| title = 2012/07/02 Davis-Besse Lr - 6/21/2012 Teleconference Summary
| title = Lr - 6/21/2012 Teleconference Summary
| author name =  
| author name =  
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 Davis-BesseNPEm Resource From: CuadradoDeJesus, Samuel Sent: Monday, July 02, 2012 8:16 AM To: dorts@firstenergycorp.com; cu sterc@firstenergycorp.com Cc:Davis-BesseHearingFile Resource; Harris, Brian
{{#Wiki_filter:Davis-BesseNPEm Resource From:                       CuadradoDeJesus, Samuel Sent:                       Monday, July 02, 2012 8:16 AM To:                         dorts@firstenergycorp.com; custerc@firstenergycorp.com Cc:                         Davis-BesseHearingFile Resource; Harris, Brian


==Subject:==
==Subject:==
6/21/2012 Teleconference Summary Attachments:
6/21/2012 Teleconference Summary Attachments:               6 21 2012 DB NRC Telecon Summary.docx Cliff and Steve, Attached for your review is a draft summary of our June 21, 2012, teleconference. Let me know if you have any comments.
6 21 2012 DB NRC Telecon Summary.docxCliff and Steve, Attached for your review is a draft summary of our June 21, 2012, teleconference. Let me know if you have any comments.  
: Regards, Samuel Cuadrado de Jesús Project Manager Projects Branch 1 Division of License Renewal U.S. Nuclear Regulatory Commission Phone: 301-415-2946 Samuel.CuadradoDeJesus@nrc.gov 1


Regards, Samuel Cuadrado de Jesús Project Manager Projects Branch 1
Hearing Identifier:     Davis_BesseLicenseRenewal_Saf_NonPublic Email Number:           3890 Mail Envelope Properties     (377CB97DD54F0F4FAAC7E9FD88BCA6D0AA50B432C3)
 
Division of License Renewal U.S. Nuclear Regulatory Commission Phone:  301-415-2946 Samuel.CuadradoDeJesus@nrc.gov
 
Hearing Identifier: Davis_BesseLicenseRenewal_Saf_NonPublic Email Number: 3890   Mail Envelope Properties   (377CB97DD54F0F4FAAC7E9FD88BCA6D0AA50B432C3)


==Subject:==
==Subject:==
6/21/2012 Teleconference Summary Sent Date:   7/2/2012 8:15:56 AM Received Date: 7/2/2012 8:15:58 AM From:   CuadradoDeJesus, Samuel Created By:   Samuel.CuadradoDeJesus@nrc.gov Recipients:     "Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov> Tracking Status: None "Harris, Brian" <Brian.Harris2@nrc.gov>
6/21/2012 Teleconference Summary Sent Date:               7/2/2012 8:15:56 AM Received Date:           7/2/2012 8:15:58 AM From:                   CuadradoDeJesus, Samuel Created By:             Samuel.CuadradoDeJesus@nrc.gov Recipients:
Tracking Status: None "dorts@firstenergycorp.com" <dorts@firstenergycorp.com> Tracking Status: None "custerc@firstenergycorp.com" <custerc@firstenergycorp.com> Tracking Status: None  
"Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>
 
Tracking Status: None "Harris, Brian" <Brian.Harris2@nrc.gov>
Post Office:   HQCLSTR01.nrc.gov Files     Size     Date & Time MESSAGE   410     7/2/2012 8:15:58 AM 6 21 2012 DB NRC Telecon Summary.docx   30368 Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:
Tracking Status: None "dorts@firstenergycorp.com" <dorts@firstenergycorp.com>
LICENSEE: FirstEnergy Nuclear Operating Company
Tracking Status: None "custerc@firstenergycorp.com" <custerc@firstenergycorp.com>
Tracking Status: None Post Office:             HQCLSTR01.nrc.gov Files                           Size                   Date & Time MESSAGE                         410                     7/2/2012 8:15:58 AM 6 21 2012 DB NRC Telecon Summary.docx                         30368 Options Priority:                       Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
Recipients Received:


FACILITY: Davis-Besse  
LICENSEE:        FirstEnergy Nuclear Operating Company FACILITY:       Davis-Besse


