ML18096A676: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 49: Line 49:
             ~,! 11111 20.405(o)(1 lfiiil                                    50.73(oJ(2JliJ                              50.731oll2HviiiJIAI                            J66AJ 20.405(oJl1 lll*I 20.40filol11 IM
             ~,! 11111 20.405(o)(1 lfiiil                                    50.73(oJ(2JliJ                              50.731oll2HviiiJIAI                            J66AJ 20.405(oJl1 lll*I 20.40filol11 IM
                                                                                     -          50.73(oll2lliil 50.731*112lliii) 50.73101 (21 (viii I (Bl 50.731*11211*1 LICENSEE CONTACT FOR THIS LER 112!
                                                                                     -          50.73(oll2lliil 50.731*112lliii) 50.73101 (21 (viii I (Bl 50.731*11211*1 LICENSEE CONTACT FOR THIS LER 112!
NAME                                                                                                                                                                                TELEPHONE NUMBER AREA CODE M. J. Pollack                    -  LER Coordinator                                                                                                                61 0 I        313 19 I              12 10 I 212 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT 1131 MANUFAC*              REPORTABLE                                                                                  MANUFAC*        REPORTABLE
NAME                                                                                                                                                                                TELEPHONE NUMBER AREA CODE M. J. Pollack                    -  LER Coordinator                                                                                                                61 0 I        313 19 I              12 10 I 212 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT 1131 MANUFAC*              REPORTABLE                                                                                  MANUFAC*        REPORTABLE CAUSE        SYSTEM    COMPONENT TUR ER              TO NPRDS        1:::*:.:: :*::::::: :::::  CAUSE  SYSTEM      COMPONENT                  TUR ER          TQ NPRDS
:-::::;::;::
CAUSE        SYSTEM    COMPONENT TUR ER              TO NPRDS        1:::*:.:: :*::::::: :::::  CAUSE  SYSTEM      COMPONENT                  TUR ER          TQ NPRDS
                                                                                                                                                                                                                                        .;:::;:;:::;:;:-:;:;
                                                                                                                                                                                                       *:***:*:,:*-::.:::\:*:::.:\.:: * .;.;.;.;.;.;.;.-
                                                                                                                                                                                                       *:***:*:,:*-::.:::\:*:::.:\.:: * .;.;.;.;.;.;.;.-
2:::1:::::                                                                                                  :(i::::*::.:11:::::::::::::::::,:::::::::::*
2:::1:::::                                                                                                  :(i::::*::.:11:::::::::::::::::,:::::::::::*

Latest revision as of 10:47, 23 February 2020

LER 92-009-00:on 920406,blackout Loading Occurred on 1B Vital Bus.Caused by Personnel Error.A Night Order Book Entry Has Been Made re-stressing Self Verification Techniques & Need to Maintain Attention to detail.W/920430 Ltr
ML18096A676
Person / Time
Site: Salem PSEG icon.png
Issue date: 04/30/1992
From: Pollack M, Vondra C
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-92-009, LER-92-9, NUDOCS 9205070042
Download: ML18096A676 (5)


Text

Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Salem Generating Station April 30, 1992 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir:

SALEM GENERATING STATION LICENSE NO. DPR-70 DOCKET NO. 50-272 UNIT NO.* 1.

LICENSEE EVENT REPORT 92-009-00 This Licensee Event Report is being submitted pursuant t6 the requirements of the* Code of Federal Regulations 10CFR 50.73(a) (2) (iv}. This report is required to be. issued within thirty (30) days of event discovery.

Sincerely yours,

,-/ l .

,~~**/I ~/

  • . .. / j ,./1 *

/ii ~~('Vmck'-c I /(,,.,:{ /

C. A Vondra General Manager -

Salem Operations MJP:pc Distribution

/

/,l

/"!./

1: v I

~l

\1 II 9205070042 920430 PDR ADOCK 05000272

fli'ilC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION 16-89) APPROVE'1 OMB NO. 3150*0104 EXf*IRES: 4130/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REQUEST: 50.0 HRS. FORWARD

. LICENSEE EVENT REPORT (LERI COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENT BRANCH IP*530J, U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555, AND TO J

THE .PAPERWORK REDUCTION PROJECT 13150-0104), OFFICE I

OF MANAGEMENT AND BUDGET, WASHINGTON, DC 20503.

FACILITY NA.ME (11. DOCKET NUMBER 121 I PAGE 131 Salem Generating Station TITLE 141

,.... Unit 1 o ts t o t o t o t 2 17 I 2 1 loi= 0.14 ESF Actuation: Blackout Loading On lB Vital.Bus Undervoltage Due To Personnel . Error* .

EVENT DATE 151 LER NUMBER (61 REPORT DATE 171 . OTHER FACILITIES INVOLVED 181 MONTH D.AY YEAR YEAR  :() SEQUENTIAL NUMBER !t\ REVISION NUMBER MONTH DAY YEAR FACILITY NAMES DOCKET NUMBERISI 0 1 5 \ o to I o 1 I I 0J4 oJ 6 9 2 9 12 - o I 019 - ojo ol 4 3Jo 91-.2 0 I 5 I 0 I 0* I O 1 I I THI& REPORT IS SUBMITTED PURSUANT TO THE RtQUIREMENTS OF 10 CFR §: (Check on* or moro of rh* following} 1111 OPERATING 5

-- x MODE (9) 50.73(ol(2J(ivl 73.711bl 20.402lbJ 20.405.lcJ POWER 20.405(olf1 lfil 50.38(cll1 I 50.731o1121M 73.71 (cl LEVEL 1101 o,o 0- 20.405(0)(1 Jliil 50.38(cJl2J 50.73(o112Jlviil *

- OTHER (S~cify tn Abstr*ct I:

bttlo~ *nd in Ttutr, NRC Form

~,! 11111 20.405(o)(1 lfiiil 50.73(oJ(2JliJ 50.731oll2HviiiJIAI J66AJ 20.405(oJl1 lll*I 20.40filol11 IM

- 50.73(oll2lliil 50.731*112lliii) 50.73101 (21 (viii I (Bl 50.731*11211*1 LICENSEE CONTACT FOR THIS LER 112!

NAME TELEPHONE NUMBER AREA CODE M. J. Pollack - LER Coordinator 61 0 I 313 19 I 12 10 I 212 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT 1131 MANUFAC* REPORTABLE MANUFAC* REPORTABLE CAUSE SYSTEM COMPONENT TUR ER TO NPRDS 1:::*:.:: :*::::::: ::::: CAUSE SYSTEM COMPONENT TUR ER TQ NPRDS

          • ,:*-::.:::\:*:::.:\.:: * .;.;.;.;.;.;.;.-

2:::1:::::  :(i::::*::.:11:::::::::::::::::,:::::::::::*

I I I I. I I I I I I I I I I

. I I I I I I I  ::::**:::::::r*i<:::* I I. I I I I I

'.::::=:::::,: c< ::::

SUPPLEMENTAL REPORT EXPECTED 1141 MONTH DAY YEAR EX.PECTED

~NO SUBMISSION I YES (If vos. compl*r* EXPECTED SUBMISSION DA TEI DATE 1151 I I I AB_STRACT fllmir ro 1400 S(JaC8S i fl .* a(Jpro}l(im*rety fifreen smgltJ*SJ)lJCtl ry(Jt!Wrirren lines/ n~n Ori April 6, 1992, at 2213 hours0.0256 days <br />0.615 hours <br />0.00366 weeks <br />8.420465e-4 months <br />, a* ,blackout loading occurred on lB Vital Bus. At the time of the event,. the Reactor Coolant Pumps (RCP) were being. started to facilitate Reactor coolant System (RC_S) cleanup (i.e. r "crud burst" operations). The lB Diesel Generator (D/G) started and loaded per design. The root cause of this event has been attributed to personnel error as a result of inattention to detail.

