| number = ML14174A938
| number = ML14174A938
| issue date = 07/17/2014
| issue date = 07/17/2014
| title = Joseph M. Farley Nuclear Plant, Units 1 and 2 - Relaxation of Response Due Dates Regarding Flooding Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of the Insights from the Fukushima Dai-Ichi Accident
| title = Relaxation of Response Due Dates Regarding Flooding Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of the Insights from the Fukushima Dai-Ichi Accident
| author name = Leeds E J
| author name = Leeds E
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
| addressee name = Pierce C R
| addressee name = Pierce C
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000348, 05000364
| docket = 05000348, 05000364
| license number =  
| license number =  
| contact person = Sebrosky J M, NRR/JLD, 415-1132
| contact person = Sebrosky J, NRR/JLD, 415-1132
| case reference number = TAC MF3638, TAC MF3639
| case reference number = TAC MF3638, TAC MF3639
| document type = Letter
| document type = Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Mr. C. R. Pierce Regulatory Affairs Director UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 17, 2014 Southern Nuclear Operating  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 17, 2014 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Company, Inc.
: Company, Inc. P.O. Box 1295 Bin 038 Birmingham, AL 35201-1295  
P.O. Box 1295 Bin 038 Birmingham, AL 35201-1295


==SUBJECT:==
==SUBJECT:==
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2- RELAXATION OF RESPONSE DUE DATES REGARDING FLOODING HAZARD REEVALUATIONS FOR RECOMMENDATION 2.1 OF THE NEAR-TERM TASK FORCE REVIEW OF THE INSIGHTS FROM THE FUKUSHIMA DAI-ICHI ACCIDENT (TAC NOS.
MF3638 and MF3639)


JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2-RELAXATION OF RESPONSE DUE DATES REGARDING FLOODING HAZARD REEVALUATIONS FOR RECOMMENDATION 2.1 OF THE NEAR-TERM TASK FORCE REVIEW OF THE INSIGHTS FROM THE FUKUSHIMA DAI-ICHI ACCIDENT (TAC NOS. MF3638 and MF3639)
==Dear Mr. Pierce:==


