ML15126A423: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15126A423
| number = ML15126A423
| issue date = 05/06/2015
| issue date = 05/06/2015
| title = Sequoyah Initial Exam 2015-301 Draft Sim IN-Plant JPMs
| title = Initial Exam 2015-301 Draft Sim IN-Plant JPMs
| author name =  
| author name =  
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPMA Task: Shutdown Bank Withdrawal Task#: 0010180101 1503 NRC Sim JPM A Page 2of18 Task Standard:
{{#Wiki_filter:SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPMA
The examinee will close the Reactor Trip Breakers and commence Shutdown Bank withdrawal.
 
The examinee will Trip the Reactor when continuous rod withdrawal occurs. Alternate Path: YES: X NO: ---Time Critical Task: YES: NO: x ---KIA Reference/Ratings:
1503 NRC Sim JPM A Page 2of18 Task:               Shutdown Bank Withdrawal Task#:             0010180101 Task Standard:     The examinee will close the Reactor Trip Breakers and commence Shutdown Bank withdrawal.
001A2.11 (4.4/4.7)
The examinee will Trip the Reactor when continuous rod withdrawal occurs.
Method of Testing: Simulated Performance:
Alternate Path:             YES: - -  X - NO:
Actual Performance:
Time Critical Task:         YES:   ---
x Evaluation Method: Simulator x In-Plant Classroom
NO:         x KIA Reference/Ratings:         001A2.11 (4.4/4.7)
-------Main Control Room Mock-up Performer:
Method of Testing:
Trainee Name Evaluator:
Simulated Performance:                     Actual Performance:         x Evaluation Method:
I Name I Signature DATE Performance Rating: SAT: UNSAT: Validation Time: 23 min Total Time: Performance Time: Start Time: Finish Time: COMMENTS SPECIAL INSTRUCTIONS TO EVALUATOR:  
Simulator     ---
: 1. Ensure Simulator Operator Checklist is complete 2. Reset to IC 256 3. IF IC #256 is not available then reset to IC#16 1503 NRC Sim JPM A Page 3of18
x     In-Plant   - - - - Classroom Main Control Room                               Mock-up Performer:
* Hold FW Isolation  
Trainee Name Evaluator:                                       I Name I Signature                                     DATE Performance Rating:     SAT:                 UNSAT:
'reset pushbuttons' and trip the Reactor. Leave Rods in Manual.
Validation Time:           23 min                         Total Time:
Performance Time:           Start Time:                     Finish Time:
COMMENTS
 
1503 NRC Sim JPM A Page 3of18 SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 256
: 3. IF IC #256 is not available then reset to IC#16
* Hold FW Isolation 'reset pushbuttons' and trip the Reactor. Leave Rods in Manual.
* Select a SR and IR pen for NR45.
* Select a SR and IR pen for NR45.
* Ensure Audio Count rate is audible.
* Ensure Audio Count rate is audible.
* Clear and unblock HI Flux at Shutdown alarm.
* Clear and unblock HI Flux at Shutdown alarm.
* Clear 1st out.
* Clear 1st out.
* Insert overrides to cause either SD bank A to withdraw continuously when Rods Out Light comes on. * {zdiflrm1  
* Insert overrides to cause either SD bank A to withdraw continuously when Rods Out Light comes on.
[1]} IOR ZDIFLRM1 f:1 (overrides In-Hold-Out switch to OUT) * {zdiflrm1  
    *   {zdiflrm1 [1]} IOR ZDIFLRM1 f:1 (overrides In-Hold-Out switch to OUT)
[1]} IOR ZDIRBSS1 f:6 (overrides Bank Select Switch to SOB A)
    *   {zdiflrm1 [1]} IOR ZDIRBSS1 f:6 (overrides Bank Select Switch to SOB A)
* IOR AN_OV_325 f:1 (fails annunciator as is for Computer Alarm Rod Dev.) 4. JPM Steps 7 through 10 will require a simulator operator.  
* IOR AN_OV_325 f:1 (fails annunciator as is for Computer Alarm Rod Dev.)
: 5. PLACE SIMULA TOR IN RUN 6. An extra operator will be required to acknowledge alarms. 7. ACKNOWLEDGE ALARMS 8. FREEZE SIMULA TOR 9. Save as a temporary IC, if repeat runs of JPM will be desired. 10. PLACE SIMULATOR IN RUN 11. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted. 12. Tools/Equipment/Procedures Needed: Marked up copy of O-S0-85-1, Control Rod Drive System, section 5.5 (marked through Step 10) and 6.3 Tl-28 Attachment 6  
: 4. JPM Steps 7 through 10 will require a simulator operator.
: 5. PLACE SIMULATOR IN RUN
: 6. An extra operator will be required to acknowledge alarms.
: 7. ACKNOWLEDGE ALARMS
: 8. FREEZE SIMULATOR
: 9. Save as a temporary IC, if repeat runs of JPM will be desired.
: 10. PLACE SIMULATOR IN RUN
: 11. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
: 12. Tools/Equipment/Procedures Needed:
Marked up copy of O-S0-85-1, Control Rod Drive System, section 5.5 (marked through Step 10) and 6.3 Tl-28 Attachment 6


==References:==
==References:==


Reference . Title Rev No. 1. O-S0-85-1 Control Rod Drive System 42 ====================================================================================
Reference                         .             Title                       Rev No.
DIRECTIONS TO EXAMINEE:
: 1. O-S0-85-1                             Control Rod Drive System                               42
1503 NRC Sim JPM A Page 4of18 I will explain the initial conditions, and state the task to be performed.
====================================================================================
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
 
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME! INITIAL CONDITIONS:  
1503 NRC Sim JPM A Page 4of18 DIRECTIONS TO EXAMINEE:
: 1. Unit 1 is in MODE 3 with Tavg at 547F and RCS pressure at 2235 psig. 2. Both M-G sets are in service. 3. All Precautions and Prerequisites of O-S0-85-1, Control Rod Drive System have been met. (Sections 3.0 and 4.0 are complete).  
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
: 4. O-S0-85-1 Control Rod Drive System Section 5.5 is complete through Step 9. INITIATING CUES: 1. You will close the "Reactor Trip" breakers and withdraw the Shutdown Banks using O-S0-85-1, Control Rod Drive System Section 5.5, beginning with step 10. 2. Inform the SM when the shutdown banks have been withdrawn.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
STEP 1 Standard:
HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME!
Cue: Examiner Note: Comment STEP 2 Standard:
INITIAL CONDITIONS:
Cue: Comment 1503 NRC Sim JPM A Page 5of18 Start Time SAT --Obtain a copy of O-S0-85-1, Control Rod Drive System section 5.5 (and then section 6.3) UNSAT --Examinee obtains a copy of O-S0-85-1, Control Rod Drive System section 5.5. Provide a marked up copy of O-S0-85-1, Control Rod Drive System section 5.5 (and then section 6.3). Initiating conditions cover several steps in section 5.5 prior to step 10. These steps are not addressed in the JPM. ["IO] [CTS] IF unit is in Mode 3,THEN SAT ENSURE requirements of Tech Spec 3.4:1.2 are met --[ffS] IF unit is in Mode 3,THEN UNSAT --ENSURE requirements of Tech Spec 3.4_5 are met Examinee ensures TS 3.4.1.2 requirements are met. Provide the following cue: "The SRO has verified requirements are met."
: 1. Unit 1 is in MODE 3 with Tavg at 547F and RCS pressure at 2235 psig.
STEP 3 Standard:
: 2. Both M-G sets are in service.
Examiner Note Comment STEP 4 Comment STEP 5 Standard:
: 3. All Precautions and Prerequisites of O-S0-85-1, Control Rod Drive System have been met. (Sections 3.0 and 4.0 are complete).
Comment 1503 NRG Sim JPM A (nJ DEPRESS and HOLD FW !sol Reset pushbuttons  
: 4. O-S0-85-1 Control Rod Drive System Section 5.5 is complete through Step 9.
[HS-3-99A]
INITIATING CUES:
: 1. You will close the "Reactor Trip" breakers and withdraw the Shutdown Banks using O-S0-85-1, Control Rod Drive System Section 5.5, beginning with step 10.
: 2. Inform the SM when the shutdown banks have been withdrawn.
 
1503 NRC Sim JPM A Page 5of18 Start Time STEP      1                                                                                --
SAT Obtain a copy of O-S0-85-1, Control Rod Drive System section 5.5 (and then section 6.3)
                                                                                          - - UNSAT Examinee obtains a copy of O-S0-85-1, Control Rod Drive System section Standard:
5.5.
Provide a marked up copy of O-S0-85-1, Control Rod Drive System section Cue:
5.5 (and then section 6.3).
Examiner  Initiating conditions cover several steps in section 5.5 prior to step 10.
Note:    These steps are not addressed in the JPM.
Comment
["IO]   [CTS] IF unit is in Mode 3,THEN STEP      2          ENSURE requirements of Tech Spec 3.4:1.2 are met                     --   SAT
[ffS] IF unit is in Mode 3,THEN                                           UNSAT ENSURE requirements of Tech Spec 3.4_5 are met Standard: Examinee ensures TS 3.4.1.2 requirements are met.
Cue:    Provide the following cue: "The SRO has verified requirements are met."
Comment
 
1503 NRG Sim JPM A Page 6 of 18 STEP  3                                                                                  SAT (nJ   DEPRESS and HOLD FW !sol Reset pushbuttons [HS-3-99A]               -
and [HS-3-99BJ[C.1]
and [HS-3-99BJ[C.1]
Examinee verifies both HS-3-99A and B, FW Isolation A & B Train Reset pushbuttons, are being held in the IN Reset position.
UNSAT Standard: Examinee verifies both HS-3-99A and B, FW Isolation A & B Train Reset pushbuttons, are being held in the IN Reset position.
Have the simulator operator play role as CRO and depress both A& B FW Isolation Reset pushbuttons.  
Examiner  Have the simulator operator play role as CRO and depress both A& B FW Note    Isolation Reset pushbuttons.
["i2] IF resetting Unit 1 Reactor Trip Breakers, THEN [B] CLOSE Rx Trip Breakers by placing [1-HS-99-7], in CLOSE position_
Comment STEP    4    ["i2] IF resetting Unit 1 Reactor Trip Breakers, THEN                       SAT CLOSE Rx Trip Breakers by placing [1-HS-99-7], in CLOSE position_                                                             UNSAT Comment STEP    5  [B]    IF resetting Unit 2 Reactor Trip Breakers, THEN                   - - SAT CLOSE Rx Trip Breakers by placing [2-HS-99-7], in CLOSE position.                                                         - - UNSAT Standard:  Examinee determines step is N/A.
IF resetting Unit 2 Reactor Trip Breakers, THEN CLOSE Rx Trip Breakers by placing [2-HS-99-7], in CLOSE position.
Comment
Examinee determines step is N/A. Page 6 of 18 SAT -UNSAT -SAT UNSAT SAT --UNSAT --
 
STEP 6 Standard:
1503 NRC Sim JPM A Page 7of18
Comment STEP 7 Standard:
[14]  VERIFY Reactor Trip Breakers CLOSED by RED indicating STEP    6 lights on M-4:                                                        - - SAT BREAKER      RED LIGHT      INITIALS                    - - UNSAT POSITION INDICATION RTA            ON RTB            ON Examinee verifies Red indicating lights come on and green lights go off Standard:
Comment STEP 8 Standard:
on Reactor Trip Breaker indicating lights on panel M 4.
Cue: Comment I [14] VERIFY Reactor Trip Breakers CLOSED by RED indicating lights on M-4: BREAKER RED LIGHT INITIALS POSITION INDICATION RTA ON RTB ON Examinee verifies Red indicating lights come on and green lights go off on Reactor Trip Breaker indicating lights on panel M 4. ['15] RELEASE FY.l lsol Reset pushbuttons
Comment STEP     7                                                                               - - SAT
[HS-3-99A]
['15]   RELEASE FY.l lsol Reset pushbuttons [HS-3-99A] and
and [HS-3-998].[C.1]
[HS-3-998].[C.1]
Examinee directs additional operator to release pushbuttons
                                                                                            - - UNSAT Standard: Examinee directs additional operator to release pushbuttons Comment STEP      8                                                                              - - SAT
["16] NOTIFY !Ms to periom1 *1,2-Pl-IFT-099-0P4.0, Verification of P4 Contacts.
["16] NOTIFY !Ms to periom1 *1,2-Pl-IFT-099-0P4.0, Verification of P4 Contacts.
1503 NRC Sim JPM A Page 7of18 SAT --UNSAT --SAT --UNSAT --SAT --UNSAT --Examinee notifies I Ms to perform 1 ,2-Pl-IFT-099-0P4.0, Verification ofP4 Contacts.
                                                                                            - - UNSAT Examinee notifies IMs to perform 1,2-Pl-IFT-099-0P4.0, Verification ofP4 Standard:
Provide the following cue: "The SRO will notify the IMs to perform this Pl."
Contacts.
STEP 9 Standard:
Provide the following cue: "The SRO will notify the IMs to perform this Cue:
Comment STEP 10 Standard:
Pl."
Comment STEP 11 Standard:
Comment I
Cue: ['17] IF Shutdown or Control Rods will be withdrawn and both MG Sets are NOT in operation but are available, THEN PERFORM one of the follo'Wing AND RETURN to this Section (Mark selection NOT made NIA): ['17.'I} GO TO Section 6.1, Placing MG Set A In Service With MG Set B Operating OR ['17-2] GO TO Section 6-2, Placing MG Set B In Service With MG Set A Operating Examinee determines both steps are N/A [18) IF Shutdown or Control Rods 'Will be withdrawn, THEN GO TO Sedion 6.3, Manual Operation of Rod Control System Below -15 Percent Power. End of 5.5 Examinee determines Section 6.3 is applicable.
 
Obtain a copy of O-S0-85-1, Control Rod Drive System section 6.3 1503 NRC Sim JPM A Page 8of18 SAT --UNSAT --D D SAT --UNSAT --SAT --UNSAT --Examinee obtains a copy of O-S0-85-1, Control Rod Drive System section 6.3.* Provide a copy of O-S0-85-1, Control Rod Drive System section 6.3.
1503 NRC Sim JPM A Page 8of18 STEP    9  ['17]    IF Shutdown or Control Rods will be withdrawn and both MG Sets are NOT in operation but are available, THEN                - - SAT PERFORM one of the follo'Wing AND RETURN to this Section (Mark selection NOT made NIA):                                    - - UNSAT
1503 NRC Sim JPM A Page 9of18 CAUTIONS 1) (CTS] TR 3.1.3.3 [ITSJ TRM 8.1.3 requires group demand position indicator capable of determining within +/-2 steps, the demand position for each rod not fully inserted.
['17.'I}  GO TO Section 6.1, Placing MG Set A In Service With MG Set B Operating                                    D OR
In Modes 3, 4, or 5 and greater than +/-2 steps deviation refer to AOP-C.01.  
['17-2]    GO TO Section 6-2, Placing MG Set B In Service With MG Set A Operating                                    D Standard: Examinee determines both steps are N/A Comment STEP   10   [18)      IF Shutdown or Control Rods 'Will be withdrawn, THEN
: 2) If reactor trip breakers are CLOSED and an RCS cooldown of greater than 50°F is planned, the shutdown and control banks should be withdrawn at least 5 steps each. This will limit the possibility of "thennal lock-up" of the rods. Thermal lock-up is NOT a concern during unit heatup. NOTE When RCS temperatures are greater than 350"'F, continuous rod motion shall comply with these restrictions:
                                                                                        - - SAT GO TO Sedion 6.3, Manual Operation of Rod Control System Below -15 Percent Power.
CROM OUTLET ROD MOTION LIMITS TEMPERATURE  
                                                                                        - - UNSAT End of Se~tion 5.5 Standard: Examinee determines Section 6.3 is applicable.
:s;190"F *10 minutes ON 20 minutes OFF :QOO"F 6 minutes ON 24 minutes OFF STEP 12 SAT --[1] ENSURE Section 5_5, Reset/Close Reactor Trip Breakers has been completed_
Comment STEP    11                                                                              - - SAT Obtain a copy of O-S0-85-1, Control Rod Drive System section 6.3
D UNSAT --Standard:
                                                                                        - - UNSAT Standard: Examinee obtains a copy of O-S0-85-1, Control Rod Drive System section 6.3.*
Examinee determines Section 5.5 is complete.
Cue:    Provide a copy of O-S0-85-1, Control Rod Drive System section 6.3.
Comment STEP 13 {2] IF the shutdown and control rods were withdrmvn 5 steps to SAT --prevent them1al lockup during an RCS cooldown, THEN UNSAT ENSURE rods are fully inserted prior to withdrawaL  
 
--Standard:
1503 NRC Sim JPM A Page 9of18 CAUTIONS
Examinee determines step is N/A. Comment I STEP 14 Standard:
: 1) (CTS] TR 3.1.3.3 [ITSJ TRM 8.1.3 requires group demand position indicator capable of determining within +/-2 steps, the demand position for each rod not fully inserted. In Modes 3, 4, or 5 and greater than +/-2 steps deviation refer to AOP-C.01.
Cue: Comment STEP 15 Comment 1503 NRC Sim JPM A Page 10of18 [3] IF RCS temperatures are greater than 350"F, THEN ENSURE CROM cooling fans are aligned and in service in accordance wfth O-S0-30-6.
: 2) If reactor trip breakers are CLOSED and an RCS cooldown of greater than 50°F is planned, the shutdown and control banks should be withdrawn at least 5 steps each. This will limit the possibility of "thennal lock-up" of the rods. Thermal lock-up is NOT a concern during unit heatup.
Examinee ensures that CROM cooling fans are aligned and in service per O-S0-30-6 Provide the following cue: "CROM cooling fans are aligned and in service per 0-50-30-6" CAUTION ROD CONTROL STARTUP STEP COUNTER RESET (SUS on M-4} should never be held in STARTUP position for any extended period of time. Holding this switch in STARTUP position may cause damage to the counters.
NOTE When RCS temperatures are greater than 350"'F, continuous rod motion shall comply with these restrictions:
NOTE ROD CONTROL STARTUP STEP COUNTER RESET (SUS on M-4) Resets: A. All GROUP STEP COUNTERS on the Control Board. B. The master cyder reversible coonter. C. All slave cycler counters.
CROM OUTLET               ROD MOTION LIMITS TEMPERATURE
D. The bank overlap counter. E. All internal memory and alarm circuits.
:s;190"F       *10 minutes ON       20 minutes OFF
F. All pulse-to-analog converters in the Rod Position Indication System. [4] MOMENTARILY PLACE [SUS], Rod Control Startup Step Counter Reset to the STARTUP position to reset Control Rod Drive System. SAT --UNSAT --SAT UNSAT STEP 16 Standard:
:QOO"F         6 minutes ON       24 minutes OFF STEP   12                                                                                         - - SAT
Comment STEP 17 I Standard:
[1]     ENSURE Section 5_5, Reset/Close Reactor Trip Breakers has been completed_                                                     D
Comment STEP 18 Standard:
                                                                                                    - - UNSAT Standard:       Examinee determines Section 5.5 is complete.
Comment CAUTION 1503 NRC Sim JPM A Page 11 of 18 Before withdrawing any rod from the fully inserted position, all Group Step Counters and all Rod Position indicators must be at zero steps. SAT --[5J ENSURE all Full Length Rod step counters resetto zero. UNSAT --Examinee verifies rod step counters have reset to zero. SAT --[6] VERIFY rod control IN-OUT direction lights are NOT UT. UNSAT --Examinee verifies both IN and OUT lights NOT lit. SAT --[7] DEPRESS [RCAS], Rod Urgent Failure Alam1 Reset UNSAT --Examinee depresses RCAS, Rod Urgent Failure Alarm Reset.
Comment STEP   13       {2]     IF the shutdown and control rods were withdrmvn 5 steps to               - - SAT prevent them1al lockup during an RCS cooldown, THEN ENSURE rods are fully inserted prior to withdrawaL                       - - UNSAT Standard:     Examinee determines step is N/A.
STEP 19 Standard:
Comment I
Comment STEP 20 Standard:
 
Comment 1503 NRC Sim JPM A Page 12of18 [8] RESET Window 6 (A-6), ROD CONTROL SYSTEM URGENT SAT --F Al LURE alami on panel JXA-55-48]
1503 NRC Sim JPM A Page 10of18 STEP    14        [3]     IF RCS temperatures are greater than 350"F,
using (XS-55-4.AJ, Annunciator RESET/ACKffEST Switch. UNSAT --Examinee resets ROD CONTROL SYSTEM URGENT FAILURE alarm. NOTE Window 13 (B-6) may be marked NIA if Shift Manager approval is obtained for reactor startup with Non-Urgent Failure Alarm. Risk of dropped rods (if additional failure occurs or during subsequent corrective maintenance) should be evaluated.
                                                                                                - - SAT THEN ENSURE CROM cooling fans are aligned and in service in accordance wfth O-S0-30-6.                                           - - UNSAT Standard:      Examinee ensures that CROM cooling fans are aligned and in service per O-S0-30-6 Cue:        Provide the following cue: "CROM cooling fans are aligned and in service per 0-50-30-6" Comment CAUTION ROD CONTROL STARTUP STEP COUNTER RESET (SUS on M-4} should never be held in STARTUP position for any extended period of time. Holding this switch in STARTUP position may cause damage to the counters.
19] VERIFY the following rod control system alanns on panel SAT are NOT LIT: --WINDOW NUMBER NOT LIT('/} WINDOW NUMBER NOT LIT {\I) UNSAT --5 (A5) D 18 (C4) D 6 (A6) D 19(C5) D 11 (B4) D 27 {D6) D 12 (B5) D 34 (ES) D 13(86) D Examinee verifies that the listed annunciators are not lit STEP 21 Standard:
NOTE ROD CONTROL STARTUP STEP COUNTER RESET (SUS on M-4) Resets:
Cue: Comment STEP 22 Standard:
A.     All GROUP STEP COUNTERS on the Control Board.
Cue: Comment ['IO] ENSURE Plant computer for rod bank position are ZERO using the following computer points: COMPUTER PT ROOBANK " U0049 Control A D U0050 Control B D U0051 Control C D U0052 Control D D U0053 Shutdown A D U0054 Shutdown B D U0055 Shutdown C D U0056 Shutdown D D 1503 NRC Sim JPM A Page 13of18 SAT --UNSAT --Examinee ensures Plant computer points for rod bank position are ZERO Provide the following cue: "Another operator has verified Plant computer points for rod bank position are ZERO" [HJ MONITOR Control Rod position USING Rod Position SAT --Indicators ICS screen 30 minute trend during SD & Control UNSAT Banks \l!lithdrawal to aid in detecting rod misalignment  
B.     The master cyder reversible coonter.
--Examinee monitors Control Rod position using Rod Position Indicators ICS screen 30 minute trend. Provide the following cue: "Another operator will monitor Rod Position Indicators using ICS "
C.     All slave cycler counters.
STEP 23 [12] IF Individual Rod Position Indication does not indicate proper rod position during withdrawal of SD Banks, THEN ['12.1] STOP rod withdrawal.  
D.     The bank overlap counter.
['12-2] ENSURE subcriticality_  
E.     All internal memory and alarm circuits.
['12.3] CONTACTl&C ANO INITIATE  
F.     All pulse-to-analog converters in the Rod Position Indication System.
["12-4] IF troubleshooting does not resolve the problem, OR subcriticality can NOT be verified, THEN INITIATE Reactor TRIP_ Standard:
STEP    15        [4]     MOMENTARILY PLACE [SUS], Rod Control Startup Step                         SAT Counter Reset to the STARTUP position to reset Control Rod Drive System.                                                             UNSAT Comment
Examinee addresses step Comment STEP 24 [13] IF Individual Rod Position Indication does NOT indicate proper rod position during withdrawal of Control Banks, THEN GO TO AOP-C.01, Rod Control System Ma/functions_
 
Standard:
1503 NRC Sim JPM A Page 11 of 18 CAUTION Before withdrawing any rod from the fully inserted position, all Group Step Counters and all Rod Position indicators must be at zero steps.
Examinee addresses step Comment 1503 NRC Sim JPM A Page 14of18 SAT --UNSAT --SAT --UNSAT --
STEP    16                                                                                      - - SAT
STEP 25 Comment STEP 26 Standard:
[5J   ENSURE all Full Length Rod step counters resetto zero.
Comment 1503 NRC Sim JPM A Page 15of18 CAUTION Under normal conditions control rod banks must be withdrawn and Inserted in the prescribed sequence.
                                                                                                  - - UNSAT Standard:    Examinee verifies rod step counters have reset to zero.
For withdrawal, the sequence is Shutdown Bank A, Shutdown Bank B, Shutdown Bank C, Shutdown Bank D, Control Bank A, Control Bank B, Control Bank C, Control Bank D. The insertion sequence is the reverse of the withdrawal sequence.
Comment STEP    17                                                                                      - - SAT
NOTES 1) Startup rate, Source range, Intermediate range, Nuclear lnstrumentation recorders, Group Step Counters and the Rod Position Indicators should be monitored during each bank wlthdrawaL  
[6]   VERIFY rod control IN-OUT direction lights are NOT UT.
: 2) The fol!o:wing failures will render the rod control system incapable of automatic and I or manual motion ' ... irlhout any annunciation or indication:  
                                                                                                  - - UNSAT I
*q Hand switch failure: 2) relay failure, and 3) simultaneous failure of both *1 OOv DC power supplies (PS3 and PS6) ["14] PLACE [HS-85-5110].
Standard:    Examinee verifies both IN and OUT lights NOT lit.
Rod Control Mode Selectorto the SBA position_  
Comment STEP    18
[15] VERIFY Rod Speed Indicator  
                                                                                                  - - SAT
[Sl-412], indicates 64 Steps/minute_
[7]   DEPRESS [RCAS], Rod Urgent Failure Alam1 Reset
Examinee verifies Rod Speed Indicator reads 64 Steps/minute.  
                                                                                                  - - UNSAT Standard:    Examinee depresses RCAS, Rod Urgent Failure Alarm Reset.
----SAT UNSAT SAT UNSAT STEP 27 Standard:
Comment
Examiner Note Comment STEP 28 Standard:
 
Comment ' NOTE 1503 NRC Sim JPM A Page 16of18 Monitor Group Step Counters, Rod Position Indicator and the status lights to ensure anticipated motion as each bank is being withdrawn.
1503 NRC Sim JPM A Page 12of18 STEP    19        [8]   RESET Window 6 (A-6), ROD CONTROL SYSTEM URGENT                                 - - SAT FAl LURE alami on panel JXA-55-48] using (XS-55-4.AJ, Annunciator RESET/ACKffEST Switch.                                             - - UNSAT Standard:      Examinee resets ROD CONTROL SYSTEM URGENT FAILURE alarm.
Rod speed indicator should be reading 64 steps per minute. ['16] ENSURE Shutdo\lilTl Bank A demand position counters SAT operational by performing the following:  
Comment NOTE Window 13 (B-6) may be marked NIA if Shift Manager approval is obtained for reactor startup with Non-Urgent Failure Alarm. Risk of dropped rods (if additional failure occurs or during subsequent corrective maintenance) should be evaluated.
[C.2] --[16:1] BUMP [HS-85-5111).
STEP    20        19]   VERIFY the following rod control system alanns on panel
Rod Control Switch to withdraw UNSAT --Shutdown Bank A one-half step at a time, for one full step. Examinee momentarily places [HS-85-5111], Rod Control Switch to Withdraw for one-half step. When Rod Control Switch is taken to OUT a malfunction will cause SOB A rods to withdraw continuously forcing ALTERNATE PATH ALTERNATE PATH SAT --When moving SB A out the second full step SBA begins withdrawing UNSAT continuously with no command --1. DIAGNOSE the failure: GOTO IF ... SECTION PAGE Uncontrolled rod bank movement 2.1 4 (rod movement NOT due to actual T-avgJT-ref mismatch or change in reactor/turbine power) Examinee recognizes continuous uncontrolled rod bank movement i STEP 29 Standard:
                        ~A-55-48] are NOT LIT:
Comment STEP 29 Comment Terminating Cue: 1503 NRC Sim JPM A Page 17of18 2.1 Uncontrolled Rod Bank Movement NOTE: Step 1 is an immediate action step. 1. STOP uncontrolled rod motion: a. PLACE rod control in MAN. b. CHECK rod motion STOPPED. b. TRIP the reactor, and GO TO E-0, Reactor Trip or Injection.  
                                                                                                        - - SAT WINDOW NUMBER         NOT LIT('/}   WINDOW NUMBER           NOT LIT {\I)       - - UNSAT 5 (A5)             D               18 (C4)                 D 6 (A6)             D               19(C5)                 D 11 (B4)             D               27 {D6)                 D 12 (B5)             D               34 (ES)                 D 13(86)             D Standard:      Examinee verifies that the listed annunciators are not lit Comment
--Examinee places Rod Control in MAN and determines that rods are still moving. . 2.1 Uncontrolled Rod Bank Movement NOTE: Step 1 is an immediate action step. 1. STOP uncontrolled rod motion: a. PLACE rod control in MAN. b. CHECK rod motion STOPPED. b. TRIP the reactor, and GO TO E-0, Reactor Trip or Injection.
 
Provide the following cue, "Another operator will complete the remaininsteps of this procedure." Stop Time End of JPM SAT --UNSAT --SAT UNSAT STOP JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:
1503 NRC Sim JPM A Page 13of18 STEP   21  ['IO] ENSURE Plant computer ~nts for rod bank position are ZERO using the following computer points:                           - - SAT UNSAT COMPUTER PT U0049 ROOBANK Control A D
I will explain the initial conditions, and state the task to be performed.
U0050                 Control B             D U0051                 Control C             D U0052                 Control D             D U0053               Shutdown A               D U0054               Shutdown B               D U0055               Shutdown C               D U0056               Shutdown D               D Standard: Examinee ensures Plant computer points for rod bank position are ZERO Cue:    Provide the following cue: "Another operator has verified Plant computer points for rod bank position are ZERO" Comment STEP    22                                                                            - - SAT
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
[HJ   MONITOR Control Rod position USING Rod Position Indicators ICS screen 30 minute trend during SD & Control Banks \l!lithdrawal to aid in detecting rod misalignment           - - UNSAT Standard: Examinee monitors Control Rod position using Rod Position Indicators ICS screen 30 minute trend.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME! INITIAL CONDITIONS:  
Cue:    Provide the following cue: "Another operator will monitor Rod Position Indicators using ICS "
: 1. Unit 1 is in MODE 3 with Tavg at 547F and RCS pressure at 2235 psig. 2. Both M-G sets are in service. 3. All Precautions and Prerequisites of O-S0-85-1, Control Rod Drive System have been met. (Sections 3.0 and 4.0 are complete).  
Comment
: 4. O-S0-85-1 Control Rod Drive System Section 5.5 is complete through Step 9. INITIATING CUES: 1. You will close the "Reactor Trip" breakers and withdraw the Shutdown Banks using O-S0-85-1, Control Rod Drive System Section 5.5, beginning with step 10. 2. Inform the SM when the shutdown banks have been withdrawn.
 
SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPM B RO/SRO JOB PERFORMANCE MEASURE Task: Respond to loss of all charging per AOP-M.09.
1503 NRC Sim JPM A Page 14of18 STEP    23  [12]   IF Individual Rod Position Indication does not indicate proper rod position during withdrawal of SD Banks, THEN                     - - SAT
Task#: 0040020101 2015 NRC SIM JPM B Page 2 of 14 Task Standard:
['12.1]   STOP rod withdrawal.                                           - - UNSAT
The examinee will depressurize the RCS to facilitate SI Pump flow using AOP-M.09 LOSS OF CHARGING.
['12-2]   ENSURE subcriticality_
Alternate Path: YES: NO: x ---Time Critical Task: YES: NO: x ---KIA Reference/Ratings:
['12.3]   CONTACTl&C ANO INITIATE t~bleshooting_
APE 022 AA 1.03 (3.2/3.2)
["12-4]   IF troubleshooting does not resolve the problem, OR subcriticality can NOT be verified, THEN INITIATE Reactor TRIP_
Method of Testing: Simulated Performance:
Standard: Examinee addresses step Comment STEP   24   [13]   IF Individual Rod Position Indication does NOT indicate proper
Actual Performance:
                                                                                          - - SAT rod position during withdrawal of Control Banks, THEN GO TO AOP-C.01, Rod Control System Ma/functions_                     - - UNSAT Standard: Examinee addresses step Comment
x Evaluation Method: Simulator x In-Plant Classroom
 
----Main Control Room Mock-up Performer:
1503 NRC Sim JPM A Page 15of18 CAUTION Under normal conditions control rod banks must be withdrawn and Inserted in the prescribed sequence. For withdrawal, the sequence is Shutdown Bank A, Shutdown Bank B, Shutdown Bank C, Shutdown Bank D, Control Bank A, Control Bank B, Control Bank C, Control Bank D. The insertion sequence is the reverse of the withdrawal sequence.
Trainee Name Evaluator:
NOTES
I Name I Signature DATE Performance Rating: SAT: UNSAT: Validation Time: 20 min Total Time: Performance Time: Start Time: Finish Time: COMMENTS I SPECIAL INSTRUCTIONS:
: 1) Startup rate, Source range, Intermediate range, Nuclear lnstrumentation recorders, Group Step Counters and the Rod Position Indicators should be monitored during each bank wlthdrawaL
: 1. Ensure Simulator Operator Checklist is complete 2. Reset to IC 275 3. If IC 275 is not available perform the following:
: 2) The fol!o:wing failures will render the rod control system incapable of automatic and I or manual motion '...irlhout any annunciation or indication: *q Hand switch failure: 2) relay failure, and 3) simultaneous failure of both *1 OOv DC power supplies (PS3 and PS6)
STEP    25                                                                                                      SAT
["14]   PLACE [HS-85-5110]. Rod Control Mode Selectorto the SBA position_
UNSAT Comment STEP    26                                                                                                - - SAT
[15]   VERIFY Rod Speed Indicator [Sl-412], indicates 64 Steps/minute_
                                                                                                          - - UNSAT Standard:    Examinee verifies Rod Speed Indicator reads 64 Steps/minute.
Comment
 
1503 NRC Sim JPM A Page 16of18 NOTE Monitor Group Step Counters, Rod Position Indicator and the ~IN-OUT' status lights to ensure anticipated motion as each bank is being withdrawn. Rod speed indicator should be reading 64 steps per minute.
STEP    27        ['16]     ENSURE Shutdo\lilTl Bank A demand position counters operational by performing the following: [C.2]                         - - SAT
[16:1]     BUMP [HS-85-5111). Rod Control Switch to withdraw               --
UNSAT Shutdown Bank A one-half step at a time, for one full step.
Standard:      Examinee momentarily places [HS-85-5111], Rod Control Switch to Withdraw for one-half step.
Examiner      When Rod Control Switch is taken to OUT a malfunction will cause Note        SOB A rods to withdraw continuously forcing ALTERNATE PATH Comment ALTERNATE PATH STEP    28                                                                                          - - SAT When moving SB A out the second full step SBA begins withdrawing continuously with no command                                                       - - UNSAT
: 1. DIAGNOSE the failure:
GOTO IF ...                                               SECTION PAGE Uncontrolled rod bank movement 2.1     4 (rod movement NOT due to actual T-avgJT-ref mismatch or change in reactor/turbine power)
Standard:      Examinee recognizes continuous uncontrolled rod bank movement Comment
 
1503 NRC Sim JPM A Page 17of18 2.1   Uncontrolled Rod Bank Movement STEP    29                                                                                        - - SAT NOTE:         Step 1 is an immediate action step.                               - - UNSAT
: 1. STOP uncontrolled rod motion:
: a. PLACE rod control in MAN.
: b. CHECK rod motion STOPPED.                     b. TRIP the reactor, and GO TO E-0, Reactor Trip or Injection.
Standard: Examinee places Rod Control in MAN and determines that rods are still moving.
Comment 2.1   Uncontrolled Rod Bank Movement STEP    29                                                                                              SAT NOTE:         Step 1 is an immediate action step.                                     UNSAT
: 1. STOP uncontrolled rod motion:
: a. PLACE rod control in MAN.
: b. CHECK rod motion STOPPED.                     b. TRIP the reactor, and GO TO E-0, Reactor Trip or Injection.
Comment Terminating Provide the following cue, "Another operator will complete the Cue:                                                                                            STOP remaininsteps of this procedure."
i Stop Time End of JPM
 
JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME!
INITIAL CONDITIONS:
: 1. Unit 1 is in MODE 3 with Tavg at 547F and RCS pressure at 2235 psig.
: 2. Both M-G sets are in service.
: 3. All Precautions and Prerequisites of O-S0-85-1, Control Rod Drive System have been met. (Sections 3.0 and 4.0 are complete).
: 4. O-S0-85-1 Control Rod Drive System Section 5.5 is complete through Step 9.
INITIATING CUES:
: 1. You will close the "Reactor Trip" breakers and withdraw the Shutdown Banks using O-S0-85-1, Control Rod Drive System Section 5.5, beginning with step 10.
: 2. Inform the SM when the shutdown banks have been withdrawn.
 
SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPM B
 
2015 NRC SIM JPM B Page 2 of 14 RO/SRO JOB PERFORMANCE MEASURE Task:               Respond to loss of all charging per AOP-M.09.
Task#:             0040020101 Task Standard:     The examinee will depressurize the RCS to facilitate SI Pump flow using AOP-M.09 LOSS OF CHARGING.
Alternate Path:             YES: - - - NO:                 x Time Critical Task:         YES:   ---
NO:         x KIA Reference/Ratings:     APE 022 AA 1.03 (3.2/3.2)
Method of Testing:
Simulated Performance:                       Actual Performance:           x Evaluation Method:
Simulator         x     In-Plant   - - - - Classroom Main Control Room                               Mock-up Performer:
Trainee Name Evaluator:                                       I Name I Signature                                     DATE Performance Rating:     SAT:                 UNSAT:
Validation Time:            20 min                          Total Time:
Performance Time:          Start Time:                      Finish Time:
COMMENTS
 
2015 NRC SIM JPM B Page 3 of 14 SPECIAL INSTRUCTIONS:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 275
: 3. If IC 275 is not available perform the following:
* Reset to IC 16.
* Reset to IC 16.
* Trip the Reactor.
* Trip the Reactor.
Line 152: Line 247:
* Ensure Pressurizer Level is 25%.
* Ensure Pressurizer Level is 25%.
* Ensure T Hot is less than 550 deg.
* Ensure T Hot is less than 550 deg.
* Perform G0-12 4. PLACE SIMULATOR IN RUN 5. An extra operator will be required to acknowledge alarms. 6. ACKNOWLEDGE ALARMS 7. FREEZE SIMULATOR.  
* Perform G0-12
: 8. Save as a temporary IC, if repeat runs of JPM will be desired. 9. PLACE SIMULATOR IN RUN 2015 NRC SIM JPM B Page 3 of 14 10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted. 11. Provide an in-progress copy of AOP-M.09 LOSS OF CHARGING completed through step 29. Tools/Equipment/Procedures Needed: 1. AOP-M.09 LOSS OF CHARGING completed through step 29.  
: 4. PLACE SIMULATOR IN RUN
: 5. An extra operator will be required to acknowledge alarms.
: 6. ACKNOWLEDGE ALARMS
: 7. FREEZE SIMULATOR.
: 8. Save as a temporary IC, if repeat runs of JPM will be desired.
: 9. PLACE SIMULATOR IN RUN
: 10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
: 11. Provide an in-progress copy of AOP-M.09 LOSS OF CHARGING completed through step 29.
Tools/Equipment/Procedures Needed:
: 1. AOP-M.09 LOSS OF CHARGING completed through step 29.


