INITIATING CUES:
INITIATING CUES:
: 1. The US has directed you locally open 2AF017A, at MCC 231X3, per 2BOA ELEC-5, Attachment C.
: 1. The US has directed you locally open 2AF017A, at MCC 231X3, per 2BOA ELEC-5, Attachment C.
: 2. The SM has given you a jumper.  
: 2. The SM has given you a jumper.


Page 2 of 5 JOB PERFORMANCE MEASURE Rev. 0, 03/20/06 TASK TITLE: Locally Open SX to AF Pump Suction Valve JPM No.: Plt 100 TPO No: K&A No.: 061 K1.07 K&A IMP. 3.6/3.8 TRAINEE:_______________________________
JOB PERFORMANCE MEASURE                         Rev. 0, 03/20/06 TASK TITLE:     Locally Open SX to AF Pump Suction Valve           JPM No.: Plt 100 TPO No:                           K&A No.: 061 K1.07               K&A IMP. 3.6/3.8 TRAINEE:_______________________________                           DATE: ___/___/___
DATE:   ___/___/___
The Trainee:     PASSED_________ this JPM                   TIME STARTED: ________
The Trainee:
FAILED __________                           TIME FINISHED: ________
PASSED_________   this JPM TIME STARTED: ________
EVALUATION METHOD:         PERFORM______           SIMULATE___X____
FAILED __________
LOCATION:                   IN PLANT___X___
TIME FINISHED: ________
EVALUATION METHOD:
PERFORM______
SIMULATE___X____
LOCATION:
IN PLANT___X___
MATERIALS:
MATERIALS:
: 1. Electrical jumpers (simulated for In Plant) 2. Copy of 2BOA ELEC-5, Attachment C 3. Safety Equipment
: 1. Electrical jumpers (simulated for In Plant)
 
: 2. Copy of 2BOA ELEC-5, Attachment C
GENERAL  
: 3. Safety Equipment GENERAL  


==REFERENCES:==
==REFERENCES:==
Line 47: Line 41:
Complete the steps necessary to locally open _AF017B.
Complete the steps necessary to locally open _AF017B.
TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are a Non-Licensed Operator. 2. The control switch for 2AF017A is not functioning. 3. 2BEP-0 is in progress, due to a LOOP. 4. Unit 2 CST has been damaged by a tornado.
: 1. You are a Non-Licensed Operator.
: 2. The control switch for 2AF017A is not functioning.
: 3. 2BEP-0 is in progress, due to a LOOP.
: 4. Unit 2 CST has been damaged by a tornado.
INITIATING CUES:
INITIATING CUES:
: 1. The US has directed you locally open 2AF017A, at MCC 231X3, per 2BOA ELEC-5, Attachment C. 2. The SM has given you a jumper.
: 1. The US has directed you locally open 2AF017A, at MCC 231X3, per 2BOA ELEC-5, Attachment C.
CRITICAL ELEMENTS: (*) 3, 4, 5, 6, 7 & 12 APPROXIMATE COMPLETION TIME: 20 minutes PERFORMANCE CHECKLIST STANDARDS SAT UNSAT  N/A  Page 3 of 5 RECORD START TIME________
: 2. The SM has given you a jumper.
: 1. Refer to 2BOA ELEC-5, Attachment C Cue:  (if asked) The valve is SX to AF suction valve Cue:  (if asked) The cubicle for the valve is B5 on MCC 231X3  OPEN  2BOA ELEC-5, Attachment C o o o      2. Locate proper MCC and cubicle  LOCATE MCC 231X3 Cubicle B5 o o o  NOTE Cubicle location may be given to examinee afte r they display a method of retrieving this information (e.g. call control room, 'E' L/U's etc.)
CRITICAL ELEMENTS: (*) 3, 4, 5, 6, 7 & 12 APPROXIMATE COMPLETION TIME: 20 minutes Page 2 of 5
(401' M20 for 231X3)  After Cubicle is located, move to a different MCC in a low traffic area.
CAUTION                  Do not open breaker or cubicle door on energized MCC breakers!
The rest of this JPM may be continued on an unassigned cubicle, with SM's permission, or simulated using a photo provided.


Protective clothing required is Full Class 3 plus Safety Glasses and Hardhat with Class 2 Face Shield.  
PERFORMANCE CHECKLIST                                      STANDARDS            SAT  UNSAT N/A RECORD START TIME________
      *3. Turn breaker Off Cue:   Breaker handle is in the  
: 1. Refer to 2BOA ELEC-5,                          °    OPEN 2BOA ELEC-5,            o  o    o Attachment C                                        Attachment C Cue: (if asked) The valve is SX to AF suction valve Cue: (if asked) The cubicle for the valve is B5 on MCC 231X3
'DOWN' position (OFF)
: 2. Locate proper MCC and cubicle                  °    LOCATE MCC 231X3            o  o    o Cubicle B5 NOTE Cubicle location may be given to examinee after they display a method of retrieving this information (e.g. call control room, 'E' L/U's etc.)
At MCC 231X3Cubicle B5:  Turn breaker OFF o o o      *4. Open cubicle door Cue: Door is OPEN At MCC 231X3Cubicle B5:  OPEN cubicle door o o o PERFORMANCE CHECKLIST STANDARDS SAT UNSAT  N/A  Page 4 of 5
(401 M20 for 231X3)
    *5. Install jumper Cue:  Jumper is installed between points 2 and 3 At MCC 231X3Cubicle B5:  INSTALL jumper between points 2 and 3 on the terminal board at
After Cubicle is located, move to a different MCC in a low traffic area.
CAUTION Do not open breaker or cubicle door on energized MCC breakers!
The rest of this JPM may be continued on an unassigned cubicle, with SM's permission, or simulated using a photo provided.
Protective clothing required is Full Class 3 plus Safety Glasses and Hardhat with Class 2 Face Shield.
*3. Turn breaker Off                                 At MCC 231X3Cubicle B5:          o  o    o Cue: Breaker handle is in the
* Turn breaker OFF DOWN position (OFF)
*4. Open cubicle door                                At MCC 231X3Cubicle B5:           o   o   o Cue: Door is OPEN
* OPEN cubicle door Page 3 of 5


front of cubicle o o o      *6. Override interlock and then turn breaker on Cue: Breaker and door interlock overriden Cue: Breaker handle is in the 'UP' position (ON) and 'M' contactor picks up Cue: The 'M' contactor picks up At MCC 231X3Cubicle B5:   OVERRIDE breaker and door interlock  TURN breaker ON o o o     *7. Turn breaker off.
PERFORMANCE CHECKLIST                    STANDARDS            SAT UNSAT N/A
Cue: 'M' contactor has dropped outCue: Breaker handle is in the  
*5. Install jumper                  At MCC 231X3Cubicle B5:      o    o    o Cue: Jumper is installed between
'DOWN' position (OFF)
* INSTALL jumper points 2 and 3                    between points 2 and 3 on the terminal board at front of cubicle
At MCC 231X3Cubicle B5:  WHEN 'M' contactor drops out, IMMEDIATELY turn
*6. Override interlock and then turn At MCC 231X3Cubicle B5:      o    o    o breaker on Cue: Breaker and door interlock
* OVERRIDE breaker and overriden                         door interlock Cue: Breaker handle is in the UP
* TURN breaker ON position (ON) and 'M' contactor picks up Cue: The M contactor picks up
*7. Turn breaker off.                At MCC 231X3Cubicle B5:       o   o   o Cue: M contactor has dropped out
* WHEN 'M' contactor drops out, Cue: Breaker handle is in the           IMMEDIATELY turn DOWN position (OFF)             breaker OFF
: 8. Remove the jumper.              At MCC 231X3Cubicle B5:       o    o    o Cue: Jumper is removed              °  REMOVE jumper
: 9. Close the cubicle door.          At MCC 231X3Cubicle B5:      o    o    o Cue: Cubicle door is closed          °   CLOSE cubicle door Page 4 of 5


breaker OFF o o o      8. Remove the jumper. Cue: Jumper is removed At MCC 231X3Cubicle B5:  REMOVE jumper o o o      9. Close the cubicle door. Cue: Cubicle door is closed At MCC 231X3Cubicle B5:  CLOSE cubicle door o o o PERFORMANCE CHECKLIST STANDARDS SAT UNSAT   N/A Page 5 of 5 NOTE Valve location may be given to examinee after they display a method of retrieving this information (e.g. call the Control Room, "M" lineups, etc.)
PERFORMANCE CHECKLIST                           STANDARDS             SAT     UNSAT N/A NOTE Valve location may be given to examinee after they display a method of retrieving this information (e.g. call the Control Room, M lineups, etc.)
(383' M18 for 2AF017A)
(383 M18 for 2AF017A)
Note: Alternate Path Starts here
Note: Alternate Path Starts here
: 10. Check Local Valve position Cue: Valve is closed Verify 2AF017A is open o o o     11. Notify Control Room Cue: Shift Manager directs you to locally open valve 2AF017A   Control Room notified that 2AF017A is closed o o o      *12. Locally open 2AF017A Cue: Valve is open Simulate manually opening 2AF017A by:   Depressing the lever       (Declutching the motor from the valve) and rotating handwheel counter-clockwise.
: 10. Check Local Valve position           °    Verify 2AF017A is open     o       o       o Cue: Valve is closed
o o o      11. Notify Control Room Cue:  This JPM is completed  Control Room notified that 2AF017A is open o o o RECORD STOP TIME________
: 11. Notify Control Room                   °    Control Room notified      o      o      o that 2AF017A is closed Cue: Shift Manager directs you to locally open valve 2AF017A
*12. Locally open 2AF017A                 Simulate manually opening         o      o      o 2AF017A by:
* Depressing the lever (Declutching the motor from the valve)
Cue: Valve is open
* and rotating handwheel counter-clockwise.
: 11. Notify Control Room                   °    Control Room notified       o      o      o that 2AF017A is open Cue:    This JPM is completed RECORD STOP TIME________
COMMENTS:
COMMENTS:
Page 5 of 5
JOB PERFORMANCE MEASURE TASK CONDITIONS:
JOB PERFORMANCE MEASURE TASK CONDITIONS:
: 1. You are a Non-Licensed Operator.
: 1. You are a Non-Licensed Operator.
: 2. Unit-_ is experiencing a loss of Essential Service Water
: 2. Unit-_ is experiencing a loss of Essential Service Water.
. INITIATING CUES:
INITIATING CUES:
The Unit Supervisor has directed you to per form the actions necessary to align FP cooling to the _A Centrifugal Charging pump per _BOA PRI-7, Attachment B.  
The Unit Supervisor has directed you to perform the actions necessary to align FP cooling to the _A Centrifugal Charging pump per _BOA PRI-7, Attachment B.


Page 2 of 4 JOB PERFORMANCE MEASURE             Rev. 02, 03/20/06 TASK TITLE: Align Fire Protection Cooling to a Centrifugal Charging Pump JPM No.: Plt 200 TPO No: IV.D.OA-69 K&A No.: 086 K1.02 K&A IMP. 2.7/3.2 TRAINEE:_______________________________
JOB PERFORMANCE MEASURE                           Rev. 02, 03/20/06 TASK TITLE:     Align Fire Protection Cooling to a Centrifugal     JPM No.: Plt 200 Charging Pump TPO No: IV.D.OA-69               K&A No.: 086 K1.02               K&A IMP. 2.7/3.2 TRAINEE:_______________________________                             DATE: ___/___/___
DATE:   ___/___/___
The Trainee:     PASSED_________ this JPM                   TIME STARTED: ________
The Trainee:
FAILED __________                           TIME FINISHED: ________
PASSED_________   this JPM TIME STARTED: ________
EVALUATION METHOD:           PERFORM______           SIMULATE_______
FAILED __________
LOCATION:                   IN PLANT__X___
TIME FINISHED: ________
MATERIALS:
EVALUATION METHOD:
None GENERAL  
PERFORM______
SIMULATE_______
LOCATION:
IN PLANT__X___ MATERIALS:
None GENERAL  


==REFERENCES:==
==REFERENCES:==


_BOA PRI-7, Essential Service Water Malf unction, (Rev. 101 for U1 & Rev 102 for U2)
_BOA PRI-7, Essential Service Water Malfunction, (Rev. 101 for U1 & Rev 102 for U2)
TASK STANDARDS:
TASK STANDARDS:
Perform the actions necessary to align FP c ooling to the 1A Centrifugal Charging pump TASK CONDITIONS:
Perform the actions necessary to align FP cooling to the 1A Centrifugal Charging pump TASK CONDITIONS:
: 1. You are a Non-Licensed Operator. 2. Unit-_ is experiencing a loss of Essential Service Water
: 1. You are a Non-Licensed Operator.
. INITIATING CUES:
: 2. Unit-_ is experiencing a loss of Essential Service Water.
The Unit Supervisor has directed you to per form the actions necessary to align FP cooling to the _A Centrifugal Charging pump per _BOA PRI-7, Attachment B.
INITIATING CUES:
CRITICAL ELEMENTS: (*) 2 & 3 APPROXIMATE COMPLETION TIME:
The Unit Supervisor has directed you to perform the actions necessary to align FP cooling to the _A Centrifugal Charging pump per _BOA PRI-7, Attachment B.
10 minutes PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A  Page 3 of 4 RECORD START TIME________
CRITICAL ELEMENTS: (*) 2 & 3 APPROXIMATE COMPLETION TIME: 10 minutes Page 2 of 4
: 1. Refer to _BOA PRI-7, Attachment B, Essential Service Water Malfunction Note:  This step may be performed at any time. OPEN _BOA PRI-7, Attachment B, Essential


Service Water  
PERFORMANCE CHECKLIST                    STANDARDS                      SAT  UNSAT  N/A RECORD START TIME________
: 1. Refer to _BOA PRI-7, Attachment      °    OPEN _BOA PRI-7,            o      o    o B, Essential Service Water                 Attachment B, Essential Malfunction                                Service Water Malfunction Note: This step may be performed at any time.
NOTE The Hose stations for both Units are located at V-18, 364 (Outside the 2A CV Pump Rm)
*2. Connect FP cooling to _A
* CONNECT FP supply              o      o    o Centrifugal Charging pump            hose Cue: FP supply hose CONNECTED
*3. Align FP cooling to _A Centrifugal                                      o      o    o Charging pump At 364 V-18 AB2:
Cue: (U1) 0FP5170 is OPEN (U2) 0FP5171 is OPEN
* OPEN 0FP5170 (U1) or 0FP5171 (U2), FP hose supply isolation valve At _A CV pump:
Cue: _SX2200A is OPEN
* OPEN _SX2200A, Cue: _SX2199A is CLOSED
* CLOSE _SX2199A, Page 3 of 4


Malfunction o o o      NOTE The Hose stations for both Units are located at V-18, 364' (Outside the 2A CV Pump Rm)
PERFORMANCE CHECKLIST            STANDARDS              SAT UNSAT N/A
    *2. Connect FP cooling to _A Centrifugal Charging pump Cue: FP supply hose CONNECTED   CONNECT FP supply hose o o o      *3. Align FP cooling to _A Centrifugal Charging pump Cue: (U1) 0FP5170 is OPEN              (U2) 0FP5171 is OPEN Cue: _SX2200A is OPEN Cue: _SX2199A is CLOSED At 364 V-18 AB2: OPEN 0FP5170 (U1) or 0FP5171 (U2), FP hose
*4. Place a portable fan in door At the _A CV Pump Room  o   o   o opening.                    Door.
 
Cue: Another NLO will bring and      Place portable fan place the fan Cue: This JPM is completed RECORD STOP TIME________
supply isolation
COMMENTS:
Page 4 of 4


valve At _A CV pump:  OPEN _SX2200A,  CLOSE  _SX2199A, o o o PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A  Page 4 of 4*4. Place a portable fan in door opening. Cue: Another NLO will bring and place the fan Cue: This JPM is completed At the _A CV Pump Room Door. Place portable fan o o o      RECORD STOP TIME________
COMMENTS:
JOB PERFORMANCE MEASURE TASK CONDITIONS:
JOB PERFORMANCE MEASURE TASK CONDITIONS:
: 1. You are a non-licensed operator.
: 1. You are a non-licensed operator.
Line 118: Line 135:
: 3. Maintenance has repaired 125 VDC Battery Charger _11 and all clearance orders are lifted.
: 3. Maintenance has repaired 125 VDC Battery Charger _11 and all clearance orders are lifted.
INITIATING CUES:
INITIATING CUES:
The US directs you to startup 125 VDC Battery Charger _11 per _BOP DC-1.  
The US directs you to startup 125 VDC Battery Charger _11 per _BOP DC-1.


Page 2 of 5 JOB PERFORMANCE MEASURE                   Rev. 2, 3/20/06 TASK TITLE: Respond to a Loss of DC Power. (Startup of a 125 VDC ESF Battery Charger)
JOB PERFORMANCE MEASURE                               Rev. 2, 3/20/06 TASK TITLE:     Respond to a Loss of DC Power. (Startup of a         JPM No.: Plt 300 125 VDC ESF Battery Charger)
JPM No.: Plt 300 TPO No: IV.D.OA-23 K&A No: 063 A3.01 K&A IMP: 2.7/3.1 TRAINEE:_______________________________
TPO No: IV.D.OA-23               K&A No: 063 A3.01                 K&A IMP: 2.7/3.1 TRAINEE:_______________________________                             DATE: ___/___/___
DATE:   ___/___/___
The Trainee:     PASSED_________ this JPM                     TIME STARTED: ________
The Trainee:
FAILED __________                             TIME FINISHED: ________
PASSED_________   this JPM TIME STARTED: ________
EVALUATION METHOD:           PERFORM______           SIMULATE_______
FAILED __________
LOCATION:                   IN PLANT______
TIME FINISHED: ________
EVALUATION METHOD:
PERFORM______
SIMULATE_______
LOCATION:
IN PLANT______
MATERIALS:
MATERIALS:
: 1. Copy of _BOP DC-1 2. Calibrated hand held digital voltmeter, optional.
: 1. Copy of _BOP DC-1
: 2. Calibrated hand held digital voltmeter, optional.
GENERAL  
GENERAL  


Line 141: Line 153:
Take the actions necessary to start-up a 125V DC ESF battery charger.
Take the actions necessary to start-up a 125V DC ESF battery charger.
TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are a non-licensed operator. 2. The unit had experienced a Battery Charger _11 failure. 3. Maintenance has repaired 125 VDC Ba ttery Charger _11 and all clearance orders are lifted.
: 1. You are a non-licensed operator.
: 2. The unit had experienced a Battery Charger _11 failure.
: 3. Maintenance has repaired 125 VDC Battery Charger _11 and all clearance orders are lifted.
INITIATING CUES:
INITIATING CUES:
The US directs you to startup 125 VDC Battery Charger _11 per _BOP DC-1.
The US directs you to startup 125 VDC Battery Charger _11 per _BOP DC-1.
CRITICAL ELEMENTS: (*) 7, 8, 9, 10 APPROXIMATE COMPLETION TIME: 15 minutes PERFORMANCE CHECKLIST STANDARD SAT UNSAT  N/A Page 3 of 5 RECORD START TIME ______
CRITICAL ELEMENTS: (*) 7, 8, 9, 10 APPROXIMATE COMPLETION TIME: 15 minutes Page 2 of 5
: 1. Refer to _BOP DC-1, 125V DC ESF Battery Chargers Start-up Note: Step 1 may be performed at any time. Cue: All prerequisites have been met  LOCATE and OPEN
_BOP DC-1    Note: Bus _31X, Compartment 4B is located on 426 elevation 2. 480 VAC feed breaker to battery charger Cue:  Bus _31X, Compartment 4B
'RED' light is LIT -OR- the breaker is OPEN VERIFY/OPEN Bus
_31X, Compartment 4B    3. 125 VDC feed breaker from battery charger to battery Cue:  AF-1 is pointing to the left (OFF)  VERIFY/OPEN 125 V DC ESF Distribution Center _11