==Dear Mr. Pierce:==
By letter dated March 12, 2012, 1 the Nuclear Regulatory Commission (NRC) issued a request for information pursuant to Title 10 of the Code of Federal Regulations, Section 50.54(f)
By letter dated March 12, 2012,1 the Nuclear Regulatory Commission (NRC) issued a request for information pursuant to Title 10 of the Code of Federal Regulations, Section 50.54(f)  
(henceforth referred to as the 50.54(f) letter). The request was issued as a part of implementing lessons-learned from the accident at the Fukushima Dai-ichi nuclear power plant. Enclosure 2 to the 50.54(f) letter requested licensees to perform a reevaluation of all external flooding hazards using present-day guidance and methodologies.
(henceforth referred to as the 50.54(f) letter).
By letter dated May 11, 2012, 2 the NRC issued a prioritization of due dates for all sites. The flooding hazard reevaluation report (FHRR) was due on March 12, 2014, for Joseph M. Farley Nuclear Plant, Units 1 and 2 (Farley).
The request was issued as a part of implementing lessons-learned from the accident at the Fukushima Dai-ichi nuclear power plant. Enclosure 2 to the 50.54(f) letter requested licensees to perform a reevaluation of all external flooding hazards using present-day guidance and methodologies.
By letter dated September 26, 2013, 3 Southern Nuclear Operating Company, Inc. (Southern, the licensee) requested NRC assistance in obtaining the U.S. Army Corps of Engineers (USACE) analysis of dams that could impact the flood levels at the Farley site. By letter dated February 28, 2014, 4 Southern requested a delay in submittal of the FHRR for Farley to within 120 days of receiving the USACE final analysis. The reason for this request is that the USACE analysis is necessary to complete the flooding hazard reevaluation (FHR) and 120 days is necessary to incorporate the results.
By letter dated May 11, 2012,2 the NRC issued a prioritization of due dates for all sites. The flooding hazard reevaluation report (FHRR) was due on March 12, 2014, for Joseph M. Farley Nuclear Plant, Units 1 and 2 (Farley).
On May 16, 2014, 5 the NRC staff held a public meeting with Southern to discuss the requested extension. On May 21, 2014, 6 Southern provided additional information supporting its requested extension for providing the Farley FHRR.
By letter dated September 26, 2013,3 Southern Nuclear Operating  
1 The 50.54(f) letter is available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML12053A340.
: Company, Inc. (Southern, the licensee) requested NRC assistance in obtaining the U.S. Army Corps of Engineers (USACE) analysis of dams that could impact the flood levels at the Farley site. By letter dated February 28, 2014,4 Southern requested a delay in submittal of the FHRR for Farley to within 120 days of receiving the USACE final analysis.
2 The prioritization letter is available in ADAMS under Accession No. ML12097A509.
The reason for this request is that the USACE analysis is necessary to complete the flooding hazard reevaluation (FHR) and 120 days is necessary to incorporate the results.
3 The request for assistance in obtaining USAGE analysis is available in ADAMS under Accession No. ML13274A343.
On May 16, 2014,5 the NRC staff held a public meeting with Southern to discuss the requested extension.
4 The extension request from Southern is available in ADAMS under Accession No. ML14072A486.
On May 21, 2014,6 Southern provided additional information supporting its requested extension for providing the Farley FHRR. 1 The 50.54(f) letter is available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML 12053A340.
5 A summary of the May 16, 2014 meeting is available in ADAMS under Accession No. ML14134A031.
2 The prioritization letter is available in ADAMS under Accession No. ML 12097 A509. 3 The request for assistance in obtaining USAGE analysis is available in ADAMS under Accession No. ML 13274A343.
6 The May 21, 2014 letter is available in ADAMS under Accession No. ML14141A629.
4 The extension request from Southern is available in ADAMS under Accession No. ML 14072A486.
 
