{{#Wiki_filter:1OCFR55.40 Progress Energy Serial: RNP-RA/l 0-0098 JAN13 2011 Mr. Richard S. Baldwin Senior Operations Engineer, Department of Reactor Safety U. S. Nuclear Regulatory Commission Region II
{{#Wiki_filter:1OCFR55.40 Progress Energy Serial: RNP-RA/l 0-0098 JAN13 2011 Mr. Richard S. Baldwin Senior Operations Engineer, Department of Reactor Safety U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 303 03-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 REACTOR OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS
                                        -
Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 303 03-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 REACTOR OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS


==Dear Mr. Baldwin:==
==Dear Mr. Baldwin:==
Line 33: Line 31:
Mr. M. T. Widmann, NRC, Region II (w/o Enclosure)
Mr. M. T. Widmann, NRC, Region II (w/o Enclosure)


10CFR55.5 Progress Energy Serial: RNP-RA!1 0-0099 JPN 282011 Victor MeCree Regional Administrator U. S. Nuclear Regulatory Commission Region II
10CFR55.5 Progress Energy Serial: RNP-RA!1 0-0099 JPN 282011 Victor MeCree Regional Administrator U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 PRELIMINARY APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS
                                        -
Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 PRELIMINARY APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS


==Dear Mr. Reyes:==
==Dear Mr. Reyes:==


In response to NRC letter dated September 2, 2010, Carolina Power and Light Company, also known as Progress Energy Carolinas, Inc. (PEC), is submitting preliminary Personal Qualification Statement Licensee (i.e., NRC Form 398) and Certification of Medical
In response to NRC letter dated September 2, 2010, Carolina Power and Light Company, also known as Progress Energy Carolinas, Inc. (PEC), is submitting preliminary Personal Qualification Statement Licensee (i.e., NRC Form 398) and Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for six Senior Reactor Operator applicants and six Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. The September 2, 2010 letter requested that the preliminary forms be submitted to the NRC at least 30 days before the examination date. As discussed during a phone conversation between Mr. James Conder, PEC, and Mr. Richard S. Baldwin, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No. 2, beginning February 28, 2011.
                                    -
Examination by Facility Licensee (i.e., NRC Form 396) forms for six Senior Reactor Operator applicants and six Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. The September 2, 2010 letter requested that the preliminary forms be submitted to the NRC at least 30 days before the examination date. As discussed during a phone conversation between Mr. James Conder, PEC, and Mr. Richard S. Baldwin, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No. 2, beginning February 28, 2011.
PEC requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
PEC requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
If you have any questions concerning this matter, please contact Mr. Curt Castell at (843) 857-1626.
If you have any questions concerning this matter, please contact Mr. Curt Castell at (843) 857-1626.
Line 48: Line 42:


Victor McCree United States Nuclear Regulatory Commission Serial: RNP-RA!l 0-0099 Page 2 of 2 CKIcac Attachments Attachment I: List of Scheduled Applicants Attachment II: Personal Qualification Statement Licensee (NRC Form 398)
Victor McCree United States Nuclear Regulatory Commission Serial: RNP-RA!l 0-0099 Page 2 of 2 CKIcac Attachments Attachment I: List of Scheduled Applicants Attachment II: Personal Qualification Statement Licensee (NRC Form 398)
                                                        -
Attachment III: Certification of Medical Examination by Facility Licensee (NRC Form 396) c:      Document Control Desk (w/o Attachments)
Attachment III: Certification of Medical Examination by Facility Licensee (NRC Form 396) c:      Document Control Desk (w/o Attachments)
NRC Resident Inspector (w/o Attachments)
NRC Resident Inspector (w/o Attachments)
Line 56: Line 49:
Victor McCree United States Nuclear Regulatory Commission Attachment Ito Serial: RNP-RA!lO-0099 Page 1 of 1 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 LIST OF SCHEDULED APPLICANTS Name                                  License Laura A. Basta                        Senior Reactor Operator Richard T. Drehs                      Senior Reactor Operator Tony C. James                          Senior Reactor Operator Brian E. Kawa                          Senior Reactor Operator Patrick A. Lathrop                    Senior Reactor Operator Kenneth M. Myhren, Jr.                Senior Reactor Operator Harold T. Cluney, II                  Reactor Operator Jon M. Griffin                        Reactor Operator Karl C. Hess                          Reactor Operator Shane A. Lewis                        Reactor Operator Kirk M. Schauer, II                    Reactor Operator Brent M. Sostak                        Reactor Operator
Victor McCree United States Nuclear Regulatory Commission Attachment Ito Serial: RNP-RA!lO-0099 Page 1 of 1 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 LIST OF SCHEDULED APPLICANTS Name                                  License Laura A. Basta                        Senior Reactor Operator Richard T. Drehs                      Senior Reactor Operator Tony C. James                          Senior Reactor Operator Brian E. Kawa                          Senior Reactor Operator Patrick A. Lathrop                    Senior Reactor Operator Kenneth M. Myhren, Jr.                Senior Reactor Operator Harold T. Cluney, II                  Reactor Operator Jon M. Griffin                        Reactor Operator Karl C. Hess                          Reactor Operator Shane A. Lewis                        Reactor Operator Kirk M. Schauer, II                    Reactor Operator Brent M. Sostak                        Reactor Operator


