Line 3: Line 3:
| issue date = 10/05/2009
| issue date = 10/05/2009
| title = 2009 Braidwood Initial License Examination Proposed JPMs
| title = 2009 Braidwood Initial License Examination Proposed JPMs
| author name = Palagi B B
| author name = Palagi B
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:R-101 1 TASK CONDITIONS:  
{{#Wiki_filter:TASK CONDITIONS:
: 1. You are the Unit NSO.  
: 1. You are the Unit NSO.
: 2. Unit 1 is at full power.  
: 2. Unit 1 is at full power.
: 3. Unit 2 is at full power.  
: 3. Unit 2 is at full power.
 
INITIATING CUES:
INITIATING CUES:  
The US directs you to perform the weekly QPTR calculation using 1BwOSR 3.2.4.1 and the process computer.
 
1 R-101
The US directs you to perform the weekly QPTR calcul ation using 1BwOSR 3.2.4.1 and the process computer.
R-101 2  TASK TITLE: Perform a QPTR Calculation with the Process Computer JPM No.: R-101 REV: NRC 09-1 TPO No.: 4.C.RK-01 K&A No.: 2.1.19 TASK No.: R-RK-003, Perform a QPTR calculation K&A IMP: 3.9/3.8 and evaluate TS limits
 
EXAMINEE:
RO  SRO  (circle one)
 
EVALUATOR:
DATE: 
 
The Examinee: PASSED this JPM.
TIME STARTED:
FAILED TIME FINISHED:


JPM TIME: MINUTES CRITICAL ELEMENTS:  
TASK TITLE: Perform a QPTR Calculation with the Process Computer JPM No.:    R-101                                            REV:          NRC 09-1 TPO No.:    4.C.RK-01                                        K&A No.:      2.1.19 TASK No.:  R-RK-003, Perform a QPTR calculation            K&A IMP:      3.9/3.8 and evaluate TS limits EXAMINEE:                                                    RO SRO (circle one)
(*) 5, 6, 7 APPROX COMPLETION TIME:
EVALUATOR:                                                  DATE:
15 MINUTES CRITICAL TIME:
The Examinee:      PASSED              this JPM.          TIME STARTED:
NA EVALUATION METHOD:
FAILED                                  TIME FINISHED:
LOCATION:
JPM TIME:                MINUTES CRITICAL ELEMENTS:           (*) 5, 6, 7                   APPROX COMPLETION TIME: 15 MINUTES CRITICAL TIME:               NA EVALUATION METHOD:                                           LOCATION:
X   PERFORM       IN PLANT SIMULATE X   SIMULATOR GENERAL  
X PERFORM                                         IN PLANT SIMULATE                                     X SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. 1BwOSR 3.2.4.1, Rev. 6, Unit One Quadrant Power Tilt Ratio (QPTR) Calculation MATERIALS:  
: 1. 1BwOSR 3.2.4.1, Rev. 6, Unit One Quadrant Power Tilt Ratio (QPTR) Calculation MATERIALS:
: 1. 1BwOSR 3.2.4.1  
: 1. 1BwOSR 3.2.4.1
: 2. Calculator TASK STANDARDS:  
: 2. Calculator TASK STANDARDS:
: 1. Perform 1BwOSR 3.2.4.1, Unit One Quadrant Power Tilt Ratio (QPTR) Calculation.
: 1. Perform 1BwOSR 3.2.4.1, Unit One Quadrant Power Tilt Ratio (QPTR) Calculation.
TASK CONDITIONS:  
TASK CONDITIONS:
: 1. You are the Unit NSO.  
: 1. You are the Unit NSO.
: 2. Unit 1 is at full power with PDMS inoperable.  
: 2. Unit 1 is at full power with PDMS inoperable.
: 3. Unit 2 is at full power.  
: 3. Unit 2 is at full power.
INITIATING CUES:
: 1. The US directs you to perform the weekly QPTR calculation using 1BwOSR 3.2.4.1 and the process computer.
2 R-101


INITIATING CUES:
RECORD START TIME PERFORMANCE STEP                        STANDARD                    Circle applicable
: 1. The US directs you to perform the weekly QPTR calculation using 1BwOSR 3.2.4.1 and the process computer.  
: 1. Prepare for 1BwOSR 3.2.4.1                                             SAT UNSAT      N/A QPTR Calculation.                                                      Comments:
* Sign, record time and date Note:    Give examinee the            on the surveillance cover procedure with cover          sheet.
sheet.
* VERIFY the applicable CUE:    Prerequisites are met.          Prerequisites, Precautions, and Limitations and Actions are addressed.
: 2. Determine Surveillance              Indicate the Applicability of this SAT UNSAT      N/A applicability.                      surveillance on the D-2 data      Comments:
sheet:
* Block 7 Days checked.
: 3. Record Date and Time on Data        RECORD Date and Time on            SAT UNSAT      N/A Sheet D-2.                          data sheet D-2.                    Comments:
: 4. Record power range NIs              On Data Sheet D-3, RECORD          SAT UNSAT      N/A operability status.                the following for power range      Comments:
NIs 41-44:
CUE:    If asked, the Unit is in No
* Y block checked for each LCOARs at this time.            channel operable.
* 100% (or present power reading from each channel at 1PM07J).
  *5. Determine the Power Range NI        DETERMINE the QPTR                SAT UNSAT      N/A Detector computer point            (detector voltages) using the      Comments:
readings using the Process Computer Points.                    Process Computer, by either selecting each point o  HMI trend page group 0001.      individually, or a group that o  OPCON.                           contains each point and RECORD the present value:
Upper Detectors (A):
* N0041 (N41).
* N0043 (N42).
* N0045 (N43).
* N0047 (N44).
Lower Detectors (B):
* N0042 (N41).
* N0044 (N42).
* N0046 (N43).
* N0048 (N44).
3 R-101


R-101 3 RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable
  *6. Determine the AVERAGE  DETERMINE the AVERAGE        SAT UNSAT N/A computer point reading. computer point reading by:    Comments:
: 1. Prepare for 1BwOSR 3.2.4.1 QPTR Calculation.
* Adding the sum of the upper detector computer points and dividing by 4.
* Adding the sum of the lower detector computer points and dividing by 4.
* Record the AVERAGES on data sheet D-2.
  *7. Determine the QPTR. DETERMINE the QPTR for        SAT UNSAT N/A each channel by dividing the  Comments:
computer point reading for each channel by the average of the channel readings and RECORD on data sheet D-2:
* QPTR for the Uppers.
* QPTR for the Lowers.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME COMMENTS:
4 R-101


Note: Give examinee the procedure with cover
SIMULATOR SETUP INSTRUCTIONS JPM NO: R-101 REQUIRED SIMULATOR MODE (S): 100% power steady state MALFUNCTION #S: N/A COMMENTS:
: 1. Ensure that HMI is NOT on QPTR parameters.
: 2. Make a KEY in table below of the surveillance for the evaluator to reference with current simulator core load.
Channel                                        N41              N42                N43              N44 Is the channel operable?                    Y      N        Y      N            Y      N        Y      N Instrument reading                                    %                  %                %                %
Upper Detectors (A)
Computer point                                N0041            N0043              N0045            N0047 Present computer point reading Average computer point reading Upper power tilt ratio (¢1.02)          ¢                ¢                  ¢              ¢ Lower Detectors (B)
Computer point                                N0042            N0044              N0046            N0048 Present computer point reading Average computer point reading Lowerr power tilt ratio (¢1.02)        ¢                ¢                  ¢              ¢ 5
R-101


sheet. CUE: Prerequisites are met.
JOB PERFORMANCE MEASURE TASK CONDITIONS:
Sign, record time and date on the surveillance cover sheet. VERIFY the applicable Prerequisites, Precautions, and Limitations and
: 1. You are an active licensed RO/SRO for the past year.
 
: 2. Attached is your work schedule history for the 14 weeks during the third quarter of 2009.
Actions are addressed.
: 3. All positions were appropriately logged in the SM log during this time period.
SAT    UNSAT      N/A Comments: 2. Determine Surveillance applicability.
INITIATING CUES:
Indicate the Applicability of this surveillance on the D-2 data
 
sheet:  Block '7 Days' checked.
SAT    UNSAT      N/A Comments: 3. Record Date and Time on Data Sheet D-2.
RECORD Date and Time on data sheet D-2.
SAT    UNSAT      N/A Comments: 4. Record power range NIs operability status.
 
CUE: If asked, the Unit is in No LCOARs at this time.
On Data Sheet D-3, RECORD
 
the following for power range
 
NIs 41-44:
 
'Y' block checked for each channel operable. 100% (or present power reading from each channel at 1PM07J).
SAT    UNSAT      N/A Comments: *5. Determine the Power Range NI Detector computer point
 
readings using the Process
 
Computer Points.
 
o HMI trend page group 0001.
o OPCON. DETERMINE the QPTR (detector voltages) using the Process Computer, by either
 
selecting each point
 
individually, or a group that
 
contains each point and RECORD the present value:
Upper Detectors (A):  N0041 (N41). N0043 (N42). N0045 (N43). N0047 (N44).
Lower Detectors (B):  N0042 (N41). N0044 (N42). N0046 (N43). N0048 (N44).
SAT    UNSAT      N/A Comments:
R-101 4*6. Determine the AVERAGE computer point reading.
DETERMINE the AVERAGE computer point reading by:
Adding the sum of the upper detector computer
 
points and dividing by 4. Adding the sum of the lower detector computer
 
points and dividing by 4. Record the AVERAGES on data sheet D-2.
SAT    UNSAT      N/A Comments: *7. Determine the QPTR.
DETERMINE the QPTR for each channel by dividing the computer point reading for
 
each channel by the average
 
of the channel readings and
 
RECORD on data sheet D-2:
QPTR for the Uppers. QPTR for the Lowers.
SAT    UNSAT      N/A Comments:  CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME COMMENTS:
 
SIMULATOR SETUP INSTRUCTIONS
 
JPM NO: R-101
 
REQUIRED SIMULATOR MODE (S): 100% power steady state
 
MALFUNCTION #'S:  N/A
 
COMMENTS: 
: 1. Ensure that HMI is NOT on QPTR parameters.
: 2. Make a "KEY" in table below of the surveillance for the evaluator to reference with current simulator core load. 
 
Channel N41 N42 N43 N44 Is the channel operable?
Y N Y N Y N Y N Instrument reading
%%% %Upper Detectors (A)
Computer point N0041 N0043 N0045 N0047 Present computer point reading Average computer point reading Upper power tilt ratio (¢ 1.02) ¢ ¢ ¢ ¢ Lower Detectors (B)
Computer point N0042 N0044 N0046 N0048 Present computer point reading Average computer point reading Lowerr power tilt ratio (¢ 1.02) ¢ ¢ ¢ ¢  R-101 5 R-109      Page 1 of 11 JOB PERFORMANCE MEASURE  
 
TASK CONDITIONS:  
: 1. You are an active licensed RO/SRO for the past year.  
: 2. Attached is your work schedule history for the 14 weeks during the third quarter of 2009.  
: 3. All positions were appropriately logged in the SM log during this time period.  
 
INITIATING CUES:  
: 1. The Operations Support Manager asks that you complete your Active License Tracking Log for the third quarter of 2009, per OP-AA-105-102.
: 1. The Operations Support Manager asks that you complete your Active License Tracking Log for the third quarter of 2009, per OP-AA-105-102.
R-109     Page 2 of 11 RO Work History:      Hours Day Date  Shift Worked Job Position/Assignment Week 1  M 6/29/09  D 12  Unit 1 NSO  T 6/30/09  D 12  Unit 2 NSO W  7/1/09  D 12  Unit 2 Admin NSO Th 7/2/09  D 12  Extra NSO in control room F 7/3/09  N/A  Day Off S 7/4/09  N/A  Day Off S 7/5/09  N/A  Day Off Week 2  M 7/6/09  D 12  Clearance Order Writer  T 7/7/09  D 12  Clearance Order Writer W 7/8/09  D 12  Clearance Order Writer Th 7/9/09  D 12  Clearance Order Writer F 7/10/09  N/A  Day Off S 7/11/09  N/A  Day Off  S 7/12/09  N/A  Day Off Week 3  M 7/13/09  N/A  Day Off  T 7/14/09 N/A  Day Off  W 7/15/09 N/A  Day Off  Th 7/16/09 N/A  Day Off  F 7/17/09 D 12  Unit 1 Admin (relieved 2 hrs for NRC physical)
R-109                                       Page 1 of 11
S 7/18/09 D 12  Unit 1 NSO  S 7/19/09 D 12  Unit 2 NSO Week 4  M  7/20/09    N/A  Day Off  T 7/21/09 N/A  Day Off  W 7/22/09 N/A  Day Off  Th  7/23/09 N/A  Day Off  F 7/24/09 N 12  Unit 2 Admin (relieved 2 hrs for PHC meeting)
S 7/25/09 N 12  Extra NSO in control room S 7/26/09 N 12  Unit 1 Admin NSO


Week 5   M 7/27/09   N/A  Day Off  T 7/28/09 T 8  Requal Training   W 7/29/09 T 8  Requal Training   Th 7/30/09 T Requal Training F 7/31/09 T 8  Requal Training S 8/1/09 N/A  Day Off  S 8/2/09 N/A  Day Off Weeks 6 and 7   8/3/09 thru 8/16/09   N/A  ON VACATION R-109      Page 3 of 11 RO Work History continued:
RO Work History:
Hours   Day Date  Shift Worked Job Description Week 8   M 8/17/09     N/A   Day Off  T 8/18/09 N/A   Day Off  W 8/19/09 N/A   Day Off   Th 8/20/09 N/A  Day Off  F 8/21/09 D 12 Clearance Order Writer   S 8/22/09 D 12  Unit 2 NSO S 8/23/09 D 12  Unit 2 Admin NSO
Hours Day Date          Shift Worked      Job Position/Assignment Week 1      M  6/29/09        D    12          Unit 1 NSO T  6/30/09        D    12          Unit 2 NSO W  7/1/09        D    12          Unit 2 Admin NSO Th  7/2/09        D    12          Extra NSO in control room F   7/3/09         N/A               Day Off S   7/4/09        N/A                Day Off S   7/5/09         N/A                Day Off Week 2      M   7/6/09         D    12          Clearance Order Writer T  7/7/09         D    12          Clearance Order Writer W  7/8/09        D    12          Clearance Order Writer Th 7/9/09        D    12          Clearance Order Writer F   7/10/09       N/A                Day Off S   7/11/09       N/A               Day Off S   7/12/09        N/A                Day Off Week 3      M   7/13/09       N/A               Day Off T   7/14/09        N/A                Day Off 7/15/09       N/A                Day Off Th  7/16/09       N/A               Day Off F   7/17/09        D    12          Unit 1 Admin (relieved 2 hrs for NRC physical)
S  7/18/09        D    12          Unit 1 NSO S   7/19/09        D    12          Unit 2 NSO Week 4      M   7/20/09       N/A               Day Off T   7/21/09       N/A               Day Off W   7/22/09       N/A               Day Off Th 7/23/09       N/A               Day Off F  7/24/09        N    12          Unit 2 Admin (relieved 2 hrs for PHC meeting)
S  7/25/09        N    12          Extra NSO in control room S  7/26/09        N    12          Unit 1 Admin NSO Week 5      M   7/27/09        N/A                Day Off T   7/28/09        T    8           Requal Training W  7/29/09       T    8            Requal Training Th 7/30/09        T    8            Requal Training F   7/31/09        T    8            Requal Training S   8/1/09         N/A                Day Off S  8/2/09        N/A                Day Off Weeks 6 and 7    8/3/09 thru 8/16/09       N/A                ON VACATION R-109                                Page 2 of 11


Week 9  8/24/09     N/A   Day Off  T 8/25/09 N/A   Day Off  W 8/26/09 N/A   Day Off   Th  8/27/09 N/A   Day Off  F 8/28/09 N 12 Extra NSO in control room S 8/29/09 N 12 Unit 1 NSO S 8/30/09 N 12 Unit 2 NSO  
RO Work History continued:
Hours Day Date          Shift Worked      Job Description Week 8      M  8/17/09        N/A                Day Off T  8/18/09        N/A                Day Off W  8/19/09        N/A                Day Off Th  8/20/09        N/A                Day Off F  8/21/09        D    12          Clearance Order Writer S  8/22/09        D    12          Unit 2 NSO S  8/23/09        D    12          Unit 2 Admin NSO Week 9       M   8/24/09       N/A               Day Off T   8/25/09       N/A               Day Off W   8/26/09       N/A               Day Off Th  8/27/09       N/A               Day Off F   8/28/09       N     12           Extra NSO in control room S   8/29/09       N     12           Unit 1 NSO S   8/30/09       N     12           Unit 2 NSO Week 10      M  8/31/09        N/A                Day Off T  9/1/09        T    8            Requal Training W  9/2/09        T    8            Requal Training Th  9/3/09        T    8            Requal Training F  9/4/09        T    8            Requal Training S  9/5/09        N/A                Day Off S  9/6/09        N/A                Day Off Weeks 11 thru 13 9/7/09 thru 9/27/09              ON VACATION Week 14      M  9/28/09        N/A                Day Off T  9/29/09        N/A                Day Off W  9/30/09        N/A                Day Off R-109                                Page 3 of 11


Week 10 M 8/31/09    N/A  Day Off  T 9/1/09 T 8 Requal Training W 9/2/09   T 8 Requal Training Th 9/3/09 T 8 Requal Training F 9/4/09 T 8 Requal Training S 9/5/09 N/A   Day Off  S 9/6/09 N/A   Day Off  
SRO Work History:
Hours Day Date          Shift Worked      Job Position/Assignment Week 1      M  6/29/09        D    12          Unit 1 US T  6/30/09        D    12          Unit 1 US W  7/1/09        D    12          Unit 1 US Th  7/2/09        D    12          WEC Supervisor F  7/3/09        N/A                Day Off S  7/4/09        N/A                Day Off S  7/5/09        N/A                Day Off Week 2      M   7/6/09        D    12          Clearance Order Group Supervisor T  7/7/09        D    12          Clearance Order Group Supervisor W  7/8/09        D    12          Clearance Order Group Supervisor Th  7/9/09         D     12          Clearance Order Group Supervisor F  7/10/09        N/A               Day Off S   7/11/09        N/A                Day Off S   7/12/09        N/A                Day Off Week 3      M  7/13/09        N/A                Day Off T   7/14/09        N/A                Day Off W  7/15/09        N/A                Day Off Th  7/16/09        N/A                Day Off F  7/17/09        D    12          Field Supervisor S  7/18/09        D    12          Field Supervisor S  7/19/09        D    12          Field Supervisor Week 4      M  7/20/09        N/A                Day Off T  7/21/09        N/A                Day Off W  7/22/09        N/A                Day Off Th  7/23/09        N/A                Day Off F  7/24/09        N    12          WEC Supervisor S  7/25/09        N    12          WEC Supervisor S  7/26/09        N    12          Unit 1 US Week 5      M  7/27/09       N/A                Day Off T  7/28/09        T     8           Requal Training W   7/29/09       T     8           Requal Training Th 7/30/09       T     8           Requal Training F   7/31/09       T     8           Requal Training S   8/1/09         N/A               Day Off S   8/2/09         N/A               Day Off Weeks 6 and 7    8/3/09 thru 8/16/09              ON VACATION R-109                                Page 4 of 11


Weeks 11 thru 13    9/7/09 thru 9/27/09 ON VACATION Week 14 M 9/28/09     N/A   Day Off  T 9/29/09 N/A   Day Off   W 9/30/09 N/A   Day Off R-109      Page 4 of 11 SRO Work History:      Hours   Day Date  Shift Worked Job Position/Assignment Week 1  M 6/29/09 D 12 Unit 1 US  T 6/30/09 D 12 Unit 1 US W  7/1/09 D 12 Unit 1 US Th 7/2/09 D 12  WEC Supervisor F 7/3/09   N/A   Day Off S 7/4/09   N/A   Day Off S 7/5/09   N/A   Day Off Week 2   M 7/6/09   D 12 Clearance Order Group Supervisor  T 7/7/09 D 12 Clearance Order Group Supervisor W 7/8/09  D 12  Clearance Order Group Supervisor Th 7/9/09 D 12 Clearance Order Group Supervisor F 7/10/09 N/A   Day Off S 7/11/09 N/A   Day Off  S 7/12/09  N/A  Day Off Week 3   M 7/13/09  N/A  Day Off  T 7/14/09 N/A   Day Off  W 7/15/09 N/A   Day Off  Th 7/16/09 N/A   Day Off   F 7/17/09 D 12  Field Supervisor S 7/18/09 D 12  Field Supervisor  S 7/19/09 D 12  Field Supervisor Week 4   M  7/20/09   N/A   Day Off  T 7/21/09 N/A   Day Off   W 7/22/09 N/A   Day Off  Th  7/23/09 N/A   Day Off   F 7/24/09 N 12  WEC Supervisor S 7/25/09 N 12  WEC Supervisor S 7/26/09 N 12  Unit 1 US
SRO Work History continued:
Hours Day Date          Shift Worked      Job Description Week 8      M  8/17/09       N/A                Day Off T  8/18/09       N/A               Day Off W   8/19/09       N/A               Day Off Th  8/20/09       N/A               Day Off F   8/21/09       D     12           Unit 2 US S   8/22/09       D     12           Unit 2 US S  8/23/09       D     12           Unit 2 US Week 9      M  8/24/09       N/A                Day Off T  8/25/09       N/A               Day Off W  8/26/09       N/A               Day Off Th  8/27/09       N/A               Day Off F   8/28/09       N    12           WEC Supervisor S   8/29/09       N    12           WEC Supervisor 8/30/09       N    12           WEC Supervisor Week 10      M  8/31/09       N/A               Day Off T  9/1/09         T    8            Requal Training W   9/2/09         T    8            Requal Training Th 9/3/09         T    8            Requal Training F   9/4/09         T    8            Requal Training S   9/5/09         N/A               Day Off S   9/6/09         N/A               Day Off Weeks 11 thru 13 9/7/09 thru 9/27/09               ON VACATION Week 14      M   9/28/09       N/A               Day Off T   9/29/09       N/A               Day Off W  9/30/09       N/A               Day Off R-109                                Page 5 of 11


Week 5  M 7/27/09    N/A  Day Off  T 7/28/09 T 8  Requal Training  W 7/29/09  T 8  Requal Training  Th 7/30/09 T 8  Requal Training F 7/31/09 T 8  Requal Training S 8/1/09 N/A  Day Off  S 8/2/09 N/A  Day Off Weeks 6 and 7  8/3/09 thru 8/16/09    ON VACATION R-109      Page 5 of 11 SRO Work History continued:
TASK TITLE: Complete NRC Active License Maintenance Log JPM No.:       R-109                                                 REV:           2009 NRC Task No.:     R-AM-075                                             K/A No.:       2.1.4 Objective No.: 4E.AM-75                                             K/A IMP:       3.3/3.8 EXAMINEE:                                                           SRO EVALUATOR:                                                           DATE:
Hours  Day Date  Shift Worked Job Description Week 8  M 8/17/09    N/A  Day Off  T 8/18/09 N/A  Day Off  W 8/19/09 N/A  Day Off  Th 8/20/09 N/A  Day Off  F 8/21/09 D 12  Unit 2 US  S 8/22/09 D 12  Unit 2 US S 8/23/09 D 12  Unit 2 US
The Examinee:         PASSED             this JPM.                 TIME STARTED:
 
FAILED                                       TIME FINISHED:
Week 9  M  8/24/09    N/A  Day Off  T 8/25/09 N/A  Day Off  W 8/26/09 N/A  Day Off  Th  8/27/09 N/A  Day Off  F 8/28/09 N 12  WEC Supervisor S 8/29/09 N 12  WEC Supervisor S 8/30/09 N 12  WEC Supervisor
JPM TIME:                 MINUTES CRITICAL ELEMENTS:             (*) 3, 4, 5, 6                   APPROX COMPLETION TIME: 10 MINUTES CRITICAL TIME:                 N/A EVALUATION METHOD:                                                   LOCATION:
 
X PERFORM                                             X IN PLANT SIMULATE                                           X SIMULATOR X CLASSROOM GENERAL  
Week 10 M 8/31/09    N/A  Day Off  T 9/1/09  T 8  Requal Training W 9/2/09  T 8  Requal Training Th 9/3/09  T 8  Requal Training F 9/4/09  T 8  Requal Training S 9/5/09 N/A  Day Off  S 9/6/09 N/A  Day Off
 
Weeks 11 thru 13    9/7/09 thru 9/27/09 ON VACATION Week 14 M 9/28/09    N/A  Day Off  T 9/29/09 N/A  Day Off  W 9/30/09 N/A  Day Off R-109      Page 6 of 11 TASK TITLE: Complete NRC Active License Maintenance Log JPM No.: R-109 REV: 2009 NRC Task No.: R-AM-075 K/A No.: 2.1.4 Objective No.: 4E.AM-75 K/A IMP: 3.3/3.8  
 
EXAMINEE:
SRO EVALUATOR:   DATE:
The Examinee: PASSED           this JPM. TIME STARTED:
FAILED TIME FINISHED:  
 
JPM TIME: MINUTES CRITICAL ELEMENTS:  
(*) 3, 4, 5, 6 APPROX COMPLETION TIME: 10 MINUTES CRITICAL TIME:
N/A EVALUATION METHOD: LOCATION:
X PERFORM   X   IN PLANT SIMULATE X   SIMULATOR X   CLASSROOM GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE.  
: 1.     OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE.
: 2. 10CFR55.53(e) MATERIALS:  
: 2.     10CFR55.53(e)
: 1. OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE. TASK STANDARDS:  
MATERIALS:
: 1. Determine shift activities that are credited toward active license maintenance.  
: 1.     OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE.
: 2. Complete OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE, Attachment 1 Active License Maintenance Tracking Log.
TASK STANDARDS:
TASK CONDITIONS:  
: 1.     Determine shift activities that are credited toward active license maintenance.
: 1. You are an active licensed RO/SRO for the past year.  
: 2.     Complete OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE, Attachment 1 Active License Maintenance Tracking Log.
: 2. Attached is your work schedule history for the 14 weeks that are partially or entirely within the third quarter of 2009.  
TASK CONDITIONS:
: 3. All positions were appropriately logged in the SM log for during this time period.  
: 1.     You are an active licensed RO/SRO for the past year.
: 2.     Attached is your work schedule history for the 14 weeks that are partially or entirely within the third quarter of 2009.
: 3.     All positions were appropriately logged in the SM log for during this time period.
INITIATING CUES:
: 1.      The Operations Support Manager asks that you complete your Active License Tracking Log for the third quarter of 2009, per OP-AA-105-102.
: 2.      Inform the Operations Support Manager when you have completed OP-AA-105-102, Attachment 1.
R-109                                          Page 6 of 11


INITIATING CUES:
RECORD START TIME:
: 1. The Operations Support Manager asks that you complete your Active License Tracking Log for the third quarter of 2009, per OP-AA-105-102.
PERFORMANCE STEP                       STANDARD                 CIRCLE APPLICABLE
: 2. Inform the Operations Support Manager when you have completed OP-AA-105-102, Attachment 1.
: 1. Refer to OP-AA-105-102, NRC       Refer to OP-AA-105-102:           SAT UNSAT    N/A ACTIVE LICENSE
R-109      Page 7 of 11 RECORD START TIME:
* Determines Attachment 1         Comments:
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE  
MAINTENANCE.                        needs to be completed.
: 1. Refer to OP-AA-105-102, NRC ACTIVE LICENSE MAINTENANCE. CUE: Provide examinee copy of OP-AA-105-102.
CUE: Provide examinee copy of OP-AA-105-102.
Refer to OP-AA-105-102: Determines Attachment 1 needs to be completed.
: 2. Complete upper section of
SAT    UNSAT      N/A
* From initiating cue, writes 3rd SAT UNSAT    N/A Attachment 1.                      quarter of 2009.               Comments:
 
* From initiating cue, writes examinee name and circles ACTIVE license status.
Comments:
  *3. Complete date column of table
: 2. Complete upper section of .
* Lists at least 5 dates of the   SAT UNSAT    N/A on Attachment 1.                    shifts listed below, from       Comments:
From initiating cue, writes 3 rd quarter of 2009. From initiating cue, writes examinee name and circles ACTIVE license status.
attached schedule, that count as credited days Note: Any date listed in June or    toward license maintenance.
SAT    UNSAT      N/A Comments: *3. Complete date column of table on  Attachment 1.
October would not be within the 3rd quarter of o RO (any 5 of 8) the year, thereby          o 7/1/09 D 12 2 incorrect.                  o 7/18/09 D 12 1 o 7/19/09 D 12 2 o 7/26/09 N 12 1 o 8/22/09 D 12 2 o 8/23/09 D 12 2 o 8/29/09 N 12 1 o 8/30/09 N 12 2 o SRO
Note: Any date listed in June or October would not be within the 3 rd quarter of the year, thereby incorrect.
* 7/1/09       D 12  1
Lists at least 5 dates of the shifts listed below, from attached schedule, that count as credited days toward license maintenance.
* 7/26/09       D 12  1
o RO (any 5 of 8) o 7/1/09     D   12   2 o 7/18/09   D   12   1 o 7/19/09   D   12   2 o 7/26/09   N   12   1 o 8/22/09   D   12   2 o 8/23/09   D   12   2 o 8/29/09   N   12   1 o 8/30/09   N   12   2 o SRO   7/1/09     D   12  1 7/26/09   D   12  1 8/21/09   D   12  2 8/22/09   D   12  2 8/23/09   D   12  2 SAT    UNSAT      N/A Comments: *4. Complete shift column of table on Attachment 1. List the shift worked (N or D as applicable)
* 8/21/09       D 12  2
SAT    UNSAT      N/A Comments:
* 8/22/09       D 12  2
*5. Complete length column of table on Attachment 1. List the shift length (12 hours) SAT    UNSAT      N/A  
* 8/23/09       D 12  2
 
  *4. Complete shift column of table
Comments:
* List the shift worked (N or D   SAT UNSAT     N/A on Attachment 1.                    as applicable)                  Comments:
*6. Complete unit column of table on  Attachment 1. List the applicable unit SAT    UNSAT      N/A Comments:
  *5. Complete length column of
 
* List the shift length (12       SAT UNSAT     N/A table on Attachment 1.              hours)                          Comments:
R-109     Page 8 of 11 PERFORMANCE STEP STANDARD CIRCLE APPLICABLE 7 Give completed Attachment 1 to evaluator.
  *6. Complete unit column of table
 
* List the applicable unit       SAT UNSAT     N/A on Attachment 1.                                                    Comments:
SAT    UNSAT      N/A Comments:  CUE: THIS COMPLETES THIS JPM.
R-109                                   Page 7 of 11


PERFORMANCE STEP                    STANDARD    CIRCLE APPLICABLE 7  Give completed Attachment 1 to                    SAT UNSAT    N/A evaluator.                                        Comments:
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME:
RECORD STOP TIME:
COMMENTS:  
COMMENTS:
R-109                                Page 8 of 11


R-109      Page 9 of 11 SIMULATOR SETUP INSTRUCTIONS N/A COMMENTS Provide copy of OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE. Fill out Key for evaluator reference.  
SIMULATOR SETUP INSTRUCTIONS
* N/A COMMENTS
* Provide copy of OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE.
* Fill out Key for evaluator reference.
R-109                                  Page 9 of 11


OP-AA-105-102 Revision 9 Page 6 of 7 R-109      Page 10 of 11 ATTACHMENT 1 Active License Tracking Log Page 1 of 1 SHIFT COVERAGE FOR THE ___
OP-AA-105-102 Revision 9 Page 6 of 7 ATTACHMENT 1 Active License Tracking Log Page 1 of 1 SHIFT COVERAGE FOR THE ___3rd__(1ST, 2ND, 3RD, 4TH) CALENDAR QUARTER OF __2009__(YEAR)
3rd__(1 ST , 2 ND , 3 RD , 4 TH) CALENDAR QUARTER OF __2009__(YEAR) ____Examinees Name____     ACTIVE / INACTIVE Name of License Holder       License Status At Start (Print)       Quarter (circle one)
____Examinees Name____                                                         ACTIVE / INACTIVE Name of License Holder                                                         License Status At Start (Print)                                                               Quarter (circle one)
RECORD OF EIGHT/TWELVE HOUR SHIFTS SERVED DURING QUARTER ENTER the date the shift ended, the shift, the shift length, the Unit, position covered, circle Y or N for logged in the SM log and signature. If working an 8-hour or 8/12-hour schedule, enter a "1
RECORD OF EIGHT/TWELVE HOUR SHIFTS SERVED DURING QUARTER ENTER the date the shift ended, the shift, the shift length, the Unit, position covered, circle Y or N for logged in the SM log and signature. If working an 8-hour or 8/12-hour schedule, enter a 1 for the midnight shift, 2 for the day shift, or a 3 for the afternoon shift (only enter shifts at least 8 hours length for which turnovers were conducted). Seven shifts at least 8-hours in length are required per quarter. If working a straight 12-hour schedule, enter a N for night shift or a D for dayshift (only enter shifts at least 12 hours in length for which turnovers were conducted). Five 12-hour shifts are required per quarter. The quarterly shift watch requirement may be completed with a combination of complete 8- and 12-hour shifts (in a position required by the plants Technical Specifications) at sites having a mixed shift schedule, and watches shall not be truncated when the minimum quarterly requirement (56 hours) is satisfied. (NUREG 1021, Revision 9)
" for the midnight shift, "2" for the day shift, or a "3" for the afternoon shift (only enter shifts at least 8 hours length for which turnovers were conducted). Seven shifts at least 8-hours in length are required per quarter. If working a straight 12-hour schedule, enter a "N" for night shift or a "D" for dayshift (only enter shifts at least 12 hours in length for which turnovers were conducted). Five 12-hour shifts are required per quarter. The quarterly shift watch requirement may be completed with a combination of complete 8- and 12-hour shifts (in a position required by the plant's Technical Specifications) at sites having a mixed shift schedule, and watches shall not be truncated when the minimum quarterly requirement (56 hours) is satisfied. (NUREG 1021, Revision 9)
DATE       SHIFT     LENGTH     UNIT           POSITION             SM              SIGNATURE (circle one)           log Logged 7/1/09     D         12         2       FHS     SM   US   RO             Examinees Signature Y/N Logged 7/18/09 D             12         1       FHS     SM   US   RO             Examinees Signature Y/N Logged 7/19/09 D             12         2       FHS     SM   US   RO             Examinees Signature Y/N Logged 7/26/09 N             12         1       FHS     SM   US   RO             Examinees Signature Y/N Logged 8/22/09 D             12         2       FHS     SM   US   RO             Examinees Signature Y/N Logged 8/23/09 D             12         2       FHS     SM   US   RO             Examinees Signature Y/N Logged 8/29/09 N             12         1       FHS     SM   US   RO             Examinees Signature Y/N Logged 8/30/09 N             12         2       FHS     SM   US   RO             Examinees Signature Y/N At least 5 of the 8 rows above.
DATE SHIFT LENGTH UNIT POSITION (circle one)
R-109                                                Page 10 of 11
SM log SIGNATURE 7/1/09 D 12 2 FHS SM US RO Logged Y/N Examinees Signature 7/18/09 D 12 1 FHS SM US RO Logged Y/N Examinees Signature 7/19/09 D 12 2 FHS SM US RO Logged Y/N Examinees Signature 7/26/09 N 12 1 FHS SM US RO Logged Y/N Examinees Signature 8/22/09 D 12 2 FHS SM US RO Logged Y/N Examinees Signature 8/23/09 D 12 2 FHS SM US RO Logged Y/N Examinees Signature 8/29/09 N 12 1 FHS SM US RO Logged Y/N Examinees Signature 8/30/09 N 12 2 FHS SM US RO Logged Y/N Examinees Signature


At least 5 of the 8 rows above.
OP-AA-105-102 Revision 9 Page 6 of 7 ATTACHMENT 1 Active License Tracking Log Page 1 of 1 SHIFT COVERAGE FOR THE ___3rd__(1ST, 2ND, 3RD, 4TH) CALENDAR QUARTER OF __2009__(YEAR)
OP-AA-105-102 Revision 9 Page 6 of 7 R-109      Page 11 of 11 ATTACHMENT 1 Active License Tracking Log Page 1 of 1 SHIFT COVERAGE FOR THE ___
____Examinees Name____                                                         ACTIVE / INACTIVE Name of License Holder                                                         License Status At Start (Print)                                                               Quarter (circle one)
3rd__(1 ST , 2 ND , 3 RD , 4 TH) CALENDAR QUARTER OF __2009__(YEAR) ____Examinees Name____     ACTIVE / INACTIVE Name of License Holder       License Status At Start (Print)       Quarter (circle one)
RECORD OF EIGHT/TWELVE HOUR SHIFTS SERVED DURING QUARTER ENTER the date the shift ended, the shift, the shift length, the Unit, position covered, circle Y or N for logged in the SM log and signature. If working an 8-hour or 8/12-hour schedule, enter a 1 for the midnight shift, 2 for the day shift, or a 3 for the afternoon shift (only enter shifts at least 8 hours length for which turnovers were conducted). Seven shifts at least 8-hours in length are required per quarter. If working a straight 12-hour schedule, enter a N for night shift or a D for dayshift (only enter shifts at least 12 hours in length for which turnovers were conducted). Five 12-hour shifts are required per quarter. The quarterly shift watch requirement may be completed with a combination of complete 8- and 12-hour shifts (in a position required by the plants Technical Specifications) at sites having a mixed shift schedule, and watches shall not be truncated when the minimum quarterly requirement (56 hours) is satisfied. (NUREG 1021, Revision 9)
RECORD OF EIGHT/TWELVE HOUR SHIFTS SERVED DURING QUARTER ENTER the date the shift ended, the shift, the shift length, the Unit, position covered, circle Y or N for logged in the SM log and signature. If working an 8-hour or 8/12-hour schedule, enter a "1
DATE       SHIFT     LENGTH     UNIT           POSITION             SM              SIGNATURE (circle one)           log Logged 7/1/09     D         12         1       FHS     SM   US   RO             Examinees Signature Y/N Logged 7/26/09 D             12         1       FHS     SM   US   RO             Examinees Signature Y/N Logged 8/21/09 D             12         2       FHS     SM   US   RO             Examinees Signature Y/N Logged 8/22/09 D             12         2       FHS     SM   US   RO             Examinees Signature Y/N Logged 8/23/09 D             12         2       FHS     SM   US   RO             Examinees Signature Y/N R-109                                                Page 11 of 11
" for the midnight shift, "2" for the day shift, or a "3" for the afternoon shift (only enter shifts at least 8 hours length for which turnovers were conducted). Seven shifts at least 8-hours in length are required per quarter. If working a straight 12-hour schedule, enter a "N" for night shift or a "D" for dayshift (only enter shifts at least 12 hours in length for which turnovers were conducted). Five 12-hour shifts are required per quarter. The quarterly shift watch requirement may be completed with a combination of complete 8- and 12-hour shifts (in a position required by the plant's Technical Specifications) at sites having a mixed shift schedule, and watches shall not be truncated when the minimum quarterly requirement (56 hours) is satisfied. (NUREG 1021, Revision 9)
DATE SHIFT LENGTH UNIT POSITION (circle one)
SM log SIGNATURE 7/1/09 D 12 1 FHS SM US RO Logged Y/N Examinees Signature 7/26/09 D 12 1 FHS SM US RO Logged Y/N Examinees Signature 8/21/09 D 12 2 FHS SM US RO Logged Y/N Examinees Signature 8/22/09 D 12 2 FHS SM US RO Logged Y/N Examinees Signature 8/23/09 D 12 2 FHS SM US RO Logged Y/N Examinees Signature


JOB PERFORMANCE MEASURE  
JOB PERFORMANCE MEASURE TASK CONDITIONS:
: 1.      You are an extra operator on shift.
: 2.      2CV03F, Unit 2 RC Filter, needs to be replaced.
: 3.      A worker tagout to isolate and drain 2CV03F, in accordance with BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, step F.3, has been prepared by another operator.
INITIATING CUES:
: 1.      Jim NSO asks you to peer check the clearance orders isolation points, sequence and OOS/RTS positions.
: 2.      Inform Jim when you have completed the peer check.
R-200                                      Page 1 of 9


TASK CONDITIONS:
TASK TITLE: Verify Worker Tagout Checklist.
: 1. You are an extra operator on shift.
JPM No.:       R-200                                             REV:           NRC 09-1 Task No.:     4E.AM-06                                           K&A No.:       2.2.13 Objective No.: R-AM-010                                           K&A IMP:       4.1/4.3 EXAMINEE:                                                         RO      SRO    (circle one)
: 2. 2CV03F, Unit 2 RC Filter, needs to be replaced.
EVALUATOR:                                                       DATE:
: 3. A worker tagout to isolate and drain 2CV03F, in accordance with BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, step F.3, has been prepared by another operator.
The Examinee:         PASSED            this JPM.               TIME STARTED:
INITIATING CUES:
FAILED                                     TIME FINISHED:
: 1. Jim NSO asks you to peer check the clearance orders isolation points, sequence and OOS/RTS positions.
JPM TIME:                   MINUTES CRITICAL ELEMENTS:             (*) 4, 6                         APPROX COMPLETION TIME: 30 MINUTES CRITICAL TIME:                 N/A EVALUATION METHOD:                                               LOCATION:
: 2. Inform Jim when you have completed the peer check. R-200 Page 1 of 9 TASK TITLE: Verify Worker Tagout Checklist.
X PERFORM                                         X IN PLANT SIMULATE                                       X SIMULATOR GENERAL  
JPM No.: R-200 REV: NRC 09-1 Task No.: 4E.AM-06 K&A No.: 2.2.13 Objective No.: R-AM-010 K&A IMP: 4.1/4.3  
 
EXAMINEE:
RO      SRO    (circle one)
EVALUATOR:   DATE:
The Examinee: PASSED            this JPM. TIME STARTED:
FAILED TIME FINISHED:
JPM TIME: MINUTES CRITICAL ELEMENTS:  
(*) 4, 6 APPROX COMPLETION TIME: 30 MINUTES CRITICAL TIME:
N/A EVALUATION METHOD: LOCATION:
X   PERFORM   X   IN PLANT SIMULATE X   SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. OP-AA-109-101, CLEARANCE AND TAGGING, REV 1.  
: 1.     OP-AA-109-101, CLEARANCE AND TAGGING, REV 1.
: 2. BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, REV 18.  
: 2.     BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, REV 18.
: 3. M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.  
: 3.     M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.
: 4. BwOP WX-197, CHANGING LIQUID RADWASTE FILTERS, Rev 19. MATERIALS:  
: 4.     BwOP WX-197, CHANGING LIQUID RADWASTE FILTERS, Rev 19.
: 1. OP-AA-109-101, CLEARANCE AND TAGGING, REV 0.  
MATERIALS:
: 2. BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, REV 18.  
: 1.     OP-AA-109-101, CLEARANCE AND TAGGING, REV 0.
: 3. M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.  
: 2.     BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, REV 18.
: 4. BwOP WX-197, CHANGING LIQUID RADWASTE FILTERS, Rev 19. TASK STANDARDS:  
: 3.     M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.
: 1. Verify isolation points correct for 2CV03F.  
: 4.     BwOP WX-197, CHANGING LIQUID RADWASTE FILTERS, Rev 19.
: 2. Determine 2CV8425 position incorrect for 2CV03F.  
TASK STANDARDS:
: 3. Determine the sequence of isolation points for 2CV03F is incorrect.
: 1.     Verify isolation points correct for 2CV03F.
TASK CONDITIONS:  
: 2.     Determine 2CV8425 position incorrect for 2CV03F.
: 1. You are an extra operator on shift.  
: 3.     Determine the sequence of isolation points for 2CV03F is incorrect.
: 2. 2CV03F, Unit 2 RC Filter, needs to be replaced.  
TASK CONDITIONS:
: 3. A worker tagout to isolate and drain 2CV03F, in accordance with BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, step F.3, has been prepared by another operator.
: 1.     You are an extra operator on shift.
INITIATING CUES:  
: 2.     2CV03F, Unit 2 RC Filter, needs to be replaced.
: 3.     A worker tagout to isolate and drain 2CV03F, in accordance with BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, step F.3, has been prepared by another operator.
INITIATING CUES:
: 1. The Unit Supervisor directs you to peer check the clearance orders isolation points, sequence and OOS/RTS positions.
: 1. The Unit Supervisor directs you to peer check the clearance orders isolation points, sequence and OOS/RTS positions.
CUE: Hand examinee partially completed Worker Tagout.
CUE: Hand examinee partially completed Worker Tagout.
: 2. Inform Jim when you have completed the peer check. R-200 Page 2 of 9 RECORD START TIME:
: 2. Inform Jim when you have completed the peer check.
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE  
R-200                                         Page 2 of 9
: 1. Refer to BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE.
 