Compartment AF-1     4. AC power breaker on battery charger Cue: AC power breaker, CB-1 is in the DOWN (off) position VERIFY/OPEN AC power breaker, CB-1 on  
PERFORMANCE CHECKLIST                STANDARD                      SAT UNSAT N/A RECORD START TIME ______
: 1. Refer to _BOP DC-1, 125V DC      °    LOCATE and OPEN ESF Battery Chargers Start-up          _BOP DC-1 Note: Step 1 may be performed at any time.
Cue: All prerequisites have been met Note: Bus _31X, Compartment 4B is located on 426 elevation
: 2. 480 VAC feed breaker to battery charger                          °    VERIFY/OPEN Bus
_31X, Compartment 4B Cue: Bus _31X, Compartment 4B RED light is LIT -OR- the breaker is OPEN
: 3. 125 VDC feed breaker from battery °    VERIFY/OPEN 125 V charger to battery                    DC ESF Distribution Center _11 Cue: AF-1 is pointing to the left        Compartment AF-1 (OFF)
: 4. AC power breaker on battery charger                           °    VERIFY/OPEN AC power breaker, CB-1 on Cue: AC power breaker, CB-1 is in         _11 Battery Charger the DOWN (off) position
: 5. DC power breaker on battery      °    VERIFY/OPEN DC charger                                power breaker, CB-2 on Cue: DC power breaker, CB-2 is in        _11 Battery Charger the DOWN (off) position Page 3 of 5


_11 Battery Charger       5. DC power breaker on battery charger Cue: DC power breaker, CB-2 is in the DOWN (off) position VERIFY/OPEN DC power breaker, CB-2 on
PERFORMANCE CHECKLIST                  STANDARDS                      SAT    UNSAT N/A
: 6. Float/Equalize selector switch and  ENSURE Battery Charger equalize timer                      _11:
Cue: Float/Equalize selector switch      °    Float/Equalize selector is over to the LEFT (float)            switch in FLOAT position
                                        °    Equalize timer is TIMED Cue: Equalize timer is set at ZERO            OUT NOTE The Safety Rule Book is unclear regarding the personnel protection equipment requirements for this manipulation. Ensure the trainee can describe how they would close the breaker in the next step.
Note: Bus _31X, Compartment 4B is located on 426 elevation
*7. Energize the battery charger
* CLOSE bus _31X compartment 4B Cue: Breaker _31X compartment 4B GREEN light is LIT OR (if remaining at the Battery Charger)
Cue: Breaker _31X compartment 4B breaker is CLOSED
*8. Connect the battery charger to the
* CLOSE breaker AF-1 distribution panel                        on ESF distribution panel
_11 Cue: AF-1 pointing up (ON)
*9 DC power breaker
* CLOSE breaker CB-2 on Battery Charger _11 Cue: CB-2 is in the UP (on) position Page 4 of 5


_11 Battery Charger PERFORMANCE CHECKLIST STANDARDS SAT  UNSAT   N/A Page 4 of 56. Float/Equalize selector switch and equalize timer Cue: Float/Equalize selector switch is over to the LEFT (float) position Cue: Equalize timer is set at ZERO ENSURE Battery Charger
PERFORMANCE CHECKLIST                       STANDARDS                       SAT  UNSAT N/A
_11:  Float/Equalize selector switch in FLOAT  Equalize timer is TIMED OUT NOTE The Safety Rule Book is unclear r egarding the personnel protection equipment requirements for this manipulation. Ensure the trainee can describe how they would close the breaker in the next step.
*10 Energize the DC bus and batteries
Note: Bus _31X, Compartment 4B is located on 426 elevation
* CLOSE breaker CB-1 on from the battery charger                    Battery Charger _11 Cue: CB-1 is in the UP (on) position Cue: (If requested) Battery charger amp meter is at 80 and slowly decreasing NOTE In the following step, if a voltmeter is not available, have the trainee demonstrate how voltage would be measured then:
*7. Energize the battery charger Cue: Breaker _31X compartment 4B
Cue: Battery _11 terminal voltage = 128.9 volts (measured between cells #1 & #58)
'GREEN' light is LIT OR (if remaining at the Battery Charger) Cue: Breaker _31X compartment 4B breaker is CLOSED CLOSE bus _31X compartment 4B        *8. Connect the battery charger to the distribution panel Cue: AF-1 pointing up (ON)  CLOSE breaker AF-1 on ESF distribution panel
If voltage is measured elsewhere modify voltage as required, on the right side each row is 17 cells (37.81 volts) and each left side is 12 cells (26.69 volts)
: 11. Verify the battery and charger are      °    MEASURE battery operating properly                            terminal voltage NOTE: see cue above                          °    ENSURE voltage between 128.2 and 130.5 VDC
: 12. Battery charger alarm                    °    CHECK _-21-E8 annunciator CLEAR Cue: Unit _ NSO reports _-21-E8, 125V DC BATT CHGR _11 TROUBLE has CLEARED Cue: This JPM is completed RECORD STOP TIME_________
COMMENTS:
Page 5 of 5


_11      *9 DC power breaker Cue: CB-2 is in the UP (on) position  CLOSE breaker CB-2 on Battery Charger _11 PERFORMANCE CHECKLIST STANDARDS SAT  UNSAT  N/A  Page 5 of 5*10 Energize the DC bus and batteries from the battery charger Cue: CB-1 is in the UP (on) position Cue: (If requested)
JOB PERFORMANCE MEASURE TASK CONDITIONS:
Battery charger amp meter is at 80 and slowly decreasing  CLOSE breaker CB-1 on Battery Charger _11        NOTE In the following step, if a voltmeter is not available, have the trainee demonstrate how voltage would be measured then: Cue:  Battery _11 terminal voltage = 128.9 volts (measured between cells #1 & #58) If voltage is measured elsewhere modify vo ltage as required, on the right side each row is 17 cells (37.81 volts) and each left side is 12 cells (26.69 volts)
: 1. You are an extra NSO.
: 11. Verify the battery and charger are operating properly NOTE: see cue above  MEASURE battery terminal voltage  ENSURE voltage between 128.2 and 130.5 VDC          12. Battery charger alarm Cue:  Unit _ NSO reports _-21-E8, 125V DC BATT CHGR _11 TROUBLE has CLEARED Cue:  This JPM is completed RECORD STOP TIME_________  CHECK _-21-E8 annunciator CLEAR      COMMENTS:
: 2. The Unit is near full power with excess letdown in service and flow directed to the CV pump suction header.
JOB PERFORMANCE MEASURE TASK CONDITIONS: 1. You are an extra NSO. 2. The Unit is near full power with excess letdown in service and flow directed to the CV pump suction header. 3. Valve strokes for 1CV8152 and 1CV8160 are complete and normal letdown has been restored.
: 3. Valve strokes for 1CV8152 and 1CV8160 are complete and normal letdown has been restored.
INITIATING CUES:
INITIATING CUES:
: 1. The US has directed you to secure excess letdown operations.  
: 1. The US has directed you to secure excess letdown operations.


Page 2 of 5 JOB PERFORMANCE MEASURE Rev. 1 TASK TITLE: Remove Excess Letdown from Service JPM No.: Sim 100 TPO No: IV.C.CV-07 K&A No.: 004 A4.06 K&A IMP. 3.6/3.1 TRAINEE:_______________________________
JOB PERFORMANCE MEASURE                         Rev. 1 TASK TITLE:     Remove Excess Letdown from Service                 JPM No.:Sim 100 TPO No: IV.C.CV-07               K&A No.: 004 A4.06               K&A IMP. 3.6/3.1 TRAINEE:_______________________________                             DATE: ___/___/___
DATE:   ___/___/___
The Trainee:     PASSED_________ this JPM                   TIME STARTED: ________
The Trainee:
FAILED __________                           TIME FINISHED: ________
PASSED_________   this JPM TIME STARTED: ________
EVALUATION METHOD:         PERFORM___ X ___ SIMULATE LOCATION:                   IN PLANT                 SIMULATOR____ X __
FAILED __________
MATERIALS:
TIME FINISHED: ________
None GENERAL  
EVALUATION METHOD:
PERFORM___
X ___ SIMULATE LOCATION:
IN PLANT SIMULATOR____
X __ MATERIALS:
None GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. BOP CV-15, Rev. 7, Excess Letdown Operations.
: 1. BOP CV-15, Rev. 7, Excess Letdown Operations.
TASK STANDARDS: Remove excess letdown from service.
TASK STANDARDS:
TASK CONDITIONS: 1. You are an extra NSO. 2. The Unit is near full power with excess letdown in service and flow directed to the CV pump suction header. 3. Valve strokes for 1CV8152 and 1CV8160 are complete and normal letdown has been restored.
Remove excess letdown from service.
INITIATING CUES: 1. The US has directed you to secure excess letdown operations.
TASK CONDITIONS:
CRITICAL ELEMENTS: (*) 2,4 APPROXIMATE COMPLETION TIME:
: 1. You are an extra NSO.
5   minutes PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A  Page 3 of 5 RECORD START TIME_______
: 2. The Unit is near full power with excess letdown in service and flow directed to the CV pump suction header.
NOTEProvide examinee with a copy of BOP CV-15 when located.
: 3. Valve strokes for 1CV8152 and 1CV8160 are complete and normal letdown has been restored.
: 1. Refer to BOP CV-15, step F.2
INITIATING CUES:
. Cue: All Prerequisites and Precautions have been met.
: 1. The US has directed you to secure excess letdown operations.
Locate and Open BOP CV-15,step F.2.
CRITICAL ELEMENTS: (*)
o o o      *2. Isolate excess letdown flowpath.
2,4 APPROXIMATE COMPLETION TIME: 5 minutes Page 2 of 5
At 1PM05J  SLOWLY CLOSE 1CV123, Exc Ltdwn HX


Flow Cont Vlv, o o o      3. Isolate excess letdown flowpath At 1PM05J CLOSE 1CV8153A, Exc Ltdwn HX 1A Inlet Isol  
PERFORMANCE CHECKLIST                STANDARDS                  SAT  UNSAT N/A RECORD START TIME_______
NOTE Provide examinee with a copy of BOP CV-15 when located.
: 1. Refer to BOP CV-15, step F.2.    °  Locate and Open BOP    o    o    o CV-15,step F.2.
Cue: All Prerequisites and Precautions have been met.
*2. Isolate excess letdown flowpath. At 1PM05J                  o    o    o
* SLOWLY CLOSE 1CV123, Exc Ltdwn HX Flow Cont Vlv,
: 3. Isolate excess letdown flowpath At 1PM05J                   o    o    o
                                      °  CLOSE 1CV8153A, Exc Ltdwn HX 1A Inlet Isol Vlv,
                                      °  CLOSE 1CV8153B, Exc Ltdwn HX 1B Inlet Isol Vlv,
*4. Isolate excess letdown flowpath  At 1PM05J                  o    o    o
* CLOSE 1RC8037A, Loop drain Vlv
                                      °  CLOSE 1RC8037B, Loop drain Vlv
                                      °  CLOSE 1RC8037C, Loop drain Vlv
                                      °  CLOSE 1RC8037D, Loop drain Vlv Page 3 of 5


Vlv,  CLOSE 1CV8153B, Exc Ltdwn HX 1B Inlet Isol  
PERFORMANCE CHECKLIST              STANDARDS                    SAT UNSAT N/A
: 5. Isolate Component Cooling    At 1PM06J                    o    o    o Water Flow to Excess Letdown HXs.                        °  CLOSE 1CC9437A, CC to Exc Ltdwn HX Isol Vlv
                                    °  CLOSE 1CC9437B, CC from Exc Ltdwn HX Isol Vlv Vlv
: 6. Restore CV lineup.          At 1PM05J                    o    o    o
                                    °   VERIFY 1CV8143, Exc Ltdwn to Seal Filter or RCDT Vlv in the VCT position
: 7. Aligning Seal Return Flow.  °  Locally open _CV8484,    o    o    o Seal Wtr HX Outlet to Cue: If asked, step F.1.d was not      CV Pp Suct Hdr performed.
                                    °  Locally close _CV8482, Cue:This completes the JPM.            Seal Wtr HX Outlet to VCT Isol Vlv RECORD STOP TIME ________
COMMENTS:
Page 4 of 5


Vlv, o o o      *4. Isolate excess letdown flowpath At 1PM05J CLOSE 1RC8037A, Loop drain Vlv  CLOSE 1RC8037B, Loop drain Vlv  CLOSE 1RC8037C, Loop drain Vlv  CLOSE 1RC8037D, Loop drain Vlv o o o PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A  Page 4 of 5
SIMULATOR SETUP INSTRUCTIONS JPM NO: Sim 100 REQUIRED SIMULATOR MODE(S): 99.8% power steady state MALFUNCTION #S: N/A COMMENTS:
: 5. Isolate Component Cooling Water Flow to Excess Letdown HXs. At  1PM06J  CLOSE 1CC9437A, CC to Exc Ltdwn HX Isol Vlv  CLOSE 1CC9437B, CC from Exc Ltdwn HX Isol
: 1) Place excess letdown in service using only loop A drain valve, 1RC8037A and both excess letdown heat exchangers, 1CV8153A and 1CV8153B per BOP CV-15.
: 2) Leave flow aligned to CV pump suction header (1CV8482 closed, 1CV8484 Open).
Page 5 of 5


Vlv Vlv  o o o      6. Restore CV lineup.
JOB PERFORMANCE MEASURE TASK CONDITIONS:
At  1PM05J  VERIFY 1CV8143, Exc Ltdwn to Seal Filter or
: 1. You are the Unit 1 Assist NSO.
 
RCDT Vlv in the VCT
 
position o o o      7. Aligning Seal Return Flow. Cue: If asked, step F.1.d was not performed. Cue: This completes the JPM. Locally open _CV8484, Seal Wtr HX Outlet to
 
CV Pp Suct Hdr  Locally close _CV8482, Seal Wtr HX Outlet to
 
VCT Isol Vlv o o o      RECORD STOP TIME ________
COMMENTS:
SIMULATOR SETUP INSTRUCTIONS Page 5 of 5 JPM NO: Sim 100 REQUIRED SIMULATOR MODE(S):
99.8% power steady state MALFUNCTION #'S:  N/A COMMENTS: 1) Place excess letdown in service using only loop A drain valve, 1RC8037A and both excess letdown heat exchangers, 1CV 8153A and 1CV8153B per BOP CV-15. 2) Leave flow aligned to CV pump suction header (1CV8482 closed, 1CV8484 Open).
_ JOB PERFORMANCE MEASURE TASK CONDITIONS
: 1. You are the Unit 1 Assist NSO.
: 2. Unit _ has experienced a LOCA.
: 2. Unit _ has experienced a LOCA.
: 3. _BEP-0 is in progress in response to the event.
: 3. _BEP-0 is in progress in response to the event.
INITIATING CUES: You are directed to verify Control Room, Auxiliary Building, and Fuel Handling Building ventilation is aligned for emergency operati on per steps 21, 22, and 23 of _BEP-0.  
INITIATING CUES:
You are directed to verify Control Room, Auxiliary Building, and Fuel Handling Building ventilation is aligned for emergency operation per steps 21, 22, and 23 of _BEP-0.


Page 2 of 8 JOB PERFORMANCE MEASURE Rev. 6, 3/28/06 TASK TITLE: Align Ventilation Systems for Emergency Operations (Failure of Inaccessible Filter Plenum Fans to Start)
JOB PERFORMANCE MEASURE               Rev. 6, 3/28/06 TASK TITLE:     Align Ventilation Systems for Emergency             JPM No.: Sim 200 Operations (Failure of Inaccessible Filter Plenum Fans to Start)
JPM No.: Sim 200 TPO No: 4D.EP-19 K&A No.: 013 K1.13 K&A IMP. 2.8/3.1 EXAMINEE: _______________________________
TPO No: 4D.EP-19                   K&A No.: 013 K1.13               K&A IMP. 2.8/3.1 EXAMINEE: _______________________________                           DATE: ___/___/___
DATE:   ___/___/___
The Examinee:     PASSED_________ this JPM                     TIME STARTED: ________
The Examinee:
FAILED __________                           TIME FINISHED: ________
PASSED_________ this JPM TIME STARTED: ________
EVALUATION METHOD:           PERFORM______         SIMULATE_______
FAILED __________
LOCATION:                     IN PLANT______       SIMULATOR__X___
TIME FINISHED: ________
MATERIALS:
EVALUATION METHOD:
: 1. Copy of _BEP-0, steps 21 - 23
PERFORM______
: 2. Copy of BOP VA-5 GENERAL  
SIMULATE_______
LOCATION:
IN PLANT______
SIMULATOR__
X___  MATERIALS: 1. Copy of _BEP-0, steps 21 - 23 2. Copy of BOP VA-5 GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. _BEP-0, Reactor Trip or Safety Injection (Rev. 107) 2. BOP VA-5, Aux Building Charcoal Booster Fan Operation (Rev. 6)
: 1. _BEP-0, Reactor Trip or Safety Injection (Rev. 107)
: 2. BOP VA-5, Aux Building Charcoal Booster Fan Operation (Rev. 6)
TASK STANDARDS:
TASK STANDARDS:
Perform the actions necessary to align the Control Room, Auxiliary Building, and Fuel Handling Building for emergency operations.
Perform the actions necessary to align the Control Room, Auxiliary Building, and Fuel Handling Building for emergency operations.
TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are the Unit 1 Assist NSO. 2. Unit _ has experienced a LOCA. 3. _BEP-0 is in progress in response to the event.
: 1. You are the Unit 1 Assist NSO.
: 2. Unit _ has experienced a LOCA.
: 3. _BEP-0 is in progress in response to the event.
INITIATING CUES:
INITIATING CUES:
You are directed to verify Control Room, Au xiliary Building, and Fuel Handling Building ventilation is aligned for emergency operati on per steps 21, 22, and 23 of _BEP-0.
You are directed to verify Control Room, Auxiliary Building, and Fuel Handling Building ventilation is aligned for emergency operation per steps 21, 22, and 23 of _BEP-0.
CRITICAL ELEMENTS: (*) 7, 9, 10 & 11 APPROXIMATE COMPLETION TIME: 7 minutes PERFORMANCE CHECKLIST                    STANDARD SAT UNSAT  N/A  Page 3 of 8 RECORD START TIME__________
CRITICAL ELEMENTS: (*) 7, 9, 10 & 11 APPROXIMATE COMPLETION TIME: 7 minutes Page 2 of 8
: 1. Refer to _BEP-0, Reactor Trip or Safety Injection, Step 21 Note: Provide examinee a copy of
_BEP-0, steps 21 - 23  LOCATE and OPEN
_BEP-0 to Step 21    Note: JPM steps 2 through 6 verify that contro l room ventilation is aligned for emergency operation 2. Dispatch an NLO to trip Control Room Office HVAC Supply Fans Cue: 0VV01CA is tripped Cue: 0VV01CB is tripped Dispatch NLO to trip:  0VV01CA  0VV01CB        3. Operating VC train equipment alignment At 0PM02J, VERIFY 0_ train equipment RUNNING:  Supply Fan  Return Fan  M/U Fan  Chilled Water Pump  MCR Chiller        4. Operating VC train dampers alignment At 0PM02J, Verify:  M/U fan outlet damper NOT FULLY CLOSED:  0VC24Y (Train A)  0VC08Y (Train B)
M/U filter light LIT PERFORMANCE CHECKLIST                    STANDARD SAT UNSAT  N/A  Page 4 of 85. Operating VC train charcoal absorber alignment At 0PM02J, VERIFY VC train charcoal absorber ALIGNED:  Train A  0VC43Y Bypass damper CLOSED:  0VC21Y Inlet damper OPEN  0VC22Y Outlet damper OPEN


