HNP-06-067, HNP-06-067, FAQs Requesting Additional Guidance or Clarification Regarding Transition to NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants. April 2007 FAQ Emails: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/30/2006
| issue date = 04/30/2006
| title = HNP-06-067, FAQs Requesting Additional Guidance or Clarification Regarding Transition to NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants. April 2007 FAQ Emails
| title = HNP-06-067, FAQs Requesting Additional Guidance or Clarification Regarding Transition to NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants. April 2007 FAQ Emails
| author name = Corlett D H, Voelsing K
| author name = Corlett D, Voelsing K
| author affiliation = Progress Energy Co
| author affiliation = Progress Energy Co
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Attached please find HNP-06-067, FAQs Requesting Additional Guidance or Clarification Regarding Transition to NFPA 805 "Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants." If a hard copy is desired or if I can be of further assistance please contact Kelli Voelsing (VNET 751-3057).  
{{#Wiki_filter:Attached please find HNP-06-067, FAQs Requesting Additional Guidance or Clarification Regarding Transition to NFPA 805 "Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants." If a hard copy is desired or if I can be of further assistance please contact Kelli Voelsing (VNET 751-3057).
  <<HNP-06-067.pdf>>
<<HNP-06-067.pdf>>
Kelli Voelsing Senior Engineering and Technical Support Specialist Licensing and Regulatory Affairs Harris Nuclear Plant 919-362-3057 Kelli.Voelsing@pgnmail.com
Kelli Voelsing Senior Engineering and Technical Support Specialist Licensing and Regulatory Affairs Harris Nuclear Plant 919-362-3057 Kelli.Voelsing@pgnmail.com


Mail Envelope Properties (4450D76A.BE3 : 15 : 11235)  
Mail Envelope Properties       (4450D76A.BE3 : 15 : 11235)


==Subject:==
==Subject:==
HNP-06-067, FAQs for NFPA 805 Creation Date Thu, Apr 27, 2006 10:21 AM From: "Voelsing, Kelli" <Kelli.Voelsing@pgnmail.com>
HNP-06-067, FAQs for NFPA 805 Creation Date           Thu, Apr 27, 2006 10:21 AM From:                   "Voelsing, Kelli" <Kelli.Voelsing@pgnmail.com>
Created By: Kelli.Voelsing@pgnmail.com Recipients nrc.gov   TWGWPO02.HQGWDO01 SDW1 (Sunil Weerakkody) nrc.gov   TWGWPO01.HQGWDO01     CPP (Chandu Patel)
Created By:             Kelli.Voelsing@pgnmail.com Recipients nrc.gov TWGWPO02.HQGWDO01 SDW1 (Sunil Weerakkody) nrc.gov TWGWPO01.HQGWDO01 CPP (Chandu Patel)
PWL (Paul Lain) pgnmail.com     Jeffery.Ertman CC (Jeffery Ertman)     ken.heffner CC (Ken Heffner) mike.franklin CC (Mike Franklin)     Alan.Holder CC (Alan Holder)     michael.fletcher CC (Michael Fletcher)     robert.steele (Bob Steele)     eric.mccartney (Eric McCartney) michael.janus (Michael Janus)     scotty.hinnant (Scotty Hinnant)     paul.fulford (Paul Fulford)     dave.conley (Dave Conley)     george.attarian (George Attarian)     NRC.Resident (HNP NRC Resident) exchsmtp.cplc.com     HNPLicRegProg CC (HNP Lic Reg Prog) duke-energy.com dwhenneke CC htbarret CC msn.com     andy_ratchford CC haifire.com     ekleinsorg CC nei.org     btj     am Post Office Route TWGWPO02.HQGWDO01 nrc.gov TWGWPO01.HQGWDO01 nrc.gov   pgnmail.com exchsmtp.cplc.com duke-energy.com msn.com   haifire.com nei.org Files Size Date & Time MESSAGE 518 Thursday, April 27, 2006 10:21 AM TEXT.htm 1340 HNP-06-067.pdf 1979274 Mime.822 2713613 Options Expiration Date:
PWL (Paul Lain) pgnmail.com Jeffery.Ertman CC (Jeffery Ertman) ken.heffner CC (Ken Heffner) mike.franklin CC (Mike Franklin)
None Priority:
Alan.Holder CC (Alan Holder) michael.fletcher CC (Michael Fletcher) robert.steele (Bob Steele) eric.mccartney (Eric McCartney) michael.janus (Michael Janus) scotty.hinnant (Scotty Hinnant) paul.fulford (Paul Fulford) dave.conley (Dave Conley) george.attarian (George Attarian)
Standard ReplyRequested:
NRC.Resident (HNP NRC Resident) exchsmtp.cplc.com HNPLicRegProg CC (HNP Lic Reg Prog) duke-energy.com dwhenneke CC htbarret CC msn.com andy_ratchford CC haifire.com ekleinsorg CC nei.org btj am Post Office                                                           Route
No Return Notification:
 
