{{#Wiki_filter:U.S. Department of Homeland Security One Independence Mall, Sixth Floor 615 Chestnut Street Philadelphia, PA 19106-4404 DFEMA SEP 2 3 2008 NRC Headquarters Document Control Desk US Nuclear Regulatory Commission Washington, DC 20555-0001 Enclosed is the final report for the Beaver Valley Power Station (BVPS) Radiological Emergency Preparedness Exercise that was held on June 24, 2008.If you have any questions, please contact Darrell Hammons at (215) 931-5546.Sincerely, Darrell Hammons Regional Assistance Committee Chair Enclosure-AX'4!;www.fema.gov Beaver Valley Power Station Exercise Report -2008-06-24 Final Report -Radiological Emergency Preparedness (REP) Program 2008-09-19 SFEMA FEMA Exercise Report Beaver Valley Power Station Exercise Date: 2008-06-24 Report Date: 2008-09-19 U.S. DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency REP Program 615 Chestnut Street Philadelphia, PA 19106 Table of Contents Chapter 1 Executive Summary Chapter 2 Introduction Chapter 3 Exercise Overview Section 3.1 EPZ Description Section 3.2 Exercise Participants Section 3.3 Exercise Timeline Chapter 4 Exercise Evaluation and Results Section 4.1 Summary Results of Exercise Evaluation Section 4.2 Status of Jurisdictions Evaluated 4.2.1 State Jurisdictions 4.2.1.1 Beaver Valley Joint Public Information Center 4.2.1.2 PA State Field Monitoring Team A, South West Region 4.2.1.3 PA State Field Monitoring Team B, South West Region 4.2.1.4 Commonwealth of Pennsylvania State Traffic/Access Control Points 4.2.1.5 State of West Virginia Emergency Operations Center 4.2.1.6 West Virginia Public Information Center 4.2.1.7 West Virginia Accicent Assessment Center 4.2.1.8 West Virginia Field Air Monitoring Team 4.2.2 Risk Jurisdictions 4.2.2.1 Beaver County Emergency Operations Center 4.2.2.2 Aliquippa Emergency Operations Center 4.2.2.3 Beaver Borough Emergency Operations Center 4.2.2.4 Beaver County, Beaver Borough, Back-up Route Alerting 4.2.2.5 Bridgewater/Fallston Emergency Operations Center 4.2.2.6 Brighton Township Emergency Operations Center 4.2.2.7 Beaver County, Brighton Township, Back-up Route Alerting 4.2.2.8 Center Township Emergency Operations Center 4.2.2.9 Chippewa Township Emergency Operations Center 4.2.2.10 Beaver County, Chippewa Township, Back-up Route Alerting 4.2.2.11 Frankfort Springs Borough, Hanover Township, Georgetown borough, Greene Township, Hookstown Borough Emergency Operations Center 4.2.2.12 Independence Township Emergency Operations Center 4.2.2.13 Industry Emergency Operations Center 4.2.2.14 Hopewell Township Emergency Operations Center 4.2.2.15 Beaver County, Hopewell Township, Back-up Route Alerting 4.2.2.16 Midland Emergency Operations Center 4.2.2.17 Monaca Emergency Operations Center 4.2.2.18 Beaver County, Monaca Back-up Route Alerting 4.2.2.19 Patterson Heights/Patterson Township Emergency Operations Center 4.2.2.20 Beaver County, Patterson Township, Back-up Route Alerting 4.2.2.21 Potter Township Emergency Operations Center 4.2.2.22 Raccoon Township Emergency Operations Center 4.2.2.23 Shippingport Emergency Operations Center 4.2.2.24 South Beaver/Ohioville/Glasgow Emergency Operations Center 4.2.2.25 South Heights Emergency Operations Center 4.2.2.26 Vanport Emergency Operations Center 4.2.2.27 Beaver County Emergency Worker Monitoring and Decontamination Station, Beaver Falls FD 4.2.2.28 Beaver County Emergency Worker Monitoring and Decontamination Station South Beaver Township Fire Department 4.2.2.29 Aliquippa School District 4.2.2.30 Aliquippa Elementary School 4.2.2.31 Beaver Area School Distirct 4.2.2.32 Beaver Area Junior Senior High School 4.2.2.33 Blackhawk School District 4.2.2.34 Patterson Primary School 4.2.2.35 Center Area School District 4.2.2.36 Center Area Junior High School, Center Area School District 4.2.2.37 Hopewell Area School District 4.2.2.38 Margaret Ross Elementary School 4.2.2.39 Midland Borough School District 4.2.2.40 Neel Elementary School 4.2.2.41 Monaca School District 4.2.2.42 Fifth Ward Elementary School, Monaca School District 4.2.2.43 New Brighton School District 4.2.2.44 Ambridge Area School District 4.2.2.45 South Side Area School District 4.2.2.46 South Side Middle School 4.2.2.47 Western Beaver Schools 4.2.2.48 Western Beaver Jr/Sr High School 4.2.2.49 Hancock County Emergency Operations Center 4.2.2.50 Hancock County Traffic and Access Control, County Court House 4.2.2.51 Hancock County Back-up Route Alerting, Oakland Fire Department 4.2.2.52 Hancock County Reception Center, Weir High School Complex 4.2.2.53 Hancock County Monitoring and Decontamination Center, Weir High School Complex 4.2.2.54 Hancock County Mass Care Center, Weir High School Complex 4.2.2.55 Hancock County Emergency Worker Monitor and Decontamination Station, New Cumberland Fire Department 4.2.2.56 Hancock County School District 4.2.2.57 Oak Glen High School, Hancock County School District 4.2.3 Support Jurisdictions 4.2.3.1 Allegheny County Emergency Operations Center 4.2.3.2 Allegheny Co Reception Center South Park Fair Grounds 4.2.3.3 Allegheny County Monitoring and Decontamination Center, South Park Fair Grounds 4.2.3.4 Allegheny Co Mass Care Center, SouthPark High School 4.2.3.5 Butler County Emergency Operations Center 4.2.3.6 Butler County Reception Center, Slippery Rock University 4.2.3.7 Butler County Mass Care Center, Slippery Rock University 4.2.3.8 Butler County Monitoring and Decontamination Center 4.2.3.9 Lawrence County Emergency Operations Center 4.2.3.10 Lawrence County Reception Center Mohawk Area High School 4.2.3.11 Lawrence County Monitoring and Decontamination Center, Mohawk High School 4.2.3.12 Lawrence County Mass Care Center, Union High School 4.2.3.13 Washington County Emergency Operations Center 4.2.3.14 Washington Co Reception Center County Fair Grounds 4.2.3.15 Washington County Monitoring and Decontamination Center McGuffey High School 4.2.3.16 Washington County Mass Care Center, McGuffey Jr/Sr High School Appendices Appendix 1 -Acronyms and Abbreviations Appendix 2 -Exercise Evaluators and Team Leaders Appendix 3 -Exercise Evaluation Areas and Extent of Play Agreement
{{#Wiki_filter:U.S. Department of Homeland Security One Independence Mall, Sixth Floor 615 Chestnut Street Philadelphia, PA 19106-4404 DFEMA SEP 2 3 2008 NRC Headquarters Document Control Desk US Nuclear Regulatory Commission Washington, DC 20555-0001 Enclosed is the final report for the Beaver Valley Power Station (BVPS) Radiological Emergency Preparedness Exercise that was held on June 24, 2008.
: 1. Executive Summary On June 24, 2008, a full-scale plume exercise was conducted in the 10-mile plume exposure pathway, emergency planning zone (EPZ) around the Beaver Valley Power Station (BVPS) by the Department of Homeland Security/Federal Emergency Management Agency, Region Ill/National Preparedness Division/Radiological Emergency Preparedness Program (DHS/FEMARIII/NPD/REPP), Philadelphia, Pennsylvania.
If you have any questions, please contact Darrell Hammons at (215) 931-5546.
Out-of-sequence demonstrations were conducted on May 14, 2008. The purpose of the exercise and the out-of-sequence demonstrations was to assess the level of State and local preparedness in responding to a radiological emergency.
Sincerely, Darrell Hammons Regional Assistance Committee Chair Enclosure
The exercise and out-of-sequence demonstrations were held in accordance with DHS/FEMARIII/NPD/REPP policies and guidance concerning the exercise of State and local radiological emergency response plans (RERP) and procedures.
                                                                                                  -AX'4!;
The most recent prior full-scale exercise at this site was conducted on June 26 -30, 2006.FEMA wishes to acknowledge the efforts of the many individuals in the Commonwealth of Pennsylvania, its one risk county (Beaver), its twenty seven risk jurisdictions (City of Aliquippa, Beaver Borough, Bridgewater Borough, Brighton Township, Center Township, Chippewa Township, Fallston Borough, Frankfort Springs Borough, Georgetown Borough, Glasgow Borough, Greene Township, Hanover Township, Hookstown Borough, Hopewell Township, Independence Township, Industry Borough, Midland Borough, Monaca Borough, Ohioville Borough, Patterson Township, Patterson Heights Borough, Potter Township, Raccoon Township, Shippingport Borough, South Beaver Township, South Heights Borough, and Vanport Township), and its four support counties (Allegheny, Butler, Lawrence, and Washington), as well as the State of West Virginia and its one risk county (Hancock), who were evaluated at this exercise.Protecting the public health and safety is the full-time job of some of the exercise participants and an additional assigned responsibility for others. Still others have willingly sought this responsibility by volunteering to provide vital emergency services to their communities.
www.fema.gov
Cooperation and teamwork of all the participants were evident during this exercise.This report containsthe final evaluation of the biennial exercise and the evaluation of 1 the following out-of-sequence activities:
 
Beaver Valley Power Station Exercise Report - 2008-06-24 Final Report - Radiological Emergency Preparedness (REP) Program 2008-09-19 SFEMA
 
FEMA Exercise Report Beaver Valley Power Station Exercise Date: 2008-06-24 Report Date: 2008-09-19 U.S. DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency REP Program 615 Chestnut Street Philadelphia, PA 19106
 
Table of Contents Chapter 1 Executive Summary Chapter 2 Introduction Chapter 3 Exercise Overview Section 3.1 EPZ Description Section 3.2 Exercise Participants Section 3.3 Exercise Timeline Chapter 4 Exercise Evaluation and Results Section 4.1 Summary Results of Exercise Evaluation Section 4.2 Status of Jurisdictions Evaluated 4.2.1 State Jurisdictions 4.2.1.1 Beaver Valley Joint Public Information Center 4.2.1.2 PA State Field Monitoring Team A, South West Region 4.2.1.3 PA State Field Monitoring Team B, South West Region 4.2.1.4 Commonwealth of Pennsylvania State Traffic/Access Control Points 4.2.1.5 State of West Virginia Emergency Operations Center 4.2.1.6 West Virginia Public Information Center 4.2.1.7 West Virginia Accicent Assessment Center 4.2.1.8 West Virginia Field Air Monitoring Team 4.2.2 Risk Jurisdictions 4.2.2.1 Beaver County Emergency Operations Center 4.2.2.2 Aliquippa Emergency Operations Center 4.2.2.3 Beaver Borough Emergency Operations Center 4.2.2.4 Beaver County, Beaver Borough, Back-up Route Alerting 4.2.2.5 Bridgewater/Fallston Emergency Operations Center 4.2.2.6 Brighton Township Emergency Operations Center 4.2.2.7 Beaver County, Brighton Township, Back-up Route Alerting 4.2.2.8 Center Township Emergency Operations Center 4.2.2.9 Chippewa Township Emergency Operations Center 4.2.2.10 Beaver County, Chippewa Township, Back-up Route Alerting 4.2.2.11 Frankfort Springs Borough, Hanover Township, Georgetown borough, Greene Township, Hookstown Borough Emergency Operations Center 4.2.2.12 Independence Township Emergency Operations Center 4.2.2.13 Industry Emergency Operations Center
 
4.2.2.14 Hopewell Township Emergency Operations Center 4.2.2.15 Beaver County, Hopewell Township, Back-up Route Alerting 4.2.2.16 Midland Emergency Operations Center 4.2.2.17 Monaca Emergency Operations Center 4.2.2.18 Beaver County, Monaca Back-up Route Alerting 4.2.2.19 Patterson Heights/Patterson Township Emergency Operations Center 4.2.2.20 Beaver County, Patterson Township, Back-up Route Alerting 4.2.2.21 Potter Township Emergency Operations Center 4.2.2.22 Raccoon Township Emergency Operations Center 4.2.2.23 Shippingport Emergency Operations Center 4.2.2.24 South Beaver/Ohioville/Glasgow Emergency Operations Center 4.2.2.25 South Heights Emergency Operations Center 4.2.2.26 Vanport Emergency Operations Center 4.2.2.27 Beaver County Emergency Worker Monitoring and Decontamination Station, Beaver Falls FD 4.2.2.28 Beaver County Emergency Worker Monitoring and Decontamination Station South Beaver Township Fire Department 4.2.2.29 Aliquippa School District 4.2.2.30 Aliquippa Elementary School 4.2.2.31 Beaver Area School Distirct 4.2.2.32 Beaver Area Junior Senior High School 4.2.2.33 Blackhawk School District 4.2.2.34 Patterson Primary School 4.2.2.35 Center Area School District 4.2.2.36 Center Area Junior High School, Center Area School District 4.2.2.37 Hopewell Area School District 4.2.2.38 Margaret Ross Elementary School 4.2.2.39 Midland Borough School District 4.2.2.40 Neel Elementary School 4.2.2.41 Monaca School District 4.2.2.42 Fifth Ward Elementary School, Monaca School District 4.2.2.43 New Brighton School District 4.2.2.44 Ambridge Area School District 4.2.2.45 South Side Area School District 4.2.2.46 South Side Middle School 4.2.2.47 Western Beaver Schools
 
4.2.2.48 Western Beaver Jr/Sr High School 4.2.2.49 Hancock County Emergency Operations Center 4.2.2.50 Hancock County Traffic and Access Control, County Court House 4.2.2.51 Hancock County Back-up Route Alerting, Oakland Fire Department 4.2.2.52 Hancock County Reception Center, Weir High School Complex 4.2.2.53 Hancock County Monitoring and Decontamination Center, Weir High School Complex 4.2.2.54 Hancock County Mass Care Center, Weir High School Complex 4.2.2.55 Hancock County Emergency Worker Monitor and Decontamination Station, New Cumberland Fire Department 4.2.2.56 Hancock County School District 4.2.2.57 Oak Glen High School, Hancock County School District 4.2.3 Support Jurisdictions 4.2.3.1 Allegheny County Emergency Operations Center 4.2.3.2 Allegheny Co Reception Center South Park Fair Grounds 4.2.3.3 Allegheny County Monitoring and Decontamination Center, South Park Fair Grounds 4.2.3.4 Allegheny Co Mass Care Center, SouthPark High School 4.2.3.5 Butler County Emergency Operations Center 4.2.3.6 Butler County Reception Center, Slippery Rock University 4.2.3.7 Butler County Mass Care Center, Slippery Rock University 4.2.3.8 Butler County Monitoring and Decontamination Center 4.2.3.9 Lawrence County Emergency Operations Center 4.2.3.10 Lawrence County Reception Center Mohawk Area High School 4.2.3.11 Lawrence County Monitoring and Decontamination Center, Mohawk High School 4.2.3.12 Lawrence County Mass Care Center, Union High School 4.2.3.13 Washington County Emergency Operations Center 4.2.3.14 Washington Co Reception Center County Fair Grounds 4.2.3.15 Washington County Monitoring and Decontamination Center McGuffey High School 4.2.3.16 Washington County Mass Care Center, McGuffey Jr/Sr High School Appendices Appendix 1 - Acronyms and Abbreviations Appendix 2 - Exercise Evaluators and Team Leaders Appendix 3 - Exercise Evaluation Areas and Extent of Play Agreement
: 1. Executive Summary On June 24, 2008, a full-scale plume exercise was conducted in the 10-mile plume exposure pathway, emergency planning zone (EPZ) around the Beaver Valley Power Station (BVPS) by the Department of Homeland Security/Federal Emergency Management Agency, Region Ill/National Preparedness Division/Radiological Emergency Preparedness Program (DHS/FEMARIII/NPD/REPP), Philadelphia, Pennsylvania. Out-of-sequence demonstrations were conducted on May 14, 2008. The purpose of the exercise and the out-of-sequence demonstrations was to assess the level of State and local preparedness in responding to a radiological emergency. The exercise and out-of-sequence demonstrations were held in accordance with DHS/FEMARIII/NPD/REPP policies and guidance concerning the exercise of State and local radiological emergency response plans (RERP) and procedures.
The most recent prior full-scale exercise at this site was conducted on June 26 - 30, 2006.
FEMA wishes to acknowledge the efforts of the many individuals in the Commonwealth of Pennsylvania, its one risk county (Beaver), its twenty seven risk jurisdictions (City of Aliquippa, Beaver Borough, Bridgewater Borough, Brighton Township, Center Township, Chippewa Township, Fallston Borough, Frankfort Springs Borough, Georgetown Borough, Glasgow Borough, Greene Township, Hanover Township, Hookstown Borough, Hopewell Township, Independence Township, Industry Borough, Midland Borough, Monaca Borough, Ohioville Borough, Patterson Township, Patterson Heights Borough, Potter Township, Raccoon Township, Shippingport Borough, South Beaver Township, South Heights Borough, and Vanport Township), and its four support counties (Allegheny, Butler, Lawrence, and Washington), as well as the State of West Virginia and its one risk county (Hancock), who were evaluated at this exercise.
Protecting the public health and safety is the full-time job of some of the exercise participants and an additional assigned responsibility for others. Still others have willingly sought this responsibility by volunteering to provide vital emergency services to their communities. Cooperation and teamwork of all the participants were evident during this exercise.
This report containsthe final evaluation of the biennial exercise and the evaluation of 1
 
the following out-of-sequence activities:
Commonwealth of Pennsylvania The State Emergency Operations Center (EOC), Commonwealth Emergency.
Commonwealth of Pennsylvania The State Emergency Operations Center (EOC), Commonwealth Emergency.
Information News Center (CENIC), Emergency Operating Facility (EOF), and Radiological Rapid Response Vehicle (R3V) were evaluated on 22 April 2008.during the Peach Bottom Atomic Power Station Exercise.
Information News Center (CENIC), Emergency Operating Facility (EOF), and Radiological Rapid Response Vehicle (R3V) were evaluated on 22 April 2008.during the Peach Bottom Atomic Power Station Exercise. Therefore, those activities were monitored and observed, but not evaluated.
Therefore, those activities were monitored and observed, but not evaluated.
The State Emergency Operations Center (EOC), Commonwealth Emergency Information News Center (CENIC), Emergency Operating Facility (EOF), and Radiological Rapid Response Vehicle- (R3V) were evaluated on 22 April 2008 during the Peach Bottom Atomic Power Station Exercise. Therefore, those activities were6 .
The State Emergency Operations Center (EOC), Commonwealth Emergency Information News Center (CENIC), Emergency Operating Facility (EOF), and Radiological Rapid Response Vehicle- (R3V) were evaluated on 22 April 2008 during the Peach Bottom Atomic Power Station Exercise.
monitored and observed, but not evaluated.
Therefore, those activities were6 .monitored and observed, but not evaluated.
Emergency Worker, Monitoring and Decontamination: Conducted on May 1,4,' 2008.
Emergency Worker, Monitoring and Decontamination:
between 1900 and 2130 hours in Beaver County.
Conducted on May 1,4,' 2008.between 1900 and 2130 hours in Beaver County.Mass Care: Conducted on June May 14, 2008 between 1900 and 21,00 hours in Lawrenceand Washington Counties.Reception Center and Monitoring/Decontamination: -Conducted.
Mass Care: Conducted on June May 14, 2008 between 1900 and 21,00 hours in Lawrenceand Washington Counties.
on May 14, 2008 between 1900 and 2100 hours in Allegheny, Butler, Lawrence, and-Washington  
Reception Center and Monitoring/Decontamination: -Conducted. on May 14, 2008 between 1900 and 2100 hours in Allegheny, Butler, Lawrence, and-Washington       -
-Counties.Traffic/Access Control: Conducted on June 24, 2008 between 1300 and 1500 hours at the State Police Barracks.Schools: Conducted May 14, 2008 between 0900 and 1100 in Beaver County.Execpt where noted in this report, the Commonwealth and local orgaizations demonstrated knowledge of their emerency respone plans and procedures and adequately implemented them. There were no Deficiencies reported.
Counties.
However, six Areas Requiring Corrective Action (ARCAs) were identified as a result of theis exercise;five of the ARCAs were successfully re-demonstrated; one prior ARCA was successfully re-demonstrated.
Traffic/Access Control: Conducted on June 24, 2008 between 1300 and 1500 hours at the State Police Barracks.
Two new planning issues were identified and have been corrected and one prior planning issue was resolved.2 6 State of West Virginia Emergency Worker, Monitoring and Decontamination:
Schools: Conducted May 14, 2008 between 0900 and 1100 in Beaver County.
Conducted on June 24, 2008 between 1900 and 2100 hours in Hancock.County.
Execpt where noted in this report, the Commonwealth and local orgaizations demonstrated knowledge of their emerency respone plans and procedures and adequately implemented them. There were no Deficiencies reported. However, six Areas Requiring Corrective Action (ARCAs) were identified as a result of theis exercise; five of the ARCAs were successfully re-demonstrated; one prior ARCA was successfully re-demonstrated. Two new planning issues were identified and have been corrected and one prior planning issue was resolved.
Mass Care: Conducted on June 24i 2008 between 1900 and 2100 hours in Hancock County.Reception Center and Monitoring/Decontamination:
2 6
Conducted on June 24, 2008 between 1900 and 2100 hours in Hancock County.Route Alerting:
 
Conducted on June 24,,2008 between 1900 and 2100 hours in Hancock County. .. .Traffic/Access Control: Conducted on May 14, 2008 from 1900 hours until completion in Hancock County. : Except where noted in this report, the State and local organizations demonstrated knowledge of their emergency response plans and procedures and adequately.
State of West Virginia Emergency Worker, Monitoring and Decontamination: Conducted on June 24, 2008 between 1900 and 2100 hours in Hancock.County.
implemented them. There were no Deficiencies reported.
Mass Care: Conducted on June 24i 2008 between 1900 and 2100 hours in Hancock County.
There were no Areas Requiring Corrective Action (ARCAs) identified as a result of this exercise.
Reception Center and Monitoring/Decontamination: Conducted on June 24, 2008 between 1900 and 2100 hours in Hancock County.
One new planning issues was identified-and corrected; four planning issues from previous exercises were resolved.3 0 2. Introduction On December 7, 1979, the President directed the Federal Emergency Management Agency (FEMA) to assume the lead responsibility for all off-site nuclear planning and response.
Route Alerting: Conducted on June 24,,2008 between 1900 and 2100 hours in Hancock County.                                         ..         .
FEMA's activities were conducted pursuant to 44 Code of Federal Regulations (CFR) Parts 350, 351 and 352. These regulations are a key element in the Radiological Emergency Preparedness (REP) Program that was established following the Three Mile Island Nuclear Station accident in March 1979. In October 2005, the.REP Program was moved to the Department of Homeland Security/Office of, Infrastructure Protection/Chemical  
Traffic/Access Control: Conducted on May 14, 2008 from 1900 hours until completion in Hancock County. :
& Nuclear Preparedness and Protection..
Except where noted in this report, the State and local organizations demonstrated knowledge of their emergency response plans and procedures and adequately.
Division/Radiological Emergency Preparedness (DHS/OIP/CNPPD/,REP).
implemented them. There were no Deficiencies reported. There were no Areas Requiring Corrective Action (ARCAs) identified as a result of this exercise. One new planning issues was identified-and corrected; four planning issues from previous exercises were resolved.
In.March of 2007 legistlation was passed that transferred the REP Program back to FEMA.Modification of the 44 CFR series .is underway to reflect the new .organizational str~ucture of the REP Program. Radiological Emergency Preparedness is now, a branch of the Preparedness Division.
3
At FEMA Region Ill, the Radiological Emerency Preparedness Program is part of the Technological H azalrds5.
 
Branch. -44 CFR 350 establishes the policies and procedures for FEMA's initial and continued approval of Tribal, State, and local governments'":radiological emergency plannirg,,and, preparedness for- commercial nuclear power plants.. This, approval is contingent; in part,, on Tribal, State and local government participation in joint exercises, with licensees.
0
REP's responsibilities in radiolog~ical emergency planningjfor fixed .nuclear facilities, include the following:
: 2. Introduction On December 7, 1979, the President directed the Federal Emergency Management Agency (FEMA) to assume the lead responsibility for all off-site nuclear planning and response. FEMA's activities were conducted pursuant to 44 Code of Federal Regulations (CFR) Parts 350, 351 and 352. These regulations are a key element in the Radiological Emergency Preparedness (REP) Program that was established following the Three Mile Island Nuclear Station accident in March 1979. In October 2005, the.
_Taking the lead in offsite emergency planning and in the review and evaluation of Radiological Emergency lResponse Plans (RERPs) and. procedures developed by Tribal, State and local governments; Determining whether such plans and procedures can be-implemented on the basis of observation and evaluation of exercises of the plans and procedures conducted, by Tribal, State and local governments; Responding to requests by the U.S. Nuclear Regulatory Commission (NRC)pursuant to the Memorandum of Understanding between the NRC and FEMA dated June 17, 1993 (Federal Register, Vol. 58, No. 176, September 14, 1993; and 4 a Coordinating the activities of the following Federal agencies with responsibilities in the radiological emergency planning process:-U.S. Department of Commerce,-U.S. Nuclear Regulatory Commission,-U.S. Environmental Protection Agency,.-U.S. Department of Energy,-U:S. Department of Health and-Human Services,-U.S. Department of Transportation,-U.S. Department of Agriculture,,-
REP Program was moved to the Department of Homeland Security/Office of, Infrastructure Protection/Chemical & Nuclear Preparedness and Protection..
-U.S. Department Of the Interior, and-U.S. Food and Drug Administration.'
Division/Radiological Emergency Preparedness (DHS/OIP/CNPPD/,REP). In.March of 2007 legistlation was passed that transferred the REP Program back to FEMA.
Representatives'of theseagendcies-serve on the Radiological Assistance Committee (RAC), which'is chaired by Regional Technological.
Modification of the 44 CFR series .is underway to reflect the new .organizational str~ucture of the REP Program. Radiological Emergency Preparedness is now, a branch of the Preparedness Division. At FEMA Region Ill, the Radiological Emerency Preparedness Program is part of the Technological Hazalrds5.Branch.           -
Hazards Branch Chief.A REP exercise was conducted on June,24, 2008,ý to assess the capabilities of State and local emergency preparedness organizations in implementing their RERPs and procedures' to protect the public-health arid safety'during a radiological emergency involving Beaver Valley'Power Station '.(BVPS).
44 CFR 350 establishes the policies and procedures for FEMA's initial and continued approval of Tribal, State, and local governments'":radiological emergency plannirg,,and, preparedness for-commercial nuclear power plants.. This, approval is contingent; in part,,
The purpose of this exercise report is to present the exercise results adnd findings on the performance of'the off-site response organizations (OROs) during a simulated raidiological emergency-The findings presented'ih this report are based on the evaluations of the Federal evaluator team, with final determinations made by the RAC Chair and approved by the Regional Administrator, FEMA Region Ill, Philadelphia, PA.The criteria utilized in the REP evaluation process are contained in'the following:
on Tribal, State and local government participation in joint exercises, with licensees.
NUREG-0654/FEMA-REP-1, Rev. 1, "Criteria for Preparation and Evaluation of Radiological Emergehcy Response Plans and Preparedness, in Suppoort of Nuclear Power Plants," NoVember..1980;  
REP's responsibilities in radiolog~ical emergency planningjfor fixed .nuclear facilities, include the following: _
" FEMA Guidance Memoranda MS-1, "Medical Services," November 1986;FEMA-REP-14, "Radiological Emergency Preparedness Exercise Manual," September 1991;5 a 66 FR 47546, "FEMA Radiological Emergency Preparedness:
Taking the lead in offsite emergency planning and in the review and evaluation of Radiological Emergency lResponse Plans (RERPs) and. procedures developed by Tribal, State and local governments; Determining whether such plans and procedures can be-implemented on the basis of observation and evaluation of exercises of the plans and procedures conducted, by Tribal, State and local governments; Responding to requests by the U.S. Nuclear Regulatory Commission (NRC) pursuant to the Memorandum of Understanding between the NRC and FEMA dated June 17, 1993 (Federal Register, Vol. 58, No. 176, September 14, 1993; and 4
Alert and Notification," September 12, 2001; and 67 FR 20580, "FEMA Radiological Emergency Preparedness:
a
Exercise Evaluation Methodology," April 25, 2002.Section III of this report, entitled "Exercise Overview," presents basic information'and data relevant to the exercise.
 
This section of the report contains a description of the'plume pathway emergency planning zone (EPZ), a listing of all participating jurisdictions and functional entities that were evaluated, and a tabular presentation of the time of actual occurrence of key exercise events and activities.
Coordinating the activities of the following Federal agencies with responsibilities in the radiological emergency planning process:
Section IV of this report, entitled "Exercise Evaluation and Results," .presents detailed information on the demonstration of applicable exercise evalu'ation areas at each jurisdiction or functional entity evaluated in a jurisdiction-based, issues-only format.This section also contains:
  - U.S. Department of Commerce,
(1) descriptions of all Deficiencies and Areas Requiring Corrective Action (ARCAs) assessed during this exercise, recommended corrective actions, and the Tribal, State, anddlocal governments' schedule of corrective actions for each identified exercise issue and (2) descriptions of ARCAs assessed during previous exercises and resolved at this exercise, including the corrective action demonstrated, as well as ARCAS assessed during previous exercises and scheduled for demonstration at this exercise which remain unresolved.
  - U.S. Nuclear Regulatory Commission,
The final section of the report is comprised of the appendices, which present the following supplementary information:
  - U.S. Environmental Protection Agency,.
acronyms and abbreviations, exercise evaluators and team leaders, exercise evaluation area criteria and extent of play agreement, and the exercise scenario.
  - U.S. Department of Energy,
It also presents information on planning issues (both new planning issues identified during this exercise and resolved planning issues identified during previous exercises), and additional prior issues not scheduled for demonstration at this exercise.a 0 6 6
  - U:S. Department of Health and-Human Services,
  - U.S. Department of Transportation,
  - U.S. Department of Agriculture,,-
  - U.S. Department Of the Interior, and
  - U.S. Food and Drug Administration.'
Representatives'of theseagendcies-serve on the Radiological Assistance Committee (RAC), which'is chaired by Regional Technological. Hazards Branch Chief.
A REP exercise was conducted on June,24, 2008,ý to assess the capabilities of State and local emergency preparedness organizations in implementing their RERPs and procedures' to protect the public-health arid safety'during a radiological emergency involving Beaver Valley'Power Station '.(BVPS). The purpose of this exercise report is to present the exercise results adnd findings on the performance of'the off-site response organizations (OROs) during a simulated raidiological emergency-The findings presented'ih this report are based on the evaluations of the Federal evaluator team, with final determinations made by the RAC Chair and approved by the Regional Administrator, FEMA Region Ill, Philadelphia, PA.
The criteria utilized in the REP evaluation process are contained in'the following:
NUREG-0654/FEMA-REP-1, Rev. 1, "Criteria for Preparation and Evaluation of Radiological Emergehcy Response Plans and Preparedness, in Suppoort of Nuclear Power Plants," NoVember..1980;       "
FEMA Guidance Memoranda MS-1, "Medical Services," November 1986; FEMA-REP-14, "Radiological Emergency Preparedness Exercise Manual," September 1991; 5
 
a 66 FR 47546, "FEMA Radiological Emergency Preparedness: Alert and Notification,"
September 12, 2001; and 67 FR 20580, "FEMA Radiological Emergency Preparedness: Exercise Evaluation Methodology," April 25, 2002.
Section III of this report, entitled "Exercise Overview," presents basic information'and data relevant to the exercise. This section of the report contains a description of the' plume pathway emergency planning zone (EPZ), a listing of all participating jurisdictions and functional entities that were evaluated, and a tabular presentation of the time of actual occurrence of key exercise events and activities.
a Section IVof this report, entitled "Exercise Evaluation and Results," .presents detailed information on the demonstration of applicable exercise evalu'ation areas at each jurisdiction or functional entity evaluated in a jurisdiction-based, issues-only format.
This section also contains: (1) descriptions of all Deficiencies and Areas Requiring Corrective Action (ARCAs) assessed during this exercise, recommended corrective actions, and the Tribal, State, anddlocal governments' schedule of corrective actions for each identified exercise issue and (2) descriptions of ARCAs assessed during previous exercises and resolved at this exercise, including the corrective action demonstrated, as well as ARCAS assessed during previous exercises and scheduled for demonstration at this exercise which remain unresolved.
The final section of the report is comprised of the appendices, which present the following supplementary information: acronyms and abbreviations, exercise evaluators and team leaders, exercise evaluation area criteria and extent of play agreement, and the exercise scenario. It also presents information on planning issues (both new planning issues identified during this exercise and resolved planning issues identified during previous exercises), and additional prior issues not scheduled for demonstration   0 at this exercise.
6 6
: 3. Exercise Overview Contained in this section are data and basic information relevant to the June 24, 2008 exercise to test the off-site emergency response capabilities in the area surrounding Beaver Valley Power Station (BVPS). This section of the exercise report includes a description of the plume pathway emergency planning zone (EPZ), a listing of all participating jurisdictions and functional entities that were evaluated, and a tabular presentation of the time of actual occurrence of key exercise events and activities.
: 3. Exercise Overview Contained in this section are data and basic information relevant to the June 24, 2008 exercise to test the off-site emergency response capabilities in the area surrounding Beaver Valley Power Station (BVPS). This section of the exercise report includes a description of the plume pathway emergency planning zone (EPZ), a listing of all participating jurisdictions and functional entities that were evaluated, and a tabular presentation of the time of actual occurrence of key exercise events and activities.
3.1. EPZ Description-BVPS is located in'western Pennsylvania on the southern bank of the Ohio River in Beaver County,ý Pennsylvania."Thesite is located near Shippingport Borough, about 1 mile from Midland Pennsylvani, obn 501 acres of fairIy level terrace owned by the FirstEnergy Nuclear OperatingCobmpahy.
3.1. EPZ Description-BVPS is located in'western Pennsylvania on the southern bank of the Ohio River in Beaver County,ý Pennsylvania."Thesite is located near Shippingport Borough, about 1 mile from Midland Pennsylvani, obn 501 acres of fairIy level terrace owned by the FirstEnergy Nuclear OperatingCobmpahy. The latitude for the site is40-37'18' north; the longitude is 8 0-2 6 '02" west. Two pressurized water reactors are located on the 17 acres of the parcel ocCupied by the power station. The operating licenses for the facility were granted in July 1976 (Unit 1) and August 1987 (Unit 2); commercial operations began at the site during October' 1976 (Unit 1) and November 1987 (Unit 2). Unit 1 generates an output of 810 megawatts (MW); the Unit 2 output is 833 MW. One hundred and ten sirens cover the plume EPZ; 85 of the sirens are in Pennsylvania.
The latitude for the site is40-37'18' north;the longitude is 8 0-2 6'02" west. Two pressurized water reactors are located on the 17 acres of the parcel ocCupied by the power station. The operating licenses for the facility were granted in July 1976 (Unit 1) and August 1987 (Unit 2); commercial operations began at the site during October' 1976 (Unit 1) and November 1987 (Unit 2). Unit 1 generates an output of 810 megawatts (MW); the Unit 2 output is 833 MW. One hundred and ten sirens cover the plume EPZ; 85 of the sirens are in Pennsylvania.
Steep slopes that cohtrib.uted to the6developm6nt of river mill towns, where most of the industry and residences are located, characterize the general topography of the region.
Steep slopes that cohtrib .uted to the6developm6nt of river mill towns, where most of the industry and residences are located, characterize the general topography of the region.The region is part of the large industrial complex centered around Pittsburgh, Pennsylvania.
The region is part of the large industrial complex centered around Pittsburgh, Pennsylvania. The terrain rises from the Ohio River to a maximum elevation of 1,160 feet above mean sea level (MSL). Drainage is predominantly toward the river.
The terrain rises from the Ohio River to a maximum elevation of 1,160 feet above mean sea level (MSL). Drainage is predominantly toward the river.The soils in the area are made up of alluvial sands and gravel. The bedrock geology consists of sedimentary formations composed of shale and sandstone.
The soils in the area are made up of alluvial sands and gravel. The bedrock geology consists of sedimentary formations composed of shale and sandstone. No faults are located under or near the facility. The Ohio River is about 664 feet above MSL, and the plant grade is 735 feet above MSL.
No faults are located under or near the facility.
The climate is a humid continental type. The average annual temperature for the area is about 50 2F. Annual precipitation is approximately 36 inches.
The Ohio River is about 664 feet above MSL, and the plant grade is 735 feet above MSL.The climate is a humid continental type. The average annual temperature for the area is about 50 2F. Annual precipitation is approximately 36 inches.7 0 The area around the plant is mostly agricultural or undeveloped.
7
The nearest community is Shippingport Borough, Pennsylvania, which is the parent borough for the site and has a population of 237. The nearest major population center of more than 25,000 people is Pittsburgh, which has a population of 334,563 and lies 22 miles to the southeast.
 
The maximum population distribution, including residents:
0 The area around the plant is mostly agricultural or undeveloped. The nearest community is Shippingport Borough, Pennsylvania, which is the parent borough for the site and has a population of 237. The nearest major population center of more than 25,000 people is Pittsburgh, which has a population of 334,563 and lies 22 miles to the southeast. The maximum population distribution, including residents: and transients, is 94,023 in the 10-mile EPZ.
and transients, is 94,023 in the 10-mile EPZ.Four major industries employ a total of 8,000 persons within 10 miles of the plant. Two small airfields (Beaver County and Herron Airport) are also in the 10 mile EPZ..Runways at both airports are oriented so that the extensions do 'not pass Over the plant.No major thoroughfares exist in the immediate vicinity.
Four major industries employ a total of 8,000 persons within 10 miles of the plant. Two small airfields (Beaver County and Herron Airport) are also in the 10 mile EPZ..
The main line of the Conrail Railroad runs parallel to the plant along the north bank of.the Ohio, River.3.2. Exercise Participants Agencies and organizations of the following jurisdictions participated in the Beaver Valley Power Station exercise: State Jurisdictions Commonwealth of Pennsylvania  
Runways at both airports are oriented so that the extensions do 'not pass Over the plant.
-.Emergency:
No major thoroughfares exist in the immediate vicinity. The main line of the Conrail 0
Operations Center Bureau of Radiation Protection Pennsylvania State Police.State of West Virginia, Department of Homeland Security, Office, of Emergency Services State of West Virginia, Department of Health, and Human Resources, Bureau of Public Health State of West Virginia, Department of Environmental Protection State of West Virginia, Department of Natural Resources State of West Virginia, Department of Agriculture.  
Railroad runs parallel to the plant along the north bank of.the Ohio, River.
..State of West Virginia, Field Air Sampling Team, Risk Jurisdictions BEAVER COUNTY EMERGENCY OPEATIONS CENTER ..Beaver County 911 Center Beaver County Agricultural Services Beaver County Board of Commissions Beaver County Department of. Health, Beaver County Emergency Management Agency 8 0 0 a Beaver County Hazardous Materials Response Beaver County Industrial Liaison Beaver County Office of the Aging Beaver County Public Works Beaver County Radiological Office Beaver.County Sherrif's Office Beaver County Transit Authority ALIQUIPA EMERGENCY OPERATIONS CENTER Aliquippa City Fire Department Aliquippa City Police Department BEAVER BOROUGH EMERGENCY OPERATIONS CENTER-.Beaver Borough Mayor's Office'Beaver Borough City Council --Beaver Borough Fire Department Beaver Borough Police BRIDGEWATER/FALLSTON BOROUGHIEMERGENCY oPERATIONS CENTER Bridgewater*Fire Department'  
3.2. Exercise Participants Agencies and organizations of the following jurisdictions participated in the Beaver Valley Power Station exercise:
" Bridgewater Police Department Fallston Fire Department BRIGHTON TOWNSHIP EMERGENCY OPERATIONS CENTER Brighton Township Board of Supervisors Brighton Township Emergency Management Agency Brighton Township Police Depar-tment Brighton Township Public Works Brighton Township rFre. Department"....  
State Jurisdictions Commonwealth of Pennsylvania -.Emergency: Operations Center Bureau of Radiation Protection Pennsylvania State Police.
..CENTER TOWNSHIP EMERGENCY OPERATIONS CENTER Center Township Fire Department Center Township Police Department CHIPPEWA TOWNSHIP EMERGENCY OPERATIONS CENTER Chippewa Township Public Works Chippewa Township Police Department Chippewa Township Volunteer Fire Department Chippewa Township Emergency Management Chippewa Township Board of Supervisors FRANKFORT SPEINGS BOROUGH/HANOVER TOWNSHIP/GEORGETOWN BOROUGH/GREEN TOWNSHIP/HOOKSTOWN BOROUGH EMERGENCY OPERATIONS CENTER 9 Green Township Board of Supervisors Hookstown Volunteer Fire Department Hookstown Borough Council Hookstown Area Emergency Services Hanover Township Council Hanover Township Emergency Management Agency HOPEWELL TOWNSHIP EMERGENCY OPERATIONS CENTER Hopewell Township Police Department Hopewell Township Fire Department Hopewell Township Shcool District Hopewell Township Public Works Hopewell Township Commissioners Office Hopewell Township Emergency ManagementAgency INDEPENDENCE TOWNSHIP EMERGENCY OPERATIONS CENTER..., Independence'Township Volunteer, Fire Department Independence Township Police Department-;
State of West Virginia, Department of Homeland Security, Office,of Emergency Services State of West Virginia, Department of Health, and Human Resources, Bureau of Public Health State of West Virginia, Department of Environmental Protection State of West Virginia, Department of Natural Resources State of West Virginia, Department of Agriculture.       ..
Independence Township Emergency Medical Services, ": Independence Township Road Department-Independence Township City Council I -.Mayior's'Office,".
0 State of West Virginia, Field Air Sampling Team, Risk Jurisdictions BEAVER COUNTY EMERGENCY OPEATIONS CENTER                       ..
Independence Township Emergency Management;, Independence Township Supervisors Office INDUSTRY BOROUGH EMERGENCY OPERATIONS CENTER Industry Borough Emergency Management Industry Borough Police Department Industry Borough City Council -Mayor'S MIDLAND BOROUGH EMERGENCY OPERATIONS CENTER Midland Borough Council Midland Borough Medical Services Midland Borough Fire Department.
Beaver County 911 Center Beaver County Agricultural Services Beaver County Board of Commissions Beaver County Department of. Health, Beaver County Emergency Management Agency 8
Midland Borough Police Department," Monaca Borough Emergency Operations Center.Monaca Borough: Volunteer Fire Department*
a
Monaca Borough Police Department Monaca Borough Mayor's Office Monaca Borough Department of Public Works PATTERSON HEIGHTS/PATTERSON TOWNSHIP EMERGENCY OPERATIONS CENTER 10 11 Patterson Heights Borough Counsel Patterson Heights Borough fire Department Patterson Heights Borough Street Department Patterson Township Board of Commissions Patterson Township Emergency Management Patterson Township Police Department Patterson Township Fire Department..
 
POTTER TOWNSHIP EMERGENCY OPERATIONS CENTER Potter Township Emergency Medical Services Potter Township Volunteer Fire Department RACOON TOWNSHIP EMERGENCY OPERATIONS CENTER Racoon Township Board of supervisors Racoon Township Fire Department Racoon Township Police'Department, SHIPPINGPORT BOROUGH EMERGENCY OPERATIONS CENTER Shippingport Borough President of Counsel_Shippingport BoroughMayor, SOUTH BEAVER TOWNSHIP/GLASGOW BOROUGH/OHIOVILLE BOROUGH EMERGENCY OPERATIONS CENTER, Ohioville Fire Department Ohioville Medical Officer Ohioville Medical Services Ohioville Police Ohioville Emergency Management South Beaver Township Secretary.'
Beaver County Hazardous Materials Response Beaver County Industrial Liaison Beaver County Office of the Aging Beaver County Public Works Beaver County Radiological Office Beaver.County Sherrif's Office Beaver County Transit Authority ALIQUIPA EMERGENCY OPERATIONS CENTER Aliquippa City Fire Department Aliquippa City Police Department BEAVER BOROUGH EMERGENCY OPERATIONS CENTER-
South Beaver Police South Beaver Board of Supervisors South Beaver Emergency Management SOUTH HEIGHTS BOROUGH EMERGENCY OPERATIONS CENTER South Heights Borough Police Department., Hopewell Volunteer Fire Department VANPORT TOWNSHIP EMERGENCYOPERATIONS CENTER.Vanport Township Board of Commissioners Vanport Township Emergency Manager Vanport Township Police Vanport Township Public Works Vanport Township Fire Department 11 Beaver Police Department PA SCHOOL DISTRICTS AND SCHOOLS Aliquippa School District Aliquippa Elementary School Beaver Area School District Beaver Area Middle School Blackhawk School District Patterson Elementary School Center Area School District Center Area Junior High School Hopewell Area School District Margret Ross Elementary School Midland borough School District, Neel Elementary School Monaca School District Monaca Elementary School New Brighton School District Ambridge School District South Side Area School District South Side Middle School Western Beaver School District Western Beaver Jr/Sr High School HANCOCK COUNTY EMERGENCY OPERATIONSCENTER Hancock County Agriculture Extension  
.Beaver Borough Mayor's Office' Beaver Borough City Council - -
..Hancock County Departmentof -Health" Hancock County 911 1 Hancock County Emergency Management Agency., Hancock County Emergency Medical Services Hancock County Fire Services 'Hancock County Sheriffs Department Hancock County Health Department New Cumberland Police Department New Cumberland Volunteer Fire Department Oak Glen High School Hancock County School District Support Jurisdictions ALLEGHENY COUNTY EMERGENCY OPERATIONS CENTER 12 a Allegheny County Emergency Services Allegheny County Managers Office Allegheny County Office of Behavior Health Allegheny County Parks Department Allegheny County Police Allegheny County Port Authority Allegheny County Public Defender's Office Allegheny County Sheriff's Office Allegheny County Manager Allegheny County Law Department Allegheny County Airport Authority Allegheny County Budget and Finance Department Allegheny County Council, Chair, Public Safety Allegheny County Department of Court Records Allegheny County Department of Human Services Allegheny County 911 Center Allegheny County GIS Pittsburgh Bureau of Fire Pittsburgh City Manager Pittsburgh Emergency Medical Service Pittsburgh Public Safety Moon Township Fire Department Municipality of.Monroeville  
Beaver Borough Fire Department Beaver Borough Police BRIDGEWATER/FALLSTON BOROUGHIEMERGENCY oPERATIONS CENTER Bridgewater*Fire Department'                 "
,-University of Pittsburgh Medical Center,.BUTLER COUNTY EMERGENCY OPERATIONS CENTER Butler County Emergency Management Agency Butler County Public Information Officer Butler County Hazmat Butler Memorial Hospital Butler County Sheriffs Office Butler County Fire Department Butler County 911 Center Cranberry Township Police Department Pennsylvania Department of Transportation LAWRENCE COUNTY EMERGENCY OPERATIONS CENTER Lawrence County Emergency Management Agency Lawrence County Board of Commissioners 13 0 Lawrence County Department of Public Safety Lawrence County Courthouse Security New Castle Fire Department" Pennsylvania Army National Guard Pennsylvania State Extension Service WASHINGTON COUNTY EMERGENCY OPERATIONS CENTER Washington County Emergency Management Washington County Information Technology Department Washington County HAZMAT Team Washington County Finance Department Washington County Department of Public Safety Washington County Department of Human Services.Washington County Purchasing Department-, Private Jurisdictions Beaver County Radio Amateur Civil Emergency Services (RACES)Radio Emergency Associated Communications Team (Beaver Co)Amateur Radio Emergency Service (ARES) .American Red Cross, South West Pennsylvania Chapter.._
Bridgewater Police Department Fallston Fire Department BRIGHTON TOWNSHIP EMERGENCY OPERATIONS CENTER Brighton Township Board of Supervisors Brighton Township Emergency Management Agency Brighton Township Police Depar-tment Brighton Township Public Works Brighton Township rFre. Department"....   ..
Salvation Army Disaster Services Troop 141, Boy Scouts of America.Marshall University Beaver Valley Power- Station Weirton/Hancock County Citizen Corps 3.3. Exercise Timeline Table 1, on the following page, presents the times at which key events and activities occurred during the BVPS exercise on June 24, 2008. Also included are times notifications were made to the participating jurisdictions/functional entities.14 0 a Table 1 -Exercise Timeline DATE: 2008-06-24, SITE: Beaver ValleyPower Station, PA Unusual Event N/A I N/A N/A Nn/A N/A N/A N/A Alert 1625 1712 1629 1640 1639 1640 1643 Site Area Emergency 1800 1807 1805 1807 1806 1808 1806 General Emergency-1920 1933 1925 1925 1926 1926. 1926 Simulated Rad. Release Started 1807 1809 1810 1810 N/R 2010 Simulated Rad. Release N/A N/A N/A N/A N/A N/A Terminated Facility Declared Operational 1728 1705 1651 1653 1656 1705 Declaration of State of Emergency 1815 '1815 '1905 " 1848 '1848' 1835 Exercise Terminated 2155 2104 2105 2026 .2012 2103 Early Precautionary Actions: 1846 1845 .1853 N/R N/R 1927 1st Protective Action Decision:
CENTER TOWNSHIP EMERGENCY OPERATIONS CENTER Center Township Fire Department Center Township Police Department CHIPPEWA TOWNSHIP EMERGENCY OPERATIONS CENTER Chippewa Township Public Works Chippewa Township Police Department Chippewa Township Volunteer Fire Department Chippewa Township Emergency Management Chippewa Township Board of Supervisors FRANKFORT SPEINGS BOROUGH/HANOVER TOWNSHIP/GEORGETOWN BOROUGH/GREEN TOWNSHIP/HOOKSTOWN BOROUGH EMERGENCY OPERATIONS CENTER 9
1846 1830 19461. 1831 1933 1843 1st Siren Activation  
 
'1840 1833 ". ________lst EAS orEBS Message ,833 ___._ _1833 2nd Protective Action Decision:
Green Township Board of Supervisors Hookstown Volunteer Fire Department Hookstown Borough Council Hookstown Area Emergency Services Hanover Township Council Hanover Township Emergency Management Agency HOPEWELL TOWNSHIP EMERGENCY OPERATIONS CENTER Hopewell Township Police Department Hopewell Township Fire Department Hopewell Township Shcool District Hopewell Township Public Works Hopewell Township Commissioners Office Hopewell Township Emergency ManagementAgency INDEPENDENCE TOWNSHIP EMERGENCY OPERATIONS CENTER...,
1954 1945 1946 o- 1946 1945 1950 2nd Siren Activation 1950 1946 2nd EAS or EBS Message 1946 3rd Protective Action Decision: 3rd Siren Activation 3rd EAS or EBS Message KI Administration Decision:
Independence'Township Volunteer, Fire Department Independence Township Police Department-;
1954 1935 1950 1948 1950 1951 15 0 Table 1 -Exercise Timeline DATE: 2008-06-24, SITE: Beaver Valley Power Station, PA Unusual Event N/A N/A N/A N/A N/A N/A *N/A Alert 1625 1637 1642 1640 1642 1646 1641 Site Area Emergency 1800 1806 1806 1812 1813 1806 .1808 General Emergency 1920 1926 1929 1926 1927 1928, 1926 Simulated Rad. Release Started 1810 1810 2010 1956 1955 1955 Simulated Rad. Release N/A N/A N/A N/A N/A N/A Terminated Facility Declared Operational 1718 1658 1715 1710 1736 .17,26 Declaration of State of Emergency N/R 1835 1835 1905.,: :'N/R 1.905.Exercise Terminated  
Independence Township Emergency Medical Services, ":
.1. 2048 2046 2052 2030 2048-.., .2036 Early Precautionary Actions: N/R 1906 1900 N/R N/R 1909 Ist Protective Action Decision:
Independence Township Road Department-Independence Township City Council I-.Mayior's'Office,".
1840 1837 1835 1832 1836 1830 I st Siren Activation 1st EAS or EBS Message 1947 _ ,, ,__2nd Protective Action Decision:
Independence Township Emergency Management;,
1950 1947 1945 1946 1945 2nd Siren Activation 2nd EAS or EBS Message 3rd Protective Action Decision: 3rd Siren Activation 3rd EAS or EBS Message KI Administration Decision:
Independence Township Supervisors Office INDUSTRY BOROUGH EMERGENCY OPERATIONS CENTER Industry Borough Emergency Management Industry Borough Police Department Industry Borough City Council - Mayor'S Office*
1947 1953 .1954 1950 1954 .1950 0 0 16 a Table 1 -Exercise Timeline DATE: 2008-06-24, SITE: Beaver Valley Power Station, PA Unusual Event N/A N/A N/A N/A N/A N/A N/A Alert 1625 1645 1640 1642 1637 1640 1645 Site Area Emergency 1800 1810 1807 1809 1806 1806 1807 General Emergency 1920 1930 1930 1930 1927 1928 1929 Simulated Rad. Release Started 1955 N/R N/R 1806 N/R N/R Simulated Rad. Release N/A N/A N/A N/A N/A N/A Terminated Facility Declared Operational I1700 1704 1713 1725 1724 1720 Declaration of State of Emeigency 1905 1 859 N/R N/R 1730 1905 Exercise Terminated 2015 2050 2054 2020 2022 2028 Early PrecautionaryActions:
MIDLAND BOROUGH EMERGENCY OPERATIONS CENTER Midland Borough Council Midland Borough Medical Services Midland Borough Fire Department.
N/R N/R N/R N/R N/R I st Protective Action Decision:
Midland Borough Police Department,"
1830 1834 1831 1832 1832 lst Siren Activation 1st EAS or EBS Message _ _ _, 2nd Protective Action Decision:
Monaca Borough Emergency Operations Center.
1950 1947 1945 '1946 1945 2nd Siren Activation 2nd EAS or EBS Message 3rd Protective Action Decision: 3rd Siren Activation 3rd EAS or EBS Message KI Administration Decision:
Monaca Borough: Volunteer Fire Department*
1952 1952 1952 1948 1949 *1950 17 a Table 1.- Exercise Timeline DATE: 2008-06-24, SITE: Beaver Valley Power Station, PA Unusual Event N/A N/A N/A. N/A N/A N/A N/A Alert 1625 1647 1639 1636 .1708 1701 .1658 Site Area Emergency 1800 1807 1810 1800 .1809 1809 .1808 General Emergency 1920 1929 1922 1929 1940. 1928k 1920 Simulated Rad. Release Started N/R 1810 .N/R 1923 1928 N/R Simulated Rad. Release N/A N/A N/A N/A N/A N/A Terminated Facility Declared Operational  
Monaca Borough Police Department Monaca Borough Mayor's Office Monaca Borough Department of Public Works PATTERSON HEIGHTS/PATTERSON TOWNSHIP EMERGENCY OPERATIONS CENTER 10 11
.1759 .1750 1650 .1730 1730 .1721 Declaration of State of Emergency 1.816 N/R N/R ... 1-.:910 1903 .1850 Exercise Terminated 2018. .. 2048. 2015 .2036 2036
 
* 2050 Early Precautionary Actions: 1905 N/R N/R 1902 1927 N/R I st Protective Action Decision:
Patterson Heights Borough Counsel Patterson Heights Borough fire Department Patterson Heights Borough Street Department Patterson Township Board of Commissions Patterson Township Emergency Management Patterson Township Police Department Patterson Township Fire Department..
1840 1832 1840 1835. '1835 1833 1st Siren Activation I st EAS or EBS Message ... ...... .2nd Protective Action Decision:
POTTER TOWNSHIP EMERGENCY OPERATIONS CENTER Potter Township Emergency Medical Services Potter Township Volunteer Fire Department RACOON TOWNSHIP EMERGENCY OPERATIONS CENTER Racoon Township Board of supervisors Racoon Township Fire Department Racoon Township Police'Department, SHIPPINGPORT BOROUGH EMERGENCY OPERATIONS CENTER Shippingport Borough President of Counsel_
1947 1945 1947 1948 1950 1947 2nd Siren Activation 2nd EAS or EBS Message. .... .. .... ...__._"__3rd Protective Action Decision: 3rd Siren Activation  
Shippingport BoroughMayor, SOUTH BEAVER TOWNSHIP/GLASGOW BOROUGH/OHIOVILLE BOROUGH EMERGENCY OPERATIONS CENTER, Ohioville Fire Department Ohioville Medical Officer Ohioville Medical Services Ohioville Police Ohioville Emergency Management South Beaver Township Secretary.'
...3rd EAS or EBS Message .. ... ...........
South Beaver Police South Beaver Board of Supervisors South Beaver Emergency Management SOUTH HEIGHTS BOROUGH EMERGENCY OPERATIONS CENTER South Heights Borough Police Department.,
___.....
Hopewell Volunteer Fire Department VANPORT TOWNSHIP EMERGENCYOPERATIONS CENTER.
* ____ .__ ,_KI Administration Decision:
Vanport Township Board of Commissioners Vanport Township Emergency Manager Vanport Township Police Vanport Township Public Works Vanport Township Fire Department 11
1950 1949 1951 1950 .....1953' 1950 0 0 18 0l Table 1 -Exercise Timeline DATE: 2008-06-24, SITE: Beaver Valley Power Station, PA Unusual Event N/A N/A N/A N/A N/A N/A Alert 1625 1648 1627 1627 1627 1630 Site Area Emergency 1800 1809 1809 1809 1809 1805 General Emergency  
 
-1920 1929 1922 1922 1922 1925, Simulated Rad. Release Started " 1939 1938 1938 1938 1805 Simulated Rad. Release N/A N/A N/A N/A N/A Terminated Facility Declared Operational  
Beaver Police Department PA SCHOOL DISTRICTS AND SCHOOLS Aliquippa School District Aliquippa Elementary School Beaver Area School District Beaver Area Middle School Blackhawk School District Patterson Elementary School Center Area School District Center Area Junior High School Hopewell Area School District Margret Ross Elementary School Midland borough School District, Neel Elementary School Monaca School District Monaca Elementary School New Brighton School District Ambridge School District South Side Area School District South Side Middle School Western Beaver School District Western Beaver Jr/Sr High School HANCOCK COUNTY EMERGENCY OPERATIONSCENTER Hancock County Agriculture Extension .   .
.1710 1650 1650 1650 1659 Declaration of State of Emergency  
Hancock County Departmentof -Health" Hancock County 911                   1 Hancock County Emergency Management Agency.,
.1846 1817 1817 ..1817 1745 Exercise Terminated 2100 2155 2155 2155 2157 Early Precautionary Actions: 1839 1833 1833 1833 1839 1st Protective Action Decision:
Hancock County Emergency Medical Services Hancock County Fire Services                 '
1821 1829 1829 1829 1830 1 st Siren Activation 1829 1829 1840 1st EAS or EBS Message ..." ...... 1829 1829 1843 2nd Protective Action Decision:
Hancock County Sheriffs Department Hancock County Health Department New Cumberland Police Department New Cumberland Volunteer Fire Department Oak Glen High School Hancock County School District Support Jurisdictions ALLEGHENY COUNTY EMERGENCY OPERATIONS CENTER 12 a
1937 1938 1938 1938 1944 2nd Siren Activation 1938 1938 1950 2nd EAS or F'BS Message 1938 1938 1953 3rd Protective Action Decision:
 
2100 2100 2100 N/A 3rd Siren Activation 3rd EAS or EBS Message KI Administration Decision:, 1950. 1938 1938 1925 19 0 4. Exercise Evaluation and Results Contained in this section are the results and findings of the evaluation of all jurisdictions and functional entities that participated in the June 24, 2008 biennial Radiological Emergency Preparedness (REP) exercise.
Allegheny County Emergency Services Allegheny County Managers Office Allegheny County Office of Behavior Health Allegheny County Parks Department Allegheny County Police Allegheny County Port Authority Allegheny County Public Defender's Office Allegheny County Sheriff's Office Allegheny County Manager Allegheny County Law Department Allegheny County Airport Authority Allegheny County Budget and Finance Department Allegheny County Council, Chair, Public Safety Allegheny County Department of Court Records Allegheny County Department of Human Services Allegheny County 911 Center Allegheny County GIS Pittsburgh Bureau of Fire Pittsburgh City Manager Pittsburgh Emergency Medical Service Pittsburgh Public Safety Moon Township Fire Department Municipality of.Monroeville ,-
The exercise was held to test the offsite emergency response capabilities of local governments'in the 10-mile Emergency Planning Zone (EPZ) surrounding the Beaver Valley Power Station (BVPS).Each jurisdiction and functional entity was evaluated on the basis of its demonstration of the exercise evaluation area criteria contained in the REP Exercise Evaluation, Methodology.
University of Pittsburgh Medical Center,.
Detailed information on the exercise evaluation area criteria and the extent-of-play agreement used in this exercise are found in. Appendix 3 of this report.4.1. Summary Results of Exercisel Evaluation The matrix presented in Table, 2, onthefoillowing pages, pe'sents the -status of the exercise evaluation area criteria from the REP Exercise Evaluation.Methodology that were scheduled for demonstration during this exercise-by all participating jurisdictionns-and functional entities.
BUTLER COUNTY EMERGENCY OPERATIONS CENTER Butler County Emergency Management Agency Butler County Public Information Officer Butler County Hazmat Butler Memorial Hospital Butler County Sheriffs Office Butler County Fire Department Butler County 911 Center Cranberry Township Police Department Pennsylvania Department of Transportation LAWRENCE COUNTY EMERGENCY OPERATIONS CENTER Lawrence County Emergency Management Agency Lawrence County Board of Commissioners 13
Exercise evaluation area criteria.are listed by .number and the demonstration status of the criteria is indicated by the use of the following letters::" M Met (No Deficiency or ARCAs assessed and-no unresolved ARCAs from prior exercises)
 
0 Lawrence County Department of Public Safety Lawrence County Courthouse Security New Castle Fire Department" Pennsylvania Army National Guard Pennsylvania State Extension Service WASHINGTON COUNTY EMERGENCY OPERATIONS CENTER Washington County Emergency Management Washington County Information Technology Department Washington County HAZMAT Team Washington County Finance Department Washington County Department of Public Safety Washington County Department of Human Services.
0 Washington County Purchasing Department-,
Private Jurisdictions Beaver County Radio Amateur Civil Emergency Services (RACES)
Radio Emergency Associated Communications Team (Beaver Co)
Amateur Radio Emergency Service (ARES) .
American Red Cross, South West Pennsylvania Chapter.._
Salvation Army Disaster Services Troop 141, Boy Scouts of America.
Marshall University Beaver Valley Power- Station Weirton/Hancock County Citizen Corps 3.3. Exercise Timeline Table 1, on the following page, presents the times at which key events and activities occurred during the BVPS exercise on June 24, 2008. Also included are times notifications were made to the participating jurisdictions/functional entities.
14 a
 
Table 1 - Exercise Timeline DATE: 2008-06-24, SITE: Beaver ValleyPower Station, PA Unusual Event                     N/A       I N/A       N/A       Nn/A             N/A         N/A   N/A Alert                             1625         1712     1629     1640           1639         1640   1643 Site Area Emergency               1800         1807     1805     1807           1806         1808   1806 General Emergency-               1920         1933     1925     1925           1926         1926. 1926 Simulated Rad. Release Started                 1807     1809     1810           1810         N/R   2010 Simulated Rad. Release                         N/A       N/A       N/A             N/A           N/A   N/A Terminated Facility Declared Operational                 1728     1705     1651           1653         1656   1705 Declaration of State of Emergency             1815     '1815   '1905         " 1848         '1848' 1835 Exercise Terminated                           2155       2104     2105           2026         .2012   2103 Early Precautionary Actions:                   1846     1845   .1853             N/R           N/R   1927 1st Protective Action Decision:               1846     1830     19461.         1831         1933 1843 1st Siren Activation                                   '1840     1833   ". ________
lst EAS orEBS Message                 ,833                                 ___._       _1833 2nd Protective Action Decision:               1954     1945     1946         o-1946         1945   1950 2nd Siren Activation                                     1950     1946 2nd EAS or EBS Message                                             1946 3rd Protective Action Decision:
3rd Siren Activation 3rd EAS or EBS Message KI Administration Decision:                   1954       1935     1950           1948         1950   1951 15
 
0 Table 1 - Exercise Timeline DATE: 2008-06-24, SITE: Beaver Valley Power Station, PA Unusual Event                     N/A       N/A     N/A       N/A     N/A       N/A         *N/A Alert                             1625       1637     1642     1640   1642       1646         1641 Site Area Emergency               1800       1806     1806     1812   1813       1806   .1808 General Emergency                 1920       1926     1929     1926   1927       1928,         1926 Simulated Rad. Release Started               1810     1810     2010   1956       1955         1955 Simulated Rad. Release                       N/A     N/A       N/A   N/A         N/A           N/A Terminated Facility Declared Operational               1718     1658     1715   1710       1736         .17,26 0 Declaration of State of Emergency           N/R     1835     1835   1905.,:   :'N/R           1.905.
Exercise Terminated                     .1. 2048   2046     2052   2030       2048-..,     .2036 Early Precautionary Actions:                 N/R     1906     1900   N/R         N/R           1909 Ist Protective Action Decision:             1840     1837     1835   1832       1836           1830 Ist Siren Activation 1st EAS or   EBS Message                                     1947           _       ,,     ,__
2nd Protective Action Decision:             1950     1947             1945       1946           1945 2nd Siren Activation 2nd EAS or EBS Message 3rd Protective Action Decision:
3rd Siren Activation 3rd EAS or EBS Message KI Administration Decision:                 1947   1953   . 1954   1950       1954         .1950 0
16 a
 
Table 1 - Exercise Timeline DATE: 2008-06-24, SITE: Beaver Valley Power Station, PA Unusual Event                   N/A       N/A       N/A     N/A     N/A       N/A   N/A Alert                             1625     1645     1640     1642   1637       1640   1645 Site Area Emergency               1800     1810     1807     1809   1806       1806   1807 General Emergency                 1920     1930     1930     1930   1927       1928   1929 Simulated Rad. Release Started             1955       N/R     N/R     1806       N/R   N/R Simulated Rad. Release                     N/A       N/A     N/A     N/A       N/A   N/A Terminated Facility Declared Operational               I1700     1704     1713   1725       1724   1720 Declaration of State of Emeigency           1905     1859    N/R     N/R       1730   1905 Exercise Terminated                       2015     2050     2054     2020     2022   2028 Early PrecautionaryActions:                 N/R       N/R             N/R       N/R   N/R Ist Protective Action Decision:           1830     1834             1831       1832 1832 lst Siren Activation 1st EAS or EBS Message                 _                         _   _,
2nd Protective Action Decision:             1950     1947             1945     '1946 1945 2nd Siren Activation 2nd EAS or EBS Message 3rd Protective Action Decision:
3rd Siren Activation 3rd EAS or EBS Message KI Administration Decision:                 1952     1952     1952   1948       1949 *1950 17
 
a Table 1.- Exercise Timeline DATE: 2008-06-24, SITE: Beaver Valley Power Station, PA Unusual Event                         N/A         N/A           N/A.           N/A             N/A               N/A                 N/A Alert                                   1625       1647           1639           1636   .       1708               1701               .1658 Site Area Emergency                     1800       1807           1810           1800         .1809               1809             . 1808 General Emergency                       1920       1929           1922           1929           1940.             1928k               1920 Simulated Rad. Release Started                     N/R           1810       .N/R               1923               1928               N/R Simulated Rad. Release                             N/A             N/A           N/A             N/A               N/A                 N/A Terminated Facility Declared Operational     .               1759         .1750             1650       . 1730               1730       .       1721 0 Declaration of State of Emergency                 1.816           N/R           N/R ...       1-.:910             1903           . 1850 Exercise Terminated                               2018.     .. 2048.           2015     .     2036               2036
* 2050 Early Precautionary Actions:                       1905           N/R           N/R           1902               1927               N/R Ist Protective Action Decision:                   1840           1832           1840           1835.       '1835                       1833 1st Siren Activation Ist EAS or EBS Message                       ...                                         .     .....                           .
2nd Protective Action Decision:                   1947           1945           1947           1948               1950               1947 2nd Siren Activation 2nd EAS or EBS Message.                                 ....           ..       ....                         ...__._"__
3rd Protective Action Decision:
3rd Siren Activation             ...
3rd EAS or EBS Message ..           ...                           ........... ___.....
* ____     .__ ,_
KI Administration Decision:                       1950           1949           1951           1950.     .... 1953'               1950 0
18 0l
 
Table 1 - Exercise Timeline DATE: 2008-06-24, SITE: Beaver Valley Power Station, PA Unusual Event                               N/A       N/A       N/A     N/A     N/A   N/A Alert                                       1625     1648     1627     1627   1627 1630 Site Area Emergency                         1800     1809     1809     1809   1809 1805 General Emergency                 -       1920     1929     1922     1922     1922 1925, Simulated Rad. Release Started                 "     1939     1938     1938     1938 1805 Simulated Rad. Release                               N/A     N/A       N/A     N/A N/A Terminated Facility Declared Operational               .         1710     1650     1650     1650 1659 Declaration of State of Emergency             .       1846     1817     1817 .. 1817 1745 Exercise Terminated                                 2100     2155     2155   2155 2157 Early Precautionary Actions:                         1839     1833     1833     1833 1839 1st Protective Action Decision:                     1821     1829     1829   1829 1830 1st Siren Activation                                         1829             1829 1840 1st EAS or EBS Message ...       "   ......                   1829             1829 1843 2nd Protective Action Decision:                       1937     1938     1938   1938 1944 2nd Siren Activation                                           1938             1938 1950 2nd EAS or F'BS Message                                       1938             1938 1953 3rd Protective Action Decision:                               2100     2100   2100 N/A 3rd Siren Activation 3rd EAS or EBS Message KI Administration Decision:,                         1950. 1938             1938 1925 19
 
0
: 4. Exercise Evaluation and Results Contained in this section are the results and findings of the evaluation of all jurisdictions and functional entities that participated in the June 24, 2008 biennial Radiological Emergency Preparedness (REP) exercise. The exercise was held to test the offsite emergency response capabilities of local governments'in the 10-mile Emergency Planning Zone (EPZ) surrounding the Beaver Valley Power Station (BVPS).
Each jurisdiction and functional entity was evaluated on the basis of its demonstration of the exercise evaluation area criteria contained in the REP Exercise Evaluation, Methodology. Detailed information on the exercise evaluation area criteria and the extent-of-play agreement used in this exercise are found in. Appendix 3 of this report.
4.1. Summary Results of Exercisel Evaluation The matrix presented in Table, 2, onthefoillowing pages, pe'sents the -statusof the exercise evaluation area criteria from the REP Exercise Evaluation.Methodology that were scheduled for demonstration during this exercise-by all participating jurisdictionns-and functional entities. Exercise evaluation area criteria.are listed by .number and the demonstration status of the criteria is indicated by the use of the following letters::"
M Met (No Deficiency or ARCAs assessed and-no unresolved ARCAs from prior exercises)
A ARCA(s) assessed Al ARCA(s) assessed, but successfully re-demonstrated R Resolved ARCA(s) from prior exercises.
A ARCA(s) assessed Al ARCA(s) assessed, but successfully re-demonstrated R Resolved ARCA(s) from prior exercises.
20 a Table 2 -Summary of Exercise Evaluation (8 pages)U DATE: 2008-06-24 SITE: Beaver Valley Power Station, PA U UI U A:ARCA, D: Deficiency, M:Met > U WL M U LL -U M C/n 2nU M EmergencyOpciations Management 7 Mobilization lal M M M M M M M M M Facilities INb Direction and Control Icl M MM M M M Communications Equipment Idl M M M M M M M M M M Equip & Supplies to support operations lel M M M M M M M M M M Emergency Worker Exposure Control 2al M Radiological Assessment and PARs 2bl Decisionis for'the PlumePhase
20 a
:PADs -.-. 262 PADsfor protection of special populations  
 
.... M_2cI M Rad Assessment and Decision making for the Ingestion Exposure Pathway 2dl Rad Assessment and Decision making concerning Relocation, Reentry, and 2el Return Implementation of emergency worker exposure' control ' 3a MM M M M M M M M M Implementation'of KI bdecision', " .-' ,3bl. M M M M MIMIM M M M Implementation of protectiveactions for special populations  
Table 2 - Summary of Exercise Evaluation (8 pages)
-EOCs 3cl M A M M M Implementation of protective actions for Schools 3c2 M Implementation of traffic and access control 3df" M M M M, Impediments to evacuation are identified andresolved
U DATE: 2008-06-24 SITE: Beaver Valley Power Station, PA U         UI   U A:ARCA, D: Deficiency, M:Met                             >           U WL M U LL - U M C/n   2nU M EmergencyOpciations Management                                                                     7 Mobilization                                                               lal   M M       M M M M M M M Facilities                                                                 INb Direction and Control                                                     Icl               M MM M   M M Communications Equipment                                                   Idl   M M M M M M M M M M Equip & Supplies to support operations                                     lel     M   M   M M M M M M M M Emergency Worker Exposure Control                                         2al               M Radiological Assessment and PARs                                           2bl Decisionis for'the PlumePhase :PADs           -.-.                         262 PADsfor protection of special populations ....                                               M_2cI M
* 3,_,_.,_3d2  
Rad Assessment and Decision making for the Ingestion Exposure Pathway       2dl Rad Assessment and Decision making concerning Relocation, Reentry, and     2el Return Implementation of emergency worker exposure' control '                     3a     MM M M MM          M M M M Implementation'of KI bdecision',           "     .   -' ,3bl.                     M M M M MIMIM M M M Implementation of protectiveactions for special populations - EOCs         3cl               M A M     M M Implementation of protective actions for Schools                           3c2               M Implementation of traffic and access control                               3df"             M M     M   M, Impediments to evacuation are identified andresolved
'M M M M M M Implementation of ingestion t6athway decisions  
* 3,_,_.,_3d2     'M M M M     M M Implementation of ingestion t6athway decisions - availability/use of info 3el Materials for lngestion*Pathway PADs are available                         3e2 Implementation of relocation, re-entry, and return decisions.             3fl Field                 i                     .     :#
-availability/use of info 3el Materials for lngestion*Pathway PADs are available 3e2 Implementation of relocation, re-entry, and return decisions.
Adequate Equipment for Plume Phase Field Measurements                     4al     M M Field Teams obtain sufficient information                                 4a2     M   M Field Teams Manage Sample Collection Appropriately                         4a3     M M Post plume phase field measurements and sampling                           4bl Laboratory operations                                                     4c I
3fl Field i .:#Adequate Equipment for Plume Phase Field Measurements 4al M M Field Teams obtain sufficient information 4a2 M M Field Teams Manage Sample Collection Appropriately 4a3 M M Post plume phase field measurements and sampling 4bl Laboratory operations 4c I..me. .. ...No .ificati.
..me.   ..No... .ificati.
n a. d Public f Into .Activation of the prompt alert and notification system., 5al 1 M M M M M1 Activation of the prompt alert and notification system -Fast Breaker 5a2 I Activation of the prompt alert and notification system -Exception areas 5a3 M M Emergency information and instructions for the public and the media-. 5bl M .M iiPpdiiOperutiuns/ffacil ,ities.Mon/ decon of evacuees and emergency workers, and registration of evacuees 6a]Mon / decon of emergency worker equipment 6bl Temporary care of evacuees 6c I Transportation and treatment of contaminated injured individuals 6dl 21 0 Table 2 -Summary of Exercise Evaluation (Continued.
n a. d Public Into f                                                             .
page 2/8)©0 DATE: 2008-06-24 SITE: Beaver Valley Power Station, PA" U M U W) U U" A: ARCA, D: Deficiency, M: Met 0 0 Mobilization lal M M M M MM M M M M Facilities IN b_ M Direction and Control Icl M M M M M _ M M M Communications Equipment Idl M M M M M M M M M M Equip & Supplies to support operations lel M M M M M M M M M M Emergency Worker Exposure Control 2al Radiological Assessment and PARs 2bl ---Decisions for the Plume Phase*:PADs*
Activation of the prompt alert and notification system.,                   5al             1   M M M     M M1 Activation of the prompt alert and notification system - Fast Breaker     5a2             I Activation of the prompt alert and notification system - Exception areas   5a3                         M       M Emergency information and instructions for the public and the media-.     5bl   M     .     M iiPpdiiOperutiuns/ffacil ,ities.
2b2 ...PADs for protection of special populations 2c I ." Rad Assessment and Decision making for the Ingestion Exposure'Pathhway.
Mon/ decon of evacuees and emergency workers, and registration of evacuees 6a]
2dl 'Rad Assessment and Decision making concerning Relocation, Reentry, and 2el' I Return ... ... ....Protective ActionIlmplemrientation
Mon / decon of emergency worker equipment                                 6bl Temporary care of evacuees                                                 6c I Transportation and treatment of contaminated injured individuals           6dl 21
: ,:.......Implementation of emergency Worker exposure control 3a I M M M M M M M M M M Implementation of KI decision .... .....3 M M M M M M M M M M Implementation of protective actions for special populations  
 
-3cl M M M M M M M M Implementation of protective actions for Schools 3c2 Implementation of traffic and access control ............  
0 Table 2 - Summary of Exercise Evaluation (Continued. page 2/8)
....... 3di M -___" M Impediments to evacuation are identified and resolved 3d2 M M M M M M M M Implementation of ingestion pathway decisions  
                                                                                                                          © 0
-availability/use of info 3el Materials for Ingestion Pathway PADs are available  
DATE: 2008-06-24 SITE: Beaver Valley Power Station, PA
..3e2 -Implementation of relocation, re-entry, and return decisions.
                                            "                                                               U     M         U     W)   U U" A: ARCA, D: Deficiency, M: Met                                                       0                               0 Mobilization                                                                                   lal   M M           M M MM           M M M   M Facilities                                                                                       b_
3f IF-Field:Measurement: Aas Adequate Equipment for Plume Phase Field Measurements' 4a" Field Teams obtain sufficient information 42 " Field Teams Manage Sample Collection Appropriately 4a3 Post plume phase field measuremnents and sampling 4bI Laboratory operations  
IN                                 M Direction and Control                                                                           Icl   M M                 M M_ M   M     M M Communications Equipment                                                                       Idl   M M M               M M M     M M M   M Equip & Supplies to support operations                                                         lel   M M M               M M M     M M M M Emergency Worker Exposure Control                                                             2al Radiological Assessment and PARs                                                               2bl   ---
....4c1 Activation of the prompt alert and notification system 5al M M M1M M M M M Activation of the prompt alert and notification system -Fast Breaker 5a2 Activation of the prompt alert and hotification system -Exception areas 5a3 M M Emergency information and instructions for the public and the media 5b.Mon / decon of evacuees and emergency workers, and registration of evacuees 6a I " -I " Mon / decon of emergency Worker equipment 6bl --.Temporary care of evacuees 6cl Transportation and treatment of contaminated injured individuals 6dl -0 0 22 a Table 2 -Summary of Exercise Evaluation (Continued.
0 Decisions for the Plume Phase*:PADs*                                                           2b2 .             ..
page 3/8)r T DATE: 2008-06-24  
PADs for protection of special populations                                                     2c I           .         "
< <SITE: Beaver Valley Power Station, PA U=A: ARCA, D: Deficiency, M: Met C) W 6 W Emergency Operatons Management Mobilization lal M M M M M M M M M Facilities INb Direction and Control Icl M M M M M M M Communications Equipment .Idl M M M M M M M M M Equip & Supplies to support operations lel M M M M M M M M M M Pi otecteAction.
Rad Assessment and Decision making for the Ingestion Exposure'Pathhway.                       2dl           '
ecic. son a, .,. , Emergency Worker Exposure Control 2al Radiological Assessment and PARs 2bl Decisions for the Plume Pha-se -PADs .2b2 PADs for protection of special populations 2c I Rad Assessmient and Decision m-akinrg for the-Ingestion Exposure Pathway 2dl Rad Assessment and Decision making conce'rning Relocation, Reentry, and 2e1 I Return Protective Action lriibIameiitation.
Rad Assessment and Decision making concerning Relocation, Reentry, and                         2el'I Return                 . ..                                                   .           ..                 .     . ..
Implementation of emergency worker exposurecontrol  
Protective ActionIlmplemrientation   :                                           ,:.......
.... 3al M M M M M M M M M M Implementation of KI decision -3bl M M M M M M M M M Implementation of protective actons for special populations  
Implementation of emergency Worker exposure control                                           3a I   M     M M         M M     M M M   M M Implementation of KI decision             .               .   ..         .....               3     M     M M M M               M M M   M M Implementation of protective actions for special populations - EO*Cs                          3cl   M     M           M M M M         M M Implementation of protective actions for Schools                                               3c2 Implementation of traffic and access control ............         .......                     3di   M       -___"                         M Impediments to evacuation are identified and resolved                                         3d2   M M                 M M M     M     M M Implementation of ingestion pathway decisions - availability/use of info                       3el Materials for Ingestion Pathway PADs are available ..                                         3e2                           -
-EOCs 3cl M M M M M M M Implementation of protective actions for Schools- 3c2 Implementation~of traffic and-access control " .3dl M M M Impediments to evacuation are identifiediand resolved " 3d2 M M M M M M M Implementation of ingestion pathway decisioins  
Implementation of relocation, re-entry, and return decisions.                                 3f IF-Field:Measurement:     Aas
-availability/use of info ......3el Materials for Ingestion Pathway PADs are'available  
* Adequate Equipment for Plume Phase Field Measurements'                                         4a" Field Teams obtain sufficient information                                                     42       "
-3e2 Implementation of relocation, re-entry; andreturn decisions:
Field Teams Manage Sample Collection Appropriately                                             4a3 Post plume phase field measuremnents and sampling                                             4bI Laboratory operations               ....                                                     4c1 Activation of the prompt alert and notification system                                         5al   M     M           M1M       M M     M M Activation of the prompt alert and notification system - Fast Breaker                         5a2 0
3fl Adequate Equipment for Plume-Phase Field Measurements 4al Field Teams obtain sufficient information  
Activation of the prompt alert and hotification system - Exception areas                       5a3               M                     M Emergency information and instructions for the public and the media                           5b.
-4a2 Field Teams Manage Sample Collection Appropriately 4a3 Post plume phase field measurements and sampling 4bl " Laboratory operations  
Mon / decon of evacuees and emergency workers, and registration of evacuees                   6a II      "               -   "
.4c0 *Emergenc~y Notification and Public tnf A &/( ,, .., Activation of the prompt alert and notification system 5al M M M M M M M Activation of the prompt'alert and notification system -FastBreaker 5a2 Activation of the prompt alert and notification system -Exception areas 5a3 M -M Emergency information and instructions for the' public and the media 5bl Support Operanions/Facilt  
Mon / decon of emergency Worker equipment                                                     6bl       -             -.
!ies Mon / decon of evacuees andemergencyworkers, and registration of evacuees 6al M Mon / decon of emergency worker equipment  
Temporary care of evacuees                                                                     6cl Transportation and treatment of contaminated injured individuals                               6dl                   -
-6b I M Temporary care of evacuees 6c I Transportation and treatment of contaminated injured individuals 16dI 23 0 Table 2 -Summary of Exercise Evaluation (Continued.
22 a
page 4/8)LL.DATE: 2008-06-24 SITE: Beaver Valley Power Station, PA A: ARCA, D: Deficiency, M: Met 0 U 0 U 0 U U U Emergency Operations Mana>gteht  
 