OR     Train B  0VC44Y Bypass damper CLOSED: 0VC05Y Inlet damper OPEN  0VC06Y Outlet damper OPEN
PERFORMANCE CHECKLIST                            STANDARD                  SAT UNSAT N/A RECORD START TIME__________
: 6. MCR pressure Cue:   Control room pressure reads approximately +0.2 inches of water At 0PM02J:   CHECK control room pressure > +.125" H 2 O        Note: Alternate Path starts here Note: The examinee will find the fans for plenums 0A and 0B off and the dampers in the
: 1. Refer to _BEP-0, Reactor Trip or     °    LOCATE and OPEN Safety Injection, Step 21                _BEP-0 to Step 21 Note: Provide examinee a copy of
_BEP-0, steps 21 - 23 Note:
JPM steps 2 through 6 verify that control room ventilation is aligned for emergency operation
: 2. Dispatch an NLO to trip Control      Dispatch NLO to trip:
Room Office HVAC Supply Fans
                                        °    0VV01CA Cue: 0VV01CA is tripped
                                        °    0VV01CB Cue: 0VV01CB is tripped
: 3. Operating VC train equipment        At 0PM02J, VERIFY 0_ train alignment                            equipment RUNNING:
                                        °    Supply Fan
                                        °    Return Fan
                                        °    M/U Fan
                                        °    Chilled Water Pump
                                        °    MCR Chiller
: 4. Operating VC train dampers          At 0PM02J, Verify:
alignment
* M/U fan outlet damper NOT FULLY CLOSED:
                                              ° 0VC24Y (Train A)
                                              ° 0VC08Y (Train B)
* M/U filter light LIT Page 3 of 8


corresponding positions for fans off.
PERFORMANCE CHECKLIST                          STANDARD            SAT UNSAT N/A
: 5. Operating VC train charcoal        At 0PM02J, VERIFY VC train absorber alignment                charcoal absorber ALIGNED:
                                      °  Train A
* 0VC43Y Bypass damper CLOSED:
* 0VC21Y Inlet damper OPEN
* 0VC22Y Outlet damper OPEN OR
                                      °    Train B
* 0VC44Y Bypass damper CLOSED:
* 0VC05Y Inlet damper OPEN
* 0VC06Y Outlet damper OPEN
: 6. MCR pressure                      At 0PM02J:
Cue: Control room pressure reads      °  CHECK control room approximately +0.2 inches of        pressure > +.125" H2O water Note: Alternate Path starts here Note:
The examinee will find the fans for plenums 0A and 0B off and the dampers in the corresponding positions for fans off.
Page 4 of 8


PERFORMANCE CHECKLIST                   STANDARD SAT UNSAT   N/A Page 5 of 8 *7. Inaccessible filter plenums.
PERFORMANCE CHECKLIST                   STANDARD               SAT UNSAT N/A
VERIFY 2 Plenums aligned with Charcoal Absorbers on-line:
*7. Inaccessible filter plenums.
Note: Determines that Fans 0VA03CB and 0VA03CA are not  
* At 0PM02J (PLENUM VERIFY 2 Plenums aligned with   0A), verify fan run light Charcoal Absorbers on-line:      LIT, flow control damper OPEN and bypass damper CLOSED:
                                  °  0VA03CA run light LIT 0VA022Y OPEN 0VA020Y CLOSED OR
* 0VA03CB run light LIT Note: Determines that Fans           0VA023Y OPEN 0VA03CB and 0VA03CA are not         0VA436Y CLOSED running.
                                  °  At 0PM02J (PLENUM 0B), verify fan run light LIT, flow control damper OPEN and bypass damper CLOSED:
                                  °  0VA03CC run light LIT 0VA024Y OPEN 0VA021Y CLOSED OR
                                  °  0VA03CD run light LIT 0VA025Y OPEN 0VA437Y CLOSED
* At 0PM02J (PLENUM 0C), verify fan run light LIT, flow control damper OPEN and bypass damper CLOSED:
                                  °  0VA03CE run light LIT 0VA067Y OPEN 0VA052Y CLOSED OR
* 0VA03CF run light LIT 0VA072Y OPEN 0VA438Y CLOSED Page 5 of 8


running. At 0PM02J (PLENUM 0A), verify fan run light
PERFORMANCE CHECKLIST                                STANDARD              SAT UNSAT N/A Note:
In the following step, the lead fan to start in each plenum is the second (e.g. B, D, or F for A, B, or C plenum respectively).
The examinee may attempt to manually start 0VA03CB or may attempt to place 0VA03CA in service but these attempts will not be successful, thus 0B plenum may be placed in service per BOP VA-5 prior to verifying 0C plenum in service.
: 8. Refer to BOP VA-5, Aux Building          °    LOCATE and OPEN Charcoal Booster Fan Operation                BOP VA-5, step F.1 Note: Provide the examinee a copy of BOP VA-5 Cue: If asked, prerequisites are met.
Note:
Since more than 15 seconds have elapsed since the SI signal occurred, both the 0C and 0D fans will start as soon as the 0B plenum has been aligned. The RNO directs the use of BOP VA-5 for start of fans. VA-5 directs placing one fan in PTL for this situation, with the option of restoring to After Trip after the first fan starts.
*9. Place one out of the two plenum      At 0PM02J (PLENUM 0B),
B fans in Pull to Lock (PTL)        place 0B fan in PTL
* 0VA03CC OR
* 0VA03CD
*10. Align plenum B                          At 0PM02J:
* OPEN 0VA085Y
                                            °    CLOSE 0VA084Y Page 6 of 8


LIT, flow control damper  
PERFORMANCE CHECKLIST                          STANDARD              SAT UNSAT N/A
 
*11. Verify fan running in plenum B    At 0PM02J (PLENUM 0B),
OPEN and bypass
and aligned to charcoal absorber verify fan run light LIT, flow control damper OPEN and bypass damper CLOSED:
* 0VA03CC run light LIT
* 0VA024Y OPEN
* 0VA021Y CLOSED OR
* 0VA03CD run light LIT
* 0VA025Y OPEN
* 0VA437Y CLOSED Note:
Student may take non running 0B Plenum fan out of PTL
: 12. Verify FH bldg ventilation aligned  At 0PM02J, VERIFY:                     
                                        °  Train A Cue: This JPM is completed
* 0VA04CA running
* 0VA060Y OPEN
* 0VA057Y OPEN
* 0VA051Y CLOSED OR
                                        °  Train B
* 0VA04CB running
* 0VA055Y OPEN
* 0VA062Y OPEN
* 0VA435Y CLOSED RECORD STOP TIME___________
COMMENTS:
Page 7 of 8


damper CLOSED:  0VA03CA run lightLIT 0VA022Y OPEN
SIMULATOR SETUP INSTRUCTIONS JPM NO: Sim 200 REQUIRED SIMULATOR MODE(S): N/A MALFUNCTION #S:
 
: 1. IMF HV02A
0VA020Y CLOSED OR  0VA03CB run light LIT     
: 2. IMF HV02B
 
: 3. IMF AN01M
0VA023Y OPEN
: 4. IOR ZLOBYAN14 Off
 
: 5. MRF RP70 in
0VA436Y CLOSED At 0PM02J (PLENUM 0B), verify fan run light
: 6. MRF RP44 in
 
: 7. IOR ZDIWO01PA Trip COMMENTS:
LIT, flow control damper
: 1. Verify 0A and 0C Plenums online Page 8 of 8
 
OPEN and bypass
 
damper CLOSED:  0VA03CC run light LIT 0VA024Y OPEN 0VA021Y CLOSED OR  0VA03CD run light LIT 0VA025Y OPEN 
 
0VA437Y CLOSED At 0PM02J (PLENUM
 
0C), verify fan run light
 
LIT, flow control damper
 
OPEN and bypass
 
damper CLOSED:  0VA03CE run light LIT 0VA067Y OPEN
 
0VA052Y CLOSED OR  0VA03CF run light LIT 0VA072Y OPEN
 
0VA438Y CLOSED PERFORMANCE CHECKLIST                    STANDARD SAT UNSAT  N/A  Page 6 of 8 Note: In the following step, the lead fan to start in each plenum is the second (e.g. B, D, or F for A, B, or C plenum respectively).
The examinee may attempt to manually st art 0VA03CB or may attempt to place 0VA03CA in service but these attempts will not be successful, thus 0B plenum may be placed in service per BOP VA-5 prior to verifying 0C plenum in service. 8. Refer to BOP VA-5, Aux Building Charcoal Booster Fan Operation Note: Provide the examinee a copy of BOP VA-5 Cue: If asked, prerequisites are met. LOCATE and OPEN BOP VA-5, step F.1    Note: Since more than 15 seconds have elapsed since the SI signal occurred, both the 0C
 
and 0D fans will start as soon as the 0B plenum has been aligned. The RNO directs the use of BOP VA-5 for start of fans. VA-5 direct s placing one fan in PTL for this situation, with the option of restoring to After Trip after the first fan starts.  *9. Place one out of the two plenum B fans in Pull to Lock (PTL)
At 0PM02J (PLENUM 0B),
place 0B fan in PTL  0VA03CC OR  0VA03CD        *10. Align plenum B At 0PM02J:  OPEN 0VA085Y  CLOSE 0VA084Y PERFORMANCE CHECKLIST                    STANDARD SAT UNSAT  N/A  Page 7 of 8  *11. Verify fan running in plenum B and aligned to charcoal absorber At 0PM02J (PLENUM 0B), verify fan run light LIT, flow
 
control damper OPEN and
 
bypass damper CLOSED:
0VA03CC run light LIT 0VA024Y OPEN 0VA021Y CLOSED OR    0VA03CD run light LIT 0VA025Y OPEN 0VA437Y CLOSED    Note: Student may take non running 0B Plenum fan out of PTL 12. Verify FH bldg ventilation aligned Cue: This JPM is completed At 0PM02J, VERIFY:  Train A    0VA04CA running 0VA060Y OPEN 0VA057Y OPEN 0VA051Y CLOSED OR  Train B 0VA04CB running 0VA055Y OPEN 0VA062Y OPEN 0VA435Y CLOSED    RECORD STOP TIME___________
COMMENTS:
SIMULATOR SETUP INSTRUCTIONS Page 8 of 8 JPM NO: Sim 200 REQUIRED SIMULATOR MODE(S): N/A MALFUNCTION #'S:   1. IMF HV02A 2. IMF HV02B 3. IMF AN01M 4. IOR ZLOBYAN14 Off 5. MRF RP70 in 6. MRF RP44 in 7. IOR ZDIWO01PA   Trip COMMENTS: 1. Verify 0A and 0C Plenums online  


JOB PERFORMANCE MEASURE TASK CONDITIONS:
JOB PERFORMANCE MEASURE TASK CONDITIONS:
Line 308: Line 380:
: 2. The unit is in hot shutdown INITIATING CUES:
: 2. The unit is in hot shutdown INITIATING CUES:
: 1. Unit 1 RWST level is 90%.
: 1. Unit 1 RWST level is 90%.
: 2. The Unit Supervisor directs you to ali gn and initiate makeup to the Unit 1 RWST using BOP SI-13 starting at st ep f.4, to achieve 94% level.  
: 2. The Unit Supervisor directs you to align and initiate makeup to the Unit 1 RWST using BOP SI-13 starting at step f.4, to achieve 94% level.


Page 2 of 7 JOB PERFORMANCE MEASURE       Rev. 9, 03/17/06 TASK TITLE: Fill the Refueling Water Storage Tank JPM No.: Sim 300 TPO No: IV.C.CV-17 K&A No.: 006 A4.03 K&A IMP. 4.4/4.4 TRAINEE:_______________________________
JOB PERFORMANCE MEASURE                             Rev. 9, 03/17/06 TASK TITLE:     Fill the Refueling Water Storage Tank               JPM No.: Sim 300 TPO No: IV.C.CV-17                 K&A No.: 006 A4.03               K&A IMP. 4.4/4.4 TRAINEE:_______________________________                             DATE: ___/___/___
DATE:   ___/___/___
The Trainee:     PASSED_________ this JPM                   TIME STARTED: ________
The Trainee:
FAILED __________                           TIME FINISHED: ________
PASSED_________   this JPM TIME STARTED: ________
EVALUATION METHOD:           PERFORM___X___        SIMULATE_______
FAILED __________
LOCATION:                     IN PLANT______         SIMULATOR__X____
TIME FINISHED: ________
MATERIALS:
EVALUATION METHOD:
Calculator BOP SI-13, Filling the RWST (Rev. 21) filled out to step f.4 GENERAL  
PERFORM___
X___ SIMULATE_______
LOCATION:
IN PLANT______
SIMULATOR__
X____ MATERIALS:
Calculator BOP SI-13, Filling the RWST (R ev. 21) filled out to step f.4 GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. BOP SI-13, Filling the RWST (Rev. 21) 2. 1BCB Fig. 16, Blended Flow (Rev. 1)
: 1. BOP SI-13, Filling the RWST (Rev. 21)
: 2. 1BCB Fig. 16, Blended Flow (Rev. 1)
TASK STANDARDS:
TASK STANDARDS:
Makeup to RWST with  
Makeup to RWST with > 2300 ppm blended flow from RCMS.
> 2300 ppm blended flow from RCMS.
TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are the unit NSO. 2. The unit is in hot shutdown.
: 1. You are the unit NSO.
: 2. The unit is in hot shutdown.
INITIATING CUES:
INITIATING CUES:
: 1. Unit 1 RWST level is 90%. 2. The Unit Supervisor directs you to ali gn and initiate makeup to the Unit 1 RWST using BOP SI-13 starting at step f.4, to achieve 94% level.
: 1. Unit 1 RWST level is 90%.
CRITICAL ELEMENTS: (*) 2, 3, 4 &7 APPROXIMATE COMPLETION TIME: 15 minutes PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A  Page 3 of 7 RECORD START TIME________
: 2. The Unit Supervisor directs you to align and initiate makeup to the Unit 1 RWST using BOP SI-13 starting at step f.4, to achieve 94% level.
Note: Provide the examinee a copy of BOP SI-13
CRITICAL ELEMENTS: (*) 2, 3, 4 &7 APPROXIMATE COMPLETION TIME: 15 minutes Page 2 of 7
: 1. Refer to BOP SI-13, Filling the RWST Cue: All prerequisites, precautions, limitations and


actions are met
PERFORMANCE CHECKLIST                  STANDARDS                    SAT UNSAT N/A RECORD START TIME________
° REVIEW prerequisites, precautions, limitations and actions     *2. Prepare RMCS for RWST fill At 1PM05J:
Note:
* PLACE makeup control switch to 'Stop'
Provide the examinee a copy of BOP SI-13
* PLACE reactor makeup mode select switch to  
: 1. Refer to BOP SI-13, Filling the    °   REVIEW prerequisites, RWST                                  precautions, limitations and actions Cue: All prerequisites, precautions, limitations and actions are met
*2. Prepare RMCS for RWST fill         At 1PM05J:
* PLACE makeup control switch to Stop
* PLACE reactor makeup mode select switch to Manual
* PLACE 1CV110B to Close
* PLACE 1CV111B to Close Page 3 of 7


'Manual'
PERFORMANCE CHECKLIST STANDARDS                     SAT UNSAT N/A
* PLACE 1CV110B to
*3. Setup PW totalizer At _PM05J:
'Close'
* SET 1FY-0111
* PLACE 1CV111B to
* PRESS RST on PW total flow totalizer and Verify the counter reads 0.
'Close' PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A   Page 4 of 7*3. Setup PW totalizer At _PM05J: SET 1FY-0111 PRESS 'RST' on PW total flow totalizer and Verify the counter  
* PRESS PST on PW total flow totalizer
* PRESS  until desired digit flashes on the lower data display
* PRESS + or - to change flashing digit until the desired gallons is indicated on the lower data display
* PRESS ENT to lock-in the desired number of gallons (18360 gals)
                          °  Verify the correct number of desired gallons is displayed on the lower data display with no numbers flashing Page 4 of 7


reads 0. PRESS 'PST' on PW total flow totalizer  PRESS '' until desired digit flashes  
PERFORMANCE CHECKLIST              STANDARDS                    SAT UNSAT N/A
*4. Setup Boric Acid totalizer    At 1PM05J:
* SET 1FY-0110
* PRESS RST on BA total totalizer and Verify the counter reads 0.
* PRESS PST on BA total totalizer
* PRESS until desired digit flashes on the lower data display
* PRESS + or - to change flashing digit until the desired gallons is indicated on the lower data display
* PRESS ENT to lock-in the desired number of gallons (6169 gals)
                                      °  Verify the correct number of desired gallons is displayed on the lower data display with no numbers flashing
: 5. Determine desired blended flow
* SET 1FK110 = 8.4 control setpoints                  (+/- 1 turn)
* SET 1FK111 = 6.25
(+/- 1 turn)
Page 5 of 7


on the lower data
PERFORMANCE CHECKLIST              STANDARDS                    SAT UNSAT N/A
: 6. Perform valve alignment        DIRECT operator to:
Cue: Local operator reports CV8553 °  VERIFY/CLOSED is CLOSED                      1CV8553 Cue: Local operator reports CV8432
* OPEN 1CV8432 is OPEN Cue: Local operator reports CV8434
* UNLOCK and OPEN is OPEN                        1CV8434
*7. Fill RWST with > 2300 ppm
* PLACE makeup control blended flow                      switch to Start
                                  °  VERIFY PW pump starts
                                  °  Verify boric acid transfer pump starts
                                  °  Verify BA and PW flowrates are as expected on 1FR-0110
                                  °  MONITOR RWST level and BAT level
: 8. Sample blended flow            °  REQUEST chemistry notify control room when Cue: Chemistry acknowldges ready to sample blender request Cue:    This completes this JPM.
RECORD STOP TIME________
COMMENTS:
Page 6 of 7


display  PRESS '+' or '-' to change flashing digit
Simulator Setup Instructions JPM NO: Sim 300 REQUIRED SIMULATOR MODE(S): N/A MALFUNCTION #S:
: 1. Enter and Set Monitor Parameter RHMRWST to 3.43 e6
: 2. MRF CV65 Open COMMENTS:
Ensure BOP SI-13, Filling the RWST (Rev. 21) is filled out to step f.4 and PW and BA totalizers are reset.
Page 7 of 7


until the desired
JOB PERFORMANCE MEASURE TASK CONDITIONS:
: 1. You are the Unit 1 NSO.
: 2. The Unit is at 100% power.            .
INITIATING CUES:
: 1. Annunciator 1-7-B3 RCP SEAL LEAKOFF FLOW HIGH has just gone into alarm.


gallons is indicated on
JOB PERFORMANCE MEASURE                   Rev. 1, 3/28/06 TASK TITLE:     Respond to High RCP Seal Leakoff Flow           JPM No.: Sim 400 TPO No: IV.D.OA.05               K&A No.: 003 A2.01           K&A IMP. 3.5/3.9 TRAINEE:_______________________________                         DATE: ___/___/___
 
The Trainee:     PASSED_________ this JPM               TIME STARTED: ________
the lower data display  PRESS 'ENT' to lock-in the desired number
FAILED __________                     TIME FINISHED: ________
 
EVALUATION METHOD:           PERFORM___ X ___ SIMULATE LOCATION:                   IN PLANT             SIMULATOR__ X ___
of gallons (18360 gals)  Verify the correct number of desired gallons is displayed
MATERIALS:
 
on the lower data
 
display with no
 
numbers flashing 
 
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A  Page 5 of 7  *4. Setup Boric Acid totalizer At 1PM05J:  SET 1FY-0110 PRESS 'RST' on BA total totalizer and Verify the counter
 
reads 0. PRESS 'PST' on BA total totalizer  PRESS '' until desired digit flashes
 
on the lower data
 
display  PRESS '+' or '-' to change flashing digit
 
until the desired
 
gallons is indicated
 
on the lower data
 
display  PRESS 'ENT' to lock-in the desired number
 
of gallons (6169 gals)  Verify the correct number of desired gallons is displayed
 
on the lower data
 
display with no
 
numbers flashing
: 5. Determine desired blended flow control setpoints SET 1FK110 = 8.4     
 
(+/- 1 turn)
SET 1FK111 = 6.25   
 
(+/- 1 turn)
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A  Page 6 of 7 6. Perform valve alignment Cue: Local operator reports CV8553 is CLOSED Cue: Local operator reports CV8432 is OPEN Cue: Local operator reports CV8434 is OPEN DIRECT operator to:
°  VERIFY/CLOSED 1CV8553  OPEN 1CV8432 UNLOCK and OPEN 1CV8434        *7. Fill RWST with
> 2300 ppm blended flow PLACE makeup control
 
switch to 'Start'
°  VERIFY PW pump starts
°  Verify boric acid transfer pump starts °  Verify BA and PW flowrates are as expected on 1FR-0110 
°    MONITOR RWST level and BAT level        8. Sample blended flow Cue: Chemistry acknowldges request Cue:  This completes this JPM.
°  REQUEST chemistry notify control room when ready to sample blender RECORD STOP TIME________
COMMENTS:
Simulator Setup Instructions Page 7 of 7 JPM NO: Sim 300 REQUIRED SIMULATOR MODE(S): N/A MALFUNCTION #'S:  1. Enter and Set Monitor Parameter RHMRWST to 3.43 e6 2. MRF CV65 Open COMMENTS: Ensure BOP SI-13, Filling the RWST (Rev. 21) is filled out to step f.4 and PW and BA totalizers are reset.
 