5 A summary of the May 16, 2014 meeting is available in ADAMS under Accession No. ML 14134A031.
C. Pierce                                         The NRC reviewed the justification provided and considered the following factors when reviewing the new schedule:
6 The May 21, 2014 letter is available in ADAMS under Accession No. ML 14141 A629.
C. Pierce The NRC reviewed the justification provided and considered the following factors when reviewing the new schedule:
* Southern has completed the analysis required for the Farley FHR not related to the information request to USAGE and has implemented interim actions to account for the higher than anticipated local intense precipitation event.
* Southern has completed the analysis required for the Farley FHR not related to the information request to USAGE and has implemented interim actions to account for the higher than anticipated local intense precipitation event.
* As stated in the NRC's interim staff guidance (ISG) JLD-ISG-2013-01  
* As stated in the NRC's interim staff guidance (ISG) JLD-ISG-2013-01 ,7 "Guidance for Assessment of Flooding Hazards Due to Dam Failure," evaluating flooding hazards for nuclear power plants needs to include consideration of floods resulting from dam failures. The FHR for Farley needs to consider dams that are operated by various government agencies including the USAGE. The NRC has entered into an interagency agreement with the USAGE to provide the necessary information for Farley to complete its FHR. Therefore, the FHRR for Farley cannot be completed until the NRC provides the analysis of the USAGE dams to the licensee.
,7 "Guidance for Assessment of Flooding Hazards Due to Dam Failure,"
* As stated in NRC letter dated March 1, 2013, 8 "incomplete hazard reports that only contain an analysis of some flooding hazard mechanisms would not be of substantitive benefit for staff and would not be acceptable." Therefore, the information requested from the USAGE is necessary before an FHRR can be acceptably submitted to the NRC in compliance with the request in the 50.54(f) letter.
evaluating flooding hazards for nuclear power plants needs to include consideration of floods resulting from dam failures.
The FHR for Farley needs to consider dams that are operated by various government agencies including the USAGE. The NRC has entered into an interagency agreement with the USAGE to provide the necessary information for Farley to complete its FHR. Therefore, the FHRR for Farley cannot be completed until the NRC provides the analysis of the USAGE dams to the licensee.
* As stated in NRC letter dated March 1, 2013,8 "incomplete hazard reports that only contain an analysis of some flooding hazard mechanisms would not be of substantitive benefit for staff and would not be acceptable."
Therefore, the information requested from the USAGE is necessary before an FHRR can be acceptably submitted to the NRC in compliance with the request in the 50.54(f) letter.
* The limited duration of the proposed extension (120 days after receiving the necessary information) and the fact that Farley has implemented interim actions to account for unbounded reevaluated flooding hazards support the proposed schedule.
* The limited duration of the proposed extension (120 days after receiving the necessary information) and the fact that Farley has implemented interim actions to account for unbounded reevaluated flooding hazards support the proposed schedule.
Given these considerations, the NRC considers the revised schedule proposed by Southern to be acceptable.
Given these considerations, the NRC considers the revised schedule proposed by Southern to be acceptable. Accordingly, and based upon the authority granted to the Director, Office of Nuclear Reactor Regulation, the revised required response date for submitting the FHRR for Farley is 120 days after Southern receives the information from USAGE. The NRC will include the date when the Farley FHRR is due when the requested USAGE information is transmitted to the licensee. The transmittal letter will also note that if the USAGE analysis results in a higher flood hazard relative to the design basis, the NRC staff will request that, within 60 days of receipt of the USAGE analysis, Southern provide interim actions it will take or plans to take to address the higher flooding hazard.
Accordingly, and based upon the authority granted to the Director, Office of Nuclear Reactor Regulation, the revised required response date for submitting the FHRR for Farley is 120 days after Southern receives the information from USAGE. The NRC will include the date when the Farley FHRR is due when the requested USAGE information is transmitted to the licensee.
7 JLD-ISG-2013-01 is available in ADAMS under Accession no. ML13151A153 8
The transmittal letter will also note that if the USAGE analysis results in a higher flood hazard relative to the design basis, the NRC staff will request that, within 60 days of receipt of the USAGE analysis, Southern provide interim actions it will take or plans to take to address the higher flooding hazard. 7 JLD-ISG-2013-01 is available in ADAMS under Accession no. ML 13151A153 8 NRC's March 1, 2013 letter is available in ADAMS under Accession no. ML 13044A561.
NRC's March 1, 2013 letter is available in ADAMS under Accession no. ML13044A561.
C. Pierce If you have any questions regarding this matter, or if it is necessary to revise the submittal  
 
: schedule, please contact your NRC project manager, Shawn Williams, at (301) 415-1009 or by e-mail at Shawn.Williams@nrc.gov.
C. Pierce                                     If you have any questions regarding this matter, or if it is necessary to revise the submittal schedule, please contact your NRC project manager, Shawn Williams, at (301) 415-1009 or by e-mail at Shawn.Williams@nrc.gov.
Docket Nos. 50-348 and 50-364 cc: Listserv Sincerely, Daniel H. Dorman, Acting Director Office of Nuclear Reactor Regulation C. Pierce If you have any questions regarding this matter, or if it is necessary to revise the submittal
Sincerely, Daniel H. Dorman, Acting Director Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364 cc: Listserv
: schedule, please contact your NRC project manager, Shawn Williams, at (301) 415-1009 or by e-mail at Shawn.Williams@nrc.gov.
 