RECORD START TIME:
PERFORMANCE STEP                   STANDARD             CIRCLE APPLICABLE
: 1. Refer to BwOP CV-10, CV         Refer to BwOP CV-10, step    SAT UNSAT    N/A FILTERS ISOLATION AND           F.3:                        Comments:
RETURN TO SERVICE.
CUE: Provide examinee copy of BwOP CV-10.
CUE: Provide examinee copy of BwOP CV-10.
Refer to BwOP CV-10, step F.3:  SAT    UNSAT      N/A Comments: 
: 2. Refer to Drawing:              Refer to M-138, sheet 5B. SAT UNSAT     N/A
: 2. Refer to Drawing:  M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS CUE: Provide copy of M-138, sheet 5B.
* M-138, sheet 5B, DIAGRAM                                   Comments:
Refer to M-138, sheet 5B.
OF CVCS AND BTRS CUE: Provide copy of M-138, sheet 5B.
SAT    UNSAT      N/A Comments: 3. Verify the clearance BOUNDARY for 2CV03F.
: 3. Verify the clearance BOUNDARY   Determines clearance        SAT UNSAT    N/A for 2CV03F.                     boundary valves selected are Comments:
Determines clearance boundary valves selected are  
correct:
 
* 2CV129 C/S, Demin Hi Temp Divert Valve.
correct: 2CV129 C/S, Demin Hi Temp Divert Valve. 2CV8421, RC Filter Bypass Valve. 2CV8425, RC Filter Inlet Isol Valve. 2CV8422, RC Filter Outlet Isol Valve. 2CV8424, RC Filter Drain Valve. 2CV8423, RC Filter Vent Valve. SAT    UNSAT      N/A Comments: R-200 Page 3 of 9 EVALUATOR NOTE:  The examinee may determine the clearance position is incorrect (JPM step 7) prior to determining the sequence is incorrect (JPM step 5), or the examinee may discover both errors simultaneously. The examinee must identify both errors to complete critical tasks 5 & 7.
* 2CV8421, RC Filter Bypass Valve.
EVALUATOR NOTE:  The JPM contains corrected Worker Tagout checklist to be given to the examinee after the errors are identified.
* 2CV8425, RC Filter Inlet Isol Valve.
 
* 2CV8422, RC Filter Outlet Isol Valve.
If the examinee first determines the incorrect sequence is listed on the Worker Tagout checklist prior to determining the incorrect position is listed, provide examinee JPM page 7. If the examinee first determines the incorrect position is listed on the Worker Tagout checklist, provide examinee JPM page 8. When the examinee has determined BOTH the incorrect sequence and position are listed on the Worker Tagout checklist, provide examinee JPM page 9.
* 2CV8424, RC Filter Drain Valve.
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
* 2CV8423, RC Filter Vent Valve.
*4. Determine the clearance SEQUENCE for the 2CV03F is incorrect.
R-200                               Page 3 of 9
CUE: Acknowledge as Unit Supervisor and inform examinee the checklist sequence will be
 
corrected.
CUE: Hand examinee corrected worker tagout in accordance with the evaluator note above.
Determines clearance
 
sequence is incorrect:
: 1. 2CV129 C/S, Demin Hi Temp Divert Valve.
: 2. 2CV8421 RC Filter Bypass Valve.
: 3. 2CV8422 RC Filter Outlet Isol Valve.
: 4. 2CV8425 RC Filter Inlet Isol Valve.
: 5. 2CV8424 RC Filter Drain Valve. 6. 2CV8423 RC Filter Vent Valve. o Notifies SM and NSOs of sequencing error.
SAT    UNSAT      N/A Comments: 5. Verify the tag type for 2CV03F. Verifies clearance tag type:  2CV129 C/S, Demin Hi Temp Divert Valve - CI. 2CV8421 RC Filter Bypass Valve - RI. 2CV8425 RC Filter Inlet Isol Valve - RD. 2CV8422 RC Filter Outlet Isol Valve - RD. 2CV8424 RC Filter Drain Valve - RI. 2CV8423 RC Filter Vent Valve - RI.
R-200 Page 4 of 9 PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
*6. Determine the clearance POSITION for the 2CV03F is
 
incorrect.


CUE: Acknowledge as Unit Supervisor and inform examinee the checklist position will be  
EVALUATOR NOTE: The examinee may determine the clearance position is incorrect (JPM step 7) prior to determining the sequence is incorrect (JPM step 5), or the examinee may discover both errors simultaneously. The examinee must identify both errors to complete critical tasks 5 & 7.
EVALUATOR NOTE: The JPM contains corrected Worker Tagout checklist to be given to the examinee after the errors are identified.
If the examinee first determines the incorrect sequence is listed on the Worker Tagout checklist prior to determining the incorrect position is listed, provide examinee JPM page 7.
If the examinee first determines the incorrect position is listed on the Worker Tagout checklist, provide examinee JPM page 8.
When the examinee has determined BOTH the incorrect sequence and position are listed on the Worker Tagout checklist, provide examinee JPM page 9.
PERFORMANCE STEP                        STANDARD                  CIRCLE APPLICABLE
  *4. Determine the clearance            Determines clearance            SAT UNSAT      N/A SEQUENCE for the 2CV03F is          sequence is incorrect:          Comments:
incorrect.                          1. 2CV129 C/S, Demin Hi Temp Divert Valve.
: 2. 2CV8421 RC Filter Bypass Valve.
CUE: Acknowledge as Unit Supervisor and inform       3. 2CV8422 RC Filter examinee the checklist           Outlet Isol Valve.
sequence will be           4. 2CV8425 RC Filter Inlet corrected.                        Isol Valve.
: 5. 2CV8424 RC Filter Drain CUE: Hand examinee corrected              Valve.
worker tagout in accordance with the        6. 2CV8423 RC Filter Vent evaluator note above.            Valve.
o Notifies SM and NSOs of sequencing error.
: 5. Verify the tag type for 2CV03F. Verifies clearance tag type:
* 2CV129 C/S, Demin Hi Temp Divert Valve - CI.
* 2CV8421 RC Filter Bypass Valve - RI.
* 2CV8425 RC Filter Inlet Isol Valve - RD.
* 2CV8422 RC Filter Outlet Isol Valve - RD.
* 2CV8424 RC Filter Drain Valve - RI.
* 2CV8423 RC Filter Vent Valve - RI.
R-200                                  Page 4 of 9


PERFORMANCE STEP                      STANDARD              CIRCLE APPLICABLE
  *6. Determine the clearance        Determines clearance position  SAT UNSAT    N/A POSITION for the 2CV03F is      is incorrect:                  Comments:
incorrect.
* 2CV129 C/S, Demin Hi Temp Divert Valve - INFO.
* 2CV8421 RC Filter Bypass Valve - INFO.
* 2CV8425 RC Filter Inlet Isol Valve - CLOSED.
CUE: Acknowledge as Unit
* 2CV8422 RC Filter Outlet Supervisor and inform        Isol Valve - OPEN.
examinee the checklist
* 2CV8424 RC Filter Drain position will be              Valve - INFO.
corrected.
corrected.
CUE: Hand examinee corrected worker tagout in accordance with the  
* 2CV8423 RC Filter Vent Valve - INFO.
 
CUE: Hand examinee corrected worker tagout in         o Notifies SM and NSOs of accordance with the           position error.
evaluator note above.
evaluator note above.
Determines clearance position is incorrect:  2CV129 C/S, Demin Hi Temp Divert Valve - INFO. 2CV8421 RC Filter Bypass Valve - INFO. 2CV8425 RC Filter Inlet Isol Valve - CLOSED. 2CV8422 RC Filter Outlet Isol Valve - OPEN. 2CV8424 RC Filter Drain Valve - INFO. 2CV8423 RC Filter Vent Valve - INFO.
o Notifies SM and NSOs of position error.
SAT    UNSAT      N/A Comments: 
CUE: THIS COMPLETES THIS JPM.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME:
RECORD STOP TIME:
COMMENTS:  
COMMENTS:
R-200                              Page 5 of 9


R-200 Page 5 of 9 R-200 Page 6 of 9 SIMULATOR SETUP INSTRUCTIONS N/A   COMMENTS Provide copy of OP-AA-109-101, CLEARANCE AND TAGGING, REV 4, . Provide copy of BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, REV 18. Provide copy of M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.  
SIMULATOR SETUP INSTRUCTIONS
* N/A COMMENTS
* Provide copy of OP-AA-109-101, CLEARANCE AND TAGGING, REV 4, .
* Provide copy of BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, REV 18.
* Provide copy of M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.
R-200                                    Page 6 of 9


OP-AA-109-101 Revision 4 Page 71 of 77 R-200        Page 7 of 9 ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O:   Mode Dependent:   Condition Dependent:
OP-AA-109-101 Revision 4 Page 71 of 77 ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O:             Mode Dependent:                 Condition Dependent:
Production Risk:   Environmental Risk:   Atmospheric Risk:       Reactivity Risk:
Production Risk:             Environmental Risk:             Atmospheric Risk:             Reactivity Risk:
WORKER TAGOUT#
WORKER TAGOUT# PO9-005       JOB DESCRIPTION: CHANGE 2CV03F_________________
PO9-005 JOB DESCRIPTION: CHANGE 2CV03F_________________
WORKING DEPARTMENT: OPS W/O OR W/R: 12345 EQUIP. TAG# 2CV03F COMPONENT DESCRIPTION: UNIT 2 RC FILTER FIRST APPROVAL: __Jim NSO_________________________ DATE/TIME: Today/One hour ago SECOND APPROVAL: __             ___________________ DATE/TIME: __________________
WORKING DEPARTMENT:
WTO AUTHORIZATION: _             __________________ DATE/TIME __________________
OPS W/O OR W/R:
SPECIAL INSTRUCTIONS:         YES:                 NO:       (IF YES SEE ATTACHMENT 14 PART 2)
12345 EQUIP. TAG#
EQUIP. TAG/EQUIPMENT         SEQ   TAG     POSITION     HUNG     VERIF. SFTY. RTS       RTS         RTS VERIF.
2CV03F COMPONENT DESCRIPTION: UNIT 2 RC FILTER FIRST APPROVAL: __Jim NSO_________________________
NAME                                TYPE                  BY        BY     VERIF. SEQ    POSITION        BY  BY 2CV129 C/S (DEMIN HI TEMP     1     CI       INFO                                   3         AS DIVERT VLV)                                                                              REQUIRED 2CV8421 RC FILTER BYPASS     2     RI       INFO                                   1       OPEN VLV 2CV8425 RC FILTER INLET       3      RD      CLOSED                                  2      CLOSED ISOL VLV 2CV8422 RC FILTER OUTLET      4      RD      OPEN                                  2      CLOSED ISOL VLV 2CV8424 RC FILTER DRAIN      5      RI      INFO                                  2      CLOSED VLV 2CV8423 RC FILTER VENT        5      RI      INFO                                  2      CLOSED VLV WTO PLACED: _____________________________________________________________ DATE/TIME: ___________________
DATE/TIME: Today/One hour ago SECOND APPROVAL: __                     ___________________ DATE/TIME: __________________                     WTO AUTHORIZATION: _                     __________________ DATE/TIME __________________ SPECIAL INSTRUCTIONS:   YES:         NO:       (IF YES SEE ATTACHMENT 14 PART 2)
WTL COMPLETED WORK START: _                      _____________________________ DATE/TIME: ___________________
EQUIP. TAG/EQUIPMENT NAME SEQ TAG TYPE POSITION HUNG BY VERIF. BY SFTY. VERIF. RTS SEQ RTS POSITION RTS BY VERIF. BY 2CV129 C/S (DEMIN HI TEMP DIVERT VLV) 1 CI INFO   3 AS REQUIRED   2CV8421 RC FILTER BYPASS VLV 2 RI INFO   1 OPEN   2CV8425 RC FILTER INLET  
WTO FINAL CLEAR: WORK CREWMEMBER RELEASE: ____                        __________ DATE/TIME: ___________________
WTO CLEARED: ____________________________________________________________ DATE/TIME: ____________________
(COPIES MAY BE MADE OF THIS FORM FOR ADDITIONAL ISOLATION POINTS)
R-200                                                  Page 7 of 9


ISOL VLV 3 RD CLOSED   2 CLOSED   2CV8422 RC FILTER OUTLET ISOL VLV 4 RD OPEN    2 CLOSED   2CV8424 RC FILTER DRAIN VLV 5 RI INFO   2 CLOSED   2CV8423 RC FILTER VENT  
OP-AA-109-101 Revision 4 Page 71 of 77 ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O:              Mode Dependent:                  Condition Dependent:
Production Risk:              Environmental Risk:              Atmospheric Risk:              Reactivity Risk:
WORKER TAGOUT# PO9-005        JOB DESCRIPTION: CHANGE 2CV03F_________________
WORKING DEPARTMENT: OPS W/O OR W/R: 12345 EQUIP. TAG# 2CV03F COMPONENT DESCRIPTION: UNIT 2 RC FILTER FIRST APPROVAL: __Jim NSO_________________________ DATE/TIME: Today/One hour ago SECOND APPROVAL: __              ___________________ DATE/TIME: __________________
WTO AUTHORIZATION: _              __________________ DATE/TIME __________________
SPECIAL INSTRUCTIONS:        YES:                  NO:        (IF YES SEE ATTACHMENT 14 PART 2)
EQUIP. TAG/EQUIPMENT        SEQ    TAG    POSITION    HUNG    VERIF. SFTY. RTS      RTS        RTS  VERIF.
NAME                                TYPE                  BY        BY    VERIF. SEQ    POSITION        BY  BY 2CV129 C/S (DEMIN HI TEMP    1      CI      INFO                                  3        AS DIVERT VLV)                                                                              REQUIRED 2CV8421 RC FILTER BYPASS      2      RI      INFO                                  1      OPEN VLV 2CV8422 RC FILTER OUTLET      3     RD     CLOSED                                 2     CLOSED ISOL VLV 2CV8425 RC FILTER INLET      4     RD     CLOSED                                  2     CLOSED ISOL VLV 2CV8424 RC FILTER DRAIN       5     RI       INFO                                   2     CLOSED VLV 2CV8423 RC FILTER VENT       5      RI      INFO                                  2      CLOSED VLV WTO PLACED: _____________________________________________________________ DATE/TIME: ___________________
WTL COMPLETED WORK START: _                      _____________________________ DATE/TIME: ___________________
WTO FINAL CLEAR: WORK CREWMEMBER RELEASE: ____                        __________ DATE/TIME: ___________________
WTO CLEARED: ____________________________________________________________ DATE/TIME: ____________________
(COPIES MAY BE MADE OF THIS FORM FOR ADDITIONAL ISOLATION POINTS)
R-200                                                  Page 8 of 9


VLV 5 RI INFO   2 CLOSED WTO PLACED: ___________________
OP-AA-109-101 Revision 4 Page 71 of 77 ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O:              Mode Dependent:                  Condition Dependent:
__________________________________________  DATE/TIME: ___________________
Production Risk:              Environmental Risk:              Atmospheric Risk:              Reactivity Risk:
WTL COMPLETED WORK START: _                             _____________________________   DATE/TIME: ___________________
WORKER TAGOUT# PO9-005        JOB DESCRIPTION: CHANGE 2CV03F_________________
WTO FINAL CLEAR:   WORK CREWMEMBER RELEASE: ____                        __________ DATE/TIME: ___________________
WORKING DEPARTMENT: OPS W/O OR W/R: 12345 EQUIP. TAG# 2CV03F COMPONENT DESCRIPTION: UNIT 2 RC FILTER FIRST APPROVAL: __Jim NSO_________________________ DATE/TIME: Today/One hour ago SECOND APPROVAL: __              ___________________ DATE/TIME: __________________
WTO CLEARED: ____________________________________________________________ DATE/TIME: ____________________
WTO AUTHORIZATION: _              __________________ DATE/TIME __________________
  (COPIES MAY BE MADE OF THIS FORM FOR ADDITIONAL ISOLATION POINTS)
SPECIAL INSTRUCTIONS:        YES:                  NO:        (IF YES SEE ATTACHMENT 14 PART 2)
EQUIP. TAG/EQUIPMENT        SEQ    TAG    POSITION    HUNG    VERIF. SFTY. RTS      RTS        RTS  VERIF.
NAME                                TYPE                  BY        BY    VERIF. SEQ    POSITION        BY  BY 2CV129 C/S (DEMIN HI TEMP    1      CI      INFO                                  3        AS DIVERT VLV)                                                                              REQUIRED 2CV8421 RC FILTER BYPASS      2      RI      INFO                                  1      OPEN VLV 2CV8425 RC FILTER INLET      3      RD      CLOSED                                  2      CLOSED ISOL VLV 2CV8422 RC FILTER OUTLET      4      RD      CLOSED                                  2      CLOSED ISOL VLV 2CV8424 RC FILTER DRAIN      5     RI       INFO                                   2      CLOSED VLV 2CV8423 RC FILTER VENT        5      RI      INFO                                  2     CLOSED VLV WTO PLACED: _____________________________________________________________ DATE/TIME: ___________________
WTL COMPLETED WORK START: _                       _____________________________ DATE/TIME: ___________________
WTO FINAL CLEAR: WORK CREWMEMBER RELEASE: ____                        __________ DATE/TIME: ___________________
WTO CLEARED: ____________________________________________________________ DATE/TIME: ____________________
(COPIES MAY BE MADE OF THIS FORM FOR ADDITIONAL ISOLATION POINTS)
R-200                                                  Page 9 of 9


OP-AA-109-101 Revision 4 Page 71 of 77 R-200        Page 8 of 9 ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O:   Mode Dependent:    Condition Dependent:
JOB PERFORMANCE MEASURE TASK CONDITIONS:
Production Risk:   Environmental Risk:  Atmospheric Risk:        Reactivity Risk:
: 1. You are an extra NSO.
WORKER TAGOUT#
: 2. Both Units are at full power.
PO9-005 JOB DESCRIPTION: CHANGE 2CV03F_________________
: 3. 1PR01J is operable.
WORKING DEPARTMENT:
INITIATING CUES:
OPS  W/O OR W/R:
: 1. The Unit Supervisor has handed you a Containment release package G-09-001, completed through section B, and has directed you to complete Section C. All previous sections of the release package have been successfully completed.
12345  EQUIP. TAG# 2CV03F  COMPONENT DESCRIPTION: UNIT 2 RC FILTER FIRST APPROVAL: __Jim NSO_________________________
: 2. An Equipment Operator is standing by to obtain the 1FI-PR100 flowrate Page 1 of 6 R-301
DATE/TIME: Today/One hour ago SECOND APPROVAL: __                      ___________________ DATE/TIME: __________________                    WTO AUTHORIZATION: _                      __________________  DATE/TIME __________________ SPECIAL INSTRUCTIONS:  YES:          NO:      (IF YES SEE ATTACHMENT 14 PART 2)
EQUIP. TAG/EQUIPMENT NAME SEQ TAG TYPE POSITION HUNG BY VERIF. BY SFTY. VERIF. RTS SEQ RTS POSITION RTS BY VERIF. BY 2CV129 C/S (DEMIN HI TEMP DIVERT VLV) 1 CI INFO    3 AS REQUIRED  2CV8421 RC FILTER BYPASS VLV 2 RI INFO    1 OPEN  2CV8422 RC FILTER OUTLET
 
ISOL VLV 3 RD CLOSED    2 CLOSED  2CV8425 RC FILTER INLET ISOL VLV 4 RD CLOSED    2 CLOSED  2CV8424 RC FILTER DRAIN VLV 5 RI INFO    2 CLOSED  2CV8423 RC FILTER VENT


VLV 5 RI INFO    2 CLOSED    WTO PLACED:  ___________________
TASK TITLE: Perform a Containment Release Channel Check JPM No.:   R-301                                             REV:         NRC 09-1 TPO No.:   4C.WQ-01                                           K&A No.:     2.3.11 TASK No.:   R-GW-001, Perform gaseous release                 K&A IMP:     3.8/4.3 EXAMINEE:                                                     RO SRO (Circle One)
__________________________________________  DATE/TIME: ___________________
EVALUATOR:                                                     DATE:
 
The Examinee:     PASSED           this JPM.                 TIME STARTED:
WTL COMPLETED WORK START: _                              _____________________________  DATE/TIME: ___________________
FAILED                                     TIME FINISHED:
WTO FINAL CLEAR:  WORK CREWMEMBER RELEASE: ____                        __________ DATE/TIME: ___________________
JPM TIME:                 MINUTES CRITICAL ELEMENTS:         (*) 9, 10                           APPROX COMPLETION TIME: 19 MINUTES CRITICAL TIME:             NA EVALUATION METHOD:                                             LOCATION:
WTO CLEARED: ____________________________________________________________ DATE/TIME: ____________________ 
X PERFORM                                           IN PLANT SIMULATE                                         X SIMULATOR GENERAL  
  (COPIES MAY BE MADE OF THIS FORM FOR ADDITIONAL ISOLATION POINTS)
OP-AA-109-101 Revision 4 Page 71 of 77 R-200        Page 9 of 9 ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O:  Mode Dependent:    Condition Dependent:
Production Risk:    Environmental Risk:  Atmospheric Risk:        Reactivity Risk:
WORKER TAGOUT#
PO9-005 JOB DESCRIPTION: CHANGE 2CV03F_________________
WORKING DEPARTMENT:
OPS  W/O OR W/R:
12345  EQUIP. TAG# 2CV03F  COMPONENT DESCRIPTION: UNIT 2 RC FILTER FIRST APPROVAL: __Jim NSO_________________________
DATE/TIME: Today/One hour ago SECOND APPROVAL: __                      ___________________ DATE/TIME: __________________                    WTO AUTHORIZATION: _                      __________________  DATE/TIME __________________ SPECIAL INSTRUCTIONS:  YES:          NO:      (IF YES SEE ATTACHMENT 14 PART 2)
EQUIP. TAG/EQUIPMENT NAME SEQ TAG TYPE POSITION HUNG BY VERIF. BY SFTY. VERIF. RTS SEQ RTS POSITION RTS BY VERIF. BY 2CV129 C/S (DEMIN HI TEMP DIVERT VLV) 1 CI INFO    3 AS REQUIRED  2CV8421 RC FILTER BYPASS VLV 2 RI INFO    1 OPEN  2CV8425 RC FILTER INLET
 
ISOL VLV 3 RD CLOSED    2 CLOSED  2CV8422 RC FILTER OUTLET ISOL VLV 4 RD CLOSED    2 CLOSED  2CV8424 RC FILTER DRAIN VLV 5 RI INFO    2 CLOSED  2CV8423 RC FILTER VENT
 
VLV 5 RI INFO    2 CLOSED WTO PLACED:  ___________________
__________________________________________  DATE/TIME: ___________________
WTL COMPLETED WORK START: _                              _____________________________  DATE/TIME: ___________________
WTO FINAL CLEAR:  WORK CREWMEMBER RELEASE: ____                        __________ DATE/TIME: ___________________
WTO CLEARED: ____________________________________________________________ DATE/TIME: ____________________ 
  (COPIES MAY BE MADE OF THIS FORM FOR ADDITIONAL ISOLATION POINTS)
 
R-301 Page 1 of 6 JOB PERFORMANCE MEASURE
 
TASK CONDITIONS:
: 1. You are an extra NSO.
: 2. Both Units are at full power.
: 3. 1PR01J is operable.
 
INITIATING CUES:
: 1. The Unit Supervisor has handed you a Containment release package G-09-001, completed through section B, and has directed you to complete Section C. All previous sections of the release package have been successfully completed.
: 2. An Equipment Operator is standing by to obtain the 1FI-PR100 flowrate
 
R-301 Page 2 of 6 TASK TITLE:
Perform a Containment Release Channel Check JPM No.: R-301 REV: NRC 09-1 TPO No.: 4C.WQ-01 K&A No.: 2.3.11 TASK No.: R-GW-001, Perform gaseous release K&A IMP: 3.8/4.3  
 
EXAMINEE:
RO   SRO   (Circle One)  
 
EVALUATOR:
DATE:  
 
The Examinee: PASSED this JPM.
TIME STARTED:
FAILED TIME FINISHED:
JPM TIME: MINUTES CRITICAL ELEMENTS:  
(*) 9, 10 APPROX COMPLETION TIME:
19 MINUTES CRITICAL TIME:
NA EVALUATION METHOD:
LOCATION:
X   PERFORM       IN PLANT SIMULATE X   SIMULATOR  
 
GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. 1BwOS RETS 2.2.B-1, Rev 1, Unit One Pre-release Source and Channel Check of Containment Purge Effluent Monitor 1PR01J (1RE-PR001A/B/C)  
: 1. 1BwOS RETS 2.2.B-1, Rev 1, Unit One Pre-release Source and Channel Check of Containment Purge Effluent Monitor 1PR01J (1RE-PR001A/B/C)
: 2. BwRP 6110-13T1, Rev 18, Containment Release Form MATERIALS:  
: 2. BwRP 6110-13T1, Rev 18, Containment Release Form MATERIALS:
: 1. BwRP 6110-13T1, Rev 18, Containment Release Form completed through section B.  
: 1. BwRP 6110-13T1, Rev 18, Containment Release Form completed through section B.
: 2. 1BwOS RETS 2.2.B-1, Rev 1, Unit One Pre-release Source and Channel Check of Containment Purge Effluent Monitor 1PR01J (1RE-PR001A/B/C) with Predefine Cover Sheet  
: 2. 1BwOS RETS 2.2.B-1, Rev 1, Unit One Pre-release Source and Channel Check of Containment Purge Effluent Monitor 1PR01J (1RE-PR001A/B/C) with Predefine Cover Sheet TASK STANDARDS:
 
: 1. Complete Section C of Containment Release Form in accordance with BwRP 6110-13T1.
TASK STANDARDS:  
: 2. Correctly operate the RM-11 for setpoint adjustment.
: 1. Complete Section C of Containment Release Form in accordance with BwRP 6110-13T1.  
TASK CONDITIONS:
: 2. Correctly operate the RM-11 for setpoint adjustment.  
: 1. You are an extra NSO.
 
: 2. Both Units are at full power.
TASK CONDITIONS:  
: 1. You are an extra NSO.  
: 2. Both Units are at full power.  
: 3. 1PR01J is operable.
: 3. 1PR01J is operable.
INITIATING CUES:  
INITIATING CUES:
: 1. The Unit Supervisor has handed you a Containment release package G-09-001, completed through section B, and has directed you to complete Section C. All previous sections of the  
: 1. The Unit Supervisor has handed you a Containment release package G-09-001, completed through section B, and has directed you to complete Section C. All previous sections of the release package have been successfully completed.
 
Page 2 of 6 R-301
release package have been successfully completed.  
 
R-301 Page 3 of 6 RECORD START TIME Note: Provide the examinee with a copy of BwRP 6110-13T1completed through Step B and  1BwOS RETS 2.2.B-1 with Predefine cover sheet. When requested by the examinee, Independent Verification has been completed.
 
PERFORMANCE STEP STANDARD Circle applicable
: 1. Refer to partially completed BwRP 6110-13T1, Section C
 
Refer to1BwOS RETS 2.2.B-1
 
CUE: Prerequisites are met.
Locate and open BwRP 6110-13T1  Determine 1BwOS RETS 2.2.B-1 needs to be
 
performed next. VERIFY the applicable Prerequisites, Precautions, and Limitations and
 
Actions are addressed.
SAT    UNSAT      N/A
 
Comments: 2. RECORD the Release Number from BwRP 6110-13T1
 
Locate release number on page 1 of containment
 
release form and record it
 
in step 1.2 SAT    UNSAT      N/A
 
Comments: 3. Locally obtain 1FI-PR100 Flowrate


RECORD START TIME Note:  Provide the examinee with a copy of BwRP 6110-13T1completed through Step B and 1BwOS RETS 2.2.B-1 with Predefine cover sheet.
When requested by the examinee, Independent Verification has been completed.
PERFORMANCE STEP                      STANDARD                  Circle applicable
: 1. Refer to partially completed BwRP
* Locate and open BwRP        SAT UNSAT      N/A 6110-13T1, Section C                  6110-13T1                  Comments:
* Determine 1BwOS RETS Refer to1BwOS RETS 2.2.B-1            2.2.B-1 needs to be performed next.
CUE:    Prerequisites are met.
* VERIFY the applicable Prerequisites, Precautions, and Limitations and Actions are addressed.
: 2. RECORD the Release Number
* Locate release number on    SAT UNSAT      N/A from BwRP 6110-13T1                  page 1 of containment      Comments:
release form and record it in step 1.2
: 3. Locally obtain 1FI-PR100 Flowrate
* Record flowrate and name    SAT UNSAT      N/A of EO is step 1.3          Comments:
CUE: EO (any name) reports flowrate is 2.9 scfm.
CUE: EO (any name) reports flowrate is 2.9 scfm.
Record flowrate and name of EO is step 1.3 SAT     UNSAT     N/A Comments: 4. At the RM-11 Console (1PM14JB-1) VERIFY/SELECT
: 4. At the RM-11 Console
* Press grid 2 key at RM-11  SAT UNSAT      N/A (1PM14JB-1) VERIFY/SELECT            and verify grid 2 Process  Comments:
Grid 2                              Air Monitor screen comes to view.
: 5. Perform source/channel check of
* Press keys 1,2,0,1 in order SAT UNSAT      N/A 1RE-PR001A                            and then press SEL key. Comments:
* Obtain current activity reading of 1PA201 by depressing any trend, items or status key and record on surv.
* Press the CHECK SOURCE key and verify key is backlit.
* Verify CHECK SOURCE ENERGIZED is on status display.
* Verify CHECK SOURCE FAILED is not indicated after backlit goes out.
* Record cursor color of green.
* Verify color not white magenta or dark blue.
Page 3 of 6 R-301
: 6. Perform source/channel check of
* Press keys 1,1,0,1 in order SAT UNSAT N/A 1RE-PR001B                        and then press SEL key. Comments:
* Obtain current activity reading of 1PB101 and record on surv.
* Press the CHECK SOURCE key and verify key is backlit.
* Verify CHECK SOURCE ENERGIZED is on status display.
* Verify CHECK SOURCE FAILED is not indicated after backlit goes out.
* Record cursor color of green.
* Verify color not white magenta or dark blue.
: 7. Perform source/channel check of                                SAT UNSAT N/A 1RE-PR001C
* Press keys 1,3,0,1 in order Comments:
and then press SEL key.
* Obtain current activity reading of and record on surv.
* Press the CHECK SOURCE key and verify key is backlit.
* Verify CHECK SOURCE ENERGIZED is on status display.
* Verify CHECK SOURCE FAILED is not indicated after backlit goes out.
* Record cursor color of green.
* Verify color not white magenta or dark blue.
: 8.                                  o Press grid 2 key at RM-11   SAT UNSAT N/A Record original Setpoint of 1RE-   and verify grid 2 Process  Comments:
PR001 Gas Channel                  Air Monitor screen comes to view.
* Press keys 1,1,0,1 in order and then press SEL key.
* Press CHANNEL ITEMS key
* Record High Alarm setpoint
* Record Alert Alarm setpoint
* Initial and date step.
Page 4 of 6 R-301


Grid 2 Press grid 2 key at RM-11 and verify grid 2 Process
  *9 Change High alarm setpoint on
* Select SUPERVISOR          SAT UNSAT N/A 1PB101                              MODE on RM-11 with selector key.              Comments:
o Press CHANNEL ITEMS key
* Press 09 and SELECT Cue: When prompted by examinee for an independent
* Press 683-4 (or 683-04) verification, state Another NSO    and ENTER has independently verified the set point change.
* Initial and date step.
*10  Change Alert alarm setpoint on
* Press 10 and SELECT        SAT UNSAT N/A 1PB101
* Press 683-5 (or 683-05)    Comments:
Cue: When prompted by              and ENTER examinee for an independent verification,
* Initial and date step.
state Another NSO has independently verified the set point change.
11 Notify US of section C completion
* Notifies US that section C SAT UNSAT N/A is complete.
Comments:
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME COMMENTS:
Page 5 of 6 R-301


Air Monitor screen comes
SIMULATOR SETUP INSTRUCTIONS JPM NO: N-099 REQUIRED SIMULATOR MODE (S): ANY MALFUNCTION #S: N/A COMMENTS:
: 1. BwRP 6110-13T1 needs to be filled out through section B. Step D.7.b High Alarm Setpoint 2.84 x 10-4 Step A.5.d High Alarm Setpoint      6.83 x 10-4 Step A.5.d Alert Alarm Setpoint    6.83 x 10-5
: 2. Verify 1RE-PR001 setpoints as follows:
High Alarm (Channel Item 9) 6.06 x 10-4 Alert Alarm (Channel Item 10) 6.06 x 10-5
: 3. Place RM-11 on Grid 2.
: 4. Advance RM-11 printer to blank paper.
Page 6 of 6 R-301


to view.
JOB PERFORMANCE MEASURE TASK CONDITIONS:
SAT    UNSAT      N/A Comments: 5. Perform source/channel check of  
: 1. You are an extra SRO on shift.
: 2. Unit 1 is recovering from an event that caused a suspected hydrogen bubble to accumulate in the reactor vessel head.
: 3. The crew is currently performing 1BwFR-I.3 RESPONSE TO VOIDS IN REACTOR VESSEL.
: 4. Attempts to condense the vessel head void have been unsuccessful and the TSC has directed the crew to perform a direct vessel vent.
: 5. Current plant conditions are as follows:
* Containment temperature (dry bulb) = 160ºF
* Containment pressure = 3.5 psig
* Containment hydrogen concentration =1%
* RCS pressure = 1900 psig INITIATING CUES:
: 1. The Shift Manager (Jon Doe) directs you to assist the Unit 1 SRO by calculating vessel vent time per 1BwFR-I.3, Attachment B.
: 2. Inform the Shift Manager when you have completed 1BwFR-I.3, Attachment B.
S-108                                              Page 1 of 5


1RE-PR001A
TASK TITLE: Determine Venting Time For Reactor Vessel Void JPM No.:       S-108                                               REV:         NRC 09-1 Task No.:     S-FR-017                                           K/A No.:     2.1.25 Objective No.: 8D.FR-012-A                                         K/A IMP:     4.2 EXAMINEE:                                                         SRO EVALUATOR:                                                         DATE:
 
The Examinee:         PASSED           this JPM.                 TIME STARTED:
Press keys 1,2,0,1 in order and then press SEL key.
FAILED                                     TIME FINISHED:
Obtain current activity reading of 1PA201 by
JPM TIME:                 MINUTES CRITICAL ELEMENTS:           (*) 2, 3, 4, 5, 6                 APPROX COMPLETION TIME: 10 MINUTES CRITICAL TIME:               NA EVALUATION METHOD:                                                 LOCATION:
 
X PERFORM                                           IN PLANT SIMULATE                                         X SIMULATOR OR CLASSROOM GENERAL  
depressing any trend, items or status key and
 
record on surv.
Press the CHECK SOURCE key and verify key is backlit.
Verify CHECK SOURCE ENERGIZED is on status display. Verify CHECK SOURCE FAILED is not indicated after backlit goes out.
Record cursor color of green. Verify color not white magenta or dark blue.
 
SAT    UNSAT      N/A Comments:
R-301 Page 4 of 6
: 6. Perform source/channel check of 1RE-PR001B Press keys 1,1,0,1 in order and then press SEL key.
Obtain current activity reading of 1PB101 and record on surv.
Press the CHECK SOURCE key and verify key is backlit.
Verify CHECK SOURCE ENERGIZED is on status
 
display. Verify CHECK SOURCE FAILED is not indicated after backlit goes out.
Record cursor color of green.
Verify color not white magenta or dark blue.
SAT    UNSAT      N/A Comments: 7. Perform source/channel check of 1RE-PR001C
 
Press keys 1,3,0,1 in order and then press SEL key.
Obtain current activity reading of and record on surv. Press the CHECK SOURCE key and verify key is backlit.
Verify CHECK SOURCE ENERGIZED is on status
 
display. Verify CHECK SOURCE FAILED is not indicated
 
after backlit goes out.
Record cursor color of green.
Verify color not white magenta or dark blue.
SAT    UNSAT      N/A Comments: 8.
Record original Setpoint of 1RE-PR001 Gas Channel o Press grid 2 key at RM-11 and verify grid 2 Process
 
Air Monitor screen comes
 
to view. Press keys 1,1,0,1 in order and then press SEL key. Press CHANNEL ITEMS key  Record High Alarm setpoint  Record Alert Alarm setpoint  Initial and date step.
SAT    UNSAT      N/A Comments:
R-301 Page 5 of 6
*9 Change High alarm setpoint on 1PB101 
 
Cue: When prompted by examinee for an independent verification, state "Another NSO has independently verified the
 
set point change."  Select SUPERVISOR MODE on RM-11 with selector key.
o Press CHANNEL ITEMS key  Press 09 and SELECT
 
Press 683-4 (or 683-04) and ENTER
 
Initial and date step.
 
SAT    UNSAT      N/A Comments: *10 Change Alert alarm setpoint on 1PB101  Cue: When prompted by examinee for an
 
independent verification, state "Another NSO has independently verified
 
the set point change."  Press 10 and SELECT Press 683-5 (or 683-05) and ENTER Initial and date step.
 
SAT    UNSAT      N/A Comments: 11 Notify US of section C completion  Notifies US that section C is complete.
SAT    UNSAT      N/A Comments: 
 
CUE: THIS COMPLETES THIS JPM.
 
RECORD STOP TIME COMMENTS:   
 
R-301 Page 6 of 6 SIMULATOR SETUP INSTRUCTIONS
 
JPM NO: N-099
 
REQUIRED SIMULATOR MODE (S): ANY
 
MALFUNCTION #'S:  N/A
 
COMMENTS:
: 1. BwRP 6110-13T1 needs to be filled out through section B. Step D.7.b High Alarm Setpoint 2.84 x 10
-4 Step A.5.d High Alarm Setpoint 6.83 x 10
-4 Step A.5.d Alert Alarm Setpoint 6.83 x 10
-5  2. Verify 1RE-PR001 setpoints as follows: High Alarm (Channel Item 9) 6.06 x 10
-4 Alert Alarm (Channel Item 10) 6.06 x 10
-5 3. Place RM-11 on Grid 2.
: 4. Advance RM-11 printer to blank paper.
 
S-108      Page 1 of 5 JOB PERFORMANCE MEASURE
 
TASK CONDITIONS:
: 1. You are an extra SRO on shift.
: 2. Unit 1 is recovering from an event that caused a suspected hydrogen bubble to accumulate in the reactor vessel head.
: 3. The crew is currently performing 1BwFR-I.3 RESPONSE TO VOIDS IN REACTOR VESSEL. 
: 4. Attempts to condense the vessel head void have been unsuccessful and the TSC has directed the crew to perform a direct vessel vent.
: 5. Current plant conditions are as follows:  Containment temperature (dry bulb) = 160ºF  Containment pressure = 3.5 psig  Containment hydrogen concentration =1%  RCS pressure = 1900 psig
 
INITIATING CUES:
: 1. The Shift Manager (Jon Doe) directs you to assist t he Unit 1 SRO by calculating vessel vent time per 1BwFR-I.3, Attachment B.
: 2. Inform the Shift Manager when you hav e completed 1BwFR-I.3, Attachment B.
S-108      Page 2 of 5 TASK TITLE: Determine Venting Time For Reactor Vessel Void JPM No.: S-108 REV: NRC 09-1 Task No.: S-FR-017 K/A No.: 2.1.25 Objective No.: 8D.FR-012-A K/A IMP: 4.2  
 
EXAMINEE:
SRO EVALUATOR:
DATE:
The Examinee: PASSED this JPM.
TIME STARTED:
FAILED TIME FINISHED:
JPM TIME: MINUTES CRITICAL ELEMENTS:  
(*) 2, 3, 4, 5, 6 APPROX COMPLETION TIME: 10 MINUTES CRITICAL TIME:
NA EVALUATION METHOD:
LOCATION:
X   PERFORM       IN PLANT SIMULATE X   SIMULATOR OR CLASSROOM GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. 1BwFR-I.3, RESPONSE TO VOIDS IN REACTOR VESSEL, Rev 201.
: 1.     1BwFR-I.3, RESPONSE TO VOIDS IN REACTOR VESSEL, Rev 201.
MATERIALS:  
MATERIALS:
: 1. 1BwFR-I.3, RESPONSE TO VOIDS IN REACTOR VESSEL, Attachment B.  
: 1.     1BwFR-I.3, RESPONSE TO VOIDS IN REACTOR VESSEL, Attachment B.
: 2. Calculator TASK STANDARDS:  
: 2.     Calculator TASK STANDARDS:
: 1. Determine vessel venting time TASK CONDITIONS:  
: 1.     Determine vessel venting time TASK CONDITIONS:
: 1. You are an extra SRO on shift.  
: 1.     You are an extra SRO on shift.
: 2. Unit 1 is recovering from an event that caused a suspected hydrogen bubble to accumulate in the reactor vessel head.  
: 2.     Unit 1 is recovering from an event that caused a suspected hydrogen bubble to accumulate in the reactor vessel head.
: 3. The crew is currently performing 1BwFR-I.3 RESPONSE TO VOIDS IN REACTOR VESSEL.  
: 3.     The crew is currently performing 1BwFR-I.3 RESPONSE TO VOIDS IN REACTOR VESSEL.
: 4. Attempts to condense the vessel head void have been unsuccessful and the TSC has directed the crew to perform a direct vessel vent.  
: 4.     Attempts to condense the vessel head void have been unsuccessful and the TSC has directed the crew to perform a direct vessel vent.
: 5. Current plant conditions are as follows: Containment temperature (dry bulb) = 160ºF Containment pressure = 3.5 psig Containment hydrogen concentration = 1% RCS pressure = 1900 psig INITIATING CUES:  
: 5.     Current plant conditions are as follows:
: 1. The Shift Manager (Jon Doe) directs you to assi st the Unit 1 SRO by calculating vessel vent time per 1BwFR-I.3, Attachment B.  
* Containment temperature (dry bulb) = 160ºF
: 2. Inform the Shift Manager when you hav e completed 1BwFR-I.3, Attachment B.
* Containment pressure = 3.5 psig
S-108       Page 3 of 5 RECORD START TIME:
* Containment hydrogen concentration = 1%
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
* RCS pressure = 1900 psig INITIATING CUES:
: 1. Refer to 1BwFR-I.3 NOTE: Provide copy of 1BwFR-I.3 to examinee.
: 1.     The Shift Manager (Jon Doe) directs you to assist the Unit 1 SRO by calculating vessel vent time per 1BwFR-I.3, Attachment B.
Refer to 1BwFR-I.3 SAT    UNSAT      N/A Comments: *2. Calculate containment temperature in Rankine. 
: 2.     Inform the Shift Manager when you have completed 1BwFR-I.3, Attachment B.
S-108                                               Page 2 of 5


Perform Attachment B, step 1 Enter 160 in ºF blank. Add 460 to 160 and enter 620 in ºR blank.
RECORD START TIME:
SAT    UNSAT      N/A Comments: *3. Calculate containment air volume based on current temperature and pressure.
PERFORMANCE STEP                STANDARD                CIRCLE APPLICABLE
Perform Attachment B, step 2 Enter 620 in ºR blank. Enter 3.5 in CNMT press blank. Perform calculation and enter 2,750,968 (or approx.
: 1. Refer to 1BwFR-I.3          Refer to 1BwFR-I.3              SAT UNSAT    N/A NOTE: Provide copy of 1BwFR-                                Comments:
2.75E6) in ft 3 blank. SAT    UNSAT      N/A Comments: *4. Calculate maximum hydrogen volume that can be vented  
I.3 to examinee.
 
  *2. Calculate containment        Perform Attachment B, step 1   SAT UNSAT    N/A temperature in Rankine.
keeping cnmt concentration below 3%.
* Enter 160 in ºF blank.       Comments:
Perform Attachment B, step 3  Enter 1 in cnmt hydrogen conc. blank. Enter enter 2,750,968 (or approx. 2.75E6) in ft 3 blank Perform calculation and enter 55,019 (or approx.
* Add 460 to 160 and enter 620 in ºR blank.
5.5E4) in ft 3 blank. SAT    UNSAT      N/A Comments: *5. Determine hydrogen flow rate from RCS vent.
  *3. Calculate containment air   Perform Attachment B, step 2   SAT UNSAT    N/A volume based on current
Perform Attachment B, step 4 Plot RCS pressure on Figure 1BwFR I.3-4 and determine flow rate will be  
* Enter 620 in ºR blank.       Comments:
 
temperature and pressure.
5850 scfm (range of 5800  
* Enter 3.5 in CNMT press blank.
 