JOB PERFORMANCE MEASURE TASK CONDITIONS:  1. You are the Unit 1 NSO. 2. The Unit is at 100% power. . INITIATING CUES:
: 1. Annunciator 1-7-B3 "RCP SEAL LEAKOFF FLOW HIGH" has just gone into alarm.
Page 2 of 5 JOB PERFORMANCE MEASURE Rev. 1, 3/28/06 TASK TITLE:
Respond to High RCP Seal Leakoff Flow JPM No.: Sim 400 TPO No: IV.D.OA.05 K&A No.: 003 A2.01 K&A IMP. 3.5/3.9 TRAINEE:_______________________________
DATE:   ___/___/___
The Trainee:
PASSED_________   this JPM TIME STARTED: ________
FAILED __________
TIME FINISHED: ________
EVALUATION METHOD:
PERFORM___
X ___ SIMULATE LOCATION:
IN PLANT SIMULATOR__
X ___ MATERIALS:
1BOA RCP-1, Rev. 102, Reactor Coolant Seal Failure GENERAL  
1BOA RCP-1, Rev. 102, Reactor Coolant Seal Failure GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. 1BOA RCP-1, Rev. 102, Reactor Coolant Seal Failure 2. BAR 1-7-B3, Rev 10, RCP Seal Leakoff Flow High TASK STANDARDS: Respond to RCP Leakoff from No. 1 Seal.
: 1. 1BOA RCP-1, Rev. 102, Reactor Coolant Seal Failure
TASK CONDITIONS: 1. You are the Unit 1 NSO. 2. The Unit is at 100% power.
: 2. BAR 1-7-B3, Rev 10, RCP Seal Leakoff Flow High TASK STANDARDS:
Respond to RCP Leakoff from No. 1 Seal.
TASK CONDITIONS:
: 1. You are the Unit 1 NSO.
: 2. The Unit is at 100% power.
INITIATING CUES:
INITIATING CUES:
Annunciator 1-7-B3 "RCP SEAL LEAKOFF FLOW HIGH" has just gone into alarm.
Annunciator 1-7-B3 RCP SEAL LEAKOFF FLOW HIGH has just gone into alarm.
CRITICAL ELEMENTS: (*) 3,4 & 5 APPROXIMATE COMPLETION TIME:
CRITICAL ELEMENTS: (*)
5   minutes PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A  Page 3 of 5 RECORD START TIME_______
3,4 & 5 APPROXIMATE COMPLETION TIME: 5 minutes Page 2 of 5
: 1. Refer to BAR 1-7-B3, and perform Immediate Operator


Actions. Cue: The extra NSO will take care of subsequent actions Cue:   US Directs NSO to Implement 1BOA RCP-1 Locate and Open BAR 1 B3 and perform the following
PERFORMANCE CHECKLIST                STANDARDS                    SAT UNSAT N/A RECORD START TIME_______
: 1. Refer to BAR 1-7-B3, and        Locate and Open BAR 1      o    o    o perform Immediate Operator      B3 and perform the following Actions.                        Immediate Operator Actions:
* CHECK Seal Injection Flows.
* DETERMINE which pump is alarming by SER Cue: The extra NSO will take care of   printout.
subsequent actions
* REFER to 1BOA RCP-1.
Cue: US Directs NSO to Implement 1BOA RCP-1 Note:
Provide examinee a copy of 1BOA RCP-1
: 2. Enter 1BOA RCP-1 and Check
* CHECK 1B RCP No. 1        o    o    o No. 1 Seal DP.                      Seal DP GREATER THAN 200 PSID.
Page 3 of 5


Immediate Operator Actions:
PERFORMANCE CHECKLIST                 STANDARDS                   SAT   UNSAT   N/A
CHECK Seal Injection Flows. DETERMINE which pump is alarming by SER
*3. Check No. 1 Seal Leakoff Flow   Perform the following to     o      o      o DETERMINE RCP Seal Leakoff Flow is HIGH:
 
                                      ° DETERMINE Seal DP by comparing Charging Header Pressure to VCT Pressure.
printout.
* CHECK 1B RCP No. 1 Seal Leakoff Flows.
REFER to 1BOA RCP-1.
* DETERMINE Actual 1B RCP No. 1 Seal Leakoff Flow is HIGH by comparing to Figure 1BOA RCP-1-1 and GO TO step 6.
o o o Note: Provide examinee a copy of 1BOA RCP-1 2. Enter 1BOA RCP-1 and Check No. 1 Seal DP.
Note: Alternate Path starts here
CHECK 1B RCP No. 1
*4. Monitor RCP Seal Parameters
 
* Determine 1B RCP No. 1   o      o      o seal leakoff flow is greater than 6 GPM and implements RNO Step Note:
Seal DP GREATER
Once student determines the need to trip the Rx and RCP, the JPM can be terminated.
 
*5. Perform an Immediate RCP
THAN 200 PSID.
* Trip the reactor.        o      o      o Shutdown.
o o o PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A   Page 4 of 5  *3. Check No. 1 Seal Leakoff Flow Perform the following to DETERMINE RCP Seal  
* Trip the affected pump. o      o      o Cue: US acknowledges the tripping of the Rx Cue: This completes the JPM.
 
RECORD STOP TIME ________
Leakoff Flow is HIGH:  DETERMINE Seal DP by comparing Charging  
COMMENTS:
 
Page 4 of 5
Header Pressure to VCT  
 
Pressure.
CHECK 1B RCP No. 1  
 
Seal Leakoff Flows.
DETERMINE Actual 1B  
 
RCP No. 1 Seal Leakoff  
 
Flow is HIGH by  
 
comparing to Figure  
 
1BOA RCP-1-1 and GO  
 
TO step 6.
o          o  o  Note: Alternate Path starts here*4. Monitor RCP Seal Parameters Determine 1B RCP No. 1  
 
seal leakoff flow is  


greater than 6 GPM and
SIMULATOR SETUP INSTRUCTIONS JPM NO: Sim 400 REQUIRED SIMULATOR MODE(S): 100% power steady state MALFUNCTION #S:
 
: 1)    IMF CV27B Ramp from 5 gpm to 8 gpm over 180 seconds.
implements RNO Step o o o Note: Once student determines the need to trip the Rx and RCP, the JPM can be terminated.
Trip the reactor.
o o o *5. Perform an Immediate RCP Shutdown. Cue:  US acknowledges the tripping of the Rx Cue: This completes the JPM. Trip the affected pump.
o o o RECORD STOP TIME ________
COMMENTS:
COMMENTS:
SIMULATOR SETUP INSTRUCTIONS Page 5 of 5 JPM NO: Sim 400 REQUIRED SIMULATOR MODE(S): 100% power steady state MALFUNCTION #'S: 1) IMF CV27B Ramp from 5 gpm to 8 gpm over 180 seconds.
: 1)   Insert malf and freeze simulator, go to run after examinee has been cued.
COMMENTS: 1) Insert malf and freeze simulator, go to run after examinee has been cued. 2) Ensure SER is on and the correct SER poi nt (2072) is visible on the terminal at the NSO desk. 3) VCT level at top of green band. 4) 1B RCP Leakoff recorder should indicate greater than 6 gpm.  
: 2)   Ensure SER is on and the correct SER point (2072) is visible on the terminal at the NSO desk.
: 3)   VCT level at top of green band.
: 4)   1B RCP Leakoff recorder should indicate greater than 6 gpm.
Page 5 of 5


JOB PERFORMANCE MEASURE TASK CONDITIONS: 1. You are the Unit NSO. 2. The unit is at 100% power with a ll systems and controls in automatic. 3. Unit 2 is in Mode 3.
JOB PERFORMANCE MEASURE TASK CONDITIONS:
: 1. You are the Unit NSO.
: 2. The unit is at 100% power with all systems and controls in automatic.
: 3. Unit 2 is in Mode 3.
INITIATING CUES:
INITIATING CUES:
Annunciator 1-19-B6, GENERATOR FIELD FORCING comes in.  
Annunciator 1-19-B6, GENERATOR FIELD FORCING comes in.


Page 2 of 5 JOB PERFORMANCE MEASURE Rev. 3, 03/17/06 TASK TITLE: Respond to 345 KV Grid or Voltage Regulator Instability (recoverable)
JOB PERFORMANCE MEASURE                       Rev. 3, 03/17/06 TASK TITLE:     Respond to 345 KV Grid or Voltage Regulator       JPM No.: Sim 500 Instability (recoverable)
JPM No.: Sim 500 TPO No: IV.D.OA-48 K&A No.: 045 K3.01 K&A IMP. 2.9/3.2 TRAINEE:_______________________________
TPO No: IV.D.OA-48                 K&A No.: 045 K3.01             K&A IMP. 2.9/3.2 TRAINEE:_______________________________                           DATE: ___/___/___
DATE:   ___/___/___
The Trainee:     PASSED_________ this JPM                   TIME STARTED: ________
The Trainee:
FAILED __________                         TIME FINISHED: ________
PASSED_________   this JPM TIME STARTED: ________
EVALUATION METHOD:           PERFORM___X___        SIMULATE_______
FAILED __________
LOCATION:                     IN PLANT______       SIMULATOR___X___
TIME FINISHED: ________
MATERIALS:
EVALUATION METHOD:
None GENERAL  
PERFORM___X___SIMULATE_______
LOCATION:
IN PLANT______
SIMULATOR___X___ MATERIALS:
None GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. BAR 1-19-B6, GENERATOR FIELD FORCING (Rev. 5) 2. BCB-1, Fig. 20b, Gener ator Capability Curves and Underexcitation Limiter Settings (Rev. 2)
: 1. BAR 1-19-B6, GENERATOR FIELD FORCING (Rev. 5)
: 2. BCB-1, Fig. 20b, Generator Capability Curves and Underexcitation Limiter Settings (Rev. 2)
TASK STANDARDS:
TASK STANDARDS:
Take the actions necessary to respond to an automatic voltage regulator failure per BAR 1-19-B6.
Take the actions necessary to respond to an automatic voltage regulator failure per BAR 1-19-B6.
TASK CONDITIONS: 1. You are the Unit NSO. 2. The unit is at 100% power with a ll systems and controls in automatic. 3. Unit 2 is in Mode 3.
TASK CONDITIONS:
: 1. You are the Unit NSO.
: 2. The unit is at 100% power with all systems and controls in automatic.
: 3. Unit 2 is in Mode 3.
INITIATING CUES:
INITIATING CUES:
Annunciator 1-19-B6, GENERATOR FIELD FORCING comes in.
Annunciator 1-19-B6, GENERATOR FIELD FORCING comes in.
CRITICAL ELEMENTS: (*) 2, 3 APPROXIMATE COMPLETION TIME: 5 minutes PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A    Page 3 of 5 RECORD START TIME _______
CRITICAL ELEMENTS: (*) 2, 3 APPROXIMATE COMPLETION TIME: 5 minutes Page 2 of 5
: 1. Refer to BAR 1-19-B6, GENERATOR FIELD FORCING Note: JPM step 1 may be performed at any time Cue:  If asked, Grid is stable.
LOCATE and OPEN BAR 1-19-B6    *2. Turn voltage regulator off SHIFT voltage regulator to OFF Note: The generator field amps will decrease when t he voltage regulator is placed in off and the base adjuster is lowered. The trai nee should NOT have to trip the reactor. *3. Reduce excitation REDUCE base adjuster setting  OBSERVE exciter field current < 100


amps Notify Electric Operations   4. Check for Grid Instabilities. Cue: Grid is stable. If Grid instabilities are present , Then Notify  
PERFORMANCE CHECKLIST                    STANDARDS                      SAT    UNSAT    N/A RECORD START TIME _______
: 1. Refer to BAR 1-19-B6,                &deg;    LOCATE and OPEN GENERATOR FIELD FORCING                  BAR 1-19-B6 Note: JPM step 1 may be performed at any time Cue: If asked, Grid is stable.
*2. Turn voltage regulator off
* SHIFT voltage regulator to OFF Note:
The generator field amps will decrease when the voltage regulator is placed in off and the base adjuster is lowered. The trainee should NOT have to trip the reactor.
*3. Reduce excitation
* REDUCE base adjuster setting
* OBSERVE exciter field current < 100 amps
                                            &deg;    Notify Electric Operations
: 4. Check for Grid Instabilities.       &deg;    If Grid instabilities are present , Then Notify Cue: Grid is stable.                          Electric Operations of alarm Page 3 of 5


Electric Operations of  
PERFORMANCE CHECKLIST            STANDARDS                        SAT UNSAT N/A
: 5. Check for Unit 2 for Main        &deg;    Check Unit 2 for Generator adverse trends.              adverse Main Generator Trends Cue: No adverse trends on Unit 2.
                                    &deg;    If adverse trends noted, reference SPOG 1-8 for necessary actions
: 6. Verify amps less than 109.    &deg;    If generator field current CANNOT be reduced to less than 109 amps, then trip Rx if above P8 or trip turbine if below P8
: 7. Notify Electric Operations     &deg;    INFORM Electric Operations of voltage Cue: Electric Operations has been      regulator failure notified of the voltage regulator failure            &deg;    ENSURE MW and VAR within BCB-_, Figure 20b Cue: Both MW and VAR values are        limits within Figure 20b limits.
Cue: This JPM is completed RECORD STOP TIME ________
COMMENTS:
Page 4 of 5


alarm PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A    Page 4 of 55. Check for Unit 2 for Main Generator adverse trends. Cue: No adverse trends on Unit 2. Check Unit 2 for adverse Main Generator Trends  If adverse trends noted, reference
SIMULATOR SETUP INSTRUCTIONS JPM NO: Sim 500 REQUIRED SIMULATOR MODE(S): 100% power steady state MALFUNCTION #S:
: 1)    IMF EG03 to 95% severity and allow to stabilize.
COMMENTS:
Page 5 of 5


SPOG 1-8 for
necessary actions  6. Verify amps less than 109.
If generator field current CANNOT be reduced to
less than 109 amps, then
trip Rx if above P8 or trip
turbine if below P8  7. Notify Electric Operations Cue: Electric Operations has been notified of the voltage regulator failure Cue: Both MW and VAR values are within Figure 20b limits.
Cue: This JPM is completed INFORM Electric Operations of voltage regulator failure  ENSURE MW and VAR within BCB-_, Figure 20b
limits  RECORD STOP TIME ________ COMMENTS:
SIMULATOR SETUP INSTRUCTIONS Page 5 of 5 JPM NO: Sim 500 REQUIRED SIMULATOR MODE(S): 100% power steady state MALFUNCTION #'S:  1) IMF EG03 to 95% severity and allow to stabilize.
COMMENTS:
JOB PERFORMANCE MEASURE TASK CONDITIONS:
JOB PERFORMANCE MEASURE TASK CONDITIONS:
: 1. You are the Unit 1 Assist NSO.
: 1. You are the Unit 1 Assist NSO.
Line 538: Line 581:
INITIATING CUES:
INITIATING CUES:
: 1. Unit 1 PRT level has risen to 90% due to inadvertent opening of a PZR PORV.
: 1. Unit 1 PRT level has risen to 90% due to inadvertent opening of a PZR PORV.
: 2. The US has directed you to return the Unit 1 PRT level to within its normal operating band.  
: 2. The US has directed you to return the Unit 1 PRT level to within its normal operating band.