==References:==
==References:==


Reference Title Rev No. 1. AOP-M.09 LOSS OF CHARGING 6 I 2.
I              Reference                                     Title                                 Rev No.
DIRECTIONS TO TRAINEE: 2015 NRG SIM JPM B Page 4 of 14 I will explain the initial conditions, and state the task to be performed.
: 1.     AOP-M.09               LOSS OF CHARGING                                                     6 I 2.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
 
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME! INITIAL CONDITIONS:  
2015 NRG SIM JPM B Page 4 of 14 DIRECTIONS TO TRAINEE:
: 1. Unit 1 is in MODE 3. 2. Both Charging pumps are unavailable.  
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
: 3. ES-0.1, REACTOR TRIP RESPONSE has been completed.  
When you complete the task successfully, the objective for this job performance measure will be satisfied.
: 4. AOP-M.09, LOSS OF CHARGING is in progress, completed through step 28. INITIATING CUES: 1. The SRO has directed you to complete AOP-M.09, LOSS OF CHARGING starting at step 29. 2. Inform the SRO when complete.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
STEP 1 Standard:
HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME!
Cue: Comment CAUTION STEP 2 Standard:
INITIAL CONDITIONS:
Comment 2015 NRC SIM JPM B Page 5 of 14 Start Time SAT --Obtain a copy of AOP-M.09, LOSS OF CHARGING UNSAT --Examinee obtains a copy of AOP-M.09, LOSS OF CHARGING Provide an in-progress copy of AOP-M.09, LOSS OF CHARGING.
: 1.       Unit 1 is in MODE 3.
If RCS temperature is less than 350°F, operating an SI pump in later steps would violate requirements of Tech Spec LCO 3.4.12 (L TOPS}. SAT --29. MONITOR RCS T-cold greater than 350°F. UNSAT --The examinee determines RCS temperature is greater than 350 deg by observing plant instrumentation.
: 2.       Both Charging pumps are unavailable.
I NOTE I STEP. 3 Standard:
: 3.       ES-0.1, REACTOR TRIP RESPONSE has been completed.
Comment STEP 4 Standard:
: 4.       AOP-M.09, LOSS OF CHARGING is in progress, completed through step 28.
Comment 2015 NRG SIM JPM B Page 6 of 14 SI actuation is NOT necessary when RCS pressure is deliberately lowered to allow SI pump injection in later steps. 30. MONITOR if SI signal actuation SAT is needed: --a. CHECK for any of the following:  
INITIATING CUES:
: a. GO TO Step 31. UNSAT --* containment pressure greater than 1 .5 psig OR
: 1.       The SRO has directed you to complete AOP-M.09, LOSS OF CHARGING starting at step 29.
: 2.       Inform the SRO when complete.
 
2015 NRC SIM JPM B Page 5 of 14 Start Time STEP    1                                                                        --
SAT Obtain a copy of AOP-M.09, LOSS OF CHARGING
                                                                                  - - UNSAT Standard: Examinee obtains a copy of AOP-M.09, LOSS OF CHARGING Cue:    Provide an in-progress copy of AOP-M.09, LOSS OF CHARGING.
Comment CAUTION    If RCS temperature is less than 350°F, operating an SI pump in later steps would violate requirements of Tech Spec LCO 3.4.12 (LTOPS}.
STEP    2                                                                        - - SAT
: 29. MONITOR RCS T-cold greater than 350°F.
                                                                                  - - UNSAT Standard: The examinee determines RCS temperature is greater than 350 deg by observing plant instrumentation.
Comment
 
2015 NRG SIM JPM B Page 6 of 14 NOTE      SI actuation is NOT necessary when RCS pressure is deliberately lowered to I            allow SI pump injection in later steps.
I
: 30. MONITOR if SI signal actuation STEP. 3        is needed:                                                             - - SAT
: a. CHECK for any of the following:       a. GO TO Step 31.
                                                                                          - - UNSAT
* containment pressure greater than 1.5 psig                   ~
OR
* uncontrolled drop in RCS pressure to less than 1870 psig OR
* uncontrolled drop in RCS pressure to less than 1870 psig OR
* uncontrolled drop in S/G pressure to less than 600 psig. The examinee determines SI is not required by observing plant instrumentation.  
* uncontrolled drop in S/G pressure to less than 600 psig.
: 31. MONITOR if SI pump injection is needed: SAT --a. CHECK for any of the following:
Standard:  The examinee determines SI is not required by observing plant instrumentation.
UNSAT --* RCS boratlon is required to maintain shutdown margin or to prepare for RCS cooldown OR
Comment STEP    4    31. MONITOR if SI pump injection is needed:
* pressurizer level less than 25% OR
                                                                                          - - SAT
* pressurizer level needs to be raised to support RCS coo Id own. The examinee determines SI is pump injection is required by observing Pressurizer level < 25%.
: a. CHECK for any of the following:
STEP 5 Standard:
                                                                                          - - UNSAT
Comment STEP 6 Standard:
* RCS boratlon is required to maintain shutdown margin or to prepare for RCS cooldown OR
Comment CAUTION STEP 7 Comment 2015 NRG SIM JPM B Page 7 of 14 --32. CHECK T-hot less than 550"F. --The examinee determines RCS temperature is greater than 550 deg by observing plant instrumentation.  
* pressurizer level less than 25%
: 33. CHECK low pzr pressure SI signal NOT blocked: ----* permissive M-4A window 8-4 DARK . The examinee determines the Low Pressure SI signal not blocked by observing permissive M-4A window 8-4 DARK. Low pressurizer pressure SI actuation circuits will automatically unblock if pressurizer pressure rises to greater than 1970 psig. 34. REDUCE pzr pressure to 1920 psig to allow SI block: a. DE-ENERGIZE pressurizer heaters. SAT UNSAT SAT UNSAT SAT UNSAT STEP 8 Standard:
OR
Comment STEP 9 Comment 34. REDUCE pzr pressure to 1920 psig to allow SI block: b. CHECK RCPs RUNNING. 2015 NRG SIM JPM B Page 8 of 14 SAT --UNSAT --The examinee determines the RCPs running by observing red lights above HS-68-8A, 31A, 50A, and 73A Reactor Coolant Pump 1, 2, 3, and 4 ON. 34. REDUCE pzr pressure to 1920 psig to allow SI block: c. OPERATE normal spray valves as necessary to reduce pzr pressure to approximately 1920 psig. SAT UNSAT STEP 10 Comment STEP 11 Standard:
* pressurizer level needs to be raised to support RCS coo Id own.
Comment 34. REDUCE pzr pressure to 1920 psig to allow SI block: 34. d. BLOCK Low pressurizer pressure SI signal. REDUCE pzr pressure to 1920 psig to allow SI block: e. CHECK PRESSURIZER SI TRAINS A&B BLOCKED permissive LIT [M-4A, 84]. 2015 NRC SIM JPM B Page 9 of 14 SAT UNSAT SAT --UNSAT --The examinee determines the SI Low Pressure Blocked by observing PRESSURIZER SI TRAINS A&B BLOCKED permissive LIT [M-4A, 84]. CAUTION 1 Pressurizer level may rise rapidly when RCS pressure is below SI pump shutoff head. CAUTION 2 Operation of SI pump with recirc flowpath isolated could result in pump damage. STEP 12 SAT 35. ENSURE one SI pump running. UNSAT Comment NOTE STEP 12 Comment 2015 NRG SIM JPM B Page 10of14 To allow injecting with SI pump, RCS subcooling may temporarily be reduced below required value in ES-0.2 or ES-0.3 (if applicable).
The examinee determines SI is pump injection is required by Standard:
Manual SI actuation based upon low subcooling is NOT required as long as operators retain control over RCS pressure.  
observing Pressurizer level < 25%.
: 36. CONTINUE RCS depressurization UNTIL SI pump begins to inject: a. ENSURE discharge valve OPEN for running SI pump:
Comment
* FCV-63-152 (Train A) OR
 
* FCV-63-153 (Train B) b. PERFORM one of the following as necessary to reduce RCS pressure:
2015 NRG SIM JPM B Page 7 of 14 STEP    5                                                                        - - SAT
* OPERA TE one pzr PORV OR
: 32. CHECK T-hot less than 550"F.
* OPERA TE normal spray valves. SAT UNSAT STEP 13 36_ CONTINUE RCS depressurization UNTIL SI pump begins to inject c_ WHEN SI pump begins to inject AND pzr level is rising, THEN STOP RCS depressurization.
                                                                                  - - UNSAT Standard:  The examinee determines RCS temperature is greater than 550 deg by observing plant instrumentation.
Cue: "The SRO directs you to fill the Pressurizer to 65%." Comment 2015 NRG SIM JPM B Page 11 of 14 SAT UNSAT STEP 14 Comment 36. CONTINUE RCS depressurization UNTIL SI pump begins to inject d. CONTROL RCS pressure to maintain desired injection rate. 2015 NRC SIM JPM B Page 12of14 SAT UNSAT NOTE 1 NOTE2 STEP 15 Comment 2015 NRC SIM JPM B Page 13 of 14 Normal requirement for running SI pump at least 20 minutes does NOT apply in this AOP. Normal motor starting limitations are NOT applicable in this AOP. However, pump stop/start cycles should be limited as much as possible to minimize potential for overheating motor windings_  
Comment STEP    6    33. CHECK low pzr pressure SI signal
: 37. WHEN pressurizer level reaches or desired value, THEN PERFORM the following:  
                                                                                  - - SAT NOT blocked:
UNSAT
* permissive M-4A window 8-4 DARK.
Standard:  The examinee determines the Low Pressure SI signal not blocked by observing permissive M-4A window 8-4 DARK.
Comment CAUTION    Low pressurizer pressure SI actuation circuits will automatically unblock if pressurizer pressure rises to greater than 1970 psig.
STEP    7    34. REDUCE pzr pressure to 1920 psig                                 SAT to allow SI block:
UNSAT
: a. DE-ENERGIZE pressurizer heaters.
Comment
 
2015 NRG SIM JPM B Page 8 of 14 STEP   8    34. REDUCE pzr pressure to 1920 psig                                 SAT to allow SI block:
                                                                                - - UNSAT
: b. CHECK RCPs RUNNING.
The examinee determines the RCPs running by observing red lights Standard: above HS-68-8A, 31A, 50A, and 73A Reactor Coolant Pump 1, 2, 3, and 4 ON.
Comment STEP    9    34. REDUCE pzr pressure to 1920 psig                                 SAT to allow SI block:
UNSAT
: c. OPERATE normal spray valves as necessary to reduce pzr pressure to approximately 1920 psig.
Comment
 
2015 NRC SIM JPM B Page 9 of 14 STEP   10   34. REDUCE pzr pressure to 1920 psig                               SAT to allow SI block:
UNSAT
: d. BLOCK Low pressurizer pressure SI signal.
Comment STEP    11  34. REDUCE pzr pressure to 1920 psig                               SAT to allow SI block:                                        --
: e. CHECK PRESSURIZER SI TRAINS                           - - UNSAT A&B BLOCKED permissive LIT
[M-4A, 84].
The examinee determines the SI Low Pressure Blocked by observing Standard: PRESSURIZER SI TRAINS A&B BLOCKED permissive LIT [M-4A, 84].
Comment CAUTION 1   Pressurizer level may rise rapidly when RCS pressure is below SI pump shutoff head.
CAUTION 2   Operation of SI pump with recirc flowpath isolated could result in pump damage.
STEP   12                                                                         SAT
: 35. ENSURE one SI pump running.
UNSAT Comment
 
2015 NRG SIM JPM B Page 10of14 NOTE      To allow injecting with SI pump, RCS subcooling may temporarily be reduced below required value in ES-0.2 or ES-0.3 (if applicable). Manual SI actuation based upon low subcooling is NOT required as long as operators retain control over RCS pressure.
STEP  12  36. CONTINUE RCS depressurization                                   SAT UNTIL SI pump begins to inject:
UNSAT
: a. ENSURE discharge valve OPEN for running SI pump:
* FCV-63-152 (Train A)
OR
* FCV-63-153 (Train B)
: b. PERFORM one of the following as necessary to reduce RCS pressure:
* OPERATE one pzr PORV OR
* OPERATE normal spray valves.
Comment
 
2015 NRG SIM JPM B Page 11 of 14 STEP   13 36_   CONTINUE RCS depressurization                             SAT UNTIL SI pump begins to inject UNSAT c_ WHEN SI pump begins to inject AND pzr level is rising, THEN STOP RCS depressurization.
Cue: "The SRO directs you to fill the Pressurizer to 65%."
Comment
 
2015 NRC SIM JPM B Page 12of14 STEP 14 36. CONTINUE RCS depressurization                 SAT UNTIL SI pump begins to inject UNSAT
: d. CONTROL RCS pressure to maintain desired injection rate.
Comment
 
2015 NRC SIM JPM B Page 13 of 14 NOTE 1      Normal requirement for running SI pump at least 20 minutes does NOT apply in this AOP.
NOTE2      Normal motor starting limitations are NOT applicable in this AOP. However, pump stop/start cycles should be limited as much as possible to minimize potential for overheating motor windings_
STEP  15    37. WHEN pressurizer level reaches       65~10                        SAT or desired value, THEN                                                             UNSAT PERFORM the following:
: a. TERMINATE SI pump injection:
: a. TERMINATE SI pump injection:
* STOP running SI pump OR
* STOP running SI pump OR
* CLOSE SI pump discharge valve FCV-63--152 (Train A) or FCV-63-'153 (Train B). SAT UNSAT Terminating Provide the following cue, "Another operator will complete the STOP Cue: remaining steps of this procedure." Stop Time ----
* CLOSE SI pump discharge valve FCV-63--152 (Train A) or FCV-63-'153 (Train B).
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Comment Terminating Provide the following cue, "Another operator will complete the STOP Cue:   remaining steps of this procedure."
INITIAL CONDITIONS:  
Stop Time - - - -
: 1. Unit 1 is in MODE 3. 2. Both Charging pumps are unavailable.  
 
: 3. ES-0.1, REACTOR TRIP RESPONSE has been completed.  
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
: 4. AOP-M.09, LOSS OF CHARGING is in progress, completed through step 28. INITIATING CUES: 1. The SRO has directed you to complete AOP-M.09, LOSS OF CHARGING starting at step 29. 2. Inform the SRO when complete.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
INITIAL CONDITIONS:
SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPMC RO/SRO JOB PERFORMANCE MEASURE Task: Isolate the Ruptured Steam Generator (With MSIV Failure to Close) Task#: 0000380501 1503 NRC Sim JPM C Page 2 of 14 Task Standard:
: 1. Unit 1 is in MODE 3.
The examinee isolates Steam Generator  
: 2. Both Charging pumps are unavailable.
#1 with a failed #1 MSIV using E-3 Steam Generator Tube Rupture Alternate Path: YES: Time Critical Task: YES: NO: x KIA Reference/Ratings:
: 3. ES-0.1, REACTOR TRIP RESPONSE has been completed.
EPE 038 EA1.32 (4.6/4.7)
: 4. AOP-M.09, LOSS OF CHARGING is in progress, completed through step 28.
Method of Testing: Simulated Performance:
INITIATING CUES:
Actual Performance:
: 1. The SRO has directed you to complete AOP-M.09, LOSS OF CHARGING starting at step 29.
x Evaluation Method: Simulator x In-Plant Classroom
: 2. Inform the SRO when complete.
-------Main Control Room Mock-up Performer:
Acknowledge to the examiner when you are ready to begin.
Trainee Name Evaluator:
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
I Name I Signature DATE Performance Rating: SAT: UNSAT: Validation Time: 15 min Total Time: Performance Time: Start Time: Finish Time: COMMENTS SPECIAL INSTRUCTIONS:  
 
: 1. Ensure Simulator Operator Checklist is complete 2. Reset simulator to IC #265. 3. If IC is unavailable, then Initialize simulator in IC # 16 and Insert the following:
SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPMC
a) Activate malfunction IMF TH05A f:8.5 to initiate SIG tube rupture in SIG #1. b) Activate malfunction IMF MS14A f:100, to fail open SIG Loop 1 MSIV. 1503 NRC Sim JPM C Page 3 of 14 c) Actuate a MANUAL reactor trip and safety injection, take all actions up through Step 3 of E-3. d) Complete the actions of E-0 thru step 12, which will transition the crews to E-3 e) Complete any required actions in ES-0.5. Including closing the TD AFW LCVs, but do not put handswitches in pull-to-lock.
 
f) Complete the first three steps in E-3. 4. An extra operator will be required to acknowledge alarms. 5. ACKNOWLEDGE ALARMS 6. FREEZE SIMULATOR.  
1503 NRC Sim JPM C Page 2 of 14 RO/SRO JOB PERFORMANCE MEASURE Task:               Isolate the Ruptured Steam Generator (With MSIV Failure to Close)
: 7. Provide a copy of E-3 STEAM GENERATOR TUBE RUPTURE 8. PLACE SIMULATOR IN RUN SPECIAL INSTRUCTIONS TO EVALUATOR:
Task#:             0000380501 Task Standard:     The examinee isolates Steam Generator #1 with a failed #1 MSIV using E-3 Steam Generator Tube Rupture Alternate Path:           YES:
N/A Tools/Equipment/Procedures Needed: 1. In progress copy of E-3, STEAM GENERA TOR TUBE RUPTURE  
Time Critical Task:       YES:             NO:       x KIA Reference/Ratings:       EPE 038 EA1.32 (4.6/4.7)
Method of Testing:
Simulated Performance:                       Actual Performance:           x Evaluation Method:
Simulator     -- x - In-Plant       - - - - Classroom Main Control Room                                 Mock-up Performer:
Trainee Name Evaluator:                                         I Name I Signature                                   DATE Performance Rating:       SAT:                 UNSAT:
Validation Time:               15 min                       Total Time:
Performance Time:             Start Time:                     Finish Time:
COMMENTS
 
1503 NRC Sim JPM C Page 3 of 14 SPECIAL INSTRUCTIONS:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset simulator to IC #265.
: 3. If IC is unavailable, then Initialize simulator in IC # 16 and Insert the following:
a) Activate malfunction IMF TH05A f:8.5 to initiate SIG tube rupture in SIG #1.
b) Activate malfunction IMF MS14A f:100, to fail open SIG Loop 1 MSIV.
c) Actuate a MANUAL reactor trip and safety injection, take all actions up through Step 3 of E-3.
d) Complete the actions of E-0 thru step 12, which will transition the crews to E-3 e) Complete any required actions in ES-0.5. Including closing the TD AFW LCVs, but do not put handswitches in pull-to-lock.
f)   Complete the first three steps in E-3.
: 4. An extra operator will be required to acknowledge alarms.
: 5. ACKNOWLEDGE ALARMS
: 6. FREEZE SIMULATOR.
: 7. Provide a copy of E-3 STEAM GENERATOR TUBE RUPTURE
: 8. PLACE SIMULATOR IN RUN SPECIAL INSTRUCTIONS TO EVALUATOR:
N/A Tools/Equipment/Procedures Needed:
: 1. In progress copy of E-3, STEAM GENERATOR TUBE RUPTURE


==References:==
==References:==


Reference Title Rev No. 1. E-3 STEAM GENERA TOR TUBE RUPTURE 21 DIRECTIONS TO EXAMINEE:
Reference                                         Title                         Rev No.
1503 NRC Sim JPM C Page 4 of 14 I will explain the initial conditions, and state the task to be performed.
: 1. E-3                     STEAM GENERATOR TUBE RUPTURE                                     21
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
 
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME! INITIAL CONDITIONS:  
1503 NRC Sim JPM C Page 4 of 14 DIRECTIONS TO EXAMINEE:
: 1. Unit 1 has experienced a Steam Generator Tube Rupture on Steam Generator  
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
#1. 2. A manual safety injection was initiated.  
When you complete the task successfully, the objective for this job performance measure will be satisfied.
: 3. E-3, STEAM GENERATOR TUBE RUPTURE is in progress, steps 1 through 3 of E-3 have been completed INITIATING CUES: 1. You have been directed to continue with E-3, STEAM GENERATOR TUBE RUPTURE beginning at Step 4. 2. Inform the SRO when you have isolated the #1 Steam Generator.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
STEP 1 Standard:
HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME!
Cue Comment Procedure Caution: I STEP 2 Comment 1503 NRC Sim JPM C Page 5 of 14 Start Time Obtain a copy of E-3, STEAM GENERATOR TUBE RUPTURE Examinee obtains a copy of E-3, STEAM GENERATOR TUBE RUPTURE Provide a marked up copy of E-3, STEAM GENERATOR TUBE RUPTURE completed through step 3. CAUTION If the TD AFW pump is the only source of feed flow, isolating both steam supplies will result in loss of secondary heat sink. 4_ ISOLATE flow from Ruptured SiG(s): a_ ADJUST Ruptured S/G(s) atmospheric relief controller setpoint to 87% in AUTO_ ('1040 psig) SAT --UNSAT --SAT UNSAT STEP 3 Standard:
INITIAL CONDITIONS:
Comment STEP 4 Standard:
: 1.       Unit 1 has experienced a Steam Generator Tube Rupture on Steam Generator #1.
Comment STEP 5 Comment 4_ ISOLATE flow from Ruptured S/G(s): b_ CHECK Ruptured S/G{s) atmospheric relief hand switch in P-AUTO and valve(s) CLOSED_ 1503 NRC Sim JPM C Page 6 of 14 SAT --UNSAT --Examinee observes SIG #1 atmospheric relief handswitch, 1-HS-1-6, on 1-M-4 in P-AUTO and valve CLOSED. ' 4_ ISOLATE flow from Ruptured S/G(s): c_ CHECK SIG #1 or #4 ruptured_
: 2.       A manual safety injection was initiated.
Examinee observes steam generator  
: 3.       E-3, STEAM GENERATOR TUBE RUPTURE is in progress, steps 1 through 3 of E-3 have been completed INITIATING CUES:
#1 level rising with no feed or by referring to the initial conditions.
: 1.       You have been directed to continue with E-3, STEAM GENERATOR TUBE RUPTURE beginning at Step 4.
4_ ISOLATE flow from Ruptured d_ CLOSE TD AFVV pump steam supply from Ruptured SIG FCV-*1-15  
: 2.       Inform the SRO when you have isolated the #1 Steam Generator.
{S/G #1) or FCV-1-16 (SIG #4)_ SAT --UNSAT --SAT UNSAT STEP 6 Standard:
 
Comment STEP 7 Standard:
1503 NRC Sim JPM C Page 5 of 14 Start Time Obtain a copy of E-3, STEAM GENERATOR TUBE RUPTURE STEP    1                                                                                  - - SAT
Comment Examiner Note 4. ISOLATE flow from Ruptured S/G(s): e_ VERIFY Ruptured S/G{s) blowdown isolation valves CLOSED. Examinee observes FCV-1-7 and FCV-1-181 CLOSED green indication lights above handswitch 1-HS-1-71181on1-M-4 ON. 4. ISOLATE flow from Ruptured SiG(s): f_ CLOSE Ruptured S/G(s) r. .. 1s1v and IVlSIV bypass valve. Examinee places 1-HS-1-4 SIG #1 MSIV to CLOSE. Recognizes MSIV FCV-1-4 failed to close, by the red light above 1-HS-1-4 ON, and goes to the RNO to isolate the SIG. 1503 NRC Sim JPM C Page 7 of 14 SAT --UNSAT --SAT --UNSAT --SIG #1 MSIV will NOT close and the operator MUST go to the RNO column STEP 8 Comment STEP 9 Standard:
                                                                                              - - UNSAT Examinee obtains a copy of E-3, STEAM GENERATOR TUBE Standard: RUPTURE Cue    Provide a marked up copy of E-3, STEAM GENERATOR TUBE RUPTURE completed through step 3.
Cue Comment 1503 NRC Sim JPM C Page 8 of 14 Alternate path 4_ ISOLATE flow from Ruptured S/G(s): f_ PERFORM the following:  
Comment Procedure  CAUTION     If the TD AFW pump is the only source of feed flow, isolating both Caution:              steam supplies will result in loss of secondary heat sink.
: 1) CLOSE Intact SIG MSIVs and MSIV bypass valves_ (Not Critical)
I STEP    2  4_       ISOLATE flow from Ruptured SiG(s):                                         SAT a_   ADJUST Ruptured S/G(s)                                                 UNSAT atmospheric relief controller setpoint to 87% in AUTO_ ('1040 psig)
Examinee verifies MSIV bypasses closed by observing green lights ON above handswitch 1-HS-1-148, 1-HS-1-149, & 1-HS-1-150 MSIV bypass valves. 4_ ISOLATE flow from Ruptured SlG(s): f_ PERFORM the following:  
Comment
: 2) DISPATCH operator to perform EA--1-1, Closing l'v1SIVs Locally, for any t\*1SIV or MSIV bypass valve which fails to close_ Examinee dispatches an operator to perform EA-1-1, Closing MSIVs Locally, for #1 S/G MSIV. Acknowledge the direction from the examinee.
 
SAT UNSAT SAT --UNSAT --
1503 NRC Sim JPM C Page 6 of 14 4_       ISOLATE flow from Ruptured S/G(s):
STEP 10 Comment STEP 11 Standard:
STEP    3                                                                          - - SAT b_   CHECK Ruptured S/G{s)                                 - - UNSAT atmospheric relief hand switch in P-AUTO and valve(s) CLOSED_
Comment 4. 4. ISOLATE flow from Ruptured S/G(s): f. PERFORM the following:  
Standard: Examinee observes SIG #1 atmospheric relief handswitch, 1-HS-1-6, on 1-M-4 in P-AUTO and valve CLOSED.
: f.
Comment        '
* 3) ISOLATE steam header:
STEP    4    4_       ISOLATE flow from Ruptured S/G(s):
* PLACE condenser steam dumps in OFF. [M-4] ISOLATE flow from Ruptured S/G(s): PERFORM the following:  
                                                                                  - - SAT c_ CHECK SIG #1 or #4 ruptured_                                 - - UNSAT Standard: Examinee observes steam generator #1 level rising with no feed or by referring to the initial conditions.
: 3) ISOLATE steam header: ENSURE steam dump valves CLOSED. [M-4] Examinee verifies the steam dump valves are closed by observing 1503 NRC Sim JPM C Page 9 of 14 SAT UNSAT SAT --UNSAT --green light indication on 1-XX-55-4A for all steam dump valves are ON STEP 12 Comment STEP 13 Standard:
Comment STEP    5    4_       ISOLATE flow from Ruptured     S/G(s)~                          SAT d_ CLOSE TD AFVV pump steam                                         UNSAT supply from Ruptured SIG FCV-*1-15 {S/G #1) or FCV-1-16 (SIG #4)_
Comment 4_ 4_ ISOLATE flow from Ruptured S/G(s): f_ PERFORM the following:
Comment
f_ 3) ISOLATE steam header:
 
* CLOSE FCV-47-'180, HP Steam Seal Supply Isolation_  
1503 NRC Sim JPM C Page 7 of 14
[M-2] ISOLATE flow from Ruptured S/G(s): PERFORM the following:  
: 4.       ISOLATE flow from Ruptured S/G(s):
STEP    6                                                                          - - SAT e_ VERIFY Ruptured S/G{s) blowdown                           - - UNSAT isolation valves CLOSED.
Standard: Examinee observes FCV-1-7 and FCV-1-181 CLOSED green indication lights above handswitch 1-HS-1-71181on1-M-4 ON.
Comment STEP
: 4.       ISOLATE flow from Ruptured SiG(s):
7                                                                          - - SAT f_   CLOSE Ruptured S/G(s) r...1s1v
                                                                                    - - UNSAT and IVlSIV bypass valve.
Examinee places 1-HS-1-4 SIG #1 MSIV to CLOSE. Recognizes Standard: MSIV FCV-1-4 failed to close, by the red light above 1-HS-1-4 ON, and goes to the RNO to isolate the SIG.
Comment Examiner  SIG #1 MSIV will NOT close and the operator MUST go to the RNO Note    column
 
1503 NRC Sim JPM C Page 8 of 14 Alternate path STEP    8                                                                              SAT 4_       ISOLATE flow from Ruptured S/G(s):
UNSAT f_   PERFORM the following:
: 1) CLOSE Intact SIG MSIVs and MSIV bypass valves_
(Not Critical) Examinee verifies MSIV bypasses closed by observing green lights ON above handswitch 1-HS-1-148, 1-HS-1-149, & 1-HS-1-150 MSIV bypass valves.
Comment 4_       ISOLATE flow from Ruptured SlG(s):
STEP    9                                                                        - - SAT f_   PERFORM the following:
                                                                                  - - UNSAT
: 2) DISPATCH operator to perform EA-1, Closing l'v1SIVs Locally, for any t\*1SIV or MSIV bypass valve which fails to close_
Standard: Examinee dispatches an operator to perform EA- 1-1, Closing MSIVs Locally, for #1 S/G MSIV.
Cue    Acknowledge the direction from the examinee.
Comment
 
1503 NRC Sim JPM C Page 9 of 14 STEP   10
: 4.       ISOLATE flow from Ruptured S/G(s):                                SAT
: f. PERFORM the following:                                             UNSAT
: 3) ISOLATE steam header:
* PLACE condenser steam dumps in OFF. [M-4]
Comment STEP
: 4.      ISOLATE flow from Ruptured S/G(s):
11                                                                          - - SAT
: f. PERFORM the following:
                                                                                    - - UNSAT
: 3) ISOLATE steam header:
* ENSURE steam dump valves CLOSED. [M-4]
Standard: Examinee verifies the steam dump valves are closed by observing green light indication on 1-XX-55-4A for all steam dump valves are ON Comment
 
1503 NRC Sim JPM C Page 10 of 14 4_     ISOLATE flow from Ruptured S/G(s):
STEP    12                                                                            SAT f_ PERFORM the following:                                             UNSAT
: 3) ISOLATE steam header:
* CLOSE FCV-47-'180, HP Steam Seal Supply Isolation_ [M-2]
Comment 4_      ISOLATE flow from Ruptured S/G(s):
STEP    13                                                                        -
SAT f_  PERFORM the following:                                            UNSAT
: 3) ISOLATE steam header:
* ENSURE FCV-47-'18'1 HP Steam Seal Suppty Bypass CLOSED_ [M-2]
Examinee verifies FCV-47-181 HP Steam Seal Supply Bypass Standard: CLOSED by observing green light indication above the handswitch to ON.
Comment
 
1503 NRC Sim JPM C Page 11 of 14 STEP    14
: 4.        ISOLATE flow from Ruptured S/G(s):
SAT
: f. PERFORM the following:                                           UNSAT
: 3) ISOLATE steam header:
: 3) ISOLATE steam header:
* ENSURE FCV-47-'18'1 HP Steam Seal Suppty Bypass CLOSED_ [M-2] Examinee verifies FCV-47-181 HP Steam Seal Supply Bypass 1503 NRC Sim JPM C Page 10 of 14 SAT UNSAT SAT -UNSAT -CLOSED by observing green light indication above the handswitch to ON.
* CLOSE MSR HP steam supply isolation valves. [l\<<1-2]
STEP 14 Comment STEP 15 Standard:
Comment STEP    15
Cue Comment 4. 4. ISOLATE flow from Ruptured S/G(s): f. PERFORM the following:
: 4.        ISOLATE flow from Ruptured S/G(s):
f_ 3) ISOLATE steam header:
                                                                                  - - SAT f_    PERFORM the following:
* CLOSE MSR HP steam supply isolation valves. [l\<<1-2] ISOLATE flow from Ruptured S/G(s): PERFORM the following:  
                                                                                  - - UNSAT
: 3) ISOLATE steam header:
: 3) ISOLATE steam header:
* DISPATCH operator to locally isolate steam header USING EA-1-4, Local Isolation of Steam Header in Turb Bldg. Examinee dispatches an operator to locally isolate steam header USING EA-1-4, Local Isolation of Steam Header in Turb Bldg. Acknowledge the direction from the examinee.
* DISPATCH operator to locally isolate steam header USING EA-1-4, Local Isolation of Steam Header in Turb Bldg.
1503 NRC Sim JPM C Page 11 of 14 SAT UNSAT SAT --UNSAT --
Standard: Examinee dispatches an operator to locally isolate steam header USING EA-1-4, Local Isolation of Steam Header in Turb Bldg.
STEP 16 Standard:
Cue    Acknowledge the direction from the examinee.
Comment STEP 17 Standard:
Comment
Comment STEP 18 Comment 4_ ISOLATE flow from Ruptured S/G(s): f_ PERFORM the following:  
 
: 4) USE Intact S/G(s) atmospheric relief for steam dump_ Examinee addresses the procedure step. 5_ MONITOR Ruptured S/G(s) level: a_ CHECK ruptured SIG narrow range level greater than '100,'o ADV]_ Examinee verifies #1 S/G narrow range level greater than 10% by observing Ll-3-42, or Ll-3-39, or Ll-3-38 or other installed plant instrumentation_
1503 NRC Sim JPM C Page 12 of 14 4_       ISOLATE flow from Ruptured S/G(s):
5 .. MONITOR Ruptured S/G(s) level: b. ISOLATE MW to ruptured SIG: 1} ENSURE AFW LCVs for ruptured S/G are CLOSED_ 1503 NRC Sim JPM C Page 12 of 14 SAT --UNSAT --SAT --UNSAT --SAT UNSAT STEP 19 5_ Comment MONITOR Ruptured S/G(s) level: b. ENSURE AFW isolated to ruptured SIG: 2) PLACE Turbine Driven APN LCV for ruptured SIG in CLOSE PULL TO LOCK. 1503 NRC Sim JPM C Page 13of14 SAT UNSAT Terminating Provide the following cue "Another operator will perform the STOP Cue: remaining steps of this procedure." Stop Time JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
STEP    16                                                                          --
INITIAL CONDITIONS:  
SAT f_   PERFORM the following:
: 1. Unit 1 has experienced a Steam Generator Tube Rupture on Steam Generator  
                                                                                    - - UNSAT
#1. 2. A manual safety injection was initiated.  
: 4) USE Intact S/G(s) atmospheric relief for steam dump_
: 3. E-3, STEAM GENERATOR TUBE RUPTURE is in progress, steps 1 through 3 of E-3 have been completed INITIATING CUES: 1. You have been directed to continue with E-3, STEAM GENERATOR TUBE RUPTURE beginning at Step 4. 2. Inform the SRO when you have isolated the #1 Steam Generator.
Standard: Examinee addresses the procedure step.
Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
Comment STEP    17 5_       MONITOR Ruptured S/G(s) level:
SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPM D RO/SRO JOB PERFORMANCE MEASURE Task: Start a Reactor Coolant Pump Task#: 0030010101 Task Standard:
                                                                                    - - SAT
The Operator manually stops the #1 Reactor Coolant Pump. Alternate Path: YES: x NO: ---Time Critical Task: YES: NO: x KIA Reference/Ratings:
                                                                                    - - UNSAT a_ CHECK ruptured SIG narrow range level greater than '100,'o [25~,~ ADV]_
APE 015/017 AA1.03 (3.7/3.8)
Examinee verifies #1 S/G narrow range level greater than 10% by Standard: observing Ll-3-42, or Ll-3-39, or Ll-3-38 or other installed plant instrumentation_
Method of Testing: Simulated Performance:
Comment STEP    18    5.       MONITOR Ruptured S/G(s) level:                                    SAT
Actual Performance:
: b. ISOLATE MW to ruptured SIG:
x Evaluation Method: Simulator x In-Plant Classroom
UNSAT 1} ENSURE AFW LCVs for ruptured S/G are CLOSED_
-------Main Control Room Mock-up Performer:
Comment
Trainee Name Evaluator:
 
I Name I Signature Performance Rating: SAT: UNSAT: Validation Time: 15 min Total Time: Performance Time: Start Time: Finish Time: COMMENTS 1503 NRC Sim JPM D Page 2of16 DATE SPECIAL INSTRUCTIONS:  
1503 NRC Sim JPM C Page 13of14 STEP   19     5_       MONITOR Ruptured S/G(s) level:                                SAT
: 1) Ensure Simulator Operator Checklist is complete 2) Initialize to IC 268 3) IF IC 268 is not available Then initialize to IC 7 and perform the following a) Stop the #1 RCP. b) Place MODE 3 sign on Panel M-4 c) Insert AN_OV _359 to OFF (Disables Loose Parts Alarm.) d) Close the Loop 1 Pressurizer Spray valve 4) Set NR-45 to display one SRM and one IRM 5) An extra operator will be required to acknowledge alarms. 6) ACKNOWLEDGE ALARMS 7) FREEZE SIMULATOR.
: b. ENSURE AFW isolated                                             UNSAT to ruptured SIG:
1503 NRC Sim JPM D Page 3 of 16 8) Provide a marked up procedure 1-S0-68-2, Reactor Coolant Pumps Section 5.1 completed through step 10 (and also provide Appendix 10 if requested.)  
: 2) PLACE Turbine Driven APN LCV for ruptured SIG in CLOSE PULL TO LOCK.
: 9) PLACE SIMULATOR IN RUN 10) Booth operator standby to insert the SCN File RCPHEATUP.scn (from exams folder) during the JPM 11) Go to SCENS 12) GO Exam folder 13) Run SCN File RCPHEATUP when the #1 RCP is started SPECIAL INSTRUCTIONS TO EVALUATOR:  
Comment Terminating Provide the following cue "Another operator will perform the STOP Cue:   remaining steps of this procedure."
: 1. Critical steps are identified in step SAT/UNSAT column by bold print 'Critical Step.' 2. Any UNSAT requires comments.
Stop Time
Tools/Equipment/Procedures Needed: 1-S0-68-2 Reactor Coolant Pumps AOP-R.04 Reactor Coolant Pump Malfunctions  
 
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
: 1. Unit 1 has experienced a Steam Generator Tube Rupture on Steam Generator #1.
: 2. A manual safety injection was initiated.
: 3. E-3, STEAM GENERATOR TUBE RUPTURE is in progress, steps 1 through 3 of E-3 have been completed INITIATING CUES:
: 1. You have been directed to continue with E-3, STEAM GENERATOR TUBE RUPTURE beginning at Step 4.
: 2. Inform the SRO when you have isolated the #1 Steam Generator.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
 
SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPM D
 
1503 NRC Sim JPM D Page 2of16 RO/SRO JOB PERFORMANCE MEASURE Task:               Start a Reactor Coolant Pump Task#:             0030010101 Task Standard:     The Operator manually stops the #1 Reactor Coolant Pump.
Alternate Path:             YES:   ---
x       NO:
Time Critical Task:         YES:             NO:         x KIA Reference/Ratings:       APE 015/017 AA1.03 (3.7/3.8)
Method of Testing:
Simulated Performance:                       Actual Performance:         x Evaluation Method:
Simulator         x
              - - - In-Plant        - - - - Classroom Main Control Room                               Mock-up Performer:
Trainee Name Evaluator:                                       I Name I Signature                       DATE Performance Rating:       SAT:                 UNSAT:
Validation Time:             15 min                         Total Time:
Performance Time:           Start Time:                     Finish Time:
COMMENTS
 
1503 NRC Sim JPM D Page 3 of 16 SPECIAL INSTRUCTIONS:
: 1)     Ensure Simulator Operator Checklist is complete
: 2)     Initialize to IC 268
: 3)     IF IC 268 is not available Then initialize to IC 7 and perform the following a) Stop the #1 RCP.
b) Place MODE 3 sign on Panel M-4 c) Insert AN_OV_359 to OFF (Disables Loose Parts Alarm.)
d) Close the Loop 1 Pressurizer Spray valve
: 4)     Set NR-45 to display one SRM and one IRM
: 5)     An extra operator will be required to acknowledge alarms.
: 6)     ACKNOWLEDGE ALARMS
: 7)     FREEZE SIMULATOR.
: 8)     Provide a marked up procedure 1-S0-68-2, Reactor Coolant Pumps Section 5.1 completed through step 10 (and also provide Appendix 10 if requested.)
: 9)     PLACE SIMULATOR IN RUN
: 10)     Booth operator standby to insert the SCN File RCPHEATUP.scn (from exams folder) during the JPM
: 11)     Go to SCENS
: 12)     GO Exam folder
: 13)     Run SCN File RCPHEATUP when the #1 RCP is started SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Critical steps are identified in step SAT/UNSAT column by bold print 'Critical Step.'
: 2. Any UNSAT requires comments.
Tools/Equipment/Procedures Needed:
1-S0-68-2 Reactor Coolant Pumps AOP- R.04 Reactor Coolant Pump Malfunctions


==References:==
==References:==


Reference  
Reference                                       Title                          Rev No.
: 1. 1-S0-68-2 Reactor Coolant Pumps Title 2. AOP-R.04 Reactor Coolant Pump Malfunctions 3 1-AR-M5-B CVCS Seal Water and RCP Rev No. 39 27 41 DIRECTIONS TO EXAMINEE:
: 1. 1-S0-68-2               Reactor Coolant Pumps                                           39
1503 NRC Sim JPM D Page 4 of 16 I will explain the initial conditions, and state the task to be performed.
: 2. AOP- R.04               Reactor Coolant Pump Malfunctions                               27 3     1-AR-M5-B               CVCS Seal Water and RCP                                         41
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
 
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME! INITIAL CONDITIONS:  
1503 NRC Sim JPM D Page 4 of 16 DIRECTIONS TO EXAMINEE:
: 1. Unit 1 is in MODE 3 2. Preparations are being made to start #1 RCP. 3. All precautions and prerequisites are complete.  
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
: 4. 1-S0-68-2, Reactor Coolant Pumps Section 5.1, steps 1 through 10 are complete.  
When you complete the task successfully, the objective for this job performance measure will be satisfied.
: 5. All other RCPs are in service INITIATING CUES: 1. You have been directed to start and monitor the #1 RCP using 1-S0-68-2, Reactor Coolant Pumps starting at step 5.1.11. 2. Notify the SRO when you are complete.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
STEP 1 Standard:
HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME!
Cue Comment STEP 2 Comment Examiner Note 1503 NRC Sim JPM D Page 5 of 16 Start Time Obtain a copy of 1-S0-68-2, Reactor Coolant Pumps Section 5.1 completed through step 10. Examinee obtains a copy of 1-S0-68-2, Reactor Coolant Pumps Section 5.1. Provide a marked up copy of 1-S0-68-2, Reactor Coolant Pumps Section 5.1 completed through step 10. [11] PLACE [1-HS-68-84Al  
INITIAL CONDITIONS:
#1 RCP Lift Oil Pump in the START position.
: 1.       Unit 1 is in MODE 3
REAC COOL PMPS OIL LIFT PRESS LOW annunciation will come in and clear during performance of the next step SAT --UNSAT --SAT UNSAT STEP 3 Standard:
: 2.       Preparations are being made to start #1 RCP.
Cue: Comment STEP 4 Standard:
: 3.       All precautions and prerequisites are complete.
Comment STEP 5. Comment [12] WHEN Lift Oil Pump for #1 RCP has run 2 2 minutes, THEN ANNOUNCE #1 RCP start on the PIA system. Examinee addresses the procedure step. Provide the following cue, "Another operator will make the PA Announcement." [13] IF no RCPs are running AND RCP #1 is the first RCP to be started, THEN MONITOR the SRMs during startup of the RCP. [C.3] 1503 NRC Sim JPM D Page 6of16 SAT --UNSAT --SAT --UNSAT --Examinee determines other 3 RCPs are running and marks this step as N/A. SAT [14] PLACE [1-HS-68-BAJ  
: 4.       1-S0-68-2, Reactor Coolant Pumps Section 5.1, steps 1 through 10 are complete.
#1 RCP in the START position.
: 5.       All other RCPs are in service INITIATING CUES:
UNSAT Procedure Note STEP 6 Standard:
: 1.       You have been directed to start and monitor the #1 RCP using 1-S0-68-2, Reactor Coolant Pumps starting at step 5.1.11.
Comment Examiner Note Examiner Note STEP 7 Standard:
: 2.       Notify the SRO when you are complete.
Comment 1503 NRC Sim JPM D Page 7 of 16 NOTE Motor and Pump Operating Parameters are listed in Appendix D. Appendix E provides vibration limits if pump is started after maintenance activities.
 
