{{#Wiki_filter:-                                    . . - - - -
.-  43      ,'
800505093 9 (I) The engineered safety features valves associated with each of the above systems shall be operable or locked in the ES position.
3.3.2    In addition to 3.3.1 above, the following ECCS equipment shall be operable when the reactor coolant system is above 350F and irradi-ated fuel is in the core:
(A) Two out of three high pressure injection (makeup) pumps shall be maintained operable, pcwcred from independent essential busses, to provide redundant and independent flow paths .
(B)  Engineered safety features valves associated with 3.3.2.a above shall be operable or locked in the ES position.
3.3.3    In addition to 3.3.1 and 3.3.2 above, the following ECCS equipment shall be operabic when the reactor coolant system is above 800 psig:
(A)  The two core flooding tanks shall each contain an indicated minimum of 13 + 0.4 feet (1040 + 30 ft 3) of borated water at 600 3 25 psig.~                  ~
(B)  Core flooding tank boron concentration shall not be less than 2270 ppm boron.
(C) The cicetrically operated discharge valves from the core flood tanks shall be open and breakers locked open and tagged.
(D) One of the two pressure instrument channels and one of the two icyc1 ins trument channels per core flood tank shall be operable.
3.3.4 The reactor shall not be made critical unless the following equipment in addition to 3.3.1, 3.3. 2, and 3. 3. 3 ' above is operable.
(A) Two reactor building spray pumps and their associated spray no::1c headers and four reactor building emergency' cooling fans and associated cooling units.                                                .
I (B) The sodium hydroxide tank shall contain an indicated 31 ft.
of 20 wtt solution sodium hydroxide (20,500 lb.).
                    ~(C)1 ,A11 manual valves in the main discharge lines of the sodium thiosulfate and sodium hydroxide tanks shall be locked open.
(0) Engineered safety feature valves and interlocks associated with 3.3.1, 3;3.2, and 3.3.3 shall be operable or locked in the ES position.
3.3.5 Maintenance-shall be allowed during power operation on any component (s) in the high pressure injection, low pressure injection, service water, reactor building spray and reactor building cooling 37 Amendment No.''_
 
                                                                                                                                            . y.                                  .
fp 41 e*
Table            h.1-1"(cont'd)'
* Channel De'scription -              . Check. . Test ~            Calibrate                          Remarks f37. " Boric?A cid Addition'Ta'k            n                                                                                                    >
                                                                                                                                                                              .4
: a.  " Level Channel'                    :- NA      NA                  R.
                            'b.  ' Temperature Channel.              -M          NA                  LR .
: 38. ' (DELETED) l-
                  -39.        Sodium Rydroxide Tank                      NA      NA                  R l '; .                      ' Level Indicator 10.
4        Incore Neutron, Detectors                M(1)    'NA                  'NA            (1) Check Functionin6 a  .hl.      Erergency Plant Radiation Y'            -Instruments-                              M(1)      NA                  R            (1) ' Battery Check
: 42. ~ Deleted' h3. -Strong Motion Acceleographs                    Q(1)    NA.                  Q            (1) Battery Check hh.      ESAS Manual. Trip Functions
: a. Switches.&~ Logic                    NA        R                    NA
: b. Logic                                NA        M                  NA h5        tReactor Manual Trip                      LNA        P                  NA h6. Reactor Building Sump Level                    .NA        NA                  R
                -Note: S          .Each Shift      .T/W'- Twice per Week                                  R - Each Refueling Period
                                                                                                                                                  .[
D - Daily.            B/M - Every 2 Months                                NA - Not Applicable W - Weekly                    Q - Quarterly M - Monthly-                  P - Prior to Each Startup if
                                                                                                                                                                    ~
Not Done Previous Week
                                                                          ,w        n,                .          <
 