* Perform calculation and enter 2,750,968 (or approx.
to 5900) Enter flow rate in step 4 SCFM blank.
2.75E6) in ft3 blank.
SAT    UNSAT      N/A Comments: *6. Calculate maximum venting time. Perform Attachment B, step 5 Enter 55,019 (or approx.
  *4. Calculate maximum hydrogen   Perform Attachment B, step 3    SAT UNSAT    N/A volume that can be vented
5.5E4) in ft 3 blank. Enter 5850 (5800 - 5900) in SCFM blank. Calculate minutes and enter 9.4 (range of 9.3 to 9.5) in minutes blank.
* Enter 1 in cnmt hydrogen      Comments:
SAT    UNSAT      N/A Comments:
keeping cnmt concentration     conc. blank.
S-108       Page 4 of 5 PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
below 3%.
: 7. Report to SM results of venting calculation.
* Enter enter 2,750,968 (or approx. 2.75E6) in ft3 blank
Notify SM that RCS venting can be performed for approx.
* Perform calculation and enter 55,019 (or approx.
 
5.5E4) in ft3 blank.
9.4 minutes.
  *5. Determine hydrogen flow rate Perform Attachment B, step 4   SAT UNSAT    N/A from RCS vent.
 
* Plot RCS pressure on         Comments:
SAT    UNSAT      N/A Comments:
Figure 1BwFR I.3-4 and determine flow rate will be 5850 scfm (range of 5800 to 5900)
CUE: THIS COMPLETES THIS JPM.
* Enter flow rate in step 4 SCFM blank.
  *6. Calculate maximum venting   Perform Attachment B, step 5   SAT UNSAT    N/A time.
* Enter 55,019 (or approx.     Comments:
5.5E4) in ft3 blank.
* Enter 5850 (5800 - 5900) in SCFM blank.
* Calculate minutes and enter 9.4 (range of 9.3 to 9.5) in minutes blank.
S-108                                   Page 3 of 5


PERFORMANCE STEP                    STANDARD              CIRCLE APPLICABLE
: 7. Report to SM results of venting Notify SM that RCS venting  SAT UNSAT    N/A calculation.                    can be performed for approx. Comments:
9.4 minutes.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME:
RECORD STOP TIME:
COMMENTS:  
COMMENTS:
 
S-108                                       Page 4 of 5
S-108       Page 5 of 5 NOTE:  JPM can be performed in any location. If JPM is performed in simulator, inform examinee to use given information in cue. 
 
SIMULATOR SETUP INSTRUCTIONS
 
N/A 


COMMENTS:  
NOTE: JPM can be performed in any location. If JPM is performed in simulator, inform examinee to use given information in cue.
SIMULATOR SETUP INSTRUCTIONS
* N/A COMMENTS:
S-108                                        Page 5 of 5


S-300 Page 1 of 4 TASK CONDITIONS:  
TASK CONDITIONS:
: 1. You are the Unit 1 Unit Supervisor.  
: 1. You are the Unit 1 Unit Supervisor.
: 2. Unit 1 is at 100% power; all systems and controls are normally aligned.  
: 2. Unit 1 is at 100% power; all systems and controls are normally aligned.
: 3. A Unit 1 Containment release package has been initiated to lower containment pressure.
: 3. A Unit 1 Containment release package has been initiated to lower containment pressure.
INITIATING CUES:  
INITIATING CUES:
: 1. The U1 Assist NSO has completed Containment Release package G-09-001 through step C.1.f., and states that the package is ready for you.  
: 1. The U1 Assist NSO has completed Containment Release package G-09-001 through step C.1.f., and states that the package is ready for you.
: 2. Inform the U1 Admin NSO when the release package review is complete.
: 2. Inform the U1 Admin NSO when the release package review is complete.
S-300 Page 2 of 4 TASK TITLE:  Review Containment Release for Approval
S-300                                               Page 1 of 4
 
JPM No.:
S-300  REV:  NRC 09-1 TPO No.:  8C.HP-002 K&A No.:  2.3.11 TASK No.: S-HP-002:  Authorize Gaseous (Containment  K&A IMP:  4.3            or Gas Decay Tank) Rad Waste Release
 
ADMIN:  Radiation Control
 
EXAMINEE:    ____________________    SRO                                 
 
EVALUATOR:
DATE:   
 
The Examinee:  PASSED            this JPM.
TIME STARTED:
 
FAILED            TIME FINISHED: 


CRITICAL ELEMENTS: (*) 2, 4 JPM TIME:
TASK TITLE: Review Containment Release for Approval JPM No.: S-300                                                        REV: NRC 09-1 TPO No.: 8C.HP-002                                                    K&A No.: 2.3.11 TASK No.: S-HP-002: Authorize Gaseous (Containment                    K&A IMP: 4.3 or Gas Decay Tank) Rad Waste Release ADMIN: Radiation Control EXAMINEE:    ____________________                              SRO EVALUATOR:                            DATE:
MINUTES CRITICAL TIME:
The Examinee: PASSED            this JPM.                              TIME STARTED:
None APPROX COMPLETION TIME:
FAILED                  TIME FINISHED:
30 MINUTES EVALUATION METHOD:
CRITICAL ELEMENTS: (*) 2, 4                                           JPM TIME:                     MINUTES CRITICAL TIME: None                   APPROX COMPLETION TIME: 30 MINUTES EVALUATION METHOD:                                                     LOCATION:
LOCATION:
X PERFORM                                           IN PLANT SIMULATE                                       X SIMULATOR GENERAL  
X   PERFORM           IN PLANT         SIMULATE X   SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. 1BwOS RETS 2.2.B-1, Rev 1, Unit One Pre-release Source and Channel Check of Containment Purge Effluent Monitor 1PR01J (1RE-PR001A/B/C)  
: 1. 1BwOS RETS 2.2.B-1, Rev 1, Unit One Pre-release Source and Channel Check of Containment Purge Effluent Monitor 1PR01J (1RE-PR001A/B/C)
: 2. BwRP 6110-13T1, Rev 16, Containment Release Form MATERIALS:  
: 2. BwRP 6110-13T1, Rev 16, Containment Release Form MATERIALS:
: 1. Copy of partially completed BwRP 6110-13T1  
: 1. Copy of partially completed BwRP 6110-13T1
: 2. Copy of completed 0BwOS RETS 2.2.1a  
: 2. Copy of completed 0BwOS RETS 2.2.1a
: 3. 1BwOS RETS 2.2.B-1 TASK STANDARDS:  
: 3. 1BwOS RETS 2.2.B-1 TASK STANDARDS:
: 1. Review BwRP 6110-13T1 and 0BwOS RETS 2.2.1a.  
: 1. Review BwRP 6110-13T1 and 0BwOS RETS 2.2.1a.
: 2. Determine release cannot proceed due to 1PR01J status.  
: 2. Determine release cannot proceed due to 1PR01J status.
: 3. Determine entry into RETS 2.2-1A required for 1PR01J.
: 3. Determine entry into RETS 2.2-1A required for 1PR01J.
TASK CONDITIONS:  
TASK CONDITIONS:
: 1. You are the Unit 1 Unit Supervisor.  
: 1. You are the Unit 1 Unit Supervisor.
: 2. Unit 1 is at 100% power; all systems and controls are normally aligned.  
: 2. Unit 1 is at 100% power; all systems and controls are normally aligned.
: 3. A Unit 1 Containment release package has been initiated to lower containment pressure.
: 3. A Unit 1 Containment release package has been initiated to lower containment pressure.
INITIATING CUES:  
INITIATING CUES:
: 1. The U1 Assist NSO has completed Containment Release package G-09-001 through step C.1.f., and states that the package is ready for you. (Cue: Hand release package and surveillance to examinee.)
: 1. The U1 Assist NSO has completed Containment Release package G-09-001 through step C.1.f., and states that the package is ready for you. (Cue: Hand release package and surveillance to examinee.)
: 2. Inform the U1 Admin NSO when the release package review is complete.  
: 2. Inform the U1 Admin NSO when the release package review is complete.
S-300                                                Page 2 of 4


S-300 Page 3 of 4 RECORD START TIME:
RECORD START TIME:
PERFORMANCE STEP STANDARD Circle Applicable  
PERFORMANCE STEP                           STANDARD                 Circle Applicable
: 1. Refer to partially completed BwRP 6110-13T1, Section C Cue: (If asked) Gaseous Release in progress sign has been placed and the 1A VA  
: 1. Refer to partially completed BwRP 6110-
 
* Reads Step D, determines    SAT UNSAT    N/A 13T1, Section C                               SRO approval required. Comments:
exhaust fan is in operation.  
Cue:     (If asked) Gaseous Release in
 
* Reviews entire document progress sign has been placed and the 1A VA exhaust fan is in operation.
Reads Step D, determines SRO approval required. Reviews entire document SAT    UNSAT      N/A Comments: *2. Review Section B  Cue: (If asked) NSO verifies 1PB101 is WHITE. Cue: (If asked)Shift Manager acknowledges BwOS failure and an investigation is to be conducted. Cue: (if asked) RETS will be entered for 1PR01J. Reviews steps C.1.a-f: Reviews 1BwOS RETS 2.2.B-1  Notices 1PB101 is white (step 3.5 of 1BwOS RETS 2.2.B-1) which does not meet acceptance criteria SAT    UNSAT      N/A Comments:  3. Review information and ensure rest of form filled out Note: Candidate may elect to proceed no further based on the surveillance failure. If so: Cue: Shift Manager acknowledges BwOS failure, but desires you check the rest of the release package to ensure it is properly filled out  
*2. Review Section B                          Reviews steps C.1.a-f:        SAT UNSAT     N/A
 
* Reviews 1BwOS RETS        Comments:
Identify from review that the release form has no additional errors SAT    UNSAT      N/A Comments: *4. Refuse to approve release until errors have been resolved.
Cue:     (If asked) NSO verifies               2.2.B-1 1PB101 is WHITE.
Cue: If examinee asks to review 0BwOS RETS 2.2.1a., provide a copy for review.
* Notices 1PB101 is white Cue:     (If asked)Shift Manager               (step 3.5 of 1BwOS acknowledges BwOS failure             RETS 2.2.B-1) which and an investigation is to be         does not meet conducted.                           acceptance criteria Cue: (if asked) RETS will be entered for 1PR01J.
Determine release is unable to be performed  (cannot be signed) until 1BwOS/1PR001J failure corrected o Reviews RETS SAT    UNSAT      N/A Comments:
: 3. Review information and ensure rest of     Identify from review that the  SAT UNSAT     N/A form filled out                           release form has no additional Comments:
CUE: THIS COMPLETES THIS JPM  
errors Note: Candidate may elect to proceed no further based on the surveillance failure. If so:
Cue: Shift Manager acknowledges BwOS failure, but desires you check the rest of the release package to ensure it is properly filled out
  *4. Refuse to approve release until errors
* Determine release is        SAT UNSAT    N/A have been resolved.                         unable to be performed    Comments:
(cannot be signed) until 1BwOS/1PR001J failure Cue:     If examinee asks to review           corrected 0BwOS RETS 2.2.1a., provide       o Reviews RETS a copy for review.
CUE: THIS COMPLETES THIS JPM RECORD STOP TIME:
COMMENTS:
S-300                                              Page 3 of 4


RECORD STOP TIME:
SIMULATOR SETUP INSTRUCTIONS JPM NO: S-300 REQUIRED SIMULATOR MODE (S): None.
MALFUNCTION #S:
COMMENTS:
COMMENTS:
SIMULATOR SETUP INSTRUCTIONS
S-300                     Page 4 of 4
 
JPM NO: S-300  
 
REQUIRED SIMULATOR MODE (S): None.
MALFUNCTION #S:


COMMENTS:
TASK CONDITIONS:
S-300 Page 4 of 4 S-404 1 TASK CONDITIONS:  
: 1.       You are the Unit Supervisor on Unit 1.
: 1. You are the Unit Supervisor on Unit 1.  
: 2.       15 minutes ago Unit 1 experienced an automatic Rx trip from 100% power.
: 2. 15 minutes ago Unit 1 experienced an automatic Rx trip from 100% power.  
: 3.       Aux Feed automatically initiated at the proper SG level.
: 3. Aux Feed automatically initiated at the proper SG level.  
: 4.       The trip was caused by a spiking OTDT channel, while a second channel was in test.
: 4. The trip was caused by a spiking OTDT channel, while a second channel was in test.  
: 5.       All other equipment functioned as designed.
: 5. All other equipment functioned as designed.  
: 6.       1BwEP ES-0.1 is in progress.
: 6. 1BwEP ES-0.1 is in progress.  
: 7.       No Emergency Plan thresholds have been met.
: 7. No Emergency Plan thresholds have been met.
INITIATING CUES:
INITIATING CUES:
You have been directed by the SM to screen this event for reportability and complete the ENS notification worksheet for the event, if required.
You have been directed by the SM to screen this event for reportability and complete the ENS notification worksheet for the event, if required.
S-404 2 TASK TITLE: Screen an Event for Reportability and Complete ENS Worksheet JPM No.: S-404 REV: NRC 09-1 TPO No.: 8.E.AM-102 K&A No.: 2.4.30 TASK No.: S-AM-102:  Screen R eportable or  K&A IMP: 4.1 Significant Events for Reportability
1 S-404


EXAMINEE:
TASK TITLE:  Screen an Event for Reportability and Complete ENS Worksheet JPM No.:      S-404                                                    REV:              NRC 09-1 TPO No.:      8.E.AM-102                                              K&A No.:          2.4.30 TASK No.:    S-AM-102: Screen Reportable or                          K&A IMP:          4.1 Significant Events for Reportability EXAMINEE:                                                             SRO EVALUATOR:                                                             DATE:
SRO
The Examinee:         PASSED           this JPM.                     TIME STARTED:
 
FAILED                                         TIME FINISHED:
EVALUATOR:
JPM TIME:                     MINUTES CRITICAL ELEMENTS:             (*) 2, 3                               APPROX COMPLETION TIME: 25 MINUTES CRITICAL TIME:                 N/A EVALUATION METHOD:                                                     LOCATION:
DATE:  
X PERFORM                                                   IN PLANT SIMULATE                                             X SIMULATOR GENERAL  
 
The Examinee: PASSED           this JPM.
TIME STARTED:
 
FAILED TIME FINISHED:  
 
JPM TIME: MINUTES CRITICAL ELEMENTS:  
(*) 2, 3 APPROX COMPLETION TIME:
25 MINUTES
 
CRITICAL TIME:
N/A EVALUATION METHOD:
LOCATION:
X   PERFORM       IN PLANT SIMULATE X   SIMULATOR  
 
GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. LS-AA-1110, Rev. 7, Exelon Reportability Manual  
: 1. LS-AA-1110, Rev. 7, Exelon Reportability Manual
: 2. EP-AA-114, Rev. 6, Notifications  
: 2. EP-AA-114, Rev. 6, Notifications
: 3. LS-AA-1150, Rev. 0, Event Notification Worksheet  
: 3. LS-AA-1150, Rev. 0, Event Notification Worksheet MATERIALS:
: 1. LS-AA-1110
: 2. LS-AA-1150 TASK STANDARDS:
: 1. Screen an event for reportability and complete the appropriate notification worksheet.
TASK CONDITIONS:
: 1. You are the Unit Supervisor on Unit 1.
: 2. 15 minutes ago Unit 1 experienced an automatic Rx trip from 100% power.
: 3. Aux Feed automatically initiated at the proper SG level.
: 4. The trip was caused by a spiking OTDT channel, while a second channel was in test.
: 5. All other equipment functioned as designed.
: 6. 1BwEP ES-0.1 is in progress.
: 7. No Emergency Plan thresholds have been met.
INITIATING CUES:
: 1. You have been directed by the SM to screen this event for reportability and complete the ENS notification worksheet, if required.
2 S-404


MATERIALS:  
RECORD START TIME PERFORMANCE STEP                            STANDARD                    Circle applicable
: 1. LS-AA-1110
: 1. Refer to Exelon Reportability Manual. Locate and open ENS worksheet        SAT UNSAT      N/A and Exelon Reportability Manual. Comments:
: 2. LS-AA-1150
Note:   Provide a copy of the worksheet and the reportability manual.
  *2. Using the Reportability Manual,      Review the Exelon Reportability      SAT UNSAT      N/A screen the event for reporting        Manual to determine notification    Comments:
requirements.                        requirements of:
* SAF 1.6, 4 hours. (RPS)
* SAF 1.7, 8 hours. (AF)
  *3. Complete the Event Notification      Complete the ENS worksheet as        SAT UNSAT      N/A worksheet.                            follows:                            Comments:
Note:  Exact wording not            o    Notification time.
required.
* Facility (Braidwood).
* Unit (1).
o    Callers Name (students name).
o    Call back # (phone #).
* Event Time (Rx trip time)
* Date (todays date).
Cue:    Initial reactor power was
* Power/Mode Before 100%.                            (100%/1).
o    Power/Mode After (0%/Mode 3).
* X in Event Classifications Category 50.72 Non emergency.
* X in 4 Hr Non-Emergency 10CFR50.72 (b)(2)(iv)(B) -
RPS Actuation (scram)
ARPS.
* X in 8 Hr Non-Emergency 10CFR50.72 (b)(3)(iv)(A) -
Specified System Actuation AESF.
* Description of event (Unit 1 Rx Trip with AF initiation).
o    Notifications performed.
o    Anything unusual or not understood? (no).
o    Did all systems function as required? (yes, if referring to AF).
Cue:    All systems functioned as    o    Mode of Operation until required.                        corrected? (3).
Cue:    Expected mode of operation    o    Estimated Restart Date is Mode 3                          (unknown).
Cue:   Estimated restart date is tomorrow.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME COMMENTS:
3 S-404


TASK STANDARDS:
4 S-404
: 1. Screen an event for reportability and complete the appropriate notification worksheet.


TASK CONDITIONS:  
SIMULATOR SETUP INSTRUCTIONS JPM NO: S-404 REQUIRED SIMULATOR MODE (S): N/A MALFUNCTION #S: N/A COMMENTS: None 5
: 1. You are the Unit Supervisor on Unit 1.
S-404
: 2. 15 minutes ago Unit 1 experienced an automatic Rx trip from 100% power.
: 3. Aux Feed automatically initiated at the proper SG level.
: 4. The trip was caused by a spiking OTDT channel, while a second channel was in test.
: 5. All other equipment functioned as designed.
: 6. 1BwEP ES-0.1 is in progress.
: 7. No Emergency Plan thresholds have been met.


INITIATING CUES:  
TASK CONDITIONS:
: 1. You have been directed by the SM to screen this event for reportability and complete the ENS notification worksheet, if required.  
: 1.      You are the Unit 1 NSO.
: 2.      Unit 1 is at full power, all systems and controls are in automatic.
INITIATING CUES:
: 1. You have been directed to perform 1BwOSR 3.1.4.2, Unit One Movable Control Assemblies Quarterly Surveillance in the preferred order specified in surveillance.
: 2. ARO position is to remain the same.
: 3. System Engineering has determine that performance of BwVS 500-2, Checkout of the Bank Overlap Unit and System Verification is not required and support is available for removing Rod J-13 from double gripper hold.
: 4. Inform the Shift manager of your results.
SIM-111                                                  1


S-404 3 RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable
TASK TITLE: Perform Movable Control Assemblies Quarterly Surveillance JPM No.: SIM 111                                                   REV: NRC 09-1 TPO No.: 4C.GP-04                                                   K&A No.: 001000A4.03 TASK No.: R-RD-004, Perform Critical Control                       K&A IMP: 4.0/3.7 Rod Position Surveillance EXAMINEE:                                           RO   SRO       (Circle One)
: 1. Refer to Exelon Reportability Manual.
EVALUATOR:                                                         DATE:
Note: Provide a copy of the worksheet and the reportability manual.
The Examinee: PASSED             this JPM.                         TIME STARTED:
Locate and open ENS worksheet
FAILED                 TIME FINISHED:
 
CRITICAL ELEMENTS: (*) 3, 4, 5                                     JPM TIME:           MINUTES CRITICAL TIME: NA                     APPROX COMPLETION TIME: 30 MINUTES EVALUATION METHOD:                                                 LOCATION:
and Exelon Reportability Manual.
X PERFORM                                       IN PLANT SIMULATE                                     X SIMULATOR GENERAL  
 
SAT    UNSAT      N/A Comments: *2. Using the Reportability Manual, screen the event for reporting
 
requirements.
 
Review the Exelon Reportability
 
Manual to determine notification
 
requirements of:
 
SAF 1.6, 4 hours. (RPS)  SAF 1.7, 8 hours. (AF)
 
SAT    UNSAT      N/A Comments: *3. Complete the Event Notification worksheet.
 
Note: Exact wording not required.
 
Cue: Initial reactor power was 100%. 
 
Cue: All systems functioned as required. Cue: Expected mode of operation is Mode 3 Cue: Estimated restart date is tomorrow.
Complete the ENS worksheet as follows:
 
o Notification time. Facility (Braidwood). Unit (1).
o Caller's Name (student's name). o Call back # (phone #). Event Time (Rx trip time)  Date (today's date). Power/Mode Before (100%/1).
o Power/Mode After (0%/Mode 3).  'X' in Event Classifications Category '50.72 Non
 
emergency'.  'X' in '4 Hr Non-Emergency 10CFR50.72 (b)(2)(iv)(B) -
 
RPS Actuation (scram)
 
ARPS.  'X' in '8 Hr Non-Emergency 10CFR50.72 (b)(3)(iv)(A) -
 
Specified System Actuation
 
AESF. Description of event (Unit 1 Rx Trip with AF initiation).
o Notifications performed.
o Anything unusual or not understood? (no).
o Did all systems function as required? (yes, if referring to AF). o Mode of Operation until corrected? (3).
o Estimated Restart Date (unknown).
SAT    UNSAT      N/A Comments:  CUE: THIS COMPLETES THIS JPM.
 
RECORD STOP TIME COMMENTS:
 
S-404 4 S-404 5 SIMULATOR SETUP INSTRUCTIONS
 
JPM NO: S-404
 
REQUIRED SIMULATOR MODE (S): N/A
 
MALFUNCTION #'S:  N/A
 
COMMENTS: None
 
SIM-111 1  TASK CONDITIONS:
: 1. You are the Unit 1 NSO.
: 2. Unit 1 is at full power, all systems and controls are in automatic.
 
INITIATING CUES:
: 1. You have been directed to perform 1BwOSR 3.1.4.2, Unit One Movable Control Assemblies Quarterly Surveillance in the preferred order specified in surveillance. 
: 2. ARO position is to remain the same. 
: 3. System Engineering has determine that performance of BwVS 500-2, Checkout of the Bank Overlap Unit and System Verification is not required and support is available for removing Rod J-13 from double gripper hold.
: 4. Inform the Shift manager of your results.
 
SIM-111 2 TASK TITLE: Perform Movable Control Assemblies Quarterly Surveillance JPM No.:
SIM 111   REV: NRC 09-1 TPO No.: 4C.GP-04 K&A No.: 001000A4.03 TASK No.: R-RD-004, Perform Critical Control K&A IMP: 4.0/3.7   Rod Position Surveillance  
 
EXAMINEE:     RO     SRO     (Circle One)  
 
EVALUATOR:
DATE:  
 
The Examinee: PASSED this JPM.
TIME STARTED:                    
 
FAILED           TIME FINISHED:                    
 
CRITICAL ELEMENTS: (*) 3, 4, 5 JPM TIME: MINUTES CRITICAL TIME:
NA APPROX COMPLETION TIME:
30 MINUTES EVALUATION METHOD:     LOCATION:  
 
X   PERFORM IN PLANT         SIMULATE X   SIMULATOR  
 
GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. Tech Spec 3.1.4  
: 1. Tech Spec 3.1.4
: 2. 1BwOSR 3.1.4.2, Rev.17, Unit One Mov able Control Assemblies Quarterly Surveillance.
: 2. 1BwOSR 3.1.4.2, Rev.17, Unit One Movable Control Assemblies Quarterly Surveillance.
MATERIALS:  
MATERIALS:
: 1. 1BwOSR 3.1.4.2, Unit One Movable C ontrol Assemblies Quarterly Surveillance.
: 1. 1BwOSR 3.1.4.2, Unit One Movable Control Assemblies Quarterly Surveillance.
Ensure cover sheet is signed and due/late dates are modified.  
Ensure cover sheet is signed and due/late dates are modified.
: 2. Requires Reactivity Manager.
: 2. Requires Reactivity Manager.
TASK STANDARDS:  
TASK STANDARDS:
: 1. Perform the required actions of 1BwOSR 3.1.4.2, Movable Control Assemblies Quarterly Surveillance.  
: 1. Perform the required actions of 1BwOSR 3.1.4.2, Movable Control Assemblies Quarterly Surveillance.
 
TASK CONDITIONS:
TASK CONDITIONS:  
: 1. You are the Unit 1 NSO.
: 1. You are the Unit 1 NSO.  
: 2. Unit 1 is at full power, all systems and controls are in automatic.
: 2. Unit 1 is at full power, all systems and controls are in automatic.  
INITIATING CUES:
 
: 1. You have been directed to perform 1BwOSR 3.1.4.2, Unit One Movable Control Assemblies Quarterly Surveillance.
INITIATING CUES:  
: 2. ARO position is to remain the same.
: 1. You have been directed to perform 1BwOSR 3.
: 3. System Engineering has determine that performance of BwVS 500-2, Checkout of the Bank Overlap Unit and System Verification is not required and support is available for removing Rod J-13 from double gripper hold.
1.4.2, Unit One Movable Control Assemblies Quarterly Surveillance.
: 4. Inform the Shift manager of your results.
: 2. ARO position is to remain the same.
SIM-111                                                 2
: 3. System Engineering has determine that performance of BwVS 500-2, Checkout of the Bank Overlap Unit and System Verification is not required and support is available for removing Rod J-13 from double gripper hold.  
: 4. Inform the Shift manager of your results.  
 
SIM-111 3 RECORD START TIME             
 
PERFORMANCE STEP STANDARD Circle applicable  1. Refer to 1BwOSR 3.1.4.2.  (CUE:    Provide student with the marked up copy with
 
cover sheet. No cue
 
sheet is provided)
  (CUE:    Visual inspection of all U1 Rod Drive cabinets is complete and satisfactory. All other
 
prerequisites are met.)
Refer to 1BwOSR 3.1.4.2.
o Signs cover sheet
 
Verify all applicable prerequisites, precautions limitations and actions are
 
addressed.
o Places dots on expected alarms listed in limitations
 
and actions and pre-
 
reviews BwAR's.
o 1-10-A6 o 1-10-B6 o 1-12-C1 o 1-10-A7  SAT    UNSAT      N/A
 
Comments:  2. Transfer Rod Control to Manual and Verify Tave is matched to Tref. 
 
  (CUE:    When examinee gets to step 2.3.a.1), tell them that performance of BwOP RD-7 will be delayed
 
until SD bank B is to be
 
tested. o Informs US that rod control will be placed in manual. Transfer rod control to MANUAL. o Verifies rod speed at 48 stps/min VERIFY/MAINTAIN Tave matched to Tref.
SAT    UNSAT      N/A
 
Comments: *3. Selects "SBE" bank select and records SD bank E position Cue:  When necessary acknowledge alarms as US and verify SER pt 2153 is in alarm.
 
Perform the Rod Movement Verification as follows:
 
o Examinee reads note that as long as SB Rods are above 224
 
by bank demand
 
/DRPI >222 Rod
 
Insertion limits are
 
met. o Examinee reads note for preferred order on
 
SD banks. Places rod bank select switch in "SBE" Position. Examinee Records initial group step counter as found
 
readings and DRPI
 
readings for CBA on
 
Table 2. o Reads note concerning ROD DEV
 
POWER RNG TILT
 
alarm. SAT    UNSAT      N/A


RECORD START TIME PERFORMANCE STEP                          STANDARD                    Circle applicable
: 1. Refer to 1BwOSR 3.1.4.2.        Refer to 1BwOSR 3.1.4.2.
(CUE: Provide student with the        o Signs cover sheet              SAT  UNSAT      N/A marked up copy with cover sheet. No cue                                        Comments:
sheet is provided)
(CUE:    Visual inspection of all U1
* Verify all applicable Rod Drive cabinets is      prerequisites, precautions complete and                limitations and actions are satisfactory. All other    addressed.
prerequisites are met.)  o Places dots on expected alarms listed in limitations and actions and pre-reviews BwARs.
o 1-10-A6 o 1-10-B6 o 1-12-C1 o 1-10-A7
: 2. Transfer Rod Control to Manual      o    Informs US that rod and Verify Tave is matched to            control will be placed in SAT  UNSAT      N/A Tref.                                    manual.
Comments:
Comments:
SIM-111 4 PERFORMANCE STEP STANDARD Circle applicable
* Transfer rod control to (CUE:    When examinee gets to step            MANUAL.
*4 Withdraws SBE rods to 231 steps  Withdraws SBE rods to 231 on the Group Step Counters. Verifies DRPI indicates
2.3.a.1), tell them that    o    Verifies rod speed at performance of BwOP              48 stps/min RD-7 will be delayed until SD bank B is to be tested.
> 222 steps for SBE.
* VERIFY/MAINTAIN Tave matched to Tref.
SAT    UNSAT      N/A
*3.      Selects SBE bank select and    Perform the Rod Movement records SD bank E position      Verification as follows:          SAT UNSAT        N/A o    Examinee reads note that as long as SB        Comments:
Rods are above 224 Cue: When necessary acknowledge                  by bank demand alarms as US and verify SER              /DRPI >222 Rod pt 2153 is in alarm.                    Insertion limits are met.
o    Examinee reads note for preferred order on SD banks.
* Places rod bank select switch in SBE Position.
* Examinee Records initial group step counter as found readings and DRPI readings for CBA on Table 2.
o    Reads note concerning ROD DEV POWER RNG TILT alarm.
SIM-111                                              3


Comments: **ALTERNATE PATH START**  
PERFORMANCE STEP                      STANDARD                    Circle applicable
*5 Inserts SBE rods to 10-15 steps Cue: (SRO only)(If necessary) ask as US what TS is required to be entered. Attempts to insert SBE 10-15 steps as
*4 Withdraws SBE rods to 231 steps
* Withdraws SBE rods to 231 on the Group Step    SAT UNSAT      N/A Counters.
* Verifies DRPI indicates
                                              > 222 steps for SBE.      Comments:
                                    **ALTERNATE PATH START**
*5 Inserts SBE rods to 10-15 steps
* Attempts to insert SBE 10-15 steps as            SAT UNSAT      N/A indicated on the group step counter(s)
* Identifies failure of rod Comments:
H4 to move.
o Records position of SBE rods o Checks N block on data sheet D-2
* Immediately Reports Cue: (SRO only)(If necessary) ask as         Failure of rod H4 to US what TS is required to be         SM or designee (US is entered.                             acceptable)
                                            * (SRO only)
Recognizes 3.1.4 condition A is applicable.
(CUE:) THIS COMPLETES THIS JPM.
RECORD STOP TIME          __________
COMMENTS:
SIM-111                                          4


indicated on the group
SIMULATOR SETUP INSTRUCTIONS JPM NO: SIM-111 REQUIRED SIMULATOR MODE(S): 100% power steady state MALFUNCTION #S:
 
RD05H04 Stuck rod on Shutdown Bank E H4 (current rod height)
step counter(s)  Identifies failure of rod H4 to move.
COMMENTS:
o Records position of SBE rods o Checks "N" block on data sheet D-2  Immediately Reports Failure of rod H4 to SM or designee (US is acceptable)  (SRO only)
SIM-111                                          5
Recognizes 3.1.4 condition A is
 
applicable.
SAT    UNSAT      N/A
 
Comments:   
(CUE:) THIS COMPLETES THIS JPM.
 
RECORD STOP TIME
 
__________ 
 
COMMENTS:
 
SIM-111 5 SIMULATOR SETUP INSTRUCTIONS  
 
JPM NO: SIM-111  
 
REQUIRED SIMULATOR MODE(S): 100% power steady state  
 
MALFUNCTION #'S:  
 
RD05H04 Stuck rod on Shutdown Bank E H4 (current rod height)  
 
COMMENTS:  


SIM-207 1 TASK CONDITIONS:  
TASK CONDITIONS:
: 1. You are the Unit 1 Extra NSO.  
: 1. You are the Unit 1 Extra NSO.
: 2. Both Units are at power.  
: 2. Both Units are at power.
: 3. All systems and controls are normal for the present conditions.  
: 3. All systems and controls are normal for the present conditions.
: 4. This is a time critical JPM.
: 4. This is a time critical JPM.
INITIATING CUES:
Annunciator 1-5-B2, ACCUM 1B PRESS HIGH/LOW, has been in for 30 minutes. The LCOAR for the 1B SI accumulator was entered 28 minutes ago. The Unit Supervisor has directed you to respond to the alarm and correct the condition.
1 SIM-207


INITIATING CUES: Annunciator 1-5-B2, ACCUM 1B PRESS HIGH/LOW, has been in for 30 minutes. The LCOAR for the 1B SI accumulator was entered 28 minutes ago. The Unit Supervisor has directed you to respond to the alarm and correct the condition.
TASK TITLE:     Raise SI Accumulator Pressure JPM Number:     SIM-207                                                 Rev:         NRC 09-1 TPO No.:       4C.SI-04                                                 K&A No.:     006000A4.02 Task No.:       R-SI-003, Adjust SI accumulator pressure.               K&A Imp.:     4.0/3.8 EXAMINEE:                                                               RO SRO (Circle One)
SIM-207 2 TASK TITLE: Raise SI Accumulator Pressure JPM Number:
EVALUATOR:                                                               DATE:
SIM-207 Rev: NRC 09-1 TPO No.: 4C.SI-04 K&A No.: 006000A4.02 Task No.: R-SI-003, Adjust SI accumulator pressure. K&A Imp.: 4.0/3.8  
The Examinee:           PASSED         this JPM.                       TIME STARTED:
 
FAILED                                         TIME FINISHED:
EXAMINEE:
JPM TIME:                 MINUTES Critical Elements:             (*) 3, 4                                 Approx. Completion Time: 16 minutes Critical Time:                 32 minutes EVALUATION METHOD:                                                       LOCATION:
RO   SRO   (Circle One)  
X PERFORM                                                 IN PLANT SIMULATE                                             X SIMULATOR GENERAL  
 
EVALUATOR:
DATE:
The Examinee: PASSED           this JPM.
TIME STARTED:
 
FAILED TIME FINISHED:  
 
JPM TIME: MINUTES Critical Elements:  
(*) 3, 4 Approx. Completion Time:
16 minutes Critical Time:
32 minutes EVALUATION METHOD:
LOCATION:
X   PERFORM       IN PLANT SIMULATE X   SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. BwAR 1-5-B2, Rev. 6E3, ACCUM 1B PRESS HIGH/LOW  
: 1. BwAR 1-5-B2, Rev. 6E3, ACCUM 1B PRESS HIGH/LOW
: 2. BwOP SI-8, Rev. 14, Raising SI Accumulator Pressure  
: 2. BwOP SI-8, Rev. 14, Raising SI Accumulator Pressure
: 3. TS 3.5.1  
: 3. TS 3.5.1 MATERIALS:
 
: 1. BwOP SI-8 TASK STANDARDS:
MATERIALS:  
: 1. Restore SI Accumulator pressure to within Tech Spec limits TASK CONDITIONS:
: 1. BwOP SI-8  
: 1. You are the Unit 1 Extra NSO.
 
: 2. Both Units are at power.
TASK STANDARDS:  
: 3. All systems and controls are normal for the present conditions.
: 1. Restore SI Accumulator pressure to within Tech Spec limits TASK CONDITIONS:  
: 1. You are the Unit 1 Extra NSO.  
: 2. Both Units are at power.  
: 3. All systems and controls are normal for the present conditions.  
: 4. This is a time critical JPM.
: 4. This is a time critical JPM.
INITIATING CUES:
: 1. Annunciator 1-5-B2, ACCUM 1B PRESS HIGH/LOW, has been in for 30 minutes. The LCOAR for the 1B SI accumulator was entered 28 minutes ago. The Unit Supervisor has directed you to respond to the alarm and correct the condition.
2 SIM-207


INITIATING CUES:
RECORD START TIME PERFORMANCE STEP                         STANDARD                  Circle applicable
: 1. Annunciator 1-5-B2, ACCUM 1B PRESS HIGH/LOW, has been in for 30 minutes. The LCOAR for the 1B SI accumulator was entered 28 minutes ago. The Unit Supervisor has directed you to respond to the alarm and correct the condition.
: 1. Refer to BwAR 1-5-B2 and determine   Locate and open BwAR 1-5-B2      SAT UNSAT      N/A 1B SI accumulator pressure is low. and perform the following:        Comments:
 
CUE: If asked as US, confirm that   o  Monitor 1LI-952/953 for 1B 1BwOL 3.5.1 has been             accumulator level.
SIM-207 3 RECORD START TIME PERFORMANCE STEP STANDA RD Circle applicable  
entered and you are directed o   Monitor 1PI-962/963 to to raise 1B SI accumulator        determine pressure is low.
: 1. Refer to BwAR 1-5-B2 and determine 1B SI accumulator pressure is low.
pressure to 625 psig          o   Check SER points 2066 and 0603 in alarm.
CUE: If asked as US, confirm that 1BwOL 3.5.1 has been entered and you are directed to raise 1B SI accumulator pressure to 625 psig Locate and open BwAR 1-5-B2 and perform the following:
: 2. Refer to BwOP SI-8, Raising SI       Locate and open BwOP SI-8.        SAT UNSAT      N/A Accumulator Pressure.                                                 Comments:
o Monitor 1LI-952/953 for 1B accumulator level.
o Monitor 1PI-962/963 to determine pressure is low.
o Check SER points 2066 and 0603 in alarm.
SAT    UNSAT      N/A Comments: 2. Refer to BwOP SI-8, Raising SI Accumulator Pressure.
NOTE: After the student locates correct procedure, provide a copy and inform the student that all prerequisites, precautions and limitations and actions are met.
NOTE: After the student locates correct procedure, provide a copy and inform the student that all prerequisites, precautions and limitations and actions are met.
Locate and open BwOP SI-8.
  *3. Align N2 Tube trailer per BwOP NT-   Perform the following to          SAT UNSAT      N/A 9, step F.1 to pressurize the vent   pressurize the N2 header up to    Comments:
SAT    UNSAT      N/A Comments: *3. Align N 2 Tube trailer per BwOP NT-9, step F.1 to pressurize the vent header up to the vent valve, 1SI8875B.
header up to the vent valve,         the 1B SI accumulator vent valve, 1SI8875B.                            1SI8875B:
CUE: N 2 tube trailer is aligned Perform the following to pressurize the N 2 header up to the 1B SI accumulator vent valve, 1SI8875B:
CUE: N2 tube trailer is aligned      o   Dispatch EO to align N2 tube trailer per BwOP NT-9, step F.1.
o Dispatch EO to align N 2 tube trailer per BwOP NT-9, step F.1.
At 1PM06J:
At 1PM06J:  
o  Verify / Close 1SI943.
* Open 1SI8880, N2 Supply Isolation Valve.
3 SIM-207


o Verify / Close 1SI943. Open 1SI8880, N 2 Supply Isolation Valve.
NOTE: With RCS Pressure > 1000 psig, DO NOT open more than one 1SI8875A/B/C/D at a time.
SAT    UNSAT      N/A Comments:
  *4. Raise pressure in the 1B SI         Raise pressure in the 1B SI      SAT UNSAT  N/A Accumulator to within Tech Spec     Accumulator to within T.S limits  Comments:
SIM-207 4 NOTE: With RCS Pressure > 1000 psig, DO NOT open more than one 1SI8875A/B/C/D at a time.  
limits.                             as follows:
*4. Raise pressure in the 1B SI Accumulator to within Tech Spec limits. NOTE: Critical Time ends when accumulator pressure is greater than 602 psig.
NOTE: Critical Time ends when
Time 1B SI accumulator pressure > 602 psig:______
* Open 1SI8875B.
Note: Previous cue required pressure rise to be stopped at 625 psig.
accumulator pressure is     o  Monitor pressure rise on 1PI-greater than 602 psig.          962/963.
Raise pressure in the 1B SI Accumulator to within T.S limits as follows:  
o  Verify Alarm 1-5-B2 clears.
Time 1B SI accumulator pressure >
* Close 1SI8875B after clearing 602 psig:______                         low pressure alarm but prior to receiving high pressure Note: Previous cue required             alarm.
pressure rise to be stopped at 625 psig.
: 5. Exit LCOAR 3.5.1.                  Inform US pressure is within the SAT UNSAT  N/A Tech Spec limit and LCOAR        Comments:
CUE: US acknowledges pressure      1BwOL 3.5.1 may be exited.
restored and exits LCOAR.
: 6. Restores N2 lineup                  Restore N2 lineup as follows:     SAT UNSAT  N/A Comments:
CUE: EO reports N2 tube trailer has
* Close 1SI8880, N2 Supply been restored.                  Isolation Valve.
* Dispatch EO to restore N2 tube trailer per BwOP NT-9, step F.2.
CUE:  THIS COMPLETES THIS JPM RECORD STOP TIME COMMENTS:
4 SIM-207


Open 1SI8875B.
SIMULATOR SETUP INSTRUCTIONS JPM No: N-003a REQUIRED SIMULATOR MODE (S): 100% power steady state preferred, however, Mode 1, 2, or 3 > 1000 psig will work with minor adjustments to the initiating cues.
o Monitor pressure rise on 1PI-962/963. o Verify Alarm 1-5-B2 clears. Close 1SI8875B after clearing low pressure alarm but prior to receiving high pressure alarm. SAT    UNSAT      N/A Comments: 5. Exit LCOAR 3.5.1.
MALFUNCTION #S: NONE COMMENTS:
CUE: US acknowledges pressure restored and exits LCOAR.
EITHER:
Inform US pressure is within the Tech Spec limit and LCOAR 1BwOL 3.5.1 may be exited.  
: 1.      Open 1SI8875B
: 2.     Throttle open 1SICHV943 until 1B SI Accumulator pressure is slightly less than 602 psig.
: 3.     Close 1SI8875B and 1SICHV943
: 4.      Consider a snap to 0.
: 5.     Ensure SER has alarm printed and on screen.
OR
: 1.     Modify the pressure in the 1B SI Accumulator as follows:
MMP SIMN2ACC[2] 1203 (600 psig. NOTE HP alarm is at 637 psig, 1280 mass of N2 at 5.807 e4 (SIMACC[2]) mass of water. 1262 mass is 628 psig.)
5 SIM-207


SAT    UNSAT      N/A Comments: 6. Restores N 2 lineup  CUE: EO reports N 2 tube trailer has been restored.
TASK CONDITIONS:
Restore N 2 lineup as follows:
: 1. You are the Unit 1 NSO.
Close 1SI8880, N 2 Supply Isolation Valve. Dispatch EO to restore N 2 tube trailer per BwOP NT-9, step F.2.
: 2. Unit 1 is at full power, all systems and controls are in automatic.
SAT    UNSAT      N/A Comments:  CUE: THIS COMPLETES THIS JPM
: 3. Maintenance has recently completed repairs to 1RY455A PZR PORV.
 
: 4. LCO 3.4.11 is in effect for 1RY455A inoperability.
RECORD STOP TIME 
: 5. Per the IST program, 1RY455A must be stroke tested prior to declaring it operable.
 
INITIATING CUES:
COMMENTS:
: 1. You have been directed to perform 1BwOSR 3.4.11.2, Pressurizer System Valve Stroke Surveillance, steps 1, 2 and 4.
SIM-207 5 SIMULATOR SETUP INSTRUCTIONS JPM No:  N-003a REQUIRED SIMULATOR MODE (S):  100% power steady state preferred, however, Mode 1, 2, or 3 > 1000 psig will work with minor adjustments to the initiating cues. MALFUNCTION #'S:  NONE
 
COMMENTS:
EITHER: 1. Open 1SI8875B
: 2. Throttle open 1SICHV943 until 1B SI Accumulator pressure is slightly less than 602 psig.
: 3. Close 1SI8875B and 1SICHV943
: 4. Consider a snap to 0.
: 5. Ensure SER has alarm printed and on screen.
 
OR  1. Modify the pressure in the 1B SI Accumulator as follows:
MMP SIMN2ACC[2] 1203 (600 psig. NOTE HP alarm is at 637 psig, 1280 mass of N 2 at 5.807 e4 (SIMACC[2]) mass of water. 1262 mass is 628 psig.)
SIM-304 1  TASK CONDITIONS:  
: 1. You are the Unit 1 NSO.  
: 2. Unit 1 is at full power, all systems and controls are in automatic.  
: 3. Maintenance has recently completed repairs to 1RY455A PZR PORV.  
: 4. LCO 3.4.11 is in effect for 1RY455A inoperability.  
: 5. Per the IST program, 1RY455A must be stroke tested prior to declaring it operable.  
 
INITIATING CUES:  
: 1. You have been directed to perform 1BwOSR 3.4.11.2, Pressurizer System Valve Stroke Surveillance, steps 1, 2 and 4.  
: 2. Inform the Shift manager of your results.
: 2. Inform the Shift manager of your results.
SIM-304 2 TASK TITLE:
SIM-304                                                 1
Perform Pressurizer PORV Valve Stroke JPM No.:
SIM 304  REV:  NRC 09-1 TPO No.:  4C.RY-29 K&A No.: 010000A4.03  TASK No.: R-RY-023, Perform a Reactor Coolant System K&A IMP: 4.0/3.8  relief valve 18 month surveillance
 
EXAMINEE:      RO      SRO      (Circle One)
 
EVALUATOR:
DATE:   
 
The Examinee: PASSED this JPM.
TIME STARTED:


FAILED             TIME FINISHED:      
TASK TITLE: Perform Pressurizer PORV Valve Stroke JPM No.: SIM 304                                                      REV: NRC 09-1 TPO No.: 4C.RY-29                                                    K&A No.: 010000A4.03 TASK No.: R-RY-023, Perform a Reactor Coolant System                  K&A IMP: 4.0/3.8 relief valve 18 month surveillance EXAMINEE:                                            RO      SRO      (Circle One)
 
EVALUATOR:                                                            DATE:
CRITICAL ELEMENTS: (*) 2,3,4,6 JPM TIME: MINUTES CRITICAL TIME:
The Examinee: PASSED                this JPM.                        TIME STARTED:
NA APPROX COMPLETION TIME:
FAILED                                               TIME FINISHED:
15 MINUTES EVALUATION METHOD:     LOCATION:  
CRITICAL ELEMENTS: (*) 2,3,4,6                                       JPM TIME:           MINUTES CRITICAL TIME: NA                       APPROX COMPLETION TIME: 15 MINUTES EVALUATION METHOD:                                                   LOCATION:
 
X PERFORM                                       IN PLANT SIMULATE                                 X SIMULATOR GENERAL  
X   PERFORM IN PLANT         SIMULATE X   SIMULATOR  
 
GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. Tech Spec 3.4.11 2. 1BwOSR 3.4.11.2, Pressurizer Syst em PORV Valve Stroke Surveillance.
: 1. Tech Spec 3.4.11
MATERIALS:  
: 2. 1BwOSR 3.4.11.2, Pressurizer System PORV Valve Stroke Surveillance.
: 1. 1BwOSR 3.4.11.2, Pressurizer Syst em PORV Valve Stroke Surveillance.
MATERIALS:
Ensure cover sheet is signed and due/late dates are modified.  
: 1. 1BwOSR 3.4.11.2, Pressurizer System PORV Valve Stroke Surveillance.
Ensure cover sheet is signed and due/late dates are modified.
: 2. Requires digital stop watch.
: 2. Requires digital stop watch.
TASK STANDARDS:  
TASK STANDARDS:
: 1. Perform the required actions of 1BwOSR 3.4.
: 1. Perform the required actions of 1BwOSR 3.4.11.2, Pressurizer System PORV Valve Stroke Surveillance.
11.2, Pressurizer System PORV Valve Stroke Surveillance.  
TASK CONDITIONS:
 
: 1. You are the Unit 1 NSO.
TASK CONDITIONS:  
: 2. Unit 1 is at full power, all systems and controls are in automatic.
: 1. You are the Unit 1 NSO.  
: 3. Maintenance has recently completed repairs to 1RY455A PZR PORV.
: 2. Unit 1 is at full power, all systems and controls are in automatic.  
: 4. LCO 3.4.11 is in effect for 1RY455A inoperability.
: 3. Maintenance has recently completed repairs to 1RY455A PZR PORV.  
: 5. Per the IST program, 1RY455A must be stroke tested prior to declaring it operable.
: 4. LCO 3.4.11 is in effect for 1RY455A inoperability.  
INITIATING CUES:
: 5. Per the IST program, 1RY455A must be stroke tested prior to declaring it operable.  
: 1. You have been directed to perform 1BwOSR 3.4.11.2, Pressurizer System Valve Stroke Surveillance, steps 1, 2 and 4.
 
INITIATING CUES:  
: 1. You have been directed to perform 1BwOSR 3.
4.11.2, Pressurizer System Valve Stroke Surveillance, steps 1, 2 and 4.  
: 2. Inform the Shift Manager of your results.
: 2. Inform the Shift Manager of your results.
SIM-304 3 RECORD START TIME             
SIM-304                                                 2
 
PERFORMANCE STEP STANDARD Circle applicable
: 1. Refer to 1BwOSR 3.4.11.2.
  (CUE:    Provide student with the marked up copy with cover sheet.)
Refer to 1BwOSR 3.4.11.2. Signs cover sheet  Verify all applicable prerequisites, precautions limitations
 
and actions are
 
addressed. Checks cover sheet for IST coordinator listed for review of results.
o Places dots on expected alarms and pre-reviews AR's.
o 1-12-B2  Obtains stopwatch.
o Records stopwatch data on position
 
checklist. Records and initials as found positions. 1RY455A  1RY456  1RY8000A  1RY8000B SAT    UNSAT      N/A
 
Comments:
* 2. At 1PM05J, closes 1RY8000A
 
Closes 1RY8000A SAT    UNSAT      N/A
 
Comments:
* 3. Perform OPEN stroke of 1RY455A (in accordance with steps outlined in Attachment A). Perform the following:  Verify close 1RY455A  Simultaneously start the stopwatch and open 1RY455A. Stop the stopwatch when 1RY455A
 
indicates open. Record the Stroke Open Test Time. Verify 1RY455A indicates open on
 
1PM06J. Verify the open test time is within the
 
ALERT and
 
OPERABILITY Limits. Check the YES block
 
in the VER OPER
 
section to indicate that SAT    UNSAT      N/A
 
Comments:
SIM-304 4 1RY455A has been verified operable.
Initial in open stroke block provided.
* 4. Perform CLOSE stroke of 1RY455A (in accordance with steps outlined in Attachment
 
B). Perform the following:  Verify open 1RY455A  Simultaneously start the stopwatch and close 1RY455A. Stop the stopwatch when 1RY455A
 
indicates closed. Record the Stroke Close Test Time. Verify 1RY455A indicates closed on 1PM06J. Verify the close test time is within the ALERT and
 
OPERABILITY Limits. Check the YES block
 
in the VER OPER
 
section to indicate that


1RY455A has been
RECORD START TIME PERFORMANCE STEP                  STANDARD                  Circle applicable
: 1. Refer to 1BwOSR 3.4.11.2.
* Refer to 1BwOSR 3.4.11.2.                SAT UNSAT      N/A (CUE:    Provide student with the
* Signs cover sheet marked up copy with cover
* Verify all applicable    Comments:
sheet.)                        prerequisites, precautions limitations and actions are addressed.
* Checks cover sheet for IST coordinator listed for review of results.
o  Places dots on expected alarms and pre-reviews ARs.
o 1-12-B2
* Obtains stopwatch.
o  Records stopwatch data on position checklist.
* Records and initials as found positions.
* 1RY455A
* 1RY456
* 1RY8000A
* 1RY8000B
* 2. At 1PM05J, closes 1RY8000A
* Closes 1RY8000A          SAT UNSAT      N/A Comments:
* 3. Perform OPEN stroke of 1RY455A (in accordance with steps
* Perform the following:      SAT UNSAT      N/A outlined in Attachment A).
* Verify close 1RY455A
* Simultaneously start      Comments:
the stopwatch and open 1RY455A.
* Stop the stopwatch when 1RY455A indicates open.
* Record the Stroke Open Test Time.
* Verify 1RY455A indicates open on 1PM06J.
* Verify the open test time is within the ALERT and OPERABILITY Limits.
* Check the YES block in the VER OPER section to indicate that SIM-304                                        3


verified operable.
1RY455A has been verified operable.
Initial in closed stroke block provided.
* Initial in open stroke block provided.
SAT     UNSAT     N/A  
* 4. Perform CLOSE stroke of 1RY455A (in accordance with
 
* Perform the following:      SAT UNSAT N/A steps outlined in Attachment
Comments:
* Verify open 1RY455A B).
SIM-304 5 PERFORMANCE STEP STANDARD Circle applicable
* Simultaneously start      Comments:
: 5. Initial step 2.3 Verifies 1RY455A has been stroked through one complete cycle
the stopwatch and close 1RY455A.
 
* Stop the stopwatch when 1RY455A indicates closed.
and initial in space
* Record the Stroke Close Test Time.
* Verify 1RY455A indicates closed on 1PM06J.
* Verify the close test time is within the ALERT and OPERABILITY Limits.
* Check the YES block in the VER OPER section to indicate that 1RY455A has been verified operable.
* Initial in closed stroke block provided.
SIM-304                                      4


PERFORMANCE STEP                    STANDARD                  Circle applicable
: 5. Initial step 2.3
* Verifies 1RY455A has    SAT UNSAT      N/A been stroked through one complete cycle and initial in space    Comments:
provided.
provided.
SAT     UNSAT     N/A  
* 6. At 1PM05J, opens 1RY8000A
 
* Opens 1RY8000A          SAT UNSAT       N/A (Cue: If asked, cue examinee that                                    Comments:
Comments:
1RY8000A is to be returned to as found condition)
* 6. At 1PM05J, opens 1RY8000A
: 7. Complete as left position checklist.
* Records and initials as  SAT UNSAT      N/A left positions.
* 1RY455A                Comments:
* 1RY8000A (Cue: Another NSO has performed the
* Obtains verification of verifications of as left            as left positions positions)
: 8. Inform US of surveillance completion.
* Signs surveillance cover sheet.            SAT UNSAT      N/A
* Informs US that surveillance is          Comments:
complete.
(CUE:) THIS COMPLETES THIS JPM.
RECORD STOP TIME                __________
COMMENTS:
SIM-304                                          5


(Cue: If asked, cue examinee that 1RY8000A is to be
SIMULATOR SETUP INSTRUCTIONS JPM NO: SIM-304 REQUIRED SIMULATOR MODE(S): 100% power steady state MALFUNCTION #S:
None COMMENTS:
SIM-304                                    6


returned to as found
TASK CONDITIONS:
: 1.      You are the Unit 1 Assist NSO.
: 2.      Both Units are at 100% power.
: 3.      Unit 2 has placed the 2A SX pump in service and requests that Unit 1 swap operating SX trains.
1B SX pump has been shutdown for 2 weeks.
: 4.      An EO has been briefed and is standing by to assist in the field.
INITIATING CUES:
: 1.      The Unit 1 Unit Supervisor has directed you to start the 1B SX pump and shutdown the 1A SX pump per BwOP SX-7.
: 2.      Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
: 3.      Inform the Unit 1 Unit Supervisor when you have completed the pump swap.
Page 1 of 5 SIM-407S


condition)
TASK TITLE: Swap Essential Service Water Pumps JPM No.:     N-072a                                                         REV:     NRC 09-1 TPO No.:     4C.SX-03                                                       K&A No.: 076000A4.01 TASK No.:   R-SX-002/003, Startup/shutdown an Essential                   K&A IMP: 2.9/2.9 Service Water pump TRAINEE:                                                         RO SRO (Circle One)
Opens 1RY8000A
EVALUATOR:                                                       DATE:
 
The Trainee:         PASSED               this JPM.               TIME STARTED:
SAT    UNSAT      N/A
FAILED                                       TIME FINISHED:
 
JPM TIME:               MINUTES CRITICAL ELEMENTS:             (*)5, 7, 8                         COMPLETION TIME: 22 MINUTES CRITICAL TIME:                 N/A                               ALTERNATE PATH: YES @
Comments: 7. Complete as left position checklist.
EVALUATION METHOD:                                               LOCATION:
 
X PERFORM                                               IN PLANT SIMULATE                                         X SIMULATOR CONTROL ROOM GENERAL  
(Cue: Another NSO has performed the verifications of as left positions)
Records and initials as left positions. 1RY455A  1RY8000A  Obtains verification of as left positions SAT    UNSAT      N/A
 
Comments: 8. Inform US of surveillance completion. Signs surveillance cover sheet. Informs US that surveillance is complete.
 
SAT    UNSAT      N/A
 
Comments:   
(CUE:) THIS COMPLETES THIS JPM.
 
RECORD STOP TIME
 
__________ 
 
COMMENTS:
 
SIM-304 6 SIMULATOR SETUP INSTRUCTIONS
 
JPM NO: SIM-304
 
REQUIRED SIMULATOR MODE(S): 100% power steady state
 
MALFUNCTION #'S: 
 
None
 
COMMENTS:
 
SIM-407S Page 1 of 5 TASK CONDITIONS:
: 1. You are the Unit 1 Assist NSO.
: 2. Both Units are at 100% power.
: 3. Unit 2 has placed the 2A SX pump in service and requests that Unit 1 swap operating SX trains. 1B SX pump has been shutdown for 2 weeks.
: 4. An EO has been briefed and is standing by to assist in the field.
INITIATING CUES:
: 1. The Unit 1 Unit Supervisor has directed you to start the 1B SX pump and shutdown the 1A SX pump per BwOP SX-7.
: 2. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
: 3. Inform the Unit 1 Unit Supervisor when you have completed the pump swap.
SIM-407S Page 2 of 5 TASK TITLE: Swap Essential Service Water Pumps JPM No.: N-072a REV: NRC 09-1 TPO No.: 4C.SX-03 K&A No.: 076000A4.01 TASK No.: R-SX-002/003, Startup/shutdown an Essential K&A IMP: 2.9/2.9       Service Water pump  
 
TRAINEE:
RO   SRO   (Circle One)  
 
EVALUATOR:
DATE:
The Trainee: PASSED this JPM.
TIME STARTED:
 
FAILED TIME FINISHED:  
 
JPM TIME: MINUTES CRITICAL ELEMENTS:  
(*)5, 7, 8 COMPLETION TIME:
22 MINUTES CRITICAL TIME:
N/A ALTERNATE PATH: YES  
EVALUATION METHOD:
LOCATION:
X   PERFORM       IN PLANT SIMULATE X   SIMULATOR           CONTROL ROOM GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. BwOP SX-7, Rev. 18, Swapping Essential Service Water Pumps  
: 1. BwOP SX-7, Rev. 18, Swapping Essential Service Water Pumps MATERIALS:
 
: 1. BwOP SX-7, Rev. 18, Swapping Essential Service Water Pumps TASK STANDARDS:
MATERIALS:  
: 1. 1A SX pump is restarted with high vibration indicated in the piping TASK CONDITIONS:
: 1. BwOP SX-7, Rev. 18, Swapping Essential Service Water Pumps  
: 1. You are the Assist NSO.
 
: 2. The Unit is at power.
TASK STANDARDS:  
: 3. Unit 2 is at full power.
: 1. 1A SX pump is restarted with high vibration indicated in the piping TASK CONDITIONS:  
: 4. Unit 2 has placed the 2A SX pump in service and requests that Unit 1 swap operating SX trains.
: 1. You are the Assist NSO.  
1B SX pump has been shutdown for 2 weeks.
: 2. The Unit is at power.  
: 5. An EO has been briefed and is standing by to assist in the field.
: 3. Unit 2 is at full power.  
INITIATING CUES:
: 4. Unit 2 has placed the 2A SX pump in service and requests that Unit 1 swap operating SX trains. 1B SX pump has been shutdown for 2 weeks.  
: 1. The Unit 1 Unit Supervisor has directed you to start the 1B SX pump and shutdown the 1A SX pump per BwOP SX-7.
: 5. An EO has been briefed and is standing by to assist in the field.  
: 2. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
 
INITIATING CUES:  
: 1. The Unit 1 Unit Supervisor has directed you to start the 1B SX pump and shutdown the 1A SX pump per BwOP SX-7.  
: 2. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.  
: 3. Inform the Unit 1 Unit Supervisor when you have completed the pump swap.
: 3. Inform the Unit 1 Unit Supervisor when you have completed the pump swap.
SIM-407S Page 3 of 5 RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable
Page 2 of 5 SIM-407S
: 1. Refer to BwOP SX-7, SWAPPING ESSENTIAL SERVICE WATER PUMPS. CUE: Provide copy of BwOP SX-7. CUE: All Prerequisites, Precautions, Limitations


and Actions have been
RECORD START TIME PERFORMANCE STEP                        STANDARD                Circle applicable
 
: 1. Refer to BwOP SX-7, SWAPPING       Refer to BwOP SX-7,            SAT UNSAT      N/A ESSENTIAL SERVICE WATER            SWAPPING ESSENTIAL              Comments:
met. Refer to BwOP SX-7, SWAPPING ESSENTIAL  
PUMPS.                            SERVICE WATER PUMPS.
 
CUE: Provide copy of BwOP
SERVICE WATER PUMPS. VERIFY all applicable Prerequisites, Precautions, and  
* VERIFY all applicable SX-7.                            Prerequisites, CUE: All Prerequisites,         Precautions, and Precautions, Limitations        Limitations and Actions and Actions have been            are satisfactorily met.                            addressed.
 
: 2. Verify 1B SX pump suction valve   Perform the following at        SAT UNSAT      N/A open.                             1PM06J:                        Comments:
Limitations and Actions  
* Determine 1SX001B, CUE: If requested, EO reports             SX pump 1B suction that 1SX001B is open.             valve, is open.
 
EVALUATOR NOTE: The examinee may verify 1PR02J/3J are in operation prior to placing the 1B and 1D RCFCs coils in service.
are satisfactorily  
: 3. Verify RCFC 1B and 1D inlet and   Perform the following:          SAT UNSAT      N/A outlet valves open.                                               Comments:
 
* Verify/Open 1SX016B/1SX027B.
addressed.
Or CUE    If asked, US does not    o   Place Jumper to simulate desire to use a jumper.      valve position per Attachment A
SAT    UNSAT      N/A Comments: 2. Verify 1B SX pump suction valve open.  
: 4. Start 1A and 1B SX pump Aux. Oil  Direct EO to locally start 1A  SAT UNSAT       N/A pumps.                             and 1B SX pump Aux. Oil         Comments:
 
pumps. (1SX01PA/B-C)
CUE: If requested, EO reports that 1SX001B is open.
* At 1PM06J verify 1A and Note: Simulator operator to           1B SX pump Aux. Oil start both aux. oil pumps     pump run lights lit.
Perform the following at
when called.
 
  *5. Start 1B SX pump.                  Perform the following at        SAT UNSAT      N/A CUE: If contacted as Unit 2        1PM06J:                        Comments:
1PM06J:  Determine 1SX001B, SX pump 1B suction
operator, acknowledge    o Announce pump swap over upcoming SX pump            plant page swap.
 
* Start 1B SX pump by taking CUE: If dispatched as EO to           the control switch to close monitor 1B SX pump          until pump starts.
valve, is open.
start locally, report satisfactory start of 1B SX pump shortly after pump started.
SAT    UNSAT      N/A Comments:  EVALUATOR NOTE: The examinee may verify 1PR02J/3J are in operation prior to placing the 1B and 1D RCFCs coils in service.  
CUE: As Unit Supervisor, acknowledge reports of annunciators due to SX pump start/stop as they occur.
: 3. Verify RCFC 1B and 1D inlet and outlet valves open.  
Page 3 of 5 SIM-407S
 
: 6. Check running amps on both SX      Perform the following at    SAT UNSAT N/A pumps approximately equal.        1PM06J:                      Comments:
CUE If asked, US does not desire to use a jumper.
* Monitor ammeters for 1A Check running SX pump discharge        and 1B SX pumps.
Perform the following:  
pressure < 112#.
 
* Determine 1A and 1B SX pumps ammeters approximately equal.
Verify/Open 1SX016B/1SX027B.  
* Monitor 1PI-SX007 and 1PI-SX008 Determines 1A and 1B SX pumps discharge pressures both < 112 psig
 
  *7. Stops 1A SX pump.                 Stops 1A SX pump by placing  SAT UNSAT N/A CUE: As Unit Supervisor,          the control switch to TRIP. Comments:
Or o Place Jumper to simulate valve position per Attachment A SAT     UNSAT     N/A Comments: 4. Start 1A and 1B SX pump Aux. Oil pumps.  
acknowledge reports of annunciators due to SX pump start/stop as they occur.
 
                                    **ALTERNATE PATH START**
Note: Simulator operator to start both aux. oil pumps when called.
  *8. CUE: U-2 reports that the 2A SX                                SAT UNSAT N/A pump has tripped and U-                                  Comments:
Direct EO to locally start 1A and 1B SX pump Aux. Oil pumps. (1SX01PA/B-C)
2 has re-started the 2B SX pump.
CUE: EO reports high vibration
* Re-Starts the 1A SX pump in the 1A train suction header of SX.
Another NSO will complete this procedure.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME COMMENTS:
Page 4 of 5 SIM-407S


At 1PM06J verify 1A and 1B SX pump Aux. Oil
SIMULATOR SETUP INSTRUCTIONS JPM NO: SIM-407S REQUIRED SIMULATOR MODE (S): At power MALFUNCTION #S: N/A COMMENTS:
: 1. Remote functions for SX pumps aux. oil pumps:
* 1A SX pump aux. oil pump: RF SW03 ON / OFF
* 1B SX pump aux. oil pump: RF SW04 ON / OFF
: 2. Remove SX Pump Trends from the HMI.
Page 5 of 5 SIM-407S


pump run lights lit.
JOB PERFORMANCE MEASURE TASK CONDITIONS:
SAT    UNSAT      N/A Comments: *5. Start 1B SX pump. CUE: If contacted as Unit 2 operator, acknowledge
: 1. You are the Unit 1 Assist NSO.
: 2. Unit 1 is in mode 1 with all systems properly aligned.
: 3. 1BwOSR 3.6.6.2 REACTOR CONTAINMENT FAN COOLER SURVEILLANCE has been initiated and completed through step F.1 INITIATING CUES:
: 1. The Unit 1 Unit Supervisor has directed you to perform 1BwOSR 3.6.6.2 REACTOR CONTAINMENT FAN COOLER SURVEILLANCE steps F.2 and F.3.
: 2. All fans are to be return to as found condition when surveillance runs are completed.
: 3. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
: 4. Inform the Unit 1 US when steps F.2 and F.3 are complete.
SIM-507                                              Page 1 of 6


upcoming SX pump swap. CUE: If dispatched as EO to monitor 1B SX pump start locally, report satisfactory start of 1B SX pump shortly after
TASK TITLE: Perform RCFC Surveillance.
 
JPM No.: SIM-507                                                   REV:       NRC 09-1 TPO No: 4C.VP-06                                                   K/A No.: 022000A4.01 TASK No.: R-VP-007 Start-up a RCFC                                 K/A IMP: 3.6/3.6 EXAMINEE:                                                         RO SRO (Circle One)
pump started. CUE: As Unit Supervisor, acknowledge reports of annunciators due to SX pump start/stop as they
EVALUATOR:                                                         DATE:
 
The Examinee:         PASSED           this JPM.                 TIME STARTED:
occur. Perform the following at 1PM06J: o Announce pump swap over plant page  Start 1B SX pump by taking the control switch to close until pump starts.
FAILED                                     TIME FINISHED:
SAT    UNSAT      N/A Comments:
JPM TIME:                 MINUTES CRITICAL ELEMENTS:             (*) 3, 6                           APPROX COMPLETION TIME: 20 MINUTES CRITICAL TIME:                 NA EVALUATION METHOD:                                                 LOCATION:
SIM-407S Page 4 of 5
X PERFORM                                             _ IN PLANT
: 6. Check running amps on both SX pumps approximately equal.
_ SIMULATE                                         X SIMULATOR GENERAL  
 
Check running SX pump discharge pressure < 112#.
 
Perform the following at
 
1PM06J:  Monitor ammeters for 1A and 1B SX pumps. Determine 1A and 1B SX pumps ammeters approximately equal. Monitor 1PI-SX007 and 1PI-SX008 Determines 1A and 1B SX
 
pumps discharge pressures
 
both < 112 psig
 
SAT    UNSAT      N/A
 
Comments: *7. Stops 1A SX pump. CUE: As Unit Supervisor, acknowledge reports of
 
annunciators due to SX pump start/stop as they
 
occur. Stops 1A SX pump by placing the control switch to TRIP.
 
SAT    UNSAT      N/A
 
Comments: **ALTERNATE PATH START**
*8. CUE:  U-2 reports that the 2A SX pump has tripped and U-
 
2 has re-started the 2B
 
SX pump. CUE:  EO reports high vibration in the 1A train suction header of SX.
Another NSO will
 
complete this procedure.
 
Re-Starts the 1A SX pump SAT    UNSAT      N/A Comments:  CUE: THIS COMPLETES THIS JPM.
 
RECORD STOP TIME COMMENTS:
 
SIM-407S Page 5 of 5 SIMULATOR SETUP INSTRUCTIONS
 
JPM NO: SIM-407S
 
REQUIRED SIMULATOR MODE (S): At power
 
MALFUNCTION #'S:  N/A
 
COMMENTS:
: 1. Remote functions for SX pumps aux. oil pumps:  1A SX pump aux. oil pump:
RF SW03 ON / OFF 1B SX pump aux. oil pump:
RF SW04 ON / OFF
: 2. Remove SX Pump Trends from the HMI.
 
SIM-507      Page 1 of 6 JOB PERFORMANCE MEASURE
 
TASK CONDITIONS:
: 1. You are the Unit 1 Assist NSO.
: 2. Unit 1 is in mode 1 with all systems properly aligned.
: 3. 1BwOSR 3.6.6.2 REACTOR CONTAINMENT FA N COOLER SURVEILLANCE has been initiated and completed through step F.1
 
INITIATING CUES:
: 1. The Unit 1 Unit Supervisor has directed you to perform 1BwOSR 3.6.6.2 REACTOR CONTAINMENT FAN COOLER SURVEILLANCE steps F.2 and F.3.
: 2. All fans are to be return to as found condition when surveillance runs are completed.
: 3. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
: 4. Inform the Unit 1 US when steps F.2 and F.3 are complete.
 
SIM-507      Page 2 of 6 TASK TITLE: Perform RCFC Surveillance. JPM No.: SIM-507 REV: NRC 09-1 TPO No: 4C.VP-06 K/A No.: 022000A4.01 TASK No.: R-VP-007 Start-up a RCFC K/A IMP: 3.6/3.6  
 
EXAMINEE:
RO   SRO (Circle One)  
 
EVALUATOR:
DATE:
The Examinee: PASSED this JPM.
TIME STARTED:
FAILED TIME FINISHED:
JPM TIME: MINUTES CRITICAL ELEMENTS:  
(*) 3, 6 APPROX COMPLETION TIME:
20 MINUTES CRITICAL TIME:
NA EVALUATION METHOD:
LOCATION:
X PERFORM   _ IN PLANT
_   SIMULATE X SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. 1BwOSR 3.6.6.2, REACTOR CONTAINMENT FAN COOLER SURVEILLANCE, Rev. 18.  
: 1. 1BwOSR 3.6.6.2, REACTOR CONTAINMENT FAN COOLER SURVEILLANCE, Rev. 18.
: 2. BwOP VP-5, REACTOR CONTAINMENT FAN COOLER START-UP, Rev. 57.  
: 2. BwOP VP-5, REACTOR CONTAINMENT FAN COOLER START-UP, Rev. 57.
: 3. BwOP VP-6, REACTOR CONTAINMENT FAN COOLER SHUTDOWN, Rev. 55.
: 3. BwOP VP-6, REACTOR CONTAINMENT FAN COOLER SHUTDOWN, Rev. 55.
MATERIALS:  
MATERIALS:
: 1. Copy of BwOP VP-5, Rev. 57.  
: 1. Copy of BwOP VP-5, Rev. 57.
: 2. Copy of BwOP VP-6, Rev. 55.  
: 2. Copy of BwOP VP-6, Rev. 55.
: 3. 1BwOSR 3.6.6.2 completed through step F.1 TASK STANDARDS:  
: 3. 1BwOSR 3.6.6.2 completed through step F.1 TASK STANDARDS:
: 1. Perform RCFC Fan Swap  
: 1. Perform RCFC Fan Swap
: 2. Determine 1C RCFC Low Speed Breaker Trips upon start.  
: 2. Determine 1C RCFC Low Speed Breaker Trips upon start.
: 3. Recognize Tech Spec required actions for 1D RCFC low speed breaker malfunction.
: 3. Recognize Tech Spec required actions for 1D RCFC low speed breaker malfunction.
TASK CONDITIONS:  
TASK CONDITIONS:
: 1. You are the Unit 1 Assist NSO.  
: 1. You are the Unit 1 Assist NSO.
: 2. Unit 1 is in mode 1 with all systems properly aligned.  
: 2. Unit 1 is in mode 1 with all systems properly aligned.
: 3. 1BwOSR 3.6.6.2 REACTOR CONTAINMENT FA N COOLER SURVEILLANCE has been initiated and completed through step F.1 INITIATING CUES:  
: 3. 1BwOSR 3.6.6.2 REACTOR CONTAINMENT FAN COOLER SURVEILLANCE has been initiated and completed through step F.1 INITIATING CUES:
: 1. The Unit 1 Unit Supervisor has directed you to perform 1BwOSR 3.6.6.2 REACTOR CONTAINMENT FAN COOLER SURVEILLANCE steps F.2 and F.3. CUE: Hand examinee copy of 1BwOSR 3.6.6.2  
: 1. The Unit 1 Unit Supervisor has directed you to perform 1BwOSR 3.6.6.2 REACTOR CONTAINMENT FAN COOLER SURVEILLANCE steps F.2 and F.3.
: 2. All fans are to be return to as found condition when surveillance runs are completed.  
CUE: Hand examinee copy of 1BwOSR 3.6.6.2
: 3. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.  
: 2. All fans are to be return to as found condition when surveillance runs are completed.
: 4. Inform the Unit 1 US when steps F.2 and F.3 are complete.  
: 3. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
: 4. Inform the Unit 1 US when steps F.2 and F.3 are complete.
SIM-507                                              Page 2 of 6


SIM-507      Page 3 of 6 RECORD START TIME:
RECORD START TIME:
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE  
PERFORMANCE STEP                     STANDARD                 CIRCLE APPLICABLE
: 1. Refer to 1BwOSR 3.6.6.2. CUE: All prerequisites, precautions, and limitations and actions  
: 1. Refer to 1BwOSR 3.6.6.2.         Refer to 1BwOSR 3.6.6.2.        SAT  UNSAT    N/A CUE: All prerequisites,                                          Comments:
precautions, and limitations and actions are met.
: 2. Stop 1A and 1C RCFC High        Refer to BwOP VP-6              SAT  UNSAT    N/A Speed Breakers per BwOP VP-6:
* Determine step F.1 is      Comments:
CUE: All prerequisites,               applicable step.
precautions, and limitations and actions Perform the following at are met.                1PM06J:
* Place 1VP01CA, High Speed Brk to trip.
* Place 1VP01CC, High Speed Brk to trip.
*3. Start 1A and 1C RCFC Low        Refer to BwOP VP-5              SAT  UNSAT    N/A Speed Breakers per BwOP VP-5:
* Determine step F.2 is      Comments:
applicable step.
CUE: All prerequisites, precautions, and        After waiting at least 20 limitations and actions  seconds from securing fans, are met.                Perform the following at 1PM06J:
* Place 1VP01CA, Low Speed Brk to start.
* Place 1VP01CC, Low Speed Brk to start.
: 4. Record Train A run time
* Record start time of last train A fan started Time Compression
* Record current time (from cue)
CUE: 15 Minutes has elapsed since start of last train A fan.
* Calculate and record The current time is now______            total A train low speed (15 min later)                          run time SIM-507                                        Page 3 of 6


are met. Refer to 1BwOSR 3.6.6.2.
PERFORMANCE STEP                    STANDARD              CIRCLE APPLICABLE
SAT     UNSAT     N/A Comments:  2. Stop 1A and 1C RCFC High Speed Breakers per BwOP VP-6: CUE: All prerequisites, precautions, and
: 4. Return train A RCFCs to as found  Refer to BwOP VP-6           SAT  UNSAT    N/A condition.
* Determine step F.2 is    Comments:
applicable step.
Perform the following at 1PM06J:
* Place 1VP01CA, Low Speed Brk to trip.
* Place 1VP01CC, Low Speed Brk to trip.
Refer to BwOP VP-5
* Determine step F.1 is applicable step.
* Place 1VP01CA, High Speed Brk to start.
* Place 1VP01CC, High Speed Brk to start.
Cue: All verifications are
* Obtain verification of AS complete.                            LEFT positions.
: 5. Stop 1B and 1D RCFC High          Refer to BwOP VP-6            SAT   UNSAT   N/A Speed Breakers per BwOP VP-6:
* Determine step F.1 is    Comments:
applicable step.
Perform the following at 1PM06J:
* Place 1VP01CB, High Speed Brk to trip.
* Place 1VP01CD, High Speed Brk to trip.
                                    **ALTERNATE PATH START**
  *6    Start 1B and 1D RCFC Low          Refer to BwOP VP-5 Speed Breakers per BwOP VP-5:
* Determine step F.2 is applicable step.
After waiting at least 20 seconds from securing fans, Perform the following at 1PM06J:
* Place 1VP01CB, Low Speed Brk to start.
* Place 1VP01CD, Low Speed Brk to start.
* Recognize 1VP01CD low speed brk malfunction.
o  Place 1D low speed RCFC in PTL SIM-507                                        Page 4 of 6


limitations and actions
PERFORMANCE STEP                STANDARD          CIRCLE APPLICABLE
: 7. Notify US of malfunction. Notify US of 1D RCFC brk SAT  UNSAT    N/A malfunction and need to evaluate LCO entry.      Comments:
CUE: US acknowledges 1D RCFC brk malfunction and will evaluate Tech Specs for applicablility.
Cue: (SRO only)(If necessary)    (SRO only) Recognizes ask as US what TS is required    3.6.6 condition C is to be entered.                  applicable.
CUE: THIS COMPLETES THIS JPM.
RECORD STOPT TIME:
COMMENTS:
SIM-507                                    Page 5 of 6


are met. Refer to BwOP VP-6  Determine step F.1 is applicable step.
SIMULATOR SETUP INSTRUCTIONS
Perform the following at 1PM06J:  Place 1VP01CA, High Speed Brk to trip. Place 1VP01CC, High Speed Brk to trip.
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
SAT    UNSAT      N/A Comments:  *3. Start 1A and 1C RCFC Low Speed Breakers per BwOP VP-5: CUE: All prerequisites, precautions, and
* Establish conditions of Mode 1, steady state, normal alignment.
 
* IMF CH01D COMMENTS:
limitations and actions
* Provide copy of 1BwOSR 3.6.6.2 completed through step F.1
 
* Provide copy of BwOP VP-5 and BwOP VP-6.
are met. Refer to BwOP VP-5  Determine step F.2 is applicable step.
SIM-507                                            Page 6 of 6
After waiting at least 20 seconds from securing fans, Perform the following at
 
1PM06J:  Place 1VP01CA, Low Speed Brk to start. Place 1VP01CC, Low Speed Brk to start.
SAT    UNSAT      N/A Comments:   
: 4. Record Train A run time Time Compression CUE: 15 Minutes has elapsed since start of last train A fan.
The current time is now______
 
(15 min later)
Record start time of last train A fan started  Record current time (from cue)  Calculate and record total A train low speed run time 
 
SIM-507      Page 4 of 6 PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
: 4. Return train A RCFCs to as found condition.
 
Cue: All verifications are complete.
Refer to BwOP VP-6  Determine step F.2 is applicable step.
Perform the following at 1PM06J:  Place 1VP01CA, Low Speed Brk to trip. Place 1VP01CC, Low Speed Brk to trip.
Refer to BwOP VP-5  Determine step F.1 is applicable step. Place 1VP01CA, High Speed Brk to start. Place 1VP01CC, High Speed Brk to start. Obtain verification of "AS LEFT" positions.
SAT    UNSAT      N/A Comments:  5. Stop 1B and 1D RCFC High Speed Breakers per BwOP VP-6:
 
Refer to BwOP VP-6  Determine step F.1 is applicable step.
Perform the following at 1PM06J:  Place 1VP01CB, High Speed Brk to trip. Place 1VP01CD, High Speed Brk to trip.
SAT    UNSAT      N/A Comments:  **ALTERNATE PATH START**
*6 Start 1B and 1D RCFC Low Speed Breakers per BwOP VP-5: Refer to BwOP VP-5  Determine step F.2 is applicable step.
After waiting at least 20 seconds from securing fans, Perform the following at
 
1PM06J:  Place 1VP01CB, Low Speed Brk to start. Place 1VP01CD, Low Speed Brk to start. Recognize 1VP01CD low speed brk
 
malfunction.
o Place 1D low speed
 
RCFC in PTL
 
SIM-507      Page 5 of 6 PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
: 7. Notify US of malfunction.
CUE: US acknowledges 1D RCFC brk malfunction and will
 
evaluate Tech Specs for applicablility.
 
Cue:  (SRO only)(If necessary) ask as US what TS is required
 
to be entered. Notify US of 1D RCFC brk malfunction and need to evaluate LCO entry.
 
(SRO only) Recognizes
 
====3.6.6 condition====
C is
 
applicable.
SAT    UNSAT      N/A Comments:
CUE: THIS COMPLETES THIS JPM.
 
RECORD STOPT TIME:   
 
COMMENTS:
 
SIM-507      Page 6 of 6 SIMULATOR SETUP INSTRUCTIONS Verify/perform TQ-BR-201-0113, BRAIDW OOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST. Establish conditions of Mode 1, steady state, normal alignment. IMF CH01D   COMMENTS:  
 
Provide copy of 1BwOSR 3.6.6.2 completed through step F.1 Provide copy of BwOP VP-5 and BwOP VP-6.
SIM-611 Page 1 of 5 TASK CONDITIONS:
: 1. You are an extra NSO.
: 2. Unit 1 has experienced a loss of Offsite power while in mode 3. 
: 3. Unit 1 EDGs are carrying the ESF buses, but the Non-ESF buses are still de-energized.
: 4. The crew is currently performing 1BwOA ELEC-4
: 5. Unit 2 is at full power.
 
INITIATING CUES:


TASK CONDITIONS:
: 1. You are an extra NSO.
: 2. Unit 1 has experienced a loss of Offsite power while in mode 3.
: 3. Unit 1 EDGs are carrying the ESF buses, but the Non-ESF buses are still de-energized.
: 4. The crew is currently performing 1BwOA ELEC-4
: 5. Unit 2 is at full power.
INITIATING CUES:
The US has directed you to re-energize 4KV Non-ESF bus 144 per step 7 of 1BwOA ELEC-4.
The US has directed you to re-energize 4KV Non-ESF bus 144 per step 7 of 1BwOA ELEC-4.
Another NSO will monitor the re mainder of the control panels.
Another NSO will monitor the remainder of the control panels.
SIM-611 Page 2 of 5 TASK TITLE:
Page 1 of 5 SIM-611
Crosstie of ESF and Non-ESF Bus
 
JPM No.: SIM-611 REV: NRC 09-1 TPO No.: 4D.OA-60, 61 K&A No.: 062000A4.01 TASK No.: R-OA-024, Energize an El ectrical bus K&A IMP: 3.3/3.1
 
EXAMINEE:
RO  SRO  (Circle One)
 
EVALUATOR:
DATE: 
 
The Examinee: PASSED            this JPM.
TIME STARTED: 
 
FAILED TIME FINISHED:


JPM TIME: MINUTES CRITICAL ELEMENTS:  
TASK TITLE:    Crosstie of ESF and Non-ESF Bus JPM No.:      SIM-611                                                  REV:          NRC 09-1 TPO No.:      4D.OA-60, 61                                            K&A No.:      062000A4.01 TASK No.:      R-OA-024, Energize an Electrical bus                    K&A IMP:      3.3/3.1 EXAMINEE:                                                              RO SRO (Circle One)
(*) 3,4 APPROX COMPLETION TIME 6 MINUTES CRITICAL TIME:
EVALUATOR:                                                              DATE:
NA EVALUATION METHOD:
The Examinee:          PASSED            this JPM.                    TIME STARTED:
LOCATION:
FAILED                                          TIME FINISHED:
X   PERFORM       IN PLANT SIMULATE X   SIMULATOR  
JPM TIME:                 MINUTES CRITICAL ELEMENTS:               (*) 3,4                               APPROX COMPLETION TIME 6 MINUTES CRITICAL TIME:                   NA EVALUATION METHOD:                                                     LOCATION:
 
X PERFORM                                                 IN PLANT SIMULATE                                             X SIMULATOR GENERAL  
GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. 1BwOA ELEC-4, Rev 104, Loss of Offsite Power Unit 1, Step 7.
MATERIALS:
: 1. 1BwOA ELEC-4, Rev 104, Loss of Offsite Power Unit 1, Step 7.
: 1. 1BwOA ELEC-4, Rev 104, Loss of Offsite Power Unit 1, Step 7.
TASK STANDARDS:  
MATERIALS:
: 1. Perform the required actions of 1BwOA ELEC-4 , Step 7, to crosstie an ESF and Non-ESF Bus.  
: 1. 1BwOA ELEC-4, Rev 104, Loss of Offsite Power Unit 1, Step 7.
 
TASK STANDARDS:
TASK CONDITIONS:  
: 1. Perform the required actions of 1BwOA ELEC-4, Step 7, to crosstie an ESF and Non-ESF Bus.
: 6. You are an extra NSO.  
TASK CONDITIONS:
: 7. Unit 1 has experienced a loss of Offsite power while in mode 3.  
: 6. You are an extra NSO.
: 8. Unit 1 EDGs are carrying the ESF buses, but the Non-ESF buses are still de-energized.  
: 7. Unit 1 has experienced a loss of Offsite power while in mode 3.
: 9. The crew is currently performing 1BwOA ELEC-4  
: 8. Unit 1 EDGs are carrying the ESF buses, but the Non-ESF buses are still de-energized.
: 10. Unit 2 is at full power.  
: 9. The crew is currently performing 1BwOA ELEC-4
 
: 10. Unit 2 is at full power.
INITIATING CUES:  
INITIATING CUES:
 
The US has directed you to re-energize 4KV Non-ESF bus 144 per step 7 of 1BwOA ELEC-4.
The US has directed you to re-energize 4KV Non-ESF bus 144 per step 7 of 1BwOA ELEC-4.
Another NSO will monitor the re mainder of the control panels.
Another NSO will monitor the remainder of the control panels.
SIM-611 Page 3 of 5 RECORD START TIME Note:  After examinee locates procedure, provide a copy.
Page 2 of 5 SIM-611
PERFORMANCE STEP STANDARD Circle applicable
: 1. 1BwOA ELEC-4, Step 7 Locate and open 1BwOA ELEC-4, Step 7


SAT     UNSAT      N/A Comments: 2. Determine ESF Bus 142 is energized.  
RECORD START TIME Note: After examinee locates procedure, provide a copy.
PERFORMANCE STEP                          STANDARD                  Circle applicable
: 1. 1BwOA ELEC-4, Step 7                  Locate and open 1BwOA ELEC-      SAT UNSAT      N/A 4, Step 7                        Comments:
: 2. Determine ESF Bus 142 is energized. DETERMINE ESF Bus 142 is        SAT UNSAT      N/A energized:                      Comments:
o    Bus 142 live light is LIT o    Bus 142 voltage normal on 1EIAP086
  *3. Prepare to Cross tie ESF to Non-      Prepare to crosstie ESF and Non- SAT UNSAT      N/A ESF buses.                            ESF bus:                        Comments:
CUE:    (IF ASKED) Previously        At 1PM02J, PLACE in PULL OUT dispatched EO reports 0A      all breakers on bus 144:
Service Bldg. chiller in pull out.
* ACB 1441
* ACB 1442
* ACB 1445RA
* ACB 1445XY
* ACB 1445ZW
* ACB 1445BC PZR HTR
* ACB 1445VU Check Bus lockout alarms NOT LIT
* 1-22-A1
* 1-22-A2 At 0PM01J, PLACE 0B WS pump in PTL.
At 0PM02J, PLACE 1B CNMT Chiller PTL.
At 1PM02J, OPEN all 480-volt LOW side breakers for bus 144.
* ACB 034R1
* ACB 034P1
* ACB 134X1
* ACB 134Y1
* ACB 134Z1
* ACB 034W1
* ACB 134V1
* PZR HTR GRP B (1PM05J)
* PZR HTR GRP c (1PM05J)
Page 3 of 5 SIM-611


DETERMINE ESF Bus 142 is
  *4. Energize bus 144 from bus 142 via  CLOSE Non-ESF to ESF crosstie SAT UNSAT N/A the crosstie breaker.              breaker:                      Comments:
* 1421 CUE:  Acknowledge as US that bus 144 is crosstied to bus Inform US that bus 144 is 142 and inform examinee    crosstied to bus 142.
that another operator will continue with the procedure.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME COMMENTS:
Page 4 of 5 SIM-611


energized:
SIMULATOR SETUP INSTRUCTIONS JPM NO: SIM-611 REQUIRED SIMULATOR MODE (S): Mode 3 IC.
 