None   Concealed  
TWGWPO02.HQGWDO01                                   nrc.gov TWGWPO01.HQGWDO01                                   nrc.gov pgnmail.com exchsmtp.cplc.com duke-energy.com msn.com haifire.com nei.org Files                 Size     Date & Time MESSAGE             518       Thursday, April 27, 2006 10:21 AM TEXT.htm             1340 HNP-06-067.pdf       1979274 Mime.822             2713613 Options Expiration Date:     None Priority:           Standard ReplyRequested:     No Return Notification: None Concealed  


==Subject:==
==Subject:==
No Security:            Standard Progress Energy APR 2 7 2006 Serial: HNP-06-067 10 CFR 50.48 Mr. Sunil D. Weerakkody, Fire Protection Branch Chief U S . Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 FREQUENTLY ASKED QUESTIONS (FAQS), REQUESTING ADDITIONAL GUIDANCE OR CLARIFICATION REGARDING TRANSITION TO NFPA-805 PERFORMANCE BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS
==Dear Mr. Weerakkody:==
Attached please find the first of a series of Frequently Asked Questions (FAQs),
requesting additional guidance or clarification regarding Transition to NFPA-805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants. The questions are submitted in the format discussed during the March 27-30,2006 Pilot Plant status meeting in Raleigh, North Carolina with representatives of Progress Energy, Duke Energy and the NRC Staff. The FAQs represent a portion of the Parking Lot Issues identified during that meeting.
It should be noted these FAQs are not intended to be used for recommending changes to NFPA-805. They are only intended to be used for clarification of or changes to NE1 04-02, Guidance For Implementing A Risk-Informed, Performance-Based Fire Protection Program Under 10 CFR 50.48(c). Our understanding is that once approved, FAQs will be considered to be an extension of NE1 04-02 and will be incorporated at the next revision of that document.
Please review the attached FAQs, and advise on the acceptability of the proposed solutions. The guidance and clarifications sought are necessary to support further implementation of the NFPA-805 transition process for our pilot and fleet plants.
Progress Energy Carolinas, Inc.
Hairis Nuclear Plant P 0 Box165 New Hill, NC 27562
HNP-06-067 Page 2 Please refer any question regarding this submittal to Mr. Dave Corlett at (919) 362-3137.
Sincerely, Supervisor - Licensing/Regulatory Programs DHC/khv Attachments:
: 1.      FAQ 06-0001
: 2.      FAQ 06-0002
: 3.      FAQ 06-0003 C:
Mr. R. A. Musser, NRC Sr. Resident Inspector Mr. C. P. Patel, NRC Project Manager Dr. W. D. Travers, NRC Regional Administrator Mr. P. W. Lain, Fire Protection Branch Mr. A. Marion, NE1 Mr. B. T. Jamar, NE1
HNP-06-067 Page 3 bc:
Mr. G. E. Attarian Mr. K. Heffner Mr. H. T. Barnett  Mr. E. D. Hux Mr. D. T. Conley  Mr. M. T. Janus Mr. S. D. Ebneter  Ms. E. K. Kleinsorg Mr. D. G. Eisenhut Mr. R. D. Martin Mr. J. Ertman      Mr. E. A. McCartney Mr. D. M. Franklin Mr. H. J. Miller Mr. J. P. Fulford  Mr. A. Ratchford Mr. D. W. Henneke  Mr. R. A. Steele Mr. C. S. Hinnant  Licensing Files (2 copies)
Mr. A. Holder      Nuclear Records
Attachment 1 to SERIAL: HNP-06-067 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 FREQUENTLY ASKED QUESTIONS (FAQS), REQUESTING ADDITIONAL GUIDANCE OR CLARIFICATION REGARDING TRANSITION TO NFPA-805 "PERFORMANCE BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS" NFPA-805 Transition Pilot Plant FAQ 06-0001 Page AI-1 of 4
MA priate, provide proposed rewo 2 af4
Figure f
c Fim A endix R, 4 of4
Attachment 2 to SERIAL: HNP-06-067 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 FREQUENTLY ASKED QUESTIONS (FAQS), REQUESTING ADDITIONAL GUIDANCE OR CLARIFICATION REGARDING TRANSITION TO NFPA-805 PERFORMANCE BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS NFPA-805 Transition Pilot Plant FAQ 06-0002 Page A2-1 of 9
2 af
A        i-                                        nF Q ~
IM-us(oHs RISK CVALLUATION SGMMARY ll 1 I    ..-  .......  .....        _.......... ,
                    ~
mrmnw r--- "-..--*--"--""-,
r                                              mFmEws List applicable references. Include sufficient identifying detail to faciiitate independent review 1
c.
1 Revision 2i 3-2
6.
I 1-3
I Revision 21 1-4


No  Security:
Appendix I Plant Change Evaluation
Standard  :
                                      -     Form PieeLIwIlJARvRISK SG-                                   1 1
Progress Energy APR 2 7 2006 Mr. Sunil D. Weerakkody, Fire Protection Branch Chief US. Nuclear Regulatory Commission One White Flint North 1 1555 Rockville Pike Rockville, Maryland 20852-2738 Serial: HNP-06-067 10 CFR 50.48 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 FREQUENTLY ASKED QUESTIONS (FAQS), REQUESTING ADDITIONAL "PERFORMANCE BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS" GUIDANCE OR CLARIFICATION REGARDING TRANSITION TO NFPA-805
Y afany fire scenarios
: b.                                                             r C*                                            for
: d.                                                   any f i scenarios


==Dear Mr. Weerakkody:==
Revision 21 ta Attachment 4 to SERIAL: HNP-06-067 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 FREQUENTLY ASKED QUESTIONS (FAQS), REQUESTING ADDITIONAL GUIDANCE OR CLARIFICATION REGARDING TRANSITION TO NFPA-805 PERFORMANCE BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS NFPA-805 Transition Pilot Plant FAQ 06-0003 Page A4-I of 5
Attached please find the first of a series of Frequently Asked Questions (FAQs), requesting additional guidance or clarification regarding Transition to NFPA-805 "Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants." The questions are submitted in the format discussed during the March 27-30,2006 Pilot Plant status meeting in Raleigh, North Carolina with representatives of Progress Energy, Duke Energy and the NRC Staff. The FAQs represent a portion of the "Parking Lot" Issues identified during that meeting. It should be noted these FAQs are not intended to be used for recommending changes to NFPA-805.
They are only intended to be used for clarification of or changes to NE1 04-02, "Guidance For Implementing A Risk-Informed, Performance-Based Fire Protection Program Under 10 CFR 50.48(c)." Our understanding is that once approved, FAQs will be considered to be an extension of NE1 04-02 and will be incorporated at the next revision of that document. Please review the attached FAQs, and advise on the acceptability of the proposed solutions. The guidance and clarifications sought are necessary to support further implementation of the NFPA-805 transition process for our pilot and fleet plants. Progress Energy Carolinas, Inc. Hairis Nuclear Plant P 0 Box165 New Hill, NC 27562 H N P-06-067 Page 2 Please refer any question regarding this submittal to Mr. Dave Corlett at (919) 362- 3137. Sincerely, Supervisor - Licensing/Regulatory Programs DHC/khv Attachments:
: 1. FAQ 06-0001
: 2. FAQ 06-0002 3. FAQ 06-0003 C: Mr. R. A. Musser, NRC Sr. Resident Inspector Mr. C. P. Patel, NRC Project Manager Dr. W. D. Travers, NRC Regional Administrator Mr. P. W. Lain, Fire Protection Branch Mr. A. Marion, NE1 Mr. B. T. Jamar, NE1 bc: Mr. G. E. Attarian Mr. H. T. Barnett Mr. D. T. Conley Mr. S. D. Ebneter Mr. D. G. Eisenhut Mr. J. Ertman Mr. D. M. Franklin Mr. J. P. Fulford Mr. D. W. Henneke Mr. C. S. Hinnant Mr. A. Holder HNP-06-067 Page 3 Mr. K. Heffner Mr. E. D. Hux Mr. M. T. Janus Ms. E. K. Kleinsorg Mr. R. D. Martin Mr. E. A. McCartney Mr. H. J. Miller Mr. A. Ratchford Mr. R. A. Steele Licensing Files (2 copies) Nuclear Records Attachment 1 to SERIAL: HNP-06-067 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 FREQUENTLY ASKED QUESTIONS (FAQS), REQUESTING ADDITIONAL "PERFORMANCE BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS" DOCKET NO. 50-400/LICENSE NO. NPF-63 GUIDANCE OR CLARIFICATION REGARDING TRANSITION TO NFPA-805 NFPA-805 Transition Pilot Plant FAQ 06-0001 Page AI-1 of 4 MA priate, provide proposed rewo 2 af4 


