ML16056A088: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 02/25/2016 | | issue date = 02/25/2016 | ||
| title = Commission Memorandum and Order (CLI-16-03) | | title = Commission Memorandum and Order (CLI-16-03) | ||
| author name = Vietti-Cook A | | author name = Vietti-Cook A | ||
| author affiliation = NRC/SECY | | author affiliation = NRC/SECY | ||
| addressee name = | | addressee name = | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION COMMISSIONERS: | ||
Stephen G. Burns, Chairman Kristine L. Svinicki William C. Ostendorff Jeff Baran In the Matter of NEXTERA ENERGY SEABROOK, LLC Docket No. 50-443-LR (Seabrook Station, Unit 1) | |||
CLI-16-03 MEMORANDUM AND ORDER Friends of the Coast and New England Coalition (Friends/NEC) request that we order the Final Supplemental Environmental Impact Statement (Final SEIS) for the Seabrook Station, Unit 1 license renewal application to be withdrawn, re-released as a draft or supplement to the Draft Supplemental Environmental Impact Statement (Draft SEIS), and published for public comment.1 For the reasons set forth below, we deny the motion. | |||
I. BACKGROUND In May 2010, NextEra Energy Seabrook, LLC applied to renew the operating license for Seabrook for an additional twenty years.2 The NRC Staff docketed the application shortly 1 Motion to Withhold or Withdraw Final Environmental Impact Statement Pending Renewed Opportunity for Comment (July 28, 2015), at 1, 8 (Motion). | |||
2 Notice of Acceptance for Docketing of the Application and Notice of Opportunity for Hearing Regarding Renewal of Facility Operating License No. NPF-86 for an Additional 20-Year Period; | |||
thereafter and provided an opportunity for interested persons to request an adjudicatory hearing.3 Friends/NEC filed a petition to intervene at that time.4 The Atomic Safety and Licensing Board granted the petition and admitted several of their proposed contentions.5 We affirmed in part and reversed in part the Boards ruling, leaving two admitted contentions pending in the proceeding: Friends/NECs Contentions 4B and 4D.6 The Staff issued the Draft SEIS in July 2011 and made it available for public comment.7 The Staffs review of the Seabrook license renewal application continued, and in April 2013, the Staff issued a supplement to the Draft SEIS addressing new information.8 Specifically, the Draft NextEra Energy Seabrook, LLC; Seabrook Station, Unit 1, 75 Fed. Reg. 42,462, 42,462 (July 21, 2010). | |||
3 Id. at 42,462-63. | |||
4 Friends of the Coast and New England Coalition Petition for Leave to Intervene, Request for Hearing, and Admission of Contentions (Oct. 20, 2010). | |||
5 LBP-11-2, 73 NRC 28, 79 (2011). | |||
6 CLI-12-5, 75 NRC 301, 327, 329, 349 (2012). Both contentions challenged NextEras severe accident mitigation alternatives (SAMA) analysis for Seabrook. In Contention 4B, Friends/NEC challenged the use in the analysis of certain source terms. In Contention 4D, Friends/NEC challenged NextEras atmospheric dispersion model. Id. at 324-29. | |||
7 See Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Seabrook Station (Draft Report for Comment), NUREG-1437, Supp. 46 (July 2011) | |||
(ADAMS accession nos. ML11213A024 and ML11213A203) (Draft SEIS); NextEra Energy Seabrook, LLC; Notice of Availability of Draft Supplement 46 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants and Public Meetings for the License Renewal of Seabrook Station, Unit 1, 76 Fed. Reg. 47,612, 47,612 (Aug. 5, 2011). The Staff held two public meetings during the comment period to receive additional input. See Summary of Public Meetings Conducted to Discuss the Draft Supplemental Environmental Impact Statement Related to the Review of the Seabrook Station License Renewal Application (TAC No. ME3959) (Oct. 26, 2011), at 1 (ML11277A046). | |||
8 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Seabrook Station (Second Draft Report for Comment), NUREG-1437, Supp. 46 (Apr. 2013), at iii, ix (ML13113A174) (Draft SEIS Supplement). | |||
SEIS Supplement addressed (1) an updated SAMA analysis that NextEra submitted in March 2012; (2) the June 2012 decision of the U.S. Court of Appeals for the District of Columbia Circuit vacating the NRCs Waste Confidence Rule;9 and (3) new issues arising from the NRCs rulemaking to revise the Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants.10 The Draft SEIS Supplement was also made available for public comment.11 In May 2013, NextEra sought summary disposition of Contentions 4B and 4D.12 Friends/NEC offered no opposition with respect to Contention 4B and the Board dismissed the contention.13 With respect to Contention 4D, Friends/NEC, NextEra, and the Staff jointly requested that the Board issue two orders: the first to approve settlement of the contention; the second to dismiss the contention seven days after the Staff had notified the Board of publication 9 See generally New York v. NRC, 681 F.3d 471 (D.C. Cir. 2012). | |||
10 Draft SEIS Supplement at iii, ix. | |||
11 Draft Supplement to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants; NextEra Energy Seabrook; Seabrook Station, Unit 1, 78 Fed. Reg. 26,662, 26,662 (May 7, 2013) (Notice of Draft SEIS Supplement). | |||
12 See NextEras Motion for Summary Disposition of Friends of the Coast/New England Coalition Contention 4B (SAMA Analysis Source Terms) (May 10, 2013); NextEras Motion for Summary Disposition of Friends of the Coast/New England Coalition Contention 4D (SAMA Analysis Atmospheric Modeling) (May 10, 2013). | |||
13 See Friends of the Coast and New England Coalitions Answer to NextEras Motion for Summary Disposition of Contentions 4B (SAMA Source Terms) and 4D (SAMA Atmospheric Modeling) (July 15, 2013), at 1; Order (Granting Summary Disposition of Contention 4B) (Aug. | |||
12, 2013) (unpublished). | |||
of a Final SEIS providing additional analysis that the parties agreed would resolve the contention.14 The Board approved settlement of Contention 4D in August 2013.15 On July 28, 2015, Friends/NEC filed the instant motion.16 The Staff issued the Final SEIS on July 29, 2015.17 Among other things, the Final SEIS included (1) the updated SAMA analysis performed pursuant to the Board-approved settlement agreement;18 (2) a discussion of the impacts from the NRCs Continued Storage Rule and associated GEIS for Continued Storage of Spent Nuclear Fuel;19 and (3) an updated analysis related to the revision to the License Renewal GEIS, which was finalized after the issuance of the Draft SEIS Supplement.20 Shortly thereafter, and consistent with the parties earlier request, the Board dismissed Contention 4D and terminated the proceeding.21 14 Joint Motion for Approval of Settlement and Dismissal of FOTC/NEC Contention 4D (Aug. 8, 2013), at 1, 3; id., Ex. B, Proposed Initial Consent Order, at 2. The additional information involved a sensitivity analysis and related work performed in connection with the atmospheric dispersion model used in NextEras SAMA analysis. Id. at 1-3. | |||
15 Order (Approving Settlement of Contention 4D) (Aug. 12, 2013) (unpublished). | |||
16 The Staff and NextEra oppose Friends/NECs motion. See NRC Staffs Answer to Motion to Withhold or Withdraw Final Environmental Impact Statement Pending Renewed Opportunity for Comment (Aug. 7, 2015) (Staff Answer); NextEra Energy Seabrook, LLCs Answer Opposing Friends of the Coast and New England Coalitions Motion to Withhold or Withdraw Final Environmental Impact Statement (Aug. 7, 2015). | |||
17 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Seabrook Station (Final Report), NUREG-1437, Supp. 46, Vols. 1-2 (July 2015) (ML15209A575 and ML15209A870) (Final SEIS). | |||
18 See id., Vol. 1, ch. 5; id., Vol. 2, app. F. | |||
19 See id., Vol. 1, at 1-4, § 6.1. | |||
20 See id., Vol. 1, at 1-3 to -4, ch. 4. | |||
21 LBP-15-22, 82 NRC 49 (2015); see letter from Anita Ghosh, counsel for the Staff, to the Administrative Judges (July 29, 2015), at 1-2 (advising the Board of the Final SEISs issuance). | |||
II. DISCUSSION Friends/NEC request that if the SEIS has not been finalized, then we direct that the document be withheld and issued as a draft or supplement for public comment. Alternatively, were we to consider their motion following issuance of the Final SEIS, then Friends/NEC request that we direct that the document be withdrawn and re-issued as a draft or supplement for public comment.22 Because the Final SEIS has been issued and Friends/NEC request, in that circumstance, that we direct that the Final SEIS be withdrawn and re-released as a draft or supplement, our regulation at 10 C.F.R. § 51.92 governs here.23 Section 51.92 specifies the circumstances under which the Staff is required to prepare a supplement to a final environmental impact statement if (as is the case here) the proposed action has not yet been taken. More specifically, section 51.92(a) requires the Staff to prepare such a supplement if there are (1) substantial changes in the proposed action that are relevant to environmental concerns or (2) new and significant circumstances or information relevant to environmental concerns and bearing on the proposed action or its impacts. The relevant question is whether substantial changes in the proposed action or new and significant information presents a seriously different picture of the environmental impacts that have been 22 Motion at 1, 10. | |||
23 Had we considered Friends/NECs request in the context of the Draft SEIS, and thereby applied 10 C.F.R. § 51.72, which governs supplementation of a draft environmental impact statement, our analysis would have yielded the same result; sections 51.72(a) and (b) are substantively identical to sections 51.92(a) and (c). See Union Electric Co. (Callaway Plant, Unit 2), CLI-11-5, 74 NRC 141, 167 n.103 (2011). | |||