MALFUNCTION #S:
o Bus 142 live light is LIT o Bus 142 voltage normal on 1EIAP086  SAT    UNSAT      N/A Comments: *3. Prepare to Cross tie ESF to Non-
: 1. Fault SAT 142-1 via IMF ED04A COMMENTS:
 
: 1. Perform actions of 1BwOA ELEC-4 through step 6.
ESF buses.
Page 5 of 5 SIM-611
 
CUE: (IF ASKED) Previously dispatched EO reports 0A Service Bldg. chiller in pull
 
out. Prepare to crosstie ESF and Non-ESF bus:
 
At 1PM02J, PLACE in PULL OUT all breakers on bus 144:
 
ACB 1441  ACB 1442  ACB 1445RA  ACB 1445XY  ACB 1445ZW  ACB 1445BC PZR HTR  ACB 1445VU
 
Check Bus lockout alarms NOT
 
LIT 1-22-A1  1-22-A2 At 0PM01J, PLACE 0B WS pump in PTL.
 
At 0PM02J, PLACE 1B CNMT Chiller PTL.
 
At 1PM02J , OPEN all 480-volt LOW side breakers for bus 144.
ACB 034R1  ACB 034P1  ACB 134X1  ACB 134Y1  ACB 134Z1  ACB 034W1  ACB 134V1  PZR HTR GRP B (1PM05J)  PZR HTR GRP c (1PM05J)
SAT    UNSAT      N/A Comments:
SIM-611 Page 4 of 5
*4. Energize bus 144 from bus 142 via the crosstie breaker.
 
CUE: Acknowledge as US that bus 144 is crosstied to bus
 
142 and inform examinee that another operator will continue with the
 
procedure.
CLOSE Non-ESF to ESF crosstie breaker:
 
1421 Inform US that bus 144 is
 
crosstied to bus 142.
 
SAT    UNSAT      N/A Comments:
CUE: THIS COMPLETES THIS JPM.
 
RECORD STOP TIME COMMENTS:
 
SIM-611 Page 5 of 5 SIMULATOR SETUP INSTRUCTIONS  
 
JPM NO: SIM-611  
 
REQUIRED SIMULATOR MODE (S): Mode 3 IC.
 
MALFUNCTION #'S:  
: 1. Fault SAT 142-1 via IMF ED04A COMMENTS:  
: 1. Perform actions of 1BwOA ELEC-4 through step 6.  
 
SIM-710 Page 1 of 5 TASK CONDITIONS:
: 1. You are the Unit 1 Assist NSO standing in for the Unit 1 NSO while he is on break.
: 2. Unit 1 is in mode 3, following a reac tor trip (reactor trip breakers are open).
 
INITIATING CUES:


TASK CONDITIONS:
: 1. You are the Unit 1 Assist NSO standing in for the Unit 1 NSO while he is on break.
: 2. Unit 1 is in mode 3, following a reactor trip (reactor trip breakers are open).
INITIATING CUES:
Respond to changing conditions on 1PM05J.
Respond to changing conditions on 1PM05J.
SIM-710 Page 2 of 5 TASK TITLE:
Page 1 of 5 SIM-710
Respond to a Source Range NI Failure


JPM No.: SIM-710 REV: TPO No.: 4D.OA-13 K&A No.: 015000A2.02 TASK No.: R-OA-053, Respond to a loss of Source K&A IMP: 3.1/3.5 Range Instrumentation  
TASK TITLE:  Respond to a Source Range NI Failure JPM No.:     SIM-710                                                       REV:
 
TPO No.:     4D.OA-13                                                     K&A No.:       015000A2.02 TASK No.:     R-OA-053, Respond to a loss of Source                         K&A IMP:       3.1/3.5 Range Instrumentation EXAMINEE:                                                                   RO SRO (Circle One)
EXAMINEE:
EVALUATOR:                                                                 DATE:
RO   SRO   (Circle One)  
The Examinee:         PASSED            this JPM.                         TIME STARTED:
 
FAILED                                               TIME FINISHED:
EVALUATOR:
JPM TIME:               MINUTES CRITICAL ELEMENTS:             (*) 2, 6, 9, 11                             APPROX COMPLETION TIME 15 MINUTES CRITICAL TIME:                 NA EVALUATION METHOD:                                                         LOCATION:
DATE:  
X PERFORM                                                       IN PLANT SIMULATE                                                   X SIMULATOR GENERAL  
 
The Examinee: PASSED            this JPM.
TIME STARTED:
 
FAILED TIME FINISHED:  
 
JPM TIME: MINUTES CRITICAL ELEMENTS:  
(*) 2, 6, 9, 11 APPROX COMPLETION TIME 15 MINUTES CRITICAL TIME:
NA EVALUATION METHOD:
LOCATION:
X   PERFORM       IN PLANT SIMULATE X   SIMULATOR  
 
GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. 1BwOA INST-1, Attachment C, Rev.
: 1. 1BwOA INST-1, Attachment C, Rev. 103, Nuclear Instrumentation Malfunction.
103, Nuclear Instrumentation Malfunction.  
MATERIALS:
: 1. 1BwOA INST-1, Attachment C, Rev. 103.
TASK STANDARDS:
: 1. Respond to a failed source range instrument.
TASK CONDITIONS:
: 1. You are the Unit 1 Assist NSO standing in for the Unit 1 NSO while he is on break.
: 2. Unit 1 is in mode 3, following a reactor trip (reactor trip breakers are open).
INITIATING CUES:
: 1. Respond to changing conditions on 1PM05J.
Page 2 of 5 SIM-710


MATERIALS:
RECORD START TIME Note: Give the examinee a few minutes to familiarize himself with 1PM05J conditions. Cue the simulator operator to insert the SR NI failure when ready.
: 1. 1BwOA INST-1, Attachment C, Rev. 103.
PERFORMANCE STEP                         STANDARD                   Circle applicable
 
: 1. Refer to 1BwOA INST-1, Attachment     Locate and Open 1BwOA INST-1      SAT UNSAT      N/A C                                     to Attachment C                  Comments:
TASK STANDARDS:
CUE:   After the examinee reports condition, tell them that the US is busy with a higher priority task and instructs the examinee to perform the appropriate procedure for the NI failure.
: 1. Respond to a failed source range instrument.
 
TASK CONDITIONS:
: 1. You are the Unit 1 Assist NSO standing in for the Unit 1 NSO while he is on break.
: 2. Unit 1 is in mode 3, following a reac tor trip (reactor trip breakers are open).
INITIATING CUES:
: 1. Respond to changing conditions on 1PM05J.
 
SIM-710 Page 3 of 5 RECORD START TIME Note: Give the examinee a few minutes to familiarize himself with 1PM05J conditions. Cue the simulator operator to insert the SR NI failure when ready.  
 
PERFORMANCE STEP STANDARD Circle applicable  
: 1. Refer to 1BwOA INST-1, Attachment C  
 
CUE: After the examinee reports condition, tell them that the US is busy with a higher priority task and instructs  
 
the examinee to perform  
 
the appropriate procedure  
 
for the NI failure.
After examinee locates procedure provide a copy.
After examinee locates procedure provide a copy.
As US, acknowledge procedure entry and E-plan eval. Direct the NSO to continue with actions of 1BwOA INST-1.
As US, acknowledge procedure entry and E-plan eval. Direct the NSO to continue with actions of 1BwOA INST-1.
Locate and Open 1BwOA INST-1 to Attachment C
: 2. Check if SR is required               Determines power level < P6.     SAT UNSAT      N/A CHECKS P6 permissive light   Comments:
 
SAT    UNSAT      N/A Comments: 2. Check if SR is required Determines power level < P6.
C HECKS P6 permissive light  
 
(1-BP-3.2) is LIT.
(1-BP-3.2) is LIT.
SAT    UNSAT      N/A Comments: *3. Re-align audio count rate channel.
  *3. Re-align audio count rate channel. Determine audio count rate is     SAT UNSAT      N/A selected to failed channel:      Comments:
Determine audio count rate is  
AT 1PM07J, selects SR N32 on Audio Count Rate Channel Selector.
 
: 4. Determines mode 3 actions.             DETERMINE unit is in mode 3       SAT UNSAT      N/A from cue and plant indications. Comments:
selected to failed channel:  
  *5   Performs required actions for SR       Bypass and Block N31 inputs:     SAT UNSAT      N/A failure.
 
* At 1PM07J, PLACE Level       Comments:
A T 1PM07J, selects SR N32 on Audio Count Rate Channel Selector.
Trip Switch for N31 in BYPASS.
SAT    UNSAT      N/A Comments: 4. Determines mode 3 actions.
* At 1PM07J, PLACE High Flux at Shutdown Switch for N31 in BLOCK Cue: When examinee indicates that
DETERMINE unit is in mode 3  
* At 1PM07J (inside N31 SR drawer must be opened, give              drawer), PLACE Two Phi cue that The Two Phi Meter has            Meter Test Switch for N31 in been placed in Test.                      TEST.
 
Page 3 of 5 SIM-710
from cue and plant indications.
: 6. Refer to Tech Specs.                 Refers to Tech Specs:              SAT UNSAT N/A Cue: US acknowledges that Tech      Informs US that Tech Specs may    Comments:
SAT    UNSAT      N/A Comments: *5 Performs required actions for SR  
Specs may be applicable and will     be applicable.
 
evaluate.
failure. 
Cue: (SRO only) If evaluator desires (SRO only) (If prompted) a tech spec evaluation by           Recognize no tech spec applies examinee, prompt them to             due to reactor trip breakers being determine proper Tech Spec entry. open. (rods are not capable of rod withdrwl)
 
CUE: THIS COMPLETES THIS JPM.
Cue: When examinee indicates that SR drawer must be opened, give cue that "The Two Phi Meter has
RECORD STOP TIME COMMENTS:
 
Page 4 of 5 SIM-710
been placed in Test".
Bypass and Block N31 inputs: At 1PM07J, PLACE Level Trip Switch for N31 in  
 
BYPASS. At 1PM07J, PLACE High Flux at Shutdown Switch for  
 
N31 in BLOCK At 1PM07J (inside N31 drawer), PLACE Two Phi Meter Test Switch for N31 in  
 
TEST. SAT    UNSAT      N/A Comments:
SIM-710 Page 4 of 5
: 6. Refer to Tech Specs. Cue: US acknowledges that Tech Specs may be applicable and will evaluate. Cue: (SRO only) If evaluator desires a tech spec evaluation by  
 
examinee, prompt them to determine proper Tech Spec entry.  


Refers to Tech Specs:
SIMULATOR SETUP INSTRUCTIONS JPM NO: SIM-710 REQUIRED SIMULATOR MODE (S): IC-9, Mode 3, RX startup in progress with SD banks withdrawn.
Informs US that Tech Specs may be applicable.
MALFUNCTION #S:
: 1. IMF NI03A COMMENTS:
: 1. Ensure audio count rate drawer is aligned to N31 prior to beginning JPM and volume level is raised to appropriate level to detect failure.
: 2. At examiner cue, fail SR N31 low.
Page 5 of 5 SIM-710


(SRO only) (If prompted)
TASK CONDITIONS:
Recognize no tech spec applies
: 1. You are the Unit 1 Assist NSO.
: 2. Both units are at full power INITIATING CUES:
: 1. Respond to annunciator 1-2-E4 CC SURGE TANK AUTO MAKE-UP ON.
Page 1 of 6 SIM-803


due to reactor trip breakers being
TASK TITLE:   Respond to a Component Cooling Surge Tank Level Drop JPM No.:     SIM-803                                               REV:         NRC 09-1 TPO No.:     4D.OA-10                                               K&A No.:     008000A2.02 TASK No.:     R-OA-027,   Respond to a CC system                   K&A IMP:     3.2/3.5 Malfunction.
 
EXAMINEE:                                                           RO SRO (Circle One)
open. (rods are not capable of rod
EVALUATOR:                                                           DATE:
 
The Examinee:         PASSED             this JPM.                   TIME STARTED:
withdrwl)
FAILED                                         TIME FINISHED:
SAT    UNSAT      N/A Comments: 
JPM TIME:             MINUTES CRITICAL ELEMENTS:             (*) 1a, 7                             APPROX COMPLETION TIME 18 MINUTES CRITICAL TIME:                 NA EVALUATION METHOD:                                                   LOCATION:
 
X PERFORM                                               IN PLANT SIMULATE                                             X SIMULATOR GENERAL  
CUE: THIS COMPLETES THIS JPM.
 
RECORD STOP TIME COMMENTS:
 
SIM-710 Page 5 of 5 SIMULATOR SETUP INSTRUCTIONS
 
JPM NO: SIM-710
 
REQUIRED SIMULATOR MODE (S): IC-9, Mode 3, RX startup in progress with SD banks withdrawn.
 
MALFUNCTION #'S:
: 1. IMF NI03A  COMMENTS:
: 1. Ensure audio count rate drawer is aligned to N31 prior to beginning JPM and volume level is raised to appropriate level to detect failure.
: 2. At examiner' cue, fail SR N31 low.
 
SIM-803 Page 1 of 6 TASK CONDITIONS:
: 1. You are the Unit 1 Assist NSO.
: 2. Both units are at full power
 
INITIATING CUES:
: 1. Respond to annunciator 1-2-E4 "CC SURGE TANK AUTO MAKE-UP ON".
SIM-803 Page 2 of 6
 
TASK TITLE: Respond to a Component Cooling Surge Tank Level Drop
 
JPM No.: SIM-803 REV: NRC 09-1 TPO No.: 4D.OA-10 K&A No.: 008000A2.02 TASK No.: R-OA-027, Respond to a CC system K&A IMP: 3.2/3.5 Malfunction.  
 
EXAMINEE:
RO   SRO   (Circle One)  
 
EVALUATOR:
DATE:  
 
The Examinee: PASSED           this JPM.
TIME STARTED:
 
FAILED TIME FINISHED:  
 
JPM TIME: MINUTES CRITICAL ELEMENTS:  
(*) 1a, 7 APPROX COMPLETION TIME 18 MINUTES CRITICAL TIME:
NA EVALUATION METHOD:
LOCATION:
X   PERFORM       IN PLANT SIMULATE X   SIMULATOR  
 
GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. 1BwOA PRI-6, Rev. 101, Component Cooling Malfunction.  
: 1. 1BwOA PRI-6, Rev. 101, Component Cooling Malfunction.
: 2. BwAR 1-2-E4, Rev. 1E3a, "CC SURGE TANK AUTO MAKE-UP ON".  
: 2. BwAR 1-2-E4, Rev. 1E3a, CC SURGE TANK AUTO MAKE-UP ON.
: 3. BwAR 1-2-A5, Rev. 8a, "
: 3. BwAR 1-2-A5, Rev. 8a, CC Surge Tank level high low MATERIALS:
CC Surge Tank level high low"
: 1. 1BwOA PRI-6, Rev. 101, Component Cooling Malfunction.
: 2. BwAR 1-2-E4, Rev. 1E3a, CC SURGE TANK AUTO MAKE-UP ON.
: 3. BwAR 1-2-A5, Rev. 8a, CC Surge Tank level high low TASK STANDARDS:
: 1. Respond to a loss of level in the Component Cooling System.
TASK CONDITIONS:
: 1. You are the Unit 1 Assist NSO.
: 2. Both units are at full power INITIATING CUES:
: 1. Respond to annunciator 1-2-E4 CC SURGE TANK AUTO MAKE-UP ON.
Page 2 of 6 SIM-803


MATERIALS:  
RECORD START TIME Note: When ready to start, cue the simulator operator to start the slow draining of the CC surge tank per the setup comments.
: 1. 1BwOA PRI-6, Rev. 101, Component Cooling Malfunction.  
PERFORMANCE STEP                          STANDARD                      Circle applicable
: 2. BwAR 1-2-E4, Rev. 1E3a, "CC SURGE TANK AUTO MAKE-UP ON".  
: 1. Refer to BwAR 1-2-E4                  Locate and Open BwAR 1-2-E4      SAT UNSAT        N/A Comments:
: 3. BwAR 1-2-A5, Rev. 8a, "
  *1a  Dispatch EO to open manual            DISPATCH an Operator to OPEN      SAT    UNSAT    N/A makeup isolation.                      1CC9454A(WM) and/or              Comments:
CC Surge Tank level high low"
Note: This step needs to be            1CC9454B(PW) performed if auto makeup is isolated, otherwise it is N/A.
: 2. Verify auto make-up occurs as          Verify Auto make-up occurs as    SAT UNSAT        N/A required                              required:                        Comments:
o  Verify 1CC183 opens at 50%,
closes at 55%
* Verify 1CC182 opens at 45%,
closes at 55%
: 3. Verify Immediate and subsequent
* VERIFY surge tank level rises SAT UNSAT        N/A operator actions                          while makeup in progress      Comments:
* Determine cause of make-up
* Refer to 1BwOA PRI-6
: 4. Enter 1BwOA PRI-6                      Locate and Open 1BwOA PRI-6:      SAT UNSAT        N/A Comments:
* Determine level is > 13%, but CUE:    After the examinee reports        not stable condition, tell them that the
* GO TO Attachment B US is busy with a higher priority task and instructs the examinee to perform the appropriate procedure for the CC leak.
After examinee locates procedure and goes to Attachment B, provide a copy of Attachment B As, US acknowledge procedure entry, and EP call
: 5. Check CC Surge Tank Level dropping    CHECK CC Surge Tank Level        SAT UNSAT        N/A and auto make up occurring as          Decreasing and Auto Make-up      Comments:
necessary                              occurring as necessary:
o  At < 45% level, 1CC182 OPEN from PW
* At < 50% level, 1CC183 OPEN from WM Page 3 of 6 SIM-803
: 6. Check Seal Water HX for CC System      CHECK Seal Water HX for out-     SAT UNSAT N/A out-leakage                            leakage source as follows:        Comments:
* DETERMINE Seal Water HX Note:  If examinee isolates the          is not leaking by evaluating Seal Water HX, conclude            no unexpected VCT level the JPM                            increase
  *7. Locate the CC System out-leakage      Dispatch operators to locate and  SAT UNSAT N/A source and isolate                    isolate the out-leakage source as Comments:
follows:
CUE:    If contacted as radwaste operator about sump          o    Contact Rad Waste for sump levels, tell examinee that        indication no sump levels changes        o    CC HXs are noted.                   o    SFP HXs
* GW Compressor HXs CUE:   As local operators            o    BR evaporators dispatched report that it    o    PD pp oil clrs appears that the relief valve o    CC System reliefs (0CC9425A) on the 0A          o    RCP motor brg oil clrs Waste Gas Compressor HX      o    Cnmt pen clg coils is lifting and wont reseat  o    CC rad monitors (audible flow noise and      o    HRSS sample clrs leakage from relief valve    o    Aux Bldg gen area body).                       o    Isolate CC System between units per BwOP CC-8 When directed to isolate CC from the 0A GW            Determine isolation points for CC compressor, ask for          leakage from P&ID M-66 sheet isolation valve numbers.      4D, valves 0CC9480A and After being told 0CC9480A    0CC9480B.
and B need to be closed, cue the simulator operator to stop the leak, and report the valves closed and the flow noise has stopped.
: 8. Monitor CC Surge Tank level and        MONITOR CC Surge Tank Level      SAT UNSAT N/A determine leak is isolated            and DETERMINE leak is isolated:  Comments:
* Observe level indications steady on 1PM06J o    SER pt. cleared CUE:    If SER not working cue that  o    Annunciator 1-2-E4 and 1                the pt. (1434) is clear            A5 cleared
* Auto Make-up stops As US acknowledge            o    Inform US of leak location location and isolation of          and successful isolation leak.
Tell examinee another NSO will complete 1BwOA PRI-6.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME COMMENTS:
Page 4 of 6 SIM-803


TASK STANDARDS:  
TASK CONDITIONS:
: 1. Respond to a loss of level in the Component Cooling System.
: 3. You are the Unit 1 Assist NSO.
: 4. Both units are at full power INITIATING CUES:
: 2. Respond to annunciator 1-2-E4 CC SURGE TANK AUTO MAKE-UP ON.
Page 5 of 6 SIM-803


TASK CONDITIONS:
SIMULATOR SETUP INSTRUCTIONS JPM NO: N-082 REQUIRED SIMULATOR MODE (S): 100% power steady state MALFUNCTION #S: N/A COMMENTS:
: 1. You are the Unit 1 Assist NSO.
: 1.     Use IRF CC15 to drain CC surge tank to 51%, then secure draining.
: 2. Both units are at full power
: 2.     When JPM starts, drain CC Surge tank by opening CC drain valve using IRF CC15. Do not allow level to approach 13%.
 
: 3.     When dispatched to check GW compressor, report relief lifting on 0A GW compressor and will not reseat.
INITIATING CUES:
: 4.     IF asked to isolate relief 0CC9425A, ask for valve numbers. When given 0CC9480A and B, shut the drain valve (IRF CC15 0), and report the relief is isolated.
: 1. Respond to annunciator 1-2-E4 "CC SURGE TANK AUTO MAKE-UP ON".
: 5.     Use Monitored Parameter CCMSTKS to adjust CC surge tank mass (1500)
 
Page 6 of 6 SIM-803
SIM-803 Page 3 of 6 RECORD START TIME Note:  When ready to start, cue the simulator operator to start the slow draining of the CC surge tank per the
 
setup comments.
 
PERFORMANCE STEP STANDARD Circle applicable
: 1. Refer to BwAR 1-2-E4
 
Locate and Open BwAR 1-2-E4
 
SAT    UNSAT      N/A Comments: *1a Dispatch EO to open manual makeup isolation.
Note: This step needs to be performed if auto makeup is isolated, otherwise it is N/A.
DISPATCH an Operator to OPEN
 
1CC9454A(WM) and/or
 
1CC9454B(PW)
SAT    UNSAT      N/A Comments: 2. Verify auto make-up occurs as required  Verify Auto make-up occurs as
 
required:
 
Verify 1CC183 opens at 50%,
closes at 55%  Verify 1CC182 opens at 45%, closes at 55%
SAT    UNSAT      N/A Comments: 3. Verify Immediate and subsequent operator actions
 
VERIFY surge tank level rises while makeup in progress  Determine cause of make-up  Refer to 1BwOA PRI-6 SAT    UNSAT      N/A Comments: 4. Enter 1BwOA PRI-6
 
CUE: After the examinee reports condition, tell them that the US is busy with a higher priority task and instructs
 
the examinee to perform
 
the appropriate procedure
 
for the CC leak.
After examinee locates procedure and goes to Attachment B, provide a copy of Attachment B
 
As, US acknowledge procedure entry, and EP
 
call  Locate and Open 1BwOA PRI-6:
 
Determine level is > 13%, but not stable  GO TO Attachment B SAT    UNSAT      N/A Comments: 5. Check CC Surge Tank Level dropping and auto make up occurring as
 
necessary
 
CHECK CC Surge Tank Level
 
Decreasing and Auto Make-up
 
occurring as necessary:
 
At < 45% level, 1CC182 OPEN from PW  At < 50% level, 1CC183 OPEN from WM SAT    UNSAT      N/A Comments:
SIM-803 Page 4 of 6
: 6. Check Seal Water HX for CC System out-leakage
 
Note: If examinee isolates the Seal Water HX, conclude
 
the JPM  CHECK Seal Water HX for out-
 
leakage source as follows:
 
DETERMINE Seal Water HX is not leaking by evaluating
 
no unexpected VCT level
 
increase  SAT    UNSAT      N/A Comments: *7. Locate the CC System out-leakage source and isolate
 
CUE: If contacted as radwaste operator about sump levels, tell examinee that no sump levels changes
 
are noted.
 
CUE: As local operators dispatched report that it appears that the relief valve (0CC9425A) on the 0A Waste Gas Compressor HX is lifting and won't reseat (audible flow noise and leakage from relief valve body).
 
When directed to isolate CC from the 0A GW
 
compressor, ask for isolation valve numbers. 
 
After being told 0CC9480A
 
and B need to be closed, cue the simulator operator
 
to stop the leak, and report the valves closed and the flow noise has stopped.
 
Dispatch operators to locate and
 
isolate the out-leakage source as follows:
Contact Rad Waste for sump
 
indication  CC HXs  SFP HXs  GW Compressor HXs  BR evaporators  PD pp oil clrs  CC System reliefs  RCP motor brg oil clrs  Cnmt pen clg coils  CC rad monitors  HRSS sample clrs  Aux Bldg gen area  Isolate CC System between
 
units per BwOP CC-8
 
Determine isolation points for CC
 
leakage from P&ID M-66 sheet
 
4D, valves 0CC9480A and
 
0CC9480B.
SAT    UNSAT      N/A Comments: 8. Monitor CC Surge Tank level and determine leak is isolated
 
CUE: If SER not working cue that the pt. (1434) is clear
 
As US acknowledge location and isolation of leak. Tell examinee another NSO will complete 1BwOA PRI-
: 6. MONITOR CC Surge Tank Level
 
and DETERMINE leak is isolated:
 
Observe level indications steady on 1PM06J  SER pt. cleared  Annunciator 1-2-E4 and 1 A5 cleared  Auto Make-up stops  Inform US of leak location
 
and successful isolation SAT    UNSAT      N/A Comments:
CUE: THIS COMPLETES THIS JPM.
 
RECORD STOP TIME COMMENTS:
 
SIM-803 Page 5 of 6
 
TASK CONDITIONS:
: 3. You are the Unit 1 Assist NSO.
: 4. Both units are at full power
 
INITIATING CUES:
: 2. Respond to annunciator 1-2-E4 "CC SURGE TANK AUTO MAKE-UP ON".
 
SIM-803 Page 6 of 6 SIMULATOR SETUP INSTRUCTIONS  
 
JPM NO: N-082  
 
REQUIRED SIMULATOR MODE (S
): 100% power steady state  
 
MALFUNCTION #'S: N/A  
 
COMMENTS:  
: 1. Use IRF CC15 to drain CC surge tank to 51%, then secure draining.  
: 2. When JPM starts, drain CC Surge tank by opening CC drain valve using IRF CC15. Do not allow level to approach 13%.  
: 3. When dispatched to check GW compressor, report relief lifting on 0A GW compressor and will not reseat.  
: 4. IF asked to isolate relief 0CC9425A, ask for va lve numbers. When given 0CC9480A and B, shut the drain valve (IRF CC15 0
), and report the relief is isolated.  
: 5. Use Monitored Parameter CCMSTKS to adjust CC surge tank mass (1500)
IP-200 1 TASK CONDITIONS:
: 1. You are an extra NSO.
: 2. Unit 1/2 NSOs are responding to a steamline break inside containment after a safety injection.
: 3. Conditions have deteriorated to the point that an entry into 1/2BwFR-H.1, Loss of Secondary Heat Sink, has been made.
 
INITIATING CUES:


TASK CONDITIONS:
: 1. You are an extra NSO.
: 2. Unit 1/2 NSOs are responding to a steamline break inside containment after a safety injection.
: 3. Conditions have deteriorated to the point that an entry into 1/2BwFR-H.1, Loss of Secondary Heat Sink, has been made.
INITIATING CUES:
The Unit Supervisor has directed you to perform the actions of 1/2BwFR-H.1 step 7.f.
The Unit Supervisor has directed you to perform the actions of 1/2BwFR-H.1 step 7.f.
IP-200 2 TASK TITLE: Perform Local Reset of Feedwater Isolation Signal JPM No.: IP-200 REV: NRC 09-1 TPO No.: 4.D.EF-03 K&A No.: 013000A4.02 TASK No.: R-EF-003, Reset the Engineered K&A IMP: 4.1/4.0 Safety Features 
1 IP-200


EXAMINEE:
TASK TITLE: Perform Local Reset of Feedwater Isolation Signal JPM No.:    IP-200                                              REV:          NRC 09-1 TPO No.:    4.D.EF-03                                            K&A No.:      013000A4.02 TASK No.:  R-EF-003, Reset the Engineered                      K&A IMP:      4.1/4.0 Safety Features EXAMINEE:                                                       RO SRO (Circle One)
RO   SRO (Circle One)  
EVALUATOR:                                                       DATE:
 
The Examinee:       PASSED         this JPM.                   TIME STARTED:
EVALUATOR:
FAILED                                       TIME FINISHED:
DATE:  
JPM TIME:               MINUTES CRITICAL ELEMENTS:         (*) 3, 4                             APPROX COMPLETION TIME: 17 MINUTES CRITICAL TIME:             NA EVALUATION METHOD:                                               LOCATION:
 
PERFORM                                           X IN PLANT X SIMULATE                                             SIMULATOR GENERAL  
The Examinee: PASSED this JPM.
TIME STARTED:
FAILED TIME FINISHED:  
 
JPM TIME: MINUTES CRITICAL ELEMENTS:  
(*) 3, 4 APPROX COMPLETION TIME:
17 MINUTES CRITICAL TIME:
NA EVALUATION METHOD:
LOCATION:
PERFORM   X   IN PLANT X   SIMULATE SIMULATOR  
 
GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. 1/2BwFR-H.1, Rev. 200, WOG 2, Response to Loss of Secondary Heat Sink MATERIALS:  
: 1. 1/2BwFR-H.1, Rev. 200, WOG 2, Response to Loss of Secondary Heat Sink MATERIALS:
: 1. Keys for 1/2PA27J and 1/2PA28J  
: 1. Keys for 1/2PA27J and 1/2PA28J
: 2. Laser pointer (recommended)  
: 2. Laser pointer (recommended)
: 3. 1/2BwFR-H.1, step 7 TASK STANDARDS:  
: 3. 1/2BwFR-H.1, step 7 TASK STANDARDS:
: 1. Correctly RESET Feedwater Isolation Signal as required by 1/2BwFR-H.1, step 7.  
: 1. Correctly RESET Feedwater Isolation Signal as required by 1/2BwFR-H.1, step 7.
 
TASK CONDITIONS:
TASK CONDITIONS:  
: 1. You are an extra NSO.
: 1. You are an extra NSO.  
: 2. Unit 1/2 NSOs are responding to a steamline break inside containment after a safety injection.
: 2. Unit 1/2 NSOs are responding to a steamline break inside containment after a safety injection.  
: 3. Conditions have deteriorated to the point that an entry into 1/2BwFR-H.1, Loss of Secondary Heat Sink, has been made.
: 3. Conditions have deteriorated to the point that an entry into 1/2BwFR-H.1, Loss of Secondary Heat Sink, has been made.  
INITIATING CUES:
 
: 1. The Unit Supervisor has directed you to perform the actions of 1/2BwFR-H.1 step 7.f.
INITIATING CUES:  
2 IP-200
: 1. The Unit Supervisor has directed you to perform the actions of 1/2BwFR-H.1 step 7.f.  
 
IP-200 3 RECORD START TIME Note: Prompt the use of a laser pointer to identify components located inside electrical cabinets.
 
PERFORMANCE STEP STANDARD Circle applicable
: 1. Refer to 1/2BwFR H.1, step 7.f.
CUE: Hand a copy of 1/2BwFR-H.1, step 7 to the
 
student. Refer to 1/2BwFR H.1, step


7.f.
RECORD START TIME Note:  Prompt the use of a laser pointer to identify components located inside electrical cabinets.
SAT     UNSAT     N/A  
PERFORMANCE STEP                        STANDARD                  Circle applicable
 
: 1. Refer to 1/2BwFR H.1, step 7.f. Refer to 1/2BwFR H.1, step    SAT UNSAT           N/A 7.f.                          Comments:
Comments: 2. Obtain keys for and locate Safeguards Cabinets 1/2PA27J  
CUE: Hand a copy of 1/2BwFR-H.1, step 7 to the student.
 
: 2. Obtain keys for and locate         Obtains keys for and proceed  SAT UNSAT          N/A Safeguards Cabinets 1/2PA27J       to Safeguards Cabinets        Comments:
and 1/2PA28J.  
and 1/2PA28J.                     1/2PA27J and 1/2PA28J:
 
* Obtain keys for Cabinets 1/2PA27J and 1/2PA28J from the Shift Office.
Obtains keys for and proceed
* Proceed to 1/2PA27J/
 
to Safeguards Cabinets
 
1/2PA27J and 1/2PA28J:  
 
Obtain keys for Cabinets 1/2PA27J and 1/2PA28J from the Shift Office. Proceed to 1/2PA27J/
1/2PA28J (U-1/2 AEER).
1/2PA28J (U-1/2 AEER).
SAT    UNSAT      N/A Comments:
Note:   JPM steps 3 and 4 may be performed in any order. Prompt use of laser pointer vs. breaking the plane of cabinet.
Note: JPM steps 3 and 4 may be performed in any order. Prompt use of laser pointer vs. breaking the plane of cabinet.  
  *3. De-energize Feedwater Isolation   At 1/2PA27J, de-energize      SAT UNSAT          N/A Relays by removing fuses at       Feedwater Isolation Relays by Comments:
*3. De-energize Feedwater Isolation Relays by removing fuses at 1/2PA27J.  
1/2PA27J.                         removing:
 
CUE: Fuse FU-24 is removed.
CUE: Fuse FU-24 is removed.
* Fuse FU-24.
Fuse FU-27 is removed.
Fuse FU-27 is removed.
At 1/2PA27J, de-energize
* Fuse FU-27.
 
  *4. De-energize Feedwater Isolation   At 1/2PA28J, de-energize      SAT UNSAT          N/A Relays by removing fuses at       Feedwater Isolation Relays by Comments:
Feedwater Isolation Relays by
1/2PA28J.                         removing:
 
removing:
 
Fuse FU-24. Fuse FU-27.
SAT    UNSAT      N/A Comments: *4. De-energize Feedwater Isolation Relays by removing fuses at  
 
1/2PA28J.  
 
CUE: Fuse FU-24 is removed.
CUE: Fuse FU-24 is removed.
* Fuse FU-24.
Fuse FU-27 is removed.
Fuse FU-27 is removed.
At 1/2PA28J, de-energize
* Fuse FU-27.
3 IP-200


Feedwater Isolation Relays by
Note:  If the student elects to contact the Control Room to verify FW ISOL ACTD relay lights NOT LIT, then provide the following cue (otherwise N/A JPM step 5):
CUE:The US reports the FW ISOL ACTD relay lights are NOT LIT.
CUE:This completes the JPM.
: 5. Verify FW ISOL ACTD relay lights    VERIFY the FW ISOL ACTD        SAT UNSAT      N/A
      - NOT LIT.                          relay lights are NOT LIT as    Comments:
follows:
CUE: The FW ISOL ACTD relay
* At 1/2PM06J, observe FW lights are NOT LIT.              ISOL ACTD relay lights NOT LIT.
CUE: As US acknowledge
* Report completion of step completion of step 7.f.          7.f of 1/2BwFR H.1.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME COMMENTS:
4 IP-200


removing:  
SIMULATOR SETUP INSTRUCTIONS JPM NO: IP-200 REQUIRED SIMULATOR MODE (S): N/A In-plant.
MALFUNCTION #S: N/A COMMENTS:
5 IP-200


Fuse FU-24. Fuse FU-27.
TASK CONDITIONS:
SAT    UNSAT      N/A Comments:
: 1. You are an extra NSO.
IP-200 4Note: If the student elects to contact the Control Room to verify "FW ISOL ACTD" relay lights NOT LIT, then provide the following cue (otherwise N/A JPM step 5):
: 2. Unit 1/2 has just tripped in conjunction with an electrical fire in Unit 1/2 Electrical Equipment Room.
CUE: The US reports the FW ISOL ACTD relay lights are NOT LIT.
: 3. 1/2A AF pump is unavailable for operation due to maintenance.
CUE: This completes the JPM.
: 4. 1/2B AF pump did not auto start, nor will it manually start with the MCR switch or the RSP switch.
: 5. Verify FW ISOL ACTD relay lights
: 5. 1/2B AF pump MCR indications are considered unreliable due to the fire.
- NOT LIT.
: 6. Another EO is available to monitor the 1/2B AF pump governor linkage during the startup.
 
INITIATING CUES:
CUE: The FW ISOL ACTD relay lights are NOT LIT.
 
CUE: As US acknowledge completion of step 7.f.
VERIFY the FW ISOL ACTD relay lights are NOT LIT as
 
follows:
 
At 1/2PM06J, observe FW ISOL ACTD relay lights
 
NOT LIT. Report completion of step 7.f of 1/2BwFR H.1.
SAT    UNSAT      N/A Comments:  CUE: THIS COMPLETES THIS JPM.
 
RECORD STOP TIME COMMENTS:
 
IP-200 5 SIMULATOR SETUP INSTRUCTIONS
 
JPM NO: IP-200
 
REQUIRED SIMULATOR MODE (S):  N/A In-plant.
 
MALFUNCTION #'S:  N/A
 
COMMENTS:
 
IP-410S 1 TASK CONDITIONS:  
: 1. You are an extra NSO.  
: 2. Unit 1/2 has just tripped in conjunction with an electrical fire in Unit 1/2 Electrical Equipment Room. 3. 1/2A AF pump is unavailable for operation due to maintenance.  
: 4. 1/2B AF pump did not auto start, nor will it manually start with the MCR switch or the RSP switch. 5. 1/2B AF pump MCR indications are considered unreliable due to the fire.  
: 6. Another EO is available to monitor the 1/
2B AF pump governor linkage during the startup.
INITIATING CUES:  
: 1. The US has directed you to perform a local emergency start of the 1/2B AF pump at 1/2AF01J per BwOP AF-7. All Prerequisites, Precautions, and Limitations and Actions have been met, and steps 1-8 are complete.
: 1. The US has directed you to perform a local emergency start of the 1/2B AF pump at 1/2AF01J per BwOP AF-7. All Prerequisites, Precautions, and Limitations and Actions have been met, and steps 1-8 are complete.
IP-410S 2  TASK TITLE:
1 IP-410S
Local Start of 1/2B AF Pump JPM No.: IP-410S REV:  TPO No.: 4.C.AF-02 K&A No.: 061000A2.04 TASK No.: R-AF-012, Operate the diesel driven K&A IMP: 3.4/3.8 Auxiliary Feedwater Pumps


EXAMINEE:
TASK TITLE: Local Start of 1/2B AF Pump JPM No.:    IP-410S                                              REV:
RO   SRO (Circle One)  
TPO No.:    4.C.AF-02                                            K&A No.:          061000A2.04 TASK No.:  R-AF-012, Operate the diesel driven                  K&A IMP:          3.4/3.8 Auxiliary Feedwater Pumps EXAMINEE:                                                         RO SRO (Circle One)
 
EVALUATOR:                                                       DATE:
EVALUATOR:
The Examinee:       PASSED           this JPM.                   TIME STARTED:
DATE:  
FAILED                                       TIME FINISHED:
 
JPM TIME:                     MINUTES CRITICAL ELEMENTS:         (*) 4, 8                               APPROX COMPLETION TIME: 28 MINUTES CRITICAL TIME:             NA EVALUATION METHOD:                                               LOCATION:
The Examinee: PASSED this JPM.
PERFORM                                             X IN PLANT X SIMULATE                                               SIMULATOR GENERAL  
TIME STARTED:
FAILED TIME FINISHED:  
 
JPM TIME: MINUTES CRITICAL ELEMENTS:  
(*) 4, 8 APPROX COMPLETION TIME:
28 MINUTES CRITICAL TIME:
NA EVALUATION METHOD:
LOCATION:
PERFORM   X   IN PLANT X   SIMULATE SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. BwOP AF-7, Rev. 32, Auxiliary Feedwater Pump B (Diesel) Startup on Recirc  
: 1. BwOP AF-7, Rev. 32, Auxiliary Feedwater Pump B (Diesel) Startup on Recirc
: 2. BwOP AF-7T1, Rev. 5, Diesel Driven Auxiliary Feedwater Pump Operating Log MATERIALS:  
: 2. BwOP AF-7T1, Rev. 5, Diesel Driven Auxiliary Feedwater Pump Operating Log MATERIALS:
: 1. BwOP AF-7  
: 1. BwOP AF-7
: 2. BwOP AF-7T1 TASK STANDARDS:  
: 2. BwOP AF-7T1 TASK STANDARDS:
: 1. Perform a local emergency start of 1/2B AF pump.
: 1. Perform a local emergency start of 1/2B AF pump.
TASK CONDITIONS:  
TASK CONDITIONS:
: 1. You are an extra NSO.  
: 1. You are an extra NSO.
: 2. Unit 1/2 has just tripped in conjunction with an electrical fire in Unit 1/2 Aux Electrical Equipment Room. 3. 1/2A AF pump is unavailable for operation due to maintenance.  
: 2. Unit 1/2 has just tripped in conjunction with an electrical fire in Unit 1/2 Aux Electrical Equipment Room.
: 4. 1/2B AF pump did not auto start, nor will it manually start with the MCR switch or the RSP switch. 5. 1/2B AF pump MCR indications are considered unreliable due to the fire.  
: 3. 1/2A AF pump is unavailable for operation due to maintenance.
: 6. Another EO is available to monitor the 1/
: 4. 1/2B AF pump did not auto start, nor will it manually start with the MCR switch or the RSP switch.
2B AF pump governor linkage during the startup.  
: 5. 1/2B AF pump MCR indications are considered unreliable due to the fire.
 
: 6. Another EO is available to monitor the 1/2B AF pump governor linkage during the startup.
INITIATING CUES:  
INITIATING CUES:
: 1. The US has directed you to perform a local emergency start of the 1/2B AF pump at 1/2AF01J per BwOP AF-7. All Prerequisites, Precautions, and Limitations and Actions have been met, and steps 1-8 are complete.
: 1. The US has directed you to perform a local emergency start of the 1/2B AF pump at 1/2AF01J per BwOP AF-7. All Prerequisites, Precautions, and Limitations and Actions have been met, and steps 1-8 are complete.
: 2. Report status of 1/2B AF pump to US after local start.  
: 2. Report status of 1/2B AF pump to US after local start.
 
2 IP-410S
IP-410S 3 RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable
: 1. Refer to BwOP AF-7.
CUE: Give a marked up copy of BwOP AF-7 to the student. Locate and open BwOP AF-7.
SAT    UNSAT      N/A Comments: 2. Perform actions at 1/2AF01J.
 
CUE: Reset pushbutton has been depressed.


Select Switch is in Auto.  
RECORD START TIME PERFORMANCE STEP                          STANDARD                  Circle applicable
 
: 1. Refer to BwOP AF-7.                  Locate and open BwOP AF-7.      SAT UNSAT      N/A Comments:
Engine Ready light is lit.
CUE: Give a marked up copy of BwOP AF-7 to the student.
: 2. Perform actions at 1/2AF01J.        Perform the following at        SAT UNSAT      N/A 1/2AF01J:                        Comments:
CUE: Reset pushbutton has
* PUSH the Reset been depressed.                Pushbutton to clear circuit.
* VERIFY the Select Switch Select Switch is in Auto.      is in AUTO position.
* VERIFY Engine Ready Engine Ready light is lit.      light is LIT.
Governor switch is off.
Governor switch is off.
Perform the following at 1/2AF01J:
* VERIFY Diesel Governor Switch is in OFF position.
 
: 3. Verify the Air Box Trip is reset. VERIFY the Air Box Trip is      SAT UNSAT      N/A Reset as follows:                Comments:
PUSH the Reset Pushbutton to clear circuit. VERIFY the Select Switch is in AUTO position. VERIFY "Engine Ready" light is LIT. VERIFY Diesel Governor Switch is in OFF position.
SAT    UNSAT      N/A Comments: 3. Verify the Air Box Trip is reset.
CUE: Air Box Trip annunciator is not lit.
CUE: Air Box Trip annunciator is not lit.
Another EO reports Air
* CHECK AIR BOX TRIP annunciator NOT LIT.
 