SAT [15] ENSURE #1 RCP motor and pump are operating  
1503 NRC Sim JPM D Page 5 of 16 Start Time Obtain a copy of 1-S0-68-2, Reactor Coolant Pumps Section 5.1 STEP    1                                                                            SAT completed through step 10.                                             --
--within the parameters listed in Appendix D. UNSAT --Examinee monitors #1 RCP motor and pump parameters using installed instrumentation.
                                                                                  - - UNSAT Standard: Examinee obtains a copy of 1-S0-68-2, Reactor Coolant Pumps Section 5.1.
Directthe Booth Operator to insert File RCPHEATUP.scn.
Cue    Provide a marked up copy of 1-S0-68-2, Reactor Coolant Pumps Section 5.1 completed through step 10.
The motor will start heating up and result in the REAC COOL PMPS MOTOR STATOR TEMPERATURE HIGH alarm on 1-M-5, Window E-1 on 1-XA-55-58 coming in during the performance of the next steps (JPM steps 6-7; procedure steps 15-17). When alarm comes in, the . operator may not complete performing procedure step 15, 16 or 17. N/A those steps if applicable and move on to JPM step 9 if the examinee transitions to alarm procedure.  
Comment STEP    2                                                                              SAT
[16] ENSURE {1-TCV-67-861 RCP Motor Cooler 1A is SAT --OPEN (1-HS-67-86 red light illuminated}.
[11] PLACE [1-HS-68-84Al #1 RCP Lift Oil Pump in the START position.                                               UNSAT Comment Examiner REAC COOL PMPS OIL LIFT PRESS LOW annunciation will come in Note  and clear during performance of the next step
UNSAT --Examinee verifies 1-TCV-67-86 is open on Panel M-27 A by observing the red indicating light above handswitch ON.
 
STEP 8 Standard:
1503 NRC Sim JPM D Page 6of16 STEP     3  [12] WHEN Lift Oil Pump for #1 RCP has run
Comment STEP 9 I Standard:
                                                                                - - SAT 2 2 minutes, THEN ANNOUNCE #1 RCP start on the PIA system.                     - - UNSAT Standard: Examinee addresses the procedure step.
Comment Examiner Note 1503 NRC Sim JPM D Page 8 of 16 [17] WHEN Lift Oil Pump has run greater than 1 minute after SAT RCP start, TH EN --PLACE [1*HS-68-84AJ  
Cue:    Provide the following cue, "Another operator will make the PA Announcement."
#1 RCP Lift Oil Pump in UNSAT --the STOP position.
Comment
Examinee places 1-HS-68-84A  
[13] IF no RCPs are running AND RCP #1 is the first STEP    4                                                                      - - SAT RCP to be started, THEN MONITOR the SRMs during startup of the RCP. [C.3]             --
#1 RCP Lift Oil Pump handswitch to STOP I I eves SEAL WATER AND RCP SAT 1-XA-55-58  
UNSAT Standard: Examinee determines other 3 RCPs are running and marks this step as N/A.
--UNSAT --29 (E-1) REAC COOL PMPS MOTOR STATOR TEMPERATURE HIGH Examinee acknowledges alarm and observes rise in RCP motor stator temperatures.
Comment STEP    5.                                                                            SAT
If the actions contained in the Annunciator Response Procedure (ARP) are implemented, JPM steps 11-24 cover the actions directed by the ARP and AOP to stop the RCP. If RCP is stopped without implementing the ARP, JPM 10 step will end the JPM.
[14] PLACE [1-HS-68-BAJ #1 RCP in the START position.
STEP 10 STOP Loop 1 RCP If the examinee stops the RCP now provide the following cue, 1503 NRC Sim JPM D Page 9 of 16 SAT UNSAT Cue "Another operator will perform the remaining steps of this procedure." Comment Examiner The following steps are from the Annunciator Response Procedure 1-Note AR-MS-B. NOTE RCP 1-4 is known to have high winding temperature (up to Procedure approximately 303&deg;F when running with RCS temperature below Note 400&deg;F. (EWR 10-COM-068-057))
UNSAT Comment
However, alarms on RCP 1-4 should NOT be dismissed as "expected".
 
STEP 11 Corrective (1J DETERMINE which pump is in alarm by monitoring computer SAT Actions points. --Pump 1: Point T0409A, 411 A or 412A (A,B, & C Pump 2: Point T0429A, 431 A or 432A {A,B, & C UNSAT Pump 3: Point T0449A, 451A or 452A (A,B, & C 0) --Pump 4: Point T0469A, 471A or 472A (A,B, & C 0) Standard:
1503 NRC Sim JPM D Page 7 of 16 Procedure  NOTE             Motor and Pump Operating Parameters are listed in Appendix D. Appendix E provides vibration limits if pump is Note started after maintenance activities.
Examinee determines the #1 RCP in alarm by observing the ICS display. Comment STEP 12 Standard:
STEP    6                                                                                  - - SAT
Cue Comment STEP 13 Standard:
[15] ENSURE #1 RCP motor and pump are operating within the parameters listed in Appendix D.                               UNSAT Standard: Examinee monitors #1 RCP motor and pump parameters using installed instrumentation.
Comment [2] CONTACT Engineering to obtain engineering assistance in determining the validity of the alarm_ Engineering is contacted to obtain engineering assistance in determining the validity of the alarm. Respond as Unit Supervisor "Engineering has been contacted and has validated the alarm." [3] MONITOR the following parameters for increasing trends: a_ Motor Current b_ Bearing Temperatures C. Pump/Motor Vibration  
Comment Examiner Note    Directthe Booth Operator to insert File RCPHEATUP.scn.
: d. Containment Air Temperatures Examinee monitors or directs monitoring parameters by observing indications on installed instrumentation and determines indications normal. 1503 NRC Sim JPM D Page 10 of 16 SAT --UNSAT --SAT --UNSAT --
The motor will start heating up and result in the REAC COOL PMPS MOTOR STATOR TEMPERATURE HIGH alarm on 1-M-5, Window E-Examiner  1 on 1-XA-55-58 coming in during the performance of the next steps                     .
STEP 14 Standard:
Note    (JPM steps 6-7; procedure steps 15-17). When alarm comes in, the operator may not complete performing procedure step 15, 16 or
Comment Examiner Note STEP 15 Standard:
: 17. N/A those steps if applicable and move on to JPM step 9 if the examinee transitions to alarm procedure.
Comment STEP 16 Standard:
STEP    7                                                                                  - - SAT
Comment 1503 NRC Sim JPM D Page 11 of 16 SAT --[4] ENSURE ERCW' aligned to pump cooler. UNSAT --Examinee verifies ERCW aligned to pump cooler by observing red light above 1-HS-67-86 on O-M-27A ON. May have been performed in JPM step 7. SAT --[5] VERIFY ERCW system temperature and pressure normal. UNSAT --Examinee verifies ERCW system temperature and pressure normal by observing indications O-M-27 A. SAT --f 6] VERIFY lower compartment air temperature normaL UNSAT --Examinee verifies lower compartment air temperature normal by observing indications on ICS and other installed plant instrumentation.
[16] ENSURE {1-TCV-67-861 RCP Motor Cooler 1A is OPEN (1-HS-67-86 red light illuminated}.
I STEP 17 Standard:
                                                                                            - - UNSAT Standard: Examinee verifies 1-TCV-67-86 is open on Panel M-27A by observing the red indicating light above handswitch ON.
Comment Examiner Note STEP 18 1503 NRC Sim JPM D Page 12 of 16 SAT --[7] REFER TO 1-S0-68-2 for RCP operating limifa_ UNSAT --Examinee refers to 1-S0-68-2 , Reactor Coolant Pumps Appendix D for the operating limits. If the remaining actions contained in the Annunciator Response Procedure (ARP) are implemented, JPM steps 19-20 cover the actions directed by the ARP and AOP to stop the RCP. If RCP is stopped at this point, JPM 18 step will end the JPM. STOP Loop 1 RCP SAT UNSAT If the examinee stops the RCP now provide the following cue, Cue "Another operator will perform the remaining steps of this procedure." Comment STEP 19 Standard:
Comment
Comment STEP 20 Standard:
 
Cue Comment STEP 21 Standard:
1503 NRC Sim JPM D Page 8 of 16
Comment 1503 NRC Sim JPM D Page 13 of 16 [8] IF Ops/Engineering determines alarm is valid, THEN SAT PERFORM the following:
[17] WHEN Lift Oil Pump has run greater than 1 minute after STEP    8              RCP start, TH EN                                           - - SAT UNSAT PLACE [1*HS-68-84AJ #1 RCP Lift Oil Pump in                   --
--[a] CHECK pump motor amps. (normal 415 amps with 608 amps UNSAT --maximum_)  
the STOP position.
Standard: Examinee places 1-HS-68-84A #1 RCP Lift Oil Pump handswitch to STOP Comment STEP    9 I         eves SEAL WATER AND RCP 1-XA-55-58                     I            - - SAT
                                                                                      - - UNSAT 29                 (E-1)
REAC COOL PMPS MOTOR STATOR I
TEMPERATURE HIGH Standard: Examinee acknowledges alarm and observes rise in RCP motor stator temperatures.
Comment If the actions contained in the Annunciator Response Procedure (ARP)
Examiner  are implemented, JPM steps 11-24 cover the actions directed by the Note  ARP and AOP to stop the RCP. If RCP is stopped without implementing the ARP, JPM 10 step will end the JPM.
 
1503 NRC Sim JPM D Page 9 of 16 STEP   10                                                                                         SAT STOP Loop 1 RCP UNSAT If the examinee stops the RCP now provide the following cue, Cue   "Another operator will perform the remaining steps of this procedure."
Comment Examiner The following steps are from the Annunciator Response Procedure 1-Note   AR-MS-B.
NOTE               RCP 1-4 is known to have high winding temperature (up to Procedure                     approximately 303&deg;F when running with RCS temperature below Note                       400&deg;F. (EWR 10-COM-068-057)) However, alarms on RCP 1-4 should NOT be dismissed as "expected".
Corrective       (1J DETERMINE which pump is in alarm by monitoring computer STEP    11  Actions               points.                                                     - - SAT Pump 1: Point T0409A, 411 A or 412A (A,B, &C Pump 2: Point T0429A, 431 A or 432A {A,B, &C                   UNSAT Pump 3: Point T0449A, 451A or 452A (A,B, & C 0)           --
Pump 4: Point T0469A, 471A or 472A (A,B, & C 0)
Standard: Examinee determines the #1 RCP in alarm by observing the ICS display.
Comment
 
1503 NRC Sim JPM D Page 10 of 16 STEP   12                                                                           - - SAT
[2] CONTACT Engineering to obtain engineering assistance in determining the validity of the alarm_                               UNSAT Standard: Engineering is contacted to obtain engineering assistance in determining the validity of the alarm.
Respond as Unit Supervisor "Engineering has been contacted Cue and has validated the alarm."
Comment
[3] MONITOR the following parameters for increasing trends:
STEP    13 a_ Motor Current                                                 - - SAT b_ Bearing Temperatures
                                                                                      - - UNSAT C. Pump/Motor Vibration
: d. Containment Air Temperatures Examinee monitors or directs monitoring parameters by observing Standard: indications on installed instrumentation and determines indications normal.
Comment
 
1503 NRC Sim JPM D Page 11 of 16 STEP    14                                                                            - - SAT
[4] ENSURE ERCW' aligned to pump cooler.
                                                                                      - - UNSAT Standard: Examinee verifies ERCW aligned to pump cooler by observing red light above 1-HS-67-86 on O-M-27A ON.
Comment Examiner Note   May have been performed in JPM step 7.
STEP   15                                                                           - - SAT
[5] VERIFY ERCW system temperature and pressure normal.
                                                                                      - - UNSAT Standard:  Examinee verifies ERCW system temperature and pressure normal by observing indications O-M-27 A.
Comment STEP    16
                                                                                      - - SAT f6] VERIFY lower compartment air temperature normaL
                                                                                      - - UNSAT Standard: Examinee verifies lower compartment air temperature normal by observing indications on ICS and other installed plant instrumentation.
Comment
 
1503 NRC Sim JPM D Page 12 of 16 I STEP    17                                                                      --
SAT
[7] REFER TO 1-S0-68-2 for RCP operating limifa_
                                                                                  - - UNSAT Standard: Examinee refers to 1-S0-68-2 , Reactor Coolant Pumps Appendix D for the operating limits.
Comment If the remaining actions contained in the Annunciator Response Examiner Procedure (ARP) are implemented, JPM steps 19-20 cover the actions Note    directed by the ARP and AOP to stop the RCP. If RCP is stopped at this point, JPM 18 step will end the JPM.
STOP Loop 1 RCP STEP    18                                                                            SAT UNSAT If the examinee stops the RCP now provide the following cue, Cue   "Another operator will perform the remaining steps of this procedure."
Comment
 
1503 NRC Sim JPM D Page 13 of 16
[8] IF Ops/Engineering determines alarm is valid, THEN STEP    19                                                                                --
SAT PERFORM the following:
[a] CHECK pump motor amps. (normal 415 amps with 608 amps            - - UNSAT maximum_)
[b] IF RCP motor amps approach 608 amps, THEN GO TO AOP-R04, Reactor Coolant Pump Malfunctions.
[b] IF RCP motor amps approach 608 amps, THEN GO TO AOP-R04, Reactor Coolant Pump Malfunctions.
Examinee verifies pump amps normal by observing El-68-8 less than 400 amps. [9] IF Ops/Engineering determines alarm is valid and pump motor SAT --stator temperature approaches 311&deg;F (329"F for RCS temperature less than 540&deg;F}, THEN UNSAT --GO TO AOP-R.04, Reactor Coolant Pump Malfunctions.
Examinee verifies pump amps normal by observing El-68-8 less than Standard:
Examinee observes the motor winding temperature is greater than 311&deg;F using the ICS and goes to AOP-R.04.
400 amps.
Respond as Engineering "Alarm is valid." 'L DIAGNOSE the failure: SAT --UNSAT II Motor Stator Temperature High on ANY RCP I 2.6 I 24 II --Examinee goes to AOP-R.04 section 2.6 or 2.1 Procedure Caution Procedure Note STEP 22 Standard:
Comment
Comment Procedure Caution STEP 23 Standard:
[9] IF Ops/Engineering determines alarm is valid and pump motor STEP    20                                                                                - - SAT stator temperature approaches 311&deg;F (329"F for RCS temperature less than 540&deg;F}, THEN
Comment 1503 NRC Sim JPM D Page 14 of 16 CAUTION: Operating the RCP with excess winding temperature will reduce the expected life of the motor insulation.
                                                                                          - - UNSAT GO TO AOP-R.04, Reactor Coolant Pump Malfunctions.
NOTE: RCP motor winding temperature limits are as follows:
Standard: Examinee observes the motor winding temperature is greater than 311&deg;F using the ICS and goes to AOP-R.04.
Cue    Respond as Engineering "Alarm is valid."
Comment STEP    21                      'L   DIAGNOSE the failure:                               - - SAT
                                                                                          - - UNSAT II Motor Stator Temperature High on ANY RCP               I 2.6 I
24 II Standard: Examinee goes to AOP-R.04 section 2.6 or 2.1 Comment
 
1503 NRC Sim JPM D Page 14 of 16 Procedure  CAUTION:       Operating the RCP with excess winding temperature will reduce the expected Caution                life of the motor insulation.
NOTE:           RCP motor winding temperature limits are as follows:
Procedure Note
* 329&deg;F if RCS temperature is less than 540"'F.
* 329&deg;F if RCS temperature is less than 540"'F.
* 3'! 1&deg;F if RCS temperature is greater than or equal to 540&deg;F . Alternate Path SAT --1. MONITOR RCP Motor Stator temperature  
* 3'! 1&deg;F if RCS temperature is greater than or equal to 540&deg;F .
: a. IF RCP Motor Stator temperature less than applicable limit by monitoring reaches applicable limit UNSAT --the following computer points: AND indication is verified valid. Pump *1: T0409A, 41'1Aor412A THEN
Alternate Path STEP    22                                                                                                  - - SAT
* PERFORM the following:
: 1. MONITOR RCP Motor Stator temperature             a. IF RCP Motor Stator temperature less than applicable limit by monitoring             reaches applicable limit             - - UNSAT the following computer points:                       AND indication is verified valid.
THEN
* Pump *1: T0409A, 41'1Aor412A PERFORM the following:
* Pump 2: T0429A, 431A or 432A
* Pump 2: T0429A, 431A or 432A
* Pump 3: T0449A. 45'1A or 452A 1) IF reactor power less than 20%, THEN . Pump 4: T0469A, 471A or 472A GO TO Section 2. *1, ANY RCP Tripped or RCP Shutdown Required [C.1] Examinee determines the motor winding temperature is greater than 311&deg;F by observing the ICS and goes to the RNO column and ultimately to Section 2.1. 2.1 ANY RCP Tripped or RCP Shutdown Required CAUTION: A rapid drop in level and steam flow on the affected loop SIG may occur when RCP is stopped. '1. CHECK unit in Mode 1 or 2. STOP affected RCP(s). SAT --Time: UNSAT --GO TO Caution prior to Step 3. Examinee determines the Unit is in MODE 3 and proceeds to RNO STEP 24 Comment Terminating Cue: CHECK unit in Mode -1 or 2_ STOP affected RCP(s)_ Time: ___ _ 1503 NRC Sim JPM D Pa e 15 of 16 SAT UNSAT GO TO Caution prior to Step 3_ Provide the following cue "Another operator will perform the remaining steps of this procedure." STOP Stop Time ___ _
: 1)  IF reactor power less than 20%,
JPM BRIEFING SHEET I will explain the initial conditions, and state the task to be performed.
* Pump 3: T0449A. 45'1A or 452A
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
                . Pump 4: T0469A, 471A or 472A THEN GO TO Section 2. *1, ANY RCP Tripped or RCP Shutdown Required [C.1]
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:  
                                                                          ~
: 1. Unit 1 is in MODE 3 2. Preparations are being made to start #1 RCP. 3. All precautions and prerequisites are complete.  
Examinee determines the motor winding temperature is greater than Standard: 311&deg;F by observing the ICS and goes to the RNO column and ultimately to Section 2.1.
: 4. 1-S0-68-2, Reactor Coolant Pumps Section 5.1, steps 1 through 10 are complete.  
Comment 2.1   ANY RCP Tripped or RCP Shutdown Required Procedure Caution    CAUTION:       A rapid drop in level and steam flow on the affected loop SIG may occur when RCP is stopped.
: 5. All other RCP's are in service INITIATING CUE: 1. You have been directed to start and monitor the #1 RCP using 1-S0-68-2, Reactor Coolant Pumps starting at step 5.1.11. 2. Notify the SRO when you are complete.
            '1. CHECK unit in Mode 1 or 2.                       STOP affected RCP(s).
Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
STEP    23                                                                                                  --
SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPM E RO/SRO JOB PERFORMANCE MEASURE 2015 NRG SIM JPM E Page 2 of 11 Task: Respond to uncontrolled depressurization of all Steam Generators per ECA-2.1. Task#: 3310100601 Task Standard:
SAT Time:
The examinee will reduce AFW flow to all Steam Generators to less than 60 gpm but with positive flow > 30 gpm as indicated on all Steam Generators.
UNSAT GO TO Caution prior to Step 3.
Alternate Path: YES: NO: x Time Critical Task: YES: NO: x ---KIA Reference/Ratings:
                                                                      ~
EPE-E12 EA-1.1 (3.8/3.8)
Standard: Examinee determines the Unit is in MODE 3 and proceeds to RNO Comment
Method of Testing: Simulated Performance:
 
Actual Performance:
1503 NRC Sim JPM D Pa e 15 of 16 CHECK unit in Mode -1 or 2_       STOP affected RCP(s)_
x Evaluation Method: Simulator x In-Plant Classroom
STEP  24                                                                              SAT Time: _ _ __
-------Main Control Room Mock-up Performer:
UNSAT GO TO Caution prior to Step 3_
Trainee Name Evaluator:
Comment Terminating Provide the following cue "Another operator will perform the Cue:                                                                              STOP remaining steps of this procedure."
I Name I Signature DATE Performance Rating: SAT: UNSAT: Validation Time: 10 min Total Time: Performance Time: Start Time: Finish Time: COMMENTS SPECIAL INSTRUCTIONS:  
Stop Time ____
: 1. Ensure Simulator Operator Checklist is complete 2. Reset to IC 276 3. If IC 276 is not available perform the following:
 
JPM BRIEFING SHEET I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
: 1.       Unit 1 is in MODE 3
: 2.       Preparations are being made to start #1 RCP.
: 3.       All precautions and prerequisites are complete.
: 4.       1-S0-68-2, Reactor Coolant Pumps Section 5.1, steps 1 through 10 are complete.
: 5.       All other RCP's are in service INITIATING CUE:
: 1.       You have been directed to start and monitor the #1 RCP using 1-S0-68-2, Reactor Coolant Pumps starting at step 5.1.11.
: 2.       Notify the SRO when you are complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
 
SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPM E
 
2015 NRG SIM JPM E Page 2 of 11 RO/SRO JOB PERFORMANCE MEASURE Task:               Respond to uncontrolled depressurization of all Steam Generators per ECA-2.1.
Task#:             3310100601 Task Standard:     The examinee will reduce AFW flow to all Steam Generators to less than 60 gpm but with positive flow > 30 gpm as indicated on all Steam Generators.
Alternate Path:             YES:               NO:         x Time Critical Task:         YES: - - - NO:                 x KIA Reference/Ratings:       EPE-E12 EA-1.1 (3.8/3.8)
Method of Testing:
Simulated Performance:                       Actual Performance:         x Evaluation Method:
Simulator         x
              - - - In-Plant        - - - - Classroom Main Control Room                               Mock-up Performer:
Trainee Name Evaluator:                                       I Name I Signature                                     DATE Performance Rating:       SAT:                 UNSAT:
Validation Time:             10 min                         Total Time:
Performance Time:           Start Time:                     Finish Time:
COMMENTS
 
2015 NRG SIM JPM E Page 3 of 11 SPECIAL INSTRUCTIONS:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 276
: 3. If IC 276 is not available perform the following:
* Reset to IC 16.
* Reset to IC 16.
* IMF MS04A f:1
* IMF MS04A f:1
Line 375: Line 763:
* PLACE SIMULATOR IN RUN
* PLACE SIMULATOR IN RUN
* Trip the Reactor.
* Trip the Reactor.
* When T Cold has reached 470 deg, FREEZE SIMULA TOR. 4. PLACE SIMULATOR IN RUN 5. Trip the Reactor. 6. An extra operator will be required to acknowledge alarms. 7. ACKNOWLEDGE ALARMS 8. When T Cold has reached 470 deg, FREEZE SIMULATOR.  
* When T Cold has reached 470 deg, FREEZE SIMULATOR.
: 9. Save as a temporary IC, if repeat runs of JPM will be desired. 10. PLACE SIMULATOR IN RUN 2015 NRG SIM JPM E Page 3 of 11 11. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted. Tools/Equipment/Procedures Needed:  
: 4. PLACE SIMULATOR IN RUN
: 5. Trip the Reactor.
: 6. An extra operator will be required to acknowledge alarms.
: 7. ACKNOWLEDGE ALARMS
: 8. When T Cold has reached 470 deg, FREEZE SIMULATOR.
: 9. Save as a temporary IC, if repeat runs of JPM will be desired.
: 10. PLACE SIMULATOR IN RUN
: 11. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
Tools/Equipment/Procedures Needed:


==References:==
==References:==


Reference Title Rev No. 1. ECA-2.1 UNCONTROLLED DEPRESSURIZA TION OF ALL STEAM 11 GENERATORS  
Reference                                     Title                                 Rev No.
: 2.
: 1.     ECA-2.1                 UNCONTROLLED DEPRESSURIZATION OF ALL STEAM                     11 GENERATORS 2.
DIRECTIONS TO TRAINEE: 2015 NRG SIM JPM E Page 4 of 11 I will explain the initial conditions, and state the task to be performed.
 
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
2015 NRG SIM JPM E Page 4 of 11 DIRECTIONS TO TRAINEE:
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME! INITIAL CONDITIONS:  
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
: 1. Unit 1 is in MODE 3. 2. The crew has just completed all applicable steps of E-2, Faulted Steam Generator Isolation and has transitioned to ECA-2.1, UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS.  
When you complete the task successfully, the objective for this job performance measure will be satisfied.
: 3. Operators have been dispatched in attempt to close MSIVs using EA-1-1, Closing MSIVs Locally. INITIATING CUES: 1. The SRO has directed you to perform ECA-2.1, UNCONTROLLED DEPRESSURIZA TION OF ALL STEAM GENERA TORS starting at step 1. 2. Inform the SRO when complete.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
STEP 1 Standard:
HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME!
Comment CAUTION NOTE STEP 2 Standard:
INITIAL CONDITIONS:
Examiner Note: Comment 2015 NRC SIM JPM E Page 5 of 11 Start Time SAT --Obtain a copy of ECA-2.1, UNCONTROLLED DEPRESSURIZA TION OF ALL STEAM GENERATORS UNSAT --Examinee obtains a copy of ECA-2.1, UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS Isolating both steam supplies to the TD AFW pump when it is the only source of feed flow will result in loss of secondary heat sink. This procedure has a foldout page. SAT --NOTE This procedure has a foldout page. UNSAT --The examinee reviews the Foldout Page. The Foldout Page items are on the next page. The Examinee should not take any actions as a result of the Foldout Page.
: 1.       Unit 1 is in MODE 3.
FOLDOUT PAGE SI REINITIATION CRITERIA IF either of the following conditions occurs:
: 2.       The crew has just completed all applicable steps of E-2, Faulted Steam Generator Isolation and has transitioned to ECA-2.1, UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS.
: 3.       Operators have been dispatched in attempt to close MSIVs using EA-1-1, Closing MSIVs Locally.
INITIATING CUES:
: 1.       The SRO has directed you to perform ECA-2.1, UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS starting at step 1.
: 2.       Inform the SRO when complete.
 
2015 NRC SIM JPM E Page 5 of 11 Start Time STEP    1                                                                      - - SAT Obtain a copy of ECA-2.1, UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS
                                                                                - - UNSAT Standard: Examinee obtains a copy of ECA-2.1, UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS Comment CAUTION        Isolating both steam supplies to the TD AFW pump when it is the only source of feed flow will result in loss of secondary heat sink.
NOTE          This procedure has a foldout page.
STEP    2                                                                      - - SAT NOTE                 This procedure has a foldout page.
                                                                                - - UNSAT Standard: The examinee reviews the Foldout Page.
Examiner  The Foldout Page items are on the next page. The Examinee should Note:  not take any actions as a result of the Foldout Page.
Comment
 
2015 NRC SIM JPM E Page 6 of 11 FOLDOUT PAGE SI REINITIATION CRITERIA IF either of the following conditions occurs:
* RCS subcooling based on core exit T/Cs less than 40&deg;F, OR
* RCS subcooling based on core exit T/Cs less than 40&deg;F, OR
* Pressurizer level CANNOT be maintained greater than 10% [20% ADV], THEN RAISE ECCS flow by performing one or both of the following:
* Pressurizer level CANNOT be maintained greater than 10% [20% ADV],
THEN RAISE ECCS flow by performing one or both of the following:
* ESTABLISH CCPIT flow USING Appendix C
* ESTABLISH CCPIT flow USING Appendix C
* START CCPs or SI pumps manually as necessary.
* START CCPs or SI pumps manually as necessary.
EVENT DIAGNOSTICS
EVENT DIAGNOSTICS
* IF both trains of shutdown boards deenergized, THEN GO TO ECA-0.0, Loss of All AC Power. 2015 NRC SIM JPM E Page 6 of 11
* IF both trains of shutdown boards deenergized, THEN GO TO ECA-0.0, Loss of All AC Power.
* IF any SIG pressure rises at any time AND Steps 15 through 25 are NOT in progress, THEN RAISE AFW flow to intact S/G as necessary and GO TO E-2, Faulted Steam Generator Isolation.
* IF any SIG pressure rises at any time AND Steps 15 through 25 are NOT in progress, THEN RAISE AFW flow to intact S/G as necessary and GO TO E-2, Faulted Steam Generator Isolation.
* IF any S/G has level rising in an uncontrolled manner or has abnormal radiation, THEN a. RAISE ECCS flow by performing one or both of the following as necessary:
* IF any S/G has level rising in an uncontrolled manner or has abnormal radiation, THEN
: a. RAISE ECCS flow by performing one or both of the following as necessary:
* ESTABLISH CCPIT flow USING Appendix C
* ESTABLISH CCPIT flow USING Appendix C
* START CCPs or SI pumps manually as necessary.  
* START CCPs or SI pumps manually as necessary.
: b. GO TO E-3, Steam Generator Tube Rupture. TANK SWITCHOVER SETPOINTS
: b. GO TO E-3, Steam Generator Tube Rupture.
* IF CST level less than 5%, THEN ALIGN AFW suction to ERCW.
TANK SWITCHOVER SETPOINTS
* IF RWST level less than 27%, THEN GO TO ES-1.3, Transfer to RHR Containment Sump.
* IF CST level less than 5%,
STEP 3 Standard:
THEN ALIGN AFW suction to ERCW.
Cue Comment STEP 4 Standard:
* IF RWST level less than 27%,
Comment 2015 NRC SIM JPM E Page 7 of 11 1. CHECK secondary pressure boundary:
THEN GO TO ES-1.3, Transfer to RHR Containment Sump.
SAT --a. CHECK the following:  
 
: a. CLOSE valves to restore pressure boundary on at least one SIG. UNSAT
2015 NRC SIM JPM E Page 7 of 11
* MSIVs and MSIV bypass valves --CLOSED IF valves CANNOT be closed, THEN
: 1. CHECK secondary pressure boundary:
* MFW regulating valves and DISPATCH personnel to close valves reg bypass valves CLOSED locally, one loop at a time:
STEP    3                                                                                    - - SAT
: a. CHECK the following:           a. CLOSE valves to restore pressure boundary on at least one SIG.             UNSAT
* MSIVs and MSIV bypass valves                                         --
CLOSED                         IF valves CANNOT be closed, THEN
* MFW regulating valves and       DISPATCH personnel to close valves reg bypass valves CLOSED       locally, one loop at a time:
* MFW isolation valves CLOSED
* MFW isolation valves CLOSED
* CLOSE MSIV and bypass valve as necessary USING EA-1-1,
* CLOSE MSIV and bypass valve as necessary USING EA-1-1,
* Atmospheric reliefs CLOSED Closing MSIVs Locally .
* Atmospheric reliefs CLOSED         Closing MSIVs Locally .
* SIG blowdown valves CLOSED.
* SIG blowdown valves CLOSED.
* ISOLATE S/G atmospheric relief valve as necessary USING EA-1-2, Local Control of SIG PORVs.
* ISOLATE S/G atmospheric relief valve as necessary USING EA-1-2, Local Control of SIG PORVs.
* CLOSE additional feedwater or condensate MOVs as necessary.
* CLOSE additional feedwater or condensate MOVs as necessary.
* ISOLATE blowdown locally as necessary.
* ISOLATE blowdown locally as necessary.
The Examinee Checks the MSIVs are OPEN and cannot be closed. The examinee addresses the Step 1 a RNO actions. When asked provide the following cue, "Time has been compressed operators report the MSIVs cannot be closed using EA-1-1." SAT --1. b. CHECK MD AFW pumps RUNNING. UNSAT --The Examinee checks MD AFW pumps running as indicated by red light above HS-3-118A and 128A AFW Pump 1A-A and 1 B-B ON.
Standard: The Examinee Checks the MSIVs are OPEN and cannot be closed.
STEP 5 Comment NOTE STEP 6 Comment 2015 NRC SIM JPM E Page 8 of 11 c CLOSE TD AFW pump steam supply valve FCV-1-17 or FCV-1-18.
The examinee addresses the Step 1a RNO actions.
Reducing total feed flow to less than 440 gpm, as directed in this procedure, does NOT require implementation of FR-H.1, Loss of Secondary Heat Sink, as long as a total feed flow capability of 440 gpm is available.  
Cue    When asked provide the following cue, "Time has been compressed operators report the MSIVs cannot be closed using EA-1-1."
: 2. CONTROL feed flow to minimize RCS cooldown:  
Comment STEP    4                                                                                    - - SAT
: a. CHECK T-cold cooldown rate less than 1QOGF/hr.
: 1. b. CHECK MD AFW pumps RUNNING.
: a. REDUCE feed flow to 50 gpm to each SIG. OPEN MD AFW pump recirc valves FCV-3-400 and FCV-3-401 as necessary to control flow. GO TO Substep 2.c (AER column). SAT UNSAT SAT UNSAT STEP 7 Standard:
                                                                                              - - UNSAT The Examinee checks MD AFW pumps running as indicated by red Standard:
Comment STEP 8 Standard:
light above HS-3-118A and 128A AFW Pump 1A-A and 1B-B ON.
Cue: Comment 2015 NRC SIM JPM E Page 9 of 11 c. MONITOR SIG narrow range levels c. MAINTAIN feed flow to affected S/G(s) SAT --greater than 10% (25% ADV]. greater than or equal to 50 gpm UNTIL level greater than UNSAT 10% (25% ADV]. --The Examinee maintains AFW flow to all Steam Generators.  
Comment
: 3. MAINTAIN shutdown margin adequate:
 
SAT --NOTIFY Chem Lab to sample RCS UNSAT a. --boron concentration.  
2015 NRC SIM JPM E Page 8 of 11 STEP  5                                                                                        SAT c   CLOSE TD AFW pump steam supply valve FCV-1-17 or FCV-1-18.                                               UNSAT Comment NOTE      Reducing total feed flow to less than 440 gpm, as directed in this procedure, does NOT require implementation of FR-H.1, Loss of Secondary Heat Sink, as long as a total feed flow capability of 440 gpm is available.
: b. CHECK shutdown margin ADEQUATE USING O-Sl-NUC-000-038.0, Shutdown Margin. The Examinee addresses the procedure step. Acknowledge communication steps, as required.
: 2. CONTROL feed flow to minimize STEP  6      RCS cooldown:
STEP 9 Standard:
SAT
Comment Terminating Cue: 4. MONITOR if RCPs should be stopped: a. CHECK if the following conditions exist:
: a. CHECK T-cold cooldown rate       a. REDUCE feed flow to 50 gpm UNSAT less than 1QOGF/hr.                  to each SIG.
* RCS subcooling based on core exit T/Cs less than 40&deg;F ANO
OPEN MD AFW pump recirc valves FCV-3-400 and FCV-3-401 as necessary to control flow.
GO TO Substep 2.c (AER column).
Comment
 
2015 NRC SIM JPM E Page 9 of 11 STEP    7      c. MONITOR SIG narrow range levels c. MAINTAIN feed flow to affected S/G(s)   --
SAT greater than 10% (25% ADV].       greater than or equal to 50 gpm UNTIL level greater than 10% (25% ADV].                         - - UNSAT Standard: The Examinee maintains AFW flow to all Steam Generators.
Comment
: 3.     MAINTAIN shutdown margin adequate:
STEP    8                                                                                    - - SAT UNSAT
: a. NOTIFY Chem Lab to sample RCS                                       --
boron concentration.
: b. CHECK shutdown margin ADEQUATE USING O-Sl-NUC-000-038.0, Shutdown Margin.
Standard: The Examinee addresses the procedure step.
Cue:    Acknowledge communication steps, as required.
Comment
 
2015 NRC SIM JPM E Page 10of11
: 4. MONITOR if RCPs should be stopped:
STEP    9                                                                      --
SAT
: a. CHECK if the following           a. GO TO Step 5.
conditions exist:                                           - - UNSAT
* RCS subcooling based on core exit T/Cs less than 40&deg;F
                                                        ~
ANO
* RCS pressure less than i 250 psig ANO
* RCS pressure less than i 250 psig ANO
* At least one CCP OR SI pump RUNNING. b. STOP RCPs. a. GO TO Step 5. 2015 NRC SIM JPM E Page 10of11 SAT --UNSAT --The examinee determines RCP's are to be left running. Provide the following cue, "Another operator will complete the remaining steps of this procedure." STOP Stop Time ___ _
* At least one CCP OR SI pump RUNNING.
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
: b. STOP RCPs.
INITIAL CONDITIONS:  
Standard: The examinee determines RCP's are to be left running.
: 1. Unit 1 is in MODE 3. 2. The crew has just completed all applicable steps of E-2, Faulted Steam Generator Isolation and has transitioned to ECA-2.1, UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS.  
Comment Terminating Provide the following cue, "Another operator will complete the Cue:                                                                          STOP remaining steps of this procedure."
: 3. Operators have been dispatched in attempt to close MSIV's using EA-1-1, Closing MSIVs Locally. INITIATING CUES: 1. The SRO has directed you to perform ECA-2.1, UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS starting at step 1. 2. Inform the SRO when complete.
Stop Time _ _ __
Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
 
SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPM F Task: Task#: RO/SRO JOB PERFORMANCE MEASURE Respond to High Containment Pressure, Place RHR Spray in Service 3110160601 (RO) 1503 NRC Sim JPM F Page 2of13 Task Standard:
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
The examinee will establish one train of RHR spray in service using FR-Z.1, HIGH CONTAINMENT PRESSURE.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Alternate Path: YES: x NO: ---Time Critical Task: YES: NO: x KJA Reference/Ratings:
INITIAL CONDITIONS:
W/E14 EA1 .1 (3.7/3.7)
: 1.     Unit 1 is in MODE 3.
Method of Testing: Simulated Performance:
: 2.     The crew has just completed all applicable steps of E-2, Faulted Steam Generator Isolation and has transitioned to ECA-2.1, UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS.
Actual Performance:
: 3.     Operators have been dispatched in attempt to close MSIV's using EA-1-1, Closing MSIVs Locally.
x Evaluation Method: Simulator x In-Plant Classroom Main Control Room Mock-up Performer:
INITIATING CUES:
Trainee Name Evaluator:
: 1.     The SRO has directed you to perform ECA-2.1, UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS starting at step 1.
I Name I Signature DATE Performance Rating: SAT: UNSAT: Validation Time: 8 minutes Total Time: Performance Time: Start Time: Finish Time: COMMENTS SPECIAL INSTRUCTIONS TO EVALUATOR:  
: 2.     Inform the SRO when complete.
: 1. Ensure Simulator Operator Checklist is complete 2. Reset to IC 254 3. If IC 254 is not available reset to IC #24 and complete substeps below. a. Activate MF# TH01A at 35%. b. Activate MFs # CH01 A thru D at 70% (-10.2 psid) with 240 sec ramp. C. Stop RCPs. d. Complete the actions of ES-1.3, Sump Swapover.  
Acknowledge to the examiner when you are ready to begin.
: e. Activate Override ZDIHS7241A CLOSE, to prevent FCV-72-41 from opening. f. Activate ZAOPDl30133 f:5 g. Activate ZAOPDIR30133 f:0.5 4. Activate the following, as necessary, to prevent nuisance alarms: h. AN:OVRN[96]
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
to ON, prevents Turbine Zero Speed alarm i. AN:OVRN[304]
 
to ON, prevents Saturation Monitor alarm 5. Insert Remote Function RHR14 ON, places power on FCV-63-1.  
SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPM F
: 6. PLACE SIMULATOR IN RUN 7. An extra operator will be required to acknowledge alarms. 8. ACKNOWLEDGE ALARMS 9. FREEZE SIMULA TOR. 10. Save as a temporary IC, if repeat runs of JPM will be desired. 11. PLACE SIMULA TOR IN RUN 12. At JPM step 15, when candidate opens 1-FCV-72-40:  
 
