EDEex is based on the assumptions that (1) the average dose to the tissues in each compartment can be reasonably measured (with one or more dosimeters), and (2) that the dose distribution across the compartment is sufficiently constant so that this average dose can be applied to each tissue in the compartment. The compartments defined in the standard are small enough so that under most normal exposure situations these assumptions are met and a single determination of DDE in each compartment is sufficient. However, this may not be the case in those unusual situations where a significant dose gradient exists across one or more compartments (particularly the thorax and abdomen compartments). In these cases, the number and placement of dosimeters in each compartment become critical to ensuring that the EDEex is not underestimated.

To ensure that the estimates of EDEex are conservative, the licensee has committed to measuring the dose to each compartment (or composite compartment) by locating the dosimeter, calibrated to DDE, at the highest exposed portion of that compartment. The dosimeter location for each compartment will be subject to the same criteria currently used for demonstrating compliance with 10 CFR 20.1201(c).

The licensee has stated that in most normal exposure situations they intend to provide one dosimeter for a combined thorax-abdomen composite compartment, consistent with the standard and their current multi-badging practice.

3.2 Regulatory Commitments The following table identifies the regulatory commitments made by Entergy.

List of Regulatory Commitments TYPE (Check one) SCHEDULED COMPLETION ONE- CONTINUING COMMITMENT DATE (If TIME COMPLIANCE Required)

ACTION Entergy will monitor the part of the whole body within each compartment (and/or composite compartment) that receives the highest dose.

Entergy is developing a fleet wide Nuclear Management Manual procedure EN-RP-204, x

Special Monitoring Requirements, for determining dosimeter selection and placement. This procedure guidance will be consistent with that found in NRC Inspection Procedure 71121.01, issue date 03/06/02.

Based on the NRCs approval of this request, Entergy will account for dose consistent with the guidance of the standard as follows:

The DDE for each compartment will be determined from dosimeters worn at that location. When no dosimeter is worn at a particular compartment, the DDE will be determined from the dosimeter positioned where the exposure is judged to be similar. x The assigned EDE will be the sum of each DDE measurement multiplied by its appropriate compartment factor.

The assigned lens dose equivalent (LDE) will be the higher of the head or chest dosimeters.

The assigned shallow dose equivalent (SDE) will be the highest of any whole body dosimeter.

The NRC staff finds that reasonable controls for the implementation and for subsequent evaluation of proposed changes pertaining to the above regulatory commitments are provided by the licensees administrative processes, including its commitment management program.

Should the licensee choose to incorporate a regulatory commitment into the emergency plan, Updated Final Safety Analysis Report, or other documents with established regulatory controls,

the associated regulations would define the appropriate change-control and reporting requirements. The NRC staff has determined that the commitments do not warrant the creation of regulatory requirements, which would require prior NRC approval of subsequent changes.

The NRC staff has agreed that Nuclear Energy Institute 99-04, Revision 0, Guidelines for Managing NRC Commitment Changes, provides reasonable guidance for the control of regulatory commitments made to the NRC staff (see Regulatory Issue Summary 2000-17, Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff, dated September 21, 2000). The commitments should be controlled in accordance with industry guidance or comparable criteria employed by a specific licensee. The NRC staff may choose to verify the implementation and maintenance of these commitments in a future inspection or audit.

4.0 CONCLUSION

S The NRC staff concludes that calculating TEDE using EDEex in place of DDE provides a more accurate estimate of the risk associated with the radiation exposures experienced by radiation workers at a nuclear power plant. The NRC staff finds that limiting TEDE such that EDEex + CEDE < 5 rem is consistent with the basis for the dose limits, and footnote 2 to the Organ Dose Weighting Factors table in 10 CFR Part 20.1003.

Additionally, the NRC staff concludes that the multiple dosimetry method to estimate EDEex using the weighting factors listed in Table 1 of the standard, as proposed by the licensee, is technically sound and is acceptable for the purposes of demonstrating compliance with the TEDE-based requirements in 10 CFR Part 20.

Therefore, based on the above discussion and the information provided by Entergy in its submittal, the NRC staff approves the use of the weighting factors provided in the ANSI HPS N13.41-1997 (the standard) for external radiation exposures when demonstrating compliance with total effective dose equivalent (TEDE), based on requirements in 10 CFR Part 20 for ANO-2 and JAF.

Principal Contributor: R. Pedersen Date: July 19, 2006

Arkansas Nuclear One cc:

Senior Vice President Vice President, Operations Support

& Chief Operating Officer Entergy Operations, Inc.

Entergy Operations, Inc. P. O. Box 31995 P. O. Box 31995 Jackson, MS 39286-1995 Jackson, MS 39286-1995 Wise, Carter, Child & Caraway Director, Division of Radiation P. O. Box 651 Control and Emergency Management Jackson, MS 39205 Arkansas Department of Health 4815 West Markham Street, Slot 30 Mr. Jeffrey S. Forbes Little Rock, AR 72205-3867 Site Vice President Arkansas Nuclear One Winston & Strawn Entergy Operations, Inc.

1700 K Street, N.W. 1448 S. R. 333 Washington, DC 20006-3817 Russellville, AR 72801 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 310 London, AR 72847 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 County Judge of Pope County Pope County Courthouse Russellville, AR 72801 September 2005

FitzPatrick Nuclear Power Plant cc:

Mr. Gary J. Taylor Ms. Charlene D. Faison Chief Executive Officer Manager, Licensing Entergy Operations, Inc. Entergy Nuclear Operations, Inc.

1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. John T. Herron Mr. Michael J. Colomb Sr. VP and Chief Operating Officer Director of Oversight Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Mr. Peter T. Dietrich Mr. David Wallace Site Vice President Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant James A. FitzPatrick Nuclear Power Plant P.O. Box 110 P.O. Box 110 Lycoming, NY 13093 Lycoming, NY 13093 Mr. Kevin J. Mulligan Mr. James Costedio General Manager, Plant Operations Manager, Regulatory Compliance Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant James A. FitzPatrick Nuclear Power Plant P.O. Box 110 P.O. Box 110 Lycoming, NY 13093 Lycoming, NY 13093 Mr. Oscar Limpias Assistant General Counsel Vice President Engineering Entergy Nuclear Operations, Inc.

Entergy Nuclear Operations, Inc. 440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Regional Administrator, Region I Mr. Christopher Schwarz U.S. Nuclear Regulatory Commission Vice President, Operations Support 475 Allendale Road Entergy Nuclear Operations, Inc. King of Prussia, PA 19406 440 Hamilton Avenue White Plains, NY 10601 Resident Inspector's Office James A. FitzPatrick Nuclear Power Plant Mr. John F. McCann U. S. Nuclear Regulatory Commission Director, Licensing P.O. Box 136 Entergy Nuclear Operations, Inc. Lycoming, NY 13093 440 Hamilton Avenue White Plains, NY 10601

FitzPatrick Nuclear Power Plant cc:

Mr. Charles Donaldson, Esquire Mr. Garrett D. Edwards Assistant Attorney General 814 Waverly Road New York Department of Law Kennett Square, PA 19348 120 Broadway New York, NY 10271 Mr. Michael Kansler President Mr. Peter R. Smith, President Entergy Nuclear Operations, Inc.

New York State Energy, Research, 440 Hamilton Avenue and Development Authority White Plains, NY 10601 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy New York State Dept. of Public Service 3 Empire State Plaza Albany, NY 12223-1350 Oswego County Administrator Mr. Steven Lyman 46 East Bridge Street Oswego, NY 13126 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. James H. Sniezek BWR SRC Consultant 5486 Nithsdale Drive Salisbury, MD 21801-2490 Mr. Michael D. Lyster BWR SRC Consultant 5931 Barclay Lane Naples, FL 34110-7306