Another EO reports Air          - OR -
Box Trip lever is in
Box Trip lever is in
 
* Air Box Trip Lever (on normal position, limit          back side of engine) in switch is made up.              Normal position.
normal position, limit switch is made up.
  *4. Start Lube Oil systems.             START Lube Oil Auxiliary        SAT UNSAT      N/A Systems as follows at the local  Comments:
VERIFY the Air Box Trip is
control panel:
 
CUE: Gear box lube oil pump
Reset as follows:
* Aux FW Pp 1/2B Gear Box control switch is in start. Lube Oil Pp, 1/2AF01PB-C.
 
CHECK "AIR BOX TRIP" annunciator NOT LIT.  
- OR - Air Box Trip Lever (on back side of engine) in  
 
Normal position.
SAT    UNSAT      N/A Comments: *4. Start Lube Oil systems.  
 
CUE: Gear box lube oil pump control switch is in start.
Aux lube oil pump control switch is in start.
Aux lube oil pump control switch is in start.
Lube Oil within
* Aux FW Pp 1/2B Lube Oil Lube Oil within                Pp, 1/2AF01PB-A sightglass.
 
VERIFY Lube Oil inventory After the student locates      in pump sump is within inlet and outlet pressure      sightglass.
sightglass.
gages, indicate that the inlet is 28 psig, and the      VERIFY Lube Oil Filter outlet is 28 psig.              Differential Pressure is < 4 psid.
 
: 5. Verify/place VC in M/U mode per     Verify/place VC in M/U mode      SAT UNSAT      N/A BwOP VC-5, at SM discretion.         per BwOP VC-5, at SM            Comments:
After the student locates inlet and outlet pressure gages, indicate that the
discretion.
 
inlet is 28 psig, and the
 
outlet is 28 psig.
START Lube Oil Auxiliary
 
Systems as follows at the local
 
control panel:
 
Aux FW Pp 1/2B Gear Box Lube Oil Pp, 1/2AF01PB-C. Aux FW Pp 1/2B Lube Oil Pp, 1/2AF01PB-A VERIFY Lube Oil inventory  
 
in pump sump is within  
 
sightglass.
VERIFY Lube Oil Filter Differential Pressure is < 4  
 
psid. SAT    UNSAT      N/A Comments: 5. Verify/place VC in M/U mode per BwOP VC-5, at SM discretion.  
 
CUE: Another operator has performed BwOP VC-5.
CUE: Another operator has performed BwOP VC-5.
Verify/place VC in M/U mode
3 IP-410S
: 6. Align AF system discharge          ALIGN 1/2B AF pump                SAT UNSAT N/A flowpath.                          discharge flowpath in            Comments:
accordance with US direction:
* Contact US to determine if CUE: As US, if asked, direct          CLOSURE of B Train that step 17 not be            1/2AF013s or 1/2AF004B performed.                      will be necessary.
: 7. Start 1/2B AF pump locally.        START 1/2B AF Pump locally        SAT UNSAT N/A at 1/2AF01J as follows:          Comments:
CUE: Per task conditions, an          Verify personnel in position EO is standing by.              at front of diesel to monitor governor linkage during start.
CUE: Engine start switch is in
* PLACE the Engine Start Manual and the Ready          Control Switch to to Start light is not lit. MANUAL.
Start pushbutton is being depressed and held.
THE ENGINE DOES NOT
* DEPRESS and HOLD the CRANK                          START pushbutton.
VERIFY Engine Starting Engine starting light is        Light indicates starting NOT lit.                        sequence is in process.
VERIFY Engine Running Engine running light is        Light is ILLUMINATED NOT lit.                        when speed indicates 350 RPM.
Start pushbutton is released.                  o  RELEASE the START pushbutton.
Alternate Battery Bank is Selected
* Select the Alternate battery bank Reset Pushbutton is Depressed.
* Push Reset Pushbutton Start pushbutton is being depressed and
* DEPRESS and HOLD the held.                          START pushbutton.
THE ENGINE STILL
* Report to US failure of DOES NOT CRANK                  1/2B AF Pump to start locally 4
IP-410S


per BwOP VC-5, at SM
  *8. Start 1/2B AF pump from                                      SAT UNSAT N/A 2AF03J.                          Perform the following:      Comments:
CUE: US instructs you to start the 1/2B AF pump from 1/2AF03J using the START WITH BYPASS hand switch position    o Contacts additional EO to Position.                  inspect 1/2B AF pump during start.
* At 1/2AF01J, ensures Engine Selector Switch is in AUTO by observation
* At 1/2AF03J, places 1/2HS-AF157 in START WITH BYPASS position.
* At 1/2AF01J, verifies Additional EO reports      RUNNING light is LIT at 1/2B AF pump has            1/2HS-AF157 started RUNNING light is LIT
: 9. CUE:
* Reports to US successful  SAT UNSAT N/A start of 1/2B AF pump. Comments:
Another EO will complete BwOP AF-7 and take over monitoring the 1/2B AF pump.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME COMMENTS:
5 IP-410S


discretion.
SIMULATOR/ SETUP INSTRUCTIONS JPM NO: IP-410S MARK UP PROCEDURE BwOP AF-7 WITH APPROPRIATE UNIT DESIGNATORS REQUIRED SIMULATOR MODE (S): N/A, IN PLANT MALFUNCTION #S: N/A COMMENTS:
6 IP-410S


SAT    UNSAT      N/A Comments:
TASK CONDITIONS:
IP-410S 4 6. Align AF system discharge flowpath.
: 1. You are an extra NSO.
 
: 2. Unit 1/2 has just tripped in conjunction with an electrical fire in Unit 1/2 Electrical Equipment Room.
CUE: As US, if asked, direct that step 17 not be performed.
: 3. 1/2A AF pump is unavailable for operation due to maintenance.
ALIGN 1/2B AF pump discharge flowpath in
: 4. 1/2B AF pump did not auto start, nor will it manually start with the MCR switch or the RSP switch.
 
: 5. 1/2B AF pump MCR indications are considered unreliable due to the fire.
accordance with US direction:
: 6. Another EO is available to monitor the 1/2B AF pump governor linkage during the startup.
 
INITIATING CUES:
Contact US to determine if CLOSURE of B Train
 
1/2AF013s or 1/2AF004B
 
will be necessary.
SAT    UNSAT      N/A Comments: 7. Start 1/2B AF pump locally.
 
CUE: Per task conditions, an EO is standing by.
 
CUE: Engine start switch is in Manual and the 'Ready to Start light' is not lit.
 
Start pushbutton is
 
being depressed and held.
THE ENGINE DOES NOT CRANK Engine starting light is
 
NOT lit. Engine running light is
 
NOT lit.
Start pushbutton is
 
released.
 
Alternate Battery Bank is
 
Selected
 
Reset Pushbutton is
 
Depressed.
 
Start pushbutton is being depressed and
 
held.
 
THE ENGINE STILL
 
DOES NOT CRANK START 1/2B AF Pump locally at 1/2AF01J as follows:
 
Verify personnel in position at front of diesel to monitor
 
governor linkage during
 
start. PLACE the Engine Start Control Switch to MANUAL. 
 
DEPRESS and HOLD the START pushbutton.
VERIFY Engine Starting Light indicates starting
 
sequence is in process. VERIFY Engine Running Light is ILLUMINATED
 
when speed indicates 350
 
RPM.
o RELEASE the START pushbutton.
Select the Alternate battery bank  Push Reset Pushbutton
 
DEPRESS and HOLD the START pushbutton.
 
Report to US failure of 1/2B AF Pump to start
 
locally SAT    UNSAT      N/A Comments:
IP-410S 5 *8. Start 1/2B AF pump from 2AF03J.
CUE: US instructs you to start the 1/2B AF pump from
 
1/2AF03J using the
 
START WITH BYPASS hand switch position
 
Position.
 
Additional EO reports 1/2B AF pump has
 
started RUNNING light is LIT
 
Perform the following:
 
o Contacts additional EO to inspect 1/2B AF pump during start.
At 1/2AF01J, ensures Engine Selector Switch is in AUTO by observation .
At 1/2AF03J, places 1/2HS-AF157 in START WITH BYPASS position.
 
At 1/2AF01J, verifies RUNNING light is LIT at 1/2HS-AF157 SAT    UNSAT      N/A
 
Comments: 9. CUE:  Another EO will complete BwOP AF-7
 
and take over monitoring
 
the 1/2B AF pump.
Reports to US successful start of 1/2B AF pump.
 
SAT    UNSAT      N/A
 
Comments:
CUE: THIS COMPLETES THIS JPM.
 
RECORD STOP TIME COMMENTS:
 
IP-410S 6 SIMULATOR/ SETUP INSTRUCTIONS
 
JPM NO: IP-410S
 
MARK UP PROCEDURE BwOP AF-7 WITH APPROPRIATE UNIT DESIGNATORS
 
REQUIRED SIMULATOR MODE (S): N/A, IN PLANT
 
MALFUNCTION #'S:  N/A
 
COMMENTS:
 
IP-410S 1 TASK CONDITIONS:  
: 1. You are an extra NSO.  
: 2. Unit 1/2 has just tripped in conjunction with an electrical fire in Unit 1/2 Electrical Equipment Room. 3. 1/2A AF pump is unavailable for operation due to maintenance.  
: 4. 1/2B AF pump did not auto start, nor will it manually start with the MCR switch or the RSP switch. 5. 1/2B AF pump MCR indications are considered unreliable due to the fire.  
: 6. Another EO is available to monitor the 1/
2B AF pump governor linkage during the startup.
INITIATING CUES:  
: 1. The US has directed you to perform a local emergency start of the 1/2B AF pump at 1/2AF01J per BwOP AF-7. All Prerequisites, Precautions, and Limitations and Actions have been met, and steps 1-8 are complete.
: 1. The US has directed you to perform a local emergency start of the 1/2B AF pump at 1/2AF01J per BwOP AF-7. All Prerequisites, Precautions, and Limitations and Actions have been met, and steps 1-8 are complete.
IP-410S 2  TASK TITLE:
1 IP-410S
Local Start of 1/2B AF Pump JPM No.: IP-410S REV:  TPO No.: 4.C.AF-02 K&A No.: 061000A2.04 TASK No.: R-AF-012, Operate the diesel driven K&A IMP: 3.4/3.8 Auxiliary Feedwater Pumps


EXAMINEE:
TASK TITLE: Local Start of 1/2B AF Pump JPM No.:    IP-410S                                              REV:
RO   SRO (Circle One)  
TPO No.:    4.C.AF-02                                            K&A No.:          061000A2.04 TASK No.:  R-AF-012, Operate the diesel driven                  K&A IMP:          3.4/3.8 Auxiliary Feedwater Pumps EXAMINEE:                                                         RO SRO (Circle One)
 
EVALUATOR:                                                       DATE:
EVALUATOR:
The Examinee:       PASSED           this JPM.                   TIME STARTED:
DATE:  
FAILED                                       TIME FINISHED:
 
JPM TIME:                     MINUTES CRITICAL ELEMENTS:         (*) 4, 8                               APPROX COMPLETION TIME: 28 MINUTES CRITICAL TIME:             NA EVALUATION METHOD:                                               LOCATION:
The Examinee: PASSED this JPM.
PERFORM                                             X IN PLANT X SIMULATE                                               SIMULATOR GENERAL  
TIME STARTED:
FAILED TIME FINISHED:  
 
JPM TIME: MINUTES CRITICAL ELEMENTS:  
(*) 4, 8 APPROX COMPLETION TIME:
28 MINUTES CRITICAL TIME:
NA EVALUATION METHOD:
LOCATION:
PERFORM   X   IN PLANT X   SIMULATE SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. BwOP AF-7, Rev. 32, Auxiliary Feedwater Pump B (Diesel) Startup on Recirc  
: 1. BwOP AF-7, Rev. 32, Auxiliary Feedwater Pump B (Diesel) Startup on Recirc
: 2. BwOP AF-7T1, Rev. 5, Diesel Driven Auxiliary Feedwater Pump Operating Log MATERIALS:  
: 2. BwOP AF-7T1, Rev. 5, Diesel Driven Auxiliary Feedwater Pump Operating Log MATERIALS:
: 1. BwOP AF-7  
: 1. BwOP AF-7
: 2. BwOP AF-7T1 TASK STANDARDS:  
: 2. BwOP AF-7T1 TASK STANDARDS:
: 1. Perform a local emergency start of 1/2B AF pump.
: 1. Perform a local emergency start of 1/2B AF pump.
TASK CONDITIONS:  
TASK CONDITIONS:
: 1. You are an extra NSO.  
: 1. You are an extra NSO.
: 2. Unit 1/2 has just tripped in conjunction with an electrical fire in Unit 1/2 Aux Electrical Equipment Room. 3. 1/2A AF pump is unavailable for operation due to maintenance.  
: 2. Unit 1/2 has just tripped in conjunction with an electrical fire in Unit 1/2 Aux Electrical Equipment Room.
: 4. 1/2B AF pump did not auto start, nor will it manually start with the MCR switch or the RSP switch. 5. 1/2B AF pump MCR indications are considered unreliable due to the fire.  
: 3. 1/2A AF pump is unavailable for operation due to maintenance.
: 6. Another EO is available to monitor the 1/
: 4. 1/2B AF pump did not auto start, nor will it manually start with the MCR switch or the RSP switch.
2B AF pump governor linkage during the startup.  
: 5. 1/2B AF pump MCR indications are considered unreliable due to the fire.
 
: 6. Another EO is available to monitor the 1/2B AF pump governor linkage during the startup.
INITIATING CUES:  
INITIATING CUES:
: 1. The US has directed you to perform a local emergency start of the 1/2B AF pump at 1/2AF01J per BwOP AF-7. All Prerequisites, Precautions, and Limitations and Actions have been met, and steps 1-8 are complete.
: 1. The US has directed you to perform a local emergency start of the 1/2B AF pump at 1/2AF01J per BwOP AF-7. All Prerequisites, Precautions, and Limitations and Actions have been met, and steps 1-8 are complete.
: 2. Report status of 1/2B AF pump to US after local start.  
: 2. Report status of 1/2B AF pump to US after local start.
2 IP-410S


IP-410S 3 RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable  
RECORD START TIME PERFORMANCE STEP                         STANDARD                 Circle applicable
: 1. Refer to BwOP AF-7.
: 1. Refer to BwOP AF-7.                 Locate and open BwOP AF-7.      SAT UNSAT      N/A Comments:
CUE: Give a marked up copy of BwOP AF-7 to the student. Locate and open BwOP AF-7.
CUE: Give a marked up copy of BwOP AF-7 to the student.
SAT    UNSAT      N/A Comments: 2. Perform actions at 1/2AF01J.  
: 2. Perform actions at 1/2AF01J.         Perform the following at        SAT UNSAT      N/A 1/2AF01J:                        Comments:
 
CUE: Reset pushbutton has
CUE: Reset pushbutton has been depressed.  
* PUSH the Reset been depressed.                Pushbutton to clear circuit.
 
* VERIFY the Select Switch Select Switch is in Auto.      is in AUTO position.
Select Switch is in Auto.  
* VERIFY Engine Ready Engine Ready light is lit.      light is LIT.
 
Engine Ready light is lit.
Governor switch is off.
Governor switch is off.
Perform the following at 1/2AF01J:
* VERIFY Diesel Governor Switch is in OFF position.
 
: 3. Verify the Air Box Trip is reset. VERIFY the Air Box Trip is      SAT UNSAT      N/A Reset as follows:                Comments:
PUSH the Reset Pushbutton to clear circuit. VERIFY the Select Switch is in AUTO position. VERIFY "Engine Ready" light is LIT. VERIFY Diesel Governor Switch is in OFF position.
SAT    UNSAT      N/A Comments: 3. Verify the Air Box Trip is reset.
CUE: Air Box Trip annunciator is not lit.
CUE: Air Box Trip annunciator is not lit.
Another EO reports Air
* CHECK AIR BOX TRIP annunciator NOT LIT.
 
Another EO reports Air          - OR -
Box Trip lever is in
Box Trip lever is in
 
* Air Box Trip Lever (on normal position, limit          back side of engine) in switch is made up.              Normal position.
normal position, limit switch is made up.
  *4. Start Lube Oil systems.             START Lube Oil Auxiliary        SAT UNSAT      N/A Systems as follows at the local  Comments:
VERIFY the Air Box Trip is
control panel:
 
CUE: Gear box lube oil pump
Reset as follows:
* Aux FW Pp 1/2B Gear Box control switch is in start. Lube Oil Pp, 1/2AF01PB-C.
 
CHECK "AIR BOX TRIP" annunciator NOT LIT.  
- OR - Air Box Trip Lever (on back side of engine) in  
 
Normal position.
SAT    UNSAT      N/A Comments: *4. Start Lube Oil systems.  
 
CUE: Gear box lube oil pump control switch is in start.
Aux lube oil pump control switch is in start.
Aux lube oil pump control switch is in start.
Lube Oil within
* Aux FW Pp 1/2B Lube Oil Lube Oil within                Pp, 1/2AF01PB-A sightglass.
 
VERIFY Lube Oil inventory After the student locates      in pump sump is within inlet and outlet pressure      sightglass.
sightglass.
gages, indicate that the inlet is 28 psig, and the      VERIFY Lube Oil Filter outlet is 28 psig.              Differential Pressure is < 4 psid.
 
: 5. Verify/place VC in M/U mode per     Verify/place VC in M/U mode      SAT UNSAT      N/A BwOP VC-5, at SM discretion.         per BwOP VC-5, at SM            Comments:
After the student locates inlet and outlet pressure gages, indicate that the
discretion.
 
inlet is 28 psig, and the
 
outlet is 28 psig.
START Lube Oil Auxiliary
 
Systems as follows at the local
 
control panel:
 
Aux FW Pp 1/2B Gear Box Lube Oil Pp, 1/2AF01PB-C. Aux FW Pp 1/2B Lube Oil Pp, 1/2AF01PB-A VERIFY Lube Oil inventory  
 
in pump sump is within  
 
sightglass.
VERIFY Lube Oil Filter Differential Pressure is < 4  
 
psid. SAT    UNSAT      N/A Comments: 5. Verify/place VC in M/U mode per BwOP VC-5, at SM discretion.  
 
CUE: Another operator has performed BwOP VC-5.
CUE: Another operator has performed BwOP VC-5.
Verify/place VC in M/U mode
3 IP-410S
: 6. Align AF system discharge          ALIGN 1/2B AF pump                SAT UNSAT N/A flowpath.                          discharge flowpath in            Comments:
accordance with US direction:
* Contact US to determine if CUE: As US, if asked, direct          CLOSURE of B Train that step 17 not be            1/2AF013s or 1/2AF004B performed.                      will be necessary.
: 7. Start 1/2B AF pump locally.        START 1/2B AF Pump locally        SAT UNSAT N/A at 1/2AF01J as follows:          Comments:
CUE: Per task conditions, an          Verify personnel in position EO is standing by.              at front of diesel to monitor governor linkage during start.
CUE: Engine start switch is in
* PLACE the Engine Start Manual and the Ready          Control Switch to to Start light is not lit. MANUAL.
Start pushbutton is being depressed and held.
THE ENGINE DOES NOT
* DEPRESS and HOLD the CRANK                          START pushbutton.
VERIFY Engine Starting Engine starting light is        Light indicates starting NOT lit.                        sequence is in process.
VERIFY Engine Running Engine running light is        Light is ILLUMINATED NOT lit.                        when speed indicates 350 RPM.
Start pushbutton is released.                  o  RELEASE the START pushbutton.
Alternate Battery Bank is Selected
* Select the Alternate battery bank Reset Pushbutton is Depressed.
* Push Reset Pushbutton Start pushbutton is being depressed and
* DEPRESS and HOLD the held.                          START pushbutton.
THE ENGINE STILL
* Report to US failure of DOES NOT CRANK                  1/2B AF Pump to start locally 4
IP-410S


per BwOP VC-5, at SM
  *8. Start 1/2B AF pump from                                      SAT UNSAT N/A 2AF03J.                         Perform the following:       Comments:
 
CUE: US instructs you to start the 1/2B AF pump from 1/2AF03J using the START WITH BYPASS hand switch position     o Contacts additional EO to Position.                  inspect 1/2B AF pump during start.
discretion.  
* At 1/2AF01J, ensures Engine Selector Switch is in AUTO by observation
 
* At 1/2AF03J, places 1/2HS-AF157 in START WITH BYPASS position.
SAT    UNSAT      N/A Comments:
* At 1/2AF01J, verifies Additional EO reports      RUNNING light is LIT at 1/2B AF pump has            1/2HS-AF157 started RUNNING light is LIT
IP-410S 4 6. Align AF system discharge flowpath.
: 9. CUE:
 
* Reports to US successful  SAT UNSAT N/A start of 1/2B AF pump. Comments:
CUE: As US, if asked, direct that step 17 not be performed.
Another EO will complete BwOP AF-7 and take over monitoring the 1/2B AF pump.
ALIGN 1/2B AF pump discharge flowpath in
CUE: THIS COMPLETES THIS JPM.
 
RECORD STOP TIME COMMENTS:
accordance with US direction:
5 IP-410S
 
Contact US to determine if CLOSURE of B Train
 
1/2AF013s or 1/2AF004B
 
will be necessary.
SAT     UNSAT     N/A Comments: 7. Start 1/2B AF pump locally.
 
CUE: Per task conditions, an EO is standing by.
 
CUE: Engine start switch is in Manual and the 'Ready to Start light' is not lit.
 
Start pushbutton is
 
being depressed and held.
THE ENGINE DOES NOT CRANK Engine starting light is
 
NOT lit. Engine running light is
 
NOT lit.
Start pushbutton is
 
released.
 
Alternate Battery Bank is
 
Selected
 
Reset Pushbutton is
 
Depressed.
 
Start pushbutton is being depressed and
 
held.
 
THE ENGINE STILL
 
DOES NOT CRANK START 1/2B AF Pump locally at 1/2AF01J as follows:  
 
Verify personnel in position at front of diesel to monitor
 
governor linkage during
 
start. PLACE the Engine Start Control Switch to MANUAL. 
 
DEPRESS and HOLD the START pushbutton.
VERIFY Engine Starting Light indicates starting
 
sequence is in process. VERIFY Engine Running Light is ILLUMINATED
 
when speed indicates 350
 
RPM.
o RELEASE the START pushbutton.
Select the Alternate battery bank  Push Reset Pushbutton
 
DEPRESS and HOLD the START pushbutton.
 
Report to US failure of 1/2B AF Pump to start
 
locally SAT    UNSAT      N/A Comments:
IP-410S 5 *8. Start 1/2B AF pump from 2AF03J.
CUE: US instructs you to start the 1/2B AF pump from  
 
1/2AF03J using the  
 
START WITH BYPASS hand switch position  
 
Position.
 
Additional EO reports 1/2B AF pump has
 
started RUNNING light is LIT
 
Perform the following:
 
o Contacts additional EO to inspect 1/2B AF pump during start.
At 1/2AF01J, ensures Engine Selector Switch is in AUTO by observation .
At 1/2AF03J, places 1/2HS-AF157 in START WITH BYPASS position.  
 
At 1/2AF01J, verifies RUNNING light is LIT at 1/2HS-AF157 SAT     UNSAT     N/A  
 
Comments: 9. CUE:  Another EO will complete BwOP AF-7  
 
and take over monitoring  
 
the 1/2B AF pump.
Reports to US successful start of 1/2B AF pump.
 
SAT    UNSAT      N/A
 
Comments:
CUE: THIS COMPLETES THIS JPM.  
 
RECORD STOP TIME COMMENTS:  
 
IP-410S 6 SIMULATOR/ SETUP INSTRUCTIONS
 
JPM NO: IP-410S
 
MARK UP PROCEDURE BwOP AF-7 WITH APPROPRIATE UNIT DESIGNATORS
 
REQUIRED SIMULATOR MODE (S): N/A, IN PLANT
 
MALFUNCTION #'S:  N/A


COMMENTS:}}
SIMULATOR/ SETUP INSTRUCTIONS JPM NO: IP-410S MARK UP PROCEDURE BwOP AF-7 WITH APPROPRIATE UNIT DESIGNATORS REQUIRED SIMULATOR MODE (S): N/A, IN PLANT MALFUNCTION #S: N/A COMMENTS:
6 IP-410S}}

Latest revision as of 02:29, 12 March 2020

2009 Braidwood Initial License Examination Proposed JPMs
ML100700244
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 10/05/2009
From: Palagi B
Operations Branch III
To:
Exelon Generation Co
References
Download: ML100700244 (105)


Text

TASK CONDITIONS:

1. You are the Unit NSO.
2. Unit 1 is at full power.
3. Unit 2 is at full power.

INITIATING CUES:

The US directs you to perform the weekly QPTR calculation using 1BwOSR 3.2.4.1 and the process computer.

1 R-101

TASK TITLE: Perform a QPTR Calculation with the Process Computer JPM No.: R-101 REV: NRC 09-1 TPO No.: 4.C.RK-01 K&A No.: 2.1.19 TASK No.: R-RK-003, Perform a QPTR calculation K&A IMP: 3.9/3.8 and evaluate TS limits EXAMINEE: RO SRO (circle one)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 5, 6, 7 APPROX COMPLETION TIME: 15 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. 1BwOSR 3.2.4.1, Rev. 6, Unit One Quadrant Power Tilt Ratio (QPTR) Calculation MATERIALS:
1. 1BwOSR 3.2.4.1
2. Calculator TASK STANDARDS:
1. Perform 1BwOSR 3.2.4.1, Unit One Quadrant Power Tilt Ratio (QPTR) Calculation.

TASK CONDITIONS:

1. You are the Unit NSO.
2. Unit 1 is at full power with PDMS inoperable.
3. Unit 2 is at full power.

INITIATING CUES:

1. The US directs you to perform the weekly QPTR calculation using 1BwOSR 3.2.4.1 and the process computer.

2 R-101

RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable

1. Prepare for 1BwOSR 3.2.4.1 SAT UNSAT N/A QPTR Calculation. Comments:
  • Sign, record time and date Note: Give examinee the on the surveillance cover procedure with cover sheet.

sheet.

  • VERIFY the applicable CUE: Prerequisites are met. Prerequisites, Precautions, and Limitations and Actions are addressed.
2. Determine Surveillance Indicate the Applicability of this SAT UNSAT N/A applicability. surveillance on the D-2 data Comments:

sheet:

  • Block 7 Days checked.
3. Record Date and Time on Data RECORD Date and Time on SAT UNSAT N/A Sheet D-2. data sheet D-2. Comments:
4. Record power range NIs On Data Sheet D-3, RECORD SAT UNSAT N/A operability status. the following for power range Comments:

NIs 41-44:

CUE: If asked, the Unit is in No

  • Y block checked for each LCOARs at this time. channel operable.
  • 100% (or present power reading from each channel at 1PM07J).
  • 5. Determine the Power Range NI DETERMINE the QPTR SAT UNSAT N/A Detector computer point (detector voltages) using the Comments:

readings using the Process Computer Points. Process Computer, by either selecting each point o HMI trend page group 0001. individually, or a group that o OPCON. contains each point and RECORD the present value:

Upper Detectors (A):

  • N0041 (N41).
  • N0043 (N42).
  • N0045 (N43).
  • N0047 (N44).

Lower Detectors (B):

  • N0042 (N41).
  • N0044 (N42).
  • N0046 (N43).
  • N0048 (N44).

3 R-101

  • 6. Determine the AVERAGE DETERMINE the AVERAGE SAT UNSAT N/A computer point reading. computer point reading by: Comments:
  • Adding the sum of the upper detector computer points and dividing by 4.
  • Adding the sum of the lower detector computer points and dividing by 4.
  • Record the AVERAGES on data sheet D-2.
  • 7. Determine the QPTR. DETERMINE the QPTR for SAT UNSAT N/A each channel by dividing the Comments:

computer point reading for each channel by the average of the channel readings and RECORD on data sheet D-2:

  • QPTR for the Uppers.
  • QPTR for the Lowers.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

4 R-101

SIMULATOR SETUP INSTRUCTIONS JPM NO: R-101 REQUIRED SIMULATOR MODE (S): 100% power steady state MALFUNCTION #S: N/A COMMENTS:

1. Ensure that HMI is NOT on QPTR parameters.
2. Make a KEY in table below of the surveillance for the evaluator to reference with current simulator core load.

Channel N41 N42 N43 N44 Is the channel operable? Y N Y N Y N Y N Instrument reading  %  %  %  %

Upper Detectors (A)

Computer point N0041 N0043 N0045 N0047 Present computer point reading Average computer point reading Upper power tilt ratio (¢1.02) ¢ ¢ ¢ ¢ Lower Detectors (B)

Computer point N0042 N0044 N0046 N0048 Present computer point reading Average computer point reading Lowerr power tilt ratio (¢1.02) ¢ ¢ ¢ ¢ 5

R-101

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are an active licensed RO/SRO for the past year.
2. Attached is your work schedule history for the 14 weeks during the third quarter of 2009.
3. All positions were appropriately logged in the SM log during this time period.

INITIATING CUES:

1. The Operations Support Manager asks that you complete your Active License Tracking Log for the third quarter of 2009, per OP-AA-105-102.

R-109 Page 1 of 11

RO Work History:

Hours Day Date Shift Worked Job Position/Assignment Week 1 M 6/29/09 D 12 Unit 1 NSO T 6/30/09 D 12 Unit 2 NSO W 7/1/09 D 12 Unit 2 Admin NSO Th 7/2/09 D 12 Extra NSO in control room F 7/3/09 N/A Day Off S 7/4/09 N/A Day Off S 7/5/09 N/A Day Off Week 2 M 7/6/09 D 12 Clearance Order Writer T 7/7/09 D 12 Clearance Order Writer W 7/8/09 D 12 Clearance Order Writer Th 7/9/09 D 12 Clearance Order Writer F 7/10/09 N/A Day Off S 7/11/09 N/A Day Off S 7/12/09 N/A Day Off Week 3 M 7/13/09 N/A Day Off T 7/14/09 N/A Day Off W 7/15/09 N/A Day Off Th 7/16/09 N/A Day Off F 7/17/09 D 12 Unit 1 Admin (relieved 2 hrs for NRC physical)

S 7/18/09 D 12 Unit 1 NSO S 7/19/09 D 12 Unit 2 NSO Week 4 M 7/20/09 N/A Day Off T 7/21/09 N/A Day Off W 7/22/09 N/A Day Off Th 7/23/09 N/A Day Off F 7/24/09 N 12 Unit 2 Admin (relieved 2 hrs for PHC meeting)

S 7/25/09 N 12 Extra NSO in control room S 7/26/09 N 12 Unit 1 Admin NSO Week 5 M 7/27/09 N/A Day Off T 7/28/09 T 8 Requal Training W 7/29/09 T 8 Requal Training Th 7/30/09 T 8 Requal Training F 7/31/09 T 8 Requal Training S 8/1/09 N/A Day Off S 8/2/09 N/A Day Off Weeks 6 and 7 8/3/09 thru 8/16/09 N/A ON VACATION R-109 Page 2 of 11

RO Work History continued:

Hours Day Date Shift Worked Job Description Week 8 M 8/17/09 N/A Day Off T 8/18/09 N/A Day Off W 8/19/09 N/A Day Off Th 8/20/09 N/A Day Off F 8/21/09 D 12 Clearance Order Writer S 8/22/09 D 12 Unit 2 NSO S 8/23/09 D 12 Unit 2 Admin NSO Week 9 M 8/24/09 N/A Day Off T 8/25/09 N/A Day Off W 8/26/09 N/A Day Off Th 8/27/09 N/A Day Off F 8/28/09 N 12 Extra NSO in control room S 8/29/09 N 12 Unit 1 NSO S 8/30/09 N 12 Unit 2 NSO Week 10 M 8/31/09 N/A Day Off T 9/1/09 T 8 Requal Training W 9/2/09 T 8 Requal Training Th 9/3/09 T 8 Requal Training F 9/4/09 T 8 Requal Training S 9/5/09 N/A Day Off S 9/6/09 N/A Day Off Weeks 11 thru 13 9/7/09 thru 9/27/09 ON VACATION Week 14 M 9/28/09 N/A Day Off T 9/29/09 N/A Day Off W 9/30/09 N/A Day Off R-109 Page 3 of 11

SRO Work History:

Hours Day Date Shift Worked Job Position/Assignment Week 1 M 6/29/09 D 12 Unit 1 US T 6/30/09 D 12 Unit 1 US W 7/1/09 D 12 Unit 1 US Th 7/2/09 D 12 WEC Supervisor F 7/3/09 N/A Day Off S 7/4/09 N/A Day Off S 7/5/09 N/A Day Off Week 2 M 7/6/09 D 12 Clearance Order Group Supervisor T 7/7/09 D 12 Clearance Order Group Supervisor W 7/8/09 D 12 Clearance Order Group Supervisor Th 7/9/09 D 12 Clearance Order Group Supervisor F 7/10/09 N/A Day Off S 7/11/09 N/A Day Off S 7/12/09 N/A Day Off Week 3 M 7/13/09 N/A Day Off T 7/14/09 N/A Day Off W 7/15/09 N/A Day Off Th 7/16/09 N/A Day Off F 7/17/09 D 12 Field Supervisor S 7/18/09 D 12 Field Supervisor S 7/19/09 D 12 Field Supervisor Week 4 M 7/20/09 N/A Day Off T 7/21/09 N/A Day Off W 7/22/09 N/A Day Off Th 7/23/09 N/A Day Off F 7/24/09 N 12 WEC Supervisor S 7/25/09 N 12 WEC Supervisor S 7/26/09 N 12 Unit 1 US Week 5 M 7/27/09 N/A Day Off T 7/28/09 T 8 Requal Training W 7/29/09 T 8 Requal Training Th 7/30/09 T 8 Requal Training F 7/31/09 T 8 Requal Training S 8/1/09 N/A Day Off S 8/2/09 N/A Day Off Weeks 6 and 7 8/3/09 thru 8/16/09 ON VACATION R-109 Page 4 of 11

SRO Work History continued:

Hours Day Date Shift Worked Job Description Week 8 M 8/17/09 N/A Day Off T 8/18/09 N/A Day Off W 8/19/09 N/A Day Off Th 8/20/09 N/A Day Off F 8/21/09 D 12 Unit 2 US S 8/22/09 D 12 Unit 2 US S 8/23/09 D 12 Unit 2 US Week 9 M 8/24/09 N/A Day Off T 8/25/09 N/A Day Off W 8/26/09 N/A Day Off Th 8/27/09 N/A Day Off F 8/28/09 N 12 WEC Supervisor S 8/29/09 N 12 WEC Supervisor S 8/30/09 N 12 WEC Supervisor Week 10 M 8/31/09 N/A Day Off T 9/1/09 T 8 Requal Training W 9/2/09 T 8 Requal Training Th 9/3/09 T 8 Requal Training F 9/4/09 T 8 Requal Training S 9/5/09 N/A Day Off S 9/6/09 N/A Day Off Weeks 11 thru 13 9/7/09 thru 9/27/09 ON VACATION Week 14 M 9/28/09 N/A Day Off T 9/29/09 N/A Day Off W 9/30/09 N/A Day Off R-109 Page 5 of 11

TASK TITLE: Complete NRC Active License Maintenance Log JPM No.: R-109 REV: 2009 NRC Task No.: R-AM-075 K/A No.: 2.1.4 Objective No.: 4E.AM-75 K/A IMP: 3.3/3.8 EXAMINEE: SRO EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 3, 4, 5, 6 APPROX COMPLETION TIME: 10 MINUTES CRITICAL TIME: N/A EVALUATION METHOD: LOCATION:

X PERFORM X IN PLANT SIMULATE X SIMULATOR X CLASSROOM GENERAL

REFERENCES:

1. OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE.
2. 10CFR55.53(e)

MATERIALS:

1. OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE.

TASK STANDARDS:

1. Determine shift activities that are credited toward active license maintenance.
2. Complete OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE, Attachment 1 Active License Maintenance Tracking Log.

TASK CONDITIONS:

1. You are an active licensed RO/SRO for the past year.
2. Attached is your work schedule history for the 14 weeks that are partially or entirely within the third quarter of 2009.
3. All positions were appropriately logged in the SM log for during this time period.

INITIATING CUES:

1. The Operations Support Manager asks that you complete your Active License Tracking Log for the third quarter of 2009, per OP-AA-105-102.
2. Inform the Operations Support Manager when you have completed OP-AA-105-102, Attachment 1.

R-109 Page 6 of 11

RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to OP-AA-105-102, NRC Refer to OP-AA-105-102: SAT UNSAT N/A ACTIVE LICENSE
  • Determines Attachment 1 Comments:

MAINTENANCE. needs to be completed.

CUE: Provide examinee copy of OP-AA-105-102.

2. Complete upper section of
  • From initiating cue, writes 3rd SAT UNSAT N/A Attachment 1. quarter of 2009. Comments:
  • From initiating cue, writes examinee name and circles ACTIVE license status.
  • 3. Complete date column of table
  • Lists at least 5 dates of the SAT UNSAT N/A on Attachment 1. shifts listed below, from Comments:

attached schedule, that count as credited days Note: Any date listed in June or toward license maintenance.

October would not be within the 3rd quarter of o RO (any 5 of 8) the year, thereby o 7/1/09 D 12 2 incorrect. o 7/18/09 D 12 1 o 7/19/09 D 12 2 o 7/26/09 N 12 1 o 8/22/09 D 12 2 o 8/23/09 D 12 2 o 8/29/09 N 12 1 o 8/30/09 N 12 2 o SRO

  • 7/1/09 D 12 1
  • 7/26/09 D 12 1
  • 8/21/09 D 12 2
  • 8/22/09 D 12 2
  • 8/23/09 D 12 2
  • 4. Complete shift column of table
  • List the shift worked (N or D SAT UNSAT N/A on Attachment 1. as applicable) Comments:
  • 5. Complete length column of
  • List the shift length (12 SAT UNSAT N/A table on Attachment 1. hours) Comments:
  • 6. Complete unit column of table
  • List the applicable unit SAT UNSAT N/A on Attachment 1. Comments:

R-109 Page 7 of 11

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE 7 Give completed Attachment 1 to SAT UNSAT N/A evaluator. Comments:

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

R-109 Page 8 of 11

SIMULATOR SETUP INSTRUCTIONS

  • N/A COMMENTS
  • Fill out Key for evaluator reference.

R-109 Page 9 of 11

OP-AA-105-102 Revision 9 Page 6 of 7 ATTACHMENT 1 Active License Tracking Log Page 1 of 1 SHIFT COVERAGE FOR THE ___3rd__(1ST, 2ND, 3RD, 4TH) CALENDAR QUARTER OF __2009__(YEAR)

____Examinees Name____ ACTIVE / INACTIVE Name of License Holder License Status At Start (Print) Quarter (circle one)

RECORD OF EIGHT/TWELVE HOUR SHIFTS SERVED DURING QUARTER ENTER the date the shift ended, the shift, the shift length, the Unit, position covered, circle Y or N for logged in the SM log and signature. If working an 8-hour or 8/12-hour schedule, enter a 1 for the midnight shift, 2 for the day shift, or a 3 for the afternoon shift (only enter shifts at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> length for which turnovers were conducted). Seven shifts at least 8-hours in length are required per quarter. If working a straight 12-hour schedule, enter a N for night shift or a D for dayshift (only enter shifts at least 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in length for which turnovers were conducted). Five 12-hour shifts are required per quarter. The quarterly shift watch requirement may be completed with a combination of complete 8- and 12-hour shifts (in a position required by the plants Technical Specifications) at sites having a mixed shift schedule, and watches shall not be truncated when the minimum quarterly requirement (56 hours6.481481e-4 days <br />0.0156 hours <br />9.259259e-5 weeks <br />2.1308e-5 months <br />) is satisfied. (NUREG 1021, Revision 9)

DATE SHIFT LENGTH UNIT POSITION SM SIGNATURE (circle one) log Logged 7/1/09 D 12 2 FHS SM US RO Examinees Signature Y/N Logged 7/18/09 D 12 1 FHS SM US RO Examinees Signature Y/N Logged 7/19/09 D 12 2 FHS SM US RO Examinees Signature Y/N Logged 7/26/09 N 12 1 FHS SM US RO Examinees Signature Y/N Logged 8/22/09 D 12 2 FHS SM US RO Examinees Signature Y/N Logged 8/23/09 D 12 2 FHS SM US RO Examinees Signature Y/N Logged 8/29/09 N 12 1 FHS SM US RO Examinees Signature Y/N Logged 8/30/09 N 12 2 FHS SM US RO Examinees Signature Y/N At least 5 of the 8 rows above.

R-109 Page 10 of 11

OP-AA-105-102 Revision 9 Page 6 of 7 ATTACHMENT 1 Active License Tracking Log Page 1 of 1 SHIFT COVERAGE FOR THE ___3rd__(1ST, 2ND, 3RD, 4TH) CALENDAR QUARTER OF __2009__(YEAR)

____Examinees Name____ ACTIVE / INACTIVE Name of License Holder License Status At Start (Print) Quarter (circle one)

RECORD OF EIGHT/TWELVE HOUR SHIFTS SERVED DURING QUARTER ENTER the date the shift ended, the shift, the shift length, the Unit, position covered, circle Y or N for logged in the SM log and signature. If working an 8-hour or 8/12-hour schedule, enter a 1 for the midnight shift, 2 for the day shift, or a 3 for the afternoon shift (only enter shifts at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> length for which turnovers were conducted). Seven shifts at least 8-hours in length are required per quarter. If working a straight 12-hour schedule, enter a N for night shift or a D for dayshift (only enter shifts at least 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in length for which turnovers were conducted). Five 12-hour shifts are required per quarter. The quarterly shift watch requirement may be completed with a combination of complete 8- and 12-hour shifts (in a position required by the plants Technical Specifications) at sites having a mixed shift schedule, and watches shall not be truncated when the minimum quarterly requirement (56 hours6.481481e-4 days <br />0.0156 hours <br />9.259259e-5 weeks <br />2.1308e-5 months <br />) is satisfied. (NUREG 1021, Revision 9)

DATE SHIFT LENGTH UNIT POSITION SM SIGNATURE (circle one) log Logged 7/1/09 D 12 1 FHS SM US RO Examinees Signature Y/N Logged 7/26/09 D 12 1 FHS SM US RO Examinees Signature Y/N Logged 8/21/09 D 12 2 FHS SM US RO Examinees Signature Y/N Logged 8/22/09 D 12 2 FHS SM US RO Examinees Signature Y/N Logged 8/23/09 D 12 2 FHS SM US RO Examinees Signature Y/N R-109 Page 11 of 11

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are an extra operator on shift.
2. 2CV03F, Unit 2 RC Filter, needs to be replaced.
3. A worker tagout to isolate and drain 2CV03F, in accordance with BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, step F.3, has been prepared by another operator.

INITIATING CUES:

1. Jim NSO asks you to peer check the clearance orders isolation points, sequence and OOS/RTS positions.
2. Inform Jim when you have completed the peer check.

R-200 Page 1 of 9

TASK TITLE: Verify Worker Tagout Checklist.

JPM No.: R-200 REV: NRC 09-1 Task No.: 4E.AM-06 K&A No.: 2.2.13 Objective No.: R-AM-010 K&A IMP: 4.1/4.3 EXAMINEE: RO SRO (circle one)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 4, 6 APPROX COMPLETION TIME: 30 MINUTES CRITICAL TIME: N/A EVALUATION METHOD: LOCATION:

X PERFORM X IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. OP-AA-109-101, CLEARANCE AND TAGGING, REV 1.
2. BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, REV 18.
3. M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.
4. BwOP WX-197, CHANGING LIQUID RADWASTE FILTERS, Rev 19.

MATERIALS:

1. OP-AA-109-101, CLEARANCE AND TAGGING, REV 0.
2. BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, REV 18.
3. M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.
4. BwOP WX-197, CHANGING LIQUID RADWASTE FILTERS, Rev 19.

TASK STANDARDS:

1. Verify isolation points correct for 2CV03F.
2. Determine 2CV8425 position incorrect for 2CV03F.
3. Determine the sequence of isolation points for 2CV03F is incorrect.

TASK CONDITIONS:

1. You are an extra operator on shift.
2. 2CV03F, Unit 2 RC Filter, needs to be replaced.
3. A worker tagout to isolate and drain 2CV03F, in accordance with BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, step F.3, has been prepared by another operator.

INITIATING CUES:

1. The Unit Supervisor directs you to peer check the clearance orders isolation points, sequence and OOS/RTS positions.

CUE: Hand examinee partially completed Worker Tagout.

2. Inform Jim when you have completed the peer check.

R-200 Page 2 of 9

RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to BwOP CV-10, CV Refer to BwOP CV-10, step SAT UNSAT N/A FILTERS ISOLATION AND F.3: Comments:

RETURN TO SERVICE.

CUE: Provide examinee copy of BwOP CV-10.

2. Refer to Drawing: Refer to M-138, sheet 5B. SAT UNSAT N/A
  • M-138, sheet 5B, DIAGRAM Comments:

OF CVCS AND BTRS CUE: Provide copy of M-138, sheet 5B.

3. Verify the clearance BOUNDARY Determines clearance SAT UNSAT N/A for 2CV03F. boundary valves selected are Comments:

correct:

  • 2CV129 C/S, Demin Hi Temp Divert Valve.
  • 2CV8421, RC Filter Bypass Valve.
  • 2CV8425, RC Filter Inlet Isol Valve.
  • 2CV8422, RC Filter Outlet Isol Valve.
  • 2CV8424, RC Filter Drain Valve.
  • 2CV8423, RC Filter Vent Valve.

R-200 Page 3 of 9

EVALUATOR NOTE: The examinee may determine the clearance position is incorrect (JPM step 7) prior to determining the sequence is incorrect (JPM step 5), or the examinee may discover both errors simultaneously. The examinee must identify both errors to complete critical tasks 5 & 7.

EVALUATOR NOTE: The JPM contains corrected Worker Tagout checklist to be given to the examinee after the errors are identified.

If the examinee first determines the incorrect sequence is listed on the Worker Tagout checklist prior to determining the incorrect position is listed, provide examinee JPM page 7.

If the examinee first determines the incorrect position is listed on the Worker Tagout checklist, provide examinee JPM page 8.

When the examinee has determined BOTH the incorrect sequence and position are listed on the Worker Tagout checklist, provide examinee JPM page 9.

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 4. Determine the clearance Determines clearance SAT UNSAT N/A SEQUENCE for the 2CV03F is sequence is incorrect: Comments:

incorrect. 1. 2CV129 C/S, Demin Hi Temp Divert Valve.

2. 2CV8421 RC Filter Bypass Valve.

CUE: Acknowledge as Unit Supervisor and inform 3. 2CV8422 RC Filter examinee the checklist Outlet Isol Valve.

sequence will be 4. 2CV8425 RC Filter Inlet corrected. Isol Valve.

5. 2CV8424 RC Filter Drain CUE: Hand examinee corrected Valve.

worker tagout in accordance with the 6. 2CV8423 RC Filter Vent evaluator note above. Valve.

o Notifies SM and NSOs of sequencing error.

5. Verify the tag type for 2CV03F. Verifies clearance tag type:
  • 2CV129 C/S, Demin Hi Temp Divert Valve - CI.
  • 2CV8421 RC Filter Bypass Valve - RI.
  • 2CV8425 RC Filter Inlet Isol Valve - RD.
  • 2CV8422 RC Filter Outlet Isol Valve - RD.
  • 2CV8424 RC Filter Drain Valve - RI.
  • 2CV8423 RC Filter Vent Valve - RI.

R-200 Page 4 of 9

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 6. Determine the clearance Determines clearance position SAT UNSAT N/A POSITION for the 2CV03F is is incorrect: Comments:

incorrect.

  • 2CV129 C/S, Demin Hi Temp Divert Valve - INFO.
  • 2CV8421 RC Filter Bypass Valve - INFO.
  • 2CV8425 RC Filter Inlet Isol Valve - CLOSED.

CUE: Acknowledge as Unit

  • 2CV8422 RC Filter Outlet Supervisor and inform Isol Valve - OPEN.

examinee the checklist

  • 2CV8424 RC Filter Drain position will be Valve - INFO.

corrected.

  • 2CV8423 RC Filter Vent Valve - INFO.

CUE: Hand examinee corrected worker tagout in o Notifies SM and NSOs of accordance with the position error.

evaluator note above.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

R-200 Page 5 of 9

SIMULATOR SETUP INSTRUCTIONS

  • N/A COMMENTS
  • Provide copy of BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, REV 18.
  • Provide copy of M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.

R-200 Page 6 of 9

OP-AA-109-101 Revision 4 Page 71 of 77 ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O: Mode Dependent: Condition Dependent:

Production Risk: Environmental Risk: Atmospheric Risk: Reactivity Risk:

WORKER TAGOUT# PO9-005 JOB DESCRIPTION: CHANGE 2CV03F_________________

WORKING DEPARTMENT: OPS W/O OR W/R: 12345 EQUIP. TAG# 2CV03F COMPONENT DESCRIPTION: UNIT 2 RC FILTER FIRST APPROVAL: __Jim NSO_________________________ DATE/TIME: Today/One hour ago SECOND APPROVAL: __ ___________________ DATE/TIME: __________________

WTO AUTHORIZATION: _ __________________ DATE/TIME __________________

SPECIAL INSTRUCTIONS: YES: NO: (IF YES SEE ATTACHMENT 14 PART 2)

EQUIP. TAG/EQUIPMENT SEQ TAG POSITION HUNG VERIF. SFTY. RTS RTS RTS VERIF.

NAME TYPE BY BY VERIF. SEQ POSITION BY BY 2CV129 C/S (DEMIN HI TEMP 1 CI INFO 3 AS DIVERT VLV) REQUIRED 2CV8421 RC FILTER BYPASS 2 RI INFO 1 OPEN VLV 2CV8425 RC FILTER INLET 3 RD CLOSED 2 CLOSED ISOL VLV 2CV8422 RC FILTER OUTLET 4 RD OPEN 2 CLOSED ISOL VLV 2CV8424 RC FILTER DRAIN 5 RI INFO 2 CLOSED VLV 2CV8423 RC FILTER VENT 5 RI INFO 2 CLOSED VLV WTO PLACED: _____________________________________________________________ DATE/TIME: ___________________

WTL COMPLETED WORK START: _ _____________________________ DATE/TIME: ___________________

WTO FINAL CLEAR: WORK CREWMEMBER RELEASE: ____ __________ DATE/TIME: ___________________

WTO CLEARED: ____________________________________________________________ DATE/TIME: ____________________

(COPIES MAY BE MADE OF THIS FORM FOR ADDITIONAL ISOLATION POINTS)

R-200 Page 7 of 9

OP-AA-109-101 Revision 4 Page 71 of 77 ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O: Mode Dependent: Condition Dependent:

Production Risk: Environmental Risk: Atmospheric Risk: Reactivity Risk:

WORKER TAGOUT# PO9-005 JOB DESCRIPTION: CHANGE 2CV03F_________________

WORKING DEPARTMENT: OPS W/O OR W/R: 12345 EQUIP. TAG# 2CV03F COMPONENT DESCRIPTION: UNIT 2 RC FILTER FIRST APPROVAL: __Jim NSO_________________________ DATE/TIME: Today/One hour ago SECOND APPROVAL: __ ___________________ DATE/TIME: __________________

WTO AUTHORIZATION: _ __________________ DATE/TIME __________________

SPECIAL INSTRUCTIONS: YES: NO: (IF YES SEE ATTACHMENT 14 PART 2)

EQUIP. TAG/EQUIPMENT SEQ TAG POSITION HUNG VERIF. SFTY. RTS RTS RTS VERIF.

NAME TYPE BY BY VERIF. SEQ POSITION BY BY 2CV129 C/S (DEMIN HI TEMP 1 CI INFO 3 AS DIVERT VLV) REQUIRED 2CV8421 RC FILTER BYPASS 2 RI INFO 1 OPEN VLV 2CV8422 RC FILTER OUTLET 3 RD CLOSED 2 CLOSED ISOL VLV 2CV8425 RC FILTER INLET 4 RD CLOSED 2 CLOSED ISOL VLV 2CV8424 RC FILTER DRAIN 5 RI INFO 2 CLOSED VLV 2CV8423 RC FILTER VENT 5 RI INFO 2 CLOSED VLV WTO PLACED: _____________________________________________________________ DATE/TIME: ___________________

WTL COMPLETED WORK START: _ _____________________________ DATE/TIME: ___________________

WTO FINAL CLEAR: WORK CREWMEMBER RELEASE: ____ __________ DATE/TIME: ___________________

WTO CLEARED: ____________________________________________________________ DATE/TIME: ____________________

(COPIES MAY BE MADE OF THIS FORM FOR ADDITIONAL ISOLATION POINTS)

R-200 Page 8 of 9

OP-AA-109-101 Revision 4 Page 71 of 77 ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O: Mode Dependent: Condition Dependent:

Production Risk: Environmental Risk: Atmospheric Risk: Reactivity Risk:

WORKER TAGOUT# PO9-005 JOB DESCRIPTION: CHANGE 2CV03F_________________

WORKING DEPARTMENT: OPS W/O OR W/R: 12345 EQUIP. TAG# 2CV03F COMPONENT DESCRIPTION: UNIT 2 RC FILTER FIRST APPROVAL: __Jim NSO_________________________ DATE/TIME: Today/One hour ago SECOND APPROVAL: __ ___________________ DATE/TIME: __________________

WTO AUTHORIZATION: _ __________________ DATE/TIME __________________

SPECIAL INSTRUCTIONS: YES: NO: (IF YES SEE ATTACHMENT 14 PART 2)

EQUIP. TAG/EQUIPMENT SEQ TAG POSITION HUNG VERIF. SFTY. RTS RTS RTS VERIF.

NAME TYPE BY BY VERIF. SEQ POSITION BY BY 2CV129 C/S (DEMIN HI TEMP 1 CI INFO 3 AS DIVERT VLV) REQUIRED 2CV8421 RC FILTER BYPASS 2 RI INFO 1 OPEN VLV 2CV8425 RC FILTER INLET 3 RD CLOSED 2 CLOSED ISOL VLV 2CV8422 RC FILTER OUTLET 4 RD CLOSED 2 CLOSED ISOL VLV 2CV8424 RC FILTER DRAIN 5 RI INFO 2 CLOSED VLV 2CV8423 RC FILTER VENT 5 RI INFO 2 CLOSED VLV WTO PLACED: _____________________________________________________________ DATE/TIME: ___________________

WTL COMPLETED WORK START: _ _____________________________ DATE/TIME: ___________________

WTO FINAL CLEAR: WORK CREWMEMBER RELEASE: ____ __________ DATE/TIME: ___________________

WTO CLEARED: ____________________________________________________________ DATE/TIME: ____________________

(COPIES MAY BE MADE OF THIS FORM FOR ADDITIONAL ISOLATION POINTS)

R-200 Page 9 of 9

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are an extra NSO.
2. Both Units are at full power.
3. 1PR01J is operable.

INITIATING CUES:

1. The Unit Supervisor has handed you a Containment release package G-09-001, completed through section B, and has directed you to complete Section C. All previous sections of the release package have been successfully completed.
2. An Equipment Operator is standing by to obtain the 1FI-PR100 flowrate Page 1 of 6 R-301

TASK TITLE: Perform a Containment Release Channel Check JPM No.: R-301 REV: NRC 09-1 TPO No.: 4C.WQ-01 K&A No.: 2.3.11 TASK No.: R-GW-001, Perform gaseous release K&A IMP: 3.8/4.3 EXAMINEE: RO SRO (Circle One)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 9, 10 APPROX COMPLETION TIME: 19 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. 1BwOS RETS 2.2.B-1, Rev 1, Unit One Pre-release Source and Channel Check of Containment Purge Effluent Monitor 1PR01J (1RE-PR001A/B/C)
2. BwRP 6110-13T1, Rev 18, Containment Release Form MATERIALS:
1. BwRP 6110-13T1, Rev 18, Containment Release Form completed through section B.
2. 1BwOS RETS 2.2.B-1, Rev 1, Unit One Pre-release Source and Channel Check of Containment Purge Effluent Monitor 1PR01J (1RE-PR001A/B/C) with Predefine Cover Sheet TASK STANDARDS:
1. Complete Section C of Containment Release Form in accordance with BwRP 6110-13T1.
2. Correctly operate the RM-11 for setpoint adjustment.

TASK CONDITIONS:

1. You are an extra NSO.
2. Both Units are at full power.
3. 1PR01J is operable.

INITIATING CUES:

1. The Unit Supervisor has handed you a Containment release package G-09-001, completed through section B, and has directed you to complete Section C. All previous sections of the release package have been successfully completed.

Page 2 of 6 R-301

RECORD START TIME Note: Provide the examinee with a copy of BwRP 6110-13T1completed through Step B and 1BwOS RETS 2.2.B-1 with Predefine cover sheet.

When requested by the examinee, Independent Verification has been completed.

PERFORMANCE STEP STANDARD Circle applicable

1. Refer to partially completed BwRP
  • Locate and open BwRP SAT UNSAT N/A 6110-13T1, Section C 6110-13T1 Comments:
  • Determine 1BwOS RETS Refer to1BwOS RETS 2.2.B-1 2.2.B-1 needs to be performed next.

CUE: Prerequisites are met.

  • VERIFY the applicable Prerequisites, Precautions, and Limitations and Actions are addressed.
2. RECORD the Release Number
  • Locate release number on SAT UNSAT N/A from BwRP 6110-13T1 page 1 of containment Comments:

release form and record it in step 1.2

3. Locally obtain 1FI-PR100 Flowrate
  • Record flowrate and name SAT UNSAT N/A of EO is step 1.3 Comments:

CUE: EO (any name) reports flowrate is 2.9 scfm.

4. At the RM-11 Console
  • Press grid 2 key at RM-11 SAT UNSAT N/A (1PM14JB-1) VERIFY/SELECT and verify grid 2 Process Comments:

Grid 2 Air Monitor screen comes to view.

5. Perform source/channel check of
  • Press keys 1,2,0,1 in order SAT UNSAT N/A 1RE-PR001A and then press SEL key. Comments:
  • Obtain current activity reading of 1PA201 by depressing any trend, items or status key and record on surv.
  • Press the CHECK SOURCE key and verify key is backlit.
  • Verify CHECK SOURCE ENERGIZED is on status display.
  • Verify CHECK SOURCE FAILED is not indicated after backlit goes out.
  • Record cursor color of green.
  • Verify color not white magenta or dark blue.

Page 3 of 6 R-301

6. Perform source/channel check of
  • Press keys 1,1,0,1 in order SAT UNSAT N/A 1RE-PR001B and then press SEL key. Comments:
  • Obtain current activity reading of 1PB101 and record on surv.
  • Press the CHECK SOURCE key and verify key is backlit.
  • Verify CHECK SOURCE ENERGIZED is on status display.
  • Verify CHECK SOURCE FAILED is not indicated after backlit goes out.
  • Record cursor color of green.
  • Verify color not white magenta or dark blue.
7. Perform source/channel check of SAT UNSAT N/A 1RE-PR001C
  • Press keys 1,3,0,1 in order Comments:

and then press SEL key.

  • Obtain current activity reading of and record on surv.
  • Press the CHECK SOURCE key and verify key is backlit.
  • Verify CHECK SOURCE ENERGIZED is on status display.
  • Verify CHECK SOURCE FAILED is not indicated after backlit goes out.
  • Record cursor color of green.
  • Verify color not white magenta or dark blue.
8. o Press grid 2 key at RM-11 SAT UNSAT N/A Record original Setpoint of 1RE- and verify grid 2 Process Comments:

PR001 Gas Channel Air Monitor screen comes to view.

  • Press keys 1,1,0,1 in order and then press SEL key.
  • Press CHANNEL ITEMS key
  • Record High Alarm setpoint
  • Record Alert Alarm setpoint
  • Initial and date step.

Page 4 of 6 R-301

  • 9 Change High alarm setpoint on
  • Select SUPERVISOR SAT UNSAT N/A 1PB101 MODE on RM-11 with selector key. Comments:

o Press CHANNEL ITEMS key

  • Press 09 and SELECT Cue: When prompted by examinee for an independent
  • Press 683-4 (or 683-04) verification, state Another NSO and ENTER has independently verified the set point change.
  • Initial and date step.
  • 10 Change Alert alarm setpoint on
  • Press 10 and SELECT SAT UNSAT N/A 1PB101
  • Press 683-5 (or 683-05) Comments:

Cue: When prompted by and ENTER examinee for an independent verification,

  • Initial and date step.

state Another NSO has independently verified the set point change.

11 Notify US of section C completion

  • Notifies US that section C SAT UNSAT N/A is complete.

Comments:

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

Page 5 of 6 R-301

SIMULATOR SETUP INSTRUCTIONS JPM NO: N-099 REQUIRED SIMULATOR MODE (S): ANY MALFUNCTION #S: N/A COMMENTS:

1. BwRP 6110-13T1 needs to be filled out through section B. Step D.7.b High Alarm Setpoint 2.84 x 10-4 Step A.5.d High Alarm Setpoint 6.83 x 10-4 Step A.5.d Alert Alarm Setpoint 6.83 x 10-5
2. Verify 1RE-PR001 setpoints as follows:

High Alarm (Channel Item 9) 6.06 x 10-4 Alert Alarm (Channel Item 10) 6.06 x 10-5

3. Place RM-11 on Grid 2.
4. Advance RM-11 printer to blank paper.

Page 6 of 6 R-301

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are an extra SRO on shift.
2. Unit 1 is recovering from an event that caused a suspected hydrogen bubble to accumulate in the reactor vessel head.
3. The crew is currently performing 1BwFR-I.3 RESPONSE TO VOIDS IN REACTOR VESSEL.
4. Attempts to condense the vessel head void have been unsuccessful and the TSC has directed the crew to perform a direct vessel vent.
5. Current plant conditions are as follows:
  • Containment temperature (dry bulb) = 160ºF
  • Containment pressure = 3.5 psig
  • RCS pressure = 1900 psig INITIATING CUES:
1. The Shift Manager (Jon Doe) directs you to assist the Unit 1 SRO by calculating vessel vent time per 1BwFR-I.3, Attachment B.
2. Inform the Shift Manager when you have completed 1BwFR-I.3, Attachment B.

S-108 Page 1 of 5

TASK TITLE: Determine Venting Time For Reactor Vessel Void JPM No.: S-108 REV: NRC 09-1 Task No.: S-FR-017 K/A No.: 2.1.25 Objective No.: 8D.FR-012-A K/A IMP: 4.2 EXAMINEE: SRO EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 2, 3, 4, 5, 6 APPROX COMPLETION TIME: 10 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR OR CLASSROOM GENERAL

REFERENCES:

1. 1BwFR-I.3, RESPONSE TO VOIDS IN REACTOR VESSEL, Rev 201.

MATERIALS:

1. 1BwFR-I.3, RESPONSE TO VOIDS IN REACTOR VESSEL, Attachment B.
2. Calculator TASK STANDARDS:
1. Determine vessel venting time TASK CONDITIONS:
1. You are an extra SRO on shift.
2. Unit 1 is recovering from an event that caused a suspected hydrogen bubble to accumulate in the reactor vessel head.
3. The crew is currently performing 1BwFR-I.3 RESPONSE TO VOIDS IN REACTOR VESSEL.
4. Attempts to condense the vessel head void have been unsuccessful and the TSC has directed the crew to perform a direct vessel vent.
5. Current plant conditions are as follows:
  • Containment temperature (dry bulb) = 160ºF
  • Containment pressure = 3.5 psig
  • RCS pressure = 1900 psig INITIATING CUES:
1. The Shift Manager (Jon Doe) directs you to assist the Unit 1 SRO by calculating vessel vent time per 1BwFR-I.3, Attachment B.
2. Inform the Shift Manager when you have completed 1BwFR-I.3, Attachment B.

S-108 Page 2 of 5

RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to 1BwFR-I.3 Refer to 1BwFR-I.3 SAT UNSAT N/A NOTE: Provide copy of 1BwFR- Comments:

I.3 to examinee.

  • 2. Calculate containment Perform Attachment B, step 1 SAT UNSAT N/A temperature in Rankine.
  • Enter 160 in ºF blank. Comments:
  • Add 460 to 160 and enter 620 in ºR blank.
  • 3. Calculate containment air Perform Attachment B, step 2 SAT UNSAT N/A volume based on current
  • Enter 620 in ºR blank. Comments:

temperature and pressure.

  • Enter 3.5 in CNMT press blank.
  • Perform calculation and enter 2,750,968 (or approx.

2.75E6) in ft3 blank.

  • 4. Calculate maximum hydrogen Perform Attachment B, step 3 SAT UNSAT N/A volume that can be vented

keeping cnmt concentration conc. blank.

below 3%.

  • Enter enter 2,750,968 (or approx. 2.75E6) in ft3 blank
  • Perform calculation and enter 55,019 (or approx.

5.5E4) in ft3 blank.

  • 5. Determine hydrogen flow rate Perform Attachment B, step 4 SAT UNSAT N/A from RCS vent.
  • Plot RCS pressure on Comments:

Figure 1BwFR I.3-4 and determine flow rate will be 5850 scfm (range of 5800 to 5900)

  • Enter flow rate in step 4 SCFM blank.
  • 6. Calculate maximum venting Perform Attachment B, step 5 SAT UNSAT N/A time.
  • Enter 55,019 (or approx. Comments:

5.5E4) in ft3 blank.

  • Enter 5850 (5800 - 5900) in SCFM blank.
  • Calculate minutes and enter 9.4 (range of 9.3 to 9.5) in minutes blank.

S-108 Page 3 of 5

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

7. Report to SM results of venting Notify SM that RCS venting SAT UNSAT N/A calculation. can be performed for approx. Comments:

9.4 minutes.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

S-108 Page 4 of 5

NOTE: JPM can be performed in any location. If JPM is performed in simulator, inform examinee to use given information in cue.

SIMULATOR SETUP INSTRUCTIONS

  • N/A COMMENTS:

S-108 Page 5 of 5

TASK CONDITIONS:

1. You are the Unit 1 Unit Supervisor.
2. Unit 1 is at 100% power; all systems and controls are normally aligned.
3. A Unit 1 Containment release package has been initiated to lower containment pressure.

INITIATING CUES:

1. The U1 Assist NSO has completed Containment Release package G-09-001 through step C.1.f., and states that the package is ready for you.
2. Inform the U1 Admin NSO when the release package review is complete.

S-300 Page 1 of 4

TASK TITLE: Review Containment Release for Approval JPM No.: S-300 REV: NRC 09-1 TPO No.: 8C.HP-002 K&A No.: 2.3.11 TASK No.: S-HP-002: Authorize Gaseous (Containment K&A IMP: 4.3 or Gas Decay Tank) Rad Waste Release ADMIN: Radiation Control EXAMINEE: ____________________ SRO EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

CRITICAL ELEMENTS: (*) 2, 4 JPM TIME: MINUTES CRITICAL TIME: None APPROX COMPLETION TIME: 30 MINUTES EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. 1BwOS RETS 2.2.B-1, Rev 1, Unit One Pre-release Source and Channel Check of Containment Purge Effluent Monitor 1PR01J (1RE-PR001A/B/C)
2. BwRP 6110-13T1, Rev 16, Containment Release Form MATERIALS:
1. Copy of partially completed BwRP 6110-13T1
2. Copy of completed 0BwOS RETS 2.2.1a
3. 1BwOS RETS 2.2.B-1 TASK STANDARDS:
1. Review BwRP 6110-13T1 and 0BwOS RETS 2.2.1a.
2. Determine release cannot proceed due to 1PR01J status.
3. Determine entry into RETS 2.2-1A required for 1PR01J.

TASK CONDITIONS:

1. You are the Unit 1 Unit Supervisor.
2. Unit 1 is at 100% power; all systems and controls are normally aligned.
3. A Unit 1 Containment release package has been initiated to lower containment pressure.

INITIATING CUES:

1. The U1 Assist NSO has completed Containment Release package G-09-001 through step C.1.f., and states that the package is ready for you. (Cue: Hand release package and surveillance to examinee.)
2. Inform the U1 Admin NSO when the release package review is complete.

S-300 Page 2 of 4

RECORD START TIME:

PERFORMANCE STEP STANDARD Circle Applicable

1. Refer to partially completed BwRP 6110-
  • Reads Step D, determines SAT UNSAT N/A 13T1, Section C SRO approval required. Comments:

Cue: (If asked) Gaseous Release in

  • Reviews entire document progress sign has been placed and the 1A VA exhaust fan is in operation.
  • 2. Review Section B Reviews steps C.1.a-f: SAT UNSAT N/A
  • Reviews 1BwOS RETS Comments:

Cue: (If asked) NSO verifies 2.2.B-1 1PB101 is WHITE.

  • Notices 1PB101 is white Cue: (If asked)Shift Manager (step 3.5 of 1BwOS acknowledges BwOS failure RETS 2.2.B-1) which and an investigation is to be does not meet conducted. acceptance criteria Cue: (if asked) RETS will be entered for 1PR01J.
3. Review information and ensure rest of Identify from review that the SAT UNSAT N/A form filled out release form has no additional Comments:

errors Note: Candidate may elect to proceed no further based on the surveillance failure. If so:

Cue: Shift Manager acknowledges BwOS failure, but desires you check the rest of the release package to ensure it is properly filled out

  • 4. Refuse to approve release until errors
  • Determine release is SAT UNSAT N/A have been resolved. unable to be performed Comments:

(cannot be signed) until 1BwOS/1PR001J failure Cue: If examinee asks to review corrected 0BwOS RETS 2.2.1a., provide o Reviews RETS a copy for review.

CUE: THIS COMPLETES THIS JPM RECORD STOP TIME:

COMMENTS:

S-300 Page 3 of 4

SIMULATOR SETUP INSTRUCTIONS JPM NO: S-300 REQUIRED SIMULATOR MODE (S): None.

MALFUNCTION #S:

COMMENTS:

S-300 Page 4 of 4

TASK CONDITIONS:

1. You are the Unit Supervisor on Unit 1.
2. 15 minutes ago Unit 1 experienced an automatic Rx trip from 100% power.
3. Aux Feed automatically initiated at the proper SG level.
4. The trip was caused by a spiking OTDT channel, while a second channel was in test.
5. All other equipment functioned as designed.
6. 1BwEP ES-0.1 is in progress.
7. No Emergency Plan thresholds have been met.

INITIATING CUES:

You have been directed by the SM to screen this event for reportability and complete the ENS notification worksheet for the event, if required.

1 S-404

TASK TITLE: Screen an Event for Reportability and Complete ENS Worksheet JPM No.: S-404 REV: NRC 09-1 TPO No.: 8.E.AM-102 K&A No.: 2.4.30 TASK No.: S-AM-102: Screen Reportable or K&A IMP: 4.1 Significant Events for Reportability EXAMINEE: SRO EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 2, 3 APPROX COMPLETION TIME: 25 MINUTES CRITICAL TIME: N/A EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. LS-AA-1110, Rev. 7, Exelon Reportability Manual
2. EP-AA-114, Rev. 6, Notifications
3. LS-AA-1150, Rev. 0, Event Notification Worksheet MATERIALS:
1. LS-AA-1110
2. LS-AA-1150 TASK STANDARDS:
1. Screen an event for reportability and complete the appropriate notification worksheet.

TASK CONDITIONS:

1. You are the Unit Supervisor on Unit 1.
2. 15 minutes ago Unit 1 experienced an automatic Rx trip from 100% power.
3. Aux Feed automatically initiated at the proper SG level.
4. The trip was caused by a spiking OTDT channel, while a second channel was in test.
5. All other equipment functioned as designed.
6. 1BwEP ES-0.1 is in progress.
7. No Emergency Plan thresholds have been met.

INITIATING CUES:

1. You have been directed by the SM to screen this event for reportability and complete the ENS notification worksheet, if required.

2 S-404

RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable

1. Refer to Exelon Reportability Manual. Locate and open ENS worksheet SAT UNSAT N/A and Exelon Reportability Manual. Comments:

Note: Provide a copy of the worksheet and the reportability manual.

  • 2. Using the Reportability Manual, Review the Exelon Reportability SAT UNSAT N/A screen the event for reporting Manual to determine notification Comments:

requirements. requirements of:

  • SAF 1.6, 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. (RPS)
  • SAF 1.7, 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. (AF)
  • 3. Complete the Event Notification Complete the ENS worksheet as SAT UNSAT N/A worksheet. follows: Comments:

Note: Exact wording not o Notification time.

required.

  • Facility (Braidwood).
  • Unit (1).

o Callers Name (students name).

o Call back # (phone #).

  • Event Time (Rx trip time)
  • Date (todays date).

Cue: Initial reactor power was

  • Power/Mode Before 100%. (100%/1).

o Power/Mode After (0%/Mode 3).

  • X in Event Classifications Category 50.72 Non emergency.

RPS Actuation (scram)

ARPS.

Specified System Actuation AESF.

  • Description of event (Unit 1 Rx Trip with AF initiation).

o Notifications performed.

o Anything unusual or not understood? (no).

o Did all systems function as required? (yes, if referring to AF).

Cue: All systems functioned as o Mode of Operation until required. corrected? (3).

Cue: Expected mode of operation o Estimated Restart Date is Mode 3 (unknown).

Cue: Estimated restart date is tomorrow.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

3 S-404

4 S-404

SIMULATOR SETUP INSTRUCTIONS JPM NO: S-404 REQUIRED SIMULATOR MODE (S): N/A MALFUNCTION #S: N/A COMMENTS: None 5

S-404

TASK CONDITIONS:

1. You are the Unit 1 NSO.
2. Unit 1 is at full power, all systems and controls are in automatic.

INITIATING CUES:

1. You have been directed to perform 1BwOSR 3.1.4.2, Unit One Movable Control Assemblies Quarterly Surveillance in the preferred order specified in surveillance.
2. ARO position is to remain the same.
3. System Engineering has determine that performance of BwVS 500-2, Checkout of the Bank Overlap Unit and System Verification is not required and support is available for removing Rod J-13 from double gripper hold.
4. Inform the Shift manager of your results.

SIM-111 1

TASK TITLE: Perform Movable Control Assemblies Quarterly Surveillance JPM No.: SIM 111 REV: NRC 09-1 TPO No.: 4C.GP-04 K&A No.: 001000A4.03 TASK No.: R-RD-004, Perform Critical Control K&A IMP: 4.0/3.7 Rod Position Surveillance EXAMINEE: RO SRO (Circle One)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

CRITICAL ELEMENTS: (*) 3, 4, 5 JPM TIME: MINUTES CRITICAL TIME: NA APPROX COMPLETION TIME: 30 MINUTES EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. Tech Spec 3.1.4
2. 1BwOSR 3.1.4.2, Rev.17, Unit One Movable Control Assemblies Quarterly Surveillance.

MATERIALS:

1. 1BwOSR 3.1.4.2, Unit One Movable Control Assemblies Quarterly Surveillance.

Ensure cover sheet is signed and due/late dates are modified.

2. Requires Reactivity Manager.

TASK STANDARDS:

1. Perform the required actions of 1BwOSR 3.1.4.2, Movable Control Assemblies Quarterly Surveillance.

TASK CONDITIONS:

1. You are the Unit 1 NSO.
2. Unit 1 is at full power, all systems and controls are in automatic.

INITIATING CUES:

1. You have been directed to perform 1BwOSR 3.1.4.2, Unit One Movable Control Assemblies Quarterly Surveillance.
2. ARO position is to remain the same.
3. System Engineering has determine that performance of BwVS 500-2, Checkout of the Bank Overlap Unit and System Verification is not required and support is available for removing Rod J-13 from double gripper hold.
4. Inform the Shift manager of your results.

SIM-111 2

RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable

1. Refer to 1BwOSR 3.1.4.2. Refer to 1BwOSR 3.1.4.2.

(CUE: Provide student with the o Signs cover sheet SAT UNSAT N/A marked up copy with cover sheet. No cue Comments:

sheet is provided)

(CUE: Visual inspection of all U1

  • Verify all applicable Rod Drive cabinets is prerequisites, precautions complete and limitations and actions are satisfactory. All other addressed.

prerequisites are met.) o Places dots on expected alarms listed in limitations and actions and pre-reviews BwARs.

o 1-10-A6 o 1-10-B6 o 1-12-C1 o 1-10-A7

2. Transfer Rod Control to Manual o Informs US that rod and Verify Tave is matched to control will be placed in SAT UNSAT N/A Tref. manual.

Comments:

  • Transfer rod control to (CUE: When examinee gets to step MANUAL.

2.3.a.1), tell them that o Verifies rod speed at performance of BwOP 48 stps/min RD-7 will be delayed until SD bank B is to be tested.

  • VERIFY/MAINTAIN Tave matched to Tref.
  • 3. Selects SBE bank select and Perform the Rod Movement records SD bank E position Verification as follows: SAT UNSAT N/A o Examinee reads note that as long as SB Comments:

Rods are above 224 Cue: When necessary acknowledge by bank demand alarms as US and verify SER /DRPI >222 Rod pt 2153 is in alarm. Insertion limits are met.

o Examinee reads note for preferred order on SD banks.

  • Places rod bank select switch in SBE Position.
  • Examinee Records initial group step counter as found readings and DRPI readings for CBA on Table 2.

o Reads note concerning ROD DEV POWER RNG TILT alarm.

SIM-111 3

PERFORMANCE STEP STANDARD Circle applicable

  • 4 Withdraws SBE rods to 231 steps
  • Withdraws SBE rods to 231 on the Group Step SAT UNSAT N/A Counters.
  • Verifies DRPI indicates

> 222 steps for SBE. Comments:

    • ALTERNATE PATH START**
  • 5 Inserts SBE rods to 10-15 steps
  • Attempts to insert SBE 10-15 steps as SAT UNSAT N/A indicated on the group step counter(s)
  • Identifies failure of rod Comments:

H4 to move.

o Records position of SBE rods o Checks N block on data sheet D-2

  • Immediately Reports Cue: (SRO only)(If necessary) ask as Failure of rod H4 to US what TS is required to be SM or designee (US is entered. acceptable)

Recognizes 3.1.4 condition A is applicable.

(CUE:) THIS COMPLETES THIS JPM.

RECORD STOP TIME __________

COMMENTS:

SIM-111 4

SIMULATOR SETUP INSTRUCTIONS JPM NO: SIM-111 REQUIRED SIMULATOR MODE(S): 100% power steady state MALFUNCTION #S:

RD05H04 Stuck rod on Shutdown Bank E H4 (current rod height)

COMMENTS:

SIM-111 5

TASK CONDITIONS:

1. You are the Unit 1 Extra NSO.
2. Both Units are at power.
3. All systems and controls are normal for the present conditions.
4. This is a time critical JPM.

INITIATING CUES:

Annunciator 1-5-B2, ACCUM 1B PRESS HIGH/LOW, has been in for 30 minutes. The LCOAR for the 1B SI accumulator was entered 28 minutes ago. The Unit Supervisor has directed you to respond to the alarm and correct the condition.

1 SIM-207

TASK TITLE: Raise SI Accumulator Pressure JPM Number: SIM-207 Rev: NRC 09-1 TPO No.: 4C.SI-04 K&A No.: 006000A4.02 Task No.: R-SI-003, Adjust SI accumulator pressure. K&A Imp.: 4.0/3.8 EXAMINEE: RO SRO (Circle One)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES Critical Elements: (*) 3, 4 Approx. Completion Time: 16 minutes Critical Time: 32 minutes EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. BwAR 1-5-B2, Rev. 6E3, ACCUM 1B PRESS HIGH/LOW
2. BwOP SI-8, Rev. 14, Raising SI Accumulator Pressure
3. TS 3.5.1 MATERIALS:
1. BwOP SI-8 TASK STANDARDS:
1. Restore SI Accumulator pressure to within Tech Spec limits TASK CONDITIONS:
1. You are the Unit 1 Extra NSO.
2. Both Units are at power.
3. All systems and controls are normal for the present conditions.
4. This is a time critical JPM.

INITIATING CUES:

1. Annunciator 1-5-B2, ACCUM 1B PRESS HIGH/LOW, has been in for 30 minutes. The LCOAR for the 1B SI accumulator was entered 28 minutes ago. The Unit Supervisor has directed you to respond to the alarm and correct the condition.

2 SIM-207

RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable

1. Refer to BwAR 1-5-B2 and determine Locate and open BwAR 1-5-B2 SAT UNSAT N/A 1B SI accumulator pressure is low. and perform the following: Comments:

CUE: If asked as US, confirm that o Monitor 1LI-952/953 for 1B 1BwOL 3.5.1 has been accumulator level.

entered and you are directed o Monitor 1PI-962/963 to to raise 1B SI accumulator determine pressure is low.

pressure to 625 psig o Check SER points 2066 and 0603 in alarm.

2. Refer to BwOP SI-8, Raising SI Locate and open BwOP SI-8. SAT UNSAT N/A Accumulator Pressure. Comments:

NOTE: After the student locates correct procedure, provide a copy and inform the student that all prerequisites, precautions and limitations and actions are met.

  • 3. Align N2 Tube trailer per BwOP NT- Perform the following to SAT UNSAT N/A 9, step F.1 to pressurize the vent pressurize the N2 header up to Comments:

header up to the vent valve, the 1B SI accumulator vent valve, 1SI8875B. 1SI8875B:

CUE: N2 tube trailer is aligned o Dispatch EO to align N2 tube trailer per BwOP NT-9, step F.1.

At 1PM06J:

o Verify / Close 1SI943.

  • Open 1SI8880, N2 Supply Isolation Valve.

3 SIM-207

NOTE: With RCS Pressure > 1000 psig, DO NOT open more than one 1SI8875A/B/C/D at a time.

  • 4. Raise pressure in the 1B SI Raise pressure in the 1B SI SAT UNSAT N/A Accumulator to within Tech Spec Accumulator to within T.S limits Comments:

limits. as follows:

NOTE: Critical Time ends when

  • Open 1SI8875B.

accumulator pressure is o Monitor pressure rise on 1PI-greater than 602 psig. 962/963.

o Verify Alarm 1-5-B2 clears.

Time 1B SI accumulator pressure >

  • Close 1SI8875B after clearing 602 psig:______ low pressure alarm but prior to receiving high pressure Note: Previous cue required alarm.

pressure rise to be stopped at 625 psig.

5. Exit LCOAR 3.5.1. Inform US pressure is within the SAT UNSAT N/A Tech Spec limit and LCOAR Comments:

CUE: US acknowledges pressure 1BwOL 3.5.1 may be exited.

restored and exits LCOAR.

6. Restores N2 lineup Restore N2 lineup as follows: SAT UNSAT N/A Comments:

CUE: EO reports N2 tube trailer has

  • Close 1SI8880, N2 Supply been restored. Isolation Valve.
  • Dispatch EO to restore N2 tube trailer per BwOP NT-9, step F.2.

CUE: THIS COMPLETES THIS JPM RECORD STOP TIME COMMENTS:

4 SIM-207

SIMULATOR SETUP INSTRUCTIONS JPM No: N-003a REQUIRED SIMULATOR MODE (S): 100% power steady state preferred, however, Mode 1, 2, or 3 > 1000 psig will work with minor adjustments to the initiating cues.

MALFUNCTION #S: NONE COMMENTS:

EITHER:

1. Open 1SI8875B
2. Throttle open 1SICHV943 until 1B SI Accumulator pressure is slightly less than 602 psig.
3. Close 1SI8875B and 1SICHV943
4. Consider a snap to 0.
5. Ensure SER has alarm printed and on screen.

OR

1. Modify the pressure in the 1B SI Accumulator as follows:

MMP SIMN2ACC[2] 1203 (600 psig. NOTE HP alarm is at 637 psig, 1280 mass of N2 at 5.807 e4 (SIMACC[2]) mass of water. 1262 mass is 628 psig.)

5 SIM-207

TASK CONDITIONS:

1. You are the Unit 1 NSO.
2. Unit 1 is at full power, all systems and controls are in automatic.
3. Maintenance has recently completed repairs to 1RY455A PZR PORV.
4. LCO 3.4.11 is in effect for 1RY455A inoperability.
5. Per the IST program, 1RY455A must be stroke tested prior to declaring it operable.

INITIATING CUES:

1. You have been directed to perform 1BwOSR 3.4.11.2, Pressurizer System Valve Stroke Surveillance, steps 1, 2 and 4.
2. Inform the Shift manager of your results.

SIM-304 1

TASK TITLE: Perform Pressurizer PORV Valve Stroke JPM No.: SIM 304 REV: NRC 09-1 TPO No.: 4C.RY-29 K&A No.: 010000A4.03 TASK No.: R-RY-023, Perform a Reactor Coolant System K&A IMP: 4.0/3.8 relief valve 18 month surveillance EXAMINEE: RO SRO (Circle One)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

CRITICAL ELEMENTS: (*) 2,3,4,6 JPM TIME: MINUTES CRITICAL TIME: NA APPROX COMPLETION TIME: 15 MINUTES EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. Tech Spec 3.4.11
2. 1BwOSR 3.4.11.2, Pressurizer System PORV Valve Stroke Surveillance.

MATERIALS:

1. 1BwOSR 3.4.11.2, Pressurizer System PORV Valve Stroke Surveillance.

Ensure cover sheet is signed and due/late dates are modified.

2. Requires digital stop watch.

TASK STANDARDS:

1. Perform the required actions of 1BwOSR 3.4.11.2, Pressurizer System PORV Valve Stroke Surveillance.

TASK CONDITIONS:

1. You are the Unit 1 NSO.
2. Unit 1 is at full power, all systems and controls are in automatic.
3. Maintenance has recently completed repairs to 1RY455A PZR PORV.
4. LCO 3.4.11 is in effect for 1RY455A inoperability.
5. Per the IST program, 1RY455A must be stroke tested prior to declaring it operable.

INITIATING CUES:

1. You have been directed to perform 1BwOSR 3.4.11.2, Pressurizer System Valve Stroke Surveillance, steps 1, 2 and 4.
2. Inform the Shift Manager of your results.

SIM-304 2

RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable

1. Refer to 1BwOSR 3.4.11.2.
  • Refer to 1BwOSR 3.4.11.2. SAT UNSAT N/A (CUE: Provide student with the
  • Signs cover sheet marked up copy with cover
  • Verify all applicable Comments:

sheet.) prerequisites, precautions limitations and actions are addressed.

  • Checks cover sheet for IST coordinator listed for review of results.

o Places dots on expected alarms and pre-reviews ARs.

o 1-12-B2

  • Obtains stopwatch.

o Records stopwatch data on position checklist.

  • Records and initials as found positions.
  • 1RY455A
  • 1RY456
  • 1RY8000A
  • 1RY8000B
  • 2. At 1PM05J, closes 1RY8000A
  • Closes 1RY8000A SAT UNSAT N/A Comments:
  • 3. Perform OPEN stroke of 1RY455A (in accordance with steps
  • Perform the following: SAT UNSAT N/A outlined in Attachment A).
  • Verify close 1RY455A
  • Simultaneously start Comments:

the stopwatch and open 1RY455A.

  • Stop the stopwatch when 1RY455A indicates open.
  • Record the Stroke Open Test Time.
  • Verify 1RY455A indicates open on 1PM06J.
  • Verify the open test time is within the ALERT and OPERABILITY Limits.
  • Check the YES block in the VER OPER section to indicate that SIM-304 3

1RY455A has been verified operable.

  • Initial in open stroke block provided.
  • 4. Perform CLOSE stroke of 1RY455A (in accordance with
  • Perform the following: SAT UNSAT N/A steps outlined in Attachment
  • Verify open 1RY455A B).
  • Simultaneously start Comments:

the stopwatch and close 1RY455A.

  • Stop the stopwatch when 1RY455A indicates closed.
  • Record the Stroke Close Test Time.
  • Verify 1RY455A indicates closed on 1PM06J.
  • Verify the close test time is within the ALERT and OPERABILITY Limits.
  • Check the YES block in the VER OPER section to indicate that 1RY455A has been verified operable.
  • Initial in closed stroke block provided.

SIM-304 4

PERFORMANCE STEP STANDARD Circle applicable

5. Initial step 2.3
  • Verifies 1RY455A has SAT UNSAT N/A been stroked through one complete cycle and initial in space Comments:

provided.

  • 6. At 1PM05J, opens 1RY8000A
  • Opens 1RY8000A SAT UNSAT N/A (Cue: If asked, cue examinee that Comments:

1RY8000A is to be returned to as found condition)

7. Complete as left position checklist.
  • Records and initials as SAT UNSAT N/A left positions.
  • 1RY455A Comments:
  • 1RY8000A (Cue: Another NSO has performed the
  • Obtains verification of verifications of as left as left positions positions)
8. Inform US of surveillance completion.
  • Signs surveillance cover sheet. SAT UNSAT N/A
  • Informs US that surveillance is Comments:

complete.

(CUE:) THIS COMPLETES THIS JPM.

RECORD STOP TIME __________

COMMENTS:

SIM-304 5

SIMULATOR SETUP INSTRUCTIONS JPM NO: SIM-304 REQUIRED SIMULATOR MODE(S): 100% power steady state MALFUNCTION #S:

None COMMENTS:

SIM-304 6

TASK CONDITIONS:

1. You are the Unit 1 Assist NSO.
2. Both Units are at 100% power.
3. Unit 2 has placed the 2A SX pump in service and requests that Unit 1 swap operating SX trains.

1B SX pump has been shutdown for 2 weeks.

4. An EO has been briefed and is standing by to assist in the field.

INITIATING CUES:

1. The Unit 1 Unit Supervisor has directed you to start the 1B SX pump and shutdown the 1A SX pump per BwOP SX-7.
2. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
3. Inform the Unit 1 Unit Supervisor when you have completed the pump swap.

Page 1 of 5 SIM-407S

TASK TITLE: Swap Essential Service Water Pumps JPM No.: N-072a REV: NRC 09-1 TPO No.: 4C.SX-03 K&A No.: 076000A4.01 TASK No.: R-SX-002/003, Startup/shutdown an Essential K&A IMP: 2.9/2.9 Service Water pump TRAINEE: RO SRO (Circle One)

EVALUATOR: DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*)5, 7, 8 COMPLETION TIME: 22 MINUTES CRITICAL TIME: N/A ALTERNATE PATH: YES @

EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR CONTROL ROOM GENERAL

REFERENCES:

1. BwOP SX-7, Rev. 18, Swapping Essential Service Water Pumps MATERIALS:
1. BwOP SX-7, Rev. 18, Swapping Essential Service Water Pumps TASK STANDARDS:
1. 1A SX pump is restarted with high vibration indicated in the piping TASK CONDITIONS:
1. You are the Assist NSO.
2. The Unit is at power.
3. Unit 2 is at full power.
4. Unit 2 has placed the 2A SX pump in service and requests that Unit 1 swap operating SX trains.

1B SX pump has been shutdown for 2 weeks.

5. An EO has been briefed and is standing by to assist in the field.

INITIATING CUES:

1. The Unit 1 Unit Supervisor has directed you to start the 1B SX pump and shutdown the 1A SX pump per BwOP SX-7.
2. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
3. Inform the Unit 1 Unit Supervisor when you have completed the pump swap.

Page 2 of 5 SIM-407S

RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable

1. Refer to BwOP SX-7, SWAPPING Refer to BwOP SX-7, SAT UNSAT N/A ESSENTIAL SERVICE WATER SWAPPING ESSENTIAL Comments:

PUMPS. SERVICE WATER PUMPS.

CUE: Provide copy of BwOP

  • VERIFY all applicable SX-7. Prerequisites, CUE: All Prerequisites, Precautions, and Precautions, Limitations Limitations and Actions and Actions have been are satisfactorily met. addressed.
2. Verify 1B SX pump suction valve Perform the following at SAT UNSAT N/A open. 1PM06J: Comments:
  • Determine 1SX001B, CUE: If requested, EO reports SX pump 1B suction that 1SX001B is open. valve, is open.

EVALUATOR NOTE: The examinee may verify 1PR02J/3J are in operation prior to placing the 1B and 1D RCFCs coils in service.

3. Verify RCFC 1B and 1D inlet and Perform the following: SAT UNSAT N/A outlet valves open. Comments:
  • Verify/Open 1SX016B/1SX027B.

Or CUE If asked, US does not o Place Jumper to simulate desire to use a jumper. valve position per Attachment A

4. Start 1A and 1B SX pump Aux. Oil Direct EO to locally start 1A SAT UNSAT N/A pumps. and 1B SX pump Aux. Oil Comments:

pumps. (1SX01PA/B-C)

  • At 1PM06J verify 1A and Note: Simulator operator to 1B SX pump Aux. Oil start both aux. oil pumps pump run lights lit.

when called.

  • 5. Start 1B SX pump. Perform the following at SAT UNSAT N/A CUE: If contacted as Unit 2 1PM06J: Comments:

operator, acknowledge o Announce pump swap over upcoming SX pump plant page swap.

  • Start 1B SX pump by taking CUE: If dispatched as EO to the control switch to close monitor 1B SX pump until pump starts.

start locally, report satisfactory start of 1B SX pump shortly after pump started.

CUE: As Unit Supervisor, acknowledge reports of annunciators due to SX pump start/stop as they occur.

Page 3 of 5 SIM-407S

6. Check running amps on both SX Perform the following at SAT UNSAT N/A pumps approximately equal. 1PM06J: Comments:
  • Monitor ammeters for 1A Check running SX pump discharge and 1B SX pumps.

pressure < 112#.

  • Determine 1A and 1B SX pumps ammeters approximately equal.
  • 7. Stops 1A SX pump. Stops 1A SX pump by placing SAT UNSAT N/A CUE: As Unit Supervisor, the control switch to TRIP. Comments:

acknowledge reports of annunciators due to SX pump start/stop as they occur.

    • ALTERNATE PATH START**
  • 8. CUE: U-2 reports that the 2A SX SAT UNSAT N/A pump has tripped and U- Comments:

2 has re-started the 2B SX pump.

CUE: EO reports high vibration

  • Re-Starts the 1A SX pump in the 1A train suction header of SX.

Another NSO will complete this procedure.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

Page 4 of 5 SIM-407S

SIMULATOR SETUP INSTRUCTIONS JPM NO: SIM-407S REQUIRED SIMULATOR MODE (S): At power MALFUNCTION #S: N/A COMMENTS:

1. Remote functions for SX pumps aux. oil pumps:
  • 1A SX pump aux. oil pump: RF SW03 ON / OFF
  • 1B SX pump aux. oil pump: RF SW04 ON / OFF
2. Remove SX Pump Trends from the HMI.

Page 5 of 5 SIM-407S

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are the Unit 1 Assist NSO.
2. Unit 1 is in mode 1 with all systems properly aligned.
3. 1BwOSR 3.6.6.2 REACTOR CONTAINMENT FAN COOLER SURVEILLANCE has been initiated and completed through step F.1 INITIATING CUES:
1. The Unit 1 Unit Supervisor has directed you to perform 1BwOSR 3.6.6.2 REACTOR CONTAINMENT FAN COOLER SURVEILLANCE steps F.2 and F.3.
2. All fans are to be return to as found condition when surveillance runs are completed.
3. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
4. Inform the Unit 1 US when steps F.2 and F.3 are complete.

SIM-507 Page 1 of 6

TASK TITLE: Perform RCFC Surveillance.

JPM No.: SIM-507 REV: NRC 09-1 TPO No: 4C.VP-06 K/A No.: 022000A4.01 TASK No.: R-VP-007 Start-up a RCFC K/A IMP: 3.6/3.6 EXAMINEE: RO SRO (Circle One)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 3, 6 APPROX COMPLETION TIME: 20 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

X PERFORM _ IN PLANT

_ SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. 1BwOSR 3.6.6.2, REACTOR CONTAINMENT FAN COOLER SURVEILLANCE, Rev. 18.
2. BwOP VP-5, REACTOR CONTAINMENT FAN COOLER START-UP, Rev. 57.
3. BwOP VP-6, REACTOR CONTAINMENT FAN COOLER SHUTDOWN, Rev. 55.

MATERIALS:

1. Copy of BwOP VP-5, Rev. 57.
2. Copy of BwOP VP-6, Rev. 55.
3. 1BwOSR 3.6.6.2 completed through step F.1 TASK STANDARDS:
1. Perform RCFC Fan Swap
2. Determine 1C RCFC Low Speed Breaker Trips upon start.
3. Recognize Tech Spec required actions for 1D RCFC low speed breaker malfunction.

TASK CONDITIONS:

1. You are the Unit 1 Assist NSO.
2. Unit 1 is in mode 1 with all systems properly aligned.
3. 1BwOSR 3.6.6.2 REACTOR CONTAINMENT FAN COOLER SURVEILLANCE has been initiated and completed through step F.1 INITIATING CUES:
1. The Unit 1 Unit Supervisor has directed you to perform 1BwOSR 3.6.6.2 REACTOR CONTAINMENT FAN COOLER SURVEILLANCE steps F.2 and F.3.

CUE: Hand examinee copy of 1BwOSR 3.6.6.2

2. All fans are to be return to as found condition when surveillance runs are completed.
3. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
4. Inform the Unit 1 US when steps F.2 and F.3 are complete.

SIM-507 Page 2 of 6

RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to 1BwOSR 3.6.6.2. Refer to 1BwOSR 3.6.6.2. SAT UNSAT N/A CUE: All prerequisites, Comments:

precautions, and limitations and actions are met.

2. Stop 1A and 1C RCFC High Refer to BwOP VP-6 SAT UNSAT N/A Speed Breakers per BwOP VP-6:
  • Determine step F.1 is Comments:

CUE: All prerequisites, applicable step.

precautions, and limitations and actions Perform the following at are met. 1PM06J:

  • Place 1VP01CA, High Speed Brk to trip.
  • Place 1VP01CC, High Speed Brk to trip.
  • 3. Start 1A and 1C RCFC Low Refer to BwOP VP-5 SAT UNSAT N/A Speed Breakers per BwOP VP-5:
  • Determine step F.2 is Comments:

applicable step.

CUE: All prerequisites, precautions, and After waiting at least 20 limitations and actions seconds from securing fans, are met. Perform the following at 1PM06J:

  • Place 1VP01CA, Low Speed Brk to start.
  • Place 1VP01CC, Low Speed Brk to start.
4. Record Train A run time
  • Record start time of last train A fan started Time Compression
  • Record current time (from cue)

CUE: 15 Minutes has elapsed since start of last train A fan.

  • Calculate and record The current time is now______ total A train low speed (15 min later) run time SIM-507 Page 3 of 6

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

4. Return train A RCFCs to as found Refer to BwOP VP-6 SAT UNSAT N/A condition.
  • Determine step F.2 is Comments:

applicable step.

Perform the following at 1PM06J:

  • Place 1VP01CA, Low Speed Brk to trip.
  • Place 1VP01CC, Low Speed Brk to trip.

Refer to BwOP VP-5

  • Determine step F.1 is applicable step.
  • Place 1VP01CA, High Speed Brk to start.
  • Place 1VP01CC, High Speed Brk to start.

Cue: All verifications are

  • Obtain verification of AS complete. LEFT positions.
5. Stop 1B and 1D RCFC High Refer to BwOP VP-6 SAT UNSAT N/A Speed Breakers per BwOP VP-6:
  • Determine step F.1 is Comments:

applicable step.

Perform the following at 1PM06J:

  • Place 1VP01CB, High Speed Brk to trip.
  • Place 1VP01CD, High Speed Brk to trip.
    • ALTERNATE PATH START**
  • 6 Start 1B and 1D RCFC Low Refer to BwOP VP-5 Speed Breakers per BwOP VP-5:
  • Determine step F.2 is applicable step.

After waiting at least 20 seconds from securing fans, Perform the following at 1PM06J:

  • Place 1VP01CB, Low Speed Brk to start.
  • Place 1VP01CD, Low Speed Brk to start.
  • Recognize 1VP01CD low speed brk malfunction.

o Place 1D low speed RCFC in PTL SIM-507 Page 4 of 6

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

7. Notify US of malfunction. Notify US of 1D RCFC brk SAT UNSAT N/A malfunction and need to evaluate LCO entry. Comments:

CUE: US acknowledges 1D RCFC brk malfunction and will evaluate Tech Specs for applicablility.

Cue: (SRO only)(If necessary) (SRO only) Recognizes ask as US what TS is required 3.6.6 condition C is to be entered. applicable.

CUE: THIS COMPLETES THIS JPM.

RECORD STOPT TIME:

COMMENTS:

SIM-507 Page 5 of 6

SIMULATOR SETUP INSTRUCTIONS

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish conditions of Mode 1, steady state, normal alignment.
  • IMF CH01D COMMENTS:
  • Provide copy of 1BwOSR 3.6.6.2 completed through step F.1
  • Provide copy of BwOP VP-5 and BwOP VP-6.

SIM-507 Page 6 of 6

TASK CONDITIONS:

1. You are an extra NSO.
2. Unit 1 has experienced a loss of Offsite power while in mode 3.
3. Unit 1 EDGs are carrying the ESF buses, but the Non-ESF buses are still de-energized.
4. The crew is currently performing 1BwOA ELEC-4
5. Unit 2 is at full power.

INITIATING CUES:

The US has directed you to re-energize 4KV Non-ESF bus 144 per step 7 of 1BwOA ELEC-4.

Another NSO will monitor the remainder of the control panels.

Page 1 of 5 SIM-611

TASK TITLE: Crosstie of ESF and Non-ESF Bus JPM No.: SIM-611 REV: NRC 09-1 TPO No.: 4D.OA-60, 61 K&A No.: 062000A4.01 TASK No.: R-OA-024, Energize an Electrical bus K&A IMP: 3.3/3.1 EXAMINEE: RO SRO (Circle One)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 3,4 APPROX COMPLETION TIME 6 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. 1BwOA ELEC-4, Rev 104, Loss of Offsite Power Unit 1, Step 7.

MATERIALS:

1. 1BwOA ELEC-4, Rev 104, Loss of Offsite Power Unit 1, Step 7.

TASK STANDARDS:

1. Perform the required actions of 1BwOA ELEC-4, Step 7, to crosstie an ESF and Non-ESF Bus.

TASK CONDITIONS:

6. You are an extra NSO.
7. Unit 1 has experienced a loss of Offsite power while in mode 3.
8. Unit 1 EDGs are carrying the ESF buses, but the Non-ESF buses are still de-energized.
9. The crew is currently performing 1BwOA ELEC-4
10. Unit 2 is at full power.

INITIATING CUES:

The US has directed you to re-energize 4KV Non-ESF bus 144 per step 7 of 1BwOA ELEC-4.

Another NSO will monitor the remainder of the control panels.

Page 2 of 5 SIM-611

RECORD START TIME Note: After examinee locates procedure, provide a copy.

PERFORMANCE STEP STANDARD Circle applicable

1. 1BwOA ELEC-4, Step 7 Locate and open 1BwOA ELEC- SAT UNSAT N/A 4, Step 7 Comments:
2. Determine ESF Bus 142 is energized. DETERMINE ESF Bus 142 is SAT UNSAT N/A energized: Comments:

o Bus 142 live light is LIT o Bus 142 voltage normal on 1EIAP086

  • 3. Prepare to Cross tie ESF to Non- Prepare to crosstie ESF and Non- SAT UNSAT N/A ESF buses. ESF bus: Comments:

CUE: (IF ASKED) Previously At 1PM02J, PLACE in PULL OUT dispatched EO reports 0A all breakers on bus 144:

Service Bldg. chiller in pull out.

  • ACB 1441
  • ACB 1442
  • ACB 1445RA
  • ACB 1445XY
  • ACB 1445ZW
  • ACB 1445BC PZR HTR
  • ACB 1445VU Check Bus lockout alarms NOT LIT
  • 1-22-A1
  • 1-22-A2 At 0PM01J, PLACE 0B WS pump in PTL.

At 0PM02J, PLACE 1B CNMT Chiller PTL.

At 1PM02J, OPEN all 480-volt LOW side breakers for bus 144.

  • ACB 034R1
  • ACB 034P1
  • ACB 134X1
  • ACB 134Y1
  • ACB 134Z1
  • ACB 034W1
  • ACB 134V1
  • PZR HTR GRP B (1PM05J)
  • PZR HTR GRP c (1PM05J)

Page 3 of 5 SIM-611

  • 4. Energize bus 144 from bus 142 via CLOSE Non-ESF to ESF crosstie SAT UNSAT N/A the crosstie breaker. breaker: Comments:
  • 1421 CUE: Acknowledge as US that bus 144 is crosstied to bus Inform US that bus 144 is 142 and inform examinee crosstied to bus 142.

that another operator will continue with the procedure.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

Page 4 of 5 SIM-611

SIMULATOR SETUP INSTRUCTIONS JPM NO: SIM-611 REQUIRED SIMULATOR MODE (S): Mode 3 IC.

MALFUNCTION #S:

1. Fault SAT 142-1 via IMF ED04A COMMENTS:
1. Perform actions of 1BwOA ELEC-4 through step 6.

Page 5 of 5 SIM-611

TASK CONDITIONS:

1. You are the Unit 1 Assist NSO standing in for the Unit 1 NSO while he is on break.
2. Unit 1 is in mode 3, following a reactor trip (reactor trip breakers are open).

INITIATING CUES:

Respond to changing conditions on 1PM05J.

Page 1 of 5 SIM-710

TASK TITLE: Respond to a Source Range NI Failure JPM No.: SIM-710 REV:

TPO No.: 4D.OA-13 K&A No.: 015000A2.02 TASK No.: R-OA-053, Respond to a loss of Source K&A IMP: 3.1/3.5 Range Instrumentation EXAMINEE: RO SRO (Circle One)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 2, 6, 9, 11 APPROX COMPLETION TIME 15 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. 1BwOA INST-1, Attachment C, Rev. 103, Nuclear Instrumentation Malfunction.

MATERIALS:

1. 1BwOA INST-1, Attachment C, Rev. 103.

TASK STANDARDS:

1. Respond to a failed source range instrument.

TASK CONDITIONS:

1. You are the Unit 1 Assist NSO standing in for the Unit 1 NSO while he is on break.
2. Unit 1 is in mode 3, following a reactor trip (reactor trip breakers are open).

INITIATING CUES:

1. Respond to changing conditions on 1PM05J.

Page 2 of 5 SIM-710

RECORD START TIME Note: Give the examinee a few minutes to familiarize himself with 1PM05J conditions. Cue the simulator operator to insert the SR NI failure when ready.

PERFORMANCE STEP STANDARD Circle applicable

1. Refer to 1BwOA INST-1, Attachment Locate and Open 1BwOA INST-1 SAT UNSAT N/A C to Attachment C Comments:

CUE: After the examinee reports condition, tell them that the US is busy with a higher priority task and instructs the examinee to perform the appropriate procedure for the NI failure.

After examinee locates procedure provide a copy.

As US, acknowledge procedure entry and E-plan eval. Direct the NSO to continue with actions of 1BwOA INST-1.

2. Check if SR is required Determines power level < P6. SAT UNSAT N/A CHECKS P6 permissive light Comments:

(1-BP-3.2) is LIT.

  • 3. Re-align audio count rate channel. Determine audio count rate is SAT UNSAT N/A selected to failed channel: Comments:

AT 1PM07J, selects SR N32 on Audio Count Rate Channel Selector.

4. Determines mode 3 actions. DETERMINE unit is in mode 3 SAT UNSAT N/A from cue and plant indications. Comments:
  • 5 Performs required actions for SR Bypass and Block N31 inputs: SAT UNSAT N/A failure.
  • At 1PM07J, PLACE Level Comments:

Trip Switch for N31 in BYPASS.

  • At 1PM07J, PLACE High Flux at Shutdown Switch for N31 in BLOCK Cue: When examinee indicates that
  • At 1PM07J (inside N31 SR drawer must be opened, give drawer), PLACE Two Phi cue that The Two Phi Meter has Meter Test Switch for N31 in been placed in Test. TEST.

Page 3 of 5 SIM-710

6. Refer to Tech Specs. Refers to Tech Specs: SAT UNSAT N/A Cue: US acknowledges that Tech Informs US that Tech Specs may Comments:

Specs may be applicable and will be applicable.

evaluate.

Cue: (SRO only) If evaluator desires (SRO only) (If prompted) a tech spec evaluation by Recognize no tech spec applies examinee, prompt them to due to reactor trip breakers being determine proper Tech Spec entry. open. (rods are not capable of rod withdrwl)

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

Page 4 of 5 SIM-710

SIMULATOR SETUP INSTRUCTIONS JPM NO: SIM-710 REQUIRED SIMULATOR MODE (S): IC-9, Mode 3, RX startup in progress with SD banks withdrawn.

MALFUNCTION #S:

1. IMF NI03A COMMENTS:
1. Ensure audio count rate drawer is aligned to N31 prior to beginning JPM and volume level is raised to appropriate level to detect failure.
2. At examiner cue, fail SR N31 low.

Page 5 of 5 SIM-710

TASK CONDITIONS:

1. You are the Unit 1 Assist NSO.
2. Both units are at full power INITIATING CUES:
1. Respond to annunciator 1-2-E4 CC SURGE TANK AUTO MAKE-UP ON.

Page 1 of 6 SIM-803

TASK TITLE: Respond to a Component Cooling Surge Tank Level Drop JPM No.: SIM-803 REV: NRC 09-1 TPO No.: 4D.OA-10 K&A No.: 008000A2.02 TASK No.: R-OA-027, Respond to a CC system K&A IMP: 3.2/3.5 Malfunction.

EXAMINEE: RO SRO (Circle One)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 1a, 7 APPROX COMPLETION TIME 18 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. 1BwOA PRI-6, Rev. 101, Component Cooling Malfunction.
2. BwAR 1-2-E4, Rev. 1E3a, CC SURGE TANK AUTO MAKE-UP ON.
3. BwAR 1-2-A5, Rev. 8a, CC Surge Tank level high low MATERIALS:
1. 1BwOA PRI-6, Rev. 101, Component Cooling Malfunction.
2. BwAR 1-2-E4, Rev. 1E3a, CC SURGE TANK AUTO MAKE-UP ON.
3. BwAR 1-2-A5, Rev. 8a, CC Surge Tank level high low TASK STANDARDS:
1. Respond to a loss of level in the Component Cooling System.

TASK CONDITIONS:

1. You are the Unit 1 Assist NSO.
2. Both units are at full power INITIATING CUES:
1. Respond to annunciator 1-2-E4 CC SURGE TANK AUTO MAKE-UP ON.

Page 2 of 6 SIM-803

RECORD START TIME Note: When ready to start, cue the simulator operator to start the slow draining of the CC surge tank per the setup comments.

PERFORMANCE STEP STANDARD Circle applicable

1. Refer to BwAR 1-2-E4 Locate and Open BwAR 1-2-E4 SAT UNSAT N/A Comments:
  • 1a Dispatch EO to open manual DISPATCH an Operator to OPEN SAT UNSAT N/A makeup isolation. 1CC9454A(WM) and/or Comments:

Note: This step needs to be 1CC9454B(PW) performed if auto makeup is isolated, otherwise it is N/A.

2. Verify auto make-up occurs as Verify Auto make-up occurs as SAT UNSAT N/A required required: Comments:

o Verify 1CC183 opens at 50%,

closes at 55%

  • Verify 1CC182 opens at 45%,

closes at 55%

3. Verify Immediate and subsequent
  • VERIFY surge tank level rises SAT UNSAT N/A operator actions while makeup in progress Comments:
  • Determine cause of make-up
  • Refer to 1BwOA PRI-6
4. Enter 1BwOA PRI-6 Locate and Open 1BwOA PRI-6: SAT UNSAT N/A Comments:
  • Determine level is > 13%, but CUE: After the examinee reports not stable condition, tell them that the
  • GO TO Attachment B US is busy with a higher priority task and instructs the examinee to perform the appropriate procedure for the CC leak.

After examinee locates procedure and goes to Attachment B, provide a copy of Attachment B As, US acknowledge procedure entry, and EP call

5. Check CC Surge Tank Level dropping CHECK CC Surge Tank Level SAT UNSAT N/A and auto make up occurring as Decreasing and Auto Make-up Comments:

necessary occurring as necessary:

o At < 45% level, 1CC182 OPEN from PW

  • At < 50% level, 1CC183 OPEN from WM Page 3 of 6 SIM-803
6. Check Seal Water HX for CC System CHECK Seal Water HX for out- SAT UNSAT N/A out-leakage leakage source as follows: Comments:
  • DETERMINE Seal Water HX Note: If examinee isolates the is not leaking by evaluating Seal Water HX, conclude no unexpected VCT level the JPM increase
  • 7. Locate the CC System out-leakage Dispatch operators to locate and SAT UNSAT N/A source and isolate isolate the out-leakage source as Comments:

follows:

CUE: If contacted as radwaste operator about sump o Contact Rad Waste for sump levels, tell examinee that indication no sump levels changes o CC HXs are noted. o SFP HXs

  • GW Compressor HXs CUE: As local operators o BR evaporators dispatched report that it o PD pp oil clrs appears that the relief valve o CC System reliefs (0CC9425A) on the 0A o RCP motor brg oil clrs Waste Gas Compressor HX o Cnmt pen clg coils is lifting and wont reseat o CC rad monitors (audible flow noise and o HRSS sample clrs leakage from relief valve o Aux Bldg gen area body). o Isolate CC System between units per BwOP CC-8 When directed to isolate CC from the 0A GW Determine isolation points for CC compressor, ask for leakage from P&ID M-66 sheet isolation valve numbers. 4D, valves 0CC9480A and After being told 0CC9480A 0CC9480B.

and B need to be closed, cue the simulator operator to stop the leak, and report the valves closed and the flow noise has stopped.

8. Monitor CC Surge Tank level and MONITOR CC Surge Tank Level SAT UNSAT N/A determine leak is isolated and DETERMINE leak is isolated: Comments:
  • Observe level indications steady on 1PM06J o SER pt. cleared CUE: If SER not working cue that o Annunciator 1-2-E4 and 1 the pt. (1434) is clear A5 cleared
  • Auto Make-up stops As US acknowledge o Inform US of leak location location and isolation of and successful isolation leak.

Tell examinee another NSO will complete 1BwOA PRI-6.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

Page 4 of 6 SIM-803

TASK CONDITIONS:

3. You are the Unit 1 Assist NSO.
4. Both units are at full power INITIATING CUES:
2. Respond to annunciator 1-2-E4 CC SURGE TANK AUTO MAKE-UP ON.

Page 5 of 6 SIM-803

SIMULATOR SETUP INSTRUCTIONS JPM NO: N-082 REQUIRED SIMULATOR MODE (S): 100% power steady state MALFUNCTION #S: N/A COMMENTS:

1. Use IRF CC15 to drain CC surge tank to 51%, then secure draining.
2. When JPM starts, drain CC Surge tank by opening CC drain valve using IRF CC15. Do not allow level to approach 13%.
3. When dispatched to check GW compressor, report relief lifting on 0A GW compressor and will not reseat.
4. IF asked to isolate relief 0CC9425A, ask for valve numbers. When given 0CC9480A and B, shut the drain valve (IRF CC15 0), and report the relief is isolated.
5. Use Monitored Parameter CCMSTKS to adjust CC surge tank mass (1500)

Page 6 of 6 SIM-803

TASK CONDITIONS:

1. You are an extra NSO.
2. Unit 1/2 NSOs are responding to a steamline break inside containment after a safety injection.
3. Conditions have deteriorated to the point that an entry into 1/2BwFR-H.1, Loss of Secondary Heat Sink, has been made.

INITIATING CUES:

The Unit Supervisor has directed you to perform the actions of 1/2BwFR-H.1 step 7.f.

1 IP-200

TASK TITLE: Perform Local Reset of Feedwater Isolation Signal JPM No.: IP-200 REV: NRC 09-1 TPO No.: 4.D.EF-03 K&A No.: 013000A4.02 TASK No.: R-EF-003, Reset the Engineered K&A IMP: 4.1/4.0 Safety Features EXAMINEE: RO SRO (Circle One)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 3, 4 APPROX COMPLETION TIME: 17 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

PERFORM X IN PLANT X SIMULATE SIMULATOR GENERAL

REFERENCES:

1. 1/2BwFR-H.1, Rev. 200, WOG 2, Response to Loss of Secondary Heat Sink MATERIALS:
1. Keys for 1/2PA27J and 1/2PA28J
2. Laser pointer (recommended)
3. 1/2BwFR-H.1, step 7 TASK STANDARDS:
1. Correctly RESET Feedwater Isolation Signal as required by 1/2BwFR-H.1, step 7.

TASK CONDITIONS:

1. You are an extra NSO.
2. Unit 1/2 NSOs are responding to a steamline break inside containment after a safety injection.
3. Conditions have deteriorated to the point that an entry into 1/2BwFR-H.1, Loss of Secondary Heat Sink, has been made.

INITIATING CUES:

1. The Unit Supervisor has directed you to perform the actions of 1/2BwFR-H.1 step 7.f.

2 IP-200

RECORD START TIME Note: Prompt the use of a laser pointer to identify components located inside electrical cabinets.

PERFORMANCE STEP STANDARD Circle applicable

1. Refer to 1/2BwFR H.1, step 7.f. Refer to 1/2BwFR H.1, step SAT UNSAT N/A 7.f. Comments:

CUE: Hand a copy of 1/2BwFR-H.1, step 7 to the student.

2. Obtain keys for and locate Obtains keys for and proceed SAT UNSAT N/A Safeguards Cabinets 1/2PA27J to Safeguards Cabinets Comments:

and 1/2PA28J. 1/2PA27J and 1/2PA28J:

  • Obtain keys for Cabinets 1/2PA27J and 1/2PA28J from the Shift Office.
  • Proceed to 1/2PA27J/

1/2PA28J (U-1/2 AEER).

Note: JPM steps 3 and 4 may be performed in any order. Prompt use of laser pointer vs. breaking the plane of cabinet.

  • 3. De-energize Feedwater Isolation At 1/2PA27J, de-energize SAT UNSAT N/A Relays by removing fuses at Feedwater Isolation Relays by Comments:

1/2PA27J. removing:

CUE: Fuse FU-24 is removed.

  • Fuse FU-24.

Fuse FU-27 is removed.

  • Fuse FU-27.
  • 4. De-energize Feedwater Isolation At 1/2PA28J, de-energize SAT UNSAT N/A Relays by removing fuses at Feedwater Isolation Relays by Comments:

1/2PA28J. removing:

CUE: Fuse FU-24 is removed.

  • Fuse FU-24.

Fuse FU-27 is removed.

  • Fuse FU-27.

3 IP-200

Note: If the student elects to contact the Control Room to verify FW ISOL ACTD relay lights NOT LIT, then provide the following cue (otherwise N/A JPM step 5):

CUE:The US reports the FW ISOL ACTD relay lights are NOT LIT.

CUE:This completes the JPM.

5. Verify FW ISOL ACTD relay lights VERIFY the FW ISOL ACTD SAT UNSAT N/A

- NOT LIT. relay lights are NOT LIT as Comments:

follows:

CUE: The FW ISOL ACTD relay

  • At 1/2PM06J, observe FW lights are NOT LIT. ISOL ACTD relay lights NOT LIT.

CUE: As US acknowledge

  • Report completion of step completion of step 7.f. 7.f of 1/2BwFR H.1.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

4 IP-200

SIMULATOR SETUP INSTRUCTIONS JPM NO: IP-200 REQUIRED SIMULATOR MODE (S): N/A In-plant.

MALFUNCTION #S: N/A COMMENTS:

5 IP-200

TASK CONDITIONS:

1. You are an extra NSO.
2. Unit 1/2 has just tripped in conjunction with an electrical fire in Unit 1/2 Electrical Equipment Room.
3. 1/2A AF pump is unavailable for operation due to maintenance.
4. 1/2B AF pump did not auto start, nor will it manually start with the MCR switch or the RSP switch.
5. 1/2B AF pump MCR indications are considered unreliable due to the fire.
6. Another EO is available to monitor the 1/2B AF pump governor linkage during the startup.

INITIATING CUES:

1. The US has directed you to perform a local emergency start of the 1/2B AF pump at 1/2AF01J per BwOP AF-7. All Prerequisites, Precautions, and Limitations and Actions have been met, and steps 1-8 are complete.

1 IP-410S

TASK TITLE: Local Start of 1/2B AF Pump JPM No.: IP-410S REV:

TPO No.: 4.C.AF-02 K&A No.: 061000A2.04 TASK No.: R-AF-012, Operate the diesel driven K&A IMP: 3.4/3.8 Auxiliary Feedwater Pumps EXAMINEE: RO SRO (Circle One)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 4, 8 APPROX COMPLETION TIME: 28 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

PERFORM X IN PLANT X SIMULATE SIMULATOR GENERAL

REFERENCES:

1. BwOP AF-7, Rev. 32, Auxiliary Feedwater Pump B (Diesel) Startup on Recirc
2. BwOP AF-7T1, Rev. 5, Diesel Driven Auxiliary Feedwater Pump Operating Log MATERIALS:
1. BwOP AF-7
2. BwOP AF-7T1 TASK STANDARDS:
1. Perform a local emergency start of 1/2B AF pump.

TASK CONDITIONS:

1. You are an extra NSO.
2. Unit 1/2 has just tripped in conjunction with an electrical fire in Unit 1/2 Aux Electrical Equipment Room.
3. 1/2A AF pump is unavailable for operation due to maintenance.
4. 1/2B AF pump did not auto start, nor will it manually start with the MCR switch or the RSP switch.
5. 1/2B AF pump MCR indications are considered unreliable due to the fire.
6. Another EO is available to monitor the 1/2B AF pump governor linkage during the startup.

INITIATING CUES:

1. The US has directed you to perform a local emergency start of the 1/2B AF pump at 1/2AF01J per BwOP AF-7. All Prerequisites, Precautions, and Limitations and Actions have been met, and steps 1-8 are complete.
2. Report status of 1/2B AF pump to US after local start.

2 IP-410S

RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable

1. Refer to BwOP AF-7. Locate and open BwOP AF-7. SAT UNSAT N/A Comments:

CUE: Give a marked up copy of BwOP AF-7 to the student.

2. Perform actions at 1/2AF01J. Perform the following at SAT UNSAT N/A 1/2AF01J: Comments:

CUE: Reset pushbutton has

  • PUSH the Reset been depressed. Pushbutton to clear circuit.
  • VERIFY the Select Switch Select Switch is in Auto. is in AUTO position.
  • VERIFY Engine Ready Engine Ready light is lit. light is LIT.

Governor switch is off.

  • VERIFY Diesel Governor Switch is in OFF position.
3. Verify the Air Box Trip is reset. VERIFY the Air Box Trip is SAT UNSAT N/A Reset as follows: Comments:

CUE: Air Box Trip annunciator is not lit.

Another EO reports Air - OR -

Box Trip lever is in

  • Air Box Trip Lever (on normal position, limit back side of engine) in switch is made up. Normal position.
  • 4. Start Lube Oil systems. START Lube Oil Auxiliary SAT UNSAT N/A Systems as follows at the local Comments:

control panel:

CUE: Gear box lube oil pump

  • Aux FW Pp 1/2B Gear Box control switch is in start. Lube Oil Pp, 1/2AF01PB-C.

Aux lube oil pump control switch is in start.

  • Aux FW Pp 1/2B Lube Oil Lube Oil within Pp, 1/2AF01PB-A sightglass.

VERIFY Lube Oil inventory After the student locates in pump sump is within inlet and outlet pressure sightglass.

gages, indicate that the inlet is 28 psig, and the VERIFY Lube Oil Filter outlet is 28 psig. Differential Pressure is < 4 psid.

5. Verify/place VC in M/U mode per Verify/place VC in M/U mode SAT UNSAT N/A BwOP VC-5, at SM discretion. per BwOP VC-5, at SM Comments:

discretion.

CUE: Another operator has performed BwOP VC-5.

3 IP-410S

6. Align AF system discharge ALIGN 1/2B AF pump SAT UNSAT N/A flowpath. discharge flowpath in Comments:

accordance with US direction:

  • Contact US to determine if CUE: As US, if asked, direct CLOSURE of B Train that step 17 not be 1/2AF013s or 1/2AF004B performed. will be necessary.
7. Start 1/2B AF pump locally. START 1/2B AF Pump locally SAT UNSAT N/A at 1/2AF01J as follows: Comments:

CUE: Per task conditions, an Verify personnel in position EO is standing by. at front of diesel to monitor governor linkage during start.

CUE: Engine start switch is in

  • PLACE the Engine Start Manual and the Ready Control Switch to to Start light is not lit. MANUAL.

Start pushbutton is being depressed and held.

THE ENGINE DOES NOT

  • DEPRESS and HOLD the CRANK START pushbutton.

VERIFY Engine Starting Engine starting light is Light indicates starting NOT lit. sequence is in process.

VERIFY Engine Running Engine running light is Light is ILLUMINATED NOT lit. when speed indicates 350 RPM.

Start pushbutton is released. o RELEASE the START pushbutton.

Alternate Battery Bank is Selected

  • Select the Alternate battery bank Reset Pushbutton is Depressed.
  • Push Reset Pushbutton Start pushbutton is being depressed and
  • DEPRESS and HOLD the held. START pushbutton.

THE ENGINE STILL

  • Report to US failure of DOES NOT CRANK 1/2B AF Pump to start locally 4

IP-410S

  • 8. Start 1/2B AF pump from SAT UNSAT N/A 2AF03J. Perform the following: Comments:

CUE: US instructs you to start the 1/2B AF pump from 1/2AF03J using the START WITH BYPASS hand switch position o Contacts additional EO to Position. inspect 1/2B AF pump during start.

  • At 1/2AF01J, ensures Engine Selector Switch is in AUTO by observation
  • At 1/2AF03J, places 1/2HS-AF157 in START WITH BYPASS position.
  • At 1/2AF01J, verifies Additional EO reports RUNNING light is LIT at 1/2B AF pump has 1/2HS-AF157 started RUNNING light is LIT
9. CUE:
  • Reports to US successful SAT UNSAT N/A start of 1/2B AF pump. Comments:

Another EO will complete BwOP AF-7 and take over monitoring the 1/2B AF pump.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

5 IP-410S

SIMULATOR/ SETUP INSTRUCTIONS JPM NO: IP-410S MARK UP PROCEDURE BwOP AF-7 WITH APPROPRIATE UNIT DESIGNATORS REQUIRED SIMULATOR MODE (S): N/A, IN PLANT MALFUNCTION #S: N/A COMMENTS:

6 IP-410S

TASK CONDITIONS:

1. You are an extra NSO.
2. Unit 1/2 has just tripped in conjunction with an electrical fire in Unit 1/2 Electrical Equipment Room.
3. 1/2A AF pump is unavailable for operation due to maintenance.
4. 1/2B AF pump did not auto start, nor will it manually start with the MCR switch or the RSP switch.
5. 1/2B AF pump MCR indications are considered unreliable due to the fire.
6. Another EO is available to monitor the 1/2B AF pump governor linkage during the startup.

INITIATING CUES:

1. The US has directed you to perform a local emergency start of the 1/2B AF pump at 1/2AF01J per BwOP AF-7. All Prerequisites, Precautions, and Limitations and Actions have been met, and steps 1-8 are complete.

1 IP-410S

TASK TITLE: Local Start of 1/2B AF Pump JPM No.: IP-410S REV:

TPO No.: 4.C.AF-02 K&A No.: 061000A2.04 TASK No.: R-AF-012, Operate the diesel driven K&A IMP: 3.4/3.8 Auxiliary Feedwater Pumps EXAMINEE: RO SRO (Circle One)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 4, 8 APPROX COMPLETION TIME: 28 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

PERFORM X IN PLANT X SIMULATE SIMULATOR GENERAL

REFERENCES:

1. BwOP AF-7, Rev. 32, Auxiliary Feedwater Pump B (Diesel) Startup on Recirc
2. BwOP AF-7T1, Rev. 5, Diesel Driven Auxiliary Feedwater Pump Operating Log MATERIALS:
1. BwOP AF-7
2. BwOP AF-7T1 TASK STANDARDS:
1. Perform a local emergency start of 1/2B AF pump.

TASK CONDITIONS:

1. You are an extra NSO.
2. Unit 1/2 has just tripped in conjunction with an electrical fire in Unit 1/2 Aux Electrical Equipment Room.
3. 1/2A AF pump is unavailable for operation due to maintenance.
4. 1/2B AF pump did not auto start, nor will it manually start with the MCR switch or the RSP switch.
5. 1/2B AF pump MCR indications are considered unreliable due to the fire.
6. Another EO is available to monitor the 1/2B AF pump governor linkage during the startup.

INITIATING CUES:

1. The US has directed you to perform a local emergency start of the 1/2B AF pump at 1/2AF01J per BwOP AF-7. All Prerequisites, Precautions, and Limitations and Actions have been met, and steps 1-8 are complete.
2. Report status of 1/2B AF pump to US after local start.

2 IP-410S

RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable

1. Refer to BwOP AF-7. Locate and open BwOP AF-7. SAT UNSAT N/A Comments:

CUE: Give a marked up copy of BwOP AF-7 to the student.

2. Perform actions at 1/2AF01J. Perform the following at SAT UNSAT N/A 1/2AF01J: Comments:

CUE: Reset pushbutton has

  • PUSH the Reset been depressed. Pushbutton to clear circuit.
  • VERIFY the Select Switch Select Switch is in Auto. is in AUTO position.
  • VERIFY Engine Ready Engine Ready light is lit. light is LIT.

Governor switch is off.

  • VERIFY Diesel Governor Switch is in OFF position.
3. Verify the Air Box Trip is reset. VERIFY the Air Box Trip is SAT UNSAT N/A Reset as follows: Comments:

CUE: Air Box Trip annunciator is not lit.

Another EO reports Air - OR -

Box Trip lever is in

  • Air Box Trip Lever (on normal position, limit back side of engine) in switch is made up. Normal position.
  • 4. Start Lube Oil systems. START Lube Oil Auxiliary SAT UNSAT N/A Systems as follows at the local Comments:

control panel:

CUE: Gear box lube oil pump

  • Aux FW Pp 1/2B Gear Box control switch is in start. Lube Oil Pp, 1/2AF01PB-C.

Aux lube oil pump control switch is in start.

  • Aux FW Pp 1/2B Lube Oil Lube Oil within Pp, 1/2AF01PB-A sightglass.

VERIFY Lube Oil inventory After the student locates in pump sump is within inlet and outlet pressure sightglass.

gages, indicate that the inlet is 28 psig, and the VERIFY Lube Oil Filter outlet is 28 psig. Differential Pressure is < 4 psid.

5. Verify/place VC in M/U mode per Verify/place VC in M/U mode SAT UNSAT N/A BwOP VC-5, at SM discretion. per BwOP VC-5, at SM Comments:

discretion.

CUE: Another operator has performed BwOP VC-5.

3 IP-410S

6. Align AF system discharge ALIGN 1/2B AF pump SAT UNSAT N/A flowpath. discharge flowpath in Comments:

accordance with US direction:

  • Contact US to determine if CUE: As US, if asked, direct CLOSURE of B Train that step 17 not be 1/2AF013s or 1/2AF004B performed. will be necessary.
7. Start 1/2B AF pump locally. START 1/2B AF Pump locally SAT UNSAT N/A at 1/2AF01J as follows: Comments:

CUE: Per task conditions, an Verify personnel in position EO is standing by. at front of diesel to monitor governor linkage during start.

CUE: Engine start switch is in

  • PLACE the Engine Start Manual and the Ready Control Switch to to Start light is not lit. MANUAL.

Start pushbutton is being depressed and held.

THE ENGINE DOES NOT

  • DEPRESS and HOLD the CRANK START pushbutton.

VERIFY Engine Starting Engine starting light is Light indicates starting NOT lit. sequence is in process.

VERIFY Engine Running Engine running light is Light is ILLUMINATED NOT lit. when speed indicates 350 RPM.

Start pushbutton is released. o RELEASE the START pushbutton.

Alternate Battery Bank is Selected

  • Select the Alternate battery bank Reset Pushbutton is Depressed.
  • Push Reset Pushbutton Start pushbutton is being depressed and
  • DEPRESS and HOLD the held. START pushbutton.

THE ENGINE STILL

  • Report to US failure of DOES NOT CRANK 1/2B AF Pump to start locally 4

IP-410S

  • 8. Start 1/2B AF pump from SAT UNSAT N/A 2AF03J. Perform the following: Comments:

CUE: US instructs you to start the 1/2B AF pump from 1/2AF03J using the START WITH BYPASS hand switch position o Contacts additional EO to Position. inspect 1/2B AF pump during start.

  • At 1/2AF01J, ensures Engine Selector Switch is in AUTO by observation
  • At 1/2AF03J, places 1/2HS-AF157 in START WITH BYPASS position.
  • At 1/2AF01J, verifies Additional EO reports RUNNING light is LIT at 1/2B AF pump has 1/2HS-AF157 started RUNNING light is LIT
9. CUE:
  • Reports to US successful SAT UNSAT N/A start of 1/2B AF pump. Comments:

Another EO will complete BwOP AF-7 and take over monitoring the 1/2B AF pump.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

5 IP-410S

SIMULATOR/ SETUP INSTRUCTIONS JPM NO: IP-410S MARK UP PROCEDURE BwOP AF-7 WITH APPROPRIATE UNIT DESIGNATORS REQUIRED SIMULATOR MODE (S): N/A, IN PLANT MALFUNCTION #S: N/A COMMENTS:

6 IP-410S