: j. Modify malfunction CH01A f:O r:240 k:1 k. Modify malfunction CH01B f:O r:240 k:1 I. Modify malfunction CH01 B f:O r:240 k: 1 m. Modify malfunction CH01 D f:O r:240 k: 1 1503 NRC Sim JPM F Page 3of13 13. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
1503 NRC Sim JPM F Page 2of13 RO/SRO JOB PERFORMANCE MEASURE Task:              Respond to High Containment Pressure, Place RHR Spray in Service Task#:              3110160601     (RO)
: 14. Tools/Equipment/Procedures Needed: FR-Z.1, HIGH CONTAINMENT PRESSURE, step 13 (marked up through step 12)  
Task Standard:     The examinee will establish one train of RHR spray in service using FR-Z.1, HIGH CONTAINMENT PRESSURE.
Alternate Path:           YES: - -    x - NO:
Time Critical Task:       YES:               NO:         x KJA Reference/Ratings:     W/E14 EA1 .1 (3.7/3.7)
Method of Testing:
Simulated Performance:                       Actual Performance:           x Evaluation Method:
Simulator         x     In-Plant               Classroom Main Control Room                               Mock-up Performer:
Trainee Name Evaluator:                                       I Name I Signature                                       DATE Performance Rating:     SAT:                   UNSAT:
Validation Time:           8 minutes                       Total Time:
Performance Time:           Start Time:                     Finish Time:
COMMENTS
 
1503 NRC Sim JPM F Page 3of13 SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 254
: 3. If IC 254 is not available reset to IC #24 and complete substeps below.
: a. Activate MF# TH01A at 35%.
: b. Activate MFs # CH01 A thru D at 70% (-10.2 psid) with 240 sec ramp.
C. Stop RCPs.
: d. Complete the actions of ES-1.3, Sump Swapover.
: e. Activate Override ZDIHS7241A CLOSE, to prevent FCV-72-41 from opening.
: f. Activate ZAOPDl30133 f:5
: g. Activate ZAOPDIR30133 f:0.5
: 4. Activate the following, as necessary, to prevent nuisance alarms:
: h. AN:OVRN[96] to ON, prevents Turbine Zero Speed alarm
: i. AN:OVRN[304] to ON, prevents Saturation Monitor alarm
: 5. Insert Remote Function RHR14 ON, places power on FCV-63-1.
: 6. PLACE SIMULATOR IN RUN
: 7. An extra operator will be required to acknowledge alarms.
: 8. ACKNOWLEDGE ALARMS
: 9. FREEZE SIMULATOR.
: 10. Save as a temporary IC, if repeat runs of JPM will be desired.
: 11. PLACE SIMULATOR IN RUN
: 12. At JPM step 15, when candidate opens 1-FCV-72-40:
: j. Modify malfunction CH01A f:O r:240 k:1
: k. Modify malfunction CH01B f:O r:240 k:1 I. Modify malfunction CH01 B f:O r:240 k: 1
: m. Modify malfunction CH01 D f:O r:240 k: 1
: 13. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
 
1503 NRC Sim JPM F Page 4of13
: 14. Tools/Equipment/Procedures Needed:
FR-Z.1, HIGH CONTAINMENT PRESSURE, step 13 (marked up through step 12)


==References:==
==References:==


Reference Title 1. FR-Z.1 High Containment Pressure 1503 NRC Sim JPM F Page 4of13 Rev No. 19 DIRECTIONS TO EXAMINEE:
Reference                                   Title                 Rev No.
1503 NRC Sim JPM F Page 5of13 I will explain the initial conditions, and state the task to be performed.
: 1. FR-Z.1                           High Containment Pressure                       19
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
 
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME! INITIAL CONDITIONS;  
1503 NRC Sim JPM F Page 5of13 DIRECTIONS TO EXAMINEE:
: 1. Unit 1 has experienced a reactor trip and Safety Injection in conjunction with a large break LOCA. 2. The crew is monitoring step 13 of FR-Z.1, HIGH CONTAINMENT PRESSURE.  
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME!
INITIAL CONDITIONS;
: 1. Unit 1 has experienced a reactor trip and Safety Injection in conjunction with a large break LOCA.
: 2. The crew is monitoring step 13 of FR-Z.1, HIGH CONTAINMENT PRESSURE.
: 3. 1 hour has elapsed since the accident.
: 3. 1 hour has elapsed since the accident.
INITIATING CUES: 1. The SRO directed you to initiate one train of RHR spray per FR-Z.1, HIGH CONTAINMENT PRESSURE starting at step 13. 2. Inform the SRO when a train of RHR spray has been established.
INITIATING CUES:
STEP 1 Standard:
: 1. The SRO directed you to initiate one train of RHR spray per FR-Z.1, HIGH CONTAINMENT PRESSURE starting at step 13.
Cue Comment STEP 2 Standard:
: 2. Inform the SRO when a train of RHR spray has been established.
Comment 1503 NRC Sim JPM F Page 6of13 Start Time SAT --Obtain a copy of the FR-Z.1, HIGH CONTAINMENT PRESSURE UNSAT --Examinee obtains a copy of FR-Z.1, HIGH CONTAINMENT PRESSURE Provide an in-progress copy of FR-Z.1, HIGH CONTAINMENT PRESSURE complete through step 12 n_ MONITOR if RHR spray should be placed SAT 1n service: --CHECK the following:
 
UNSAT a_ --. Containment pressure greater than 9 .5 psig AND Examinee checks 1-PDl-30-45 and 44 and determines that pressure is greater than 9.5 STEP 3 Standard:
1503 NRC Sim JPM F Page 6of13 Start Time 1
Cue Comment STEP 4 Standard:
STEP                                                                            - - SAT Obtain a copy of the FR-Z.1, HIGH CONTAINMENT PRESSURE UNSAT Standard: Examinee obtains a copy of FR-Z.1, HIGH CONTAINMENT PRESSURE Cue    Provide an in-progress copy of FR-Z.1, HIGH CONTAINMENT PRESSURE complete through step 12 Comment STEP 2    n_     MONITOR if RHR spray should be placed 1n service:                                                   - - SAT a_ CHECK the following:                                       - - UNSAT
Cue Comment n_ MONITOR if RHR spray should be placed in seMce: a_ CHECK the following: . At least 1 hour has elapsed since beginning of accident 1503 NRC Sim JPM F Page 7of13 SAT --UNSAT --Examinee determines from initiating cues (or asks US) that 1 hour has elapsed IF asked, provide the following cue, "1 hour has elapsed since beginning of accident".
                      . Containment pressure greater than 9 .5 psig AND Standard: Examinee checks 1-PDl-30-45 and 44 and determines that pressure is greater than 9.5 Comment
n_ MONITOR if RHR spray should be placed SAT 111 seMce: --a._ CHECK the follo*wing:
 
UNSAT --. RHR suction ALIGNED to containment sump Examinee checks FCV-63-72 and 73 OPEN and FCV-74-3 and 21 CLOSED, or asks if ES-1.3, "Transfer to RHR Containment Sump," has been completed.
1503 NRC Sim JPM F Page 7of13 STEP 3   n_   MONITOR if RHR spray should be placed in seMce:                                                         - - SAT a_ CHECK the following:                                           - - UNSAT
IF asked, provide the following cue, "ES-1.3 has been completed."
                      . At least 1 hour has elapsed since beginning of accident Standard: Examinee determines from initiating cues (or asks US) that 1 hour has elapsed Cue    IF asked, provide the following cue, "1 hour has elapsed since beginning of accident".
STEP 5 Standard:
Comment STEP 4    n_   MONITOR if RHR spray should be placed 111 seMce:                                                         - - SAT a._ CHECK the follo*wing:                                         - - UNSAT
Comment STEP 6 Standard:
                      . RHR suction ALIGNED to containment sump Examinee checks FCV-63-72 and 73 OPEN and FCV-74-3 and 21 Standard: CLOSED, or asks if ES-1.3, "Transfer to RHR Containment Sump,"
Comment STEP 7 Standard:
has been completed.
Comment n_ MONITOR if RHR spray should be placed 1n service: a_ CHECK the following: . At least one CCP AND one SI pump RUNNING. Examinee verifies at least one CCP is running as indicated by Red light on HS-62-104A or 108A ON. AND Verifies at least one SI pump is running as indicated by Red lights on HS-63-10A or 15A ON. 13. MONITOR if RHR spray should be placed in b_ CHECK both RHR pumps RUNNING. Examinee checks that both RHR pumps are running as indicated by red lights on HS-74-10A and 20A "ON". 13. c: ESTABLISH Train B RHR spray: 1) CHECK Train B RHR pump RUNNING. 1503 NRC Sim JPM F Page 8 of 13 SAT --UNSAT --SAT --UNSAT --SAT --UNSAT --Examinee checks that 1 B-B RHR pump is running as indicated by red light on HS-74-20A "ON".
Cue    IF asked, provide the following cue, "ES-1.3 has been completed."
STEP 8 Standard:
Comment
Comment STEP g Comment STEP 10 Standard:
 
Comment n. C. ESTABLISH Train B RHR spray: 2) ENSURE RHR crosstie FCV-74-35 CLOSED. 1503 NRC Sim JPM F Page 9of13 SAT --UNSAT --Examinee verifies FCV-74-35 in the CLOSED position as indicated by HS green light ON and red light OFF B. c. ESTABLISH Train B RHR spray: 3) CLOSE RHR injection FCV-63-94.
1503 NRC Sim JPM F Page 8 of 13 STEP 5    n_     MONITOR if RHR spray should be placed SAT 1n service:                                                         --
Begin ALTERNATE PATH n. C. ESTABLISH Train B RHR spray: 4) OPEN RHR spray FCV-72-41.
a_ CHECK the following:                                             - - UNSAT
Examinee places handswitch for RHR injection FCV-72-41 in the OPEN position and recognizes that the green light stays ON and the red light is OFF, goes to RNO column. SAT UNSAT SAT --UNSAT --
                        . At least one CCP AND one SI pump RUNNING.
STEP 11 Standard:
Examinee verifies at least one CCP is running as indicated by Red light on HS-62-104A or 108A ON.
Comment STEP 12 Comment STEP 13 Standard:
Standard: AND Verifies at least one SI pump is running as indicated by Red lights on HS-63-10A or 15A ON.
Comment ALTERNATE PATH c_ IF Train B RHR spray CANNOT be established, THEN PERFORM the following:
Comment 6
a) ENSURE RHRspray FCV-72-41 CLOSED. Examinee verifies FCV-72-41 closed as indicated by green light ON and red light OFF. c. IF Train B RHR spray CANNOT be established, THEN C. PERFORM the following:
STEP        13. MONITOR if RHR spray should be placed
b) IF RHR aligned for cold leg recirculation, THEN ENSURE FCV-63-94 OPEN. IF Train B RHR spray CANNOT be established, THEN PERFORM the follmving:
                                                                                        - - SAT in service~
c) ESTABLISH Train A RHR spray: ('I) ENSURE RHR crosstie FCV-74-33 CLOSED. Examinee verifies RHR crosstie FCV-74-33 in the CLOSED position as indicated by green light ON handswitch.
b_ CHECK both RHR pumps RUNNING.                                     - - UNSAT Standard: Examinee checks that both RHR pumps are running as indicated by red lights on HS-74-10A and 20A "ON".
1503 NRC Sim JPM F Page 10 of 13 SAT --UNSAT --SAT UNSAT SAT --UNSAT --
Comment 7
STEP 14 Comment STEP 15 Examiner Note Comment c. IF Train B RHR spray CANNOT be established, THEN PERFORM the following:
STEP        13. c: ESTABLISH Train B RHR spray:                                      - - SAT
c) ESTABLISH Train A RHR spray: (2) CLOSE RHR injection FCV-63-93.  
: 1) CHECK Train B RHR pump
: c. IF Train B RHRspray CANNOT be established, THEN PERFORM the following:
                                                                                        - - UNSAT RUNNING.
c) ESTABLISH Train A RHR spray: (3) OPEN RHR spray FCV-72--40.
Standard: Examinee checks that 1B-B RHR pump is running as indicated by red light on HS-74-20A "ON".
1503 NRC Sim JPM F Page 11 of 13 SAT UNSAT SAT UNSAT When examinee starts to open FCV-72-40, initate a 240 sec ramp on CH01 A thru D to reduce CNMT pressure from 10.2 to zero (0).
Comment
STEP 16 Standard:
 
Comment Terminating Cue: 1503 NRC Sim JPM F Page 12 of 13 Examinee verifies that RHR Containment spray is effective in lowering CNMT pressure.
1503 NRC Sim JPM F Page 9of13 8
Examinee verifies that CNMT pressure is lowering by observing Lower pressure readings on CH01A thru D Provide the following cue, "Another operator will complete the remaining steps of this procedure." Stop Time SAT --UNSAT --STOP ----
STEP         n. C. ESTABLISH Train B RHR spray:                                  - - SAT
: 2) ENSURE RHR crosstie FCV-74-35 CLOSED.                                       - - UNSAT Standard: Examinee verifies FCV-74-35 in the CLOSED position as indicated by HS green light ON and red light OFF Comment STEP  g    B. c. ESTABLISH Train B RHR spray:                                      SAT
: 3) CLOSE RHR injection                                           UNSAT FCV-63-94.
Comment 10  Begin ALTERNATE PATH STEP                                                                                - - SAT
: n. C. ESTABLISH Train B RHR spray:                                      UNSAT
: 4) OPEN RHR spray FCV-72-41.
Examinee places handswitch for RHR injection FCV-72-41 in the Standard: OPEN position and recognizes that the green light stays ON and the red light is OFF, goes to RNO column.
Comment
 
1503 NRC Sim JPM F Page 10 of 13 11  ALTERNATE PATH STEP                                                                              - - SAT c_ IF Train B RHR spray CANNOT be established,                                             - - UNSAT THEN PERFORM the following:
a) ENSURE RHRspray FCV-72-41 CLOSED.
Examinee verifies FCV-72-41 closed as indicated by green light ON Standard:
and red light OFF.
Comment 12    c. IF Train B RHR spray STEP                                                                                    SAT CANNOT be established, THEN PERFORM the following:                                                   UNSAT b) IF RHR aligned for cold leg recirculation, THEN ENSURE FCV-63-94 OPEN.
Comment 13    C. IF Train B RHR spray STEP CANNOT be established,                                             - - SAT THEN PERFORM the follmving:                                             - - UNSAT c) ESTABLISH Train A RHR spray:
('I) ENSURE RHR crosstie FCV-74-33 CLOSED.
Examinee verifies RHR crosstie FCV-74-33 in the CLOSED position Standard:
as indicated by green light ON handswitch.
Comment
 
1503 NRC Sim JPM F Page 11 of 13 14 c. IF Train B RHR spray STEP                                                                                  SAT CANNOT be established, THEN PERFORM the following:
UNSAT c) ESTABLISH Train A RHR spray:
(2) CLOSE RHR injection FCV-63-93.
Comment 15  c. IF Train B RHRspray STEP                                                                                  SAT CANNOT be established, THEN PERFORM the following:                                                   UNSAT c) ESTABLISH Train A RHR spray:
(3) OPEN RHR spray FCV-72--40.
Examiner When examinee starts to open FCV-72-40, initate a 240 sec ramp on Note  CH01 A thru D to reduce CNMT pressure from 10.2 to zero (0).
Comment
 
1503 NRC Sim JPM F Page 12 of 13 16 STEP                                                                                - - SAT Examinee verifies that RHR Containment spray is effective in lowering CNMT pressure.                                                           --
UNSAT Standard: Examinee verifies that CNMT pressure is lowering by observing Lower pressure readings on CH01A thru D Comment Terminating Provide the following cue, "Another operator will complete the Cue:                                                                                STOP remaining steps of this procedure."
Stop Time   ----
 
DIRECTIONS TO EXAMINEE:
DIRECTIONS TO EXAMINEE:
I will explain the initial conditions, and state the task to be performed.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME! INITIAL CONDITIONS:  
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
: 1. Unit 1 has experienced a reactor trip and Safety Injection in conjunction with a large break LOCA. 2. The crew is monitoring step 13 of FR-Z.1, HIGH CONTAINMENT PRESSURE.  
HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME!
INITIAL CONDITIONS:
: 1. Unit 1 has experienced a reactor trip and Safety Injection in conjunction with a large break LOCA.
: 2. The crew is monitoring step 13 of FR-Z.1, HIGH CONTAINMENT PRESSURE.
: 3. 1 hour has elapsed since the accident.
: 3. 1 hour has elapsed since the accident.
INITIATING CUES: 1. The SRO directed you to initiate one train of RHR spray per FR-Z.1, HIGH CONTAINMENT PRESSURE starting at step 13. 2. Inform the SRO when a train of RHR spray has been established.
INITIATING CUES:
SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPMG Task: Task#: RO/SRO JOB PERFORMANCE MEASURE 3210430301 Respond to a loss of Shutdown Board using AOP-P.05.
: 1. The SRO directed you to initiate one train of RHR spray per FR-Z.1, HIGH CONTAINMENT PRESSURE starting at step 13.
2015 NRG SIM JPM G Page 2 of 10 Task Standard:
: 2. Inform the SRO when a train of RHR spray has been established.
The examinee will respond to a loss of Shutdown Board using AOP-P.05 and start the 1A Charging pump. Subsequently the examinee will place the 1 B Diesel Generator in emergency stop due to a failure of the cooling water valve to open. Alternate Path: YES: x NO: ---Time Critical Task: YES: NO: x KIA Reference/Ratings:
 
062 A2.04 (3.1/3.4)
SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPMG
Method of Testing: Simulated Performance:
 
Actual Performance:
2015 NRG SIM JPM G Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task:              3210430301 Task#:              Respond to a loss of Shutdown Board using AOP-P.05.
x Evaluation Method: Simulator x In-Plant Classroom Main Control Room Mock-up Performer:
Task Standard:     The examinee will respond to a loss of Shutdown Board using AOP-P.05 and start the 1A Charging pump. Subsequently the examinee will place the 1B Diesel Generator in emergency stop due to a failure of the cooling water valve to open.
Trainee Name Evaluator:
Alternate Path:             YES: - -  x - NO:
I Name I Signature DATE Performance Rating: SAT: UNSAT: Validation Time: 8 min Total Time: Performance Time: Start Time: Finish Time: COMMENTS SPECIAL INSTRUCTIONS:  
Time Critical Task:         YES:             NO:         x KIA Reference/Ratings:     062 A2.04 (3.1/3.4)
: 1. Ensure Simulator Operator Checklist is complete 2. Reset to IC 16 3. PLACE SIMULATOR IN RUN 4. An extra operator will be required to acknowledge alarms. 5. ACKNOWLEDGE ALARMS 6. FREEZE SIMULA TOR 7. Save as a temporary IC, if repeat runs of JPM will be desired. 8. PLACE SIMULATOR IN RUN 9. De-energize the 1 B 6.9 kv Shutdown Board by inserting IMF ED068 2015 NRG SIM JPM G Page 3 of 10 10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted. Tools/Equipment/Procedures Needed:  
Method of Testing:
Simulated Performance:                     Actual Performance:         x Evaluation Method:
Simulator         x     In-Plant               Classroom Main Control Room                               Mock-up Performer:
Trainee Name Evaluator:                                       I Name I Signature                               DATE Performance Rating:     SAT:                   UNSAT:
Validation Time:           8 min                           Total Time:
Performance Time:           Start Time:                     Finish Time:
COMMENTS
 
2015 NRG SIM JPM G Page 3 of 10 SPECIAL INSTRUCTIONS:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 16
: 3. PLACE SIMULATOR IN RUN
: 4. An extra operator will be required to acknowledge alarms.
: 5. ACKNOWLEDGE ALARMS
: 6. FREEZE SIMULATOR
: 7. Save as a temporary IC, if repeat runs of JPM will be desired.
: 8. PLACE SIMULATOR IN RUN
: 9. De-energize the 1B 6.9 kv Shutdown Board by inserting IMF ED068
: 10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
Tools/Equipment/Procedures Needed:


==References:==
==References:==


Reference Title Rev No. 1. AOP-P.05 LOSS OF UNIT 1 SHUTDOWN BOARDS 23 2.
Reference                                       Title                               Rev No.
DIRECTIONS TO TRAINEE: 2015 NRC SIM JPM G Page 4 of 10 I will explain the initial conditions, and state the task to be performed.
: 1. AOP-P.05                 LOSS OF UNIT 1 SHUTDOWN BOARDS                                       23 2.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
 
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME! INITIAL CONDITIONS:  
2015 NRC SIM JPM G Page 4 of 10 DIRECTIONS TO TRAINEE:
: 1. Unit 1 is in MODE 1. INITIATING CUES: 1. Respond to plant conditions 2015 NRC SIM JPM G Page 5 of 10 Start Time STEP 1 SAT --Obtain a copy of AOP-P.05 LOSS OF UNIT 1 SHUTDOWN BOARDS. UNSAT --Standard:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
Examinee obtains a copy of AOP-P.05 LOSS OF UNIT 1 SHUTDOWN BOARDS. Comment 2. DETERMINE applicable section: GOTO IF ... SECTION PAGE 1A-A 2.1 4 6900V Shutdown Board DE-ENERGIZED 18-8 2.2 20 STEP 2 SAT --Determine applicable section. UNSAT --Standard:
When you complete the task successfully, the objective for this job performance measure will be satisfied.
The examinee determines the 1 B 6.9 kv Shutdown Board is de-energized and proceeds to section 2.2. Comment NOTE *
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
* STEP 3 Standard:
HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME!
Comment CAUTION *
INITIAL CONDITIONS:
* STEP 4 Standard:
: 1.       Unit 1 is in MODE 1.
Comment 2015 NRC SIM JPM G Page 6 of 10 MSR HP Steam Supply valves will close due to loss of power, resulting in load reduction.
INITIATING CUES:
Loss of power to this board will result in a loss of RPls and rod bottom lights . SAT --1. MONITOR 1 A-A 6900V Shutdown Board ENERGIZED.
: 1.       Respond to plant conditions
UNSAT --The examinee monitors 1A-A 6900V Shutdown Board ENERGIZED by observing plant instrumentation.
 
Restoring seal cooling to an overheated RCP seal could result in RCP seal damage or steam voiding in CCS. Operation of RCPs for greater than 2 minutes without CCS cooling to oil coolers will result in bearing temperatures greater than 200&deg;F. 2. CHECK RCP seal cooling available:
2015 NRC SIM JPM G Page 5 of 10 Start Time STEP   1                                                                           - - SAT Obtain a copy of AOP-P.05 LOSS OF UNIT 1 SHUTDOWN BOARDS.
SAT --* seal injection flow UNSAT --OR
                                                                                    - - UNSAT Standard:     Examinee obtains a copy of AOP-P.05 LOSS OF UNIT 1 SHUTDOWN BOARDS.
* thermal barrier cooling flow Addresses the procedure step.
Comment
STEP 5 Standard:
: 2. DETERMINE applicable section:
Comment STEP 6 Comment STEP 7 Standard:
GOTO IF ...                                               SECTION         PAGE 1A-A         2.1             4 6900V Shutdown Board DE-ENERGIZED 18-8         2.2             20 STEP   2                                                                           --
Comment 2015 NRC SIM JPM G Page 7 of 10 3. ENSURE at least one Train B ERCW Pump RUNNING:
SAT Determine applicable section.
* M-B ERCW Pump OR
                                                                                    - - UNSAT Standard:     The examinee determines the 1B 6.9 kv Shutdown Board is de-energized and proceeds to section 2.2.
* P-B ERCW Pump The examinee verifies B Train ERCW running by observing the red light above the respective handswitch ON. ALTERNATE PATH 4. ENSURE the following:
Comment
 
2015 NRC SIM JPM G Page 6 of 10 NOTE
* MSR HP Steam Supply valves will close due to loss of power, resulting in load reduction.
* Loss of power to this board will result in a loss of RPls and rod bottom lights .
STEP    3                                                                                  --
SAT
: 1. MONITOR 1A-A 6900V Shutdown Board ENERGIZED.                                                           - - UNSAT Standard:    The examinee monitors 1A-A 6900V Shutdown Board ENERGIZED by observing plant instrumentation.
Comment CAUTION
* Restoring seal cooling to an overheated RCP seal could result in RCP seal damage or steam voiding in CCS.
* Operation of RCPs for greater than 2 minutes without CCS cooling to oil coolers will result in bearing temperatures greater than 200&deg;F.
STEP            2. CHECK RCP seal cooling available:
                                                                                            - - SAT 4
* seal injection flow UNSAT OR
* thermal barrier cooling flow Standard:    Addresses the procedure step.
Comment
 
2015 NRC SIM JPM G Page 7 of 10
: 3. ENSURE at least one Train B ERCW Pump STEP    5          RUNNING:                                                                 - - SAT
* M-B ERCW Pump
                                                                                            - - UNSAT OR
* P-B ERCW Pump Standard: The examinee verifies B Train ERCW running by observing the red light above the respective handswitch ON.
Comment ALTERNATE PATH STEP    6                                                                                        SAT
: 4. ENSURE the following:               EMERGENCY STOP any running DIG with NO ERCW cooling available.            UNSAT
* D/Gs RUNNING
* D/Gs RUNNING
* ERCW ALIGNED to running D/Gs. EMERGENCY STOP any running DIG with NO ERCW cooling available.  
* ERCW ALIGNED to running D/Gs.
: 5. ENSURE CCS pumps RUNNING: a. ENSURE 1A-A CCS Pump supplying Train A. b. ENSURE 28-B or C-S CCS Pump supplying Train B. The examinee verifies 1A CCS pump running by observing the red light above the HS-70-47A ON. The examinee verifies C-S CCS pump running by observing the red light above the HS-70-51A ON. SAT --UNSAT --SAT UNSAT SAT --UNSAT --
Comment STEP    7    5. ENSURE CCS pumps RUNNING:                                              - - SAT
NOTE STEP 8 Standard:
: a. ENSURE 1A-A CCS Pump                                             - - UNSAT supplying Train A.
Comment STEP 9 Standard:
: b. ENSURE 28-B or C-S CCS Pump supplying Train B.
Comment STEP 9 Comment 2015 NRG SIM JPM G Page 8of10 If RHR pump 1 B-B was in service for shutdown cooling prior to loss of 6900V Shutdown Board 18-8, the pump will not restart automatically.  
The examinee verifies 1A CCS pump running by observing the red light above the HS-70-47A ON.
: 6. IF RHR pump 1 B-B was in service for shutdown cooling, THEN ENSURE AOP-R.03, RHR System Malfunctions, entered to address RHR pump trip, WHILE continuing in this procedure.
Standard:
The examinee addresses the procedure step as N/A. 7. MONITOR REACTOR COOLANT PUMPS MOTOR THRUST BEARING TEMP HIGH alarm DARK. [1-M-58, E-3) The Examinee observes [1-M-58, E-3] dark. ALTERNATE PATH 8. CHECK CCP 1A-A RUNNING. PERFORM the following:  
The examinee verifies C-S CCS pump running by observing the red light above the HS-70-51A ON.
Comment
 
2015 NRG SIM JPM G Page 8of10 NOTE      If RHR pump 1B-B was in service for shutdown cooling prior to loss of 6900V Shutdown Board 18-8, the pump will not restart automatically.
: 6. IF RHR pump 1B-B was in service STEP    8                                                                                      --
SAT for shutdown cooling, THEN ENSURE AOP-R.03, RHR System                                               - - UNSAT Malfunctions, entered to address RHR pump trip, WHILE continuing in this procedure.
Standard:    The examinee addresses the procedure step as N/A.
Comment STEP    9                                                                                      - - SAT
: 7. MONITOR REACTOR COOLANT PUMPS MOTOR THRUST BEARING TEMP HIGH UNSAT alarm DARK. [1-M-58, E-3)                                                 --
Standard:    The Examinee observes [1-M-58, E-3] dark.
Comment ALTERNATE PATH STEP    9                                                                                          SAT
: 8. CHECK CCP 1A-A RUNNING.             PERFORM the following:
UNSAT
: a. ENSURE CCP suction path:
: a. ENSURE CCP suction path:
* LCV-62-132 and -133 OPEN with VCT level greater than 20% OR
* LCV-62-132 and -133 OPEN with VCT level greater than 20%
* LCV-62-135 OPEN b. START CCP 1A-A. SAT --UNSAT --SAT --UNSAT --SAT UNSAT 2015 NRG SIM JPM G Page 9 of 10 Terminating Provide the following cue, "Another operator will complete the STOP Cue: remaining steps of this procedure." Stop Time ___ _
OR
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
* LCV-62-135 OPEN
INITIAL CONDITIONS:  
: b. START CCP 1A-A.
: 1. Unit 1 is in MODE 1. INITIATING CUES: 1. Respond to plant conditions Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
Comment
SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPM H RO/SRO JOB PERFORMANCE MEASURE 2015 NRC SIM JPM H Page 2 of 16 Task: Respond to a loss of Essential Raw Cooling Water per AOP-M.01.
 
Task#: 0000620501 Task Standard:
2015 NRG SIM JPM G Page 9 of 10 Terminating Provide the following cue, "Another operator will complete the STOP Cue:     remaining steps of this procedure."
The examinee will respond to a loss of ERCW by starting the STANDBY A TRAIN ERCW Pump and the ERCW Header leak has been isolated.
Stop Time ____
Alternate Path: YES: x NO: ---Time Critical Task: YES: NO: x KIA Reference/Ratings:
 
APE A07AA1.3 (3.3/3.5)
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Method of Testing: Simulated Performance:
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Actual Performance:
INITIAL CONDITIONS:
x Evaluation Method: Simulator x In-Plant Classroom
: 1. Unit 1 is in MODE 1.
------Main Control Room Mock-up Performer:
INITIATING CUES:
Trainee Name Evaluator:
: 1. Respond to plant conditions Acknowledge to the examiner when you are ready to begin.
I Name I Signature DATE Performance Rating: SAT: UNSAT: Validation Time: 20 min Total Time: Performance Time: Start Time: Finish Time: COMMENTS SPECIAL INSTRUCTIONS:  
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
: 1. Ensure Simulator Operator Checklist is complete 2. Reset to IC 16 3. PLACE SIMULATOR IN RUN 4. An extra operator will be required to acknowledge alarms. 5. ACKNOWLEDGE ALARMS 6. FREEZE SIMULATOR.  
 
: 7. Save as a temporary IC, if repeat runs of JPM will be desired. 8. PLACE SIMULATOR IN RUN 2015 NRC SIM JPM H Page 3 of 16 9. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted. 10. When directed insert malfunction MF RW01G (Trips Q-A ERCW Pump) 11. When directed insert malfunction RW138 at 90% prior to JPM step 8. Tools/Equipment/Procedures Needed:  
SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPM H
 
2015 NRC SIM JPM H Page 2 of 16 RO/SRO JOB PERFORMANCE MEASURE Task:               Respond to a loss of Essential Raw Cooling Water per AOP-M.01.
Task#:             0000620501 Task Standard:     The examinee will respond to a loss of ERCW by starting the STANDBY A TRAIN ERCW Pump and the ERCW Header leak has been isolated.
Alternate Path:                     x YES: - - - NO:
Time Critical Task:       YES:               NO:         x KIA Reference/Ratings:   APE A07AA1.3 (3.3/3.5)
Method of Testing:
Simulated Performance:                     Actual Performance:         x Evaluation Method:
Simulator         x
              - - - In-Plant      - - - Classroom Main Control Room                             Mock-up Performer:
Trainee Name Evaluator:                                     I Name I Signature                               DATE Performance Rating:     SAT:                 UNSAT:
Validation Time:           20 min                         Total Time:
Performance Time:         Start Time:                     Finish Time:
COMMENTS
 
2015 NRC SIM JPM H Page 3 of 16 SPECIAL INSTRUCTIONS:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 16
: 3. PLACE SIMULATOR IN RUN
: 4. An extra operator will be required to acknowledge alarms.
: 5. ACKNOWLEDGE ALARMS
: 6. FREEZE SIMULATOR.
: 7. Save as a temporary IC, if repeat runs of JPM will be desired.
: 8. PLACE SIMULATOR IN RUN
: 9. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
: 10. When directed insert malfunction MF RW01G (Trips Q-A ERCW Pump)
: 11. When directed insert malfunction RW138 at 90% prior to JPM step 8.
Tools/Equipment/Procedures Needed:


==References:==
==References:==


Reference Title Rev No. 1. AOP-M.01 Loss of ERCW 28 2.
Reference                                     Title                                 Rev No.
DIRECTIONS TO TRAINEE: 2015 NRG SIM JPM H Page 4 of 16 I will explain the initial conditions, and state the task to be performed.
: 1. AOP-M.01                 Loss of ERCW                                                         28 2.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
 
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME! INITIAL CONDITIONS:  
2015 NRG SIM JPM H Page 4 of 16 DIRECTIONS TO TRAINEE:
: 1. Unit 1 is in MODE 1. INITIATING CUES: 1. Respond to plant conditions STEP 1 Standard:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
Comment 2015 NRG SIM JPM H Page 5 of 16 Start Time ERCW/CCS PUMP PUMP R-A MOTOR DISH PRESS LOW TRIP Responds to alarm using ARP O-AR-M27-A, B-2 and/or O-AR-M27-BA, SAT E-4 --UNSAT [1] IF ERCW pump motor TRIPS, THEN --GO TO AOP-M_Oi, Loss of Essential Raw Cooling Water. [2] IF CCS motor trip, THEN GO TO AOP-rvt03, Loss of Component Cooling Water. [3] DETERMINE which motor tripped. [4] TURN control switch to OFF position to reset alarm_ [5] DISPATCH operator to investigate cause of alarm. [6] EVALUATE LCO 3T3 (CCS) or 3.7A (ERCW). Examinee Places O-HS-67-460A ERCW Pump Q-A in PTL.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
STEP 2 Standard:
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Comment STEP 3 Standard:
HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME!
Comment 2015 NRC SIM JPM H Page 6 of 16 CAUTION: ERCW header rupture in Aux Bldg could fill passive sump in 15 minutes. Prompt action may be needed to isolate rupture using this AOP. 1. CHECK for indlcations of ERCW rupture GO TO Step4. SAT inside Aux Building: --* flooding from ERCW inside Aux Bldg UNSAT which requires rapid isolation to protect --equipment or personnel OR
INITIAL CONDITIONS:
: 1.       Unit 1 is in MODE 1.
INITIATING CUES:
: 1.       Respond to plant conditions
 
2015 NRG SIM JPM H Page 5 of 16 Start Time ERCW/CCS PUMP PUMP R-A DISH PRESS MOTOR LOW                         TRIP Responds to alarm using ARP O-AR-M27-A, B-2 and/or O-AR-M27-BA, STEP    1                                                                          SAT E-4                                                               --
UNSAT
[1] IF ERCW pump motor TRIPS, THEN GO TO AOP-M_Oi, Loss of Essential Raw Cooling Water.
[2] IF CCS motor trip, THEN GO TO AOP-rvt03, Loss of Component Cooling Water.
[3] DETERMINE which motor tripped.
[4] TURN control switch to OFF position to reset alarm_
[5] DISPATCH operator to investigate cause of alarm.
[6] EVALUATE LCO 3T3 (CCS) or 3.7A (ERCW).
Standard: Examinee Places O-HS-67-460A ERCW Pump Q-A in PTL.
Comment
 
2015 NRC SIM JPM H Page 6 of 16 CAUTION:       ERCW header rupture in Aux Bldg could fill passive sump in 15 minutes.
Prompt action may be needed to isolate rupture using this AOP.
: 1. CHECK for indlcations of ERCW rupture         GO TO Step4.
STEP    2        inside Aux Building:                                                             - - SAT
* flooding from ERCW inside Aux Bldg which requires rapid isolation to protect
                                                                  ~                                --
UNSAT equipment or personnel OR
* abnormal high flow indicated on any ERCW supptf header in conjunction with flooding alarms or other indications of ruptl.Jre.
* abnormal high flow indicated on any ERCW supptf header in conjunction with flooding alarms or other indications of ruptl.Jre.
Examinee determines no leak exists in the Aux Building based on no reports of flooding and no indications of high flow and so goes to RNO and then to STEP 4 4. IF this procedure entered for any reason SAT --other than ERCW rupture in Aux Bldg, THEN UNSAT GO TO applicable section: --The examinee determines a pump trip has occurred and goes to section 2. 1.
Examinee determines no leak exists in the Aux Building based on no Standard:  reports of flooding and no indications of high flow and so goes to RNO and then to STEP 4 Comment STEP    3    4. IF this procedure entered for any reason
IF ... GO TO SECTION 2015 NRC SIM JPM H Page 7 of 16 PAGE ERCW Pump(s) tripped or failed 2.1 ERCW pump failure 9 STEP 4 Standard:
                                                                                                  - - SAT other than ERCW rupture in Aux Bldg, THEN GO TO applicable section:                                                     - - UNSAT Standard:  The examinee determines a pump trip has occurred and goes to section 2. 1.
Comment STEP 5 Comment STEP 6 Standard:
Comment
Comment 1-IDENTIFY and LOCK OUT failed ERCW pump. Examinee Places O-HS-67-460A ERCW Pump Q-A in PTL if not already performed.  
 
: 2. START additional ERCW pumps 3. as required to maintain supply header pressure between 78 psig and 124 psig. CHECK two Train A ERCW Pumps AVAILABLE.
2015 NRC SIM JPM H Page 7 of 16 IF ...                                                GO TO SECTION                  PAGE ERCW Pump(s) tripped or failed                         2.1 ERCW pump failure           9 STEP     4                                                                         --
Examinee verifies that 2 Train A ERCW Pumps are available based on various indications.
SAT 1-   IDENTIFY and LOCK OUT failed ERCW pump.
SAT --UNSAT --SAT UNSAT SAT --UNSAT --
                                                                                    - - UNSAT Standard: Examinee Places O-HS-67-460A ERCW Pump Q-A in PTL if not already performed.
STEP 7 Standard:
Comment STEP    5                                                                              SAT
Comment Examiner Note: STEP 8 Standard:
: 2. START additional ERCW pumps as required to maintain supply header pressure between 78 psig and 124 psig.                                  UNSAT Comment STEP    6                                                                          - - SAT
Comment 2015 NRG SIM JPM H Page 8 of 16 4. CHECK 1A and 2A ERCW supply SAT header pressures and flows NORMAL: --a. Supply header pressures UNSAT Ibetween psig and 124 psig]: --,. 1-Pl-67-493A
: 3. CHECK two Train A ERCW Pumps AVAILABLE.
* 2-Pl-67-493A  
                                                                                    - - UNSAT Standard: Examinee verifies that 2 Train A ERCW Pumps are available based on various indications.
: b. Supply header flows [expected vatue]: It 1-Fi-67-61
Comment
* 2-FJ-67-61 Examinee determines that A Train supply header pressures and flows are normal based on plant indicators.
 