assessed in the relevant licensing action, and of our analysis of those impacts, when compared to the previously issued final environmental impact statement.24 Friends/NEC express concern that the DEIS is a departure from what the public was given the opportunity to review back in 2011 and that the NRC was deprived of the benefit of public comment (input) on significant portions of the DEIS now containing new information.25 Friends/NEC also assert that the material substance of the Draft SEIS has been altered due to the nearly four years between the end of the public comment period for the Draft SEIS and the issuance of the Final SEIS.26 Friends/NEC have not, however, identified any changes in the proposed license renewal action. Friends/NEC also have not pointed to new and significant information relevant to the Seabrook environmental review. | |||
Moreover, the Staffs approach to the environmental review for Seabrook satisfied the purposes of the National Environmental Policy Act of 1969 (NEPA). The requirement under NEPA to prepare an environmental impact statement serves two purposes.27 First, it ensures that decisionmakers will have available, and will carefully consider, detailed information concerning significant environmental impacts.28 Second, it guarantees that the relevant 24 DTE Electric Co. (Fermi Nuclear Power Plant, Unit 3), CLI-15-10, 81 NRC 535, 543 (2015) | |||
(quoting Hydro Resources, Inc. (P.O. Box 15910, Rio Rancho, NM 87174), CLI-04-39, 60 NRC 657, 659 (2004)). | |||
25 Motion at 6. | |||
26 Id. at 1-2. | |||
27 Fermi, CLI-15-10, 81 NRC at 540 (citing Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 349 (1989)). | |||
28 Id. (quoting Robertson, 490 U.S. at 349). | |||
information will be made available to the larger audience . . . that may also play a role in the decisionmaking process.29 The Staffs approach has fulfilled both of these purposes. | |||
First, the Staffs efforts have ensured that the NRC has available for its consideration detailed information regarding the environmental impacts of the Seabrook Unit 1 license renewal application. Prior to issuance of the Final SEIS, the Staff identified new information meriting preparation of a supplement to the Draft SEIS.30 The Staff issued the Draft SEIS Supplement analyzing that information in April 2013.31 The Final SEIS incorporates both the Draft SEIS and the Draft SEIS Supplement.32 The Final SEIS also considers the public comments submitted on the Draft SEIS as well as those submitted on the Draft SEIS Supplement.33 As the Staff acknowledges, the NRCs environmental review in this matter required additional time to complete, in large part becauseas relevant herethe Staff identified new information that merited preparation of a supplement to the Draft SEIS.34 Friends/NEC have not identified additional information that was not considered before issuance of the Final SEIS. | |||
Second, the Staffs efforts have ensured that relevant information was made available to the public and other stakeholders. The record reflects that the Staff afforded Friends/NEC and 29 Id. at 540-41 (quoting Robertson, 490 U.S. at 349). | |||
30 License Renewal Application for Seabrook Station, Unit 1; NextEra Energy Seabrook, LLC, 77 Fed. Reg. 35,079, 35,080 (June 12, 2012) (informing the public of the Staffs intent to prepare a supplement to the Draft SEIS to address new information related to SAMA analysis). | |||
31 Draft SEIS Supplement at iii, ix. | |||
32 Final SEIS, Vol. 1, at 1-3. | |||
33 Id. | |||
34 See Staff Answer at 8-9. | |||
the public sufficient opportunity to provide input to both the Draft SEIS and the Draft SEIS Supplement.35 Further, the public had an opportunity to provide comments on issues addressed in the Final SEIS through the Continued Storage rulemaking and the revision process for the License Renewal GEIS.36 In summary, Friends/NEC have not shown that supplementation, or an accompanying new opportunity for public comment, is required under our regulations because they have not identified substantial changes in the proposed action or significant new information. The Staffs approach to considering new and significant information, providing opportunities for public input thereon, and issuing a Final SEIS after completing these efforts was reasonable and consistent with the dual objectives of NEPAs environmental-impact-statement requirement.37 35 See Notice of Draft SEIS Supplement, 78 Fed. Reg. at 26,662; NextEra Energy Seabrook, LLC; Notice of Availability of Draft Supplement 46 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants and Public Meetings for the License Renewal of Seabrook Station, Unit 1, 76 Fed. Reg. 47,612, 47,612 (Aug. 5, 2011); Summary of Public Meetings Conducted to Discuss the Draft Supplemental Environmental Impact Statement Related to the Review of the Seabrook Station License Renewal Application (TAC No. ME3959) | |||
(Oct. 26, 2011), at 1 (ML11277A046). | |||
36 See Waste ConfidenceContinued Storage of Spent Nuclear Fuel, 78 Fed. Reg. 56,776, 56,776 (Sept. 13, 2013) (soliciting public comments on the proposed rule for continued storage of spent nuclear fuel); Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses, 74 Fed. Reg. 38,117, 38,117 (July 31, 2009) (soliciting public comments on the revised GEIS for License Renewal). | |||
37 For the same reasons, Friends/NEC have not identified a circumstance in which a supplement should be prepared as a matter of discretion. See 10 C.F.R. § 51.92(c) (providing that the Staff may prepare a supplement to a final environmental impact statement when, in its opinion, doing so will further the purposes of NEPA). | |||
III. CONCLUSION As discussed above, Friends/NEC have not demonstrated that withdrawal of the Final SEIS in this matter is warranted. We therefore deny Friends/NECs motion. | |||
IT IS SO ORDERED. | |||
For the Commission NRC Seal | |||
/RA/ | |||
Annette L. Vietti-Cook Secretary of the Commission Dated at Rockville, Maryland, this 25th day of February, 2016. | |||
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of ) | |||
) | |||
NEXTERA ENERGY SEABROOK, LLC ) Docket No. 50-443-LR (Seabrook Station, Unit 1) ) | |||
) | |||
(License Renewal) ) | |||
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-16-03) have been served upon the following persons by Electronic Information Exchange. | |||
U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Office of the Secretary of the Commission Mail Stop: O-7H4 Mail Stop: O-16C1 Washington, DC 20555-0001 Washington, DC 20555-0001 ocaamail@nrc.gov Hearing Docket hearingdocket@nrc.gov U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop: T-3F23 Office of the General Counsel Washington, DC 20555-0001 Mail Stop: O-15D21 Washington, DC 20555-0001 Paul S. Ryerson, Chair Administrative Judge Lloyd Clark, Esq. | |||
paul.ryerson@nrc.gov lloyd.clark@nrc.gov Anita Ghosh, Esq. | |||
Michael F. Kennedy anita.ghosh@nrc.gov Administrative Judge Brian Harris, Esq. | |||
michael.kennedy@nrc.gov brian.harris@nrc.gov David Roth, Esq. | |||
Richard E. Wardwell david.roth@nrc.gov Administrative Judge Mary Spencer, Esq. | |||
richard.wardwell@nrc.gov mary.spencer@nrc.gov Jeremy Wachutka, Esq. | |||
jeremy.wachutka@nrc.gov Edward Williamson, Esq. | |||
edward.williamson@nrc.gov John Tibbetts, Paralegal john.tibbetts@nrc.gov OGC Mail Center: Members of this office have received a copy of this filing by EIE service. | |||
NEXTERA ENERGY SEABROOK, LLC (Seabrook Station Unit 1) - Docket No. 50-443-LR COMMISSION MEMORANDUM AND ORDER (CLI-16-03) | |||
NextEra Energy Seabrook, LLC New Hampshire Sierra Club 801 Pennsylvania Avenue, N.W., #220 40 N. Main Street Washington, DC 20004 Concord, NH 03870 Steven C. Hamrick, Esq. Kurt Ehrenberg, Field Organizer steven.hamrick@fpl.com kurtehrenberg@gmail.com NextEra Energy Seabrook, LLC Seacoast Anti-Pollution League 700 Universe Boulevard P.O. Box 1136 Juno Beach, FL 33408 Portsmouth, NH 03802 William Blair, Esq. Doug Bogen, Executive Director william.blair@fpl.com dbogen@metrocast.net Pillsbury Winthrop Shaw Pittman, LLP State of New Hampshire 1200 Seventeenth Street, NW Office of the Attorney General Washington, DC 20036-3006 33 Capitol Street David R. Lewis, Esq. Concord, NH 03301 david.lewis@pillsburylaw.com K. Allen Brooks, Assistant Attorney General k.allen.brooks@doj.nh.gov Friends of the Coast and Michael A. Delaney, Attorney General New England Coalition (NEC) michael.a.delaney@doj.nh.gov Post Office Box 98 Peter Roth, Assistant Attorney General Edgecomb, ME 04556 peter.roth@doj.nh.gov Raymond Shadis Debbie Grinnell State of Massachusetts debbie@c-10.org Office of the Attorney General shadis@prexar.com Environmental Protection Division One Ashburton Place, 18th Floor Beyond Nuclear Boston, MA 02108 6930 Carroll Avenue, Suite 400 John Beling, Assistant Attorney General Takoma Park, MD 20912 john.beling@state.ma.us Paul Gunter, Director, Reactor Jillian Riley, Legal Analyst Oversight Project jillian.riley@state.ma.us paul@beyondnuclear.org | |||
[Original signed by Clara Sola ] | |||
Office of the Secretary of the Commission Dated at Rockville, Maryland this 25th day of February, 2016 2 | |||
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION COMMISSIONERS: | |||
Stephen G. Burns, Chairman Kristine L. Svinicki William C. Ostendorff Jeff Baran In the Matter of NEXTERA ENERGY SEABROOK, LLC Docket No. 50-443-LR (Seabrook Station, Unit 1) | |||