&1 Mobilization lal M _ M M Facilities INb Direction and Control I 'd M M M Communications Equipment Idi d _ M M M Equip & Supplies to support operations lel M M M M Emergency Worker Exposure Control 2al Radiological Assessment and PARs 2bl........
Table 2 - Summary of Exercise Evaluation (Continued. page 3/8) rT DATE: 2008-06-24                                       <         <
Decisions for the Plume Phase -PADs. 2b2 PADs for protection of special populations  
SITE: Beaver Valley Power Station, PA                                                     U=
.. .2c l Rad Assessment and Decision making for the Ingestion Exposure Pathway 2d ... ..Rad Assessment and Decision making concerning Relocation, Reentry, and 2eI Return .Protective Action Imptementation Implementation of emergency-Worker exposure control 3al"M .M M Implementation of KI decisi6n , 3bl Implementation of protective actions for special populations  
A: ARCA, D: Deficiency, M: Met                                                     C) W 6 W Emergency Operatons Management Mobilization                                                                         lal M M M M M M M M M Facilities                                                                           INb Direction and Control                                                               Icl         M     M M M M M M Communications Equipment             .Idl                                                 M M M M M M M M M Equip & Supplies to support operations                                               lel   M M M M M M M M M M Pi otecteAction. ecic. son     a,               .     ,.                                         ,
-EOCs 3 .Implementation of protective actions for Schools "-3c2 .Implementation of traffic and access control 3dI Impediments to evacuation are identified and resolved ........ ...3d2. ...Implementation of ingestion-pathway decisions  
Emergency Worker Exposure Control                                                   2al Radiological Assessment and PARs                                                     2bl Decisions for the Plume Pha-se -PADs .                                               2b2 PADs for protection of special populations                                           2c I Rad Assessmient and Decision m-akinrg for the-Ingestion Exposure Pathway             2dl Rad Assessment and Decision making conce'rning Relocation, Reentry, and             2e1I Return Protective Action lriibIameiitation.
-availability/use of info 3el Materials for Ingestion Pathway PADs are available 3e2 Implementation of relocation, re-erntt, and return decisions.
Implementation of emergency worker exposurecontrol           ....                   3al   M M M M M M M M M M Implementation of KI decision -                                                     3bl   M M M M M M M M M Implementation of protective actons for special populations - EOCs                 3cl         M     M M M M M M Implementation of protective actions for Schools-                                   3c2 Implementation~of traffic and-access control             ".                       3dl         M       M M Impediments to evacuation are identifiediand resolved                   "         3d2         M     M M M M M M Implementation of ingestion pathway decisioins - availability/use of info ...... 3el Materials for Ingestion Pathway PADs are'available                               - 3e2 Implementation of relocation, re-entry; andreturn decisions:                       3fl Adequate Equipment for Plume-Phase Field Measurements                               4al Field Teams obtain sufficient information     -                                   4a2 Field Teams Manage Sample Collection Appropriately                                 4a3 Post plume phase field measurements and sampling                                   4bl                     "
3f1`Adequate Equipment for'Plumie Phase Field Measurements 4a..........
Laboratory operations .                                                             4c0
Field Teams obtain sufficient information 4a2 Field Teams Manage SampleCollection Appropriately  
* Emergenc~y Notification and Public tnf ,,    A     &/(                                         .   . ,
.. 4a3 Post plume phase field measurements and sampling 4b" Laboratory operations  
Activation of the prompt alert and notification system                             5al       M       M M M M M M Activation of the prompt'alert and notification system - FastBreaker               5a2 Activation of the prompt alert and notification system - Exception areas           5a3   M -     M Emergency information and instructions for the' public and the media               5bl Support Operanions/Facilt                                         !ies                 i*
".. 4c I Activation of the prompt alert and notification system 5al Activation of the prompt alert and notification system -Fast Breaker 5a2 Activation of the prompt alert and *notification system -Exception' areas 5a3-.. ..Emergencv information and instructions for the public~ahd the media " '"'5bl 'Mon / dlecon of evacuees and emergency workers, and registration of evacuees" 6al'M M M M M Mon / decon of emergency worker equipment " "6bl M .,1,.......
Mon / decon of evacuees andemergencyworkers, and registration of evacuees           6al                             M Mon / decon of emergency worker equipment           -                               6b I                           M Temporary care of evacuees                                                         6c I Transportation and treatment of contaminated injured individuals                   16dI 23
Temporary care of evacuees 6c. .........M M Transportation and treatment of contaminated injured individuals " 6dl I a 24 a Table 2 -Summary of Exercise Evaluation (Continued.
 
page 5/8)DATE: 2008-06-24 SITE: Beaver Valley Power Station, PA U.A: ARCA, D: Deficiency, M: Met U Lon Emergenicy 01r)ion-Managment Mobilization lal M Facilities INb Direction and Control Idc M Communications Equipment IdI M Equip & Supplies to support operations lel M ProtcieAcition Decision making ~ ~ ~ < V _____Emergency Worker Exposure Control 2al Radiological Assessment and PARs 2bl Decisions for the Plume Phase -PADs .2b2 PADs for protection of special populations 2c I Rad Assessment-and Decision making foi the Ingestion Exposure Pathway 2dl Rad Assessment and Decision making concerning Relocation, Reentry, and 2el Return ,t Implementation of emergency worker exposure control 3al M M Implementation of KI decision 3bI Implementation of protective actions for special populations  
0 Table 2 - Summary of Exercise Evaluation (Continued. page 4/8)
-EOCs 36 Implementation bf protective actions for Schools 3c2 M M M Implementation of traffic and access-control
LL.
* 3d1 Impediments to evac'uation are identified and resolved 3d2 Implementation of ingestion pathway decisions  
DATE: 2008-06-24 SITE: Beaver Valley Power Station, PA A: ARCA, D: Deficiency, M: Met                                                       0 U 0 U 0 U U                 U Emergency Operations Mana>gteht     &#x17d;&1 Mobilization                                                                               lal               M     _               M       M Facilities                                                                                 INb Direction and Control                                                                     I     'd         M                     M       M Communications Equipment                                                                   Idi d       _       M                     M       M Equip & Supplies to support operations                                                     lel     M M                           M       M Emergency Worker Exposure Control                                                         2al Radiological Assessment and PARs                                                         2bl........
-availability/use of info
Decisions for the Plume Phase -PADs.                                                     2b2 PADs for protection of special populations       ..                                 . 2c l Rad Assessment and Decision making for the Ingestion Exposure Pathway                     2d           ...                     ..
* 3el Materials for Ingestion Pathway PADs are available  
Rad Assessment and Decision making concerning Relocation, Reentry, and                   2eI Return               .
.3e2 -Implementation of relocation, re-entry; and return decisions.
Protective Action Imptementation Implementation of emergency-Worker exposure control                                       3al"M .                           M           M Implementation of KI decisi6n             ,                                               3bl Implementation of protective actions for special populations - EOCs                       3             .
3f I Adequate Equipment for-Plume Phase Field Measurements 14a I Field Teams obtain sufficient information 4a2 Field Teams Manage SampleCollection Appropriately  
Implementation of protective actions for Schools                                       "-3c2       .
.4a3 .Post plume phase field measurements and sampling.
Implementation of traffic and access control                                             3dI Impediments to evacuation are identified and resolved ........               ...         3d2.           .       ..
4bi Laboratory operations 4cl Activation of the prompt alert and notification system 5al Activation of the prompt alert-and-notification system -Fast Breaker 5a2 Activation of the prompt alert and notification system -Exception areas 5a3 Emergency information and instructions for the public and the media 5b I T_Suppoirt Operatdons/Facilities  
Implementation of ingestion-pathway decisions - availability/use of info                 3el Materials for Ingestion Pathway PADs are available                                       3e2 Implementation of relocation, re-erntt, and return decisions.                             3f1`
-,,- " " .i Mon / decon of evacuees~and-emergency workers, and registration of evacuees 6al M M I M M Mon / decon of emergency wbrker equipment  
Adequate Equipment for'Plumie Phase Field Measurements                                   4a..........
." 6bl Temporary care of evacuees 6c I M M Transportation and treatment of contaminated injured individuals 6d1 25 Table 2 -Summary of Exercise Evaluation (Continued.
Field Teams obtain sufficient information                                                 4a2 Field Teams Manage SampleCollection Appropriately ..                                     4a3 Post plume phase field measurements and sampling                                         4b" Laboratory operations "..                                                                 4c I Activation of the prompt alert and notification system                                   5al Activation of the prompt alert and notification system - Fast Breaker                     5a2 Activation of the prompt alert and *notification system - Exception' areas               5a3-..               .       .                   a Emergencv information and instructions for the public~ahd the media "           '"'5bl                                 '
page 6/8)DATE: 2008-06-24 SITE: Beaver Valley Power Station, PA U-" A: ARCA, D: Deficiency, M:Met < < <Emergenc, Operations Managemet .c, ..Mobilization lal Facilities INb Direction and Control Idc1 Communications Equipment  
Mon / dlecon of evacuees and emergency workers, and registration of evacuees"           6al'M             M       M               M   M Mon / decon of emergency worker equipment                                 "         "6bl         M       .       ,1,.......
... Id1 Equip & Supplies to support operations lel Protective Acion DecisionMakini:
Temporary care of evacuees                                                               6c.         .........               M       M Transportation and treatment of contaminated injured individuals                   "   6dl                   I 24 a
g .. : g ... I J' ;. I >, ,: Emergency Worker Exposure Control 2al Radiological Assessment and PARs 2bl Decisions for the Plume Phase -PADs 2b2 PADs for protection of special populations 2c I6 Rad Assessment and Decision making for the Ingestion Exposure Pathway 2di Rad Assessment and. Decision making concerning Relocation; Reentry, and 2el Return ...Implementation of emergency worker exposure control. 3al Implementation of KI decision 3bL..Implementation of protective actions for special populations.-
 
EOCs 3cl " Implementation of protective actions for Schools .3c2; M M.M M M M.M' M M M Implementation of traffic and access control 3d1 -Impediments to evacuation are identified and resolved,.  
Table 2 - Summary of Exercise Evaluation (Continued. page 5/8)
.. 3d2 Implementation of ingestion pathway'decisions.-
DATE: 2008-06-24 SITE: Beaver Valley Power Station, PA                                               U.
availability/use of info ...,.. 3el ...... .Materials for Ingestion Pathway PADs are available  
A: ARCA, D: Deficiency, M: Met                                                 U           Lon Emergenicy 01r)ion-Managment Mobilization                                                                       lal             M Facilities                                                                         INb Direction and Control                                                             Idc             M Communications Equipment                                                           IdI             M Equip & Supplies to support operations                                             lel             M ProtcieAcitionDecisionmaking              ~       ~         ~     <       V         _____
............
Emergency Worker Exposure Control                                                 2al Radiological Assessment and PARs                                                 2bl Decisions for the Plume Phase -PADs .                                             2b2 PADs for protection of special populations                                       2c I Rad Assessment-and Decision making foi the Ingestion Exposure Pathway             2dl Rad Assessment and Decision making concerning Relocation, Reentry, and           2el Return                                                       ,t Implementation of emergency worker exposure control                               3al       M         M Implementation of KI decision                                                     3bI Implementation of protective actions for special populations - EOCs               36 Implementation bf protective actions for Schools                                 3c2                       M M M Implementation of traffic and access-control
3e2 ....Implementation of relocation, re-entry.
* 3d1 Impediments to evac'uation are identified and resolved                           3d2 Implementation of ingestion pathway decisions - availability/use of info
and return decisions.....  
* 3el Materials for Ingestion Pathway PADs are available .                             3e2           -
-' ..3f I' ' " Adequate Equipment for Plume.Phase Field Measurements  
Implementation of relocation, re-entry; and return decisions.                   3f I Adequate Equipment for-Plume Phase Field Measurements                           14a I Field Teams obtain sufficient information                                         4a2 Field Teams Manage SampleCollection Appropriately               .               4a3             .
...' .4af ' "-Field Teams obtain sufficient information  
Post plume phase field measurements and sampling.                                 4bi Laboratory operations                                                             4cl Activation of the prompt alert and notification system                           5al Activation of the prompt alert-and-notification system - Fast Breaker             5a2 Activation of the prompt alert and notification system - Exception areas         5a3 Emergency information and instructions for the public and the media Suppoirt Operatdons/Facilities -,,-       i                                  "
............
5b I T_
4a2 .. ... ....Field Teams Manage Sample Collection Appropriately  
Mon / decon of evacuees~and-emergency workers, and registration of evacuees       6al     M MI        M M Mon / decon of emergency wbrker equipment                       ."               6bl Temporary care of evacuees                                                       6c I           M       M Transportation and treatment of contaminated injured individuals                 6d1 25
..........
 
:. 4a3 .Post plume phase field measurements and sampling 4bi .Laboratory operations  
Table 2 - Summary of Exercise Evaluation (Continued. page 6/8)
... .... .... 4c I Activation of the prompt alert and notification system ..... 5al Activation of the prompt alert and notification system -Fast Breaker' 5a2 Activation of the prompt alert and notificationf system -Exception.areas 5a3 Emergency information and instructions for the public and the media' .' .5bl Mon / decon of evacuees and emergency workers, and registrationof evacuees .6al.Mon / de'con of emergency worker equipment  
DATE: 2008-06-24 SITE: Beaver Valley Power Station, PA                                                                                           U A: ARCA, D: Deficiency, M:Met                                                                                           < < <
.6bl Temporary care of evacuees 6c 1 Transportation and treatment of contaminated injured individuals " .6dl 0 40 26 61 Table 2 -Summary of Exercise Evaluation (Continued.
Emergenc, Operations Managemet                                       .c,                             ..
page 7/8)DATE: 2008-06-24 SITE: Beaver Valley Power Station, PA () ( w A: ARCA, D: Deficiency, M: Met L>EmnergencyOperations Management  
Mobilization                                                                                                   lal Facilities                                                                                                       INb Direction and Control                                                                                           Idc1 Communications Equipment                                                     .       ..                         Id1 Equip & Supplies to support operations                                                                           lel Protective Acion DecisionMakini: g ..                   :                                                       .       ..       I         J'     ;. I >, ,:
.: Mobilization lal M M Facilities INb Direction and Control icI M M Communications Equipment ldl M M Equip & Supplies to support operations lel M M Protecuive -ctimon Decosion Making ..: Emergency Worker Exposure Control .2al M .M Radiological Assessment and PARs 2bl ,M M Decisions for the Plume Phase -PADs 2b2 M PADs for protection of special populations 2clI M Rad Assessment and Decision making for the Ingestion Exposure Pathway 2dl Rad Assessment and Decision making concerning Relocation, Reentry, and,, 2el Return Protectlive Act ion Irhplernentation Implementation of emergency worker exposure control 3al', Implementation of KI decision 3b1 M Implementation of protective actions for special populations  
Emergency Worker Exposure Control                                                                               2al Radiological Assessment and PARs                                                                               2bl Decisions for the Plume Phase -PADs                                                                             2b2 PADs for protection of special populations                                                                     2c I6 Rad Assessment and Decision making for the Ingestion Exposure Pathway                                           2di 0
-EOCs 3c1 Implementation of.protective actions for Schools 3c2 M M M M M M M Implementation of traffic and access control 3dl .Impediments to evacuation are identified and resolved 3d2 Implementation of ingestion pathway decisions-availability/use of info. 3ef Materials for Ingestion Pathway PADs are available 3e2 Implementation of relocation, re-entry, and return decisions..  
Rad Assessment and. Decision making concerning Relocation; Reentry, and                                         2el Return               .         .                                             .
.. 3f I Fielid Measrement and A nila\> 'Srr Adequate Ejuipment for Plume Phase Field Measurements 4al. .Field Teams obtain sufficient information 4a2' M Field Teams Manage Sample Collection Appropriately  
Implementation of emergency worker exposure control.                                                           3al Implementation of KI decision                                                                                   3bL..
..4a3 Post plume phase field measurements'and sampling 4bi Laboratory operations 4cl' Notificatida la ... .....Activation of the prompt alert and notification system 5a1,, Activation of the alert and notification system -Fast Breaker 5a2, Activation of the prompt alert and notification system -Exception areas. 5a3 Emergency information and instructions for the-public and the media 5bl .M M Supprt6 erations&i&#xfd;daw2,K  
Implementation of protective actions for special populations.- EOCs                                             3cl                     "
~<Mon/ decon of evacuees andemergency workers, and registration of evacuees 6ai Mon / decon'of emergency worker equipment 6bl Temporary care of evacuees 6c1 Transportation and treatment of contaminated injured individuals  
Implementation of protective actions for Schools                                                               .3c2; M M.M                 M M M.M' M M M Implementation of traffic and access control                                                                   3d1           -
.... 6dl 27 Table 2 -Summary of Exercise Evaluation (Continued.
Impediments to evacuation are identified and resolved,.               ..                                       3d2 Implementation of ingestion pathway'decisions.- availability/use of info                         .     .. ,.. 3el     .               .....                     .
page 8/8)UU DATE: 2008-06-24  
Materials for Ingestion Pathway PADs are available             ............                                   3e2         ....
". z SITE: Beaver Valley Power Station, PA , <U A: ARCA, D: Deficiency, M: Met W. Z En => U U U U U U U U U Emergency Operations Managiement Mobilization lal M M _Facilities IbI Direction and Control I I M Communications Equipment Idl M M M M Equip & Supplies to support operations let M MM M M Protective Action Decision Ming Emergency Worker Exposure Control 2al M M.Radiological Assessment and PARs 2bl Decisions for the Plume Phase -PADs " 2b2 PADs for protection of special populations  
Implementation of relocation, re-entry. and return decisions.....                   -         '.             . 3f I'                                         '     "
.2c I M Rad Assessmentand Decision making for the Irngestion Exposurr Pathway. 2dl Rad Assessment and Decision making concerning Relocation, Reentry, and .2el " Return Protective-Action tImplementtion  
Adequate Equipment for Plume.Phase Field Measurements                     .       ..       '             . 4af     '                                 "-
~>Implementation of emergency worker exposure control, 3al- -,M M M M, M -M M.Implementation of KI decision 3bi M M M M Ihmplementation of protedjive~actions for special populatiojis-EOCs " 3c1 M Implementation of protective-actions for Schools -3c2 M, M M Implementation of traffic and access control 3d .M M Impediments to evacuation are identified and resolved ' 3d2 M M Implementation of ingestion pathway decisions  
Field Teams obtain sufficient information     ............                                                     4a2             ..         ...     ....
-availability/use of info 3el Materials for Ingestion Pathway PADs are available 3e2 Implementation of relocation, re-entry.
Field Teams Manage Sample Collection Appropriately               ..........                               :. 4a3                           .
and return decisions.
Post plume phase field measurements and sampling                                                               4bi                                       .
13f1 FeldMeasurement .....Adequate Equipment for Plume Phase Field Measurements.
Laboratory operations       ...         .               . ..                 .             ...             4c I Activation of the prompt alert and notification system                                 .....                   5al Activation of the prompt alert and notification system - Fast Breaker'                                         5a2 Activation of the prompt alert and notificationf system - Exception.areas                                       5a3 Emergency information and instructions for the public and the media' .                             '.         5bl                                                   40 Mon / decon of evacuees and emergency workers, and registrationof evacuees                                 . 6al.
4a: M Field Teams obtain sufficient information 4a2 M.Field Teams Manage Sample Collection Appropriately 4a3 M Post plume phase field measurements and sampling 4bl Laboratory operations  
Mon / de'con of emergency worker equipment           .                                                         6bl Temporary care of evacuees                                                                                     6c 1 Transportation and treatment of contaminated injured individuals                 "     .                       6dl 26 61
-4c I Emergency Notifiiata u .... I....Activation of the prompt alert and notification system 5al M Activation of the prompt alert and notification system -Fast Breaker 5a2 Activation of the prompt alert and notification system -Exception areas 5a3 M Emergency information and instructions for the public and the media 5b1 M Mon / decon of evacuees and emergency workers, and registration of evacuees 6al M7 M M Mon / decon of emergency worker equipment 6b I M Temporary care of evacuees 6c" M Transportation and treatment of contaminated injured individuals 6dl 0 0 28 61 4.2. Status of Jurisdictions Evaluated B. Status of Jurisdictions Evaluated This subsection provides information on the evaluation of each participating and functional entity in a jurisdiction-based, issues-only format. Presented below are definitions of the terms used in this subsection relative to criteria demonstration status.Met -Listing of the demonstrated exercise evaluation area criteria under which no Deficiencies or ARCAs were assessed during this exercise and under which no ARCAs assessed during prior exercises remain unresolved.
 
Deficiency,-
Table 2 - Summary of Exercise Evaluation (Continued. page 7/8)
Listing of the demonstrated exercise evaluation area criteria under which one or more Deficiencies Were Assessed during this exercise.
DATE: 2008-06-24 SITE: Beaver Valley Power Station, PA                                           ()   w  (
Included, is a description of each Deficiency and recommended corrective actions.Area Requiring Corrective Action -Listing of the demonstrated exercise evaluation area criteria under which one or more ARCAs were assessed during the cUrrent exercise.Included is a description of the ARCAs assessed during this, exercise, and the recommended corrective actions to be demonstrated before or during-the next biennial exercise.Not Demonstrated  
A: ARCA, D: Deficiency, M: Met                                       L>
-Listing ofthe exercise evaluation area criteria that were scheduled to be demonstrated during this exercise, but were not demonstrated andthe reason they were not demonstrated.  
EmnergencyOperations Management                                         .:
.Prior ARCAs -Resolved -Descriptions of ARCAs assessed during previous.
Mobilization                                                               lal                     M M Facilities                                                                 INb Direction and Control                                                       icI                     M       M Communications Equipment                                                   ldl                     M       M Equip & Supplies to support operations                                     lel                     M       M Protecuive-ctimon Decosion Making                                                               . .   :
exercises that were resolved in this exercise and the corrective actions demonstrated.
Emergency Worker Exposure Control                               .         2al                     M   . M Radiological Assessment and PARs                                           2bl     ,M                     M Decisions for the Plume Phase -PADs                                         2b2                     M PADs for protection of special populations                                 2clI                   M Rad Assessment and Decision making for the Ingestion Exposure Pathway       2dl Rad Assessment and Decision making concerning Relocation, Reentry, and,,   2el Return Protectlive Act ion Irhplernentation Implementation of emergency worker exposure control                       3al',
Prior ARCAs -Unresolved  
Implementation of KI decision                                             3b1                     M Implementation of protective actions for special populations - EOCs       3c1 Implementation of.protective actions for Schools                           3c2 M M M M M M M Implementation of traffic and access control                               3dl Impediments to evacuation are identified and resolved                     3d2 Implementation of ingestion pathway decisions- availability/use of info. 3ef Materials for Ingestion Pathway PADs are available                         3e2 Implementation of relocation, re-entry, and return decisions..       .. 3f I Fielid Measrement and A 'Srr nila\>
-Descriptions of ARCAs assessed during prior exercises that were not resolved in this exercise.
Adequate Ejuipment for Plume Phase Field Measurements                     4al..
Included are the reasons the ARCAs remain unresolved and:recommended corrective actions to be demonstrated before or during the next biennial exercise.The following are definitions of the two types of exercise issues that are discussed in this report.A Deficiency is defined in the FEMA-REP-14 as "...an observed or identified inadequacy 29 0 of organizational performance in an exercise that could cause a finding that offsite emergency preparedness is not adequate to provide reasonable assurance that appropriate protective measures can be taken in the event of a radiological emergency to protect the health and safety of the public living in the vicinity of a nuclear power plant." An ARCA is defined in the FEMA-REP-14 as "...an observed or identified inadequacy of organizational performance in an exercise that is not considered, by itself, to adversely impact public health and safety." The Federal Emergency Management Agency (FEMA) has developed a standardized system for numbering exercise issues (Deficiencies and ARCAs).This System is used to achieve consistency in numbering exercise issues among FEMA Region, and site-specific exercise reports within each Region. It is also used to expedite tracking of exercise issues on a nationwide basis.The identifying number for Deficiencies and ARCAs includes the following"elements,l with each element separated by a hyphen (-).Plant Site Identifier  
Field Teams obtain sufficient information                                 4a2'                             M Field Teams Manage Sample Collection Appropriately ..                     4a3 Post plume phase field measurements'and sampling                           4bi Laboratory operations                                                     4cl' Emerget*cy: Notificatida             la                                         . :::Public*'
-A two-digit number corresponding to the Utility Billable'Plant Site Codes. " Exercise Year -The last two digits of the year.the exercise was conducted.
Activation of the prompt alert and notification system                     5a1,,
Evaluation Area Criterion  
Activation of the p*rompt alert and notification system - Fast Breaker     5a2, Activation of the prompt alert and notification system - Exception areas. 5a3 Emergency information and instructions for the-public and the media       5bl .                   M M Supprt6 erations&i&#xfd;daw2,K                                         ~<
-A letter and number corresponding to the criteria in the FEMA REP'Exercise Evaluation Methodology.
Mon/ decon of evacuees andemergency workers, and registration of evacuees 6ai Mon / decon'of emergency worker equipment                                 6bl Temporary care of evacuees                                                 6c1 Transportation and treatment of contaminated injured individuals ....     6dl 27
Issue Classification Identifier  
 
-(D = Deficiency, A = ARCA). Only Deficiencies and ARCAs are included in exercise reports.Exercise Issue Identification Number -A separate two digit indexing number assigned to each issue identified in the exercise.30 4.2.1. State Jurisdictions 4.2.1.1. Beaver Valley Joint Public Information Center a. MET: 5.b.1.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
Table 2 - Summary of Exercise Evaluation (Continued. page 8/8)
None d. NOT DEMONSTRATED:
UU DATE: 2008-06-24                                                   ".       z SITE: Beaver Valley Power Station, PA                                 ,     <U A: ARCA, D: Deficiency, M: Met                                       W.       Z       En =
None e. PRIOR ISSUES -RESOLVED:
                                                                                        >   U U U   U U U U U U Emergency Operations Managiement Mobilization                                                                     lal M M _
None f. PRIOR ISSUES -UNRESOLVED:
Facilities                                                                        IbI Direction and Control                                                           I I         M Communications Equipment                                                         Idl M M M M Equip & Supplies to support operations                                           let   M MM M           M Protective Action Decision Ming Emergency Worker Exposure Control                                               2al   M M.
None 4.2.1.2. PA State Field Monitoring Team A, South West Region, ;, .,, ,.a. MET: 1.a.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 4.a.1, 4.a.2, 4.a.3.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
Radiological Assessment and PARs                                                 2bl Decisions for the Plume Phase -PADs                                         " 2b2                                   0 PADs for protection of special populations                                     .2c I       M Rad Assessmentand Decision making for the Irngestion Exposurr Pathway.           2dl Rad Assessment and Decision making concerning Relocation, Reentry, and       .2el         "
None d. NOT DEMONSTRATED:
Return Protective-Action tImplementtion ~>
None e. PRIOR ISSUES -RESOLVED:
Implementation of emergency worker exposure control,                             3al- -,M   M M M, M -M   M.
None f. PRIOR ISSUES t-UNRESOLVED:
Implementation of KI decision                                                   3bi M     M M M Ihmplementation of protedjive~actions for special populatiojis- EOCs     "       3c1       M Implementation of protective-actions for Schools                               -3c2         M,                 M M Implementation of traffic and access control                                   3d .       M M Impediments to evacuation are identified and resolved                           '3d2       M M Implementation of ingestion pathway decisions - availability/use of info         3el Materials for Ingestion Pathway PADs are available                               3e2 Implementation of relocation, re-entry. and return decisions.                     13f1 FeldMeasurement andAnalysis-:Jj-*,        .     ....
None 4.2.1.3. PA State' Field Monitoring Team B, South West Region a. MET: :1.a.1, 1.d.1, 1.e.1, 3.,a.1, 3.b.1, 4.a.1, 4.a.2, 4.a.3.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
Adequate Equipment for Plume Phase Field Measurements.                           4a:   M Field Teams obtain sufficient information                                       4a2   M.
None d. NOT DEMONSTRATED:
Field Teams Manage Sample Collection Appropriately                               4a3   M Post plume phase field measurements and sampling                                 4bl Laboratory operations                                                   -       4c I Emergency Notifiiata       u   I....         ....
None'e. PRIOR ISSUES -RESOLVED:
Activation of the prompt alert and notification system                           5al       M Activation of the prompt alert and notification system - Fast Breaker           5a2 Activation of the prompt alert and notification system - Exception areas         5a3             M                 0 Emergency information and instructions for the public and the media             5b1       M Mon / decon of evacuees and emergency workers, and registration of evacuees     6al                 M7 M   M Mon / decon of emergency worker equipment                                       6b I                       M Temporary care of evacuees                                                     6c"                       M Transportation and treatment of contaminated injured individuals               6dl 28 61
None f. PRIOR ISSUES -UNRESOLVED:
 
None 4.2.1.4. Commonwealth of Pennsylvania State Traffic/Access Control Points 31
4.2. Status of Jurisdictions Evaluated B. Status of Jurisdictions Evaluated This subsection provides information on the evaluation of each participating and functional entity in a jurisdiction-based, issues-only format. Presented below are definitions of the terms used in this subsection relative to criteria demonstration status.
: a. MET: 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.d.1, 3.d.2.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
Met - Listing of the demonstrated exercise evaluation area criteria under which no Deficiencies or ARCAs were assessed during this exercise and under which no ARCAs assessed during prior exercises remain unresolved.
None d. NOT DEMONSTRATED:
Deficiency,- Listing of the demonstrated exercise evaluation area criteria under which one or more Deficiencies Were Assessed during this exercise. Included, is a description of each Deficiency and recommended corrective actions.
None e. PRIOR ISSUES -RESOLVED:
Area Requiring Corrective Action - Listing of the demonstrated exercise evaluation area criteria under which one or more ARCAs were assessed during the cUrrent exercise.
None f. PRIOR ISSUES -UNRESOLVED:
Included is a description of the ARCAs assessed during this, exercise, and the recommended corrective actions to be demonstrated before or during-the next biennial exercise.
None 4.2.1.5. State of West Virginia Emergency Operations Center a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 2.a.1, 2.b.1, 2.b.2, 2.c.1, 3.b.1, 5.b.1.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
Not Demonstrated - Listing ofthe exercise evaluation area criteria that were scheduled to be demonstrated during this exercise, but were not demonstrated andthe reason they were not demonstrated.            .
None d. NOT DEMONSTRATED:
Prior ARCAs - Resolved - Descriptions of ARCAs assessed during previous. exercises that were resolved in this exercise and the corrective actions demonstrated.
None e. PRIOR ISSUES -RESOLVED:
Prior ARCAs - Unresolved - Descriptions of ARCAs assessed during prior exercises that were not resolved in this exercise. Included are the reasons the ARCAs remain unresolved and:recommended corrective actions to be demonstrated before or during the next biennial exercise.
None f. PRIOR ISSUES'- UNRESOLVED:
The following are definitions of the two types of exercise issues that are discussed in this report.
None'4.2.1 .6. West Virginia Public Information Center a. MET: 1.a.1, 5.bA1.b. AREAS REQUIRING CORRECTIVE ACTION:,None
A Deficiency is defined in the FEMA-REP-14 as "...an observed or identified inadequacy 29
: c. DEFICIENCY:
 
None d. NOTDEMONSTRATED:
0 of organizational performance in an exercise that could cause a finding that offsite emergency preparedness is not adequate to provide reasonable assurance that appropriate protective measures can be taken in the event of a radiological emergency to protect the health and safety of the public living in the vicinity of a nuclear power plant."
None e. PRIOR ISSUES,-RESOLVED:
An ARCA is defined in the FEMA-REP-14 as "...an observed or identified inadequacy of organizational performance in an exercise that is not considered, by itself, to adversely impact public health and safety."
None.f. PRIOR!ISSUES, UNRESOLVED:
The Federal Emergency Management Agency (FEMA) has developed a standardized system for numbering exercise issues (Deficiencies and ARCAs).This System is used to achieve consistency in numbering exercise issues among FEMA Region, and site-specific exercise reports within each Region. It is also used to expedite tracking of exercise issues on a nationwide basis.
None -4.2.1.7. West Virginia Accicent Assessment Center a. MET: 1.c.1, 1.d.1, 1.e.1, 2.a.1., 2.b.1, 4.a,2.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
The identifying number for Deficiencies and ARCAs includes the following"elements,l with each element separated by a hyphen (-).
None d. NOT DEMONSTRATED:
Plant Site Identifier - A two-digit number corresponding to the Utility Billable'Plant Site Codes.                                                         "
None, e. PRIOR ISSUES -RESOLVED:
Exercise Year - The last two digits of the year.the exercise was conducted.
None.f. PRIOR ISSUES -UNRESOLVED:
Evaluation Area Criterion - A letter and number corresponding to the criteria in the FEMA REP'Exercise Evaluation Methodology.
2.a.1.ISSUE NO.: 03-06-2a1-P-02  
Issue Classification Identifier - (D = Deficiency, A = ARCA). Only Deficiencies and ARCAs are included in exercise reports.
-ISSUE: The exposure control system in place for West Virginia is confusing 32 a and inconsistent and does not list exposure limits in the proper units. There is also no information concerning the limits for declared pregnant Workers.While the present system does give the reporting succession for worker exposures, it does not explicitly name who may authorize exposures above the established limits.The guidelines are visually confusing:
Exercise Issue Identification Number - A separate two digit indexing number assigned to each issue identified in the exercise.
there is a table of "exceptions" that appears, at first glance, to list the exposure limits. The statement above the table "the PAG for all Emergency Workers (EWs) is 5 Rem, except for the following:" is easily overlooked.
30
The instructions about which EWs are allowed up to 25 Rem while inside the plume exposure EPZ is unclear (specific job functions would, be helpful).
 
There is no information concerning limits for declared pregnant workers.The limits are listed in "Rem" without any indication on how this value is determined.
4.2.1. State Jurisdictions 4.2.1.1. Beaver Valley Joint Public Information Center
The direct-reading dosimeters (DRDs) have units of R (exposure), not Rem (dose). The limits given are the normal dose limits (total effective dose equivalent (TEDE), which is the sum of the effective dose:equiivalent (EDE) fr6m external e*p6sure anid the committed effective dose equivalent (CEDE) from inhalation of contaminated air). DRDs can only measure the EDE portion of the TEDE. Initially, West Virginia personnel assume that there is no dose from inhalation of contaminated air (i.e., there are only noble gases in the release, no radioiodines and no particulates).
: a. MET: 5.b.1.
If Beaver Valley Power Station dose-assessment personnel provide information about the EDE/TEDE ratio being something other than 1,-thena new limit based on this ratio is calculated (this calculation is not proceduralized).
: b. AREAS REQUIRING CORRECTIVE ACTION: None
For releases that have a significant non-noble gas component over a short'duration, this method' could result in an actual dose higher than the 5 Rem dose limit before the new limit'could be determined.
: c. DEFICIENCY: None
REASON UNRESOLVED:
: d. NOT DEMONSTRATED: None
The State of West Virginia Emergency Response Plan, Annex 15, dated April 2008, contained pre-authorized exposure (turn-back) levels for various categories of EWs, whichare one half of the dose limits for each category listed in a chart on page 15-19. The turn -back levels were stated in rems rather than Roentgens as they should be to properly reflect units recorded by Direct Reading Dosimeters (DRD). The dose limits contained in the Chart did not reflect the most recent recommended PAGS for emergencyworkers contained in USEPA Guidance in that they exceed 5 33 rem for 2 categories of EW who are not specifically tasked with life saving duties or the protection of valuable property.4.2.1.8. West Virginia Field Air Monitoring Team a. MET: 1.a.1, 1.d.1, 1.e.1, 2.a.1, 3.a.1, 3.b.1, 4.a.1, 4.a.2, 4.a.3.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: e. PRIOR ISSUES     - RESOLVED: None
None d. NOT DEMONSTRATED:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.1.2. PA State Field Monitoring Team A, South West Region,                 ;, .,, ,.
None e. PRIOR ISSUES -RESOLVED:
: a. MET: 1.a.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 4.a.1, 4.a.2, 4.a.3.
4.a.3.ISSUE NO.: 03-06-4a3-P-04.....
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: d. NOT DEMONSTRATED: None
: e. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES t-UNRESOLVED: None 4.2.1.3. PA State' Field Monitoring Team B, South West Region
: a. MET: :1.a.1, 1.d.1, 1.e.1, 3.,a.1, 3.b.1, 4.a.1, 4.a.2, 4.a.3.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: d. NOT DEMONSTRATED: None'
: e. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.1.4. Commonwealth of Pennsylvania State Traffic/Access Control Points 31
: a. MET: 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.d.1, 3.d.2.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: d. NOT DEMONSTRATED: None
: e. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.1.5. State of West Virginia Emergency Operations Center
: a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 2.a.1, 2.b.1, 2.b.2, 2.c.1, 3.b.1, 5.b.1.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: d. NOT DEMONSTRATED: None
: e. PRIOR ISSUES -RESOLVED: None
: f. PRIOR ISSUES'- UNRESOLVED: None' 4.2.1 .6. West Virginia Public Information Center
: a. MET: 1.a.1, 5.bA1.
: b. AREAS REQUIRING CORRECTIVE ACTION:,None
: c. DEFICIENCY: None
: d. NOTDEMONSTRATED: None
: e. PRIOR ISSUES,-RESOLVED: None.
: f. PRIOR!ISSUES, UNRESOLVED: None                 -
4.2.1.7. West Virginia Accicent Assessment Center
: a. MET: 1.c.1, 1.d.1, 1.e.1, 2.a.1., 2.b.1, 4.a,2.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: d. NOT DEMONSTRATED: None,
: e. PRIOR ISSUES   - RESOLVED: None.
: f. PRIOR ISSUES - UNRESOLVED: 2.a.1.
ISSUE NO.: 03-06-2a1-P-02       -
ISSUE: The exposure control system in place for West Virginia is confusing 32 a
 
and inconsistent and does not list exposure limits in the proper units. There is also no information concerning the limits for declared pregnant Workers.
While the present system does give the reporting succession for worker exposures, it does not explicitly name who may authorize exposures above the established limits.
The guidelines are visually confusing: there is a table of "exceptions" that appears, at first glance, to list the exposure limits. The statement above the table "the PAG for all Emergency Workers (EWs) is 5 Rem, except for the following:" is easily overlooked. The instructions about which EWs are allowed up to 25 Rem while inside the plume exposure EPZ is unclear (specific job functions would, be helpful). There is no information concerning limits for declared pregnant workers.
The limits are listed in "Rem" without any indication on how this value is determined. The direct-reading dosimeters (DRDs) have units of R (exposure), not Rem (dose). The limits given are the normal dose limits (total effective dose equivalent (TEDE), which is the sum of the effective dose
:equiivalent (EDE) fr6m external e*p6sure anid the committed effective dose equivalent (CEDE) from inhalation of contaminated air). DRDs can only measure the EDE portion of the TEDE. Initially, West Virginia personnel assume that there is no dose from inhalation of contaminated air (i.e., there are only noble gases in the release, no radioiodines and no particulates). If Beaver Valley Power Station dose-assessment personnel provide information about the EDE/TEDE ratio being something other than 1,-thena new limit based on this ratio is calculated (this calculation is not proceduralized). For releases that have a significant non-noble gas component over a short' duration, this method' could result in an actual dose higher than the 5 Rem dose limit before the new limit'could be determined.
REASON UNRESOLVED: The State of West Virginia Emergency Response Plan, Annex 15, dated April 2008, contained pre-authorized exposure (turn-back) levels for various categories of EWs, whichare one half of the dose limits for each category listed in a chart on page 15-19. The turn - back levels were stated in rems rather than Roentgens as they should be to properly reflect units recorded by Direct Reading Dosimeters (DRD). The dose limits contained in the Chart did not reflect the most recent recommended PAGS for emergencyworkers contained in USEPA Guidance in that they exceed 5 33
 
rem for 2 categories of EW who are not specifically tasked with life saving duties or the protection of valuable property.
4.2.1.8. West Virginia Field Air Monitoring Team
: a. MET: 1.a.1, 1.d.1, 1.e.1, 2.a.1, 3.a.1, 3.b.1, 4.a.1, 4.a.2, 4.a.3.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: d. NOT DEMONSTRATED: None
: e. PRIOR ISSUES - RESOLVED: 4.a.3.
ISSUE NO.: 03-06-4a3-P-04.....
ISSUE: The West Virginia Field Monitoring Team Procedure details the collection, counting analysis, and reporting of air samples, however some information is missing and some actions should more properly be ,performed either at the Hancock ,County. Emergency Operation Center (HCEOC) or the West Virginia State Operations.Center,(WVSEOC).
ISSUE: The West Virginia Field Monitoring Team Procedure details the collection, counting analysis, and reporting of air samples, however some information is missing and some actions should more properly be ,performed either at the Hancock ,County. Emergency Operation Center (HCEOC) or the West Virginia State Operations.Center,(WVSEOC).
The procedure does not include taking ambient radiation surveys during air sample collection.
The procedure does not include taking ambient radiation surveys during air sample collection.
The procedure does require that the Field Monitoring"Team (F4M-T)'collect the sample, move to a background area, purge the sample, count the cartridge and filter separately calculating the air concentration and then reporting the count rate and concentration data to the response Team Leadedr'(RTL) at the'HCEOC. The RTL then communicates thiis to the WVSEOC.CORRECTIVE ACTION DEMONSTRATED:
The procedure does require that the Field Monitoring"Team (F4M-T)'collect the sample, move to a background area, purge the sample, count the cartridge and filter separately calculating the air concentration and then reporting the count rate and concentration data to the response Team Leadedr'(RTL) at the' HCEOC. The RTL then communicates thiis to the WVSEOC.
During the time that the air sample was being drawn, the ambient radiological conditions in the area were being continuously monitored.:When'asked, the Field Team member correctly stated that this was to determine any changes in the ambient radiological conditions that may affect the airsample."However, contrary to the state response above, the procedure has not been revised to reflect this action. The affected procedure is the "West Virginia Field Monitoring Team 34 40 Standard Operating Procedure", dated June, 2008.West Virginia OES provided the updated West Virginia Field Monitoring Team Standard Operating Procedures" Revision 6-B, dated September 2008, which contains instructions to conduct continuous ambient radiological surveying for safety.f. PRIOR ISSUES -UNRESOLVED:
CORRECTIVE ACTION DEMONSTRATED: During the time that the air sample was being drawn, the ambient radiological conditions in the area were being continuously monitored.:When'asked, the Field Team member correctly stated that this was to determine any changes in the ambient radiological conditions that may affect the airsample."However, contrary to the state response above, the procedure has not been revised to reflect this action. The affected procedure is the "West Virginia Field Monitoring Team 34 40
4.a.2.ISSUE NO.: 03-06-4a2-P-05 ISSUE: The Response Team Leader (RTL) for WV at the Hancock County Emergency Operations Center (EOC) did not comm'jnicate wind direction/speed or release time.-REASON UNRESOLVED:
 
Data provided to the Hancock County Emergency Operations Center was th'rough, Controller inject, as this was an out of sequence'exercise outlined'in the Extent of Play agreement.
Standard Operating Procedure", dated June, 2008.
However, since this was an out of seqbuence event, implementation of the recommendations above could not be completely demonstrated.
West Virginia OES provided the updated West Virginia Field Monitoring Team Standard Operating Procedures" Revision 6-B, dated September 2008, which contains instructions to conduct continuous ambient radiological surveying for safety.
4.2.2. Risk Jurisdictions 4.2.2.1 Beaver County Emergency Operations Center a. MET:. 1.a.i,.1.c.1, 1.d.1, 1.e.1,2.a.1, 2.c.1,3.a.1, 3.b.1, 3.c.1, 3.c.2, 3.d.1, 3.d.2, 5.a.1,:5.b.1.
: f. PRIOR ISSUES - UNRESOLVED: 4.a.2.
: b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
ISSUE NO.: 03-06-4a2-P-05 ISSUE: The Response Team Leader (RTL) for WV at the Hancock County Emergency Operations Center (EOC) did not comm'jnicate wind direction/speed or release time.
None d. NOT DEMONSTRATED:
        - REASON UNRESOLVED: Data provided to the Hancock County Emergency Operations Center was th'rough, Controller inject, as this was an out of sequence'exercise outlined'in the Extent of Play agreement. However, since this was an out of seqbuence event, implementation of the recommendations above could not be completely demonstrated.
None e. PRIOR ISSUES -RESOLVED:
4.2.2. Risk Jurisdictions 4.2.2.1 Beaver County Emergency Operations Center
None 35
: a. MET:. 1.a.i,.1.c.1, 1.d.1, 1.e.1,2.a.1, 2.c.1,3.a.1, 3.b.1, 3.c.1, 3.c.2, 3.d.1, 3.d.2, 5.a.1,:5.b.1.
: f. PRIOR ISSUES -UNRESOLVED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None 4.2.2.2. Aliquippa Emergency Operations Center a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.d.2, 5.a.1.b. AREAS REQUIRING CORRECTIVE ACTION: 3.c.1.ISSUE NO.: 03-08-3cl-A-01 ISSUE: PADs are implemented for'special population groups within. areas subject to protective actions. (NUREG-0654, E.7., J.9., 1O.c.d.e.g)..
: c. DEFICIENCY: None
CONDITION:
: d. NOT DEMONSTRATED: None
The Communications Officer did not~notify Special Needs Facilities in the city at the Alert ECL, as specified in' the plan, nor did'the Emergency Management Coordinator ensure thatthis had been-done until later than the plan specifies.  
: e. PRIOR ISSUES - RESOLVED: None 35
.POSSIBLE CAUSE: Lack of familiarity with plans and not using procedures in the plan.
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.2. Aliquippa Emergency Operations Center
: a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.d.2, 5.a.1.
: b. AREAS REQUIRING CORRECTIVE ACTION: 3.c.1.
ISSUE NO.: 03-08-3cl-A-01 ISSUE: PADs are implemented for'special population groups within. areas subject to protective actions. (NUREG-0654, E.7., J.9., 1O.c.d.e.g)..
CONDITION: The Communications Officer did not~notify Special Needs Facilities in the city at the Alert ECL, as specified in' the plan, nor did'the Emergency Management Coordinator ensure thatthis had been-done until later than the plan specifies.                .
POSSIBLE CAUSE: Lack of familiarity with plans and not using procedures in the plan.


==REFERENCE:==
==REFERENCE:==
City of Aliquippa Emergency Operation Plan
* SOP C, Emergency Management Coordinator, page 0-7, 7th itemr "Attachment C-2, SOP, SectionW C.2.3, Alert; page :C-20, bullet 12 -
      " Section C.2.4, SAE, page.C 21, b'ullet.7.',
* SOP D, Communications Service Officer, Page D-3, first item-.`.-.
      - Attachment D-3, Section D.3.3, bullet 12.
* Notification and Resource Manual EFFECT: If Special Needs facilities are not notified early there may not be adequate resources to implement an evacuation protective action that might occur.
RECOMMENDATION: Emergency workers should be trained to become familiar with and utilize their plans and procedures..
Schedule of Corrective Actions: PEMA comments, "All.municipal plans and procudures have been rewritten and clearly deliniate that the county has primary responsibility for notifying special needs population facilities and the 36 a


City of Aliquippa Emergency Operation Plan* SOP C, Emergency Management Coordinator, page 0-7, 7th itemr" Attachment C-2, SOP, SectionW C.2.3, Alert; page :C-20, bullet 12 -" Section C.2.4, SAE, page.C 21, b'ullet.7.',* SOP D, Communications Service Officer, Page D-3, first item-.`.-.
municipalities must verify that this has occurred after each escalation at the plant. This will be demonstrated during the next biennial exercise."
-Attachment D-3, Section D.3.3, bullet 12.* Notification and Resource Manual EFFECT: If Special Needs facilities are not notified early there may not be adequate resources to implement an evacuation protective action that might occur.RECOMMENDATION:
: c. DEFICIENCY: None
Emergency workers should be trained to become familiar with and utilize their plans and procedures..
: d. NOT DEMONSTRATED: None
Schedule of Corrective Actions: PEMA comments, "All.municipal plans and procudures have been rewritten and clearly deliniate that the county has primary responsibility for notifying special needs population facilities and the 36 a municipalities must verify that this has occurred after each escalation at the plant. This will be demonstrated during the next biennial exercise." c. DEFICIENCY:
: e. PRIOR ISSUES - RESOLVED: None
None d. NOT DEMONSTRATED:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.3. Beaver Borough Emergency Operations Center
None e. PRIOR ISSUES -RESOLVED:
: a. MET: 1.a.1,,1.c.1, 1.d.1, 1.e.1,.3.a.1, 3.b.1, 3.c.1, 3.d.1, 3.d.2, 5.a.1.
None f. PRIOR ISSUES -UNRESOLVED:
b.. AREAS REQUIRING CORRECTIVE ACTION: None
None 4.2.2.3. Beaver Borough Emergency Operations Center a. MET: 1.a.1,,1.c.1, 1.d.1, 1.e.1,.3.a.1, 3.b.1, 3.c.1, 3.d.1, b.. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: c. DEFICIENCY: None,
None, d. NOT DEMONSTRATED:
: d. NOT DEMONSTRATED: None
None e. PRIOR ISSUES -RESOLVED:
: e. PRIOR ISSUES - RESOLVED: None
None f. PRIOR ISSUES -UNRESOLVED:
: f. PRIOR ISSUES - UNRESOLVED: Nope, 4.2.2.4. Beaver County, Beaver Borough, Back-up Route Alerting
Nope, 3.d.2, 5.a.1.4.2.2.4. Beaver County, Beaver Borough, Route Alerting a. MET:. 1.a.1, 1.d:3,.1.e.1, 3:a.1, 3.b:1,, 5.a.3.b. AREAS REQUIRING CORRECTIVE ACTION.: None c. DEFICIENCY.:-None  
: a. MET:. 1.a.1, 1.d:3,.1.e.1, 3:a.1, 3.b:1,, 5.a.3.
-d. NOT DEMONSTRATED:
: b. AREAS REQUIRING CORRECTIVE ACTION.: None
None e. PRIOR ISSUES -RESOLVED:
: c. DEFICIENCY.:-None           -
None*f. PRIOR ISSUES -UNRESOLVED:
: d. NOT DEMONSTRATED: None
None Back-up 4.2.2.5. Bridgewater/Fallston Emergency Operations Center a. MET: 1.a.1, 1'.c.1, 1.d.1, 1.e.1', 3.a.1,3.b.1, 3.c.1, 3.d.1, 3.d.2, 5.a.1.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: e. PRIOR ISSUES - RESOLVED: None*
None d. NOT DEMONSTRATED:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.5. Bridgewater/Fallston Emergency Operations Center
None e. PRIOR ISSUES -RESOLVED:
: a. MET: 1.a.1, 1'.c.1, 1.d.1, 1.e.1', 3.a.1,3.b.1, 3.c.1, 3.d.1, 3.d.2, 5.a.1.
None 37
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: f. PRIOR ISSUES -UNRESOLVED:
: c. DEFICIENCY: None
None 4.2.2.6. Brighton Township Emergency Operations Center a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.2, 5.a.l.b. AREAS REQUIRING CORRECTIVE'ACTION:
: d. NOT DEMONSTRATED: None
None c. DEFICIENCY:
: e. PRIOR ISSUES - RESOLVED: None 37
None d. NOT DEMONSTRATED:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.6. Brighton Township Emergency Operations Center
None e. PRIOR ISSUES -RESOLVED:
: a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.2, 5.a.l.
None f. PRIOR ISSUES -UNRESOLVED:
: b. AREAS REQUIRING CORRECTIVE'ACTION: None
None 0 4.2.2.7. Beaver County, Brighton Township, Back-up Route Alerting a. MET: 1.a.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 5.a.3.b. AREAS REQUIRING CORRECTIVE ACTION: ..5a.3.ISSUE NO.: 03-08-5a3-A-04 ISSUE: Activities associated with FEMA approved exception areas are completed within 45 minutes following the initial decision by authorized offsite emergency officials to notify the public of an semergency stuation.
: c. DEFICIENCY: None
Backup A&N of the public is completed-within 45 minutes following the detedtion by the ORO of a failure of the primary A&N system. (NUREG-0654, E.6., Appendix 3.B.2.c)CONDITION:
: d. NOT DEMONSTRATED: None
The route alerting team did not run the route in the sector in which the siren failed to sound.POSSIBLE CAUSE: Supervisory personnel in both the' EOC and in the Fire House where route alerting teams were staged, Were apparently so focused on demonstrating supplemental routes, they were inattentive when Beaver County reported that Siren 36 had failed and the Sector 2 routes should be run.
: e. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES - UNRESOLVED: None 0
4.2.2.7. Beaver County, Brighton Township, Back-up Route Alerting
: a. MET: 1.a.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 5.a.3.
: b. AREAS REQUIRING CORRECTIVE ACTION: ..5a.3.
ISSUE NO.: 03-08-5a3-A-04 ISSUE: Activities associated with FEMA approved exception areas are completed within 45 minutes following the initial decision by authorized offsite emergency officials to notify the public of an               stuation. Backup semergency A&N of the public is completed-within 45 minutes following the detedtion by the ORO of a failure of the primary A&N system. (NUREG-0654, E.6.,
Appendix 3.B.2.c)
CONDITION: The route alerting team did not run the route in the sector in which the siren failed to sound.
POSSIBLE CAUSE: Supervisory personnel in both the' EOC and in the Fire House where route alerting teams were staged, Were apparently so focused on demonstrating supplemental routes, they were inattentive when Beaver County reported that Siren 36 had failed and the Sector 2 routes should be run.


==REFERENCE:==
==REFERENCE:==
NUREG-0654 Appendix 3; B.2.c; E.6 38 0


NUREG-0654 Appendix 3; B.2.c; E.6 38 0 Brighton Township Emergency Operations Plan, Attachment F-i, "Public Alert/Notification and Route Alerting," pp. F-10-1 1 Brighton Township Route Alert Checklist EFFECT: Failure to promptly notify residents in the event of a siren failure would delay their tuning in to their EAS station to obtain protective action instructions, thereby potentially placing them at risk.CORRECTIVE ACTION DEMONSTRATED:
Brighton Township Emergency Operations Plan, Attachment F-i, "Public Alert/Notification and Route Alerting," pp. F-10-1 1 Brighton Township Route Alert Checklist EFFECT: Failure to promptly notify residents in the event of a siren failure would delay their tuning in to their EAS station to obtain protective action instructions, thereby potentially placing them at risk.
Route alerting in Sector 2 was demonstrated at General Emergency by two vehicles, completing the routes, and all required procedures, in 45 minutes, thereby resolving this issue.c. DEFICIENCY:
CORRECTIVE ACTION DEMONSTRATED: Route alerting in Sector 2 was demonstrated at General Emergency by two vehicles, completing the routes, and all required procedures, in 45 minutes, thereby resolving this issue.
None d. NOT DEMONSTRATED:
: c. DEFICIENCY: None
None e. PRIOR ISSUES -RESOLVED:
: d. NOT DEMONSTRATED: None
None f. PRIOR ISSUES -UNRESOLVED:
: e. PRIOR ISSUES - RESOLVED: None
None 4.2.2.8. Center Township Emergency Operations Center, ..a. MET: 1.a.1, .1c.1, 1.d.1, 1.e.1, 3.a.:1, 3.b.1, 3.c.1, 3.d.1, 3.d.2,5.a.1.
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.8. Center Township Emergency Operations Center,           .     .
: b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: a. MET: 1.a.1, .1c.1, 1.d.1, 1.e.1, 3.a.:1, 3.b.1, 3.c.1, 3.d.1, 3.d.2,5.a.1.
None d. NOT DEMONSTRATED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None e. PRIOR ISSUES -RESOLVED:
: c. DEFICIENCY: None
3.b.1.ISSUE NO.: 03-06-3bl-P-O1 ISSUE: At 1959, emergency workers at the Center Township Emergency Operations Center (CTEOC) were directed by the Beaver County EOC through PMARS radio to take potassium, iodide (KI). All personnel in the EOC were aware of this Precautionary Protective Action, but only the'Radiological Service Officer and his Deputy recorded an entry in their "EPP EVENT LOG." Thus, there is no record that Police Officers in the field at TCP/ACP locations, or Fire/Rescue personnel.
: d. NOT DEMONSTRATED: None
in the field, providing route alerting and evacuation assistance were directed to ingest their provided KI.39 a CORRECTIVE ACTION DEMONSTRATED:
: e. PRIOR ISSUES - RESOLVED: 3.b.1.
Center Township Emergency Operations Center sucessfully demonstrated this criterion during the 24 June 08 Plume Exercise.
ISSUE NO.: 03-06-3bl-P-O1 ISSUE: At 1959, emergency workers at the Center Township Emergency Operations Center (CTEOC) were directed by the Beaver County EOC through PMARS radio to take potassium, iodide (KI). All personnel in the EOC were aware of this Precautionary Protective Action, but only the' Radiological Service Officer and his Deputy recorded an entry in their "EPP EVENT LOG." Thus, there is no record that Police Officers in the field at TCP/ACP locations, or Fire/Rescue personnel. in the field, providing route alerting and evacuation assistance were directed to ingest their provided KI.
Beaver County and it's constituant jurisdiction emergency operations centers employ a web-based communications system ("Knowledge Center") to relay directions, request resources, and confirm information.
39
The log of the Center Township EOC indicates that at the General Emergency the EOC notified field personnel that the consumption of Potassium Iodide was directed..,f. PRIOR ISSUES -UNRESOLVED:
 
None 4.2.2.9. Chippewa Township Eme gency Operations Center a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.2, 5.a.1.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
a CORRECTIVE ACTION DEMONSTRATED: Center Township Emergency Operations Center sucessfully demonstrated this criterion during the 24 June 08 Plume Exercise. Beaver County and it's constituant jurisdiction emergency operations centers employ a web-based communications system
None d. NOT DEMONSTRATED:
("Knowledge Center") to relay directions, request resources, and confirm information. The log of the Center Township EOC indicates that at the General Emergency the EOC notified field personnel that the consumption of Potassium Iodide was directed.
None e. PRIOR ISSUES -RESOLVED:
  .,f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.9. Chippewa Township Eme gency Operations Center
None f. PRIOR ISSUES -UNRESOLVED:
: a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.2, 5.a.1.
None 4.2.2.10.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
Beaver County, Chippewa.Township, Back-,up Route. Alerting a. MET: 1.a.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 5.a.3..b. AREAS REQUIRING CORRECTIVE ACTION:- 5.a.3., ISSUE NO.: 03-08-5a3-A-05 ISSUE: Activities associated with FEMA approved exception areas are completed within 45 minutesfollowing the initial decision by authorized offsite emergency officials to notify the public of an emergency situation.
: c. DEFICIENCY: None
Backup A&N of the public is completed within 45 minutes following the detection by the ORO of a failure of the primary A&N system. (NUREG-0654, E.6., Appendix 3.B.2.c)40 a CONDITION:
: d. NOT DEMONSTRATED: None
45 minute timeframe allowed for back up route alerting caused by a failed siren was not met.* POSSIBLE CAUSE: There was a misunderstanding between the EOC fire personnel and the fire personnel located at the fire station as to who would dispatch staff to perform the route alert function.
: e. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.10. Beaver County, Chippewa.Township, Back-,up Route. Alerting
: a. MET: 1.a.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 5.a.3..
: b. AREAS REQUIRING CORRECTIVE ACTION:- 5.a.3.,
ISSUE NO.: 03-08-5a3-A-05 ISSUE: Activities associated with FEMA approved exception areas are completed within 45 minutesfollowing the initial decision by authorized offsite emergency officials to notify the public of an emergency situation. Backup A&N of the public is completed within 45 minutes following the detection by the ORO of a failure of the primary A&N system. (NUREG-0654, E.6.,
Appendix 3.B.2.c) 40 a
 
CONDITION: 45 minute timeframe allowed for back up route alerting caused by a failed siren was not met.
* POSSIBLE CAUSE: There was a misunderstanding between the EOC fire personnel and the fire personnel located at the fire station as to who would dispatch staff to perform the route alert function.


==REFERENCE:==
==REFERENCE:==
NUREG-0654, E.6, Appendix 3.B.2.c.
EFFECT: Since siren #137 failed.to sound, a number of residents may have not been informed of the emergency at Beaver Valley Power Station.
CORRECTIVE ACTION DEMONSTRATED: This issue Was resolved by a successful re-demonstration at General Emergency (GE).
: c. DEFICIENCY: None
: d. NOT DEMONSTRATED: None
: e. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.11. Frankfort Springs Borough, Hanover Township, Georgetowhnborough, Greene Township, Hookstown Borough Emergency Operatibns Center
: a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.2, 5.a.1.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: d. NOT DEMONSTRATED: None
: e. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES      - UNRESOLVED: None 4.2.2.12. Independence Township Emergency Operations Center 41
: a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.C.1, 3.d.2, 5.a.1.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: d. NOT DEMONSTRATED: None
: e. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.13. Industry Emergency Operations Center
: a. MET: 1.a.1, 1.b.1,,1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.2,.5.a.]. .
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: d. NOT DEMONSTRATED: None            .
: e. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES    - UNRESOLVED: None 4.2.2.14. Hopewell Township Emergency Operations
: Center,
: a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.2, 5.a.1.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: d. NOT DEMONSTRATED: None
: e. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.15. Beaver County, Hopewell Township, Back-up Route Alerting
: a. MET: 1.a.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 5.a.3.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: d. NOT DEMONSTRATED: None
: e. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES - UNRESOLVED: None 42 0


NUREG-0654, E.6, Appendix 3.B.2.c.EFFECT: Since siren #137 failed.to sound, a number of residents may have not been informed of the emergency at Beaver Valley Power Station.CORRECTIVE ACTION DEMONSTRATED:
4.2.2.16. Midland Emergency Operations Center
This issue Was resolved by a successful re-demonstration at General Emergency (GE).c. DEFICIENCY:
: a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.,3a1, 3.b.1, 3.c.1,3.d.2,5.a.1.
None d. NOT DEMONSTRATED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None e. PRIOR ISSUES -RESOLVED:
: c. DEFICIENCY: None
None f. PRIOR ISSUES -UNRESOLVED:
: d. NOT DEMONSTRATED: None
None 4.2.2.11.
: e. PRIOR ISSUES - RESOLVED: None
Frankfort Springs Borough, Hanover Township, Georgetowhnborough, Greene Township, Hookstown Borough Emergency Operatibns Center a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.2, 5.a.1.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.17. Monaca Emergency Operations Center
None d. NOT DEMONSTRATED:
: a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.1, 3.d.2, 5.a.1.
None e. PRIOR ISSUES -RESOLVED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None.
None f. PRIOR ISSUES -UNRESOLVED:
: c. DEFICIENCY: None
None 4.2.2.12.
: d. NOT DEMONSTRATED: None
Independence Township Emergency Operations Center 41
: e. PRIOR ISSUES - RESOLVED: None
: a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.C.1, 3.d.2, 5.a.1.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.18. Beaver County, Monaca Back-up Route Alerting
None d. NOT DEMONSTRATED:
: a. MET: 1.a.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 5.a.3.
None e. PRIOR ISSUES -RESOLVED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None f. PRIOR ISSUES -UNRESOLVED:
: c. DEFICIENCY: None
None 4.2.2.13.
: d. NOT DEMONSTRATED: None
Industry Emergency Operations Center a. MET: 1.a.1, 1.b.1,,1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.2,.5.a.].
: e. PRIOR ISSUES - RESOLVED: None
.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.19. Patterson Heights/Patterson Township Emergency Operations" Center
None d. NOT DEMONSTRATED:
: a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.1, 3.d.2,5.a.1.
None .e. PRIOR ISSUES -RESOLVED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None f. PRIOR ISSUES -UNRESOLVED:
: c. DEFICIENCY: None
None 4.2.2.14.
: d. NOT DEMONSTRATED: None
Hopewell Township Emergency Operations Center, a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.2, 5.a.1.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: e. PRIOR ISSUES - RESOLVED: None
None d. NOT DEMONSTRATED:
: f. PRIOR ISSUES - UNRESOLVED: None 43
None e. PRIOR ISSUES -RESOLVED:
 
None f. PRIOR ISSUES -UNRESOLVED:
0 4.2.2.20. Beaver County, Patterson Township, Back-up Route Alerting
None 4.2.2.15.
: a. MET: 1.a.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 5.a.3.
Beaver County, Hopewell Township, Back-up Route Alerting a. MET: 1.a.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 5.a.3.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None d. NOT DEMONSTRATED:
: c. DEFICIENCY: None
None e. PRIOR ISSUES -RESOLVED:
: d. NOT DEMONSTRATED: None
None f. PRIOR ISSUES -UNRESOLVED:
: e. PRIOR ISSUES - RESOLVED: None
None 42 0 4.2.2.16.
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.21. Potter Township Emergency operations Center
Midland Emergency Operations Center a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.,3a1, 3.b.1, 3.c.1,3.d.2,5.a.1.
: a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.2,5.a.1.
: b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: b. AREAS REQUIRING CORRECTIVE. ACTION: &#xfd;None;
None d. NOT DEMONSTRATED:
: c. DEFICIENCY: None
None e. PRIOR ISSUES -RESOLVED:
: d. NOT DEMONSTRATED: None
None f. PRIOR ISSUES -UNRESOLVED:
: e. PRIOR ISSUES - RESOLVED: None
None 4.2.2.17.
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.22. Raccoon Township Emergency Operations Center
Monaca Emergency Operations Center a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.1, 3.d.2, 5.a.1.b. AREAS REQUIRING CORRECTIVE ACTION: None.c. DEFICIENCY:
: a. MET: 1.a.1, 1:C.1, 1.d.1,"1.e.1, 3.a.1, 3.b.i, 3..1,cI3.d.l, 3.d.2', 5.a.1.'
None d. NOT DEMONSTRATED:
: b. AREAS REQUIRING CORRECTIVEACTION: None
None e. PRIOR ISSUES -RESOLVED:
: c. DEFICIENCY: None
None f. PRIOR ISSUES -UNRESOLVED:
: d. NOT DEMONSTRATED: None
None 4.2.2.18.
: e. PRIOR ISSUES     - RESOLVED: None                                     "
Beaver County, Monaca Back-up Route Alerting a. MET: 1.a.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 5.a.3.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: f. PRIOR ISSUES - UNRESOLVED: None" 4.2.2.23. Shippingport Emergency Operations Center
None d. NOT DEMONSTRATED:
: a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.1,3.d.2,5.a.1.
None e. PRIOR ISSUES -RESOLVED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None f. PRIOR ISSUES -UNRESOLVED:
: c. DEFICIENCY: None 44 0
None 4.2.2.19.
: d. NOT DEMONSTRATED: None
Patterson Heights/Patterson Township Emergency Operations" Center a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.1, 3.d.2,5.a.1.
: e. PRIOR ISSUES - RESOLVED: None
: b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.24. South Beaver/Ohioville/Glasgow Emergency Operations Center
None d. NOT DEMONSTRATED:
: a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1,:3.b.1, 3.c.1, 3.d.2,5.a.1.
None e. PRIOR ISSUES -RESOLVED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None f. PRIOR ISSUES -UNRESOLVED:
: c. DEFICIENCY: None
None 43 0 4.2.2.20.
: d. NOT DEMONSTRATED: None
Beaver County, Patterson Township, Back-up Route Alerting a. MET: 1.a.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 5.a.3.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: e. PRIOR ISSUES - RESOLVED: None
None d. NOT DEMONSTRATED:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.25. South Heights Emergency Operations Center
None e. PRIOR ISSUES -RESOLVED:
: a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1,3.a.1,3.b.1,3,c.1,3.d.2,.5.a.1..
None f. PRIOR ISSUES -UNRESOLVED:
None 4.2.2.21.
Potter Township Emergency operations Center a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.2,5.a.1.
: b. AREAS REQUIRING CORRECTIVE.
ACTION: &#xfd;None;c. DEFICIENCY:
None d. NOT DEMONSTRATED:
None e. PRIOR ISSUES -RESOLVED:
None f. PRIOR ISSUES -UNRESOLVED:
None 4.2.2.22.
Raccoon Township Emergency Operations Center a. MET: 1.a.1, 1:C.1, 1.d.1,"1.e.1, 3.a.1, 3.b.i, 3..1,cI3.d.l, 3.d.2', 5.a.1.'b. AREAS REQUIRING CORRECTIVEACTION:
None c. DEFICIENCY:
None d. NOT DEMONSTRATED:
None e. PRIOR ISSUES -RESOLVED:
None " f. PRIOR ISSUES -UNRESOLVED:
None" 4.2.2.23.
Shippingport Emergency Operations Center a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.1,3.d.2,5.a.1.
: b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
None 44 0
: d. NOT DEMONSTRATED:
None e. PRIOR ISSUES -RESOLVED:
None f. PRIOR ISSUES -UNRESOLVED:
None 4.2.2.24.
South Beaver/Ohioville/Glasgow Emergency Operations Center a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1,:3.b.1, 3.c.1, 3.d.2,5.a.1.
: b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
None d. NOT DEMONSTRATED:
None e. PRIOR ISSUES -RESOLVED:
None f. PRIOR ISSUES -UNRESOLVED:
None 4.2.2.25.
South Heights Emergency Operations Center a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1,3.a.1,3.b.1,3,c.1,3.d.2,.5.a.1..
: b. AREAS REQUIRING CORRECTIVE ACTION:.3.a.1.
: b. AREAS REQUIRING CORRECTIVE ACTION:.3.a.1.
ISSUE NO.: 03-08-3a1-A-06 ISSUE: OROs issue appropriate dosimetry and procedures, and manage radiological exposure to emergency workers lAW plans andprocedures.
ISSUE NO.: 03-08-3a1-A-06 ISSUE: OROs issue appropriate dosimetry and procedures, and manage radiological exposure to emergency workers lAW plans andprocedures.
Emergency workers periodically and at theend of each mission read and record dosimeter reading. (NUREG-0654, K.3)CONDITION:
Emergency workers periodically and at theend of each mission read and record dosimeter reading. (NUREG-0654, K.3)
The South Heights Borough Radiation Officer confused the requirements for wearing Self Reading Dosimeters with those for wearing Permanent Record Dosimeters.
CONDITION: The South Heights Borough Radiation Officer confused the requirements for wearing Self Reading Dosimeters with those for wearing Permanent Record Dosimeters. He stated all emergency workers were required to wear the SRDs and only one in three was required to wear the PRD.
He stated all emergency workers were required to wear the SRDs and only one in three was required to wear the PRD.POSSIBLE CAUSE: The South Heights Borough Radiation Officer did not reference his procedures during the emergency worker briefing.45 0  
POSSIBLE CAUSE: The South Heights Borough Radiation Officer did not reference his procedures during the emergency worker briefing.
45
 
0


==REFERENCE:==
==REFERENCE:==
NUREG 0654, K.3.a            -
EFFECT: A permanent record of radiation exposure would not be available for the emergency worker(s).
CORRECTIVE ACTION DEMONSTRATED:.The Radiation Officer should use his check sheets when briefing emergency workers.
Corrective action demonstrated.
: c. DEFICIENCY: None        2
: d. NOT DEMONSTRATED: None
: e. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES -.UNRESOLVED: None 4.2.2.26. Vanport Emergency Operations Center
: a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.2, 5.a.1.
: b. AREAS REQUIRING CORRECTIVE ACTION: None.,
: c. DEFICIENCY: None
: d. NOT DEMONSTRATED: None
: e. PRIOR ISSUES - RESOLVED: None.                    -  -            -, -
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.27.-Beaver'County Emergency Worker Monitoring and Decontamination Station, Beaver Falls E*
: a. MET: 1.e.1,3.a.1, 6.a.1, 6.b.1.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: d. NOT DEMONSTRATED:None
: e. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES - UNRESOLVED: None 46' 01


NUREG 0654, K.3.a -EFFECT: A permanent record of radiation exposure would not be available for the emergency worker(s).
4.2.2.28. Beaver County Emergency Worker Monitoring and Decontamination Station South Beaver Township Fire Department
CORRECTIVE ACTION DEMONSTRATED:.The Radiation Officer should use his check sheets when briefing emergency workers.Corrective action demonstrated.
: a. MET: 1.e.1, 3.a.1, 6.a.1, 6.b.1.
: c. DEFICIENCY:
: b. AREAS REQUIRING CORRECTIVE ACTION: 6.a.1, 6.a.1.
None 2 d. NOT DEMONSTRATED:
ISSUE NO.: 03-08-6a1-A-02 ISSUE: Reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers.
None e. PRIOR ISSUES -RESOLVED:
(NUREG-0654, J.10.h., K.5.b)
None f. PRIOR ISSUES -.UNRESOLVED:
CONDITION: On Wednesday,- May 14, 2008 at 1900, a South Beaver Fire Department (SBFD) emergency worker (EW), while performing the operational check of a Ludlum Model 2241-3 survey meter procedure, failed
None 4.2.2.26.
      'to clear the alarm'duringthe source check.
Vanport Emergency Operations Center a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.2, 5.a.1.b. AREAS REQUIRING CORRECTIVE ACTION: None., c. DEFICIENCY:
POSSIBLE CAUSE: "Inadequate'training in radiological monitoring equipment checks.
None d. NOT DEMONSTRATED:
None e. PRIOR ISSUES -RESOLVED:
None. ---, -f. PRIOR ISSUES -UNRESOLVED:
None 4.2.2.27.-Beaver'County Emergency Worker Monitoring and Decontamination Station, Beaver Falls a. MET: 1.e.1,3.a.1, 6.a.1, 6.b.1.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
None d. NOT DEMONSTRATED:None
: e. PRIOR ISSUES -RESOLVED:
None f. PRIOR ISSUES -UNRESOLVED:
None 46'01 4.2.2.28.
Beaver County Emergency Worker Monitoring and Decontamination Station South Beaver Township Fire Department
: a. MET: 1.e.1, 3.a.1, 6.a.1, 6.b.1.b. AREAS REQUIRING CORRECTIVE ACTION: 6.a.1, 6.a.1.ISSUE NO.: 03-08-6a1-A-02 ISSUE: Reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers.(NUREG-0654, J.10.h., K.5.b)CONDITION:
On Wednesday,-
May 14, 2008 at 1900, a South Beaver Fire Department (SBFD) emergency worker (EW), while performing the operational check of a Ludlum Model 2241-3 survey meter procedure, failed'to clear the alarm'duringthe s ource check.POSSIBLE CAUSE: "Inadequate'training in radiological monitoring equipment checks.


==REFERENCE:==
==REFERENCE:==
NUREG-0654, K.5.a.
South Beaver Fire Department Radiological Emergency Worker Decontamination Station Procedure, Attachment'3 (Radiological Monitoring Equipment Check), secti0on: IV'.B. 10) (page 18)
EFFECT: If the audible alarm is not reset following operational check of the survey meter, it is possible that the monitor may not note visually if an area being surveyed equals or exceeds 300 counts per minute which indicates contamination.
CORRECTIVE ACTION DEMONSTRATED: The operational check was stopped and the EW was retrained on the procedure. The training was completed at 1910. At 1912, the survey meter was successfully operationally checked. No further action is required.
47


NUREG-0654, K.5.a.South Beaver Fire Department Radiological Emergency Worker Decontamination Station Procedure, Attachment'3 (Radiological Monitoring Equipment Check), secti0on:
0 ISSUE NO.: 03-08-6a1-A-03 ISSUE: Reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers.
IV'.B. 10) (page 18)EFFECT: If the audible alarm is not reset following operational check of the survey meter, it is possible that the monitor may not note visually if an area being surveyed equals or exceeds 300 counts per minute which indicates contamination.
(NUREG-0654, J.10.h., K.5.b)
CORRECTIVE ACTION DEMONSTRATED:
CONDITION: On Wednesday, May 14, 2008, at 1930, the South Beaver Fire Department (SBFD) monitor performingla thyroid survey of an emergency worker (EW) using a Ludlum Model 2241-3 survey meter failed to change from the Ludlum Model 44-9-probe to the Ludlum Model 44-2probe and performed the survey using the window side of the Ludlum Model 44n-9 probe.
The operational check was stopped and the EW was retrained on the procedure.
POSSIBLE CAUSE: Inadequate training in radiological surveying procedures.
The training was completed at 1910. At 1912, the survey meter was successfully operationally checked. No further action is required.47 0 ISSUE NO.: 03-08-6a1-A-03 ISSUE: Reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers.(NUREG-0654, J.10.h., K.5.b)CONDITION:
On Wednesday, May 14, 2008, at 1930, the South Beaver Fire Department (SBFD) monitor performingla thyroid survey of an emergency worker (EW) using a Ludlum Model 2241-3 survey meter failed to change from the Ludlum Model 44-9-probe to the Ludlum Model 44-2probe and performed the survey using the window side of the Ludlum Model 44n-9 probe.POSSIBLE CAUSE: Inadequate training in radiological surveying procedures.