The Control Room Op~rator reviewed procedure -oI II-1.3.1,. "Reactor Coolant Pump Operation"~ prior to putting the No. 14 RCP in service but did not complete the required procedure steps. The procedure requires the operator to depress th~ "Defeat 2nd* Level Undervoltage" bezel pushbuttons prior to starting ari RCP, which the operator did not do~ After initiating partial action to start No. 14 RCP, the operator had to respond to an alarm. When he returned to start the No. 14 RCP, he failed to recognize that he had not pushed the manual defeat bezel pushbuttons thereby resulting in the B Vital Bus experiencing a II II valid undervoltage condition. This event has been reviewed by Operations Department management. Appropriate corrective disciplinary.

action with the individual(s) involved has been completed. A Night Order Book (NOB) entry has been made re-stressing self verification techniques and the need to maintain attention to detail when performing work. The 'lB 4KV Vital Bus was returned to service at 0053 hours6.134259e-4 days <br />0.0147 hours <br />8.763227e-5 weeks <br />2.01665e-5 months <br /> on April 7, l992.

NRC. Form 366 16-891

1-.

LICENSEE EVENT REPORT (LER} TEXT CONTINUATION Salem Generating Station DOCKET NUMBER LER NUMBER . PAGE U-=-=n=i~t-=1=--~~~~~~~~~~~~---=5~0~0~0~2~7~2=--~~~--'9~2=--009-00 2 of 4.

PLANT AND SYSTEM IDENTIFICATION:

Westinghouse* Pressurized Water Reactor Energy Industry Identification Syst~m (EIIS) codes ar~*~dent~fied in the text as *[xx}

IDENTIFICATION OF OCCURRENCE:

Engineered Safety F~ature Actuation; Blackout Loading on lB Vital Bus Due To Personnel Error Event Date: 4/0~/92 Report Date: 4/30/92 This *report was initiated by Incident Report No.92-228.

CONDITIONS PRIOR TO OCCURRENCE:

Mode 5 (Cold Shutdown); lQth Refueling Outage in progress

. DESCRIPTION OF OCCURRENCE:

On April 6, 1992, at 2213 hours0.0256 days <br />0.615 hours <br />0.00366 weeks <br />8.420465e-4 months <br />, a* blackout loading occurred on lB Vital Bus {EB}. At the time of the event, the Reactor Coolant Pumps (RCP) [AB} were being started to facilitate Reactor Coolant System (RCS) {AB} cleanup (i.e~, "crud burst" operations). The lB biesel Generator (D/G) JEKI. started and loaded per design.

The Nuclear Regulatory Commission was notified of the inadvertent actuation of an Engineered Safety Feature (ESF) [JEI, bla~kbut loading, at 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br /> on *April 6, 1992, in acc~rdance with Code of Federal Reguiations 10CFR so. 72 (b) ( 2) (ii) ~ **

APPARENT CAUSE OF OCCURRENCE*:

The root cau~e of this event has been attributed to personnel error as a result of inattention to detail. The Control Room Operator reviewed procedure OI II-1.3~i, ~Reactor Coolant Pump Operation",

prior to putting the No. 14 RCP in service but did not complete the required procedure steps~ ~he procedure re~uires the operator* to depress the "Defeat 2nd Level Undervoltage" bezel pushbuttons prior to starting an RCP, which the operator did not do.

As stated above, the RCPs were being* cycled to facilitate RCS cleanup during crud burst operations. Prior to this event, the Nos. 11 and 12 RCPs had b~en successfully ~tarted. Afte~ initiating partiai action to start No. 14 RCP, the operator had to respond to a Spent Fuel Pool low level alarm. Whe~ he returned to start the No. 14 RCP, he failed to recognize that he had not pushed the mariual defeat bezel pushbuttons for the Vital Busses thereby resulting-in the "B" Vital

_Bus exp~~iencing a valid undervoltage condition~ The "A" and

LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Sale~ Generating Station DOCKET NUMBER LER NUMBER PAGE Unit 1 5000272 92-009-00 3 of 4 APPARENT CAUSE OF.OCCURRENCE: (cont'd)

"C" Vital Bti~ses did not experience a valid undervoltage ~onditio~*

since they were being powered from the other Station Power Transformer at the time of this event.

ANALYSIS OF OCCURRENCE:

Prior to RCS and Stea~ Generator work, in s~pport of refueling/

maintenance outages*, "crud burst" operations are performed to minimize dose received in support of work. This operation includes

. the addition of hydrogen peroxide which breaks. up' a_ccumulated corrosion-products (i.e.,.crud). The RCPs ~re run. to help facilitate crud re~oval. .

When a RCP is started procedure OI II-1. 3 .1 requires defeating the I

vital busses' secondary level undervoltage protection which ~s set at less than 91.6% of 4160 volt~ for 13 seconds. 'Thia prevents blackout loading on the vital busses due to the momentary undervoltage .

condition caused by the start of a RCP motor.

  • The undervoltage protection automatically reinstates within 2 minutes of depressing the. pushbuttons.

In Mode 5 (Cold Shutdown), both the Group Busses and the Vital B~s*es are powered from the Station Pqwer Transformers. The RCPs are powered from the Group Busses. Therefore, undervoltage conditions on the Group Busses, caused by a RCP start, are also seen on the Vital Busses.

The lB 4KV Vital Bus specifically provides load to the lB 460 VAC Vital Bus; _the lB 230 VAC Vital Bus and the following safety related pumps:

No. 12 Motor Driven Auxiliary Feedwater* (MDAFW) Pump {BAI No. 11 Centrifugal Charging Pump No. 13 Service Water Pump No. 14 Service Water Pump No. 12 Residual Heat Removal Pump No. 12 Cqmponent Cooling Pump Nos. 11 and 12 Steam Generators (S/Gs) are fed with the automatic start of the No.* 12 MDAFW Pump. Prior to this event, No. 12 MDAFW Pump had been put in service for chemical* addition to No. *11 S/G.

During this event, St~am Generator level was maint~ined automatically per program.

In this event, the lB Vital Bus undervoltage protection functioned as designed. The SEC {JC} received a valid bus undervoltage signal resulting in the successful blackout loading of the lB Vital Bus.

The lB D/G started and loaded per design .. Therefore, this event did not affect the health-or safety of the public. It is reportable, due to actuation of an ESF system, in accordance with Code of Federal Regulation 10CFR 50.73(a) (2j (i~).

LICENSEE EVENT REPORT (LER} TEXT CONTINUATION

" Salem Generating Station. DOCKET NUMBER LER NUMBER PAGE Unit 1 5000272 92-009-00 4- of 4 ANALYSIS OF OCCURRENCE: (cont'd}

On Februa~y 7, 1989 (reference LER 272/89-008-00), blacko~t 16adin~

of a Vital Bus, due to the start of a RCP, had occurred. Although

  • the initiating circumstances were different (i.e.,* Unit was in Mode 3 and functional testing was in progress} the root cause was ~dentical to this everit.

-CORRECTIVE ACTION:

This* event has been reviewed by Operations Department management.

Appropriate correc_tive disciplinary action with the individual (s}

involv.ed has been . completed.

A Night Order Book (NOB) entry has been made re-stressing self verification techniques and the need to maintain. attention to detail when performing work.

The 1B 41\V Vital Bus was returned to service at 0053 hours6.134259e-4 days <br />0.0147 hours <br />8.763227e-5 weeks <br />2.01665e-5 months <br /> on April 7, 1992.

&p:_

General Manager -

Salem Operations

.. MJP :pc SORC Mtg.92-054