CLI-16-03 MEMORANDUM AND ORDER Friends of the Coast and New England Coalition (Friends/NEC) request that we order the Final Supplemental Environmental Impact Statement (Final SEIS) for the Seabrook Station, Unit 1 license renewal application to be withdrawn, re-released as a draft or supplement to the Draft Supplemental Environmental Impact Statement (Draft SEIS), and published for public comment.1 For the reasons set forth below, we deny the motion. | |||
I. BACKGROUND In May 2010, NextEra Energy Seabrook, LLC applied to renew the operating license for Seabrook for an additional twenty years.2 The NRC Staff docketed the application shortly 1 Motion to Withhold or Withdraw Final Environmental Impact Statement Pending Renewed Opportunity for Comment (July 28, 2015), at 1, 8 (Motion). | |||
2 Notice of Acceptance for Docketing of the Application and Notice of Opportunity for Hearing Regarding Renewal of Facility Operating License No. NPF-86 for an Additional 20-Year Period; | |||
thereafter and provided an opportunity for interested persons to request an adjudicatory hearing.3 Friends/NEC filed a petition to intervene at that time.4 The Atomic Safety and Licensing Board granted the petition and admitted several of their proposed contentions.5 We affirmed in part and reversed in part the Boards ruling, leaving two admitted contentions pending in the proceeding: Friends/NECs Contentions 4B and 4D.6 The Staff issued the Draft SEIS in July 2011 and made it available for public comment.7 The Staffs review of the Seabrook license renewal application continued, and in April 2013, the Staff issued a supplement to the Draft SEIS addressing new information.8 Specifically, the Draft NextEra Energy Seabrook, LLC; Seabrook Station, Unit 1, 75 Fed. Reg. 42,462, 42,462 (July 21, 2010). | |||
3 Id. at 42,462-63. | |||
4 Friends of the Coast and New England Coalition Petition for Leave to Intervene, Request for Hearing, and Admission of Contentions (Oct. 20, 2010). | |||
5 LBP-11-2, 73 NRC 28, 79 (2011). | |||
6 CLI-12-5, 75 NRC 301, 327, 329, 349 (2012). Both contentions challenged NextEras severe accident mitigation alternatives (SAMA) analysis for Seabrook. In Contention 4B, Friends/NEC challenged the use in the analysis of certain source terms. In Contention 4D, Friends/NEC challenged NextEras atmospheric dispersion model. Id. at 324-29. | |||
7 See Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Seabrook Station (Draft Report for Comment), NUREG-1437, Supp. 46 (July 2011) | |||
(ADAMS accession nos. ML11213A024 and ML11213A203) (Draft SEIS); NextEra Energy Seabrook, LLC; Notice of Availability of Draft Supplement 46 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants and Public Meetings for the License Renewal of Seabrook Station, Unit 1, 76 Fed. Reg. 47,612, 47,612 (Aug. 5, 2011). The Staff held two public meetings during the comment period to receive additional input. See Summary of Public Meetings Conducted to Discuss the Draft Supplemental Environmental Impact Statement Related to the Review of the Seabrook Station License Renewal Application (TAC No. ME3959) (Oct. 26, 2011), at 1 (ML11277A046). | |||
8 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Seabrook Station (Second Draft Report for Comment), NUREG-1437, Supp. 46 (Apr. 2013), at iii, ix (ML13113A174) (Draft SEIS Supplement). | |||
SEIS Supplement addressed (1) an updated SAMA analysis that NextEra submitted in March 2012; (2) the June 2012 decision of the U.S. Court of Appeals for the District of Columbia Circuit vacating the NRCs Waste Confidence Rule;9 and (3) new issues arising from the NRCs rulemaking to revise the Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants.10 The Draft SEIS Supplement was also made available for public comment.11 In May 2013, NextEra sought summary disposition of Contentions 4B and 4D.12 Friends/NEC offered no opposition with respect to Contention 4B and the Board dismissed the contention.13 With respect to Contention 4D, Friends/NEC, NextEra, and the Staff jointly requested that the Board issue two orders: the first to approve settlement of the contention; the second to dismiss the contention seven days after the Staff had notified the Board of publication 9 See generally New York v. NRC, 681 F.3d 471 (D.C. Cir. 2012). | |||
10 Draft SEIS Supplement at iii, ix. | |||
11 Draft Supplement to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants; NextEra Energy Seabrook; Seabrook Station, Unit 1, 78 Fed. Reg. 26,662, 26,662 (May 7, 2013) (Notice of Draft SEIS Supplement). | |||
12 See NextEras Motion for Summary Disposition of Friends of the Coast/New England Coalition Contention 4B (SAMA Analysis Source Terms) (May 10, 2013); NextEras Motion for Summary Disposition of Friends of the Coast/New England Coalition Contention 4D (SAMA Analysis Atmospheric Modeling) (May 10, 2013). | |||
13 See Friends of the Coast and New England Coalitions Answer to NextEras Motion for Summary Disposition of Contentions 4B (SAMA Source Terms) and 4D (SAMA Atmospheric Modeling) (July 15, 2013), at 1; Order (Granting Summary Disposition of Contention 4B) (Aug. | |||
12, 2013) (unpublished). | |||
of a Final SEIS providing additional analysis that the parties agreed would resolve the contention.14 The Board approved settlement of Contention 4D in August 2013.15 On July 28, 2015, Friends/NEC filed the instant motion.16 The Staff issued the Final SEIS on July 29, 2015.17 Among other things, the Final SEIS included (1) the updated SAMA analysis performed pursuant to the Board-approved settlement agreement;18 (2) a discussion of the impacts from the NRCs Continued Storage Rule and associated GEIS for Continued Storage of Spent Nuclear Fuel;19 and (3) an updated analysis related to the revision to the License Renewal GEIS, which was finalized after the issuance of the Draft SEIS Supplement.20 Shortly thereafter, and consistent with the parties earlier request, the Board dismissed Contention 4D and terminated the proceeding.21 14 Joint Motion for Approval of Settlement and Dismissal of FOTC/NEC Contention 4D (Aug. 8, 2013), at 1, 3; id., Ex. B, Proposed Initial Consent Order, at 2. The additional information involved a sensitivity analysis and related work performed in connection with the atmospheric dispersion model used in NextEras SAMA analysis. Id. at 1-3. | |||
15 Order (Approving Settlement of Contention 4D) (Aug. 12, 2013) (unpublished). | |||
16 The Staff and NextEra oppose Friends/NECs motion. See NRC Staffs Answer to Motion to Withhold or Withdraw Final Environmental Impact Statement Pending Renewed Opportunity for Comment (Aug. 7, 2015) (Staff Answer); NextEra Energy Seabrook, LLCs Answer Opposing Friends of the Coast and New England Coalitions Motion to Withhold or Withdraw Final Environmental Impact Statement (Aug. 7, 2015). | |||
17 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Seabrook Station (Final Report), NUREG-1437, Supp. 46, Vols. 1-2 (July 2015) (ML15209A575 and ML15209A870) (Final SEIS). | |||
18 See id., Vol. 1, ch. 5; id., Vol. 2, app. F. | |||
19 See id., Vol. 1, at 1-4, § 6.1. | |||
20 See id., Vol. 1, at 1-3 to -4, ch. 4. | |||
21 LBP-15-22, 82 NRC 49 (2015); see letter from Anita Ghosh, counsel for the Staff, to the Administrative Judges (July 29, 2015), at 1-2 (advising the Board of the Final SEISs issuance). | |||
II. DISCUSSION Friends/NEC request that if the SEIS has not been finalized, then we direct that the document be withheld and issued as a draft or supplement for public comment. Alternatively, were we to consider their motion following issuance of the Final SEIS, then Friends/NEC request that we direct that the document be withdrawn and re-issued as a draft or supplement for public comment.22 Because the Final SEIS has been issued and Friends/NEC request, in that circumstance, that we direct that the Final SEIS be withdrawn and re-released as a draft or supplement, our regulation at 10 C.F.R. § 51.92 governs here.23 Section 51.92 specifies the circumstances under which the Staff is required to prepare a supplement to a final environmental impact statement if (as is the case here) the proposed action has not yet been taken. More specifically, section 51.92(a) requires the Staff to prepare such a supplement if there are (1) substantial changes in the proposed action that are relevant to environmental concerns or (2) new and significant circumstances or information relevant to environmental concerns and bearing on the proposed action or its impacts. The relevant question is whether substantial changes in the proposed action or new and significant information presents a seriously different picture of the environmental impacts that have been 22 Motion at 1, 10. | |||
23 Had we considered Friends/NECs request in the context of the Draft SEIS, and thereby applied 10 C.F.R. § 51.72, which governs supplementation of a draft environmental impact statement, our analysis would have yielded the same result; sections 51.72(a) and (b) are substantively identical to sections 51.92(a) and (c). See Union Electric Co. (Callaway Plant, Unit 2), CLI-11-5, 74 NRC 141, 167 n.103 (2011). | |||
assessed in the relevant licensing action, and of our analysis of those impacts, when compared to the previously issued final environmental impact statement.24 Friends/NEC express concern that the DEIS is a departure from what the public was given the opportunity to review back in 2011 and that the NRC was deprived of the benefit of public comment (input) on significant portions of the DEIS now containing new information.25 Friends/NEC also assert that the material substance of the Draft SEIS has been altered due to the nearly four years between the end of the public comment period for the Draft SEIS and the issuance of the Final SEIS.26 Friends/NEC have not, however, identified any changes in the proposed license renewal action. Friends/NEC also have not pointed to new and significant information relevant to the Seabrook environmental review. | |||
Moreover, the Staffs approach to the environmental review for Seabrook satisfied the purposes of the National Environmental Policy Act of 1969 (NEPA). The requirement under NEPA to prepare an environmental impact statement serves two purposes.27 First, it ensures that decisionmakers will have available, and will carefully consider, detailed information concerning significant environmental impacts.28 Second, it guarantees that the relevant 24 DTE Electric Co. (Fermi Nuclear Power Plant, Unit 3), CLI-15-10, 81 NRC 535, 543 (2015) | |||
(quoting Hydro Resources, Inc. (P.O. Box 15910, Rio Rancho, NM 87174), CLI-04-39, 60 NRC 657, 659 (2004)). | |||
25 Motion at 6. | |||
26 Id. at 1-2. | |||
27 Fermi, CLI-15-10, 81 NRC at 540 (citing Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 349 (1989)). | |||
28 Id. (quoting Robertson, 490 U.S. at 349). | |||
information will be made available to the larger audience . . . that may also play a role in the decisionmaking process.29 The Staffs approach has fulfilled both of these purposes. | |||
First, the Staffs efforts have ensured that the NRC has available for its consideration detailed information regarding the environmental impacts of the Seabrook Unit 1 license renewal application. Prior to issuance of the Final SEIS, the Staff identified new information meriting preparation of a supplement to the Draft SEIS.30 The Staff issued the Draft SEIS Supplement analyzing that information in April 2013.31 The Final SEIS incorporates both the Draft SEIS and the Draft SEIS Supplement.32 The Final SEIS also considers the public comments submitted on the Draft SEIS as well as those submitted on the Draft SEIS Supplement.33 As the Staff acknowledges, the NRCs environmental review in this matter required additional time to complete, in large part becauseas relevant herethe Staff identified new information that merited preparation of a supplement to the Draft SEIS.34 Friends/NEC have not identified additional information that was not considered before issuance of the Final SEIS. | |||
Second, the Staffs efforts have ensured that relevant information was made available to the public and other stakeholders. The record reflects that the Staff afforded Friends/NEC and 29 Id. at 540-41 (quoting Robertson, 490 U.S. at 349). | |||
30 License Renewal Application for Seabrook Station, Unit 1; NextEra Energy Seabrook, LLC, 77 Fed. Reg. 35,079, 35,080 (June 12, 2012) (informing the public of the Staffs intent to prepare a supplement to the Draft SEIS to address new information related to SAMA analysis). | |||
31 Draft SEIS Supplement at iii, ix. | |||
32 Final SEIS, Vol. 1, at 1-3. | |||
33 Id. | |||
34 See Staff Answer at 8-9. | |||
the public sufficient opportunity to provide input to both the Draft SEIS and the Draft SEIS Supplement.35 Further, the public had an opportunity to provide comments on issues addressed in the Final SEIS through the Continued Storage rulemaking and the revision process for the License Renewal GEIS.36 In summary, Friends/NEC have not shown that supplementation, or an accompanying new opportunity for public comment, is required under our regulations because they have not identified substantial changes in the proposed action or significant new information. The Staffs approach to considering new and significant information, providing opportunities for public input thereon, and issuing a Final SEIS after completing these efforts was reasonable and consistent with the dual objectives of NEPAs environmental-impact-statement requirement.37 35 See Notice of Draft SEIS Supplement, 78 Fed. Reg. at 26,662; NextEra Energy Seabrook, LLC; Notice of Availability of Draft Supplement 46 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants and Public Meetings for the License Renewal of Seabrook Station, Unit 1, 76 Fed. Reg. 47,612, 47,612 (Aug. 5, 2011); Summary of Public Meetings Conducted to Discuss the Draft Supplemental Environmental Impact Statement Related to the Review of the Seabrook Station License Renewal Application (TAC No. ME3959) | |||
(Oct. 26, 2011), at 1 (ML11277A046). | |||
36 See Waste ConfidenceContinued Storage of Spent Nuclear Fuel, 78 Fed. Reg. 56,776, 56,776 (Sept. 13, 2013) (soliciting public comments on the proposed rule for continued storage of spent nuclear fuel); Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses, 74 Fed. Reg. 38,117, 38,117 (July 31, 2009) (soliciting public comments on the revised GEIS for License Renewal). | |||
37 For the same reasons, Friends/NEC have not identified a circumstance in which a supplement should be prepared as a matter of discretion. See 10 C.F.R. § 51.92(c) (providing that the Staff may prepare a supplement to a final environmental impact statement when, in its opinion, doing so will further the purposes of NEPA). | |||
III. CONCLUSION As discussed above, Friends/NEC have not demonstrated that withdrawal of the Final SEIS in this matter is warranted. We therefore deny Friends/NECs motion. | |||
IT IS SO ORDERED. | |||
For the Commission NRC Seal | |||
/RA/ | |||
Annette L. Vietti-Cook Secretary of the Commission Dated at Rockville, Maryland, this 25th day of February, 2016. | |||
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of ) | |||
) | |||
NEXTERA ENERGY SEABROOK, LLC ) Docket No. 50-443-LR (Seabrook Station, Unit 1) ) | |||
) | |||
(License Renewal) ) | |||
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-16-03) have been served upon the following persons by Electronic Information Exchange. | |||
U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Office of the Secretary of the Commission Mail Stop: O-7H4 Mail Stop: O-16C1 Washington, DC 20555-0001 Washington, DC 20555-0001 ocaamail@nrc.gov Hearing Docket hearingdocket@nrc.gov U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop: T-3F23 Office of the General Counsel Washington, DC 20555-0001 Mail Stop: O-15D21 Washington, DC 20555-0001 Paul S. Ryerson, Chair Administrative Judge Lloyd Clark, Esq. | |||
paul.ryerson@nrc.gov lloyd.clark@nrc.gov Anita Ghosh, Esq. | |||
Michael F. Kennedy anita.ghosh@nrc.gov Administrative Judge Brian Harris, Esq. | |||
michael.kennedy@nrc.gov brian.harris@nrc.gov David Roth, Esq. | |||
Richard E. Wardwell david.roth@nrc.gov Administrative Judge Mary Spencer, Esq. | |||
richard.wardwell@nrc.gov mary.spencer@nrc.gov Jeremy Wachutka, Esq. | |||
jeremy.wachutka@nrc.gov Edward Williamson, Esq. | |||
edward.williamson@nrc.gov John Tibbetts, Paralegal john.tibbetts@nrc.gov OGC Mail Center: Members of this office have received a copy of this filing by EIE service. | |||
NEXTERA ENERGY SEABROOK, LLC (Seabrook Station Unit 1) - Docket No. 50-443-LR COMMISSION MEMORANDUM AND ORDER (CLI-16-03) | |||
NextEra Energy Seabrook, LLC New Hampshire Sierra Club 801 Pennsylvania Avenue, N.W., #220 40 N. Main Street Washington, DC 20004 Concord, NH 03870 Steven C. Hamrick, Esq. Kurt Ehrenberg, Field Organizer steven.hamrick@fpl.com kurtehrenberg@gmail.com NextEra Energy Seabrook, LLC Seacoast Anti-Pollution League 700 Universe Boulevard P.O. Box 1136 Juno Beach, FL 33408 Portsmouth, NH 03802 William Blair, Esq. Doug Bogen, Executive Director william.blair@fpl.com dbogen@metrocast.net Pillsbury Winthrop Shaw Pittman, LLP State of New Hampshire 1200 Seventeenth Street, NW Office of the Attorney General Washington, DC 20036-3006 33 Capitol Street David R. Lewis, Esq. Concord, NH 03301 david.lewis@pillsburylaw.com K. Allen Brooks, Assistant Attorney General k.allen.brooks@doj.nh.gov Friends of the Coast and Michael A. Delaney, Attorney General New England Coalition (NEC) michael.a.delaney@doj.nh.gov Post Office Box 98 Peter Roth, Assistant Attorney General Edgecomb, ME 04556 peter.roth@doj.nh.gov Raymond Shadis Debbie Grinnell State of Massachusetts debbie@c-10.org Office of the Attorney General shadis@prexar.com Environmental Protection Division One Ashburton Place, 18th Floor Beyond Nuclear Boston, MA 02108 6930 Carroll Avenue, Suite 400 John Beling, Assistant Attorney General Takoma Park, MD 20912 john.beling@state.ma.us Paul Gunter, Director, Reactor Jillian Riley, Legal Analyst Oversight Project jillian.riley@state.ma.us paul@beyondnuclear.org | |||
[Original signed by Clara Sola ] | |||
Office of the Secretary of the Commission Dated at Rockville, Maryland this 25th day of February, 2016 2}} |
Latest revision as of 04:41, 5 February 2020
ML16056A088 | |
Person / Time | |
---|---|
Site: | Seabrook |
Issue date: | 02/25/2016 |
From: | Annette Vietti-Cook NRC/SECY |
To: | |
SECY RAS | |
References | |
50-443-LR, ASLBP 10-906-02-LR-BD01, CLI-16-03, RAS 50946 | |
Download: ML16056A088 (11) | |
Text
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION COMMISSIONERS:
Stephen G. Burns, Chairman Kristine L. Svinicki William C. Ostendorff Jeff Baran In the Matter of NEXTERA ENERGY SEABROOK, LLC Docket No. 50-443-LR (Seabrook Station, Unit 1)
CLI-16-03 MEMORANDUM AND ORDER Friends of the Coast and New England Coalition (Friends/NEC) request that we order the Final Supplemental Environmental Impact Statement (Final SEIS) for the Seabrook Station, Unit 1 license renewal application to be withdrawn, re-released as a draft or supplement to the Draft Supplemental Environmental Impact Statement (Draft SEIS), and published for public comment.1 For the reasons set forth below, we deny the motion.