==REFERENCE:==
==REFERENCE:==
NUREG-0654, K.5.a.
South Beaver Fire Department Radiological Emergency Worker Decontamination Station Procedure, Attachment 4 (Surveying and Decontamination Procedures), Sectin ,V.B'.
EFFECT: By using the Ludlum Model 44-9 probe; the readingmay be higher than the correct value due to the lack of probe shielding": This could-result in a reading greater than 0.1 mR/hr above background andwould necessitate referring the individual to a medical- facility for further evaluation.' With the proper probe (Ludlum Model 44-2)&#xfd; such an evaltuation maynrot be necessary.
CORRECTIVE ACTION DEMONSTRATED: Between Wednesday, May 14, 2008 and Monday June 23, 2008, the piocedure for thyroid s6rvey was revised and the EWs were retrained. On Monday, June 23, 2008, between 1852 and 1902, the procedure was successfully redemonstrated. No further action is required.
: c. DEFICIENCY: None
: d. NOT DEMONSTRATED: None 48 61
: e. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES - UNRESOLVED- None 4.2.2.29. Aliquippa School District
: a. MET: 3.c.2.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: d. NOT DEMONSTRATED: None
: e. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES -UNRESOLVED: None 4.2.2.30.. Aliquippa Elementary School.
: a. MET: 3'c.2.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEb ICIENCY: None'"'-'
: d. NOT DEMONSTRATED: None
: e. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.31. Beaver Area: School Distirct
: a. MET: 3.c.2.
b., AREAS REQUIRING CORRECTIVE ACTION: None.
: c. DEFICIENCY: None.
: d. NOT DEMONSTRATED: None.
: e. PRIOR ISSUES  - RESOLVED:.None,..
: f. PRIOR ISSUES  - UNRESOLVED: None 4.2.2.32. Beaver Area Junior Senior High School
: a. MET: 3.c.2.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: d. NOT DEMONSTRATED: None
: e. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES - UNRESOLVED: None 49


NUREG-0654, K.5.a.South Beaver Fire Department Radiological Emergency Worker Decontamination Station Procedure, Attachment 4 (Surveying and Decontamination Procedures), Sectin ,V.B'.EFFECT: By using the Ludlum Model 44-9 probe; the readingmay be higher than the correct value due to the lack of probe shielding":
a 4.2.2.33. Blackhawk School District
This could-result in a reading greater than 0.1 mR/hr above background andwould necessitate referring the individual to a medical- facility for further evaluation.'
: a. MET: 3.c.2.
With the proper probe (Ludlum Model 44-2)&#xfd; such an evaltuation maynrot be necessary.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
CORRECTIVE ACTION DEMONSTRATED:
: c. DEFICIENCY: None
Between Wednesday, May 14, 2008 and Monday June 23, 2008, the piocedure for thyroid s6rvey was revised and the EWs were retrained.
: d. NOT DEMONSTRATED: None
On Monday, June 23, 2008, between 1852 and 1902, the procedure was successfully redemonstrated.
: e. PRIOR ISSUES - RESOLVED: None
No further action is required.c. DEFICIENCY:
: f. PRIOR ISSUES - UNRESOLVED!: None 4.2.2.34. Patterson Primary.School
None d. NOT DEMONSTRATED:
: a. MET: 3.c.2.'
None 48 61
: b. AREAS REQUIRING CORRECTIVE ACTION:,None ,,.
: e. PRIOR ISSUES -RESOLVED:
: c. DEFICIENCY: None
None f. PRIOR ISSUES -UNRESOLVED-None 4.2.2.29.
: d. NOT DEMONSTRATED: None
Aliquippa School District a. MET: 3.c.2.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: e. PRIOR ISSUES- RESOLVED: None-,''
None d. NOT DEMONSTRATED:
: f. PRIOR ISSUES - UNRESOLVED: None,"
None e. PRIOR ISSUES -RESOLVED:
4.2.2.35. Center Area School District.-            K'.,"
None f. PRIOR ISSUES -UNRESOLVED:
: a. MET: 3.c.2.
None 4.2.2.30..
: b. AREAS REQUIRING CORRECTIVE ACTION:"None
Aliquippa Elementary School.a. MET: 3'c.2.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEb ICIENCY: None'"'-'d. NOT DEMONSTRATED:
: c. DEFICIENCY: None
None e. PRIOR ISSUES -RESOLVED:
: d. NOT DEMONSTRATED: None
None f. PRIOR ISSUES -UNRESOLVED:
: e. PRIOR ISSUES - RESOLVED: None,
None 4.2.2.31.
: f. PRIOR ISSUES- UNRESOLVED:: None' 4.2.2.36. Center Area JuniorHigh School;. Center Area School District
Beaver Area: School Distirct a. MET: 3.c.2.b., AREAS REQUIRING CORRECTIVE ACTION: None.c. DEFICIENCY:
: a. MET: 3.c.2.
None.d. NOT DEMONSTRATED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None,
None.e. PRIOR ISSUES -RESOLVED:.None,..
: c. DEFICIENCY: None
: f. PRIOR ISSUES -UNRESOLVED:
: d. NOT DEMONSTRATED: None
None 4.2.2.32.
: e. PRIOR ISSUES - RESOLVED: None
Beaver Area Junior Senior High School a. MET: 3.c.2.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: f. PRIOR ISSUES - UNRESOLVED: None 50 0
None d. NOT DEMONSTRATED:
 
None e. PRIOR ISSUES -RESOLVED:
4.2.2.37. Hopewell Area School District
None f. PRIOR ISSUES -UNRESOLVED:
: a. MET: 3.c.2.
None 49 a 4.2.2.33.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
Blackhawk School District a. MET: 3.c.2.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: c. DEFICIENCY: None
None d. NOT DEMONSTRATED:
: d. NOT DEMONSTRATED: None
None e. PRIOR ISSUES -RESOLVED:
: e. PRIOR ISSUES - RESOLVED: None
None f. PRIOR ISSUES -UNRESOLVED!:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.38. Margaret Ross Elementary School
None 4.2.2.34.
: a. MET: 3.c.2.
Patterson Primary.School
: b. AREAS REQUIRING.CORRECTIVE ACTION: None
: a. MET: 3.c.2.'b. AREAS REQUIRING CORRECTIVE ACTION:,None
: c. DEFICIENCY: None
,,.c. DEFICIENCY:
: d. NOT DEMONSTRATED: None
None d. NOT DEMONSTRATED:
: e. PRIOR ISSUES - RESOLVED: None,
None e. PRIOR ISSUES- RESOLVED:
: f. PRIOR ISSUES - UNRESOLVED: -None..,
None-,''f. PRIOR ISSUES -UNRESOLVED:
4.2.2.39. Midland. 'Borough, School District-.
None," 4.2.2.35.
: a. MET: 3.c.2.
Center Area School District.-
: b. AREAS REQUIRING CORRECTIVE ACTION:None,
K'.," a. MET: 3.c.2.b. AREAS REQUIRING CORRECTIVE ACTION:"None
: c. DEFICIENCY: None
: c. DEFICIENCY:
: d. NOT DEMONSTRATED: None
None d. NOT DEMONSTRATED:
: e. PRIOR ISSUES - RESOLVED: None:,
None e. PRIOR ISSUES -RESOLVED:
: f. PRIOR ISSUES - UNRESOLVED:&#xfd;None.
None, f. PRIOR ISSUES- UNRESOLVED::
4.2.2.40. Neel .Elementary School
None'4.2.2.36.
: a. MET: 3.c.2.
Center Area JuniorHigh School;. Center Area School District a. MET: 3.c.2.b. AREAS REQUIRING CORRECTIVE ACTION: None, c. DEFICIENCY:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None d. NOT DEMONSTRATED:
: c. DEFICIENCY: None
None e. PRIOR ISSUES -RESOLVED:
: d. NOT DEMONSTRATED: None
None f. PRIOR ISSUES -UNRESOLVED:
: e. PRIOR ISSUES - RESOLVED: None
None 50 0 4.2.2.37.
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.41. Monaca School District 51.
Hopewell Area School District a. MET: 3.c.2.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
 
None d. NOT DEMONSTRATED:
0
None e. PRIOR ISSUES -RESOLVED:
: a. MET: 3.c.2.
None f. PRIOR ISSUES -UNRESOLVED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None 4.2.2.38.
: c. DEFICIENCY: None
Margaret Ross Elementary School a. MET: 3.c.2.b. AREAS REQUIRING.CORRECTIVE ACTION: None c. DEFICIENCY:
: d. NOT DEMONSTRATED: None
None d. NOT DEMONSTRATED:
: e. PRIOR ISSUES - RESOLVED: None
None e. PRIOR ISSUES -RESOLVED:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.42. Fifth Ward Elementary School,. Monaca School District
None, f. PRIOR ISSUES -UNRESOLVED: -None.., 4.2.2.39.
: a. MET: 3.c.2.
Midland. 'Borough, School District-.
: b. AREAS REQUIRING CORRECTIVE ACTION:,None. 0
: a. MET: 3.c.2.b. AREAS REQUIRING CORRECTIVE ACTION:None, c. DEFICIENCY:
: c. DEFICIENCY: None
None d. NOT DEMONSTRATED:
: d. NOT DEMONSTRATED: None        ...
None e. PRIOR ISSUES -RESOLVED:
: e. PRIOR ISSUES - RESOLVED: None
None:, f. PRIOR ISSUES -UNRESOLVED:&#xfd;None.
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.43. New Brighton, School, District.
4.2.2.40.
: a. MET: 3.c.2.
Neel .Elementary School a. MET: 3.c.2.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None d. NOT DEMONSTRATED:
: c. DEFICIENCY: None
None e. PRIOR ISSUES -RESOLVED:
: d. NOT DEMONSTRATED: None        ..
None f. PRIOR ISSUES -UNRESOLVED:
: e. PRIOR ISSUES - RESOLVED: None
None 4.2.2.41.
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.44. Ambridge Area School District
Monaca School District 51.
: a. MET: 3.c.2.
0 a. MET: 3.c.2.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
0
None d. NOT DEMONSTRATED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None:
None e. PRIOR ISSUES -RESOLVED:
: c. DEFICIENCY: None
None f. PRIOR ISSUES -UNRESOLVED:
: d. NOT DEMONSTRATED: None
None 4.2.2.42.
: e. PRIOR ISSUES - RESOLVED: None
Fifth Ward Elementary School,. Monaca School District a. MET: 3.c.2.b. AREAS REQUIRING CORRECTIVE ACTION:,None.
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.45. South Side Area School District 52 0
: c. DEFICIENCY:
: a. MET: 3.c.2.
None d. NOT DEMONSTRATED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None C. DEFICIENCY: None
None ...e. PRIOR ISSUES -RESOLVED:
: d. NOT DEMONSTRATED: None
None f. PRIOR ISSUES -UNRESOLVED:
: e. PRIOR ISSUES - RESOLVED: None
None 0 4.2.2.43.
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.46. South Side Middle School
New Brighton, School, District.a. MET: 3.c.2.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: a. MET: 3.c.2.
None d. NOT DEMONSTRATED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None ..e. PRIOR ISSUES -RESOLVED:
: c. DEFICIENCY: None
None f. PRIOR ISSUES -UNRESOLVED:
: d. NOT DEMONSTRATED: None
None 4.2.2.44.
: e. PRIOR ISSUES - RESOLVED: None
Ambridge Area School District a. MET: 3.c.2.b. AREAS REQUIRING CORRECTIVE ACTION: None: c. DEFICIENCY:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.47. Western Beaver Schools
None d. NOT DEMONSTRATED:
: a. MET: 3.c.2.
None e. PRIOR ISSUES -RESOLVED:
: b. AREAS REQUIRING CORRECTIVE'ACTION: None
None f. PRIOR ISSUES -UNRESOLVED:
: c. DEFICIENCY: None
None 4.2.2.45.
: d. NOT DEMONSTRATED: None
South Side Area School District 52 0 0 a.b.C.d.e.f.MET: 3.c.2.AREAS REQUIRING CORRECTIVE ACTION: None DEFICIENCY:
: e. PRIOR ISSUES - RESOLVED: None
None NOT DEMONSTRATED:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.48. Western Beaver Jr/Sr High School
None PRIOR ISSUES -RESOLVED:
: a. MET: 3.c.2.
None PRIOR ISSUES -UNRESOLVED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None 4.2.2.46.
: c. DEFICIENCY: None
South Side Middle School a. MET: 3.c.2.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: d. NOT DEMONSTRATED: None
None d. NOT DEMONSTRATED:
: e. PRIOR ISSUES - RESOLVED: None
None e. PRIOR ISSUES -RESOLVED:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.49. Hancock County Emergency Operations Center 53
None f. PRIOR ISSUES -UNRESOLVED:
 
None 4.2.2.47.
0
Western Beaver Schools a. MET: 3.c.2.b. AREAS REQUIRING CORRECTIVE'ACTION:
: a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 2.a.1, 2.c.1, 3.a.1, 3.b.1, 3.c.1, 3.c.2, 3.d.1, 3.d.2, 5.a.1, 5.b.1.
None c. DEFICIENCY:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None d. NOT DEMONSTRATED:
: c. DEFICIENCY: None
None e. PRIOR ISSUES -RESOLVED:
: d. NOT DEMONSTRATED: None
None f. PRIOR ISSUES -UNRESOLVED:
: e. PRIOR ISSUES - RESOLVED: None
None 4.2.2.48.
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.50. Hancock County Traffic and Access Control, County Court House
Western Beaver Jr/Sr High a. MET: 3.c.2.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: a. MET: 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.d.1, 3.d.2.                                   0
None d. NOT DEMONSTRATED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None e. PRIOR ISSUES -RESOLVED:
: c. DEFICIENCY: None
None f. PRIOR ISSUES -UNRESOLVED:
: d. NOT DEMONSTRATED: None"
None School 4.2.2.49.
: e. PRIOR ISSUES- RESOLVED: None
Hancock County Emergency Operations Center 53 0 a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 2.a.1, 2.c.1, 3.a.1, 3.b.1, 3.c.1, 3.c.2, 3.d.1, 3.d.2, 5.a.1, 5.b.1.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: f. PRIOR ISSUES - UNRESOLVED1 None,                    .  .
None d. NOT DEMONSTRATED:
4.2.2.51. Hancock County Back'-upRoute Alerting, Oakland Fire Department-                            ..
None e. PRIOR ISSUES -RESOLVED:
: a. MET: 1.d.1, 1.e.1,3.a.1,3.b.1,5.a.3.
None f. PRIOR ISSUES -UNRESOLVED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None 4.2.2.50.
: c. DEFICIENCY: None
Hancock County Traffic and Access Control, County Court House a. MET: 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.d.1, 3.d.2.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: d. NOT DEMONSTRATED: None
None d. NOT DEMONSTRATED:
: e. PRIOR ISSUES - RESOLVED: None
None" e. PRIOR ISSUES- RESOLVED:
: f. PRIOR ISSUES - UNRESOLVED: NKone:
None f. PRIOR ISSUES -UNRESOLVED1 None, ..4.2.2.51.
0 4.2.2.52. Hancock County Reception Center, weir High School Complex
Hancock County Back'-upRoute Alerting, Oakland Fire Department-
: a. MET: 3.a.1, 6.a.1.
..a. MET: 1.d.1, 1.e.1,3.a.1,3.b.1,5.a.3.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: c. DEFICIENCY: None
None d. NOT DEMONSTRATED:
: d. NOT DEMONSTRATED: None
None e. PRIOR ISSUES -RESOLVED:
: e. PRIOR ISSUES - RESOLVED: None 54 01
None f. PRIOR ISSUES -UNRESOLVED:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.53. Hancock County Monitoring and Decontamination Center, Weir High School Complex
NKone: 4.2.2.52.
: a. MET: 3.a.1, 6.a.1.
Hancock County Reception Center, weir High School Complex a. MET: 3.a.1, 6.a.1.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None d. NOT DEMONSTRATED:
: c. DEFICIENCY: None
None e. PRIOR ISSUES -RESOLVED:
: d. NOT DEMONSTRATED: None
None 54 0 0 01
: e. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES -UNRESOLVED:
: f. PRIOR ISSUES - UNRESOLVED: None'.
None 4.2.2.53.
4.2.2.54. Hancock CoUnty Mass Care Center, Weir High School Complex
Hancock County Monitoring and Decontamination Center, Weir High School Complex a. MET: 3.a.1, 6.a.1.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: a. MET: 1.e.1, 6.c.1.
None d. NOT DEMONSTRATED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None'
None e. PRIOR ISSUES -RESOLVED:
: c. DEFICIENCY: None d.; NOT DEMONSTRATED: None        -
None f. PRIOR ISSUES -UNRESOLVED:
: e. PRIOR ISSUES - RESOLVED: None
None'.4.2.2.54.
: f. PRIOR ISSUES - UNRESOLVED: None.'
Hancock CoUnty Mass Care Center, Weir High School Complex a. MET: 1.e.1, 6.c.1.b. AREAS REQUIRING CORRECTIVE ACTION: None'c. DEFICIENCY:
4.2.2.55. Hancock County Emergency Worker Monitor and Decontamination Statiohn, -New Cumberland Fire Department..-
None d.; NOT DEMONSTRATED:
: a. MET: 3.a.1, 6.a.1, 6.b.1.
None -e. PRIOR ISSUES -RESOLVED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None f. PRIOR ISSUES -UNRESOLVED:
: c. DEFICIENCY: None
None.'4.2.2.55.
: d. NOT DEMONSTRATED: None
Hancock County Emergency Worker Monitor and Decontamination Statiohn, -New Cumberland Fire Department..-
: e. PRIOR ISSUES -.RESOLVED: None
: a. MET: 3.a.1, 6.a.1, 6.b.1.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: f. PRIOR ISSUES - UNRESOLVED: None.
None d. NOT DEMONSTRATED:
4.2.2.56. Hancock County School District 55
None e. PRIOR ISSUES -.RESOLVED:
 
None f. PRIOR ISSUES -UNRESOLVED:
0
None.4.2.2.56.
: a. MET: 3.c.2.
Hancock County School District 55 0 a.b.C.d.e.f.MET: 3.c.2.AREAS REQUIRING CORRECTIVE ACTION: None DEFICIENCY:
: b. AREAS REQUIRING CORRECTIVE ACTION: None C. DEFICIENCY: None
None NOT DEMONSTRATED:
: d. NOT DEMONSTRATED: None
None PRIOR ISSUES -RESOLVED:
: e. PRIOR ISSUES - RESOLVED: None
None PRIOR ISSUES -UNRESOLVED:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.57. Oak Glen High School, Hancock County School District
None 4.2.2.57.
: a. MET: 3.c.2.
Oak Glen High School, Hancock County School District a. MET: 3.c.2.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: b. AREAS REQUIRING CORRECTIVE ACTION: None     0
None d. NOT DEMONSTRATED:
: c. DEFICIENCY: None
None e. PRIOR ISSUES- RESOLVED:
: d. NOT DEMONSTRATED: None
None f. PRIOR ISSUES -UNRESOLV'ED:
: e. PRIOR ISSUES- RESOLVED: None
None b 4.2.3. Support Jurisdictions 4.2.3.1. Allegheny County Emergency Opera tions Center a. MET: 1.a.1,1.c.1,1.d.1,1.e.1.
: f. PRIOR ISSUES - UNRESOLV'ED: Noneb 4.2.3. Support Jurisdictions 4.2.3.1. Allegheny County Emergency Opera tions Center
: b. AREAS REQUIRING CORRECTIVE ACTION: None 'c. DEFICIENCY:
: a. MET: 1.a.1,1.c.1,1.d.1,1.e.1.
None d. NOT DEMONSTRATED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None '
None e. PRIOR ISSUES -RESOLVED:
: c. DEFICIENCY: None
None f. PRIOR ISSUES -UNRESOLVED:'
: d. NOT DEMONSTRATED: None
None 4.2.3.2. Allegheny Co Reception Center. South Park 0 0 Fair a.b.C.Grounds MET: 6.a.1.AREAS REQUIRING CORRECTIVE ACTION: None, DEFICIENCY:
: e. PRIOR ISSUES - RESOLVED: None                0
None 56 0
: f. PRIOR ISSUES - UNRESOLVED:' None 4.2.3.2. Allegheny Co Reception Center. South Park Fair Grounds
: d. NOT DEMONSTRATED:
: a. MET: 6.a.1.
None e. PRIOR ISSUES -RESOLVED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None, C. DEFICIENCY: None 56 0
None f. PRIOR ISSUES -UNRESOLVED:
: d. NOT DEMONSTRATED: None
None 4.2.3.3. Allegheny County Monitoring and Decontamination Center, South Park Fair Grounds a. MET: 3.a.1, 6.a.1.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: e. PRIOR ISSUES - RESOLVED: None
None d. NOT DEMONSTRATED:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.3.3. Allegheny County Monitoring and Decontamination Center, South Park Fair Grounds
None e. PRIOR ISSUES- RESOLVED:
: a. MET: 3.a.1, 6.a.1.
None f. PRIOR ISSUES -UNRESOLVED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None 4.2.3.4. Allegheny Co Mass Care Center, South.Park High School a. MET: 6.c.1.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: c. DEFICIENCY: None
None d. NOT DEMONSTRATED:
: d. NOT DEMONSTRATED: None
None e. PRIOR ISSUES -RESOLVED:'None
: e. PRIOR ISSUES- RESOLVED: None
: f. PRIOR ISSUES -UNRESOLVED:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.3.4. Allegheny Co Mass Care Center, South
None 4.2.3.5. Butler County Emergency Operations Center a. MET: 1.a.1,1.c.1,1.d.1,1.e.1.
.Park High School
: b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: a. MET: 6.c.1.
None d. NOT DEMONSTRATED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None e. PRIOR iSSUES'- RESOLVED:
: c. DEFICIENCY: None
None'" f. PRIOR ISSUES -UNRESOLVED:
: d. NOT DEMONSTRATED: None
None 4.2.3.6. Butler County Reception Center, Slippery Rock University 57
: e. PRIOR ISSUES - RESOLVED:'None
: a. MET: 6.a.1.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.3.5. Butler County Emergency Operations Center
None d. NOT DEMONSTRATED:.
: a. MET: 1.a.1,1.c.1,1.d.1,1.e.1.
None e. PRIOR ISSUES -RESOLVED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None f. PRIOR ISSUES -UNRESOLVED:
: c. DEFICIENCY: None
None 4.2.3.7. Butler County Mass Care Center, Slippery Rock University
: d. NOT DEMONSTRATED: None
: a. MET: 6.c.l.b. AREAS REQUIRING CORRECTIVE ACTION: None S c. DEFICIENCY:
: e. PRIOR iSSUES'- RESOLVED: None'"
None'd. NOT DEMONSTRATED:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.3.6. Butler County Reception Center, Slippery Rock University 57
None e. PRIOR ISSUES: RESOLVED:
: a. MET: 6.a.1.
None f. PRIOR ISSUES -UNRESOLVED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None 4.2.3.8. Butler County.- Monitoring-and Decontamination Center ... ..... .a. MET: 3.a.1, 6.a.1.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: c. DEFICIENCY: None
None" d. NOT DEMONSTRATED:
: d. NOT DEMONSTRATED:. None
None e. PRIOR ISSUES -RESOLVED:
: e. PRIOR ISSUES - RESOLVED: None
6.a.1.ISSUE NO.: 03-06-6a1-A-03 ISSUE: The team assigned to the Monitoring and Decontamination Center was not familiar with procedures, including:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.3.7. Butler County Mass Care Center, Slippery Rock University
: a. Monitoring/decontamination sequences required when using portal monitor;b. Identification of clean, or decontaminated, evacuees ofr admittance to Registration; 58 0
: a. MET: 6.c.l.
: c. Methods employed to minimize contamination of the facility (e.g. step-off pads not used);d. Signing to control traffic flow, such as identification of "clean" and"contaminated" zones, pathways, or areas;e. Source check of portal monitor according to procedure;
: b. AREAS REQUIRING CORRECTIVE ACTION: None                                     S
: c. DEFICIENCY: None'
: d. NOT DEMONSTRATED: None
: e. PRIOR ISSUES: RESOLVED: None
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.3.8. Butler County.- Monitoring-and Decontamination Center                       ... .    . .    ..            .
: a. MET: 3.a.1, 6.a.1.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None"
: d. NOT DEMONSTRATED: None
: e. PRIOR ISSUES - RESOLVED: 6.a.1.
ISSUE NO.: 03-06-6a1-A-03 ISSUE: The team assigned to the Monitoring and Decontamination Center was not familiar with procedures, including:
: a. Monitoring/decontamination sequences required when using portal monitor;
: b. Identification of clean, or decontaminated, evacuees ofr admittance to Registration; 58 0
: c. Methods employed to minimize contamination of the facility (e.g. step-off pads not used);
: d. Signing to control traffic flow, such as identification of "clean" and "contaminated" zones, pathways, or areas;
: e. Source check of portal monitor according to procedure;
: f. Processing of personal items and valuables.
: f. Processing of personal items and valuables.
CORRECTIVE ACTION DEMONSTRATED:
CORRECTIVE ACTION DEMONSTRATED: Issue Number 03-06-6.a. 1-A-03 for the Monitoring and Decontamination. Team not being familiar with procedures was closed with the demonstration for this exercise. Traffic flow was controlled to identify contaminated pathways. Personal items found to be contaminated were identified, bagged, and segregated. The portal monitor was source checked per procedure. Only evacuees free of contamination were identified for admittance to Registration. The monitoring and decontamination sequences were successfully demonstrated using the portal monitor and hand held su''rvey meter.:
Issue Number 03-06-6.a.
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.3.9. Lawrence County Emergency Operations Center
1 -A-03 for the Monitoring and Decontamination.
: a. MET: 1.a.1,1.c.1,1.d.1,1.e.1.
Team not being familiar with procedures was closed with the demonstration for this exercise.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
Traffic flow was controlled to identify contaminated pathways.
: c. DEFICIENCY: None
Personal items found to be contaminated were identified, bagged, and segregated.
: d. NOT DEMONSTRATED: None
The portal monitor was source checked per procedure.
: e. PRIOR ISSUES - RESOLVED: None
Only evacuees free of contamination were identified for admittance to Registration.
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.3.10. Lawrence County Reception Center Mohawk Area High School.
The monitoring and decontamination sequences were successfully demonstrated using the portal monitor and hand held su''rvey meter.: f. PRIOR ISSUES -UNRESOLVED:
: a. MET: 6.a.1.
None 4.2.3.9. Lawrence County Emergency Operations Center a. MET: 1.a.1,1.c.1,1.d.1,1.e.1.
59
: b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
 
None d. NOT DEMONSTRATED:
a
None e. PRIOR ISSUES -RESOLVED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None C. DEFICIENCY: None
None f. PRIOR ISSUES -UNRESOLVED:
: d. NOT DEMONSTRATED: None
None 4.2.3.10.
: e. PRIOR ISSUES - RESOLVED: None
Lawrence County Reception Center Mohawk Area High School.a. MET: 6.a.1.59 a b.C.d.e.f.AREAS REQUIRING CORRECTIVE ACTION: None DEFICIENCY:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.3.11. Lawrence County Monitoring and Decontamination Center, Mohawk High School,
None NOT DEMONSTRATED:
: a. MET: 3.a.1, 6.a.1.
None PRIOR ISSUES -RESOLVED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None,
None PRIOR ISSUES -UNRESOLVED:
: c. DEFICIENCY: None:                            0
None 4.2.3.11.
: d. NOT DEMONSTRATED: None,
Lawrence County Monitoring and Decontamination Center, Mohawk High School, a. MET: 3.a.1, 6.a.1.b. AREAS REQUIRING CORRECTIVE ACTION: None, c. DEFICIENCY:
: e. PRIOR ISSUES   - RESOLVED: None       . .,
None: d. NOT DEMONSTRATED:
: f. PRIOR ISSUES - UNRESQLVED: None 4.2.3.12. Lawrence County MasS Care center, Union High School
None, e. PRIOR ISSUES -RESOLVED:
: a. MET: 6.c.1.
None .., f. PRIOR ISSUES -UNRESQLVED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None 4.2.3.12.
: c. DEFICIENCY" None
Lawrence County MasS Care center, 0 Union High School a. MET: 6.c.1.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY" None d. NOT DEMONSTRATED:
: d. NOT DEMONSTRATED: None
None e. PRIOR ISSUES -RESOLVED:
: e. PRIOR ISSUES - RESOLVED: None
None f. PRIOR ISSUES -UNRESOLVED:
: f. PRIOR ISSUES - UNRESOLVED: None..
None..4.2.3.13.
4.2.3.13. Washington County Emergency Operations 0
Washington County Emergency Operations Center a. MET: 1.a.1,1.c.1,1.d.1,1.e.1.
Center
: b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: a. MET: 1.a.1,1.c.1,1.d.1,1.e.1.
None d. NOT DEMONSTRATED:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None e. PRIOR ISSUES -RESOLVED:
: c. DEFICIENCY: None
None f. PRIOR ISSUES -UNRESOLVED:
: d. NOT DEMONSTRATED: None
None 60 0 49 4.2.3.14.
: e. PRIOR ISSUES - RESOLVED: None
Washington Co Reception Center County Fair Grounds a. MET: 6.a.1.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: f. PRIOR ISSUES - UNRESOLVED: None 60 49
None d. NOT DEMONSTRATED:
 
None e. PRIOR ISSUES -RESOLVED:
4.2.3.14. Washington Co Reception Center County Fair Grounds
None f. PRIOR ISSUES -UNRESOLVED:
: a. MET: 6.a.1.
None 4.2.3.15.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
Washington County Monitoring arid Decontamination Center McGuffey High School a. MET: 3.a.1, 6.a.1.b. AREAS REQUIRING CORRECTIVE ACTION: None c. DEFICIENCY:
: c. DEFICIENCY: None
None d. NOT DEMONSTRATED:
: d. NOT DEMONSTRATED: None
None, e. PRIOR ISSUES -RESOLVED:
: e. PRIOR ISSUES - RESOLVED: None
None f. PRIOR ISSUES -UNRESOLVED:
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.3.15. Washington County Monitoring arid Decontamination Center McGuffey High School
None 4.2.3.16.
: a. MET: 3.a.1, 6.a.1.
Washington County Mass Care Center, McGuffey Jr/Sr High School a. MET: 6.c.1.b. AREAS REQUIRING CORRECTIVE ACTION: None'c. DEFICIENCY:
: b. AREAS REQUIRING CORRECTIVE ACTION: None
None d. NOT DEMONSTRATED:
: c. DEFICIENCY: None
None e. PRIOR ISSUES- RESOLVED:
: d. NOT DEMONSTRATED: None,
None f. PRIOR ISSUES -UNRESOLVED:
: e. PRIOR ISSUES - RESOLVED: None
None 61 0 APPENDIX 1 ACRONYMS AND ABBREVIATIONS AAC Accident Assessment Coordinator ACEMA Allegheny County Emergency Management Agency ACP Access Control Points ALARA As Low As Reasonably Achievable ARC American Red Cross ARES Amateur Radio Emergency Service AS Assistant Superintendent BASD Beaver Area School District BASDEOP Beaver Area School District Emergency Operations Plan BB Beaver Borough.BCEMA Beaver County.Emergency Management Agency .BCEOC Beaver County.Emergency Operations Center..BED Beaver Fire Department  
: f. PRIOR ISSUES - UNRESOLVED: None 4.2.3.16. Washington County Mass Care Center, McGuffey Jr/Sr High School
' ".BHS Beaver High School.BHSP Beaver High School Principal BMSP Beaver Middle School Principal.., BSD Blackhawk School District BVIU Beaver.Valley Intermediate Unit BVIUD Beaver Valley Intermediate Unit Director BVNPS Beaver Valley Nuclear PowerStation.
: a. MET: 6.c.1.
BVPS Beaver Valley Power Station CC Communications Center.CO Communications Officer DC Dosimetry Coordinator'  
: b. AREAS REQUIRING CORRECTIVE ACTION: None'
.DRD Direct Reading Dosimeter.'....
: c. DEFICIENCY: None
EAL Emergency Action Level EAS Emergency Alert System .ECL Emergency Classification Level EMA Emergency Management Agency EMC Emergency Management Coordinator EMD Emergency Management Director EMS Emergency Medical Services EOC Emergency Operations Center .2 .EOF Emergency Operating Facility EOP Emergency Operations Plan EPZ Emergency Planning Zone * ..ERDS Emergency Response Data System.ERF Emergency Response Facility EW Emergency Workers EWDC Emergency.Worker Decontamination Center FEMA Federal Emergency Management Agency FENOC First Energy Nuclear Operating Company FMP Field Monitoring Point 40 40 62.61 FMT Field Monitoring Team FTC Field Team Coordinator GE General Emergency GEC Gold Executive Conference GIS Geographic Information System GPS Global Positioning System HCCC, Hancock County Communications Center HCEN Hancock County Emergency Network HCEOC Hancock County Emergency Operations Center HS High School ICS Incident Command System IP Internet Protocol IU Intermediate Unit JIC Joint Information Center JPIC Joint Public Information Center.KC Knowledge Center LCEMA Lawrence County EmergencyManagement Agency MCC Mass Care Center MPD Monaca Police Department MSD Medical Services Director MT .McCarter Trans ortation NCVFD New Cumberland Volunteer Fire Department-NRC .Nuclear Regulatory Commission PA Public Address PAD 'Protective Action Decisions PAG. Protective Action Guides PAR Protective Action Recommendation PC Personal Computer PEMA Pennsylvania Emergency Management Agency PEMARS Pennsylvania Emergency Management Agency Radio System PEMRS Pennsylvania Emergency Management Radio System PES Patterson Elementary School PHBVFD Patterson Heights Borough Volunteer Fire Department PIC Pubiic information Center Pio Public Information Officer PRD Permanent Record Dosimeter PSP Pennsylvania State Police.RAC Radiological Assistance Committee RACES Radio Amateur Communications Emergency Services RC Reception Center RCO Rumor Control Officer'REACT Radio Emergency Assistance Communications Team REP Radioiogical Emergency Planning RO Radiologicai Officer RPO Radiological Protection Officer RSO Radiological Safety Officer SAE Site Area Emergency SBFD South Beaver Fire Department SEOC State Emergency Operations Center 63 0 SHO State Health Officer SOP Standard Operating Procedure SRHS Slippery Rock High School SSO School Services Officer TC Transportation Coordinator TCP Traffic Control Points TEDE Total Effective Dose Equivalent TO Transportation Officer VFD Volunteer Fire Department VHF Very High Frequency WV West Virginia 0 0 64 0 APPENDIX 2 EXERCISE EVALUATORS AND TEAM LEADERS 65 6 DATE: 2008-06-24, SITE: Beaver Valley Power Station, PA LOCATION~
: d. NOT DEMONSTRATED: None
K. ~ ~ < i EVALUATOR  
: e. PRIOR ISSUES- RESOLVED: None
~ AGENCY Beaver Valley Joint Public Information Center Gary Bolender ICF PA State Field Monitoring Team A, South West Region W. Morrison Jackson ICF PA State Field Monitoring Team B; South West Region Ronald Biernacki ICF Commonwealth of Pennsylvania State Traffic/Access Control DeeEll Fifield ICF Points State of West Virginia Emergency Operations Center David Petta ICF Chris Thompson FAA West Virginia Public Information Center Paul Nied ICF West Virginia Accicent Assessment Center James Hickey ICF West Virginia Field Air Monitoring Team Paul Cromier " ICF Beaver County Emergency Operations Center Marcy.Campbell ICF* .DeeEIlFifield  
: f. PRIOR ISSUES - UNRESOLVED: None 61
*iCF.Richard Wessman ICF Aliquippa Emergency Operations Center Deborah Bell ' ICF Beaver Borough Emergency Operations.Center.
 
Clark Cofer ' " ICF-: Robert Duggleby ICFE Beaver County, Beaver Borough, Back-up Route Alerting Robert Duggleby-.-.:, .ICF Bridgewater/Fallston Emergency.Operations Center John Flynn .*- I CF7_1 .Brighton Township Emergency:Operations Center -. Michael Meshenberg ICF Michael Petullo ICF Beaver County, Brighton Township, Back-up Route Alerting Michael Meshenberg ICF Center Township Emergency Operations Center .Michael Burriss ICE Chippewa Township Emergency Operations Center .Robert Gantt IdF Quirano lannazzo ICE .Beaver County, Chippewa Township, Back-up Route Ale'rting Robert Gantt ICFE Frankfort Springs Borough, Hanover Township, Georgetown.
0 APPENDIX 1 ACRONYMS AND ABBREVIATIONS AAC     Accident Assessment Coordinator ACEMA   Allegheny County Emergency Management Agency ACP     Access Control Points ALARA   As Low As Reasonably Achievable ARC     American Red Cross ARES   Amateur Radio Emergency Service AS     Assistant Superintendent BASD   Beaver Area School District BASDEOP Beaver Area School District Emergency Operations Plan BB     Beaver Borough.                                               40 BCEMA   Beaver County.Emergency Management Agency .
Robert -Lemeshka, ICF" borough, Greene Township, Hookstown Borough'Emergency GeorgeR MacDonald ICF " Operations Center ., , Independence Township Emergency Operations Center Kieth Earnshaw ICF -Industry Emergency Operations Center, Gary'G0ldberg iCF Hopewell Township Emergency Operations Center,. .' , Albert Lookabaugh IC" F Beaver County, Hopewell Township, Back-up Route Alerting Roger Jobe ICF Midland Emergency Operations Center .Simon (Guereca" ICF Monaca Emergency Operations Center Mark Dalton, .ICF Beaver County, Monaca Back-up Route Alerting Nick Lowe .ICF Patterson Heights/Patterson Township Emergency Operations William -Edmonson ICF Center Beaver County, Patterson Township, Back-up Route Alerting Lenora Borchardt-ICF Potter Township Emergency Operations Center Michael Burns ICF Raccoon Township Emergency.
BCEOC   Beaver County.Emergency Operations Center..
Operations Center Ernest Boaze- .. ICF Shippingport Emergency Operations Center -Earl Shollenberger ICF South Beaver/Ohioville/Glasgow Emergency Operations Center Nancy Johnson. ICF.... ..__ __ _ _ Denise Solomon ICF South Heights Emergency Operations Center Marynette Herndon ICF Vanport Emergency Operations Center David White ICF Beaver County Emergency Worker Monitoring and Ronald Biernacki ICF Decontamination Station, Beaver Falls FD Beaver County Emergency Worker Monitoring and Steve Denson " ICF Decontamination Station South Beaver Township Fire Department 0 66 61 Aliquippa School District Ronald Biernacki ICF Aliquippa Elementary School Ronald Biernacki ICF Beaver Area School Distirct Steve Denson ICF Beaver Area Junior Senior High School Steve Denson ICF Blackhawk School District James Hickey ICF Patterson Primary School James Hickey ICF Center Area School District Jill Leatherman ICF Center Area Junior High School, Center Area School District Jill Leatherman ICF Hopewell Area School District Michael Petullo ICF Margaret Ross Elementary School. Michael Petullo ICF Midland Borough School District David StUenkel.
BED     Beaver Fire Department                       '       ".
ICF Neel Elementary School David Stuenkel ICF Monaca School District Patrick Taylor ICF Fifth Ward Elementary School, Monaca School District PatrickTaylor ICF New Brighton School District Robert Black ICF Ambridge Area School District Gary Bolender ICF South Side Area School District.'
BHS     Beaver High School.
John Flynn. -ICF South Side Middle School"' John Flynn ICF Western Beaver Schools Lawrence Visniesky ICF Western Beaver Jr/Sr High School Lawrence Visniesky ICF Hancock County Emergency Operations, Center W. LyleSlagle ICF Joseph.Suders  
BHSP   Beaver High School Principal BMSP   Beaver Middle School Principal..,
.. FEMA RIII Jim Torgler ICF.. ...........
BSD     Blackhawk School District BVIU   Beaver.Valley Intermediate Unit BVIUD   Beaver Valley Intermediate Unit Director BVNPS   Beaver Valley Nuclear PowerStation.
__ _ _ _ _ Lawrence Visniesky ICF Hancock Cob'nty Traffic and Access Control, County Court Patrick Taylor ICF House ". " Hancock County Back-up:Route Alerting:, Oakland Fire' Paul Nied ICF Department.  
BVPS   Beaver Valley Power Station CC     Communications Center.
..Hancock Couinty Reception Center, Weir High*Scho0ol Complex David Stuenkel ICF Hancock County Monitoring and Decontamination Center, Weir David Stuenkel ICF High School Complex. ...............-
CO     Communications Officer DC     Dosimetry Coordinator'                                     .
Hancock County Mass Care CenterWeir High School Complex David Stuenkel ICF Hancock County Emergency Workeir Monitor and Patrick..Tay I o ICF Decontamination Statin,'Ne6W Cumberland Fire Department
DRD     Direct Reading Dosimeter.'....
* Ta.. r ICE Hancock County School District I ..awrernice.Visniesky ICE Oak Glen High School, Hancock County School District Lawrence Visniesky ICFE Allegheny County. Emergency Operations Center Rosemary[Samsel ICF Allegheny Co Reception Center South Park Fair Grounds Robert Black ICF Allegheny County Monitoring and Decontamination-Center, JamesHickey ICF South Park Fair Grounds ....Allegheny Co Mass Care.Center, South Park HighSchool Robert Black ICF Butler County Emergency-Operatiohs Center-. Wendy Swygert ICF Butler County Reception-Center, Slippery Rock University  
EAL     Emergency Action Level EAS     Emergency Alert System                 .
-Gary Bolender ICF Butler County Mass Cai-e .Center, Slippery Rock University Gary Bolender ICEF Butler County Monitoring'.and Decontamination Center Jill Leatherman ICF Lawrence County Emergency Operations Center William Vocke ICF Lawrence County Reception Center Mohawk Area High School John Flynn ICF Lawrence County Monitoringand Decontamination Center,- Michael Petullo ICF Mohawk High School .Lawrence County Mass Care Center, Union High School John Flynn ICF Washington County Emergency Operations Center .. Patrick Taylor ICF Washington Co Reception Center County Fair Grounds Lawrence Visniesky ICF 67 0 Washington County Monitoring and Decontamination Center David Stuenkel ICF McGuffey High School Washington County Mass Care Center, McGuffey Jr/Sr High Lawrence Visniesky ICF School 0 0 68 6 APPENDIX 3 EXERCISE EVALUATION AREAS AND EXTENT OF PLAY COMMON WEALTH OF PENNSYLVANIA BEAVER VALLEY POWER STATION 2008 RADIOLOGICAL EMERGENCY PREPAREDNESS EXERCISE METHOD OF OPERATION March 27, 2008 1. Beaver Valley Power Station The facility normally uses off-watch section personnel to participate in the exercise.The plant's simulated events, radiation readings, and emergency classifications will trigger offsite exercise actions. BVPS will notify the State EOC, the Bureau of Radiation Protection (BRP), and the risk county of emergency classifications.
ECL     Emergency Classification Level EMA     Emergency Management Agency EMC     Emergency Management Coordinator EMD     Emergency Management Director EMS     Emergency Medical Services 40 EOC     Emergency Operations Center       .       2     .
: 2. Bureau of Radiation Protection (BRP)Personnel will be present at the State EOC, the nuclear facility EOF, and at field locations.
EOF     Emergency Operating Facility EOP     Emergency Operations Plan EPZ     Emergency Planning Zone                         *       ..
Only the field teams will be evaluated.
ERDS   Emergency Response Data System.
: 3. PEMA Operations at State EOC / PEMA Headquarters This "Method of Operation" Document includes activities for the Full-Scale Plume Exercise (June 24, 2008), and the "Out of Sequence" Activities (May 14, 2008).A. Plume Exercise -June 24, 2008 PEMA Bureau of Operations and Training staff, augmented by designated PEMA personnel from the Fire Commissioner's Office, the Bureau of Administration, Technical Services, Plans, plus Emergency Preparedness Liaison Officers (EPLOs) with accompanying response team members from designated state departments/agencies, including representatives from the USDA State Emergency Board will comprise initial operations at the State Emergency Operations Center (EOC). The State EOC will not be evaluated during this exercise.B. Plume Exercise -"Out of Sequence" Activities  
ERF     Emergency Response Facility EW     Emergency Workers EWDC   Emergency.Worker Decontamination Center FEMA   Federal Emergency Management Agency FENOC   First Energy Nuclear Operating Company FMP     Field Monitoring Point 62.
-May 14, 2008.PEMA Bureau of Operations and Training staff, augmented by designated PEMA personnel will disseminate exercise related messages to the participating Counties 69 0 for dissemination to the participating School Districts during the morning of May 14, 2008. The State Emergency Operations Center (EOC) and County EOCs will NOT be evaluated during the "Out of Sequence" component.
61
PEMA personnel will serve as "observers" at the identified School Districts.
 
C. "Out of Sequence" Activities  
FMT       Field Monitoring Team FTC       Field Team Coordinator GE       General Emergency GEC       Gold Executive Conference GIS       Geographic Information System GPS       Global Positioning System HCCC,     Hancock County Communications Center HCEN     Hancock County Emergency Network HCEOC     Hancock County Emergency Operations Center HS       High School ICS       Incident Command System IP       Internet Protocol IU       Intermediate Unit JIC       Joint Information Center JPIC     Joint Public Information Center.
-May 14, 2008.PEMA personnel will serve as "Observers" at the various field exercise locations during the evening "Out-of-Sequence" component May 14, 2008. An exercise coordinator will remain in the State EOC. The State Emergency Operations Center (EOC) and Counties will NOTbe evaluated during the evening "Out of Sequence" component.  
KC       Knowledge Center LCEMA     Lawrence County EmergencyManagement Agency MCC       Mass Care Center MPD       Monaca Police Department MSD       Medical Services Director MT     .McCarter Trans ortation NCVFD     New Cumberland Volunteer Fire Department-NRC . Nuclear Regulatory Commission PA       Public Address PAD     'Protective Action Decisions PAG.     Protective Action Guides PAR       Protective Action Recommendation PC       Personal Computer PEMA     Pennsylvania Emergency Management Agency PEMARS   Pennsylvania Emergency Management Agency Radio System PEMRS   Pennsylvania Emergency Management Radio System PES     Patterson Elementary School PHBVFD   Patterson Heights Borough Volunteer Fire Department PIC     Pubiic information Center Pio     Public Information Officer PRD     Permanent Record Dosimeter PSP     Pennsylvania State Police.
.. .'4. PEMA Area Office Operations The PEMA Area Office rat Indiana will"hot.be activated or evaluated during, this exercise.
RAC     Radiological Assistance Committee RACES   Radio Amateur Communications Emergency Services RC       Reception Center RCO     Rumor Control Officer' REACT   Radio Emergency Assistance Communications Team REP     Radioiogical Emergency Planning RO       Radiologicai Officer RPO     Radiological Protection Officer RSO     Radiological Safety Officer SAE     Site Area Emergency SBFD     South Beaver Fire Department SEOC     State Emergency Operations Center 63
Selected staff of the area office will serve.as liaison officers to the risk and support counties as assigned.
 
Liaison officers&#xfd; are, exercise participants.
0 SHO State Health Officer SOP Standard Operating Procedure SRHS Slippery Rock High School SSO School Services Officer TC   Transportation Coordinator TCP Traffic Control Points TEDE Total Effective Dose Equivalent TO   Transportation Officer VFD Volunteer Fire Department VHF Very High Frequency WV   West Virginia 0
: 5. Counties Designated to Participate The risk county (Beaver), in coordination with PEMA, will demonstrate the capability to mobilize appropriate staff, activate their respective-Ernergenry Operations  
0 64 0
'Centers and implement emergency response operations to include sheltering and/or 'evacuation.
 
County government will provide direction and coordination to:risk municipalities.
APPENDIX 2 EXERCISE EVALUATORS AND TEAM LEADERS 65
The four support counties (Allegheny, Butler, Lawrence, and Washington) will participate in their assigned support roles. Actual sheltering or~evacuafion
 
:of the'general public will be simulated.
6 DATE: 2008-06-24, SITE: Beaver Valley Power Station, PA LOCATION~ K.             ~   ~     < i                       EVALUATOR             ~ AGENCY Beaver Valley Joint Public Information Center                   Gary Bolender             ICF PA State Field Monitoring Team A, South West Region             W. Morrison Jackson       ICF PA State Field Monitoring Team B; South West Region             Ronald Biernacki         ICF Commonwealth of Pennsylvania State Traffic/Access Control       DeeEll Fifield           ICF Points State of West Virginia Emergency Operations Center               David Petta               ICF Chris Thompson           FAA West Virginia Public Information Center                         Paul Nied               ICF West Virginia Accicent Assessment Center                       James Hickey             ICF West Virginia Field Air Monitoring Team                         Paul Cromier "           ICF Beaver County Emergency Operations Center                     Marcy.Campbell           ICF
6.' PEMA Liaison Officers Liaison officers will be present at the participating risk county EOC,. the BVPS Emergency Operations Facility (EOF), Joint Information Center (JIC), and the Ohio and West Virginia EOCs to provide assistance, guidance, and support: These liaison officers will participate as players in the exercise.
                            *     .                             DeeEIlFifield *iCF
These liaison officers will participate as players in the plume phase exercise on June 24, 2008'.7. Controllers Controllers will be present at the emergency worker monitoring/decontaminating stations and the mass care monitoring/
                                        .                       Richard Wessman           ICF Aliquippa Emergency Operations Center                           Deborah Bell         '   ICF Beaver Borough Emergency Operations.Center.                     Clark Cofer       "
decontamination centers (May 14, 2008).Controllers are not players. Controllers will provide pre-approved injects and information to the players, as appropriate, regarding radiological readings during the monitoring of personnel.
                                                                                  '     ICF-:
Live radioactive sources will not be used. Exception:
Robert Duggleby           ICFE Beaver County, Beaver Borough, Back-up Route Alerting           Robert Duggleby-.-.:, . ICF Bridgewater/Fallston Emergency.Operations Center               John Flynn     .*-       ICF7_1 .
70 individuals tasked with the setup ofportal monitoring equipment will use a standard 1 micro curie Cesium 13 7 source for the purpose of conducting oVerational tests.Additionally, appropriate test sources will be available and used to verify the operation of the monitoring  
Brighton Township Emergency:Operations Center                 -.Michael Meshenberg       ICF Michael Petullo           ICF Beaver County, Brighton Township, Back-up Route Alerting       Michael Meshenberg         ICF Center Township Emergency Operations Center       .           Michael Burriss           ICE Chippewa Township Emergency Operations Center .Robert                   Gantt             IdF Quirano lannazzo           ICE .
/ survey instruments per manufacturers recommendations.
Beaver County, Chippewa Township, Back-up Route Ale'rting     Robert Gantt               ICFE Frankfort Springs Borough, Hanover Township, Georgetown.       Robert -Lemeshka,         ICF" borough, Greene Township, Hookstown Borough'Emergency         GeorgeR MacDonald         ICF "
: 8. PEMA Observers* PEMA staff, qualified county emergency management personnel,.and/or nuclear power plant personnel will be assigned if required to key locations for the purpose of observing, noting response actions and. conditions, and recording observations for future use. Observers will not take' anactive part in the proceedings, but will interact with staff members to the extent necessary to fulfill their observer responsibilities.
Operations Center                         .         ,           ,
Coaching of players by observers is not permitted except to provide training to participants awaiting a re-demonstration. (Refer to paragraph 13)9. FEMA Evaluators Out of Sequence Period (May 14, 2008): Federal evaluators will be present at the identified "out-of-sequence" demonstration sites per Attachment A, Section 1. 1 These include the identified Public' School Districts.'
Independence Township Emergency Operations Center             Kieth Earnshaw             ICF -
They will also be present at identified Reception Centers, Emergency Worker Monitoring and Decontamination Stations, Mass Care Shelters, and Monitoring and Decontamination, Centers, as identified in Attachment A, Section I.B. 1, I.B.2 and I.B.3.Plume PhaseExercise (June 24, 2008): Federal evaluators will be present at the identified risk and support county.EOC's to evaluate playerresponse to the actual and simulated events in the, exercise scenario.  
Industry Emergency Operations Center,                         Gary'G0ldberg             iCF Hopewell Township Emergency Operations Center,.         .' , Albert Lookabaugh         IC"F Beaver County, Hopewell Township, Back-up Route Alerting       Roger Jobe               ICF Midland Emergency Operations Center           .               Simon (Guereca"           ICF Monaca Emergency Operations Center                             Mark Dalton, .           ICF Beaver County, Monaca Back-up Route Alerting                   Nick Lowe .               ICF Patterson Heights/Patterson Township Emergency Operations     William -Edmonson         ICF Center                                                                                             0 Beaver County, Patterson Township, Back-up Route Alerting     Lenora Borchardt-         ICF Potter Township Emergency Operations Center                   Michael Burns             ICF Raccoon Township Emergency. Operations Center                 Ernest Boaze- ..         ICF Shippingport Emergency Operations Center                     -Earl Shollenberger       ICF South Beaver/Ohioville/Glasgow Emergency Operations Center Nancy Johnson.               ICF
...10. Demonstration.Windows  
            ....             __ .. __         _       _     Denise Solomon           ICF South Heights Emergency Operations Center                     Marynette Herndon         ICF Vanport Emergency Operations Center                           David White               ICF Beaver County Emergency Worker Monitoring and                 Ronald Biernacki           ICF Decontamination Station, Beaver Falls FD Beaver County Emergency Worker Monitoring and                 Steve Denson "             ICF Decontamination Station South Beaver Township Fire Department 66 61
, In order to provide for more effective demonstrations, as well as to permit the release of volunteers from exercise play at a reasonable hour, periods of time (Demonstration Windows) have been designated during which specified actions will be accomplished  
 
/demonstrated. , , .The "demonstration windows" for this exercise are: A. Plume Phase Exercise The out-of-sequence MS- 1 hospital demonstration was federally evaluated at Ellwood City Hospital, Lawrence County, December 12, 2007.The out-of-sequence exercise window for school demonstrations will be from 9:00 until 11:00 on May 14, 2008.71 0 The out-of-sequence demonstration of reception centers, mass care centers, monitoring  
Aliquippa School District                                                     Ronald Biernacki   ICF Aliquippa Elementary School                                                   Ronald Biernacki   ICF Beaver Area School Distirct                                                   Steve Denson       ICF Beaver Area Junior Senior High School                                         Steve Denson       ICF Blackhawk School District                                                     James Hickey       ICF Patterson Primary School                                                       James Hickey       ICF Center Area School District                                                   Jill Leatherman     ICF Center Area Junior High School, Center Area School District                   Jill Leatherman     ICF Hopewell Area School District                                                 Michael Petullo     ICF Margaret Ross Elementary School.                                               Michael Petullo     ICF Midland Borough School District                                               David StUenkel. ICF Neel Elementary School                                                         David Stuenkel     ICF Monaca School District                                                         Patrick Taylor     ICF Fifth Ward Elementary School, Monaca School District                           PatrickTaylor       ICF New Brighton School District                                                   Robert Black       ICF Ambridge Area School District                                                 Gary Bolender       ICF South Side Area School District.'                                             John Flynn. -       ICF South Side Middle School"'                                                   John Flynn           ICF Western Beaver Schools                                                         Lawrence Visniesky ICF Western Beaver Jr/Sr High School                                               Lawrence Visniesky ICF Hancock County Emergency Operations, Center                                   W. LyleSlagle       ICF Joseph.Suders .. FEMA RIII Jim Torgler         ICF
/ decontamination centers and emergency worker stations will be conducted from 7:00 -9:30 p.m. on May 14, 2008. Locations are specified within Attachment A, Section II.The out-of-sequence interview of Pennsylvania State Police traffic control/access control points will be from 1:00 p.m. -3:00 p.m. June 24, 2008.All demonstrations will commence promptly and, barring any complications, not continue beyond the time of the designated demonstration window.County and municipal EOC operations will be conducted on June 24, 2008. (Please refer to the Extent of Play Demonstration Tables, Attachment A).B. Post Plume Exercise No post-plume phase exercise is scheduled during this evaluation.
                                          ..     . __.........._ _ _ _         Lawrence Visniesky ICF Hancock Cob'nty Traffic and Access Control, County Court                       Patrick Taylor     ICF House     ".                                                         "
Hancock County Back-up:Route Alerting:, Oakland Fire'                         Paul Nied         ICF Department.             .               .
Hancock Couinty Reception Center, Weir High*Scho0ol Complex David Stuenkel                       ICF Hancock County Monitoring and Decontamination Center, Weir David Stuenkel                         ICF High School Complex.             ...............-
Hancock County Mass Care CenterWeir High School Complex David Stuenkel                           ICF Hancock County Emergency Workeir Monitor and                                 Patrick..Tay Io    ICF Decontamination Statin,'Ne6W Cumberland Fire Department
* Ta.. r     ICE Hancock County School District               I             . .awrernice.Visniesky                 ICE Oak Glen High School, Hancock County School District                         Lawrence Visniesky ICFE Allegheny County. Emergency Operations Center                                 Rosemary[Samsel     ICF Allegheny Co Reception Center South Park Fair Grounds                         Robert Black       ICF Allegheny County Monitoring and Decontamination-Center,                       JamesHickey         ICF South Park Fair Grounds     ....
Allegheny Co Mass Care.Center, South Park HighSchool                         Robert Black       ICF Butler County Emergency-Operatiohs Center-.                                   Wendy Swygert       ICF Butler County Reception-Center, Slippery Rock University -                   Gary Bolender       ICF Butler County Mass Cai-e .Center, Slippery Rock University                   Gary Bolender       ICEF Butler County Monitoring'.and Decontamination Center                         Jill Leatherman     ICF Lawrence County Emergency Operations Center                                   William Vocke       ICF Lawrence County Reception Center Mohawk Area High School John Flynn                               ICF Lawrence County Monitoringand Decontamination Center,-                       Michael Petullo     ICF Mohawk High School         .
Lawrence County Mass Care Center, Union High School                           John Flynn         ICF Washington County Emergency Operations Center                           .. Patrick Taylor     ICF Washington Co Reception Center County Fair Grounds                           Lawrence Visniesky ICF 67
 
0 Washington County Monitoring and Decontamination Center David Stuenkel     ICF McGuffey High School Washington County Mass Care Center, McGuffey Jr/Sr High Lawrence Visniesky ICF School 0
0 68 6
 
APPENDIX 3 EXERCISE EVALUATION AREAS AND EXTENT OF PLAY COMMON WEALTH OF PENNSYLVANIA BEAVER VALLEY POWER STATION 2008 RADIOLOGICAL EMERGENCY PREPAREDNESS EXERCISE METHOD OF OPERATION March 27, 2008
: 1. Beaver Valley Power Station The facility normally uses off-watch section personnel to participate in the exercise.
The plant's simulated events, radiation readings, and emergency classifications will trigger offsite exercise actions. BVPS will notify the State EOC, the Bureau of Radiation Protection (BRP), and the risk county of emergency classifications.
: 2. Bureau of Radiation Protection (BRP)
Personnel will be present at the State EOC, the nuclear facility EOF, and at field locations. Only the field teams will be evaluated.
: 3. PEMA Operations at State EOC / PEMA Headquarters This "Method of Operation" Document includes activities for the Full-Scale Plume Exercise (June 24, 2008), and the "Out of Sequence" Activities (May 14, 2008).
A. Plume Exercise - June 24, 2008 PEMA Bureau of Operations and Training staff, augmented by designated PEMA personnel from the Fire Commissioner's Office, the Bureau of Administration, Technical Services, Plans, plus Emergency Preparedness Liaison Officers (EPLOs) with accompanying response team members from designated state departments/agencies, including representatives from the USDA State Emergency Board will comprise initial operations at the State Emergency Operations Center (EOC). The State EOC will not be evaluated during this exercise.
B. Plume Exercise - "Out of Sequence" Activities - May 14, 2008.
PEMA Bureau of Operations and Training staff, augmented by designated PEMA personnel will disseminate exercise related messages to the participating Counties 69
 
0 for dissemination to the participating School Districts during the morning of May 14, 2008. The State Emergency Operations Center (EOC) and County EOCs will NOT be evaluated during the "Out of Sequence" component. PEMA personnel will serve as "observers" at the identified School Districts.
C. "Out of Sequence" Activities - May 14, 2008.
PEMA personnel will serve as "Observers" at the various field exercise locations during the evening "Out-of-Sequence" component May 14, 2008. An exercise coordinator will remain in the State EOC. The State Emergency Operations Center (EOC) and Counties will NOTbe evaluated during the evening "Out of Sequence" component.                 ..       . '
: 4. PEMA Area Office Operations The PEMA Area Office rat Indiana will"hot.be activated or evaluated during, this exercise. Selected staff of the area office will serve.as liaison officers to the risk and support counties as assigned. Liaison officers&#xfd; are, exercise participants.
: 5. Counties Designated to Participate The risk county (Beaver), in coordination with PEMA, will demonstrate the capability to mobilize appropriate staff, activate their respective-Ernergenry Operations 'Centers and implement emergency response operations to include sheltering and/or 'evacuation.
County government will provide direction and coordination to:risk municipalities. The four support counties (Allegheny, Butler, Lawrence, and Washington) will participate in their assigned support roles. Actual sheltering or~evacuafion :of the'general public will be simulated.
6.' PEMA Liaison Officers Liaison officers will be present at the participating risk county EOC,. the BVPS Emergency Operations Facility (EOF), Joint Information Center (JIC), and the Ohio and West Virginia EOCs to provide assistance, guidance, and support: These liaison officers will participate as players in the exercise. These liaison officers will participate as players in the plume phase exercise on June 24, 2008'.
: 7. Controllers Controllers will be present at the emergency worker monitoring/decontaminating stations and the mass care monitoring/ decontamination centers (May 14, 2008).
Controllers are not players. Controllers will provide pre-approved injects and information to the players, as appropriate, regarding radiological readings during the monitoring of personnel. Live radioactive sources will not be used. Exception:
70
 
individuals tasked with the setup ofportal monitoringequipment will use a standard1 micro curie Cesium 13 7 sourcefor the purpose of conducting oVerationaltests.
Additionally, appropriatetest sources will be availableand used to verify the operation of the monitoring/ survey instrumentsper manufacturersrecommendations.
: 8. PEMA Observers
    *PEMA staff, qualified county emergency management personnel,.and/or nuclear power plant personnel will be assigned if required to key locations for the purpose of observing, noting response actions and. conditions, and recording observations for future use. Observers will not take' anactive part in the proceedings, but will interact with staff members to the extent necessary to fulfill their observer responsibilities.
Coaching of players by observers is not permitted except to provide training to participants awaiting a re-demonstration. (Refer to paragraph 13)
: 9. FEMA Evaluators Out of Sequence Period (May 14, 2008): Federal evaluators will be present at the identified "out-of-sequence" demonstration sites per Attachment A, Section 1.1 These include the identified Public' School Districts.' They will also be present at identified Reception Centers, Emergency Worker Monitoring and Decontamination Stations, Mass Care Shelters, and Monitoring and Decontamination, Centers, as identified in Attachment A, Section I.B. 1, I.B.2 and I.B.3.
Plume PhaseExercise (June 24, 2008): Federal evaluators will be present at the identified risk and support county.EOC's to evaluate playerresponse to the actual and simulated events in the, exercise scenario.               ...
: 10. Demonstration.Windows         ,
In order to provide for more effective demonstrations, as well as to permit the release of volunteers from exercise play at a reasonable hour, periods of time (Demonstration Windows) have been designated during which specified actions will be accomplished /
demonstrated.               ,       ,   .
The "demonstration windows" for this exercise are:
A. Plume Phase Exercise The out-of-sequence MS- 1 hospital demonstration was federally evaluated at Ellwood City Hospital, Lawrence County, December 12, 2007.
The out-of-sequence exercise window for school demonstrations will be from 9:00 until 11:00 on May 14, 2008.
71
 
0 The out-of-sequence demonstration of reception centers, mass care centers, monitoring / decontamination centers and emergency worker stations will be conducted from 7:00 - 9:30 p.m. on May 14, 2008. Locations are specified within Attachment A, Section II.
The out-of-sequence interview of Pennsylvania State Police traffic control/access control points will be from 1:00 p.m. - 3:00 p.m. June 24, 2008.
All demonstrations will commence promptly and, barring any complications, not continue beyond the time of the designated demonstration window.
County and municipal EOC operations will be conducted on June 24, 2008. (Please refer to the Extent of Play Demonstration Tables, Attachment A).
B. Post Plume Exercise No post-plume phase exercise is scheduled during this evaluation.
: 11. Stand-down All jurisdictions will request approval on a jurisdiction by jurisdiction basis prior to stand-down.
: 11. Stand-down All jurisdictions will request approval on a jurisdiction by jurisdiction basis prior to stand-down.
: a. Upon completion of all requirements and after having informed the FEMA evaluator that all evaluation areas have been demonstrated and/or completed, the risk municipality EOCs may request approval from their county EOC to terminate the exercise.b. Support counties may likewise request approval to terminate the exercise upon completion of all evaluated objectives from the state EOC.c. The risk county EOC will remain operational until the exercise is officially terminated by the State. The State EOC will issue an Exercise Termination Message.12. General Concepts An emergency plan is drafted to address the generally expected conditions of an emergency, Not everything in the emergency plan may be applicable for a given scenario.
: a. Upon completion of all requirements and after having informed the FEMA evaluator that all evaluation areas have been demonstrated and/or completed, the risk municipality EOCs may request approval from their county EOC to terminate the exercise.
The main purpose of an emergency plan is to assemble sufficient expertise and officials so as to properly react to the events as they occur. The responders should not be so tied to a plan that they cannot take actions that are more protective of the public. Therefore, if, by not following the plan, the responders protect the public equally as well as provided in the plan, it should be noted f6r possible modification of the plan, but not classified as a negative incident.
: b. Support counties may likewise request approval to terminate the exercise upon completion of all evaluated objectives from the state EOC.
Furthermore, if, by following the 72 6 plan there is a failure to protect the public health and safety, it should be noted so that the plan can be modified and the appropriate negative assessment applied.13. Re-demonstrations During the exercise any activity that is not satisfactorily demonstrated may be re-demonstrated by the participants during the exercise provided it does not negatively interfere with the exercise.
: c. The risk county EOC will remain operational until the exercise is officially terminated by the State. The State EOC will issue an Exercise Termination Message.
Refresher training can be provided by the players, observers, and/or controllers.
: 12.       General Concepts An emergency plan is drafted to address the generally expected conditions of an emergency, Not everything in the emergency plan may be applicable for a given scenario. The main purpose of an emergency plan is to assemble sufficient expertise and officials so as to properly react to the events as they occur. The responders should not be so tied to a plan that they cannot take actions that are more protective of the public. Therefore, if, by not following the plan, the responders protect the public equally as well as provided in the plan, it should be noted f6r possible modification of the plan, but not classified as a negative incident. Furthermore, if, by following the 72 6
Evaluators are not permitted to provide refresher training.
 
Re-demonstrations will be negotiated between the players, observers, controllers, and evaluat6rs.
plan there is a failure to protect the public health and safety, it should be noted so that the plan can be modified and the appropriate negative assessment applied.
The RAC Chair/designee will be advised prior to initiating anyre-demonstrations.
: 13.       Re-demonstrations During the exercise any activity that is not satisfactorily demonstrated may be re-demonstrated by the participants during the exercise provided it does not negatively interfere with the exercise. Refresher training can be provided by the players, observers, and/or controllers. Evaluators are not permitted to provide refresher training. Re-demonstrations will be negotiated between the players, observers, controllers, and evaluat6rs. The RAC Chair/designee will be advised prior to initiating anyre-demonstrations. It is permissible to extend the evaluation time to accommodate the re-demonstration. Activities corrected from a re-demonstration will be so noted.
It is permissible to extend the evaluation time to accommodate the re-demonstration.
73
Activities corrected from a re-demonstration will be so noted.73 0 BEAVER VALLEY POWER STATION 2008 RADIOLOGICAL EMERGENCY PREPAREDNESS EXERCISE EXTENT OF PLAY AGREEMENT EVALUATION AREA 1 Emergency Operations Management Sub-element L.a -Mobilization INTENT.This sub-element derives from NUREG-0654, which provides.that Offsite Response Organizations (ORO) should have the capability to alert, notify, and mobilize emergency personnel and to activate and staff emergency facilities.
 
Criterion 1.a.l: OROs use effective procedures to alert, notify, and mobilize emergency personnel and activate facilities in a timely manner. (NUREG-.0654, A.4;D.3, 4; E.1, 2; H.4)EXTENT OF PLA Y Responsible OROs should demonstrate the capability to receive notification of.an-emergency situation from the licensee, verify the notification, and contact, alert', and mobilize .key emergency personnel in a timely manner. Responsible OROs should demonstrate the activation of facilities for immediate use by mobilized personnel when they arrive to begin emergency operations.
0 BEAVER VALLEY POWER STATION 2008 RADIOLOGICAL EMERGENCY PREPAREDNESS EXERCISE EXTENT OF PLAY AGREEMENT EVALUATION AREA 1 Emergency Operations Management Sub-element L.a - Mobilization INTENT.
Activation of facilities should be completed in accordance with the plan and/or procedures.
This sub-element derives from NUREG-0654, which provides.that Offsite Response Organizations (ORO) should have the capability to alert, notify, and mobilize emergency personnel and to activate and staff emergency facilities.
Pre-positioning of emergency personnel appropriate, in accordance with the extent of play agreement, at those facilities located beyond a normalcommuting distance from the individual's duty location or residence.
Criterion 1.a.l: OROs use effective procedures to alert, notify, and mobilize emergency personnel and activate facilities in a timely manner. (NUREG-.0654, A.4; D.3, 4; E.1, 2; H.4)
Further,.
EXTENT OF PLA Y Responsible OROs should demonstrate the capability to receive notification of.an-emergency situation from the licensee, verify the notification, and contact, alert', and mobilize .key emergency personnel in a timely manner. Responsible OROs should demonstrate the activation of facilities for immediate use by mobilized personnel when they arrive to begin emergency operations. Activation of facilities should be completed in accordance with the plan and/or procedures. Pre-positioning of emergency personnel appropriate, in accordance with the extent of play agreement, at those facilities located beyond a normalcommuting distance from the individual's duty location or residence. Further,. pre-positioning of.staff for out-of-sequence demonstrations is appropriate in accordance with the extent of play agreement.
pre-positioning of.staff for out-of-sequence demonstrations is appropriate in accordance with the extent of play agreement.
All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated .in the extent of play agreement.
All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated .in the extent of play agreement.
PEMA Negotiated Extent of Play: Pre-positioning of state emergency personnel (Liaison Officers) at the Emergency Operations Facility (EOF), the Media Operations Center (MQC) and Risk and Support Counties is appropriate due to the commuting distance from the individual's duty location or residence.
PEMA Negotiated Extent of Play:
Risk municipalities will conduct callmouts to demonstrate the mobilization oftkey personnel.
Pre-positioningof state emergency personnel (Liaison Officers) at the Emergency OperationsFacility (EOF), the Media Operations Center (MQC) and Risk and Support Counties is appropriatedue to the commuting distancefrom the individual'sduty location or residence. Risk municipalities will conduct callmouts to demonstrate the mobilization oftkey personnel.
74 61  
74 61
-Actual calls (orpager notifications) will be made to the municipal EOC personnel for the Plume Phase exercise, June 24, 2008, per plans and procedures.
 
* In all instances, the demonstration of a shift change is NOT required.Twenty-four hour staffing will be demonstrated by means of a roster or staffing chart.* All out-of-sequence players and equipment will be pre-positioned (School District personnel, Pennsylvania State Police A CP, Reception Centers, Emergency Worker Monitoring and Decontamination Stations and Monitoring and Decontamination Centers).* Individuals working in state facilities and county. EOCs may bepre-positioned for the plume phase.* County andstate locations for individuals may be prepositionedfor the plume phase. " , ....Sub-element 1.b -Facilities INTENT, ~ -, This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have facilities to support the emergency response.Criterion 1.b.1: Facilities are'sufficie'nt to-support the emergency response'.(NUREG-0654 1H.3) " EXTENTOF PLAY " Facilities Will'only be specifically' evaluated for this -criterion if-they are new or have substantial changes in structureI or-mission:.
            -   Actual calls (orpagernotifications) will be made to the municipal EOC personnelfor the Plume Phase exercise, June 24, 2008, perplans and procedures.
Responsible OROs shoulddemonstrate the availability of facilities' that support the- accompli'shmient of emergency Operations.
* In all instances, the demonstration of a shift change is NOT required.
Some of the areas to be considered are: adequate space, furnishings, lighting, restrooms, ventilation, backup power and/or alternate facility (if required to support operations.)
Twenty-four hour staffing will be demonstratedby means of a roster or staffing chart.
* All out-of-sequenceplayers and equipment will be pre-positioned(School Districtpersonnel, PennsylvaniaState PoliceA CP,Reception Centers, Emergency Worker Monitoringand DecontaminationStations and Monitoring and DecontaminationCenters).
* Individuals working in statefacilities and county.EOCs may bepre-positioned for the plume phase.
* County andstate locationsfor individuals may be prepositionedforthe plume phase. "           , ....
Sub-element 1.b - Facilities INTENT,             ~                 -       ,
This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have facilities to support the emergency response.
Criterion 1.b.1: Facilities are'sufficie'nt to-support the emergency response'.
(NUREG-0654 1H.3)           "
EXTENTOF PLAY                 "
Facilities Will'only be specifically' evaluated for this -criterion if-they are new or have substantial changes in structureI or-mission:. Responsible OROs shoulddemonstrate the availability of facilities' that support the-accompli'shmient of emergency Operations. Some of the areas to be considered are: adequate space, furnishings, lighting, restrooms, ventilation, backup power and/or alternate facility (if required to support operations.)
Facilities must be set up based .on the ORO's plans and procedures and demonstrated as they would be used in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
Facilities must be set up based .on the ORO's plans and procedures and demonstrated as they would be used in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play: None Sub-element i.c -Direction and Control INTENT 75 0 This sub-element derives from NUREG-0654, which-provides that Offsite Response Organizations (ORO) have the capability to control their overall response to an emergency.
PEMA NegotiatedExtent of Play: None Sub-element i.c - Direction and Control INTENT 75
Criterion 1.c.1: Key personnel with leadership roles for the ORO provide direction and control to that part of the overall response effort for which they are responsible. (NUREG-0654, A.A.d; A.2.a, b)EXTENT-OFPLAY.
 
Leadership personnel should demonstrate the ability to carry out essential functions of the response effort, for example: keeping the staff informed through periodic briefings and/or other means, coordinating with other appropyiate,0ROs, and ensuring completion of re n a ue t requirements and req. sts.All activities associated with direction and control must be performed based on'the ORO's plans and procedures and completed as they would be in an actual emergency, unless otherwise noted above or indicated in the extent 6f play- agreement.,.
0 This sub-element derives from NUREG-0654, which-provides that Offsite Response Organizations (ORO) have the capability to control their overall response to an emergency.
PEMA Negotiated Extent of Play: None, Sub-element 1.d --Communications Equipment INTENT This sub-element derives from NUREG-0654, which proVides-that'Offsite Response Organizations (ORO) should establish reliable primary and backup communication systems to ensure communications, with key emergency personnel at.!locations-such asthe following:
Criterion 1.c.1: Key personnel with leadership roles for the ORO provide direction and control to that part of the overall response effort for which they are responsible. (NUREG-0654, A.A.d; A.2.a, b)
appropriate contiguous governments within the emergency planningzone (EPZ), Federal emergency response organizations, the licensee and its facilities, emergency operations centers (EOC), and field teams.Criterion  
EXTENT-OFPLAY.
.1.d.l: At least two communicationwsystemsiare available, at least one operates properly, and communication links are established' and maintained with appropriate locations.
Leadership personnel should demonstrate the ability to carry out essential functions of the response effort, for example: keeping the staff informed through periodic briefings and/or otherre means, n              ue t with other appropyiate,0ROs, and ensuring completion of coordinating a
Communications capabilities are managed in support of emergency operations. (NUREG-0654, F.1, 2)EXTENT OF PLAY OROs will demonstrate that a primary and at least one backup system are fully functional at the beginning of an exercise.
requirements and req. sts.
If a communications system or systems are not functional, but 76 0 exercise performance is not affected, no exercise issue will be assessed.
All activities associated with direction and control must be performed based on'the ORO's plans and procedures and completed as they would be in an actual emergency, unless otherwise noted above or indicated in the extent 6f play-agreement.,.
Communications equipment and procedures for facilities and field units shouldbe used as needed for the transmission and receipt of exercise messages.
PEMA NegotiatedExtent of Play: None, Sub-element 1.d   -- Communications   Equipment INTENT This sub-element derives from NUREG-0654, which proVides-that'Offsite Response Organizations (ORO) should establish reliable primary and backup communication systems to ensure communications, with key emergency personnel at.!locations-such asthe following:
All facilities and field teams should have the capabilityto access at least one communication system that is independent of the commercial telephone system. Responsible OROs should demonstrate the capability to manage'the communication systems and ensure that all message traffic is handledwithout delays that might disrupt the conduct of emergency operations.
appropriate contiguous governments within the emergency planningzone (EPZ), Federal emergency response organizations, the licensee and its facilities, emergency operations centers (EOC), and field teams.
OROs should ensure that a coordinated communication link for fixed and mobile medical support facilities exists. The specific communications capabilities of OROs should be commensurate with that specified in the response plan and/or procedures.
Criterion .1.d.l: At least two communicationwsystemsiare available, at least one operates properly, and communication links are established' and maintained with appropriate locations. Communications capabilities are managed in support of emergency operations. (NUREG-0654, F.1, 2)
Exercise scenarios could require the failure of a communications system and the use of an alternate system, as negotiated in the extent of play dgreement..
EXTENT OF PLAY OROs will demonstrate that a primary and at least one backup system are fully functional at the beginning of an exercise. If a communications system or systems are not functional, but 76 0
.~t it'. .h .e c , .' : " ". , All activities associated with the management of communications capabilities must be demonstrated based on the ORO's plans and procedures and'completed as they would be in an actual emergency, unless otherwise noted above or in the extent of play agreement;, PEMA Negotiated Extent of Play: Risk and Support Counties will communicate with the State EOC via SEVAN (primary) and e-mail (secondary.)
 
PASTAR, State 800 MHz Radio System, and commercial telephone are available for back-up. The State EOC may communicate with the utility and the risk counties via dedicated telephone circuits, conference bridges, 'commercial "didl-up "- lines, or other available means.Risk Counties will communicate with their risk municipalities via public safety radio frequencies (EM4 Radio), Commercial Telephone, Fax, or Amateur Radio Communications (ARES / R-A CES) or, other, available -means.. ..Sub-element i.e -Equipment'and Supplies'to Suppoit Operations  
exercise performance is not affected, no exercise issue will be assessed. Communications equipment and procedures for facilities and field units shouldbe used as needed for the transmission and receipt of exercise messages. All facilities and field teams should have the capabilityto access at least one communication system that is independent of the commercial telephone system. Responsible OROs should demonstrate the capability to manage'the communication systems and ensure that all message traffic is handledwithout delays that might disrupt the conduct of emergency operations. OROs should ensure that a coordinated communication link for fixed and mobile medical support facilities exists. The specific communications capabilities of OROs should be commensurate with that specified in the response plan and/or procedures. Exercise scenarios could require the failure of a communications system and the use of an alternate system, as negotiated in the extent of play dgreement..
'INTENT This sub-element derives from NUREG-0654,'Which prdvides'that Offsite Response Organizations (ORO), have emergency'equipmerit'and supplies adequate to support the emergency response ,'Criterion 1.e.l: Equipment, maps, displays, dosimetry, potassium iodide (KI), and other supplies are sufficient to support emergency operations. (NUREG-0654, 11.7,10;J.10.a, b, e, J.11; K.3.a)77 0 EXTENT OF PLAY Equipment within the facility (facilities) should be sufficient and consistent with the role assigned to that facility in the ORO's plans and/or procedures in support of emergency operations.
      .~t .h .e     ,     it'.      .' : "       ". ,     c All activities associated with the management of communications capabilities must be demonstrated based on the ORO's plans and procedures and'completed as they would be in an actual emergency, unless otherwise noted above or in the extent of play agreement;,
Use of maps and displays is encouraged.
PEMA NegotiatedExtent of Play:
All instruments should be inspected, inventoried, and operationally checked before each use.Instruments should be calibrated in accordance with the manufacturer's recommendations.
Risk and Support Counties will communicate with the State EOC via SEVAN (primary)and e-mail (secondary.) PASTAR, State 800 MHz Radio System, and commercial telephone are availablefor back-up. The State EOC may communicate with the utility and the risk counties via dedicatedtelephone circuits, conference bridges,'commercial"didl-up "- lines, or other available means.
Unmodified CDV-700 series instruments and other instruments without a manufacturer's recommendation should be calibrated annually.
Risk Counties will communicate with their risk municipalities via public safety radio frequencies (EM4 Radio), Commercial Telephone, Fax, or Amateur Radio Communications (ARES / R-A CES) or,other,available-means.. *..
Modified,CDV-700 instruments should be calibrated in accordance with the recommendation of the modification manufacturer.
Sub-element i.e - Equipment'and Supplies'to Suppoit Operations               '
A label indicating such calibration should be on each instrument, or calibrated frequency can be verified by other means. Additionally, instruments beingiused to measure activity should have a range of reading sticker affixed to the side of the instrument. ,The above: * .., , considerations should be included in 4.a. 1 for field team equipment; 4.c. 1 for radiological laboratory, equipment (does not apply to analytical equipment;.
INTENT This sub-element derives from NUREG-0654,'Which prdvides'that Offsite Response Organizations (ORO), have emergency'equipmerit'and supplies adequate to support the emergency response       ,'
reception center and .... .emergency worker facilities' equipment under 6.a. 1; and ambulance, and medical-facilities' equipment under 6.d. 1.Sufficient quantities of appropriate direct-reading and permanent record dosimetry and dosimeter chargers should be available for issu~ance to'all categories of emergenc'y'workers that could be deployed from that facility.
Criterion 1.e.l: Equipment, maps, displays, dosimetry, potassium iodide (KI), and other supplies are sufficient to support emergency operations. (NUREG-0654, 11.7,10; J.10.a, b, e, J.11; K.3.a) 77
Apltorriate direct-reading dosimetry's'hould allow individual(s) to read the administrative reporting limits and maximum exposure limits contained in the ORO's plans and procedures.
 
Dosimetry should be inspected for electrical leakage at least annually and replaced, if necessary.
0 EXTENT OF PLAY Equipment within the facility (facilities) should be sufficient and consistent with the role assigned to that facility in the ORO's plans and/or procedures in support of emergency operations. Use of maps and displays is encouraged.
CDV-138s, due to their documented history of electrical leakage problems, should be inspected for electrical leakage at least quarterly and replaced if necessary.
All instruments should be inspected, inventoried, and operationally checked before each use.
This leakage testing will be verified during the exercise through documentation.
Instruments should be calibrated in accordance with the manufacturer's recommendations.
Responsible OROs should demonstrate the capability to maintain inventories of KI sufficient for use by emergency workers, as indicated on rosters; institutionalized individuals, as indicated in capacity lists for facilities; and, where stipulated by the plan and/or procedures, members of the general public (including transients) within the plume pathway EPZ.Quantities of dosimetry and KI available and storage locations(s) will be confirmed by physical inspection at storage location(s) or through documentation of current inventory submitted during the exercise.
Unmodified CDV-700 series instruments and other instruments without a manufacturer's recommendation should be calibrated annually. Modified,CDV-700 instruments should be calibrated in accordance with the recommendation of the modification manufacturer. A label indicating such calibration should be on each instrument, or calibrated frequency can be verified by other means. Additionally, instruments beingiused to measure activity should have a range of reading sticker affixed to the side of the instrument. ,The above: * .. , ,
Available supplies of KI should be within the expiration date indicated on KI bottles or blister packs. As an alternative, the ORO may produce a letter from a certified private or State laboratory indicating that the KI supply remains potent, in accordance with U.S. Pharmacopoeia standards.
considerations should be included in 4.a. 1 for field team equipment; 4.c. 1 for radiological laboratory, equipment (does not apply to analytical equipment;. reception center and .... .
78 61 At locations where traffic and access control personnel are deployed, appropriate equipment (for example, vehicles, barriers, traffic cones and signs, etc.) should be available or their availability described.
emergency worker facilities' equipment under 6.a. 1; and ambulance, and medical-facilities' equipment under 6.d. 1.
Sufficient quantities of appropriate direct-reading and permanent record dosimetry and dosimeter chargers should be available for issu~ance to'all categories of emergenc'y'workers that could be deployed from that facility. Apltorriate direct-reading dosimetry's'hould allow individual(s) to read the administrative reporting limits and maximum exposure limits contained in the ORO's plans and procedures.
Dosimetry should be inspected for electrical leakage at least annually and replaced, if necessary. CDV-138s, due to their documented history of electrical leakage problems, should be inspected for electrical leakage at least quarterly and replaced if necessary. This leakage testing will be verified during the exercise through documentation.
Responsible OROs should demonstrate the capability to maintain inventories of KI sufficient for use by emergency workers, as indicated on rosters; institutionalized individuals, as indicated in capacity lists for facilities; and, where stipulated by the plan and/or procedures, members of the general public (including transients) within the plume pathway EPZ.
Quantities of dosimetry and KI available and storage locations(s) will be confirmed by physical inspection at storage location(s) or through documentation of current inventory submitted during the exercise. Available supplies of KI should be within the expiration date indicated on KI bottles or blister packs. As an alternative, the ORO may produce a letter from a certified private or State laboratory indicating that the KI supply remains potent, in accordance with U.S. Pharmacopoeia standards.
78 61
 
At locations where traffic and access control personnel are deployed, appropriate equipment (for example, vehicles, barriers, traffic cones and signs, etc.) should be available or their availability described.
All activities must be based on the ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
All activities must be based on the ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play: In Pennsylvania CD V- 700s are calibrated every 4-years. Support counties do, not have DRDs; .or KI, but those responsible for reception'centers and/or monitoring and decontamination centers will have simulated PRDs.: Evaluation of KI quantities will be'verified using inventory sheets. KI will'not be removed from storage locations and boxes/packages will not be opened. KI questions will'be addressed through interviews.
PEMA NegotiatedExtent of Play:
In Pennsylvania CD V- 700s are calibratedevery 4-years. Support counties do,not have DRDs;.or KI, but those responsiblefor reception'centersand/ormonitoring and decontaminationcenters will have simulatedPRDs.:
Evaluation of KI quantities will be'verified using inventory sheets. KI will'not be removed from storage locations and boxes/packages will not be opened. KI questions will'be addressedthrough interviews.
Leakage testing verification and KI extension letters will be available to the evaluator.
Leakage testing verification and KI extension letters will be available to the evaluator.
Dosimetr and KI are not pre-distributed in Beaver County. Evaluation of this sub-element will take place at the Beaver County Hazmat Garage.79 6 EVALUATION AREA 2 Protective Action Decision-Making Sub-element 2.a -Emergency Worker Exposure Control INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to assess and6 cdntrol the radiation exposure received by emergency workers and have a decision chain in place, as specified in the ORO's plans and procedures, to authorize emergency worker exposure limits to be exceeded for specific missions.Radiation exposure limits for emergenc y wotkers'are the iecommen&d  
Dosimetr and KI are not pre-distributedin Beaver County. Evaluation of this sub-element will take place at the Beaver County Hazmat Garage.
'accumul'ted .dose limits or exposure rates emergency workelrs may-bep~itfed to, inurdduring an'emergency.
79
These limits include any pre-established administrative&rep6rtingI limits (that take into'consideration Total Effective Dose Equivalent or organ-specific' limits) identified in the ORO's plans and procedures.  
 
