ML15288A564: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML15288A564 | | number = ML15288A564 | ||
| issue date = 10/15/2015 | | issue date = 10/15/2015 | ||
| title = | | title = NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review for the License Amendment Application to Replace TS Figure 4.1-1 with Text, Site and Exclusion Area Boundaries and Low-Population Zone | ||
| author name = Lingam S | | author name = Lingam S | ||
| author affiliation = NRC/NRR/DORL/LPLIV-1 | | author affiliation = NRC/NRR/DORL/LPLIV-1 | ||
| addressee name = Shaw J | | addressee name = Shaw J | ||
| addressee affiliation = Nebraska Public Power District (NPPD) | | addressee affiliation = Nebraska Public Power District (NPPD) | ||
| docket = 05000298 | | docket = 05000298 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:NRR-PMDAPEm Resource From: Lingam, Siva Sent: Thursday, October 15, 2015 9:28 AM To: 'jdshaw@nppd.com' Cc: Markley, Michael; Elliott, Robert; West, Khadijah | ||
==Subject:== | ==Subject:== | ||
Cooper Nuclear Station - Acceptance Review for the License Amendment Application to Replace TS Figure 4.1-1 with Text, Site and Exclusion Area Boundaries and Low-Population Zone (CAC No. MF6692)By letter dated September 8, 2015 (Agencywide Documents Access and Management System Accession No. ML15258A185), Nebraska Public power District submitted a license amendment request for Cooper Nuclear Station (CNS), requesting an approval to replace Technical Specification (TS) Figure 4.1-1, | Cooper Nuclear Station - Acceptance Review for the License Amendment Application to Replace TS Figure 4.1-1 with Text, Site and Exclusion Area Boundaries and Low-Population Zone (CAC No. MF6692) | ||
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC | By letter dated September 8, 2015 (Agencywide Documents Access and Management System Accession No. ML15258A185), Nebraska Public power District submitted a license amendment request for Cooper Nuclear Station (CNS), requesting an approval to replace Technical Specification (TS) Figure 4.1-1, Site and Exclusion Area Boundaries and Low Population Zone, with a text description in TS 4.1, Site Location. in addition, a typographical error is being corrected from LGHR to LHGR [Linear Heat Generation Rate] in Section 1.1, Definitions. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | ||
If you have any questions, please contact me. Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1) Cooper Nuclear Station Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov Hearing Identifier: | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. | ||
If you have any questions, please contact me. | |||
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1) | |||
Cooper Nuclear Station Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov 1 | |||
Hearing Identifier: NRR_PMDA Email Number: 2454 Mail Envelope Properties (Siva.Lingam@nrc.gov20151015092800) | |||
==Subject:== | ==Subject:== | ||
Cooper Nuclear Station - Acceptance Review for the License Amendment Application to Replace TS Figure 4.1-1 with Text, Site and Exclusion Area Boundaries and Low-Population Zone (CAC No. MF6692) | Cooper Nuclear Station - Acceptance Review for the License Amendment Application to Replace TS Figure 4.1-1 with Text, Site and Exclusion Area Boundaries and Low-Population Zone (CAC No. MF6692) | ||
Sent Date: | Sent Date: 10/15/2015 9:28:17 AM Received Date: 10/15/2015 9:28:00 AM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients: | ||
Tracking Status: None | "Markley, Michael" <Michael.Markley@nrc.gov> | ||
Tracking Status: None "Elliott, Robert" <Robert.Elliott@nrc.gov> | |||
Tracking Status: None "West, Khadijah" <Khadijah.West@nrc.gov> | |||
Tracking Status: None | |||
"'jdshaw@nppd.com'" <jdshaw@nppd.com> | |||
Tracking Status: None Post Office: | |||
Files Size Date & Time MESSAGE 2256 10/15/2015 9:28:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: | |||
Recipients Received: | |||
NRR-PMDAPEm Resource From: Lingam, Siva Sent: Thursday, October 15, 2015 9:28 AM To: 'jdshaw@nppd.com' Cc: Markley, Michael; Elliott, Robert; West, Khadijah | |||
==Subject:== | ==Subject:== | ||
Cooper Nuclear Station - Acceptance Review for the License Amendment Application to Replace TS Figure 4.1-1 with Text, Site and Exclusion Area Boundaries and Low-Population Zone (CAC No. MF6692)By letter dated September 8, 2015 (Agencywide Documents Access and Management System Accession No. ML15258A185), Nebraska Public power District submitted a license amendment request for Cooper Nuclear Station (CNS), requesting an approval to replace Technical Specification (TS) Figure 4.1-1, | Cooper Nuclear Station - Acceptance Review for the License Amendment Application to Replace TS Figure 4.1-1 with Text, Site and Exclusion Area Boundaries and Low-Population Zone (CAC No. MF6692) | ||
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC | By letter dated September 8, 2015 (Agencywide Documents Access and Management System Accession No. ML15258A185), Nebraska Public power District submitted a license amendment request for Cooper Nuclear Station (CNS), requesting an approval to replace Technical Specification (TS) Figure 4.1-1, Site and Exclusion Area Boundaries and Low Population Zone, with a text description in TS 4.1, Site Location. in addition, a typographical error is being corrected from LGHR to LHGR [Linear Heat Generation Rate] in Section 1.1, Definitions. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | ||