I. BACKGROUND In May 2010, NextEra Energy Seabrook, LLC applied to renew the operating license for Seabrook for an additional twenty years.2 The NRC Staff docketed the application shortly 1 Motion to Withhold or Withdraw Final Environmental Impact Statement Pending Renewed Opportunity for Comment (July 28, 2015), at 1, 8 (Motion).
2 Notice of Acceptance for Docketing of the Application and Notice of Opportunity for Hearing Regarding Renewal of Facility Operating License No. NPF-86 for an Additional 20-Year Period;
thereafter and provided an opportunity for interested persons to request an adjudicatory hearing.3 Friends/NEC filed a petition to intervene at that time.4 The Atomic Safety and Licensing Board granted the petition and admitted several of their proposed contentions.5 We affirmed in part and reversed in part the Boards ruling, leaving two admitted contentions pending in the proceeding: Friends/NECs Contentions 4B and 4D.6 The Staff issued the Draft SEIS in July 2011 and made it available for public comment.7 The Staffs review of the Seabrook license renewal application continued, and in April 2013, the Staff issued a supplement to the Draft SEIS addressing new information.8 Specifically, the Draft NextEra Energy Seabrook, LLC; Seabrook Station, Unit 1, 75 Fed. Reg. 42,462, 42,462 (July 21, 2010).
3 Id. at 42,462-63.
4 Friends of the Coast and New England Coalition Petition for Leave to Intervene, Request for Hearing, and Admission of Contentions (Oct. 20, 2010).
5 LBP-11-2, 73 NRC 28, 79 (2011).
6 CLI-12-5, 75 NRC 301, 327, 329, 349 (2012). Both contentions challenged NextEras severe accident mitigation alternatives (SAMA) analysis for Seabrook. In Contention 4B, Friends/NEC challenged the use in the analysis of certain source terms. In Contention 4D, Friends/NEC challenged NextEras atmospheric dispersion model. Id. at 324-29.
7 See Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Seabrook Station (Draft Report for Comment), NUREG-1437, Supp. 46 (July 2011)
(ADAMS accession nos. ML11213A024 and ML11213A203) (Draft SEIS); NextEra Energy Seabrook, LLC; Notice of Availability of Draft Supplement 46 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants and Public Meetings for the License Renewal of Seabrook Station, Unit 1, 76 Fed. Reg. 47,612, 47,612 (Aug. 5, 2011). The Staff held two public meetings during the comment period to receive additional input. See Summary of Public Meetings Conducted to Discuss the Draft Supplemental Environmental Impact Statement Related to the Review of the Seabrook Station License Renewal Application (TAC No. ME3959) (Oct. 26, 2011), at 1 (ML11277A046).
8 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Seabrook Station (Second Draft Report for Comment), NUREG-1437, Supp. 46 (Apr. 2013), at iii, ix (ML13113A174) (Draft SEIS Supplement).
SEIS Supplement addressed (1) an updated SAMA analysis that NextEra submitted in March 2012; (2) the June 2012 decision of the U.S. Court of Appeals for the District of Columbia Circuit vacating the NRCs Waste Confidence Rule;9 and (3) new issues arising from the NRCs rulemaking to revise the Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants.10 The Draft SEIS Supplement was also made available for public comment.11 In May 2013, NextEra sought summary disposition of Contentions 4B and 4D.12 Friends/NEC offered no opposition with respect to Contention 4B and the Board dismissed the contention.13 With respect to Contention 4D, Friends/NEC, NextEra, and the Staff jointly requested that the Board issue two orders: the first to approve settlement of the contention; the second to dismiss the contention seven days after the Staff had notified the Board of publication 9 See generally New York v. NRC, 681 F.3d 471 (D.C. Cir. 2012).
10 Draft SEIS Supplement at iii, ix.
11 Draft Supplement to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants; NextEra Energy Seabrook; Seabrook Station, Unit 1, 78 Fed. Reg. 26,662, 26,662 (May 7, 2013) (Notice of Draft SEIS Supplement).
12 See NextEras Motion for Summary Disposition of Friends of the Coast/New England Coalition Contention 4B (SAMA Analysis Source Terms) (May 10, 2013); NextEras Motion for Summary Disposition of Friends of the Coast/New England Coalition Contention 4D (SAMA Analysis Atmospheric Modeling) (May 10, 2013).
13 See Friends of the Coast and New England Coalitions Answer to NextEras Motion for Summary Disposition of Contentions 4B (SAMA Source Terms) and 4D (SAMA Atmospheric Modeling) (July 15, 2013), at 1; Order (Granting Summary Disposition of Contention 4B) (Aug.
12, 2013) (unpublished).
of a Final SEIS providing additional analysis that the parties agreed would resolve the contention.14 The Board approved settlement of Contention 4D in August 2013.15 On July 28, 2015, Friends/NEC filed the instant motion.16 The Staff issued the Final SEIS on July 29, 2015.17 Among other things, the Final SEIS included (1) the updated SAMA analysis performed pursuant to the Board-approved settlement agreement;18 (2) a discussion of the impacts from the NRCs Continued Storage Rule and associated GEIS for Continued Storage of Spent Nuclear Fuel;19 and (3) an updated analysis related to the revision to the License Renewal GEIS, which was finalized after the issuance of the Draft SEIS Supplement.20 Shortly thereafter, and consistent with the parties earlier request, the Board dismissed Contention 4D and terminated the proceeding.21 14 Joint Motion for Approval of Settlement and Dismissal of FOTC/NEC Contention 4D (Aug. 8, 2013), at 1, 3; id., Ex. B, Proposed Initial Consent Order, at 2. The additional information involved a sensitivity analysis and related work performed in connection with the atmospheric dispersion model used in NextEras SAMA analysis. Id. at 1-3.
15 Order (Approving Settlement of Contention 4D) (Aug. 12, 2013) (unpublished).
16 The Staff and NextEra oppose Friends/NECs motion. See NRC Staffs Answer to Motion to Withhold or Withdraw Final Environmental Impact Statement Pending Renewed Opportunity for Comment (Aug. 7, 2015) (Staff Answer); NextEra Energy Seabrook, LLCs Answer Opposing Friends of the Coast and New England Coalitions Motion to Withhold or Withdraw Final Environmental Impact Statement (Aug. 7, 2015).
17 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Seabrook Station (Final Report), NUREG-1437, Supp. 46, Vols. 1-2 (July 2015) (ML15209A575 and ML15209A870) (Final SEIS).
18 See id., Vol. 1, ch. 5; id., Vol. 2, app. F.
19 See id., Vol. 1, at 1-4, § 6.1.
20 See id., Vol. 1, at 1-3 to -4, ch. 4.
21 LBP-15-22, 82 NRC 49 (2015); see letter from Anita Ghosh, counsel for the Staff, to the Administrative Judges (July 29, 2015), at 1-2 (advising the Board of the Final SEISs issuance).
II. DISCUSSION Friends/NEC request that if the SEIS has not been finalized, then we direct that the document be withheld and issued as a draft or supplement for public comment. Alternatively, were we to consider their motion following issuance of the Final SEIS, then Friends/NEC request that we direct that the document be withdrawn and re-issued as a draft or supplement for public comment.22 Because the Final SEIS has been issued and Friends/NEC request, in that circumstance, that we direct that the Final SEIS be withdrawn and re-released as a draft or supplement, our regulation at 10 C.F.R. § 51.92 governs here.23 Section 51.92 specifies the circumstances under which the Staff is required to prepare a supplement to a final environmental impact statement if (as is the case here) the proposed action has not yet been taken. More specifically, section 51.92(a) requires the Staff to prepare such a supplement if there are (1) substantial changes in the proposed action that are relevant to environmental concerns or (2) new and significant circumstances or information relevant to environmental concerns and bearing on the proposed action or its impacts. The relevant question is whether substantial changes in the proposed action or new and significant information presents a seriously different picture of the environmental impacts that have been 22 Motion at 1, 10.
23 Had we considered Friends/NECs request in the context of the Draft SEIS, and thereby applied 10 C.F.R. § 51.72, which governs supplementation of a draft environmental impact statement, our analysis would have yielded the same result; sections 51.72(a) and (b) are substantively identical to sections 51.92(a) and (c). See Union Electric Co. (Callaway Plant, Unit 2), CLI-11-5, 74 NRC 141, 167 n.103 (2011).
assessed in the relevant licensing action, and of our analysis of those impacts, when compared to the previously issued final environmental impact statement.24 Friends/NEC express concern that the DEIS is a departure from what the public was given the opportunity to review back in 2011 and that the NRC was deprived of the benefit of public comment (input) on significant portions of the DEIS now containing new information.25 Friends/NEC also assert that the material substance of the Draft SEIS has been altered due to the nearly four years between the end of the public comment period for the Draft SEIS and the issuance of the Final SEIS.26 Friends/NEC have not, however, identified any changes in the proposed license renewal action. Friends/NEC also have not pointed to new and significant information relevant to the Seabrook environmental review.
Moreover, the Staffs approach to the environmental review for Seabrook satisfied the purposes of the National Environmental Policy Act of 1969 (NEPA). The requirement under NEPA to prepare an environmental impact statement serves two purposes.27 First, it ensures that decisionmakers will have available, and will carefully consider, detailed information concerning significant environmental impacts.28 Second, it guarantees that the relevant 24 DTE Electric Co. (Fermi Nuclear Power Plant, Unit 3), CLI-15-10, 81 NRC 535, 543 (2015)
(quoting Hydro Resources, Inc. (P.O. Box 15910, Rio Rancho, NM 87174), CLI-04-39, 60 NRC 657, 659 (2004)).
25 Motion at 6.
26 Id. at 1-2.
27 Fermi, CLI-15-10, 81 NRC at 540 (citing Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 349 (1989)).
28 Id. (quoting Robertson, 490 U.S. at 349).
information will be made available to the larger audience . . . that may also play a role in the decisionmaking process.29 The Staffs approach has fulfilled both of these purposes.
First, the Staffs efforts have ensured that the NRC has available for its consideration detailed information regarding the environmental impacts of the Seabrook Unit 1 license renewal application. Prior to issuance of the Final SEIS, the Staff identified new information meriting preparation of a supplement to the Draft SEIS.30 The Staff issued the Draft SEIS Supplement analyzing that information in April 2013.31 The Final SEIS incorporates both the Draft SEIS and the Draft SEIS Supplement.32 The Final SEIS also considers the public comments submitted on the Draft SEIS as well as those submitted on the Draft SEIS Supplement.33 As the Staff acknowledges, the NRCs environmental review in this matter required additional time to complete, in large part becauseas relevant herethe Staff identified new information that merited preparation of a supplement to the Draft SEIS.34 Friends/NEC have not identified additional information that was not considered before issuance of the Final SEIS.
Second, the Staffs efforts have ensured that relevant information was made available to the public and other stakeholders. The record reflects that the Staff afforded Friends/NEC and 29 Id. at 540-41 (quoting Robertson, 490 U.S. at 349).
30 License Renewal Application for Seabrook Station, Unit 1; NextEra Energy Seabrook, LLC, 77 Fed. Reg. 35,079, 35,080 (June 12, 2012) (informing the public of the Staffs intent to prepare a supplement to the Draft SEIS to address new information related to SAMA analysis).
31 Draft SEIS Supplement at iii, ix.
32 Final SEIS, Vol. 1, at 1-3.
33 Id.
34 See Staff Answer at 8-9.
the public sufficient opportunity to provide input to both the Draft SEIS and the Draft SEIS Supplement.35 Further, the public had an opportunity to provide comments on issues addressed in the Final SEIS through the Continued Storage rulemaking and the revision process for the License Renewal GEIS.36 In summary, Friends/NEC have not shown that supplementation, or an accompanying new opportunity for public comment, is required under our regulations because they have not identified substantial changes in the proposed action or significant new information. The Staffs approach to considering new and significant information, providing opportunities for public input thereon, and issuing a Final SEIS after completing these efforts was reasonable and consistent with the dual objectives of NEPAs environmental-impact-statement requirement.37 35 See Notice of Draft SEIS Supplement, 78 Fed. Reg. at 26,662; NextEra Energy Seabrook, LLC; Notice of Availability of Draft Supplement 46 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants and Public Meetings for the License Renewal of Seabrook Station, Unit 1, 76 Fed. Reg. 47,612, 47,612 (Aug. 5, 2011); Summary of Public Meetings Conducted to Discuss the Draft Supplemental Environmental Impact Statement Related to the Review of the Seabrook Station License Renewal Application (TAC No. ME3959)
(Oct. 26, 2011), at 1 (ML11277A046).
36 See Waste ConfidenceContinued Storage of Spent Nuclear Fuel, 78 Fed. Reg. 56,776, 56,776 (Sept. 13, 2013) (soliciting public comments on the proposed rule for continued storage of spent nuclear fuel); Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses, 74 Fed. Reg. 38,117, 38,117 (July 31, 2009) (soliciting public comments on the revised GEIS for License Renewal).
37 For the same reasons, Friends/NEC have not identified a circumstance in which a supplement should be prepared as a matter of discretion. See 10 C.F.R. § 51.92(c) (providing that the Staff may prepare a supplement to a final environmental impact statement when, in its opinion, doing so will further the purposes of NEPA).
III. CONCLUSION As discussed above, Friends/NEC have not demonstrated that withdrawal of the Final SEIS in this matter is warranted. We therefore deny Friends/NECs motion.
For the Commission NRC Seal
/RA/
Annette L. Vietti-Cook Secretary of the Commission Dated at Rockville, Maryland, this 25th day of February, 2016.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )
)
NEXTERA ENERGY SEABROOK, LLC ) Docket No. 50-443-LR (Seabrook Station, Unit 1) )
)
(License Renewal) )
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-16-03) have been served upon the following persons by Electronic Information Exchange.
U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Office of the Secretary of the Commission Mail Stop: O-7H4 Mail Stop: O-16C1 Washington, DC 20555-0001 Washington, DC 20555-0001 ocaamail@nrc.gov Hearing Docket hearingdocket@nrc.gov U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop: T-3F23 Office of the General Counsel Washington, DC 20555-0001 Mail Stop: O-15D21 Washington, DC 20555-0001 Paul S. Ryerson, Chair Administrative Judge Lloyd Clark, Esq.
paul.ryerson@nrc.gov lloyd.clark@nrc.gov Anita Ghosh, Esq.
Michael F. Kennedy anita.ghosh@nrc.gov Administrative Judge Brian Harris, Esq.
michael.kennedy@nrc.gov brian.harris@nrc.gov David Roth, Esq.
Richard E. Wardwell david.roth@nrc.gov Administrative Judge Mary Spencer, Esq.
richard.wardwell@nrc.gov mary.spencer@nrc.gov Jeremy Wachutka, Esq.
jeremy.wachutka@nrc.gov Edward Williamson, Esq.
edward.williamson@nrc.gov John Tibbetts, Paralegal john.tibbetts@nrc.gov OGC Mail Center: Members of this office have received a copy of this filing by EIE service.
NEXTERA ENERGY SEABROOK, LLC (Seabrook Station Unit 1) - Docket No. 50-443-LR COMMISSION MEMORANDUM AND ORDER (CLI-16-03)
NextEra Energy Seabrook, LLC New Hampshire Sierra Club 801 Pennsylvania Avenue, N.W., #220 40 N. Main Street Washington, DC 20004 Concord, NH 03870 Steven C. Hamrick, Esq. Kurt Ehrenberg, Field Organizer steven.hamrick@fpl.com kurtehrenberg@gmail.com NextEra Energy Seabrook, LLC Seacoast Anti-Pollution League 700 Universe Boulevard P.O. Box 1136 Juno Beach, FL 33408 Portsmouth, NH 03802 William Blair, Esq. Doug Bogen, Executive Director william.blair@fpl.com dbogen@metrocast.net Pillsbury Winthrop Shaw Pittman, LLP State of New Hampshire 1200 Seventeenth Street, NW Office of the Attorney General Washington, DC 20036-3006 33 Capitol Street David R. Lewis, Esq. Concord, NH 03301 david.lewis@pillsburylaw.com K. Allen Brooks, Assistant Attorney General k.allen.brooks@doj.nh.gov Friends of the Coast and Michael A. Delaney, Attorney General New England Coalition (NEC) michael.a.delaney@doj.nh.gov Post Office Box 98 Peter Roth, Assistant Attorney General Edgecomb, ME 04556 peter.roth@doj.nh.gov Raymond Shadis Debbie Grinnell State of Massachusetts debbie@c-10.org Office of the Attorney General shadis@prexar.com Environmental Protection Division One Ashburton Place, 18th Floor Beyond Nuclear Boston, MA 02108 6930 Carroll Avenue, Suite 400 John Beling, Assistant Attorney General Takoma Park, MD 20912 john.beling@state.ma.us Paul Gunter, Director, Reactor Jillian Riley, Legal Analyst Oversight Project jillian.riley@state.ma.us paul@beyondnuclear.org
[Original signed by Clara Sola ]
Office of the Secretary of the Commission Dated at Rockville, Maryland this 25th day of February, 2016 2
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION COMMISSIONERS:
Stephen G. Burns, Chairman Kristine L. Svinicki William C. Ostendorff Jeff Baran In the Matter of NEXTERA ENERGY SEABROOK, LLC Docket No. 50-443-LR (Seabrook Station, Unit 1)
CLI-16-03 MEMORANDUM AND ORDER Friends of the Coast and New England Coalition (Friends/NEC) request that we order the Final Supplemental Environmental Impact Statement (Final SEIS) for the Seabrook Station, Unit 1 license renewal application to be withdrawn, re-released as a draft or supplement to the Draft Supplemental Environmental Impact Statement (Draft SEIS), and published for public comment.1 For the reasons set forth below, we deny the motion.