Direct the simulator operator to insert RW138 at 90% prior to JPM step 8. Change to B Train. ALTERNATE PATH SAT --r CHECK 1B am:l 2B ERCW supply header If header leak or rupture is indicated, "* UNSAT pressures and flows NORMAL: THEN --RETURN TO Section 2.0 for diagnosis.  
2015 NRG SIM JPM H Page 8 of 16
: a. Supply header pressures  
: 4. CHECK 1A and 2A ERCW supply STEP    7      header pressures and flows NORMAL:                                                       --
{between _;1111--78 psig and 124 psig]:
SAT
                                                                                                        - - UNSAT
: a. Supply header pressures Ibetween 7~ psig and 124 psig]:
                    ,. 1-Pl-67-493A
* 2-Pl-67-493A
: b. Supply header flows
[expected vatue]:
It 1-Fi-67-61
* 2-FJ-67-61 Standard: Examinee determines that A Train supply header pressures and flows are normal based on plant indicators.
Comment Examiner  Direct the simulator operator to insert RW138 at 90% prior to JPM step Note:  8. Change to B Train.
ALTERNATE PATH STEP    8                                                                                              - - SAT r
            "* CHECK 1B am:l 2B ERCW supply header       If header leak or rupture is indicated, pressures and flows NORMAL:               THEN                                           - - UNSAT RETURN TO Section 2.0 for diagnosis.
: a. Supply header pressures {between 78 psig and 124 psig]:                 _;1111--
* 1-PJ-67-488A If NO Train B ERCW pump ls available,
* 1-PJ-67-488A If NO Train B ERCW pump ls available,
* 2-Pl-67-488A THEN GO TO Section 2.11, Loss of Train B ERGW. b. Supply header !lows [expected valuej:
* 2-Pl-67-488A                       THEN GO TO Section 2.11, Loss of Train B ERGW.
* 1-Fl-67-62
: b. Supply header !lows [expected valuej:
* 2-Fl-67-62 If pressure is low due to only one pump available, THEN EVALUATE isolatlcn of non-essential ERCW loads. Examinee checks Train B header pressures and flows and determines flows are abnormal based on the listed indicators, goes to the RNO and then to Section 2.0 for diagnosis 2015 NRG SIM JPM H aqe 0 p 9 f 16 CAUTION: ERCW header rupture in Aux Bldg could fill passive sump in 'f5 minutes. Prompt action may be needed to isolate rupture using this AOP. STEP 9 1. CHECK for indications of ERCW rupture GO TO Step4. SAT inside Aux Building: --* flooding from ERCW inside Aux Bldg UNSAT which requires rapid isolation to protect --equipment or personnel OR
* 1-Fl-67-62                           ~
* abnom1al high !low indicated on any ERON supp.ly header in conjunction with flooding a!amis or other indications of mpture. Cue If asked provide the following cue," There are no reports of flooding from the Aux Building." Examinee determines no leak exists in the Aux Building based on no Standard:
* 2-Fl-67-62                         If pressure is low due to only one pump available, THEN EVALUATE isolatlcn of non-essential ERCW loads.
reports of flooding and no indications of high flow and so goes to RNO and then to STEP 4 Comment STEP 10 4. If this procedure entered for any reason SAT other lhan ERCW mpture in Aux Bldg, --THEN GO TO applicable section: UNSAT --law flow ERCW supply headers 18 and 26, AND STRAINER D!FF PRESS alarms DARK [M-27A, C-6 and 0-SJ, AND at least one of the following alarms UT:
Examinee checks Train B header pressures and flows and determines Standard: flows are abnormal based on the listed indicators, goes to the RNO and then to Section 2.0 for diagnosis Comment
* ERCW DECK SUMP LEVEL HI alarm UT 2.11 Supply Header B Rupture 127 [1-M-156, A-3] Upstream of Strainer Inlet OR Valves OR Loss of Train B ERCW
 
* ERCW DECK SUMP PMP RUNNING I1-M-15B, D-2 or D-4} OR
2015 NRG SIM JPM H p aqe 9 0 f 16 CAUTION:           ERCW header rupture in Aux Bldg could fill passive sump in 'f5 minutes.
* MECH EQUIP SUMP lVl HI alam1 UT {1-M-15A, B-6] Examinee determines Section 2.11 is applicable based on Low flow on Standard:
Prompt action may be needed to isolate rupture using this AOP.
ERCW supply headers 1 B and 28 and one or more of the specified alarms. Comment STEP 11 Standard:
: 1. CHECK for indications of ERCW rupture             GO TO Step4.
Cue: Comment STEP 12 Comment 2015 NRG SIM JPM H 1. CHECK this section entered for any of the following:
STEP    9            inside Aux Building:                                                               - - SAT
* rupture known to be upstream of ERON strainer inlet valve (I or 2-FCV-67-489)
* flooding from ERCW inside Aux Bldg which requires rapid isolation to protect
                                                                        ~                              - - UNSAT equipment or personnel OR
* abnom1al high !low indicated on any ERON supp.ly header in conjunction with flooding a!amis or other indications of mpture.
If asked provide the following cue," There are no reports of flooding Cue from the Aux Building."
Examinee determines no leak exists in the Aux Building based on no Standard:   reports of flooding and no indications of high flow and so goes to RNO and then to STEP 4 Comment STEP   10     4. If this procedure entered for any reason other lhan ERCW mpture in Aux Bldg,                                               - - SAT THEN
                                                                                                        - - UNSAT GO TO applicable section:
law flow ERCW supply headers 18 and 26, AND STRAINER D!FF PRESS alarms DARK
[M-27A, C-6 and 0-SJ, AND at least one of the following alarms UT:
* ERCW DECK SUMP LEVEL HI alarm UT           2.11 Supply Header B Rupture     127
[1-M-156, A-3]                                   Upstream of Strainer Inlet Valves OR OR Loss of Train B ERCW
* ERCW DECK SUMP PMP RUNNING I1-M-15B, D-2 or D-4}
OR
* MECH EQUIP SUMP lVl HI alam1 UT
{1-M-15A, B-6]
Examinee determines Section 2.11 is applicable based on Low flow on Standard:   ERCW supply headers 1B and 28 and one or more of the specified alarms.
Comment
 
2015 NRG SIM JPM H p age 10 0 f 16
: 1. CHECK this section entered for any STEP    11      of the following:                                                             --
SAT
* rupture known to be upstream of ERON strainer inlet valve                                                       - - UNSAT (I or 2-FCV-67-489)
OR
OR
* rupture which CANNOT be isolated OR
* rupture which CANNOT be isolated OR
* rupture which requires stopping aH Train 8 ERCW flow. Examinee determines that rupture is known to be upstream of due to absence of Strainer Differential Pressure alarms in combination with low flow in both 1 B and 28 headers as identified in diagnosis step. If asked provide the following cue, "The leak is upstream of the 8 Train strainer." CAUTION: If running, Train B CCP and SI Pumps may experience bearing failure 10 minutes after loss of ERCW cooling. ALTERNATE PATH 2. STOP and LOCK OUT aUTrain B ERCW Pumps. p 10 f 16 age 0 SAT --UNSAT --SAT UNSAT STEP 13 Standard:
* rupture which requires stopping aH Train 8 ERCW flow.
Cue Comment STEP 14 2015 NRC SIM JPM H Page 11 of 16 CAUTION: Pipe rupture inside ERCW Pumping Station could result in safety hazards due to water spray and flooded compartments.  
Examinee determines that rupture is known to be upstream of due to Standard: absence of Strainer Differential Pressure alarms in combination with low flow in both 1B and 28 headers as identified in diagnosis step.
: 3. IF performing this section due to rupture Inside ERCW pumping station OR due to rupture in unknown location, THEN DISPATCH operators with radios to perform me following:
Cue:    If asked provide the following cue, "The leak is upstream of the 8 Train strainer."
* PERFORM Appendix G.2, ERCWMCC Valves. [ERCW Pumping Station} .. EHSURE all pumping station watertight doors are CLOSED. [ERCW Pumping Station]_
Comment CAUTION:       If running, Train B CCP and SI Pumps may experience bearing failure 10 minutes after loss of ERCW cooling.
Examinee addresses step and dispatches personnel to perform the required appendix and close watertight doors. Role play and acknowledge the request. 4_ OPEN alternate ERCW supply to Train B DfGs
ALTERNATE PATH STEP    12                                                                                            SAT
* 1-FCV-67-65 (1B-B DIG)
: 2. STOP and LOCK OUT aUTrain B ERCW Pumps.                                                                               UNSAT Comment
* 2-FCV-<>7-65 (2B-B O!G'.f SAT --UNSAT --SAT UNSAT Cue: Provide the following cue, "Unit 2 HS-67-65 has been opened." Comment STEP 15 Standard:
 
Cue Comment STEP 16 Standard:
2015 NRC SIM JPM H Page 11 of 16 CAUTION:     Pipe rupture inside ERCW Pumping Station could result in safety hazards due to water spray and flooded compartments.
Comment 5. DISPATCH operator to place Train B Aux Air Compressor in SAFE STOP. [Aux Bldg, 734' elev, Refuel Floor} Examinee addresses the procedure step. Role play and acknowledge the request. 6. Unit *1 Only: STOP affected pumps: a. CHECK CCP '1A-A RUNNING. a. 2015 NRC SIM JPM H Page 12 of 16 SAT --UNSAT --SAT --IF RCP thermal barrier cooling is UNSAT in service, --THEN 1) ENSURE letdown orifice valves CLOSED. 2) GO TO Substep 6.b. Examinee identifies that 1A CCP is not running and goes to RNO.
: 3. IF performing this section due to rupture STEP    13      Inside ERCW pumping station                                                     - - SAT OR due to rupture in unknown location, THEN                                                                                 UNSAT DISPATCH operators with radios to perform me following:
STEP 17 Comment STEP 18 Comment STEP 19 Standard:
* PERFORM Appendix G.2, ERCWMCC Valves. [ERCW Pumping Station}
Comment b. PLACE CCP 1B-B in PULL TO LOCK. c. PLACE SI pump 18-B in PULL TO LOCK. 2015 NRC SIM JPM H Page 13of16 a. IF RCP them1al barrier cooling is in service, THEH 1) ENSURE letdown orifice valves CLOSED. 2) GO TO Substep 6-b. ----SAT UNSAT SAT UNSAT SAT UNSAT Examinee places HS-63-1 SA SI Pump 1 Bin PTL.
                . EHSURE all pumping station watertight doors are CLOSED.
STEP 20 Standard:
[ERCW Pumping Station]_
Cue: Comment STEP 21 Comment 7. Unit2 Onty: STOP affected pumps: a. CHECK CCP 2A-A RUNNING. a. IF RCP thermal barrier cooling is in s.enrlce, THEN 1) ENSURE letdown orifice valves CLOSED. 2) GO TO Substep 7.b. IF RCP thermal barrier cooling is NOT in service, THEN PERFORM Ille folfowing:  
Standard: Examinee addresses step and dispatches personnel to perform the required appendix and close watertight doors.
: 1) WHEN :CCP 2A-A ls running {Step 8}, THEN PLACE CCP 26-B in PULL TO LOCK. 2) GO TO Substep 7.c. b. PLACE CCP 2B-B in PULL TO LOCK. c. PLACE SI pump 28-B in PULL TO LOCK Examinee addresses the procedure step. Provide the following cue, "Unit 2 will perform Step 7". 8. ENSURE Train A CCPs RUNNING. 2015 NRC SIM JPM H Page 14 of 16 SAT --UNSAT --SAT UNSAT 2015 NRG SIM JPM H Page 15of16 Terminating Provide the following cue, "Another operator will complete the STOP Cue: remaining steps of this procedure." Stop Time ___ _
Cue    Role play and acknowledge the request.
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Comment 4_ OPEN alternate ERCW supply to STEP    14      Train B DfGs SAT
INITIAL CONDITIONS:  
* 1-FCV-67-65 (1B-B DIG)                                                           UNSAT
: 1. Unit 1 is in MODE 3. INITIATING CUES: 1 . Respond to plant conditions Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
* 2-FCV-<>7-65 (2B-B O!G'.f Cue:   Provide the following cue, "Unit 2 HS-67-65 has been opened."
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1503 NRC PLANT JPM I RO/SRO JOB PERFORMANCE MEASURE Task: Locally closing MSIV's by pulling control power fuses. Task#: 3010030601 1503 NRC PLANT JPM I Page 2 of 10 Task Standard:
Comment
The examinee closes MSIV's for SG 2, 3, and 4 by placing its transfer control switch in the Auxiliary Control Room in the AUX position then removes the control power fuses on the associated 125 V Vital Battery Board for SG 1. Alternate Path: YES: NO: x ---Time Critical Task: YES: NO: x KIA Reference/Ratings:
 
APE 040AA1.04 (4.3/4.3)
2015 NRC SIM JPM H Page 12 of 16 STEP   15 5. DISPATCH operator to place Train B                                       - - SAT Aux Air Compressor in SAFE STOP.
Method of Testing: Simulated Performance:
[Aux Bldg, 734' elev, Refuel Floor}
x Actual Performance:
                                                                                          - - UNSAT Standard: Examinee addresses the procedure step.
Evaluation Method: Simulator In-Plant x Classroom Main Control Room Mock-up Performer:
Cue    Role play and acknowledge the request.
Trainee Name Evaluator:
Comment
I Name I Signature DATE Performance Rating: SAT: UNSAT: Validation Time: 8 min Total Time: -----Performance Time: Start Time: Finish Time: COMMENTS 1503 NRC PLANT JPM I Page 3of10 SPECIAL INSTRUCTIONS TO EVALUATOR:  
: 6. Unit *1 Only:
: 1. SM approval will be required to enter the 'Trip Hazard Zone" in backup control room. 2. Critical steps are identified in step SAT/UNSAT column by bold print 'Critical Step.' 3. Any UNSAT requires comments.
STEP    16      STOP affected pumps:                                                      - - SAT
Tools/Equipment/Procedures Needed:  
: a. CHECK CCP '1A-A RUNNING.     a. IF RCP thermal barrier cooling is in service,                       - - UNSAT THEN
: 1) ENSURE letdown orifice valves CLOSED.
: 2) GO TO Substep 6.b.
                                                            ~
Standard: Examinee identifies that 1A CCP is not running and goes to RNO.
Comment
 
2015 NRC SIM JPM H Page 13of16 STEP    17                                  a. IF RCP them1al barrier cooling is           SAT in service, THEH UNSAT
: 1) ENSURE letdown orifice valves CLOSED.
: 2) GO TO Substep 6-b.
                                                    ~
Comment STEP    18                                                                                SAT
: b. PLACE CCP 1B-B in PULL TO LOCK.
UNSAT Comment STEP    19                                                                            - - SAT
: c. PLACE SI pump 18-B in PULL TO LOCK.
                                                                                      - - UNSAT Standard: Examinee places HS-63-1 SA SI Pump 1Bin PTL.
Comment
 
2015 NRC SIM JPM H Page 14 of 16
: 7. Unit2 Onty:
STEP    20      STOP affected pumps:
SAT
: a. CHECK CCP 2A-A RUNNING. a. IF RCP thermal barrier cooling is in s.enrlce, THEN                                           --
UNSAT
: 1) ENSURE letdown orifice valves CLOSED.
: 2) GO TO Substep 7.b.
                                                        ~
IF RCP thermal barrier cooling is NOT in service, THEN PERFORM Ille folfowing:
: 1) WHEN :CCP 2A-A ls running {Step 8},
THEN PLACE CCP 26-B in PULL TO LOCK.
: 2) GO TO Substep 7.c.
                                                        ~
: b. PLACE CCP 2B-B in PULL TO LOCK.
: c. PLACE SI pump 28-B in PULL TO LOCK Standard: Examinee addresses the procedure step.
Cue:    Provide the following cue, "Unit 2 will perform Step 7".
Comment STEP    21                                                                                            SAT
: 8. ENSURE Train A CCPs RUNNING.
UNSAT Comment
 
2015 NRG SIM JPM H Page 15of16 Terminating Provide the following cue, "Another operator will complete the STOP Cue:     remaining steps of this procedure."
Stop Time _ _ __
 
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
: 1. Unit 1 is in MODE 3.
INITIATING CUES:
: 1. Respond to plant conditions Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
 
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1503 NRC PLANT JPM I
 
1503 NRC PLANT JPM I Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task:             Locally closing MSIV's by pulling control power fuses.
Task#:         3010030601 Task Standard:     The examinee closes MSIV's for SG 2, 3, and 4 by placing its transfer control switch in the Auxiliary Control Room in the AUX position then removes the control power fuses on the associated 125 V Vital Battery Board for SG 1.
Alternate Path:           YES: - - - NO:               x Time Critical Task:       YES:             NO:         x KIA Reference/Ratings:       APE 040AA1.04 (4.3/4.3)
Method of Testing:
Simulated Performance:         x         Actual Performance:
Evaluation Method:
Simulator               In-Plant       x     Classroom Main Control Room                             Mock-up Performer:
Trainee Name Evaluator:                                     I Name I Signature                               DATE Performance Rating:     SAT:                 UNSAT:
Validation Time:           8 min                         Total Time:
Performance Time:           Start Time:                   Finish Time:
COMMENTS
 
1503 NRC PLANT JPM I Page 3of10 SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. SM approval will be required to enter the 'Trip Hazard Zone" in backup control room.
: 2. Critical steps are identified in step SAT/UNSAT column by bold print 'Critical Step.'
: 3. Any UNSAT requires comments.
Tools/Equipment/Procedures Needed:


==References:==
==References:==


Reference Title Rev No. 1. EA-1-1 Closing MSIVs Locally 1 ====================================================================================
Reference                                       Title                       Rev No.
READ TO EXAMINEE HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME! DIRECTIONS TO OPERATOR:
: 1.     EA-1-1                                 Closing MSIVs Locally                               1
I will explain the initial conditions, and state the task to be performed.
====================================================================================
All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.
READ TO EXAMINEE HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
When you complete the task successfully, the objective for this job performance measure will be satisfied.
DIRECTIONS TO OPERATOR:
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:  
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.
: 1. Unit 2 is in MODE 3 2. Unit 2 has experienced faulted SG's. 3. Attempts to close MSIV's from the main control room (MCR) have failed. 4. All MSIV bypass valves are closed. INITIATING CUES: 1. The SRO has directed you to attempt to close MSIV's, using EA-1-1. 2. Inform the SRO when complete.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
STEP 1 Obtain a copy of EA-1-1, Closing MSIVs Locally. Standard:
INITIAL CONDITIONS:
Operator obtains a copy of EA-1-1, Closing MSIVs Locally. Cue ProvideacopyofEA-1-1, Closing MSIVs Locally. Comment STEP 2 4.1 Section, Applicability  
: 1. Unit 2 is in MODE 3
: 2. Unit 2 has experienced faulted SG's.
: 3. Attempts to close MSIV's from the main control room (MCR) have failed.
: 4. All MSIV bypass valves are closed.
INITIATING CUES:
: 1. The SRO has directed you to attempt to close MSIV's, using EA-1-1.
: 2. Inform the SRO when complete.
 
1503 NRC PLANT JPM I Page 4 of 10 Start Time STEP     1                                                                       - - SAT Obtain a copy of EA-1-1, Closing MSIVs Locally.
                                                                                  - - UNSAT Standard: Operator obtains a copy of EA-1-1, Closing MSIVs Locally.
Cue   ProvideacopyofEA-1-1, Closing MSIVs Locally.
Comment 4.1     Section, Applicability STEP    2                                                                        - - SAT
: 1. SELECT applicable unit:
: 1. SELECT applicable unit:
* Unit 1 --* Unit2 --Standard:
                                                                                  - - UNSAT
The Examinee selects Unit 2 based on the initiating cue. Comment 1503 NRC PLANT JPM I Page 4 of 10 Start Time SAT --UNSAT --SAT --UNSAT --
* Unit 1
I STEP 3 Standard:
* Unit2 - -
Comment STEP 4 : Standard:
Standard: The Examinee selects Unit 2 based on the initiating cue.
Comment STEP 5 Standard:
Comment
Comment 2. SELECT affected valve(s):
 
SIG AFFECTED VALVE{S) #1 MSIV 0 MSIV bypass 0 #2 MSIV 0 MSIV bypass 0 #3 MSIV 0 MSIV bypass 0 #4 MSIV 0 MSIV bypass 0 The examinee selects all MSIV's based on the initiating cue 3. IF any Unit 1 MSIV will NOT close, THEN GO TO Section 4.2. The examinee addresses the procedure step as N/A. 4. IF any Unit 1 MSIV bypass valve will NOT close, THEN GO TO Section 4.3. The Examinee addresses the step as N/A. 1503 NRC PLANT JPM I Page 5of10 SAT --UNSAT --SAT --D UNSAT --SAT --D UNSAT --
1503 NRC PLANT JPM I Page 5of10 I                    2. SELECT affected valve(s):
I STEP 6 Standard:
STEP    3                                                                                      - - SAT SIG                          AFFECTED VALVE{S)
Comment STEP 7 Standard:
UNSAT
Comment 5. IF any Unit 2 MS!V will NOT close, THEN GO TO Section 4.4. The Examinee goes to section 4.4 4.4 Unit 2 MSIV Isolation  
                                    #1                       MSIV 0     MSIV bypass 0
: 1. PLACE affected MSIV transfer control switch in AUX position:  
                                    #2                       MSIV 0     MSIV bypass 0
[Auxiliary Control Room, Panels 2-L-11A and 2-L-118] SIG EQUIPMENT AUX TRANSFER SWITCH 1 MS!V Loop 1, Train A, 2-FCV-1-4 2-XS-1-4A MS!V Loop 1, Train B, 2-FCV-1-4 2-XS-1-48 1503 NRC PLANT JPM I Page 6of10 SAT --D UNSAT --SAT --UNSAT --AUX POSITION ,/ D D The Examinee places 2-XS-1-4A
                                    #3                       MSIV 0     MSIV bypass 0
& 2-XS-1-48 and to AUX.
                                    #4                       MSIV 0     MSIV bypass 0 Standard: The examinee selects all MSIV's based on the initiating cue Comment
STEP 8 Comment STEP 9 Standard:
: 3. IF any Unit 1 MSIV will NOT close, STEP    4              THEN                                                                     - - SAT GO TO Section 4.2.                                                   D
Cue Comment 4.4 Unit 2 MSIV Isolation  
                        ~                                                                        - - UNSAT Standard: The examinee addresses the procedure step as N/A.
: 1. PLACE affected MSIV transfer control switch in AUX position:  
Comment
[Auxiliary Control Room, Panels 2-L-11A and 2-L-11B] S/G EQUIPMENT AUX TRANSFER SWITCH 2 MSIV Loop 2, Train A, 2-FCV-1-11 2-XS-1-11A MSIV Loop 2, Train B. 2-FCV-1-11 2-XS-1-118 3 MSIV Loop 3, Train A, 2-FCV-1-22 2-XS-1-22A MSIV Loop 3, Train B, 2-FCV-1-22 2-XS-1-228 4 MSIV Loop 4. Train A, 2-FCV-1-29 2-XS-1-29A MSIV Loop 4, Train B. 2-FCV-1-29 2-XS-1-298  
: 4. IF any Unit 1 MSIV bypass valve will NOT close, STEP    5              THEN                                                                   - - SAT GO TO Section 4.3.                                               D
: 2. CONSULT UO to determine if affected MSIV closed. 1503 NRC PLANT JPM I Page 7 of 10 SAT UNSAT AUX POSITION '1 D D D D D D D SAT --UNSAT --The Examinee contacts the MCR to determine status of MSIV's. CRITICAL When asked provide the following cue, "The MSIV for Loop 1 is OPEN The MSIV's for Loop 2, 3 and 4 are CLOSED."
                        ~                                                                        - - UNSAT Standard: The Examinee addresses the step as N/A.
STEP 10 Cue Comment 1503 NRC PLANT JPM I Page 8 of 10 NOTE1 Fuse pullers and flashlight will be needed for next step. These may be obtained from AOP-C.04 cabinet in 6.9KV Shutdown Board Room A. NOTE2 Fuses may be removed in any order. 3. IF affected MSIV still open SIG 1 OR control power fuse removal desired, THEN REMOVE fuses for affected MS!V{s): EQUIPMENT MSIV Loop 1, Train A, 2-FCV-1-4 MSIV Loop 1, Train 8, 2-FCV-1-4 FUSE LOCATION (Two per circuit) 125V Vital Battery Bd !II Circuit A-46 Circuit B-46 125V Vital Battery Bd IV Circuit A-46 Circuit B-46 FUSES REMOVED v' 0 0 0 0 If asked provide the following cue, "Loop 1 MSIV is CLOSED. Steam generator  
Comment
#1 pressure is 450 psig and stable." SAT UNSAT STEP 11 4. GO TO Section 4.1, step in effect 1503 NRC PLANT JPM I Page 9 of 10 SAT UNSAT END OF SECTION Standard:
 
The Examinee addresses the procedure step. Comment Terminating The JPM is complete when the Examinee returns the cue sheet to Cue: the Examiner.
1503 NRC PLANT JPM I Page 6of10 I            5. IF any Unit 2 MS!V will NOT close, STEP    6                                                                                          - - SAT THEN GO TO Section 4.4.                                                              D
STOP Stop Time JPM BRIEFING SHEET DIRECTIONS TO OPERATOR:
                                                                                                      - - UNSAT
All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed.
                  ~
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:  
Standard: The Examinee goes to section 4.4 Comment 4.4    Unit 2 MSIV Isolation STEP    7                                                                                          - - SAT
: 1. Unit 2 is in MODE 3 2. Unit 2 has experienced faulted SG's. 3. Attempts to close MSIV's from the main control room (MCR) have failed. 4. All MSIV bypass valves are closed. INITIATING CUES: 1. The SRO has directed you to attempt to close MSIV's, using EA-1-1. 2. Inform the SRO when complete.
: 1. PLACE affected MSIV transfer control switch in AUX position:
Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
                                                                                                      - - UNSAT
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1503 NRC PLANT JPMJ RO/SRO JOB PERFORMANCE MEASURE PLANT JPM J Page 2 of 8 Task: Take Local Control of the Turbine Driven AFW Level Control valve 2-LCV-3-175.
[Auxiliary Control Room, Panels 2-L-11A and 2-L-118]
Task#: 0000140504 Task Standard:
AUX TRANSFER      AUX POSITION SIG                 EQUIPMENT                                         ,/
The Examinee simulates assuming local control of 2-LCV-3-175.
SWITCH 1
Alternate Path: YES: NO: x Time Critical Task: YES: NO: x ---KIA Reference/Ratings:
MS!V Loop 1, Train A, 2-FCV-1-4           2-XS-1-4A           D MS!V Loop 1, Train B, 2-FCV-1-4           2-XS-1-48           D Standard: The Examinee places 2-XS-1-4A & 2-XS-1-48 and to AUX.
APE 068 AA1 .03 (4.1/4.3)
Comment
Method of Testing: Simulated Performance:
 
x Actual Performance:
1503 NRC PLANT JPM I Page 7 of 10 4.4 Unit 2 MSIV Isolation STEP    8                                                                                              SAT
Evaluation Method: Simulator In-Plant x Classroom
: 1. PLACE affected MSIV transfer control switch in AUX position:
------Main Control Room Mock-up Performer:
[Auxiliary Control Room, Panels 2-L-11A and 2-L-11B]                             UNSAT AUX TRANSFER      AUX POSITION S/G                 EQUIPMENT SWITCH             '1 MSIV Loop 2, Train A, 2-FCV-1-11         2-XS-1-11A           D 2
Trainee Name Evaluator:
MSIV Loop 2, Train B. 2-FCV-1-11         2-XS-1-118           D 3
I Name I Signature DATE Performance Rating: SAT: UNSAT: Validation Time: 12 min Total Time: Performance Time: Start Time: Finish Time: COMMENTS SPECIAL INSTRUCTIONS TO EVALUATOR:  
MSIV Loop 3, Train A, 2-FCV-1-22         2-XS-1-22A           D MSIV Loop 3, Train B, 2-FCV-1-22         2-XS-1-228           D 4
: 1. Critical steps are identified in step SAT/UNSAT column by bold print 'Critical Step.' 2. Any UNSAT requires comments.
MSIV Loop 4. Train A, 2-FCV-1-29         2-XS-1-29A           D MSIV Loop 4, Train B. 2-FCV-1-29         2-XS-1-298           D Comment
Tools/Equipment/Procedures Needed: References*
: 2. CONSULT UO to determine if affected MSIV closed.                     D STEP    9                                                                                        - - SAT
Reference Title 1. AOP-C.04 SHUTDOWN FROM AUXILIARY CONTROL ROOM PLANT JPM J Page 3 of 8 Rev No. 35 ====================================================================================
                                                                                                  - - UNSAT Standard: The Examinee contacts the MCR to determine status of MSIV's.                           CRITICAL Cue    When asked provide the following cue, "The MSIV for Loop 1 is OPEN The MSIV's for Loop 2, 3 and 4 are CLOSED."
READ TO EXAMINEE HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME! DIRECTIONS TO OPERATOR:
Comment
I will explain the initial conditions, and state the task to be performed.
 
All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.
1503 NRC PLANT JPM I Page 8 of 10 NOTE1                     Fuse pullers and flashlight will be needed for next step.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
These may be obtained from AOP-C.04 cabinet in 6.9KV Shutdown Board Room A.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:  
NOTE2                     Fuses may be removed in any order.
: 1. Unit 2 is in MODE 3. 2. Unit 2 TD AFW Loop 4 LCV (2-LCV-175) is OPEN. 3. AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM is in progress.  
: 3. IF affected MSIV still open STEP  10        OR control power fuse removal desired,                                           SAT THEN REMOVE fuses for affected MS!V{s):                                               UNSAT FUSES FUSE LOCATION SIG              EQUIPMENT                                           REMOVED (Two per circuit) v' 125V Vital Battery Bd !II MSIV Loop 1, Train A, 2-FCV-1-4     Circuit A-46                  0 1                                        Circuit B-46                  0 125V Vital Battery Bd IV MSIV Loop 1, Train 8, 2-FCV-1-4     Circuit A-46                 0 Circuit B-46                 0 Cue  If asked provide the following cue, "Loop 1 MSIV is CLOSED. Steam generator #1 pressure is 450 psig and stable."
: 4. APPENDIX W.2 CONTROL OF UNIT 2 TURBINE DRIVEN AFW FLOW FROM OUTSIDE MCR has been completed through step 5. INITIATING CUES: 1. You have been directed to locally shut Unit 2 TD AFW Loop 4 LCV (2-LCV-175) using APPENDIX W.2 CONTROL OF UNIT 2 TURBINE DRIVEN AFW FLOW FROM OUTSIDE MCR starting at step 6. 2. Inform the SRO when complete.
Comment
STEP 1 Obtain a copy of AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM. Standard:
 
Operator obtains a copy of AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM. Cue Provide a copy of AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM Appendix W.2. Comment STEP 2 6. IF necessary to locally control TD AFW flow to Unit 2 SIG #1. THEN PERFORM the following:  
1503 NRC PLANT JPM I Page 9 of 10 STEP   11                                                                       SAT
[Aux Bldg el 714 Unit 2 Pen Rm at emergency control station for 2-LCV-3-174]
: 4. GO TO Section 4.1, step in effect UNSAT END OF SECTION Standard: The Examinee addresses the procedure step.
Standard:
Comment Terminating The JPM is complete when the Examinee returns the cue sheet to STOP Cue:   the Examiner.
The Examinee addresses the procedure step as N/A. Comment STEP 3 7. IF necessary to locally control TD AFW flow to Unit 2 S/G #2 or 3. THEN THROTTLE or CLOSE TD AFW valves as directed:
Stop Time
Standard:
 
The Examinee addresses the procedure step as N/A. Comment PLANT JPM J Page 4 of 8 Start Time SAT --UNSAT --SAT --UNSAT --SAT --UNSAT --
JPM BRIEFING SHEET DIRECTIONS TO OPERATOR:
NOTE1 NOTE2 STEP 4 Comment STEP 5 Comment PLANT JPM J Page 5 of 8 Turbine-Driven AFW level control valves fail in OPEN position on loss of control air. The following step uses air from SBO air bottle to close S/G #4 TDAFW LCV from emergency control station. Approximately 45 psig (on outlet pressure indicator 2-Pl-3-1758) should be applied if necessary to close valve. At minimum SBO air bottle pressure (800 psig), sufficient air supply is available for at least four full strokes (open to closed) of TD AFW LCV. Valve strokes should be minimized to conserve air supply. 8. IF necessary to locally control TD AFW flow to Unit 2 SIG #4, THEN PERFORM the following:  
All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
[Aux Bldg el 714 Unit 2 Pen Rm using emergency control station for 2-LCV-3-175]  
INITIAL CONDITIONS:
: a. CLOSE [2-VTIV-3-175EJ.
: 1. Unit 2 is in MODE 3
Vent Valve. D Provide the following cue, "Valve handle turned 90&deg; CW and is now snug." 8. IF necessary to locally control TD AFW flow to Unit 2 SIG #4. THEN PERFORM the following:  
: 2. Unit 2 has experienced faulted SG's.
[Aux Bldg el 714 Unit 2 Pen Rm using emergency control station for 2-LCV-3-175]  
: 3. Attempts to close MSIV's from the main control room (MCR) have failed.
: b. ENSURE [2-PREG-3-175), Pressure Regulator.
: 4. All MSIV bypass valves are closed.
is adjusted fully counterclockwise (lower direction).
INITIATING CUES:
D Provide the following cue, "Regulator handle turned several turns CCW and is now snug." SAT UNSAT SAT UNSAT 
: 1. The SRO has directed you to attempt to close MSIV's, using EA-1-1.
.STEP 6 Comment STEP 7 Comment 8. IF necessary to locally control TD AFW flow to Unit 2 SIG #4, THEN PERFORM the following:  
: 2. Inform the SRO when complete.
[Aux Bldg el 714 Unit 2 Pen Rm using emergency control station for 2-LCV-3-175]  
Acknowledge to the examiner when you are ready to begin.
: c. OPEN [2-ISIV-32-1866KJ, SBO/App. R HP Air Cy! !sol Valve. Provide the following cue, "Valve handle turned 90&deg; CCW and is now snug." If asked provide the following cue point to 90 psig on pressure indicator 2-Pl-3-1750.  
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
: 8. IF necessary to locally control TD AFW flow to Unit 2 S/G #4. THEN PERFORM the following:  
 
[Aux Bldg el 714 Unit 2 Pen Rm using emergency control station for 2-LCV-3-175]
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1503 NRC PLANT JPMJ
Provide the following cue, "Valve handle turned 90&deg; CCW and is now snug." D PLANT JPM J Page 6 of 8 SAT UNSAT SAT UNSAT STEP 8 8. IF necessary to locally control TD AFW flow to Unit 2 SIG #4, THEN PERFORM the following:  
 
[Aux Bldg el 714 Unit 2 Pen Rm using emergency control station for 2-LCV-3-175}
PLANT JPM J Page 2 of 8 RO/SRO JOB PERFORMANCE MEASURE Task:             Take Local Control of the Turbine Driven AFW Level Control valve 2-LCV-3-175.
Cue Provide the following cue, "Valve handle turned 90&deg; CCW." Comment STEP 9 Comment Terminating Cue: 8. IF necessary to locally control TD AFW flow to Unit 2 S/G #4, THEN PERFORM the following:  
Task#:             0000140504 Task Standard:     The Examinee simulates assuming local control of 2-LCV-3-175.
[Aux Bldg el 714 Unit 2 Pen Rm using emergency control station for 2-LCV-3-175]  
Alternate Path:           YES:             NO:         x Time Critical Task:       YES: ---
: f. ADJUST [2-PREG-3-1751.
NO:         x KIA Reference/Ratings:     APE 068 AA1 .03 (4.1/4.3)
Pressure Regulator.
Method of Testing:
slowly in clockwise direction to close 2-LCV-3-175 as directed by ACR D If asked as to where to place 2-LCV-3-175, direct the Examinee to refer to the initiating cue. After the Examinee simulates adjusting  
Simulated Performance:         x         Actual Performance:
[2-PREG-3-175], Pressure Regulator, in full clockwise direction point approximately to 45 psig on outlet pressure indicator 2-Pl-3-1758.
Evaluation Method:
Provide the following cue "Another operator will perform the remaining steps of this procedure." PLANT JPM J Page 7 of 8 SAT UNSAT SAT UNSAT STOP Stop Time JPM BRIEFING SHEET DIRECTIONS TO OPERATOR:
Simulator     ---
All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed.
In-Plant  ---
When you complete the task successfully, the objective for this job performance measure will be satisfied.
x      Classroom Main Control Room                             Mock-up Performer:
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:  
Trainee Name Evaluator:                                     I Name I Signature                               DATE Performance Rating:   SAT:                 UNSAT:
: 1. Unit 2 is in MODE 3. 2. Unit 2 TD AFW Loop 4 LCV (2-LCV-175) is OPEN. 3. AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM is in progress.  
Validation Time:           12 min                         Total Time:
: 4. APPENDIX W.2 CONTROL OF UNIT 2 TURBINE DRIVEN AFW FLOW FROM OUTSIDE MCR has been completed through step 5. INITIATING CUES: 1. You have been directed to locally shut Unit 2 TD AFW Loop 4 LCV (2-LCV-175) using APPENDIX W.2 CONTROL OF UNIT 2 TURBINE DRIVEN AFW FLOW FROM OUTSIDE MCR starting at step 6. 2. Inform the SRO when complete.
Performance Time:         Start Time:                   Finish Time:
Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
COMMENTS
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1503 NRC PLANT JPMK RO/SRO JOB PERFORMANCE MEASURE PLANT JPM K Page 2 of 14 Task: Radiation Monitor O-RE-90-122 Flushing After Hi Radiation Signal Isolation of Release. Task#: 0690100104 Task Standard:
 
The examinee completes flushing of O-RE-90-122 after isolation due to high radiation.
PLANT JPM J Page 3 of 8 SPECIAL INSTRUCTIONS TO EVALUATOR:
Alternate Path: YES: x NO: ---Time Critical Task: YES: NO: x ---KIA Reference/Ratings:
: 1. Critical steps are identified in step SAT/UNSAT column by bold print 'Critical Step.'
073 K4.02 (3.3/3.9)
: 2. Any UNSAT requires comments.
Method of Testing: Simulated Performance:
Tools/Equipment/Procedures Needed:
Actual Performance:
References*
x Evaluation Method: Simulator In-Plant x Classroom Main Control Room Mock-up Performer:
Reference                                       Title                       Rev No.
Trainee Name Evaluator:
: 1.     AOP-C.04                             SHUTDOWN FROM AUXILIARY CONTROL                     35 ROOM
I Name I Signature DATE Performance Rating: SAT: UNSAT: Validation Time: 20 min Total Time: Performance Time: Start Time: Finish Time: COMMENTS SPECIAL INSTRUCTIONS TO EVALUATOR:  
====================================================================================
: 1. Critical steps are identified in step SAT/UNSAT column by bold print 'Critical Step.' 2. Any UNSAT requires comments.
READ TO EXAMINEE HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
Tools/Equipment/Procedures Needed:  
DIRECTIONS TO OPERATOR:
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
: 1. Unit 2 is in MODE 3.
: 2. Unit 2 TD AFW Loop 4 LCV (2-LCV-175) is OPEN.
: 3. AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM is in progress.
: 4. APPENDIX W.2 CONTROL OF UNIT 2 TURBINE DRIVEN AFW FLOW FROM OUTSIDE MCR has been completed through step 5.
INITIATING CUES:
: 1. You have been directed to locally shut Unit 2 TD AFW Loop 4 LCV (2-LCV-175) using APPENDIX W.2 CONTROL OF UNIT 2 TURBINE DRIVEN AFW FLOW FROM OUTSIDE MCR starting at step 6.
: 2. Inform the SRO when complete.
 