a        .
  .    . .,,.a. .. . , . ,  _                              -,                      Tr.ble 4.1
* MinaMUM SAMPLING.AND ANALYSIS FREQUENCY
                                .                                                                            .s
                                      ' _! t em -          , --) .                      Test'                              Frecuency
: 1.        Reactor Coolant                  a.      Gamma Isotopic' Analysis                      a.
Samples                                                                                    Bi-weekly (7)
                                        ,                          b. ' Gross Activity-Deternination                    b. 3 times / week ar.-
at least every third oay(1),o',,-
: c. ' Gross Radioiodine Determination                  c. Weekly (3)(6)(7)
: d.      Dissolved Cases                              d. Week l y ' ( 7 )(11) l>
: e.      Chemistry (C1, F, and 02 )                  c.
3 times / week (5) f.
Boron Concentration                          f. 3 times / week
: g.      Radiochemical Analysis for                  g. Monthly (7)
                                                                          ~f Determination' (2)(4)
: 2.        Dorated hater Storage Tank Water                          Boron Concentration                              Weekly and af t er Sampic                                                                                        each makeup I
                  ~3.        Cope flooding Tank Sample                                    Boron Concentration                              Monthly and after cach nakeup 4      -Spent Fuct Pool Water Sample                              Boron Concentration                              Monthly and after ~  ,
each makeup-(9',
: 5. ~ Secondary Coolant                        a.
Sampies.                                  . Gross Radioiodine' Concentration            a. Weekly (5)(7)(10)
: b.      Isotopic Radioiodine                        b. Monthly (7)(10'        ~
Concentration (4)
                '6.          Sodium Ilydroxide Sodium Ilydroxide Concentration                    Quarterly and Tank Samp~ie                                                                                                        '
after each makeus No t e s':                                                      '
                -(1)
_ of; the -total radioactivity of the primary                                  coolant. A gross radioactivit in units of uCi/gm.      The total primary coolant activity shall be the sum of the degassed beta-gamma act ivity and the' total 'of 'all. identified gaseous activities 15 minutes af ter the primary system is ' sampled.
concentration execeds -10'. .of the limitWhenever the gross radioactivity
                                                              ~
specified in the Specification 3.1.4.1- or increases .hv IO. LCi/g . from the previous nr. asured level, the fregttency of _ sa.r.plini; and analy ir.g -sh.1-1 he increased ,to a minimum of-once/ day until .a steady activity ' level as established.
                                                                                          - ' 74 -
Amendment No. 12 4
                                                                                                  ,b                              s
 