10 CFR 55.5 Progress Energy Serial: RNP-RAI10-01 00 FEB10 20W Mr. Victor McCree Regional Administrator U. S. Nuclear Regulatory Commission Region II
10 CFR 55.5 Progress Energy Serial: RNP-RAI10-01 00 FEB10 20W Mr. Victor McCree Regional Administrator U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBfNSON STEAM ELECTRIC PLANT, U1flT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS
                                        -
Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBfNSON STEAM ELECTRIC PLANT, U1flT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS


==Dear Mr. McCree:==
==Dear Mr. McCree:==


In response to the letter dated September 2, 2010, Carolina Power and Light Company, also known as Progress Energy Carolinas, Inc., is submitting the original Personal Qualification Statement Licensee (i.e., NRC Form 398) and the Certification of Medical Examination by
In response to the letter dated September 2, 2010, Carolina Power and Light Company, also known as Progress Energy Carolinas, Inc., is submitting the original Personal Qualification Statement Licensee (i.e., NRC Form 398) and the Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for five Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No.
              -
Facility Licensee (i.e., NRC Form 396) forms for five Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No.
: 2. The September 2, 2010 letter requested that the signed applications be submitted to the NRC at least 14 days before the first examination date. As discussed during a phone conversation between Mr. James Conder, PEC, and Mr. Richard S. Baldwin, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No. 2, beginning February 28, 2011.
: 2. The September 2, 2010 letter requested that the signed applications be submitted to the NRC at least 14 days before the first examination date. As discussed during a phone conversation between Mr. James Conder, PEC, and Mr. Richard S. Baldwin, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No. 2, beginning February 28, 2011.
PEC requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
PEC requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
If you have any questions concerning this matter, please contact Mr. Curt Castell at (843) 857-1626.
If you have any questions concerning this matter, please contact Mr. Curt Castell at (843) 857-1626.
Sincerely, Chris Kamilaris Manager Support Services Nuclear
Sincerely, Chris Kamilaris Manager Support Services Nuclear Progress Energy Carolinas, Inc.
                                                                -                -
Progress Energy Carolinas, Inc.
Robinson Nucleai Pant 3581 West Entrance Roar]
Robinson Nucleai Pant 3581 West Entrance Roar]
FEB 1 4    ou Haitsv]]Ie, SC 29550
FEB 1 4    ou Haitsv]]Ie, SC 29550
Line 76: Line 63:
Victor McCree United States Nuclear Regulatory Commission Serial: RNP-RA/1 0-0100 Page 2 of 2 CKIcac Attachments:
Victor McCree United States Nuclear Regulatory Commission Serial: RNP-RA/1 0-0100 Page 2 of 2 CKIcac Attachments:
I. List of Scheduled Applicants II. Personal Qualification Statement Licensee (NRC Form 398)
I. List of Scheduled Applicants II. Personal Qualification Statement Licensee (NRC Form 398)
                                              -
III. Certification of Medical Examination by Facility Licensee (NRC Form 396) c:      Document Control Desk (w/o Attachments)
III. Certification of Medical Examination by Facility Licensee (NRC Form 396) c:      Document Control Desk (w/o Attachments)
NRC Resident Inspector (w/o Attachments)
NRC Resident Inspector (w/o Attachments)
Line 82: Line 68:
Mr. M. T. Widmann, NRC, Region II
Mr. M. T. Widmann, NRC, Region II