PLANT JPM J Page 4 of 8 Start Time STEP     1                                                                                     --
SAT Obtain a copy of AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM.                                                                       --
UNSAT Standard: Operator obtains a copy of AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM.
Cue   Provide a copy of AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM Appendix W.2.
Comment
: 6. IF necessary to locally control TD AFW flow to Unit 2 SIG #1.
STEP    2      THEN                                                                           - - SAT PERFORM the following: [Aux Bldg el 714 Unit 2 Pen Rm
                                                                                                - - UNSAT at emergency control station for 2-LCV-3-174]
Standard: The Examinee addresses the procedure step as N/A.
Comment
: 7. IF necessary to locally control TD AFW flow to Unit 2 S/G #2 or 3.
STEP    3        THEN                                                                         - - SAT THROTTLE or CLOSE TD AFW valves as directed:
                                                                                                - - UNSAT Standard: The Examinee addresses the procedure step as N/A.
Comment
 
PLANT JPM J Page 5 of 8 NOTE1        Turbine-Driven AFW level control valves fail in OPEN position on loss of control air. The following step uses air from SBO air bottle to close S/G #4 TDAFW LCV from emergency control station. Approximately 45 psig (on outlet pressure indicator 2-Pl-3-1758) should be applied if necessary to close valve.
NOTE2        At minimum SBO air bottle pressure (800 psig), sufficient air supply is available for at least four full strokes (open to closed) of TD AFW LCV. Valve strokes should be minimized to conserve air supply.
: 8. IF necessary to locally control TD AFW flow to Unit 2 SIG #4, STEP  4        THEN                                                                   SAT PERFORM the following: [Aux Bldg el 714 Unit 2 Pen Rm using emergency control station for 2-LCV-3-175]                       UNSAT
: a. CLOSE [2-VTIV-3-175EJ. Vent Valve.                         D Provide the following cue, "Valve handle turned 90&deg; CW and is now snug."
Comment
: 8. IF necessary to locally control TD AFW flow to Unit 2 SIG #4.
STEP  5        THEN                                                                   SAT PERFORM the following: [Aux Bldg el 714 Unit 2 Pen Rm using emergency control station for 2-LCV-3-175]                       UNSAT
: b. ENSURE [2-PREG-3-175), Pressure Regulator. is adjusted fully counterclockwise (lower direction).                 D Provide the following cue, "Regulator handle turned several turns CCW and is now snug."
Comment
 
PLANT JPM J Page 6 of 8
: 8. IF necessary to locally control TD AFW flow to Unit 2 SIG #4,
.STEP  6        THEN                                                                 SAT PERFORM the following: [Aux Bldg el 714 Unit 2 Pen Rm using emergency control station for 2-LCV-3-175]                     UNSAT
: c. OPEN [2-ISIV-32-1866KJ, SBO/App. R HP Air Cy! !sol Valve. D Provide the following cue, "Valve handle turned 90&deg; CCW and is now snug."
If asked provide the following cue point to 90 psig on pressure indicator 2-Pl-3-1750.
Comment
: 8. IF necessary to locally control TD AFW flow to Unit 2 S/G #4.
STEP  7        THEN                                                                 SAT PERFORM the following: [Aux Bldg el 714 Unit 2 Pen Rm using emergency control station for 2-LCV-3-175]                     UNSAT Provide the following cue, "Valve handle turned 90&deg; CCW and is now snug."
Comment
 
PLANT JPM J Page 7 of 8
: 8. IF necessary to locally control TD AFW flow to Unit 2 SIG #4, STEP    8        THEN                                                                             SAT PERFORM the following: [Aux Bldg el 714 Unit 2 Pen Rm using emergency control station for 2-LCV-3-175}                                 UNSAT Cue     Provide the following cue, "Valve handle turned 90&deg; CCW."
Comment
: 8. IF necessary to locally control TD AFW flow to Unit 2 S/G #4, STEP    9        THEN                                                                             SAT PERFORM the following: [Aux Bldg el 714 Unit 2 Pen Rm using emergency control station for 2-LCV-3-175]                                 UNSAT
: f. ADJUST [2-PREG-3-1751. Pressure Regulator. slowly in clockwise direction to close 2-LCV-3-175 as directed by ACR                 D If asked as to where to place 2-LCV-3-175, direct the Examinee to refer to the initiating cue.
After the Examinee simulates adjusting [2-PREG-3-175], Pressure Regulator, in full clockwise direction point approximately to 45 psig on outlet pressure indicator 2-Pl-3-1758.
Comment Terminating Provide the following cue "Another operator will perform the Cue:                                                                                        STOP remaining steps of this procedure."
Stop Time
 
JPM BRIEFING SHEET DIRECTIONS TO OPERATOR:
All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
: 1. Unit 2 is in MODE 3.
: 2. Unit 2 TD AFW Loop 4 LCV (2-LCV-175) is OPEN.
: 3. AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM is in progress.
: 4. APPENDIX W.2 CONTROL OF UNIT 2 TURBINE DRIVEN AFW FLOW FROM OUTSIDE MCR has been completed through step 5.
INITIATING CUES:
: 1. You have been directed to locally shut Unit 2 TD AFW Loop 4 LCV (2-LCV-175) using APPENDIX W.2 CONTROL OF UNIT 2 TURBINE DRIVEN AFW FLOW FROM OUTSIDE MCR starting at step 6.
: 2. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
 
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1503 NRC PLANT JPMK
 
PLANT JPM K Page 2 of 14 RO/SRO JOB PERFORMANCE MEASURE Task:             Radiation Monitor O-RE-90-122 Flushing After Hi Radiation Signal Isolation of Release.
Task#:             0690100104 Task Standard:             The examinee completes flushing of O-RE-90-122 after isolation due to high radiation.
Alternate Path:           YES: - -  x - NO:
Time Critical Task:       YES: - - - NO:                 x KIA Reference/Ratings:     073 K4.02 (3.3/3.9)
Method of Testing:
Simulated Performance:                     Actual Performance:         x Evaluation Method:
Simulator               In-Plant       x       Classroom Main Control Room                               Mock-up Performer:
Trainee Name Evaluator:                                       I Name I Signature                                       DATE Performance Rating:   SAT:                   UNSAT:
Validation Time:           20 min                           Total Time:
Performance Time:         Start Time:                     Finish Time:
COMMENTS
 
PLANT JPM K Page 3 of 14 SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Critical steps are identified in step SAT/UNSAT column by bold print 'Critical Step.'
: 2. Any UNSAT requires comments.
Tools/Equipment/Procedures Needed:


==References:==
==References:==


Reference Title O-S0-77-1 Waste Disposal System PLANT JPM K Page 3 of 14 Rev No. 53 ====================================================================================
Reference                                       Title                       Rev No.
O-S0-77-1                             Waste Disposal System                               53
====================================================================================
READ TO EXAMINEE DIRECTIONS TO EXAMINEE:
READ TO EXAMINEE DIRECTIONS TO EXAMINEE:
I will explain the initial conditions, and state the task to be performed.
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.
All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME!
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME! INITIAL CONDITIONS:  
INITIAL CONDITIONS:
: 1. A release from the CDCT has just been initiated using O-S0-77-1, Waste Disposal System and Sl-CEM-077-400.1 Liquid Waste Effluent Batch Release. 2. The calculated high radiation trip setpoint for O-RM-90-122 is 8.59 E+04 cpm, using O-Sl-CEM-077-400.1, Liquid Waste Effluent Batch Release. 3. A high radiation signal on O-RE-90-122 occurred shortly after initiation of the release, causing an isolation of the release. 4. O-RCV-77-43 has been verified CLOSED. 5. All Prerequisite Actions are complete (Section 4.0) INITIATING CUES: 1. You have been directed to perform Section 8.2 of O-S0-77-1, Waste Disposal System to flush RE-90-122 after the High Radiation Isolation.  
: 1. A release from the CDCT has just been initiated using O-S0-77-1, Waste Disposal System and O-Sl-CEM-077-400.1 Liquid Waste Effluent Batch Release.
: 2. The calculated high radiation trip setpoint for O-RM-90-122 is 8.59 E+04 cpm, using O-Sl-CEM-077-400.1, Liquid Waste Effluent Batch Release.
: 3. A high radiation signal on O-RE-90-122 occurred shortly after initiation of the release, causing an isolation of the release.
: 4. O-RCV-77-43 has been verified CLOSED.
: 5. All Prerequisite Actions are complete (Section 4.0)
INITIATING CUES:
: 1. You have been directed to perform Section 8.2 of O-S0-77-1, Waste Disposal System to flush O-RE-90-122 after the High Radiation Isolation.
: 2. Inform the SRO when complete.
: 2. Inform the SRO when complete.
STEP 1 Standard:
 
Cue Comment STEP 2 Standard:
PLANT JPM K Page 4 of 14 Start Time STEP    1                                                                              - - SAT Obtain a copy of O-S0-77-1, Waste Disposal System UNSAT Standard: Operator obtains a copy of O-S0-77-1, Waste Disposal System Provide an in progress copy of O-S0-77-1, Waste Disposal System, Cue    section 8.2 Radiation Monitor O-RE-90-122 Flushing After Hi Radiation Signal Isolation of Release.
Cue Comment PLANT JPM K Page 4 of 14 Start Time SAT --Obtain a copy of O-S0-77-1, Waste Disposal System UNSAT --Operator obtains a copy of O-S0-77-1, Waste Disposal System Provide an in progress copy of O-S0-77-1, Waste Disposal System, section 8.2 Radiation Monitor O-RE-90-122 Flushing After Hi Radiation Signal Isolation of Release. SAT --[1] ENSURE [0-RCV-77-43]
Comment STEP    2                                                                              - - SAT
Radiation Control Valve is CLOSED. UNSAT --The Examinee refers to the procedure step. If asked, tell the Examinee to refer to the initial conditions.
[1]   ENSURE [0-RCV-77-43] Radiation Control Valve is CLOSED.
I STEP 3 Standard:
                                                                                        - - UNSAT Standard: The Examinee refers to the procedure step.
Cue Comment STEP 4 Comment [2] ENSURE [0-77-689AJ Radiation Monitor Inlet Isolation Valve is OPEN. Examinee simulates ensuring [0-77-689A]
Cue    If asked, tell the Examinee to refer to the initial conditions.
Radiation Monitor Inlet Isolation Valve is OPEN. If asked provide the following cue, "valve HW turned in the CW direction slightly and then returned fully CCW valve to original position." [3] OPEN [0-77-68981 Discharge to FDCT Isolation Valve. If asked provide the following cue, "valve HW turned in the CCW direction several turns and is now snug." PLANT JPM K Page 5 of 14 SAT --UNSAT --SAT UNSAT STEP 5 Standard:
Comment
Comment STEP 6 Standard:
 
Cue Comment [4] CLOSE [0-77-689C]
PLANT JPM K Page 5 of 14 I STEP     3                                                                             - - SAT
Radiation Monitor Return to Release Header Isolation Valve. Examinee simulates closing [0-77-689C]
[2]   ENSURE [0-77-689AJ Radiation Monitor Inlet Isolation Valve is OPEN.
Radiation Monitor Return to Release Header Isolation Valve. [5] VERIFY [0-RE-90-122]
                                                                                        - - UNSAT Standard: Examinee simulates ensuring [0-77-689A] Radiation Monitor Inlet Isolation Valve is OPEN.
radiation monitor pump is running. Examinee simulates ensuring [O-RE-90-122]
If asked provide the following cue, "valve HW turned in the CW Cue    direction slightly and then returned fully CCW valve to original position."
radiation monitor pump is running. If asked provide the following cue," Red light above O-HS-90-1228 is ON." PLANT JPM K Page 6 of 14 SAT UNSAT SAT --UNSAT --
Comment STEP    4                                                                                  SAT
I STEP 7 Standard:
[3]   OPEN [0-77-68981 Discharge to FDCT Isolation Valve.
Cue Comment STEP 8 Comment [6] ALLOW [0-RE-90-1221 Radiation Monitor to flush to FDCT for 5 minutes. Examinee addresses the procedure step. Provide the following cue, "Time has been compressed, five minutes has passed." [7J OPEN f0-77-689C].
UNSAT If asked provide the following cue, "valve HW turned in the CCW direction several turns and is now snug."
If asked provide the following cue, "valve HW turned in the CCW direction several turns and is now snug." PLANT JPM K Page 7 of 14 SAT --UNSAT --SAT UNSAT STEP 9 Comment STEP 10 Standard:
Comment
Cue Comment [8] CLOSE [0-77-689BJ.
 
If asked provide the following cue, "valve HW turned in the CW direction several turns and is now snug." [9] RECORD O-RE-90-122 reading: O-RE-90-122 Reading cpm. Examinee records O-RE-90-122 reading. Provide the following cue "O-RE-90-122 is reading 9.00 E+04 cpm" PLANT JPM K Page 8 of 14 SAT UNSAT SAT --UNSAT --
PLANT JPM K Page 6 of 14 STEP     5                                                                             SAT
I STEP 11 . Standard:
[4] CLOSE [0-77-689C] Radiation Monitor Return to Release Header Isolation Valve.
Comment STEP 12 Comment [1 OJ IF the reading obtained in step 8.2[9] is below the trip setpoint, THEN The Examinee addresses the procedure step as N/A. [11] IF the reading obtained in step 8.2[9] is still above the trip setpoint, THEN PERFORM the following steps to lmver the radiation monitor reading: [11.1] CLOSE applicable tank isolation valve from release header (NIA tanks not aligned):
UNSAT Standard: Examinee simulates closing [0-77-689C] Radiation Monitor Return to Release Header Isolation Valve.
Tank Being Released Isolation Valve INITIALS Cask Decon Collector Tank 0-77-679 Monitor Tank 0-77-1306 If asked provide the following cue, "valve HW turned in the CW direction several turns and is now snug." PLANT JPM K Page 9 of 14 SAT --UNSAT --SAT UNSAT STEP 13 Comment STEP 14 Comment [11.2] OPEN [0-VLV-59-735]
Comment STEP    6                                                                        - - SAT
Demin Flush To Radwaste !SOL If asked provide the following cue, "valve HW turned in the CCW direction several turns and is now snug." [11.3] OPEN [0-77-68981 Discharge to FDCT Isolation Valve. If asked provide the following cue, "valve HW turned in the CCW direction several turns and is now snug." PLANT JPM K Page 10 of 14 SAT UNSAT SAT UNSAT STEP 15 Comment STEP 16 Cue Comment [11.4] CLOSE [0*77 -689CJ Radiation Monitor Return to Release Header Isolation Valve. If asked provide the following cue, "valve HW turned in the CW direction several turns and is now snug." [11.5] WHEN count rate on fO-RE-90-1221 lowers to its minimum value, THEN [11.5.1] OPEN f0-77-689CJ Radiation Monitor Return to Release Header Isolation Valve. Provide the following cue, "Count rate on O-RE-90-122 has lowered to 8.0 E+02 cpm and is stable." If asked provide the following cue, "valve HW turned in the CCW direction several turns and is now snug." PLANT JPM K Page 11 of 14 SAT UNSAT SAT UNSAT STEP 17 Comment STEP 18 Cue Comment (11.5] WHEN count rate on [O-RE-90-122]
[5] VERIFY [0-RE-90-122] radiation monitor pump is running.
lowers to its minimum value, THEN [11.5.2] CLOSE [0-77-68981 Discharge to FDCT Isolation Valve. If asked provide the following cue, "valve HW turned in the CW direction several turns and is now snug." [11.6] CLOSE [O-VLV-59-735)
                                                                                  - - UNSAT Standard: Examinee simulates ensuring [O-RE-90-122] radiation monitor pump is running.
Demin Flush To Radwaste !sol. If asked provide the following cue, "valve HW turned in the CW direction several turns and is now snug." PLANT JPM K Page 12 of 14 SAT UNSAT SAT UNSAT STEP 19 Comment STEP 20 Standard:
Cue    If asked provide the following cue," Red light above O-HS-90-1228 is ON."
Comment Terminating Cue: [11.7] OPEN applicable tank isolation valve previously closed in step 8.2[11.1] (NIA tanks not aligned):
Comment
Tank Being Released Isolation Valve INITIALS Cask Decon Collector Tank 0-77-679 Monitor Tank 0-77-1306 If asked provide the following cue, "valve HW turned in the CCW direction several turns and is now snug." [11.8] IF hi radiation alarm will NOT clear, THEN NOTIFY the appropriate US/SRO that alarm will NOT clear. The Examinee addresses the procedure step as N/A. Provide the following cue "Another operator will perform the remaining steps of this procedure." PLANT JPM K Page 13 of 14 SAT UNSAT SAT --UNSAT --STOP Stop Time JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:
 
I will explain the initial conditions, and state the task to be performed.
PLANT JPM K Page 7 of 14 I
All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.
STEP    7                                                                  - - SAT
When you complete the task successfully, the objective for this job performance measure will be satisfied.
[6] ALLOW [0-RE-90-1221 Radiation Monitor to flush to FDCT for 5 minutes.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:  
                                                                              - - UNSAT Standard: Examinee addresses the procedure step.
: 1. A release from the CDCT has just been initiated using O-S0-77-1 Waste Disposal System and Sl-CEM-077-400.1 Liquid Waste Effluent Batch Release. 2. The calculated high radiation trip setpoint for O-RM-90-122 is 8.59 E+04 cpm, using O-Sl-CEM-077-400.1, Liquid Waste Effluent Batch Release. 3. A high radiation signal on O-RE-90-122 occurred shortly after initiation of the release, causing an isolation of the release. 4. O-RCV-77-43 has been verified CLOSED. 5. All Prerequisite Actions are complete (Section 4.0) INITIATING CUES: 3. You have been directed to perform Section 8.2 of O-S0-77-1, Waste Disposal System to flush RE-90-122 after the High Radiation Isolation.  
Cue    Provide the following cue, "Time has been compressed, five minutes has passed."
Comment STEP    8                                                                        SAT
[7J   OPEN f0-77-689C].
UNSAT If asked provide the following cue, "valve HW turned in the CCW direction several turns and is now snug."
Comment
 
PLANT JPM K Page 8 of 14 STEP     9                                                                         SAT
[8]   CLOSE [0-77-689BJ.
UNSAT If asked provide the following cue, "valve HW turned in the CW direction several turns and is now snug."
Comment STEP    10  [9]   RECORD O-RE-90-122 reading:                               - - SAT
                                                                              - - UNSAT O-RE-90-122 Reading           cpm.
Standard: Examinee records O-RE-90-122 reading.
Cue    Provide the following cue "O-RE-90-122 is reading 9.00 E+04 cpm" Comment
 
PLANT JPM K Page 9 of 14 I
STEP    11                                                                                        - - SAT
[1 OJ   IF the reading obtained in step 8.2[9] is below the trip setpoint,
      .                THEN
                                                                                                    - - UNSAT Standard: The Examinee addresses the procedure step as N/A.
Comment STEP    12  [11]     IF the reading obtained in step 8.2[9] is still above the trip SAT setpoint, THEN UNSAT PERFORM the following steps to lmver the radiation monitor reading:
[11.1]     CLOSE applicable tank isolation valve from release header (NIA tanks not aligned):
Tank Being Released                 Isolation Valve           INITIALS Cask Decon Collector Tank                   0-77-679 Monitor Tank                       0-77-1306 If asked provide the following cue, "valve HW turned in the CW direction several turns and is now snug."
Comment
 
PLANT JPM K Page 10 of 14 STEP 13                                                                       SAT
[11.2] OPEN [0-VLV-59-735] Demin Flush To Radwaste !SOL UNSAT If asked provide the following cue, "valve HW turned in the CCW direction several turns and is now snug."
Comment STEP  14                                                                        SAT
[11.3] OPEN [0-77-68981 Discharge to FDCT Isolation Valve.
UNSAT If asked provide the following cue, "valve HW turned in the CCW direction several turns and is now snug."
Comment
 
PLANT JPM K Page 11 of 14 STEP   15                                                                         SAT
[11.4]   CLOSE [0*77 -689CJ Radiation Monitor Return to Release Header Isolation Valve.                             UNSAT If asked provide the following cue, "valve HW turned in the CW direction several turns and is now snug."
Comment
[11.5]   WHEN count rate on fO-RE-90-1221 STEP  16            lowers to its minimum value, THEN SAT
[11.5.1] OPEN f0-77-689CJ Radiation Monitor Return to           UNSAT Release Header Isolation Valve.
Cue  Provide the following cue, "Count rate on O-RE-90-122 has lowered to 8.0 E+02 cpm and is stable."
If asked provide the following cue, "valve HW turned in the CCW direction several turns and is now snug."
Comment
 
PLANT JPM K Page 12 of 14 STEP   17   (11.5]   WHEN count rate on [O-RE-90-122]                         SAT lowers to its minimum value, THEN
[11.5.2] CLOSE [0-77-68981 Discharge to FDCT Isolation         UNSAT Valve.
If asked provide the following cue, "valve HW turned in the CW direction several turns and is now snug."
Comment STEP  18                                                                      SAT
[11.6]   CLOSE [O-VLV-59-735) Demin Flush To Radwaste !sol.
UNSAT Cue  If asked provide the following cue, "valve HW turned in the CW direction several turns and is now snug."
Comment
 
PLANT JPM K Page 13 of 14
[11.7]   OPEN applicable tank isolation valve previously closed STEP    19                in step 8.2[11.1] (NIA tanks not aligned):                           SAT Tank Being Released           Isolation Valve INITIALS                 UNSAT Cask Decon Collector Tank         0-77-679 Monitor Tank               0-77-1306 If asked provide the following cue, "valve HW turned in the CCW direction several turns and is now snug."
Comment STEP    20    [11.8]   IF hi radiation alarm will NOT clear, THEN
                                                                                          - - SAT NOTIFY the appropriate US/SRO that alarm will NOT clear.                                                             - - UNSAT Standard: The Examinee addresses the procedure step as N/A.
Comment Terminating Provide the following cue "Another operator will perform the STOP Cue:    remaining steps of this procedure."
Stop Time
 
JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
: 1. A release from the CDCT has just been initiated using O-S0-77-1 Waste Disposal System and O-Sl-CEM-077-400.1 Liquid Waste Effluent Batch Release.
: 2. The calculated high radiation trip setpoint for O-RM-90-122 is 8.59 E+04 cpm, using O-Sl-CEM-077-400.1, Liquid Waste Effluent Batch Release.
: 3. A high radiation signal on O-RE-90-122 occurred shortly after initiation of the release, causing an isolation of the release.
: 4. O-RCV-77-43 has been verified CLOSED.
: 5. All Prerequisite Actions are complete (Section 4.0)
INITIATING CUES:
: 3. You have been directed to perform Section 8.2 of O-S0-77-1, Waste Disposal System to flush O-RE-90-122 after the High Radiation Isolation.
: 4. Inform the SRO when complete.
: 4. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.}}
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.}}

Latest revision as of 13:02, 5 February 2020

Initial Exam 2015-301 Draft Sim IN-Plant JPMs
ML15126A423
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/06/2015
From:
NRC/RGN-II
To:
Tennessee Valley Authority
References
Download: ML15126A423 (144)


Text

SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPMA

1503 NRC Sim JPM A Page 2of18 Task: Shutdown Bank Withdrawal Task#: 0010180101 Task Standard: The examinee will close the Reactor Trip Breakers and commence Shutdown Bank withdrawal.

The examinee will Trip the Reactor when continuous rod withdrawal occurs.

Alternate Path: YES: - - X - NO:

Time Critical Task: YES: ---

NO: x KIA Reference/Ratings: 001A2.11 (4.4/4.7)

Method of Testing:

Simulated Performance: Actual Performance: x Evaluation Method:

Simulator ---

x In-Plant - - - - Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: I Name I Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 23 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

1503 NRC Sim JPM A Page 3of18 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 256
3. IF IC #256 is not available then reset to IC#16
  • Hold FW Isolation 'reset pushbuttons' and trip the Reactor. Leave Rods in Manual.
  • Select a SR and IR pen for NR45.
  • Ensure Audio Count rate is audible.
  • Clear and unblock HI Flux at Shutdown alarm.
  • Clear 1st out.
  • Insert overrides to cause either SD bank A to withdraw continuously when Rods Out Light comes on.
  • {zdiflrm1 [1]} IOR ZDIFLRM1 f:1 (overrides In-Hold-Out switch to OUT)
  • {zdiflrm1 [1]} IOR ZDIRBSS1 f:6 (overrides Bank Select Switch to SOB A)
  • IOR AN_OV_325 f:1 (fails annunciator as is for Computer Alarm Rod Dev.)
4. JPM Steps 7 through 10 will require a simulator operator.
5. PLACE SIMULATOR IN RUN
6. An extra operator will be required to acknowledge alarms.
7. ACKNOWLEDGE ALARMS
8. FREEZE SIMULATOR
9. Save as a temporary IC, if repeat runs of JPM will be desired.
10. PLACE SIMULATOR IN RUN
11. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
12. Tools/Equipment/Procedures Needed:

Marked up copy of O-S0-85-1, Control Rod Drive System, section 5.5 (marked through Step 10) and 6.3 Tl-28 Attachment 6

References:

Reference . Title Rev No.

1. O-S0-85-1 Control Rod Drive System 42
========================================================================

1503 NRC Sim JPM A Page 4of18 DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3 with Tavg at 547F and RCS pressure at 2235 psig.
2. Both M-G sets are in service.
3. All Precautions and Prerequisites of O-S0-85-1, Control Rod Drive System have been met. (Sections 3.0 and 4.0 are complete).
4. O-S0-85-1 Control Rod Drive System Section 5.5 is complete through Step 9.

INITIATING CUES:

1. You will close the "Reactor Trip" breakers and withdraw the Shutdown Banks using O-S0-85-1, Control Rod Drive System Section 5.5, beginning with step 10.
2. Inform the SM when the shutdown banks have been withdrawn.

1503 NRC Sim JPM A Page 5of18 Start Time STEP 1 --

SAT Obtain a copy of O-S0-85-1, Control Rod Drive System section 5.5 (and then section 6.3)

- - UNSAT Examinee obtains a copy of O-S0-85-1, Control Rod Drive System section Standard:

5.5.

Provide a marked up copy of O-S0-85-1, Control Rod Drive System section Cue:

5.5 (and then section 6.3).

Examiner Initiating conditions cover several steps in section 5.5 prior to step 10.

Note: These steps are not addressed in the JPM.

Comment

["IO] [CTS] IF unit is in Mode 3,THEN STEP 2 ENSURE requirements of Tech Spec 3.4:1.2 are met -- SAT

[ffS] IF unit is in Mode 3,THEN UNSAT ENSURE requirements of Tech Spec 3.4_5 are met Standard: Examinee ensures TS 3.4.1.2 requirements are met.

Cue: Provide the following cue: "The SRO has verified requirements are met."

Comment

1503 NRG Sim JPM A Page 6 of 18 STEP 3 SAT (nJ DEPRESS and HOLD FW !sol Reset pushbuttons [HS-3-99A] -

and [HS-3-99BJ[C.1]

UNSAT Standard: Examinee verifies both HS-3-99A and B, FW Isolation A & B Train Reset pushbuttons, are being held in the IN Reset position.

Examiner Have the simulator operator play role as CRO and depress both A& B FW Note Isolation Reset pushbuttons.

Comment STEP 4 ["i2] IF resetting Unit 1 Reactor Trip Breakers, THEN SAT CLOSE Rx Trip Breakers by placing [1-HS-99-7], in CLOSE position_ UNSAT Comment STEP 5 [B] IF resetting Unit 2 Reactor Trip Breakers, THEN - - SAT CLOSE Rx Trip Breakers by placing [2-HS-99-7], in CLOSE position. - - UNSAT Standard: Examinee determines step is N/A.

Comment

1503 NRC Sim JPM A Page 7of18

[14] VERIFY Reactor Trip Breakers CLOSED by RED indicating STEP 6 lights on M-4: - - SAT BREAKER RED LIGHT INITIALS - - UNSAT POSITION INDICATION RTA ON RTB ON Examinee verifies Red indicating lights come on and green lights go off Standard:

on Reactor Trip Breaker indicating lights on panel M 4.

Comment STEP 7 - - SAT

['15] RELEASE FY.l lsol Reset pushbuttons [HS-3-99A] and

[HS-3-998].[C.1]

- - UNSAT Standard: Examinee directs additional operator to release pushbuttons Comment STEP 8 - - SAT

["16] NOTIFY !Ms to periom1 *1,2-Pl-IFT-099-0P4.0, Verification of P4 Contacts.

- - UNSAT Examinee notifies IMs to perform 1,2-Pl-IFT-099-0P4.0, Verification ofP4 Standard:

Contacts.

Provide the following cue: "The SRO will notify the IMs to perform this Cue:

Pl."

Comment I

1503 NRC Sim JPM A Page 8of18 STEP 9 ['17] IF Shutdown or Control Rods will be withdrawn and both MG Sets are NOT in operation but are available, THEN - - SAT PERFORM one of the follo'Wing AND RETURN to this Section (Mark selection NOT made NIA): - - UNSAT

['17.'I} GO TO Section 6.1, Placing MG Set A In Service With MG Set B Operating D OR

['17-2] GO TO Section 6-2, Placing MG Set B In Service With MG Set A Operating D Standard: Examinee determines both steps are N/A Comment STEP 10 [18) IF Shutdown or Control Rods 'Will be withdrawn, THEN

- - SAT GO TO Sedion 6.3, Manual Operation of Rod Control System Below -15 Percent Power.

- - UNSAT End of Se~tion 5.5 Standard: Examinee determines Section 6.3 is applicable.

Comment STEP 11 - - SAT Obtain a copy of O-S0-85-1, Control Rod Drive System section 6.3

- - UNSAT Standard: Examinee obtains a copy of O-S0-85-1, Control Rod Drive System section 6.3.*

Cue: Provide a copy of O-S0-85-1, Control Rod Drive System section 6.3.

1503 NRC Sim JPM A Page 9of18 CAUTIONS

1) (CTS] TR 3.1.3.3 [ITSJ TRM 8.1.3 requires group demand position indicator capable of determining within +/-2 steps, the demand position for each rod not fully inserted. In Modes 3, 4, or 5 and greater than +/-2 steps deviation refer to AOP-C.01.
2) If reactor trip breakers are CLOSED and an RCS cooldown of greater than 50°F is planned, the shutdown and control banks should be withdrawn at least 5 steps each. This will limit the possibility of "thennal lock-up" of the rods. Thermal lock-up is NOT a concern during unit heatup.

NOTE When RCS temperatures are greater than 350"'F, continuous rod motion shall comply with these restrictions:

CROM OUTLET ROD MOTION LIMITS TEMPERATURE

s;190"F *10 minutes ON 20 minutes OFF
QOO"F 6 minutes ON 24 minutes OFF STEP 12 - - SAT

[1] ENSURE Section 5_5, Reset/Close Reactor Trip Breakers has been completed_ D

- - UNSAT Standard: Examinee determines Section 5.5 is complete.

Comment STEP 13 {2] IF the shutdown and control rods were withdrmvn 5 steps to - - SAT prevent them1al lockup during an RCS cooldown, THEN ENSURE rods are fully inserted prior to withdrawaL - - UNSAT Standard: Examinee determines step is N/A.

Comment I

1503 NRC Sim JPM A Page 10of18 STEP 14 [3] IF RCS temperatures are greater than 350"F,

- - SAT THEN ENSURE CROM cooling fans are aligned and in service in accordance wfth O-S0-30-6. - - UNSAT Standard: Examinee ensures that CROM cooling fans are aligned and in service per O-S0-30-6 Cue: Provide the following cue: "CROM cooling fans are aligned and in service per 0-50-30-6" Comment CAUTION ROD CONTROL STARTUP STEP COUNTER RESET (SUS on M-4} should never be held in STARTUP position for any extended period of time. Holding this switch in STARTUP position may cause damage to the counters.

NOTE ROD CONTROL STARTUP STEP COUNTER RESET (SUS on M-4) Resets:

A. All GROUP STEP COUNTERS on the Control Board.

B. The master cyder reversible coonter.

C. All slave cycler counters.

D. The bank overlap counter.

E. All internal memory and alarm circuits.

F. All pulse-to-analog converters in the Rod Position Indication System.

STEP 15 [4] MOMENTARILY PLACE [SUS], Rod Control Startup Step SAT Counter Reset to the STARTUP position to reset Control Rod Drive System. UNSAT Comment

1503 NRC Sim JPM A Page 11 of 18 CAUTION Before withdrawing any rod from the fully inserted position, all Group Step Counters and all Rod Position indicators must be at zero steps.

STEP 16 - - SAT

[5J ENSURE all Full Length Rod step counters resetto zero.

- - UNSAT Standard: Examinee verifies rod step counters have reset to zero.

Comment STEP 17 - - SAT

[6] VERIFY rod control IN-OUT direction lights are NOT UT.

- - UNSAT I

Standard: Examinee verifies both IN and OUT lights NOT lit.

Comment STEP 18

- - SAT

[7] DEPRESS [RCAS], Rod Urgent Failure Alam1 Reset

- - UNSAT Standard: Examinee depresses RCAS, Rod Urgent Failure Alarm Reset.

Comment

1503 NRC Sim JPM A Page 12of18 STEP 19 [8] RESET Window 6 (A-6), ROD CONTROL SYSTEM URGENT - - SAT FAl LURE alami on panel JXA-55-48] using (XS-55-4.AJ, Annunciator RESET/ACKffEST Switch. - - UNSAT Standard: Examinee resets ROD CONTROL SYSTEM URGENT FAILURE alarm.

Comment NOTE Window 13 (B-6) may be marked NIA if Shift Manager approval is obtained for reactor startup with Non-Urgent Failure Alarm. Risk of dropped rods (if additional failure occurs or during subsequent corrective maintenance) should be evaluated.

STEP 20 19] VERIFY the following rod control system alanns on panel

~A-55-48] are NOT LIT:

- - SAT WINDOW NUMBER NOT LIT('/} WINDOW NUMBER NOT LIT {\I) - - UNSAT 5 (A5) D 18 (C4) D 6 (A6) D 19(C5) D 11 (B4) D 27 {D6) D 12 (B5) D 34 (ES) D 13(86) D Standard: Examinee verifies that the listed annunciators are not lit Comment

1503 NRC Sim JPM A Page 13of18 STEP 21 ['IO] ENSURE Plant computer ~nts for rod bank position are ZERO using the following computer points: - - SAT UNSAT COMPUTER PT U0049 ROOBANK Control A D

U0050 Control B D U0051 Control C D U0052 Control D D U0053 Shutdown A D U0054 Shutdown B D U0055 Shutdown C D U0056 Shutdown D D Standard: Examinee ensures Plant computer points for rod bank position are ZERO Cue: Provide the following cue: "Another operator has verified Plant computer points for rod bank position are ZERO" Comment STEP 22 - - SAT

[HJ MONITOR Control Rod position USING Rod Position Indicators ICS screen 30 minute trend during SD & Control Banks \l!lithdrawal to aid in detecting rod misalignment - - UNSAT Standard: Examinee monitors Control Rod position using Rod Position Indicators ICS screen 30 minute trend.

Cue: Provide the following cue: "Another operator will monitor Rod Position Indicators using ICS "

Comment

1503 NRC Sim JPM A Page 14of18 STEP 23 [12] IF Individual Rod Position Indication does not indicate proper rod position during withdrawal of SD Banks, THEN - - SAT

['12.1] STOP rod withdrawal. - - UNSAT

['12-2] ENSURE subcriticality_

['12.3] CONTACTl&C ANO INITIATE t~bleshooting_

["12-4] IF troubleshooting does not resolve the problem, OR subcriticality can NOT be verified, THEN INITIATE Reactor TRIP_

Standard: Examinee addresses step Comment STEP 24 [13] IF Individual Rod Position Indication does NOT indicate proper

- - SAT rod position during withdrawal of Control Banks, THEN GO TO AOP-C.01, Rod Control System Ma/functions_ - - UNSAT Standard: Examinee addresses step Comment

1503 NRC Sim JPM A Page 15of18 CAUTION Under normal conditions control rod banks must be withdrawn and Inserted in the prescribed sequence. For withdrawal, the sequence is Shutdown Bank A, Shutdown Bank B, Shutdown Bank C, Shutdown Bank D, Control Bank A, Control Bank B, Control Bank C, Control Bank D. The insertion sequence is the reverse of the withdrawal sequence.

NOTES

1) Startup rate, Source range, Intermediate range, Nuclear lnstrumentation recorders, Group Step Counters and the Rod Position Indicators should be monitored during each bank wlthdrawaL
2) The fol!o:wing failures will render the rod control system incapable of automatic and I or manual motion '...irlhout any annunciation or indication: *q Hand switch failure: 2) relay failure, and 3) simultaneous failure of both *1 OOv DC power supplies (PS3 and PS6)

STEP 25 SAT

["14] PLACE [HS-85-5110]. Rod Control Mode Selectorto the SBA position_

UNSAT Comment STEP 26 - - SAT

[15] VERIFY Rod Speed Indicator [Sl-412], indicates 64 Steps/minute_

- - UNSAT Standard: Examinee verifies Rod Speed Indicator reads 64 Steps/minute.

Comment

1503 NRC Sim JPM A Page 16of18 NOTE Monitor Group Step Counters, Rod Position Indicator and the ~IN-OUT' status lights to ensure anticipated motion as each bank is being withdrawn. Rod speed indicator should be reading 64 steps per minute.

STEP 27 ['16] ENSURE Shutdo\lilTl Bank A demand position counters operational by performing the following: [C.2] - - SAT

[16:1] BUMP [HS-85-5111). Rod Control Switch to withdraw --

UNSAT Shutdown Bank A one-half step at a time, for one full step.

Standard: Examinee momentarily places [HS-85-5111], Rod Control Switch to Withdraw for one-half step.

Examiner When Rod Control Switch is taken to OUT a malfunction will cause Note SOB A rods to withdraw continuously forcing ALTERNATE PATH Comment ALTERNATE PATH STEP 28 - - SAT When moving SB A out the second full step SBA begins withdrawing continuously with no command - - UNSAT

1. DIAGNOSE the failure:

GOTO IF ... SECTION PAGE Uncontrolled rod bank movement 2.1 4 (rod movement NOT due to actual T-avgJT-ref mismatch or change in reactor/turbine power)

Standard: Examinee recognizes continuous uncontrolled rod bank movement Comment

1503 NRC Sim JPM A Page 17of18 2.1 Uncontrolled Rod Bank Movement STEP 29 - - SAT NOTE: Step 1 is an immediate action step. - - UNSAT

1. STOP uncontrolled rod motion:
a. PLACE rod control in MAN.
b. CHECK rod motion STOPPED. b. TRIP the reactor, and GO TO E-0, Reactor Trip or Injection.

Standard: Examinee places Rod Control in MAN and determines that rods are still moving.

Comment 2.1 Uncontrolled Rod Bank Movement STEP 29 SAT NOTE: Step 1 is an immediate action step. UNSAT

1. STOP uncontrolled rod motion:
a. PLACE rod control in MAN.
b. CHECK rod motion STOPPED. b. TRIP the reactor, and GO TO E-0, Reactor Trip or Injection.

Comment Terminating Provide the following cue, "Another operator will complete the Cue: STOP remaininsteps of this procedure."

i Stop Time End of JPM

JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3 with Tavg at 547F and RCS pressure at 2235 psig.
2. Both M-G sets are in service.
3. All Precautions and Prerequisites of O-S0-85-1, Control Rod Drive System have been met. (Sections 3.0 and 4.0 are complete).
4. O-S0-85-1 Control Rod Drive System Section 5.5 is complete through Step 9.

INITIATING CUES:

1. You will close the "Reactor Trip" breakers and withdraw the Shutdown Banks using O-S0-85-1, Control Rod Drive System Section 5.5, beginning with step 10.
2. Inform the SM when the shutdown banks have been withdrawn.

SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPM B

2015 NRC SIM JPM B Page 2 of 14 RO/SRO JOB PERFORMANCE MEASURE Task: Respond to loss of all charging per AOP-M.09.

Task#: 0040020101 Task Standard: The examinee will depressurize the RCS to facilitate SI Pump flow using AOP-M.09 LOSS OF CHARGING.

Alternate Path: YES: - - - NO: x Time Critical Task: YES: ---

NO: x KIA Reference/Ratings: APE 022 AA 1.03 (3.2/3.2)

Method of Testing:

Simulated Performance: Actual Performance: x Evaluation Method:

Simulator x In-Plant - - - - Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: I Name I Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 20 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

2015 NRC SIM JPM B Page 3 of 14 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 275
3. If IC 275 is not available perform the following:
  • Reset to IC 16.
  • Trip the Reactor.
  • Place both Charging Pump HS in PTL.
  • Establish AFW flow at approx. 600 gpm.
  • Place Steam Dumps in STEAM PRESSURE MODE.
  • Isolate Letdown.
  • Ensure Pressurizer Level is 25%.
  • Ensure T Hot is less than 550 deg.
  • Perform G0-12
4. PLACE SIMULATOR IN RUN
5. An extra operator will be required to acknowledge alarms.
6. ACKNOWLEDGE ALARMS
7. FREEZE SIMULATOR.
8. Save as a temporary IC, if repeat runs of JPM will be desired.
9. PLACE SIMULATOR IN RUN
10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
11. Provide an in-progress copy of AOP-M.09 LOSS OF CHARGING completed through step 29.

Tools/Equipment/Procedures Needed:

1. AOP-M.09 LOSS OF CHARGING completed through step 29.

References:

I Reference Title Rev No.

1. AOP-M.09 LOSS OF CHARGING 6 I 2.

2015 NRG SIM JPM B Page 4 of 14 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3.
2. Both Charging pumps are unavailable.
3. ES-0.1, REACTOR TRIP RESPONSE has been completed.
4. AOP-M.09, LOSS OF CHARGING is in progress, completed through step 28.

INITIATING CUES:

1. The SRO has directed you to complete AOP-M.09, LOSS OF CHARGING starting at step 29.
2. Inform the SRO when complete.

2015 NRC SIM JPM B Page 5 of 14 Start Time STEP 1 --

SAT Obtain a copy of AOP-M.09, LOSS OF CHARGING

- - UNSAT Standard: Examinee obtains a copy of AOP-M.09, LOSS OF CHARGING Cue: Provide an in-progress copy of AOP-M.09, LOSS OF CHARGING.

Comment CAUTION If RCS temperature is less than 350°F, operating an SI pump in later steps would violate requirements of Tech Spec LCO 3.4.12 (LTOPS}.

STEP 2 - - SAT

29. MONITOR RCS T-cold greater than 350°F.

- - UNSAT Standard: The examinee determines RCS temperature is greater than 350 deg by observing plant instrumentation.

Comment

2015 NRG SIM JPM B Page 6 of 14 NOTE SI actuation is NOT necessary when RCS pressure is deliberately lowered to I allow SI pump injection in later steps.

I

30. MONITOR if SI signal actuation STEP. 3 is needed: - - SAT
a. CHECK for any of the following: a. GO TO Step 31.

- - UNSAT

  • containment pressure greater than 1.5 psig ~

OR

  • uncontrolled drop in RCS pressure to less than 1870 psig OR
  • uncontrolled drop in S/G pressure to less than 600 psig.

Standard: The examinee determines SI is not required by observing plant instrumentation.

Comment STEP 4 31. MONITOR if SI pump injection is needed:

- - SAT

a. CHECK for any of the following:

- - UNSAT

  • pressurizer level less than 25%

OR

  • pressurizer level needs to be raised to support RCS coo Id own.

The examinee determines SI is pump injection is required by Standard:

observing Pressurizer level < 25%.

Comment

2015 NRG SIM JPM B Page 7 of 14 STEP 5 - - SAT

32. CHECK T-hot less than 550"F.

- - UNSAT Standard: The examinee determines RCS temperature is greater than 550 deg by observing plant instrumentation.

Comment STEP 6 33. CHECK low pzr pressure SI signal

- - SAT NOT blocked:

UNSAT

  • permissive M-4A window 8-4 DARK.

Standard: The examinee determines the Low Pressure SI signal not blocked by observing permissive M-4A window 8-4 DARK.

Comment CAUTION Low pressurizer pressure SI actuation circuits will automatically unblock if pressurizer pressure rises to greater than 1970 psig.

STEP 7 34. REDUCE pzr pressure to 1920 psig SAT to allow SI block:

UNSAT

a. DE-ENERGIZE pressurizer heaters.

Comment

2015 NRG SIM JPM B Page 8 of 14 STEP 8 34. REDUCE pzr pressure to 1920 psig SAT to allow SI block:

- - UNSAT

b. CHECK RCPs RUNNING.

The examinee determines the RCPs running by observing red lights Standard: above HS-68-8A, 31A, 50A, and 73A Reactor Coolant Pump 1, 2, 3, and 4 ON.

Comment STEP 9 34. REDUCE pzr pressure to 1920 psig SAT to allow SI block:

UNSAT

c. OPERATE normal spray valves as necessary to reduce pzr pressure to approximately 1920 psig.

Comment

2015 NRC SIM JPM B Page 9 of 14 STEP 10 34. REDUCE pzr pressure to 1920 psig SAT to allow SI block:

UNSAT

d. BLOCK Low pressurizer pressure SI signal.

Comment STEP 11 34. REDUCE pzr pressure to 1920 psig SAT to allow SI block: --

e. CHECK PRESSURIZER SI TRAINS - - UNSAT A&B BLOCKED permissive LIT

[M-4A, 84].

The examinee determines the SI Low Pressure Blocked by observing Standard: PRESSURIZER SI TRAINS A&B BLOCKED permissive LIT [M-4A, 84].

Comment CAUTION 1 Pressurizer level may rise rapidly when RCS pressure is below SI pump shutoff head.

CAUTION 2 Operation of SI pump with recirc flowpath isolated could result in pump damage.

STEP 12 SAT

35. ENSURE one SI pump running.

UNSAT Comment

2015 NRG SIM JPM B Page 10of14 NOTE To allow injecting with SI pump, RCS subcooling may temporarily be reduced below required value in ES-0.2 or ES-0.3 (if applicable). Manual SI actuation based upon low subcooling is NOT required as long as operators retain control over RCS pressure.

STEP 12 36. CONTINUE RCS depressurization SAT UNTIL SI pump begins to inject:

UNSAT

a. ENSURE discharge valve OPEN for running SI pump:
  • FCV-63-152 (Train A)

OR

  • FCV-63-153 (Train B)
b. PERFORM one of the following as necessary to reduce RCS pressure:
  • OPERATE normal spray valves.

Comment

2015 NRG SIM JPM B Page 11 of 14 STEP 13 36_ CONTINUE RCS depressurization SAT UNTIL SI pump begins to inject UNSAT c_ WHEN SI pump begins to inject AND pzr level is rising, THEN STOP RCS depressurization.

Cue: "The SRO directs you to fill the Pressurizer to 65%."

Comment

2015 NRC SIM JPM B Page 12of14 STEP 14 36. CONTINUE RCS depressurization SAT UNTIL SI pump begins to inject UNSAT

d. CONTROL RCS pressure to maintain desired injection rate.

Comment

2015 NRC SIM JPM B Page 13 of 14 NOTE 1 Normal requirement for running SI pump at least 20 minutes does NOT apply in this AOP.

NOTE2 Normal motor starting limitations are NOT applicable in this AOP. However, pump stop/start cycles should be limited as much as possible to minimize potential for overheating motor windings_

STEP 15 37. WHEN pressurizer level reaches 65~10 SAT or desired value, THEN UNSAT PERFORM the following:

a. TERMINATE SI pump injection:
  • STOP running SI pump OR
  • CLOSE SI pump discharge valve FCV-63--152 (Train A) or FCV-63-'153 (Train B).

Comment Terminating Provide the following cue, "Another operator will complete the STOP Cue: remaining steps of this procedure."

Stop Time - - - -

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3.
2. Both Charging pumps are unavailable.
3. ES-0.1, REACTOR TRIP RESPONSE has been completed.
4. AOP-M.09, LOSS OF CHARGING is in progress, completed through step 28.

INITIATING CUES:

1. The SRO has directed you to complete AOP-M.09, LOSS OF CHARGING starting at step 29.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPMC

1503 NRC Sim JPM C Page 2 of 14 RO/SRO JOB PERFORMANCE MEASURE Task: Isolate the Ruptured Steam Generator (With MSIV Failure to Close)

Task#: 0000380501 Task Standard: The examinee isolates Steam Generator #1 with a failed #1 MSIV using E-3 Steam Generator Tube Rupture Alternate Path: YES:

Time Critical Task: YES: NO: x KIA Reference/Ratings: EPE 038 EA1.32 (4.6/4.7)

Method of Testing:

Simulated Performance: Actual Performance: x Evaluation Method:

Simulator -- x - In-Plant - - - - Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: I Name I Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 15 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

1503 NRC Sim JPM C Page 3 of 14 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset simulator to IC #265.
3. If IC is unavailable, then Initialize simulator in IC # 16 and Insert the following:

a) Activate malfunction IMF TH05A f:8.5 to initiate SIG tube rupture in SIG #1.

b) Activate malfunction IMF MS14A f:100, to fail open SIG Loop 1 MSIV.

c) Actuate a MANUAL reactor trip and safety injection, take all actions up through Step 3 of E-3.

d) Complete the actions of E-0 thru step 12, which will transition the crews to E-3 e) Complete any required actions in ES-0.5. Including closing the TD AFW LCVs, but do not put handswitches in pull-to-lock.

f) Complete the first three steps in E-3.

4. An extra operator will be required to acknowledge alarms.
5. ACKNOWLEDGE ALARMS
6. FREEZE SIMULATOR.
7. Provide a copy of E-3 STEAM GENERATOR TUBE RUPTURE
8. PLACE SIMULATOR IN RUN SPECIAL INSTRUCTIONS TO EVALUATOR:

N/A Tools/Equipment/Procedures Needed:

1. In progress copy of E-3, STEAM GENERATOR TUBE RUPTURE

References:

Reference Title Rev No.

1. E-3 STEAM GENERATOR TUBE RUPTURE 21

1503 NRC Sim JPM C Page 4 of 14 DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 has experienced a Steam Generator Tube Rupture on Steam Generator #1.
2. A manual safety injection was initiated.
3. E-3, STEAM GENERATOR TUBE RUPTURE is in progress, steps 1 through 3 of E-3 have been completed INITIATING CUES:
1. You have been directed to continue with E-3, STEAM GENERATOR TUBE RUPTURE beginning at Step 4.
2. Inform the SRO when you have isolated the #1 Steam Generator.

1503 NRC Sim JPM C Page 5 of 14 Start Time Obtain a copy of E-3, STEAM GENERATOR TUBE RUPTURE STEP 1 - - SAT

- - UNSAT Examinee obtains a copy of E-3, STEAM GENERATOR TUBE Standard: RUPTURE Cue Provide a marked up copy of E-3, STEAM GENERATOR TUBE RUPTURE completed through step 3.

Comment Procedure CAUTION If the TD AFW pump is the only source of feed flow, isolating both Caution: steam supplies will result in loss of secondary heat sink.

I STEP 2 4_ ISOLATE flow from Ruptured SiG(s): SAT a_ ADJUST Ruptured S/G(s) UNSAT atmospheric relief controller setpoint to 87% in AUTO_ ('1040 psig)

Comment

1503 NRC Sim JPM C Page 6 of 14 4_ ISOLATE flow from Ruptured S/G(s):

STEP 3 - - SAT b_ CHECK Ruptured S/G{s) - - UNSAT atmospheric relief hand switch in P-AUTO and valve(s) CLOSED_

Standard: Examinee observes SIG #1 atmospheric relief handswitch, 1-HS-1-6, on 1-M-4 in P-AUTO and valve CLOSED.

Comment '

STEP 4 4_ ISOLATE flow from Ruptured S/G(s):

- - SAT c_ CHECK SIG #1 or #4 ruptured_ - - UNSAT Standard: Examinee observes steam generator #1 level rising with no feed or by referring to the initial conditions.

Comment STEP 5 4_ ISOLATE flow from Ruptured S/G(s)~ SAT d_ CLOSE TD AFVV pump steam UNSAT supply from Ruptured SIG FCV-*1-15 {S/G #1) or FCV-1-16 (SIG #4)_

Comment

1503 NRC Sim JPM C Page 7 of 14

4. ISOLATE flow from Ruptured S/G(s):

STEP 6 - - SAT e_ VERIFY Ruptured S/G{s) blowdown - - UNSAT isolation valves CLOSED.

Standard: Examinee observes FCV-1-7 and FCV-1-181 CLOSED green indication lights above handswitch 1-HS-1-71181on1-M-4 ON.

Comment STEP

4. ISOLATE flow from Ruptured SiG(s):

7 - - SAT f_ CLOSE Ruptured S/G(s) r...1s1v

- - UNSAT and IVlSIV bypass valve.

Examinee places 1-HS-1-4 SIG #1 MSIV to CLOSE. Recognizes Standard: MSIV FCV-1-4 failed to close, by the red light above 1-HS-1-4 ON, and goes to the RNO to isolate the SIG.

Comment Examiner SIG #1 MSIV will NOT close and the operator MUST go to the RNO Note column

1503 NRC Sim JPM C Page 8 of 14 Alternate path STEP 8 SAT 4_ ISOLATE flow from Ruptured S/G(s):

UNSAT f_ PERFORM the following:

1) CLOSE Intact SIG MSIVs and MSIV bypass valves_

(Not Critical) Examinee verifies MSIV bypasses closed by observing green lights ON above handswitch 1-HS-1-148, 1-HS-1-149, & 1-HS-1-150 MSIV bypass valves.

Comment 4_ ISOLATE flow from Ruptured SlG(s):

STEP 9 - - SAT f_ PERFORM the following:

- - UNSAT

2) DISPATCH operator to perform EA-1, Closing l'v1SIVs Locally, for any t\*1SIV or MSIV bypass valve which fails to close_

Standard: Examinee dispatches an operator to perform EA- 1-1, Closing MSIVs Locally, for #1 S/G MSIV.

Cue Acknowledge the direction from the examinee.

Comment

1503 NRC Sim JPM C Page 9 of 14 STEP 10

4. ISOLATE flow from Ruptured S/G(s): SAT
f. PERFORM the following: UNSAT
3) ISOLATE steam header:
  • PLACE condenser steam dumps in OFF. [M-4]

Comment STEP

4. ISOLATE flow from Ruptured S/G(s):

11 - - SAT

f. PERFORM the following:

- - UNSAT

3) ISOLATE steam header:
  • ENSURE steam dump valves CLOSED. [M-4]

Standard: Examinee verifies the steam dump valves are closed by observing green light indication on 1-XX-55-4A for all steam dump valves are ON Comment

1503 NRC Sim JPM C Page 10 of 14 4_ ISOLATE flow from Ruptured S/G(s):

STEP 12 SAT f_ PERFORM the following: UNSAT

3) ISOLATE steam header:
  • CLOSE FCV-47-'180, HP Steam Seal Supply Isolation_ [M-2]

Comment 4_ ISOLATE flow from Ruptured S/G(s):

STEP 13 -

SAT f_ PERFORM the following: UNSAT

3) ISOLATE steam header:
  • ENSURE FCV-47-'18'1 HP Steam Seal Suppty Bypass CLOSED_ [M-2]

Examinee verifies FCV-47-181 HP Steam Seal Supply Bypass Standard: CLOSED by observing green light indication above the handswitch to ON.

Comment

1503 NRC Sim JPM C Page 11 of 14 STEP 14

4. ISOLATE flow from Ruptured S/G(s):

SAT

f. PERFORM the following: UNSAT
3) ISOLATE steam header:
  • CLOSE MSR HP steam supply isolation valves. [l\<<1-2]

Comment STEP 15

4. ISOLATE flow from Ruptured S/G(s):

- - SAT f_ PERFORM the following:

- - UNSAT

3) ISOLATE steam header:
  • DISPATCH operator to locally isolate steam header USING EA-1-4, Local Isolation of Steam Header in Turb Bldg.

Standard: Examinee dispatches an operator to locally isolate steam header USING EA-1-4, Local Isolation of Steam Header in Turb Bldg.

Cue Acknowledge the direction from the examinee.

Comment

1503 NRC Sim JPM C Page 12 of 14 4_ ISOLATE flow from Ruptured S/G(s):

STEP 16 --

SAT f_ PERFORM the following:

- - UNSAT

4) USE Intact S/G(s) atmospheric relief for steam dump_

Standard: Examinee addresses the procedure step.

Comment STEP 17 5_ MONITOR Ruptured S/G(s) level:

- - SAT

- - UNSAT a_ CHECK ruptured SIG narrow range level greater than '100,'o [25~,~ ADV]_

Examinee verifies #1 S/G narrow range level greater than 10% by Standard: observing Ll-3-42, or Ll-3-39, or Ll-3-38 or other installed plant instrumentation_

Comment STEP 18 5. MONITOR Ruptured S/G(s) level: SAT

b. ISOLATE MW to ruptured SIG:

UNSAT 1} ENSURE AFW LCVs for ruptured S/G are CLOSED_

Comment

1503 NRC Sim JPM C Page 13of14 STEP 19 5_ MONITOR Ruptured S/G(s) level: SAT

b. ENSURE AFW isolated UNSAT to ruptured SIG:
2) PLACE Turbine Driven APN LCV for ruptured SIG in CLOSE PULL TO LOCK.

Comment Terminating Provide the following cue "Another operator will perform the STOP Cue: remaining steps of this procedure."

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 has experienced a Steam Generator Tube Rupture on Steam Generator #1.
2. A manual safety injection was initiated.
3. E-3, STEAM GENERATOR TUBE RUPTURE is in progress, steps 1 through 3 of E-3 have been completed INITIATING CUES:
1. You have been directed to continue with E-3, STEAM GENERATOR TUBE RUPTURE beginning at Step 4.
2. Inform the SRO when you have isolated the #1 Steam Generator.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPM D

1503 NRC Sim JPM D Page 2of16 RO/SRO JOB PERFORMANCE MEASURE Task: Start a Reactor Coolant Pump Task#: 0030010101 Task Standard: The Operator manually stops the #1 Reactor Coolant Pump.

Alternate Path: YES: ---

x NO:

Time Critical Task: YES: NO: x KIA Reference/Ratings: APE 015/017 AA1.03 (3.7/3.8)

Method of Testing:

Simulated Performance: Actual Performance: x Evaluation Method:

Simulator x

- - - In-Plant - - - - Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: I Name I Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 15 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

1503 NRC Sim JPM D Page 3 of 16 SPECIAL INSTRUCTIONS:

1) Ensure Simulator Operator Checklist is complete
2) Initialize to IC 268
3) IF IC 268 is not available Then initialize to IC 7 and perform the following a) Stop the #1 RCP.

b) Place MODE 3 sign on Panel M-4 c) Insert AN_OV_359 to OFF (Disables Loose Parts Alarm.)

d) Close the Loop 1 Pressurizer Spray valve

4) Set NR-45 to display one SRM and one IRM
5) An extra operator will be required to acknowledge alarms.
6) ACKNOWLEDGE ALARMS
7) FREEZE SIMULATOR.
8) Provide a marked up procedure 1-S0-68-2, Reactor Coolant Pumps Section 5.1 completed through step 10 (and also provide Appendix 10 if requested.)
9) PLACE SIMULATOR IN RUN
10) Booth operator standby to insert the SCN File RCPHEATUP.scn (from exams folder) during the JPM
11) Go to SCENS
12) GO Exam folder
13) Run SCN File RCPHEATUP when the #1 RCP is started SPECIAL INSTRUCTIONS TO EVALUATOR:
1. Critical steps are identified in step SAT/UNSAT column by bold print 'Critical Step.'
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

1-S0-68-2 Reactor Coolant Pumps AOP- R.04 Reactor Coolant Pump Malfunctions

References:

Reference Title Rev No.

1. 1-S0-68-2 Reactor Coolant Pumps 39
2. AOP- R.04 Reactor Coolant Pump Malfunctions 27 3 1-AR-M5-B CVCS Seal Water and RCP 41

1503 NRC Sim JPM D Page 4 of 16 DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3
2. Preparations are being made to start #1 RCP.
3. All precautions and prerequisites are complete.
4. 1-S0-68-2, Reactor Coolant Pumps Section 5.1, steps 1 through 10 are complete.
5. All other RCPs are in service INITIATING CUES:
1. You have been directed to start and monitor the #1 RCP using 1-S0-68-2, Reactor Coolant Pumps starting at step 5.1.11.
2. Notify the SRO when you are complete.

1503 NRC Sim JPM D Page 5 of 16 Start Time Obtain a copy of 1-S0-68-2, Reactor Coolant Pumps Section 5.1 STEP 1 SAT completed through step 10. --

- - UNSAT Standard: Examinee obtains a copy of 1-S0-68-2, Reactor Coolant Pumps Section 5.1.

Cue Provide a marked up copy of 1-S0-68-2, Reactor Coolant Pumps Section 5.1 completed through step 10.

Comment STEP 2 SAT

[11] PLACE [1-HS-68-84Al #1 RCP Lift Oil Pump in the START position. UNSAT Comment Examiner REAC COOL PMPS OIL LIFT PRESS LOW annunciation will come in Note and clear during performance of the next step

1503 NRC Sim JPM D Page 6of16 STEP 3 [12] WHEN Lift Oil Pump for #1 RCP has run

- - SAT 2 2 minutes, THEN ANNOUNCE #1 RCP start on the PIA system. - - UNSAT Standard: Examinee addresses the procedure step.

Cue: Provide the following cue, "Another operator will make the PA Announcement."

Comment

[13] IF no RCPs are running AND RCP #1 is the first STEP 4 - - SAT RCP to be started, THEN MONITOR the SRMs during startup of the RCP. [C.3] --

UNSAT Standard: Examinee determines other 3 RCPs are running and marks this step as N/A.

Comment STEP 5. SAT

[14] PLACE [1-HS-68-BAJ #1 RCP in the START position.

UNSAT Comment

1503 NRC Sim JPM D Page 7 of 16 Procedure NOTE Motor and Pump Operating Parameters are listed in Appendix D. Appendix E provides vibration limits if pump is Note started after maintenance activities.

STEP 6 - - SAT

[15] ENSURE #1 RCP motor and pump are operating within the parameters listed in Appendix D. UNSAT Standard: Examinee monitors #1 RCP motor and pump parameters using installed instrumentation.

Comment Examiner Note Directthe Booth Operator to insert File RCPHEATUP.scn.

The motor will start heating up and result in the REAC COOL PMPS MOTOR STATOR TEMPERATURE HIGH alarm on 1-M-5, Window E-Examiner 1 on 1-XA-55-58 coming in during the performance of the next steps .

Note (JPM steps 6-7; procedure steps 15-17). When alarm comes in, the operator may not complete performing procedure step 15, 16 or

17. N/A those steps if applicable and move on to JPM step 9 if the examinee transitions to alarm procedure.

STEP 7 - - SAT

[16] ENSURE {1-TCV-67-861 RCP Motor Cooler 1A is OPEN (1-HS-67-86 red light illuminated}.

- - UNSAT Standard: Examinee verifies 1-TCV-67-86 is open on Panel M-27A by observing the red indicating light above handswitch ON.

Comment

1503 NRC Sim JPM D Page 8 of 16

[17] WHEN Lift Oil Pump has run greater than 1 minute after STEP 8 RCP start, TH EN - - SAT UNSAT PLACE [1*HS-68-84AJ #1 RCP Lift Oil Pump in --

the STOP position.

Standard: Examinee places 1-HS-68-84A #1 RCP Lift Oil Pump handswitch to STOP Comment STEP 9 I eves SEAL WATER AND RCP 1-XA-55-58 I - - SAT

- - UNSAT 29 (E-1)

REAC COOL PMPS MOTOR STATOR I

TEMPERATURE HIGH Standard: Examinee acknowledges alarm and observes rise in RCP motor stator temperatures.

Comment If the actions contained in the Annunciator Response Procedure (ARP)

Examiner are implemented, JPM steps 11-24 cover the actions directed by the Note ARP and AOP to stop the RCP. If RCP is stopped without implementing the ARP, JPM 10 step will end the JPM.

1503 NRC Sim JPM D Page 9 of 16 STEP 10 SAT STOP Loop 1 RCP UNSAT If the examinee stops the RCP now provide the following cue, Cue "Another operator will perform the remaining steps of this procedure."

Comment Examiner The following steps are from the Annunciator Response Procedure 1-Note AR-MS-B.

NOTE RCP 1-4 is known to have high winding temperature (up to Procedure approximately 303°F when running with RCS temperature below Note 400°F. (EWR 10-COM-068-057)) However, alarms on RCP 1-4 should NOT be dismissed as "expected".

Corrective (1J DETERMINE which pump is in alarm by monitoring computer STEP 11 Actions points. - - SAT Pump 1: Point T0409A, 411 A or 412A (A,B, &C Pump 2: Point T0429A, 431 A or 432A {A,B, &C UNSAT Pump 3: Point T0449A, 451A or 452A (A,B, & C 0) --

Pump 4: Point T0469A, 471A or 472A (A,B, & C 0)

Standard: Examinee determines the #1 RCP in alarm by observing the ICS display.

Comment

1503 NRC Sim JPM D Page 10 of 16 STEP 12 - - SAT

[2] CONTACT Engineering to obtain engineering assistance in determining the validity of the alarm_ UNSAT Standard: Engineering is contacted to obtain engineering assistance in determining the validity of the alarm.

Respond as Unit Supervisor "Engineering has been contacted Cue and has validated the alarm."

Comment

[3] MONITOR the following parameters for increasing trends:

STEP 13 a_ Motor Current - - SAT b_ Bearing Temperatures

- - UNSAT C. Pump/Motor Vibration

d. Containment Air Temperatures Examinee monitors or directs monitoring parameters by observing Standard: indications on installed instrumentation and determines indications normal.

Comment

1503 NRC Sim JPM D Page 11 of 16 STEP 14 - - SAT

[4] ENSURE ERCW' aligned to pump cooler.

- - UNSAT Standard: Examinee verifies ERCW aligned to pump cooler by observing red light above 1-HS-67-86 on O-M-27A ON.

Comment Examiner Note May have been performed in JPM step 7.

STEP 15 - - SAT

[5] VERIFY ERCW system temperature and pressure normal.

- - UNSAT Standard: Examinee verifies ERCW system temperature and pressure normal by observing indications O-M-27 A.

Comment STEP 16

- - SAT f6] VERIFY lower compartment air temperature normaL

- - UNSAT Standard: Examinee verifies lower compartment air temperature normal by observing indications on ICS and other installed plant instrumentation.

Comment

1503 NRC Sim JPM D Page 12 of 16 I STEP 17 --

SAT

[7] REFER TO 1-S0-68-2 for RCP operating limifa_

- - UNSAT Standard: Examinee refers to 1-S0-68-2 , Reactor Coolant Pumps Appendix D for the operating limits.

Comment If the remaining actions contained in the Annunciator Response Examiner Procedure (ARP) are implemented, JPM steps 19-20 cover the actions Note directed by the ARP and AOP to stop the RCP. If RCP is stopped at this point, JPM 18 step will end the JPM.

STOP Loop 1 RCP STEP 18 SAT UNSAT If the examinee stops the RCP now provide the following cue, Cue "Another operator will perform the remaining steps of this procedure."

Comment

1503 NRC Sim JPM D Page 13 of 16

[8] IF Ops/Engineering determines alarm is valid, THEN STEP 19 --

SAT PERFORM the following:

[a] CHECK pump motor amps. (normal 415 amps with 608 amps - - UNSAT maximum_)

[b] IF RCP motor amps approach 608 amps, THEN GO TO AOP-R04, Reactor Coolant Pump Malfunctions.

Examinee verifies pump amps normal by observing El-68-8 less than Standard:

400 amps.

Comment

[9] IF Ops/Engineering determines alarm is valid and pump motor STEP 20 - - SAT stator temperature approaches 311°F (329"F for RCS temperature less than 540°F}, THEN

- - UNSAT GO TO AOP-R.04, Reactor Coolant Pump Malfunctions.

Standard: Examinee observes the motor winding temperature is greater than 311°F using the ICS and goes to AOP-R.04.

Cue Respond as Engineering "Alarm is valid."

Comment STEP 21 'L DIAGNOSE the failure: - - SAT

- - UNSAT II Motor Stator Temperature High on ANY RCP I 2.6 I

24 II Standard: Examinee goes to AOP-R.04 section 2.6 or 2.1 Comment

1503 NRC Sim JPM D Page 14 of 16 Procedure CAUTION: Operating the RCP with excess winding temperature will reduce the expected Caution life of the motor insulation.

NOTE: RCP motor winding temperature limits are as follows:

Procedure Note

  • 329°F if RCS temperature is less than 540"'F.
  • 3'! 1°F if RCS temperature is greater than or equal to 540°F .

Alternate Path STEP 22 - - SAT

1. MONITOR RCP Motor Stator temperature a. IF RCP Motor Stator temperature less than applicable limit by monitoring reaches applicable limit - - UNSAT the following computer points: AND indication is verified valid.

THEN

  • Pump *1: T0409A, 41'1Aor412A PERFORM the following:
  • Pump 2: T0429A, 431A or 432A
1) IF reactor power less than 20%,
  • Pump 3: T0449A. 45'1A or 452A

. Pump 4: T0469A, 471A or 472A THEN GO TO Section 2. *1, ANY RCP Tripped or RCP Shutdown Required [C.1]

~

Examinee determines the motor winding temperature is greater than Standard: 311°F by observing the ICS and goes to the RNO column and ultimately to Section 2.1.

Comment 2.1 ANY RCP Tripped or RCP Shutdown Required Procedure Caution CAUTION: A rapid drop in level and steam flow on the affected loop SIG may occur when RCP is stopped.

'1. CHECK unit in Mode 1 or 2. STOP affected RCP(s).

STEP 23 --

SAT Time:

UNSAT GO TO Caution prior to Step 3.

~

Standard: Examinee determines the Unit is in MODE 3 and proceeds to RNO Comment

1503 NRC Sim JPM D Pa e 15 of 16 CHECK unit in Mode -1 or 2_ STOP affected RCP(s)_

STEP 24 SAT Time: _ _ __

UNSAT GO TO Caution prior to Step 3_

Comment Terminating Provide the following cue "Another operator will perform the Cue: STOP remaining steps of this procedure."

Stop Time ____

JPM BRIEFING SHEET I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3
2. Preparations are being made to start #1 RCP.
3. All precautions and prerequisites are complete.
4. 1-S0-68-2, Reactor Coolant Pumps Section 5.1, steps 1 through 10 are complete.
5. All other RCP's are in service INITIATING CUE:
1. You have been directed to start and monitor the #1 RCP using 1-S0-68-2, Reactor Coolant Pumps starting at step 5.1.11.
2. Notify the SRO when you are complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPM E

2015 NRG SIM JPM E Page 2 of 11 RO/SRO JOB PERFORMANCE MEASURE Task: Respond to uncontrolled depressurization of all Steam Generators per ECA-2.1.

Task#: 3310100601 Task Standard: The examinee will reduce AFW flow to all Steam Generators to less than 60 gpm but with positive flow > 30 gpm as indicated on all Steam Generators.

Alternate Path: YES: NO: x Time Critical Task: YES: - - - NO: x KIA Reference/Ratings: EPE-E12 EA-1.1 (3.8/3.8)

Method of Testing:

Simulated Performance: Actual Performance: x Evaluation Method:

Simulator x

- - - In-Plant - - - - Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: I Name I Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 10 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

2015 NRG SIM JPM E Page 3 of 11 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 276
3. If IC 276 is not available perform the following:
  • Reset to IC 16.
  • IMF MS04A f:1
  • IMF MS04B f:1
  • IMF MS04C f:1
  • IMF MS04D f: 1
  • IMF MS01A f:100
  • PLACE SIMULATOR IN RUN
  • Trip the Reactor.
  • When T Cold has reached 470 deg, FREEZE SIMULATOR.
4. PLACE SIMULATOR IN RUN
5. Trip the Reactor.
6. An extra operator will be required to acknowledge alarms.
7. ACKNOWLEDGE ALARMS
8. When T Cold has reached 470 deg, FREEZE SIMULATOR.
9. Save as a temporary IC, if repeat runs of JPM will be desired.
10. PLACE SIMULATOR IN RUN
11. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1. ECA-2.1 UNCONTROLLED DEPRESSURIZATION OF ALL STEAM 11 GENERATORS 2.

2015 NRG SIM JPM E Page 4 of 11 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3.
2. The crew has just completed all applicable steps of E-2, Faulted Steam Generator Isolation and has transitioned to ECA-2.1, UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS.
3. Operators have been dispatched in attempt to close MSIVs using EA-1-1, Closing MSIVs Locally.

INITIATING CUES:

1. The SRO has directed you to perform ECA-2.1, UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS starting at step 1.
2. Inform the SRO when complete.

2015 NRC SIM JPM E Page 5 of 11 Start Time STEP 1 - - SAT Obtain a copy of ECA-2.1, UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS

- - UNSAT Standard: Examinee obtains a copy of ECA-2.1, UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS Comment CAUTION Isolating both steam supplies to the TD AFW pump when it is the only source of feed flow will result in loss of secondary heat sink.

NOTE This procedure has a foldout page.

STEP 2 - - SAT NOTE This procedure has a foldout page.

- - UNSAT Standard: The examinee reviews the Foldout Page.

Examiner The Foldout Page items are on the next page. The Examinee should Note: not take any actions as a result of the Foldout Page.

Comment

2015 NRC SIM JPM E Page 6 of 11 FOLDOUT PAGE SI REINITIATION CRITERIA IF either of the following conditions occurs:

  • RCS subcooling based on core exit T/Cs less than 40°F, OR
  • Pressurizer level CANNOT be maintained greater than 10% [20% ADV],

THEN RAISE ECCS flow by performing one or both of the following:

  • ESTABLISH CCPIT flow USING Appendix C
  • START CCPs or SI pumps manually as necessary.

EVENT DIAGNOSTICS

  • IF both trains of shutdown boards deenergized, THEN GO TO ECA-0.0, Loss of All AC Power.
  • IF any SIG pressure rises at any time AND Steps 15 through 25 are NOT in progress, THEN RAISE AFW flow to intact S/G as necessary and GO TO E-2, Faulted Steam Generator Isolation.
  • IF any S/G has level rising in an uncontrolled manner or has abnormal radiation, THEN
a. RAISE ECCS flow by performing one or both of the following as necessary:
  • ESTABLISH CCPIT flow USING Appendix C
  • START CCPs or SI pumps manually as necessary.
b. GO TO E-3, Steam Generator Tube Rupture.

TANK SWITCHOVER SETPOINTS

  • IF CST level less than 5%,

THEN ALIGN AFW suction to ERCW.

  • IF RWST level less than 27%,

THEN GO TO ES-1.3, Transfer to RHR Containment Sump.

2015 NRC SIM JPM E Page 7 of 11

1. CHECK secondary pressure boundary:

STEP 3 - - SAT

a. CHECK the following: a. CLOSE valves to restore pressure boundary on at least one SIG. UNSAT

CLOSED IF valves CANNOT be closed, THEN

  • MFW regulating valves and DISPATCH personnel to close valves reg bypass valves CLOSED locally, one loop at a time:
  • MFW isolation valves CLOSED
  • CLOSE MSIV and bypass valve as necessary USING EA-1-1,
  • Atmospheric reliefs CLOSED Closing MSIVs Locally .
  • SIG blowdown valves CLOSED.
  • ISOLATE S/G atmospheric relief valve as necessary USING EA-1-2, Local Control of SIG PORVs.
  • ISOLATE blowdown locally as necessary.

Standard: The Examinee Checks the MSIVs are OPEN and cannot be closed.

The examinee addresses the Step 1a RNO actions.

Cue When asked provide the following cue, "Time has been compressed operators report the MSIVs cannot be closed using EA-1-1."

Comment STEP 4 - - SAT

1. b. CHECK MD AFW pumps RUNNING.

- - UNSAT The Examinee checks MD AFW pumps running as indicated by red Standard:

light above HS-3-118A and 128A AFW Pump 1A-A and 1B-B ON.

Comment

2015 NRC SIM JPM E Page 8 of 11 STEP 5 SAT c CLOSE TD AFW pump steam supply valve FCV-1-17 or FCV-1-18. UNSAT Comment NOTE Reducing total feed flow to less than 440 gpm, as directed in this procedure, does NOT require implementation of FR-H.1, Loss of Secondary Heat Sink, as long as a total feed flow capability of 440 gpm is available.

2. CONTROL feed flow to minimize STEP 6 RCS cooldown:

SAT

a. CHECK T-cold cooldown rate a. REDUCE feed flow to 50 gpm UNSAT less than 1QOGF/hr. to each SIG.

OPEN MD AFW pump recirc valves FCV-3-400 and FCV-3-401 as necessary to control flow.

GO TO Substep 2.c (AER column).

Comment

2015 NRC SIM JPM E Page 9 of 11 STEP 7 c. MONITOR SIG narrow range levels c. MAINTAIN feed flow to affected S/G(s) --

SAT greater than 10% (25% ADV]. greater than or equal to 50 gpm UNTIL level greater than 10% (25% ADV]. - - UNSAT Standard: The Examinee maintains AFW flow to all Steam Generators.

Comment

3. MAINTAIN shutdown margin adequate:

STEP 8 - - SAT UNSAT

a. NOTIFY Chem Lab to sample RCS --

boron concentration.

b. CHECK shutdown margin ADEQUATE USING O-Sl-NUC-000-038.0, Shutdown Margin.

Standard: The Examinee addresses the procedure step.

Cue: Acknowledge communication steps, as required.

Comment

2015 NRC SIM JPM E Page 10of11

4. MONITOR if RCPs should be stopped:

STEP 9 --

SAT

a. CHECK if the following a. GO TO Step 5.

conditions exist: - - UNSAT

  • RCS subcooling based on core exit T/Cs less than 40°F

~

ANO

  • RCS pressure less than i 250 psig ANO
  • At least one CCP OR SI pump RUNNING.
b. STOP RCPs.

Standard: The examinee determines RCP's are to be left running.

Comment Terminating Provide the following cue, "Another operator will complete the Cue: STOP remaining steps of this procedure."

Stop Time _ _ __

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3.
2. The crew has just completed all applicable steps of E-2, Faulted Steam Generator Isolation and has transitioned to ECA-2.1, UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS.
3. Operators have been dispatched in attempt to close MSIV's using EA-1-1, Closing MSIVs Locally.

INITIATING CUES:

1. The SRO has directed you to perform ECA-2.1, UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS starting at step 1.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPM F

1503 NRC Sim JPM F Page 2of13 RO/SRO JOB PERFORMANCE MEASURE Task: Respond to High Containment Pressure, Place RHR Spray in Service Task#: 3110160601 (RO)

Task Standard: The examinee will establish one train of RHR spray in service using FR-Z.1, HIGH CONTAINMENT PRESSURE.

Alternate Path: YES: - - x - NO:

Time Critical Task: YES: NO: x KJA Reference/Ratings: W/E14 EA1 .1 (3.7/3.7)

Method of Testing:

Simulated Performance: Actual Performance: x Evaluation Method:

Simulator x In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: I Name I Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 8 minutes Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

1503 NRC Sim JPM F Page 3of13 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 254
3. If IC 254 is not available reset to IC #24 and complete substeps below.
a. Activate MF# TH01A at 35%.
b. Activate MFs # CH01 A thru D at 70% (-10.2 psid) with 240 sec ramp.

C. Stop RCPs.

d. Complete the actions of ES-1.3, Sump Swapover.
e. Activate Override ZDIHS7241A CLOSE, to prevent FCV-72-41 from opening.
f. Activate ZAOPDl30133 f:5
g. Activate ZAOPDIR30133 f:0.5
4. Activate the following, as necessary, to prevent nuisance alarms:
h. AN:OVRN[96] to ON, prevents Turbine Zero Speed alarm
i. AN:OVRN[304] to ON, prevents Saturation Monitor alarm
5. Insert Remote Function RHR14 ON, places power on FCV-63-1.
6. PLACE SIMULATOR IN RUN
7. An extra operator will be required to acknowledge alarms.
8. ACKNOWLEDGE ALARMS
9. FREEZE SIMULATOR.
10. Save as a temporary IC, if repeat runs of JPM will be desired.
11. PLACE SIMULATOR IN RUN
12. At JPM step 15, when candidate opens 1-FCV-72-40:
j. Modify malfunction CH01A f:O r:240 k:1
k. Modify malfunction CH01B f:O r:240 k:1 I. Modify malfunction CH01 B f:O r:240 k: 1
m. Modify malfunction CH01 D f:O r:240 k: 1
13. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.

1503 NRC Sim JPM F Page 4of13

14. Tools/Equipment/Procedures Needed:

FR-Z.1, HIGH CONTAINMENT PRESSURE, step 13 (marked up through step 12)

References:

Reference Title Rev No.

1. FR-Z.1 High Containment Pressure 19

1503 NRC Sim JPM F Page 5of13 DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME!

INITIAL CONDITIONS;

1. Unit 1 has experienced a reactor trip and Safety Injection in conjunction with a large break LOCA.
2. The crew is monitoring step 13 of FR-Z.1, HIGH CONTAINMENT PRESSURE.
3. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> has elapsed since the accident.

INITIATING CUES:

1. The SRO directed you to initiate one train of RHR spray per FR-Z.1, HIGH CONTAINMENT PRESSURE starting at step 13.
2. Inform the SRO when a train of RHR spray has been established.

1503 NRC Sim JPM F Page 6of13 Start Time 1

STEP - - SAT Obtain a copy of the FR-Z.1, HIGH CONTAINMENT PRESSURE UNSAT Standard: Examinee obtains a copy of FR-Z.1, HIGH CONTAINMENT PRESSURE Cue Provide an in-progress copy of FR-Z.1, HIGH CONTAINMENT PRESSURE complete through step 12 Comment STEP 2 n_ MONITOR if RHR spray should be placed 1n service: - - SAT a_ CHECK the following: - - UNSAT

. Containment pressure greater than 9 .5 psig AND Standard: Examinee checks 1-PDl-30-45 and 44 and determines that pressure is greater than 9.5 Comment

1503 NRC Sim JPM F Page 7of13 STEP 3 n_ MONITOR if RHR spray should be placed in seMce: - - SAT a_ CHECK the following: - - UNSAT

. At least 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> has elapsed since beginning of accident Standard: Examinee determines from initiating cues (or asks US) that 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> has elapsed Cue IF asked, provide the following cue, "1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> has elapsed since beginning of accident".

Comment STEP 4 n_ MONITOR if RHR spray should be placed 111 seMce: - - SAT a._ CHECK the follo*wing: - - UNSAT

. RHR suction ALIGNED to containment sump Examinee checks FCV-63-72 and 73 OPEN and FCV-74-3 and 21 Standard: CLOSED, or asks if ES-1.3, "Transfer to RHR Containment Sump,"

has been completed.

Cue IF asked, provide the following cue, "ES-1.3 has been completed."

Comment

1503 NRC Sim JPM F Page 8 of 13 STEP 5 n_ MONITOR if RHR spray should be placed SAT 1n service: --

a_ CHECK the following: - - UNSAT

. At least one CCP AND one SI pump RUNNING.

Examinee verifies at least one CCP is running as indicated by Red light on HS-62-104A or 108A ON.

Standard: AND Verifies at least one SI pump is running as indicated by Red lights on HS-63-10A or 15A ON.

Comment 6

STEP 13. MONITOR if RHR spray should be placed

- - SAT in service~

b_ CHECK both RHR pumps RUNNING. - - UNSAT Standard: Examinee checks that both RHR pumps are running as indicated by red lights on HS-74-10A and 20A "ON".

Comment 7

STEP 13. c: ESTABLISH Train B RHR spray: - - SAT

1) CHECK Train B RHR pump

- - UNSAT RUNNING.

Standard: Examinee checks that 1B-B RHR pump is running as indicated by red light on HS-74-20A "ON".