-"" Criterion 2.a.1: OROS use a 'decision-making process, considering relevant factors and appropriate coordiniation' to ensure'that an exposure contro1 system, including the use of KI, is in place for emergency workers including provisions to authorize radiation exposure in excess of administrative limits or protective action guides. (NUREG-0654,K.4,J.10.e,f)  
6 EVALUATION AREA 2 Protective Action Decision-Making Sub-element 2.a - Emergency Worker Exposure Control INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to assess and6cdntrol the radiation exposure received by emergency workers and have a decision chain in place, as specified in the ORO's plans and procedures, to authorize emergency worker exposure limits to be exceeded for specific missions.
," , " ~~~~~~~...  
Radiation exposure limits for emergenc y wotkers'are the iecommen&d 'accumul'ted .dose limits or exposure rates emergency workelrs may-bep~itfed to, inurdduring an'emergency.
....... .....' -i.' - EXTENT OF PLAY OROs authorized to send emergency workers into the plume exposure pathway EPZ should demonstrate a capability to meet the criterion based on their  
These limits include any pre-established administrative&rep6rtingI limits (that take into' consideration Total Effective Dose Equivalent or organ-specific' limits) identified in the ORO's plans and procedures.                         -   ""
'and procedures.
Criterion 2.a.1: OROS use a 'decision-making process, considering relevant factors and appropriate coordiniation' to ensure'that an exposure contro1 system, including the use of KI, is in place for emergency workers including provisions to authorize radiation exposure in excess of administrative limits or protective action guides. (NUREG-0654,K.4,J.10.e,f) ,
Responsible OROs should demonstrate the capability to make decisions, concerning the authorization of exposure levels in excess of pre-authorized levels and.to the number of emergency workers receiving radiation dose above, pre-authorized levels.As appropriate, OROs should demonstratethe capability to make decisions on the distribution and administration of KI as a protective' measure, based on the ORO's plan and/or procedures or projected thyroid dose compared with the established Protective Action Guides (PAGs) for KI administration.
            ",         " ~~~~~~~.......... ..... '   -   *. i.'     - *....I EXTENT OF PLAY OROs authorized to send emergency workers into the plume exposure pathway EPZ should demonstrate a capability to meet the criterion based on their emergenc*,plans 'and procedures.
80 a All activities must be based on the ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
Responsible OROs should demonstrate the capability to make decisions, concerning the authorization of exposure levels in excess of pre-authorized levels and.to the number of emergency workers receiving radiation dose above, pre-authorized levels.
PEMA Negotiated Extent of Play: None.Sub-element 2.b. -Radiological Assessment and Protective Action Recommendations and Decisions for the.Plume Phase of the Emergency INTENT-This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the rapability toN Ue all available data to independently, project integrated dose and compare the estimated dose Savings with the protective action guides.OROs have the, capability t0ochoose, among a. range of protective actions, those most appropriate in a given emergency situation.
As appropriate, OROs should demonstratethe capability to make decisions on the distribution and administration of KI as a protective' measure, based on the ORO's plan and/or procedures or projected thyroid dose compared with the established Protective Action Guides (PAGs) for KI administration.
OROsbase these choices oh PAGs from the ORO's plans and procedures or EPA 400-R-92-001 and other criteria, such as, plant conditions, licensee protective action recommendations, coordination of protective action decisions with other political jurisdictions.(for example, other affected OROs), availability of appropriate in-pjace shelter, weather conditions, and situations that .create higher than normal risk from evacuation.
80 a
Criterion 2.b.f: Appropriate  
 
'protective action recommendations are based on available information on plant conditions, field monitoring data, and licensee and ORO dose projections, as well as knowledge of onsite and offsite environmental conditions. (NUREG-0654, 1.8, 10 and Supplement 3)EXTENT OF PLAY During the initial stage of the emergency response, following notification of plant conditions that may warrant offsite protective actions, the ORO should demonstrate the capability to use appropriate means, described in the plan and/or procedures, to develop protective action recommendations' (PARs) for decision-makers based on available information and recommendations from the licensee and field monitoring data, if available.
All activities must be based on the ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
When the licensee provides release and meteorological data, the ORO also considers these data.The ORO should demonstrate a reliable capability to independently validate dose projections.
PEMA Negotiated Extent of Play: None.
The types of calculations to be demonstrated depend on the data available and the need for assessments to support the PARs appropriate to the scenario.
Sub-element 2.b. - Radiological Assessment and Protective Action Recommendations and Decisions for the.Plume Phase of the Emergency INTENT-This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the rapability toN     Ue all available data to independently, project integrated dose and compare the estimated dose Savings with the protective action guides.
In all cases, calculation of projected dose should be demonstrated.
OROs have the, capability t0ochoose, among a. range of protective actions, those most appropriate in a given emergency situation. OROsbase these choices oh PAGs from the ORO's plans and procedures or EPA 400-R-92-001 and other criteria, such as, plant conditions, licensee protective action recommendations, coordination of protective action decisions with other political jurisdictions.(for example, other affected OROs), availability of appropriate in-pjace shelter, weather conditions, and situations that .create higher than normal risk from evacuation.
Projected doses should be related to quantities and units 81 0 of the PAGs to which they will be compared.
Criterion 2.b.f: Appropriate 'protective action recommendations are based on available information on plant conditions, field monitoring data, and licensee and ORO dose projections, as well as knowledge of onsite and offsite environmental conditions. (NUREG-0654, 1.8, 10 and Supplement 3)
PARs should be promptly transmitted to decision-makers in a prearranged format.Differences greater than a factor of 10 between projected doses by the licensee and the ORO should be discussed with the licensee with respect to the input data and assumptions used, the use of differentmodels, or other possible reasons. Resolution of these differences should be incorporated into the PAR if timely and appropriate.
EXTENT OF PLAY During the initial stage of the emergency response, following notification of plant conditions that may warrant offsite protective actions, the ORO should demonstrate the capability to use appropriate means, described in the plan and/or procedures, to develop protective action recommendations' (PARs) for decision-makers based on available information and recommendations from the licensee and field monitoring data, if available.
The ORO should demonstrate the capability to useany additional data to refine projected doses and exposure rates and revise the associated PARs.All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless n6ted above or otherwise indicated in the'extent  
When the licensee provides release and meteorological data, the ORO also considers these data.
'of play agreement.
The ORO should demonstrate a reliable capability to independently validate dose projections.
PEMA Negotiated Extent of Play: None.Criterion 2.b.2: A decision-making process involvinig consideration of appropriate factors and necessary coordination is used to make protective action decisions  
The types of calculations to be demonstrated depend on the data available and the need for assessments to support the PARs appropriate to the scenario. In all cases, calculation of projected dose should be demonstrated. Projected doses should be related to quantities and units 81
, (PAD) for the general public (including the recommendation for the use, ofUKI, if ORO policy). (NUREG-0654, J.9, I0.f,m), EXTENT OF PLAY OROs should have the capability to make both initial and subsequent PADs. They should demonstrate the capability to make initial- PADs in, a timely manner appropriate ,to the situation, based on notification from the licensee;!assessmfent of plant status, and releases, and PARs from the utility and ORO staff.The dose assessment personnel may provide additional PARs based on the subsequent dose projections, field monitoring data, or information on plant conditions.
 
The decision-makers should demonstrate the capability to change protective actions as appropriate based on these projections.
0 of the PAGs to which they will be compared. PARs should be promptly transmitted to decision-makers in a prearranged format.
Differences greater than a factor of 10 between projected doses by the licensee and the ORO should be discussed with the licensee with respect to the input data and assumptions used, the use of differentmodels, or other possible reasons. Resolution of these differences should be incorporated into the PAR if timely and appropriate. The ORO should demonstrate the capability to useany additional data to refine projected doses and exposure rates and revise the associated PARs.
All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless n6ted above or otherwise indicated in the'extent 'ofplay agreement.
PEMA NegotiatedExtent of Play: None.
Criterion 2.b.2: A decision-making process involvinig consideration of appropriate factors and necessary coordination is used to make protective action decisions ,
(PAD) for the general public (including the recommendation for the use, ofUKI, if ORO policy). (NUREG-0654, J.9, I0.f,m),
EXTENT OF PLAY OROs should have the capability to make both initial and subsequent PADs. They should demonstrate the capability to make initial- PADs in,a timely manner appropriate ,to the situation, based on notification from the licensee;!assessmfent of plant status, and releases, and PARs from the utility and ORO staff.
The dose assessment personnel may provide additional PARs based on the subsequent dose projections, field monitoring data, or information on plant conditions. The decision-makers should demonstrate the capability to change protective actions as appropriate based on these projections.
If the ORO has determined that KI will be used as a protective measure 0for the general public under off-site plans, then the ORO should demonstrate the capability to make decisions on the distribution and administration of KI as a protective measure for the general public to supplement shelter and evacuation., This decision should be based on the ORO's plan and/or procedures or projected thyroid dose compared with the established PAG for KI administration.
If the ORO has determined that KI will be used as a protective measure 0for the general public under off-site plans, then the ORO should demonstrate the capability to make decisions on the distribution and administration of KI as a protective measure for the general public to supplement shelter and evacuation., This decision should be based on the ORO's plan and/or procedures or projected thyroid dose compared with the established PAG for KI administration.
The KI decision-making process should involve close coordination with appropriate assessment and decision-making staff.82 40 If more than one ORO is involved in decision-making, OROs should communicate and coordinate PADs with affected OROs. OROs should demonstrate the capability to communicate the contents of decisions to the affected jurisdictions.
The KI decision-making process should involve close coordination with appropriate assessment and decision-making staff.
82 40
 
If more than one ORO is involved in decision-making, OROs should communicate and coordinate PADs with affected OROs. OROs should demonstrate the capability to communicate the contents of decisions to the affected jurisdictions.
All decision-making activities by ORO personnel must be performed based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
All decision-making activities by ORO personnel must be performed based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play: None.Sub-element 2.c -Protective Action Decisions Consideration for the Protection of Special Populations INTENT This sub-element derives from"NUREG-0654; which provides that Offsite Response-Organizations (ORO) shouldhave thecapability to determine protective action recommendations, including evacuation;, sheltering and use of potassium iodide (KI), if applicable, for special population groups (for example;, hospitals, nursing homes, correctional facilities, schools, licensed day care centers, mobility impaired individuals, and transportation dependent individuals).
PEMA Negotiated Extent of Play: None.
Focus is on those special population groups that are (or potentially will be) affected by a radiological release from a nuclear power plant.Criterion 2-c,1: Protective action decisions are made, as appropriate, for special population groups.' (NUREG-0654, J.9, J.10.d,e)EXTENT OF PLAY Usually, it is appropriate to-implement evacuation in areas where doses are projected to exceed the lower end of the range of PAGs, except for situations where there is a high-risk environment or where high-risk groups (e.g., the immobile or infirm) are involved.
Sub-element 2.c - Protective Action Decisions Consideration for the Protection of Special Populations INTENT This sub-element derives from"NUREG-0654; which provides that Offsite Response-Organizations (ORO) shouldhave thecapability to determine protective action recommendations, including evacuation;, sheltering and use of potassium iodide (KI), if applicable, for special population groups (for example;, hospitals, nursing homes, correctional facilities, schools, licensed day care centers, mobility impaired individuals, and transportation dependent individuals). Focus is on those special population groups that are (or potentially will be) affected by a radiological release from a nuclear power plant.
In these cases, examples of factors that should be considered are weather conditions, shelter availability, availability of transportation assets, 'riskof evacuation vs. risk from the avoided dose, and precautionary school evacuations.
Criterion 2-c,1: Protective action decisions are made, as appropriate, for special population groups.' (NUREG-0654, J.9, J.10.d,e)
In situations were an institutionalized population cannot be evacuated, the administration of KI should be considered by the OROs.Applicable OROs should demonstrate the capability to alert and notify all public school systems/districts of emergency conditions that are expected to or may necessitate protective actions for students.
EXTENT OF PLAY Usually, it is appropriate to-implement evacuation in areas where doses are projected to exceed the lower end of the range of PAGs, except for situations where there is a high-risk environment or where high-risk groups (e.g., the immobile or infirm) are involved. In these cases, examples of factors that should be considered are weather conditions, shelter availability, availability of transportation assets, 'riskof evacuation vs. risk from the avoided dose, and precautionary school evacuations. In situations were an institutionalized population cannot be evacuated, the administration of KI should be considered by the OROs.
Contacts with public schoolsystems/districts must be actual.83 In accordance with plans and/or procedures, OROs and/or officials of pubic school systems/districts should demonstrate the capability to make prompt decisions on protective actions for students.
Applicable OROs should demonstrate the capability to alert and notify all public school systems/districts of emergency conditions that are expected to or may necessitate protective actions for students. Contacts with public schoolsystems/districts must be actual.
Officials should demonstrate that the decision making process for protective actions considers (that is, either accepts automatically or gives heavy weight to)protective action recommendations made by ORO personnel, the ECL at which these recommendations are received, preplanned strategies for protective actions for that ECL, and the location of students at the time (for example, whether the students are still at home, en route to the school, or at the school).All decision-making activities associated with protective actions,, including consideration of available resources, for speciaipopulation groups must be based onthe ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in theextent of play agreement.
83
PEMA Negotiated Extent of Play: None Sub-element 2.d. -Radiological Assessment and Decision-Making for the Ingestion Exposure Pathway This sub-element will not be evaluated during this exercise.Sub-element 2.e. -Radiological Assessment and Decision-Making Concerning Relocation, Re-entry, and Return This sub-element will not be evaluated during this xeercise.84 0 EVALUATION AREA 3'Protective Action Implementation Sub-element 3.a -Implementation of Emergency Worker Exposure Control INTENT This sub-element derives from NUREG-0654, which provides that OROs should have the capability to provide for the following:
 
distribution, use, collection, and processing of direct-reading dosimetry and permanent record dosimetry; the reading of direct-reading dosimetry by emergency Workers at appropriate frequencies; maintaining a -adiation dose record for each emergency worker; and establishing a decision chain or authorization procedure for emergency w6rkers to inicur fadiation exposures in excess of protective action guides, always applying the ALRAk (As LOW As i9 Reasonably'Achievable) pri'iciple as appropriate.
In accordance with plans and/or procedures, OROs and/or officials of pubic school systems/districts should demonstrate the capability to make prompt decisions on protective actions for students. Officials should demonstrate that the decision making process for protective actions considers (that is, either accepts automatically or gives heavy weight to) protective action recommendations made by ORO personnel, the ECL at which these recommendations are received, preplanned strategies for protective actions for that ECL, and the location of students at the time (for example, whether the students are still at home, en route to the school, or at the school).
Criterion 3.a.l: The OROs issue appropriate dosimetry and procedures, and manage radiological exposure to emergency workers in accordance with the plans and procedures.'
All decision-making activities associated with protective actions,, including consideration of available resources, for speciaipopulation groups must be based onthe ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in theextent of play agreement.
Emergeicy Workers periodically'and at the end'of each mission read their dosimeters and record the readings on the appropriate exposure record or chart. (NUREG-0654, K.3.a,b)EXTENT OF PLA Y OROs should demonstrate the capability to provide appropriate direct-reading; and permanent record dosimetry, dosimeter chargers, and instructions on the use of dosimetry to emergency workers. For evaluation purposes, appropriate direct-reading dosimetry is defined as dosimetry that allows individual(s) to read the administrative reporting limits (that are pre-established at a level low enough to consider subsequent calculation of Total Effective Dose Equivalent) and maximum exposure limits (for those emergency workers involved in life saving activities) contained in the ORO's plans and procedures.
PEMA Negotiated Extent of Play: None Sub-element 2.d. - Radiological Assessment and Decision-Making for the Ingestion Exposure Pathway This sub-element will not be evaluated duringthis exercise.
Each emergency worker should have the basic knowledge of radiation exposure limits as specified in the ORO's plan and/or procedures.
Sub-element 2.e. - Radiological Assessment and Decision-Making Concerning Relocation, Re-entry, and Return This sub-element will not be evaluatedduring this xeercise.
Procedures to monitor and record dosimeter readings and to manage radiological exposure control should be demonstrated.
84 0
During a plume phase exercise, emergency workers should demonstrate the procedures to be followed when administrative exposure limits and turn-back values are reached. The.emergency worker should report accumulated exposures during the exercise as indicated in the plans and procedures.
 
OROs should demonstrate the actions described in the plan and/or procedures by determining whether to replace the worker, to authorize the worker to incur additional exposures or to take other actions. If scenario events do not require emergency workers to seek authorizations for additional exposure, evaluators should interview at least two emergency workers, to determine their knowledge of whom to contact in the event authorization is needed and at what exposure levels. Emergency workers may use any 85 available resources (for example, written procedures and/or co-workers) in providing responses.
EVALUATION AREA 3
Although it is desirable for all emergency workers to each have a direct-reading dosimeter, there may be situations where team members will be in close proximity to each other during the entire mission and adequate control of exposure can be effected for all members of the team by one dosimeter worn by the team leader. Emergency workers who are assigned to low exposure rate areas, for example, at reception centers, counting laboratories, emergency operations centers, and communications centers, may have individual direct-reading dosimeters or they may be monitored by-dosimeters strategically placed in:the.work areA. It should be noted that, even in these situations, each team member must'still have their. own permanent record dosimetry.
'Protective Action Implementation Sub-element 3.a - Implementation of Emergency Worker Exposure Control INTENT This sub-element derives from NUREG-0654, which provides that OROs should have the capability to provide for the following: distribution, use, collection, and processing of direct-reading dosimetry and permanent record dosimetry; the reading of direct-reading dosimetry by emergency Workers at appropriate frequencies; maintaining a -adiation dose record for each emergency worker; and establishing a decision chain or authorization procedure for emergency w6rkers to inicur fadiation exposures in excess of protective action guides, always applying the ALRAk (As LOW As i9 Reasonably'Achievable) pri'iciple as appropriate.
Individuals without specific radiological response missions,.
Criterion 3.a.l: The OROs issue appropriate dosimetry and procedures, and manage radiological exposure to emergency workers in accordance with the plans and procedures.' Emergeicy Workers periodically'and at the end'of each mission read their dosimeters and record the readings on the appropriate exposure record or chart. (NUREG-0654, K.3.a,b)
such as farmers for animal 'care, essential utility service personnel, or other members of the public who must re-enter an evacuated areafollowing or during the plume passage, Should be limited.to the lowest radiological exposure commensuratewith completing:
EXTENT OF PLA Y OROs should demonstrate the capability to provide appropriate direct-reading; and permanent record dosimetry, dosimeter chargers, and instructions on the use of dosimetry to emergency workers. For evaluation purposes, appropriate direct-reading dosimetry is defined as dosimetry that allows individual(s) to read the administrative reporting limits (that are pre-established at a level low enough to consider subsequent calculation of Total Effective Dose Equivalent) and maximum exposure limits (for those emergency workers involved in life saving activities) contained in the ORO's plans and procedures.
theirmissions.
Each emergency worker should have the basic knowledge of radiation exposure limits as specified in the ORO's plan and/or procedures. Procedures to monitor and record dosimeter readings and to manage radiological exposure control should be demonstrated.
During a plume phase exercise, emergency workers should demonstrate the procedures to be followed when administrative exposure limits and turn-back values are reached. The.
emergency worker should report accumulated exposures during the exercise as indicated in the plans and procedures. OROs should demonstrate the actions described in the plan and/or procedures by determining whether to replace the worker, to authorize the worker to incur additional exposures or to take other actions. If scenario events do not require emergency workers to seek authorizations for additional exposure, evaluators should interview at least two emergency workers, to determine their knowledge of whom to contact in the event authorization is needed and at what exposure levels. Emergency workers may use any 85
 
available resources (for example, written procedures and/or co-workers) in providing responses.
Although it is desirable for all emergency workers to each have a direct-reading dosimeter, there may be situations where team members will be in close proximity to each other during the entire mission and adequate control of exposure can be effected for all members of the team by one dosimeter worn by the team leader. Emergency workers who are assigned to low exposure rate areas, for example, at reception centers, counting laboratories, emergency operations centers, and communications centers, may have individual direct-reading dosimeters or they may be monitored by-dosimeters strategically placed in:the.work areA. It should be noted that, even in these situations, each team member must'still have their. own permanent record dosimetry. Individuals without specific radiological response missions,.
such as farmers for animal 'care, essential utility service personnel, or other members of the public who must re-enter an evacuated areafollowing or during the plume passage, Should be limited.to the lowest radiological exposure commensuratewith completing: theirmissions.
All activities must be based on the ORO's plans and.procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the, extent of play agreement.
All activities must be based on the ORO's plans and.procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the, extent of play agreement.
PEMA Negotiated Extent of Play: .Radiological briefings will be provided to address exposure limits and procedures, to replace those approaching limits and how permission to exceed limits is obtained from the municipality and county. Emergency workers will also be briefed on when to take KI and on whose authority.
PEMA Negotiated Extent of Play: .
Distribution of KI will be simulated The completion of a KI repo'rt formn vNiil be demonstrated OROs should also demonstrate the use of all dosimetry forms.. .f At any time, players may.ask other players or supervisors to clarify radiological information.
Radiologicalbriefings will be providedto address exposure limits andprocedures,to replace those approachinglimits and how permission to exceed limits is obtainedfrom the municipality and county. Emergency workers will also be briefed on when to take KI andon whose authority. Distributionof KI will be simulated The completion of a KI repo'rtformn vNiil be demonstrated OROs should also demonstrate the use of all dosimetryforms..       .             f At any time, players may.ask other players or supervisors to clarify radiologicalinformation.
In Pennsylvania, emergency workers do not have turn back!values.  
In Pennsylvania,emergency workers do not have turn back!values.             -..   *.
-.. *.Emergency workers who are assigned to low exposure)rate areas, e.g., at-reception centers, counting laboratories,, emergency operations centers, and communications centers, may have individual permanent record dosimeters or they Miay be monitored by dosimeters strategically placed in. the work area. In Pennsylvania this will be accomplished through the use of an area kit. The area kit process is explainedin state, tcounty and'municipal plans.Standard issue of dosimetry and potassium iodide for each category of emergency worker is asjbllows:.
Emergency workers who are assignedto low exposure)rateareas, e.g., at-receptioncenters, counting laboratories,,emergency operations centers, and communications centers, may have individualpermanent record dosimeters or they Miay be monitoredby dosimeters strategicallyplaced in. the work area. In Pennsylvaniathis will be accomplished through the use of an area kit. The area kit process is explainedin state,tcounty and'municipalplans.
Category A: 1 PRD, 1 DRD, and 1 unit of K!Category B.: 1 PRD and I unit of KI Category C: 1 PRD 86 0 All locations that have dosimetry equipment indicated within their Radiological Emergency Response Plan (RERP), will make the dosimetry equipment (and KI) available for inspection by the Federal Evaluator.
Standardissue of dosimetry andpotassium iodidefor each category of emergency worker is asjbllows:.
Simulation PRDs with mock serial numbers will be used.Sub-element 3.b -Implementation of KI Decision INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO), should have the capability to provide radioprotective drugs for emergency workers, institutionalized individuals, and, if in the plan and/or procedures, to the general public for whom immediate evacuation may not be feasible, very difficult, or significantlydelayed. .While-it is.necessary fort OROs to have the:capability to provide KI to emergency workers and institutionalized individuals, the provision of KI to the general public is an ORO option and is reflected in ORO's plans and procedures.
Category A: 1 PRD, 1 DRD, and 1 unit of K!
Provisions should include the availability, of adequate quantities; storage; and means of the distribution of radioprotective drugs..Criterion 3.b.l: KI and appropriate instructions are available should a decision to recommend use of KI be made. Appropriate-record keeping of the administration of KI for emergency workers and institutionalized individuals is maintained. (NUREG-0654, J. 10. e).EXTENT OF PLAY ..Offsite Response Organizations (ORO) should demonstrate the capability to make KI available to emergency workers, institutionalized individuals, and, where provided for in the ORO plan and/or procedures, to members of the general public. OROs should demonstrate the capability to'accomplish distribution of KI consistent with decisions made..Organizations should have the capability to develop and maintain lists of emergency workers and institutionalized individuals who have ingested KI, including documentation of the date(s) and time(s) they were instructed to ingest KI. The ingestion of KI recommended by the designated ORO health official..isvoluntary.
Category B.: 1 PRD and I unit of KI Category C: 1 PRD 86 0
For evaluation purposes, the actual ingestion of KI is not necessary.
 
OROs should demonstrate the capability to formulate and disseminate appropriate instructions on the use of KI for those advised to take it. If a recommendation is&#xfd; made for the general public to take KI, appropriate information should be provided to the public by the means of notification specified in the ORO's plan and/or procedures.
All locations that have dosimetry equipment indicatedwithin their RadiologicalEmergency Response Plan (RERP), will make the dosimetry equipment (andKI) availablefor inspection by the FederalEvaluator. Simulation PRDs with mock serial numbers will be used.
Sub-element 3.b - Implementation of KI Decision INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO), should have the capability to provide radioprotective drugs for emergency workers, institutionalized individuals, and, if in the plan and/or procedures, to the general public for whom immediate evacuation may not be feasible, very difficult, or significantlydelayed. .While-it is.necessary fort OROs to have the:capability to provide KI to emergency workers and institutionalized individuals, the provision of KI to the general public is an ORO option and is reflected in ORO's plans and procedures. Provisions should include the availability, of adequate quantities; storage; and means of the distribution of radioprotective drugs..
Criterion 3.b.l: KI and appropriate instructions are available should a decision to recommend use of KI be made. Appropriate-record keeping of the administration of KI for emergency workers and institutionalized individuals is maintained. (NUREG-0654, J. 10. e).
EXTENT OF PLAY           ..
Offsite Response Organizations (ORO) should demonstrate the capability to make KI available to emergency workers, institutionalized individuals, and, where provided for in the ORO plan and/or procedures, to members of the general public. OROs should demonstrate the capability to'accomplish distribution ofKI consistent with decisions made..
Organizations should have the capability to develop and maintain lists of emergency workers and institutionalized individuals who have ingested KI, including documentation of the date(s) and time(s) they were instructed to ingest KI. The ingestion of KI recommended by the designated ORO health official..isvoluntary. For evaluation purposes, the actual ingestion of KI is not necessary. OROs should demonstrate the capability to formulate and disseminate appropriate instructions on the use of KI for those advised to take it. If a recommendation is&#xfd; made for the general public to take KI, appropriate information should be provided to the public by the means of notification specified in the ORO's plan and/or procedures.
Emergency workers should demonstrate the basic knowledge of procedures for the use of KI whether or not. the scenario drives the use of KI. This can be accomplished through an interview by the evaluator.
Emergency workers should demonstrate the basic knowledge of procedures for the use of KI whether or not. the scenario drives the use of KI. This can be accomplished through an interview by the evaluator.
87 0 All.activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
87
PEMA Negotiated Extent of Play: Within Pennsylvania, the Pennsylvania Department of Health is responsible for distribu tion of KI to the general public located within the EPZ. Pre-distribution is accomplished on an annual basis. KI is not distributed to the general public at the time of an emergency.
 
Evaluation of emergency worker KI quantities will be verified usinginventory sheets, vI will not be removed from storage locations and boxes will not be opened. KI questions will be addressed through interviews.
0 All.activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
Personnel assigned to operate Monitoring  
PEMA NegotiatedExtent of Play:
/ Decontaminfation centers and stations are not issued DRDs or KI since the centers/stations are located outside the EPZ. Each will be issued a simulated PRD with mock serial numbers.Sub-element 3.c -Implementation of Protective Actions fo, Special Populations INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have the capability to implement protective action decisions, including evacuation and/or sheltering, for all special populations.
Within Pennsylvania,the PennsylvaniaDepartment of Health is responsiblefor distribution of KI to the generalpublic located within the EPZ. Pre-distributionis accomplished on an annual basis. KI is not distributedto the generalpublic at the time of an emergency.
Focus is on those special populations that are (or potentially will be) affected by a radillogical release from a nuclear power plant. ." Criterion 3.c.1: Protective action' decisions are impolmented for special populations other than schools Within areas'subjectt0 protective actions.(NUREG-0654, J.10.c,d,g)
Evaluation of emergency worker KI quantities will be verified usinginventory vI      sheets,   will not be removedfrom storage locations and boxes will not be opened. KI questions will be addressedthrough interviews.
Personnel assignedto operate Monitoring/ Decontaminfation centers and stations are not issued DRDs or KI since the centers/stationsare located outside the EPZ. Each will be issued a simulatedPRD with mock serial numbers.
Sub-element 3.c - Implementation of Protective Actions fo, Special Populations INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have the capability to implement protective action decisions, including evacuation and/or sheltering, for all special populations. Focus is on those special populations that are (or potentially will be) affected by a radillogical release from a nuclear power plant.                                   .         "
Criterion 3.c.1: Protective action' decisions are impolmented for special populations other than schools Within areas'subjectt0 protective actions.
(NUREG-0654, J.10.c,d,g)
EXTENT OF PLAY Applicable OROs should demonstrate the capability td alert and notify (for example, provide protective action recommeiidations and 'emergency information and instructioris) special populations (hospitals, nursing homes, correctional facilities, mobiiity impaired individuals, transportation dependent, etc.). OROs should demonstrate the capability to provide for the needs of special populdtions in accordance with the ORO's plans and procedures.
EXTENT OF PLAY Applicable OROs should demonstrate the capability td alert and notify (for example, provide protective action recommeiidations and 'emergency information and instructioris) special populations (hospitals, nursing homes, correctional facilities, mobiiity impaired individuals, transportation dependent, etc.). OROs should demonstrate the capability to provide for the needs of special populdtions in accordance with the ORO's plans and procedures.
Contact with special populations and reception facilities may be actual or simulated, as agreed to in the Extent of Play. Some contacts with transportation providers should be actual, as negotiated in the extent of play. All actual and simulated contacts should be logged.88 U All implementing activities associated with protective actions for special populations must be based orn the ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
Contact with special populations and reception facilities may be actual or simulated, as agreed to in the Extent of Play. Some contacts with transportation providers should be actual, as negotiated in the extent of play. All actual and simulated contacts should be logged.
PEMA Negotiated Extent of Play: Lists ofpeople with special needs are maintained at the municipal EOCs. Copies of these lists will not be provided to the evaluators however,;
88 U
evaluators will be able to inspect these lists during the exercise.Initial contact with special population facilities will be actual (hospitals, nursing homes and correctional facilities).
 
All subsequent calls will be simulated Actual contacts (up to two)will be made& ) ith providers as per plan. All actual and simulated contacts should be logged'&#xfd;Criterion 3.c.2: ROs/School officials implementprotective actions for schools.(NUREG-0654, J.1O.c, d, g)EXTENT OF PLA Y'PUblic 'school systems/disti'cts shall demonstra~te the ability to implement protective action decisions 1for studenis The de monstratiionr shall be made as' follows: At least one school in each affected school system or district, as appropriate, needs to demonstrate the implementation of protective actions. The implementation of canceling the school day, dismissing eirly, or sheltering should be simulafed by describing to'e'valuators the. procedures that would be f6llowed.
All implementing activities associated with protective actions for special populations must be based orn the ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
if e vac'uatio n is the implemented protdcti'e4 action, all activities to coordinate and complete the evacuation of students to reception c&enters, congregate care centers, or host schools may actually be demonstrated or accomplished through an interview process. If accomplished through an interview process, appropriate school-personnel including decision making officials (e.g., superintendent/principal, transportation director/bus dispatcher), and at least one bus driver (and the bus driver's escort, if applicable) should be available to demonstrate knowledge of their role(s) in the evacuation of school children.Communications capabilities between school officials.
PEMA NegotiatedExtent of Play:
and the buses, if required by the plan and/or procedures, should be verified., Officials of the school system(s) should demonstrate the capability to develop and provide timely information to OROs for use in messages to parents, the general public, and the media on the status of protective actions for schools. .The provisions of this criterion also apply. to any private schools, private kindergartens and.day care centers that participate in REP exercises pursuant to the ORO's plans and procedures as negotiated in the Extent of Play Agreement.
Lists ofpeople with special needs are maintainedat the municipal EOCs. Copies of these lists will not be provided to the evaluators however,; evaluatorswill be able to inspect these lists during the exercise.
89 a All activities must be based on the ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
Initialcontact with specialpopulationfacilities will be actual (hospitals,nursing homes and correctionalfacilities). All subsequent calls will be simulated Actual contacts (up to two) will be made& )ith trwnsj*ortati6nproviders as perplan. All actualand simulated contacts should be logged
PEMA Negotiated Extent of Play: School students will not be involved during the exercise.
          '&#xfd;Criterion3.c.2: ROs/School officials implementprotective actionsfor schools.
Actions, and activities associated with the demonstration of Criterion
(NUREG-0654, J.1O.c, d, g)
: 3. c. 2 will be limited to the school district administration key personnel and the county. Eyqcuation 9f students will be conducted.through an interview process with school district personnel or the building principal.
EXTENT OF PLA Y
The role of the bus driver may be conducted through an interview with school or transportation officials (or designee,)
'PUblic 'school systems/disti'cts shall demonstra~te the ability to implement protective action decisions 1for studenis The de monstratiionr shall be made as' follows: At least one school in each affected school system or district, as appropriate, needs to demonstrate the implementation of protective actions. The implementation of canceling the school day, dismissing eirly, or sheltering should be simulafed by describing to'e'valuators the. procedures that would be f6llowed. if e vac'uatio n is the implemented protdcti'e4 action, all activities to coordinate and complete the evacuation of students to reception c&enters, congregate care centers, or host schools may actually be demonstrated or accomplished through an interview process. If accomplished through an interview process, appropriate school-personnel including decision making officials (e.g., superintendent/principal, transportation director/bus dispatcher), and at least one bus driver (and the bus driver's escort, if applicable) should be available to demonstrate knowledge of their role(s) in the evacuation of school children.
if/a bus driver is not availab, le.,, Actual demonstration of the bus route is not required and will not be demonstrated..,Maps or route descriptions will be available for illustration purposes.  
Communications capabilities between school officials. and the buses, if required by the plan and/or procedures, should be verified.,
.Risk County school plans do not require communications betweenthe school, andvehicles.
Officials of the school system(s) should demonstrate the capability to develop and provide timely information to OROs for use in messages to parents, the general public, and the media on the status of protective actions for schools.                     .
Bus drivers are not considered emergency workers and therefore do not require dosimetry.
The provisions of this criterion also apply. to any private schools, private kindergartens and.day care centers that participate in REP exercises pursuant to the ORO's plans and procedures as negotiated in the Extent of Play Agreement.
Private schools, private, kindergartens, and day care centers do not participate in REP exercises.
89
However, OROs will beprepared,to show evaluators lists of thesefacilities that they will contact in the event of an emergency in accordance with plans and procedures.
 
Any.simulated contacts should be logged Sub-element 3.d. -Implementation of Traffic and Access Control ..INTENT This sub-element derives from NUREG-0654, which provides that.Offsite Response Organizations (ORO) have the capability to implement protective action plans, including relocation and restriction of access .to evacuated/sheltered areas. This sub-element focuses on selecting, establishing, and staffing of traffic and access control points and -removal of impediments to the flow of evacuation traffic.Criterion 3.d.l: Appropriate traffic and access controlis established.
a All activities must be based on the ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
Accurate instructions are provided to traffic and access control personnel. (NUREG-0654, J.10.g, j)EXTENT OF PLAY 90 60 OROs should demonstrate the capability to select, establish, and staff appropriate traffic and access control points, consistent with protective action decisions (for example, evacuating, sheltering, and relocation), in a timely manner. OROs should demonstrate the capability to provide instructions to traffic and access control staff on actions to take when modifications in protective action strategies necessitate changes in evacuation patterns or in the area(s)where access is controlled.
PEMA Negotiated Extent of Play:
Traffic and access control staff should demonstrate accurate knowledge of their roles and responsibilities.
School students will not be involved during the exercise. Actions,and activities associated with the demonstration of Criterion 3.c. 2 will be limited to the school district administration key personnel and the county. Eyqcuation 9f students will be conducted.through an interview process with school districtpersonnel or the buildingprincipal.
This capability may be demonstrated by actual deployment or by interview, in accordance with the extent of play.In instances where OROs lack authority necessary to control access by certain types of traffic (rail, water, and air traffic), they should demonstrate the capability, to contact the State or Federal agencies with authority to control access.All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emnergency, unless noted above or otherwise indicated in the extent of play agreement.
The role of the bus driver may be conductedthrough an interview with school or transportationofficials (or designee,) if/a bus driver is not availab,le.,, Actual demonstration of the bus route is not requiredand will not be demonstrated..,Mapsor route descriptions will be availablefor illustrationpurposes.                              .
PEMA Negotiated Extent of Play:'Municipal traffic and access control will be demonstrated by interview at the applicable EOC ofjurisdiction.
Risk County school plans do not require communications betweenthe school,andvehicles.
The traffic/access control personnel will not be' deployed to the traffiC/dccess controlpoint(s).'
Bus drivers are not consideredemergency workers and therefore do not require dosimetry.
If the 'designated-assignment is a location within the EPZ a radiological briefing will be prov~ided to the assigned individuals.
Privateschools,private,kindergartens,andday care centers do not participatein REP exercises. However, OROs will beprepared,toshow evaluators lists of thesefacilities that they will contact in the event of an emergency in accordance with plans andprocedures. Any.
Criterion 3.d.2: Impediments to evacuation are identified and resolved.(NUREG-0654, J.1'0.k) .EXTENT OF PLAY OROs should demonstrate the capability; as required by the scenario, to identify and take appropriate actionsconcerning impediments to evacuation.
simulated contacts should be logged Sub-element 3.d. - Implementation of Traffic and Access Control                 ..
Actual dispatch of resources to deal with impediments, such as wreckers, need not be demonstrated; however, all contacts, actual or simulated, should be logged.: All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unlessnoted above or otherwise indicated in the extent of play agreement.
INTENT This sub-element derives from NUREG-0654, which provides that.Offsite Response Organizations (ORO) have the capability to implement protective action plans, including relocation and restriction of access .to evacuated/sheltered areas. This sub-element focuses on selecting, establishing, and staffing of traffic and access control points and -removal of impediments to the flow of evacuation traffic.
PEMA Negotiated Extent of Play: 91 0 ORO's should demonstrate the capability, as required by the scenario, to identify and take appropriate actions concerning impediments to evacuation.
Criterion 3.d.l: Appropriate traffic and access controlis established. Accurate instructions are provided to traffic and access control personnel. (NUREG-0654, J.10.g, j)
Actual dispatch of resources to deal with impediments, such as tow trucks, need not be demonstrated; however, simulated contacts will be logged Sub-element 3.e -Implementation of Ingestion Pathway Decisions This sub-element will not be evaluated during this exercise.Sub-element 3.f- Implementation of Relocation, Re-entry, and Return.Decisions This sub-element will not be evaluated during this exercise.0 92 61 EVALUATION AREA 4 Field Measurement And Analysis Sub-element 4.a -Plume Phase Field Measurements and Analyses INTENT This sub-element derives from NUREG-0654, which provides that OROs should have the capability to deploy field teams with the equipment, methods, and expertise necessary to determine the location of airborne radiation and particulate deposition on the ground from an airborne plume., &#xfd; In addition, NUREG-0654 indicates that OROs should have the capability to use field teams within the plume emergency planning zone to measure airborne radioiodine in the presence of noble gases and to measure radioactiye particulate material in the airborne plume. In the event of an accident at a nuclear power plant, the possible release of radioactive material may pose a risk to the nearby population and environment.
EXTENT OF PLAY 90 60
Although accident assessment methods are available to project the extent and magnitude of a release, these methods are subject to large uncertainties.
 
During an accident, it is important to collect field radiological data in order to help characterize any radiological release. Adequate equipment and procedures are essential to such field measurement efforts.Criterion 4.a.l: The field teams are equipped to perform field measurements of direct radiation exposure (cloud and ground shine) and to sample airborne radioiodine and particulates. (NUREG-0654, H.10; 1.7, 8, 9).EXTENT OF PLAY Field teams should be equipped with all instrumentation and supplies necessary to accomplish their mission. This should include instruments capable of measuring gamma exposure rates and detecting the presence of beta radiation.
OROs should demonstrate the capability to select, establish, and staff appropriate traffic and access control points, consistent with protective action decisions (for example, evacuating, sheltering, and relocation), in a timely manner. OROs should demonstrate the capability to provide instructions to traffic and access control staff on actions to take when modifications in protective action strategies necessitate changes in evacuation patterns or in the area(s) where access is controlled.
These instruments should be capable of measuring a range of activity and exposure,.
Traffic and access control staff should demonstrate accurate knowledge of their roles and responsibilities. This capability may be demonstrated by actual deployment or by interview, in accordance with the extent of play.
including radiological protection/exposure control of team members and detection of activity on the air sample collection media, consistent with the intended use of the instrument and the ORO's plans and procedures.
In instances where OROs lack authority necessary to control access by certain types of traffic (rail, water, and air traffic), they should demonstrate the capability, to contact the State or Federal agencies with authority to control access.
An appropriate radioactive check source should be used to verify proper operational response for each low range radiation measurement instrument (less than 1 R/hr)and for high range instruments when available.
All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emnergency, unless noted above or otherwise indicated in the extent of play agreement.
If a source is not available for a high range instrument, a procedure should exist to operationally test the instrument before entering an area where only a high range instrument can make useful readings.All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA NegotiatedExtent of Play:'
PEMA Negotiated Extent of Play: 93 0 Department  
Municipaltraffic and access control will be demonstratedby interview at the applicable EOC ofjurisdiction. The traffic/access controlpersonnel will not be' deployed to the traffiC/dccess controlpoint(s).' If the 'designated-assignmentis a location within the EPZ a radiologicalbriefing will be prov~ided to the assignedindividuals.
'of Environmental Protection (DEP), Bureau of Radiation Protection (BRP) field teams are equipped with the necessary instrumentation and supplies.Evaluators will meet the field teams at the DEP South Western Regional Office at 1:30 p.m. on June 24, 2008 to observe instrumentation checks and equipment inventory verification.
Criterion 3.d.2: Impediments to evacuation are identified and resolved.
Criterion 4.a.2: Field teams are managed to obtain sufficient information to help.characterize the release and to control radiation exposure. (NUREG-0654, H.12;1.8., 11; J.10.a).EXTENT&#xfd; OF PLAY Responsible Offsite Response, Organizations (ORO) should the capability to.brief teams on predicted plume location and direction, travel speed, and exposure control procedures before deployment.
(NUREG-0654, J.1'0.k)                     .
Field measurements are needed to help characterize the release and to support the adequacy of implemented protective actions or to be a factor: in modifying protective actions. Teams should be directed to take measurements in such tlocations, at such times to provide.information-sufficient to characterize the plume and.impacts.,'
EXTENT OF PLAY OROs should demonstrate the capability; as required by the scenario, to identify and take appropriate actionsconcerning impediments to evacuation. Actual dispatch of resources to deal with impediments, such as wreckers, need not be demonstrated; however, all contacts, actual or simulated, should be logged.:
If the responsibility to obtain peak measurement&#xfd; in the plume has beenlaccepftd by licensee field monitoring teams, with concurrence from OROs, there is no requirement for these measurements to be repeated by State and local monitoring teams. If the licensee teams do not obtain peak measurements in the, plume, it is the ORO's decision as to whether peak measurements are necessary to sufficiently cfiarat&erize the`piume.'
All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unlessnoted above or otherwise indicated in the extent of play agreement.
The sharing and coordination of plume measurement information ami"ng all field teams (lioehsee,'federal, and ORO ) is essential.
PEMA NegotiatedExtent of Play:
Coordination concerning ttafisfer of samples, including a: chain-of-custody form, to a radiological laboratory should be demonstrated.
91
 
0 ORO's should demonstrate the capability, as requiredby the scenario, to identify and take appropriateactions concerning impediments to evacuation. Actual dispatch of resources to deal with impediments, such as tow trucks, need not be demonstrated; however, simulated contacts will be logged Sub-element 3.e - Implementation of Ingestion Pathway Decisions This sub-element will not be evaluated during this exercise.
Sub-element 3.f- Implementation of Relocation, Re-entry, and Return.Decisions This sub-element will not be evaluated during this exercise.
0 92 61
 
EVALUATION AREA 4 Field Measurement And Analysis Sub-element 4.a - Plume Phase Field Measurements and Analyses INTENT This sub-element derives from NUREG-0654, which provides that OROs should have the capability to deploy field teams with the equipment, methods, and expertise necessary to determine the location of airborne radiation and particulate deposition on the ground from an airborne plume., &#xfd;In addition, NUREG-0654 indicates that OROs should have the capability to use field teams within the plume emergency planning zone to measure airborne radioiodine in the presence of noble gases and to measure radioactiye particulate material in the airborne plume. In the event of an accident at a nuclear power plant, the possible release of radioactive material may pose a risk to the nearby population and environment. Although accident assessment methods are available to project the extent and magnitude of a release, these methods are subject to large uncertainties. During an accident, it is important to collect field radiological data in order to help characterize any radiological release. Adequate equipment and procedures are essential to such field measurement efforts.
Criterion 4.a.l: The field teams are equipped to perform field measurements of direct radiation exposure (cloud and ground shine) and to sample airborne radioiodine and particulates. (NUREG-0654, H.10; 1.7, 8, 9).
EXTENT OF PLAY Field teams should be equipped with all instrumentation and supplies necessary to accomplish their mission. This should include instruments capable of measuring gamma exposure rates and detecting the presence of beta radiation. These instruments should be capable of measuring a range of activity and exposure,. including radiological protection/exposure control of team members and detection of activity on the air sample collection media, consistent with the intended use of the instrument and the ORO's plans and procedures. An appropriate radioactive check source should be used to verify proper operational response for each low range radiation measurement instrument (less than 1 R/hr) and for high range instruments when available. If a source is not available for a high range instrument, a procedure should exist to operationally test the instrument before entering an area where only a high range instrument can make useful readings.
All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play:
93
 
0 Department'ofEnvironmentalProtection (DEP),Bureau of Radiation Protection (BRP)field teams are equipped with the necessary instrumentationand supplies.
Evaluators will meet the field teams at the DEP South Western Regional Office at 1:30 p.m. on June 24, 2008 to observe instrumentation checks and equipment inventory verification.
Criterion 4.a.2: Field teams are managed to obtain sufficient information to help
        .characterize the release and to control radiation exposure. (NUREG-0654, H.12; 1.8., 11; J.10.a).
EXTENT&#xfd; OF PLAY Responsible Offsite Response, Organizations (ORO) should demoinstrat* the capability to
.brief teams on predicted plume location and direction, travel speed, and exposure control procedures before deployment.
Field measurements are needed to help characterize the release and to support the adequacy of implemented protective actions or to be a factor: in modifying protective actions. Teams should be directed to take measurements in such tlocations, at such times to provide.
information-sufficient to characterize the plume and.impacts.,'
If the responsibility to obtain peak measurement&#xfd; in the plume has beenlaccepftd by licensee field monitoring teams, with concurrence from OROs, there is no requirement for these measurements to be repeated by State and local monitoring teams. If the licensee teams do not obtain peak measurements in the, plume, it is the ORO's decision as to whether peak measurements are necessary to sufficiently cfiarat&erize the`piume.' The sharing and coordination of plume measurement information ami"ng all field teams (lioehsee,'federal, and ORO ) is essential. Coordination concerning ttafisfer of samples, including a: chain-of-custody form, to a radiological laboratory should be demonstrated.
OROs should use Federal resources as identified in'the Federal Radiological Emergency Response Plan (FRERP), and other resources (for example, compacts, utility, etc), if available.
OROs should use Federal resources as identified in'the Federal Radiological Emergency Response Plan (FRERP), and other resources (for example, compacts, utility, etc), if available.
Evaluation of this criterion will take into consideration the level of Federal and other resources participating in the exercise.All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise, indicated in the extent of play agreement.
Evaluation of this criterion will take into consideration the level of Federal and other resources participating in the exercise.
PEMA Negotiated Extent of Play: 94 0 Field Team Control will be performed within or near the 10 mile EPZ using the DEP Radiological Rapid Response Vehicle (R3 V). Field Team control is expected to initially be out of sequence with the plume timeline.
All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise, indicated in the extent of play agreement.
During the exercise the field teams will be directed to take measurements in locations to provide information sufficient to characterize the plume and impacts. In addition to field team measurements, remote detectors will be located by the field teams near the expected plume pathway, these detectors will automatically transmit data to the R3 V. These detectors will be used to keepfield team dose ALARA. A FEMA Evaluator will be located at the R3 V location, arriving at the same time as the Field Teams, expected to be at 1600 on June 24, 2008.Criterion 4.a.3: Ambient radiation measurements are made and recorded at appropriate locations, and radioiodine and particulate samples are collected.
PEMA NegotiatedExtent of Play:
Teams will move to an appropriate low background location to determine whether any significant (as specified in the plan and/or procedures) amount of radioactivity has been collected on the sampling media. (NUREG-0654, I. 9).EXTENT OF PLAY Field -teams should demonstrate the capability to report measurements and field data pertaining to the measurement of airbome.radioiodine and particulates and ambient radiation to the field team coordinator, dose assessment, or other appropriate authority.
94 0
If samples have radioactivity significantly above background, ,the appropriate authority should consider the need for expedited laboratory analyses of these samples. OROs should share data in a timely manner with all appropriate OROs. All methodology, including contamination control, instrumentation, preparation of samples,, and a chain-of-custody form .f6r tra-nsfer to a laboi'atory, will be in accordance with the ORO plan and/or pr&6eduies.
 
OROs should use Federal resources as identified in the FRERP, and 6ther resources (for example, compacts, utility, nuclear insurers, etc), if available.
Field Team Control will be performed within or near the 10 mile EPZ using the DEP RadiologicalRapid Response Vehicle (R3 V). Field Team control is expected to initially be out of sequence with the plume timeline. During the exercise the field teams will be directed to take measurements in locations to provide information sufficient to characterize the plume and impacts. In addition to field team measurements, remote detectors will be locatedby the field teams near the expected plume pathway, these detectors will automatically transmit data to the R3 V. These detectors will be used to keepfield team dose ALARA. A FEMA Evaluator will be located at the R3 V location, arrivingat the same time as the Field Teams, expected to be at 1600 on June 24, 2008.
Evaluation of thiscriterion will take into consideration the level of Federal and other resources participating in the exercise.All activities must be based on the ORO's plans and procedures&#xfd; and completed as they$ would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
Criterion 4.a.3: Ambient radiation measurements are made and recorded at appropriate locations, and radioiodine and particulate samples are collected.
PEMA Negotiated Extent of Play: Measurements will be made by Department of Environmental Protection (DEP), Bureau of Radiation Protection (BRP), in accordance with the BRP Standard Implementing Procedures (IPs). Two mobile monitoring teams from BRP DEP South, Western Regional Office will demonstrate ambient radiation monitoring and radioiodine and particulate sampling.
Teams will move to an appropriate low background location to determine whether any significant (as specified in the plan and/or procedures) amount of radioactivity has been collected on the sampling media. (NUREG-0654, I. 9).
Field teams will be equipped with appropriate dosimetry and KI. Both teams will be evaluated by FEMA. Each team will be directed to monitoring locations and perform actual radiation measurements at each location.
EXTENT OF PLAY Field -teams should demonstrate the capability to report measurements and field data pertaining to the measurement of airbome.radioiodine and particulates and ambient radiation to the field team coordinator, dose assessment, or other appropriate authority. If samples have radioactivity significantly above background, ,the appropriate authority should consider the need for expedited laboratory analyses of these samples. OROs should share data in a timely manner with all appropriate OROs. All methodology, including contamination control, instrumentation, preparation of samples,, and a chain-of-custody form .f6r tra-nsfer to a laboi'atory, will be in accordance with the ORO plan and/or pr&6eduies.
Measurements may consist of truck installed radiation monitor or hand-held radiation instruments.  
OROs should use Federal resources as identified in the FRERP, and 6ther resources (for example, compacts, utility, nuclear insurers, etc), if available. Evaluation of thiscriterion will take into consideration the level of Federal and other resources participating in the exercise.
-An actual air sample will be taken at the first location that meets the requirements for taking an air sample ( I mR/hr) as directed.95 0 Teams will then take additional simulated air samples, as directed, at additional locations, if conditions are appropriate for radioiodine sampling and relay information to the Radiological Rapid Response Vehicle (R3 V). In place of silver zeolite cartridges, charcoal cartridges will be used for the exercise.
All activities must be based on the ORO's plans and procedures&#xfd; and completed as they$would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
All measurements will be forwarded to theR3 V immediately upon obtaining data. Evaluators will meet the field teams at the DEP South Western Regional Office at 1:30p.m., June 24, 2008.Sub-element 4.b -Post Plume Phase Field Measurements and Sampling This sub-element will not be evaluated during, .thisexercise...  
PEMA NegotiatedExtent of Play:
...Sub-element 4.c.- Laboratory Operations  
Measurements will be made by Department of Environmental Protection (DEP), Bureau of Radiation Protection(BRP), in accordancewith the BRP StandardImplementing Procedures (IPs). Two mobile monitoring teamsfrom BRP DEPSouth, Western Regional Office will demonstrate ambient radiationmonitoring and radioiodineandparticulatesampling. Field teams will be equipped with appropriatedosimetry andKI. Both teams will be evaluated by FEMA. Each team will be directed to monitoring locationsandperform actual radiation measurements at each location. Measurements may consist of truck installedradiation monitor or hand-held radiationinstruments. - An actual air sample will be taken at the first location that meets the requirementsfor taking an airsample ( I mR/hr) as directed.
..This sub-element will not be evaluated duringthis exercise._.
95
0 0 96 0 EVALUATION AREA 5 Emergency Notification and Public Information Sub-element 5.a -Activation of the Prompt Alert and Notification System INTENT This sub-element derives from NUREG-0654, which provides that OROs should have the capability to provide prompt instructions to the public within the plume pathway EPZ. Specific provisions addressed in this sub-element are derived from the Nuclear Regulatory Commission (NRC) regulations (10 CFR Part 50, Appendix E.IV.D.), and FEMA-REP-10, "Guide for the Evaluation of Alert and Notification systems for Nuclear PoWer'Plants." Criterion 5.a.1: Activities associated with primary alerting and notification of the public are completed in a timely manner following the initial decision by authorized offsite emergency officials to notify the public of an emergency situation.
 
The initial instructional message to the public must include as a minimum the elements required by current FEMA REP guidance.
0 Teams will then take additionalsimulatedair samples, as directed,at additionallocations, if conditions are appropriatefor radioiodinesampling and relay information to the RadiologicalRapidResponse Vehicle (R3 V). In place of silver zeolite cartridges,charcoal cartridgeswill be usedfor the exercise. All measurements will be forwardedto theR3 V immediately upon obtainingdata. Evaluators will meet thefield teams at the DEP South Western Regional Office at 1:30p.m., June 24, 2008.
(10'CFR Part 50, Appendix E.IV.D and NUREG-0654, E.5, 6, 7)EXTENT OF PLAY Responsible Offsite Response Organizations (ORO) should demonstrate the capability to sequentially provide an alert signal followed by an initial instructional message to populated areas (permanent resident and transient) throughout the 10-mile plume pathway EPZ.Following the decision to activate the alert and notification system, in accordance with the ORO's plan and/or procedures, completion of system activation should be accomplished in a timely manner (will not be subject to specific time requirements) for primary alerting/notification.
Sub-element 4.b - Post Plume Phase Field Measurements and Sampling 0
The initial message should include the elements required by current FEMA REP guidance.Offsite Response Organizations (OROs) with route alerting as the primary method of alerting and notifying the public should demonstrate the capability to accomplish the primary route alerting, following the decision to activate the alert and notification system, in a timely manner (will not be subject to specific time requirements) in accordance with the ORO's plan and/or procedures.
This sub-element will not be evaluatedduring,.thisexercise... ...
At least one route needs to be demonstrated and evaluated.
Sub-element 4.c.- Laboratory Operations             .                       .
The selected route(s) should vary from exercise to exercise.
This sub-element will not be evaluated duringthis exercise._.
However, the most difficult route should be demonstrated at least once every six years. All alert and notification activities along the route should be simulated (that is, the message that would actually be used is read for the evaluator, but not actually broadcast) as agreed upon in the extent of play. Actual testing of the mobile public address system will be conducted at some agreed upon location.
0 96 0
The initial message should include the elements required by current FEMA REP guidance.For exercise purposes, timely is defined as "the responsible ORO personnel/representatives demonstrate actions to disseminate the appropriate information/instructions with a sense of 97 0 urgency and without undue delay." If message dissemination is to be identified as not having been accomplished in a timely manner, the evaluator(s).will document a specific.delay or cause as to why a message was not considered timely.Procedures to broadcast the message should be fully demonstrated as they would in an actual emergency up to the point of transmission.
 
Broadcast of the message(s) or test messages is not required.
EVALUATION AREA 5 Emergency Notification and Public Information Sub-element 5.a - Activation of the Prompt Alert and Notification System INTENT This sub-element derives from NUREG-0654, which provides that OROs should have the capability to provide prompt instructions to the public within the plume pathway EPZ. Specific provisions addressed in this sub-element are derived from the Nuclear Regulatory Commission (NRC) regulations (10 CFR Part 50, Appendix E.IV.D.), and FEMA-REP-10, "Guide for the Evaluation of Alert and Notification systems for Nuclear PoWer'Plants."
The alert signal activation may be simulated.
Criterion 5.a.1: Activities associated with primary alerting and notification of the public are completed in a timely manner following the initial decision by authorized offsite emergency officials to notify the public of an emergency situation. The initial instructional message to the public must include as a minimum the elements required by current FEMA REP guidance. (10'CFR Part 50, Appendix E.IV.D and NUREG-0654, E.5, 6, 7)
However, the, procedures should be demonstrated up to the point of actual activation.
EXTENT OF PLAY Responsible Offsite Response Organizations (ORO) should demonstrate the capability to sequentially provide an alert signal followed by an initial instructional message to populated areas (permanent resident and transient) throughout the 10-mile plume pathway EPZ.
The capability of the primary notification system to broadcast an instrdictional message on a 24-hour basis should be verified during an ifiterview with appropriate personnel from'the primary notification system.' ...All activities for this .criterion must be based on the.ORO's plans and procedures~and completed as. they would be in an actual emergency,.exceptas noted above or otherwise indicated in the extent of play agreement.
Following the decision to activate the alert and notification system, in accordance with the ORO's plan and/or procedures, completion of system activation should be accomplished in a timely manner (will not be subject to specific time requirements) for primary alerting/notification. The initial message should include the elements required by current FEMA REP guidance.
PEMA Negotiated Extent of Play: The Commonwealth of Pennsylvania has implemented a Statewide EAS Control system in cooperation with the Pennsylvania Association ofBroadcasters per the State Emergency, Communications Committee and Pennsylvania Emergency Alert System State EAS Plan (April 1, 2004). The State EOC (PEMA) is the initiating pointfor the activation of the EAS.Risk counties have the control equipment for activation of sirens. Coordination will occur between the State EOC and the affected counties with respect to the Alert and Notification System (ANS) process. Sirens will be coordihnated ahd the soundihg simulat'd ai the appropriate time with the simulated activation 6fEAS taAking place approxinidtely 3 minutes following the simulated activation of the sirens: .Regular broadcasting will :not be interrupted on the EAS Stations.
Offsite Response Organizations (OROs) with route alerting as the primary method of alerting and notifying the public should demonstrate the capability to accomplish the primary route alerting, following the decision to activate the alert and notification system, in a timely manner (will not be subject to specific time requirements) in accordance with the ORO's plan and/or procedures. At least one route needs to be demonstrated and evaluated. The selected route(s) should vary from exercise to exercise. However, the most difficult route should be demonstrated at least once every six years. All alert and notification activities along the route should be simulated (that is, the message that would actually be used is read for the evaluator, but not actually broadcast) as agreed upon in the extent of play. Actual testing of the mobile public address system will be conducted at some agreed upon location. The initial message should include the elements required by current FEMA REP guidance.
All subsequent actions to broajcast stations will be simulated.
For exercise purposes, timely is defined as "the responsible ORO personnel/representatives demonstrate actions to disseminate the appropriate information/instructions with a sense of 97
Broadcast of the message(s)
 
Or test. message(s) is NOT-required and NOT requested.
0 urgency and without undue delay." If message dissemination is to be identified as not having been accomplished in a timely manner, the evaluator(s).will document a specific.delay or cause as to why a message was not considered timely.
Counties may elect to prtovide county specific EAS messages to" their LAS 'sations.Following the decision to activate the alert and notification  
Procedures to broadcast the message should be fully demonstrated as they would in an actual emergency up to the point of transmission. Broadcast of the message(s) or test messages is not required. The alert signal activation may be simulated. However, the, procedures should be demonstrated up to the point of actual activation.
'system, in accordance With the ORO's plan and/or procedures, ANS activation should be accomplished in a timely manner for primary alerting/notification.
The capability of the primary notification system to broadcast an instrdictional message on a 24-hour basis should be verified during an ifiterview with appropriate personnel from'the primary notification system.'         .       ..
This action will NOT be subject to specific time r'equirements.
All activities for this .criterion must be based on the.ORO's plans and procedures~and completed as. they would be in an actual emergency,.exceptas noted above or otherwise indicated in the extent of play agreement.
All actions to broadcast stations will be simulated.
PEMA NegotiatedExtent of Play:
Systems that use automatic sending technology may be demonstrated by explanation during an interview.
The Commonwealth of Pennsylvaniahas implemented a Statewide EAS Control system in cooperationwith the PennsylvaniaAssociation ofBroadcastersper the State Emergency, Communications Committee and PennsylvaniaEmergency Alert System State EAS Plan (April 1, 2004). The State EOC (PEMA) is the initiatingpointfor the activation of the EAS.
Each evaluated municipality per risk county will demonstrate route alerting.of the hearing impaired residents within their jurisdiction by interview at the EOC.Criterion 5.a.2: [RESERVED]
Risk counties have the control equipmentfor activation of sirens. Coordinationwill occur between the State EOC and the affected counties with respect to the Alert andNotification System (ANS) process. Sirens will be coordihnatedahd the soundihg simulat'dai the appropriatetime with the simulated activation 6fEAS taAking place approxinidtely3 minutes following the simulated activation of the sirens:.Regular broadcastingwill :not be interrupted on the EAS Stations. All subsequent actions to broajcaststations will be simulated.
98 a Criterion 5.a.3: Activities associated with FEMA approved exception areas (where applicable) are completed within 45 minutes following the initial decision by authorized offsite emergency officials to notify the public of an emergency situation.
Broadcastof the message(s) Or test.message(s) is NOT-requiredand NOT requested.
Backup alert and notification of the public is completed within 45 minutes following the detection by the ORO of a failure of the primary alert and notification system. (NUREG-0654, E. 6, Appendix 3.B.2.c)EXTENT OF PLAY Offsite Response Organizations (ORO) with FEMA-approved exception areas (identified in the approved Alert and Notification System Design Report) 5-10 miles from the nuclear power plant should demonstrate the capabi.lity to accomplish primary alerting and notification of the exception area(s) within 45 minutes following the initial decision by authorized offsite emergency officials to notify the public of an emergency situation.
Counties may elect to prtovide county specific EAS messages to" their LAS 'sations.
The 45-minute clock will begin when the OROs make the decision to activate the alert and notification system for the first time&#xfd; for a specific mefegency-situation.L The initial message should, at a minimum, inchide: a statemefit-'thit an emergency' exists at the plant and where to obtain additionail information.
Following the decision to activate the alert and notification'system, in accordance With the ORO's plan and/orprocedures,ANS activationshould be accomplished in a timely mannerfor primary alerting/notification. This action will NOT be subject to specific time r'equirements.
For exception area alerting, at least one route needs to be demonstrfited and evaluated:, The selected route(s) should vary from exercise to exercise.
All actions to broadcaststations will be simulated. Systems that use automatic sending technology may be demonstratedby explanation during an interview.
However, the most difficult route should be demonstrated at least once every six.years.
Each evaluatedmunicipality per risk county will demonstrate route alerting.ofthe hearing impaired residents within theirjurisdiction by interview at the EOC.
All alert and notification activities along-the route should be'simulated (that is, the message that would actually be used is read for the ,evaluator, but not actually broadcast) as, agreed upon in the extent of play. Actual testing' of the mobile public address system will be conducted at some agreed-upon location.Backup alert and notification of the public should be completed within 45 minutes following the detection by the ORO of a. failure ofthe primary alert and notification system. Backup route alerting only needs to be demonstrated and evaluated, in accordance with the ORO's plan and/or procedures and the extent of play agreement, if the exercise scenario calls for failure of any portion of the primary, system(s), or if any portion of the primary system(s)actually fails to function..
Criterion 5.a.2: [RESERVED]
If demonstrated, only one route needs to be selected and demonstrated.
98 a
All alert and notification activities along the route should be simulated (that is, the message that would actually be used is read for the evaluator, but not actually broadcast) as. agreed ,upon in the extent 'of play. Actual testing of the mobile public address system will be conductedat some agreed-upon location.All activities for this' criterion must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, except as noted above or otherwise indicated in the'extent-of play agreement.
 
PEMA Negotiated Extent of Play: Back-up alert notification of the public due to a simulated siren failure will be demonstrated.(Refer to Attachment A, Section L 4.) PEAA liaison will give an inject to the risk county 99 6 coordinator that a particular siren has failed in the municipalities scheduled to demonstrate back-up route alerting.
Criterion 5.a.3: Activities associated with FEMA approved exception areas (where applicable) are completed within 45 minutes following the initial decision by authorized offsite emergency officials to notify the public of an emergency situation. Backup alert and notification of the public is completed within 45 minutes following the detection by the ORO of a failure of the primary alert and notification system. (NUREG-0654, E. 6, Appendix 3.B.2.c)
This siren failure will. then be communicated to the appropriate municipalities so they can demonstrate one back-up route alert run. Pennsylvania does not have any "exception areas.'Sub-element 5.b -Emergency Information and Instructions for the Public and the Media INTENT This sub-element.
EXTENT OF PLAY Offsite Response Organizations (ORO) with FEMA-approved exception areas (identified in the approved Alert and Notification System Design Report) 5-10 miles from the nuclear power plant should demonstrate the capabi.lity to accomplish primary alerting and notification of the exception area(s) within 45 minutes following the initial decision by authorized offsite emergency officials to notify the public of an emergency situation. The 45-minute clock will begin when the OROs make the decision to activate the alert and notification system for the first time&#xfd; for a specific mefegency-situation.L The initial message should, at a minimum, inchide: a statemefit-'thit an emergency' exists at the plant and where to obtain additionail information.
derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have theicapability tp disseminate to the public appropriate emergency information and instructions,, including any recommended protective actions. In addition, NUREG-0654 provides that OROs should ensure that the capability exists for providing information to the media. This includes the availability of a physical location for use by the media'during an emergency.
For exception area alerting, at least one route needs to be demonstrfited and evaluated:, The selected route(s) should vary from exercise to exercise. However, the most difficult route should be demonstrated at least once every six.years. All alert and notification activities along-the route should be'simulated (that is, the message that would actually be used is read for the ,evaluator, but not actually broadcast) as, agreed upon in the extent of play. Actual testing' of the mobile public address system will be conducted at some agreed-upon location.
NUREG-0654 also pifovides that a system'sfh6uld be available for dealing with rinumors.
Backup alert and notification of the public should be completed within 45 minutes following the detection by the ORO of a. failure ofthe primary alert and notification system. Backup route alerting only needs to be demonstrated and evaluated, in accordance with the ORO's plan and/or procedures and the extent of play agreement, if the exercise scenario calls for failure of any portion of the primary, system(s), or if any portion of the primary system(s) actually fails to function.. If demonstrated, only one route needs to be selected and demonstrated. All alert and notification activities along the route should be simulated (that is, the message that would actually be used is read for the evaluator, but not actually broadcast) as. agreed ,upon in the extent 'of play. Actual testing of the mobile public address system will be conductedat some agreed-upon location.
This systemiw'will hereafter be kniown as the public inquiry hotline. " -' " -.. ' : -"~~~~~~~~~.  
All activities for this' criterion must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, except as noted above or otherwise indicated in the'extent-of play agreement.
.. ,. .. .. ' ... : "z .Criterion 5.b.1I OROs prov'ide accurate emergency information and instructions to the public and the news media in a timely manner. (NUREG-0654,.
PEMA NegotiatedExtent of Play:
E. 5, 7&#xfd;; G.3.a, EXTENT OF PLAY Subsequent emergency information and'instructibris lshould be provided to the&'public and the media in. a timely-manner (will not be subjectrto'specific time iequirements)&#xfd;.
Back-up alert notification of the public due to a simulatedsirenfailure will be demonstrated.
For exercise purposes, timely.is, defined as "the responsible .ORO persbnnel'/representatiVes demonstrate actions to disseminate the: appropriate information/instructiofts with a sense of urgency and without undue delay.' If message dissemination is' to be identified as not having been accomplished in a timely manner, the evaluator(s) will document a specific delay or cause as to why a message was not consideredtimely.>  
(Refer to Attachment A, Section L 4.) PEAA liaison will give an inject to the risk county 99
-The ORO should ensure that emergency information and instructions'are consistent with protective action decisions made by appropriate officials.
 
The emergency information should contain all necessary and applicable instructions (for example, evacuation instructions, evacuation routes, reception center locations, what to take when evacuating, information concerning pets, shelter-in-place instructions, information concerning protective actions for schools and special populations, public inquiry telephone number, etc.) to assist the public in carrying out protective action decisions provided to them. The ORO should also be prepared to disclose and explain the Emergency Classification Level (ECL) of the incident.
6 coordinatorthat a particularsiren has failed in the municipalitiesscheduled to demonstrate back-up route alerting. This sirenfailure will.then be communicated to the appropriate municipalitiesso they can demonstrate one back-up route alert run. Pennsylvaniadoes not have any "exception areas.'
At a minimum, this information must be included in niedia briefings and/or media releases.OROs should demonstrate the capability to use language that is clear and understandable to the public within both the plume and ingestion pathway EPZs.. This includes demonstration of the capability to use familiar landmarks and boundaries to describe protective action areas.100 a The emergency information should be all-inclusive by including' previously identified protective action areas that are still valid, as well as new areas. The OROs should demonstrate the capability to ensure that emergency information that is no longer valid is rescinded and not repeated by broadcast media. In addition, the OROs should demonstrate the capability to ensure that current emergency information is repeated at pre-established intervals in accordance with the plan and/or procedures.
Sub-element 5.b - Emergency Information and Instructions for the Public and the Media INTENT This sub-element. derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have theicapability tp disseminate to the public appropriate emergency information and instructions,, including any recommended protective actions. In addition, NUREG-0654 provides that OROs should ensure that the capability exists for providing information to the media. This includes the availability of a physical location for use by the media'during an emergency. NUREG-0654 also pifovides that a system'sfh6uld be available for dealing with rinumors. This systemiw'will hereafter be kniown as the public inquiry hotline.                   ..
: ' ..*' - *"~~~~~~~~~.
                                                      - .. ' .. ' " . i.".'* .. : "z .
Criterion 5.b.1I OROs prov'ide accurate emergency information and instructions to the public and the news media in a timely manner. (NUREG-0654,. E. 5, 7&#xfd;; G.3.a, EXTENT OF PLAY Subsequent emergency information and'instructibris lshould be provided to the&'public and the media in. a timely-manner (will not be subjectrto'specific time iequirements)&#xfd;. For exercise purposes, timely.is, defined as "the responsible .ORO persbnnel'/representatiVes demonstrate actions to disseminate the: appropriate information/instructiofts with a sense of urgency and without undue delay.' If message dissemination is' to be identified as not having been accomplished in a timely manner, the evaluator(s) will document a specific delay or cause as to why a message was not consideredtimely.>                           -
The ORO should ensure that emergency information and instructions'are consistent with protective action decisions made by appropriate officials. The emergency information should contain all necessary and applicable instructions (for example, evacuation instructions, evacuation routes, reception center locations, what to take when evacuating, information concerning pets, shelter-in-place instructions, information concerning protective actions for schools and special populations, public inquiry telephone number, etc.) to assist the public in carrying out protective action decisions provided to them. The ORO should also be prepared to disclose and explain the Emergency Classification Level (ECL) of the incident. At a minimum, this information must be included in niedia briefings and/or media releases.
OROs should demonstrate the capability to use language that is clear and understandable to the public within both the plume and ingestion pathway EPZs.. This includes demonstration of the capability to use familiar landmarks and boundaries to describe protective action areas.
100 a
 
The emergency information should be all-inclusive by including' previously identified protective action areas that are still valid, as well as new areas. The OROs should demonstrate the capability to ensure that emergency information that is no longer valid is rescinded and not repeated by broadcast media. In addition, the OROs should demonstrate the capability to ensure that current emergency information is repeated at pre-established intervals in accordance with the plan and/or procedures.
OROs should demonstrate the capability to develop emergency information in a non-English language when required by the plan and/or procedures.
OROs should demonstrate the capability to develop emergency information in a non-English language when required by the plan and/or procedures.
If ingestion pathway measures are exercised, OROs should demonstrate that a system exists for rapid dissemination of ingestion pathway information to pre-determined indiViduals and businesses inaccordanrce Wih the ORO's plan and/or procedures.
If ingestion pathway measures are exercised, OROs should demonstrate that a system exists for rapid dissemination of ingestion pathway information to pre-determined indiViduals and businesses inaccordanrce Wih the ORO's plan and/or procedures.
oROs should demonstrate the capability to provide timely, accurate, concise, and coordinated information to the news media .for subsequent dissemination to the public. This would include demonstration of the capability to conduct timely and pertinent media briefings and distribute media releases as the situation warrants.
oROs should demonstrate the capability to provide timely, accurate, concise, and coordinated information to the news media .for subsequent dissemination to the public. This would include demonstration of the capability to conduct timely and pertinent media briefings and distribute media releases as the situation warrants. The OROs should demonstrate the.capability to respond appropriately to. inquiries. from the news media.: All information presented in media briefings and media releases, should be consistent with protective action decisions and other emergency information provided to the public. Copies of pertinent emergency information (e.g., EAS messages and media releases) and media information kits should be available for dissemination to the media.
The OROs should demonstrate the.capability to respond appropriately to. inquiries.
OROs should demonstrate that an effective system is in place for dealing with calls to the public, inquiry hotline. Hotline staff should demonstrate the capability to provide or obtain accurate information for callers or refer them to. an appropriate information source.
from the news media.: All information presented in media briefings and media releases, should be consistent with protective action decisions and other emergency information provided to the public. Copies of pertinent emergency information (e.g., EAS messages and media releases) and media information kits should be available for dissemination to the media.OROs should demonstrate that an effective system is in place for dealing with calls to the public, inquiry hotline. Hotline staff should demonstrate the capability to provide or obtain accurate information for callers or refer them to. an appropriate information source.Information from the hotline staff, including information that corrects false or. inaccurate information when~trends are noted,, should.be included, asiappropriate;,in emergency information provided to the public,media briefings, and/or media-releases.
Information from the hotline staff, including information that corrects false or.inaccurate information when~trends are noted,, should.be included, asiappropriate;,in emergency information provided to the public,media briefings, and/or media-releases.
All activities for this criterion must be based on the ORO's plans.and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.L PEMA Negotiated Extent of Play: Subsequent emergency information and instructions should be provided to the public and the media in a timely manner. This will NOT be subject to specific time requirements.
All activities for this criterion must be based on the ORO's plans.and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.L PEMA NegotiatedExtent of Play:
Any subsequent information/news statements required by the ORO Plans will be made by the individual counties to, ONE specific electronic news media/information outlet serving the county. One media briefing will be demonstrated in each risk county.101 0 Risk and support counties will receive and handle "public inquiry" messages via their individual "public inquiry"processes (In compliance with NIMS terminology, rumor control is now considered to be '"public inquiry").
Subsequent emergency information and instructionsshould be provided to the public and the media in a timely manner. This will NOT be subject to specific time requirements. Any subsequent information/news statements requiredby the ORO Plans will be made by the individual counties to, ONE specific electronic news media/information outlet serving the county. One media briefing will be demonstratedin each risk county.
Counties will receive approximately ten (10)public inquiry calls from the state exercise cell assigned this responsibility.
101
Counties will be expected to receive and log the calls, identify any trends and take appropriate actions.0* ..0 102 0 EVALUATION AREA 6 Support Operation/Facilities Sub-element 6.a -Monitoring and Decontamination of Evacuees and Emergency Workers and Registration of Evacuees INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to implement radiological monitoring and decontamination of evacuees and emergency workers, while minimizing contamination of the facility, and registration of evacuees at reception centers.Criterion 6.a.l: The reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers.(NUREG-0654, J.10.h; J.12; K.5.a)EXTENT OF PLAY Radiological monitoring, decontamination, and registration facilities for evacuees/emergency workers should be set up and demonstrated as they would be in an actual emergency or as indicated in the extent of play agreement.
 
This would include adequate space for evacuees' vehicles.
0 Risk and support counties will receive and handle "publicinquiry" messages via their individual "public inquiry"processes(In compliance with NIMS terminology, rumor control is now consideredto be '"publicinquiry"). Counties will receive approximately ten (10) public inquiry callsfrom the state exercise cell assignedthis responsibility. Counties will be expected to receive and log the calls, identify any trends and take appropriateactions.
Expected demonstration should include 1/3 of the monitoring teams/portal monitors required to monitor 20% of the population allocated to the facility within 12 hours. Before using monitoring instrument(s), the monitor(s) should demonstrate the process of checking the instrument(s) for proper operation.
0 0
Staff responsible for the radiological monitoring of evacuees should demonstrate the capability to attain and sustain a monitoring productivity rate per hour needed to monitor the 20% emergency planning zone (EPZ) population planning base within about 12 hours. This monitoring productivity rate per hour is the number of evacuees that can be monitored per hour by the total complement of monitors using an appropriate monitoring procedure.
102 0
A minimum of six individuals per monitoring station should be monitored, using equipment and procedures specified in the plan and/or procedures, to allow demonstration of monitoring, decontamination, and registration capabilities.
 
The monitoring sequences for the first six simulated evacuees per monitoring team will betimed by the evaluators in order to determine whether the twelve-hour requirement can be meet. Monitoring of emergency workers does not have to meet the twelve-hour requirement.
EVALUATION AREA 6 Support Operation/Facilities Sub-element 6.a - Monitoring and Decontamination of Evacuees and Emergency Workers and Registration of Evacuees INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to implement radiological monitoring and decontamination of evacuees and emergency workers, while minimizing contamination of the facility, and registration of evacuees at reception centers.
However, appropriate monitoring procedures should be demonstrated for a minimum of two emergency workers.Decontamination of evacuees/emergency workers may be simulated and conducted by interview.
Criterion 6.a.l: The reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers.
The availability of provisions for separately showering shouldbe demonstrated or explained.
(NUREG-0654, J.10.h; J.12; K.5.a)
The staff should demonstrate provisions for limiting the spread of contamination.
EXTENT OF PLAY Radiological monitoring, decontamination, and registration facilities for evacuees/
Provisions could include floor coverings, signs and appropriate means (for example, partitions, 103 0 roped-off areas) to separate clean from potentially contaminated areas. Provisions should also exist to separate contaminated and uncontaminated individuals, provide changes of clothing for individuals whose clothing is contaminated, and store contaminated clothing and personal belongings to prevent further contamination of evacuees or facilities.
emergency workers should be set up and demonstrated as they would be in an actual emergency or as indicated in the extent of play agreement. This would include adequate space for evacuees' vehicles. Expected demonstration should include 1/3 of the monitoring teams/portal monitors required to monitor 20% of the population allocated to the facility within 12 hours. Before using monitoring instrument(s), the monitor(s) should demonstrate the process of checking the instrument(s) for proper operation.
In addition, for any individual found to be contaminated, procedures should be discussed concerning the handling of potential contamination of vehicles and personal belongings.
Staff responsible for the radiological monitoring of evacuees should demonstrate the capability to attain and sustain a monitoring productivity rate per hour needed to monitor the 20% emergency planning zone (EPZ) population planning base within about 12 hours. This monitoring productivity rate per hour is the number of evacuees that can be monitored per hour by the total complement of monitors using an appropriate monitoring procedure. A minimum of six individuals per monitoring station should be monitored, using equipment and procedures specified in the plan and/or procedures, to allow demonstration of monitoring, decontamination, and registration capabilities. The monitoring sequences for the first six simulated evacuees per monitoring team will betimed by the evaluators in order to determine whether the twelve-hour requirement can be meet. Monitoring of emergency workers does not have to meet the twelve-hour requirement. However, appropriate monitoring procedures should be demonstrated for a minimum of two emergency workers.
Monitoring personnel should explain the use of action levels for determining the need .for decontamination.
Decontamination of evacuees/emergency workers may be simulated and conducted by interview. The availability of provisions for separately showering shouldbe demonstrated or explained. The staff should demonstrate provisions for limiting the spread of contamination.
They should also explain the procedures for referring evacuees who cannot be adequately decontaminated for assessment and follow up in accordance with the ORO's plans and procedures.
Provisions could include floor coverings, signs and appropriate means (for example, partitions, 103
Contamination of the individual will be determined by controller inject and not simulated with any low-level radiation source.The capability to register individuals upon completion of the monitoring and'decontamination activities should be demonstrated:
 
The registration activities demonstrated should include the establishment of a iegistrationrecord for each individual, consisting of the individual's name, address, results of monitoring,-
0 roped-off areas) to separate clean from potentially contaminated areas. Provisions should also exist to separate contaminated and uncontaminated individuals, provide changes of clothing for individuals whose clothing is contaminated, and store contaminated clothing and personal belongings to prevent further contamination of evacuees or facilities. In addition, for any individual found to be contaminated, procedures should be discussed concerning the handling of potential contamination of vehicles and personal belongings.
andtime of'decontamiriation, if any; or as otherwise designated in the plan. Audio recorders, camcorders, or written records are all acceptable means for registration  
Monitoring personnel should explain the use of action levels for determining the need .for decontamination. They should also explain the procedures for referring evacuees who cannot be adequately decontaminated for assessment and follow up in accordance with the ORO's plans and procedures. Contamination of the individual will be determined by controller inject and not simulated with any low-level radiation source.
... .', ..All activities associated with this criterion must'be based'on the ORO's plans and', procedures and completed, as they would be in an actual emergency, unless otherwise indicated in the extent of play agreement.
The capability to register individuals upon completion of the monitoring and' decontamination activities should be demonstrated: The registration activities demonstrated should include the establishment of a iegistrationrecord for each individual, consisting of the individual's name, address, results of monitoring,- andtime of'decontamiriation, if any; or as otherwise designated in the plan. Audio recorders, camcorders, or written records are all acceptable means for registration       ... . ',         .       .
PEMA Negotiated Extent of Play: Radiological monitoring demonstration sites should possess a roster of the monitoring personnel required to process 20% of the population allocated to thefacility within a 12 hour period.. .' .' " Water from decontamination activities may go directly to a storm drain or other sewer or drain system or area normally designated for wastewater that has, been used for bathing or washing Of jvehicles and or equipment.  
All activities associated with this criterion must'be based'on the ORO's plans and',
......At each reception center, a minimum of three volunteer evacuees will be processed, briefed, issued the appropriate strip map or directions, and instructed to proceed to a mass care center designated for demonstration of monitoring,.
procedures and completed, as they would be in an actual emergency, unless otherwise indicated in the extent of play agreement.
decontamination, andregistration.
PEMA NegotiatedExtent of Play:
A sample ofthe appropriate strip maps 'or directions will be made available for the demonstration.
Radiologicalmonitoringdemonstration sites shouldpossess a roster of the monitoring personnel requiredto process 20% of the population allocatedto thefacility within a 12 hour period..           .'                 .         '                     "
Co-located facilities do not require strip maps or Written directions.
Waterfrom decontamination activities may go directly to a storm drain or other sewer or drain system or area normally designatedfor wastewater that has, been usedfor bathing or washing Ofjvehicles and or equipment.                                     ......
One mass care center and one mass care monitoring/decontamination center will be demonstrated per county during the out-of-sequence window. The counties will provide space at designated mass care centers jbr operation of monitoring/decontamination centers.Schematics of these monitoring  
At each reception center, a minimum of three volunteer evacuees will be processed, briefed, issued the appropriatestrip map or directions, and instructedto proceed to a mass care center designatedfor demonstration of monitoring,.decontamination,andregistration. A sample ofthe appropriatestrip maps 'ordirections will be made availablefor the demonstration. Co-locatedfacilities do not requirestrip maps or Written directions.
/decontamination centers will be available to show the organization and layout within the facility and space management for monitoring and 104 01 decontamination.
One mass care center and one mass care monitoring/decontaminationcenter will be demonstratedper county during the out-of-sequence window. The counties will provide space at designatedmass care centersjbr operation of monitoring/decontaminationcenters.
Procedures will be demonstrated to show the separation of contaminated and non-contaminated (clean) individuals to minimize cross contamination.
Schematics of these monitoring/decontaminationcenters will be available to show the organizationand layout within thefacility andspace managementfor monitoring and 104 01
At the evacuee monitoring/decontamination center, a minimum of six (6) volunteer evacuees will be monitored (or one volunteer evacuee may be monitored six times). Suitable radiological monitoring instruments will be issued to and demonstrated by the initial monitoring team(s). A monitoring team consists of one monitor and one recorder equipped with one survey instrument.
 
Those individuals found to be free of "contamination  
decontamination. Procedureswill be demonstratedto show the separationof contaminated and non-contaminated(clean) individuals to minimize cross contamination.
", based upon scenario injects, will be directed to the mass care registration point forfurther processing.
At the evacuee monitoring/decontaminationcenter, a minimum of six (6) volunteer evacuees will be monitored (or one volunteer evacuee may be monitored six times). Suitable radiologicalmonitoringinstruments will be issued to and demonstratedby the initial monitoringteam(s). A monitoring team consists of one monitor and one recorder equipped with one survey instrument. Those individualsfound to be free of "contamination", based upon scenario injects, will be directed to the mass care registrationpointforfurther processing. Note: Actual radiologicalsources will not be attachedto or hidden upon the volunteer evacuees.
Note: Actual radiological sources will not be attached to or hidden upon the volunteer evacuees.One of the simulated evacuees, based upon controller injects, will not be able to be decontaminated.
One of the simulatedevacuees, based upon controller injects, will not be able to be decontaminated. Discussions concerning the processingof contaminatedpersonnel will include capabilitiesand written proceduresfor showeringfemales separatefrom males.
Discussions concerning the processing of contaminated personnel will include capabilities and written procedures for showering females separate from males.Showering will be simulated; water willnot be, used Note: Ifportal monitors are used, the Portal Monitor Extent of Play described below shall be used.At the emergencV worker monitoring/decontamination stations one emergency worker will be monitored Discussions concerning processing of contaminated personnel will include capabilities and written procedUres,for showering females separate from males.! Showering will be simulated, water will not be used Suitable radiological monitoring instruments will be issued to the initial monitoring team. Note:- Ifportal monitors are, used, the Portal Monitor Extent of Play described below shall be used.Portal Monitor Use: Risk and Support counties may, during this exercise, utilize portal monitors to monitor simulated evacuees and/or emergency workers..
Showering will be simulated; water willnot be,used Note: Ifportalmonitors are used, the PortalMonitor Extent of Play describedbelow shall be used.
The monitoring  
At the emergencV worker monitoring/decontaminationstations one emergency worker will be monitored Discussionsconcerningprocessingof contaminatedpersonnel will include capabilitiesand written procedUres,forshoweringfemales separatefrom males.! Showering will be simulated, water will not be used Suitable radiologicalmonitoring instruments will be issued to the initialmonitoring team. Note:- Ifportalmonitors are,used, the Portal Monitor Extent of Play described below shall be used.
/decontamination team, requirements.
PortalMonitor Use: Risk and Support counties may, duringthis exercise, utilize portal monitors to monitor simulatedevacuees and/or emergency workers.. The monitoring/
will be based on the portal monitor capabilities as applicable based on the procedure/guidelines, and the recommendations of the.: manufacturer.
decontamination team,requirements.will be basedon the portal monitor capabilitiesas applicable basedon the procedure/guidelines,and the recommendationsof the.:
Note: PEMA Circular C2004-2 shall apply.Monitoring/decontamination centers and Emergency Worker monitoring, and decontamination station personnel are not issued DRDs. or K! since the centers and stations are outside the EPZ. Category "C" dosimetry applies. Simulated personal record dosimeters (PRDs) will be worn., Radiation readings / contamination data for.the evacuees and vehicle will be provided by the controller as appropriate based upon. information contained in the scenario package. Set-up of theJacility will be-perjbrmed the same as for an actual emergency with all route markings and contamination control measures in place including step-offpads.
manufacturer. Note: PEMA CircularC2004-2 shall apply.
Long runs ofplastic covered with paper will not be demonstrated, but the materials shall be available and explained Positioning of afire apparatus on-site may be simulated iotherwise required Sub-element 6.b -Monitoring and Decontamination of Emergency Worker Equipment'INTENT 105 This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to implement radiological monitoring and decontamination of emergency worker equipment, including vehicles.Criterion 6.b.l: The facility/ORO has adequate procedures and resources for the accomplishment of monitoring and decontamination of emergency worker equipment, including vehicles. (NUREG-0654, K.5.b)EXTENT OF PLAY The monitoring staff should demonstrate the capability to monitor equipment, including vehicles, forcontamination in accordance with the Offsite Response Organizations (ORO)plans and procedures. "Specific attentiion should.be given, to equipment, including vehicles, that was in contact with individuals found to be co'ntaninated.
Monitoring/decontaminationcenters and Emergency Worker monitoring,and decontamination stationpersonnel are not issued DRDs.or K! since the centers and stations are outside the EPZ. Category "C" dosimetry applies. Simulatedpersonal record dosimeters (PRDs) will be worn.,
The monitoring staff should demonstrate the capability to,make decisions on th6 need fOr decohtamination of equipment, including vehicles, based on guidance levels and procedures statd in the plan and/or procedures.  
Radiation readings/ contamination datafor.the evacuees and vehicle will be provided by the controlleras appropriatebased upon.information containedin the scenariopackage. Set-up of theJacility will be-perjbrmedthe same asfor an actual emergency with all route markings and contamination control measures in place includingstep-offpads. Long runs ofplastic covered with paper will not be demonstrated,but the materialsshall be available and explained Positioningof afire apparatuson-site may be simulated iotherwise required Sub-element 6.b - Monitoring and Decontamination of Emergency Worker Equipment
., .. .The area to be used for monitoring and decontamination should be set up as it w6uldbe in an actual emergency, with all route markings, instrumentation, record keeping and contamination control measures in place. Monitoring procedures should be demonstrated for a minimum of one vehicle..
'INTENT 105
it is generally not necessary to monitor the entire surface of vehicles.
 
However, ihe 'capability to monitor areas s'uch as radiator~grills, bumpIers, wheeI wells, tires, and door handles should be demonstrated.
This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to implement radiological monitoring and decontamination of emergency worker equipment, including vehicles.
Interior surfaces of vefiicles that were in contact with individuals found to be contaminated should also be checked.Decontamination.
Criterion 6.b.l: The facility/ORO has adequate procedures and resources for the accomplishment of monitoring and decontamination of emergency worker equipment, including vehicles. (NUREG-0654, K.5.b)
capabilities, and provisions for vehicles and equipment'that cannot be decontaminated, may be simulated and conducted by intelriew.
EXTENT OF PLAY The monitoring staff should demonstrate the capability to monitor equipment, including vehicles, forcontamination in accordance with the Offsite Response Organizations (ORO) plans and procedures. "Specific attentiion should.be given, to equipment, including vehicles, that was in contact with individuals found to be co'ntaninated. The monitoring staff should demonstrate the capability to,make decisions on th6 need fOr decohtamination of equipment, including vehicles, based on guidance levels and procedures statd in the plan and/or procedures. .,                                         ..                   .
All activities associated with this criterion must be based on the ORO's plans and procedures and completed as they would be in an actual emergency,&#xfd;unless noted above or otherwise indicated in the extentof play agreement.  
The area to be used for monitoring and decontamination should be set up as it w6uldbe in an actual emergency, with all route markings, instrumentation, record keeping and contamination control measures in place. Monitoring procedures should be demonstrated for a minimum of one vehicle.. it is generally not necessary to monitor the entire surface of vehicles. However, ihe 'capability to monitor areas s'uch as radiator~grills, bumpIers, wheeI wells, tires, and door handles should be demonstrated. Interior surfaces of vefiicles that were in contact with individuals found to be contaminated should also be checked.
*PEMA Negotiated Extent of Play: Emergency worker station personnel will consist of a minimum of one monitor and one recorder and sufficient personnel to demonstrate monitoring of at least ohe vehicle.Schematics of these monitoring/decbntamination stations will be available to show organization and space management.
Decontamination. capabilities, and provisions for vehicles and equipment'that cannot be decontaminated, may be simulated and conducted by intelriew.
The evaluator will request that vehicle decontamination procedures be explained after the vehicle (with simulated contamination) has been monitored.
All activities associated with this criterion must be based on the ORO's plans and procedures and completed as they would be in an actual emergency,&#xfd;unless noted above or otherwise indicated in the extentof play agreement.
One radiological survey meter, will be issued-to each vehicle monitoring/decontamination team. One vehicleand/or piece of equipment will not be able to be decontaminated.
* PEMA NegotiatedExtent of Play:
Simulated radiation contamination data will be included in the scenario package, and injected by a controller.
Emergency worker stationpersonnel will consist of a minimum of one monitor and one recorderand sufficient personnel to demonstrate monitoring of at least ohe vehicle.
Set-up of the facility will be performed as closely as possible to that for an actual emergency with all route markings in place.106 61 Decontamination capabilities, and provisions for vehicles and equipment that cannot be decontaminated, will be simulated and conducted by interview.
Schematics of these monitoring/decbntaminationstations will be available to show organizationandspace management. The evaluatorwill request that vehicle decontaminationproceduresbe explained after the vehicle (with simulated contamination) has been monitored. One radiologicalsurvey meter, will be issued-to each vehicle monitoring/decontaminationteam. One vehicleand/orpiece of equipment will not be able to be decontaminated. Simulated radiationcontamination data will be included in the scenario package, and injected by a controller. Set-up of thefacility will be performed as closely as possible to thatfor an actualemergency with all route markings in place.
Water will NOT be used.Sub-element 6.c -Temporary Care of Evacuees, INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) demonstrate the capability to establish relocation centers in host areas.The American Red Cross (ARC) normally provides congregate care in support of OROs under existing letters of agreement.
106 61
Criterion 6c.:' Managers o6f.ongiregate carefacilities demonstrate that the centers-haVe iesources to provide services and accommodations consistent with American Red Cross planning guidelines. (Found in MASS CARE -Preparedness Operatiolns, ARC 3031) Managers demonstrate the procedures to assure that evacuees have beenmonitored fo'rcontamination and have been decontaminated as appropriate before entering congregate care facilities.(NUREG-0654, J.10.h, J.12)EXTENT OF PLAY Underfthis criterion,1 demonstration of congregate card centers may be conducted out of sequence with-the exercise scenario.
 
The evaluator should conduct a walk-through of the center to defermine, through observation and inquiries, that the services and accommodations are consistent with ARC 3031. In this simutioh, it is not necessary to'set up operations as they would be in an actual emergency.
Decontaminationcapabilities,andprovisionsfor vehicles and equipment that cannot be decontaminated,will be simulatedand conducted by interview. Water will NOT be used.
Alter-nativelly, capabilities  
Sub-element 6.c - Temporary Care of Evacuees, INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) demonstrate the capability to establish relocation centers in host areas.
'may be demonstrated by setting up stations for various services and providing those services to simulated evacuees.
The American Red Cross (ARC) normally provides congregate care in support of OROs under existing letters of agreement.
Given the substantial differences between demonstration and simulation of this&#xfd; objective, exercise demonstration expectations should be clearly specified in extent-of-play agreements.
Criterion 6c.:' Managers o6f.ongiregate carefacilities demonstrate that the centers-haVe iesources to provide services and accommodations consistent with American Red Cross planning guidelines. (Found in MASS CARE -
Congregate care,.staff should also dcemonstrate the capability to ensure that evacuees have been monitored for contamination, have been decontaminated as appropriate,.and have been registered before entering the facility.
Preparedness Operatiolns, ARC 3031) Managers demonstrate the procedures to assure that evacuees have beenmonitored fo'rcontamination and have been decontaminated as appropriate before entering congregate care facilities.
This capability may be determined through an interview process.If operations at the center are demonstrated, material that would be difficult or expensive to transport (for example, cots, blankets, sundries, and large-scale food supplies) need not be physically available at, the facility (facilities).
(NUREG-0654, J.10.h, J.12)
However,, availability of such items should be verified by providing the evaluator a list of sources with locations and estimates of quantities.
EXTENT OF PLAY Underfthis criterion,1 demonstration of congregate card centers may be conducted out of sequence with-the exercise scenario. The evaluator should conduct a walk-through of the center to defermine, through observation and inquiries, that the services and accommodations are consistent with ARC 3031. In this simutioh, it is not necessary to'set up operations as they would be in an actual emergency. Alter-nativelly, capabilities 'may be demonstrated by setting up stations for various services and providing those services to simulated evacuees. Given the substantial differences between demonstration and simulation of this&#xfd; objective, exercise demonstration expectations should be clearly specified in extent-of-play agreements.
Congregate care,.staff should also dcemonstrate the capability to ensure that evacuees have been monitored for contamination, have been decontaminated as appropriate,.and have been registered before entering the facility. This capability may be determined through an interview process.
If operations at the center are demonstrated, material that would be difficult or expensive to transport (for example, cots, blankets, sundries, and large-scale food supplies) need not be physically available at,the facility (facilities). However,, availability of such items should be verified by providing the evaluator a list of sources with locations and estimates of quantities.
All activities associated.with this criterion must be based on the ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
All activities associated.with this criterion must be based on the ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play: 107 All counties demonstrating the operation of mass care centers during the out-of-sequence window will provide floor plans of the mass care centers to show organization within the facility and space management during a real emergency.
PEMA NegotiatedExtent of Play:
Mass care center locations are listed in. the demonstration tables "Demonstration of Mass Care Centers (Attachment A, Section B.3)".Personnel, at a minimum, will consist of one manager and one assistant for each mass care center opened during the out-of-sequence window. The responsible American Red Cross chapter will show the source and quantities, byjob finctional description, to be provided to mass care centers to support the 24-hour operation.
107
The responsible Red Cross Chapter(s) will be visited, or telephonically contacted during business hours on May 14; 2008, by an exercise evaluator, or interviewed at the mass care center during the out-of-sequence evaluation to provide information regarding the 24-hour operation..
 
Schematics of thesemass care centers will be available, during the demonstration window, to show organization within the facility and space allocation for the registration and sheltering, the evacudting public. .NecesSary signs;directional arrows andforms will be available and used-to demonstrate registration, i-lt a minimum, of three evacuees requiring emergency;housing.
All counties demonstrating the operation of mass care centers during the out-of-sequence window will providefloor plans of the mass care centers to show organizationwithin the facility andspace management duringa realemergency. Mass care center locations are listed in.the demonstration tables "Demonstrationof Mass Care Centers (AttachmentA, Section B.3)".
Evacuees will be shown :the location where they would be housed in an actual situation.  
Personnel,at a minimum, will consist of one manager and one assistantfor each mass care center opened duringthe out-of-sequence window. The responsibleAmerican Red Cross chapter will show the source and quantities, byjob finctionaldescription, to be provided to mass care centers to support the 24-hour operation. The responsibleRed Cross Chapter(s)will be visited, or telephonically contactedduring business hours on May 14; 2008, by an exercise evaluator,or interviewed at the mass care center duringthe out-of-sequence evaluation to provide information regardingthe 24-houroperation.. Schematics of thesemass care centers will be available, duringthe demonstration window, to show organizationwithin the facility and space allocationfor the registrationandsheltering,the evacudtingpublic. .NecesSarysigns; directionalarrows andforms will be availableand used-to demonstrate registration,i-lt a minimum, of three evacuees requiringemergency;housing. Evacuees will be shown :the location where they would be housed in an actualsituation. !Bedding,-cots,f6od, etc. normally~i associatedwith masscare:willnotbe moved to the Site,. butthe Sources of those items should be explainedto FEMA evaluators.' This out-of-sequenceldemonstrationwindow will befroin 7.:00 PM- 9:30 PMon May 14, 2008.                 .         .           .'       .
!Bedding, -cots, f6od, etc. normally~i associated with masscare:will notbe moved to the Site,. butthe Sources of those items should be explained to FEMA evaluators.'
American Red Cross Chapters and POCs are as follows:
This out-of-sequenceldemonstration window will befroin 7.:00 PM- 9:30 PMon May 14, 2008. ...' .American Red Cross Chapters and POCs are as follows: (Allegheny and Washington CoUnties) (Butler County).Southwest PA Chapter Butler County Area 225 Blvd. Of the Allies 312 Mercer St. ....Pittsburgh, PA 15230 Butler, PA 16001 POC: Rob Skertich POC: Melissa Wilson 412-263-3100.  
(Allegheny and Washington CoUnties)                     (Butler County).
.724-283-2810 (Beaver and Lawrence County)133.Friendship Cir. .BeaverPA 15009 " POC: -John Stubbs 724-775-9700 Sub-element 6.d -Transportation and Treatment of Contaminated Injured Individuals This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO's) should have the capability to transport contaminated injured individuals to medical facilities with the capability to provide medical services.108 40 Criterion 6.d.1: The facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals. (NUREG-0654, F.2; H.10;K.5, a, b; L.1,4)EXTENT OF PLAY Monitoring, decontamination, and contamination control efforts will not delay urgent medical care for the victim.Offsite Response Organizations (ORO) should demonstrate the capability to transport contaminated injured individuals to medical facilities.
Southwest PA Chapter                                   Butler County Area 225 Blvd. Of the Allies                                 312 Mercer St. .       ...
An ambulance should be used for the response to the- victim. However, to avoid taking an ambulance out of service for an extended~time, any vehicle (e.g., car, truck,, or van) may be utilized to transport.the victim to the medical facility..
Pittsburgh, PA 15230                                   Butler, PA 16001 POC: Rob Skertich                                       POC: Melissa Wilson 412-263-3100.                                   . 724-283-2810 (Beaver and Lawrence County) 133.Friendship Cir.                           .
Normal communications, between the ambulance/dispatcher and the receiving medical facility should be demonstrated.;
BeaverPA 15009                                       "
If a substitute vehicle is used for transport .to the medical facility; this communication must occur, prior to releasing the ambulance from the drill. This communication would include reporting radiation-monitoring results, if available  
POC: -John Stubbs 724-775-9700 Sub-element 6.d - Transportation and Treatment of Contaminated Injured Individuals This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO's) should have the capability to transport contaminated injured individuals to medical facilities with the capability to provide medical services.
.Additionally, the ambulance crew should demonstrate, by interview, knowledge of where the ambulance and crew-would be monitored and decontaminated,z if required, or whom to contact for such information.
108 40
Monitoring of the Victim may be performed prior to transport, done enroute, or deferred to the medical facility.
 
Prior to using a monitoring instrument(s), the monitor(s) should demonstrate the process of checking the instrument(s) for proper operation.
Criterion 6.d.1: The facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals. (NUREG-0654, F.2; H.10; K.5, a, b; L.1,4)
All monitoring activities should be~cornpleted, as they would be in an actual emergency.
EXTENT OF PLAY Monitoring, decontamination, and contamination control efforts will not delay urgent medical care for the victim.
Appropriate contamination control measures should be demonstrated prior-to and during transport and at the receiving medical facility.The medical facility should demonstrate the capability to activate and set up a radiological emergency area for treatment.
Offsite Response Organizations (ORO) should demonstrate the capability to transport contaminated injured individuals to medical facilities. An ambulance should be used for the response to the-victim. However, to avoid taking an ambulance out of service for an extended~time, any vehicle (e.g., car, truck,, or van) may be utilized to transport.the victim to the medical facility.. Normal communications, between the ambulance/dispatcher and the receiving medical facility should be demonstrated.; If a substitute vehicle is used for transport .to the medical facility; this communication must occur, prior to releasing the ambulance from the drill. This communication would include reporting radiation-monitoring results, if available .Additionally, the ambulance crew should demonstrate, by interview, knowledge of where the ambulance and crew-would be monitored and decontaminated,z if required, or whom to contact for such information.
Equipment and supplies should be available for the treatment of contaminated injured individuals.
Monitoring of the Victim may be performed prior to transport, done enroute, or deferred to the medical facility. Prior to using a monitoring instrument(s), the monitor(s) should demonstrate the process of checking the instrument(s) for proper operation. All monitoring activities should be~cornpleted, as they would be in an actual emergency.
Appropriate contamination control measures should be demonstrated prior-to and during transport and at the receiving medical facility.
The medical facility should demonstrate the capability to activate and set up a radiological emergency area for treatment. Equipment and supplies should be available for the treatment of contaminated injured individuals.
The medical facility should demonstrate the capability to make decisions on the need for decontamination of the individual, to follow appropriate decontamination procedures, and to maintain records of all survey measurements and samples taken. All procedures for the collection and analysis of samples and the decontamination of the individual should be demonstrated or described to the evaluator.
The medical facility should demonstrate the capability to make decisions on the need for decontamination of the individual, to follow appropriate decontamination procedures, and to maintain records of all survey measurements and samples taken. All procedures for the collection and analysis of samples and the decontamination of the individual should be demonstrated or described to the evaluator.
All activities associated with this criterion must be based on the ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
All activities associated with this criterion must be based on the ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play: This sub-element was evaluated at Ellwood City Hospital on December 12, 2007.109.
PEMA NegotiatedExtent of Play:
t S 0 110 61 ATTACHMENT A Beaver Valley Power Station 2008 Extent of Play Demonstration Tables PLUME PHASE EXERCISE -A. Activities  
This sub-element was evaluated at Ellwood City Hospital on December 12, 2007.
-May 14, 2008 1. Risk Public School Districts with schools located within the EPZ and those districts situated outside the EPZ, but with students living within the EPZ, will participate and be evaluated by the Department of Homeland Security.
109.
Each identified District Administration Office will be evaluated.
 
When a school system is comprised of multiple buildings (High School, Middle School, Elementary School), the affected buildings (those with students from the EPZ)will be evaluated on a rotational basis to coincide with the six-year exercise cycle.Time: Out of Sequence -9:00 -11:00 AM County School District School Beaver Aliquippa Aliquippa Elem Beaver Area Beaver Area MS/HS Blackhawk Patterson Primary Center Area Center Area Junior HS Hopewell Margaret Ross Elem Midland Borough Neel Elem Monaca Monaca Elem South Side Area South Side Middle School Western Beaver Western Beaver Jr/Sr HS New Brighton See Note below Ambridge See Note below NOTE: New Brighton and Ambridge School Districts do not have schools within the EPZ.They do have students attending their schools who reside in the EPZ. Procedures for holding those students at their respective schools until picked up by parents or guardians will be explained by the district superintendent or representative.
t S
As procedures are the same district wide there will be no need to visit individual schools for evaluation.
0 110 61
: 2. County Emergency Operations Centers (EOCs)Time: Per Scenario 111 0 DEMONSTRATION FOR EOC'MOBILIZATION.FOR COINTIES (Plume Phase Exercise)County Date Time Beaver' June 24, 2008 TBD Allegheny June 24, 2008 TBD Butler June 24, 2008 TBD Lawrence June 24, 2008 TBD Washington June 24, 2008 TBD 3. Municipal Emergency Operations Centers (EOC)Time: Per Scenario ...DEMONSTRATION FOR EOC"MOBILIZATION FOR MUNICIPALITIES (Plume Phase Exercise)RISK COUNTY MUNICIPALITY.  
 
.DATE Beaver City of Aliquippa'  
ATTACHMENT A Beaver Valley Power Station 2008 Extent of Play Demonstration Tables PLUME PHASE EXERCISE -
.... .June 24,2008 Beaver Borough, June:24, 2008 Bridgewater/Fallston Borough* June 24, 2008.-Brighton Township' June 24, 2.008 Center Township, .. June 24, 2008 Chippewa Township ' June 24, 2008 Frankfort Springs/Hanover*
A. Activities - May 14, 2008
June 24, 2008 Georgetown/Greene/Hookstown*
: 1. Risk Public School Districts with schools located within the EPZ and those districts situated outside the EPZ, but with students living within the EPZ, will participate and be evaluated by the Department of Homeland Security. Each identified District Administration Office will be evaluated. When a school system is comprised of multiple buildings (High School, Middle School, Elementary School), the affected buildings (those with students from the EPZ) will be evaluated on a rotational basis to coincide with the six-year exercise cycle.
June 24, 2008 Glasgow/Ohioville/S,.
Time: Out of Sequence - 9:00 - 11:00 AM County                             School District                             School Beaver                                 Aliquippa                         Aliquippa Elem Beaver Area                       Beaver Area MS/HS Blackhawk                         Patterson Primary Center Area                     Center Area Junior HS Hopewell                       Margaret Ross Elem Midland Borough                           Neel Elem Monaca                             Monaca Elem South Side Area                   South Side Middle School Western Beaver                   Western Beaver Jr/Sr HS New Brighton                         See Note below Ambridge                           See Note below NOTE: New Brighton and Ambridge School Districtsdo not have schools within the EPZ.
Beaver*...''
They do have students attending their schools who reside in the EPZ. Proceduresfor holding those students at their respective schools untilpicked up by parents or guardianswill be explained by the district superintendentor representative. As proceduresare the same district wide there will be no need to visit individualschoolsfor evaluation.
June 24, 2008 Hopewell Township June 24, 2008 Independence Township June 24, 2008 Industry Borough June 24, 2008 Midland Borough June 24, 2008 Monaca Borough June 24, 2008 Patterson Twp/Patterson Hts Boro* June 24, 2008 Potter Township June 24, 2008 Raccoon Township.  
: 2. County Emergency Operations Centers (EOCs)
.. June 24, 2008 Shippingport Borough June 24, 2008 South Heights Borough June 24, 2008 Vanport Township June 24, 2008 60 0* Joint EOC 4. One back-up one route alerting demonstration by each risk municipality listed below. (During Scenario Exercise)112 61 COUNTY RISK MUNICIPALITY DATE Beaver Beaver Borough June 24, 2008 Brighton Township June 24, 2008 Chippewa Township June 24, 2008 Hopewell Township June 24, 2008 Monaca Township June 24, 2008 Patterson Heights/Patterson Borough June 24, 2008 5. Traffic and Access Control Points a. The Pennsylvania State Police will brief at the PSP Beaver Barracks, 1400 Brighton Road, Beaver, PA 415009 Those attending the briefing will not actually deploy to the TCP/ACPs."'.,b". .lThe PSP briefing will be periformed out of sequence in a demonstration window of 1:00 p.m. to 3:00 p.lm. on June 24,42008.
Time: Per Scenario 111
:..c; !Each municipal/
 
regional police force:,with a TCP assigned in its plan will demonstrate all preparation duties including TCP responsibilities and radiological
0 DEMONSTRATION FOR EOC'MOBILIZATION
.,.briefing.
                                        .FOR COINTIES (Plume Phase Exercise)
Dispatch of persons to the TCP site will not occur during the exercise..d Municipal and county staffs will berprepared to brief the DHS evaluator on actions',to be, taken should there be an impedimentto evacuation on a designated route. This wiill. be demonstrated betweeni7:00 .pm -9:30 pm on June 24,.2008.MUNICIPAL  
County                                 Date                               Time Beaver'                         June 24, 2008                             TBD Allegheny                         June 24, 2008                             TBD Butler                           June 24, 2008                             TBD Lawrence                           June 24, 2008                             TBD Washington                         June 24, 2008                             TBD
/ REGIONAL POLICE FORCES COUNTY POLICE FORCE Beaver Beaver Bridgewater/Fallston Center.Monaca Patterson Heights/Patterson
: 3. Municipal Emergency Operations Centers (EOC)                                         60 Time: Per Scenario                                   .     . .
-Raccoon Shippingport B. May 14, 2008 113 0 1. Reception Centers (Out of Sequence)Demonstration of Reception Centers COUNTY DATE TIME Allegheny May 14, 2008 7:00 p.m. -9:30 p.m.Butler May 14, 2008 7:00 p.m. -9:30 p.m.Lawrence May 14, 2008 7:00 p.m. -9:30 p.m.Washington May 14,2008 7:00 p.m. -9:30 p.m.COUNTY Reception CenterLocation Allegheny South Park Museum Buildinig Butler Slippery Rock University Lawrence Mohaw'k Area HOifi S 6hol:.Washington Washington' County Fairgr'o0unds.
DEMONSTRATION FOR EOC"MOBILIZATION FOR MUNICIPALITIES (Plume Phase Exercise)
0 2. Monitoring/Decontamination Centers (0ut0of Sequence)'
RISK COUNTY                       MUNICIPALITY.                     .           DATE Beaver                       City of Aliquippa' ....     .           June 24,2008 Beaver Borough,                           June:24, 2008 Bridgewater/Fallston Borough*                     June 24, 2008
Demonstration of Mon/Decon Centers COUNTY DATE TIME..Allegheny May 14, 2008 7:00 plm. -9:30 p.m.Butler May 14,2008 7:00 p.m. -9:30,pm.Lawrence May 14,2008 7:00 p.m. -9;30p.m." Washington May 14; 2008 7:00p.m. -9:30Vp.m..
                          .- Brighton Township'                         June 24, 2.008 Center Township,                   .. June 24, 2008 Chippewa Township           '             June 24, 2008 Frankfort Springs/Hanover*                     June 24, 2008 Georgetown/Greene/Hookstown*                       June 24, 2008 Glasgow/Ohioville/S,. Beaver*...''               June 24, 2008 Hopewell Township                           June 24, 2008 Independence Township                         June 24, 2008 Industry Borough                           June 24, 2008 Midland Borough                           June 24, 2008 Monaca Borough                           June 24, 2008 Patterson Twp/Patterson Hts Boro*                   June 24, 2008 0 Potter Township                           June 24, 2008 Raccoon Township. ..                       June 24, 2008 Shippingport Borough                         June 24, 2008 South Heights Borough                       June 24, 2008 Vanport Township                           June 24, 2008
COUNTY Mon/Decon Center Locations Allegheny South Park Museum Building Butler Slippery Rock University Lawrence Mohawk High School Washington McGuffey High School 3. Mass Care Centers (Out of Sequence)Demonstration of Mass Care Centers COUNTY DATE TIME Allegheny May 14, 2008 7:00 p.m. -9:30 p.m.Butler May 14, 2008 7:00 p.m. -9:30 p.m.Lawrence May 14, 2008 7:00 p.m. -9:30 p.m.Washington May 14, 2008 7:00 p.m. -9:30 p.m.0 COUNTY Mass Care Center Locations Allegheny South Park High School 114 0 Butler Slippery Rock University Lawrence Mohawk High School Washington McGuffey High School NOTE: The following actions will take place at the designated counties: Allegheny  
* Joint EOC
-reception, mon/decon (personnel and vehicle,)
: 4. One back-up one route alerting demonstration by each risk municipality listed below. (During Scenario Exercise) 112 61
and mass care demonstrations will take place at South Park.'Butler -reception, mon/decon (personnel and vehicle,)
 
and mass care demonstrations will take place at Slippery Rock..Lawrence -reception, mon/decon (peisonnel and vehicle,)
COUNTY                       RISK MUNICIPALITY                                 DATE Beaver                           Beaver Borough                           June 24, 2008 Brighton Township                           June 24, 2008 Chippewa Township                           June 24, 2008 Hopewell Township                           June 24, 2008 Monaca Township                           June 24, 2008 Patterson Heights/Patterson Borough                 June 24, 2008
and mass care demonstrations will take place at M.6hawk High School.'.Washington  
: 5. Traffic and Access Control Points
-reception and driving directions will be demonstrated at the Washington County Fairgrounds.
: a. The Pennsylvania State Police will brief at the PSP Beaver Barracks, 1400 Brighton Road, Beaver, PA 415009 Those attending the briefing will not actually deploy to the TCP/ACPs.
Personnel, and vehicle mon/decon and mass care will be demonstrated at McGuffey -igfh Scho'ol."" " " " ' ' ! , I , " .4.- Emergency Worker Monitoring Decontamination Stations (Out of Seq uence)B eaiver I Beaver Falls 1 FD- May 14, 2008 Beaver -South Beaver FD May 14, 2008 ATTACHMENT B PREVIOUS ISSUES 115 0 Number 03-06-6.a.
    "'.,b". .lThe PSP briefing will be periformed out of sequence in a demonstration window of 1:00 p.m. to 3:00 p.lm. on June 24,42008. :..
1-A-03 03-06-3.b.1-P-01 BVX92-27R (1.c. 1)BVX92-28R (1.b. 1)Facilit Evaluated Butler Mon/Decon
c; !Each municipal/ regional police force:,with a TCP assigned in its plan will demonstrate all preparation duties including TCP responsibilities and radiological
-team not familiar with procedures Center Township -no log record for KI ingestion Armstrong County -16 year old ingestion issue that will not go away. Will be re-demonstrated in 14 years Greene County -16 year old ingestion issue that will not go away. Will be re-demonstrated in 14 years 0 61 116 6 BVPS 2008 REP EXERCISE -WV EXTENT OF PLAY AGREEMENT Beaver Valley Power Station: The facility normally uses off-watch section personnel to participate in the exercise.
    .,.briefing. Dispatch of persons to the TCP site will not occur during the exercise.
The plant's simulated events, radiation readings, and emergency classifications will trigger offsite exercise actions.2. Offsite Response Functions:
          .dMunicipal and county staffs will berprepared to brief the DHS evaluator on actions
State: West Virginia Emergency Operations Center* Direction  
      ',to be, taken should there be an impedimentto evacuation on a designated route. This wiill. be demonstrated betweeni7:00 .pm - 9:30 pm on June 24,.2008.
& Control o Accident Assessment
MUNICIPAL / REGIONAL POLICE FORCES COUNTY                                 POLICE FORCE Beaver                                     Beaver Bridgewater/Fallston Center
                                .                                 Monaca Patterson Heights/Patterson
                                                            -     Raccoon Shippingport B. May 14, 2008 113
 
0
: 1. Reception Centers (Out of Sequence)
Demonstration of Reception Centers COUNTY                       DATE                                 TIME Allegheny                 May 14, 2008                     7:00 p.m. - 9:30 p.m.
Butler                 May 14, 2008                     7:00 p.m. - 9:30 p.m.
Lawrence                 May 14, 2008                     7:00 p.m. - 9:30 p.m.
Washington                 May 14,2008                       7:00 p.m. - 9:30 p.m.
COUNTY                     Reception CenterLocation Allegheny                 South Park Museum Buildinig Butler                     Slippery Rock University                     0 Lawrence                   Mohaw'k Area HOifi S 6hol:.
Washington               Washington' County Fairgr'o0unds.
: 2. Monitoring/Decontamination Centers (0ut0of Sequence)'
Demonstration of Mon/Decon Centers COUNTY                       DATE                                 TIME..
Allegheny                 May 14, 2008                     7:00 plm. - 9:30 p.m.
Butler                 May 14,2008                     7:00 p.m. - 9:30,pm.
Lawrence                 May 14,2008                     7:00 p.m. - 9;30p.m."
Washington               May 14; 2008                     7:00p.m. - 9:30Vp.m..
COUNTY                       Mon/Decon Center Locations Allegheny                   South Park Museum Building Butler                       Slippery Rock University Lawrence                       Mohawk High School Washington                       McGuffey High School 0
: 3. Mass Care Centers (Out of Sequence)
Demonstration of Mass Care Centers COUNTY                       DATE                                 TIME Allegheny                 May 14, 2008                   7:00 p.m. - 9:30 p.m.
Butler                 May 14, 2008                   7:00 p.m. - 9:30 p.m.
Lawrence                 May 14, 2008                   7:00 p.m. - 9:30 p.m.
Washington               May 14, 2008                   7:00 p.m. - 9:30 p.m.
COUNTY                       Mass Care Center Locations Allegheny                       South Park High School 114 0
 
Butler                             Slippery Rock University Lawrence                             Mohawk High School Washington                             McGuffey High School NOTE: The following actions will take place at the designated counties:
Allegheny - reception, mon/decon (personnel and vehicle,) and mass care demonstrations will take place at South Park.
'Butler - reception, mon/decon (personnel and vehicle,) and mass care demonstrations will take place at Slippery Rock..
Lawrence - reception, mon/decon (peisonnel and vehicle,) and mass care demonstrations will take place at M.6hawk High School.'.
Washington - reception and driving directions will be demonstrated at the Washington County Fairgrounds. Personnel, and vehicle mon/decon and mass care will be demonstrated at McGuffey -igfh Scho'ol."
                  " " " " ' ' !   ,  , I       *  " .
4.- Emergency Worker Monitoring Decontamination Stations (Out of Seq uence)
B eaiver       I                 Beaver Falls1 FD-                       May 14, 2008 Beaver                         -South Beaver FD                         May 14, 2008 ATTACHMENT B PREVIOUS ISSUES 115
 
0 Number             Facilit Evaluated 03-06-6.a. 1-A-03 Butler Mon/Decon - team not familiar with procedures 03-06-3.b.1-P-01   Center Township - no log record for KI ingestion BVX92-27R (1.c. 1) Armstrong County - 16 year old ingestion issue that will not go away. Will be re-demonstrated in 14 years BVX92-28R (1.b. 1) Greene County - 16 year old ingestion issue that will not go away. Will be re-demonstrated in 14 years     0 61 116 6
 
BVPS 2008 REP EXERCISE - WV EXTENT OF PLAY AGREEMENT Beaver Valley Power Station: The facility normally uses off-watch section personnel to participate in the exercise. The plant's simulated events, radiation readings, and emergency classifications will trigger offsite exercise actions.
: 2. Offsite Response Functions:
State: West Virginia Emergency Operations Center
* Direction & Control o Accident Assessment
* Public Information
* Communications Hancock County Emergency Operations Center
* Accident Assessment Beaver Valley Power Station Emergency Response Facility
* Accident Assessment Beaver Valley Power Station Joint Public Information Center
* Public Information.
County: Hancock County Emergency Operations Center
* Direction & Control
* Public Information
* Public Information
* Communications Hancock County Emergency Operations Center* Accident Assessment Beaver Valley Power Station Emergency Response Facility* Accident Assessment Beaver Valley Power Station Joint Public Information Center* Public Information.
County: Hancock County Emergency Operations Center* Direction
& Control* Public Information
* Alert & Notification
* Alert & Notification
* Communications Field Play: (See 5. Demonstration Windows)3. Controllers:
* Communications Field Play: (See 5. Demonstration Windows)
First Energy Nuclear Operating Company (FENOC) will provide controller at the Hancock County EOC and at Hancock County field locations.
: 3. Controllers: First Energy Nuclear Operating Company (FENOC) will provide controller at the Hancock County EOC and at Hancock County field locations. Controllers will not take an active part in the proceedings, but will interact with staff members to the extent necessary to fulfill their observer responsibilities or to provide data when requested. Coaching of players by Controllers is not permitted except to provide training to participants awaiting a re-demonstration.
Controllers will not take an active part in the proceedings, but will interact with staff members to the extent necessary to fulfill their observer responsibilities or to provide data when requested.
Coaching of players by Controllers is not permitted except to provide training to participants awaiting a re-demonstration.
117
117
: 4. FEMA Evaluators:
: 4. FEMA Evaluators: Federal evaluators will be present at the State EOC, Hancock County EOC, and at field locations to evaluate player response to the actual and simulated events in the exercise scenario.
Federal evaluators will be present at the State EOC, Hancock County EOC, and at field locations to evaluate player response to the actual and simulated events in the exercise scenario.5. Demonstration Windows: The demonstration windows are those periods of time designated in, the exercise during which specified demonstrations will be accomplished.
: 5. Demonstration Windows: The demonstration windows are those periods of time designated in, the exercise during which specified demonstrations will be accomplished. The purpose of the window is to provide for more effective demonstrations as well as permitting the release of volunteers from the exercise play at a reasonable hour.
The purpose of the window is to provide for more effective demonstrations as well as permitting the release of volunteers from the exercise play at a reasonable hour.* The State &'Hancock County EOC Operations will be conducted on June 24, 2008.* The State will be represented at the BVPS Emergency Response Facility during the June 24, 2008 exercise.r The State.will be represented at the BVPS Joint: Public Information Center (JPIC) during the June 24,2008 'exercise.
      *The State &'Hancock County EOC Operations will be conducted on June 24, 2008.
* Out of Sequence Demonstrations-will run independently of each other.* Out of Sequence Demonstrations.
* The State will be represented at the BVPS Emergency Response Facility during the June 24, 2008 exercise.
will be managed by the Lead Controller at each field location.* MS-1 Hospital Exercise was conducted on April 24,.-;2007 and Federal Evaluated atthe Weirton Medical Center. '* School demonstration:.
r   The State.will be represented at the BVPS Joint: Public Information Center (JPIC) during the June 24,2008 'exercise.
Will 'be condu'cted on June 24, 2008 at 0900 -1100 hou'rs at Oak'Glen High School in New Cumberland, WV. Bus Drivers will also be, evaluated at that time.* Reception Center/Mass:
* Out of Sequence Demonstrations-will *be run independently of each other.
Care Center; Monitoring/Decontamination Center -June 24, 2008 at Weir High.Complex at 1900 -2100 Hours.0 Emergency Worker Monitoring.
* Out of Sequence Demonstrations. will be managed by the Lead Controller at each field location.
and -Decontamination:
* MS-1 Hospital Exercise was conducted on April 24,.-;2007 and Federal Evaluated atthe Weirton Medical Center. '
May 14, 2008'at New Cumberland, Fire'Dept, at 1900- 2100 Hours.* Traffic Control / Access Control: May 14, 2008 at 1900 -2100 hours at New Cumberland Fire Dept.* Route Alerting:
* School demonstration:. Will 'be condu'cted on June 24, 2008 at 0900 - 1100 hou'rs at Oak'Glen High School in New Cumberland, WV. Bus Drivers will also be, evaluated at that time.
May 14, 2008 at Oakland VFD at 1900 -2100 hours.* Field Monitoring Team: June 24, 2008 at 0900 -1100 hours.Team will form at the Hancock County Court House.All demonstrations will commence promptly and, barring any complications, not continue past the end of the windows.6. Termination:
* Reception Center/Mass: Care Center; Monitoring/Decontamination Center -June 24, 2008 at Weir High.Complex at 1900 - 2100 Hours.
The Lead Controller in the Hancock County EOC will coordinate the Exercise Termination with the West Virginia EOC, the BVPS EOF, and the EOCs in Beaver and Columbiana County for the June 24, 2008 Exercise.118 U]
0 Emergency Worker Monitoring. and -Decontamination:           May 14, 2008'at New Cumberland, Fire'Dept, at 1900- 2100 Hours.
Field Locations  
* Traffic Control / Access Control: May 14, 2008 at 1900 - 2100 hours at New Cumberland Fire Dept.
/ Out of Sequence Demonstrations will be terminated by the Lead Controller at each location.
* Route Alerting: May 14, 2008 at Oakland VFD at 1900 - 2100 hours.
The termination will be based on -the completion of the objectives.
* Field Monitoring Team: June 24, 2008 at 0900 - 1100 hours.
The termination can happen sooner than the identified end time.7.. General Concepts:
Team will form at the Hancock County Court House.
An emergency plan is drafted to address the generally expected conditions of an emergency.
All demonstrations will commence promptly and, barring             any complications, not continue past the end of the windows.
Not everything in the emergency plan may be applicable for a given scenario.
: 6. Termination: The Lead Controller in the Hancock County EOC will coordinate the Exercise Termination with the West Virginia EOC, the BVPS EOF, and the EOCs in Beaver and Columbiana County for the June 24, 2008 Exercise.
The main purpose of an emergency plan is to assemble sufficient expertise and officials so as to properly react to the events as they occur. The responders-should not be so tied to a plan' that they cannot take actions that &#xfd;are more- protective of the public. Therefore, if, by not following, the.-plan,'the responders protect the' public equally as well as providedin -the plan, -it should be noted for possible modification of the plan, but not classified as a negative incident.
118 U]
Furthermore, if, by following the pian there is a failure to protect the public health and safety, it should be noted so that the plan can! be modified and the appropriate negative assessment applied:--8. Re-demonstrations: .During the.,out-of-sequence demonstrations on during the weekof May 14, ,2008; or the.Plume&#xfd; Exercise on June 24, 2008, any activity that is not satisfactorily demonstrated may be re-demonstrated by the participants during the exercise provided it does not negatively interfere with the exercise.
 
Refresher training can be provided by the players,'
Field Locations / Out of Sequence Demonstrations will be terminated by the Lead Controller at each location. The termination will be based on -the completion of the objectives. The termination can happen sooner than the identified end time.
observers, and/or' controllers.
7.. General Concepts: An emergency plan is drafted to address the generally expected conditions of an emergency. Not everything in the emergency plan may be applicable for a given scenario. The main purpose of an emergency plan is to assemble sufficient expertise and officials so as to properly react to the events as they occur. The responders-should not be so tied to a plan' that they cannot take actions that &#xfd;are more- protective of the public. Therefore, if, by not following, the.-plan,'the responders protect the' public equally as well as providedin -the plan, -it should be noted for possible modification of the plan, but not classified as a negative incident. Furthermore, if, by following the pian there is a failure to protect the public health and safety, it should be noted so that the plan can! be modified and the appropriate negative assessment applied:-
Re-demonstrations,-will be, negotiated between' the players, observers, controllers;'evaluators8 and RACCha'ir, or designee.
-8. Re-demonstrations: .During the.,out-of-sequence demonstrations on during the weekof May 14, ,2008; or the.Plume&#xfd; Exercise on June 24, 2008, any activity that is not satisfactorily demonstrated may be re-demonstrated by the participants during the exercise provided it does not negatively interfere with the exercise. Refresher training can be provided by the players,' observers, and/or' controllers.             Re-demonstrations,-will be, negotiated between' the players, observers, controllers;'evaluators8 and RACCha'ir, or designee. It is permissible to
It is permissible to , extend the evaluation time to .accommodate.
    ,extend the evaluation time to .accommodate. the re-demonstration.
the re-demonstration.
Activities corrected,from a re-demonstration will be so noted.
Activities corrected,from a re-demonstration will be so noted.119 0 EVALUATION AREA 1 -Emergency Operations Management Sub-element l.a -Mobilization INTENT This sub-element is derived from NUREG-0654, which proyides that Offsite Response Organizations (ORO) should have the capability to alert, notify, and mobilize emergency personnel and to activate and staff emergency facilities.
119
Criterion 1.a.1: OROs use effective procedures to alert, notify, and mobilize emergency personnel and activate-facilitiesin.
 
a timely manner. (NUREG-0654, A.4; D.3, 4;,E.1, 2; H.4)A-EXTENT OF PLAY State:-Demonstrate the capability to receive notification of an emergency situation from the licensee.
0 EVALUATION AREA 1 - Emergency Operations Management Sub-element l.a - Mobilization INTENT This sub-element is derived from NUREG-0654, which proyides that Offsite Response Organizations (ORO) should have the capability to alert, notify, and mobilize emergency personnel and to activate and staff emergency facilities.
Contact, alert, and mobilize key emergency personnel in a timely manner.-Demonstrate the activation of facilities for immediate use by mobilized personnel when they arrive to begin emergency operations.
Criterion 1.a.1: OROs use effective procedures to alert, notify, and mobilize emergency personnel and activate-facilitiesin. a timely manner. (NUREG-0654, A.4; D.3, 4;,E.1, 2; H.4)A-EXTENT OF PLAY State:
-Activation of facilities will not start until an Alert is declared.-Activation of facilities should be completed in accordance with the plan and/or procedures.
      - Demonstrate the capability to receive notification of an emergency situation from the licensee.           Contact, alert, and mobilize key emergency personnel in a timely manner.
-Pre-positioning is permitted for all field locations and any out-of-sequence demonstrations.
      - Demonstrate the activation of facilities for immediate use by mobilized personnel when they arrive to begin emergency operations.
State personnel assigned to field activities (i.e. County EOC, BVPS EOF, BVPS JPIC) will be permitted to pre-position.-EOC Twenty-four (24) Hour Staffing will be demonstrated by roster.County: 120 a  
      - Activation of facilities will not start until an Alert is declared.
-Demonstrate the capability to receive notification of an emergency situation from the licensee.
      - Activation of facilities should be completed in accordance with the plan and/or procedures.
Contact, alert, and mobilize key emergency personnel in a timely manner.-Demonstrate the activation of facilities for immediate use by mobilized personnel when they arrive to begin emergency operations.
      - Pre-positioning is permitted for all field locations and any out-of-sequence demonstrations. State personnel assigned to field activities (i.e. County EOC, BVPS EOF, BVPS JPIC) will be permitted to pre-position.
-Activation of facilities should be completed in accordance.
      - EOC Twenty-four (24) Hour Staffing will be demonstrated by roster.
with the plan and/or procedures.
County:
-Activation of facilities will not start until an Alert is declared.-Pre-positioning is permitted for all field locations and any out-of-sequence demonstrations..
120 a
-EOC Twenty-fourl(24)
 
Hour Staffing wilLbe demonstrated by roster.All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
    -   Demonstrate the capability to receive notification of an emergency situation from the licensee.           Contact, alert, and mobilize key emergency personnel in a timely manner.
121 0 EVALUATIONAREA 1 -Emergency Operations Management Sub-element 1.b -Facilities INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response.
    -   Demonstrate the activation of facilities for immediate use by mobilized personnel when they arrive to begin emergency operations.
Organizations (ORO) have. facilities to support the emergency response.Criterion 1.b.1: Facilities are sufficient to support the emergency response. (NUREG-0654, H.3)0 EXTENT OF PLAY State: &#xfd;,, * ; : ,. ., :-All facilities identified in the method of operations have been evaluated during previous exercises in order to establish a baseline.
    -   Activation of facilities should be completed in accordance. with the plan and/or procedures.
Facilities will not be evaluated.
    -   Activation of facilities will not start until an Alert is declared.
County: All facilities identified in thermethodof operations have been evaluated during previous exercises, in order to establisha baseline.
    -   Pre-positioning is permitted for all field locations and any out-of-sequence demonstrations..
Facilities will not be evaluated,.- " ..Facilities must be set up based on the ORO's plans and procedures and demonstrated as they would be used in an actual emergency, indicated in the extent of play agreement.
    -   EOC Twenty-fourl(24) Hour Staffing wilLbe demonstrated by roster.
unless noted above or otherwise a 122 4 EVALUATION-AREA 1, -Emergency Operations Management Sub-element 1.c -Direction and Control INTENT This sub-element is derived from NUREG-0654, which provides-that Offsite Response Organizations (ORO) have the capability to control, their overall response to an emergency.
Criterion 1.c.1: Key personnel with leadership roles for the ORO provide direction and control to that part of the overall response effort for which they are responsible. (NUREG-0654,.A.1.d; A.2.a, b)., EXTENT OF PLAY State:-Leadership personnel should demonstrate the ability to carry out essential functions of the response effort, for example: keeping the-staff informed, through ".periodic-briefings and/or other means, coordinating.
with' other appropriate response organizations, and ensuring completion of requirements and. requests.
y." Leadership personnel should demonstrate the ability to carry out essential functions of the response effort, for example: keeping the staff informed through periodic briefings and/or other means, coordinating with other appropriate response organizations, and ensuring completion-of requirements and requests.All activities associated with direction and control must be performed based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless otherwise noted above or indicated in the extent of play agreement.
123 0 EVALUATION AREA 1 -Emergency Operations Management Sub-element 1.d -Communications Equipment INTENT ThiS: sub-element is derived from NUREG-0654, which provides that Offsite;'Response Organizations (ORO) should establish reliable primary and backup communication systems to ensure communications witlh ,key emergency personnel at locations such as the following:
appropriate contiguous governments within the emergency planning zone (EPZ), Federal emergency response organizations, the licensee and its facilities, emergency operations centers (EOC), and field teams.Criterion 1.d.1: At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate locations.
Communications capabilities are managed in support of emergency operations. (NUREG-0654, F.1, 2)EXTENT OF PLAY State:-EOC will demonstrate telephone and at least one radio communications system.-Field Teams will demonstrate the capability to communicate from the field locations, independent from commercial hard line telephone.
-Demonstrate the capability to manage the communication systems and ensure that all message traffic is handled without delays that might disrupt the conduct of emergency operations.
County:-EOC will demonstrate telephone and at least one radio communications system.-Demonstrate the capability to manage the communication systems and ensure that all message traffic is handled without delays that might disrupt the conduct of emergency operations.
124 E0
-Out-of-sequence demonstrations will have :communications available and demonstrated (i.e. radio / communications check).-Communications associated with demonstrated during the April 24, Exercise.medical support" facilities were 2007, MS-1 Federal Evaluated All activities associated with the management of communications capabilities must be demonstrated based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless otherwise noted above or in the extent of play agreement." ..r .'.;.: t .I --.I 125 0 EVALUATION AREA 1 -Emergency Operations Management Sub-element i.e -Equipment and Supplies to Support Operations INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) have emergency equipment and supplies adequate to support the emergency response.Criterion.
1.e.1: Equipment, maps, displays, dosimetry, potassium iodide (KI), and other supplies, are Sufficient
'to .support emergency operations. (NUREG-0654, H.7, 10; J.10.a, b, e, J.11; K.3.a)EXTENT OF PLAY,,, State:-Maps and displays will be utilized in the EOC.-Radiological instruments used by the State Field Team will be with the team in Hancock County and demonstrated out-of-sequence.
Instruments will be operationally checked. A label indicating such calibration should be on each instrument or verifiable by other means, such as a letter.-Dosimetry for the State Field Team will be issued by the County.County:-The dosimetry is exchanged annually and documentation will be verified during the exercise.-The County will demonstrate the capability to maintain inventories of KI sufficient for use by emergency workers-Adequate quantities of dosimetry and KI are available at the County EOC and will be confirmed by physical inspection.
Available supplies of KI will be within the expiration date indicated on KI bottles or blister packs.-Maps and displays will be utilized in the EOC.126 0 Hancock County does not.pre-distribute dosimetry.
.Dosimetry will not be distributed during the exercise.Dosimetry "Training Kits" will be available at the field locations to demonstrate the use of dosimetry.
-A Law Enforcement Officer, in the County EOC, will discuss the process to establish Traffic and Access Control Points during the EOC play on June,24, 2008.-The responsibility of the officer at a Traffic and Access Control Point will be explained through the interview process during Out-of-Sequence play;on May 14, 2008.at 1900 -21.00.hours at the New, Cumberland Fire Department:
All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
127 0 EVALUATION AREA 2 -Protective Action Decision-Making Sub-element 2.a -Emergency Worker Exposure Control INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to assess and control the radiation exposure received by emergency workers and have a decision chain in place, as specified in the ORO's plans and procedures, to authorize emergency worker exposure limits to be exceeded for specific missions.Radiation exposure limits for emergency workers are the recommended accumulated dose limits or exposure rates that emergency workers may be permitted to incur during an emergency.
121
These limits include any pre-established administrative reporting limits (that take into consideration Total Effective Dose Equivalent or organ-specific limits) identified in the ORO's plans and procedures.
 
Criterion 2.a.1: OROs use a decision-making process, considering relevant factors and appropriate coordination, to ensure that an exposure control system, including the use of KI, is in place for emergency workers including provisions to authorize radiation exposure in excess of administrative limits or protective action guides.(NUREG-0654, K.4, J.10. e, f)EXTENT OF PLAY State:-As appropriate, demonstrate the capability to make decisions on the distribution and administration of KI as a protective measure.-A decision not to take KI is an acceptable decision.County:-Demonstrate the capability to make decisions concerning the authorization to exceed predetermined administrative exposure limits. This will be done by interview.
0 EVALUATIONAREA 1 - Emergency Operations Management Sub-element 1.b - Facilities INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response. Organizations (ORO) have. facilities to support the emergency response.
-Demonstrate through interview with County Director or his designee, how KI would be distributed to EPZ Emergency Workers.128 a 129 0 EVALUATION AREA 2 -Protective Action Decision-Making Sub-element 2.b. -Radiological Assessment and Protective Action Recommendations and Decisions for the Plume Phase of the Emergency INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to independently project integrated dose from exposure rates or other information and compare the estimated dose savin'gs with the protective action guides. OROs have the capability to choose, among a-. range, of ' protective:-
Criterion 1.b.1: Facilities are sufficient to support the emergency response. (NUREG-0654, H.3) 0 EXTENT OF PLAY State:                                                                &#xfd;,,i:** ; : ,. . , :
actions, those most appropriate in a given emergency situation.
      -    All facilities identified in the method of operations have been evaluated during previous exercises in order to establish a baseline. Facilities will not be evaluated.
OROs base these choices on PAGs from the ORO's'plans and procedures*'or EPA 400-R'92-001 and other criteria, such as, plant conditions, licensee protective action recommendations, coordination of protective action decisions with other political jurisdictions (e.g., other affected OROs),.availability of appropriate in-place shelter, weather conditions, evacuation-time estimates, and situations that create higher than normal risk from: evacuation.
County:
Criterion 2.b.1: Appropriate protective action recommendations are based on available information on plant conditions, field monitoring data, and licensee'and OROdose projections, as-well as knowledge of onsite and 'offsite environmental conditions. (NUREG-0654, 1.8, 10 and Supplement 3)EXTENT OF PLAY State: Protective Action Recommendations will be developed in accordance with Plans and/or Procedures..,-As data 'becomes available, .accident assessment -will, be, performed and PARs developed in accordance with Plans and/or Procedures.
All facilities identified in thermethodof operations have been evaluated during previous exercises, in order to establisha baseline. Facilities will not be evaluated,.- " ..
County:-N/A Criterion 2.b.2: A decision-making process involving consideration of appropriate factors and necessary coordination is used to make 130 a protective action decisions (PAD) for the general public (including the recommendation for the use of KI, if ORO policy). (NUREG-0654, J.9, 10.f, m)EXTENT OF PLAY State:-.- The State should have. the capability,.
Facilities must be set up based on the ORO's plans and procedures and demonstrated as they would be used in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
to .make., both initial and'subsequent protectiveactions.  
a 122 4
,-Demonstrate the capability to make. initial, protective actions in a timely , manner.,-The dose assessment personnel may:provide additional PARs based on the subsequent dose projections,.'
 
field -monitoring.
EVALUATION- AREA 1,- Emergency Operations Management Sub-element 1.c - Direction and Control INTENT This sub-element is derived from NUREG-0654, which provides-that Offsite Response Organizations (ORO) have the capability to control, their overall response to an emergency.
data, or information on,,- plant, conditions.  
Criterion 1.c.1: Key personnel with leadership roles for the ORO provide direction and control to that part of the overall response effort for which they are responsible. (NUREG-0654,.A.1.d; A.2.a, b).,
.The. decision-makers should demonstrate the capability to change protective actions as appropriate based on these projections.-,,-The PAR should be. coordinated between the 3 States and the three counties. -A coordinated PAR ,does.. not necessarily mean. the same PAR.-At least one PAR will be demonstrated.
EXTENT OF PLAY State:
County:-A least one PAD based on the recommendations coordinated between the states and counties will be'demonstrated.
    -  Leadership personnel should demonstrate the ability to carry out essential functions of the response effort, for example: keeping the
-        staff informed, through ".periodic- briefings and/or other means, coordinating. with' other appropriate response organizations, and ensuring completion of requirements and. requests.
Cou*'nty:
y."
Leadership personnel should demonstrate the ability to carry out essential functions of the response effort, for example: keeping the staff informed through periodic briefings and/or other means, coordinating with other appropriate response organizations, and ensuring completion-of requirements and requests.
All activities associated with direction and control must be performed based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless otherwise noted above or indicated in the extent of play agreement.
123
 
0 EVALUATION AREA 1 - Emergency Operations Management Sub-element 1.d - Communications Equipment INTENT ThiS: sub-element is derived from NUREG-0654, which provides that Offsite
;'Response Organizations (ORO) should establish reliable primary and backup communication systems to ensure communications witlh ,key emergency personnel at locations such as the following: appropriate contiguous governments within the emergency planning zone (EPZ), Federal emergency response organizations, the licensee and its facilities, emergency operations centers (EOC), and field teams.
Criterion 1.d.1: At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate locations.                  Communications capabilities are managed in support of emergency operations. (NUREG-0654, F.1, 2)
EXTENT OF PLAY State:
    -  EOC will demonstrate          telephone    and  at  least  one  radio communications system.
    -  Field Teams will demonstrate the capability to communicate from the field locations, independent from commercial hard line telephone.
    -  Demonstrate the capability to manage the communication systems and ensure that all message traffic is handled without delays that might disrupt the conduct of emergency operations.
County:
    -  EOC will demonstrate        telephone    and  at  least  one  radio communications system.
    -  Demonstrate the capability to manage the communication systems and ensure that all message traffic is handled without delays that might disrupt the conduct of emergency operations.
124 E0
 
    -    Out-of-sequence demonstrations will have :communications available and demonstrated (i.e. radio / communications check).
    -    Communications associated with medical support" facilities were demonstrated during the April 24, 2007, MS-1 Federal Evaluated Exercise.
All activities associated with the management of communications capabilities must be demonstrated based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless otherwise noted above or in the extent of play agreement.
                *, " "* . .1.*: .r .'.;.:    t .
I  - -    . I 125
 
0 EVALUATION AREA 1 - Emergency Operations Management Sub-element i.e    -  Equipment and Supplies to Support Operations INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) have emergency equipment and supplies adequate to support the emergency response.
Criterion. 1.e.1:      Equipment, maps, displays, dosimetry, potassium iodide (KI), and other supplies, are Sufficient 'to .support emergency operations. (NUREG-0654, H.7, 10; J.10.a, b, e, J.11; K.3.a)
EXTENT OF PLAY,,,
State:
    -  Maps and displays will be utilized in the EOC.
    -  Radiological instruments used by the State Field Team will be with the team in Hancock County and demonstrated out-of-sequence.
Instruments will be operationally checked. A label indicating such calibration should be on each instrument or verifiable by other means, such as a letter.
  -  Dosimetry for the State Field Team will be issued by the County.
County:
  -  The dosimetry is exchanged annually and documentation will be verified during the exercise.
  -  The County will demonstrate the capability to maintain inventories of KI sufficient for use by emergency workers
  -  Adequate quantities of dosimetry and KI are available at the County EOC and will be confirmed by physical inspection. Available supplies of KI will be within the expiration date indicated on KI bottles or blister packs.
  -    Maps and displays will be utilized in the EOC.
126 0
 
Hancock County does not.pre-distribute dosimetry. . Dosimetry will not be distributed during the exercise.
Dosimetry "Training Kits" will be available at the field locations to demonstrate the use of dosimetry.
    -  A Law Enforcement Officer, in the County EOC, will discuss the process to establish Traffic and Access Control Points during the EOC play on June,24, 2008.
    -  The responsibility of the officer at a Traffic and Access Control Point will be explained through the interview process during Out-of-Sequence play;on May 14, 2008.at 1900 -21.00.hours at the New, Cumberland Fire Department:
All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
127
 
0 EVALUATION AREA 2 - Protective Action Decision-Making Sub-element 2.a - Emergency Worker Exposure Control INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to assess and control the radiation exposure received by emergency workers and have a decision chain in place, as specified in the ORO's plans and procedures, to authorize emergency worker exposure limits to be exceeded for specific missions.
Radiation exposure limits for emergency workers are the recommended accumulated dose limits or exposure rates that emergency workers may be permitted to incur during an emergency. These limits include any pre-established administrative reporting limits (that take into consideration Total Effective Dose Equivalent or organ-specific limits) identified in the ORO's plans and procedures.
Criterion 2.a.1: OROs use a decision-making process, considering relevant factors and appropriate coordination, to ensure that an exposure control system, including the use of KI, is in place for emergency workers including provisions to authorize radiation exposure in excess of administrative limits or protective action guides.
(NUREG-0654, K.4, J.10. e, f)
EXTENT OF PLAY State:
  -   As appropriate, demonstrate the capability to make decisions on the distribution and administration of KI as a protective measure.
  -   A decision not to take KI is an acceptable decision.
County:
  -   Demonstrate the capability to make decisions concerning the authorization to exceed predetermined administrative exposure limits. This will be done by interview.
  -   Demonstrate through interview with County Director or his designee, how KI would be distributed to EPZ Emergency Workers.
128 a
 
129 0
EVALUATION AREA 2 - Protective Action Decision-Making Sub-element 2.b. - Radiological Assessment and Protective Action Recommendations and Decisions for the Plume Phase of the Emergency INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to independently project integrated dose from exposure rates or other information and compare the estimated dose savin'gs with the protective action guides. OROs have the capability to choose, among a-. range, of ' protective:- actions, those most appropriate in a given emergency situation. OROs base these choices on PAGs from the ORO's'plans and procedures*'or EPA 400-R'92-001 and other criteria,   such     as, plant       conditions, licensee     protective   action recommendations, coordination of protective action decisions with other political jurisdictions (e.g., other affected OROs),.availability of appropriate in-place shelter, weather conditions, evacuation- time estimates, and situations that create higher than normal risk from: evacuation.
Criterion 2.b.1: Appropriate protective action recommendations are based on available information on plant conditions, field monitoring data, and licensee'and OROdose projections, as-well as knowledge of onsite and 'offsite environmental conditions. (NUREG-0654, 1.8, 10 and Supplement 3)
EXTENT OF PLAY State:
Protective Action Recommendations will be developed in accordance with Plans and/or Procedures..,
    -   As data 'becomes available, .accident assessment -will, be, performed and PARs developed in accordance with Plans and/or Procedures.
County:
    -   N/A Criterion 2.b.2: A decision-making process involving consideration of appropriate factors and necessary coordination is used to make 130 a
 
protective action decisions (PAD) for the general public (including the recommendation for the use of KI, if ORO policy). (NUREG-0654, J.9, 10.f, m)
EXTENT OF PLAY State:
    - .- The State should have. the capability,. to .make., both initial and
        'subsequent protectiveactions.                   ,
    -   Demonstrate the capability to make. initial, protective actions in a timely
      , manner.,
    -   The dose assessment personnel may:provide additional PARs based on the subsequent dose projections,.' field -monitoring. data, or information on,,- plant, conditions. . The. decision-makers should demonstrate the capability to change protective actions as appropriate based on these projections.-,,
    -   The PAR should be. coordinated between the 3 States and the three counties. -A coordinated PAR ,does.. not necessarily mean. the same PAR.
    -   At least one PAR will be demonstrated.
County:
      - A least one PAD based on the recommendations coordinated between the states and counties will be'demonstrated.
All decision-making activities' by ORO. personnel must be performed based on the ORO's plans and procedures and completed as. they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
All decision-making activities' by ORO. personnel must be performed based on the ORO's plans and procedures and completed as. they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
131 0 EVALUATION AREA 2 -Protective Action Decision-Making Sub-element 2.c -Protective Action Decisions Consideration for the Protection of Special Populations INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have the capability to determine protective action recommendations, including evacuation, sheltering and use of potassium iodide (KI),, if &#xfd;applicable,, for special population groups (e.g., hospitals, nursing homes, correctional facilities, schools, licensed day care centers, mobility impaired individuals, and transportation dependent individuals).
131
Focus is on those special populatiqn.gro.ups that are (or potentially will be) affected by a radiological release from a nuclear power plant. --Criterion Protective action decisions.are.
 
made, as appropriate, for special population groups., (NUREG-O.654, .J.9,:J,1O.d, e) -EXTENT OF PLAY State:-N/A County:-Schools and bus drivers will be demonstrated out of sequence on June 24, 2008 at 0900 -1100 hours.-Bus will not run a route to the host school.-Special populations will be demonstrated through interview with appropriate EOC staff during the June 24, 2008 exercise.All decision-making activities associated with protective actions, including consideration of available resources, for special population groups must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
0 EVALUATION AREA 2 - Protective Action Decision-Making Sub-element 2.c - Protective Action Decisions Consideration for the Protection of Special Populations INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have the capability to determine protective action recommendations, including evacuation, sheltering and use of potassium iodide (KI),, if &#xfd;applicable,, for special population groups (e.g.,
132 a EVALUATION AREA 2 -Protective Action Decision-Making Sub-element 2.d. -Radiological Assessment and Decision-Making for the Ingestion Exposure Pathway EXTENT OF PLAY State:* This element will not be demonstrated -during this exercise.County:.* This element will not be demonstrated during this exercise.':Sub-element  
hospitals, nursing homes, correctional facilities, schools, licensed day care centers, mobility impaired individuals, and transportation dependent individuals). Focus is on those special populatiqn.gro.ups that are (or potentially will be) affected by a radiological release from a nuclear power plant. -           -
' 2.e.--!,,Radiological  
Criterion ,2*c.1:, Protective action decisions.are. made, as appropriate, for special population groups., (NUREG-O.654, .J.9,:J,1O.d, e) -
,'Assessment' and., Decision-Making Concerning Relocation,-.Re-entry, and Return, State:* This element will not be demonstrated during this exercise.County:* This element will not be demonstrated during this exercise.133 0 EVALUATIONAREA 3 -Protective Action Implementation Sub-element 3.a -Implementation of Emergency Worker Exposure Control INTENT,-This sub-element is derived from NUREG-0654, which provides that OROs.,should have the capability to provide for the following:  
EXTENT OF PLAY State:
.,distribution, use, collection, and processing of .direct-reading dosimetry-and permanent record dosimetry; the reading of direct-reading dosimetry by emergency workers at appropriate frequencies; maintaining a' radlation ,dose record for each emergency worker; and establishing a decision, chain or authorization procedure for emergency workers to incur radiation exposures in excess of protective action guides, always applying the ALARA (As Low As is Reasonably Achievable) principle Criterion 3.a.1: The OROs issue appropriate dosimetry and procedures, and manage radiological exposure to emergency workers in accordance with the plans and procedures.
    -   N/A County:
Emergency workers periodically and at the end of each mission read their dosimeters and record the readings on the appropriate exposure record or chart. (NUREG-0654, K.3.a, b)EXTENT OF PLAY State:-N/A County:-Emergency Workers who are assigned dosimetry will demonstrate the procedures to monitor and record dosimetry readings.
    -   Schools and bus drivers will be demonstrated out of sequence on June 24, 2008 at 0900 - 1100 hours.
The workers may be interviewed by the evaluator to determine their knowledge of radiological exposure control, radiation exposure limits, turn back values and whom to contact in the event authorization is needed to exceed their limits.-OROs should demonstrate the actions described in the plan and/or procedures by determining whether to replace the worker, to authorize the worker to incur additional exposures or to take other actions. If scenario events do not require emergency workers to seek authorizations for additional exposure, evaluators should interview at 134 a least two emergency workers, to determine their knowledge of whom to contact in the event authorization is needed..-Emergency workers may use any available resources (e.g., written procedures and/or co-workers) in providing responses:
    -   Bus will not run a route to the host school.
-Dosimetry "Training Kits" will be available at the field locations to demonstrate the use of dosimetry.
    -   Special populations will be demonstrated through interview with appropriate EOC staff during the June 24, 2008 exercise.
A "Training Kit" is designed to have sufficient supplies to demonstrate Radiological Exposure Control. The kit will not necessarily have sufficient supplies for all the emergency workers at the facility.
All decision-making activities associated with protective actions, including consideration of available resources, for special population groups must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
Area monitoring kits may be utilized-.-
132 a
.. The supply 'of, DRDs,:.PRDs and KI -will be available' in the Hancock County EOC:.All actiVities must be' based on the ORO's plans and procedures'and completed as they would be in an actual emergency, unless' noted above or otherwise indicated in the extent of play agreement.
 
135 0 EVALUATION AREA 3 -Protective Action Implementation Sub-element 3.b -Implementation of KI Decision INTENT.This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have the capability to provide radioprotective drugs for emergency workers, institutionalized individuals, and, if in the plan and/or procedures, to the general public for whom immediate evacuation may not be feasible, very difficult, or' significantly delayed. .While it is necessary for, OROs to have the capability-to provide KI to emergency workers and institutionalized individuals, the provision of KI to.the general -.public is an ORO option and is reflected in.ORO's,.plans and procedures.,.
EVALUATION AREA 2 - Protective Action Decision-Making Sub-element 2.d. - Radiological Assessment and Decision-Making for the Ingestion Exposure Pathway EXTENT OF PLAY State:
Provisions should include, the avai.lability:of adequate quantities, storage, and means of the distribution.
* This element will not be demonstrated-duringthis exercise.
of radioprotectiv,e drugs.-.Criterion 3.b.1: KI and appropriate instructions are available should a decisionto recommend use ofKl. be made. ,Appropriate record keeping of the administration of Kl for emergency workers! and institutionalized individuals (not the general public) is maintained., (NUREG-0654, J. 10.e)EXTENT OF PLAY State:-The State should demonstrate the capability to, formulate and disseminate appropriate instructions on the use of KI for those advised to take it.SA, decision not to take KIis "an acceptable decision.County:-The County will demonstrate the capability to make KI available to ,,emergency workers. The County will demonstrate.
County:.
the capability to accomplish distribution .of K[ consistent with decisions made.Organizations should have the capability to develop and maintain lists of emergency workers 'who have ingested KI, including documentation of the date(s) and time(s) they were instructed to, ingest KI. The ingestion of KI recommended by the designated health official is voluntary.
* This element will not be demonstrated during this exercise.
For evaluation purposes, the actual ingestion of KI is not.necessary.
':Sub-element ' 2.e.--!,,Radiological ,'Assessment' and., Decision-Making Concerning Relocation,-.Re-entry, and Return, State:
* This element will not be demonstrated during this exercise.
County:
* This element will not be demonstratedduring this exercise.
133
 
0 EVALUATIONAREA 3 - Protective Action Implementation Sub-element 3.a       - Implementation of Emergency Worker Exposure Control INTENT,-
This sub-element is derived from NUREG-0654, which provides that OROs
.,should have the capability to provide for the following: .,distribution, use, collection, and processing of.direct-reading dosimetry- and permanent record dosimetry; the reading of direct-reading dosimetry by emergency workers at appropriate frequencies; maintaining a' radlation ,dose record for each emergency worker; and establishing a decision, chain or authorization procedure for emergency workers to incur radiation exposures in excess of protective action guides, always applying the ALARA (As Low As is Reasonably Achievable) principle asappropriate..*.
Criterion 3.a.1: The OROs issue appropriate dosimetry and procedures, and manage radiological exposure to emergency workers in accordance with the plans and procedures. Emergency workers periodically and at the end of each mission read their dosimeters and record the readings on the appropriate exposure record or chart. (NUREG-0654, K.3.a, b)
EXTENT OF PLAY State:
      -   N/A County:
      -   Emergency Workers who are assigned dosimetry will demonstrate the procedures to monitor and record dosimetry readings. The workers may be interviewed by the evaluator to determine their knowledge of radiological exposure control, radiation exposure limits, turn back values and whom to contact in the event authorization is needed to exceed their limits.
    -   OROs should demonstrate the actions described in the plan and/or procedures by determining whether to replace the worker, to authorize the worker to incur additional exposures or to take other actions. If scenario events do not require emergency workers to seek authorizations for additional exposure, evaluators should interview at 134 a
 
least two emergency workers, to determine their knowledge of whom to contact in the event authorization is needed..
    -   Emergency workers may use any available resources (e.g., written procedures and/or co-workers) in providing responses:
    -   Dosimetry "Training Kits" will be available at the field locations to demonstrate the use of dosimetry. A "Training Kit" is designed to have sufficient supplies to demonstrate Radiological Exposure Control. The kit will not necessarily have sufficient supplies for all the emergency workers at the facility. Area monitoring kits may be utilized-.-
    .. The supply 'of, DRDs,:.PRDs and KI -will be available' in the Hancock County EOC:.
All actiVities must be' based on the ORO's plans and procedures'and completed as they would be in an actual emergency, unless' noted above or otherwise indicated in the extent of play agreement.
135
 
0 EVALUATION AREA 3 - Protective Action Implementation Sub-element 3.b - Implementation of KI Decision INTENT.
This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have the capability to provide radioprotective drugs for emergency workers, institutionalized individuals, and, if in the plan and/or procedures, to the general public for whom immediate evacuation may not be feasible, very difficult, or' significantly delayed. . While it is necessary for, OROs to have the capability-to provide KI to emergency workers and institutionalized individuals, the provision of KI to
.the general -.public is an ORO option and is reflected in.ORO's,.plans and procedures.,. Provisions should include, the avai.lability:of adequate quantities, storage, and means of the distribution. of radioprotectiv,e drugs.-.
Criterion 3.b.1: KI and appropriate instructions are available should a decisionto recommend use ofKl. be made. ,Appropriate record keeping of the administration of Kl for emergency workers! and institutionalized individuals (not the general public) is maintained., (NUREG-0654, J. 10.
e)
EXTENT OF PLAY State:
    -   The State should demonstrate the capability to, formulate and disseminate appropriate instructions on the use of KI for those advised to take it.
SA,   decision not to take KIis "anacceptable decision.
County:
    -   The County will demonstrate the capability to make KI available to
      ,,emergency workers. The County will demonstrate. the capability to accomplish distribution .of K[ consistent with decisions made.
Organizations should have the capability to develop and maintain lists of emergency workers 'who have ingested KI, including documentation of the date(s) and time(s) they were instructed to, ingest KI. The ingestion of KI recommended by the designated health official is voluntary. For evaluation purposes, the actual ingestion of KI is not.
necessary.
Emergency workers should demonstrate the basic knowledge of procedures for the use of KI whether or not the scenario drives the use of KI. This can be accomplished by an interview with the evaluator.
Emergency workers should demonstrate the basic knowledge of procedures for the use of KI whether or not the scenario drives the use of KI. This can be accomplished by an interview with the evaluator.
136 0 All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
136 0
EVALUATION AREA 3 -Protective Action Implementation Sub-element 3.c -Implementation of Protective Actions for Special Populations INTENT This sub-element is deriVed'from NUREG-0654, which provides that Offsite Response Organizations (ORO) should- have' the capability to implement ,protective action decisions, including' levacuation and/or sheltering, for all special populations'.
 