Page 2 of 6 JOB PERFORMANCE MEASURE             Rev. 1, 03/17/2006 TASK TITLE: Drain the PZR Relief Tank (PRT)
JOB PERFORMANCE MEASURE                         Rev. 1, 03/17/2006 TASK TITLE:     Drain the PZR Relief Tank (PRT)                   JPM No.: Sim 600 TPO No: IV.C.RY-03               K&A No.: 007 A1.01               K&A IMP: 2.9 / 3.1 TRAINEE:_______________________________                           DATE: ___/___/___
JPM No.: Sim 600 TPO No: IV.C.RY-03 K&A No.: 007 A1.01 K&A IMP: 2.9 / 3.1 TRAINEE:_______________________________
The Trainee:     PASSED_________ this JPM                 TIME STARTED: ________
DATE:   ___/___/___
FAILED __________                         TIME FINISHED: ________
The Trainee:
EVALUATION METHOD:           PERFORM__X___         SIMULATE_______
PASSED_________   this JPM TIME STARTED: ________
LOCATION:                   PLANT__ __           SIMULATOR__X__
FAILED __________
MATERIALS:
TIME FINISHED: ________
EVALUATION METHOD:
PERFORM__X___
SIMULATE_______
LOCATION:
PLANT__ __ SIMULATOR__
X__  MATERIALS:
: 1. Copy of BOP RY-4 GENERAL  
: 1. Copy of BOP RY-4 GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. BOP RY-4, Rev. 5, Draining the Pressurizer Relief Tank TASK STANDARDS:
: 1. BOP RY-4, Rev. 5, Draining the Pressurizer Relief Tank TASK STANDARDS:
: 1. Decrease PRT level to < 88%, but > 59%. 2. Restores PRT Pressure to > 0 psig, if reduced to  
: 1. Decrease PRT level to < 88%, but > 59%.
< 0 psig. TASK CONDITIONS:
: 2. Restores PRT Pressure to > 0 psig, if reduced to < 0 psig.
: 1. You are the Unit 1 Assist NSO. 2. Unit 1 is at 100% power.
TASK CONDITIONS:
: 1. You are the Unit 1 Assist NSO.
: 2. Unit 1 is at 100% power.
INITIATING CUES:
INITIATING CUES:
: 1. Unit 1 PRT level has risen to 90% due to inadvertent opening of a PZR PORV. 2. The US has directed you to return the Un it 1 PRT level to within its normal operating band. CRITICAL ELEMENTS: (*) 6, 7, 9, 11, 12 & 13 APPROXIMATE COMPLETION TIME:
: 1. Unit 1 PRT level has risen to 90% due to inadvertent opening of a PZR PORV.
10 minutes PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 3 of 6 RECORD START TIME ________
: 2. The US has directed you to return the Unit 1 PRT level to within its normal operating band.
Note: Examinee may refer to BAR 1-12-A7 "PRT Level High Low" Actions here will direct: 1) Checking PORV and Safety Valves NOT open, 2) Pump down the PRT, 3) Check RCS leakage. It is not required for the examinee to perform these actions, but is acceptable if done. Initiating cues provided the cause for the high level alarm. 1. Refer to BOP RY-4, Draining the Pressurizer Relief Tank Cue: Prerequisites are met. LOCATE and OPEN BOP RY-4 o o o Note: Provide the examinee with a copy of BOP RY-4.
CRITICAL ELEMENTS: (*) 6, 7, 9, 11, 12 & 13 APPROXIMATE COMPLETION TIME: 10 minutes Page 2 of 6
: 2. Verify/Close 1RY469.
 
At 1PM05J:  
PERFORMANCE CHECKLIST                     STANDARDS                     SAT     UNSAT   N/A RECORD START TIME ________
&deg; Verify/Close 1RY469 o o o      3. Verify 1RY8034 is maintaining PRT pressure.
Note:
At 1PM05J:  Verify PRT pressure is  
Examinee may refer to BAR 1-12-A7 PRT Level High Low Actions here will direct:
~3 psig o o o      4. Verify/Open 1RY8033.
: 1) Checking PORV and Safety Valves NOT open, 2) Pump down the PRT, 3) Check RCS leakage. It is not required for the examinee to perform these actions, but is acceptable if done. Initiating cues provided the cause for the high level alarm.
At 1PM05J: Verify/Open 1RY8033 o o o      5. Verify/Open 1RE9170 At 1PM11J: Verify/Open 1RE9170 o o o      *6. Verify/Open 1RE1003 At 1PM11J: Verify/Open 1RE1003 o o o PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 4 of 6      *7. Open 1RY8031 At 1PM05J:
: 1. Refer to BOP RY-4, Draining the       &deg;    LOCATE and OPEN            o        o      o Pressurizer Relief Tank                     BOP RY-4 Cue: Prerequisites are met.
Open 1RY8031 o o o Note: Alternate Path starts here.
Note:
: 8. Verify/Start 1RE01PB Cue:   US acknowledges that pump didn't start as expected and informs the NSO to continue with the procedure.
Provide the examinee with a copy of BOP RY-4.
At 1PM05J:  Verify/Start 1RE01PB  Inform US that 1RE01PB did not start o o o      *9. Start 1RE01PA At 1PM05J:   Start 1RE01PA Verify that 1RE01PA started o o o      10. Ensure PRT pressure remains above 0 psig.
: 2. Verify/Close 1RY469.                   At 1PM05J:                       o        o      o
At 1PM05J:  Monitor PRT pressure on 1PI-469 o o o      *11. Close 1RY8031.
                                          &deg;       Verify/Close 1RY469
At 1PM05J: Close 1RY8031 o o o     *12. Stop 1RE01PA At 1PM05J: Stop 1RE01PA o o o PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 5 of 6 *13. Close 1RE1003 At 1PM11J:
: 3. Verify 1RY8034 is maintaining PRT At 1PM05J:                            o        o      o pressure.
Close 1RE1003 o o o RECORD STOP TIME ________
Verify PRT pressure is
                                                ~3 psig
: 4. Verify/Open 1RY8033.                   At 1PM05J:                       o        o      o Verify/Open 1RY8033
: 5. Verify/Open 1RE9170                   At 1PM11J:                       o        o      o Verify/Open 1RE9170
*6. Verify/Open 1RE1003                   At 1PM11J:                       o        o      o
* Verify/Open 1RE1003 Page 3 of 6
 
PERFORMANCE CHECKLIST                 STANDARDS                   SAT UNSAT N/A
*7. Open 1RY8031                       At 1PM05J:                   o    o    o
* Open 1RY8031 Note: Alternate Path starts here.
: 8. Verify/Start 1RE01PB               At 1PM05J:                    o    o    o Cue: US acknowledges that pump             Verify/Start 1RE01PB didnt start as expected and Inform US that 1RE01PB informs the NSO to continue           did not start with the procedure.
*9. Start 1RE01PA                     At 1PM05J:                   o    o    o
* Start 1RE01PA
                                      &deg;    Verify that 1RE01PA started
: 10. Ensure PRT pressure remains       At 1PM05J:                    o    o    o above 0 psig.
Monitor PRT pressure on 1PI-469
*11. Close 1RY8031.                   At 1PM05J:                   o   o   o
* Close 1RY8031
*12. Stop 1RE01PA                     At 1PM05J:                   o   o   o
* Stop 1RE01PA Page 4 of 6
 
PERFORMANCE CHECKLIST     STANDARDS         SAT UNSAT N/A
*13. Close 1RE1003       At 1PM11J:         o    o    o
* Close 1RE1003 RECORD STOP TIME ________
COMMENTS:
COMMENTS:
SIMULATOR SETUP INSTRUCTIONS Page 6 of 6 JPM NO: Sim 600 REQUIRED SIMULATOR MODE(S): 100% power steady state MALFUNCTION #'S: 1. IOR ZDI1RE01PB (Stop)
Page 5 of 6
COMMENTS: 1. Raise PRT level to 90% by opening PW supply to PRT.
 
SIMULATOR SETUP INSTRUCTIONS JPM NO: Sim 600 REQUIRED SIMULATOR MODE(S): 100% power steady state MALFUNCTION #S:
: 1. IOR ZDI1RE01PB (Stop)
COMMENTS:
: 1. Raise PRT level to 90% by opening PW supply to PRT.
Page 6 of 6
 
JOB PERFORMANCE MEASURE TASK CONDITIONS:
JOB PERFORMANCE MEASURE TASK CONDITIONS:
: 1. You are the extra NSO.
: 1. You are the extra NSO.
Line 585: Line 652:
: 4. Jacket water and lube oil temperatures are acceptable for loading the diesel generator.
: 4. Jacket water and lube oil temperatures are acceptable for loading the diesel generator.
INITIATING CUES:
INITIATING CUES:
The Unit Supervisor directs you to paralle l and load the 1A Diesel Generator to 5400 KW per step F.5 of BOP DG-11.  
The Unit Supervisor directs you to parallel and load the 1A Diesel Generator to 5400 KW per step F.5 of BOP DG-11.


Page 2 of 6 JOB PERFORMANCE MEASURE             Rev. 5, 3/17/06 TASK TITLE: Synchronize a D/G to a Bus and Load to 5400 KW (DG will not pick up load)
JOB PERFORMANCE MEASURE                         Rev. 5, 3/17/06 TASK TITLE: Synchronize a D/G to a Bus and Load to 5400 KW         JPM No.: Sim 700 (DG will not pick up load)
JPM No.: Sim 700 TPO No: IV.C.DG-02 K&A No.: 064 A4.06 K&A IMP. 3.9/3.9 TRAINEE:_______________________________
TPO No: IV.C.DG-02                 K&A No.: 064 A4.06               K&A IMP. 3.9/3.9 TRAINEE:_______________________________                             DATE: ___/___/___
DATE:   ___/___/___
The Trainee:     PASSED_________ this JPM                   TIME STARTED: ________
The Trainee:
FAILED __________                         TIME FINISHED: ________
PASSED_________   this JPM TIME STARTED: ________
EVALUATION METHOD:           PERFORM__X____        SIMULATE_______
FAILED __________
LOCATION:                   IN PLANT______         SIMULATOR__X___
TIME FINISHED: ________
MATERIALS:
EVALUATION METHOD:
BOP DG-11, Diesel Generator Startup (Rev. 19) completed thru step f.4 GENERAL  
PERFORM__X____SIMULATE_______
LOCATION:
IN PLANT______
SIMULATOR__X___ MATERIALS:
BOP DG-11, Diesel Generat or Startup (Rev. 19) completed thru step f.4 GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. BOP DG-11, Diesel Gener ator Startup (Rev. 19) 2. BOP DG-11T1, Diesel Generat or Start /Stop Log (Rev. 2)
: 1. BOP DG-11, Diesel Generator Startup (Rev. 19)
: 2. BOP DG-11T1, Diesel Generator Start /Stop Log (Rev. 2)
TASK STANDARDS:
TASK STANDARDS:
Perform the actions necessary to synchronize and load the 1A Diesel Generator to it's ESF bus. TASK CONDITIONS:
Perform the actions necessary to synchronize and load the 1A Diesel Generator to its ESF bus.
TASK CONDITIONS:
: 1. You are the extra NSO.
: 1. You are the extra NSO.
: 2. The unit's ESF busses are being supplied by the SATs.
: 2. The unit's ESF busses are being supplied by the SATs.
: 3. The 1A Diesel Generator has been running unloaded for approximately fifteen minutes after a manual start. 4. Jacket water and lube oil temperatures are acceptable for loading the diesel generator.
: 3. The 1A Diesel Generator has been running unloaded for approximately fifteen minutes after a manual start.
: 4. Jacket water and lube oil temperatures are acceptable for loading the diesel generator.
INITIATING CUES:
INITIATING CUES:
The Unit Supervisor directs you to paralle l and load the 1A Diesel Generator to 5400 KW per step F.5 of BOP DG-11.
The Unit Supervisor directs you to parallel and load the 1A Diesel Generator to 5400 KW per step F.5 of BOP DG-11.
CRITICAL ELEMENTS: (*) 6, 9, & 11 APPROXIMATE COMPLETION TIME: 15 minutes PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 3 of 6 RECORD START TIME ________
CRITICAL ELEMENTS: (*) 6, 9, & 11 APPROXIMATE COMPLETION TIME: 15 minutes Page 2 of 6
: 1. Refer to BOP DG-11, Diesel Generator Startup Cue: All prerequisites have been met Cue: (If asked) The 1A DG was started per step F.1 Note:  This step may be performed at any time. LOCATE and OPEN BOP DG-11, step F.5 o o o      2. Notify Electric Operations of pending diesel generator parallel operation, estimated run time, and


loading Cue: Electric Operations has been informed  Notify Electric Operations o o o     3. Auto Re-close Circuit Arm Selector At 1PM01J: PLACE Auto Re-close Circuit Arm Selector  
PERFORMANCE CHECKLIST                    STANDARDS                      SAT UNSAT N/A RECORD START TIME ________
                                          &deg;  LOCATE and OPEN
: 1. Refer to BOP DG-11, Diesel                                            o    o    o BOP DG-11, step F.5 Generator Startup Cue: All prerequisites have been met Cue: (If asked) The 1A DG was started per step F.1 Note: This step may be performed at any time.
                                          &deg;  Notify Electric Operations
: 2. Notify Electric Operations of                                          o   o   o pending diesel generator parallel operation, estimated run time, and loading Cue: Electric Operations has been informed
: 3. Auto Re-close Circuit Arm Selector At 1PM01J:
o    o    o
                                          &deg;  PLACE Auto Re-close Circuit Arm Selector Switch to SURV TEST At 1PM01J, CHECK:
: 4. Verify DG operating properly                                          o    o    o
                                          &deg;      DG frequency
                                          &deg;      DG voltage At 1PM01J, CHECK:
: 5. Verify the same voltage across                                        o    o    o each phase.                            &deg;      DG phase voltages Page 3 of 6


Switch to SURV TEST o o o      4. Verify DG operating properly At 1PM01J, CHECK:  DG frequency  DG voltage o o o      5. Verify the same voltage across each phase.
PERFORMANCE CHECKLIST                 STANDARDS                     SAT UNSAT N/A At 1PM01J:
At 1PM01J, CHECK:  DG phase voltages o o o PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 4 of 6
*6. Turn on the 1A DG Feed to 141                                 o    o    o Sync Selector switch.
    *6. Turn on the 1A DG Feed to 141 Sync Selector switch.
* TURN Sync Selector switch for DG 1A Feed to KV Bus 141 to ON At 1PM01J:
At 1PM01J:  TURN Sync Selector switch for DG 1A Feed to KV Bus 141 to ON o o o      7. Adjust the incoming voltage.
: 7.      Adjust the incoming voltage.                                  o   o   o
At 1PM01J:  ADJUST incoming
                                      &deg;  ADJUST incoming voltage SLIGHTLY HIGHER than running voltage using DG 1A Volt Adj control At 1PM01J:
: 8.     Adjust 1A DG speed.                                           o    o    o
                                      &deg;  Adjust speed so synchroscope rotates SLOWLY in FAST DIRECTION using DG 1A Gov Adj control At 1PM01J:
*9. Synchronize the DG                                                o    o    o
* PLACE control switch for Cue: If requested, NLO is locally        ACB 1413 to CLOSE monitoring temperatures per      when synchroscope is notes in BOP                      slightly before 12 oclock At 1PM01J:
: 10. Verify the synchroscope is locked                                o    o    o in.                              &deg;   VERIFY synchroscope "locks in" at 12 o'clock Page 4 of 6


voltage SLIGHTLY
PERFORMANCE CHECKLIST                    STANDARDS                  SAT UNSAT N/A Note: Alternate Path starts here At 1PM01J:
*11. Immediately load the 1A DG to                                    o    o    o 1000 KW.                              &deg;  IMMEDIATELY load DG to 1000 KW by going to Note: The governor adjust is failed          RAISE on Gov Adj such that the diesel generator        Control will NOT load
* OPEN output breaker
                                          &deg;  NOTIFY Unit Supervisor
: 12. Notify the US of the unsuccessful                                o    o    o of the unsuccessful loading of the diesel loading of the diesel Cue: The Unit Supervisor acknowledges the failure and will initiate an WR for maintenance to investigate Cue: This JPM is completed RECORD STOP TIME ________
COMMENTS:
Page 5 of 6


HIGHER than running
SIMULATOR SETUP INSTRUCTIONS JPM NO: Sim 700 REQUIRED SIMULATOR MODE(S): 99.8% power steady state MALFUNCTION #S:
: 1. trgset 7 ZIO1HSDG026(3).gt.0
: 2. trg 7 imf eg07a 22 COMMENTS:
: 1. Start 1A DG
: 2. MRF eg06 reset
: 3. Set trigger Page 6 of 6


voltage using DG 1A Volt
JOB PERFORMANCE MEASURE TASK CONDITIONS:
 
: 1. You are the Unit NSO.
Adj control o o o      8. Adjust 1A DG speed.
: 2. The reactor is at 100% power.
At 1PM01J:  Adjust speed so
 
synchroscope rotates
 
SLOWLY in FAST
 
DIRECTION using DG
 
1A Gov Adj  control o o o      *9. Synchronize the DG Cue:  If requested, NLO is locally monitoring temperatures per notes in BOP At 1PM01J:  PLACE control switch for ACB 1413  to CLOSE when synchroscope is
 
slightly before 12 o'clock o o o      10. Verify the synchroscope is locked in. At 1PM01J:  VERIFY synchroscope "locks in" at 12 o'clock o o o PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 5 of 6 Note: Alternate Path starts here*11. Immediately load the 1A DG to 1000 KW. Note: The governor adjust is failed such that the diesel generator will NOT load At 1PM01J:  IMMEDIATELY load DG to 1000 KW by going to RAISE on Gov Adj
 
Control      OPEN output breaker o o o      12. Notify the US of the unsuccessful loading of the diesel Cue:  The Unit Supervisor acknowledges the failure and will initiate an WR for
 
maintenance to investigate NOTIFY Unit Supervisor of the unsuccessful
 
loading of the diesel o o o Cue: This JPM  is completed RECORD STOP TIME ________
COMMENTS:
SIMULATOR SETUP INSTRUCTIONS Page 6 of 6 JPM NO: Sim 700 REQUIRED SIMULATOR MODE(S):
99.8% power steady state MALFUNCTION #'S:  1. trgset 7 "ZIO1HSDG026(3).gt.0"  2. trg 7 "imf eg07a 22" COMMENTS: 1. Start 1A DG 2. MRF eg06 reset 3. Set trigger 
 
JOB PERFORMANCE MEASURE TASK CONDITIONS: 1. You are the Unit NSO. 2. The reactor is at 100% power.
: 3. All systems and controls are in automatic.
: 3. All systems and controls are in automatic.
INITIATING CUE:  
INITIATING CUE:
Respond to MCB alarms on 1PM05J.


Respond to MCB alarms on 1PM05J.
JOB PERFORMANCE MEASURE                         Rev. 8, 4/3/2006 TASK TITLE:     Response to a Power Range NI Failure               JPM No.: Sim 800 TPO No: IV.D.OA-15               K&A No.: 015 A2.01                 K&A IMP. 3.5 / 3.9 EXAMINEE: _______________________________                           DATE: ___/___/___
 
The Examinee:     PASSED_________ this JPM                   TIME STARTED: ________
Page 2 of 7 JOB PERFORMANCE MEASURE Rev. 8, 4/3/2006 TASK TITLE: Response to a Power Range NI Failure JPM No.: Sim 800 TPO No: IV.D.OA-15 K&A No.: 015 A2.01 K&A IMP. 3.5 / 3.9 EXAMINEE: _______________________________ DATE:   ___/___/___
FAILED __________                           TIME FINISHED: ________
The Examinee: PASSED_________ this JPM TIME STARTED: ________
EVALUATION METHOD:         PERFORM______           SIMULATE_______
FAILED __________ TIME FINISHED: ________
LOCATION:                   IN PLANT______         SIMULATOR__X___
EVALUATION METHOD: PERFORM______ SIMULATE_______
MATERIALS:
LOCATION: IN PLANT______
SIMULATOR__
X___  MATERIALS:
: 1. Copy of 1BOA INST-1, Attachment A GENERAL  
: 1. Copy of 1BOA INST-1, Attachment A GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. 1BOA INST-1, Nuclear Instrumentation Malfunction (Rev. 104)
: 1. 1BOA INST-1, Nuclear Instrumentation Malfunction (Rev. 104)
: 2. BAR 1-10-A3, PWR RNG HIGH STPT RX TRIP ALERT (Rev. 51) 3. BAR 1-10-A4, PWR RNG UPPER DET FLUX DEV HIGH (Rev. 5)
: 2. BAR 1-10-A3, PWR RNG HIGH STPT RX TRIP ALERT (Rev. 51)
: 3. BAR 1-10-A4, PWR RNG UPPER DET FLUX DEV HIGH (Rev. 5)
: 4. BAR 1-10-A7, ROD DEV POWER RNG TILTS (Rev. 16)
: 4. BAR 1-10-A7, ROD DEV POWER RNG TILTS (Rev. 16)
: 5. BAR 1-10-B5, PWR RNG FLUX HIGH ROD STOP (Rev. 1)
: 5. BAR 1-10-B5, PWR RNG FLUX HIGH ROD STOP (Rev. 1)
TASK STANDARDS: 1. Respond to a PR NI failure. 2. Trip the associated bistables.  
TASK STANDARDS:
 
: 1. Respond to a PR NI failure.
TASK CONDITIONS: 1. You are the Unit 1 NSO. 2. The reactor is at 100% power.
: 2. Trip the associated bistables.
: 3. All systems and controls are in automatic.  
TASK CONDITIONS:
 
: 1. You are the Unit 1 NSO.
: 2. The reactor is at 100% power.
: 3. All systems and controls are in automatic.
INITIATING CUE:
INITIATING CUE:
: 1. Respond to MCB alarms on 1PM05J.
: 1. Respond to MCB alarms on 1PM05J.
CRITICAL ELEMENTS: (*) 2, 3, 7, 8, & 9 APPROXIMATE COMPLETION TIME: 10 minutes
CRITICAL ELEMENTS: (*) 2, 3, 7, 8, & 9 APPROXIMATE COMPLETION TIME: 10 minutes Page 2 of 7
 
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A  Page 3 of 7 RECORD START TIME ________
Note:  Once the examinee has the Unit, Inform Machine O8perator to insert malfunction
: 1. Refer to 1BOA INST-1, Nuclear Instrumentation Malfunction Note:  This may be performed at any time. Cue: SM will evaluate E-Plan. LOCATE and OPEN 1BOA INST-1, Attachment A  Inform SM to evaluate conditions for the E-Plan o o o Note: Provide the examinee a copy of 1BOA INST-1, Attachment A. *2. Check rod control status At 1PM05J:  PLACE Rod Bank Select switch in MANUAL o o o Cue: When the examinee reports the failure to the US, acknowledge the report and gives the following direction: Perform act ions required and the U1 Assist NSO will monitor the Unit while you continue
. *3. Check for Rod Stop At 1PM05J:
Check Alarm 1-10-B5 is LIT At 1PM07J:  PLACE Rod Stop Bypass switch in the N-41 position o o o      4. Check Tave-Tref deviation At 1PM05J:  CHECK Tave-Tref STABLE and within 1  F o o o PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A  Page 4 of 75. Match Tave to Tref Cue: U1 Assist NSO will restore Tave RESTORE Tave-Tref to within 1  F by:  Manual rod control  Adjusting turbine load  Adjusting RCS boron o o o      6. Check SG levels At 1PM04J:  CHECK SG levels o o o      *7. Bypass PR 41 At 1PM07J:
BYPASS N41 on the Detector Current
 
Comparator:    Upper current comparator  Lower current comparator BYPASS N41 on the Miscellaneous Control and


Indication Section:   Power mismatch bypass  Rod Stop bypass BYPASS N41 on the  
PERFORMANCE CHECKLIST                  STANDARDS                        SAT UNSAT  N/A RECORD START TIME ________
Note:
Once the examinee has the Unit, Inform Machine O8perator to insert malfunction
: 1. Refer to 1BOA INST-1, Nuclear      &deg;    LOCATE and OPEN              o    o    o Instrumentation Malfunction              1BOA INST-1, Attachment A Note: This may be performed at any time.                            &deg;    Inform SM to evaluate conditions for the E-Plan Cue: SM will evaluate E-Plan.
Note:
Provide the examinee a copy of 1BOA INST-1, Attachment A.
*2. Check rod control status            At 1PM05J:                        o    o    o
* PLACE Rod Bank Select switch in MANUAL Cue: When the examinee reports the failure to the US, acknowledge the report and gives the following direction: Perform actions required and the U1 Assist NSO will monitor the Unit while you continue.
*3. Check for Rod Stop                  At 1PM05J:                      o    o    o
* Check Alarm 1-10-B5 is LIT At 1PM07J:
* PLACE Rod Stop Bypass switch in the N-41 position
: 4. Check Tave-Tref deviation          At 1PM05J:                        o  o    o
                                        &deg;  CHECK Tave-Tref STABLE and within 1 &deg;F Page 3 of 7


Comparator and Rate Panel:  Comparator channel defeat o o o PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A   Page 5 of 7 Note: Placement of orange dots is one method of ensuring coincidence will not be met, causing a reactor trip. The evaluator shoul d apply discretion in accepting alternate methods since no specific method is stated in 1BOA INST-1.  
PERFORMANCE CHECKLIST           STANDARDS                   SAT UNSAT N/A
*8. Trip Hi/Lo and Positive rate Rx trip bistables for channel N-41 At 1PM07J: REMOVE control power fuses for N-41
: 5. Match Tave to Tref          RESTORE Tave-Tref to within  o    o    o 1 &deg;F by:
Cue: U1 Assist NSO will restore &deg;    Manual rod control Tave
                                &deg;    Adjusting turbine load
                                &deg;    Adjusting RCS boron
: 6. Check SG levels            At 1PM04J:                  o    o    o
                                &deg;    CHECK SG levels
*7. Bypass PR 41               At 1PM07J:                   o    o    o BYPASS N41 on the Detector Current Comparator:
* Upper current comparator
* Lower current comparator BYPASS N41 on the Miscellaneous Control and Indication Section:
* Power mismatch bypass
                                    &deg;  Rod Stop bypass BYPASS N41 on the Comparator and Rate Panel:
* Comparator channel defeat Page 4 of 7


to TRIP bistables: NC41P   NC41R NC41U/K o o o Note: If the task is performed on the simulator, an ex tra NSO will be required, insure examinee can discuss how the bistables in the field would be tripped.  
PERFORMANCE CHECKLIST                      STANDARDS                        SAT  UNSAT  N/A Note:
*9. Trip Hi/Lo and Positive rate Rx trip bistables for channel N-41 Cue: TB411C is TRIPPED Cue: TB411D is TRIPPED Locally TRIP bistables by placing switches in TEST: TB411C  TB411D o o o      10. Select operable channels At 1PM05J, SELECT operable channel for: Loop T recorder o o o PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A  Page 6 of 7 Note: The examinee only needs to place one of the three computer points into test. 11. Defeat effect channel input to PDMS Cue: An extra NSO will place the remaining points into TEST.
Placement of orange dots is one method of ensuring coincidence will not be met, causing a reactor trip. The evaluator should apply discretion in accepting alternate methods since no specific method is stated in 1BOA INST-1.
*8. Trip Hi/Lo and Positive rate Rx trip    At 1PM07J:                        o      o    o bistables for channel N-41
* REMOVE control power fuses for N-41 to TRIP bistables:
* NC41P
* NC41R
* NC41U/K Note:
If the task is performed on the simulator, an extra NSO will be required, insure examinee can discuss how the bistables in the field would be tripped.
*9. Trip Hi/Lo and Positive rate Rx trip   Locally TRIP bistables by          o      o    o bistables for channel N-41           placing switches in TEST:
* TB411C Cue:     TB411C is TRIPPED Cue: TB411D is TRIPPED
* TB411D
: 10. Select operable channels               At 1PM05J, SELECT                 o      o    o operable channel for:
                                            &deg;    Loop T recorder Page 5 of 7


Cue: This JPM is completed.
PERFORMANCE CHECKLIST                  STANDARDS                      SAT    UNSAT  N/A Note:
Using the OPCON computer:  REMOVE N0049A from scan Place N0041 in TEST Place N0042 in TEST Place U1144 in TEST o o o      RECORD STOP TIME ________
The examinee only needs to place one of the three computer points into test.
: 11. Defeat effect channel input to                                    o        o    o PDMS                              Using the OPCON computer:
                                      &deg;   REMOVE N0049A from Cue: An extra NSO will place the          scan remaining points into TEST.
                                      &deg;  Place N0041 in TEST Cue: This JPM is completed.            &deg;  Place N0042 in TEST
                                      &deg;  Place U1144 in TEST RECORD STOP TIME ________
COMMENTS:
COMMENTS:
Simulator Setup Instructions Page 7 of 7 JPM NO: Sim 800
Page 6 of 7
 
REQUIRED SIMULATOR MODE(S): 100% power steady state


MALFUNCTION #'S: 1. IMF NI09a to 120 when directed by examiner COMMENTS:
Simulator Setup Instructions JPM NO: Sim 800 REQUIRED SIMULATOR MODE(S): 100% power steady state MALFUNCTION #S:
Ensure computer points are restored to normal status after each examinee.}}
: 1. IMF NI09a to 120 when directed by examiner COMMENTS:
Ensure computer points are restored to normal status after each examinee.
Page 7 of 7}}

Latest revision as of 00:40, 14 March 2020

Initial Submittal of the Walkthrough Jpms for the Byron Initial Examination - June 2006
ML062900467
Person / Time
Site: Byron  Constellation icon.png
Issue date: 06/19/2006
From: Palagi B
NRC/RGN-III/DRS/OLB
To:
References
50-454/06-301, 50-455/06-301
Download: ML062900467 (63)


Text

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are a Non-Licensed Operator.
2. The control switch for 2AF017A is not functioning.
3. 2BEP-0 is in progress, due to a LOOP.
4. Unit 2 CST has been damaged by a tornado.

INITIATING CUES:

1. The US has directed you locally open 2AF017A, at MCC 231X3, per 2BOA ELEC-5, Attachment C.
2. The SM has given you a jumper.

JOB PERFORMANCE MEASURE Rev. 0, 03/20/06 TASK TITLE: Locally Open SX to AF Pump Suction Valve JPM No.: Plt 100 TPO No: K&A No.: 061 K1.07 K&A IMP. 3.6/3.8 TRAINEE:_______________________________ DATE: ___/___/___

The Trainee: PASSED_________ this JPM TIME STARTED: ________

FAILED __________ TIME FINISHED: ________

EVALUATION METHOD: PERFORM______ SIMULATE___X____

LOCATION: IN PLANT___X___

MATERIALS:

1. Electrical jumpers (simulated for In Plant)
2. Copy of 2BOA ELEC-5, Attachment C
3. Safety Equipment GENERAL

REFERENCES:

2BOA ELEC-5, Local Emergency Control of Safe Shutdown Equipment (Rev. 100)

TASK STANDARDS:

Complete the steps necessary to locally open _AF017B.

TASK CONDITIONS:

1. You are a Non-Licensed Operator.
2. The control switch for 2AF017A is not functioning.
3. 2BEP-0 is in progress, due to a LOOP.
4. Unit 2 CST has been damaged by a tornado.

INITIATING CUES:

1. The US has directed you locally open 2AF017A, at MCC 231X3, per 2BOA ELEC-5, Attachment C.
2. The SM has given you a jumper.

CRITICAL ELEMENTS: (*) 3, 4, 5, 6, 7 & 12 APPROXIMATE COMPLETION TIME: 20 minutes Page 2 of 5

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A RECORD START TIME________

1. Refer to 2BOA ELEC-5, ° OPEN 2BOA ELEC-5, o o o Attachment C Attachment C Cue: (if asked) The valve is SX to AF suction valve Cue: (if asked) The cubicle for the valve is B5 on MCC 231X3
2. Locate proper MCC and cubicle ° LOCATE MCC 231X3 o o o Cubicle B5 NOTE Cubicle location may be given to examinee after they display a method of retrieving this information (e.g. call control room, 'E' L/U's etc.)

(401 M20 for 231X3)

After Cubicle is located, move to a different MCC in a low traffic area.

CAUTION Do not open breaker or cubicle door on energized MCC breakers!

The rest of this JPM may be continued on an unassigned cubicle, with SM's permission, or simulated using a photo provided.

Protective clothing required is Full Class 3 plus Safety Glasses and Hardhat with Class 2 Face Shield.

  • 3. Turn breaker Off At MCC 231X3Cubicle B5: o o o Cue: Breaker handle is in the
  • Turn breaker OFF DOWN position (OFF)
  • 4. Open cubicle door At MCC 231X3Cubicle B5: o o o Cue: Door is OPEN
  • OPEN cubicle door Page 3 of 5

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A

  • 5. Install jumper At MCC 231X3Cubicle B5: o o o Cue: Jumper is installed between
  • INSTALL jumper points 2 and 3 between points 2 and 3 on the terminal board at front of cubicle
  • 6. Override interlock and then turn At MCC 231X3Cubicle B5: o o o breaker on Cue: Breaker and door interlock
  • OVERRIDE breaker and overriden door interlock Cue: Breaker handle is in the UP
  • 7. Turn breaker off. At MCC 231X3Cubicle B5: o o o Cue: M contactor has dropped out
  • WHEN 'M' contactor drops out, Cue: Breaker handle is in the IMMEDIATELY turn DOWN position (OFF) breaker OFF
8. Remove the jumper. At MCC 231X3Cubicle B5: o o o Cue: Jumper is removed ° REMOVE jumper
9. Close the cubicle door. At MCC 231X3Cubicle B5: o o o Cue: Cubicle door is closed ° CLOSE cubicle door Page 4 of 5

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A NOTE Valve location may be given to examinee after they display a method of retrieving this information (e.g. call the Control Room, M lineups, etc.)

(383 M18 for 2AF017A)

Note: Alternate Path Starts here

10. Check Local Valve position ° Verify 2AF017A is open o o o Cue: Valve is closed
11. Notify Control Room ° Control Room notified o o o that 2AF017A is closed Cue: Shift Manager directs you to locally open valve 2AF017A
  • 12. Locally open 2AF017A Simulate manually opening o o o 2AF017A by:
  • Depressing the lever (Declutching the motor from the valve)

Cue: Valve is open

  • and rotating handwheel counter-clockwise.
11. Notify Control Room ° Control Room notified o o o that 2AF017A is open Cue: This JPM is completed RECORD STOP TIME________

COMMENTS:

Page 5 of 5

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are a Non-Licensed Operator.
2. Unit-_ is experiencing a loss of Essential Service Water.

INITIATING CUES:

The Unit Supervisor has directed you to perform the actions necessary to align FP cooling to the _A Centrifugal Charging pump per _BOA PRI-7, Attachment B.

JOB PERFORMANCE MEASURE Rev. 02, 03/20/06 TASK TITLE: Align Fire Protection Cooling to a Centrifugal JPM No.: Plt 200 Charging Pump TPO No: IV.D.OA-69 K&A No.: 086 K1.02 K&A IMP. 2.7/3.2 TRAINEE:_______________________________ DATE: ___/___/___

The Trainee: PASSED_________ this JPM TIME STARTED: ________

FAILED __________ TIME FINISHED: ________

EVALUATION METHOD: PERFORM______ SIMULATE_______

LOCATION: IN PLANT__X___

MATERIALS:

None GENERAL

REFERENCES:

_BOA PRI-7, Essential Service Water Malfunction, (Rev. 101 for U1 & Rev 102 for U2)

TASK STANDARDS:

Perform the actions necessary to align FP cooling to the 1A Centrifugal Charging pump TASK CONDITIONS:

1. You are a Non-Licensed Operator.
2. Unit-_ is experiencing a loss of Essential Service Water.

INITIATING CUES:

The Unit Supervisor has directed you to perform the actions necessary to align FP cooling to the _A Centrifugal Charging pump per _BOA PRI-7, Attachment B.

CRITICAL ELEMENTS: (*) 2 & 3 APPROXIMATE COMPLETION TIME: 10 minutes Page 2 of 4

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A RECORD START TIME________

1. Refer to _BOA PRI-7, Attachment ° OPEN _BOA PRI-7, o o o B, Essential Service Water Attachment B, Essential Malfunction Service Water Malfunction Note: This step may be performed at any time.

NOTE The Hose stations for both Units are located at V-18, 364 (Outside the 2A CV Pump Rm)

  • 2. Connect FP cooling to _A
  • CONNECT FP supply o o o Centrifugal Charging pump hose Cue: FP supply hose CONNECTED
  • 3. Align FP cooling to _A Centrifugal o o o Charging pump At 364 V-18 AB2:

Cue: (U1) 0FP5170 is OPEN (U2) 0FP5171 is OPEN

  • OPEN 0FP5170 (U1) or 0FP5171 (U2), FP hose supply isolation valve At _A CV pump:

Cue: _SX2200A is OPEN

  • OPEN _SX2200A, Cue: _SX2199A is CLOSED
  • CLOSE _SX2199A, Page 3 of 4

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A

  • 4. Place a portable fan in door At the _A CV Pump Room o o o opening. Door.

Cue: Another NLO will bring and Place portable fan place the fan Cue: This JPM is completed RECORD STOP TIME________

COMMENTS:

Page 4 of 4

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are a non-licensed operator.
2. The unit had experienced a Battery Charger _11 failure.
3. Maintenance has repaired 125 VDC Battery Charger _11 and all clearance orders are lifted.

INITIATING CUES:

The US directs you to startup 125 VDC Battery Charger _11 per _BOP DC-1.

JOB PERFORMANCE MEASURE Rev. 2, 3/20/06 TASK TITLE: Respond to a Loss of DC Power. (Startup of a JPM No.: Plt 300 125 VDC ESF Battery Charger)

TPO No: IV.D.OA-23 K&A No: 063 A3.01 K&A IMP: 2.7/3.1 TRAINEE:_______________________________ DATE: ___/___/___

The Trainee: PASSED_________ this JPM TIME STARTED: ________

FAILED __________ TIME FINISHED: ________

EVALUATION METHOD: PERFORM______ SIMULATE_______

LOCATION: IN PLANT______

MATERIALS:

1. Copy of _BOP DC-1
2. Calibrated hand held digital voltmeter, optional.

GENERAL

REFERENCES:

1. _BOP DC-1, 125V DC ESF Battery Chargers Start-up (Rev. 10)

TASK STANDARDS:

Take the actions necessary to start-up a 125V DC ESF battery charger.

TASK CONDITIONS:

1. You are a non-licensed operator.
2. The unit had experienced a Battery Charger _11 failure.
3. Maintenance has repaired 125 VDC Battery Charger _11 and all clearance orders are lifted.

INITIATING CUES:

The US directs you to startup 125 VDC Battery Charger _11 per _BOP DC-1.

CRITICAL ELEMENTS: (*) 7, 8, 9, 10 APPROXIMATE COMPLETION TIME: 15 minutes Page 2 of 5

PERFORMANCE CHECKLIST STANDARD SAT UNSAT N/A RECORD START TIME ______

1. Refer to _BOP DC-1, 125V DC ° LOCATE and OPEN ESF Battery Chargers Start-up _BOP DC-1 Note: Step 1 may be performed at any time.

Cue: All prerequisites have been met Note: Bus _31X, Compartment 4B is located on 426 elevation

2. 480 VAC feed breaker to battery charger ° VERIFY/OPEN Bus

_31X, Compartment 4B Cue: Bus _31X, Compartment 4B RED light is LIT -OR- the breaker is OPEN

3. 125 VDC feed breaker from battery ° VERIFY/OPEN 125 V charger to battery DC ESF Distribution Center _11 Cue: AF-1 is pointing to the left Compartment AF-1 (OFF)
4. AC power breaker on battery charger ° VERIFY/OPEN AC power breaker, CB-1 on Cue: AC power breaker, CB-1 is in _11 Battery Charger the DOWN (off) position
5. DC power breaker on battery ° VERIFY/OPEN DC charger power breaker, CB-2 on Cue: DC power breaker, CB-2 is in _11 Battery Charger the DOWN (off) position Page 3 of 5

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A

6. Float/Equalize selector switch and ENSURE Battery Charger equalize timer _11:

Cue: Float/Equalize selector switch ° Float/Equalize selector is over to the LEFT (float) switch in FLOAT position

° Equalize timer is TIMED Cue: Equalize timer is set at ZERO OUT NOTE The Safety Rule Book is unclear regarding the personnel protection equipment requirements for this manipulation. Ensure the trainee can describe how they would close the breaker in the next step.