I. BACKGROUND In May 2010, NextEra Energy Seabrook, LLC applied to renew the operating license for Seabrook for an additional twenty years.2 The NRC Staff docketed the application shortly 1 Motion to Withhold or Withdraw Final Environmental Impact Statement Pending Renewed Opportunity for Comment (July 28, 2015), at 1, 8 (Motion).
2 Notice of Acceptance for Docketing of the Application and Notice of Opportunity for Hearing Regarding Renewal of Facility Operating License No. NPF-86 for an Additional 20-Year Period;
thereafter and provided an opportunity for interested persons to request an adjudicatory hearing.3 Friends/NEC filed a petition to intervene at that time.4 The Atomic Safety and Licensing Board granted the petition and admitted several of their proposed contentions.5 We affirmed in part and reversed in part the Boards ruling, leaving two admitted contentions pending in the proceeding: Friends/NECs Contentions 4B and 4D.6 The Staff issued the Draft SEIS in July 2011 and made it available for public comment.7 The Staffs review of the Seabrook license renewal application continued, and in April 2013, the Staff issued a supplement to the Draft SEIS addressing new information.8 Specifically, the Draft NextEra Energy Seabrook, LLC; Seabrook Station, Unit 1, 75 Fed. Reg. 42,462, 42,462 (July 21, 2010).
3 Id. at 42,462-63.
4 Friends of the Coast and New England Coalition Petition for Leave to Intervene, Request for Hearing, and Admission of Contentions (Oct. 20, 2010).
5 LBP-11-2, 73 NRC 28, 79 (2011).
6 CLI-12-5, 75 NRC 301, 327, 329, 349 (2012). Both contentions challenged NextEras severe accident mitigation alternatives (SAMA) analysis for Seabrook. In Contention 4B, Friends/NEC challenged the use in the analysis of certain source terms. In Contention 4D, Friends/NEC challenged NextEras atmospheric dispersion model. Id. at 324-29.
7 See Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Seabrook Station (Draft Report for Comment), NUREG-1437, Supp. 46 (July 2011)
(ADAMS accession nos. ML11213A024 and ML11213A203) (Draft SEIS); NextEra Energy Seabrook, LLC; Notice of Availability of Draft Supplement 46 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants and Public Meetings for the License Renewal of Seabrook Station, Unit 1, 76 Fed. Reg. 47,612, 47,612 (Aug. 5, 2011). The Staff held two public meetings during the comment period to receive additional input. See Summary of Public Meetings Conducted to Discuss the Draft Supplemental Environmental Impact Statement Related to the Review of the Seabrook Station License Renewal Application (TAC No. ME3959) (Oct. 26, 2011), at 1 (ML11277A046).
8 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Seabrook Station (Second Draft Report for Comment), NUREG-1437, Supp. 46 (Apr. 2013), at iii, ix (ML13113A174) (Draft SEIS Supplement).
SEIS Supplement addressed (1) an updated SAMA analysis that NextEra submitted in March 2012; (2) the June 2012 decision of the U.S. Court of Appeals for the District of Columbia Circuit vacating the NRCs Waste Confidence Rule;9 and (3) new issues arising from the NRCs rulemaking to revise the Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants.10 The Draft SEIS Supplement was also made available for public comment.11 In May 2013, NextEra sought summary disposition of Contentions 4B and 4D.12 Friends/NEC offered no opposition with respect to Contention 4B and the Board dismissed the contention.13 With respect to Contention 4D, Friends/NEC, NextEra, and the Staff jointly requested that the Board issue two orders: the first to approve settlement of the contention; the second to dismiss the contention seven days after the Staff had notified the Board of publication 9 See generally New York v. NRC, 681 F.3d 471 (D.C. Cir. 2012).
10 Draft SEIS Supplement at iii, ix.
11 Draft Supplement to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants; NextEra Energy Seabrook; Seabrook Station, Unit 1, 78 Fed. Reg. 26,662, 26,662 (May 7, 2013) (Notice of Draft SEIS Supplement).
12 See NextEras Motion for Summary Disposition of Friends of the Coast/New England Coalition Contention 4B (SAMA Analysis Source Terms) (May 10, 2013); NextEras Motion for Summary Disposition of Friends of the Coast/New England Coalition Contention 4D (SAMA Analysis Atmospheric Modeling) (May 10, 2013).
13 See Friends of the Coast and New England Coalitions Answer to NextEras Motion for Summary Disposition of Contentions 4B (SAMA Source Terms) and 4D (SAMA Atmospheric Modeling) (July 15, 2013), at 1; Order (Granting Summary Disposition of Contention 4B) (Aug.
12, 2013) (unpublished).
of a Final SEIS providing additional analysis that the parties agreed would resolve the contention.14 The Board approved settlement of Contention 4D in August 2013.15 On July 28, 2015, Friends/NEC filed the instant motion.16 The Staff issued the Final SEIS on July 29, 2015.17 Among other things, the Final SEIS included (1) the updated SAMA analysis performed pursuant to the Board-approved settlement agreement;18 (2) a discussion of the impacts from the NRCs Continued Storage Rule and associated GEIS for Continued Storage of Spent Nuclear Fuel;19 and (3) an updated analysis related to the revision to the License Renewal GEIS, which was finalized after the issuance of the Draft SEIS Supplement.20 Shortly thereafter, and consistent with the parties earlier request, the Board dismissed Contention 4D and terminated the proceeding.21 14 Joint Motion for Approval of Settlement and Dismissal of FOTC/NEC Contention 4D (Aug. 8, 2013), at 1, 3; id., Ex. B, Proposed Initial Consent Order, at 2. The additional information involved a sensitivity analysis and related work performed in connection with the atmospheric dispersion model used in NextEras SAMA analysis. Id. at 1-3.
15 Order (Approving Settlement of Contention 4D) (Aug. 12, 2013) (unpublished).
16 The Staff and NextEra oppose Friends/NECs motion. See NRC Staffs Answer to Motion to Withhold or Withdraw Final Environmental Impact Statement Pending Renewed Opportunity for Comment (Aug. 7, 2015) (Staff Answer); NextEra Energy Seabrook, LLCs Answer Opposing Friends of the Coast and New England Coalitions Motion to Withhold or Withdraw Final Environmental Impact Statement (Aug. 7, 2015).
17 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Seabrook Station (Final Report), NUREG-1437, Supp. 46, Vols. 1-2 (July 2015) (ML15209A575 and ML15209A870) (Final SEIS).
18 See id., Vol. 1, ch. 5; id., Vol. 2, app. F.
19 See id., Vol. 1, at 1-4, § 6.1.
20 See id., Vol. 1, at 1-3 to -4, ch. 4.
21 LBP-15-22, 82 NRC 49 (2015); see letter from Anita Ghosh, counsel for the Staff, to the Administrative Judges (July 29, 2015), at 1-2 (advising the Board of the Final SEISs issuance).
II. DISCUSSION Friends/NEC request that if the SEIS has not been finalized, then we direct that the document be withheld and issued as a draft or supplement for public comment. Alternatively, were we to consider their motion following issuance of the Final SEIS, then Friends/NEC request that we direct that the document be withdrawn and re-issued as a draft or supplement for public comment.22 Because the Final SEIS has been issued and Friends/NEC request, in that circumstance, that we direct that the Final SEIS be withdrawn and re-released as a draft or supplement, our regulation at 10 C.F.R. § 51.92 governs here.23 Section 51.92 specifies the circumstances under which the Staff is required to prepare a supplement to a final environmental impact statement if (as is the case here) the proposed action has not yet been taken. More specifically, section 51.92(a) requires the Staff to prepare such a supplement if there are (1) substantial changes in the proposed action that are relevant to environmental concerns or (2) new and significant circumstances or information relevant to environmental concerns and bearing on the proposed action or its impacts. The relevant question is whether substantial changes in the proposed action or new and significant information presents a seriously different picture of the environmental impacts that have been 22 Motion at 1, 10.