Docket Nos. 50-348 and 50-364 cc: Listserv DISTRIBUTION:
ML14174A938                                *via email   **Previously concurred OFFICE     NRRIJLD/JHMB/PM   NRRIJLD/JHMB/LA**       NRR!DORULPL2-1/PM* NRRIJLD/JHMB/BC       DSENRHM1/BC*
PUBLIC JLD RIF RidsAcrsAcnw_MaiiCTR Resource RidsNrrOd Resource RidsNrrDorl Resource ADAMS Accession No. ML 1417 4A938 Sincerely, IRA/ Daniel H. Dorman, Acting Director Office of Nuclear Reactor Regulation RidsNrrDoriLpl2-1 Resource RidsNrrPMFarley Resource RidsNrrLASLent Resource RidsRgn1MaiiCenter Resource
NAME       JSebrosky         Slent                   SWilliams           MMitchel             CCook (KErwin for)
*via email MMitchell, NRR DSkeen, JLD EMiller, DORL RTaylor, DSS RKuntz, JLD **Previously concurred OFFICE NRRIJLD/JHMB/PM NRRIJLD/JHMB/LA**
DATE       07/17/14           06/23/14               07/08/14           07/02/14             06/30/14 OFFICE     DSENRHM2/BC*       OGC NLO                 NRRIJLD/D           NRRID NAME       RKaras             BHarris               DSkeen               DOorman DATE       06/27/14           06/27/14               07/03/14             07/17/14}}
N RR!DORULPL2-1/PM*
NRRIJLD/JHMB/BC DSENRHM1/BC*
NAME JSebrosky Slent SWilliams MMitchel CCook (KErwin for) DATE 07/17/14 06/23/14 07/08/14 07/02/14 06/30/14 OFFICE DSENRHM2/BC*
OGC NLO NRRIJLD/D NRRID NAME RKaras BHarris DSkeen DOorman DATE 06/27/14 06/27/14 07/03/14 07/17/14 OFFICIAL RECORD COPY}}

Latest revision as of 20:23, 5 February 2020

Relaxation of Response Due Dates Regarding Flooding Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of the Insights from the Fukushima Dai-Ichi Accident
ML14174A938
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/17/2014
From: Leeds E
Office of Nuclear Reactor Regulation
To: Pierce C
Southern Nuclear Operating Co
Sebrosky J, NRR/JLD, 415-1132
References
TAC MF3638, TAC MF3639
Download: ML14174A938 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 17, 2014 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Company, Inc.

P.O. Box 1295 Bin 038 Birmingham, AL 35201-1295

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2- RELAXATION OF RESPONSE DUE DATES REGARDING FLOODING HAZARD REEVALUATIONS FOR RECOMMENDATION 2.1 OF THE NEAR-TERM TASK FORCE REVIEW OF THE INSIGHTS FROM THE FUKUSHIMA DAI-ICHI ACCIDENT (TAC NOS.

MF3638 and MF3639)

Dear Mr. Pierce:

By letter dated March 12, 2012, 1 the Nuclear Regulatory Commission (NRC) issued a request for information pursuant to Title 10 of the Code of Federal Regulations, Section 50.54(f)

(henceforth referred to as the 50.54(f) letter). The request was issued as a part of implementing lessons-learned from the accident at the Fukushima Dai-ichi nuclear power plant. Enclosure 2 to the 50.54(f) letter requested licensees to perform a reevaluation of all external flooding hazards using present-day guidance and methodologies.

By letter dated May 11, 2012, 2 the NRC issued a prioritization of due dates for all sites. The flooding hazard reevaluation report (FHRR) was due on March 12, 2014, for Joseph M. Farley Nuclear Plant, Units 1 and 2 (Farley).

By letter dated September 26, 2013, 3 Southern Nuclear Operating Company, Inc. (Southern, the licensee) requested NRC assistance in obtaining the U.S. Army Corps of Engineers (USACE) analysis of dams that could impact the flood levels at the Farley site. By letter dated February 28, 2014, 4 Southern requested a delay in submittal of the FHRR for Farley to within 120 days of receiving the USACE final analysis. The reason for this request is that the USACE analysis is necessary to complete the flooding hazard reevaluation (FHR) and 120 days is necessary to incorporate the results.