Note: Bus _31X, Compartment 4B is located on 426 elevation

  • 7. Energize the battery charger
  • CLOSE bus _31X compartment 4B Cue: Breaker _31X compartment 4B GREEN light is LIT OR (if remaining at the Battery Charger)

Cue: Breaker _31X compartment 4B breaker is CLOSED

  • 8. Connect the battery charger to the
  • CLOSE breaker AF-1 distribution panel on ESF distribution panel

_11 Cue: AF-1 pointing up (ON)

  • 9 DC power breaker
  • CLOSE breaker CB-2 on Battery Charger _11 Cue: CB-2 is in the UP (on) position Page 4 of 5

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A

  • 10 Energize the DC bus and batteries
  • CLOSE breaker CB-1 on from the battery charger Battery Charger _11 Cue: CB-1 is in the UP (on) position Cue: (If requested) Battery charger amp meter is at 80 and slowly decreasing NOTE In the following step, if a voltmeter is not available, have the trainee demonstrate how voltage would be measured then:

Cue: Battery _11 terminal voltage = 128.9 volts (measured between cells #1 & #58)

If voltage is measured elsewhere modify voltage as required, on the right side each row is 17 cells (37.81 volts) and each left side is 12 cells (26.69 volts)

11. Verify the battery and charger are ° MEASURE battery operating properly terminal voltage NOTE: see cue above ° ENSURE voltage between 128.2 and 130.5 VDC
12. Battery charger alarm ° CHECK _-21-E8 annunciator CLEAR Cue: Unit _ NSO reports _-21-E8, 125V DC BATT CHGR _11 TROUBLE has CLEARED Cue: This JPM is completed RECORD STOP TIME_________

COMMENTS:

Page 5 of 5

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are an extra NSO.
2. The Unit is near full power with excess letdown in service and flow directed to the CV pump suction header.
3. Valve strokes for 1CV8152 and 1CV8160 are complete and normal letdown has been restored.

INITIATING CUES:

1. The US has directed you to secure excess letdown operations.

JOB PERFORMANCE MEASURE Rev. 1 TASK TITLE: Remove Excess Letdown from Service JPM No.:Sim 100 TPO No: IV.C.CV-07 K&A No.: 004 A4.06 K&A IMP. 3.6/3.1 TRAINEE:_______________________________ DATE: ___/___/___

The Trainee: PASSED_________ this JPM TIME STARTED: ________

FAILED __________ TIME FINISHED: ________

EVALUATION METHOD: PERFORM___ X ___ SIMULATE LOCATION: IN PLANT SIMULATOR____ X __

MATERIALS:

None GENERAL

REFERENCES:

1. BOP CV-15, Rev. 7, Excess Letdown Operations.

TASK STANDARDS:

Remove excess letdown from service.

TASK CONDITIONS:

1. You are an extra NSO.
2. The Unit is near full power with excess letdown in service and flow directed to the CV pump suction header.
3. Valve strokes for 1CV8152 and 1CV8160 are complete and normal letdown has been restored.

INITIATING CUES:

1. The US has directed you to secure excess letdown operations.

CRITICAL ELEMENTS: (*)

2,4 APPROXIMATE COMPLETION TIME: 5 minutes Page 2 of 5

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A RECORD START TIME_______

NOTE Provide examinee with a copy of BOP CV-15 when located.

1. Refer to BOP CV-15, step F.2. ° Locate and Open BOP o o o CV-15,step F.2.

Cue: All Prerequisites and Precautions have been met.

  • 2. Isolate excess letdown flowpath. At 1PM05J o o o
  • SLOWLY CLOSE 1CV123, Exc Ltdwn HX Flow Cont Vlv,
3. Isolate excess letdown flowpath At 1PM05J o o o

° CLOSE 1CV8153A, Exc Ltdwn HX 1A Inlet Isol Vlv,

° CLOSE 1CV8153B, Exc Ltdwn HX 1B Inlet Isol Vlv,

  • 4. Isolate excess letdown flowpath At 1PM05J o o o
  • CLOSE 1RC8037A, Loop drain Vlv

° CLOSE 1RC8037B, Loop drain Vlv

° CLOSE 1RC8037C, Loop drain Vlv

° CLOSE 1RC8037D, Loop drain Vlv Page 3 of 5

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A

5. Isolate Component Cooling At 1PM06J o o o Water Flow to Excess Letdown HXs. ° CLOSE 1CC9437A, CC to Exc Ltdwn HX Isol Vlv

° CLOSE 1CC9437B, CC from Exc Ltdwn HX Isol Vlv Vlv

6. Restore CV lineup. At 1PM05J o o o

° VERIFY 1CV8143, Exc Ltdwn to Seal Filter or RCDT Vlv in the VCT position

7. Aligning Seal Return Flow. ° Locally open _CV8484, o o o Seal Wtr HX Outlet to Cue: If asked, step F.1.d was not CV Pp Suct Hdr performed.

° Locally close _CV8482, Cue:This completes the JPM. Seal Wtr HX Outlet to VCT Isol Vlv RECORD STOP TIME ________

COMMENTS:

Page 4 of 5

SIMULATOR SETUP INSTRUCTIONS JPM NO: Sim 100 REQUIRED SIMULATOR MODE(S): 99.8% power steady state MALFUNCTION #S: N/A COMMENTS:

1) Place excess letdown in service using only loop A drain valve, 1RC8037A and both excess letdown heat exchangers, 1CV8153A and 1CV8153B per BOP CV-15.
2) Leave flow aligned to CV pump suction header (1CV8482 closed, 1CV8484 Open).

Page 5 of 5

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are the Unit 1 Assist NSO.
2. Unit _ has experienced a LOCA.
3. _BEP-0 is in progress in response to the event.

INITIATING CUES:

You are directed to verify Control Room, Auxiliary Building, and Fuel Handling Building ventilation is aligned for emergency operation per steps 21, 22, and 23 of _BEP-0.

JOB PERFORMANCE MEASURE Rev. 6, 3/28/06 TASK TITLE: Align Ventilation Systems for Emergency JPM No.: Sim 200 Operations (Failure of Inaccessible Filter Plenum Fans to Start)

TPO No: 4D.EP-19 K&A No.: 013 K1.13 K&A IMP. 2.8/3.1 EXAMINEE: _______________________________ DATE: ___/___/___

The Examinee: PASSED_________ this JPM TIME STARTED: ________

FAILED __________ TIME FINISHED: ________

EVALUATION METHOD: PERFORM______ SIMULATE_______

LOCATION: IN PLANT______ SIMULATOR__X___

MATERIALS:

1. Copy of _BEP-0, steps 21 - 23
2. Copy of BOP VA-5 GENERAL

REFERENCES:

1. _BEP-0, Reactor Trip or Safety Injection (Rev. 107)
2. BOP VA-5, Aux Building Charcoal Booster Fan Operation (Rev. 6)

TASK STANDARDS:

Perform the actions necessary to align the Control Room, Auxiliary Building, and Fuel Handling Building for emergency operations.

TASK CONDITIONS:

1. You are the Unit 1 Assist NSO.
2. Unit _ has experienced a LOCA.
3. _BEP-0 is in progress in response to the event.

INITIATING CUES:

You are directed to verify Control Room, Auxiliary Building, and Fuel Handling Building ventilation is aligned for emergency operation per steps 21, 22, and 23 of _BEP-0.

CRITICAL ELEMENTS: (*) 7, 9, 10 & 11 APPROXIMATE COMPLETION TIME: 7 minutes Page 2 of 8

PERFORMANCE CHECKLIST STANDARD SAT UNSAT N/A RECORD START TIME__________

1. Refer to _BEP-0, Reactor Trip or ° LOCATE and OPEN Safety Injection, Step 21 _BEP-0 to Step 21 Note: Provide examinee a copy of

_BEP-0, steps 21 - 23 Note:

JPM steps 2 through 6 verify that control room ventilation is aligned for emergency operation

2. Dispatch an NLO to trip Control Dispatch NLO to trip:

Room Office HVAC Supply Fans

° 0VV01CA Cue: 0VV01CA is tripped

° 0VV01CB Cue: 0VV01CB is tripped

3. Operating VC train equipment At 0PM02J, VERIFY 0_ train alignment equipment RUNNING:

° Supply Fan

° Return Fan

° M/U Fan

° Chilled Water Pump

° MCR Chiller

4. Operating VC train dampers At 0PM02J, Verify:

alignment

  • M/U fan outlet damper NOT FULLY CLOSED:

° 0VC24Y (Train A)

° 0VC08Y (Train B)

  • M/U filter light LIT Page 3 of 8

PERFORMANCE CHECKLIST STANDARD SAT UNSAT N/A

5. Operating VC train charcoal At 0PM02J, VERIFY VC train absorber alignment charcoal absorber ALIGNED:

° Train A

° Train B

6. MCR pressure At 0PM02J:

Cue: Control room pressure reads ° CHECK control room approximately +0.2 inches of pressure > +.125" H2O water Note: Alternate Path starts here Note:

The examinee will find the fans for plenums 0A and 0B off and the dampers in the corresponding positions for fans off.

Page 4 of 8

PERFORMANCE CHECKLIST STANDARD SAT UNSAT N/A

  • 7. Inaccessible filter plenums.
  • At 0PM02J (PLENUM VERIFY 2 Plenums aligned with 0A), verify fan run light Charcoal Absorbers on-line: LIT, flow control damper OPEN and bypass damper CLOSED:

° 0VA03CA run light LIT 0VA022Y OPEN 0VA020Y CLOSED OR

  • 0VA03CB run light LIT Note: Determines that Fans 0VA023Y OPEN 0VA03CB and 0VA03CA are not 0VA436Y CLOSED running.

° At 0PM02J (PLENUM 0B), verify fan run light LIT, flow control damper OPEN and bypass damper CLOSED:

° 0VA03CC run light LIT 0VA024Y OPEN 0VA021Y CLOSED OR

° 0VA03CD run light LIT 0VA025Y OPEN 0VA437Y CLOSED

  • At 0PM02J (PLENUM 0C), verify fan run light LIT, flow control damper OPEN and bypass damper CLOSED:

° 0VA03CE run light LIT 0VA067Y OPEN 0VA052Y CLOSED OR

  • 0VA03CF run light LIT 0VA072Y OPEN 0VA438Y CLOSED Page 5 of 8

PERFORMANCE CHECKLIST STANDARD SAT UNSAT N/A Note:

In the following step, the lead fan to start in each plenum is the second (e.g. B, D, or F for A, B, or C plenum respectively).

The examinee may attempt to manually start 0VA03CB or may attempt to place 0VA03CA in service but these attempts will not be successful, thus 0B plenum may be placed in service per BOP VA-5 prior to verifying 0C plenum in service.

8. Refer to BOP VA-5, Aux Building ° LOCATE and OPEN Charcoal Booster Fan Operation BOP VA-5, step F.1 Note: Provide the examinee a copy of BOP VA-5 Cue: If asked, prerequisites are met.

Note:

Since more than 15 seconds have elapsed since the SI signal occurred, both the 0C and 0D fans will start as soon as the 0B plenum has been aligned. The RNO directs the use of BOP VA-5 for start of fans. VA-5 directs placing one fan in PTL for this situation, with the option of restoring to After Trip after the first fan starts.

  • 9. Place one out of the two plenum At 0PM02J (PLENUM 0B),

B fans in Pull to Lock (PTL) place 0B fan in PTL

  • 0VA03CC OR
  • 0VA03CD
  • 10. Align plenum B At 0PM02J:
  • OPEN 0VA085Y

° CLOSE 0VA084Y Page 6 of 8

PERFORMANCE CHECKLIST STANDARD SAT UNSAT N/A

  • 11. Verify fan running in plenum B At 0PM02J (PLENUM 0B),

and aligned to charcoal absorber verify fan run light LIT, flow control damper OPEN and bypass damper CLOSED:

  • 0VA03CC run light LIT
  • 0VA024Y OPEN
  • 0VA021Y CLOSED OR
  • 0VA03CD run light LIT
  • 0VA025Y OPEN
  • 0VA437Y CLOSED Note:

Student may take non running 0B Plenum fan out of PTL

12. Verify FH bldg ventilation aligned At 0PM02J, VERIFY:

° Train A Cue: This JPM is completed

  • 0VA04CA running
  • 0VA060Y OPEN
  • 0VA057Y OPEN
  • 0VA051Y CLOSED OR

° Train B

  • 0VA04CB running
  • 0VA055Y OPEN
  • 0VA062Y OPEN
  • 0VA435Y CLOSED RECORD STOP TIME___________

COMMENTS:

Page 7 of 8

SIMULATOR SETUP INSTRUCTIONS JPM NO: Sim 200 REQUIRED SIMULATOR MODE(S): N/A MALFUNCTION #S:

1. IMF HV02A
2. IMF HV02B
3. IMF AN01M
4. IOR ZLOBYAN14 Off
5. MRF RP70 in
6. MRF RP44 in
7. IOR ZDIWO01PA Trip COMMENTS:
1. Verify 0A and 0C Plenums online Page 8 of 8

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are the unit NSO.
2. The unit is in hot shutdown INITIATING CUES:
1. Unit 1 RWST level is 90%.
2. The Unit Supervisor directs you to align and initiate makeup to the Unit 1 RWST using BOP SI-13 starting at step f.4, to achieve 94% level.

JOB PERFORMANCE MEASURE Rev. 9, 03/17/06 TASK TITLE: Fill the Refueling Water Storage Tank JPM No.: Sim 300 TPO No: IV.C.CV-17 K&A No.: 006 A4.03 K&A IMP. 4.4/4.4 TRAINEE:_______________________________ DATE: ___/___/___

The Trainee: PASSED_________ this JPM TIME STARTED: ________

FAILED __________ TIME FINISHED: ________

EVALUATION METHOD: PERFORM___X___ SIMULATE_______

LOCATION: IN PLANT______ SIMULATOR__X____

MATERIALS:

Calculator BOP SI-13, Filling the RWST (Rev. 21) filled out to step f.4 GENERAL

REFERENCES:

1. BOP SI-13, Filling the RWST (Rev. 21)
2. 1BCB Fig. 16, Blended Flow (Rev. 1)

TASK STANDARDS:

Makeup to RWST with > 2300 ppm blended flow from RCMS.

TASK CONDITIONS:

1. You are the unit NSO.
2. The unit is in hot shutdown.

INITIATING CUES:

1. Unit 1 RWST level is 90%.
2. The Unit Supervisor directs you to align and initiate makeup to the Unit 1 RWST using BOP SI-13 starting at step f.4, to achieve 94% level.

CRITICAL ELEMENTS: (*) 2, 3, 4 &7 APPROXIMATE COMPLETION TIME: 15 minutes Page 2 of 7

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A RECORD START TIME________

Note:

Provide the examinee a copy of BOP SI-13

1. Refer to BOP SI-13, Filling the ° REVIEW prerequisites, RWST precautions, limitations and actions Cue: All prerequisites, precautions, limitations and actions are met
  • 2. Prepare RMCS for RWST fill At 1PM05J:
  • PLACE makeup control switch to Stop
  • PLACE reactor makeup mode select switch to Manual
  • PLACE 1CV110B to Close
  • PLACE 1CV111B to Close Page 3 of 7

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A

  • 3. Setup PW totalizer At _PM05J:
  • PRESS RST on PW total flow totalizer and Verify the counter reads 0.
  • PRESS PST on PW total flow totalizer
  • PRESS until desired digit flashes on the lower data display
  • PRESS + or - to change flashing digit until the desired gallons is indicated on the lower data display
  • PRESS ENT to lock-in the desired number of gallons (18360 gals)

° Verify the correct number of desired gallons is displayed on the lower data display with no numbers flashing Page 4 of 7

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A

  • PRESS RST on BA total totalizer and Verify the counter reads 0.
  • PRESS PST on BA total totalizer
  • PRESS until desired digit flashes on the lower data display
  • PRESS + or - to change flashing digit until the desired gallons is indicated on the lower data display
  • PRESS ENT to lock-in the desired number of gallons (6169 gals)

° Verify the correct number of desired gallons is displayed on the lower data display with no numbers flashing

5. Determine desired blended flow
  • SET 1FK110 = 8.4 control setpoints (+/- 1 turn)
  • SET 1FK111 = 6.25

(+/- 1 turn)

Page 5 of 7

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A

6. Perform valve alignment DIRECT operator to:

Cue: Local operator reports CV8553 ° VERIFY/CLOSED is CLOSED 1CV8553 Cue: Local operator reports CV8432

  • OPEN 1CV8432 is OPEN Cue: Local operator reports CV8434
  • UNLOCK and OPEN is OPEN 1CV8434
  • 7. Fill RWST with > 2300 ppm
  • PLACE makeup control blended flow switch to Start

° VERIFY PW pump starts

° Verify boric acid transfer pump starts

° Verify BA and PW flowrates are as expected on 1FR-0110

° MONITOR RWST level and BAT level

8. Sample blended flow ° REQUEST chemistry notify control room when Cue: Chemistry acknowldges ready to sample blender request Cue: This completes this JPM.

RECORD STOP TIME________

COMMENTS:

Page 6 of 7

Simulator Setup Instructions JPM NO: Sim 300 REQUIRED SIMULATOR MODE(S): N/A MALFUNCTION #S:

1. Enter and Set Monitor Parameter RHMRWST to 3.43 e6
2. MRF CV65 Open COMMENTS:

Ensure BOP SI-13, Filling the RWST (Rev. 21) is filled out to step f.4 and PW and BA totalizers are reset.

Page 7 of 7

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are the Unit 1 NSO.
2. The Unit is at 100% power. .

INITIATING CUES:

1. Annunciator 1-7-B3 RCP SEAL LEAKOFF FLOW HIGH has just gone into alarm.

JOB PERFORMANCE MEASURE Rev. 1, 3/28/06 TASK TITLE: Respond to High RCP Seal Leakoff Flow JPM No.: Sim 400 TPO No: IV.D.OA.05 K&A No.: 003 A2.01 K&A IMP. 3.5/3.9 TRAINEE:_______________________________ DATE: ___/___/___

The Trainee: PASSED_________ this JPM TIME STARTED: ________

FAILED __________ TIME FINISHED: ________

EVALUATION METHOD: PERFORM___ X ___ SIMULATE LOCATION: IN PLANT SIMULATOR__ X ___

MATERIALS:

1BOA RCP-1, Rev. 102, Reactor Coolant Seal Failure GENERAL

REFERENCES:

1. 1BOA RCP-1, Rev. 102, Reactor Coolant Seal Failure
2. BAR 1-7-B3, Rev 10, RCP Seal Leakoff Flow High TASK STANDARDS:

Respond to RCP Leakoff from No. 1 Seal.

TASK CONDITIONS:

1. You are the Unit 1 NSO.
2. The Unit is at 100% power.

INITIATING CUES:

Annunciator 1-7-B3 RCP SEAL LEAKOFF FLOW HIGH has just gone into alarm.

CRITICAL ELEMENTS: (*)

3,4 & 5 APPROXIMATE COMPLETION TIME: 5 minutes Page 2 of 5

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A RECORD START TIME_______

1. Refer to BAR 1-7-B3, and Locate and Open BAR 1 o o o perform Immediate Operator B3 and perform the following Actions. Immediate Operator Actions:
  • CHECK Seal Injection Flows.
  • DETERMINE which pump is alarming by SER Cue: The extra NSO will take care of printout.

subsequent actions

  • REFER to 1BOA RCP-1.