Nsb;Rv.195                                                                              v.s. NUCLEAn REGULATORY COMMISSICN              QQCKET NUMEE R (2 des ' * *              .
                                                                                                                          }/ 9Jef            $~ 3d
.'                        NRC DISTR'IBUTION ron PA / 50 DOCKET MATERIAL
                    "*** DAVI5                                                FROMARKANSAS POWER & LIGHT C0                                cars CP oCCUMENT TO:
f                                                                                        LITTLE ROCK, ARKANSAS                              7/5/77 J.D. PHILLIPS                                        cATE RECE!VED
!                                                                                                                                            7/5/77 j %EnER                                        ONOTORIZIO                      PRCP                                lNPUT PCRM              NUMBER OF COPIES RECEIVED l              RIGIN AL                      MNCLASSIPIE D
; QESCRIPTION                                                                                            ENCLOSURE
;                  ,7          ..,.,_                .:
                                                                  - '"~ -    %
                                                                                                                                        }
f                    Amdt, to OL/changg' to tech specs...
concerns the deletion of Sodium Thiosulphate e
                                                                                      ;/                      'romtheReactor(uildingSpraySystem......
                                                                                                                                                      ?.h (1-P )                  (3-P)    ./    .
                                                                                                                                /-'T~M.T
_.?ff.
                                                                                                                                              . i.1.w W          .' N .,Tv d-N.V vn
                                    . . . . . . _ , .                                                                                                                                    I PLANT NAME: Arkansas Unit No.1 RJL              7/12/77 cappy                                                        FOR ACTION /INFORMATION                                  ENVIPENMENTAL I ASSIGNED ADe                                              _              _      s              l'    ASSIGNED AD:          V. MOORE (LTR) t/f nRANcM cu7pp,                                                D au p ,3,    ( g)                            BRANCH CHIEF:
IM            PROJECT MANAGER:                                          $nMdO                                  PROJECT MANAGER:
                                                                                                                                                                                    ~
VI            LICENSING ASSISTANT:                                          O [ -C ( .$.                      LICENSING ASSISTANT:
i                                                                                                        B. HARLESS 1                                                                                INTERNAL DISTRIBUTION l/. een rT f E q                                                  SYS'TFMS SAFEIY                              PLANT SYSTEMS                  I    SITE SAFEIY &
f/        Nur pnR                .                              HEINEMAN                                    TEDESCO                            ENVIRON ANALYSIS 767 a,              y ( 2)                                      SCHROEDER                                    BENAROYA                              DENTON & MULLER
      / n et n                                                                                                  LATNAS                                CR17CMrTrfD COSSICK & STAFF                                        ENGINEERING                                IPPOLITO                                                              -
A tiivattv7                                                    KNTCMT                                      F. ROSA                              ENVIRO TECH.
3 I VTpc                                                        nOSNAK                                                                            ERNST l j cur                      .                  V              SIHWELL                                IOPERATING REACTORS                      BALLARD l Iunvn                                                          PAWLTcKI                        '
STELLO                              YOUNGBLOOD I                                                                                            /, ETcFNMTfT l ormrcT MANACrvrNT                            '
REACTOR SAFETV                    d          SHAO                              _ __. _. _..
                                                                                                                                                      " ' ~ ^ ~ ~
* Ievnvuot?                                              ROSS                              /]          BAER I o. cotLINS                                            NOVAK                                /l      BUTLER                              GAMMILL              (2) unUS'mN                                              ROSZTOCZY                            /        GRIMES vetT"                                                CHECK                                                                              SITE ANALYSIS urtreveq                                                                                                                              l VOLLER eT                                                  AT&T                                    I                                      l BUNCH ISALTZv_AN                            I l                                / J. COLLINS IRL~' BERG                            I l                                          KREGER l                      _                      ..
                                                              ,. EXTERN AL DISTRIBUTION                                                                  CONTROL NUMBE R i      A1?ca V,su tilo,Ile MKK                                                                        l l
        /I TIC
                                                          #M            NSIC                          l l                                                              ~
INAT LAB                                      i l                                                                                                                h).2 iREG IV (J. HANCHETT)i                              I            /
i/
r ,16 CYS ACRS SENT CATEGORY                          , ,
4 i ,
I
                                                                                                                                          =
                                                                                                                                            ~
I[
                                                                                                                          .                                          ~
f}}

Latest revision as of 17:37, 21 February 2020

Tech Specs 3.3.2-3.3.5 Change Request for Eccs,Deleting Sodium Thiosulphate from Reactor Bldg Spray Sys
ML19317H248
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/05/1977
From:
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19317H247 List:
References
NUDOCS 8005050435
Download: ML19317H248 (4)


Text

- . . - - - -

.- 43 ,'

800505093 9 (I) The engineered safety features valves associated with each of the above systems shall be operable or locked in the ES position.

3.3.2 In addition to 3.3.1 above, the following ECCS equipment shall be operable when the reactor coolant system is above 350F and irradi-ated fuel is in the core:

(A) Two out of three high pressure injection (makeup) pumps shall be maintained operable, pcwcred from independent essential busses, to provide redundant and independent flow paths .

(B) Engineered safety features valves associated with 3.3.2.a above shall be operable or locked in the ES position.

3.3.3 In addition to 3.3.1 and 3.3.2 above, the following ECCS equipment shall be operabic when the reactor coolant system is above 800 psig:

(A) The two core flooding tanks shall each contain an indicated minimum of 13 + 0.4 feet (1040 + 30 ft 3) of borated water at 600 3 25 psig.~ ~

(B) Core flooding tank boron concentration shall not be less than 2270 ppm boron.

(C) The cicetrically operated discharge valves from the core flood tanks shall be open and breakers locked open and tagged.

(D) One of the two pressure instrument channels and one of the two icyc1 ins trument channels per core flood tank shall be operable.

3.3.4 The reactor shall not be made critical unless the following equipment in addition to 3.3.1, 3.3. 2, and 3. 3. 3 ' above is operable.

(A) Two reactor building spray pumps and their associated spray no::1c headers and four reactor building emergency' cooling fans and associated cooling units. .

I (B) The sodium hydroxide tank shall contain an indicated 31 ft.

of 20 wtt solution sodium hydroxide (20,500 lb.).

~(C)1 ,A11 manual valves in the main discharge lines of the sodium thiosulfate and sodium hydroxide tanks shall be locked open.

(0) Engineered safety feature valves and interlocks associated with 3.3.1, 3;3.2, and 3.3.3 shall be operable or locked in the ES position.

3.3.5 Maintenance-shall be allowed during power operation on any component (s) in the high pressure injection, low pressure injection, service water, reactor building spray and reactor building cooling 37 Amendment No._

. y. .

fp 41 e*

Table h.1-1"(cont'd)'

  • Channel De'scription - . Check. . Test ~ Calibrate Remarks f37. " Boric?A cid Addition'Ta'k n >

.4

a. " Level Channel'  :- NA NA R.

'b. ' Temperature Channel. -M NA LR .

38. ' (DELETED) l-

-39. Sodium Rydroxide Tank NA NA R l '; . ' Level Indicator 10.

4 Incore Neutron, Detectors M(1) 'NA 'NA (1) Check Functionin6 a .hl. Erergency Plant Radiation Y' -Instruments- M(1) NA R (1) ' Battery Check

42. ~ Deleted' h3. -Strong Motion Acceleographs Q(1) NA. Q (1) Battery Check hh. ESAS Manual. Trip Functions
a. Switches.&~ Logic NA R NA
b. Logic NA M NA h5 tReactor Manual Trip LNA P NA h6. Reactor Building Sump Level .NA NA R

-Note: S .Each Shift .T/W'- Twice per Week R - Each Refueling Period

.[

D - Daily. B/M - Every 2 Months NA - Not Applicable W - Weekly Q - Quarterly M - Monthly- P - Prior to Each Startup if

~

Not Done Previous Week

,w n, . <

a .

. . .,,.a. .. . , . , _ -, Tr.ble 4.1

  • MinaMUM SAMPLING.AND ANALYSIS FREQUENCY

. .s

' _! t em - , --) . Test' Frecuency

1. Reactor Coolant a. Gamma Isotopic' Analysis a.

Samples Bi-weekly (7)

, b. ' Gross Activity-Deternination b. 3 times / week ar.-

at least every third oay(1),o',,-

c. ' Gross Radioiodine Determination c. Weekly (3)(6)(7)
d. Dissolved Cases d. Week l y ' ( 7 )(11) l>
e. Chemistry (C1, F, and 02 ) c.

3 times / week (5) f.

Boron Concentration f. 3 times / week

g. Radiochemical Analysis for g. Monthly (7)

~f Determination' (2)(4)

2. Dorated hater Storage Tank Water Boron Concentration Weekly and af t er Sampic each makeup I

~3. Cope flooding Tank Sample Boron Concentration Monthly and after cach nakeup 4 -Spent Fuct Pool Water Sample Boron Concentration Monthly and after ~ ,

each makeup-(9',

5. ~ Secondary Coolant a.

Sampies. . Gross Radioiodine' Concentration a. Weekly (5)(7)(10)

b. Isotopic Radioiodine b. Monthly (7)(10' ~

Concentration (4)

'6. Sodium Ilydroxide Sodium Ilydroxide Concentration Quarterly and Tank Samp~ie '

after each makeus No t e s': '

-(1)

_ of; the -total radioactivity of the primary coolant. A gross radioactivit in units of uCi/gm. The total primary coolant activity shall be the sum of the degassed beta-gamma act ivity and the' total 'of 'all. identified gaseous activities 15 minutes af ter the primary system is ' sampled.

concentration execeds -10'. .of the limitWhenever the gross radioactivity

~

specified in the Specification 3.1.4.1- or increases .hv IO. LCi/g . from the previous nr. asured level, the fregttency of _ sa.r.plini; and analy ir.g -sh.1-1 he increased ,to a minimum of-once/ day until .a steady activity ' level as established.

- ' 74 -

Amendment No. 12 4

,b s

Nsb;Rv.195 v.s. NUCLEAn REGULATORY COMMISSICN QQCKET NUMEE R (2 des ' * * .

}/ 9Jef $~ 3d

.' NRC DISTR'IBUTION ron PA / 50 DOCKET MATERIAL

"*** DAVI5 FROMARKANSAS POWER & LIGHT C0 cars CP oCCUMENT TO:

f LITTLE ROCK, ARKANSAS 7/5/77 J.D. PHILLIPS cATE RECE!VED

! 7/5/77 j %EnER ONOTORIZIO PRCP lNPUT PCRM NUMBER OF COPIES RECEIVED l RIGIN AL MNCLASSIPIE D

QESCRIPTION ENCLOSURE
,7 ..,.,_ .

- '"~ -  %

}

f Amdt, to OL/changg' to tech specs...

concerns the deletion of Sodium Thiosulphate e

/ 'romtheReactor(uildingSpraySystem......

?.h (1-P ) (3-P) ./ .

/-'T~M.T

_.?ff.

. i.1.w W .' N .,Tv d-N.V vn

. . . . . . _ , . I PLANT NAME: Arkansas Unit No.1 RJL 7/12/77 cappy FOR ACTION /INFORMATION ENVIPENMENTAL I ASSIGNED ADe _ _ s l' ASSIGNED AD: V. MOORE (LTR) t/f nRANcM cu7pp, D au p ,3, ( g) BRANCH CHIEF:

IM PROJECT MANAGER: $nMdO PROJECT MANAGER:

~

VI LICENSING ASSISTANT: O [ -C ( .$. LICENSING ASSISTANT:

i B. HARLESS 1 INTERNAL DISTRIBUTION l/. een rT f E q SYS'TFMS SAFEIY PLANT SYSTEMS I SITE SAFEIY &

f/ Nur pnR . HEINEMAN TEDESCO ENVIRON ANALYSIS 767 a, y ( 2) SCHROEDER BENAROYA DENTON & MULLER

/ n et n LATNAS CR17CMrTrfD COSSICK & STAFF ENGINEERING IPPOLITO -

A tiivattv7 KNTCMT F. ROSA ENVIRO TECH.

3 I VTpc nOSNAK ERNST l j cur . V SIHWELL IOPERATING REACTORS BALLARD l Iunvn PAWLTcKI '

STELLO YOUNGBLOOD I /, ETcFNMTfT l ormrcT MANACrvrNT '

REACTOR SAFETV d SHAO _ __. _. _..

" ' ~ ^ ~ ~

  • Ievnvuot? ROSS /] BAER I o. cotLINS NOVAK /l BUTLER GAMMILL (2) unUS'mN ROSZTOCZY / GRIMES vetT" CHECK SITE ANALYSIS urtreveq l VOLLER eT AT&T I l BUNCH ISALTZv_AN I l / J. COLLINS IRL~' BERG I l KREGER l _ ..

,. EXTERN AL DISTRIBUTION CONTROL NUMBE R i A1?ca V,su tilo,Ile MKK l l

/I TIC

  1. M NSIC l l ~

INAT LAB i l h).2 iREG IV (J. HANCHETT)i I /

i/

r ,16 CYS ACRS SENT CATEGORY , ,

4 i ,

I

=

~

I[

. ~

f