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF TELEPHONE CONFERENCE CALL HELD ON JUNE 21. 2012, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION, LICENSE RENEWAL APPLICATION (TAC. NO. ME4640)  
OF TELEPHONE CONFERENCE CALL HELD ON JUNE 21. 2012, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION, LICENSE RENEWAL APPLICATION (TAC. NO. ME4640)
 
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on June 21, 2012, to discuss and clarify the applicants response to the staffs requests for additional information (RAIs) 4.7.5.1-1 concerning the Davis-Besse license renewal application. provides a listing of the participants and Enclosure 2 contains a description of the staff concerns discussed with the applicant. A brief description on the status of the items is also included.
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on June 21, 2012, to discuss and clarify the applicant's response to the staff's requests for additional information (RAIs) 4.7.5.1-1 concerning the Davis-Besse license renewal application.  
The applicant had an opportunity to comment on this summary.
 
Brian K. Harris, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Number:50-346
provides a listing of the participants and Enclosure 2 contains a description of the staff concerns discussed with the applicant. A brief description on the status of the items is also included.  
 
The applicant had an opportunity to comment on this summary.  
 
Brian K. Harris, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Number:50-346  


==Enclosures:==
==Enclosures:==
: 1. List of Participants
: 1. List of Participants
: 2. List of Requests for Additional  
: 2. List of Requests for Additional Information cc w/encls: See next page
 
Information  
 
cc w/encls: See next page  
 
DOCUMENT NAME: 


OFFICE LA:DLR PM:RPB1:DLR BC:RPB1:DLR NAME S Cuadrado de Jes&#xfa;s D Morey DATE       /       /       /         /         /         /
DOCUMENT NAME:
ENCLOSURE 1
OFFICE     LA:DLR             PM:RPB1:DLR             BC:RPB1:DLR NAME                           S Cuadrado de           D Morey Jes&#xfa;s DATE             /   /             /     /                 /     /


==SUMMARY==
==SUMMARY==
OF TELEPHONE CONFERENCE CALL DAVIS-BESSE LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS June 21, 2012 PARTICIPANTS A FFILIATIONSSamuel Cuadrado de Jes&#xfa;s U.S. Nuclear Re g ulator y Commission (NRC) Christo p her S y dno r NRC A llen Hise r NRC Cliff Custe r FirstEner gy Nuclear O p eratin g Com p an y (FENOC)Steve Dort FENOC
OF TELEPHONE CONFERENCE CALL DAVIS-BESSE LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS June 21, 2012 PARTICIPANTS                     AFFILIATIONS Samuel Cuadrado de Jes&#xfa;s         U.S. Nuclear Regulatory Commission (NRC)
 
Christopher Sydnor              NRC Allen Hiser                      NRC Cliff Custer                    FirstEnergy Nuclear Operating Company (FENOC)
Larr y Hinkle FENOC John Harti g an FENOC  
Steve Dort                       FENOC Larry Hinkle                     FENOC John Hartigan                    FENOC ENCLOSURE 1
 
ENCLOSURE 2


==SUMMARY==
==SUMMARY==
OF TELEPHONE CONFERENCE CALL DAVIS-BESSE LICENSE RENEWAL APPLICATION June 21, 2012  
OF TELEPHONE CONFERENCE CALL DAVIS-BESSE LICENSE RENEWAL APPLICATION June 21, 2012 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on June 21, 2012, to discuss and clarify the following response to requests for additional information (RAIs) concerning the Davis-Besse license renewal application (LRA).
 