FocUs,:is on .those.. special .populations that are (or potentially will be) .affected' by; a radiological release from a nuclear power plant.Critertion 3.c: Protective action decisions a 1re implemented for special populations
All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
:other"tha schools within areas subject to protective T h-actions..(NUREG0654 J.10.`,6cd, g) .EXTENT OF PLAY State:-N/A. -County:-Demonstrate the, capability_
EVALUATION AREA 3 - Protective Action Implementation Sub-element 3.c         - Implementation of Protective Actions for Special Populations INTENT This sub-element is deriVed'from NUREG-0654, which provides that Offsite Response Organizations (ORO) should- have' the capability to implement
to alert .-and notify, special populations (hospitals, nursing homes, correctional facilities, mobility-impaired individuals, transportation dependent, State licensed day care centers, etc.).-"Demonstrate-the capability "to provide for the needs of special populations in'accordance with plans and procedures.
  ,protective action decisions, including' levacuation and/or sheltering, for all special populations'. FocUs,:is on .those.. special .populations that are (or potentially will be) .affected' by; a radiological release from a nuclear power plant.
-Contact with 'special populations and 'reception facilities will be&#xfd;simulated.
Critertion 3.c: Protective action decisions a 1re implemented for special populations :other"tha schools within areas subject to protective Th
-Telephone calls will not be made-One transportation provider will be contacted; all other calls will be simulated.
-actions..(NUREG0654 J.10.`,6cd, g)           .
All simulated contacts should be logged.137 0-Route Alerting will be conducted Out-of-Sequence on May 14, 2008 at Oakland VFD at 1900- 2100 hours.-Notification of special needs people will be simulated by the Route Alerting Fire Department or notification from EOC staff.-Notification of special populations will be procedurally explained.
EXTENT OF PLAY State:
Criterion 3.c.2: OROs/School officials decide upon and implement protective actionS, for -schools. " (NUREG-0654, J.1O.c, d, g)EXTENT OF PLAY State:-N/A County:-Demonstrate the capability to alert and notify the Hancock County School District of emergency conditions that are expected to or may necessitate protective actions for students.-Contact with the public school district will be demonstrated during the out-of-sequence school play on June 24, 2008 at 0900 -1100 hours.-The Hancock County OEM and/or officials of the Hancock County School District will demonstrate the capability to make prompt decisions on protective actions for students.-School Officials will demonstrate the decision making process for protective actions.-One School in the Hancock County School District will participate during the Out-of-Sequence Demonstration on June 24, 2008 at 0900-1100 hours.-Transportation of school children, if necessary, will be simulated.
        -N/A.                     -
138  
County:
-One Bus Driver will be available, at the participating school, for an interview between 0900 -1100 hours on June 24, 2008-The bus will not run the route to the Host School, but will explain the procedure.
      -     Demonstrate the, capability_ to alert .-and notify, special populations (hospitals, nursing homes, correctional facilities, mobility-impaired individuals, transportation dependent, State licensed day care centers, etc.).
-The implementation of canceling the school day, dismissing early, or sheltering will be simulated by describing to evaluators the procedures that would be followed.
      -"Demonstrate-the capability "to provide for the needs of special populations in'accordance with plans and procedures.
If evacuation is the implemented protective action, all activities to coordinate and complete the evacuation of students to the host school will be accomplished through an interview process..,Communi.cations will be yerified by. the Bus Driver by interview.
      -     Contact with 'special populations and 'reception       facilities will be
Officials of the school will demonstrate the capability to develop and provide timely information to the HCEOC for use in messages to parents, the general public, and the media on the status of protective actions for schools.-A controller will be at the school location to inject scenario.All activities must be based on the ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
          &#xfd;simulated.
139 0 EVALUATION AREA 3 -Protective Action Implementation Sub-element 3.d. -Implementation of Traffic and Access Control INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to implement protective action plans, including relocation and restriction of access to evacuated/sheltered areas. This sub-element focuses on selecting, establishing, and staffing of traffic and access control points and removal of impediments to the flow of evacuation traffic.Criterion 3.d.1: Appropriate traffic and accesscontrol is established.
      -   Telephone calls will not be made
Accurate instructions are provided to traffic and access control personnel.' (NUREG-0654, J.10.g, j)' -EXTENT OF PLAY State:--N/A County: During the June 24, 2008 exercise, HCEOC will demonstrate the capability to select, establish, and staff appropriate traffic and access control points, consistent with protective actions.-Staffing of Traffic and Access Control Points will be simulated.
      -   One transportation provider will be contacted; all other calls will be simulated.
-The capability to provide instructions to traffic and access control staff will be demonstrated through an interview with the Law Enforcement Officer in the HCEOC during the June 24, 2008 exercise.-The HCEOC will demonstrate the ability to control access to rail, water and air traffic, under its control by interview.
All simulated contacts should be logged.
Traffic Control / Access Control Points will be demonstrated Out-of-Sequence on May 14, 2008 at 1900 -2100, by interview at the New Cumberland Fire Department.
137
Communications check will be conducted following the interview.
 
140 6 Criterion 3.d.2: Impediments to evacuation are identified and resolved.(NUREG-0654, J.10.k)EXTENT OF PLAY State:-N/A County:-The HCEOC will demonstrate the capability by interview to identify and take appropriate.
0
actions concerning impediments to evacuation.
    - Route Alerting will be conducted Out-of-Sequence on May 14, 2008 at Oakland VFD at 1900- 2100 hours.
    -   Notification of special needs people will be simulated by the Route Alerting Fire Department or notification from EOC staff.
    -   Notification of special populations will be procedurally explained.
Criterion 3.c.2: OROs/School officials decide upon and implement protective actionS, for -schools. " (NUREG-0654, J.1O.c, d, g)
EXTENT OF PLAY State:
  -N/A County:
  -   Demonstrate the capability to alert and notify the Hancock County School District of emergency conditions that are expected to or may necessitate protective actions for students.
  -   Contact with the public school district will be demonstrated during the out-of-sequence school play on June 24, 2008 at 0900 - 1100 hours.
  -   The Hancock County OEM and/or officials of the Hancock County School District will demonstrate the capability to make prompt decisions on protective actions for students.
  -   School Officials will demonstrate the decision making process for protective actions.
  -   One School in the Hancock County School District will participate during the Out-of-Sequence Demonstration on June 24, 2008 at 0900
      - 1100 hours.
  -   Transportation of school children, if necessary, will be simulated.
138
 
    -   One Bus Driver will be available, at the participating school, for an interview between 0900 - 1100 hours on June 24, 2008
    -   The bus will not run the route to the Host School, but will explain the procedure.
    -   The implementation of canceling the school day, dismissing early, or sheltering will be simulated by describing to evaluators the procedures that would be followed. If evacuation is the implemented protective action, all activities to coordinate and complete the evacuation of students to the host school will be accomplished through an interview process.
        .,Communi.cations will be yerified by. the Bus Driver by interview.
Officials of the school will demonstrate the capability to develop and provide timely information to the HCEOC for use in messages to parents, the general public, and the media on the status of protective actions for schools.
    -   A controller will be at the school location to inject scenario.
All activities must be based on the ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
139
 
0 EVALUATION AREA 3 - Protective Action Implementation Sub-element 3.d. - Implementation of Traffic and Access Control INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to implement protective action plans, including relocation and restriction of access to evacuated/sheltered areas.           This sub-element focuses on selecting, establishing, and staffing of traffic and access control points and removal of impediments to the flow of evacuation traffic.
Criterion 3.d.1: Appropriate traffic and accesscontrol is established.
Accurate instructions are provided to traffic and access control personnel.' (NUREG-0654, J.10.g, j)' -
EXTENT OF PLAY State:-
    -   N/A County:
During the June 24, 2008 exercise, HCEOC will demonstrate the capability to select, establish, and staff appropriate traffic and access control points, consistent with protective actions.
    - Staffing of Traffic and Access Control Points will be simulated.
    - The capability to provide instructions to traffic and access control staff will be demonstrated through an interview with the Law Enforcement Officer in the HCEOC during the June 24, 2008 exercise.
    - The HCEOC will demonstrate the ability to control access to rail, water and air traffic, under its control by interview.
Traffic Control / Access Control Points will be demonstrated Out-of-Sequence on May 14, 2008 at 1900 - 2100, by interview at the New Cumberland Fire Department.             Communications check will be conducted following the interview.
140 6
 
Criterion 3.d.2: Impediments to evacuation are identified and resolved.
(NUREG-0654, J.10.k)
EXTENT OF PLAY State:
    -N/A County:
    -   The HCEOC will demonstrate the capability by interview to identify and take appropriate. actions concerning impediments to evacuation.
Actual dispatch of resources will be simulated to deal with impediments and will be explained during the interview.
Actual dispatch of resources will be simulated to deal with impediments and will be explained during the interview.
All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
141 EVALUATION AREA 3 -Protective Action Implementation Sub-element 3.e. -Implementation of Ingestion Pathway Decisions EXTNET OF PLAY State:* This element will not.be demonstrated during this exercise.County: .* This element will not be demonstrated during this exercise.Sub-element 3.f. -Implementation, of Reloca t ion, Re-entry, and Return Decisions  
141
-.EXTNETOF PLAY State: .* This element will not be demonstrated during this exercise.County: This element will not be demonstrated during this exercise.142 EVALUATION AREA 4 -Field Measurement And Analysis Sub-element 4.a -Plume Phase Field Measurements and Analyses INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have the capability to deploy field teams with the equipment, methods, and expertise necessary to determine the location of airborne radiation and particulate deposition on the ground.-from an airborne plume. ln addition, NUREG-0654 indicates that OROs should have the capability to use field teams within the plume Emergency Planning Zone to measure airborne radioiodine in the, presence of noble gases and to measure radioactive particulate material in the airborne plume.In the event of an accident at a nuclear power plant, the possible release of radioactive material may pose a risk to the nearby population and"''environment.
 
Althoughaccident''assessmeht, methodsare available to project the extent and magnitude of a release, these methods are subject to large uncertainties.
EVALUATION AREA 3 - Protective Action Implementation Sub-element 3.e. - Implementation of Ingestion Pathway Decisions EXTNET OF PLAY State:
During an accident, it is important to collect field radiological data in order to help characterize any radiological release. This does not imply that plume exposure projections should be made from the field data.Adequate equipment and procedures are essential to such field measurement efforts.Criterion 4.a.1: The field teams are equipped to perform field measurements of direct radiation exposure (cloud and ground shine)and to sample airborne radioiodine and particulates. (NUREG-0654, H.10; 1.7, 8, 9)EXTENT OF PLAY State:-Field teams will be equipped with instrumentation and supplies necessary to accomplish their mission as identified in the plan and/or procedures.
* This element will not.be demonstratedduring this exercise.
-One Field Team will be utilized.-The Field Team will deploy from HCEOC.-A minimum of six (6)-sampling locations will be demonstrated.
County:           .
Field Team Equipment will be demonstrated at three (3) sample locations.
* This element will not be demonstrated during this exercise.
Sub-element 3.f. - Implementation, of Reloca t ion, Re-entry, and Return Decisions                 -.
EXTNETOF PLAY State:                 .
* This element will not be demonstrated during this exercise.
County:
This element will not be demonstratedduring this exercise.
142
 
EVALUATION AREA 4 - Field Measurement And Analysis Sub-element 4.a - Plume Phase Field Measurements and Analyses INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have the capability to deploy field teams with the equipment, methods, and expertise necessary to determine the location of airborne radiation and particulate deposition on the ground
.-from an airborne plume. ln addition, NUREG-0654 indicates that OROs should have the capability to use field teams within the plume Emergency Planning Zone to measure airborne radioiodine in the, presence of noble gases and to measure radioactive particulate material in the airborne plume.
In the event of an accident at a nuclear power plant, the possible release of radioactive material may pose a risk to the nearby population and
"''environment. Althoughaccident''assessmeht, methodsare available to project the extent and magnitude of a release, these methods are subject to large uncertainties. During an accident, it is important to collect field radiological data in order to help characterize any radiological release. This does not imply that plume exposure projections should be made from the field data.
Adequate equipment and procedures are essential to such field measurement efforts.
Criterion 4.a.1: The field teams are equipped to perform field measurements of direct radiation exposure (cloud and ground shine) and to sample airborne radioiodine and particulates. (NUREG-0654, H.10; 1.7, 8, 9)
EXTENT OF PLAY State:
      -   Field teams will be equipped with instrumentation and supplies necessary to accomplish their mission as identified in the plan and/or procedures.
      -   One Field Team will be utilized.
      -   The Field Team will deploy from HCEOC.
      - A minimum of six (6)-sampling locations will be demonstrated. Field Team Equipment will be demonstrated at three (3) sample locations.
Equipment use will be simulated at the other three (3) locations.
Equipment use will be simulated at the other three (3) locations.
143  
143
-Transfer of samples to -courier for transport to Ohio lab will be simulated.-
 
-In-route readings will be taken.-The Field Team will be demonstrated Out-of-Sequence on June 24, 2008 at 0900 -1100 hours.Field'data will be provided to the field team by controller injects.County: 0-N/A Criterion 4.a.2: Field teams are managed to obtain sufficient information to help characterize the release, define the edge of the plume and to control radiation exposure., (NUREG-0654, H.12; 1.8, 11; J.10.a)EXTENT OF PLAY State:-Responsible Offsite Response Organizations (ORO) will demonstrate the capability to brief teams on predicted plume location and direction, travel speed, and expo:sure;`contro procedures before d6ployment.
    - Transfer of samples to -courier for transport to Ohio lab will be simulated.-
-The State will simulate contact of the FEMA III RRCC.-Radiological data will be provided to the field team by the controller.
    -   In-route readings will be taken.
County:-N/A Criterion 4.a.3: Ambient radiation measurements are made and recorded at appropriate locations, and radioiodine and particulate samples are collected.
  -   The Field Team will be demonstrated Out-of-Sequence on June 24, 2008 at 0900 - 1100 hours.
Teams will move to an appropriate low background location to determine whether any significant (as specified 144 40 0 in the plan and/or procedures) amount of- radioactivity has been collected on the sampling media. (NUREG-0654, I. 9)EXTENT OF PLAY State:-- Field teams will demonstrate the capability to report measurements and field data pertaining to the measurement of airborne radioiodine and particulates and ambient radiation to the field team coordinator.
Field'data will be provided to the field team by controller injects.
Charcoal filters will be utilized instead of Silver Xeolite..Simulation of sharing of field data with Ohio and Pennsylvania will be demonstrated in a timely manner.Labs will not be demonstrated in this exercise.The request for, Federal resources willbe simulated by the WVEOC.A A controller will provide Fild'&Team readings.'
County:                                                                     0
County:-N/A All activities must e-' must .be based on the ORO's plans and procedures and completedas they would'be in'an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
  -N/A Criterion 4.a.2: Field teams are managed to obtain sufficient information to help characterize the release, define the edge of the plume and to control radiation exposure., (NUREG-0654, H.12; 1.8, 11; J.10.a)
145 EVALUATION AREA 4 -Field Measurement And Analysis Sub-element 4.b -Post Plume' Phase Field Measurements and Sampling EXTNET OF PLAY State:* This element will not be demonstrated during this exercise.County: S ,This element will not be demonstrated during this exercise.Sub-element 4.c -LaboratoryOpierations EXTNET OF PLAY,, State: A This element will not be demonstrated during this exercise.
EXTENT OF PLAY State:
The WV State Plan identifies the State of Ohio's laboratories as the primary laboratories used for all sample- analysis.County: Y)* N/A 146 a EVALUATIONAREA 5 -Emergency Notification and Public Information Sub-element-5.a -Activation of the Prompt 'Alert and Notification System INTENT This sub-element is derived from. NUREG-0654, which provides that OROs should have the capability to provide prompt instructions to the public within the plume pathway EPZ. Specific provisions addressed in this sub-element are derived from the Nuclear Regulatory Commission (NRC) regulations (10 CFR Part 50, Appendix E.IV.D.), and FEMA-REP-10, "Guide for the , Evaluatipn of Alert and. Notification systems for Nuclear Power Plants." Criterion 5.a.1: Activities associated with primary alerting and notification of the public are completed in a timely -manner following the initial decision by authorized offsite emergency officials to notify the public of an emergency situation.
  -   Responsible Offsite Response Organizations (ORO) will demonstrate the capability to brief teams on predicted plume location and direction, travel speed, and expo:sure;`contro procedures before d6ployment.
The initial instructional message to the public must include as a minimum the elements required by current FEMA REP guidance.
  -   The State will simulate contact of the FEMA III RRCC.
(10 CFR Part 50, Appendix E.IV.D and NUREG-0654, E.5, 6, 7)EXTENT OF PLAY%.State:-N/A County:-The County will demonstrate the capability to sequentially provide an alert signal followed by an initial instructional message to populated areas (permanent resident and transient) throughout the 10-mile plume pathway EPZ. Following the decision to activate the alert and notification system, in accordance with the County plan and/or procedures, completion of system activation should be accomplished in a timely manner (will not be subject to specific time requirements) for primary alerting/notification.
  -   Radiological data will be provided to the field team by the controller.
The initial message should include the elements required by current FEMA REP guidance.-Siren activation will be explained.
40 County:
Sirens will not be sounded.-Procedures to broadcast the message should be fully demonstrated as they would in an actual emergency up to the point of transmission.
  -   N/A Criterion 4.a.3: Ambient radiation measurements are made and recorded at appropriate locations, and radioiodine and particulate samples are collected.         Teams will move to an appropriate low background location to determine whether any significant (as specified 144 0
Broadcast of the message(s) or test messages will not be 147 demonstrated.  
 
.The alert signal activation*
in the plan and/or procedures) amount of- radioactivity has been collected on the sampling media. (NUREG-0654, I. 9)
will be simulated.
EXTENT OF PLAY State:
The procedures will be demonstrated up to the point of actual activation.
    -- Field teams will demonstrate the capability to report measurements and field data pertaining to the measurement of airborne radioiodine and particulates and ambient radiation to the field team coordinator.
-In Hancock County the EAS Station is activated through the National Weather Service.-For Exercise purposes the NWS will be contacted, EAS message provided, but the EAS Radio Station will not be activated.
Charcoal filters will be utilized instead of Silver Xeolite..
-The capability of'the primary notification system to broadcast an instructionral message on a 24-hour basis should be verified during an interview with the HCOEM Director or designee.0 Criterion 5.a.2: [RESERVED]
Simulation of sharing of field data with Ohio and Pennsylvania will be demonstrated in a timely manner.
Criterion 5.a.3: Activities associated with FEMA approved exception ,areas (where'applicable) are completed' within 45 minutes following the initial decision by' authorized offsite emergeoncy officials.
Labs will not be demonstrated in this exercise.
to notify the public of an emergency situationd-:
The request for, Federal resources willbe simulated by the WVEOC.
Backup ailert ridnotiffica4tion of the public is completed within 45 minutes following the detection by the ORO of a failure of the primary alert and notification system. (NUREG-0654, E. 6, Appendix 3.B.2.c)EXTENT OF PLAY .-State:-N/A County:-Backup Route Alerting will be demonstrated from.1900  
A controller will provide Fild'&Team readings.'
-2100 hours on May 14, 2008 at Oakland Volunteer Fire Department.
County:
-one route will be actually run and alert and 'notification activities along*the route will be simulated (that is, the message that"Would actually be used is read for the evaluator, but not actually broadcast).
    -N/A All activities must   e-' must .be based on the ORO's plans and procedures and completedas they would'be in'an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
-Actual testing of the mobile public address system will be conducted at the Fire Station.148 0 EVALUATION AREA 5 -Emergency Notification and Public Information Sub-element 5.b -Emergency Information and Instructions for the Public and the Media INTENT This sub-element is-derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have the capability to disseminate to thepublic appropriate emergency information and instructions, including any recommended protective actions..
145
In addition, NUREG70654 provides that OROs should ensure that the ,capab'lity exists for providing information to the media. This includes the availability of a physical location for use by the media during an emergency.
 
NUREG-0654 also provides that a system should be available for dealing with rumors. This system will hereafter be known as the public inquiry hotline.Criterion 5.b.1: OROs provide accurate, emergency information and* -,,instructions to .the .public and the news media in, a timely manner.r,(NUREG-0654, E.5, 7; G.3.a, G.4.c). EXTENT OF PLAY ..State:-The State will ensure that emergency information and instructions are consistent with protective action decisions made by appropriate officials.
EVALUATION AREA 4 - Field Measurement And Analysis Sub-element 4.b - Post Plume' Phase Field Measurements and Sampling EXTNET OF PLAY State:
The State should be prepared to disclose and explain the Emergency Classification Level (ECL) of the incident..
* This element will not be demonstratedduring this exercise.
-Public inquiries will be demonstrated at the EOC.-Tends in rumors.will be identified, if applicable.
County:
7 Subsequent emergency.information and instructions will be provided to..the.public and the media through'the Joint Public Information Center.-One News Briefing will'be conducted at the EOC.County: The County will ensure that emergency information and instructions are consistent with protective action decisions made by appropriate officials.
S     ,This element will not be demonstrated during this exercise.
The County should be prepared to disclose and explain the Emergency Classification Level (ECL) of the incident.149 0-Public inquiries will be demonstrated at the EOC.-Trends in rumors will be identified, if applicable.
Sub-element 4.c - LaboratoryOpierations EXTNET OF PLAY,,
-Subsequent emergency information and instructions will be provided to the public and the media through the state representative at the Joint Public Information Center..- OneNews Briefing will be conducted at the EOC.All activities for this criterion must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
State:                                         A This element will not be demonstrated during this exercise. The WV State Plan identifies the State of Ohio's laboratoriesas the primary laboratoriesused for all sample-analysis.
~4- .....,.0 150 0 EVALUATIONAREA 6 -Support Operation/Facilities Sub-element 6.a -Monitoring and Decontamination of Evacuees and Emergency Workers and Registration of Evacuees INTENT This sub-element is derived from NUREG-0654; which provides that Offsite Response Organizations (ORO) have the capability to implement radiological monitoring and decontamination of.evacuees and emergency workers, while minimizing contamination of the facility, and registration of evacuees at reception centers.Criterion 6.a.1: The reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers. (NUREG-0654, J.10.h; J.12; K.5.a)EXTENT OF PLAY State:-N/A County:-Reception/
County:                                               Y)
Mass Care Center, Monitoring/
* N/A 146 a
Decontamination Center will be conducted from 1900 -2100 hours on June 24, 2008 at the Weir High School Complex.-Decontamination of evacuees/emergency workers may be simulated and conducted by interview.
 
-The availability of provisions for separately showering should be demonstrated or explained.
EVALUATIONAREA 5 - Emergency Notification and Public Information Sub-element- 5.a     -   Activation of the Prompt 'Alert and Notification System INTENT This sub-element is derived from. NUREG-0654, which provides that OROs should have the capability to provide prompt instructions to the public within the plume pathway EPZ. Specific provisions addressed in this sub-element are derived from the Nuclear Regulatory Commission (NRC) regulations (10 CFR Part 50, Appendix E.IV.D.), and FEMA-REP-10, "Guide for the
-The staff should demonstrate provisions for limiting the spread of contamination.
, Evaluatipn of Alert and. Notification systems for Nuclear Power Plants."
-Provisions should also exist to separate contaminated and uncontaminated individuals.
Criterion 5.a.1: Activities associated with primary alerting and notification of the public are completed in a timely -manner following the initial decision by authorized offsite emergency officials to notify the public of an emergency situation. The initial instructional message to the public must include as a minimum the elements required by current FEMA REP guidance. (10 CFR Part 50, Appendix E.IV.D and NUREG-0654, E.5, 6, 7)
-Change of clothing for individuals .whose clothing is contaminated will be simulated.
EXTENT OF PLAY%.
151 S-Storage of contaminated clothing and personal belongings to prevent further contamination of evacuees or facilities will be explained.
State:
-Procedures should be discussed concerning the handling of potential contamination of vehicles and personal belongings of any individual found to be contaminated.
      -   N/A County:
-Monitoring personnel should explain.'
      -   The County will demonstrate the capability to sequentially provide an alert signal followed by an initial instructional message to populated areas (permanent resident and transient) throughout the 10-mile plume pathway EPZ.       Following the decision to activate the alert and notification system, in accordance with the County plan and/or procedures, completion of system activation should be accomplished in a timely manner (will not be subject to specific time requirements) for primary alerting/notification. The initial message should include the elements required by current FEMA REP guidance.
the use of action -levels for determining the. need for decontamination.
      -   Siren activation will be explained. Sirens will not be sounded.
-Monitoring personnel should explain the procedures for referring evacuees-who cannot be adequately decontaminated for assessment and follow up...-Contamination of the individual will be determined by controller inject and not simulated with any low-level radiation source.-The capability to register individuals was demonstrated during the 2006 Federal Evaluated Exercise, and will not be demonstrated during this exercise.-The Emergency Worker Decontamination Center will be conducted from 1900- 2100 hours on May 14, 2008 at the New Cumberland Fire Department.
      -   Procedures to broadcast the message should be fully demonstrated as they would in an actual emergency up to the point of transmission.
Qne monitoring station will. be established at each location.-One decontamination area will be established at each location.-A totalof.,six  
Broadcast of the message(s) or test messages will not be 147
.(6).people  
 
'will be- monitored..:at the Monitoring and Decontamination area. At least one (1) will be contaminated.
demonstrated. . The alert signal activation* will be simulated. The procedures will be demonstrated up to the point of actual activation.
.Decontamination of personnel/equipment/vehicles -will be explained.
      -   In Hancock County the EAS Station is activated through the National Weather Service.
      -   For Exercise purposes the NWS will be contacted, EAS message provided, but the EAS Radio Station will not be activated.
      -   The capability of'the primary notification system to broadcast an instructionral message on a 24-hour basis should be verified during an interview with the HCOEM Director or designee.
0 Criterion 5.a.2: [RESERVED]
Criterion 5.a.3: Activities associated with FEMA approved exception
,areas (where'applicable) are completed' within 45 minutes following the initial decision by' authorized offsite emergeoncy officials. to notify the public of an emergency situationd-: Backup ailert ridnotiffica4tion of the public is completed within 45 minutes following the detection by the ORO of a failure of the primary alert and notification system. (NUREG-0654, E. 6, Appendix 3.B.2.c)
EXTENT OF PLAY .-
State:
        -N/A County:
    -     Backup Route Alerting will be demonstrated from.1900 - 2100 hours on May 14, 2008 at Oakland Volunteer Fire Department.
      -   one route will be actually run and alert and 'notification activities along
          *the route will be simulated (that is, the message that"Would actually be used is read for the evaluator, but not actually broadcast).
    -   Actual testing of the mobile public address system will be conducted at the Fire Station.
148 0
 
EVALUATION AREA 5 - Emergency Notification and Public Information Sub-element 5.b - Emergency Information and Instructions for the Public and the Media INTENT This sub-element is-derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have the capability to disseminate to thepublic appropriate emergency information and instructions, including any recommended protective actions.. In addition, NUREG70654 provides that OROs should ensure that the ,capab'lity exists for providing information to the media. This includes the availability of a physical location for use by the media during an emergency. NUREG-0654 also provides that a system should be available for dealing with rumors. This system will hereafter be known as the public inquiry hotline.
Criterion 5.b.1: OROs provide accurate, emergency information and
* -,,instructions to .the .public and the news media in, a timely manner.
r,(NUREG-0654, E.5, 7; G.3.a, G.4.c).             .,,-...*
EXTENT OF PLAY                             ..
State:
        -   The State will ensure that emergency information and instructions are consistent with protective action decisions made by appropriate officials. The State should be prepared to disclose and explain the Emergency Classification Level (ECL) of the incident..
        -   Public inquiries will be demonstrated at the EOC.
        -   Tends in rumors.will be identified, if applicable.
7   Subsequent emergency.information and instructions will be provided to
          ..the.public and the media through'the Joint Public Information Center.
        -   One News Briefing will'be conducted at the EOC.
County:
The County will ensure that emergency information and instructions are consistent with protective action decisions made by appropriate officials. The County should be prepared to disclose and explain the Emergency Classification Level (ECL) of the incident.
149
 
0
    -   Public inquiries will be demonstrated at the EOC.
    -   Trends in rumors will be identified, if applicable.
    -   Subsequent emergency information and instructions will be provided to the public and the media through the state representative at the Joint Public Information Center.
    .-   OneNews Briefing will be conducted at the EOC.
All activities for this criterion must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
                                                ~
4-   .....   ,.
0 150 0
 
EVALUATIONAREA 6 - Support Operation/Facilities Sub-element 6.a - Monitoring and Decontamination of Evacuees and Emergency Workers and Registration of Evacuees INTENT This sub-element is derived from NUREG-0654; which provides that Offsite Response Organizations (ORO) have the capability to implement radiological monitoring and decontamination of.evacuees and emergency workers, while minimizing contamination of the facility, and registration of evacuees at reception centers.
Criterion 6.a.1: The reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers. (NUREG-0654, J.10.h; J.12; K.5.a)
EXTENT OF PLAY State:
  -N/A County:
  -   Reception/ Mass Care Center, Monitoring/ Decontamination Center will be conducted from 1900 - 2100 hours on June 24, 2008 at the Weir High School Complex.
  -   Decontamination of evacuees/emergency workers may be simulated and conducted by interview.
  -   The availability of provisions for separately showering should be demonstrated or explained.
  -   The staff should demonstrate provisions for limiting the spread of contamination.
  -   Provisions should also exist       to separate     contaminated   and uncontaminated individuals.
  -   Change of clothing for individuals .whose clothing is contaminated will be simulated.
151
 
S
    -   Storage of contaminated clothing and personal belongings to prevent further contamination of evacuees or facilities will be explained.
    -   Procedures should be discussed concerning the handling of potential contamination of vehicles and personal belongings of any individual found to be contaminated.
    -   Monitoring personnel should explain.' the use of action -levels for determining the. need for decontamination.
    -   Monitoring personnel should explain the procedures for referring evacuees-who cannot be adequately decontaminated for assessment and follow up...
    -   Contamination of the individual will be determined by controller inject and not simulated with any low-level radiation source.
    -   The capability to register individuals was demonstrated during the 2006 Federal Evaluated Exercise, and will not be demonstrated during this exercise.
    -   The Emergency Worker Decontamination Center will be conducted from 1900- 2100 hours on May 14, 2008 at the New Cumberland Fire Department.
Qne monitoring station will. be established at each location.
    -   One decontamination area will be established at each location.
    -   A totalof.,six .(6).people 'will be- monitored..:at the Monitoring and Decontamination area. At least one (1) will be contaminated.
    . Decontamination of personnel/equipment/vehicles -will be explained.
Actual decontamination will be simulated.
Actual decontamination will be simulated.
All activities associated with this criterion must be based on the ORO's plans and procedures and completed as they' would be in an actual emergency, unless otherwise indicated in the extent of play agreement.
All activities associated with this criterion must be based on the ORO's plans and procedures and completed as they' would be in an actual emergency, unless otherwise indicated in the extent of play agreement.
152 0  
152 0
-EVALUATION AREA 6 -Support Operation/Facilities Sub-element 6.b -Monitoring and Decontamination of Emergency Worker Equipment INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to implement radiological monitoring and decontamination of emergency worker equipment, including vehicles.Criterion 6.b,1: The facility/ORO has adequate procedures and resources for the accomplishment of monitoring and decontamination of emergency worker equipment, including vehicles. (NUREG-0654, K.5.b)'.EXTENT OF PLAY State:-N/A-County: The Emergency Worker Decontamination Center will be conducted from 1900 -2100 ho'urs' riq May'14, 2008 at the New Cumberland Fire Department.
 
-A total of six (6) people will be monitored at the Emergency Worker Decontamination Cetter>, At least one (1) Will be contaminated.
-EVALUATION AREA 6 - Support Operation/Facilities Sub-element 6.b -         Monitoring and Decontamination of Emergency Worker Equipment INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to implement radiological monitoring and decontamination of emergency worker equipment, including vehicles.
-One Emergency Worker will be monitored for contamination.
Criterion 6.b,1:         The facility/ORO has adequate procedures and resources for the accomplishment of monitoring and decontamination of emergency worker equipment, including vehicles. (NUREG-0654, K.5.b)'.
:Discussions on the need for decontamination will be made based on Controller injected radiation levels.-Contamination control. &#xfd;and record-keeping procedures will be demonstrated.
EXTENT OF PLAY State:
-Decontamination efforts will be procedurally explained, but actual decontamination will be simulated.
    -N/A
-The proper sequence for monitoring/decontamination efforts and the decision to refer individuals who cannot be decontaminated to medical facilities will be demonstrated via inquiries.
-   County:
153 S-One vehicle will be monitored and decisions regarding the need for decontamination will be 'made as radiation -levels ,are presented via Controller injects.-Record-keeping procedures will be demonstrated.
The Emergency Worker Decontamination Center will be conducted from 1900 - 2100 ho'urs' riq May'14, 2008 at the New Cumberland Fire Department.
-No vehicles will be washed, but decontamination procedures will be explained.
    -   A total of six (6) people will be monitored at the Emergency Worker Decontamination Cetter>, At least one (1) Will be contaminated.
    -   One Emergency Worker will be monitored for contamination.
:Discussions on the need for decontamination will be made based on Controller injected radiation levels.
    -   Contamination     control. &#xfd;and record-keeping procedures   will be demonstrated.
    -   Decontamination efforts will be procedurally explained, but actual decontamination will be simulated.
    -   The proper sequence for monitoring/decontamination efforts and the decision to refer individuals who cannot be decontaminated to medical facilities will be demonstrated via inquiries.
153
 
S
    -   One vehicle will be monitored and decisions regarding the need for decontamination will be 'made as radiation -levels ,are presented via Controller injects.
    -   Record-keeping procedures will be demonstrated.
    -   No vehicles will be washed, but decontamination procedures will be explained.
Decontamination of personnel/equipment/vehicles will be explained.
Decontamination of personnel/equipment/vehicles will be explained.
Actual decontamination will, be simulated.
Actual decontamination will, be simulated.
All activities associated with this criterion must be based on the ORO's plans and procedures and! completed, as they: would'be in:,an. ac'tualf emergency,'
All activities associated with this criterion must be based on the ORO's plans and     0 procedures and! completed, as they: would'be in:,an. ac'tualf emergency,' I'nless noted aboveor otherwise: indicatedin'the extent of play agreement-.
I'nless noted aboveor otherwise:
0 154 0
indicatedin'the extent of play agreement-.
 
0 0 154 0 EVALUATION AREA 6 -Support Operation/Facilities Sub-element 6.c -Temporary Care of Evacuees INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) demonstrate the capability to establish relocation centers in host areas. Congregate care is normally provided in support of OROs by the American Red Cross (ARC) under existing letters of agreement.
EVALUATION AREA 6 - Support Operation/Facilities Sub-element 6.c - Temporary Care of Evacuees INTENT This sub-element is derived from         NUREG-0654, which provides that Offsite Response Organizations (ORO)             demonstrate the capability to establish relocation centers in host areas.         Congregate care is normally provided in support of OROs by the American         Red Cross (ARC) under existing letters of agreement.
Criterion 6.c.l:- Managers of congregate care facilities demonstrate that the centers have resources to&#xfd; provide, services and accommodations consistent with American Red Cross planning guidelines. (Found in MASS CARE -Preparedness Operations, ARC 3031) Managers demonstrate the procedures to assure that evacuees have been monitored for contamination and have been decontaminated as appropriate prior to entering congregate care facilities. (NUREG-0654, J.10.h, J.12)EXTENT OF PLAY State:-N/A County:-The Red Cross responsibility for Mass Care Centers was demonstrated at the Weir High Complex during the 2006 Federal Evaluated Exercise, and will not be demonstrated during this exercise.All activities associated with this criterion must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
Criterion 6.c.l:- Managers of congregate care facilities demonstrate that the centers have resources to&#xfd; provide, services and accommodations consistent with American Red Cross planning guidelines. (Found in MASS CARE - Preparedness Operations, ARC 3031)                         Managers demonstrate the procedures to assure that evacuees have been monitored for contamination and have been decontaminated as appropriate prior to entering congregate care facilities. (NUREG-0654, J.10.h, J.12)
EXTENT OF PLAY State:
    -   N/A County:
    -   The Red Cross responsibility for Mass Care Centers was demonstrated at the Weir High Complex during the 2006 Federal Evaluated Exercise, and will not be demonstrated during this exercise.
All activities associated with this criterion must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
155}}
155}}

Latest revision as of 20:55, 12 March 2020

Final Report for Radiological Emergency Preparedness Exercise Held on June 24, 2008
ML082770115
Person / Time
Site: Beaver Valley
Issue date: 09/23/2008
From: Hammons D
US Dept of Homeland Security, Federal Emergency Management Agency
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
Download: ML082770115 (161)


Text

U.S. Department of Homeland Security One Independence Mall, Sixth Floor 615 Chestnut Street Philadelphia, PA 19106-4404 DFEMA SEP 2 3 2008 NRC Headquarters Document Control Desk US Nuclear Regulatory Commission Washington, DC 20555-0001 Enclosed is the final report for the Beaver Valley Power Station (BVPS) Radiological Emergency Preparedness Exercise that was held on June 24, 2008.

If you have any questions, please contact Darrell Hammons at (215) 931-5546.

Sincerely, Darrell Hammons Regional Assistance Committee Chair Enclosure

-AX'4!;

www.fema.gov

Beaver Valley Power Station Exercise Report - 2008-06-24 Final Report - Radiological Emergency Preparedness (REP) Program 2008-09-19 SFEMA

FEMA Exercise Report Beaver Valley Power Station Exercise Date: 2008-06-24 Report Date: 2008-09-19 U.S. DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency REP Program 615 Chestnut Street Philadelphia, PA 19106

Table of Contents Chapter 1 Executive Summary Chapter 2 Introduction Chapter 3 Exercise Overview Section 3.1 EPZ Description Section 3.2 Exercise Participants Section 3.3 Exercise Timeline Chapter 4 Exercise Evaluation and Results Section 4.1 Summary Results of Exercise Evaluation Section 4.2 Status of Jurisdictions Evaluated 4.2.1 State Jurisdictions 4.2.1.1 Beaver Valley Joint Public Information Center 4.2.1.2 PA State Field Monitoring Team A, South West Region 4.2.1.3 PA State Field Monitoring Team B, South West Region 4.2.1.4 Commonwealth of Pennsylvania State Traffic/Access Control Points 4.2.1.5 State of West Virginia Emergency Operations Center 4.2.1.6 West Virginia Public Information Center 4.2.1.7 West Virginia Accicent Assessment Center 4.2.1.8 West Virginia Field Air Monitoring Team 4.2.2 Risk Jurisdictions 4.2.2.1 Beaver County Emergency Operations Center 4.2.2.2 Aliquippa Emergency Operations Center 4.2.2.3 Beaver Borough Emergency Operations Center 4.2.2.4 Beaver County, Beaver Borough, Back-up Route Alerting 4.2.2.5 Bridgewater/Fallston Emergency Operations Center 4.2.2.6 Brighton Township Emergency Operations Center 4.2.2.7 Beaver County, Brighton Township, Back-up Route Alerting 4.2.2.8 Center Township Emergency Operations Center 4.2.2.9 Chippewa Township Emergency Operations Center 4.2.2.10 Beaver County, Chippewa Township, Back-up Route Alerting 4.2.2.11 Frankfort Springs Borough, Hanover Township, Georgetown borough, Greene Township, Hookstown Borough Emergency Operations Center 4.2.2.12 Independence Township Emergency Operations Center 4.2.2.13 Industry Emergency Operations Center

4.2.2.14 Hopewell Township Emergency Operations Center 4.2.2.15 Beaver County, Hopewell Township, Back-up Route Alerting 4.2.2.16 Midland Emergency Operations Center 4.2.2.17 Monaca Emergency Operations Center 4.2.2.18 Beaver County, Monaca Back-up Route Alerting 4.2.2.19 Patterson Heights/Patterson Township Emergency Operations Center 4.2.2.20 Beaver County, Patterson Township, Back-up Route Alerting 4.2.2.21 Potter Township Emergency Operations Center 4.2.2.22 Raccoon Township Emergency Operations Center 4.2.2.23 Shippingport Emergency Operations Center 4.2.2.24 South Beaver/Ohioville/Glasgow Emergency Operations Center 4.2.2.25 South Heights Emergency Operations Center 4.2.2.26 Vanport Emergency Operations Center 4.2.2.27 Beaver County Emergency Worker Monitoring and Decontamination Station, Beaver Falls FD 4.2.2.28 Beaver County Emergency Worker Monitoring and Decontamination Station South Beaver Township Fire Department 4.2.2.29 Aliquippa School District 4.2.2.30 Aliquippa Elementary School 4.2.2.31 Beaver Area School Distirct 4.2.2.32 Beaver Area Junior Senior High School 4.2.2.33 Blackhawk School District 4.2.2.34 Patterson Primary School 4.2.2.35 Center Area School District 4.2.2.36 Center Area Junior High School, Center Area School District 4.2.2.37 Hopewell Area School District 4.2.2.38 Margaret Ross Elementary School 4.2.2.39 Midland Borough School District 4.2.2.40 Neel Elementary School 4.2.2.41 Monaca School District 4.2.2.42 Fifth Ward Elementary School, Monaca School District 4.2.2.43 New Brighton School District 4.2.2.44 Ambridge Area School District 4.2.2.45 South Side Area School District 4.2.2.46 South Side Middle School 4.2.2.47 Western Beaver Schools

4.2.2.48 Western Beaver Jr/Sr High School 4.2.2.49 Hancock County Emergency Operations Center 4.2.2.50 Hancock County Traffic and Access Control, County Court House 4.2.2.51 Hancock County Back-up Route Alerting, Oakland Fire Department 4.2.2.52 Hancock County Reception Center, Weir High School Complex 4.2.2.53 Hancock County Monitoring and Decontamination Center, Weir High School Complex 4.2.2.54 Hancock County Mass Care Center, Weir High School Complex 4.2.2.55 Hancock County Emergency Worker Monitor and Decontamination Station, New Cumberland Fire Department 4.2.2.56 Hancock County School District 4.2.2.57 Oak Glen High School, Hancock County School District 4.2.3 Support Jurisdictions 4.2.3.1 Allegheny County Emergency Operations Center 4.2.3.2 Allegheny Co Reception Center South Park Fair Grounds 4.2.3.3 Allegheny County Monitoring and Decontamination Center, South Park Fair Grounds 4.2.3.4 Allegheny Co Mass Care Center, SouthPark High School 4.2.3.5 Butler County Emergency Operations Center 4.2.3.6 Butler County Reception Center, Slippery Rock University 4.2.3.7 Butler County Mass Care Center, Slippery Rock University 4.2.3.8 Butler County Monitoring and Decontamination Center 4.2.3.9 Lawrence County Emergency Operations Center 4.2.3.10 Lawrence County Reception Center Mohawk Area High School 4.2.3.11 Lawrence County Monitoring and Decontamination Center, Mohawk High School 4.2.3.12 Lawrence County Mass Care Center, Union High School 4.2.3.13 Washington County Emergency Operations Center 4.2.3.14 Washington Co Reception Center County Fair Grounds 4.2.3.15 Washington County Monitoring and Decontamination Center McGuffey High School 4.2.3.16 Washington County Mass Care Center, McGuffey Jr/Sr High School Appendices Appendix 1 - Acronyms and Abbreviations Appendix 2 - Exercise Evaluators and Team Leaders Appendix 3 - Exercise Evaluation Areas and Extent of Play Agreement

1. Executive Summary On June 24, 2008, a full-scale plume exercise was conducted in the 10-mile plume exposure pathway, emergency planning zone (EPZ) around the Beaver Valley Power Station (BVPS) by the Department of Homeland Security/Federal Emergency Management Agency, Region Ill/National Preparedness Division/Radiological Emergency Preparedness Program (DHS/FEMARIII/NPD/REPP), Philadelphia, Pennsylvania. Out-of-sequence demonstrations were conducted on May 14, 2008. The purpose of the exercise and the out-of-sequence demonstrations was to assess the level of State and local preparedness in responding to a radiological emergency. The exercise and out-of-sequence demonstrations were held in accordance with DHS/FEMARIII/NPD/REPP policies and guidance concerning the exercise of State and local radiological emergency response plans (RERP) and procedures.

The most recent prior full-scale exercise at this site was conducted on June 26 - 30, 2006.

FEMA wishes to acknowledge the efforts of the many individuals in the Commonwealth of Pennsylvania, its one risk county (Beaver), its twenty seven risk jurisdictions (City of Aliquippa, Beaver Borough, Bridgewater Borough, Brighton Township, Center Township, Chippewa Township, Fallston Borough, Frankfort Springs Borough, Georgetown Borough, Glasgow Borough, Greene Township, Hanover Township, Hookstown Borough, Hopewell Township, Independence Township, Industry Borough, Midland Borough, Monaca Borough, Ohioville Borough, Patterson Township, Patterson Heights Borough, Potter Township, Raccoon Township, Shippingport Borough, South Beaver Township, South Heights Borough, and Vanport Township), and its four support counties (Allegheny, Butler, Lawrence, and Washington), as well as the State of West Virginia and its one risk county (Hancock), who were evaluated at this exercise.

Protecting the public health and safety is the full-time job of some of the exercise participants and an additional assigned responsibility for others. Still others have willingly sought this responsibility by volunteering to provide vital emergency services to their communities. Cooperation and teamwork of all the participants were evident during this exercise.

This report containsthe final evaluation of the biennial exercise and the evaluation of 1

the following out-of-sequence activities:

Commonwealth of Pennsylvania The State Emergency Operations Center (EOC), Commonwealth Emergency.

Information News Center (CENIC), Emergency Operating Facility (EOF), and Radiological Rapid Response Vehicle (R3V) were evaluated on 22 April 2008.during the Peach Bottom Atomic Power Station Exercise. Therefore, those activities were monitored and observed, but not evaluated.

The State Emergency Operations Center (EOC), Commonwealth Emergency Information News Center (CENIC), Emergency Operating Facility (EOF), and Radiological Rapid Response Vehicle- (R3V) were evaluated on 22 April 2008 during the Peach Bottom Atomic Power Station Exercise. Therefore, those activities were6 .

monitored and observed, but not evaluated.

Emergency Worker, Monitoring and Decontamination: Conducted on May 1,4,' 2008.

between 1900 and 2130 hours0.0247 days <br />0.592 hours <br />0.00352 weeks <br />8.10465e-4 months <br /> in Beaver County.

Mass Care: Conducted on June May 14, 2008 between 1900 and 21,00 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> in Lawrenceand Washington Counties.

Reception Center and Monitoring/Decontamination: -Conducted. on May 14, 2008 between 1900 and 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> in Allegheny, Butler, Lawrence, and-Washington -

Counties.

Traffic/Access Control: Conducted on June 24, 2008 between 1300 and 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> at the State Police Barracks.

Schools: Conducted May 14, 2008 between 0900 and 1100 in Beaver County.

Execpt where noted in this report, the Commonwealth and local orgaizations demonstrated knowledge of their emerency respone plans and procedures and adequately implemented them. There were no Deficiencies reported. However, six Areas Requiring Corrective Action (ARCAs) were identified as a result of theis exercise; five of the ARCAs were successfully re-demonstrated; one prior ARCA was successfully re-demonstrated. Two new planning issues were identified and have been corrected and one prior planning issue was resolved.

2 6

State of West Virginia Emergency Worker, Monitoring and Decontamination: Conducted on June 24, 2008 between 1900 and 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> in Hancock.County.

Mass Care: Conducted on June 24i 2008 between 1900 and 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> in Hancock County.

Reception Center and Monitoring/Decontamination: Conducted on June 24, 2008 between 1900 and 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> in Hancock County.

Route Alerting: Conducted on June 24,,2008 between 1900 and 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> in Hancock County. .. .

Traffic/Access Control: Conducted on May 14, 2008 from 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br /> until completion in Hancock County. :

Except where noted in this report, the State and local organizations demonstrated knowledge of their emergency response plans and procedures and adequately.

implemented them. There were no Deficiencies reported. There were no Areas Requiring Corrective Action (ARCAs) identified as a result of this exercise. One new planning issues was identified-and corrected; four planning issues from previous exercises were resolved.

3

0

2. Introduction On December 7, 1979, the President directed the Federal Emergency Management Agency (FEMA) to assume the lead responsibility for all off-site nuclear planning and response. FEMA's activities were conducted pursuant to 44 Code of Federal Regulations (CFR) Parts 350, 351 and 352. These regulations are a key element in the Radiological Emergency Preparedness (REP) Program that was established following the Three Mile Island Nuclear Station accident in March 1979. In October 2005, the.

REP Program was moved to the Department of Homeland Security/Office of, Infrastructure Protection/Chemical & Nuclear Preparedness and Protection..

Division/Radiological Emergency Preparedness (DHS/OIP/CNPPD/,REP). In.March of 2007 legistlation was passed that transferred the REP Program back to FEMA.

Modification of the 44 CFR series .is underway to reflect the new .organizational str~ucture of the REP Program. Radiological Emergency Preparedness is now, a branch of the Preparedness Division. At FEMA Region Ill, the Radiological Emerency Preparedness Program is part of the Technological Hazalrds5.Branch. -

44 CFR 350 establishes the policies and procedures for FEMA's initial and continued approval of Tribal, State, and local governments'":radiological emergency plannirg,,and, preparedness for-commercial nuclear power plants.. This, approval is contingent; in part,,

on Tribal, State and local government participation in joint exercises, with licensees.

REP's responsibilities in radiolog~ical emergency planningjfor fixed .nuclear facilities, include the following: _

Taking the lead in offsite emergency planning and in the review and evaluation of Radiological Emergency lResponse Plans (RERPs) and. procedures developed by Tribal, State and local governments; Determining whether such plans and procedures can be-implemented on the basis of observation and evaluation of exercises of the plans and procedures conducted, by Tribal, State and local governments; Responding to requests by the U.S. Nuclear Regulatory Commission (NRC) pursuant to the Memorandum of Understanding between the NRC and FEMA dated June 17, 1993 (Federal Register, Vol. 58, No. 176, September 14, 1993; and 4

a

Coordinating the activities of the following Federal agencies with responsibilities in the radiological emergency planning process:

- U.S. Department of Commerce,

- U.S. Nuclear Regulatory Commission,

- U.S. Environmental Protection Agency,.

- U.S. Department of Energy,

- U:S. Department of Health and-Human Services,

- U.S. Department of Transportation,

- U.S. Department of Agriculture,,-

- U.S. Department Of the Interior, and

- U.S. Food and Drug Administration.'

Representatives'of theseagendcies-serve on the Radiological Assistance Committee (RAC), which'is chaired by Regional Technological. Hazards Branch Chief.

A REP exercise was conducted on June,24, 2008,ý to assess the capabilities of State and local emergency preparedness organizations in implementing their RERPs and procedures' to protect the public-health arid safety'during a radiological emergency involving Beaver Valley'Power Station '.(BVPS). The purpose of this exercise report is to present the exercise results adnd findings on the performance of'the off-site response organizations (OROs) during a simulated raidiological emergency-The findings presented'ih this report are based on the evaluations of the Federal evaluator team, with final determinations made by the RAC Chair and approved by the Regional Administrator, FEMA Region Ill, Philadelphia, PA.

The criteria utilized in the REP evaluation process are contained in'the following:

NUREG-0654/FEMA-REP-1, Rev. 1, "Criteria for Preparation and Evaluation of Radiological Emergehcy Response Plans and Preparedness, in Suppoort of Nuclear Power Plants," NoVember..1980; "

FEMA Guidance Memoranda MS-1, "Medical Services," November 1986; FEMA-REP-14, "Radiological Emergency Preparedness Exercise Manual," September 1991; 5

a 66 FR 47546, "FEMA Radiological Emergency Preparedness: Alert and Notification,"

September 12, 2001; and 67 FR 20580, "FEMA Radiological Emergency Preparedness: Exercise Evaluation Methodology," April 25, 2002.

Section III of this report, entitled "Exercise Overview," presents basic information'and data relevant to the exercise. This section of the report contains a description of the' plume pathway emergency planning zone (EPZ), a listing of all participating jurisdictions and functional entities that were evaluated, and a tabular presentation of the time of actual occurrence of key exercise events and activities.

a Section IVof this report, entitled "Exercise Evaluation and Results," .presents detailed information on the demonstration of applicable exercise evalu'ation areas at each jurisdiction or functional entity evaluated in a jurisdiction-based, issues-only format.

This section also contains: (1) descriptions of all Deficiencies and Areas Requiring Corrective Action (ARCAs) assessed during this exercise, recommended corrective actions, and the Tribal, State, anddlocal governments' schedule of corrective actions for each identified exercise issue and (2) descriptions of ARCAs assessed during previous exercises and resolved at this exercise, including the corrective action demonstrated, as well as ARCAS assessed during previous exercises and scheduled for demonstration at this exercise which remain unresolved.

The final section of the report is comprised of the appendices, which present the following supplementary information: acronyms and abbreviations, exercise evaluators and team leaders, exercise evaluation area criteria and extent of play agreement, and the exercise scenario. It also presents information on planning issues (both new planning issues identified during this exercise and resolved planning issues identified during previous exercises), and additional prior issues not scheduled for demonstration 0 at this exercise.

6 6

3. Exercise Overview Contained in this section are data and basic information relevant to the June 24, 2008 exercise to test the off-site emergency response capabilities in the area surrounding Beaver Valley Power Station (BVPS). This section of the exercise report includes a description of the plume pathway emergency planning zone (EPZ), a listing of all participating jurisdictions and functional entities that were evaluated, and a tabular presentation of the time of actual occurrence of key exercise events and activities.

3.1. EPZ Description-BVPS is located in'western Pennsylvania on the southern bank of the Ohio River in Beaver County,ý Pennsylvania."Thesite is located near Shippingport Borough, about 1 mile from Midland Pennsylvani, obn 501 acres of fairIy level terrace owned by the FirstEnergy Nuclear OperatingCobmpahy. The latitude for the site is40-37'18' north; the longitude is 8 0-2 6 '02" west. Two pressurized water reactors are located on the 17 acres of the parcel ocCupied by the power station. The operating licenses for the facility were granted in July 1976 (Unit 1) and August 1987 (Unit 2); commercial operations began at the site during October' 1976 (Unit 1) and November 1987 (Unit 2). Unit 1 generates an output of 810 megawatts (MW); the Unit 2 output is 833 MW. One hundred and ten sirens cover the plume EPZ; 85 of the sirens are in Pennsylvania.

Steep slopes that cohtrib.uted to the6developm6nt of river mill towns, where most of the industry and residences are located, characterize the general topography of the region.

The region is part of the large industrial complex centered around Pittsburgh, Pennsylvania. The terrain rises from the Ohio River to a maximum elevation of 1,160 feet above mean sea level (MSL). Drainage is predominantly toward the river.

The soils in the area are made up of alluvial sands and gravel. The bedrock geology consists of sedimentary formations composed of shale and sandstone. No faults are located under or near the facility. The Ohio River is about 664 feet above MSL, and the plant grade is 735 feet above MSL.

The climate is a humid continental type. The average annual temperature for the area is about 50 2F. Annual precipitation is approximately 36 inches.

7

0 The area around the plant is mostly agricultural or undeveloped. The nearest community is Shippingport Borough, Pennsylvania, which is the parent borough for the site and has a population of 237. The nearest major population center of more than 25,000 people is Pittsburgh, which has a population of 334,563 and lies 22 miles to the southeast. The maximum population distribution, including residents: and transients, is 94,023 in the 10-mile EPZ.

Four major industries employ a total of 8,000 persons within 10 miles of the plant. Two small airfields (Beaver County and Herron Airport) are also in the 10 mile EPZ..

Runways at both airports are oriented so that the extensions do 'not pass Over the plant.

No major thoroughfares exist in the immediate vicinity. The main line of the Conrail 0

Railroad runs parallel to the plant along the north bank of.the Ohio, River.

3.2. Exercise Participants Agencies and organizations of the following jurisdictions participated in the Beaver Valley Power Station exercise:

State Jurisdictions Commonwealth of Pennsylvania -.Emergency: Operations Center Bureau of Radiation Protection Pennsylvania State Police.

State of West Virginia, Department of Homeland Security, Office,of Emergency Services State of West Virginia, Department of Health, and Human Resources, Bureau of Public Health State of West Virginia, Department of Environmental Protection State of West Virginia, Department of Natural Resources State of West Virginia, Department of Agriculture. ..

0 State of West Virginia, Field Air Sampling Team, Risk Jurisdictions BEAVER COUNTY EMERGENCY OPEATIONS CENTER ..

Beaver County 911 Center Beaver County Agricultural Services Beaver County Board of Commissions Beaver County Department of. Health, Beaver County Emergency Management Agency 8

a

Beaver County Hazardous Materials Response Beaver County Industrial Liaison Beaver County Office of the Aging Beaver County Public Works Beaver County Radiological Office Beaver.County Sherrif's Office Beaver County Transit Authority ALIQUIPA EMERGENCY OPERATIONS CENTER Aliquippa City Fire Department Aliquippa City Police Department BEAVER BOROUGH EMERGENCY OPERATIONS CENTER-

.Beaver Borough Mayor's Office' Beaver Borough City Council - -

Beaver Borough Fire Department Beaver Borough Police BRIDGEWATER/FALLSTON BOROUGHIEMERGENCY oPERATIONS CENTER Bridgewater*Fire Department' "

Bridgewater Police Department Fallston Fire Department BRIGHTON TOWNSHIP EMERGENCY OPERATIONS CENTER Brighton Township Board of Supervisors Brighton Township Emergency Management Agency Brighton Township Police Depar-tment Brighton Township Public Works Brighton Township rFre. Department".... ..

CENTER TOWNSHIP EMERGENCY OPERATIONS CENTER Center Township Fire Department Center Township Police Department CHIPPEWA TOWNSHIP EMERGENCY OPERATIONS CENTER Chippewa Township Public Works Chippewa Township Police Department Chippewa Township Volunteer Fire Department Chippewa Township Emergency Management Chippewa Township Board of Supervisors FRANKFORT SPEINGS BOROUGH/HANOVER TOWNSHIP/GEORGETOWN BOROUGH/GREEN TOWNSHIP/HOOKSTOWN BOROUGH EMERGENCY OPERATIONS CENTER 9

Green Township Board of Supervisors Hookstown Volunteer Fire Department Hookstown Borough Council Hookstown Area Emergency Services Hanover Township Council Hanover Township Emergency Management Agency HOPEWELL TOWNSHIP EMERGENCY OPERATIONS CENTER Hopewell Township Police Department Hopewell Township Fire Department Hopewell Township Shcool District Hopewell Township Public Works Hopewell Township Commissioners Office Hopewell Township Emergency ManagementAgency INDEPENDENCE TOWNSHIP EMERGENCY OPERATIONS CENTER...,

Independence'Township Volunteer, Fire Department Independence Township Police Department-;

Independence Township Emergency Medical Services, ":

Independence Township Road Department-Independence Township City Council I-.Mayior's'Office,".

Independence Township Emergency Management;,

Independence Township Supervisors Office INDUSTRY BOROUGH EMERGENCY OPERATIONS CENTER Industry Borough Emergency Management Industry Borough Police Department Industry Borough City Council - Mayor'S Office*

MIDLAND BOROUGH EMERGENCY OPERATIONS CENTER Midland Borough Council Midland Borough Medical Services Midland Borough Fire Department.

Midland Borough Police Department,"

Monaca Borough Emergency Operations Center.

Monaca Borough: Volunteer Fire Department*

Monaca Borough Police Department Monaca Borough Mayor's Office Monaca Borough Department of Public Works PATTERSON HEIGHTS/PATTERSON TOWNSHIP EMERGENCY OPERATIONS CENTER 10 11

Patterson Heights Borough Counsel Patterson Heights Borough fire Department Patterson Heights Borough Street Department Patterson Township Board of Commissions Patterson Township Emergency Management Patterson Township Police Department Patterson Township Fire Department..

POTTER TOWNSHIP EMERGENCY OPERATIONS CENTER Potter Township Emergency Medical Services Potter Township Volunteer Fire Department RACOON TOWNSHIP EMERGENCY OPERATIONS CENTER Racoon Township Board of supervisors Racoon Township Fire Department Racoon Township Police'Department, SHIPPINGPORT BOROUGH EMERGENCY OPERATIONS CENTER Shippingport Borough President of Counsel_

Shippingport BoroughMayor, SOUTH BEAVER TOWNSHIP/GLASGOW BOROUGH/OHIOVILLE BOROUGH EMERGENCY OPERATIONS CENTER, Ohioville Fire Department Ohioville Medical Officer Ohioville Medical Services Ohioville Police Ohioville Emergency Management South Beaver Township Secretary.'

South Beaver Police South Beaver Board of Supervisors South Beaver Emergency Management SOUTH HEIGHTS BOROUGH EMERGENCY OPERATIONS CENTER South Heights Borough Police Department.,

Hopewell Volunteer Fire Department VANPORT TOWNSHIP EMERGENCYOPERATIONS CENTER.

Vanport Township Board of Commissioners Vanport Township Emergency Manager Vanport Township Police Vanport Township Public Works Vanport Township Fire Department 11

Beaver Police Department PA SCHOOL DISTRICTS AND SCHOOLS Aliquippa School District Aliquippa Elementary School Beaver Area School District Beaver Area Middle School Blackhawk School District Patterson Elementary School Center Area School District Center Area Junior High School Hopewell Area School District Margret Ross Elementary School Midland borough School District, Neel Elementary School Monaca School District Monaca Elementary School New Brighton School District Ambridge School District South Side Area School District South Side Middle School Western Beaver School District Western Beaver Jr/Sr High School HANCOCK COUNTY EMERGENCY OPERATIONSCENTER Hancock County Agriculture Extension . .

Hancock County Departmentof -Health" Hancock County 911 1 Hancock County Emergency Management Agency.,

Hancock County Emergency Medical Services Hancock County Fire Services '

Hancock County Sheriffs Department Hancock County Health Department New Cumberland Police Department New Cumberland Volunteer Fire Department Oak Glen High School Hancock County School District Support Jurisdictions ALLEGHENY COUNTY EMERGENCY OPERATIONS CENTER 12 a

Allegheny County Emergency Services Allegheny County Managers Office Allegheny County Office of Behavior Health Allegheny County Parks Department Allegheny County Police Allegheny County Port Authority Allegheny County Public Defender's Office Allegheny County Sheriff's Office Allegheny County Manager Allegheny County Law Department Allegheny County Airport Authority Allegheny County Budget and Finance Department Allegheny County Council, Chair, Public Safety Allegheny County Department of Court Records Allegheny County Department of Human Services Allegheny County 911 Center Allegheny County GIS Pittsburgh Bureau of Fire Pittsburgh City Manager Pittsburgh Emergency Medical Service Pittsburgh Public Safety Moon Township Fire Department Municipality of.Monroeville ,-

University of Pittsburgh Medical Center,.

BUTLER COUNTY EMERGENCY OPERATIONS CENTER Butler County Emergency Management Agency Butler County Public Information Officer Butler County Hazmat Butler Memorial Hospital Butler County Sheriffs Office Butler County Fire Department Butler County 911 Center Cranberry Township Police Department Pennsylvania Department of Transportation LAWRENCE COUNTY EMERGENCY OPERATIONS CENTER Lawrence County Emergency Management Agency Lawrence County Board of Commissioners 13

0 Lawrence County Department of Public Safety Lawrence County Courthouse Security New Castle Fire Department" Pennsylvania Army National Guard Pennsylvania State Extension Service WASHINGTON COUNTY EMERGENCY OPERATIONS CENTER Washington County Emergency Management Washington County Information Technology Department Washington County HAZMAT Team Washington County Finance Department Washington County Department of Public Safety Washington County Department of Human Services.

0 Washington County Purchasing Department-,

Private Jurisdictions Beaver County Radio Amateur Civil Emergency Services (RACES)

Radio Emergency Associated Communications Team (Beaver Co)

Amateur Radio Emergency Service (ARES) .

American Red Cross, South West Pennsylvania Chapter.._

Salvation Army Disaster Services Troop 141, Boy Scouts of America.

Marshall University Beaver Valley Power- Station Weirton/Hancock County Citizen Corps 3.3. Exercise Timeline Table 1, on the following page, presents the times at which key events and activities occurred during the BVPS exercise on June 24, 2008. Also included are times notifications were made to the participating jurisdictions/functional entities.

14 a

Table 1 - Exercise Timeline DATE: 2008-06-24, SITE: Beaver ValleyPower Station, PA Unusual Event N/A I N/A N/A Nn/A N/A N/A N/A Alert 1625 1712 1629 1640 1639 1640 1643 Site Area Emergency 1800 1807 1805 1807 1806 1808 1806 General Emergency- 1920 1933 1925 1925 1926 1926. 1926 Simulated Rad. Release Started 1807 1809 1810 1810 N/R 2010 Simulated Rad. Release N/A N/A N/A N/A N/A N/A Terminated Facility Declared Operational 1728 1705 1651 1653 1656 1705 Declaration of State of Emergency 1815 '1815 '1905 " 1848 '1848' 1835 Exercise Terminated 2155 2104 2105 2026 .2012 2103 Early Precautionary Actions: 1846 1845 .1853 N/R N/R 1927 1st Protective Action Decision: 1846 1830 19461. 1831 1933 1843 1st Siren Activation '1840 1833 ". ________

lst EAS orEBS Message ,833 ___._ _1833 2nd Protective Action Decision: 1954 1945 1946 o-1946 1945 1950 2nd Siren Activation 1950 1946 2nd EAS or EBS Message 1946 3rd Protective Action Decision:

3rd Siren Activation 3rd EAS or EBS Message KI Administration Decision: 1954 1935 1950 1948 1950 1951 15

0 Table 1 - Exercise Timeline DATE: 2008-06-24, SITE: Beaver Valley Power Station, PA Unusual Event N/A N/A N/A N/A N/A N/A *N/A Alert 1625 1637 1642 1640 1642 1646 1641 Site Area Emergency 1800 1806 1806 1812 1813 1806 .1808 General Emergency 1920 1926 1929 1926 1927 1928, 1926 Simulated Rad. Release Started 1810 1810 2010 1956 1955 1955 Simulated Rad. Release N/A N/A N/A N/A N/A N/A Terminated Facility Declared Operational 1718 1658 1715 1710 1736 .17,26 0 Declaration of State of Emergency N/R 1835 1835 1905.,:  :'N/R 1.905.

Exercise Terminated .1. 2048 2046 2052 2030 2048-.., .2036 Early Precautionary Actions: N/R 1906 1900 N/R N/R 1909 Ist Protective Action Decision: 1840 1837 1835 1832 1836 1830 Ist Siren Activation 1st EAS or EBS Message 1947 _ ,, ,__

2nd Protective Action Decision: 1950 1947 1945 1946 1945 2nd Siren Activation 2nd EAS or EBS Message 3rd Protective Action Decision:

3rd Siren Activation 3rd EAS or EBS Message KI Administration Decision: 1947 1953 . 1954 1950 1954 .1950 0

16 a

Table 1 - Exercise Timeline DATE: 2008-06-24, SITE: Beaver Valley Power Station, PA Unusual Event N/A N/A N/A N/A N/A N/A N/A Alert 1625 1645 1640 1642 1637 1640 1645 Site Area Emergency 1800 1810 1807 1809 1806 1806 1807 General Emergency 1920 1930 1930 1930 1927 1928 1929 Simulated Rad. Release Started 1955 N/R N/R 1806 N/R N/R Simulated Rad. Release N/A N/A N/A N/A N/A N/A Terminated Facility Declared Operational I1700 1704 1713 1725 1724 1720 Declaration of State of Emeigency 1905 1859 N/R N/R 1730 1905 Exercise Terminated 2015 2050 2054 2020 2022 2028 Early PrecautionaryActions: N/R N/R N/R N/R N/R Ist Protective Action Decision: 1830 1834 1831 1832 1832 lst Siren Activation 1st EAS or EBS Message _ _ _,

2nd Protective Action Decision: 1950 1947 1945 '1946 1945 2nd Siren Activation 2nd EAS or EBS Message 3rd Protective Action Decision:

3rd Siren Activation 3rd EAS or EBS Message KI Administration Decision: 1952 1952 1952 1948 1949 *1950 17

a Table 1.- Exercise Timeline DATE: 2008-06-24, SITE: Beaver Valley Power Station, PA Unusual Event N/A N/A N/A. N/A N/A N/A N/A Alert 1625 1647 1639 1636 . 1708 1701 .1658 Site Area Emergency 1800 1807 1810 1800 .1809 1809 . 1808 General Emergency 1920 1929 1922 1929 1940. 1928k 1920 Simulated Rad. Release Started N/R 1810 .N/R 1923 1928 N/R Simulated Rad. Release N/A N/A N/A N/A N/A N/A Terminated Facility Declared Operational . 1759 .1750 1650 . 1730 1730 . 1721 0 Declaration of State of Emergency 1.816 N/R N/R ... 1-.:910 1903 . 1850 Exercise Terminated 2018. .. 2048. 2015 . 2036 2036

  • 2050 Early Precautionary Actions: 1905 N/R N/R 1902 1927 N/R Ist Protective Action Decision: 1840 1832 1840 1835. '1835 1833 1st Siren Activation Ist EAS or EBS Message ... . ..... .

2nd Protective Action Decision: 1947 1945 1947 1948 1950 1947 2nd Siren Activation 2nd EAS or EBS Message. .... .. .... ...__._"__

3rd Protective Action Decision:

3rd Siren Activation ...

3rd EAS or EBS Message .. ... ........... ___.....

  • ____ .__ ,_

KI Administration Decision: 1950 1949 1951 1950. .... 1953' 1950 0

18 0l

Table 1 - Exercise Timeline DATE: 2008-06-24, SITE: Beaver Valley Power Station, PA Unusual Event N/A N/A N/A N/A N/A N/A Alert 1625 1648 1627 1627 1627 1630 Site Area Emergency 1800 1809 1809 1809 1809 1805 General Emergency - 1920 1929 1922 1922 1922 1925, Simulated Rad. Release Started " 1939 1938 1938 1938 1805 Simulated Rad. Release N/A N/A N/A N/A N/A Terminated Facility Declared Operational . 1710 1650 1650 1650 1659 Declaration of State of Emergency . 1846 1817 1817 .. 1817 1745 Exercise Terminated 2100 2155 2155 2155 2157 Early Precautionary Actions: 1839 1833 1833 1833 1839 1st Protective Action Decision: 1821 1829 1829 1829 1830 1st Siren Activation 1829 1829 1840 1st EAS or EBS Message ... " ...... 1829 1829 1843 2nd Protective Action Decision: 1937 1938 1938 1938 1944 2nd Siren Activation 1938 1938 1950 2nd EAS or F'BS Message 1938 1938 1953 3rd Protective Action Decision: 2100 2100 2100 N/A 3rd Siren Activation 3rd EAS or EBS Message KI Administration Decision:, 1950. 1938 1938 1925 19

0

4. Exercise Evaluation and Results Contained in this section are the results and findings of the evaluation of all jurisdictions and functional entities that participated in the June 24, 2008 biennial Radiological Emergency Preparedness (REP) exercise. The exercise was held to test the offsite emergency response capabilities of local governments'in the 10-mile Emergency Planning Zone (EPZ) surrounding the Beaver Valley Power Station (BVPS).

Each jurisdiction and functional entity was evaluated on the basis of its demonstration of the exercise evaluation area criteria contained in the REP Exercise Evaluation, Methodology. Detailed information on the exercise evaluation area criteria and the extent-of-play agreement used in this exercise are found in. Appendix 3 of this report.

4.1. Summary Results of Exercisel Evaluation The matrix presented in Table, 2, onthefoillowing pages, pe'sents the -statusof the exercise evaluation area criteria from the REP Exercise Evaluation.Methodology that were scheduled for demonstration during this exercise-by all participating jurisdictionns-and functional entities. Exercise evaluation area criteria.are listed by .number and the demonstration status of the criteria is indicated by the use of the following letters::"

M Met (No Deficiency or ARCAs assessed and-no unresolved ARCAs from prior exercises)

A ARCA(s) assessed Al ARCA(s) assessed, but successfully re-demonstrated R Resolved ARCA(s) from prior exercises.

20 a

Table 2 - Summary of Exercise Evaluation (8 pages)

U DATE: 2008-06-24 SITE: Beaver Valley Power Station, PA U UI U A:ARCA, D: Deficiency, M:Met > U WL M U LL - U M C/n 2nU M EmergencyOpciations Management 7 Mobilization lal M M M M M M M M M Facilities INb Direction and Control Icl M MM M M M Communications Equipment Idl M M M M M M M M M M Equip & Supplies to support operations lel M M M M M M M M M M Emergency Worker Exposure Control 2al M Radiological Assessment and PARs 2bl Decisionis for'the PlumePhase :PADs -.-. 262 PADsfor protection of special populations .... M_2cI M

Rad Assessment and Decision making for the Ingestion Exposure Pathway 2dl Rad Assessment and Decision making concerning Relocation, Reentry, and 2el Return Implementation of emergency worker exposure' control ' 3a MM M M MM M M M M Implementation'of KI bdecision', " . -' ,3bl. M M M M MIMIM M M M Implementation of protectiveactions for special populations - EOCs 3cl M A M M M Implementation of protective actions for Schools 3c2 M Implementation of traffic and access control 3df" M M M M, Impediments to evacuation are identified andresolved

  • 3,_,_.,_3d2 'M M M M M M Implementation of ingestion t6athway decisions - availability/use of info 3el Materials for lngestion*Pathway PADs are available 3e2 Implementation of relocation, re-entry, and return decisions. 3fl Field i .  :#

Adequate Equipment for Plume Phase Field Measurements 4al M M Field Teams obtain sufficient information 4a2 M M Field Teams Manage Sample Collection Appropriately 4a3 M M Post plume phase field measurements and sampling 4bl Laboratory operations 4c I

..me. ..No... .ificati.

n a. d Public Into f .

Activation of the prompt alert and notification system., 5al 1 M M M M M1 Activation of the prompt alert and notification system - Fast Breaker 5a2 I Activation of the prompt alert and notification system - Exception areas 5a3 M M Emergency information and instructions for the public and the media-. 5bl M . M iiPpdiiOperutiuns/ffacil ,ities.

Mon/ decon of evacuees and emergency workers, and registration of evacuees 6a]

Mon / decon of emergency worker equipment 6bl Temporary care of evacuees 6c I Transportation and treatment of contaminated injured individuals 6dl 21

0 Table 2 - Summary of Exercise Evaluation (Continued. page 2/8)

© 0

DATE: 2008-06-24 SITE: Beaver Valley Power Station, PA

" U M U W) U U" A: ARCA, D: Deficiency, M: Met 0 0 Mobilization lal M M M M MM M M M M Facilities b_

IN M Direction and Control Icl M M M M_ M M M M Communications Equipment Idl M M M M M M M M M M Equip & Supplies to support operations lel M M M M M M M M M M Emergency Worker Exposure Control 2al Radiological Assessment and PARs 2bl ---

0 Decisions for the Plume Phase*:PADs* 2b2 . ..

PADs for protection of special populations 2c I . "

Rad Assessment and Decision making for the Ingestion Exposure'Pathhway. 2dl '

Rad Assessment and Decision making concerning Relocation, Reentry, and 2el'I Return . .. . .. . . ..

Protective ActionIlmplemrientation  : ,:.......

Implementation of emergency Worker exposure control 3a I M M M M M M M M M M Implementation of KI decision . . .. ..... 3 M M M M M M M M M M Implementation of protective actions for special populations - EO*Cs 3cl M M M M M M M M Implementation of protective actions for Schools 3c2 Implementation of traffic and access control ............ ....... 3di M -___" M Impediments to evacuation are identified and resolved 3d2 M M M M M M M M Implementation of ingestion pathway decisions - availability/use of info 3el Materials for Ingestion Pathway PADs are available .. 3e2 -

Implementation of relocation, re-entry, and return decisions. 3f IF-Field:Measurement: Aas

  • Adequate Equipment for Plume Phase Field Measurements' 4a" Field Teams obtain sufficient information 42 "

Field Teams Manage Sample Collection Appropriately 4a3 Post plume phase field measuremnents and sampling 4bI Laboratory operations .... 4c1 Activation of the prompt alert and notification system 5al M M M1M M M M M Activation of the prompt alert and notification system - Fast Breaker 5a2 0

Activation of the prompt alert and hotification system - Exception areas 5a3 M M Emergency information and instructions for the public and the media 5b.

Mon / decon of evacuees and emergency workers, and registration of evacuees 6a II " - "

Mon / decon of emergency Worker equipment 6bl - -.

Temporary care of evacuees 6cl Transportation and treatment of contaminated injured individuals 6dl -

22 a

Table 2 - Summary of Exercise Evaluation (Continued. page 3/8) rT DATE: 2008-06-24 < <

SITE: Beaver Valley Power Station, PA U=

A: ARCA, D: Deficiency, M: Met C) W 6 W Emergency Operatons Management Mobilization lal M M M M M M M M M Facilities INb Direction and Control Icl M M M M M M M Communications Equipment .Idl M M M M M M M M M Equip & Supplies to support operations lel M M M M M M M M M M Pi otecteAction. ecic. son a, . ,. ,

Emergency Worker Exposure Control 2al Radiological Assessment and PARs 2bl Decisions for the Plume Pha-se -PADs . 2b2 PADs for protection of special populations 2c I Rad Assessmient and Decision m-akinrg for the-Ingestion Exposure Pathway 2dl Rad Assessment and Decision making conce'rning Relocation, Reentry, and 2e1I Return Protective Action lriibIameiitation.

Implementation of emergency worker exposurecontrol .... 3al M M M M M M M M M M Implementation of KI decision - 3bl M M M M M M M M M Implementation of protective actons for special populations - EOCs 3cl M M M M M M M Implementation of protective actions for Schools- 3c2 Implementation~of traffic and-access control ". 3dl M M M Impediments to evacuation are identifiediand resolved " 3d2 M M M M M M M Implementation of ingestion pathway decisioins - availability/use of info ...... 3el Materials for Ingestion Pathway PADs are'available - 3e2 Implementation of relocation, re-entry; andreturn decisions: 3fl Adequate Equipment for Plume-Phase Field Measurements 4al Field Teams obtain sufficient information - 4a2 Field Teams Manage Sample Collection Appropriately 4a3 Post plume phase field measurements and sampling 4bl "

Laboratory operations . 4c0

  • Emergenc~y Notification and Public tnf ,, A &/( . . ,

Activation of the prompt alert and notification system 5al M M M M M M M Activation of the prompt'alert and notification system - FastBreaker 5a2 Activation of the prompt alert and notification system - Exception areas 5a3 M - M Emergency information and instructions for the' public and the media 5bl Support Operanions/Facilt !ies i*

Mon / decon of evacuees andemergencyworkers, and registration of evacuees 6al M Mon / decon of emergency worker equipment - 6b I M Temporary care of evacuees 6c I Transportation and treatment of contaminated injured individuals 16dI 23

0 Table 2 - Summary of Exercise Evaluation (Continued. page 4/8)

LL.

DATE: 2008-06-24 SITE: Beaver Valley Power Station, PA A: ARCA, D: Deficiency, M: Met 0 U 0 U 0 U U U Emergency Operations Mana>gteht Ž&1 Mobilization lal M _ M M Facilities INb Direction and Control I 'd M M M Communications Equipment Idi d _ M M M Equip & Supplies to support operations lel M M M M Emergency Worker Exposure Control 2al Radiological Assessment and PARs 2bl........

Decisions for the Plume Phase -PADs. 2b2 PADs for protection of special populations .. . 2c l Rad Assessment and Decision making for the Ingestion Exposure Pathway 2d ... ..

Rad Assessment and Decision making concerning Relocation, Reentry, and 2eI Return .

Protective Action Imptementation Implementation of emergency-Worker exposure control 3al"M . M M Implementation of KI decisi6n , 3bl Implementation of protective actions for special populations - EOCs 3 .

Implementation of protective actions for Schools "-3c2 .

Implementation of traffic and access control 3dI Impediments to evacuation are identified and resolved ........ ... 3d2. . ..

Implementation of ingestion-pathway decisions - availability/use of info 3el Materials for Ingestion Pathway PADs are available 3e2 Implementation of relocation, re-erntt, and return decisions. 3f1`

Adequate Equipment for'Plumie Phase Field Measurements 4a..........

Field Teams obtain sufficient information 4a2 Field Teams Manage SampleCollection Appropriately .. 4a3 Post plume phase field measurements and sampling 4b" Laboratory operations ".. 4c I Activation of the prompt alert and notification system 5al Activation of the prompt alert and notification system - Fast Breaker 5a2 Activation of the prompt alert and *notification system - Exception' areas 5a3-.. . . a Emergencv information and instructions for the public~ahd the media " '"'5bl '

Mon / dlecon of evacuees and emergency workers, and registration of evacuees" 6al'M M M M M Mon / decon of emergency worker equipment " "6bl M . ,1,.......

Temporary care of evacuees 6c. ......... M M Transportation and treatment of contaminated injured individuals " 6dl I 24 a

Table 2 - Summary of Exercise Evaluation (Continued. page 5/8)

DATE: 2008-06-24 SITE: Beaver Valley Power Station, PA U.

A: ARCA, D: Deficiency, M: Met U Lon Emergenicy 01r)ion-Managment Mobilization lal M Facilities INb Direction and Control Idc M Communications Equipment IdI M Equip & Supplies to support operations lel M ProtcieAcitionDecisionmaking ~ ~ ~ < V _____

Emergency Worker Exposure Control 2al Radiological Assessment and PARs 2bl Decisions for the Plume Phase -PADs . 2b2 PADs for protection of special populations 2c I Rad Assessment-and Decision making foi the Ingestion Exposure Pathway 2dl Rad Assessment and Decision making concerning Relocation, Reentry, and 2el Return ,t Implementation of emergency worker exposure control 3al M M Implementation of KI decision 3bI Implementation of protective actions for special populations - EOCs 36 Implementation bf protective actions for Schools 3c2 M M M Implementation of traffic and access-control

  • 3d1 Impediments to evac'uation are identified and resolved 3d2 Implementation of ingestion pathway decisions - availability/use of info
  • 3el Materials for Ingestion Pathway PADs are available . 3e2 -

Implementation of relocation, re-entry; and return decisions. 3f I Adequate Equipment for-Plume Phase Field Measurements 14a I Field Teams obtain sufficient information 4a2 Field Teams Manage SampleCollection Appropriately . 4a3 .

Post plume phase field measurements and sampling. 4bi Laboratory operations 4cl Activation of the prompt alert and notification system 5al Activation of the prompt alert-and-notification system - Fast Breaker 5a2 Activation of the prompt alert and notification system - Exception areas 5a3 Emergency information and instructions for the public and the media Suppoirt Operatdons/Facilities -,,- i "

5b I T_

Mon / decon of evacuees~and-emergency workers, and registration of evacuees 6al M MI M M Mon / decon of emergency wbrker equipment ." 6bl Temporary care of evacuees 6c I M M Transportation and treatment of contaminated injured individuals 6d1 25

Table 2 - Summary of Exercise Evaluation (Continued. page 6/8)

DATE: 2008-06-24 SITE: Beaver Valley Power Station, PA U A: ARCA, D: Deficiency, M:Met < < <

Emergenc, Operations Managemet .c, ..

Mobilization lal Facilities INb Direction and Control Idc1 Communications Equipment . .. Id1 Equip & Supplies to support operations lel Protective Acion DecisionMakini: g ..  : . .. I J'  ;. I >, ,:

Emergency Worker Exposure Control 2al Radiological Assessment and PARs 2bl Decisions for the Plume Phase -PADs 2b2 PADs for protection of special populations 2c I6 Rad Assessment and Decision making for the Ingestion Exposure Pathway 2di 0

Rad Assessment and. Decision making concerning Relocation; Reentry, and 2el Return . . .

Implementation of emergency worker exposure control. 3al Implementation of KI decision 3bL..

Implementation of protective actions for special populations.- EOCs 3cl "

Implementation of protective actions for Schools .3c2; M M.M M M M.M' M M M Implementation of traffic and access control 3d1 -

Impediments to evacuation are identified and resolved,. .. 3d2 Implementation of ingestion pathway'decisions.- availability/use of info . .. ,.. 3el . ..... .

Materials for Ingestion Pathway PADs are available ............ 3e2 ....

Implementation of relocation, re-entry. and return decisions..... - '. . 3f I' ' "

Adequate Equipment for Plume.Phase Field Measurements . .. ' . 4af ' "-

Field Teams obtain sufficient information ............ 4a2 .. ... ....

Field Teams Manage Sample Collection Appropriately ..........  :. 4a3 .

Post plume phase field measurements and sampling 4bi .

Laboratory operations ... . . .. . ... 4c I Activation of the prompt alert and notification system ..... 5al Activation of the prompt alert and notification system - Fast Breaker' 5a2 Activation of the prompt alert and notificationf system - Exception.areas 5a3 Emergency information and instructions for the public and the media' . '. 5bl 40 Mon / decon of evacuees and emergency workers, and registrationof evacuees . 6al.

Mon / de'con of emergency worker equipment . 6bl Temporary care of evacuees 6c 1 Transportation and treatment of contaminated injured individuals " . 6dl 26 61

Table 2 - Summary of Exercise Evaluation (Continued. page 7/8)

DATE: 2008-06-24 SITE: Beaver Valley Power Station, PA () w (

A: ARCA, D: Deficiency, M: Met L>

EmnergencyOperations Management .:

Mobilization lal M M Facilities INb Direction and Control icI M M Communications Equipment ldl M M Equip & Supplies to support operations lel M M Protecuive-ctimon Decosion Making . .  :

Emergency Worker Exposure Control . 2al M . M Radiological Assessment and PARs 2bl ,M M Decisions for the Plume Phase -PADs 2b2 M PADs for protection of special populations 2clI M Rad Assessment and Decision making for the Ingestion Exposure Pathway 2dl Rad Assessment and Decision making concerning Relocation, Reentry, and,, 2el Return Protectlive Act ion Irhplernentation Implementation of emergency worker exposure control 3al',

Implementation of KI decision 3b1 M Implementation of protective actions for special populations - EOCs 3c1 Implementation of.protective actions for Schools 3c2 M M M M M M M Implementation of traffic and access control 3dl Impediments to evacuation are identified and resolved 3d2 Implementation of ingestion pathway decisions- availability/use of info. 3ef Materials for Ingestion Pathway PADs are available 3e2 Implementation of relocation, re-entry, and return decisions.. .. 3f I Fielid Measrement and A 'Srr nila\>

Adequate Ejuipment for Plume Phase Field Measurements 4al..

Field Teams obtain sufficient information 4a2' M Field Teams Manage Sample Collection Appropriately .. 4a3 Post plume phase field measurements'and sampling 4bi Laboratory operations 4cl' Emerget*cy: Notificatida la . :::Public*'

Activation of the prompt alert and notification system 5a1,,

Activation of the p*rompt alert and notification system - Fast Breaker 5a2, Activation of the prompt alert and notification system - Exception areas. 5a3 Emergency information and instructions for the-public and the media 5bl . M M Supprt6 erations&iýdaw2,K ~<

Mon/ decon of evacuees andemergency workers, and registration of evacuees 6ai Mon / decon'of emergency worker equipment 6bl Temporary care of evacuees 6c1 Transportation and treatment of contaminated injured individuals .... 6dl 27

Table 2 - Summary of Exercise Evaluation (Continued. page 8/8)

UU DATE: 2008-06-24 ". z SITE: Beaver Valley Power Station, PA , U U U U U U U U U Emergency Operations Managiement Mobilization lal M M _

Facilities IbI Direction and Control I I M Communications Equipment Idl M M M M Equip & Supplies to support operations let M MM M M Protective Action Decision Ming Emergency Worker Exposure Control 2al M M.

Radiological Assessment and PARs 2bl Decisions for the Plume Phase -PADs " 2b2 0 PADs for protection of special populations .2c I M Rad Assessmentand Decision making for the Irngestion Exposurr Pathway. 2dl Rad Assessment and Decision making concerning Relocation, Reentry, and .2el "

Return Protective-Action tImplementtion ~>

Implementation of emergency worker exposure control, 3al- -,M M M M, M -M M.

Implementation of KI decision 3bi M M M M Ihmplementation of protedjive~actions for special populatiojis- EOCs " 3c1 M Implementation of protective-actions for Schools -3c2 M, M M Implementation of traffic and access control 3d . M M Impediments to evacuation are identified and resolved '3d2 M M Implementation of ingestion pathway decisions - availability/use of info 3el Materials for Ingestion Pathway PADs are available 3e2 Implementation of relocation, re-entry. and return decisions. 13f1 FeldMeasurement andAnalysis-:Jj-*, . ....

Adequate Equipment for Plume Phase Field Measurements. 4a: M Field Teams obtain sufficient information 4a2 M.

Field Teams Manage Sample Collection Appropriately 4a3 M Post plume phase field measurements and sampling 4bl Laboratory operations - 4c I Emergency Notifiiata u I.... ....

Activation of the prompt alert and notification system 5al M Activation of the prompt alert and notification system - Fast Breaker 5a2 Activation of the prompt alert and notification system - Exception areas 5a3 M 0 Emergency information and instructions for the public and the media 5b1 M Mon / decon of evacuees and emergency workers, and registration of evacuees 6al M7 M M Mon / decon of emergency worker equipment 6b I M Temporary care of evacuees 6c" M Transportation and treatment of contaminated injured individuals 6dl 28 61

4.2. Status of Jurisdictions Evaluated B. Status of Jurisdictions Evaluated This subsection provides information on the evaluation of each participating and functional entity in a jurisdiction-based, issues-only format. Presented below are definitions of the terms used in this subsection relative to criteria demonstration status.

Met - Listing of the demonstrated exercise evaluation area criteria under which no Deficiencies or ARCAs were assessed during this exercise and under which no ARCAs assessed during prior exercises remain unresolved.

Deficiency,- Listing of the demonstrated exercise evaluation area criteria under which one or more Deficiencies Were Assessed during this exercise. Included, is a description of each Deficiency and recommended corrective actions.

Area Requiring Corrective Action - Listing of the demonstrated exercise evaluation area criteria under which one or more ARCAs were assessed during the cUrrent exercise.

Included is a description of the ARCAs assessed during this, exercise, and the recommended corrective actions to be demonstrated before or during-the next biennial exercise.

Not Demonstrated - Listing ofthe exercise evaluation area criteria that were scheduled to be demonstrated during this exercise, but were not demonstrated andthe reason they were not demonstrated. .

Prior ARCAs - Resolved - Descriptions of ARCAs assessed during previous. exercises that were resolved in this exercise and the corrective actions demonstrated.

Prior ARCAs - Unresolved - Descriptions of ARCAs assessed during prior exercises that were not resolved in this exercise. Included are the reasons the ARCAs remain unresolved and:recommended corrective actions to be demonstrated before or during the next biennial exercise.

The following are definitions of the two types of exercise issues that are discussed in this report.

A Deficiency is defined in the FEMA-REP-14 as "...an observed or identified inadequacy 29

0 of organizational performance in an exercise that could cause a finding that offsite emergency preparedness is not adequate to provide reasonable assurance that appropriate protective measures can be taken in the event of a radiological emergency to protect the health and safety of the public living in the vicinity of a nuclear power plant."

An ARCA is defined in the FEMA-REP-14 as "...an observed or identified inadequacy of organizational performance in an exercise that is not considered, by itself, to adversely impact public health and safety."

The Federal Emergency Management Agency (FEMA) has developed a standardized system for numbering exercise issues (Deficiencies and ARCAs).This System is used to achieve consistency in numbering exercise issues among FEMA Region, and site-specific exercise reports within each Region. It is also used to expedite tracking of exercise issues on a nationwide basis.

The identifying number for Deficiencies and ARCAs includes the following"elements,l with each element separated by a hyphen (-).

Plant Site Identifier - A two-digit number corresponding to the Utility Billable'Plant Site Codes. "

Exercise Year - The last two digits of the year.the exercise was conducted.

Evaluation Area Criterion - A letter and number corresponding to the criteria in the FEMA REP'Exercise Evaluation Methodology.

Issue Classification Identifier - (D = Deficiency, A = ARCA). Only Deficiencies and ARCAs are included in exercise reports.

Exercise Issue Identification Number - A separate two digit indexing number assigned to each issue identified in the exercise.

30

4.2.1. State Jurisdictions 4.2.1.1. Beaver Valley Joint Public Information Center

a. MET: 5.b.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.1.2. PA State Field Monitoring Team A, South West Region,  ;, .,, ,.
a. MET: 1.a.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 4.a.1, 4.a.2, 4.a.3.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES t-UNRESOLVED: None 4.2.1.3. PA State' Field Monitoring Team B, South West Region
a. MET: :1.a.1, 1.d.1, 1.e.1, 3.,a.1, 3.b.1, 4.a.1, 4.a.2, 4.a.3.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None'
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.1.4. Commonwealth of Pennsylvania State Traffic/Access Control Points 31
a. MET: 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.d.1, 3.d.2.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.1.5. State of West Virginia Emergency Operations Center
a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 2.a.1, 2.b.1, 2.b.2, 2.c.1, 3.b.1, 5.b.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES -RESOLVED: None
f. PRIOR ISSUES'- UNRESOLVED: None' 4.2.1 .6. West Virginia Public Information Center
a. MET: 1.a.1, 5.bA1.
b. AREAS REQUIRING CORRECTIVE ACTION:,None
c. DEFICIENCY: None
d. NOTDEMONSTRATED: None
e. PRIOR ISSUES,-RESOLVED: None.
f. PRIOR!ISSUES, UNRESOLVED: None -

4.2.1.7. West Virginia Accicent Assessment Center

a. MET: 1.c.1, 1.d.1, 1.e.1, 2.a.1., 2.b.1, 4.a,2.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None,
e. PRIOR ISSUES - RESOLVED: None.
f. PRIOR ISSUES - UNRESOLVED: 2.a.1.

ISSUE NO.: 03-06-2a1-P-02 -

ISSUE: The exposure control system in place for West Virginia is confusing 32 a

and inconsistent and does not list exposure limits in the proper units. There is also no information concerning the limits for declared pregnant Workers.

While the present system does give the reporting succession for worker exposures, it does not explicitly name who may authorize exposures above the established limits.

The guidelines are visually confusing: there is a table of "exceptions" that appears, at first glance, to list the exposure limits. The statement above the table "the PAG for all Emergency Workers (EWs) is 5 Rem, except for the following:" is easily overlooked. The instructions about which EWs are allowed up to 25 Rem while inside the plume exposure EPZ is unclear (specific job functions would, be helpful). There is no information concerning limits for declared pregnant workers.

The limits are listed in "Rem" without any indication on how this value is determined. The direct-reading dosimeters (DRDs) have units of R (exposure), not Rem (dose). The limits given are the normal dose limits (total effective dose equivalent (TEDE), which is the sum of the effective dose

equiivalent (EDE) fr6m external e*p6sure anid the committed effective dose equivalent (CEDE) from inhalation of contaminated air). DRDs can only measure the EDE portion of the TEDE. Initially, West Virginia personnel assume that there is no dose from inhalation of contaminated air (i.e., there are only noble gases in the release, no radioiodines and no particulates). If Beaver Valley Power Station dose-assessment personnel provide information about the EDE/TEDE ratio being something other than 1,-thena new limit based on this ratio is calculated (this calculation is not proceduralized). For releases that have a significant non-noble gas component over a short' duration, this method' could result in an actual dose higher than the 5 Rem dose limit before the new limit'could be determined.

REASON UNRESOLVED: The State of West Virginia Emergency Response Plan, Annex 15, dated April 2008, contained pre-authorized exposure (turn-back) levels for various categories of EWs, whichare one half of the dose limits for each category listed in a chart on page 15-19. The turn - back levels were stated in rems rather than Roentgens as they should be to properly reflect units recorded by Direct Reading Dosimeters (DRD). The dose limits contained in the Chart did not reflect the most recent recommended PAGS for emergencyworkers contained in USEPA Guidance in that they exceed 5 33

rem for 2 categories of EW who are not specifically tasked with life saving duties or the protection of valuable property.

4.2.1.8. West Virginia Field Air Monitoring Team

a. MET: 1.a.1, 1.d.1, 1.e.1, 2.a.1, 3.a.1, 3.b.1, 4.a.1, 4.a.2, 4.a.3.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: 4.a.3.

ISSUE NO.: 03-06-4a3-P-04.....

ISSUE: The West Virginia Field Monitoring Team Procedure details the collection, counting analysis, and reporting of air samples, however some information is missing and some actions should more properly be ,performed either at the Hancock ,County. Emergency Operation Center (HCEOC) or the West Virginia State Operations.Center,(WVSEOC).

The procedure does not include taking ambient radiation surveys during air sample collection.

The procedure does require that the Field Monitoring"Team (F4M-T)'collect the sample, move to a background area, purge the sample, count the cartridge and filter separately calculating the air concentration and then reporting the count rate and concentration data to the response Team Leadedr'(RTL) at the' HCEOC. The RTL then communicates thiis to the WVSEOC.

CORRECTIVE ACTION DEMONSTRATED: During the time that the air sample was being drawn, the ambient radiological conditions in the area were being continuously monitored.:When'asked, the Field Team member correctly stated that this was to determine any changes in the ambient radiological conditions that may affect the airsample."However, contrary to the state response above, the procedure has not been revised to reflect this action. The affected procedure is the "West Virginia Field Monitoring Team 34 40

Standard Operating Procedure", dated June, 2008.

West Virginia OES provided the updated West Virginia Field Monitoring Team Standard Operating Procedures" Revision 6-B, dated September 2008, which contains instructions to conduct continuous ambient radiological surveying for safety.

f. PRIOR ISSUES - UNRESOLVED: 4.a.2.

ISSUE NO.: 03-06-4a2-P-05 ISSUE: The Response Team Leader (RTL) for WV at the Hancock County Emergency Operations Center (EOC) did not comm'jnicate wind direction/speed or release time.

- REASON UNRESOLVED: Data provided to the Hancock County Emergency Operations Center was th'rough, Controller inject, as this was an out of sequence'exercise outlined'in the Extent of Play agreement. However, since this was an out of seqbuence event, implementation of the recommendations above could not be completely demonstrated.

4.2.2. Risk Jurisdictions 4.2.2.1 Beaver County Emergency Operations Center

a. MET:. 1.a.i,.1.c.1, 1.d.1, 1.e.1,2.a.1, 2.c.1,3.a.1, 3.b.1, 3.c.1, 3.c.2, 3.d.1, 3.d.2, 5.a.1,:5.b.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None 35
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.2. Aliquippa Emergency Operations Center
a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.d.2, 5.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: 3.c.1.

ISSUE NO.: 03-08-3cl-A-01 ISSUE: PADs are implemented for'special population groups within. areas subject to protective actions. (NUREG-0654, E.7., J.9., 1O.c.d.e.g)..

CONDITION: The Communications Officer did not~notify Special Needs Facilities in the city at the Alert ECL, as specified in' the plan, nor did'the Emergency Management Coordinator ensure thatthis had been-done until later than the plan specifies. .

POSSIBLE CAUSE: Lack of familiarity with plans and not using procedures in the plan.

REFERENCE:

City of Aliquippa Emergency Operation Plan

  • SOP C, Emergency Management Coordinator, page 0-7, 7th itemr "Attachment C-2, SOP, SectionW C.2.3, Alert; page :C-20, bullet 12 -

" Section C.2.4, SAE, page.C 21, b'ullet.7.',

  • SOP D, Communications Service Officer, Page D-3, first item-.`.-.

- Attachment D-3, Section D.3.3, bullet 12.

  • Notification and Resource Manual EFFECT: If Special Needs facilities are not notified early there may not be adequate resources to implement an evacuation protective action that might occur.

RECOMMENDATION: Emergency workers should be trained to become familiar with and utilize their plans and procedures..

Schedule of Corrective Actions: PEMA comments, "All.municipal plans and procudures have been rewritten and clearly deliniate that the county has primary responsibility for notifying special needs population facilities and the 36 a

municipalities must verify that this has occurred after each escalation at the plant. This will be demonstrated during the next biennial exercise."

c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.3. Beaver Borough Emergency Operations Center
a. MET: 1.a.1,,1.c.1, 1.d.1, 1.e.1,.3.a.1, 3.b.1, 3.c.1, 3.d.1, 3.d.2, 5.a.1.

b.. AREAS REQUIRING CORRECTIVE ACTION: None

c. DEFICIENCY: None,
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: Nope, 4.2.2.4. Beaver County, Beaver Borough, Back-up Route Alerting
a. MET:. 1.a.1, 1.d:3,.1.e.1, 3:a.1, 3.b:1,, 5.a.3.
b. AREAS REQUIRING CORRECTIVE ACTION.: None
c. DEFICIENCY.:-None -
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None*
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.5. Bridgewater/Fallston Emergency Operations Center
a. MET: 1.a.1, 1'.c.1, 1.d.1, 1.e.1', 3.a.1,3.b.1, 3.c.1, 3.d.1, 3.d.2, 5.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None 37
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.6. Brighton Township Emergency Operations Center
a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.2, 5.a.l.
b. AREAS REQUIRING CORRECTIVE'ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 0

4.2.2.7. Beaver County, Brighton Township, Back-up Route Alerting

a. MET: 1.a.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 5.a.3.
b. AREAS REQUIRING CORRECTIVE ACTION: ..5a.3.

ISSUE NO.: 03-08-5a3-A-04 ISSUE: Activities associated with FEMA approved exception areas are completed within 45 minutes following the initial decision by authorized offsite emergency officials to notify the public of an stuation. Backup semergency A&N of the public is completed-within 45 minutes following the detedtion by the ORO of a failure of the primary A&N system. (NUREG-0654, E.6.,

Appendix 3.B.2.c)

CONDITION: The route alerting team did not run the route in the sector in which the siren failed to sound.

POSSIBLE CAUSE: Supervisory personnel in both the' EOC and in the Fire House where route alerting teams were staged, Were apparently so focused on demonstrating supplemental routes, they were inattentive when Beaver County reported that Siren 36 had failed and the Sector 2 routes should be run.

REFERENCE:

NUREG-0654 Appendix 3; B.2.c; E.6 38 0

Brighton Township Emergency Operations Plan, Attachment F-i, "Public Alert/Notification and Route Alerting," pp. F-10-1 1 Brighton Township Route Alert Checklist EFFECT: Failure to promptly notify residents in the event of a siren failure would delay their tuning in to their EAS station to obtain protective action instructions, thereby potentially placing them at risk.

CORRECTIVE ACTION DEMONSTRATED: Route alerting in Sector 2 was demonstrated at General Emergency by two vehicles, completing the routes, and all required procedures, in 45 minutes, thereby resolving this issue.

c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.8. Center Township Emergency Operations Center, . .
a. MET: 1.a.1, .1c.1, 1.d.1, 1.e.1, 3.a.:1, 3.b.1, 3.c.1, 3.d.1, 3.d.2,5.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: 3.b.1.

ISSUE NO.: 03-06-3bl-P-O1 ISSUE: At 1959, emergency workers at the Center Township Emergency Operations Center (CTEOC) were directed by the Beaver County EOC through PMARS radio to take potassium, iodide (KI). All personnel in the EOC were aware of this Precautionary Protective Action, but only the' Radiological Service Officer and his Deputy recorded an entry in their "EPP EVENT LOG." Thus, there is no record that Police Officers in the field at TCP/ACP locations, or Fire/Rescue personnel. in the field, providing route alerting and evacuation assistance were directed to ingest their provided KI.

39

a CORRECTIVE ACTION DEMONSTRATED: Center Township Emergency Operations Center sucessfully demonstrated this criterion during the 24 June 08 Plume Exercise. Beaver County and it's constituant jurisdiction emergency operations centers employ a web-based communications system

("Knowledge Center") to relay directions, request resources, and confirm information. The log of the Center Township EOC indicates that at the General Emergency the EOC notified field personnel that the consumption of Potassium Iodide was directed.

.,f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.9. Chippewa Township Eme gency Operations Center

a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.2, 5.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.10. Beaver County, Chippewa.Township, Back-,up Route. Alerting
a. MET: 1.a.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 5.a.3..
b. AREAS REQUIRING CORRECTIVE ACTION:- 5.a.3.,

ISSUE NO.: 03-08-5a3-A-05 ISSUE: Activities associated with FEMA approved exception areas are completed within 45 minutesfollowing the initial decision by authorized offsite emergency officials to notify the public of an emergency situation. Backup A&N of the public is completed within 45 minutes following the detection by the ORO of a failure of the primary A&N system. (NUREG-0654, E.6.,

Appendix 3.B.2.c) 40 a

CONDITION: 45 minute timeframe allowed for back up route alerting caused by a failed siren was not met.

  • POSSIBLE CAUSE: There was a misunderstanding between the EOC fire personnel and the fire personnel located at the fire station as to who would dispatch staff to perform the route alert function.

REFERENCE:

NUREG-0654, E.6, Appendix 3.B.2.c.

EFFECT: Since siren #137 failed.to sound, a number of residents may have not been informed of the emergency at Beaver Valley Power Station.

CORRECTIVE ACTION DEMONSTRATED: This issue Was resolved by a successful re-demonstration at General Emergency (GE).

c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.11. Frankfort Springs Borough, Hanover Township, Georgetowhnborough, Greene Township, Hookstown Borough Emergency Operatibns Center
a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.2, 5.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.12. Independence Township Emergency Operations Center 41
a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.C.1, 3.d.2, 5.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.13. Industry Emergency Operations Center
a. MET: 1.a.1, 1.b.1,,1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.2,.5.a.]. .
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None .
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.14. Hopewell Township Emergency Operations
Center,
a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.2, 5.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.15. Beaver County, Hopewell Township, Back-up Route Alerting
a. MET: 1.a.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 5.a.3.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 42 0

4.2.2.16. Midland Emergency Operations Center

a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.,3a1, 3.b.1, 3.c.1,3.d.2,5.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.17. Monaca Emergency Operations Center
a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.1, 3.d.2, 5.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None.
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.18. Beaver County, Monaca Back-up Route Alerting
a. MET: 1.a.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 5.a.3.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.19. Patterson Heights/Patterson Township Emergency Operations" Center
a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.1, 3.d.2,5.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 43

0 4.2.2.20. Beaver County, Patterson Township, Back-up Route Alerting

a. MET: 1.a.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 5.a.3.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.21. Potter Township Emergency operations Center
a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.2,5.a.1.
b. AREAS REQUIRING CORRECTIVE. ACTION: ýNone;
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.22. Raccoon Township Emergency Operations Center
a. MET: 1.a.1, 1:C.1, 1.d.1,"1.e.1, 3.a.1, 3.b.i, 3..1,cI3.d.l, 3.d.2', 5.a.1.'
b. AREAS REQUIRING CORRECTIVEACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None "
f. PRIOR ISSUES - UNRESOLVED: None" 4.2.2.23. Shippingport Emergency Operations Center
a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.1,3.d.2,5.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None 44 0
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.24. South Beaver/Ohioville/Glasgow Emergency Operations Center
a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1,:3.b.1, 3.c.1, 3.d.2,5.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.25. South Heights Emergency Operations Center
a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1,3.a.1,3.b.1,3,c.1,3.d.2,.5.a.1..
b. AREAS REQUIRING CORRECTIVE ACTION:.3.a.1.

ISSUE NO.: 03-08-3a1-A-06 ISSUE: OROs issue appropriate dosimetry and procedures, and manage radiological exposure to emergency workers lAW plans andprocedures.

Emergency workers periodically and at theend of each mission read and record dosimeter reading. (NUREG-0654, K.3)

CONDITION: The South Heights Borough Radiation Officer confused the requirements for wearing Self Reading Dosimeters with those for wearing Permanent Record Dosimeters. He stated all emergency workers were required to wear the SRDs and only one in three was required to wear the PRD.

POSSIBLE CAUSE: The South Heights Borough Radiation Officer did not reference his procedures during the emergency worker briefing.

45

0

REFERENCE:

NUREG 0654, K.3.a -

EFFECT: A permanent record of radiation exposure would not be available for the emergency worker(s).

CORRECTIVE ACTION DEMONSTRATED:.The Radiation Officer should use his check sheets when briefing emergency workers.

Corrective action demonstrated.

c. DEFICIENCY: None 2
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES -.UNRESOLVED: None 4.2.2.26. Vanport Emergency Operations Center
a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.c.1, 3.d.2, 5.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None.,
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None. - - -, -
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.27.-Beaver'County Emergency Worker Monitoring and Decontamination Station, Beaver Falls E*
a. MET: 1.e.1,3.a.1, 6.a.1, 6.b.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED:None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 46' 01

4.2.2.28. Beaver County Emergency Worker Monitoring and Decontamination Station South Beaver Township Fire Department

a. MET: 1.e.1, 3.a.1, 6.a.1, 6.b.1.
b. AREAS REQUIRING CORRECTIVE ACTION: 6.a.1, 6.a.1.

ISSUE NO.: 03-08-6a1-A-02 ISSUE: Reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers.

(NUREG-0654, J.10.h., K.5.b)

CONDITION: On Wednesday,- May 14, 2008 at 1900, a South Beaver Fire Department (SBFD) emergency worker (EW), while performing the operational check of a Ludlum Model 2241-3 survey meter procedure, failed

'to clear the alarm'duringthe source check.

POSSIBLE CAUSE: "Inadequate'training in radiological monitoring equipment checks.

REFERENCE:

NUREG-0654, K.5.a.

South Beaver Fire Department Radiological Emergency Worker Decontamination Station Procedure, Attachment'3 (Radiological Monitoring Equipment Check), secti0on: IV'.B. 10) (page 18)

EFFECT: If the audible alarm is not reset following operational check of the survey meter, it is possible that the monitor may not note visually if an area being surveyed equals or exceeds 300 counts per minute which indicates contamination.

CORRECTIVE ACTION DEMONSTRATED: The operational check was stopped and the EW was retrained on the procedure. The training was completed at 1910. At 1912, the survey meter was successfully operationally checked. No further action is required.

47

0 ISSUE NO.: 03-08-6a1-A-03 ISSUE: Reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers.

(NUREG-0654, J.10.h., K.5.b)

CONDITION: On Wednesday, May 14, 2008, at 1930, the South Beaver Fire Department (SBFD) monitor performingla thyroid survey of an emergency worker (EW) using a Ludlum Model 2241-3 survey meter failed to change from the Ludlum Model 44-9-probe to the Ludlum Model 44-2probe and performed the survey using the window side of the Ludlum Model 44n-9 probe.

POSSIBLE CAUSE: Inadequate training in radiological surveying procedures.

REFERENCE:

NUREG-0654, K.5.a.

South Beaver Fire Department Radiological Emergency Worker Decontamination Station Procedure, Attachment 4 (Surveying and Decontamination Procedures), Sectin ,V.B'.

EFFECT: By using the Ludlum Model 44-9 probe; the readingmay be higher than the correct value due to the lack of probe shielding": This could-result in a reading greater than 0.1 mR/hr above background andwould necessitate referring the individual to a medical- facility for further evaluation.' With the proper probe (Ludlum Model 44-2)ý such an evaltuation maynrot be necessary.

CORRECTIVE ACTION DEMONSTRATED: Between Wednesday, May 14, 2008 and Monday June 23, 2008, the piocedure for thyroid s6rvey was revised and the EWs were retrained. On Monday, June 23, 2008, between 1852 and 1902, the procedure was successfully redemonstrated. No further action is required.

c. DEFICIENCY: None
d. NOT DEMONSTRATED: None 48 61
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED- None 4.2.2.29. Aliquippa School District
a. MET: 3.c.2.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES -UNRESOLVED: None 4.2.2.30.. Aliquippa Elementary School.
a. MET: 3'c.2.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEb ICIENCY: None'"'-'
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.31. Beaver Area: School Distirct
a. MET: 3.c.2.

b., AREAS REQUIRING CORRECTIVE ACTION: None.

c. DEFICIENCY: None.
d. NOT DEMONSTRATED: None.
e. PRIOR ISSUES - RESOLVED:.None,..
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.32. Beaver Area Junior Senior High School
a. MET: 3.c.2.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 49

a 4.2.2.33. Blackhawk School District

a. MET: 3.c.2.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED!: None 4.2.2.34. Patterson Primary.School
a. MET: 3.c.2.'
b. AREAS REQUIRING CORRECTIVE ACTION:,None ,,.
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES- RESOLVED: None-,
f. PRIOR ISSUES - UNRESOLVED: None,"

4.2.2.35. Center Area School District.- K'.,"

a. MET: 3.c.2.
b. AREAS REQUIRING CORRECTIVE ACTION:"None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None,
f. PRIOR ISSUES- UNRESOLVED:: None' 4.2.2.36. Center Area JuniorHigh School;. Center Area School District
a. MET: 3.c.2.
b. AREAS REQUIRING CORRECTIVE ACTION: None,
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 50 0

4.2.2.37. Hopewell Area School District

a. MET: 3.c.2.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.38. Margaret Ross Elementary School
a. MET: 3.c.2.
b. AREAS REQUIRING.CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None,
f. PRIOR ISSUES - UNRESOLVED: -None..,

4.2.2.39. Midland. 'Borough, School District-.

a. MET: 3.c.2.
b. AREAS REQUIRING CORRECTIVE ACTION:None,
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None:,
f. PRIOR ISSUES - UNRESOLVED:ýNone.

4.2.2.40. Neel .Elementary School

a. MET: 3.c.2.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.41. Monaca School District 51.

0

a. MET: 3.c.2.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.42. Fifth Ward Elementary School,. Monaca School District
a. MET: 3.c.2.
b. AREAS REQUIRING CORRECTIVE ACTION:,None. 0
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None ...
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.43. New Brighton, School, District.
a. MET: 3.c.2.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None ..
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.44. Ambridge Area School District
a. MET: 3.c.2.

0

b. AREAS REQUIRING CORRECTIVE ACTION: None:
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.45. South Side Area School District 52 0
a. MET: 3.c.2.
b. AREAS REQUIRING CORRECTIVE ACTION: None C. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.46. South Side Middle School
a. MET: 3.c.2.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.47. Western Beaver Schools
a. MET: 3.c.2.
b. AREAS REQUIRING CORRECTIVE'ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.48. Western Beaver Jr/Sr High School
a. MET: 3.c.2.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.49. Hancock County Emergency Operations Center 53

0

a. MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 2.a.1, 2.c.1, 3.a.1, 3.b.1, 3.c.1, 3.c.2, 3.d.1, 3.d.2, 5.a.1, 5.b.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.50. Hancock County Traffic and Access Control, County Court House
a. MET: 1.d.1, 1.e.1, 3.a.1, 3.b.1, 3.d.1, 3.d.2. 0
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None"
e. PRIOR ISSUES- RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED1 None, . .

4.2.2.51. Hancock County Back'-upRoute Alerting, Oakland Fire Department- ..

a. MET: 1.d.1, 1.e.1,3.a.1,3.b.1,5.a.3.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: NKone:

0 4.2.2.52. Hancock County Reception Center, weir High School Complex

a. MET: 3.a.1, 6.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None 54 01
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.53. Hancock County Monitoring and Decontamination Center, Weir High School Complex
a. MET: 3.a.1, 6.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None'.

4.2.2.54. Hancock CoUnty Mass Care Center, Weir High School Complex

a. MET: 1.e.1, 6.c.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None'
c. DEFICIENCY: None d.; NOT DEMONSTRATED: None -
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None.'

4.2.2.55. Hancock County Emergency Worker Monitor and Decontamination Statiohn, -New Cumberland Fire Department..-

a. MET: 3.a.1, 6.a.1, 6.b.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES -.RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None.

4.2.2.56. Hancock County School District 55

0

a. MET: 3.c.2.
b. AREAS REQUIRING CORRECTIVE ACTION: None C. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.2.57. Oak Glen High School, Hancock County School District
a. MET: 3.c.2.
b. AREAS REQUIRING CORRECTIVE ACTION: None 0
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES- RESOLVED: None
f. PRIOR ISSUES - UNRESOLV'ED: Noneb 4.2.3. Support Jurisdictions 4.2.3.1. Allegheny County Emergency Opera tions Center
a. MET: 1.a.1,1.c.1,1.d.1,1.e.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None '
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None 0
f. PRIOR ISSUES - UNRESOLVED:' None 4.2.3.2. Allegheny Co Reception Center. South Park Fair Grounds
a. MET: 6.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None, C. DEFICIENCY: None 56 0
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.3.3. Allegheny County Monitoring and Decontamination Center, South Park Fair Grounds
a. MET: 3.a.1, 6.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES- RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.3.4. Allegheny Co Mass Care Center, South

.Park High School

a. MET: 6.c.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED:'None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.3.5. Butler County Emergency Operations Center
a. MET: 1.a.1,1.c.1,1.d.1,1.e.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR iSSUES'- RESOLVED: None'"
f. PRIOR ISSUES - UNRESOLVED: None 4.2.3.6. Butler County Reception Center, Slippery Rock University 57
a. MET: 6.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED:. None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.3.7. Butler County Mass Care Center, Slippery Rock University
a. MET: 6.c.l.
b. AREAS REQUIRING CORRECTIVE ACTION: None S
c. DEFICIENCY: None'
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES: RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.3.8. Butler County.- Monitoring-and Decontamination Center ... . . . .. .
a. MET: 3.a.1, 6.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None"
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: 6.a.1.

ISSUE NO.: 03-06-6a1-A-03 ISSUE: The team assigned to the Monitoring and Decontamination Center was not familiar with procedures, including:

a. Monitoring/decontamination sequences required when using portal monitor;
b. Identification of clean, or decontaminated, evacuees ofr admittance to Registration; 58 0
c. Methods employed to minimize contamination of the facility (e.g. step-off pads not used);
d. Signing to control traffic flow, such as identification of "clean" and "contaminated" zones, pathways, or areas;
e. Source check of portal monitor according to procedure;
f. Processing of personal items and valuables.

CORRECTIVE ACTION DEMONSTRATED: Issue Number 03-06-6.a. 1-A-03 for the Monitoring and Decontamination. Team not being familiar with procedures was closed with the demonstration for this exercise. Traffic flow was controlled to identify contaminated pathways. Personal items found to be contaminated were identified, bagged, and segregated. The portal monitor was source checked per procedure. Only evacuees free of contamination were identified for admittance to Registration. The monitoring and decontamination sequences were successfully demonstrated using the portal monitor and hand held survey meter.:

f. PRIOR ISSUES - UNRESOLVED: None 4.2.3.9. Lawrence County Emergency Operations Center
a. MET: 1.a.1,1.c.1,1.d.1,1.e.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.3.10. Lawrence County Reception Center Mohawk Area High School.
a. MET: 6.a.1.

59

a

b. AREAS REQUIRING CORRECTIVE ACTION: None C. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.3.11. Lawrence County Monitoring and Decontamination Center, Mohawk High School,
a. MET: 3.a.1, 6.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None,
c. DEFICIENCY: None: 0
d. NOT DEMONSTRATED: None,
e. PRIOR ISSUES - RESOLVED: None . .,
f. PRIOR ISSUES - UNRESQLVED: None 4.2.3.12. Lawrence County MasS Care center, Union High School
a. MET: 6.c.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY" None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None..

4.2.3.13. Washington County Emergency Operations 0

Center

a. MET: 1.a.1,1.c.1,1.d.1,1.e.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 60 49

4.2.3.14. Washington Co Reception Center County Fair Grounds

a. MET: 6.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.3.15. Washington County Monitoring arid Decontamination Center McGuffey High School
a. MET: 3.a.1, 6.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None,
e. PRIOR ISSUES - RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 4.2.3.16. Washington County Mass Care Center, McGuffey Jr/Sr High School
a. MET: 6.c.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None'
c. DEFICIENCY: None
d. NOT DEMONSTRATED: None
e. PRIOR ISSUES- RESOLVED: None
f. PRIOR ISSUES - UNRESOLVED: None 61

0 APPENDIX 1 ACRONYMS AND ABBREVIATIONS AAC Accident Assessment Coordinator ACEMA Allegheny County Emergency Management Agency ACP Access Control Points ALARA As Low As Reasonably Achievable ARC American Red Cross ARES Amateur Radio Emergency Service AS Assistant Superintendent BASD Beaver Area School District BASDEOP Beaver Area School District Emergency Operations Plan BB Beaver Borough. 40 BCEMA Beaver County.Emergency Management Agency .

BCEOC Beaver County.Emergency Operations Center..

BED Beaver Fire Department ' ".

BHS Beaver High School.

BHSP Beaver High School Principal BMSP Beaver Middle School Principal..,

BSD Blackhawk School District BVIU Beaver.Valley Intermediate Unit BVIUD Beaver Valley Intermediate Unit Director BVNPS Beaver Valley Nuclear PowerStation.

BVPS Beaver Valley Power Station CC Communications Center.

CO Communications Officer DC Dosimetry Coordinator' .

DRD Direct Reading Dosimeter.'....

EAL Emergency Action Level EAS Emergency Alert System .

ECL Emergency Classification Level EMA Emergency Management Agency EMC Emergency Management Coordinator EMD Emergency Management Director EMS Emergency Medical Services 40 EOC Emergency Operations Center . 2 .

EOF Emergency Operating Facility EOP Emergency Operations Plan EPZ Emergency Planning Zone * ..

ERDS Emergency Response Data System.

ERF Emergency Response Facility EW Emergency Workers EWDC Emergency.Worker Decontamination Center FEMA Federal Emergency Management Agency FENOC First Energy Nuclear Operating Company FMP Field Monitoring Point 62.

61

FMT Field Monitoring Team FTC Field Team Coordinator GE General Emergency GEC Gold Executive Conference GIS Geographic Information System GPS Global Positioning System HCCC, Hancock County Communications Center HCEN Hancock County Emergency Network HCEOC Hancock County Emergency Operations Center HS High School ICS Incident Command System IP Internet Protocol IU Intermediate Unit JIC Joint Information Center JPIC Joint Public Information Center.

KC Knowledge Center LCEMA Lawrence County EmergencyManagement Agency MCC Mass Care Center MPD Monaca Police Department MSD Medical Services Director MT .McCarter Trans ortation NCVFD New Cumberland Volunteer Fire Department-NRC . Nuclear Regulatory Commission PA Public Address PAD 'Protective Action Decisions PAG. Protective Action Guides PAR Protective Action Recommendation PC Personal Computer PEMA Pennsylvania Emergency Management Agency PEMARS Pennsylvania Emergency Management Agency Radio System PEMRS Pennsylvania Emergency Management Radio System PES Patterson Elementary School PHBVFD Patterson Heights Borough Volunteer Fire Department PIC Pubiic information Center Pio Public Information Officer PRD Permanent Record Dosimeter PSP Pennsylvania State Police.

RAC Radiological Assistance Committee RACES Radio Amateur Communications Emergency Services RC Reception Center RCO Rumor Control Officer' REACT Radio Emergency Assistance Communications Team REP Radioiogical Emergency Planning RO Radiologicai Officer RPO Radiological Protection Officer RSO Radiological Safety Officer SAE Site Area Emergency SBFD South Beaver Fire Department SEOC State Emergency Operations Center 63

0 SHO State Health Officer SOP Standard Operating Procedure SRHS Slippery Rock High School SSO School Services Officer TC Transportation Coordinator TCP Traffic Control Points TEDE Total Effective Dose Equivalent TO Transportation Officer VFD Volunteer Fire Department VHF Very High Frequency WV West Virginia 0

0 64 0

APPENDIX 2 EXERCISE EVALUATORS AND TEAM LEADERS 65

6 DATE: 2008-06-24, SITE: Beaver Valley Power Station, PA LOCATION~ K. ~ ~ < i EVALUATOR ~ AGENCY Beaver Valley Joint Public Information Center Gary Bolender ICF PA State Field Monitoring Team A, South West Region W. Morrison Jackson ICF PA State Field Monitoring Team B; South West Region Ronald Biernacki ICF Commonwealth of Pennsylvania State Traffic/Access Control DeeEll Fifield ICF Points State of West Virginia Emergency Operations Center David Petta ICF Chris Thompson FAA West Virginia Public Information Center Paul Nied ICF West Virginia Accicent Assessment Center James Hickey ICF West Virginia Field Air Monitoring Team Paul Cromier " ICF Beaver County Emergency Operations Center Marcy.Campbell ICF

  • . DeeEIlFifield *iCF

. Richard Wessman ICF Aliquippa Emergency Operations Center Deborah Bell ' ICF Beaver Borough Emergency Operations.Center. Clark Cofer "

' ICF-:

Robert Duggleby ICFE Beaver County, Beaver Borough, Back-up Route Alerting Robert Duggleby-.-.:, . ICF Bridgewater/Fallston Emergency.Operations Center John Flynn .*- ICF7_1 .

Brighton Township Emergency:Operations Center -.Michael Meshenberg ICF Michael Petullo ICF Beaver County, Brighton Township, Back-up Route Alerting Michael Meshenberg ICF Center Township Emergency Operations Center . Michael Burriss ICE Chippewa Township Emergency Operations Center .Robert Gantt IdF Quirano lannazzo ICE .

Beaver County, Chippewa Township, Back-up Route Ale'rting Robert Gantt ICFE Frankfort Springs Borough, Hanover Township, Georgetown. Robert -Lemeshka, ICF" borough, Greene Township, Hookstown Borough'Emergency GeorgeR MacDonald ICF "

Operations Center . , ,

Independence Township Emergency Operations Center Kieth Earnshaw ICF -

Industry Emergency Operations Center, Gary'G0ldberg iCF Hopewell Township Emergency Operations Center,. .' , Albert Lookabaugh IC"F Beaver County, Hopewell Township, Back-up Route Alerting Roger Jobe ICF Midland Emergency Operations Center . Simon (Guereca" ICF Monaca Emergency Operations Center Mark Dalton, . ICF Beaver County, Monaca Back-up Route Alerting Nick Lowe . ICF Patterson Heights/Patterson Township Emergency Operations William -Edmonson ICF Center 0 Beaver County, Patterson Township, Back-up Route Alerting Lenora Borchardt- ICF Potter Township Emergency Operations Center Michael Burns ICF Raccoon Township Emergency. Operations Center Ernest Boaze- .. ICF Shippingport Emergency Operations Center -Earl Shollenberger ICF South Beaver/Ohioville/Glasgow Emergency Operations Center Nancy Johnson. ICF

.... __ .. __ _ _ Denise Solomon ICF South Heights Emergency Operations Center Marynette Herndon ICF Vanport Emergency Operations Center David White ICF Beaver County Emergency Worker Monitoring and Ronald Biernacki ICF Decontamination Station, Beaver Falls FD Beaver County Emergency Worker Monitoring and Steve Denson " ICF Decontamination Station South Beaver Township Fire Department 66 61

Aliquippa School District Ronald Biernacki ICF Aliquippa Elementary School Ronald Biernacki ICF Beaver Area School Distirct Steve Denson ICF Beaver Area Junior Senior High School Steve Denson ICF Blackhawk School District James Hickey ICF Patterson Primary School James Hickey ICF Center Area School District Jill Leatherman ICF Center Area Junior High School, Center Area School District Jill Leatherman ICF Hopewell Area School District Michael Petullo ICF Margaret Ross Elementary School. Michael Petullo ICF Midland Borough School District David StUenkel. ICF Neel Elementary School David Stuenkel ICF Monaca School District Patrick Taylor ICF Fifth Ward Elementary School, Monaca School District PatrickTaylor ICF New Brighton School District Robert Black ICF Ambridge Area School District Gary Bolender ICF South Side Area School District.' John Flynn. - ICF South Side Middle School"' John Flynn ICF Western Beaver Schools Lawrence Visniesky ICF Western Beaver Jr/Sr High School Lawrence Visniesky ICF Hancock County Emergency Operations, Center W. LyleSlagle ICF Joseph.Suders .. FEMA RIII Jim Torgler ICF

.. . __.........._ _ _ _ Lawrence Visniesky ICF Hancock Cob'nty Traffic and Access Control, County Court Patrick Taylor ICF House ". "

Hancock County Back-up:Route Alerting:, Oakland Fire' Paul Nied ICF Department. . .

Hancock Couinty Reception Center, Weir High*Scho0ol Complex David Stuenkel ICF Hancock County Monitoring and Decontamination Center, Weir David Stuenkel ICF High School Complex. ...............-

Hancock County Mass Care CenterWeir High School Complex David Stuenkel ICF Hancock County Emergency Workeir Monitor and Patrick..Tay Io ICF Decontamination Statin,'Ne6W Cumberland Fire Department

  • Ta.. r ICE Hancock County School District I . .awrernice.Visniesky ICE Oak Glen High School, Hancock County School District Lawrence Visniesky ICFE Allegheny County. Emergency Operations Center Rosemary[Samsel ICF Allegheny Co Reception Center South Park Fair Grounds Robert Black ICF Allegheny County Monitoring and Decontamination-Center, JamesHickey ICF South Park Fair Grounds ....

Allegheny Co Mass Care.Center, South Park HighSchool Robert Black ICF Butler County Emergency-Operatiohs Center-. Wendy Swygert ICF Butler County Reception-Center, Slippery Rock University - Gary Bolender ICF Butler County Mass Cai-e .Center, Slippery Rock University Gary Bolender ICEF Butler County Monitoring'.and Decontamination Center Jill Leatherman ICF Lawrence County Emergency Operations Center William Vocke ICF Lawrence County Reception Center Mohawk Area High School John Flynn ICF Lawrence County Monitoringand Decontamination Center,- Michael Petullo ICF Mohawk High School .

Lawrence County Mass Care Center, Union High School John Flynn ICF Washington County Emergency Operations Center .. Patrick Taylor ICF Washington Co Reception Center County Fair Grounds Lawrence Visniesky ICF 67

0 Washington County Monitoring and Decontamination Center David Stuenkel ICF McGuffey High School Washington County Mass Care Center, McGuffey Jr/Sr High Lawrence Visniesky ICF School 0

0 68 6

APPENDIX 3 EXERCISE EVALUATION AREAS AND EXTENT OF PLAY COMMON WEALTH OF PENNSYLVANIA BEAVER VALLEY POWER STATION 2008 RADIOLOGICAL EMERGENCY PREPAREDNESS EXERCISE METHOD OF OPERATION March 27, 2008

1. Beaver Valley Power Station The facility normally uses off-watch section personnel to participate in the exercise.

The plant's simulated events, radiation readings, and emergency classifications will trigger offsite exercise actions. BVPS will notify the State EOC, the Bureau of Radiation Protection (BRP), and the risk county of emergency classifications.

2. Bureau of Radiation Protection (BRP)

Personnel will be present at the State EOC, the nuclear facility EOF, and at field locations. Only the field teams will be evaluated.

3. PEMA Operations at State EOC / PEMA Headquarters This "Method of Operation" Document includes activities for the Full-Scale Plume Exercise (June 24, 2008), and the "Out of Sequence" Activities (May 14, 2008).

A. Plume Exercise - June 24, 2008 PEMA Bureau of Operations and Training staff, augmented by designated PEMA personnel from the Fire Commissioner's Office, the Bureau of Administration, Technical Services, Plans, plus Emergency Preparedness Liaison Officers (EPLOs) with accompanying response team members from designated state departments/agencies, including representatives from the USDA State Emergency Board will comprise initial operations at the State Emergency Operations Center (EOC). The State EOC will not be evaluated during this exercise.

B. Plume Exercise - "Out of Sequence" Activities - May 14, 2008.

PEMA Bureau of Operations and Training staff, augmented by designated PEMA personnel will disseminate exercise related messages to the participating Counties 69

0 for dissemination to the participating School Districts during the morning of May 14, 2008. The State Emergency Operations Center (EOC) and County EOCs will NOT be evaluated during the "Out of Sequence" component. PEMA personnel will serve as "observers" at the identified School Districts.

C. "Out of Sequence" Activities - May 14, 2008.

PEMA personnel will serve as "Observers" at the various field exercise locations during the evening "Out-of-Sequence" component May 14, 2008. An exercise coordinator will remain in the State EOC. The State Emergency Operations Center (EOC) and Counties will NOTbe evaluated during the evening "Out of Sequence" component. .. . '

4. PEMA Area Office Operations The PEMA Area Office rat Indiana will"hot.be activated or evaluated during, this exercise. Selected staff of the area office will serve.as liaison officers to the risk and support counties as assigned. Liaison officersý are, exercise participants.
5. Counties Designated to Participate The risk county (Beaver), in coordination with PEMA, will demonstrate the capability to mobilize appropriate staff, activate their respective-Ernergenry Operations 'Centers and implement emergency response operations to include sheltering and/or 'evacuation.

County government will provide direction and coordination to:risk municipalities. The four support counties (Allegheny, Butler, Lawrence, and Washington) will participate in their assigned support roles. Actual sheltering or~evacuafion :of the'general public will be simulated.

6.' PEMA Liaison Officers Liaison officers will be present at the participating risk county EOC,. the BVPS Emergency Operations Facility (EOF), Joint Information Center (JIC), and the Ohio and West Virginia EOCs to provide assistance, guidance, and support: These liaison officers will participate as players in the exercise. These liaison officers will participate as players in the plume phase exercise on June 24, 2008'.

7. Controllers Controllers will be present at the emergency worker monitoring/decontaminating stations and the mass care monitoring/ decontamination centers (May 14, 2008).

Controllers are not players. Controllers will provide pre-approved injects and information to the players, as appropriate, regarding radiological readings during the monitoring of personnel. Live radioactive sources will not be used. Exception:

70

individuals tasked with the setup ofportal monitoringequipment will use a standard1 micro curie Cesium 13 7 sourcefor the purpose of conducting oVerationaltests.

Additionally, appropriatetest sources will be availableand used to verify the operation of the monitoring/ survey instrumentsper manufacturersrecommendations.

8. PEMA Observers
  • PEMA staff, qualified county emergency management personnel,.and/or nuclear power plant personnel will be assigned if required to key locations for the purpose of observing, noting response actions and. conditions, and recording observations for future use. Observers will not take' anactive part in the proceedings, but will interact with staff members to the extent necessary to fulfill their observer responsibilities.

Coaching of players by observers is not permitted except to provide training to participants awaiting a re-demonstration. (Refer to paragraph 13)

9. FEMA Evaluators Out of Sequence Period (May 14, 2008): Federal evaluators will be present at the identified "out-of-sequence" demonstration sites per Attachment A, Section 1.1 These include the identified Public' School Districts.' They will also be present at identified Reception Centers, Emergency Worker Monitoring and Decontamination Stations, Mass Care Shelters, and Monitoring and Decontamination, Centers, as identified in Attachment A,Section I.B. 1, I.B.2 and I.B.3.

Plume PhaseExercise (June 24, 2008): Federal evaluators will be present at the identified risk and support county.EOC's to evaluate playerresponse to the actual and simulated events in the, exercise scenario. ...

10. Demonstration.Windows ,

In order to provide for more effective demonstrations, as well as to permit the release of volunteers from exercise play at a reasonable hour, periods of time (Demonstration Windows) have been designated during which specified actions will be accomplished /

demonstrated. , , .

The "demonstration windows" for this exercise are:

A. Plume Phase Exercise The out-of-sequence MS- 1 hospital demonstration was federally evaluated at Ellwood City Hospital, Lawrence County, December 12, 2007.

The out-of-sequence exercise window for school demonstrations will be from 9:00 until 11:00 on May 14, 2008.

71

0 The out-of-sequence demonstration of reception centers, mass care centers, monitoring / decontamination centers and emergency worker stations will be conducted from 7:00 - 9:30 p.m. on May 14, 2008. Locations are specified within Attachment A,Section II.

The out-of-sequence interview of Pennsylvania State Police traffic control/access control points will be from 1:00 p.m. - 3:00 p.m. June 24, 2008.

All demonstrations will commence promptly and, barring any complications, not continue beyond the time of the designated demonstration window.

County and municipal EOC operations will be conducted on June 24, 2008. (Please refer to the Extent of Play Demonstration Tables, Attachment A).

B. Post Plume Exercise No post-plume phase exercise is scheduled during this evaluation.

11. Stand-down All jurisdictions will request approval on a jurisdiction by jurisdiction basis prior to stand-down.
a. Upon completion of all requirements and after having informed the FEMA evaluator that all evaluation areas have been demonstrated and/or completed, the risk municipality EOCs may request approval from their county EOC to terminate the exercise.
b. Support counties may likewise request approval to terminate the exercise upon completion of all evaluated objectives from the state EOC.
c. The risk county EOC will remain operational until the exercise is officially terminated by the State. The State EOC will issue an Exercise Termination Message.
12. General Concepts An emergency plan is drafted to address the generally expected conditions of an emergency, Not everything in the emergency plan may be applicable for a given scenario. The main purpose of an emergency plan is to assemble sufficient expertise and officials so as to properly react to the events as they occur. The responders should not be so tied to a plan that they cannot take actions that are more protective of the public. Therefore, if, by not following the plan, the responders protect the public equally as well as provided in the plan, it should be noted f6r possible modification of the plan, but not classified as a negative incident. Furthermore, if, by following the 72 6

plan there is a failure to protect the public health and safety, it should be noted so that the plan can be modified and the appropriate negative assessment applied.

13. Re-demonstrations During the exercise any activity that is not satisfactorily demonstrated may be re-demonstrated by the participants during the exercise provided it does not negatively interfere with the exercise. Refresher training can be provided by the players, observers, and/or controllers. Evaluators are not permitted to provide refresher training. Re-demonstrations will be negotiated between the players, observers, controllers, and evaluat6rs. The RAC Chair/designee will be advised prior to initiating anyre-demonstrations. It is permissible to extend the evaluation time to accommodate the re-demonstration. Activities corrected from a re-demonstration will be so noted.

73

0 BEAVER VALLEY POWER STATION 2008 RADIOLOGICAL EMERGENCY PREPAREDNESS EXERCISE EXTENT OF PLAY AGREEMENT EVALUATION AREA 1 Emergency Operations Management Sub-element L.a - Mobilization INTENT.

This sub-element derives from NUREG-0654, which provides.that Offsite Response Organizations (ORO) should have the capability to alert, notify, and mobilize emergency personnel and to activate and staff emergency facilities.

Criterion 1.a.l: OROs use effective procedures to alert, notify, and mobilize emergency personnel and activate facilities in a timely manner. (NUREG-.0654, A.4; D.3, 4; E.1, 2; H.4)

EXTENT OF PLA Y Responsible OROs should demonstrate the capability to receive notification of.an-emergency situation from the licensee, verify the notification, and contact, alert', and mobilize .key emergency personnel in a timely manner. Responsible OROs should demonstrate the activation of facilities for immediate use by mobilized personnel when they arrive to begin emergency operations. Activation of facilities should be completed in accordance with the plan and/or procedures. Pre-positioning of emergency personnel appropriate, in accordance with the extent of play agreement, at those facilities located beyond a normalcommuting distance from the individual's duty location or residence. Further,. pre-positioning of.staff for out-of-sequence demonstrations is appropriate in accordance with the extent of play agreement.

All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated .in the extent of play agreement.

PEMA Negotiated Extent of Play:

Pre-positioningof state emergency personnel (Liaison Officers) at the Emergency OperationsFacility (EOF), the Media Operations Center (MQC) and Risk and Support Counties is appropriatedue to the commuting distancefrom the individual'sduty location or residence. Risk municipalities will conduct callmouts to demonstrate the mobilization oftkey personnel.

74 61

- Actual calls (orpagernotifications) will be made to the municipal EOC personnelfor the Plume Phase exercise, June 24, 2008, perplans and procedures.

  • In all instances, the demonstration of a shift change is NOT required.

Twenty-four hour staffing will be demonstratedby means of a roster or staffing chart.

  • All out-of-sequenceplayers and equipment will be pre-positioned(School Districtpersonnel, PennsylvaniaState PoliceA CP,Reception Centers, Emergency Worker Monitoringand DecontaminationStations and Monitoring and DecontaminationCenters).
  • Individuals working in statefacilities and county.EOCs may bepre-positioned for the plume phase.
  • County andstate locationsfor individuals may be prepositionedforthe plume phase. " , ....

Sub-element 1.b - Facilities INTENT, ~ - ,

This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have facilities to support the emergency response.

Criterion 1.b.1: Facilities are'sufficie'nt to-support the emergency response'.

(NUREG-0654 1H.3) "

EXTENTOF PLAY "

Facilities Will'only be specifically' evaluated for this -criterion if-they are new or have substantial changes in structureI or-mission:. Responsible OROs shoulddemonstrate the availability of facilities' that support the-accompli'shmient of emergency Operations. Some of the areas to be considered are: adequate space, furnishings, lighting, restrooms, ventilation, backup power and/or alternate facility (if required to support operations.)

Facilities must be set up based .on the ORO's plans and procedures and demonstrated as they would be used in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.

PEMA NegotiatedExtent of Play: None Sub-element i.c - Direction and Control INTENT 75

0 This sub-element derives from NUREG-0654, which-provides that Offsite Response Organizations (ORO) have the capability to control their overall response to an emergency.

Criterion 1.c.1: Key personnel with leadership roles for the ORO provide direction and control to that part of the overall response effort for which they are responsible. (NUREG-0654, A.A.d; A.2.a, b)

EXTENT-OFPLAY.

Leadership personnel should demonstrate the ability to carry out essential functions of the response effort, for example: keeping the staff informed through periodic briefings and/or otherre means, n ue t with other appropyiate,0ROs, and ensuring completion of coordinating a

requirements and req. sts.

All activities associated with direction and control must be performed based on'the ORO's plans and procedures and completed as they would be in an actual emergency, unless otherwise noted above or indicated in the extent 6f play-agreement.,.

PEMA NegotiatedExtent of Play: None, Sub-element 1.d -- Communications Equipment INTENT This sub-element derives from NUREG-0654, which proVides-that'Offsite Response Organizations (ORO) should establish reliable primary and backup communication systems to ensure communications, with key emergency personnel at.!locations-such asthe following:

appropriate contiguous governments within the emergency planningzone (EPZ), Federal emergency response organizations, the licensee and its facilities, emergency operations centers (EOC), and field teams.

Criterion .1.d.l: At least two communicationwsystemsiare available, at least one operates properly, and communication links are established' and maintained with appropriate locations. Communications capabilities are managed in support of emergency operations. (NUREG-0654, F.1, 2)

EXTENT OF PLAY OROs will demonstrate that a primary and at least one backup system are fully functional at the beginning of an exercise. If a communications system or systems are not functional, but 76 0

exercise performance is not affected, no exercise issue will be assessed. Communications equipment and procedures for facilities and field units shouldbe used as needed for the transmission and receipt of exercise messages. All facilities and field teams should have the capabilityto access at least one communication system that is independent of the commercial telephone system. Responsible OROs should demonstrate the capability to manage'the communication systems and ensure that all message traffic is handledwithout delays that might disrupt the conduct of emergency operations. OROs should ensure that a coordinated communication link for fixed and mobile medical support facilities exists. The specific communications capabilities of OROs should be commensurate with that specified in the response plan and/or procedures. Exercise scenarios could require the failure of a communications system and the use of an alternate system, as negotiated in the extent of play dgreement..

.~t .h .e , it'. .' : " ". , c All activities associated with the management of communications capabilities must be demonstrated based on the ORO's plans and procedures and'completed as they would be in an actual emergency, unless otherwise noted above or in the extent of play agreement;,

PEMA NegotiatedExtent of Play:

Risk and Support Counties will communicate with the State EOC via SEVAN (primary)and e-mail (secondary.) PASTAR, State 800 MHz Radio System, and commercial telephone are availablefor back-up. The State EOC may communicate with the utility and the risk counties via dedicatedtelephone circuits, conference bridges,'commercial"didl-up "- lines, or other available means.

Risk Counties will communicate with their risk municipalities via public safety radio frequencies (EM4 Radio), Commercial Telephone, Fax, or Amateur Radio Communications (ARES / R-A CES) or,other,available-means.. *..

Sub-element i.e - Equipment'and Supplies'to Suppoit Operations '

INTENT This sub-element derives from NUREG-0654,'Which prdvides'that Offsite Response Organizations (ORO), have emergency'equipmerit'and supplies adequate to support the emergency response ,'

Criterion 1.e.l: Equipment, maps, displays, dosimetry, potassium iodide (KI), and other supplies are sufficient to support emergency operations. (NUREG-0654, 11.7,10; J.10.a, b, e, J.11; K.3.a) 77

0 EXTENT OF PLAY Equipment within the facility (facilities) should be sufficient and consistent with the role assigned to that facility in the ORO's plans and/or procedures in support of emergency operations. Use of maps and displays is encouraged.

All instruments should be inspected, inventoried, and operationally checked before each use.

Instruments should be calibrated in accordance with the manufacturer's recommendations.

Unmodified CDV-700 series instruments and other instruments without a manufacturer's recommendation should be calibrated annually. Modified,CDV-700 instruments should be calibrated in accordance with the recommendation of the modification manufacturer. A label indicating such calibration should be on each instrument, or calibrated frequency can be verified by other means. Additionally, instruments beingiused to measure activity should have a range of reading sticker affixed to the side of the instrument. ,The above: * .. , ,

considerations should be included in 4.a. 1 for field team equipment; 4.c. 1 for radiological laboratory, equipment (does not apply to analytical equipment;. reception center and .... .

emergency worker facilities' equipment under 6.a. 1; and ambulance, and medical-facilities' equipment under 6.d. 1.

Sufficient quantities of appropriate direct-reading and permanent record dosimetry and dosimeter chargers should be available for issu~ance to'all categories of emergenc'y'workers that could be deployed from that facility. Apltorriate direct-reading dosimetry's'hould allow individual(s) to read the administrative reporting limits and maximum exposure limits contained in the ORO's plans and procedures.

Dosimetry should be inspected for electrical leakage at least annually and replaced, if necessary. CDV-138s, due to their documented history of electrical leakage problems, should be inspected for electrical leakage at least quarterly and replaced if necessary. This leakage testing will be verified during the exercise through documentation.

Responsible OROs should demonstrate the capability to maintain inventories of KI sufficient for use by emergency workers, as indicated on rosters; institutionalized individuals, as indicated in capacity lists for facilities; and, where stipulated by the plan and/or procedures, members of the general public (including transients) within the plume pathway EPZ.

Quantities of dosimetry and KI available and storage locations(s) will be confirmed by physical inspection at storage location(s) or through documentation of current inventory submitted during the exercise. Available supplies of KI should be within the expiration date indicated on KI bottles or blister packs. As an alternative, the ORO may produce a letter from a certified private or State laboratory indicating that the KI supply remains potent, in accordance with U.S. Pharmacopoeia standards.

78 61

At locations where traffic and access control personnel are deployed, appropriate equipment (for example, vehicles, barriers, traffic cones and signs, etc.) should be available or their availability described.

All activities must be based on the ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.

PEMA NegotiatedExtent of Play:

In Pennsylvania CD V- 700s are calibratedevery 4-years. Support counties do,not have DRDs;.or KI, but those responsiblefor reception'centersand/ormonitoring and decontaminationcenters will have simulatedPRDs.:

Evaluation of KI quantities will be'verified using inventory sheets. KI will'not be removed from storage locations and boxes/packages will not be opened. KI questions will'be addressedthrough interviews.

Leakage testing verification and KI extension letters will be available to the evaluator.

Dosimetr and KI are not pre-distributedin Beaver County. Evaluation of this sub-element will take place at the Beaver County Hazmat Garage.

79

6 EVALUATION AREA 2 Protective Action Decision-Making Sub-element 2.a - Emergency Worker Exposure Control INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to assess and6cdntrol the radiation exposure received by emergency workers and have a decision chain in place, as specified in the ORO's plans and procedures, to authorize emergency worker exposure limits to be exceeded for specific missions.

Radiation exposure limits for emergenc y wotkers'are the iecommen&d 'accumul'ted .dose limits or exposure rates emergency workelrs may-bep~itfed to, inurdduring an'emergency.

These limits include any pre-established administrative&rep6rtingI limits (that take into' consideration Total Effective Dose Equivalent or organ-specific' limits) identified in the ORO's plans and procedures. - ""

Criterion 2.a.1: OROS use a 'decision-making process, considering relevant factors and appropriate coordiniation' to ensure'that an exposure contro1 system, including the use of KI, is in place for emergency workers including provisions to authorize radiation exposure in excess of administrative limits or protective action guides. (NUREG-0654,K.4,J.10.e,f) ,

", " ~~~~~~~.......... ..... ' - *. i.' - *....I EXTENT OF PLAY OROs authorized to send emergency workers into the plume exposure pathway EPZ should demonstrate a capability to meet the criterion based on their emergenc*,plans 'and procedures.

Responsible OROs should demonstrate the capability to make decisions, concerning the authorization of exposure levels in excess of pre-authorized levels and.to the number of emergency workers receiving radiation dose above, pre-authorized levels.

As appropriate, OROs should demonstratethe capability to make decisions on the distribution and administration of KI as a protective' measure, based on the ORO's plan and/or procedures or projected thyroid dose compared with the established Protective Action Guides (PAGs) for KI administration.

80 a

All activities must be based on the ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.

PEMA Negotiated Extent of Play: None.

Sub-element 2.b. - Radiological Assessment and Protective Action Recommendations and Decisions for the.Plume Phase of the Emergency INTENT-This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the rapability toN Ue all available data to independently, project integrated dose and compare the estimated dose Savings with the protective action guides.

OROs have the, capability t0ochoose, among a. range of protective actions, those most appropriate in a given emergency situation. OROsbase these choices oh PAGs from the ORO's plans and procedures or EPA 400-R-92-001 and other criteria, such as, plant conditions, licensee protective action recommendations, coordination of protective action decisions with other political jurisdictions.(for example, other affected OROs), availability of appropriate in-pjace shelter, weather conditions, and situations that .create higher than normal risk from evacuation.

Criterion 2.b.f: Appropriate 'protective action recommendations are based on available information on plant conditions, field monitoring data, and licensee and ORO dose projections, as well as knowledge of onsite and offsite environmental conditions. (NUREG-0654, 1.8, 10 and Supplement 3)

EXTENT OF PLAY During the initial stage of the emergency response, following notification of plant conditions that may warrant offsite protective actions, the ORO should demonstrate the capability to use appropriate means, described in the plan and/or procedures, to develop protective action recommendations' (PARs) for decision-makers based on available information and recommendations from the licensee and field monitoring data, if available.

When the licensee provides release and meteorological data, the ORO also considers these data.

The ORO should demonstrate a reliable capability to independently validate dose projections.

The types of calculations to be demonstrated depend on the data available and the need for assessments to support the PARs appropriate to the scenario. In all cases, calculation of projected dose should be demonstrated. Projected doses should be related to quantities and units 81

0 of the PAGs to which they will be compared. PARs should be promptly transmitted to decision-makers in a prearranged format.

Differences greater than a factor of 10 between projected doses by the licensee and the ORO should be discussed with the licensee with respect to the input data and assumptions used, the use of differentmodels, or other possible reasons. Resolution of these differences should be incorporated into the PAR if timely and appropriate. The ORO should demonstrate the capability to useany additional data to refine projected doses and exposure rates and revise the associated PARs.

All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless n6ted above or otherwise indicated in the'extent 'ofplay agreement.

PEMA NegotiatedExtent of Play: None.

Criterion 2.b.2: A decision-making process involvinig consideration of appropriate factors and necessary coordination is used to make protective action decisions ,

(PAD) for the general public (including the recommendation for the use, ofUKI, if ORO policy). (NUREG-0654, J.9, I0.f,m),

EXTENT OF PLAY OROs should have the capability to make both initial and subsequent PADs. They should demonstrate the capability to make initial- PADs in,a timely manner appropriate ,to the situation, based on notification from the licensee;!assessmfent of plant status, and releases, and PARs from the utility and ORO staff.

The dose assessment personnel may provide additional PARs based on the subsequent dose projections, field monitoring data, or information on plant conditions. The decision-makers should demonstrate the capability to change protective actions as appropriate based on these projections.

If the ORO has determined that KI will be used as a protective measure 0for the general public under off-site plans, then the ORO should demonstrate the capability to make decisions on the distribution and administration of KI as a protective measure for the general public to supplement shelter and evacuation., This decision should be based on the ORO's plan and/or procedures or projected thyroid dose compared with the established PAG for KI administration.

The KI decision-making process should involve close coordination with appropriate assessment and decision-making staff.

82 40

If more than one ORO is involved in decision-making, OROs should communicate and coordinate PADs with affected OROs. OROs should demonstrate the capability to communicate the contents of decisions to the affected jurisdictions.

All decision-making activities by ORO personnel must be performed based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.

PEMA Negotiated Extent of Play: None.

Sub-element 2.c - Protective Action Decisions Consideration for the Protection of Special Populations INTENT This sub-element derives from"NUREG-0654; which provides that Offsite Response-Organizations (ORO) shouldhave thecapability to determine protective action recommendations, including evacuation;, sheltering and use of potassium iodide (KI), if applicable, for special population groups (for example;, hospitals, nursing homes, correctional facilities, schools, licensed day care centers, mobility impaired individuals, and transportation dependent individuals). Focus is on those special population groups that are (or potentially will be) affected by a radiological release from a nuclear power plant.

Criterion 2-c,1: Protective action decisions are made, as appropriate, for special population groups.' (NUREG-0654, J.9, J.10.d,e)

EXTENT OF PLAY Usually, it is appropriate to-implement evacuation in areas where doses are projected to exceed the lower end of the range of PAGs, except for situations where there is a high-risk environment or where high-risk groups (e.g., the immobile or infirm) are involved. In these cases, examples of factors that should be considered are weather conditions, shelter availability, availability of transportation assets, 'riskof evacuation vs. risk from the avoided dose, and precautionary school evacuations. In situations were an institutionalized population cannot be evacuated, the administration of KI should be considered by the OROs.

Applicable OROs should demonstrate the capability to alert and notify all public school systems/districts of emergency conditions that are expected to or may necessitate protective actions for students. Contacts with public schoolsystems/districts must be actual.

83

In accordance with plans and/or procedures, OROs and/or officials of pubic school systems/districts should demonstrate the capability to make prompt decisions on protective actions for students. Officials should demonstrate that the decision making process for protective actions considers (that is, either accepts automatically or gives heavy weight to) protective action recommendations made by ORO personnel, the ECL at which these recommendations are received, preplanned strategies for protective actions for that ECL, and the location of students at the time (for example, whether the students are still at home, en route to the school, or at the school).

All decision-making activities associated with protective actions,, including consideration of available resources, for speciaipopulation groups must be based onthe ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in theextent of play agreement.

PEMA Negotiated Extent of Play: None Sub-element 2.d. - Radiological Assessment and Decision-Making for the Ingestion Exposure Pathway This sub-element will not be evaluated duringthis exercise.

Sub-element 2.e. - Radiological Assessment and Decision-Making Concerning Relocation, Re-entry, and Return This sub-element will not be evaluatedduring this xeercise.

84 0

EVALUATION AREA 3

'Protective Action Implementation Sub-element 3.a - Implementation of Emergency Worker Exposure Control INTENT This sub-element derives from NUREG-0654, which provides that OROs should have the capability to provide for the following: distribution, use, collection, and processing of direct-reading dosimetry and permanent record dosimetry; the reading of direct-reading dosimetry by emergency Workers at appropriate frequencies; maintaining a -adiation dose record for each emergency worker; and establishing a decision chain or authorization procedure for emergency w6rkers to inicur fadiation exposures in excess of protective action guides, always applying the ALRAk (As LOW As i9 Reasonably'Achievable) pri'iciple as appropriate.

Criterion 3.a.l: The OROs issue appropriate dosimetry and procedures, and manage radiological exposure to emergency workers in accordance with the plans and procedures.' Emergeicy Workers periodically'and at the end'of each mission read their dosimeters and record the readings on the appropriate exposure record or chart. (NUREG-0654, K.3.a,b)

EXTENT OF PLA Y OROs should demonstrate the capability to provide appropriate direct-reading; and permanent record dosimetry, dosimeter chargers, and instructions on the use of dosimetry to emergency workers. For evaluation purposes, appropriate direct-reading dosimetry is defined as dosimetry that allows individual(s) to read the administrative reporting limits (that are pre-established at a level low enough to consider subsequent calculation of Total Effective Dose Equivalent) and maximum exposure limits (for those emergency workers involved in life saving activities) contained in the ORO's plans and procedures.

Each emergency worker should have the basic knowledge of radiation exposure limits as specified in the ORO's plan and/or procedures. Procedures to monitor and record dosimeter readings and to manage radiological exposure control should be demonstrated.

During a plume phase exercise, emergency workers should demonstrate the procedures to be followed when administrative exposure limits and turn-back values are reached. The.

emergency worker should report accumulated exposures during the exercise as indicated in the plans and procedures. OROs should demonstrate the actions described in the plan and/or procedures by determining whether to replace the worker, to authorize the worker to incur additional exposures or to take other actions. If scenario events do not require emergency workers to seek authorizations for additional exposure, evaluators should interview at least two emergency workers, to determine their knowledge of whom to contact in the event authorization is needed and at what exposure levels. Emergency workers may use any 85

available resources (for example, written procedures and/or co-workers) in providing responses.

Although it is desirable for all emergency workers to each have a direct-reading dosimeter, there may be situations where team members will be in close proximity to each other during the entire mission and adequate control of exposure can be effected for all members of the team by one dosimeter worn by the team leader. Emergency workers who are assigned to low exposure rate areas, for example, at reception centers, counting laboratories, emergency operations centers, and communications centers, may have individual direct-reading dosimeters or they may be monitored by-dosimeters strategically placed in:the.work areA. It should be noted that, even in these situations, each team member must'still have their. own permanent record dosimetry. Individuals without specific radiological response missions,.

such as farmers for animal 'care, essential utility service personnel, or other members of the public who must re-enter an evacuated areafollowing or during the plume passage, Should be limited.to the lowest radiological exposure commensuratewith completing: theirmissions.

All activities must be based on the ORO's plans and.procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the, extent of play agreement.

PEMA Negotiated Extent of Play: .

Radiologicalbriefings will be providedto address exposure limits andprocedures,to replace those approachinglimits and how permission to exceed limits is obtainedfrom the municipality and county. Emergency workers will also be briefed on when to take KI andon whose authority. Distributionof KI will be simulated The completion of a KI repo'rtformn vNiil be demonstrated OROs should also demonstrate the use of all dosimetryforms.. . f At any time, players may.ask other players or supervisors to clarify radiologicalinformation.

In Pennsylvania,emergency workers do not have turn back!values. -.. *.

Emergency workers who are assignedto low exposure)rateareas, e.g., at-receptioncenters, counting laboratories,,emergency operations centers, and communications centers, may have individualpermanent record dosimeters or they Miay be monitoredby dosimeters strategicallyplaced in. the work area. In Pennsylvaniathis will be accomplished through the use of an area kit. The area kit process is explainedin state,tcounty and'municipalplans.

Standardissue of dosimetry andpotassium iodidefor each category of emergency worker is asjbllows:.

Category A: 1 PRD, 1 DRD, and 1 unit of K!

Category B.: 1 PRD and I unit of KI Category C: 1 PRD 86 0

All locations that have dosimetry equipment indicatedwithin their RadiologicalEmergency Response Plan (RERP), will make the dosimetry equipment (andKI) availablefor inspection by the FederalEvaluator. Simulation PRDs with mock serial numbers will be used.

Sub-element 3.b - Implementation of KI Decision INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO), should have the capability to provide radioprotective drugs for emergency workers, institutionalized individuals, and, if in the plan and/or procedures, to the general public for whom immediate evacuation may not be feasible, very difficult, or significantlydelayed. .While-it is.necessary fort OROs to have the:capability to provide KI to emergency workers and institutionalized individuals, the provision of KI to the general public is an ORO option and is reflected in ORO's plans and procedures. Provisions should include the availability, of adequate quantities; storage; and means of the distribution of radioprotective drugs..

Criterion 3.b.l: KI and appropriate instructions are available should a decision to recommend use of KI be made. Appropriate-record keeping of the administration of KI for emergency workers and institutionalized individuals is maintained. (NUREG-0654, J. 10. e).

EXTENT OF PLAY ..

Offsite Response Organizations (ORO) should demonstrate the capability to make KI available to emergency workers, institutionalized individuals, and, where provided for in the ORO plan and/or procedures, to members of the general public. OROs should demonstrate the capability to'accomplish distribution ofKI consistent with decisions made..

Organizations should have the capability to develop and maintain lists of emergency workers and institutionalized individuals who have ingested KI, including documentation of the date(s) and time(s) they were instructed to ingest KI. The ingestion of KI recommended by the designated ORO health official..isvoluntary. For evaluation purposes, the actual ingestion of KI is not necessary. OROs should demonstrate the capability to formulate and disseminate appropriate instructions on the use of KI for those advised to take it. If a recommendation isý made for the general public to take KI, appropriate information should be provided to the public by the means of notification specified in the ORO's plan and/or procedures.

Emergency workers should demonstrate the basic knowledge of procedures for the use of KI whether or not. the scenario drives the use of KI. This can be accomplished through an interview by the evaluator.

87

0 All.activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.

PEMA NegotiatedExtent of Play:

Within Pennsylvania,the PennsylvaniaDepartment of Health is responsiblefor distribution of KI to the generalpublic located within the EPZ. Pre-distributionis accomplished on an annual basis. KI is not distributedto the generalpublic at the time of an emergency.

Evaluation of emergency worker KI quantities will be verified usinginventory vI sheets, will not be removedfrom storage locations and boxes will not be opened. KI questions will be addressedthrough interviews.

Personnel assignedto operate Monitoring/ Decontaminfation centers and stations are not issued DRDs or KI since the centers/stationsare located outside the EPZ. Each will be issued a simulatedPRD with mock serial numbers.

Sub-element 3.c - Implementation of Protective Actions fo, Special Populations INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have the capability to implement protective action decisions, including evacuation and/or sheltering, for all special populations. Focus is on those special populations that are (or potentially will be) affected by a radillogical release from a nuclear power plant. . "

Criterion 3.c.1: Protective action' decisions are impolmented for special populations other than schools Within areas'subjectt0 protective actions.

(NUREG-0654, J.10.c,d,g)

EXTENT OF PLAY Applicable OROs should demonstrate the capability td alert and notify (for example, provide protective action recommeiidations and 'emergency information and instructioris) special populations (hospitals, nursing homes, correctional facilities, mobiiity impaired individuals, transportation dependent, etc.). OROs should demonstrate the capability to provide for the needs of special populdtions in accordance with the ORO's plans and procedures.

Contact with special populations and reception facilities may be actual or simulated, as agreed to in the Extent of Play. Some contacts with transportation providers should be actual, as negotiated in the extent of play. All actual and simulated contacts should be logged.

88 U

All implementing activities associated with protective actions for special populations must be based orn the ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.

PEMA NegotiatedExtent of Play:

Lists ofpeople with special needs are maintainedat the municipal EOCs. Copies of these lists will not be provided to the evaluators however,; evaluatorswill be able to inspect these lists during the exercise.

Initialcontact with specialpopulationfacilities will be actual (hospitals,nursing homes and correctionalfacilities). All subsequent calls will be simulated Actual contacts (up to two) will be made& )ith trwnsj*ortati6nproviders as perplan. All actualand simulated contacts should be logged

'ýCriterion3.c.2: ROs/School officials implementprotective actionsfor schools.

(NUREG-0654, J.1O.c, d, g)

EXTENT OF PLA Y

'PUblic 'school systems/disti'cts shall demonstra~te the ability to implement protective action decisions 1for studenis The de monstratiionr shall be made as' follows: At least one school in each affected school system or district, as appropriate, needs to demonstrate the implementation of protective actions. The implementation of canceling the school day, dismissing eirly, or sheltering should be simulafed by describing to'e'valuators the. procedures that would be f6llowed. if e vac'uatio n is the implemented protdcti'e4 action, all activities to coordinate and complete the evacuation of students to reception c&enters, congregate care centers, or host schools may actually be demonstrated or accomplished through an interview process. If accomplished through an interview process, appropriate school-personnel including decision making officials (e.g., superintendent/principal, transportation director/bus dispatcher), and at least one bus driver (and the bus driver's escort, if applicable) should be available to demonstrate knowledge of their role(s) in the evacuation of school children.

Communications capabilities between school officials. and the buses, if required by the plan and/or procedures, should be verified.,

Officials of the school system(s) should demonstrate the capability to develop and provide timely information to OROs for use in messages to parents, the general public, and the media on the status of protective actions for schools. .

The provisions of this criterion also apply. to any private schools, private kindergartens and.day care centers that participate in REP exercises pursuant to the ORO's plans and procedures as negotiated in the Extent of Play Agreement.