Cue: US Directs NSO to Implement 1BOA RCP-1 Note:

Provide examinee a copy of 1BOA RCP-1

2. Enter 1BOA RCP-1 and Check
  • CHECK 1B RCP No. 1 o o o No. 1 Seal DP. Seal DP GREATER THAN 200 PSID.

Page 3 of 5

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A

  • 3. Check No. 1 Seal Leakoff Flow Perform the following to o o o DETERMINE RCP Seal Leakoff Flow is HIGH:

° DETERMINE Seal DP by comparing Charging Header Pressure to VCT Pressure.

  • CHECK 1B RCP No. 1 Seal Leakoff Flows.
  • DETERMINE Actual 1B RCP No. 1 Seal Leakoff Flow is HIGH by comparing to Figure 1BOA RCP-1-1 and GO TO step 6.

Note: Alternate Path starts here

  • 4. Monitor RCP Seal Parameters
  • Determine 1B RCP No. 1 o o o seal leakoff flow is greater than 6 GPM and implements RNO Step Note:

Once student determines the need to trip the Rx and RCP, the JPM can be terminated.

  • 5. Perform an Immediate RCP
  • Trip the reactor. o o o Shutdown.
  • Trip the affected pump. o o o Cue: US acknowledges the tripping of the Rx Cue: This completes the JPM.

RECORD STOP TIME ________

COMMENTS:

Page 4 of 5

SIMULATOR SETUP INSTRUCTIONS JPM NO: Sim 400 REQUIRED SIMULATOR MODE(S): 100% power steady state MALFUNCTION #S:

1) IMF CV27B Ramp from 5 gpm to 8 gpm over 180 seconds.

COMMENTS:

1) Insert malf and freeze simulator, go to run after examinee has been cued.
2) Ensure SER is on and the correct SER point (2072) is visible on the terminal at the NSO desk.
3) VCT level at top of green band.
4) 1B RCP Leakoff recorder should indicate greater than 6 gpm.

Page 5 of 5

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are the Unit NSO.
2. The unit is at 100% power with all systems and controls in automatic.
3. Unit 2 is in Mode 3.

INITIATING CUES:

Annunciator 1-19-B6, GENERATOR FIELD FORCING comes in.

JOB PERFORMANCE MEASURE Rev. 3, 03/17/06 TASK TITLE: Respond to 345 KV Grid or Voltage Regulator JPM No.: Sim 500 Instability (recoverable)

TPO No: IV.D.OA-48 K&A No.: 045 K3.01 K&A IMP. 2.9/3.2 TRAINEE:_______________________________ DATE: ___/___/___

The Trainee: PASSED_________ this JPM TIME STARTED: ________

FAILED __________ TIME FINISHED: ________

EVALUATION METHOD: PERFORM___X___ SIMULATE_______

LOCATION: IN PLANT______ SIMULATOR___X___

MATERIALS:

None GENERAL

REFERENCES:

1. BAR 1-19-B6, GENERATOR FIELD FORCING (Rev. 5)
2. BCB-1, Fig. 20b, Generator Capability Curves and Underexcitation Limiter Settings (Rev. 2)

TASK STANDARDS:

Take the actions necessary to respond to an automatic voltage regulator failure per BAR 1-19-B6.

TASK CONDITIONS:

1. You are the Unit NSO.
2. The unit is at 100% power with all systems and controls in automatic.
3. Unit 2 is in Mode 3.

INITIATING CUES:

Annunciator 1-19-B6, GENERATOR FIELD FORCING comes in.

CRITICAL ELEMENTS: (*) 2, 3 APPROXIMATE COMPLETION TIME: 5 minutes Page 2 of 5

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A RECORD START TIME _______

1. Refer to BAR 1-19-B6, ° LOCATE and OPEN GENERATOR FIELD FORCING BAR 1-19-B6 Note: JPM step 1 may be performed at any time Cue: If asked, Grid is stable.
  • 2. Turn voltage regulator off
  • SHIFT voltage regulator to OFF Note:

The generator field amps will decrease when the voltage regulator is placed in off and the base adjuster is lowered. The trainee should NOT have to trip the reactor.

  • 3. Reduce excitation
  • REDUCE base adjuster setting
  • OBSERVE exciter field current < 100 amps

° Notify Electric Operations

4. Check for Grid Instabilities. ° If Grid instabilities are present , Then Notify Cue: Grid is stable. Electric Operations of alarm Page 3 of 5

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A

5. Check for Unit 2 for Main ° Check Unit 2 for Generator adverse trends. adverse Main Generator Trends Cue: No adverse trends on Unit 2.

° If adverse trends noted, reference SPOG 1-8 for necessary actions

6. Verify amps less than 109. ° If generator field current CANNOT be reduced to less than 109 amps, then trip Rx if above P8 or trip turbine if below P8
7. Notify Electric Operations ° INFORM Electric Operations of voltage Cue: Electric Operations has been regulator failure notified of the voltage regulator failure ° ENSURE MW and VAR within BCB-_, Figure 20b Cue: Both MW and VAR values are limits within Figure 20b limits.

Cue: This JPM is completed RECORD STOP TIME ________

COMMENTS:

Page 4 of 5

SIMULATOR SETUP INSTRUCTIONS JPM NO: Sim 500 REQUIRED SIMULATOR MODE(S): 100% power steady state MALFUNCTION #S:

1) IMF EG03 to 95% severity and allow to stabilize.

COMMENTS:

Page 5 of 5

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are the Unit 1 Assist NSO.
2. Unit 1is at 100% power.

INITIATING CUES:

1. Unit 1 PRT level has risen to 90% due to inadvertent opening of a PZR PORV.
2. The US has directed you to return the Unit 1 PRT level to within its normal operating band.

JOB PERFORMANCE MEASURE Rev. 1, 03/17/2006 TASK TITLE: Drain the PZR Relief Tank (PRT) JPM No.: Sim 600 TPO No: IV.C.RY-03 K&A No.: 007 A1.01 K&A IMP: 2.9 / 3.1 TRAINEE:_______________________________ DATE: ___/___/___

The Trainee: PASSED_________ this JPM TIME STARTED: ________

FAILED __________ TIME FINISHED: ________

EVALUATION METHOD: PERFORM__X___ SIMULATE_______

LOCATION: PLANT__ __ SIMULATOR__X__

MATERIALS:

1. Copy of BOP RY-4 GENERAL

REFERENCES:

1. BOP RY-4, Rev. 5, Draining the Pressurizer Relief Tank TASK STANDARDS:
1. Decrease PRT level to < 88%, but > 59%.
2. Restores PRT Pressure to > 0 psig, if reduced to < 0 psig.

TASK CONDITIONS:

1. You are the Unit 1 Assist NSO.
2. Unit 1 is at 100% power.

INITIATING CUES:

1. Unit 1 PRT level has risen to 90% due to inadvertent opening of a PZR PORV.
2. The US has directed you to return the Unit 1 PRT level to within its normal operating band.

CRITICAL ELEMENTS: (*) 6, 7, 9, 11, 12 & 13 APPROXIMATE COMPLETION TIME: 10 minutes Page 2 of 6

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A RECORD START TIME ________

Note:

Examinee may refer to BAR 1-12-A7 PRT Level High Low Actions here will direct:

1) Checking PORV and Safety Valves NOT open, 2) Pump down the PRT, 3) Check RCS leakage. It is not required for the examinee to perform these actions, but is acceptable if done. Initiating cues provided the cause for the high level alarm.
1. Refer to BOP RY-4, Draining the ° LOCATE and OPEN o o o Pressurizer Relief Tank BOP RY-4 Cue: Prerequisites are met.

Note:

Provide the examinee with a copy of BOP RY-4.

2. Verify/Close 1RY469. At 1PM05J: o o o

° Verify/Close 1RY469

3. Verify 1RY8034 is maintaining PRT At 1PM05J: o o o pressure.

Verify PRT pressure is

~3 psig

4. Verify/Open 1RY8033. At 1PM05J: o o o Verify/Open 1RY8033
5. Verify/Open 1RE9170 At 1PM11J: o o o Verify/Open 1RE9170
  • 6. Verify/Open 1RE1003 At 1PM11J: o o o
  • Verify/Open 1RE1003 Page 3 of 6

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A

  • 7. Open 1RY8031 At 1PM05J: o o o
  • Open 1RY8031 Note: Alternate Path starts here.
8. Verify/Start 1RE01PB At 1PM05J: o o o Cue: US acknowledges that pump Verify/Start 1RE01PB didnt start as expected and Inform US that 1RE01PB informs the NSO to continue did not start with the procedure.
  • 9. Start 1RE01PA At 1PM05J: o o o
  • Start 1RE01PA

° Verify that 1RE01PA started

10. Ensure PRT pressure remains At 1PM05J: o o o above 0 psig.

Monitor PRT pressure on 1PI-469

  • 11. Close 1RY8031. At 1PM05J: o o o
  • Close 1RY8031
  • 12. Stop 1RE01PA At 1PM05J: o o o
  • Stop 1RE01PA Page 4 of 6

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A

  • 13. Close 1RE1003 At 1PM11J: o o o
  • Close 1RE1003 RECORD STOP TIME ________

COMMENTS:

Page 5 of 6

SIMULATOR SETUP INSTRUCTIONS JPM NO: Sim 600 REQUIRED SIMULATOR MODE(S): 100% power steady state MALFUNCTION #S:

1. IOR ZDI1RE01PB (Stop)

COMMENTS:

1. Raise PRT level to 90% by opening PW supply to PRT.

Page 6 of 6

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are the extra NSO.
2. The unit's ESF busses are being supplied by the SATs.
3. The 1A Diesel Generator has been running unloaded for approximately fifteen minutes after a manual start.
4. Jacket water and lube oil temperatures are acceptable for loading the diesel generator.

INITIATING CUES:

The Unit Supervisor directs you to parallel and load the 1A Diesel Generator to 5400 KW per step F.5 of BOP DG-11.

JOB PERFORMANCE MEASURE Rev. 5, 3/17/06 TASK TITLE: Synchronize a D/G to a Bus and Load to 5400 KW JPM No.: Sim 700 (DG will not pick up load)

TPO No: IV.C.DG-02 K&A No.: 064 A4.06 K&A IMP. 3.9/3.9 TRAINEE:_______________________________ DATE: ___/___/___

The Trainee: PASSED_________ this JPM TIME STARTED: ________

FAILED __________ TIME FINISHED: ________

EVALUATION METHOD: PERFORM__X____ SIMULATE_______

LOCATION: IN PLANT______ SIMULATOR__X___

MATERIALS:

BOP DG-11, Diesel Generator Startup (Rev. 19) completed thru step f.4 GENERAL

REFERENCES:

1. BOP DG-11, Diesel Generator Startup (Rev. 19)
2. BOP DG-11T1, Diesel Generator Start /Stop Log (Rev. 2)

TASK STANDARDS:

Perform the actions necessary to synchronize and load the 1A Diesel Generator to its ESF bus.

TASK CONDITIONS:

1. You are the extra NSO.
2. The unit's ESF busses are being supplied by the SATs.
3. The 1A Diesel Generator has been running unloaded for approximately fifteen minutes after a manual start.
4. Jacket water and lube oil temperatures are acceptable for loading the diesel generator.

INITIATING CUES:

The Unit Supervisor directs you to parallel and load the 1A Diesel Generator to 5400 KW per step F.5 of BOP DG-11.

CRITICAL ELEMENTS: (*) 6, 9, & 11 APPROXIMATE COMPLETION TIME: 15 minutes Page 2 of 6

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A RECORD START TIME ________

° LOCATE and OPEN

1. Refer to BOP DG-11, Diesel o o o BOP DG-11, step F.5 Generator Startup Cue: All prerequisites have been met Cue: (If asked) The 1A DG was started per step F.1 Note: This step may be performed at any time.

° Notify Electric Operations

2. Notify Electric Operations of o o o pending diesel generator parallel operation, estimated run time, and loading Cue: Electric Operations has been informed
3. Auto Re-close Circuit Arm Selector At 1PM01J:

o o o

° PLACE Auto Re-close Circuit Arm Selector Switch to SURV TEST At 1PM01J, CHECK:

4. Verify DG operating properly o o o

° DG frequency

° DG voltage At 1PM01J, CHECK:

5. Verify the same voltage across o o o each phase. ° DG phase voltages Page 3 of 6

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A At 1PM01J:

  • 6. Turn on the 1A DG Feed to 141 o o o Sync Selector switch.
  • TURN Sync Selector switch for DG 1A Feed to KV Bus 141 to ON At 1PM01J:
7. Adjust the incoming voltage. o o o

° ADJUST incoming voltage SLIGHTLY HIGHER than running voltage using DG 1A Volt Adj control At 1PM01J:

8. Adjust 1A DG speed. o o o

° Adjust speed so synchroscope rotates SLOWLY in FAST DIRECTION using DG 1A Gov Adj control At 1PM01J:

  • 9. Synchronize the DG o o o
  • PLACE control switch for Cue: If requested, NLO is locally ACB 1413 to CLOSE monitoring temperatures per when synchroscope is notes in BOP slightly before 12 oclock At 1PM01J:
10. Verify the synchroscope is locked o o o in. ° VERIFY synchroscope "locks in" at 12 o'clock Page 4 of 6

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Note: Alternate Path starts here At 1PM01J:

  • 11. Immediately load the 1A DG to o o o 1000 KW. ° IMMEDIATELY load DG to 1000 KW by going to Note: The governor adjust is failed RAISE on Gov Adj such that the diesel generator Control will NOT load
  • OPEN output breaker

° NOTIFY Unit Supervisor

12. Notify the US of the unsuccessful o o o of the unsuccessful loading of the diesel loading of the diesel Cue: The Unit Supervisor acknowledges the failure and will initiate an WR for maintenance to investigate Cue: This JPM is completed RECORD STOP TIME ________

COMMENTS:

Page 5 of 6

SIMULATOR SETUP INSTRUCTIONS JPM NO: Sim 700 REQUIRED SIMULATOR MODE(S): 99.8% power steady state MALFUNCTION #S:

1. trgset 7 ZIO1HSDG026(3).gt.0
2. trg 7 imf eg07a 22 COMMENTS:
1. Start 1A DG
2. MRF eg06 reset
3. Set trigger Page 6 of 6

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are the Unit NSO.
2. The reactor is at 100% power.
3. All systems and controls are in automatic.

INITIATING CUE:

Respond to MCB alarms on 1PM05J.

JOB PERFORMANCE MEASURE Rev. 8, 4/3/2006 TASK TITLE: Response to a Power Range NI Failure JPM No.: Sim 800 TPO No: IV.D.OA-15 K&A No.: 015 A2.01 K&A IMP. 3.5 / 3.9 EXAMINEE: _______________________________ DATE: ___/___/___

The Examinee: PASSED_________ this JPM TIME STARTED: ________

FAILED __________ TIME FINISHED: ________

EVALUATION METHOD: PERFORM______ SIMULATE_______

LOCATION: IN PLANT______ SIMULATOR__X___

MATERIALS:

1. Copy of 1BOA INST-1, Attachment A GENERAL

REFERENCES:

1. 1BOA INST-1, Nuclear Instrumentation Malfunction (Rev. 104)
2. BAR 1-10-A3, PWR RNG HIGH STPT RX TRIP ALERT (Rev. 51)
3. BAR 1-10-A4, PWR RNG UPPER DET FLUX DEV HIGH (Rev. 5)
4. BAR 1-10-A7, ROD DEV POWER RNG TILTS (Rev. 16)
5. BAR 1-10-B5, PWR RNG FLUX HIGH ROD STOP (Rev. 1)

TASK STANDARDS:

1. Respond to a PR NI failure.
2. Trip the associated bistables.

TASK CONDITIONS:

1. You are the Unit 1 NSO.
2. The reactor is at 100% power.
3. All systems and controls are in automatic.

INITIATING CUE:

1. Respond to MCB alarms on 1PM05J.

CRITICAL ELEMENTS: (*) 2, 3, 7, 8, & 9 APPROXIMATE COMPLETION TIME: 10 minutes Page 2 of 7

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A RECORD START TIME ________

Note:

Once the examinee has the Unit, Inform Machine O8perator to insert malfunction

1. Refer to 1BOA INST-1, Nuclear ° LOCATE and OPEN o o o Instrumentation Malfunction 1BOA INST-1, Attachment A Note: This may be performed at any time. ° Inform SM to evaluate conditions for the E-Plan Cue: SM will evaluate E-Plan.

Note:

Provide the examinee a copy of 1BOA INST-1, Attachment A.

  • 2. Check rod control status At 1PM05J: o o o
  • PLACE Rod Bank Select switch in MANUAL Cue: When the examinee reports the failure to the US, acknowledge the report and gives the following direction: Perform actions required and the U1 Assist NSO will monitor the Unit while you continue.
  • 3. Check for Rod Stop At 1PM05J: o o o
  • Check Alarm 1-10-B5 is LIT At 1PM07J:
  • PLACE Rod Stop Bypass switch in the N-41 position
4. Check Tave-Tref deviation At 1PM05J: o o o

° CHECK Tave-Tref STABLE and within 1 °F Page 3 of 7

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A

5. Match Tave to Tref RESTORE Tave-Tref to within o o o 1 °F by:

Cue: U1 Assist NSO will restore ° Manual rod control Tave

° Adjusting turbine load

° Adjusting RCS boron

6. Check SG levels At 1PM04J: o o o

° CHECK SG levels

  • 7. Bypass PR 41 At 1PM07J: o o o BYPASS N41 on the Detector Current Comparator:
  • Upper current comparator
  • Lower current comparator BYPASS N41 on the Miscellaneous Control and Indication Section:
  • Power mismatch bypass

° Rod Stop bypass BYPASS N41 on the Comparator and Rate Panel:

  • Comparator channel defeat Page 4 of 7

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Note:

Placement of orange dots is one method of ensuring coincidence will not be met, causing a reactor trip. The evaluator should apply discretion in accepting alternate methods since no specific method is stated in 1BOA INST-1.

  • 8. Trip Hi/Lo and Positive rate Rx trip At 1PM07J: o o o bistables for channel N-41
  • REMOVE control power fuses for N-41 to TRIP bistables:
  • NC41P
  • NC41R
  • NC41U/K Note:

If the task is performed on the simulator, an extra NSO will be required, insure examinee can discuss how the bistables in the field would be tripped.

  • 9. Trip Hi/Lo and Positive rate Rx trip Locally TRIP bistables by o o o bistables for channel N-41 placing switches in TEST:
  • TB411C Cue: TB411C is TRIPPED Cue: TB411D is TRIPPED
  • TB411D
10. Select operable channels At 1PM05J, SELECT o o o operable channel for:

° Loop T recorder Page 5 of 7

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Note:

The examinee only needs to place one of the three computer points into test.

11. Defeat effect channel input to o o o PDMS Using the OPCON computer:

° REMOVE N0049A from Cue: An extra NSO will place the scan remaining points into TEST.

° Place N0041 in TEST Cue: This JPM is completed. ° Place N0042 in TEST

° Place U1144 in TEST RECORD STOP TIME ________

COMMENTS:

Page 6 of 7

Simulator Setup Instructions JPM NO: Sim 800 REQUIRED SIMULATOR MODE(S): 100% power steady state MALFUNCTION #S:

1. IMF NI09a to 120 when directed by examiner COMMENTS:

Ensure computer points are restored to normal status after each examinee.