10 CFR 55.5 Progress Energy Serial: RNP-RA/11-0017 FEB 22 lUll Mr. Victor McCree Regional Administrator U. S. Nuclear Regulatory Commission Region II
10 CFR 55.5 Progress Energy Serial: RNP-RA/11-0017 FEB 22 lUll Mr. Victor McCree Regional Administrator U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 RESUBMITTAL OF TWO LICENSE APPLICATIONS FOR OPERATOR LICENSE EXAMINATIONS
                                        -
Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 RESUBMITTAL OF TWO LICENSE APPLICATIONS FOR OPERATOR LICENSE EXAMINATIONS


==Dear Mr. McCree:==
==Dear Mr. McCree:==
Line 92: Line 76:
If you have any questions concerning this matter, please contact Mr. Curt Castell at (843) 857-1626.
If you have any questions concerning this matter, please contact Mr. Curt Castell at (843) 857-1626.
Sincerely, (c
Sincerely, (c
Chris Kamilaris Manager Support Services Nuclear
Chris Kamilaris Manager Support Services Nuclear CKIcac Attachment c:      Document Control Desk (w/o Attachments)
                                                                -                -
CKIcac Attachment c:      Document Control Desk (w/o Attachments)
NRC Resident Inspector (w/o Attachments)
NRC Resident Inspector (w/o Attachments)
Ms. B. Mozafari, NRC, NRR (w/o Attachments)
Ms. B. Mozafari, NRC, NRR (w/o Attachments)
Line 102: Line 84:
Victor McCree United States Nuclear Regulatory Commission Attachment to Serial: RNP-RA!l 1-00 17 5 Pages (cover page and two [2] two-sided forms)
Victor McCree United States Nuclear Regulatory Commission Attachment to Serial: RNP-RA!l 1-00 17 5 Pages (cover page and two [2] two-sided forms)
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 PERSONAL QUALIFICATION STATEMENT LICENSEE (NRC FORM 398)
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 PERSONAL QUALIFICATION STATEMENT LICENSEE (NRC FORM 398)
                                        -


10CFR55.5 Progress Energy Serial: RNP-RA/1 0-0099 JM) 282011 Victor McCree Regional Administrator U. S. Nuclear Regulatory Commission Region II
10CFR55.5 Progress Energy Serial: RNP-RA/1 0-0099 JM) 282011 Victor McCree Regional Administrator U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 PRELIMINARY APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS
                                        -
Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 PRELIMINARY APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS


==Dear Mr. Reyes:==
==Dear Mr. Reyes:==


In response to NRC letter dated September 2, 2010, Carolina Power and Light Company, also known as Progress Energy Carolinas, Inc. (PEC), is submitting preliminary Personal Qualification Statement Licensee (i.e., NRC Form 398) and Certification of Medical
In response to NRC letter dated September 2, 2010, Carolina Power and Light Company, also known as Progress Energy Carolinas, Inc. (PEC), is submitting preliminary Personal Qualification Statement Licensee (i.e., NRC Form 398) and Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for six Senior Reactor Operator applicants and six Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. The September 2, 2010 letter requested that the preliminary forms be submitted to the NRC at least 30 days before the examination date. As discussed during a phone conversation between Mr. James Conder, PEC, and Mr. Richard S. Baldwin, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No. 2, beginning February 28, 2011.
                                    -
Examination by Facility Licensee (i.e., NRC Form 396) forms for six Senior Reactor Operator applicants and six Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. The September 2, 2010 letter requested that the preliminary forms be submitted to the NRC at least 30 days before the examination date. As discussed during a phone conversation between Mr. James Conder, PEC, and Mr. Richard S. Baldwin, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No. 2, beginning February 28, 2011.
PEC requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
PEC requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
If you have any questions concerning this matter, please contact Mr. Curt Castell at (843) 857-1626.
If you have any questions concerning this matter, please contact Mr. Curt Castell at (843) 857-1626.
Line 119: Line 96:


Victor McCree United States Nuclear Regulatory Commission Serial: RNP-RA/1 0-0099 Page 2 of 2 CKIcac Attachments Attachment I: List of Scheduled Applicants Attachment II: Personal Qualification Statement Licensee (NRC Form 398)
Victor McCree United States Nuclear Regulatory Commission Serial: RNP-RA/1 0-0099 Page 2 of 2 CKIcac Attachments Attachment I: List of Scheduled Applicants Attachment II: Personal Qualification Statement Licensee (NRC Form 398)
                                                        -
Attachment III: Certification of Medical Examination by Facility Licensee (NRC Form 396) c:      Document Control Desk (w/o Attachments)
Attachment III: Certification of Medical Examination by Facility Licensee (NRC Form 396) c:      Document Control Desk (w/o Attachments)
NRC Resident Inspector (w/o Attachments)
NRC Resident Inspector (w/o Attachments)
Line 127: Line 103:
Victor McCree United States Nuclear Regulatory Commission Attachment Ito Serial: RNP-RA/1O-0099 Page 1 of 1 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 LIST OF SCHEDULED APPLICANTS Name                                  License Laura A. Basta                        Senior Reactor Operator Richard T. Drehs                      Senior Reactor Operator Tony C. James                          Senior Reactor Operator Brian E. Kawa                          Senior Reactor Operator Patrick A. Lathrop                    Senior Reactor Operator Kenneth M. Myhren, Jr.                Senior Reactor Operator Harold T. Cluney, II                  Reactor Operator Jon M. Griffin                        Reactor Operator Karl C. Hess                          Reactor Operator Shane A. Lewis                        Reactor Operator Kirk M. Schauer, II                    Reactor Operator Brent M. Sostak                        Reactor Operator
Victor McCree United States Nuclear Regulatory Commission Attachment Ito Serial: RNP-RA/1O-0099 Page 1 of 1 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 LIST OF SCHEDULED APPLICANTS Name                                  License Laura A. Basta                        Senior Reactor Operator Richard T. Drehs                      Senior Reactor Operator Tony C. James                          Senior Reactor Operator Brian E. Kawa                          Senior Reactor Operator Patrick A. Lathrop                    Senior Reactor Operator Kenneth M. Myhren, Jr.                Senior Reactor Operator Harold T. Cluney, II                  Reactor Operator Jon M. Griffin                        Reactor Operator Karl C. Hess                          Reactor Operator Shane A. Lewis                        Reactor Operator Kirk M. Schauer, II                    Reactor Operator Brent M. Sostak                        Reactor Operator


10 CFR 55.40 Progress Energy Serial: RNP-RAJ1O-0097 DEC 1 321Q Mr. Richard S. Baldwin Operations Engineer, Division of Reactor Safety U. S. Nuclear Regulatory Commission Region II
10 CFR 55.40 Progress Energy Serial: RNP-RAJ1O-0097 DEC 1 321Q Mr. Richard S. Baldwin Operations Engineer, Division of Reactor Safety U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTPJC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION OUTLINES
                                        -
Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTPJC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION OUTLINES


==Dear Mr. Baldwin:==
==Dear Mr. Baldwin:==
Line 140: Line 114:


Unied States Nuclear Regulatory Commission Serial: RNP-RAJ1 0-0097 Page 2 of 2 If you have any questions concerning this matter, please contact Mr. James Edwards at (843) 857-1558.
Unied States Nuclear Regulatory Commission Serial: RNP-RAJ1 0-0097 Page 2 of 2 If you have any questions concerning this matter, please contact Mr. James Edwards at (843) 857-1558.
Sincerely, Chris Kamilaris Manager Support Services
Sincerely, Chris Kamilaris Manager Support Services Nuclear CSKIcac Enclosure c:  Document Control Desk (w/o Enclosure)
 