Figure f c Fim A endix R, 4 of4 to SERIAL: HNP-06-067 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 FREQUENTLY ASKED QUESTIONS (FAQS), REQUESTING ADDITIONAL "PERFORMANCE BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS" DOCKET NO. 50-400/LICENSE NO. NPF-63 GUIDANCE OR CLARIFICATION REGARDING TRANSITION TO NFPA-805 NFPA-805 Transition Pilot Plant FAQ 06-0002 Page A2-1 of 9 2 af 
sed New ly in ude ph number, and lirre 2of5


A i- n FQ~ ll ___.__.....
b.
_.......... , 1 I ..- ....... ~ ..... "-..--*--"--""-, r--- IM-us(oHs RISK CVALLUATION SGMMARY ._____. , . ._____....
C' us
.. . . ._...__......
: d. aritrios}}
_... _-_- mrmnw r mFmEw*s 1 List applicable references.
Include sufficient identifying detail to facii itate independent review 
: c. 1 Revision 2i 3-2 
: 6. I 1-3 I Revision 21 1-4 Appendix I - Plant Change Evaluation - Form PieeLIwIlJARv RISK SG- 1 1 Y afany fire scenarios
: b. r C* for d. any fi scenarios Revision 21 ta to SERIAL: HNP-06-067 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 FREQUENTLY ASKED QUESTIONS (FAQS), REQUESTING ADDITIONAL "PERFORMANCE BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS" DOCKET NO. 50-400/LICENSE NO. NPF-63 GUIDANCE OR CLARIFICATION REGARDING TRANSITION TO NFPA-805 NFPA-805 Transition Pilot Plant FAQ 06-0003 Page A4-I of 5 sed New ly in ude ph number, and lirre 2of5 
: b. C' us d. aritrios}}

Latest revision as of 15:07, 13 March 2020

HNP-06-067, FAQs Requesting Additional Guidance or Clarification Regarding Transition to NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants. April 2007 FAQ Emails
ML071630323
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/30/2006
From: Corlett D, Voelsing K
Progress Energy Co
To:
Office of Nuclear Reactor Regulation
References
HNP-06-067, NFPA 805
Download: ML071630323 (25)


Text

Attached please find HNP-06-067, FAQs Requesting Additional Guidance or Clarification Regarding Transition to NFPA 805 "Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants." If a hard copy is desired or if I can be of further assistance please contact Kelli Voelsing (VNET 751-3057).

<<HNP-06-067.pdf>>

Kelli Voelsing Senior Engineering and Technical Support Specialist Licensing and Regulatory Affairs Harris Nuclear Plant 919-362-3057 Kelli.Voelsing@pgnmail.com

Mail Envelope Properties (4450D76A.BE3 : 15 : 11235)

Subject:

HNP-06-067, FAQs for NFPA 805 Creation Date Thu, Apr 27, 2006 10:21 AM From: "Voelsing, Kelli" <Kelli.Voelsing@pgnmail.com>

Created By: Kelli.Voelsing@pgnmail.com Recipients nrc.gov TWGWPO02.HQGWDO01 SDW1 (Sunil Weerakkody) nrc.gov TWGWPO01.HQGWDO01 CPP (Chandu Patel)

PWL (Paul Lain) pgnmail.com Jeffery.Ertman CC (Jeffery Ertman) ken.heffner CC (Ken Heffner) mike.franklin CC (Mike Franklin)

Alan.Holder CC (Alan Holder) michael.fletcher CC (Michael Fletcher) robert.steele (Bob Steele) eric.mccartney (Eric McCartney) michael.janus (Michael Janus) scotty.hinnant (Scotty Hinnant) paul.fulford (Paul Fulford) dave.conley (Dave Conley) george.attarian (George Attarian)

NRC.Resident (HNP NRC Resident) exchsmtp.cplc.com HNPLicRegProg CC (HNP Lic Reg Prog) duke-energy.com dwhenneke CC htbarret CC msn.com andy_ratchford CC haifire.com ekleinsorg CC nei.org btj am Post Office Route

TWGWPO02.HQGWDO01 nrc.gov TWGWPO01.HQGWDO01 nrc.gov pgnmail.com exchsmtp.cplc.com duke-energy.com msn.com haifire.com nei.org Files Size Date & Time MESSAGE 518 Thursday, April 27, 2006 10:21 AM TEXT.htm 1340 HNP-06-067.pdf 1979274 Mime.822 2713613 Options Expiration Date: None Priority: Standard ReplyRequested: No Return Notification: None Concealed

Subject:

No Security: Standard Progress Energy APR 2 7 2006 Serial: HNP-06-067 10 CFR 50.48 Mr. Sunil D. Weerakkody, Fire Protection Branch Chief U S . Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 FREQUENTLY ASKED QUESTIONS (FAQS), REQUESTING ADDITIONAL GUIDANCE OR CLARIFICATION REGARDING TRANSITION TO NFPA-805 PERFORMANCE BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS

Dear Mr. Weerakkody:

Attached please find the first of a series of Frequently Asked Questions (FAQs),

requesting additional guidance or clarification regarding Transition to NFPA-805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants. The questions are submitted in the format discussed during the March 27-30,2006 Pilot Plant status meeting in Raleigh, North Carolina with representatives of Progress Energy, Duke Energy and the NRC Staff. The FAQs represent a portion of the Parking Lot Issues identified during that meeting.

It should be noted these FAQs are not intended to be used for recommending changes to NFPA-805. They are only intended to be used for clarification of or changes to NE1 04-02, Guidance For Implementing A Risk-Informed, Performance-Based Fire Protection Program Under 10 CFR 50.48(c). Our understanding is that once approved, FAQs will be considered to be an extension of NE1 04-02 and will be incorporated at the next revision of that document.

Please review the attached FAQs, and advise on the acceptability of the proposed solutions. The guidance and clarifications sought are necessary to support further implementation of the NFPA-805 transition process for our pilot and fleet plants.

Progress Energy Carolinas, Inc.

Hairis Nuclear Plant P 0 Box165 New Hill, NC 27562

HNP-06-067 Page 2 Please refer any question regarding this submittal to Mr. Dave Corlett at (919) 362-3137.

Sincerely, Supervisor - Licensing/Regulatory Programs DHC/khv Attachments:

1. FAQ 06-0001
2. FAQ 06-0002
3. FAQ 06-0003 C:

Mr. R. A. Musser, NRC Sr. Resident Inspector Mr. C. P. Patel, NRC Project Manager Dr. W. D. Travers, NRC Regional Administrator Mr. P. W. Lain, Fire Protection Branch Mr. A. Marion, NE1 Mr. B. T. Jamar, NE1

HNP-06-067 Page 3 bc:

Mr. G. E. Attarian Mr. K. Heffner Mr. H. T. Barnett Mr. E. D. Hux Mr. D. T. Conley Mr. M. T. Janus Mr. S. D. Ebneter Ms. E. K. Kleinsorg Mr. D. G. Eisenhut Mr. R. D. Martin Mr. J. Ertman Mr. E. A. McCartney Mr. D. M. Franklin Mr. H. J. Miller Mr. J. P. Fulford Mr. A. Ratchford Mr. D. W. Henneke Mr. R. A. Steele Mr. C. S. Hinnant Licensing Files (2 copies)

Mr. A. Holder Nuclear Records

Attachment 1 to SERIAL: HNP-06-067 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 FREQUENTLY ASKED QUESTIONS (FAQS), REQUESTING ADDITIONAL GUIDANCE OR CLARIFICATION REGARDING TRANSITION TO NFPA-805 "PERFORMANCE BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS" NFPA-805 Transition Pilot Plant FAQ 06-0001 Page AI-1 of 4

MA priate, provide proposed rewo 2 af4

Figure f

c Fim A endix R, 4 of4

Attachment 2 to SERIAL: HNP-06-067 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 FREQUENTLY ASKED QUESTIONS (FAQS), REQUESTING ADDITIONAL GUIDANCE OR CLARIFICATION REGARDING TRANSITION TO NFPA-805 PERFORMANCE BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS NFPA-805 Transition Pilot Plant FAQ 06-0002 Page A2-1 of 9

2 af

A i- nF Q ~

IM-us(oHs RISK CVALLUATION SGMMARY ll 1 I ..- ....... ..... _.......... ,

~

mrmnw r--- "-..--*--"--""-,

r mFmEws List applicable references. Include sufficient identifying detail to faciiitate independent review 1

c.

1 Revision 2i 3-2

6.

I 1-3

I Revision 21 1-4

Appendix I Plant Change Evaluation

- Form PieeLIwIlJARvRISK SG- 1 1

Y afany fire scenarios

b. r C* for
d. any f i scenarios

Revision 21 ta Attachment 4 to SERIAL: HNP-06-067 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 FREQUENTLY ASKED QUESTIONS (FAQS), REQUESTING ADDITIONAL GUIDANCE OR CLARIFICATION REGARDING TRANSITION TO NFPA-805 PERFORMANCE BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS NFPA-805 Transition Pilot Plant FAQ 06-0003 Page A4-I of 5

sed New ly in ude ph number, and lirre 2of5

b.

C' us

d. aritrios