RAI 4.7.5.1-1 related to LRA Section 4.7.5.1, Reactor Coolant System Loop 1 Cold Leg Drain Line Weld Overlay Repair.
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on June 21, 2012, to discuss and clarify the following response to requests for additional information (RAIs) concerning the Davis-Besse license renewal application (LRA).
Discussion:
RAI 4.7.5.1-1 related to LRA Section 4.7.5.1, "Reactor Coolant System Loop 1 Cold Leg Drain Line Weld Overlay Repair."
The staff stated that in response to RAI 4.7.5.1-1, the applicant cited a summary calculation package that was prepared to document the design and analysis of the Davis-Besse reactor coolant pump 1-1 inlet cold leg drain line nozzle-to-elbow weld overlay. The package included summaries of an American Society of Mechanical Engineer's Boiler and Pressure Vessel (ASME) Code Section III evaluation (Calculation Number DB-06Q-304, Rev. 1) and a fatigue crack growth analysis (Calculation Number DB-06Q-307, Rev. 0). The staff stated that LRA Section 4.7.5.1 only identified the ASME Code Section III evaluation as a TLAA. The staff further stated that its position is that the fatigue crack growth analysis is also a TLAA requiring disposition for license renewal.
Discussion:  
The applicant agreed that the fatigue crack growth analysis is a TLAA. The applicant also agreed to provide a supplemental response to RAI 4.7.5.1-1 to disposition the TLAA associated with the fatigue crack growth analysis. Since the subject analysis is not docketed, it was also agreed that the supplemental response would provide sufficient details (e.g., address residual stresses, primary water stress corrosion cracking, etc.) to support the staffs review. The applicant stated that the target date for submittal of the supplemental response is July 10, 2012.
 
The staff stated that in response to RAI 4.7.5.1-1, the applic ant cited a summary calculation package that was prepared to document the design an d analysis of the Davis-Besse reactor coolant pump 1-1 inlet cold leg drain line nozzle-to-elbow weld overlay. The package included summaries of an American Society of Mechanical Engineer's Boiler and Pressure Vessel (ASME)
Code Section III evaluation (Calculation Number DB-06Q-304, Rev. 1) and a fatigue crack growth analysis (Calculation Number DB-06Q-307, Rev. 0). The staff stated that LRA Section 4.7.5.1 only identified the ASME Code Section III evaluation as a TLAA. The staff further stated that its position is that the fatigue crack growth analysis is al so a TLAA requiring disposition for license renewal.  
 
The applicant agreed that the fa tigue crack growth analysis is a TLAA. The applicant also agreed to provide a supplemental res ponse to RAI 4.7.5.1-1 to disposition the TLAA associated with the fatigue crack growth analysis. Since the subject analysis is not docketed, it was also agreed that the supplemental response would provide sufficient details (e.g., address residual stresses, primary water stress corrosion cracking, etc.) to support the staff's review. The applicant stated that the target date for submittal of the supplemental response is July 10, 2012.  
 
There was no further discussion, and the call was concluded.
There was no further discussion, and the call was concluded.
Action: The applicant will provide a supplemental response to RAI 4.7.5.1-1.  
Action: The applicant will provide a supplemental response to RAI 4.7.5.1-1.
 
ENCLOSURE 2
ENCLOSURE 2  


==SUBJECT:==
==SUBJECT:==
Summary of Telephone Conference Call conducted on June 21, 2012  
Summary of Telephone Conference Call conducted on June 21, 2012 DISTRIBUTION:
 
DISTRIBUTION:
 
HARD COPY:
HARD COPY:
DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource  
DLR RF E-MAIL:
 
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource PCooper BHarris SCuadrado EMiller MMahoney D.McIntyre, OPA TRiley, OCA BHarris, OGC ENCLOSURE 2}}
RidsNrrDlrRarb Resource  
 
RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource  
---------------------
 
PCooper BHarris SCuadrado EMiller MMahoney D.McIntyre, OPA  
 
TRiley, OCA  
 
BHarris, OGC}}

Latest revision as of 13:01, 6 February 2020

Lr - 6/21/2012 Teleconference Summary
ML12269A591
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/02/2012
From:
Office of Nuclear Reactor Regulation
To:
Division of License Renewal
References
Download: ML12269A591 (7)


Text

Davis-BesseNPEm Resource From: CuadradoDeJesus, Samuel Sent: Monday, July 02, 2012 8:16 AM To: dorts@firstenergycorp.com; custerc@firstenergycorp.com Cc: Davis-BesseHearingFile Resource; Harris, Brian

Subject:

6/21/2012 Teleconference Summary Attachments: 6 21 2012 DB NRC Telecon Summary.docx Cliff and Steve, Attached for your review is a draft summary of our June 21, 2012, teleconference. Let me know if you have any comments.

Regards, Samuel Cuadrado de Jesús Project Manager Projects Branch 1 Division of License Renewal U.S. Nuclear Regulatory Commission Phone: 301-415-2946 Samuel.CuadradoDeJesus@nrc.gov 1

Hearing Identifier: Davis_BesseLicenseRenewal_Saf_NonPublic Email Number: 3890 Mail Envelope Properties (377CB97DD54F0F4FAAC7E9FD88BCA6D0AA50B432C3)

Subject:

6/21/2012 Teleconference Summary Sent Date: 7/2/2012 8:15:56 AM Received Date: 7/2/2012 8:15:58 AM From: CuadradoDeJesus, Samuel Created By: Samuel.CuadradoDeJesus@nrc.gov Recipients:

"Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>

Tracking Status: None "Harris, Brian" <Brian.Harris2@nrc.gov>

Tracking Status: None "dorts@firstenergycorp.com" <dorts@firstenergycorp.com>

Tracking Status: None "custerc@firstenergycorp.com" <custerc@firstenergycorp.com>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 410 7/2/2012 8:15:58 AM 6 21 2012 DB NRC Telecon Summary.docx 30368 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JUNE 21. 2012, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION, LICENSE RENEWAL APPLICATION (TAC. NO. ME4640)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on June 21, 2012, to discuss and clarify the applicants response to the staffs requests for additional information (RAIs) 4.7.5.1-1 concerning the Davis-Besse license renewal application. provides a listing of the participants and Enclosure 2 contains a description of the staff concerns discussed with the applicant. A brief description on the status of the items is also included.

The applicant had an opportunity to comment on this summary.

Brian K. Harris, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Number:50-346

Enclosures:

1. List of Participants
2. List of Requests for Additional Information cc w/encls: See next page

DOCUMENT NAME:

OFFICE LA:DLR PM:RPB1:DLR BC:RPB1:DLR NAME S Cuadrado de D Morey Jesús DATE / / / / / /

SUMMARY

OF TELEPHONE CONFERENCE CALL DAVIS-BESSE LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS June 21, 2012 PARTICIPANTS AFFILIATIONS Samuel Cuadrado de Jesús U.S. Nuclear Regulatory Commission (NRC)

Christopher Sydnor NRC Allen Hiser NRC Cliff Custer FirstEnergy Nuclear Operating Company (FENOC)

Steve Dort FENOC Larry Hinkle FENOC John Hartigan FENOC ENCLOSURE 1

SUMMARY

OF TELEPHONE CONFERENCE CALL DAVIS-BESSE LICENSE RENEWAL APPLICATION June 21, 2012 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on June 21, 2012, to discuss and clarify the following response to requests for additional information (RAIs) concerning the Davis-Besse license renewal application (LRA).

RAI 4.7.5.1-1 related to LRA Section 4.7.5.1, Reactor Coolant System Loop 1 Cold Leg Drain Line Weld Overlay Repair.

Discussion:

The staff stated that in response to RAI 4.7.5.1-1, the applicant cited a summary calculation package that was prepared to document the design and analysis of the Davis-Besse reactor coolant pump 1-1 inlet cold leg drain line nozzle-to-elbow weld overlay. The package included summaries of an American Society of Mechanical Engineer's Boiler and Pressure Vessel (ASME) Code Section III evaluation (Calculation Number DB-06Q-304, Rev. 1) and a fatigue crack growth analysis (Calculation Number DB-06Q-307, Rev. 0). The staff stated that LRA Section 4.7.5.1 only identified the ASME Code Section III evaluation as a TLAA. The staff further stated that its position is that the fatigue crack growth analysis is also a TLAA requiring disposition for license renewal.

The applicant agreed that the fatigue crack growth analysis is a TLAA. The applicant also agreed to provide a supplemental response to RAI 4.7.5.1-1 to disposition the TLAA associated with the fatigue crack growth analysis. Since the subject analysis is not docketed, it was also agreed that the supplemental response would provide sufficient details (e.g., address residual stresses, primary water stress corrosion cracking, etc.) to support the staffs review. The applicant stated that the target date for submittal of the supplemental response is July 10, 2012.

There was no further discussion, and the call was concluded.

Action: The applicant will provide a supplemental response to RAI 4.7.5.1-1.

ENCLOSURE 2

SUBJECT:

Summary of Telephone Conference Call conducted on June 21, 2012 DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource PCooper BHarris SCuadrado EMiller MMahoney D.McIntyre, OPA TRiley, OCA BHarris, OGC ENCLOSURE 2