Nuclear CSKIcac Enclosure c:  Document Control Desk (w/o Enclosure)
NRC Resident Inspector, HBRSEP (w/o Enclosure)
NRC Resident Inspector, HBRSEP (w/o Enclosure)
Mr. L. A. Reyes, NRC, Region 11 (w/o Enclosure)
Mr. L. A. Reyes, NRC, Region 11 (w/o Enclosure)
Line 148: Line 120:
Mr. M. T. Widmann, NRC, Region II (w/o Enclosure)
Mr. M. T. Widmann, NRC, Region II (w/o Enclosure)


10CFR55.40 Progress Energy Serial: RNP-RA/1 0-0097 DEC 1 32010 Mr. Richard S. Baldwin Operations Engineer, Division of Reactor Safety U. S. Nuclear Regulatory Commission Region II
10CFR55.40 Progress Energy Serial: RNP-RA/1 0-0097 DEC 1 32010 Mr. Richard S. Baldwin Operations Engineer, Division of Reactor Safety U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION OUTLINES
                                        -
Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION OUTLINES


==Dear Mr. Baldwin:==
==Dear Mr. Baldwin:==
Line 161: Line 131:


United States Nuclear Regulatory Corimission Serial: RNP-RA/1O-0097 Page 2 of 2 If you have any questions concerning this matter, please contact Mr. James Edwards at (843) 857-1558.
United States Nuclear Regulatory Corimission Serial: RNP-RA/1O-0097 Page 2 of 2 If you have any questions concerning this matter, please contact Mr. James Edwards at (843) 857-1558.
Sincerely, Chris Kamilaris Manager Support Services
Sincerely, Chris Kamilaris Manager Support Services Nuclear CSKlcac Enclosure c:  Document Control Desk (w/o Enclosure)
 
Nuclear CSKlcac Enclosure c:  Document Control Desk (w/o Enclosure)
NRC Resident Inspector, HBRSEP (w/o Enclosure)
NRC Resident Inspector, HBRSEP (w/o Enclosure)
Mr. L. A. Reyes, NRC, Region II (w/o Enclosure)
Mr. L. A. Reyes, NRC, Region II (w/o Enclosure)
Ms. B. Mozafari, NRC, NRR (w/o Enclosure)
Ms. B. Mozafari, NRC, NRR (w/o Enclosure)
Mr. M. T. Widmann, NRC, Region II (w/o Enclosure)}}
Mr. M. T. Widmann, NRC, Region II (w/o Enclosure)}}

Revision as of 10:17, 5 February 2020

Initial Exam 2011-301 General Correspondence
ML15245A576
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 09/02/2015
From: Kamilaris C
Progress Energy Co
To: Baldwin R
Division of Reactor Safety II
References
Download: ML15245A576 (16)


Text

1OCFR55.40 Progress Energy Serial: RNP-RA/l 0-0098 JAN13 2011 Mr. Richard S. Baldwin Senior Operations Engineer, Department of Reactor Safety U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 303 03-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 REACTOR OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS

Dear Mr. Baldwin:

In accordance with the guidelines in Revision 9, Supplement 1, ofNUREG-1021, Operator Licensing Examination Standards for Power Reactors, Carolina Power and Light Company, now doing business as Progress Energy Carolinas, Inc., is providing the enclosed operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-20 1, Reference Material Guidelines For Initial Licensing Examinations, for examinations scheduled to begin the week of February 28, 2011.

As required by Attachment 1 of Revision 9, Supplement 1, of NUREG- 1021, Section ES-20 1, Examination Security and Integrity Considerations, please ensure that these examination materials are withheld from public disclosure until after the examinations are complete.

If you have any questions concerning this matter, please contact Mr. James Edwards at (843) 857-1558.