Comment

1503 NRC Sim JPM F Page 9of13 8

STEP n. C. ESTABLISH Train B RHR spray: - - SAT

2) ENSURE RHR crosstie FCV-74-35 CLOSED. - - UNSAT Standard: Examinee verifies FCV-74-35 in the CLOSED position as indicated by HS green light ON and red light OFF Comment STEP g B. c. ESTABLISH Train B RHR spray: SAT
3) CLOSE RHR injection UNSAT FCV-63-94.

Comment 10 Begin ALTERNATE PATH STEP - - SAT

n. C. ESTABLISH Train B RHR spray: UNSAT
4) OPEN RHR spray FCV-72-41.

Examinee places handswitch for RHR injection FCV-72-41 in the Standard: OPEN position and recognizes that the green light stays ON and the red light is OFF, goes to RNO column.

Comment

1503 NRC Sim JPM F Page 10 of 13 11 ALTERNATE PATH STEP - - SAT c_ IF Train B RHR spray CANNOT be established, - - UNSAT THEN PERFORM the following:

a) ENSURE RHRspray FCV-72-41 CLOSED.

Examinee verifies FCV-72-41 closed as indicated by green light ON Standard:

and red light OFF.

Comment 12 c. IF Train B RHR spray STEP SAT CANNOT be established, THEN PERFORM the following: UNSAT b) IF RHR aligned for cold leg recirculation, THEN ENSURE FCV-63-94 OPEN.

Comment 13 C. IF Train B RHR spray STEP CANNOT be established, - - SAT THEN PERFORM the follmving: - - UNSAT c) ESTABLISH Train A RHR spray:

('I) ENSURE RHR crosstie FCV-74-33 CLOSED.

Examinee verifies RHR crosstie FCV-74-33 in the CLOSED position Standard:

as indicated by green light ON handswitch.

Comment

1503 NRC Sim JPM F Page 11 of 13 14 c. IF Train B RHR spray STEP SAT CANNOT be established, THEN PERFORM the following:

UNSAT c) ESTABLISH Train A RHR spray:

(2) CLOSE RHR injection FCV-63-93.

Comment 15 c. IF Train B RHRspray STEP SAT CANNOT be established, THEN PERFORM the following: UNSAT c) ESTABLISH Train A RHR spray:

(3) OPEN RHR spray FCV-72--40.

Examiner When examinee starts to open FCV-72-40, initate a 240 sec ramp on Note CH01 A thru D to reduce CNMT pressure from 10.2 to zero (0).

Comment

1503 NRC Sim JPM F Page 12 of 13 16 STEP - - SAT Examinee verifies that RHR Containment spray is effective in lowering CNMT pressure. --

UNSAT Standard: Examinee verifies that CNMT pressure is lowering by observing Lower pressure readings on CH01A thru D Comment Terminating Provide the following cue, "Another operator will complete the Cue: STOP remaining steps of this procedure."

Stop Time ----

DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 has experienced a reactor trip and Safety Injection in conjunction with a large break LOCA.
2. The crew is monitoring step 13 of FR-Z.1, HIGH CONTAINMENT PRESSURE.
3. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> has elapsed since the accident.

INITIATING CUES:

1. The SRO directed you to initiate one train of RHR spray per FR-Z.1, HIGH CONTAINMENT PRESSURE starting at step 13.
2. Inform the SRO when a train of RHR spray has been established.

SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPMG

2015 NRG SIM JPM G Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task: 3210430301 Task#: Respond to a loss of Shutdown Board using AOP-P.05.

Task Standard: The examinee will respond to a loss of Shutdown Board using AOP-P.05 and start the 1A Charging pump. Subsequently the examinee will place the 1B Diesel Generator in emergency stop due to a failure of the cooling water valve to open.

Alternate Path: YES: - - x - NO:

Time Critical Task: YES: NO: x KIA Reference/Ratings: 062 A2.04 (3.1/3.4)

Method of Testing:

Simulated Performance: Actual Performance: x Evaluation Method:

Simulator x In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: I Name I Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 8 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

2015 NRG SIM JPM G Page 3 of 10 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 16
3. PLACE SIMULATOR IN RUN
4. An extra operator will be required to acknowledge alarms.
5. ACKNOWLEDGE ALARMS
6. FREEZE SIMULATOR
7. Save as a temporary IC, if repeat runs of JPM will be desired.
8. PLACE SIMULATOR IN RUN
9. De-energize the 1B 6.9 kv Shutdown Board by inserting IMF ED068
10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1. AOP-P.05 LOSS OF UNIT 1 SHUTDOWN BOARDS 23 2.

2015 NRC SIM JPM G Page 4 of 10 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1.

INITIATING CUES:

1. Respond to plant conditions

2015 NRC SIM JPM G Page 5 of 10 Start Time STEP 1 - - SAT Obtain a copy of AOP-P.05 LOSS OF UNIT 1 SHUTDOWN BOARDS.

- - UNSAT Standard: Examinee obtains a copy of AOP-P.05 LOSS OF UNIT 1 SHUTDOWN BOARDS.

Comment

2. DETERMINE applicable section:

GOTO IF ... SECTION PAGE 1A-A 2.1 4 6900V Shutdown Board DE-ENERGIZED 18-8 2.2 20 STEP 2 --

SAT Determine applicable section.

- - UNSAT Standard: The examinee determines the 1B 6.9 kv Shutdown Board is de-energized and proceeds to section 2.2.

Comment

2015 NRC SIM JPM G Page 6 of 10 NOTE

  • MSR HP Steam Supply valves will close due to loss of power, resulting in load reduction.
  • Loss of power to this board will result in a loss of RPls and rod bottom lights .

STEP 3 --

SAT

1. MONITOR 1A-A 6900V Shutdown Board ENERGIZED. - - UNSAT Standard: The examinee monitors 1A-A 6900V Shutdown Board ENERGIZED by observing plant instrumentation.

Comment CAUTION

  • Restoring seal cooling to an overheated RCP seal could result in RCP seal damage or steam voiding in CCS.
  • Operation of RCPs for greater than 2 minutes without CCS cooling to oil coolers will result in bearing temperatures greater than 200°F.

STEP 2. CHECK RCP seal cooling available:

- - SAT 4

  • seal injection flow UNSAT OR
  • thermal barrier cooling flow Standard: Addresses the procedure step.

Comment

2015 NRC SIM JPM G Page 7 of 10

3. ENSURE at least one Train B ERCW Pump STEP 5 RUNNING: - - SAT

- - UNSAT OR

  • P-B ERCW Pump Standard: The examinee verifies B Train ERCW running by observing the red light above the respective handswitch ON.

Comment ALTERNATE PATH STEP 6 SAT

4. ENSURE the following: EMERGENCY STOP any running DIG with NO ERCW cooling available. UNSAT
  • D/Gs RUNNING
  • ERCW ALIGNED to running D/Gs.

Comment STEP 7 5. ENSURE CCS pumps RUNNING: - - SAT

a. ENSURE 1A-A CCS Pump - - UNSAT supplying Train A.
b. ENSURE 28-B or C-S CCS Pump supplying Train B.

The examinee verifies 1A CCS pump running by observing the red light above the HS-70-47A ON.

Standard:

The examinee verifies C-S CCS pump running by observing the red light above the HS-70-51A ON.

Comment

2015 NRG SIM JPM G Page 8of10 NOTE If RHR pump 1B-B was in service for shutdown cooling prior to loss of 6900V Shutdown Board 18-8, the pump will not restart automatically.

6. IF RHR pump 1B-B was in service STEP 8 --

SAT for shutdown cooling, THEN ENSURE AOP-R.03, RHR System - - UNSAT Malfunctions, entered to address RHR pump trip, WHILE continuing in this procedure.

Standard: The examinee addresses the procedure step as N/A.

Comment STEP 9 - - SAT

7. MONITOR REACTOR COOLANT PUMPS MOTOR THRUST BEARING TEMP HIGH UNSAT alarm DARK. [1-M-58, E-3) --

Standard: The Examinee observes [1-M-58, E-3] dark.

Comment ALTERNATE PATH STEP 9 SAT

8. CHECK CCP 1A-A RUNNING. PERFORM the following:

UNSAT

a. ENSURE CCP suction path:
  • LCV-62-132 and -133 OPEN with VCT level greater than 20%

OR

  • LCV-62-135 OPEN
b. START CCP 1A-A.

Comment

2015 NRG SIM JPM G Page 9 of 10 Terminating Provide the following cue, "Another operator will complete the STOP Cue: remaining steps of this procedure."

Stop Time ____

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1.

INITIATING CUES:

1. Respond to plant conditions Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1503 NRC SIMULATOR JPM H

2015 NRC SIM JPM H Page 2 of 16 RO/SRO JOB PERFORMANCE MEASURE Task: Respond to a loss of Essential Raw Cooling Water per AOP-M.01.

Task#: 0000620501 Task Standard: The examinee will respond to a loss of ERCW by starting the STANDBY A TRAIN ERCW Pump and the ERCW Header leak has been isolated.

Alternate Path: x YES: - - - NO:

Time Critical Task: YES: NO: x KIA Reference/Ratings: APE A07AA1.3 (3.3/3.5)

Method of Testing:

Simulated Performance: Actual Performance: x Evaluation Method:

Simulator x

- - - In-Plant - - - Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: I Name I Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 20 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

2015 NRC SIM JPM H Page 3 of 16 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 16
3. PLACE SIMULATOR IN RUN
4. An extra operator will be required to acknowledge alarms.
5. ACKNOWLEDGE ALARMS
6. FREEZE SIMULATOR.
7. Save as a temporary IC, if repeat runs of JPM will be desired.
8. PLACE SIMULATOR IN RUN
9. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
10. When directed insert malfunction MF RW01G (Trips Q-A ERCW Pump)
11. When directed insert malfunction RW138 at 90% prior to JPM step 8.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1. AOP-M.01 Loss of ERCW 28 2.

2015 NRG SIM JPM H Page 4 of 16 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1.

INITIATING CUES:

1. Respond to plant conditions

2015 NRG SIM JPM H Page 5 of 16 Start Time ERCW/CCS PUMP PUMP R-A DISH PRESS MOTOR LOW TRIP Responds to alarm using ARP O-AR-M27-A, B-2 and/or O-AR-M27-BA, STEP 1 SAT E-4 --

UNSAT

[1] IF ERCW pump motor TRIPS, THEN GO TO AOP-M_Oi, Loss of Essential Raw Cooling Water.

[2] IF CCS motor trip, THEN GO TO AOP-rvt03, Loss of Component Cooling Water.

[3] DETERMINE which motor tripped.

[4] TURN control switch to OFF position to reset alarm_

[5] DISPATCH operator to investigate cause of alarm.

[6] EVALUATE LCO 3T3 (CCS) or 3.7A (ERCW).

Standard: Examinee Places O-HS-67-460A ERCW Pump Q-A in PTL.

Comment

2015 NRC SIM JPM H Page 6 of 16 CAUTION: ERCW header rupture in Aux Bldg could fill passive sump in 15 minutes.

Prompt action may be needed to isolate rupture using this AOP.

1. CHECK for indlcations of ERCW rupture GO TO Step4.

STEP 2 inside Aux Building: - - SAT

  • flooding from ERCW inside Aux Bldg which requires rapid isolation to protect

~ --

UNSAT equipment or personnel OR

  • abnormal high flow indicated on any ERCW supptf header in conjunction with flooding alarms or other indications of ruptl.Jre.

Examinee determines no leak exists in the Aux Building based on no Standard: reports of flooding and no indications of high flow and so goes to RNO and then to STEP 4 Comment STEP 3 4. IF this procedure entered for any reason

- - SAT other than ERCW rupture in Aux Bldg, THEN GO TO applicable section: - - UNSAT Standard: The examinee determines a pump trip has occurred and goes to section 2. 1.

Comment

2015 NRC SIM JPM H Page 7 of 16 IF ... GO TO SECTION PAGE ERCW Pump(s) tripped or failed 2.1 ERCW pump failure 9 STEP 4 --

SAT 1- IDENTIFY and LOCK OUT failed ERCW pump.

- - UNSAT Standard: Examinee Places O-HS-67-460A ERCW Pump Q-A in PTL if not already performed.

Comment STEP 5 SAT

2. START additional ERCW pumps as required to maintain supply header pressure between 78 psig and 124 psig. UNSAT Comment STEP 6 - - SAT
3. CHECK two Train A ERCW Pumps AVAILABLE.

- - UNSAT Standard: Examinee verifies that 2 Train A ERCW Pumps are available based on various indications.

Comment

2015 NRG SIM JPM H Page 8 of 16

4. CHECK 1A and 2A ERCW supply STEP 7 header pressures and flows NORMAL: --

SAT

- - UNSAT

a. Supply header pressures Ibetween 7~ psig and 124 psig]:

,. 1-Pl-67-493A

  • 2-Pl-67-493A
b. Supply header flows

[expected vatue]:

It 1-Fi-67-61

  • 2-FJ-67-61 Standard: Examinee determines that A Train supply header pressures and flows are normal based on plant indicators.

Comment Examiner Direct the simulator operator to insert RW138 at 90% prior to JPM step Note: 8. Change to B Train.

ALTERNATE PATH STEP 8 - - SAT r

"* CHECK 1B am:l 2B ERCW supply header If header leak or rupture is indicated, pressures and flows NORMAL: THEN - - UNSAT RETURN TO Section 2.0 for diagnosis.

a. Supply header pressures {between 78 psig and 124 psig]: _;1111--
  • 1-PJ-67-488A If NO Train B ERCW pump ls available,
  • 2-Pl-67-488A THEN GO TO Section 2.11, Loss of Train B ERGW.
b. Supply header !lows [expected valuej:
  • 1-Fl-67-62 ~
  • 2-Fl-67-62 If pressure is low due to only one pump available, THEN EVALUATE isolatlcn of non-essential ERCW loads.

Examinee checks Train B header pressures and flows and determines Standard: flows are abnormal based on the listed indicators, goes to the RNO and then to Section 2.0 for diagnosis Comment

2015 NRG SIM JPM H p aqe 9 0 f 16 CAUTION: ERCW header rupture in Aux Bldg could fill passive sump in 'f5 minutes.

Prompt action may be needed to isolate rupture using this AOP.

1. CHECK for indications of ERCW rupture GO TO Step4.

STEP 9 inside Aux Building: - - SAT

  • flooding from ERCW inside Aux Bldg which requires rapid isolation to protect

~ - - UNSAT equipment or personnel OR

  • abnom1al high !low indicated on any ERON supp.ly header in conjunction with flooding a!amis or other indications of mpture.

If asked provide the following cue," There are no reports of flooding Cue from the Aux Building."

Examinee determines no leak exists in the Aux Building based on no Standard: reports of flooding and no indications of high flow and so goes to RNO and then to STEP 4 Comment STEP 10 4. If this procedure entered for any reason other lhan ERCW mpture in Aux Bldg, - - SAT THEN

- - UNSAT GO TO applicable section:

law flow ERCW supply headers 18 and 26, AND STRAINER D!FF PRESS alarms DARK

[M-27A, C-6 and 0-SJ, AND at least one of the following alarms UT:

[1-M-156, A-3] Upstream of Strainer Inlet Valves OR OR Loss of Train B ERCW

OR

  • MECH EQUIP SUMP lVl HI alam1 UT

{1-M-15A, B-6]

Examinee determines Section 2.11 is applicable based on Low flow on Standard: ERCW supply headers 1B and 28 and one or more of the specified alarms.

Comment

2015 NRG SIM JPM H p age 10 0 f 16

1. CHECK this section entered for any STEP 11 of the following: --

SAT

  • rupture known to be upstream of ERON strainer inlet valve - - UNSAT (I or 2-FCV-67-489)

OR

  • rupture which CANNOT be isolated OR
  • rupture which requires stopping aH Train 8 ERCW flow.

Examinee determines that rupture is known to be upstream of due to Standard: absence of Strainer Differential Pressure alarms in combination with low flow in both 1B and 28 headers as identified in diagnosis step.

Cue: If asked provide the following cue, "The leak is upstream of the 8 Train strainer."

Comment CAUTION: If running, Train B CCP and SI Pumps may experience bearing failure 10 minutes after loss of ERCW cooling.

ALTERNATE PATH STEP 12 SAT

2. STOP and LOCK OUT aUTrain B ERCW Pumps. UNSAT Comment

2015 NRC SIM JPM H Page 11 of 16 CAUTION: Pipe rupture inside ERCW Pumping Station could result in safety hazards due to water spray and flooded compartments.

3. IF performing this section due to rupture STEP 13 Inside ERCW pumping station - - SAT OR due to rupture in unknown location, THEN UNSAT DISPATCH operators with radios to perform me following:
  • PERFORM Appendix G.2, ERCWMCC Valves. [ERCW Pumping Station}

. EHSURE all pumping station watertight doors are CLOSED.

[ERCW Pumping Station]_

Standard: Examinee addresses step and dispatches personnel to perform the required appendix and close watertight doors.

Cue Role play and acknowledge the request.

Comment 4_ OPEN alternate ERCW supply to STEP 14 Train B DfGs SAT

  • 1-FCV-67-65 (1B-B DIG) UNSAT
  • 2-FCV-<>7-65 (2B-B O!G'.f Cue: Provide the following cue, "Unit 2 HS-67-65 has been opened."

Comment

2015 NRC SIM JPM H Page 12 of 16 STEP 15 5. DISPATCH operator to place Train B - - SAT Aux Air Compressor in SAFE STOP.

[Aux Bldg, 734' elev, Refuel Floor}

- - UNSAT Standard: Examinee addresses the procedure step.

Cue Role play and acknowledge the request.

Comment

6. Unit *1 Only:

STEP 16 STOP affected pumps: - - SAT

a. CHECK CCP '1A-A RUNNING. a. IF RCP thermal barrier cooling is in service, - - UNSAT THEN
1) ENSURE letdown orifice valves CLOSED.
2) GO TO Substep 6.b.

~

Standard: Examinee identifies that 1A CCP is not running and goes to RNO.

Comment

2015 NRC SIM JPM H Page 13of16 STEP 17 a. IF RCP them1al barrier cooling is SAT in service, THEH UNSAT

1) ENSURE letdown orifice valves CLOSED.
2) GO TO Substep 6-b.

~

Comment STEP 18 SAT

b. PLACE CCP 1B-B in PULL TO LOCK.

UNSAT Comment STEP 19 - - SAT

c. PLACE SI pump 18-B in PULL TO LOCK.

- - UNSAT Standard: Examinee places HS-63-1 SA SI Pump 1Bin PTL.

Comment

2015 NRC SIM JPM H Page 14 of 16

7. Unit2 Onty:

STEP 20 STOP affected pumps:

SAT

a. CHECK CCP 2A-A RUNNING. a. IF RCP thermal barrier cooling is in s.enrlce, THEN --

UNSAT

1) ENSURE letdown orifice valves CLOSED.
2) GO TO Substep 7.b.

~

IF RCP thermal barrier cooling is NOT in service, THEN PERFORM Ille folfowing:

1) WHEN :CCP 2A-A ls running {Step 8},

THEN PLACE CCP 26-B in PULL TO LOCK.

2) GO TO Substep 7.c.

~

b. PLACE CCP 2B-B in PULL TO LOCK.
c. PLACE SI pump 28-B in PULL TO LOCK Standard: Examinee addresses the procedure step.

Cue: Provide the following cue, "Unit 2 will perform Step 7".

Comment STEP 21 SAT

8. ENSURE Train A CCPs RUNNING.

UNSAT Comment

2015 NRG SIM JPM H Page 15of16 Terminating Provide the following cue, "Another operator will complete the STOP Cue: remaining steps of this procedure."

Stop Time _ _ __

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3.

INITIATING CUES:

1. Respond to plant conditions Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1503 NRC PLANT JPM I

1503 NRC PLANT JPM I Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task: Locally closing MSIV's by pulling control power fuses.

Task#: 3010030601 Task Standard: The examinee closes MSIV's for SG 2, 3, and 4 by placing its transfer control switch in the Auxiliary Control Room in the AUX position then removes the control power fuses on the associated 125 V Vital Battery Board for SG 1.

Alternate Path: YES: - - - NO: x Time Critical Task: YES: NO: x KIA Reference/Ratings: APE 040AA1.04 (4.3/4.3)

Method of Testing:

Simulated Performance: x Actual Performance:

Evaluation Method:

Simulator In-Plant x Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: I Name I Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 8 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

1503 NRC PLANT JPM I Page 3of10 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. SM approval will be required to enter the 'Trip Hazard Zone" in backup control room.
2. Critical steps are identified in step SAT/UNSAT column by bold print 'Critical Step.'
3. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1. EA-1-1 Closing MSIVs Locally 1
========================================================================

READ TO EXAMINEE HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

DIRECTIONS TO OPERATOR:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 2 is in MODE 3
2. Unit 2 has experienced faulted SG's.
3. Attempts to close MSIV's from the main control room (MCR) have failed.
4. All MSIV bypass valves are closed.

INITIATING CUES:

1. The SRO has directed you to attempt to close MSIV's, using EA-1-1.
2. Inform the SRO when complete.

1503 NRC PLANT JPM I Page 4 of 10 Start Time STEP 1 - - SAT Obtain a copy of EA-1-1, Closing MSIVs Locally.

- - UNSAT Standard: Operator obtains a copy of EA-1-1, Closing MSIVs Locally.

Cue ProvideacopyofEA-1-1, Closing MSIVs Locally.

Comment 4.1 Section, Applicability STEP 2 - - SAT

1. SELECT applicable unit:

- - UNSAT

  • Unit 1
  • Unit2 - -

Standard: The Examinee selects Unit 2 based on the initiating cue.

Comment

1503 NRC PLANT JPM I Page 5of10 I 2. SELECT affected valve(s):

STEP 3 - - SAT SIG AFFECTED VALVE{S)

UNSAT

  1. 1 MSIV 0 MSIV bypass 0
  1. 2 MSIV 0 MSIV bypass 0
  1. 3 MSIV 0 MSIV bypass 0
  1. 4 MSIV 0 MSIV bypass 0 Standard: The examinee selects all MSIV's based on the initiating cue Comment
3. IF any Unit 1 MSIV will NOT close, STEP 4 THEN - - SAT GO TO Section 4.2. D

~ - - UNSAT Standard: The examinee addresses the procedure step as N/A.

Comment

4. IF any Unit 1 MSIV bypass valve will NOT close, STEP 5 THEN - - SAT GO TO Section 4.3. D

~ - - UNSAT Standard: The Examinee addresses the step as N/A.

Comment

1503 NRC PLANT JPM I Page 6of10 I 5. IF any Unit 2 MS!V will NOT close, STEP 6 - - SAT THEN GO TO Section 4.4. D

- - UNSAT

~

Standard: The Examinee goes to section 4.4 Comment 4.4 Unit 2 MSIV Isolation STEP 7 - - SAT

1. PLACE affected MSIV transfer control switch in AUX position:

- - UNSAT

[Auxiliary Control Room, Panels 2-L-11A and 2-L-118]

AUX TRANSFER AUX POSITION SIG EQUIPMENT ,/

SWITCH 1

MS!V Loop 1, Train A, 2-FCV-1-4 2-XS-1-4A D MS!V Loop 1, Train B, 2-FCV-1-4 2-XS-1-48 D Standard: The Examinee places 2-XS-1-4A & 2-XS-1-48 and to AUX.

Comment

1503 NRC PLANT JPM I Page 7 of 10 4.4 Unit 2 MSIV Isolation STEP 8 SAT

1. PLACE affected MSIV transfer control switch in AUX position:

[Auxiliary Control Room, Panels 2-L-11A and 2-L-11B] UNSAT AUX TRANSFER AUX POSITION S/G EQUIPMENT SWITCH '1 MSIV Loop 2, Train A, 2-FCV-1-11 2-XS-1-11A D 2

MSIV Loop 2, Train B. 2-FCV-1-11 2-XS-1-118 D 3

MSIV Loop 3, Train A, 2-FCV-1-22 2-XS-1-22A D MSIV Loop 3, Train B, 2-FCV-1-22 2-XS-1-228 D 4

MSIV Loop 4. Train A, 2-FCV-1-29 2-XS-1-29A D MSIV Loop 4, Train B. 2-FCV-1-29 2-XS-1-298 D Comment

2. CONSULT UO to determine if affected MSIV closed. D STEP 9 - - SAT

- - UNSAT Standard: The Examinee contacts the MCR to determine status of MSIV's. CRITICAL Cue When asked provide the following cue, "The MSIV for Loop 1 is OPEN The MSIV's for Loop 2, 3 and 4 are CLOSED."

Comment

1503 NRC PLANT JPM I Page 8 of 10 NOTE1 Fuse pullers and flashlight will be needed for next step.

These may be obtained from AOP-C.04 cabinet in 6.9KV Shutdown Board Room A.

NOTE2 Fuses may be removed in any order.

3. IF affected MSIV still open STEP 10 OR control power fuse removal desired, SAT THEN REMOVE fuses for affected MS!V{s): UNSAT FUSES FUSE LOCATION SIG EQUIPMENT REMOVED (Two per circuit) v' 125V Vital Battery Bd !II MSIV Loop 1, Train A, 2-FCV-1-4 Circuit A-46 0 1 Circuit B-46 0 125V Vital Battery Bd IV MSIV Loop 1, Train 8, 2-FCV-1-4 Circuit A-46 0 Circuit B-46 0 Cue If asked provide the following cue, "Loop 1 MSIV is CLOSED. Steam generator #1 pressure is 450 psig and stable."

Comment

1503 NRC PLANT JPM I Page 9 of 10 STEP 11 SAT

4. GO TO Section 4.1, step in effect UNSAT END OF SECTION Standard: The Examinee addresses the procedure step.

Comment Terminating The JPM is complete when the Examinee returns the cue sheet to STOP Cue: the Examiner.

Stop Time

JPM BRIEFING SHEET DIRECTIONS TO OPERATOR:

All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 2 is in MODE 3
2. Unit 2 has experienced faulted SG's.
3. Attempts to close MSIV's from the main control room (MCR) have failed.
4. All MSIV bypass valves are closed.

INITIATING CUES:

1. The SRO has directed you to attempt to close MSIV's, using EA-1-1.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1503 NRC PLANT JPMJ

PLANT JPM J Page 2 of 8 RO/SRO JOB PERFORMANCE MEASURE Task: Take Local Control of the Turbine Driven AFW Level Control valve 2-LCV-3-175.

Task#: 0000140504 Task Standard: The Examinee simulates assuming local control of 2-LCV-3-175.

Alternate Path: YES: NO: x Time Critical Task: YES: ---

NO: x KIA Reference/Ratings: APE 068 AA1 .03 (4.1/4.3)

Method of Testing:

Simulated Performance: x Actual Performance:

Evaluation Method:

Simulator ---

In-Plant ---

x Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: I Name I Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 12 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

PLANT JPM J Page 3 of 8 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified in step SAT/UNSAT column by bold print 'Critical Step.'
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

References*

Reference Title Rev No.

1. AOP-C.04 SHUTDOWN FROM AUXILIARY CONTROL 35 ROOM
========================================================================

READ TO EXAMINEE HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

DIRECTIONS TO OPERATOR:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 2 is in MODE 3.
2. Unit 2 TD AFW Loop 4 LCV (2-LCV-175) is OPEN.
3. AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM is in progress.
4. APPENDIX W.2 CONTROL OF UNIT 2 TURBINE DRIVEN AFW FLOW FROM OUTSIDE MCR has been completed through step 5.

INITIATING CUES:

1. You have been directed to locally shut Unit 2 TD AFW Loop 4 LCV (2-LCV-175) using APPENDIX W.2 CONTROL OF UNIT 2 TURBINE DRIVEN AFW FLOW FROM OUTSIDE MCR starting at step 6.
2. Inform the SRO when complete.

PLANT JPM J Page 4 of 8 Start Time STEP 1 --

SAT Obtain a copy of AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM. --

UNSAT Standard: Operator obtains a copy of AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM.

Cue Provide a copy of AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM Appendix W.2.

Comment

6. IF necessary to locally control TD AFW flow to Unit 2 SIG #1.

STEP 2 THEN - - SAT PERFORM the following: [Aux Bldg el 714 Unit 2 Pen Rm

- - UNSAT at emergency control station for 2-LCV-3-174]

Standard: The Examinee addresses the procedure step as N/A.

Comment

7. IF necessary to locally control TD AFW flow to Unit 2 S/G #2 or 3.

STEP 3 THEN - - SAT THROTTLE or CLOSE TD AFW valves as directed:

- - UNSAT Standard: The Examinee addresses the procedure step as N/A.

Comment

PLANT JPM J Page 5 of 8 NOTE1 Turbine-Driven AFW level control valves fail in OPEN position on loss of control air. The following step uses air from SBO air bottle to close S/G #4 TDAFW LCV from emergency control station. Approximately 45 psig (on outlet pressure indicator 2-Pl-3-1758) should be applied if necessary to close valve.

NOTE2 At minimum SBO air bottle pressure (800 psig), sufficient air supply is available for at least four full strokes (open to closed) of TD AFW LCV. Valve strokes should be minimized to conserve air supply.

8. IF necessary to locally control TD AFW flow to Unit 2 SIG #4, STEP 4 THEN SAT PERFORM the following: [Aux Bldg el 714 Unit 2 Pen Rm using emergency control station for 2-LCV-3-175] UNSAT
a. CLOSE [2-VTIV-3-175EJ. Vent Valve. D Provide the following cue, "Valve handle turned 90° CW and is now snug."

Comment

8. IF necessary to locally control TD AFW flow to Unit 2 SIG #4.

STEP 5 THEN SAT PERFORM the following: [Aux Bldg el 714 Unit 2 Pen Rm using emergency control station for 2-LCV-3-175] UNSAT

b. ENSURE [2-PREG-3-175), Pressure Regulator. is adjusted fully counterclockwise (lower direction). D Provide the following cue, "Regulator handle turned several turns CCW and is now snug."

Comment

PLANT JPM J Page 6 of 8

8. IF necessary to locally control TD AFW flow to Unit 2 SIG #4,

.STEP 6 THEN SAT PERFORM the following: [Aux Bldg el 714 Unit 2 Pen Rm using emergency control station for 2-LCV-3-175] UNSAT

c. OPEN [2-ISIV-32-1866KJ, SBO/App. R HP Air Cy! !sol Valve. D Provide the following cue, "Valve handle turned 90° CCW and is now snug."

If asked provide the following cue point to 90 psig on pressure indicator 2-Pl-3-1750.

Comment

8. IF necessary to locally control TD AFW flow to Unit 2 S/G #4.

STEP 7 THEN SAT PERFORM the following: [Aux Bldg el 714 Unit 2 Pen Rm using emergency control station for 2-LCV-3-175] UNSAT Provide the following cue, "Valve handle turned 90° CCW and is now snug."

Comment

PLANT JPM J Page 7 of 8

8. IF necessary to locally control TD AFW flow to Unit 2 SIG #4, STEP 8 THEN SAT PERFORM the following: [Aux Bldg el 714 Unit 2 Pen Rm using emergency control station for 2-LCV-3-175} UNSAT Cue Provide the following cue, "Valve handle turned 90° CCW."

Comment

8. IF necessary to locally control TD AFW flow to Unit 2 S/G #4, STEP 9 THEN SAT PERFORM the following: [Aux Bldg el 714 Unit 2 Pen Rm using emergency control station for 2-LCV-3-175] UNSAT
f. ADJUST [2-PREG-3-1751. Pressure Regulator. slowly in clockwise direction to close 2-LCV-3-175 as directed by ACR D If asked as to where to place 2-LCV-3-175, direct the Examinee to refer to the initiating cue.

After the Examinee simulates adjusting [2-PREG-3-175], Pressure Regulator, in full clockwise direction point approximately to 45 psig on outlet pressure indicator 2-Pl-3-1758.

Comment Terminating Provide the following cue "Another operator will perform the Cue: STOP remaining steps of this procedure."

Stop Time

JPM BRIEFING SHEET DIRECTIONS TO OPERATOR:

All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 2 is in MODE 3.
2. Unit 2 TD AFW Loop 4 LCV (2-LCV-175) is OPEN.
3. AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM is in progress.
4. APPENDIX W.2 CONTROL OF UNIT 2 TURBINE DRIVEN AFW FLOW FROM OUTSIDE MCR has been completed through step 5.

INITIATING CUES:

1. You have been directed to locally shut Unit 2 TD AFW Loop 4 LCV (2-LCV-175) using APPENDIX W.2 CONTROL OF UNIT 2 TURBINE DRIVEN AFW FLOW FROM OUTSIDE MCR starting at step 6.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1503 NRC PLANT JPMK

PLANT JPM K Page 2 of 14 RO/SRO JOB PERFORMANCE MEASURE Task: Radiation Monitor O-RE-90-122 Flushing After Hi Radiation Signal Isolation of Release.

Task#: 0690100104 Task Standard: The examinee completes flushing of O-RE-90-122 after isolation due to high radiation.

Alternate Path: YES: - - x - NO:

Time Critical Task: YES: - - - NO: x KIA Reference/Ratings: 073 K4.02 (3.3/3.9)

Method of Testing:

Simulated Performance: Actual Performance: x Evaluation Method:

Simulator In-Plant x Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: I Name I Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 20 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

PLANT JPM K Page 3 of 14 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified in step SAT/UNSAT column by bold print 'Critical Step.'
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

O-S0-77-1 Waste Disposal System 53

========================================================================

READ TO EXAMINEE DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAM/NEE AT THIS TIME!

INITIAL CONDITIONS:

1. A release from the CDCT has just been initiated using O-S0-77-1, Waste Disposal System and O-Sl-CEM-077-400.1 Liquid Waste Effluent Batch Release.
2. The calculated high radiation trip setpoint for O-RM-90-122 is 8.59 E+04 cpm, using O-Sl-CEM-077-400.1, Liquid Waste Effluent Batch Release.
3. A high radiation signal on O-RE-90-122 occurred shortly after initiation of the release, causing an isolation of the release.
4. O-RCV-77-43 has been verified CLOSED.
5. All Prerequisite Actions are complete (Section 4.0)

INITIATING CUES:

1. You have been directed to perform Section 8.2 of O-S0-77-1, Waste Disposal System to flush O-RE-90-122 after the High Radiation Isolation.
2. Inform the SRO when complete.

PLANT JPM K Page 4 of 14 Start Time STEP 1 - - SAT Obtain a copy of O-S0-77-1, Waste Disposal System UNSAT Standard: Operator obtains a copy of O-S0-77-1, Waste Disposal System Provide an in progress copy of O-S0-77-1, Waste Disposal System, Cue section 8.2 Radiation Monitor O-RE-90-122 Flushing After Hi Radiation Signal Isolation of Release.

Comment STEP 2 - - SAT

[1] ENSURE [0-RCV-77-43] Radiation Control Valve is CLOSED.

- - UNSAT Standard: The Examinee refers to the procedure step.

Cue If asked, tell the Examinee to refer to the initial conditions.

Comment

PLANT JPM K Page 5 of 14 I STEP 3 - - SAT

[2] ENSURE [0-77-689AJ Radiation Monitor Inlet Isolation Valve is OPEN.

- - UNSAT Standard: Examinee simulates ensuring [0-77-689A] Radiation Monitor Inlet Isolation Valve is OPEN.

If asked provide the following cue, "valve HW turned in the CW Cue direction slightly and then returned fully CCW valve to original position."

Comment STEP 4 SAT

[3] OPEN [0-77-68981 Discharge to FDCT Isolation Valve.

UNSAT If asked provide the following cue, "valve HW turned in the CCW direction several turns and is now snug."

Comment

PLANT JPM K Page 6 of 14 STEP 5 SAT

[4] CLOSE [0-77-689C] Radiation Monitor Return to Release Header Isolation Valve.

UNSAT Standard: Examinee simulates closing [0-77-689C] Radiation Monitor Return to Release Header Isolation Valve.

Comment STEP 6 - - SAT

[5] VERIFY [0-RE-90-122] radiation monitor pump is running.

- - UNSAT Standard: Examinee simulates ensuring [O-RE-90-122] radiation monitor pump is running.

Cue If asked provide the following cue," Red light above O-HS-90-1228 is ON."

Comment

PLANT JPM K Page 7 of 14 I

STEP 7 - - SAT

[6] ALLOW [0-RE-90-1221 Radiation Monitor to flush to FDCT for 5 minutes.

- - UNSAT Standard: Examinee addresses the procedure step.

Cue Provide the following cue, "Time has been compressed, five minutes has passed."

Comment STEP 8 SAT

[7J OPEN f0-77-689C].

UNSAT If asked provide the following cue, "valve HW turned in the CCW direction several turns and is now snug."

Comment

PLANT JPM K Page 8 of 14 STEP 9 SAT

[8] CLOSE [0-77-689BJ.

UNSAT If asked provide the following cue, "valve HW turned in the CW direction several turns and is now snug."

Comment STEP 10 [9] RECORD O-RE-90-122 reading: - - SAT

- - UNSAT O-RE-90-122 Reading cpm.

Standard: Examinee records O-RE-90-122 reading.

Cue Provide the following cue "O-RE-90-122 is reading 9.00 E+04 cpm" Comment

PLANT JPM K Page 9 of 14 I

STEP 11 - - SAT

[1 OJ IF the reading obtained in step 8.2[9] is below the trip setpoint,

. THEN

- - UNSAT Standard: The Examinee addresses the procedure step as N/A.

Comment STEP 12 [11] IF the reading obtained in step 8.2[9] is still above the trip SAT setpoint, THEN UNSAT PERFORM the following steps to lmver the radiation monitor reading:

[11.1] CLOSE applicable tank isolation valve from release header (NIA tanks not aligned):

Tank Being Released Isolation Valve INITIALS Cask Decon Collector Tank 0-77-679 Monitor Tank 0-77-1306 If asked provide the following cue, "valve HW turned in the CW direction several turns and is now snug."

Comment

PLANT JPM K Page 10 of 14 STEP 13 SAT

[11.2] OPEN [0-VLV-59-735] Demin Flush To Radwaste !SOL UNSAT If asked provide the following cue, "valve HW turned in the CCW direction several turns and is now snug."

Comment STEP 14 SAT

[11.3] OPEN [0-77-68981 Discharge to FDCT Isolation Valve.

UNSAT If asked provide the following cue, "valve HW turned in the CCW direction several turns and is now snug."

Comment

PLANT JPM K Page 11 of 14 STEP 15 SAT

[11.4] CLOSE [0*77 -689CJ Radiation Monitor Return to Release Header Isolation Valve. UNSAT If asked provide the following cue, "valve HW turned in the CW direction several turns and is now snug."

Comment

[11.5] WHEN count rate on fO-RE-90-1221 STEP 16 lowers to its minimum value, THEN SAT

[11.5.1] OPEN f0-77-689CJ Radiation Monitor Return to UNSAT Release Header Isolation Valve.

Cue Provide the following cue, "Count rate on O-RE-90-122 has lowered to 8.0 E+02 cpm and is stable."

If asked provide the following cue, "valve HW turned in the CCW direction several turns and is now snug."

Comment

PLANT JPM K Page 12 of 14 STEP 17 (11.5] WHEN count rate on [O-RE-90-122] SAT lowers to its minimum value, THEN

[11.5.2] CLOSE [0-77-68981 Discharge to FDCT Isolation UNSAT Valve.

If asked provide the following cue, "valve HW turned in the CW direction several turns and is now snug."

Comment STEP 18 SAT

[11.6] CLOSE [O-VLV-59-735) Demin Flush To Radwaste !sol.

UNSAT Cue If asked provide the following cue, "valve HW turned in the CW direction several turns and is now snug."

Comment

PLANT JPM K Page 13 of 14

[11.7] OPEN applicable tank isolation valve previously closed STEP 19 in step 8.2[11.1] (NIA tanks not aligned): SAT Tank Being Released Isolation Valve INITIALS UNSAT Cask Decon Collector Tank 0-77-679 Monitor Tank 0-77-1306 If asked provide the following cue, "valve HW turned in the CCW direction several turns and is now snug."

Comment STEP 20 [11.8] IF hi radiation alarm will NOT clear, THEN

- - SAT NOTIFY the appropriate US/SRO that alarm will NOT clear. - - UNSAT Standard: The Examinee addresses the procedure step as N/A.

Comment Terminating Provide the following cue "Another operator will perform the STOP Cue: remaining steps of this procedure."

Stop Time

JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. A release from the CDCT has just been initiated using O-S0-77-1 Waste Disposal System and O-Sl-CEM-077-400.1 Liquid Waste Effluent Batch Release.
2. The calculated high radiation trip setpoint for O-RM-90-122 is 8.59 E+04 cpm, using O-Sl-CEM-077-400.1, Liquid Waste Effluent Batch Release.
3. A high radiation signal on O-RE-90-122 occurred shortly after initiation of the release, causing an isolation of the release.
4. O-RCV-77-43 has been verified CLOSED.
5. All Prerequisite Actions are complete (Section 4.0)

INITIATING CUES:

3. You have been directed to perform Section 8.2 of O-S0-77-1, Waste Disposal System to flush O-RE-90-122 after the High Radiation Isolation.
4. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.