89

a All activities must be based on the ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.

PEMA Negotiated Extent of Play:

School students will not be involved during the exercise. Actions,and activities associated with the demonstration of Criterion 3.c. 2 will be limited to the school district administration key personnel and the county. Eyqcuation 9f students will be conducted.through an interview process with school districtpersonnel or the buildingprincipal.

The role of the bus driver may be conductedthrough an interview with school or transportationofficials (or designee,) if/a bus driver is not availab,le.,, Actual demonstration of the bus route is not requiredand will not be demonstrated..,Mapsor route descriptions will be availablefor illustrationpurposes. .

Risk County school plans do not require communications betweenthe school,andvehicles.

Bus drivers are not consideredemergency workers and therefore do not require dosimetry.

Privateschools,private,kindergartens,andday care centers do not participatein REP exercises. However, OROs will beprepared,toshow evaluators lists of thesefacilities that they will contact in the event of an emergency in accordance with plans andprocedures. Any.

simulated contacts should be logged Sub-element 3.d. - Implementation of Traffic and Access Control ..

INTENT This sub-element derives from NUREG-0654, which provides that.Offsite Response Organizations (ORO) have the capability to implement protective action plans, including relocation and restriction of access .to evacuated/sheltered areas. This sub-element focuses on selecting, establishing, and staffing of traffic and access control points and -removal of impediments to the flow of evacuation traffic.

Criterion 3.d.l: Appropriate traffic and access controlis established. Accurate instructions are provided to traffic and access control personnel. (NUREG-0654, J.10.g, j)

EXTENT OF PLAY 90 60

OROs should demonstrate the capability to select, establish, and staff appropriate traffic and access control points, consistent with protective action decisions (for example, evacuating, sheltering, and relocation), in a timely manner. OROs should demonstrate the capability to provide instructions to traffic and access control staff on actions to take when modifications in protective action strategies necessitate changes in evacuation patterns or in the area(s) where access is controlled.

Traffic and access control staff should demonstrate accurate knowledge of their roles and responsibilities. This capability may be demonstrated by actual deployment or by interview, in accordance with the extent of play.

In instances where OROs lack authority necessary to control access by certain types of traffic (rail, water, and air traffic), they should demonstrate the capability, to contact the State or Federal agencies with authority to control access.

All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emnergency, unless noted above or otherwise indicated in the extent of play agreement.

PEMA NegotiatedExtent of Play:'

Municipaltraffic and access control will be demonstratedby interview at the applicable EOC ofjurisdiction. The traffic/access controlpersonnel will not be' deployed to the traffiC/dccess controlpoint(s).' If the 'designated-assignmentis a location within the EPZ a radiologicalbriefing will be prov~ided to the assignedindividuals.

Criterion 3.d.2: Impediments to evacuation are identified and resolved.

(NUREG-0654, J.1'0.k) .

EXTENT OF PLAY OROs should demonstrate the capability; as required by the scenario, to identify and take appropriate actionsconcerning impediments to evacuation. Actual dispatch of resources to deal with impediments, such as wreckers, need not be demonstrated; however, all contacts, actual or simulated, should be logged.:

All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unlessnoted above or otherwise indicated in the extent of play agreement.

PEMA NegotiatedExtent of Play:

91

0 ORO's should demonstrate the capability, as requiredby the scenario, to identify and take appropriateactions concerning impediments to evacuation. Actual dispatch of resources to deal with impediments, such as tow trucks, need not be demonstrated; however, simulated contacts will be logged Sub-element 3.e - Implementation of Ingestion Pathway Decisions This sub-element will not be evaluated during this exercise.

Sub-element 3.f- Implementation of Relocation, Re-entry, and Return.Decisions This sub-element will not be evaluated during this exercise.

0 92 61

EVALUATION AREA 4 Field Measurement And Analysis Sub-element 4.a - Plume Phase Field Measurements and Analyses INTENT This sub-element derives from NUREG-0654, which provides that OROs should have the capability to deploy field teams with the equipment, methods, and expertise necessary to determine the location of airborne radiation and particulate deposition on the ground from an airborne plume., ýIn addition, NUREG-0654 indicates that OROs should have the capability to use field teams within the plume emergency planning zone to measure airborne radioiodine in the presence of noble gases and to measure radioactiye particulate material in the airborne plume. In the event of an accident at a nuclear power plant, the possible release of radioactive material may pose a risk to the nearby population and environment. Although accident assessment methods are available to project the extent and magnitude of a release, these methods are subject to large uncertainties. During an accident, it is important to collect field radiological data in order to help characterize any radiological release. Adequate equipment and procedures are essential to such field measurement efforts.

Criterion 4.a.l: The field teams are equipped to perform field measurements of direct radiation exposure (cloud and ground shine) and to sample airborne radioiodine and particulates. (NUREG-0654, H.10; 1.7, 8, 9).

EXTENT OF PLAY Field teams should be equipped with all instrumentation and supplies necessary to accomplish their mission. This should include instruments capable of measuring gamma exposure rates and detecting the presence of beta radiation. These instruments should be capable of measuring a range of activity and exposure,. including radiological protection/exposure control of team members and detection of activity on the air sample collection media, consistent with the intended use of the instrument and the ORO's plans and procedures. An appropriate radioactive check source should be used to verify proper operational response for each low range radiation measurement instrument (less than 1 R/hr) and for high range instruments when available. If a source is not available for a high range instrument, a procedure should exist to operationally test the instrument before entering an area where only a high range instrument can make useful readings.

All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.

PEMA Negotiated Extent of Play:

93

0 Department'ofEnvironmentalProtection (DEP),Bureau of Radiation Protection (BRP)field teams are equipped with the necessary instrumentationand supplies.

Evaluators will meet the field teams at the DEP South Western Regional Office at 1:30 p.m. on June 24, 2008 to observe instrumentation checks and equipment inventory verification.

Criterion 4.a.2: Field teams are managed to obtain sufficient information to help

.characterize the release and to control radiation exposure. (NUREG-0654, H.12; 1.8., 11; J.10.a).

EXTENTý OF PLAY Responsible Offsite Response, Organizations (ORO) should demoinstrat* the capability to

.brief teams on predicted plume location and direction, travel speed, and exposure control procedures before deployment.

Field measurements are needed to help characterize the release and to support the adequacy of implemented protective actions or to be a factor: in modifying protective actions. Teams should be directed to take measurements in such tlocations, at such times to provide.

information-sufficient to characterize the plume and.impacts.,'

If the responsibility to obtain peak measurementý in the plume has beenlaccepftd by licensee field monitoring teams, with concurrence from OROs, there is no requirement for these measurements to be repeated by State and local monitoring teams. If the licensee teams do not obtain peak measurements in the, plume, it is the ORO's decision as to whether peak measurements are necessary to sufficiently cfiarat&erize the`piume.' The sharing and coordination of plume measurement information ami"ng all field teams (lioehsee,'federal, and ORO ) is essential. Coordination concerning ttafisfer of samples, including a: chain-of-custody form, to a radiological laboratory should be demonstrated.

OROs should use Federal resources as identified in'the Federal Radiological Emergency Response Plan (FRERP), and other resources (for example, compacts, utility, etc), if available.

Evaluation of this criterion will take into consideration the level of Federal and other resources participating in the exercise.

All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise, indicated in the extent of play agreement.

PEMA NegotiatedExtent of Play:

94 0

Field Team Control will be performed within or near the 10 mile EPZ using the DEP RadiologicalRapid Response Vehicle (R3 V). Field Team control is expected to initially be out of sequence with the plume timeline. During the exercise the field teams will be directed to take measurements in locations to provide information sufficient to characterize the plume and impacts. In addition to field team measurements, remote detectors will be locatedby the field teams near the expected plume pathway, these detectors will automatically transmit data to the R3 V. These detectors will be used to keepfield team dose ALARA. A FEMA Evaluator will be located at the R3 V location, arrivingat the same time as the Field Teams, expected to be at 1600 on June 24, 2008.

Criterion 4.a.3: Ambient radiation measurements are made and recorded at appropriate locations, and radioiodine and particulate samples are collected.

Teams will move to an appropriate low background location to determine whether any significant (as specified in the plan and/or procedures) amount of radioactivity has been collected on the sampling media. (NUREG-0654, I. 9).

EXTENT OF PLAY Field -teams should demonstrate the capability to report measurements and field data pertaining to the measurement of airbome.radioiodine and particulates and ambient radiation to the field team coordinator, dose assessment, or other appropriate authority. If samples have radioactivity significantly above background, ,the appropriate authority should consider the need for expedited laboratory analyses of these samples. OROs should share data in a timely manner with all appropriate OROs. All methodology, including contamination control, instrumentation, preparation of samples,, and a chain-of-custody form .f6r tra-nsfer to a laboi'atory, will be in accordance with the ORO plan and/or pr&6eduies.

OROs should use Federal resources as identified in the FRERP, and 6ther resources (for example, compacts, utility, nuclear insurers, etc), if available. Evaluation of thiscriterion will take into consideration the level of Federal and other resources participating in the exercise.

All activities must be based on the ORO's plans and proceduresý and completed as they$would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.

PEMA NegotiatedExtent of Play:

Measurements will be made by Department of Environmental Protection (DEP), Bureau of Radiation Protection(BRP), in accordancewith the BRP StandardImplementing Procedures (IPs). Two mobile monitoring teamsfrom BRP DEPSouth, Western Regional Office will demonstrate ambient radiationmonitoring and radioiodineandparticulatesampling. Field teams will be equipped with appropriatedosimetry andKI. Both teams will be evaluated by FEMA. Each team will be directed to monitoring locationsandperform actual radiation measurements at each location. Measurements may consist of truck installedradiation monitor or hand-held radiationinstruments. - An actual air sample will be taken at the first location that meets the requirementsfor taking an airsample ( I mR/hr) as directed.

95

0 Teams will then take additionalsimulatedair samples, as directed,at additionallocations, if conditions are appropriatefor radioiodinesampling and relay information to the RadiologicalRapidResponse Vehicle (R3 V). In place of silver zeolite cartridges,charcoal cartridgeswill be usedfor the exercise. All measurements will be forwardedto theR3 V immediately upon obtainingdata. Evaluators will meet thefield teams at the DEP South Western Regional Office at 1:30p.m., June 24, 2008.

Sub-element 4.b - Post Plume Phase Field Measurements and Sampling 0

This sub-element will not be evaluatedduring,.thisexercise... ...

Sub-element 4.c.- Laboratory Operations . .

This sub-element will not be evaluated duringthis exercise._.

0 96 0

EVALUATION AREA 5 Emergency Notification and Public Information Sub-element 5.a - Activation of the Prompt Alert and Notification System INTENT This sub-element derives from NUREG-0654, which provides that OROs should have the capability to provide prompt instructions to the public within the plume pathway EPZ. Specific provisions addressed in this sub-element are derived from the Nuclear Regulatory Commission (NRC) regulations (10 CFR Part 50, Appendix E.IV.D.), and FEMA-REP-10, "Guide for the Evaluation of Alert and Notification systems for Nuclear PoWer'Plants."

Criterion 5.a.1: Activities associated with primary alerting and notification of the public are completed in a timely manner following the initial decision by authorized offsite emergency officials to notify the public of an emergency situation. The initial instructional message to the public must include as a minimum the elements required by current FEMA REP guidance. (10'CFR Part 50, Appendix E.IV.D and NUREG-0654, E.5, 6, 7)

EXTENT OF PLAY Responsible Offsite Response Organizations (ORO) should demonstrate the capability to sequentially provide an alert signal followed by an initial instructional message to populated areas (permanent resident and transient) throughout the 10-mile plume pathway EPZ.

Following the decision to activate the alert and notification system, in accordance with the ORO's plan and/or procedures, completion of system activation should be accomplished in a timely manner (will not be subject to specific time requirements) for primary alerting/notification. The initial message should include the elements required by current FEMA REP guidance.

Offsite Response Organizations (OROs) with route alerting as the primary method of alerting and notifying the public should demonstrate the capability to accomplish the primary route alerting, following the decision to activate the alert and notification system, in a timely manner (will not be subject to specific time requirements) in accordance with the ORO's plan and/or procedures. At least one route needs to be demonstrated and evaluated. The selected route(s) should vary from exercise to exercise. However, the most difficult route should be demonstrated at least once every six years. All alert and notification activities along the route should be simulated (that is, the message that would actually be used is read for the evaluator, but not actually broadcast) as agreed upon in the extent of play. Actual testing of the mobile public address system will be conducted at some agreed upon location. The initial message should include the elements required by current FEMA REP guidance.

For exercise purposes, timely is defined as "the responsible ORO personnel/representatives demonstrate actions to disseminate the appropriate information/instructions with a sense of 97

0 urgency and without undue delay." If message dissemination is to be identified as not having been accomplished in a timely manner, the evaluator(s).will document a specific.delay or cause as to why a message was not considered timely.

Procedures to broadcast the message should be fully demonstrated as they would in an actual emergency up to the point of transmission. Broadcast of the message(s) or test messages is not required. The alert signal activation may be simulated. However, the, procedures should be demonstrated up to the point of actual activation.

The capability of the primary notification system to broadcast an instrdictional message on a 24-hour basis should be verified during an ifiterview with appropriate personnel from'the primary notification system.' . ..

All activities for this .criterion must be based on the.ORO's plans and procedures~and completed as. they would be in an actual emergency,.exceptas noted above or otherwise indicated in the extent of play agreement.

PEMA NegotiatedExtent of Play:

The Commonwealth of Pennsylvaniahas implemented a Statewide EAS Control system in cooperationwith the PennsylvaniaAssociation ofBroadcastersper the State Emergency, Communications Committee and PennsylvaniaEmergency Alert System State EAS Plan (April 1, 2004). The State EOC (PEMA) is the initiatingpointfor the activation of the EAS.

Risk counties have the control equipmentfor activation of sirens. Coordinationwill occur between the State EOC and the affected counties with respect to the Alert andNotification System (ANS) process. Sirens will be coordihnatedahd the soundihg simulat'dai the appropriatetime with the simulated activation 6fEAS taAking place approxinidtely3 minutes following the simulated activation of the sirens:.Regular broadcastingwill :not be interrupted on the EAS Stations. All subsequent actions to broajcaststations will be simulated.

Broadcastof the message(s) Or test.message(s) is NOT-requiredand NOT requested.

Counties may elect to prtovide county specific EAS messages to" their LAS 'sations.

Following the decision to activate the alert and notification'system, in accordance With the ORO's plan and/orprocedures,ANS activationshould be accomplished in a timely mannerfor primary alerting/notification. This action will NOT be subject to specific time r'equirements.

All actions to broadcaststations will be simulated. Systems that use automatic sending technology may be demonstratedby explanation during an interview.

Each evaluatedmunicipality per risk county will demonstrate route alerting.ofthe hearing impaired residents within theirjurisdiction by interview at the EOC.

Criterion 5.a.2: [RESERVED]

98 a

Criterion 5.a.3: Activities associated with FEMA approved exception areas (where applicable) are completed within 45 minutes following the initial decision by authorized offsite emergency officials to notify the public of an emergency situation. Backup alert and notification of the public is completed within 45 minutes following the detection by the ORO of a failure of the primary alert and notification system. (NUREG-0654, E. 6, Appendix 3.B.2.c)

EXTENT OF PLAY Offsite Response Organizations (ORO) with FEMA-approved exception areas (identified in the approved Alert and Notification System Design Report) 5-10 miles from the nuclear power plant should demonstrate the capabi.lity to accomplish primary alerting and notification of the exception area(s) within 45 minutes following the initial decision by authorized offsite emergency officials to notify the public of an emergency situation. The 45-minute clock will begin when the OROs make the decision to activate the alert and notification system for the first timeý for a specific mefegency-situation.L The initial message should, at a minimum, inchide: a statemefit-'thit an emergency' exists at the plant and where to obtain additionail information.

For exception area alerting, at least one route needs to be demonstrfited and evaluated:, The selected route(s) should vary from exercise to exercise. However, the most difficult route should be demonstrated at least once every six.years. All alert and notification activities along-the route should be'simulated (that is, the message that would actually be used is read for the ,evaluator, but not actually broadcast) as, agreed upon in the extent of play. Actual testing' of the mobile public address system will be conducted at some agreed-upon location.

Backup alert and notification of the public should be completed within 45 minutes following the detection by the ORO of a. failure ofthe primary alert and notification system. Backup route alerting only needs to be demonstrated and evaluated, in accordance with the ORO's plan and/or procedures and the extent of play agreement, if the exercise scenario calls for failure of any portion of the primary, system(s), or if any portion of the primary system(s) actually fails to function.. If demonstrated, only one route needs to be selected and demonstrated. All alert and notification activities along the route should be simulated (that is, the message that would actually be used is read for the evaluator, but not actually broadcast) as. agreed ,upon in the extent 'of play. Actual testing of the mobile public address system will be conductedat some agreed-upon location.

All activities for this' criterion must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, except as noted above or otherwise indicated in the'extent-of play agreement.

PEMA NegotiatedExtent of Play:

Back-up alert notification of the public due to a simulatedsirenfailure will be demonstrated.

(Refer to Attachment A, Section L 4.) PEAA liaison will give an inject to the risk county 99

6 coordinatorthat a particularsiren has failed in the municipalitiesscheduled to demonstrate back-up route alerting. This sirenfailure will.then be communicated to the appropriate municipalitiesso they can demonstrate one back-up route alert run. Pennsylvaniadoes not have any "exception areas.'

Sub-element 5.b - Emergency Information and Instructions for the Public and the Media INTENT This sub-element. derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have theicapability tp disseminate to the public appropriate emergency information and instructions,, including any recommended protective actions. In addition, NUREG-0654 provides that OROs should ensure that the capability exists for providing information to the media. This includes the availability of a physical location for use by the media'during an emergency. NUREG-0654 also pifovides that a system'sfh6uld be available for dealing with rinumors. This systemiw'will hereafter be kniown as the public inquiry hotline. ..

' ..*' - *"~~~~~~~~~.

- .. ' .. ' " . i.".'* .. : "z .

Criterion 5.b.1I OROs prov'ide accurate emergency information and instructions to the public and the news media in a timely manner. (NUREG-0654,. E. 5, 7ý; G.3.a, EXTENT OF PLAY Subsequent emergency information and'instructibris lshould be provided to the&'public and the media in. a timely-manner (will not be subjectrto'specific time iequirements)ý. For exercise purposes, timely.is, defined as "the responsible .ORO persbnnel'/representatiVes demonstrate actions to disseminate the: appropriate information/instructiofts with a sense of urgency and without undue delay.' If message dissemination is' to be identified as not having been accomplished in a timely manner, the evaluator(s) will document a specific delay or cause as to why a message was not consideredtimely.> -

The ORO should ensure that emergency information and instructions'are consistent with protective action decisions made by appropriate officials. The emergency information should contain all necessary and applicable instructions (for example, evacuation instructions, evacuation routes, reception center locations, what to take when evacuating, information concerning pets, shelter-in-place instructions, information concerning protective actions for schools and special populations, public inquiry telephone number, etc.) to assist the public in carrying out protective action decisions provided to them. The ORO should also be prepared to disclose and explain the Emergency Classification Level (ECL) of the incident. At a minimum, this information must be included in niedia briefings and/or media releases.

OROs should demonstrate the capability to use language that is clear and understandable to the public within both the plume and ingestion pathway EPZs.. This includes demonstration of the capability to use familiar landmarks and boundaries to describe protective action areas.

100 a

The emergency information should be all-inclusive by including' previously identified protective action areas that are still valid, as well as new areas. The OROs should demonstrate the capability to ensure that emergency information that is no longer valid is rescinded and not repeated by broadcast media. In addition, the OROs should demonstrate the capability to ensure that current emergency information is repeated at pre-established intervals in accordance with the plan and/or procedures.

OROs should demonstrate the capability to develop emergency information in a non-English language when required by the plan and/or procedures.

If ingestion pathway measures are exercised, OROs should demonstrate that a system exists for rapid dissemination of ingestion pathway information to pre-determined indiViduals and businesses inaccordanrce Wih the ORO's plan and/or procedures.

oROs should demonstrate the capability to provide timely, accurate, concise, and coordinated information to the news media .for subsequent dissemination to the public. This would include demonstration of the capability to conduct timely and pertinent media briefings and distribute media releases as the situation warrants. The OROs should demonstrate the.capability to respond appropriately to. inquiries. from the news media.: All information presented in media briefings and media releases, should be consistent with protective action decisions and other emergency information provided to the public. Copies of pertinent emergency information (e.g., EAS messages and media releases) and media information kits should be available for dissemination to the media.

OROs should demonstrate that an effective system is in place for dealing with calls to the public, inquiry hotline. Hotline staff should demonstrate the capability to provide or obtain accurate information for callers or refer them to. an appropriate information source.

Information from the hotline staff, including information that corrects false or.inaccurate information when~trends are noted,, should.be included, asiappropriate;,in emergency information provided to the public,media briefings, and/or media-releases.

All activities for this criterion must be based on the ORO's plans.and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.L PEMA NegotiatedExtent of Play:

Subsequent emergency information and instructionsshould be provided to the public and the media in a timely manner. This will NOT be subject to specific time requirements. Any subsequent information/news statements requiredby the ORO Plans will be made by the individual counties to, ONE specific electronic news media/information outlet serving the county. One media briefing will be demonstratedin each risk county.

101

0 Risk and support counties will receive and handle "publicinquiry" messages via their individual "public inquiry"processes(In compliance with NIMS terminology, rumor control is now consideredto be '"publicinquiry"). Counties will receive approximately ten (10) public inquiry callsfrom the state exercise cell assignedthis responsibility. Counties will be expected to receive and log the calls, identify any trends and take appropriateactions.

0 0

102 0

EVALUATION AREA 6 Support Operation/Facilities Sub-element 6.a - Monitoring and Decontamination of Evacuees and Emergency Workers and Registration of Evacuees INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to implement radiological monitoring and decontamination of evacuees and emergency workers, while minimizing contamination of the facility, and registration of evacuees at reception centers.

Criterion 6.a.l: The reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers.

(NUREG-0654, J.10.h; J.12; K.5.a)

EXTENT OF PLAY Radiological monitoring, decontamination, and registration facilities for evacuees/

emergency workers should be set up and demonstrated as they would be in an actual emergency or as indicated in the extent of play agreement. This would include adequate space for evacuees' vehicles. Expected demonstration should include 1/3 of the monitoring teams/portal monitors required to monitor 20% of the population allocated to the facility within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Before using monitoring instrument(s), the monitor(s) should demonstrate the process of checking the instrument(s) for proper operation.

Staff responsible for the radiological monitoring of evacuees should demonstrate the capability to attain and sustain a monitoring productivity rate per hour needed to monitor the 20% emergency planning zone (EPZ) population planning base within about 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. This monitoring productivity rate per hour is the number of evacuees that can be monitored per hour by the total complement of monitors using an appropriate monitoring procedure. A minimum of six individuals per monitoring station should be monitored, using equipment and procedures specified in the plan and/or procedures, to allow demonstration of monitoring, decontamination, and registration capabilities. The monitoring sequences for the first six simulated evacuees per monitoring team will betimed by the evaluators in order to determine whether the twelve-hour requirement can be meet. Monitoring of emergency workers does not have to meet the twelve-hour requirement. However, appropriate monitoring procedures should be demonstrated for a minimum of two emergency workers.

Decontamination of evacuees/emergency workers may be simulated and conducted by interview. The availability of provisions for separately showering shouldbe demonstrated or explained. The staff should demonstrate provisions for limiting the spread of contamination.

Provisions could include floor coverings, signs and appropriate means (for example, partitions, 103

0 roped-off areas) to separate clean from potentially contaminated areas. Provisions should also exist to separate contaminated and uncontaminated individuals, provide changes of clothing for individuals whose clothing is contaminated, and store contaminated clothing and personal belongings to prevent further contamination of evacuees or facilities. In addition, for any individual found to be contaminated, procedures should be discussed concerning the handling of potential contamination of vehicles and personal belongings.

Monitoring personnel should explain the use of action levels for determining the need .for decontamination. They should also explain the procedures for referring evacuees who cannot be adequately decontaminated for assessment and follow up in accordance with the ORO's plans and procedures. Contamination of the individual will be determined by controller inject and not simulated with any low-level radiation source.

The capability to register individuals upon completion of the monitoring and' decontamination activities should be demonstrated: The registration activities demonstrated should include the establishment of a iegistrationrecord for each individual, consisting of the individual's name, address, results of monitoring,- andtime of'decontamiriation, if any; or as otherwise designated in the plan. Audio recorders, camcorders, or written records are all acceptable means for registration ... . ', . .

All activities associated with this criterion must'be based'on the ORO's plans and',

procedures and completed, as they would be in an actual emergency, unless otherwise indicated in the extent of play agreement.

PEMA NegotiatedExtent of Play:

Radiologicalmonitoringdemonstration sites shouldpossess a roster of the monitoring personnel requiredto process 20% of the population allocatedto thefacility within a 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> period.. .' . ' "

Waterfrom decontamination activities may go directly to a storm drain or other sewer or drain system or area normally designatedfor wastewater that has, been usedfor bathing or washing Ofjvehicles and or equipment. ......

At each reception center, a minimum of three volunteer evacuees will be processed, briefed, issued the appropriatestrip map or directions, and instructedto proceed to a mass care center designatedfor demonstration of monitoring,.decontamination,andregistration. A sample ofthe appropriatestrip maps 'ordirections will be made availablefor the demonstration. Co-locatedfacilities do not requirestrip maps or Written directions.

One mass care center and one mass care monitoring/decontaminationcenter will be demonstratedper county during the out-of-sequence window. The counties will provide space at designatedmass care centersjbr operation of monitoring/decontaminationcenters.

Schematics of these monitoring/decontaminationcenters will be available to show the organizationand layout within thefacility andspace managementfor monitoring and 104 01

decontamination. Procedureswill be demonstratedto show the separationof contaminated and non-contaminated(clean) individuals to minimize cross contamination.

At the evacuee monitoring/decontaminationcenter, a minimum of six (6) volunteer evacuees will be monitored (or one volunteer evacuee may be monitored six times). Suitable radiologicalmonitoringinstruments will be issued to and demonstratedby the initial monitoringteam(s). A monitoring team consists of one monitor and one recorder equipped with one survey instrument. Those individualsfound to be free of "contamination", based upon scenario injects, will be directed to the mass care registrationpointforfurther processing. Note: Actual radiologicalsources will not be attachedto or hidden upon the volunteer evacuees.

One of the simulatedevacuees, based upon controller injects, will not be able to be decontaminated. Discussions concerning the processingof contaminatedpersonnel will include capabilitiesand written proceduresfor showeringfemales separatefrom males.

Showering will be simulated; water willnot be,used Note: Ifportalmonitors are used, the PortalMonitor Extent of Play describedbelow shall be used.

At the emergencV worker monitoring/decontaminationstations one emergency worker will be monitored Discussionsconcerningprocessingof contaminatedpersonnel will include capabilitiesand written procedUres,forshoweringfemales separatefrom males.! Showering will be simulated, water will not be used Suitable radiologicalmonitoring instruments will be issued to the initialmonitoring team. Note:- Ifportalmonitors are,used, the Portal Monitor Extent of Play described below shall be used.

PortalMonitor Use: Risk and Support counties may, duringthis exercise, utilize portal monitors to monitor simulatedevacuees and/or emergency workers.. The monitoring/

decontamination team,requirements.will be basedon the portal monitor capabilitiesas applicable basedon the procedure/guidelines,and the recommendationsof the.:

manufacturer. Note: PEMA CircularC2004-2 shall apply.

Monitoring/decontaminationcenters and Emergency Worker monitoring,and decontamination stationpersonnel are not issued DRDs.or K! since the centers and stations are outside the EPZ. Category "C" dosimetry applies. Simulatedpersonal record dosimeters (PRDs) will be worn.,

Radiation readings/ contamination datafor.the evacuees and vehicle will be provided by the controlleras appropriatebased upon.information containedin the scenariopackage. Set-up of theJacility will be-perjbrmedthe same asfor an actual emergency with all route markings and contamination control measures in place includingstep-offpads. Long runs ofplastic covered with paper will not be demonstrated,but the materialsshall be available and explained Positioningof afire apparatuson-site may be simulated iotherwise required Sub-element 6.b - Monitoring and Decontamination of Emergency Worker Equipment

'INTENT 105

This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to implement radiological monitoring and decontamination of emergency worker equipment, including vehicles.

Criterion 6.b.l: The facility/ORO has adequate procedures and resources for the accomplishment of monitoring and decontamination of emergency worker equipment, including vehicles. (NUREG-0654, K.5.b)

EXTENT OF PLAY The monitoring staff should demonstrate the capability to monitor equipment, including vehicles, forcontamination in accordance with the Offsite Response Organizations (ORO) plans and procedures. "Specific attentiion should.be given, to equipment, including vehicles, that was in contact with individuals found to be co'ntaninated. The monitoring staff should demonstrate the capability to,make decisions on th6 need fOr decohtamination of equipment, including vehicles, based on guidance levels and procedures statd in the plan and/or procedures. ., .. .

The area to be used for monitoring and decontamination should be set up as it w6uldbe in an actual emergency, with all route markings, instrumentation, record keeping and contamination control measures in place. Monitoring procedures should be demonstrated for a minimum of one vehicle.. it is generally not necessary to monitor the entire surface of vehicles. However, ihe 'capability to monitor areas s'uch as radiator~grills, bumpIers, wheeI wells, tires, and door handles should be demonstrated. Interior surfaces of vefiicles that were in contact with individuals found to be contaminated should also be checked.

Decontamination. capabilities, and provisions for vehicles and equipment'that cannot be decontaminated, may be simulated and conducted by intelriew.

All activities associated with this criterion must be based on the ORO's plans and procedures and completed as they would be in an actual emergency,ýunless noted above or otherwise indicated in the extentof play agreement.

  • PEMA NegotiatedExtent of Play:

Emergency worker stationpersonnel will consist of a minimum of one monitor and one recorderand sufficient personnel to demonstrate monitoring of at least ohe vehicle.

Schematics of these monitoring/decbntaminationstations will be available to show organizationandspace management. The evaluatorwill request that vehicle decontaminationproceduresbe explained after the vehicle (with simulated contamination) has been monitored. One radiologicalsurvey meter, will be issued-to each vehicle monitoring/decontaminationteam. One vehicleand/orpiece of equipment will not be able to be decontaminated. Simulated radiationcontamination data will be included in the scenario package, and injected by a controller. Set-up of thefacility will be performed as closely as possible to thatfor an actualemergency with all route markings in place.

106 61

Decontaminationcapabilities,andprovisionsfor vehicles and equipment that cannot be decontaminated,will be simulatedand conducted by interview. Water will NOT be used.

Sub-element 6.c - Temporary Care of Evacuees, INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) demonstrate the capability to establish relocation centers in host areas.

The American Red Cross (ARC) normally provides congregate care in support of OROs under existing letters of agreement.

Criterion 6c.:' Managers o6f.ongiregate carefacilities demonstrate that the centers-haVe iesources to provide services and accommodations consistent with American Red Cross planning guidelines. (Found in MASS CARE -

Preparedness Operatiolns, ARC 3031) Managers demonstrate the procedures to assure that evacuees have beenmonitored fo'rcontamination and have been decontaminated as appropriate before entering congregate care facilities.

(NUREG-0654, J.10.h, J.12)

EXTENT OF PLAY Underfthis criterion,1 demonstration of congregate card centers may be conducted out of sequence with-the exercise scenario. The evaluator should conduct a walk-through of the center to defermine, through observation and inquiries, that the services and accommodations are consistent with ARC 3031. In this simutioh, it is not necessary to'set up operations as they would be in an actual emergency. Alter-nativelly, capabilities 'may be demonstrated by setting up stations for various services and providing those services to simulated evacuees. Given the substantial differences between demonstration and simulation of thisý objective, exercise demonstration expectations should be clearly specified in extent-of-play agreements.

Congregate care,.staff should also dcemonstrate the capability to ensure that evacuees have been monitored for contamination, have been decontaminated as appropriate,.and have been registered before entering the facility. This capability may be determined through an interview process.

If operations at the center are demonstrated, material that would be difficult or expensive to transport (for example, cots, blankets, sundries, and large-scale food supplies) need not be physically available at,the facility (facilities). However,, availability of such items should be verified by providing the evaluator a list of sources with locations and estimates of quantities.

All activities associated.with this criterion must be based on the ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.

PEMA NegotiatedExtent of Play:

107

All counties demonstrating the operation of mass care centers during the out-of-sequence window will providefloor plans of the mass care centers to show organizationwithin the facility andspace management duringa realemergency. Mass care center locations are listed in.the demonstration tables "Demonstrationof Mass Care Centers (AttachmentA, Section B.3)".

Personnel,at a minimum, will consist of one manager and one assistantfor each mass care center opened duringthe out-of-sequence window. The responsibleAmerican Red Cross chapter will show the source and quantities, byjob finctionaldescription, to be provided to mass care centers to support the 24-hour operation. The responsibleRed Cross Chapter(s)will be visited, or telephonically contactedduring business hours on May 14; 2008, by an exercise evaluator,or interviewed at the mass care center duringthe out-of-sequence evaluation to provide information regardingthe 24-houroperation.. Schematics of thesemass care centers will be available, duringthe demonstration window, to show organizationwithin the facility and space allocationfor the registrationandsheltering,the evacudtingpublic. .NecesSarysigns; directionalarrows andforms will be availableand used-to demonstrate registration,i-lt a minimum, of three evacuees requiringemergency;housing. Evacuees will be shown :the location where they would be housed in an actualsituation. !Bedding,-cots,f6od, etc. normally~i associatedwith masscare:willnotbe moved to the Site,. butthe Sources of those items should be explainedto FEMA evaluators.' This out-of-sequenceldemonstrationwindow will befroin 7.:00 PM- 9:30 PMon May 14, 2008. . . .' .

American Red Cross Chapters and POCs are as follows:

(Allegheny and Washington CoUnties) (Butler County).

Southwest PA Chapter Butler County Area 225 Blvd. Of the Allies 312 Mercer St. . ...

Pittsburgh, PA 15230 Butler, PA 16001 POC: Rob Skertich POC: Melissa Wilson 412-263-3100. . 724-283-2810 (Beaver and Lawrence County) 133.Friendship Cir. .

BeaverPA 15009 "

POC: -John Stubbs 724-775-9700 Sub-element 6.d - Transportation and Treatment of Contaminated Injured Individuals This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO's) should have the capability to transport contaminated injured individuals to medical facilities with the capability to provide medical services.

108 40

Criterion 6.d.1: The facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals. (NUREG-0654, F.2; H.10; K.5, a, b; L.1,4)

EXTENT OF PLAY Monitoring, decontamination, and contamination control efforts will not delay urgent medical care for the victim.

Offsite Response Organizations (ORO) should demonstrate the capability to transport contaminated injured individuals to medical facilities. An ambulance should be used for the response to the-victim. However, to avoid taking an ambulance out of service for an extended~time, any vehicle (e.g., car, truck,, or van) may be utilized to transport.the victim to the medical facility.. Normal communications, between the ambulance/dispatcher and the receiving medical facility should be demonstrated.; If a substitute vehicle is used for transport .to the medical facility; this communication must occur, prior to releasing the ambulance from the drill. This communication would include reporting radiation-monitoring results, if available .Additionally, the ambulance crew should demonstrate, by interview, knowledge of where the ambulance and crew-would be monitored and decontaminated,z if required, or whom to contact for such information.

Monitoring of the Victim may be performed prior to transport, done enroute, or deferred to the medical facility. Prior to using a monitoring instrument(s), the monitor(s) should demonstrate the process of checking the instrument(s) for proper operation. All monitoring activities should be~cornpleted, as they would be in an actual emergency.

Appropriate contamination control measures should be demonstrated prior-to and during transport and at the receiving medical facility.

The medical facility should demonstrate the capability to activate and set up a radiological emergency area for treatment. Equipment and supplies should be available for the treatment of contaminated injured individuals.

The medical facility should demonstrate the capability to make decisions on the need for decontamination of the individual, to follow appropriate decontamination procedures, and to maintain records of all survey measurements and samples taken. All procedures for the collection and analysis of samples and the decontamination of the individual should be demonstrated or described to the evaluator.

All activities associated with this criterion must be based on the ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.

PEMA NegotiatedExtent of Play:

This sub-element was evaluated at Ellwood City Hospital on December 12, 2007.

109.

t S

0 110 61

ATTACHMENT A Beaver Valley Power Station 2008 Extent of Play Demonstration Tables PLUME PHASE EXERCISE -

A. Activities - May 14, 2008

1. Risk Public School Districts with schools located within the EPZ and those districts situated outside the EPZ, but with students living within the EPZ, will participate and be evaluated by the Department of Homeland Security. Each identified District Administration Office will be evaluated. When a school system is comprised of multiple buildings (High School, Middle School, Elementary School), the affected buildings (those with students from the EPZ) will be evaluated on a rotational basis to coincide with the six-year exercise cycle.

Time: Out of Sequence - 9:00 - 11:00 AM County School District School Beaver Aliquippa Aliquippa Elem Beaver Area Beaver Area MS/HS Blackhawk Patterson Primary Center Area Center Area Junior HS Hopewell Margaret Ross Elem Midland Borough Neel Elem Monaca Monaca Elem South Side Area South Side Middle School Western Beaver Western Beaver Jr/Sr HS New Brighton See Note below Ambridge See Note below NOTE: New Brighton and Ambridge School Districtsdo not have schools within the EPZ.

They do have students attending their schools who reside in the EPZ. Proceduresfor holding those students at their respective schools untilpicked up by parents or guardianswill be explained by the district superintendentor representative. As proceduresare the same district wide there will be no need to visit individualschoolsfor evaluation.

2. County Emergency Operations Centers (EOCs)

Time: Per Scenario 111

0 DEMONSTRATION FOR EOC'MOBILIZATION

.FOR COINTIES (Plume Phase Exercise)

County Date Time Beaver' June 24, 2008 TBD Allegheny June 24, 2008 TBD Butler June 24, 2008 TBD Lawrence June 24, 2008 TBD Washington June 24, 2008 TBD

3. Municipal Emergency Operations Centers (EOC) 60 Time: Per Scenario . . .

DEMONSTRATION FOR EOC"MOBILIZATION FOR MUNICIPALITIES (Plume Phase Exercise)

RISK COUNTY MUNICIPALITY. . DATE Beaver City of Aliquippa' .... . June 24,2008 Beaver Borough, June:24, 2008 Bridgewater/Fallston Borough* June 24, 2008

.- Brighton Township' June 24, 2.008 Center Township, .. June 24, 2008 Chippewa Township ' June 24, 2008 Frankfort Springs/Hanover* June 24, 2008 Georgetown/Greene/Hookstown* June 24, 2008 Glasgow/Ohioville/S,. Beaver*... June 24, 2008 Hopewell Township June 24, 2008 Independence Township June 24, 2008 Industry Borough June 24, 2008 Midland Borough June 24, 2008 Monaca Borough June 24, 2008 Patterson Twp/Patterson Hts Boro* June 24, 2008 0 Potter Township June 24, 2008 Raccoon Township. .. June 24, 2008 Shippingport Borough June 24, 2008 South Heights Borough June 24, 2008 Vanport Township June 24, 2008

4. One back-up one route alerting demonstration by each risk municipality listed below. (During Scenario Exercise) 112 61

COUNTY RISK MUNICIPALITY DATE Beaver Beaver Borough June 24, 2008 Brighton Township June 24, 2008 Chippewa Township June 24, 2008 Hopewell Township June 24, 2008 Monaca Township June 24, 2008 Patterson Heights/Patterson Borough June 24, 2008

5. Traffic and Access Control Points
a. The Pennsylvania State Police will brief at the PSP Beaver Barracks, 1400 Brighton Road, Beaver, PA 415009 Those attending the briefing will not actually deploy to the TCP/ACPs.

"'.,b". .lThe PSP briefing will be periformed out of sequence in a demonstration window of 1:00 p.m. to 3:00 p.lm. on June 24,42008. :..

c; !Each municipal/ regional police force:,with a TCP assigned in its plan will demonstrate all preparation duties including TCP responsibilities and radiological

.,.briefing. Dispatch of persons to the TCP site will not occur during the exercise.

.dMunicipal and county staffs will berprepared to brief the DHS evaluator on actions

',to be, taken should there be an impedimentto evacuation on a designated route. This wiill. be demonstrated betweeni7:00 .pm - 9:30 pm on June 24,.2008.

MUNICIPAL / REGIONAL POLICE FORCES COUNTY POLICE FORCE Beaver Beaver Bridgewater/Fallston Center

. Monaca Patterson Heights/Patterson

- Raccoon Shippingport B. May 14, 2008 113

0

1. Reception Centers (Out of Sequence)

Demonstration of Reception Centers COUNTY DATE TIME Allegheny May 14, 2008 7:00 p.m. - 9:30 p.m.

Butler May 14, 2008 7:00 p.m. - 9:30 p.m.

Lawrence May 14, 2008 7:00 p.m. - 9:30 p.m.

Washington May 14,2008 7:00 p.m. - 9:30 p.m.

COUNTY Reception CenterLocation Allegheny South Park Museum Buildinig Butler Slippery Rock University 0 Lawrence Mohaw'k Area HOifi S 6hol:.

Washington Washington' County Fairgr'o0unds.

2. Monitoring/Decontamination Centers (0ut0of Sequence)'

Demonstration of Mon/Decon Centers COUNTY DATE TIME..

Allegheny May 14, 2008 7:00 plm. - 9:30 p.m.

Butler May 14,2008 7:00 p.m. - 9:30,pm.

Lawrence May 14,2008 7:00 p.m. - 9;30p.m."

Washington May 14; 2008 7:00p.m. - 9:30Vp.m..

COUNTY Mon/Decon Center Locations Allegheny South Park Museum Building Butler Slippery Rock University Lawrence Mohawk High School Washington McGuffey High School 0

3. Mass Care Centers (Out of Sequence)

Demonstration of Mass Care Centers COUNTY DATE TIME Allegheny May 14, 2008 7:00 p.m. - 9:30 p.m.

Butler May 14, 2008 7:00 p.m. - 9:30 p.m.

Lawrence May 14, 2008 7:00 p.m. - 9:30 p.m.

Washington May 14, 2008 7:00 p.m. - 9:30 p.m.

COUNTY Mass Care Center Locations Allegheny South Park High School 114 0

Butler Slippery Rock University Lawrence Mohawk High School Washington McGuffey High School NOTE: The following actions will take place at the designated counties:

Allegheny - reception, mon/decon (personnel and vehicle,) and mass care demonstrations will take place at South Park.

'Butler - reception, mon/decon (personnel and vehicle,) and mass care demonstrations will take place at Slippery Rock..

Lawrence - reception, mon/decon (peisonnel and vehicle,) and mass care demonstrations will take place at M.6hawk High School.'.

Washington - reception and driving directions will be demonstrated at the Washington County Fairgrounds. Personnel, and vehicle mon/decon and mass care will be demonstrated at McGuffey -igfh Scho'ol."

" " " " ' '  ! , , I * " .

4.- Emergency Worker Monitoring Decontamination Stations (Out of Seq uence)

B eaiver I Beaver Falls1 FD- May 14, 2008 Beaver -South Beaver FD May 14, 2008 ATTACHMENT B PREVIOUS ISSUES 115

0 Number Facilit Evaluated 03-06-6.a. 1-A-03 Butler Mon/Decon - team not familiar with procedures 03-06-3.b.1-P-01 Center Township - no log record for KI ingestion BVX92-27R (1.c. 1) Armstrong County - 16 year old ingestion issue that will not go away. Will be re-demonstrated in 14 years BVX92-28R (1.b. 1) Greene County - 16 year old ingestion issue that will not go away. Will be re-demonstrated in 14 years 0 61 116 6

BVPS 2008 REP EXERCISE - WV EXTENT OF PLAY AGREEMENT Beaver Valley Power Station: The facility normally uses off-watch section personnel to participate in the exercise. The plant's simulated events, radiation readings, and emergency classifications will trigger offsite exercise actions.

2. Offsite Response Functions:

State: West Virginia Emergency Operations Center

  • Direction & Control o Accident Assessment
  • Public Information
  • Communications Hancock County Emergency Operations Center
  • Accident Assessment Beaver Valley Power Station Emergency Response Facility
  • Accident Assessment Beaver Valley Power Station Joint Public Information Center
  • Public Information.

County: Hancock County Emergency Operations Center

  • Direction & Control
  • Public Information
  • Alert & Notification
  • Communications Field Play: (See 5. Demonstration Windows)
3. Controllers: First Energy Nuclear Operating Company (FENOC) will provide controller at the Hancock County EOC and at Hancock County field locations. Controllers will not take an active part in the proceedings, but will interact with staff members to the extent necessary to fulfill their observer responsibilities or to provide data when requested. Coaching of players by Controllers is not permitted except to provide training to participants awaiting a re-demonstration.

117

4. FEMA Evaluators: Federal evaluators will be present at the State EOC, Hancock County EOC, and at field locations to evaluate player response to the actual and simulated events in the exercise scenario.
5. Demonstration Windows: The demonstration windows are those periods of time designated in, the exercise during which specified demonstrations will be accomplished. The purpose of the window is to provide for more effective demonstrations as well as permitting the release of volunteers from the exercise play at a reasonable hour.
  • The State &'Hancock County EOC Operations will be conducted on June 24, 2008.
  • The State will be represented at the BVPS Emergency Response Facility during the June 24, 2008 exercise.

r The State.will be represented at the BVPS Joint: Public Information Center (JPIC) during the June 24,2008 'exercise.

  • Out of Sequence Demonstrations-will *be run independently of each other.
  • Out of Sequence Demonstrations. will be managed by the Lead Controller at each field location.
  • MS-1 Hospital Exercise was conducted on April 24,.-;2007 and Federal Evaluated atthe Weirton Medical Center. '
  • School demonstration:. Will 'be condu'cted on June 24, 2008 at 0900 - 1100 hou'rs at Oak'Glen High School in New Cumberland, WV. Bus Drivers will also be, evaluated at that time.
  • Reception Center/Mass: Care Center; Monitoring/Decontamination Center -June 24, 2008 at Weir High.Complex at 1900 - 2100 Hours.

0 Emergency Worker Monitoring. and -Decontamination: May 14, 2008'at New Cumberland, Fire'Dept, at 1900- 2100 Hours.

  • Traffic Control / Access Control: May 14, 2008 at 1900 - 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> at New Cumberland Fire Dept.
  • Route Alerting: May 14, 2008 at Oakland VFD at 1900 - 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br />.
  • Field Monitoring Team: June 24, 2008 at 0900 - 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br />.

Team will form at the Hancock County Court House.

All demonstrations will commence promptly and, barring any complications, not continue past the end of the windows.

6. Termination: The Lead Controller in the Hancock County EOC will coordinate the Exercise Termination with the West Virginia EOC, the BVPS EOF, and the EOCs in Beaver and Columbiana County for the June 24, 2008 Exercise.

118 U]

Field Locations / Out of Sequence Demonstrations will be terminated by the Lead Controller at each location. The termination will be based on -the completion of the objectives. The termination can happen sooner than the identified end time.

7.. General Concepts: An emergency plan is drafted to address the generally expected conditions of an emergency. Not everything in the emergency plan may be applicable for a given scenario. The main purpose of an emergency plan is to assemble sufficient expertise and officials so as to properly react to the events as they occur. The responders-should not be so tied to a plan' that they cannot take actions that ýare more- protective of the public. Therefore, if, by not following, the.-plan,'the responders protect the' public equally as well as providedin -the plan, -it should be noted for possible modification of the plan, but not classified as a negative incident. Furthermore, if, by following the pian there is a failure to protect the public health and safety, it should be noted so that the plan can! be modified and the appropriate negative assessment applied:-

-8. Re-demonstrations: .During the.,out-of-sequence demonstrations on during the weekof May 14, ,2008; or the.Plumeý Exercise on June 24, 2008, any activity that is not satisfactorily demonstrated may be re-demonstrated by the participants during the exercise provided it does not negatively interfere with the exercise. Refresher training can be provided by the players,' observers, and/or' controllers. Re-demonstrations,-will be, negotiated between' the players, observers, controllers;'evaluators8 and RACCha'ir, or designee. It is permissible to

,extend the evaluation time to .accommodate. the re-demonstration.

Activities corrected,from a re-demonstration will be so noted.

119

0 EVALUATION AREA 1 - Emergency Operations Management Sub-element l.a - Mobilization INTENT This sub-element is derived from NUREG-0654, which proyides that Offsite Response Organizations (ORO) should have the capability to alert, notify, and mobilize emergency personnel and to activate and staff emergency facilities.

Criterion 1.a.1: OROs use effective procedures to alert, notify, and mobilize emergency personnel and activate-facilitiesin. a timely manner. (NUREG-0654, A.4; D.3, 4;,E.1, 2; H.4)A-EXTENT OF PLAY State:

- Demonstrate the capability to receive notification of an emergency situation from the licensee. Contact, alert, and mobilize key emergency personnel in a timely manner.

- Demonstrate the activation of facilities for immediate use by mobilized personnel when they arrive to begin emergency operations.

- Activation of facilities will not start until an Alert is declared.

- Activation of facilities should be completed in accordance with the plan and/or procedures.

- Pre-positioning is permitted for all field locations and any out-of-sequence demonstrations. State personnel assigned to field activities (i.e. County EOC, BVPS EOF, BVPS JPIC) will be permitted to pre-position.

- EOC Twenty-four (24) Hour Staffing will be demonstrated by roster.

County:

120 a

- Demonstrate the capability to receive notification of an emergency situation from the licensee. Contact, alert, and mobilize key emergency personnel in a timely manner.

- Demonstrate the activation of facilities for immediate use by mobilized personnel when they arrive to begin emergency operations.

- Activation of facilities should be completed in accordance. with the plan and/or procedures.

- Activation of facilities will not start until an Alert is declared.

- Pre-positioning is permitted for all field locations and any out-of-sequence demonstrations..

- EOC Twenty-fourl(24) Hour Staffing wilLbe demonstrated by roster.

All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.

121

0 EVALUATIONAREA 1 - Emergency Operations Management Sub-element 1.b - Facilities INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response. Organizations (ORO) have. facilities to support the emergency response.

Criterion 1.b.1: Facilities are sufficient to support the emergency response. (NUREG-0654, H.3) 0 EXTENT OF PLAY State: ý,,i:** ; : ,. . , :

- All facilities identified in the method of operations have been evaluated during previous exercises in order to establish a baseline. Facilities will not be evaluated.

County:

All facilities identified in thermethodof operations have been evaluated during previous exercises, in order to establisha baseline. Facilities will not be evaluated,.- " ..

Facilities must be set up based on the ORO's plans and procedures and demonstrated as they would be used in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.

a 122 4

EVALUATION- AREA 1,- Emergency Operations Management Sub-element 1.c - Direction and Control INTENT This sub-element is derived from NUREG-0654, which provides-that Offsite Response Organizations (ORO) have the capability to control, their overall response to an emergency.

Criterion 1.c.1: Key personnel with leadership roles for the ORO provide direction and control to that part of the overall response effort for which they are responsible. (NUREG-0654,.A.1.d; A.2.a, b).,

EXTENT OF PLAY State:

- Leadership personnel should demonstrate the ability to carry out essential functions of the response effort, for example: keeping the

- staff informed, through ".periodic- briefings and/or other means, coordinating. with' other appropriate response organizations, and ensuring completion of requirements and. requests.

Cou*'nty:

y."

Leadership personnel should demonstrate the ability to carry out essential functions of the response effort, for example: keeping the staff informed through periodic briefings and/or other means, coordinating with other appropriate response organizations, and ensuring completion-of requirements and requests.

All activities associated with direction and control must be performed based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless otherwise noted above or indicated in the extent of play agreement.

123

0 EVALUATION AREA 1 - Emergency Operations Management Sub-element 1.d - Communications Equipment INTENT ThiS: sub-element is derived from NUREG-0654, which provides that Offsite

'Response Organizations (ORO) should establish reliable primary and backup communication systems to ensure communications witlh ,key emergency personnel at locations such as the following
appropriate contiguous governments within the emergency planning zone (EPZ), Federal emergency response organizations, the licensee and its facilities, emergency operations centers (EOC), and field teams.

Criterion 1.d.1: At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate locations. Communications capabilities are managed in support of emergency operations. (NUREG-0654, F.1, 2)

EXTENT OF PLAY State:

- EOC will demonstrate telephone and at least one radio communications system.

- Field Teams will demonstrate the capability to communicate from the field locations, independent from commercial hard line telephone.

- Demonstrate the capability to manage the communication systems and ensure that all message traffic is handled without delays that might disrupt the conduct of emergency operations.

County:

- EOC will demonstrate telephone and at least one radio communications system.

- Demonstrate the capability to manage the communication systems and ensure that all message traffic is handled without delays that might disrupt the conduct of emergency operations.

124 E0

- Out-of-sequence demonstrations will have :communications available and demonstrated (i.e. radio / communications check).

- Communications associated with medical support" facilities were demonstrated during the April 24, 2007, MS-1 Federal Evaluated Exercise.

All activities associated with the management of communications capabilities must be demonstrated based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless otherwise noted above or in the extent of play agreement.

  • , " "* . .1.*: .r .'.;.: t .

I - - . I 125

0 EVALUATION AREA 1 - Emergency Operations Management Sub-element i.e - Equipment and Supplies to Support Operations INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) have emergency equipment and supplies adequate to support the emergency response.

Criterion. 1.e.1: Equipment, maps, displays, dosimetry, potassium iodide (KI), and other supplies, are Sufficient 'to .support emergency operations. (NUREG-0654, H.7, 10; J.10.a, b, e, J.11; K.3.a)

EXTENT OF PLAY,,,

State:

- Maps and displays will be utilized in the EOC.

- Radiological instruments used by the State Field Team will be with the team in Hancock County and demonstrated out-of-sequence.

Instruments will be operationally checked. A label indicating such calibration should be on each instrument or verifiable by other means, such as a letter.

- Dosimetry for the State Field Team will be issued by the County.

County:

- The dosimetry is exchanged annually and documentation will be verified during the exercise.

- The County will demonstrate the capability to maintain inventories of KI sufficient for use by emergency workers

- Adequate quantities of dosimetry and KI are available at the County EOC and will be confirmed by physical inspection. Available supplies of KI will be within the expiration date indicated on KI bottles or blister packs.

- Maps and displays will be utilized in the EOC.

126 0

Hancock County does not.pre-distribute dosimetry. . Dosimetry will not be distributed during the exercise.

Dosimetry "Training Kits" will be available at the field locations to demonstrate the use of dosimetry.

- A Law Enforcement Officer, in the County EOC, will discuss the process to establish Traffic and Access Control Points during the EOC play on June,24, 2008.

- The responsibility of the officer at a Traffic and Access Control Point will be explained through the interview process during Out-of-Sequence play;on May 14, 2008.at 1900 -21.00.hours at the New, Cumberland Fire Department:

All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.

127

0 EVALUATION AREA 2 - Protective Action Decision-Making Sub-element 2.a - Emergency Worker Exposure Control INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to assess and control the radiation exposure received by emergency workers and have a decision chain in place, as specified in the ORO's plans and procedures, to authorize emergency worker exposure limits to be exceeded for specific missions.

Radiation exposure limits for emergency workers are the recommended accumulated dose limits or exposure rates that emergency workers may be permitted to incur during an emergency. These limits include any pre-established administrative reporting limits (that take into consideration Total Effective Dose Equivalent or organ-specific limits) identified in the ORO's plans and procedures.

Criterion 2.a.1: OROs use a decision-making process, considering relevant factors and appropriate coordination, to ensure that an exposure control system, including the use of KI, is in place for emergency workers including provisions to authorize radiation exposure in excess of administrative limits or protective action guides.

(NUREG-0654, K.4, J.10. e, f)

EXTENT OF PLAY State:

- As appropriate, demonstrate the capability to make decisions on the distribution and administration of KI as a protective measure.

- A decision not to take KI is an acceptable decision.

County:

- Demonstrate the capability to make decisions concerning the authorization to exceed predetermined administrative exposure limits. This will be done by interview.

- Demonstrate through interview with County Director or his designee, how KI would be distributed to EPZ Emergency Workers.

128 a

129 0

EVALUATION AREA 2 - Protective Action Decision-Making Sub-element 2.b. - Radiological Assessment and Protective Action Recommendations and Decisions for the Plume Phase of the Emergency INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to independently project integrated dose from exposure rates or other information and compare the estimated dose savin'gs with the protective action guides. OROs have the capability to choose, among a-. range, of ' protective:- actions, those most appropriate in a given emergency situation. OROs base these choices on PAGs from the ORO's'plans and procedures*'or EPA 400-R'92-001 and other criteria, such as, plant conditions, licensee protective action recommendations, coordination of protective action decisions with other political jurisdictions (e.g., other affected OROs),.availability of appropriate in-place shelter, weather conditions, evacuation- time estimates, and situations that create higher than normal risk from: evacuation.

Criterion 2.b.1: Appropriate protective action recommendations are based on available information on plant conditions, field monitoring data, and licensee'and OROdose projections, as-well as knowledge of onsite and 'offsite environmental conditions. (NUREG-0654, 1.8, 10 and Supplement 3)

EXTENT OF PLAY State:

Protective Action Recommendations will be developed in accordance with Plans and/or Procedures..,

- As data 'becomes available, .accident assessment -will, be, performed and PARs developed in accordance with Plans and/or Procedures.

County:

- N/A Criterion 2.b.2: A decision-making process involving consideration of appropriate factors and necessary coordination is used to make 130 a

protective action decisions (PAD) for the general public (including the recommendation for the use of KI, if ORO policy). (NUREG-0654, J.9, 10.f, m)

EXTENT OF PLAY State:

- .- The State should have. the capability,. to .make., both initial and

'subsequent protectiveactions. ,

- Demonstrate the capability to make. initial, protective actions in a timely

, manner.,

- The dose assessment personnel may:provide additional PARs based on the subsequent dose projections,.' field -monitoring. data, or information on,,- plant, conditions. . The. decision-makers should demonstrate the capability to change protective actions as appropriate based on these projections.-,,

- The PAR should be. coordinated between the 3 States and the three counties. -A coordinated PAR ,does.. not necessarily mean. the same PAR.

- At least one PAR will be demonstrated.

County:

- A least one PAD based on the recommendations coordinated between the states and counties will be'demonstrated.

All decision-making activities' by ORO. personnel must be performed based on the ORO's plans and procedures and completed as. they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.

131

0 EVALUATION AREA 2 - Protective Action Decision-Making Sub-element 2.c - Protective Action Decisions Consideration for the Protection of Special Populations INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have the capability to determine protective action recommendations, including evacuation, sheltering and use of potassium iodide (KI),, if ýapplicable,, for special population groups (e.g.,

hospitals, nursing homes, correctional facilities, schools, licensed day care centers, mobility impaired individuals, and transportation dependent individuals). Focus is on those special populatiqn.gro.ups that are (or potentially will be) affected by a radiological release from a nuclear power plant. - -

Criterion ,2*c.1:, Protective action decisions.are. made, as appropriate, for special population groups., (NUREG-O.654, .J.9,:J,1O.d, e) -

EXTENT OF PLAY State:

- N/A County:

- Schools and bus drivers will be demonstrated out of sequence on June 24, 2008 at 0900 - 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br />.

- Bus will not run a route to the host school.

- Special populations will be demonstrated through interview with appropriate EOC staff during the June 24, 2008 exercise.

All decision-making activities associated with protective actions, including consideration of available resources, for special population groups must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.

132 a

EVALUATION AREA 2 - Protective Action Decision-Making Sub-element 2.d. - Radiological Assessment and Decision-Making for the Ingestion Exposure Pathway EXTENT OF PLAY State:

  • This element will not be demonstrated-duringthis exercise.

County:.

  • This element will not be demonstrated during this exercise.

':Sub-element ' 2.e.--!,,Radiological ,'Assessment' and., Decision-Making Concerning Relocation,-.Re-entry, and Return, State:

  • This element will not be demonstrated during this exercise.

County:

  • This element will not be demonstratedduring this exercise.

133

0 EVALUATIONAREA 3 - Protective Action Implementation Sub-element 3.a - Implementation of Emergency Worker Exposure Control INTENT,-

This sub-element is derived from NUREG-0654, which provides that OROs

.,should have the capability to provide for the following: .,distribution, use, collection, and processing of.direct-reading dosimetry- and permanent record dosimetry; the reading of direct-reading dosimetry by emergency workers at appropriate frequencies; maintaining a' radlation ,dose record for each emergency worker; and establishing a decision, chain or authorization procedure for emergency workers to incur radiation exposures in excess of protective action guides, always applying the ALARA (As Low As is Reasonably Achievable) principle asappropriate..*.

Criterion 3.a.1: The OROs issue appropriate dosimetry and procedures, and manage radiological exposure to emergency workers in accordance with the plans and procedures. Emergency workers periodically and at the end of each mission read their dosimeters and record the readings on the appropriate exposure record or chart. (NUREG-0654, K.3.a, b)

EXTENT OF PLAY State:

- N/A County:

- Emergency Workers who are assigned dosimetry will demonstrate the procedures to monitor and record dosimetry readings. The workers may be interviewed by the evaluator to determine their knowledge of radiological exposure control, radiation exposure limits, turn back values and whom to contact in the event authorization is needed to exceed their limits.

- OROs should demonstrate the actions described in the plan and/or procedures by determining whether to replace the worker, to authorize the worker to incur additional exposures or to take other actions. If scenario events do not require emergency workers to seek authorizations for additional exposure, evaluators should interview at 134 a

least two emergency workers, to determine their knowledge of whom to contact in the event authorization is needed..

- Emergency workers may use any available resources (e.g., written procedures and/or co-workers) in providing responses:

- Dosimetry "Training Kits" will be available at the field locations to demonstrate the use of dosimetry. A "Training Kit" is designed to have sufficient supplies to demonstrate Radiological Exposure Control. The kit will not necessarily have sufficient supplies for all the emergency workers at the facility. Area monitoring kits may be utilized-.-

.. The supply 'of, DRDs,:.PRDs and KI -will be available' in the Hancock County EOC:.

All actiVities must be' based on the ORO's plans and procedures'and completed as they would be in an actual emergency, unless' noted above or otherwise indicated in the extent of play agreement.

135

0 EVALUATION AREA 3 - Protective Action Implementation Sub-element 3.b - Implementation of KI Decision INTENT.

This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have the capability to provide radioprotective drugs for emergency workers, institutionalized individuals, and, if in the plan and/or procedures, to the general public for whom immediate evacuation may not be feasible, very difficult, or' significantly delayed. . While it is necessary for, OROs to have the capability-to provide KI to emergency workers and institutionalized individuals, the provision of KI to

.the general -.public is an ORO option and is reflected in.ORO's,.plans and procedures.,. Provisions should include, the avai.lability:of adequate quantities, storage, and means of the distribution. of radioprotectiv,e drugs.-.

Criterion 3.b.1: KI and appropriate instructions are available should a decisionto recommend use ofKl. be made. ,Appropriate record keeping of the administration of Kl for emergency workers! and institutionalized individuals (not the general public) is maintained., (NUREG-0654, J. 10.

e)

EXTENT OF PLAY State:

- The State should demonstrate the capability to, formulate and disseminate appropriate instructions on the use of KI for those advised to take it.

SA, decision not to take KIis "anacceptable decision.

County:

- The County will demonstrate the capability to make KI available to

,,emergency workers. The County will demonstrate. the capability to accomplish distribution .of K[ consistent with decisions made.

Organizations should have the capability to develop and maintain lists of emergency workers 'who have ingested KI, including documentation of the date(s) and time(s) they were instructed to, ingest KI. The ingestion of KI recommended by the designated health official is voluntary. For evaluation purposes, the actual ingestion of KI is not.

necessary.

Emergency workers should demonstrate the basic knowledge of procedures for the use of KI whether or not the scenario drives the use of KI. This can be accomplished by an interview with the evaluator.

136 0

All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.

EVALUATION AREA 3 - Protective Action Implementation Sub-element 3.c - Implementation of Protective Actions for Special Populations INTENT This sub-element is deriVed'from NUREG-0654, which provides that Offsite Response Organizations (ORO) should- have' the capability to implement

,protective action decisions, including' levacuation and/or sheltering, for all special populations'. FocUs,:is on .those.. special .populations that are (or potentially will be) .affected' by; a radiological release from a nuclear power plant.

Critertion 3.c: Protective action decisions a 1re implemented for special populations :other"tha schools within areas subject to protective Th

-actions..(NUREG0654 J.10.`,6cd, g) .

EXTENT OF PLAY State:

-N/A. -

County:

- Demonstrate the, capability_ to alert .-and notify, special populations (hospitals, nursing homes, correctional facilities, mobility-impaired individuals, transportation dependent, State licensed day care centers, etc.).

-"Demonstrate-the capability "to provide for the needs of special populations in'accordance with plans and procedures.

- Contact with 'special populations and 'reception facilities will be

ýsimulated.

- Telephone calls will not be made

- One transportation provider will be contacted; all other calls will be simulated.

All simulated contacts should be logged.

137

0

- Route Alerting will be conducted Out-of-Sequence on May 14, 2008 at Oakland VFD at 1900- 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br />.

- Notification of special needs people will be simulated by the Route Alerting Fire Department or notification from EOC staff.

- Notification of special populations will be procedurally explained.

Criterion 3.c.2: OROs/School officials decide upon and implement protective actionS, for -schools. " (NUREG-0654, J.1O.c, d, g)

EXTENT OF PLAY State:

-N/A County:

- Demonstrate the capability to alert and notify the Hancock County School District of emergency conditions that are expected to or may necessitate protective actions for students.

- Contact with the public school district will be demonstrated during the out-of-sequence school play on June 24, 2008 at 0900 - 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br />.

- The Hancock County OEM and/or officials of the Hancock County School District will demonstrate the capability to make prompt decisions on protective actions for students.

- School Officials will demonstrate the decision making process for protective actions.

- One School in the Hancock County School District will participate during the Out-of-Sequence Demonstration on June 24, 2008 at 0900

- 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br />.

- Transportation of school children, if necessary, will be simulated.

138

- One Bus Driver will be available, at the participating school, for an interview between 0900 - 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> on June 24, 2008

- The bus will not run the route to the Host School, but will explain the procedure.

- The implementation of canceling the school day, dismissing early, or sheltering will be simulated by describing to evaluators the procedures that would be followed. If evacuation is the implemented protective action, all activities to coordinate and complete the evacuation of students to the host school will be accomplished through an interview process.

.,Communi.cations will be yerified by. the Bus Driver by interview.

Officials of the school will demonstrate the capability to develop and provide timely information to the HCEOC for use in messages to parents, the general public, and the media on the status of protective actions for schools.

- A controller will be at the school location to inject scenario.

All activities must be based on the ORO's plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.

139

0 EVALUATION AREA 3 - Protective Action Implementation Sub-element 3.d. - Implementation of Traffic and Access Control INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to implement protective action plans, including relocation and restriction of access to evacuated/sheltered areas. This sub-element focuses on selecting, establishing, and staffing of traffic and access control points and removal of impediments to the flow of evacuation traffic.

Criterion 3.d.1: Appropriate traffic and accesscontrol is established.

Accurate instructions are provided to traffic and access control personnel.' (NUREG-0654, J.10.g, j)' -

EXTENT OF PLAY State:-

- N/A County:

During the June 24, 2008 exercise, HCEOC will demonstrate the capability to select, establish, and staff appropriate traffic and access control points, consistent with protective actions.

- Staffing of Traffic and Access Control Points will be simulated.

- The capability to provide instructions to traffic and access control staff will be demonstrated through an interview with the Law Enforcement Officer in the HCEOC during the June 24, 2008 exercise.

- The HCEOC will demonstrate the ability to control access to rail, water and air traffic, under its control by interview.

Traffic Control / Access Control Points will be demonstrated Out-of-Sequence on May 14, 2008 at 1900 - 2100, by interview at the New Cumberland Fire Department. Communications check will be conducted following the interview.

140 6

Criterion 3.d.2: Impediments to evacuation are identified and resolved.

(NUREG-0654, J.10.k)

EXTENT OF PLAY State:

-N/A County:

- The HCEOC will demonstrate the capability by interview to identify and take appropriate. actions concerning impediments to evacuation.

Actual dispatch of resources will be simulated to deal with impediments and will be explained during the interview.

All activities must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.

141

EVALUATION AREA 3 - Protective Action Implementation Sub-element 3.e. - Implementation of Ingestion Pathway Decisions EXTNET OF PLAY State:

  • This element will not.be demonstratedduring this exercise.

County: .

  • This element will not be demonstrated during this exercise.

Sub-element 3.f. - Implementation, of Reloca t ion, Re-entry, and Return Decisions -.

EXTNETOF PLAY State: .

  • This element will not be demonstrated during this exercise.

County:

This element will not be demonstratedduring this exercise.

142

EVALUATION AREA 4 - Field Measurement And Analysis Sub-element 4.a - Plume Phase Field Measurements and Analyses INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have the capability to deploy field teams with the equipment, methods, and expertise necessary to determine the location of airborne radiation and particulate deposition on the ground

.-from an airborne plume. ln addition, NUREG-0654 indicates that OROs should have the capability to use field teams within the plume Emergency Planning Zone to measure airborne radioiodine in the, presence of noble gases and to measure radioactive particulate material in the airborne plume.

In the event of an accident at a nuclear power plant, the possible release of radioactive material may pose a risk to the nearby population and

"environment. Althoughaccidentassessmeht, methodsare available to project the extent and magnitude of a release, these methods are subject to large uncertainties. During an accident, it is important to collect field radiological data in order to help characterize any radiological release. This does not imply that plume exposure projections should be made from the field data.

Adequate equipment and procedures are essential to such field measurement efforts.

Criterion 4.a.1: The field teams are equipped to perform field measurements of direct radiation exposure (cloud and ground shine) and to sample airborne radioiodine and particulates. (NUREG-0654, H.10; 1.7, 8, 9)

EXTENT OF PLAY State:

- Field teams will be equipped with instrumentation and supplies necessary to accomplish their mission as identified in the plan and/or procedures.

- One Field Team will be utilized.

- The Field Team will deploy from HCEOC.

- A minimum of six (6)-sampling locations will be demonstrated. Field Team Equipment will be demonstrated at three (3) sample locations.

Equipment use will be simulated at the other three (3) locations.

143

- Transfer of samples to -courier for transport to Ohio lab will be simulated.-

- In-route readings will be taken.

- The Field Team will be demonstrated Out-of-Sequence on June 24, 2008 at 0900 - 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br />.

Field'data will be provided to the field team by controller injects.

County: 0

-N/A Criterion 4.a.2: Field teams are managed to obtain sufficient information to help characterize the release, define the edge of the plume and to control radiation exposure., (NUREG-0654, H.12; 1.8, 11; J.10.a)

EXTENT OF PLAY State:

- Responsible Offsite Response Organizations (ORO) will demonstrate the capability to brief teams on predicted plume location and direction, travel speed, and expo:sure;`contro procedures before d6ployment.

- The State will simulate contact of the FEMA III RRCC.

- Radiological data will be provided to the field team by the controller.

40 County:

- N/A Criterion 4.a.3: Ambient radiation measurements are made and recorded at appropriate locations, and radioiodine and particulate samples are collected. Teams will move to an appropriate low background location to determine whether any significant (as specified 144 0

in the plan and/or procedures) amount of- radioactivity has been collected on the sampling media. (NUREG-0654, I. 9)

EXTENT OF PLAY State:

-- Field teams will demonstrate the capability to report measurements and field data pertaining to the measurement of airborne radioiodine and particulates and ambient radiation to the field team coordinator.

Charcoal filters will be utilized instead of Silver Xeolite..

Simulation of sharing of field data with Ohio and Pennsylvania will be demonstrated in a timely manner.

Labs will not be demonstrated in this exercise.

The request for, Federal resources willbe simulated by the WVEOC.

A controller will provide Fild'&Team readings.'

County:

-N/A All activities must e-' must .be based on the ORO's plans and procedures and completedas they would'be in'an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.

145

EVALUATION AREA 4 - Field Measurement And Analysis Sub-element 4.b - Post Plume' Phase Field Measurements and Sampling EXTNET OF PLAY State:

  • This element will not be demonstratedduring this exercise.

County:

S ,This element will not be demonstrated during this exercise.

Sub-element 4.c - LaboratoryOpierations EXTNET OF PLAY,,

State: A This element will not be demonstrated during this exercise. The WV State Plan identifies the State of Ohio's laboratoriesas the primary laboratoriesused for all sample-analysis.

County: Y)

  • N/A 146 a

EVALUATIONAREA 5 - Emergency Notification and Public Information Sub-element- 5.a - Activation of the Prompt 'Alert and Notification System INTENT This sub-element is derived from. NUREG-0654, which provides that OROs should have the capability to provide prompt instructions to the public within the plume pathway EPZ. Specific provisions addressed in this sub-element are derived from the Nuclear Regulatory Commission (NRC) regulations (10 CFR Part 50, Appendix E.IV.D.), and FEMA-REP-10, "Guide for the

, Evaluatipn of Alert and. Notification systems for Nuclear Power Plants."

Criterion 5.a.1: Activities associated with primary alerting and notification of the public are completed in a timely -manner following the initial decision by authorized offsite emergency officials to notify the public of an emergency situation. The initial instructional message to the public must include as a minimum the elements required by current FEMA REP guidance. (10 CFR Part 50, Appendix E.IV.D and NUREG-0654, E.5, 6, 7)

EXTENT OF PLAY%.

State:

- N/A County:

- The County will demonstrate the capability to sequentially provide an alert signal followed by an initial instructional message to populated areas (permanent resident and transient) throughout the 10-mile plume pathway EPZ. Following the decision to activate the alert and notification system, in accordance with the County plan and/or procedures, completion of system activation should be accomplished in a timely manner (will not be subject to specific time requirements) for primary alerting/notification. The initial message should include the elements required by current FEMA REP guidance.

- Siren activation will be explained. Sirens will not be sounded.

- Procedures to broadcast the message should be fully demonstrated as they would in an actual emergency up to the point of transmission.

Broadcast of the message(s) or test messages will not be 147

demonstrated. . The alert signal activation* will be simulated. The procedures will be demonstrated up to the point of actual activation.

- In Hancock County the EAS Station is activated through the National Weather Service.

- For Exercise purposes the NWS will be contacted, EAS message provided, but the EAS Radio Station will not be activated.

- The capability of'the primary notification system to broadcast an instructionral message on a 24-hour basis should be verified during an interview with the HCOEM Director or designee.

0 Criterion 5.a.2: [RESERVED]

Criterion 5.a.3: Activities associated with FEMA approved exception

,areas (where'applicable) are completed' within 45 minutes following the initial decision by' authorized offsite emergeoncy officials. to notify the public of an emergency situationd-: Backup ailert ridnotiffica4tion of the public is completed within 45 minutes following the detection by the ORO of a failure of the primary alert and notification system. (NUREG-0654, E. 6, Appendix 3.B.2.c)

EXTENT OF PLAY .-

State:

-N/A County:

- Backup Route Alerting will be demonstrated from.1900 - 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> on May 14, 2008 at Oakland Volunteer Fire Department.

- one route will be actually run and alert and 'notification activities along

  • the route will be simulated (that is, the message that"Would actually be used is read for the evaluator, but not actually broadcast).

- Actual testing of the mobile public address system will be conducted at the Fire Station.

148 0

EVALUATION AREA 5 - Emergency Notification and Public Information Sub-element 5.b - Emergency Information and Instructions for the Public and the Media INTENT This sub-element is-derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have the capability to disseminate to thepublic appropriate emergency information and instructions, including any recommended protective actions.. In addition, NUREG70654 provides that OROs should ensure that the ,capab'lity exists for providing information to the media. This includes the availability of a physical location for use by the media during an emergency. NUREG-0654 also provides that a system should be available for dealing with rumors. This system will hereafter be known as the public inquiry hotline.

Criterion 5.b.1: OROs provide accurate, emergency information and

  • -,,instructions to .the .public and the news media in, a timely manner.

r,(NUREG-0654, E.5, 7; G.3.a, G.4.c). .,,-...*

EXTENT OF PLAY ..

State:

- The State will ensure that emergency information and instructions are consistent with protective action decisions made by appropriate officials. The State should be prepared to disclose and explain the Emergency Classification Level (ECL) of the incident..

- Public inquiries will be demonstrated at the EOC.

- Tends in rumors.will be identified, if applicable.

7 Subsequent emergency.information and instructions will be provided to

..the.public and the media through'the Joint Public Information Center.

- One News Briefing will'be conducted at the EOC.

County:

The County will ensure that emergency information and instructions are consistent with protective action decisions made by appropriate officials. The County should be prepared to disclose and explain the Emergency Classification Level (ECL) of the incident.

149

0

- Public inquiries will be demonstrated at the EOC.

- Trends in rumors will be identified, if applicable.

- Subsequent emergency information and instructions will be provided to the public and the media through the state representative at the Joint Public Information Center.

.- OneNews Briefing will be conducted at the EOC.

All activities for this criterion must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.

~

4- ..... ,.

0 150 0

EVALUATIONAREA 6 - Support Operation/Facilities Sub-element 6.a - Monitoring and Decontamination of Evacuees and Emergency Workers and Registration of Evacuees INTENT This sub-element is derived from NUREG-0654; which provides that Offsite Response Organizations (ORO) have the capability to implement radiological monitoring and decontamination of.evacuees and emergency workers, while minimizing contamination of the facility, and registration of evacuees at reception centers.

Criterion 6.a.1: The reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers. (NUREG-0654, J.10.h; J.12; K.5.a)

EXTENT OF PLAY State:

-N/A County:

- Reception/ Mass Care Center, Monitoring/ Decontamination Center will be conducted from 1900 - 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> on June 24, 2008 at the Weir High School Complex.

- Decontamination of evacuees/emergency workers may be simulated and conducted by interview.

- The availability of provisions for separately showering should be demonstrated or explained.

- The staff should demonstrate provisions for limiting the spread of contamination.

- Provisions should also exist to separate contaminated and uncontaminated individuals.

- Change of clothing for individuals .whose clothing is contaminated will be simulated.

151

S

- Storage of contaminated clothing and personal belongings to prevent further contamination of evacuees or facilities will be explained.

- Procedures should be discussed concerning the handling of potential contamination of vehicles and personal belongings of any individual found to be contaminated.

- Monitoring personnel should explain.' the use of action -levels for determining the. need for decontamination.

- Monitoring personnel should explain the procedures for referring evacuees-who cannot be adequately decontaminated for assessment and follow up...

- Contamination of the individual will be determined by controller inject and not simulated with any low-level radiation source.

- The capability to register individuals was demonstrated during the 2006 Federal Evaluated Exercise, and will not be demonstrated during this exercise.

- The Emergency Worker Decontamination Center will be conducted from 1900- 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> on May 14, 2008 at the New Cumberland Fire Department.

Qne monitoring station will. be established at each location.

- One decontamination area will be established at each location.

- A totalof.,six .(6).people 'will be- monitored..:at the Monitoring and Decontamination area. At least one (1) will be contaminated.

. Decontamination of personnel/equipment/vehicles -will be explained.

Actual decontamination will be simulated.

All activities associated with this criterion must be based on the ORO's plans and procedures and completed as they' would be in an actual emergency, unless otherwise indicated in the extent of play agreement.

152 0

-EVALUATION AREA 6 - Support Operation/Facilities Sub-element 6.b - Monitoring and Decontamination of Emergency Worker Equipment INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to implement radiological monitoring and decontamination of emergency worker equipment, including vehicles.

Criterion 6.b,1: The facility/ORO has adequate procedures and resources for the accomplishment of monitoring and decontamination of emergency worker equipment, including vehicles. (NUREG-0654, K.5.b)'.

EXTENT OF PLAY State:

-N/A

- County:

The Emergency Worker Decontamination Center will be conducted from 1900 - 2100 ho'urs' riq May'14, 2008 at the New Cumberland Fire Department.

- A total of six (6) people will be monitored at the Emergency Worker Decontamination Cetter>, At least one (1) Will be contaminated.

- One Emergency Worker will be monitored for contamination.

Discussions on the need for decontamination will be made based on Controller injected radiation levels.

- Contamination control. ýand record-keeping procedures will be demonstrated.

- Decontamination efforts will be procedurally explained, but actual decontamination will be simulated.

- The proper sequence for monitoring/decontamination efforts and the decision to refer individuals who cannot be decontaminated to medical facilities will be demonstrated via inquiries.

153

S

- One vehicle will be monitored and decisions regarding the need for decontamination will be 'made as radiation -levels ,are presented via Controller injects.

- Record-keeping procedures will be demonstrated.

- No vehicles will be washed, but decontamination procedures will be explained.

Decontamination of personnel/equipment/vehicles will be explained.

Actual decontamination will, be simulated.

All activities associated with this criterion must be based on the ORO's plans and 0 procedures and! completed, as they: would'be in:,an. ac'tualf emergency,' I'nless noted aboveor otherwise: indicatedin'the extent of play agreement-.

0 154 0

EVALUATION AREA 6 - Support Operation/Facilities Sub-element 6.c - Temporary Care of Evacuees INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations (ORO) demonstrate the capability to establish relocation centers in host areas. Congregate care is normally provided in support of OROs by the American Red Cross (ARC) under existing letters of agreement.

Criterion 6.c.l:- Managers of congregate care facilities demonstrate that the centers have resources toý provide, services and accommodations consistent with American Red Cross planning guidelines. (Found in MASS CARE - Preparedness Operations, ARC 3031) Managers demonstrate the procedures to assure that evacuees have been monitored for contamination and have been decontaminated as appropriate prior to entering congregate care facilities. (NUREG-0654, J.10.h, J.12)

EXTENT OF PLAY State:

- N/A County:

- The Red Cross responsibility for Mass Care Centers was demonstrated at the Weir High Complex during the 2006 Federal Evaluated Exercise, and will not be demonstrated during this exercise.

All activities associated with this criterion must be based on the ORO's plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.

155