23 Had we considered Friends/NECs request in the context of the Draft SEIS, and thereby applied 10 C.F.R. § 51.72, which governs supplementation of a draft environmental impact statement, our analysis would have yielded the same result; sections 51.72(a) and (b) are substantively identical to sections 51.92(a) and (c). See Union Electric Co. (Callaway Plant, Unit 2), CLI-11-5, 74 NRC 141, 167 n.103 (2011).
assessed in the relevant licensing action, and of our analysis of those impacts, when compared to the previously issued final environmental impact statement.24 Friends/NEC express concern that the DEIS is a departure from what the public was given the opportunity to review back in 2011 and that the NRC was deprived of the benefit of public comment (input) on significant portions of the DEIS now containing new information.25 Friends/NEC also assert that the material substance of the Draft SEIS has been altered due to the nearly four years between the end of the public comment period for the Draft SEIS and the issuance of the Final SEIS.26 Friends/NEC have not, however, identified any changes in the proposed license renewal action. Friends/NEC also have not pointed to new and significant information relevant to the Seabrook environmental review.
Moreover, the Staffs approach to the environmental review for Seabrook satisfied the purposes of the National Environmental Policy Act of 1969 (NEPA). The requirement under NEPA to prepare an environmental impact statement serves two purposes.27 First, it ensures that decisionmakers will have available, and will carefully consider, detailed information concerning significant environmental impacts.28 Second, it guarantees that the relevant 24 DTE Electric Co. (Fermi Nuclear Power Plant, Unit 3), CLI-15-10, 81 NRC 535, 543 (2015)
(quoting Hydro Resources, Inc. (P.O. Box 15910, Rio Rancho, NM 87174), CLI-04-39, 60 NRC 657, 659 (2004)).
25 Motion at 6.
26 Id. at 1-2.
27 Fermi, CLI-15-10, 81 NRC at 540 (citing Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 349 (1989)).
28 Id. (quoting Robertson, 490 U.S. at 349).
information will be made available to the larger audience . . . that may also play a role in the decisionmaking process.29 The Staffs approach has fulfilled both of these purposes.
First, the Staffs efforts have ensured that the NRC has available for its consideration detailed information regarding the environmental impacts of the Seabrook Unit 1 license renewal application. Prior to issuance of the Final SEIS, the Staff identified new information meriting preparation of a supplement to the Draft SEIS.30 The Staff issued the Draft SEIS Supplement analyzing that information in April 2013.31 The Final SEIS incorporates both the Draft SEIS and the Draft SEIS Supplement.32 The Final SEIS also considers the public comments submitted on the Draft SEIS as well as those submitted on the Draft SEIS Supplement.33 As the Staff acknowledges, the NRCs environmental review in this matter required additional time to complete, in large part becauseas relevant herethe Staff identified new information that merited preparation of a supplement to the Draft SEIS.34 Friends/NEC have not identified additional information that was not considered before issuance of the Final SEIS.
Second, the Staffs efforts have ensured that relevant information was made available to the public and other stakeholders. The record reflects that the Staff afforded Friends/NEC and 29 Id. at 540-41 (quoting Robertson, 490 U.S. at 349).
30 License Renewal Application for Seabrook Station, Unit 1; NextEra Energy Seabrook, LLC, 77 Fed. Reg. 35,079, 35,080 (June 12, 2012) (informing the public of the Staffs intent to prepare a supplement to the Draft SEIS to address new information related to SAMA analysis).
31 Draft SEIS Supplement at iii, ix.
32 Final SEIS, Vol. 1, at 1-3.
33 Id.
34 See Staff Answer at 8-9.
the public sufficient opportunity to provide input to both the Draft SEIS and the Draft SEIS Supplement.35 Further, the public had an opportunity to provide comments on issues addressed in the Final SEIS through the Continued Storage rulemaking and the revision process for the License Renewal GEIS.36 In summary, Friends/NEC have not shown that supplementation, or an accompanying new opportunity for public comment, is required under our regulations because they have not identified substantial changes in the proposed action or significant new information. The Staffs approach to considering new and significant information, providing opportunities for public input thereon, and issuing a Final SEIS after completing these efforts was reasonable and consistent with the dual objectives of NEPAs environmental-impact-statement requirement.37 35 See Notice of Draft SEIS Supplement, 78 Fed. Reg. at 26,662; NextEra Energy Seabrook, LLC; Notice of Availability of Draft Supplement 46 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants and Public Meetings for the License Renewal of Seabrook Station, Unit 1, 76 Fed. Reg. 47,612, 47,612 (Aug. 5, 2011); Summary of Public Meetings Conducted to Discuss the Draft Supplemental Environmental Impact Statement Related to the Review of the Seabrook Station License Renewal Application (TAC No. ME3959)
(Oct. 26, 2011), at 1 (ML11277A046).
36 See Waste ConfidenceContinued Storage of Spent Nuclear Fuel, 78 Fed. Reg. 56,776, 56,776 (Sept. 13, 2013) (soliciting public comments on the proposed rule for continued storage of spent nuclear fuel); Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses, 74 Fed. Reg. 38,117, 38,117 (July 31, 2009) (soliciting public comments on the revised GEIS for License Renewal).
37 For the same reasons, Friends/NEC have not identified a circumstance in which a supplement should be prepared as a matter of discretion. See 10 C.F.R. § 51.92(c) (providing that the Staff may prepare a supplement to a final environmental impact statement when, in its opinion, doing so will further the purposes of NEPA).
III. CONCLUSION As discussed above, Friends/NEC have not demonstrated that withdrawal of the Final SEIS in this matter is warranted. We therefore deny Friends/NECs motion.
For the Commission NRC Seal
/RA/
Annette L. Vietti-Cook Secretary of the Commission Dated at Rockville, Maryland, this 25th day of February, 2016.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )
)
NEXTERA ENERGY SEABROOK, LLC ) Docket No. 50-443-LR (Seabrook Station, Unit 1) )
)
(License Renewal) )
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-16-03) have been served upon the following persons by Electronic Information Exchange.
U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Office of the Secretary of the Commission Mail Stop: O-7H4 Mail Stop: O-16C1 Washington, DC 20555-0001 Washington, DC 20555-0001 ocaamail@nrc.gov Hearing Docket hearingdocket@nrc.gov U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop: T-3F23 Office of the General Counsel Washington, DC 20555-0001 Mail Stop: O-15D21 Washington, DC 20555-0001 Paul S. Ryerson, Chair Administrative Judge Lloyd Clark, Esq.
paul.ryerson@nrc.gov lloyd.clark@nrc.gov Anita Ghosh, Esq.
Michael F. Kennedy anita.ghosh@nrc.gov Administrative Judge Brian Harris, Esq.
michael.kennedy@nrc.gov brian.harris@nrc.gov David Roth, Esq.
Richard E. Wardwell david.roth@nrc.gov Administrative Judge Mary Spencer, Esq.
richard.wardwell@nrc.gov mary.spencer@nrc.gov Jeremy Wachutka, Esq.
jeremy.wachutka@nrc.gov Edward Williamson, Esq.
edward.williamson@nrc.gov John Tibbetts, Paralegal john.tibbetts@nrc.gov OGC Mail Center: Members of this office have received a copy of this filing by EIE service.
NEXTERA ENERGY SEABROOK, LLC (Seabrook Station Unit 1) - Docket No. 50-443-LR COMMISSION MEMORANDUM AND ORDER (CLI-16-03)
NextEra Energy Seabrook, LLC New Hampshire Sierra Club 801 Pennsylvania Avenue, N.W., #220 40 N. Main Street Washington, DC 20004 Concord, NH 03870 Steven C. Hamrick, Esq. Kurt Ehrenberg, Field Organizer steven.hamrick@fpl.com kurtehrenberg@gmail.com NextEra Energy Seabrook, LLC Seacoast Anti-Pollution League 700 Universe Boulevard P.O. Box 1136 Juno Beach, FL 33408 Portsmouth, NH 03802 William Blair, Esq. Doug Bogen, Executive Director william.blair@fpl.com dbogen@metrocast.net Pillsbury Winthrop Shaw Pittman, LLP State of New Hampshire 1200 Seventeenth Street, NW Office of the Attorney General Washington, DC 20036-3006 33 Capitol Street David R. Lewis, Esq. Concord, NH 03301 david.lewis@pillsburylaw.com K. Allen Brooks, Assistant Attorney General k.allen.brooks@doj.nh.gov Friends of the Coast and Michael A. Delaney, Attorney General New England Coalition (NEC) michael.a.delaney@doj.nh.gov Post Office Box 98 Peter Roth, Assistant Attorney General Edgecomb, ME 04556 peter.roth@doj.nh.gov Raymond Shadis Debbie Grinnell State of Massachusetts debbie@c-10.org Office of the Attorney General shadis@prexar.com Environmental Protection Division One Ashburton Place, 18th Floor Beyond Nuclear Boston, MA 02108 6930 Carroll Avenue, Suite 400 John Beling, Assistant Attorney General Takoma Park, MD 20912 john.beling@state.ma.us Paul Gunter, Director, Reactor Jillian Riley, Legal Analyst Oversight Project jillian.riley@state.ma.us paul@beyondnuclear.org
[Original signed by Clara Sola ]
Office of the Secretary of the Commission Dated at Rockville, Maryland this 25th day of February, 2016 2