On May 16, 2014, 5 the NRC staff held a public meeting with Southern to discuss the requested extension. On May 21, 2014, 6 Southern provided additional information supporting its requested extension for providing the Farley FHRR.

1 The 50.54(f) letter is available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML12053A340.

2 The prioritization letter is available in ADAMS under Accession No. ML12097A509.

3 The request for assistance in obtaining USAGE analysis is available in ADAMS under Accession No. ML13274A343.

4 The extension request from Southern is available in ADAMS under Accession No. ML14072A486.

5 A summary of the May 16, 2014 meeting is available in ADAMS under Accession No. ML14134A031.

6 The May 21, 2014 letter is available in ADAMS under Accession No. ML14141A629.

C. Pierce The NRC reviewed the justification provided and considered the following factors when reviewing the new schedule:

  • Southern has completed the analysis required for the Farley FHR not related to the information request to USAGE and has implemented interim actions to account for the higher than anticipated local intense precipitation event.
  • As stated in the NRC's interim staff guidance (ISG) JLD-ISG-2013-01 ,7 "Guidance for Assessment of Flooding Hazards Due to Dam Failure," evaluating flooding hazards for nuclear power plants needs to include consideration of floods resulting from dam failures. The FHR for Farley needs to consider dams that are operated by various government agencies including the USAGE. The NRC has entered into an interagency agreement with the USAGE to provide the necessary information for Farley to complete its FHR. Therefore, the FHRR for Farley cannot be completed until the NRC provides the analysis of the USAGE dams to the licensee.
  • As stated in NRC letter dated March 1, 2013, 8 "incomplete hazard reports that only contain an analysis of some flooding hazard mechanisms would not be of substantitive benefit for staff and would not be acceptable." Therefore, the information requested from the USAGE is necessary before an FHRR can be acceptably submitted to the NRC in compliance with the request in the 50.54(f) letter.
  • The limited duration of the proposed extension (120 days after receiving the necessary information) and the fact that Farley has implemented interim actions to account for unbounded reevaluated flooding hazards support the proposed schedule.

Given these considerations, the NRC considers the revised schedule proposed by Southern to be acceptable. Accordingly, and based upon the authority granted to the Director, Office of Nuclear Reactor Regulation, the revised required response date for submitting the FHRR for Farley is 120 days after Southern receives the information from USAGE. The NRC will include the date when the Farley FHRR is due when the requested USAGE information is transmitted to the licensee. The transmittal letter will also note that if the USAGE analysis results in a higher flood hazard relative to the design basis, the NRC staff will request that, within 60 days of receipt of the USAGE analysis, Southern provide interim actions it will take or plans to take to address the higher flooding hazard.

7 JLD-ISG-2013-01 is available in ADAMS under Accession no. ML13151A153 8

NRC's March 1, 2013 letter is available in ADAMS under Accession no. ML13044A561.

C. Pierce If you have any questions regarding this matter, or if it is necessary to revise the submittal schedule, please contact your NRC project manager, Shawn Williams, at (301) 415-1009 or by e-mail at Shawn.Williams@nrc.gov.

Sincerely, Daniel H. Dorman, Acting Director Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364 cc: Listserv

ML14174A938 *via email **Previously concurred OFFICE NRRIJLD/JHMB/PM NRRIJLD/JHMB/LA** NRR!DORULPL2-1/PM* NRRIJLD/JHMB/BC DSENRHM1/BC*

NAME JSebrosky Slent SWilliams MMitchel CCook (KErwin for)

DATE 07/17/14 06/23/14 07/08/14 07/02/14 06/30/14 OFFICE DSENRHM2/BC* OGC NLO NRRIJLD/D NRRID NAME RKaras BHarris DSkeen DOorman DATE 06/27/14 06/27/14 07/03/14 07/17/14