Sincerely, Chris Kamilaris Manager Support Services Nuclear CSK/cac Enclosure Progress Energy Carolinas, Inc.

Robinson Nuclear Plant 3581 West Entrance Read Hartsville, SC 29550

United States Nuclear Regulatory Commission Serial: RNP-RA/1 0-0098 Page 2 of 2 c: Document Control Desk (w/o Enclosure)

NRC Resident Inspector, HBRSEP (w/o Enclosure)

Mr. L. A. Reyes, NRC, Region II (w/o Enclosure)

Ms. B. Mozafari, NRC, NRR (w/o Enclosure)

Mr. M. T. Widmann, NRC, Region II (w/o Enclosure)

10CFR55.5 Progress Energy Serial: RNP-RA!1 0-0099 JPN 282011 Victor MeCree Regional Administrator U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 PRELIMINARY APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS

Dear Mr. Reyes:

In response to NRC letter dated September 2, 2010, Carolina Power and Light Company, also known as Progress Energy Carolinas, Inc. (PEC), is submitting preliminary Personal Qualification Statement Licensee (i.e., NRC Form 398) and Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for six Senior Reactor Operator applicants and six Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. The September 2, 2010 letter requested that the preliminary forms be submitted to the NRC at least 30 days before the examination date. As discussed during a phone conversation between Mr. James Conder, PEC, and Mr. Richard S. Baldwin, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No. 2, beginning February 28, 2011.

PEC requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.

If you have any questions concerning this matter, please contact Mr. Curt Castell at (843) 857-1626.

Sincerely, Chris Kamilaris Manager Support Services Nuclear Progress Energy Carolinas, Inc.

Robinson Nuclear Plant 3581 West Entrance Road Hartsville, SC 29550 FEB

Victor McCree United States Nuclear Regulatory Commission Serial: RNP-RA!l 0-0099 Page 2 of 2 CKIcac Attachments Attachment I: List of Scheduled Applicants Attachment II: Personal Qualification Statement Licensee (NRC Form 398)

Attachment III: Certification of Medical Examination by Facility Licensee (NRC Form 396) c: Document Control Desk (w/o Attachments)

NRC Resident Inspector (w/o Attachments)

Ms. B. Mozafari, NRC, NRR (w/o Attachments)

Mr. M. T. Widmanri, NRC, Region II

Victor McCree United States Nuclear Regulatory Commission Attachment Ito Serial: RNP-RA!lO-0099 Page 1 of 1 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 LIST OF SCHEDULED APPLICANTS Name License Laura A. Basta Senior Reactor Operator Richard T. Drehs Senior Reactor Operator Tony C. James Senior Reactor Operator Brian E. Kawa Senior Reactor Operator Patrick A. Lathrop Senior Reactor Operator Kenneth M. Myhren, Jr. Senior Reactor Operator Harold T. Cluney, II Reactor Operator Jon M. Griffin Reactor Operator Karl C. Hess Reactor Operator Shane A. Lewis Reactor Operator Kirk M. Schauer, II Reactor Operator Brent M. Sostak Reactor Operator

10 CFR 55.5 Progress Energy Serial: RNP-RAI10-01 00 FEB10 20W Mr. Victor McCree Regional Administrator U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBfNSON STEAM ELECTRIC PLANT, U1flT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS

Dear Mr. McCree:

In response to the letter dated September 2, 2010, Carolina Power and Light Company, also known as Progress Energy Carolinas, Inc., is submitting the original Personal Qualification Statement Licensee (i.e., NRC Form 398) and the Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for five Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No.

2. The September 2, 2010 letter requested that the signed applications be submitted to the NRC at least 14 days before the first examination date. As discussed during a phone conversation between Mr. James Conder, PEC, and Mr. Richard S. Baldwin, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No. 2, beginning February 28, 2011.

PEC requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.

If you have any questions concerning this matter, please contact Mr. Curt Castell at (843) 857-1626.

Sincerely, Chris Kamilaris Manager Support Services Nuclear Progress Energy Carolinas, Inc.

Robinson Nucleai Pant 3581 West Entrance Roar]

FEB 1 4 ou Haitsv]]Ie, SC 29550

Victor McCree United States Nuclear Regulatory Commission Serial: RNP-RA/1 0-0100 Page 2 of 2 CKIcac Attachments:

I. List of Scheduled Applicants II. Personal Qualification Statement Licensee (NRC Form 398)

III. Certification of Medical Examination by Facility Licensee (NRC Form 396) c: Document Control Desk (w/o Attachments)

NRC Resident Inspector (w/o Attachments)

Ms. B. Mozafari, NRC, NRR (w/o Attachments)

Mr. M. T. Widmann, NRC, Region II

10 CFR 55.5 Progress Energy Serial: RNP-RA/11-0017 FEB 22 lUll Mr. Victor McCree Regional Administrator U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 RESUBMITTAL OF TWO LICENSE APPLICATIONS FOR OPERATOR LICENSE EXAMINATIONS

Dear Mr. McCree:

It has been determined that two (2) license applications from letter RNP-RA/10-0 100, dated February 10, 2011, were incorrect. A reactivity manipulation, which was not in accordance with 10 CFR 55.31, needed to be replaced on one application and a typographical error, along with a reactivity manipulation not in accordance with 10 CFR 55.31, needed to be replaced on the other.

The corrected applications are provided in the attachment to this letter. These corrected forms supersede the previously submitted applications for these individuals.

If you have any questions concerning this matter, please contact Mr. Curt Castell at (843) 857-1626.

Sincerely, (c

Chris Kamilaris Manager Support Services Nuclear CKIcac Attachment c: Document Control Desk (w/o Attachments)

NRC Resident Inspector (w/o Attachments)

Ms. B. Mozafari, NRC, NRR (w/o Attachments)

Mr. M. T. Widmann, NRC, Region II FEB 23 2011 Progress Energy Carolinas, inc.

Robinson Nuclear Plant 3581 West Entrance Rsad Hartsville, SC 29550

Victor McCree United States Nuclear Regulatory Commission Attachment to Serial: RNP-RA!l 1-00 17 5 Pages (cover page and two [2] two-sided forms)

H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 PERSONAL QUALIFICATION STATEMENT LICENSEE (NRC FORM 398)

10CFR55.5 Progress Energy Serial: RNP-RA/1 0-0099 JM) 282011 Victor McCree Regional Administrator U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 PRELIMINARY APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS

Dear Mr. Reyes:

In response to NRC letter dated September 2, 2010, Carolina Power and Light Company, also known as Progress Energy Carolinas, Inc. (PEC), is submitting preliminary Personal Qualification Statement Licensee (i.e., NRC Form 398) and Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for six Senior Reactor Operator applicants and six Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. The September 2, 2010 letter requested that the preliminary forms be submitted to the NRC at least 30 days before the examination date. As discussed during a phone conversation between Mr. James Conder, PEC, and Mr. Richard S. Baldwin, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No. 2, beginning February 28, 2011.

PEC requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.

If you have any questions concerning this matter, please contact Mr. Curt Castell at (843) 857-1626.

Sincerely, Chris Kamilaris Manager Support Services Nuclear Progress Energy Carolinas, Inc.

FEB Robinson Nuclear Plant 3581 West Entrance Road Hartsville, SC 29550

Victor McCree United States Nuclear Regulatory Commission Serial: RNP-RA/1 0-0099 Page 2 of 2 CKIcac Attachments Attachment I: List of Scheduled Applicants Attachment II: Personal Qualification Statement Licensee (NRC Form 398)

Attachment III: Certification of Medical Examination by Facility Licensee (NRC Form 396) c: Document Control Desk (w/o Attachments)

NRC Resident Inspector (w/o Attachments)

Ms. B. Mozafari, NRC, NRR (w/o Attachments)

Mr. M. T. Widmann, NRC, Region II

Victor McCree United States Nuclear Regulatory Commission Attachment Ito Serial: RNP-RA/1O-0099 Page 1 of 1 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 LIST OF SCHEDULED APPLICANTS Name License Laura A. Basta Senior Reactor Operator Richard T. Drehs Senior Reactor Operator Tony C. James Senior Reactor Operator Brian E. Kawa Senior Reactor Operator Patrick A. Lathrop Senior Reactor Operator Kenneth M. Myhren, Jr. Senior Reactor Operator Harold T. Cluney, II Reactor Operator Jon M. Griffin Reactor Operator Karl C. Hess Reactor Operator Shane A. Lewis Reactor Operator Kirk M. Schauer, II Reactor Operator Brent M. Sostak Reactor Operator

10 CFR 55.40 Progress Energy Serial: RNP-RAJ1O-0097 DEC 1 321Q Mr. Richard S. Baldwin Operations Engineer, Division of Reactor Safety U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTPJC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION OUTLINES

Dear Mr. Baldwin:

In accordance with the guidelines in Revision 9, Supplement 1, ofNUREG-1021, Operator Licensing Examination Standards for Power Reactors, Carolina Power and Light Company, now doing business as Progress Energy Carolinas, Inc., is providing the enclosed outlines for examinations scheduled to begin the week of February 28, 2011.

Pursuant to 10 CFR 55.40(b)(3), Mr. James Edwards, as the designated authorized representative of the H. B. Robinson Steam Electric Plant, Unit No. 2, has approved these outlines for examination of the applicants.

As required by Revision 9, Supplement 1, of NUREG- 1021, Section ES-20 1, Initial Operator Licensing Examination Process, please ensure that these outlines are withheld from public disclosure until after the examinations are complete.

Progress Energy Carolinas, Inc.

Robinson Nuclear Plant 358t West Entrance Road Hartsville, SC 29550

Unied States Nuclear Regulatory Commission Serial: RNP-RAJ1 0-0097 Page 2 of 2 If you have any questions concerning this matter, please contact Mr. James Edwards at (843) 857-1558.

Sincerely, Chris Kamilaris Manager Support Services Nuclear CSKIcac Enclosure c: Document Control Desk (w/o Enclosure)

NRC Resident Inspector, HBRSEP (w/o Enclosure)

Mr. L. A. Reyes, NRC, Region 11 (w/o Enclosure)

Ms. B. Mozafari, NRC, NRR (w/o Enclosure)

Mr. M. T. Widmann, NRC, Region II (w/o Enclosure)

10CFR55.40 Progress Energy Serial: RNP-RA/1 0-0097 DEC 1 32010 Mr. Richard S. Baldwin Operations Engineer, Division of Reactor Safety U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION OUTLINES

Dear Mr. Baldwin:

In accordance with the guidelines in Revision 9, Supplement 1, of NUREG- 1021, Operator Licensing Examination Standards for Power Reactors, Carolina Power and Light Company, now doing business as Progress Energy Carolinas, Inc., is providing the enclosed outlines for examinations scheduled to begin the week of February 28, 2011.

Pursuant to 10 CFR 55.40(b)(3), Mr. James Edwards, as the designated authorized representative of the H. B. Robinson Steam Electric Plant, Unit No. 2, has approved these outlines for examination of the applicants.

As required by Revision 9, Supplement 1, ofNUREG-1021, Section ES-201, Initial Operator Licensing Examination Process, please ensure that these outlines are withheld from public disclosure until after the examinations are complete.

Progress Energy Carolinas, Inc.

Robrnson Nac[ear Plant 3581 West Entrance Road Hartaville, SC 29550

United States Nuclear Regulatory Corimission Serial: RNP-RA/1O-0097 Page 2 of 2 If you have any questions concerning this matter, please contact Mr. James Edwards at (843) 857-1558.

Sincerely, Chris Kamilaris Manager Support Services Nuclear CSKlcac Enclosure c: Document Control Desk (w/o Enclosure)

NRC Resident Inspector, HBRSEP (w/o Enclosure)

Mr. L. A. Reyes, NRC, Region II (w/o Enclosure)

Ms. B. Mozafari, NRC, NRR (w/o Enclosure)

Mr. M. T. Widmann, NRC, Region II (w/o Enclosure)