If you have any questions, please contact me. Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1) Cooper Nuclear Station Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov Hearing Identifier: | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. | ||
If you have any questions, please contact me. | |||
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1) | |||
Cooper Nuclear Station Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov 1 | |||
Hearing Identifier: NRR_PMDA Email Number: 2454 Mail Envelope Properties (Siva.Lingam@nrc.gov20151015092800) | |||
==Subject:== | ==Subject:== | ||
Cooper Nuclear Station - Acceptance Review for the License Amendment Application to Replace TS Figure 4.1-1 with Text, Site and Exclusion Area Boundaries and Low-Population Zone (CAC No. MF6692) | Cooper Nuclear Station - Acceptance Review for the License Amendment Application to Replace TS Figure 4.1-1 with Text, Site and Exclusion Area Boundaries and Low-Population Zone (CAC No. MF6692) | ||
Sent Date: | Sent Date: 10/15/2015 9:28:17 AM Received Date: 10/15/2015 9:28:00 AM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients: | ||
Tracking Status: None | "Markley, Michael" <Michael.Markley@nrc.gov> | ||
Tracking Status: None "Elliott, Robert" <Robert.Elliott@nrc.gov> | |||
Tracking Status: None "West, Khadijah" <Khadijah.West@nrc.gov> | |||
Tracking Status: None | |||
"'jdshaw@nppd.com'" <jdshaw@nppd.com> | |||
Tracking Status: None Post Office: | |||
Files Size Date & Time MESSAGE 2256 10/15/2015 9:28:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: | |||
Recipients Received:}} |
Latest revision as of 08:25, 5 February 2020
ML15288A564 | |
Person / Time | |
---|---|
Site: | Cooper |
Issue date: | 10/15/2015 |
From: | Siva Lingam Plant Licensing Branch IV |
To: | Shaw J Nebraska Public Power District (NPPD) |
References | |
MF6692 | |
Download: ML15288A564 (2) | |
Text
NRR-PMDAPEm Resource From: Lingam, Siva Sent: Thursday, October 15, 2015 9:28 AM To: 'jdshaw@nppd.com' Cc: Markley, Michael; Elliott, Robert; West, Khadijah
Subject:
Cooper Nuclear Station - Acceptance Review for the License Amendment Application to Replace TS Figure 4.1-1 with Text, Site and Exclusion Area Boundaries and Low-Population Zone (CAC No. MF6692)
By letter dated September 8, 2015 (Agencywide Documents Access and Management System Accession No. ML15258A185), Nebraska Public power District submitted a license amendment request for Cooper Nuclear Station (CNS), requesting an approval to replace Technical Specification (TS) Figure 4.1-1, Site and Exclusion Area Boundaries and Low Population Zone, with a text description in TS 4.1, Site Location. in addition, a typographical error is being corrected from LGHR to LHGR [Linear Heat Generation Rate] in Section 1.1, Definitions. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1)
Cooper Nuclear Station Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov 1
Hearing Identifier: NRR_PMDA Email Number: 2454 Mail Envelope Properties (Siva.Lingam@nrc.gov20151015092800)
Subject:
Cooper Nuclear Station - Acceptance Review for the License Amendment Application to Replace TS Figure 4.1-1 with Text, Site and Exclusion Area Boundaries and Low-Population Zone (CAC No. MF6692)
Sent Date: 10/15/2015 9:28:17 AM Received Date: 10/15/2015 9:28:00 AM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients:
"Markley, Michael" <Michael.Markley@nrc.gov>
Tracking Status: None "Elliott, Robert" <Robert.Elliott@nrc.gov>
Tracking Status: None "West, Khadijah" <Khadijah.West@nrc.gov>
Tracking Status: None
"'jdshaw@nppd.com'" <jdshaw@nppd.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2256 10/15/2015 9:28:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
NRR-PMDAPEm Resource From: Lingam, Siva Sent: Thursday, October 15, 2015 9:28 AM To: 'jdshaw@nppd.com' Cc: Markley, Michael; Elliott, Robert; West, Khadijah
Subject:
Cooper Nuclear Station - Acceptance Review for the License Amendment Application to Replace TS Figure 4.1-1 with Text, Site and Exclusion Area Boundaries and Low-Population Zone (CAC No. MF6692)
By letter dated September 8, 2015 (Agencywide Documents Access and Management System Accession No. ML15258A185), Nebraska Public power District submitted a license amendment request for Cooper Nuclear Station (CNS), requesting an approval to replace Technical Specification (TS) Figure 4.1-1, Site and Exclusion Area Boundaries and Low Population Zone, with a text description in TS 4.1, Site Location. in addition, a typographical error is being corrected from LGHR to LHGR [Linear Heat Generation Rate] in Section 1.1, Definitions. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1)
Cooper Nuclear Station Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov 1
Hearing Identifier: NRR_PMDA Email Number: 2454 Mail Envelope Properties (Siva.Lingam@nrc.gov20151015092800)
Subject:
Cooper Nuclear Station - Acceptance Review for the License Amendment Application to Replace TS Figure 4.1-1 with Text, Site and Exclusion Area Boundaries and Low-Population Zone (CAC No. MF6692)
Sent Date: 10/15/2015 9:28:17 AM Received Date: 10/15/2015 9:28:00 AM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients:
"Markley, Michael" <Michael.Markley@nrc.gov>
Tracking Status: None "Elliott, Robert" <Robert.Elliott@nrc.gov>
Tracking Status: None "West, Khadijah" <Khadijah.West@nrc.gov>
Tracking Status: None
"'jdshaw@nppd.com'" <jdshaw@nppd.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2256 10/15/2015 9:28:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: