ML16109A064: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/23/2016
| issue date = 03/23/2016
| title = 2016 Byron Nuclear Station Initial License Examination Administered RO Admin JPMs
| title = 2016 Byron Nuclear Station Initial License Examination Administered RO Admin JPMs
| author name = Bielby M E
| author name = Bielby M
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Exelon Nuclear Job Performance Measure Perform Offsite AC Power Availability Surveillance (BT 5-6 & 12-13 OOS) JPM Number:
{{#Wiki_filter:Exelon Nuclear Job Performance Measure Perform Offsite AC Power Availability Surveillance (BT 5-6 & 12-13 OOS)
RA-a Revision Number:
JPM Number: RA-a Revision Number: 1 Date: 9/24/2013 Revised By:     Robert Peterson             2/12/2016 Instructor           Date Validated By:   Anthony Moreno             2/15/2016 SME or Instructor         Date Approved By:     Brian Lewin                 2/15/2016 Facility Representative     Date
1 Date: 9/24/201 3 Revised By: Robert Peterson 2/12/201 6  Instructor Date Validated By:
 
Anthony Moreno 2/15/201 6  SME or Instructor Date Approved By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Brian Lewin 2/15/2016   Facility Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 1 2 below. See File Copy
: 1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
See File Copy
: 2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in
: 3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
: 4. Initial setup conditions are identified.
: 4. Initial setup conditions are identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
Line 30: Line 29:
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure 1BOSR 8.1.1
Procedure 1BOSR 8.1.1-1       Rev: 010 Procedure                     Rev:
-1 Rev: 0 10  Procedure Rev:   Procedure Rev:   9. Verify cues both verbal and visual are free of conflict.
Procedure                     Rev:
: 9. Verify cues both verbal and visual are free of conflict.
: 10. Verify performance time is accurate
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date             SME / Instructor Date       SME / Instructor Date Revision Record (Summary)
SME / Instructor                               Date SME / Instructor                               Date SME / Instructor                               Date
Revision 0 New JPM, Alternate Path Revised for use of Rev 10 of 1BOSR 8.1.1
 
-1 SIMULATOR SETUP INSTRUCTIONS
Revision Record (Summary)
: 1) Reset to IC
Revision 0 New JPM, Alternate Path Revised for use of Rev 10 of 1BOSR 8.1.1-1
-18, 75% power.
 
NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
SIMULATOR SETUP INSTRUCTIONS
: 2) Place the control switch es for BT 5-6 and BT 12-13 in PTL and place info cards on the disconnects and control switch es. 3) When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist. 4) This completes the setup for this JPM
: 1) Reset to IC-18, 75% power.
.
NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
INITIAL CONDITIONS 1. You are an extra NSO.
: 2) Place the control switches for BT 5-6 and BT 12-13 in PTL and place info cards on the disconnects and control switches.
: 3) When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
: 4) This completes the setup for this JPM.
 
INITIAL CONDITIONS
: 1. You are an extra NSO.
: 2. Unit 1 and Unit 2 are in Mode 1, steady state power.
: 2. Unit 1 and Unit 2 are in Mode 1, steady state power.
INITIATING CUE
INITIATING CUE
: 1. The 1A DG has been declared inoperable and the US has directed you to perform 1BOSR 8.1.1
: 1. The 1A DG has been declared inoperable and the US has directed you to perform 1BOSR 8.1.1-1, Normal and Reserve Offsite AC Power Availability Weekly Surveillance.
-1, Normal and Reserve Offsite AC Power Availability Weekly Surveillance. 2. The SM has signed and dated the 1BOSR 8.1.1
: 2. The SM has signed and dated the 1BOSR 8.1.1-1 data package cover sheet.
-1 data package cover sheet.
 
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps 2, 3, 4, 5 & 12 Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
* Denotes critical steps 2, 3, 4, 5 & 12 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.


RECORD START TIME:
RECORD START TIME:
ELEMENT STANDARD SAT UNSAT Comment Number NOTE Provide examinee with a copy of 1BOSR 8.1.1
Comment ELEMENT                               STANDARD               SAT   UNSAT Number NOTE Provide examinee with a copy of 1BOSR 8.1.1-1 to complete.
-1 to complete
: 1. Step F.1 Circle status of offsite     At 0PM03J, OBSERVE bus power sources.                        alive lights, line amps, and MWs for all 345 KV lines:
. 1. Step F.1 Circle status of offsite power sources.
                                              ° Line 0621 Note:    The bus alive light alone is        ° Line 0627 NOT adequate verification of bus status.                      ° Line 0624
Note: The bus alive light alone is NOT adequate verification of bus status.
                                              ° Line 0622
At 0PM03J, OBSERVE bus alive lights, line amps, and MWs for all 345 KV lines:
                                        ° CIRCLE energized for all 345 KV lines NOTE Alternate path is initiated in the following step.
° Line 0621 ° Line 0627 ° Line 0624 ° Line 0622 ° CIRCLE 'energized' for all 345 KV lines NOTE Alternate path is initiated in the following step.
At 0PM03J, INDICATE:
*2. Step F.2 Indicate status of disconnects, breakers and SAT links Cue: ACB 2412 'GREEN' light L IT Cue: ACB 2422 'GREEN' light LIT Cue: ACB 2414 'GREEN' light LIT Cue: ACB 2424 'GREEN' light LIT Cue: Both units SAT x
*2. Step F.2 Indicate status of disconnects, breakers and SAT
-tie links are REMOVED Cue: Both units SAT disconnect links are INSTALLED At 0PM03J, INDICATE:  BT 5-6 breaker and disconnects and BT 1 2-13 breaker and disconnects are OPEN using "O
* BT 5-6 breaker and links                                   disconnects and BT 12-13 breaker and disconnects Cue: ACB 2412 GREEN light LIT              are OPEN using O Cue: ACB 2422 GREEN light LIT
"  Removed SAT x
* Removed SAT x-tie links Cue: ACB 2414 GREEN light LIT using O Cue: ACB 2424 GREEN light LIT Cue: Both units SAT x-tie links are
-tie links using "O"  Closed disconnects, breakers and installed SA T links using "X
* Closed disconnects, REMOVED                                     breakers and installed SAT Cue: Both units SAT disconnect               links using X links are INSTALLED
"        *3. Step F.3 Trace path along dashed lines from any energized offsite power source to the unit ONE SAT banks  TRACE path correctly on data sheet:  Line energized, breakers and disconnects closed
*3. Step F.3 Trace path along dashed TRACE path correctly on data lines from any energized offsite sheet:
      *4. Step F.4 Trace second path from second independent power source to unit TWO SAT bank. TRACE SECOND path correctly on data sheet:
power source to the unit ONE
Line energized, breakers and disconnects closed
* Line energized, breakers SAT banks and disconnects closed
*4. Step F.4 Trace second path from     TRACE SECOND path second independent power             correctly on data sheet:
source to unit TWO SAT bank.
* Line energized, breakers and disconnects closed


ELEMENT STANDARD SAT UNSAT Comment Number *5. Step F.5 Verify independent paths exist from offsite power thru switchyard to both units SAT banks CUE: If notified as US, acknowledge failure of acceptance criteria and direct candidate to complete the surveillance.
Comment ELEMENT                           STANDARD                 SAT   UNSAT Number
Verify independent paths L0621 and L0622 NOT BOTH used  Two paths DO overlap Circle "NO" for step 5 of data sheet o MAY notify US at this time or at step 13 of JPM, of failure of acceptance criteria.       6. Step F.6 Check normal and reserve 345 KV buses energized At 0PM03J, VERIFY bus alive light and voltmeter indications for: 345 KV bus 6 345 KV bus 13 ENTER 'Yes' for both closed bullets for step 6 on data sheet  
*5. Step F.5 Verify independent paths Verify independent paths exist from offsite power thru
: 7. Step F.7 Check normal and reserve power SATs available CUE: U-2 SAT X & Y windings are normal At 1/2PM01J, VERIFY 'X' and 'Y' winding MW and amps indication for:
* L0621 and L0622 NOT switchyard to both units SAT BOTH used banks
SATs 142-1 and 142-2 SATs 242-1 and 242-2 ENTER 'Yes' for both closed bullets for step 7 on data sheet
* Two paths DO overlap
: 8. Step F.8 Check ESF buses 141 and 142 energized At 1PM01J, CHECK bus alive lights, SAT feeder breaker to bus position and bus voltmeter indication for:
* Circle NO for step 5 of data sheet o MAY notify US at this time CUE: If notified as US,                or at step 13 of JPM, of acknowledge failure of              failure of acceptance acceptance criteria and direct      criteria.
Bus 141 Bus 142 ENTER 'Yes' for both closed bullets for step 8 on data sheet
candidate to complete the surveillance.
: 6. Step F.6 Check normal and         At 0PM03J, VERIFY bus alive reserve 345 KV buses energized    light and voltmeter indications for:
* 345 KV bus 6
* 345 KV bus 13 ENTER Yes for both closed bullets for step 6 on data sheet
: 7. Step F.7 Check normal and         At 1/2PM01J, VERIFY X and reserve power SATs available      Y winding MW and amps indication for:
CUE: U-2 SAT X & Y windings are
* SATs 142-1 and 142-2 normal
* SATs 242-1 and 242-2 ENTER Yes for both closed bullets for step 7 on data sheet
: 8. Step F.8 Check ESF buses 141     At 1PM01J, CHECK bus alive and 142 energized                lights, SAT feeder breaker to bus position and bus voltmeter indication for:
* Bus 141
* Bus 142 ENTER Yes for both closed bullets for step 8 on data sheet


ELEMENT STANDARD SAT UNSAT Comment Number 9. Step F.9 CHECK ESF buses 241 and 242 energized Cue: BUS 241 BUS ALIVE light i s LIT and voltage is normal Cue: BUS 242 BUS ALIVE light is LIT and voltage is normal At 2PM01J, CHECK bus alive lights, SAT feeder breaker to bus position and bus voltmeter indication for:
Comment ELEMENT                             STANDARD                 SAT   UNSAT Number
Bus 241  Bus 242 ENTER 'Yes' for both closed bullets for step 9 on data sheet
: 9. Step F.9 CHECK ESF buses 241       At 2PM01J, CHECK bus alive and 242 energized                   lights, SAT feeder breaker to bus position and bus voltmeter indication for:
: 10. Step F.10 Check SAT Feed breakers are closed and connected Cue: ACB 2412 'GREEN' light LIT
Cue: BUS 241 BUS ALIVE light is LIT and voltage is normal
* Bus 241 Cue: BUS 242 BUS ALIVE light is
* Bus 242 LIT and voltage is normal               ENTER Yes for both closed bullets for step 9 on data sheet
: 10. Step F.10 Check SAT Feed            At 1/2PM01J, VERIFY position breakers are closed and             and control power available:
connected
* ACB 1412
* ACB 2412 Cue: ACB 2412 GREEN light LIT
* ACB 1422
* ACB 2422 Cue: ACB 2422 GREEN light LIT ENTER Yes for all closed bullets for step 10 on data sheet
: 11. Step F.11 Check SAT Reserve          At 1/2PM01J, VERIFY position Feed breakers are closed and         and control power available:
connected
* ACB 1414
* ACB 1424
* ACB 2414 Cue: ACB 2414 GREEN light LIT
* ACB 2424 Cue: ACB 2424 GREEN light LIT ENTER Yes for all closed bullets for step 11 on data sheet
*12. Step G Determine acceptance
* DETERMINE acceptance criteria are NOT met                    criteria are NOT MET
: 13. Notify US that acceptance criteria
* Notify US verbally or by are not met                              checking NO and writing in Cue: US has verified 1BOL 8.1 has            Remarks on cover sheet.
been implemented.


Cue: ACB 2422 'GREEN' light LIT At 1/2PM01J, VERIFY position and control power available:
Comment ELEMENT            STANDARD  SAT  UNSAT Number Cue: This JPM is completed.
ACB 1412  ACB 2412  ACB 1422  ACB 2422 ENTER 'Yes' for all closed bullets for step 1 0 on data sheet      11. Step F.11 Check SAT Reserve Feed breakers are closed and connected Cue: ACB 2414 'GREEN' light LIT Cue: ACB 2424 'GREEN' light LIT At 1/2PM01J, VERIFY position and control power available:
RECORD STOP TIME:
ACB 14 14  ACB 1424  ACB 2414  ACB 2424 ENTER 'Yes' for all closed bullets for step 11 on data sheet      *1 2. Step G Determine acceptance criteria are NOT met   DETERMINE acceptance criteria are NOT MET      13. Notify US that acceptance criteria are not met Cue: US has verified 1BOL 8.1 has been implemented.
Notify US verbally or by checking NO and writing in Remarks on cover sheet.


ELEMENT STANDARD SAT UNSAT Comment Number  Cue: This JPM is completed.
RECORD STOP TIME
:
JPM  
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                     Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Perform Offsite AC Power Availability Surveillance (BT 5-6 & 12-13 OOS) JPM Number:
==Title:==
RA-a (N-75c) Revision Number:
EO         RO   SRO       FS STA/IA         SRO Cert JPM
1 Task Number and Title: 4C.AP-06 Perform the Offsite AC Power Availability Surveillance
 
. K/A Number and Importance:
==Title:==
2.1.31 4.6 / 4.3 Suggested Testing Environment:
Perform Offsite AC Power Availability Surveillance (BT 5-6 & 12-13 OOS)
Simulator Alternate Path:
JPM Number: RA-a (N-75c)                   Revision Number: 1 Task Number and
Yes No SRO Only: Yes No Time Critical:
 
Yes No Reference(s):
==Title:==
1BOSR 8.1.1
4C.AP-06 Perform the Offsite AC Power Availability Surveillance.
-1, Rev 10, Normal and Reserve Offsite AC Power Availability Weekly Surveillance CRITICAL STEPS
K/A Number and Importance: 2.1.31 4.6 / 4.3 Suggested Testing Environment: Simulator Alternate Path:     Yes     No SRO Only:       Yes     No     Time Critical: Yes       No Reference(s):
(*) 2, 3, 4, 5 & 12 Actual Testing Environment:
1BOSR 8.1.1-1, Rev 10, Normal and Reserve Offsite AC Power Availability Weekly Surveillance CRITICAL STEPS (*) 2, 3, 4, 5 & 12 Actual Testing Environment:         Simulator     Control Room           In-Plant     Other Testing Method:         Simulate     Perform Estimated Time to Complete: 15 minutes             Actual Time Used:             minutes EVALUATION  
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
15 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?         Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:         Satisfactory     Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                 (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                           Date:
Satisfactory Unsatisfactory Comments:                         Evaluator's Name
 
:   (Print) Evaluator's Signature
:   Date:
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are an extra NSO.
: 1. You are an extra NSO.
: 2. Unit 1 and Unit 2 are in Mode 1, steady state power.
: 2. Unit 1 and Unit 2 are in Mode 1, steady state power.
INITIATING CUE
INITIATING CUE
: 1. The 1A DG has been declared inoperable and the US has directed you to perform 1BOSR 8.1.1
: 1. The 1A DG has been declared inoperable and the US has directed you to perform 1BOSR 8.1.1-1, Normal and Reserve Offsite AC Power Availability Weekly Surveillance.
-1, Normal and Reserve Offsite AC Power Availability Weekly Surveillance.  
: 2. The SM has signed and dated the 1BOSR 8.1.1-1 data package cover sheet.
: 2. The SM has signed and dated the 1BOSR 8.1.1
-1 data package cover sheet.


Exelon Nuclear Job Performance Measure Evaluate Technical Specification Entry Conditions
Exelon Nuclear Job Performance Measure Evaluate Technical Specification Entry Conditions JPM Number: RA-b Revision Number: 00 Date: 11/17/2015 Developed By:    Robert Peterson              11/17/2015 Instructor            Date Validated By:    J. Blumenthal                12/11/2015 SME or Instructor          Date Approved By:    B. Lewin                    12/11/2015 Operations Representative      Date


JPM Number:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
RA-b  Revision Number: 00  Date: 1 1/1 7/20 1 5 Developed By:
Robert Peterson 1 1/1 7/201 5  Instructor Date  Validated By:
J. Blumenthal 12/11/2015 SME or Instructor Date  Approved By:
B. Lewin  12/11/2015 Operations Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
__RFP__ 1. Task description and number, JPM description and number are identified.
__RFP__     1. Task description and number, JPM description and number are identified.
__RFP__ 2. Knowledge and Abilities (K/A) references are included.
__RFP__     2. Knowledge and Abilities (K/A) references are included.
__RFP__ 3. Performance location specified. (in
__RFP__     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
__RFP__     4. Initial setup conditions are identified.
__RFP__ 4. Initial setup conditions are identified.
__RFP__     5. Initiating cue (and terminating cue if required) are properly identified.
__RFP__ 5. Initiating cue (and terminating cue if required) are properly identified.
__RFP__     6. Task standards identified and verified by SME review.
__RFP__ 6. Task standards identified and verified by SME review.
__RFP__     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
__RFP__ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
__RFP__     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
__RFP__ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure BAR 1-1-B1             Rev: 2 Procedure BAR 1-1-E5                           Rev: 5 Procedure 1BOSR MS-W1 Rev: 11 Procedure BOP MS-5               Rev: 19 Procedure BAR 1-5-B2                          Rev: 1
Procedure BAR 1-1-B1 Rev: 2 Procedure BAR 1-1-E5 Rev: 5 Procedure 1BOSR MS-W1 Rev: 11 Procedure BOP MS-5 Rev: 19 Procedure BAR 1-5-B 2  Rev: 1 __ RFP__ 9. Verify cues both verbal and visual are free of conflict.
__ RFP__   9. Verify cues both verbal and visual are free of conflict.
__RFP__ 10. Verify performance time is accurate
__RFP__     10. Verify performance time is accurate
__RFP__ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
__RFP__     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
__RFP___ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
__RFP___ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date Revision Record (Summary)
SME / Instructor                             Date SME / Instructor                             Date SME / Instructor                             Date
Revision 0 Revised format to current standard Comment Resolution New JPM   Provided documents:
 
: 1. BAR 1-1-B1: Place keep to step D and write below the setpoint: "EO reports SFP temperature at 150°F and SFP level at 24'3"." 2. BAR 1-5-B2: Place keep to step D and write below the setpoint: "1B pressure is 595 PSIG". 3. BAR 1-3-C3: Place keep to step D and write below the setpoint: "EO reports spray add tank at 80%
Revision Record (Summary)
." 4. BAR 1-1-E5: Place keep to step D and write below the setpoint: "EO reports 1D MSIV active accumulator at 4950 PSIG and standby accumulator at 4750 PSIG."
Revision 0     Revised format to current standard Comment                                       Resolution New JPM Provided documents:
: 1. BAR 1-1-B1: Place keep to step D and write below the setpoint: EO reports SFP temperature at 150°F and SFP level at 243.
: 2. BAR 1-5-B2: Place keep to step D and write below the setpoint: 1B pressure is 595 PSIG.
: 3. BAR 1-3-C3: Place keep to step D and write below the setpoint: EO reports spray add tank at 80%.
: 4. BAR 1-1-E5: Place keep to step D and write below the setpoint: EO reports 1D MSIV active accumulator at 4950 PSIG and standby accumulator at 4750 PSIG.


INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the WEC NSO. 2. The unit is in MODE 1 INITIATING CUE
: 1.         You are the WEC NSO.
: 1. Given the provided marked up BARs, IDENTIFY any TS LCOs that are NOT met, and EXPLAIN the reason for your determination.
: 2.         The unit is in MODE 1 INITIATING CUE
(Applicable Conditions and Required Actions are not required).
: 1.         Given the provided marked up BARs, IDENTIFY any TS LCOs that are NOT met, and EXPLAIN the reason for your determination.
Information For Evaluator's Use:
(Applicable Conditions and Required Actions are not required).
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps 2, 4 Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
* Denotes critical steps 2, 4 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking syste
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
: m. Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.


JPM Start Time STEP ELEMENT STANDARD SAT UNSAT Comment Number NOTE This steps in this JPM may be done in any order.
JPM Start Time Comment SAT  UNSAT STEP             ELEMENT                       STANDARD Number NOTE This steps in this JPM may be done in any order.
1 Evaluate Alarm 1-1-B1 SFP Temp Hi Identify as not Technical Specification related alarm.
1   Evaluate Alarm 1-1-B1 SFP     Identify as not Technical Temp Hi                        Specification related alarm.
CUE If requested, provide student copy of 1BOSR MS-W1 and/or BOP MS
CUE   If requested, provide student copy of 1BOSR MS-W1 and/or BOP MS-5 2*   Evaluate Alarm 1-1-E5, MSIV   Identify TS 3.7.2 LCO is not 1D Hyd/Pneu Press Hi/Lo        met for 1D MSIV Accumulator Standby Pressure Low 3   Evaluate Alarm 1-3-C3, Spray   Identify that current Spray Add Add Tank Level Low            Tank reading of 80% is above the T.S 3.6.7 required value of 78.6%.
-5 2* Evaluate Alarm 1-1-E5, MSIV 1D Hyd/Pneu Press Hi/Lo Identify TS 3.7.2 LCO is not met for 1D MSIV Accumul ator Standby Pressure Low 3 Evaluate Alarm 1 C3, Spray Add Tank Level Low Identify that current Spray Add Tank reading of 80% is above the T.S 3.6.7 required value of 78.6%. 4* Evaluate Alarm 1 B2, 1 B SI Accumulator Pressure Hi/Lo Identify TS 3.5.1 LCO is not met for 1B SI Accumulator Pressure; pressure is LOW.
4*   Evaluate Alarm 1-5-B2, 1B SI   Identify TS 3.5.1 LCO is not Accumulator Pressure Hi/Lo    met for 1B SI Accumulator Pressure; pressure is LOW.
CUE This JPM is complete
CUE   This JPM is complete.
. JPM Stop Time  
JPM Stop Time


JPM  
JPM  
Line 178: Line 201:
==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                     Job
:   Job Title: EO RO SRO F S  STA/IA SRO Cert JPM Title:
 
Evaluate Technical Specification Entry Conditions JPM Number:
==Title:==
RA-b Revision Number:
EO       RO     SRO       FS STA/IA         SRO Cert JPM
0 0 Task Number and Title: R-AM-012, Apply Technical Specification Requirements K/A Number and Importance:
 
2.2.42 Imp Factor 3.9/4.6 Suggested Testing Environment: Simulator Alternate Path:
==Title:==
Yes No SRO Only: Yes No Ti me Critical:
Evaluate Technical Specification Entry Conditions JPM Number: RA-b           Revision Number: 00 Task Number and
Yes No Reference(s):
 
BAR 1-1-B1 , Rev: 2   BAR 1-1-E5 , Rev: 5   BAR 1-5-B 2 , Rev: 1   BOP MS-5 , Rev: 19 1BOSR MS-W1, Rev: 11 Actual Testing Environment:
==Title:==
Simulator Control Room In-Plant Other Testing Method:
R-AM-012, Apply Technical Specification Requirements K/A Number and Importance: 2.2.42 Imp Factor 3.9/4.6 Suggested Testing Environment: Simulator Alternate Path:     Yes     No SRO Only:       Yes     No     Time Critical:   Yes     No Reference(s):
Simulate Perform Estimated Time to Complete:
* BAR 1-1-B1, Rev: 2
20 minutes Actual Time Used:
* BAR 1-1-E5, Rev: 5
minutes EVALUATION  
* BAR 1-5-B2, Rev: 1
* BOP MS-5, Rev: 19
* 1BOSR MS-W1, Rev: 11 Actual Testing Environment:       Simulator       Control Room         In-Plant     Other Testing Method:         Simulate     Perform Estimated Time to Complete: 20 minutes             Actual Time Used:           minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?         Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:         Satisfactory     Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                 (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                           Date:
Satisfactory Unsatisfactory Comments:               Evaluator's Name
 
:   (Print) Evaluator's Signature
:   Date:
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the WEC NSO. 2. The unit is in MODE 1 INITIATING CUE
: 1. You are the WEC NSO.
: 2. The unit is in MODE 1 INITIATING CUE
: 1. Given the provided marked up BARs, IDENTIFY any TS LCOs that are NOT met, and EXPLAIN the reason for your determination.
: 1. Given the provided marked up BARs, IDENTIFY any TS LCOs that are NOT met, and EXPLAIN the reason for your determination.
  (Applicable Conditions and Required Actions are not required). Formatted:
(Applicable Conditions and Required Actions are not required).
Font: New Century SchoolbookFormatted:
Formatted: Font: New Century Schoolbook Formatted: Centered, Space Before: 0 pt, After: 6 pt, Tab stops: 1.25", Right + 1.38", Left + 4.63", Left + 5.13",
Centered, Space Before: 0 pt, After: 6 pt, Tabstops: 1.25", Right + 1.38", Left + 4.63", Left + 5.13",Right + 5.25", Left + 6", Left Exelon Nuclear Job Performance Measure Change RM-11 Setpoints in Preparation for a Unit 1 Containment Release JPM Number:
Right + 5.25", Left + 6", Left
RA-c Revision Number:
 
0 Date: 11/30/20 1 5 Revised By: R. Peterson 11/30/201 5  Instructor Date Validated By:
Exelon Nuclear Job Performance Measure Change RM-11 Setpoints in Preparation for a Unit 1 Containment Release JPM Number: RA-c Revision Number: 0 Date: 11/30/2015 Revised By:     R. Peterson                 11/30/2015 Instructor             Date Validated By:   J. Blumenthal               12/11/2015 SME or Instructor         Date Approved By:     B. Lewin                     12/11/2015 Operations Representative     Date
J. Blumenthal 12/11/2015 SME or Instructor Date Approved By:
 
B. Lewin 12/11/2015 Operations Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 1 2 below. __RFP__ 1. Task description and number, JPM description and number are identified.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
__RFP__ 2. Knowledge and Abilities (K/A) references are included.
__RFP__   1. Task description and number, JPM description and number are identified.
__RFP__ 3. Performance location specified. (in
__RFP__   2. Knowledge and Abilities (K/A) references are included.
-plant, control room, simulator, or other)
__RFP__   3. Performance location specified. (in-plant, control room, simulator, or other)
__RFP__ 4. Initial setup conditions are identified.
__RFP__   4. Initial setup conditions are identified.
__RFP__ 5. Initiating cue (and terminating cue if required) are properly identified.
__RFP__   5. Initiating cue (and terminating cue if required) are properly identified.
__RFP__ 6. Task standards identified and verified by SME review.
__RFP__   6. Task standards identified and verified by SME review.
__RFP__ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
__RFP__   7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
__RFP__ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
__RFP__   8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure BCP 400-TCNMT/ROUTINE Rev: 27 Procedure Rev:   Procedure Rev:   __RFP__ 9. Verify cues both verbal and visual are free of conflict.
Procedure BCP 400-TCNMT/ROUTINE               Rev: 27 Procedure                       Rev:
__RFP__ 10. Verify performance time is accurate
Procedure                       Rev:
__RFP__ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
__RFP__   9. Verify cues both verbal and visual are free of conflict.
__RFP__ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
__RFP__   10. Verify performance time is accurate
B. Lewin/R. Peterson 12/11/2015 SME / Instructor Date       SME / Instructor Date Revision Record (Summary)
__RFP__   11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
Revision 0 Generated New JPM for new RMS System and BCP 400
__RFP__   12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
-TCNMT/Routine revision from RA-3 rev 5.
B. Lewin/R. Peterson                                   12/11/2015 SME / Instructor                               Date SME / Instructor                               Date
SIMULATOR SETUP INSTRUCTIONS NOTE: It is okay to use a similar IC to the IC listed, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
 
: 1. Reset to IC
Revision Record (Summary)
-22 2. Ensure that either the 0A or 0B Aux Building Exhaust Fan is in operation.
Revision 0 Generated New JPM for new RMS System and BCP 400-TCNMT/Routine revision from RA-3 rev 5.
: 3. Verify that the RM S values for the appropriate channels agree with the surveillance paperwork. 4. Enter indication for Noble gas trend for 1PR11J (1PB111) on RMS as 4.684 E-06 by entering in expert mode: ramp rmr1pr11b .00000486 .00000486 7200
 
: 5. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist 6. This completes the setup for this JPM
SIMULATOR SETUP INSTRUCTIONS NOTE:     It is okay to use a similar IC to the IC listed, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 1. Reset to IC-22
: 2. Ensure that either the 0A or 0B Aux Building Exhaust Fan is in operation.
: 3. Verify that the RMS values for the appropriate channels agree with the surveillance paperwork.
: 4. Enter indication for Noble gas trend for 1PR11J (1PB111) on RMS as 4.684 E-06 by entering in expert mode: ramp rmr1pr11b .00000486 .00000486 7200
: 5. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
: 6. This completes the setup for this JPM


INITIAL CONDITIONS
INITIAL CONDITIONS
Line 235: Line 265:
: 2. A Unit 1 Containment release is pending.
: 2. A Unit 1 Containment release is pending.
: 3. 1RE-PR011 is not and has not been in LCOAR since beginning BCP preparations.
: 3. 1RE-PR011 is not and has not been in LCOAR since beginning BCP preparations.
: 4. Daily Channel Checks of 1RE
: 4. Daily Channel Checks of 1RE-PR001 has been performed Satisfactory per 0BOSR 0.1-0.
-PR001 has been performed Satisfactory per 0BOSR 0.1-0. 5. 1BOSR 11.b.6
: 5. 1BOSR 11.b.6-1, Radioactive Gaseous Effluent Monitoring Instrumentation Surv.
-1, Radioactive Gaseous Effluent Monitoring Instrumentation Surv. CNMT Purge Effluent (1(2)PR01J Source/Channel Check) has been completed and has been reviewed as Satisfactory.
CNMT Purge Effluent (1(2)PR01J Source/Channel Check) has been completed and has been reviewed as Satisfactory.
INITIATING CUE You have been instructed to perform Section 4 of BCP 400
INITIATING CUE You have been instructed to perform Section 4 of BCP 400-TCNMT/ROUTINE in preparation for this release.
-TCNMT/ROUTINE in preparation for this release.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps. (6, 7, 8, 9, 10, 11, 12, 13)
(6, 7, 8, 9, 10, 11, 12, 13)
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of callin g for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.


RECORD START TIME:
RECORD START TIME:
ELEMENT STANDARD SAT UNSAT Comment Number NOTE To initiate this JPM, hand the partially completed BCP 400
Comment ELEMENT                               STANDARD           SAT   UNSAT Number NOTE To initiate this JPM, hand the partially completed BCP 400-TCNMT/ROUTINE and Pre-Release Permit Report to the examinee.
-TCNMT/ROUTINE and Pre-Release Permit Report to the examinee.
: 1. Refer to the partially completed       °  REVIEW BCP 400-BCP 400-TCNMT/ROUTINE                     TCNMT/ROUTINE for completeness up to Section 4
: 1. Refer to the partially completed BCP 400-TCNMT/ROUTINE REVIEW BCP 400
: 2. Step 4.2.1.1 Complete daily           °  VERIFY/COMPLETE the channel checks                             daily channel check on 1RE-PR001 Cue: The daily channel check of 1RE-PR001 has been performed satisfactorily
-TCNMT/ROUTINE for completeness up to Section 4       2. Step 4.2.1.1 Complete daily channel checks Cue: The daily channel check of 1RE-PR001 has been performed satisfactor il y  VERIFY/COMPLETE the daily channel check on 1RE-PR001      3. Step 4.2.1.2 Perform Source/Channel check Cue: 1BOSR 11.b.
: 3. Step 4.2.1.2 Perform                   °  PERFORM the 1PR01J Source/Channel check                      source/channel check Cue: 1BOSR 11.b.6-1 has been completed and reviewed satisfactorily.
6-1 has been completed and reviewed satisfactor il y. PERFORM the 1PR01J source/channel check
: 4. Step 4.2.1.3 Noble gas trend for     °    VERIFY noble gas trend 1PR11J (1PB111)                           from 1PB111 has not increased by >10% from current reading on Gaseous Pre-release Permit Report
: 4. Step 4.2.1.3 Noble gas trend for 1PR11J (1PB111)
: 5. Step 4.2.1.4 As Found setpoints   At the RMS, RECORD As of 1RE-PR001                        Found setpoints of 1RE-PR001 Gas Channel:
VERIFY noble gas trend from 1PB111 has not increased by >10% from current reading on Gaseous Pre
                                        °    High alarm setpoint
-release Permit Report
                                        °    Alert alarm setpoint
: 5. Step 4.2.1.4 "As Found" setpoints of 1RE-PR001 At the R M S, RECORD "As Found" setpoints of 1RE-PR001 Gas Channel:   High alarm setpoint Alert alarm setpoint
*6. Step 4.2.1.5 RMS supervisory         At the RMS:
      *6. Step 4.2.1.5 RM S supervisory mode  At the RM S:   PLACE RM S in Supervisory Mode by clicking on Mode Select Button ELEMENT STANDARD SAT UNSAT Comment Number *7. Step 4.2.1.6 Select monitor At the RM S, Grid 2:
mode
* PLACE RMS in Supervisory Mode by clicking on Mode Select Button
 
Comment ELEMENT                         STANDARD               SAT   UNSAT Number
*7. Step 4.2.1.6 Select monitor       At the RMS, Grid 2:
o SELECT 1PB101
o SELECT 1PB101
    *8. Step 4.2.1.7 Select high alarm setpoint channel
*8. Step 4.2.1.7 Select high alarm   At the RMS:
setpoint channel
* SELECT Channel ITEMS
* SELECT 9
*9. Step 4.2.1.8-11 High alarm        At the RMS:
setpoint
* ENTER high alarm setpoint Note: The setpoint to be entered is      on 1PB101 5.855 E-04 o  SELECT Save o  SELECT Yes
* RECORD new value Cue: Your request for verification
* Request verification is acknowledged, please continue.
NOTE: The next steps repeat Steps 4.2.1.5-11 for the Alert Alarm setpoint.
*10. RMS supervisory mode          At the RMS:
Note: This step may be met per        o VERIFY/PLACE RMS in step 6 above.                    Supervisory Mode by clicking on Mode Select Button
*11. Select monitor                  At the RMS, Grid 2:
Note: This step may be met per        o VERIFY/SELECT 1PB101 step 7 above.
*12. Select Alert alarm setpoint      At the RMS:
channel
* VERIFY/SELECT Channel ITEMS
* SELECT 10
 
Comment ELEMENT                              STANDARD                SAT  UNSAT Number
*13. Select Alert alarm channel          At the RMS:
Note: The setpoint to be entered is
* ENTER Alert alarm 3.14 E-04.                              setpoint on 1PB101 o  SELECT Save o  SELECT Yes
* RECORD new value Cue: Your request for verification      °  Request verification is acknowledged, please continue.
: 14. Step 4.2.1.13 Place the RMS in      At the RMS:
Normal Mode
                                        °  PLACE the RMS in NORMAL MODE by clicking on Mode Select Button
: 15. Step 4.3 Aux building exhaust fan    At 0PM02J:
status
                                        °  ENSURE the 0A OR 0B Aux Building Exhaust Fan is in operation
: 16. Turn in Package for approval        Hand in Release package to Unit Supervisor for approval.
Cue:  The US will continue at step 5.
Cue:  This JPM is completed.
RECORD STOP TIME:


At the RM S:  SELECT "Channel ITEMS" SELECT "9"    *9. Step 4.2.1.8
JPM
-11 High alarm setpoint  Note: The setpoint to be entered is 5.8 55 E-04 


Cue: Your request for verification is acknowledged, please continue. At the RM S:  ENTER high alarm setpoint on 1PB101  o SELECT "Save"
==SUMMARY==


o SELECT "Yes" RECORD new value Request verification NOTE: The next steps repeat Steps 4.2.1.5
Operators Name:                                     Job
-11 for the Alert Alarm setpoint.
*10. RMS supervisory mode Note: This step may be met per step 6 above.
At the RMS:
o VERIFY/PLACE RMS in Supervisory Mode by clicking on Mode Select Button    *11. Select monitor Note: This step may be met per step 7 above.
At the RMS, Grid 2:
o VERIFY/SELECT 1PB101
    *12. Select Alert alarm setpoint channel At the RMS:
VERIFY/SELECT "Channel ITEMS" SELECT "10"


ELEMENT STANDARD SAT UNSAT Comment Number *1 3. Select Alert alarm channel Note: The setpoint to be entered is 3.14 E-04. 
==Title:==
EO        RO    SRO      FS STA/IA          SRO Cert JPM


Cue: Your request for verification is acknowledged, please continue. At the RMS:
==Title:==
ENTER Alert alarm setpoint on 1PB101 o SELECT "Save" o SELECT "Yes" RECORD new value Request verification 1 4. Step 4.2.1.13 Place the RM S in Normal Mode
Change RM-11 Setpoints in Preparation for a Unit 1 Containment Release JPM Number: RA-c                          Revision Number: 0 Task Number and


At the RM S:   PLACE the RM S in NORMAL MODE by clicking on Mode Select Button    1 5. Step 4.3 Aux building exhaust fan status At 0PM02J:
==Title:==
ENSURE the 0A OR 0B Aux Building Exhaust Fan is in operation 1 6. Turn in Package for approval Cue: The US will continue at step 5.
4C.GW-01 PERFORM a Gaseous Release.
Cue: This JPM is completed.
K/A Number and Importance: Generic 2.3.5 2.9/2.9 Suggested Testing Environment: Simulator Alternate Path:    Yes    No SRO Only:        Yes      No      Time Critical:    Yes    No Reference(s):
Hand in Release package to Unit Supervisor for approval.
* BCP 400-TCNMT/ROUTINE, Gaseous Effluent Release Form Type: Routine Containment Release (Rev. 27)
RECORD STOP TIME
CRITICAL STEPS (*) 6, 7, 8, 9, 10, 11, 12 & 13 Actual Testing Environment:        Simulator      Control Room            In-Plant      Other Testing Method:          Simulate      Perform Estimated Time to Complete: 15 minutes              Actual Time Used:             minutes EVALUATION
:
JPM


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes                No The operators performance was evaluated against standards contained within this JPM and has been determined to be:          Satisfactory      Unsatisfactory Comments:
Evaluators Name:                                                  (Print)
Evaluators Signature:                                            Date:


Operator's Name
:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title:
Change RM-11 Setpoints in Preparation for a Unit 1 Containment Release JPM Number:
RA-c Revision Number:
0 Task Number and Title:
4C.GW-01  PERFORM a Gaseous Release.
K/A Number and Importance:
Generic 2.3.5 2.9/2.9 Suggested Testing Environment:
Simulator Alternate Path:
Yes  No SRO Only:  Yes  No Time Critical:
Yes  No Reference(s):
BCP 400-TCNMT/ROUTINE, Gaseous Effluent Release Form Type: Routine Containment Release (Rev. 2
: 7) CRITICAL STEPS
(*) 6, 7, 8, 9, 10, 11, 12 & 13 Actual Testing Environment:
Simulator  Control Room In-Plant  Other Testing Method:
Simulate  Perform Estimated Time to Complete:
15 minutes Actual Time Used:
minutes EVALUATION
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                        Evaluator's Name
:  (Print) Evaluator's Signature:  Date:
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 1 Assist NSO.
: 1. You are the Unit 1 Assist NSO.
: 2. A Unit 1 Containment release is pending.
: 2. A Unit 1 Containment release is pending.
: 3. 1RE-PR011 is not and has not been in LCOAR since beginning BCP preparations.
: 3. 1RE-PR011 is not and has not been in LCOAR since beginning BCP preparations.
: 4. Daily Channel Checks of 1RE
: 4. Daily Channel Checks of 1RE-PR001 has been performed Satisfactory per 0BOSR 0.1-0.
-PR001 has been performed Satisfactory pe r 0BOSR 0.1-0. 5. 1BOSR 11.b.6
: 5. 1BOSR 11.b.6-1, Radioactive Gaseous Effluent Monitoring Instrumentation Surv.
-1, Radioactive Gaseous Effluent Monitoring Instrumentation Surv. CNMT Purge Effluent (1(2)PR01J Source/Channel Check) has been completed and has been reviewed as Satisfactory.
CNMT Purge Effluent (1(2)PR01J Source/Channel Check) has been completed and has been reviewed as Satisfactory.
INITIATING CUE
INITIATING CUE
: 1. You have been instructed to perform Section 4 of BCP 400
: 1. You have been instructed to perform Section 4 of BCP 400-TCNMT/ROUTINE in preparation for this release.
-TCNMT/ROUTINE in preparation for this release.


RA-d   Exelon Nuclear Job Performance Measure Activate Everbridge Notification JPM Number:
RA-d Exelon Nuclear Job Performance Measure Activate Everbridge Notification JPM Number: RA-d Revision Number: 00 Date: 11/17/2015 Developed By:   Robert Peterson             11/17/2015 Instructor             Date Validated By:   J. Blumenthal               12/11/2015 SME or Instructor         Date Approved By:     B. Lewin                     12/11/2015 Operations Representative     Date
RA-d Revision Number: 00 Date: 1 1/1 7/20 1 5 Developed By:
 
Robert Peterson 1 1/1 7/201 5  Instructor Date Validated By:
RA-d INITIAL CONDITIONS
J. Blumenthal 12/11/2015 SME or Instructor Date Approved By:
: 1. You are the WEC NSO.
B. Lewin 12/11/2015 Operations Representative Date RA-d   INITIAL CONDITIONS
: 2. The SM has declared an ALERT condition for Unit 1, and has assigned you to activate the ERO on site.
: 1. You are the WEC NSO. 2. The SM has declared an ALERT condition for Unit 1, and has assigned you to activate the ERO on site. INITIATING CUE
INITIATING CUE
: 1. Activate the ERO using Everbridge on the World Wide Web.
: 1. Activate the ERO using Everbridge on the World Wide Web.


RA-d JPM Start Time STEP ELEMENT STANDARD SAT UNSAT Comment Numbe r CUE Provide copy of "Correct Procedure
RA-d JPM Start Time Comment STEP             ELEMENT                         STANDARD               SAT   UNSAT Number CUE   Provide copy of Correct Procedure to examinee as this would be provided by the Emergency Director.
" to examinee as this would be provided by the Emergency Director.
1   Refer to Correct Procedure.       Locate and read Correct Procedure.
1 Refer to Correct Procedure
2   Circle or otherwise indicate       Circle (Byron ID number) for Byron Member ID and                ID and password.
. Locate and read Correct Procedure. 2 Circle or otherwise indicate Byron Member ID and passwor d. Circle (Byron ID number) fo r ID and password.
password.
3 Circle or otherwise indicate appropriate Activation Scenario.
3   Circle or otherwise indicate       Circle Scenario 1.
Circle Scenario 1.
appropriate Activation Scenario.
4* Open Everbridge shortcut from the computer desktop or via the internet address (URL as given in step 1.3)
4*   Open Everbridge shortcut from     Everbridge application open on the computer desktop or via the   the computer.
Everbridge application open on the computer.
internet address (URL as given in step 1.3)
CUE CAUTION: Tell examinee to log out of Everbridge, then take their hand away from the mouse. **DO NOT continue making entries in Everbridge, as this may ACTIVATE the system.
CUE     CAUTION:
CUE Provide the examinee Screen Shot #1 (Login Screen), tell the examinee to record the appropriate data and des cribe the actions they will take on the provided Screen Shots, and to WRITE the information they would type, and to CIRCLE or X over "buttons" they would click on.
Tell examinee to log out of Everbridge, then take their hand away from the mouse.
5* Type in Byron ID.
        **DO NOT continue making entries in Everbridge, as this may ACTIVATE the system.
Type (Byron ID number) in Member ID.
CUE   Provide the examinee Screen Shot #1 (Login Screen), tell the examinee to record the appropriate data and describe the actions they will take on the provided Screen Shots, and to WRITE the information they would type, and to CIRCLE or X over buttons they would click on.
6* Type in Password.
5*   Type in Byron ID.                 Type (Byron ID number) in Member ID.
Type (Byron ID number) in Password. 7* Select "Enter" or "Go".
6*   Type in Password.                 Type (Byron ID number) in Password.
Swap screen to Scenario List. CUE Provide the examinee Screen Shot #2 (Scenario Screen), tell the examinee describe the actions they will take on the provided Screen Shots.
7*   Select Enter or Go.           Swap screen to Scenario List.
CUE   Provide the examinee Screen Shot #2 (Scenario Screen), tell the examinee describe the actions they will take on the provided Screen Shots.


RA-d STEP ELEMENT STANDARD SAT UNSAT Comment Numbe r 8* Examinee discusses which Scenario would be selected.
RA-d Comment STEP             ELEMENT                           STANDARD               SAT   UNSAT Number 8*   Examinee discusses which         Examinee would select Scenario would be selected.       Scenario 1, Actual Event Response to Facility For Alert CUE   Provide the examinee Screen Shot #3 (Active Scenario Screen), tell the examinee describe the actions they will take on the provided Screen Shots.
Examinee would select "Scenario 1, Actual Event Respons e to Facility For Alert" CUE Provide the examinee Screen Shot #3 (Active Scenario Screen), tell the examinee describe the actions they will take on the provided Screen Shots.
9*   Verify Active Scenario Screen   Examinee will send message.
9* Verify "Active Scenario Screen" is displayed Examinee will "send message".
is displayed CUE   Provide the examinee Screen Shot #4 (Active Scenario Broadcasts), tell the examinee describe the actions they will take on the provided Screen Shots.
CUE Provide the examinee Screen Shot #4 (Active Scenario Broadcast s), tell the examinee describe the actions they will take on the provided Screen Shots.
10   Verify Active Scenario           Examinee will log out.
10 Verify "Active Scenario Broadcast s" is displayed Examinee will log out.
Broadcasts is displayed 11    VERIFY call to the MCR from     Verifies call to MCR has been the ERO notification system has received.
1 1 VERIFY call to the MCR from the ERO notification system has been received within 10 minutes of activation.
been received within 10 minutes of activation.
Verifies call to MCR has been received. CUE A call to MCR from ERO Notification System was received by the Unit 2 Assist NSO one minute after the System was activated
CUE   A call to MCR from ERO Notification System was received by the Unit 2 Assist NSO one minute after the System was activated.
. 1 2 RECORD time the confirmation call was received.
12    RECORD time the confirmation     Time is recorded.
Time is recorded
call was received.
. 1 3 INFORM Shift Emergency Director that ERO has been activated.
13    INFORM Shift Emergency           SED/SM is informed Director that ERO has been activated.
SED/SM is informed   CUE The Shift Emergency Director acknowledges the activation of the ERO.
CUE   The Shift Emergency Director acknowledges the activation of the ERO.
CUE This JPM is complete
CUE   This JPM is complete.
. JPM Stop Time  
JPM Stop Time


JPM  
JPM  
Line 372: Line 405:
==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                     Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Activate Everbridge Notification JPM Number:
==Title:==
RA-d Revision Number:
EO         RO     SRO       FS STA/IA           SRO Cert JPM
0 0 Task Number and Title
 
R-ZP-002, Operate the EP communication systems K/A Number and Importance:
==Title:==
2.4.43 Imp Factor 3.2/3.8 Suggested Testing Environment:
Activate Everbridge Notification JPM Number: RA-d           Revision Number: 00 Task Number and
Simulator Alternate Path:
 
Yes No SRO Only: Yes No Time Critical:
==Title:==
Yes No Reference(s):
R-ZP-002, Operate the EP communication systems K/A Number and Importance: 2.4.43 Imp Factor 3.2/3.8 Suggested Testing Environment: Simulator Alternate Path:     Yes     No SRO Only:       Yes     No     Time Critical:     Yes     No Reference(s):
  "Correct Procedure Actual Testing Environment
* Correct Procedure Actual Testing Environment:         Simulator     Control Room           In-Plant     Other Testing Method:         Simulate       Perform Estimated Time to Complete: 10 minutes             Actual Time Used:             minutes EVALUATION  
: Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
1 0 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?         Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:         Satisfactory       Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                 (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                            Date:
Satisfactory Unsatisfactory Comments:                         Evaluator's Name
 
:   (Print) Evaluator's Signature
Exelon Nuclear Job Performance Measure Perform Offsite AC Power Availability Surveillance (BT 5-6 & 12-13 OOS)
:   Date:     
JPM Number: RA-a Revision Number: 1 Date: 9/24/2013 Revised By:      Robert Peterson            2/12/2016 Instructor          Date Validated By:    Anthony Moreno              2/15/2016 SME or Instructor          Date Approved By:    Brian Lewin                2/15/2016 Facility Representative      Date


Exelon Nuclear Job Performance Measure Perform Offsite AC Power Availability Surveillance (BT 5-6 & 12-13 OOS)  JPM Number:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
RA-a  Revision Number:
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
1  Date: 9/24/201 3 Revised By: Robert Peterson 2/12/201 6  Instructor Date  Validated By:
Anthony Moreno  2/15/201 6  SME or Instructor Date  Approved By:
Brian Lewin 2/15/2016  Facility Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 1 2 below. See File Copy
: 1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
See File Copy
: 2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in
: 3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
: 4. Initial setup conditions are identified.
: 4. Initial setup conditions are identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
Line 411: Line 436:
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure 1BOSR 8.1.1
Procedure 1BOSR 8.1.1-1       Rev: 010 Procedure                     Rev:
-1 Rev: 0 10  Procedure Rev:   Procedure Rev:   9. Verify cues both verbal and visual are free of conflict.
Procedure                     Rev:
: 9. Verify cues both verbal and visual are free of conflict.
: 10. Verify performance time is accurate
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date             SME / Instructor Date       SME / Instructor Date Revision Record (Summary)
SME / Instructor                               Date SME / Instructor                               Date SME / Instructor                               Date
Revision 0 New JPM, Alternate Path Revised for use of Rev 10 of 1BOSR 8.1.1
 
-1 SIMULATOR SETUP INSTRUCTIONS
Revision Record (Summary)
: 1) Reset to IC
Revision 0 New JPM, Alternate Path Revised for use of Rev 10 of 1BOSR 8.1.1-1
-18, 75% power.
 
NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
SIMULATOR SETUP INSTRUCTIONS
: 2) Place the control switch es for BT 5-6 and BT 12-13 in PTL and place info cards on the disconnects and control switch es. 3) When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist. 4) This completes the setup for this JPM
: 1) Reset to IC-18, 75% power.
.
NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
INITIAL CONDITIONS 1. You are an extra NSO.
: 2) Place the control switches for BT 5-6 and BT 12-13 in PTL and place info cards on the disconnects and control switches.
: 3) When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
: 4) This completes the setup for this JPM.
 
INITIAL CONDITIONS
: 1. You are an extra NSO.
: 2. Unit 1 and Unit 2 are in Mode 1, steady state power.
: 2. Unit 1 and Unit 2 are in Mode 1, steady state power.
INITIATING CUE
INITIATING CUE
: 1. The 1A DG has been declared inoperable and the US has directed you to perform 1BOSR 8.1.1
: 1. The 1A DG has been declared inoperable and the US has directed you to perform 1BOSR 8.1.1-1, Normal and Reserve Offsite AC Power Availability Weekly Surveillance.
-1, Normal and Reserve Offsite AC Power Availability Weekly Surveillance. 2. The SM has signed and dated the 1BOSR 8.1.1
: 2. The SM has signed and dated the 1BOSR 8.1.1-1 data package cover sheet.
-1 data package cover sheet.
 
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps 2, 3, 4, 5 & 12 Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
* Denotes critical steps 2, 3, 4, 5 & 12 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.


RECORD START TIME:
RECORD START TIME:
ELEMENT STANDARD SAT UNSAT Comment Number NOTE Provide examinee with a copy of 1BOSR 8.1.1
Comment ELEMENT                               STANDARD               SAT   UNSAT Number NOTE Provide examinee with a copy of 1BOSR 8.1.1-1 to complete.
-1 to complete
: 1. Step F.1 Circle status of offsite     At 0PM03J, OBSERVE bus power sources.                        alive lights, line amps, and MWs for all 345 KV lines:
. 1. Step F.1 Circle status of offsite power sources.
                                              ° Line 0621 Note:    The bus alive light alone is        ° Line 0627 NOT adequate verification of bus status.                      ° Line 0624
Note: The bus alive light alone is NOT adequate verification of bus status.
                                              ° Line 0622
At 0PM03J, OBSERVE bus alive lights, line amps, and MWs for all 345 KV lines:
                                        ° CIRCLE energized for all 345 KV lines NOTE Alternate path is initiated in the following step.
° Line 0621 ° Line 0627 ° Line 0624 ° Line 0622 ° CIRCLE 'energized' for all 345 KV lines NOTE Alternate path is initiated in the following step.
At 0PM03J, INDICATE:
*2. Step F.2 Indicate status of disconnects, breakers and SAT links Cue: ACB 2412 'GREEN' light L IT Cue: ACB 2422 'GREEN' light LIT Cue: ACB 2414 'GREEN' light LIT Cue: ACB 2424 'GREEN' light LIT Cue: Both units SAT x
*2. Step F.2 Indicate status of disconnects, breakers and SAT
-tie links are REMOVED Cue: Both units SAT disconnect links are INSTALLED At 0PM03J, INDICATE:  BT 5-6 breaker and disconnects and BT 1 2-13 breaker and disconnects are OPEN using "O
* BT 5-6 breaker and links                                   disconnects and BT 12-13 breaker and disconnects Cue: ACB 2412 GREEN light LIT              are OPEN using O Cue: ACB 2422 GREEN light LIT
"  Removed SAT x
* Removed SAT x-tie links Cue: ACB 2414 GREEN light LIT using O Cue: ACB 2424 GREEN light LIT Cue: Both units SAT x-tie links are
-tie links using "O"  Closed disconnects, breakers and installed SA T links using "X
* Closed disconnects, REMOVED                                     breakers and installed SAT Cue: Both units SAT disconnect               links using X links are INSTALLED
"        *3. Step F.3 Trace path along dashed lines from any energized offsite power source to the unit ONE SAT banks  TRACE path correctly on data sheet:  Line energized, breakers and disconnects closed
*3. Step F.3 Trace path along dashed TRACE path correctly on data lines from any energized offsite sheet:
      *4. Step F.4 Trace second path from second independent power source to unit TWO SAT bank. TRACE SECOND path correctly on data sheet:
power source to the unit ONE
Line energized, breakers and disconnects closed
* Line energized, breakers SAT banks and disconnects closed
*4. Step F.4 Trace second path from     TRACE SECOND path second independent power             correctly on data sheet:
source to unit TWO SAT bank.
* Line energized, breakers and disconnects closed


ELEMENT STANDARD SAT UNSAT Comment Number *5. Step F.5 Verify independent paths exist from offsite power thru switchyard to both units SAT banks CUE: If notified as US, acknowledge failure of acceptance criteria and direct candidate to complete the surveillance.
Comment ELEMENT                           STANDARD                 SAT   UNSAT Number
Verify independent paths L0621 and L0622 NOT BOTH used  Two paths DO overlap Circle "NO" for step 5 of data sheet o MAY notify US at this time or at step 13 of JPM, of failure of acceptance criteria.       6. Step F.6 Check normal and reserve 345 KV buses energized At 0PM03J, VERIFY bus alive light and voltmeter indications for: 345 KV bus 6 345 KV bus 13 ENTER 'Yes' for both closed bullets for step 6 on data sheet  
*5. Step F.5 Verify independent paths Verify independent paths exist from offsite power thru
: 7. Step F.7 Check normal and reserve power SATs available CUE: U-2 SAT X & Y windings are normal At 1/2PM01J, VERIFY 'X' and 'Y' winding MW and amps indication for:
* L0621 and L0622 NOT switchyard to both units SAT BOTH used banks
SATs 142-1 and 142-2 SATs 242-1 and 242-2 ENTER 'Yes' for both closed bullets for step 7 on data sheet
* Two paths DO overlap
: 8. Step F.8 Check ESF buses 141 and 142 energized At 1PM01J, CHECK bus alive lights, SAT feeder breaker to bus position and bus voltmeter indication for:
* Circle NO for step 5 of data sheet o MAY notify US at this time CUE: If notified as US,                or at step 13 of JPM, of acknowledge failure of              failure of acceptance acceptance criteria and direct      criteria.
Bus 141 Bus 142 ENTER 'Yes' for both closed bullets for step 8 on data sheet
candidate to complete the surveillance.
: 6. Step F.6 Check normal and         At 0PM03J, VERIFY bus alive reserve 345 KV buses energized    light and voltmeter indications for:
* 345 KV bus 6
* 345 KV bus 13 ENTER Yes for both closed bullets for step 6 on data sheet
: 7. Step F.7 Check normal and         At 1/2PM01J, VERIFY X and reserve power SATs available      Y winding MW and amps indication for:
CUE: U-2 SAT X & Y windings are
* SATs 142-1 and 142-2 normal
* SATs 242-1 and 242-2 ENTER Yes for both closed bullets for step 7 on data sheet
: 8. Step F.8 Check ESF buses 141     At 1PM01J, CHECK bus alive and 142 energized                lights, SAT feeder breaker to bus position and bus voltmeter indication for:
* Bus 141
* Bus 142 ENTER Yes for both closed bullets for step 8 on data sheet


ELEMENT STANDARD SAT UNSAT Comment Number 9. Step F.9 CHECK ESF buses 241 and 242 energized Cue: BUS 241 BUS ALIVE light i s LIT and voltage is normal Cue: BUS 242 BUS ALIVE light is LIT and voltage is normal At 2PM01J, CHECK bus alive lights, SAT feeder breaker to bus position and bus voltmeter indication for:
Comment ELEMENT                             STANDARD                 SAT   UNSAT Number
Bus 241  Bus 242 ENTER 'Yes' for both closed bullets for step 9 on data sheet
: 9. Step F.9 CHECK ESF buses 241       At 2PM01J, CHECK bus alive and 242 energized                   lights, SAT feeder breaker to bus position and bus voltmeter indication for:
: 10. Step F.10 Check SAT Feed breakers are closed and connected Cue: ACB 2412 'GREEN' light LIT
Cue: BUS 241 BUS ALIVE light is LIT and voltage is normal
* Bus 241 Cue: BUS 242 BUS ALIVE light is
* Bus 242 LIT and voltage is normal               ENTER Yes for both closed bullets for step 9 on data sheet
: 10. Step F.10 Check SAT Feed            At 1/2PM01J, VERIFY position breakers are closed and             and control power available:
connected
* ACB 1412
* ACB 2412 Cue: ACB 2412 GREEN light LIT
* ACB 1422
* ACB 2422 Cue: ACB 2422 GREEN light LIT ENTER Yes for all closed bullets for step 10 on data sheet
: 11. Step F.11 Check SAT Reserve          At 1/2PM01J, VERIFY position Feed breakers are closed and         and control power available:
connected
* ACB 1414
* ACB 1424
* ACB 2414 Cue: ACB 2414 GREEN light LIT
* ACB 2424 Cue: ACB 2424 GREEN light LIT ENTER Yes for all closed bullets for step 11 on data sheet
*12. Step G Determine acceptance
* DETERMINE acceptance criteria are NOT met                    criteria are NOT MET
: 13. Notify US that acceptance criteria
* Notify US verbally or by are not met                              checking NO and writing in Cue: US has verified 1BOL 8.1 has            Remarks on cover sheet.
been implemented.


Cue: ACB 2422 'GREEN' light LIT At 1/2PM01J, VERIFY position and control power available:
Comment ELEMENT            STANDARD  SAT  UNSAT Number Cue: This JPM is completed.
ACB 1412  ACB 2412  ACB 1422  ACB 2422 ENTER 'Yes' for all closed bullets for step 1 0 on data sheet      11. Step F.11 Check SAT Reserve Feed breakers are closed and connected Cue: ACB 2414 'GREEN' light LIT Cue: ACB 2424 'GREEN' light LIT At 1/2PM01J, VERIFY position and control power available:
RECORD STOP TIME:
ACB 14 14  ACB 1424  ACB 2414  ACB 2424 ENTER 'Yes' for all closed bullets for step 11 on data sheet      *1 2. Step G Determine acceptance criteria are NOT met   DETERMINE acceptance criteria are NOT MET      13. Notify US that acceptance criteria are not met Cue: US has verified 1BOL 8.1 has been implemented.
Notify US verbally or by checking NO and writing in Remarks on cover sheet.


ELEMENT STANDARD SAT UNSAT Comment Number  Cue: This JPM is completed.
RECORD STOP TIME
:
JPM  
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                     Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Perform Offsite AC Power Availability Surveillance (BT 5-6 & 12-13 OOS) JPM Number:
==Title:==
RA-a (N-75c) Revision Number:
EO         RO   SRO       FS STA/IA         SRO Cert JPM
1 Task Number and Title: 4C.AP-06 Perform the Offsite AC Power Availability Surveillance
 
. K/A Number and Importance:
==Title:==
2.1.31 4.6 / 4.3 Suggested Testing Environment:
Perform Offsite AC Power Availability Surveillance (BT 5-6 & 12-13 OOS)
Simulator Alternate Path:
JPM Number: RA-a (N-75c)                   Revision Number: 1 Task Number and
Yes No SRO Only: Yes No Time Critical:
 
Yes No Reference(s):
==Title:==
1BOSR 8.1.1
4C.AP-06 Perform the Offsite AC Power Availability Surveillance.
-1, Rev 10, Normal and Reserve Offsite AC Power Availability Weekly Surveillance CRITICAL STEPS
K/A Number and Importance: 2.1.31 4.6 / 4.3 Suggested Testing Environment: Simulator Alternate Path:     Yes     No SRO Only:       Yes     No     Time Critical: Yes       No Reference(s):
(*) 2, 3, 4, 5 & 12 Actual Testing Environment:
1BOSR 8.1.1-1, Rev 10, Normal and Reserve Offsite AC Power Availability Weekly Surveillance CRITICAL STEPS (*) 2, 3, 4, 5 & 12 Actual Testing Environment:         Simulator     Control Room           In-Plant     Other Testing Method:         Simulate     Perform Estimated Time to Complete: 15 minutes             Actual Time Used:             minutes EVALUATION  
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
15 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?         Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:         Satisfactory     Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                 (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                           Date:
Satisfactory Unsatisfactory Comments:                         Evaluator's Name
 
:   (Print) Evaluator's Signature
:   Date:
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are an extra NSO.
: 1. You are an extra NSO.
: 2. Unit 1 and Unit 2 are in Mode 1, steady state power.
: 2. Unit 1 and Unit 2 are in Mode 1, steady state power.
INITIATING CUE
INITIATING CUE
: 1. The 1A DG has been declared inoperable and the US has directed you to perform 1BOSR 8.1.1
: 1. The 1A DG has been declared inoperable and the US has directed you to perform 1BOSR 8.1.1-1, Normal and Reserve Offsite AC Power Availability Weekly Surveillance.
-1, Normal and Reserve Offsite AC Power Availability Weekly Surveillance.  
: 2. The SM has signed and dated the 1BOSR 8.1.1-1 data package cover sheet.
: 2. The SM has signed and dated the 1BOSR 8.1.1
-1 data package cover sheet.


Exelon Nuclear Job Performance Measure Evaluate Technical Specification Entry Conditions
Exelon Nuclear Job Performance Measure Evaluate Technical Specification Entry Conditions JPM Number: RA-b Revision Number: 00 Date: 11/17/2015 Developed By:    Robert Peterson              11/17/2015 Instructor            Date Validated By:    J. Blumenthal                12/11/2015 SME or Instructor          Date Approved By:    B. Lewin                    12/11/2015 Operations Representative      Date


JPM Number:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
RA-b  Revision Number: 00  Date: 1 1/1 7/20 1 5 Developed By:
Robert Peterson 1 1/1 7/201 5  Instructor Date  Validated By:
J. Blumenthal 12/11/2015 SME or Instructor Date  Approved By:
B. Lewin  12/11/2015 Operations Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
__RFP__ 1. Task description and number, JPM description and number are identified.
__RFP__     1. Task description and number, JPM description and number are identified.
__RFP__ 2. Knowledge and Abilities (K/A) references are included.
__RFP__     2. Knowledge and Abilities (K/A) references are included.
__RFP__ 3. Performance location specified. (in
__RFP__     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
__RFP__     4. Initial setup conditions are identified.
__RFP__ 4. Initial setup conditions are identified.
__RFP__     5. Initiating cue (and terminating cue if required) are properly identified.
__RFP__ 5. Initiating cue (and terminating cue if required) are properly identified.
__RFP__     6. Task standards identified and verified by SME review.
__RFP__ 6. Task standards identified and verified by SME review.
__RFP__     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
__RFP__ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
__RFP__     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
__RFP__ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure BAR 1-1-B1             Rev: 2 Procedure BAR 1-1-E5                           Rev: 5 Procedure 1BOSR MS-W1 Rev: 11 Procedure BOP MS-5               Rev: 19 Procedure BAR 1-5-B2                          Rev: 1
Procedure BAR 1-1-B1 Rev: 2 Procedure BAR 1-1-E5 Rev: 5 Procedure 1BOSR MS-W1 Rev: 11 Procedure BOP MS-5 Rev: 19 Procedure BAR 1-5-B 2  Rev: 1 __ RFP__ 9. Verify cues both verbal and visual are free of conflict.
__ RFP__   9. Verify cues both verbal and visual are free of conflict.
__RFP__ 10. Verify performance time is accurate
__RFP__     10. Verify performance time is accurate
__RFP__ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
__RFP__     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
__RFP___ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
__RFP___ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date Revision Record (Summary)
SME / Instructor                             Date SME / Instructor                             Date SME / Instructor                             Date
Revision 0 Revised format to current standard Comment Resolution New JPM   Provided documents:
 
: 1. BAR 1-1-B1: Place keep to step D and write below the setpoint: "EO reports SFP temperature at 150°F and SFP level at 24'3"." 2. BAR 1-5-B2: Place keep to step D and write below the setpoint: "1B pressure is 595 PSIG". 3. BAR 1-3-C3: Place keep to step D and write below the setpoint: "EO reports spray add tank at 80%
Revision Record (Summary)
." 4. BAR 1-1-E5: Place keep to step D and write below the setpoint: "EO reports 1D MSIV active accumulator at 4950 PSIG and standby accumulator at 4750 PSIG."
Revision 0     Revised format to current standard Comment                                       Resolution New JPM Provided documents:
: 1. BAR 1-1-B1: Place keep to step D and write below the setpoint: EO reports SFP temperature at 150°F and SFP level at 243.
: 2. BAR 1-5-B2: Place keep to step D and write below the setpoint: 1B pressure is 595 PSIG.
: 3. BAR 1-3-C3: Place keep to step D and write below the setpoint: EO reports spray add tank at 80%.
: 4. BAR 1-1-E5: Place keep to step D and write below the setpoint: EO reports 1D MSIV active accumulator at 4950 PSIG and standby accumulator at 4750 PSIG.


INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the WEC NSO. 2. The unit is in MODE 1 INITIATING CUE
: 1.         You are the WEC NSO.
: 1. Given the provided marked up BARs, IDENTIFY any TS LCOs that are NOT met, and EXPLAIN the reason for your determination.
: 2.         The unit is in MODE 1 INITIATING CUE
(Applicable Conditions and Required Actions are not required).
: 1.         Given the provided marked up BARs, IDENTIFY any TS LCOs that are NOT met, and EXPLAIN the reason for your determination.
Information For Evaluator's Use:
(Applicable Conditions and Required Actions are not required).
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps 2, 4 Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
* Denotes critical steps 2, 4 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking syste
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
: m. Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.


JPM Start Time STEP ELEMENT STANDARD SAT UNSAT Comment Number NOTE This steps in this JPM may be done in any order.
JPM Start Time Comment SAT  UNSAT STEP             ELEMENT                       STANDARD Number NOTE This steps in this JPM may be done in any order.
1 Evaluate Alarm 1-1-B1 SFP Temp Hi Identify as not Technical Specification related alarm.
1   Evaluate Alarm 1-1-B1 SFP     Identify as not Technical Temp Hi                        Specification related alarm.
CUE If requested, provide student copy of 1BOSR MS-W1 and/or BOP MS
CUE   If requested, provide student copy of 1BOSR MS-W1 and/or BOP MS-5 2*   Evaluate Alarm 1-1-E5, MSIV   Identify TS 3.7.2 LCO is not 1D Hyd/Pneu Press Hi/Lo        met for 1D MSIV Accumulator Standby Pressure Low 3   Evaluate Alarm 1-3-C3, Spray   Identify that current Spray Add Add Tank Level Low            Tank reading of 80% is above the T.S 3.6.7 required value of 78.6%.
-5 2* Evaluate Alarm 1-1-E5, MSIV 1D Hyd/Pneu Press Hi/Lo Identify TS 3.7.2 LCO is not met for 1D MSIV Accumul ator Standby Pressure Low 3 Evaluate Alarm 1 C3, Spray Add Tank Level Low Identify that current Spray Add Tank reading of 80% is above the T.S 3.6.7 required value of 78.6%. 4* Evaluate Alarm 1 B2, 1 B SI Accumulator Pressure Hi/Lo Identify TS 3.5.1 LCO is not met for 1B SI Accumulator Pressure; pressure is LOW.
4*   Evaluate Alarm 1-5-B2, 1B SI   Identify TS 3.5.1 LCO is not Accumulator Pressure Hi/Lo    met for 1B SI Accumulator Pressure; pressure is LOW.
CUE This JPM is complete
CUE   This JPM is complete.
. JPM Stop Time  
JPM Stop Time


JPM  
JPM  
Line 559: Line 608:
==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                     Job
:   Job Title: EO RO SRO F S  STA/IA SRO Cert JPM Title:
 
Evaluate Technical Specification Entry Conditions JPM Number:
==Title:==
RA-b Revision Number:
EO       RO     SRO       FS STA/IA         SRO Cert JPM
0 0 Task Number and Title: R-AM-012, Apply Technical Specification Requirements K/A Number and Importance:
 
2.2.42 Imp Factor 3.9/4.6 Suggested Testing Environment: Simulator Alternate Path:
==Title:==
Yes No SRO Only: Yes No Ti me Critical:
Evaluate Technical Specification Entry Conditions JPM Number: RA-b           Revision Number: 00 Task Number and
Yes No Reference(s):
 
BAR 1-1-B1 , Rev: 2   BAR 1-1-E5 , Rev: 5   BAR 1-5-B 2 , Rev: 1   BOP MS-5 , Rev: 19 1BOSR MS-W1, Rev: 11 Actual Testing Environment:
==Title:==
Simulator Control Room In-Plant Other Testing Method:
R-AM-012, Apply Technical Specification Requirements K/A Number and Importance: 2.2.42 Imp Factor 3.9/4.6 Suggested Testing Environment: Simulator Alternate Path:     Yes     No SRO Only:       Yes     No     Time Critical:   Yes     No Reference(s):
Simulate Perform Estimated Time to Complete:
* BAR 1-1-B1, Rev: 2
20 minutes Actual Time Used:
* BAR 1-1-E5, Rev: 5
minutes EVALUATION  
* BAR 1-5-B2, Rev: 1
* BOP MS-5, Rev: 19
* 1BOSR MS-W1, Rev: 11 Actual Testing Environment:       Simulator       Control Room         In-Plant     Other Testing Method:         Simulate     Perform Estimated Time to Complete: 20 minutes             Actual Time Used:           minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?         Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:         Satisfactory     Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                 (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                           Date:
Satisfactory Unsatisfactory Comments:               Evaluator's Name
 
:   (Print) Evaluator's Signature
:   Date:
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the WEC NSO. 2. The unit is in MODE 1 INITIATING CUE
: 1. You are the WEC NSO.
: 2. The unit is in MODE 1 INITIATING CUE
: 1. Given the provided marked up BARs, IDENTIFY any TS LCOs that are NOT met, and EXPLAIN the reason for your determination.
: 1. Given the provided marked up BARs, IDENTIFY any TS LCOs that are NOT met, and EXPLAIN the reason for your determination.
  (Applicable Conditions and Required Actions are not required). Formatted:
(Applicable Conditions and Required Actions are not required).
Font: New Century SchoolbookFormatted:
Formatted: Font: New Century Schoolbook Formatted: Centered, Space Before: 0 pt, After: 6 pt, Tab stops: 1.25", Right + 1.38", Left + 4.63", Left + 5.13",
Centered, Space Before: 0 pt, After: 6 pt, Tabstops: 1.25", Right + 1.38", Left + 4.63", Left + 5.13",Right + 5.25", Left + 6", Left Exelon Nuclear Job Performance Measure Change RM-11 Setpoints in Preparation for a Unit 1 Containment Release JPM Number:
Right + 5.25", Left + 6", Left
RA-c Revision Number:
 
0 Date: 11/30/20 1 5 Revised By: R. Peterson 11/30/201 5  Instructor Date Validated By:
Exelon Nuclear Job Performance Measure Change RM-11 Setpoints in Preparation for a Unit 1 Containment Release JPM Number: RA-c Revision Number: 0 Date: 11/30/2015 Revised By:     R. Peterson                 11/30/2015 Instructor             Date Validated By:   J. Blumenthal               12/11/2015 SME or Instructor         Date Approved By:     B. Lewin                     12/11/2015 Operations Representative     Date
J. Blumenthal 12/11/2015 SME or Instructor Date Approved By:
 
B. Lewin 12/11/2015 Operations Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 1 2 below. __RFP__ 1. Task description and number, JPM description and number are identified.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
__RFP__ 2. Knowledge and Abilities (K/A) references are included.
__RFP__   1. Task description and number, JPM description and number are identified.
__RFP__ 3. Performance location specified. (in
__RFP__   2. Knowledge and Abilities (K/A) references are included.
-plant, control room, simulator, or other)
__RFP__   3. Performance location specified. (in-plant, control room, simulator, or other)
__RFP__ 4. Initial setup conditions are identified.
__RFP__   4. Initial setup conditions are identified.
__RFP__ 5. Initiating cue (and terminating cue if required) are properly identified.
__RFP__   5. Initiating cue (and terminating cue if required) are properly identified.
__RFP__ 6. Task standards identified and verified by SME review.
__RFP__   6. Task standards identified and verified by SME review.
__RFP__ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
__RFP__   7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
__RFP__ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
__RFP__   8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure BCP 400-TCNMT/ROUTINE Rev: 27 Procedure Rev:   Procedure Rev:   __RFP__ 9. Verify cues both verbal and visual are free of conflict.
Procedure BCP 400-TCNMT/ROUTINE               Rev: 27 Procedure                       Rev:
__RFP__ 10. Verify performance time is accurate
Procedure                       Rev:
__RFP__ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
__RFP__   9. Verify cues both verbal and visual are free of conflict.
__RFP__ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
__RFP__   10. Verify performance time is accurate
B. Lewin/R. Peterson 12/11/2015 SME / Instructor Date       SME / Instructor Date Revision Record (Summary)
__RFP__   11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
Revision 0 Generated New JPM for new RMS System and BCP 400
__RFP__   12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
-TCNMT/Routine revision from RA-3 rev 5.
B. Lewin/R. Peterson                                   12/11/2015 SME / Instructor                               Date SME / Instructor                               Date
SIMULATOR SETUP INSTRUCTIONS NOTE: It is okay to use a similar IC to the IC listed, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
 
: 1. Reset to IC
Revision Record (Summary)
-22 2. Ensure that either the 0A or 0B Aux Building Exhaust Fan is in operation.
Revision 0 Generated New JPM for new RMS System and BCP 400-TCNMT/Routine revision from RA-3 rev 5.
: 3. Verify that the RM S values for the appropriate channels agree with the surveillance paperwork. 4. Enter indication for Noble gas trend for 1PR11J (1PB111) on RMS as 4.684 E-06 by entering in expert mode: ramp rmr1pr11b .00000486 .00000486 7200
 
: 5. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist 6. This completes the setup for this JPM
SIMULATOR SETUP INSTRUCTIONS NOTE:     It is okay to use a similar IC to the IC listed, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 1. Reset to IC-22
: 2. Ensure that either the 0A or 0B Aux Building Exhaust Fan is in operation.
: 3. Verify that the RMS values for the appropriate channels agree with the surveillance paperwork.
: 4. Enter indication for Noble gas trend for 1PR11J (1PB111) on RMS as 4.684 E-06 by entering in expert mode: ramp rmr1pr11b .00000486 .00000486 7200
: 5. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
: 6. This completes the setup for this JPM


INITIAL CONDITIONS
INITIAL CONDITIONS
Line 616: Line 672:
: 2. A Unit 1 Containment release is pending.
: 2. A Unit 1 Containment release is pending.
: 3. 1RE-PR011 is not and has not been in LCOAR since beginning BCP preparations.
: 3. 1RE-PR011 is not and has not been in LCOAR since beginning BCP preparations.
: 4. Daily Channel Checks of 1RE
: 4. Daily Channel Checks of 1RE-PR001 has been performed Satisfactory per 0BOSR 0.1-0.
-PR001 has been performed Satisfactory per 0BOSR 0.1-0. 5. 1BOSR 11.b.6
: 5. 1BOSR 11.b.6-1, Radioactive Gaseous Effluent Monitoring Instrumentation Surv.
-1, Radioactive Gaseous Effluent Monitoring Instrumentation Surv. CNMT Purge Effluent (1(2)PR01J Source/Channel Check) has been completed and has been reviewed as Satisfactory.
CNMT Purge Effluent (1(2)PR01J Source/Channel Check) has been completed and has been reviewed as Satisfactory.
INITIATING CUE You have been instructed to perform Section 4 of BCP 400
INITIATING CUE You have been instructed to perform Section 4 of BCP 400-TCNMT/ROUTINE in preparation for this release.
-TCNMT/ROUTINE in preparation for this release.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps. (6, 7, 8, 9, 10, 11, 12, 13)
(6, 7, 8, 9, 10, 11, 12, 13)
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of callin g for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.


RECORD START TIME:
RECORD START TIME:
ELEMENT STANDARD SAT UNSAT Comment Number NOTE To initiate this JPM, hand the partially completed BCP 400
Comment ELEMENT                               STANDARD           SAT   UNSAT Number NOTE To initiate this JPM, hand the partially completed BCP 400-TCNMT/ROUTINE and Pre-Release Permit Report to the examinee.
-TCNMT/ROUTINE and Pre-Release Permit Report to the examinee.
: 1. Refer to the partially completed       °  REVIEW BCP 400-BCP 400-TCNMT/ROUTINE                     TCNMT/ROUTINE for completeness up to Section 4
: 1. Refer to the partially completed BCP 400-TCNMT/ROUTINE REVIEW BCP 400
: 2. Step 4.2.1.1 Complete daily           °  VERIFY/COMPLETE the channel checks                             daily channel check on 1RE-PR001 Cue: The daily channel check of 1RE-PR001 has been performed satisfactorily
-TCNMT/ROUTINE for completeness up to Section 4       2. Step 4.2.1.1 Complete daily channel checks Cue: The daily channel check of 1RE-PR001 has been performed satisfactor il y  VERIFY/COMPLETE the daily channel check on 1RE-PR001      3. Step 4.2.1.2 Perform Source/Channel check Cue: 1BOSR 11.b.
: 3. Step 4.2.1.2 Perform                   °  PERFORM the 1PR01J Source/Channel check                      source/channel check Cue: 1BOSR 11.b.6-1 has been completed and reviewed satisfactorily.
6-1 has been completed and reviewed satisfactor il y. PERFORM the 1PR01J source/channel check
: 4. Step 4.2.1.3 Noble gas trend for     °    VERIFY noble gas trend 1PR11J (1PB111)                           from 1PB111 has not increased by >10% from current reading on Gaseous Pre-release Permit Report
: 4. Step 4.2.1.3 Noble gas trend for 1PR11J (1PB111)
: 5. Step 4.2.1.4 As Found setpoints   At the RMS, RECORD As of 1RE-PR001                        Found setpoints of 1RE-PR001 Gas Channel:
VERIFY noble gas trend from 1PB111 has not increased by >10% from current reading on Gaseous Pre
                                        °    High alarm setpoint
-release Permit Report
                                        °    Alert alarm setpoint
: 5. Step 4.2.1.4 "As Found" setpoints of 1RE-PR001 At the R M S, RECORD "As Found" setpoints of 1RE-PR001 Gas Channel:   High alarm setpoint Alert alarm setpoint
*6. Step 4.2.1.5 RMS supervisory         At the RMS:
      *6. Step 4.2.1.5 RM S supervisory mode  At the RM S:   PLACE RM S in Supervisory Mode by clicking on Mode Select Button ELEMENT STANDARD SAT UNSAT Comment Number *7. Step 4.2.1.6 Select monitor At the RM S, Grid 2:
mode
* PLACE RMS in Supervisory Mode by clicking on Mode Select Button
 
Comment ELEMENT                         STANDARD               SAT   UNSAT Number
*7. Step 4.2.1.6 Select monitor       At the RMS, Grid 2:
o SELECT 1PB101
o SELECT 1PB101
    *8. Step 4.2.1.7 Select high alarm setpoint channel
*8. Step 4.2.1.7 Select high alarm   At the RMS:
setpoint channel
* SELECT Channel ITEMS
* SELECT 9
*9. Step 4.2.1.8-11 High alarm        At the RMS:
setpoint
* ENTER high alarm setpoint Note: The setpoint to be entered is      on 1PB101 5.855 E-04 o  SELECT Save o  SELECT Yes
* RECORD new value Cue: Your request for verification
* Request verification is acknowledged, please continue.
NOTE: The next steps repeat Steps 4.2.1.5-11 for the Alert Alarm setpoint.
*10. RMS supervisory mode          At the RMS:
Note: This step may be met per        o VERIFY/PLACE RMS in step 6 above.                    Supervisory Mode by clicking on Mode Select Button
*11. Select monitor                  At the RMS, Grid 2:
Note: This step may be met per        o VERIFY/SELECT 1PB101 step 7 above.
*12. Select Alert alarm setpoint      At the RMS:
channel
* VERIFY/SELECT Channel ITEMS
* SELECT 10
 
Comment ELEMENT                              STANDARD                SAT  UNSAT Number
*13. Select Alert alarm channel          At the RMS:
Note: The setpoint to be entered is
* ENTER Alert alarm 3.14 E-04.                              setpoint on 1PB101 o  SELECT Save o  SELECT Yes
* RECORD new value Cue: Your request for verification      °  Request verification is acknowledged, please continue.
: 14. Step 4.2.1.13 Place the RMS in      At the RMS:
Normal Mode
                                        °  PLACE the RMS in NORMAL MODE by clicking on Mode Select Button
: 15. Step 4.3 Aux building exhaust fan    At 0PM02J:
status
                                        °  ENSURE the 0A OR 0B Aux Building Exhaust Fan is in operation
: 16. Turn in Package for approval        Hand in Release package to Unit Supervisor for approval.
Cue:  The US will continue at step 5.
Cue:  This JPM is completed.
RECORD STOP TIME:


At the RM S:  SELECT "Channel ITEMS" SELECT "9"    *9. Step 4.2.1.8
JPM
-11 High alarm setpoint  Note: The setpoint to be entered is 5.8 55 E-04 


Cue: Your request for verification is acknowledged, please continue. At the RM S:  ENTER high alarm setpoint on 1PB101  o SELECT "Save"
==SUMMARY==


o SELECT "Yes" RECORD new value Request verification NOTE: The next steps repeat Steps 4.2.1.5
Operators Name:                                     Job
-11 for the Alert Alarm setpoint.
*10. RMS supervisory mode Note: This step may be met per step 6 above.
At the RMS:
o VERIFY/PLACE RMS in Supervisory Mode by clicking on Mode Select Button    *11. Select monitor Note: This step may be met per step 7 above.
At the RMS, Grid 2:
o VERIFY/SELECT 1PB101
    *12. Select Alert alarm setpoint channel At the RMS:
VERIFY/SELECT "Channel ITEMS" SELECT "10"


ELEMENT STANDARD SAT UNSAT Comment Number *1 3. Select Alert alarm channel Note: The setpoint to be entered is 3.14 E-04. 
==Title:==
EO        RO    SRO      FS STA/IA          SRO Cert JPM


Cue: Your request for verification is acknowledged, please continue. At the RMS:
==Title:==
ENTER Alert alarm setpoint on 1PB101 o SELECT "Save" o SELECT "Yes" RECORD new value Request verification 1 4. Step 4.2.1.13 Place the RM S in Normal Mode
Change RM-11 Setpoints in Preparation for a Unit 1 Containment Release JPM Number: RA-c                          Revision Number: 0 Task Number and


At the RM S:   PLACE the RM S in NORMAL MODE by clicking on Mode Select Button    1 5. Step 4.3 Aux building exhaust fan status At 0PM02J:
==Title:==
ENSURE the 0A OR 0B Aux Building Exhaust Fan is in operation 1 6. Turn in Package for approval Cue: The US will continue at step 5.
4C.GW-01 PERFORM a Gaseous Release.
Cue: This JPM is completed.
K/A Number and Importance: Generic 2.3.5 2.9/2.9 Suggested Testing Environment: Simulator Alternate Path:    Yes    No SRO Only:        Yes      No      Time Critical:    Yes    No Reference(s):
Hand in Release package to Unit Supervisor for approval.
* BCP 400-TCNMT/ROUTINE, Gaseous Effluent Release Form Type: Routine Containment Release (Rev. 27)
RECORD STOP TIME
CRITICAL STEPS (*) 6, 7, 8, 9, 10, 11, 12 & 13 Actual Testing Environment:        Simulator      Control Room            In-Plant      Other Testing Method:          Simulate      Perform Estimated Time to Complete: 15 minutes              Actual Time Used:             minutes EVALUATION
:
JPM


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes                No The operators performance was evaluated against standards contained within this JPM and has been determined to be:          Satisfactory      Unsatisfactory Comments:
Evaluators Name:                                                  (Print)
Evaluators Signature:                                            Date:


Operator's Name
:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title:
Change RM-11 Setpoints in Preparation for a Unit 1 Containment Release JPM Number:
RA-c Revision Number:
0 Task Number and Title:
4C.GW-01  PERFORM a Gaseous Release.
K/A Number and Importance:
Generic 2.3.5 2.9/2.9 Suggested Testing Environment:
Simulator Alternate Path:
Yes  No SRO Only:  Yes  No Time Critical:
Yes  No Reference(s):
BCP 400-TCNMT/ROUTINE, Gaseous Effluent Release Form Type: Routine Containment Release (Rev. 2
: 7) CRITICAL STEPS
(*) 6, 7, 8, 9, 10, 11, 12 & 13 Actual Testing Environment:
Simulator  Control Room In-Plant  Other Testing Method:
Simulate  Perform Estimated Time to Complete:
15 minutes Actual Time Used:
minutes EVALUATION
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                        Evaluator's Name
:  (Print) Evaluator's Signature:  Date:
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 1 Assist NSO.
: 1. You are the Unit 1 Assist NSO.
: 2. A Unit 1 Containment release is pending.
: 2. A Unit 1 Containment release is pending.
: 3. 1RE-PR011 is not and has not been in LCOAR since beginning BCP preparations.
: 3. 1RE-PR011 is not and has not been in LCOAR since beginning BCP preparations.
: 4. Daily Channel Checks of 1RE
: 4. Daily Channel Checks of 1RE-PR001 has been performed Satisfactory per 0BOSR 0.1-0.
-PR001 has been performed Satisfactory pe r 0BOSR 0.1-0. 5. 1BOSR 11.b.6
: 5. 1BOSR 11.b.6-1, Radioactive Gaseous Effluent Monitoring Instrumentation Surv.
-1, Radioactive Gaseous Effluent Monitoring Instrumentation Surv. CNMT Purge Effluent (1(2)PR01J Source/Channel Check) has been completed and has been reviewed as Satisfactory.
CNMT Purge Effluent (1(2)PR01J Source/Channel Check) has been completed and has been reviewed as Satisfactory.
INITIATING CUE
INITIATING CUE
: 1. You have been instructed to perform Section 4 of BCP 400
: 1. You have been instructed to perform Section 4 of BCP 400-TCNMT/ROUTINE in preparation for this release.
-TCNMT/ROUTINE in preparation for this release.


RA-d   Exelon Nuclear Job Performance Measure Activate Everbridge Notification JPM Number:
RA-d Exelon Nuclear Job Performance Measure Activate Everbridge Notification JPM Number: RA-d Revision Number: 00 Date: 11/17/2015 Developed By:   Robert Peterson             11/17/2015 Instructor             Date Validated By:   J. Blumenthal               12/11/2015 SME or Instructor         Date Approved By:     B. Lewin                     12/11/2015 Operations Representative     Date
RA-d Revision Number: 00 Date: 1 1/1 7/20 1 5 Developed By:
 
Robert Peterson 1 1/1 7/201 5  Instructor Date Validated By:
RA-d INITIAL CONDITIONS
J. Blumenthal 12/11/2015 SME or Instructor Date Approved By:
: 1. You are the WEC NSO.
B. Lewin 12/11/2015 Operations Representative Date RA-d   INITIAL CONDITIONS
: 2. The SM has declared an ALERT condition for Unit 1, and has assigned you to activate the ERO on site.
: 1. You are the WEC NSO. 2. The SM has declared an ALERT condition for Unit 1, and has assigned you to activate the ERO on site. INITIATING CUE
INITIATING CUE
: 1. Activate the ERO using Everbridge on the World Wide Web.
: 1. Activate the ERO using Everbridge on the World Wide Web.


RA-d JPM Start Time STEP ELEMENT STANDARD SAT UNSAT Comment Numbe r CUE Provide copy of "Correct Procedure
RA-d JPM Start Time Comment STEP             ELEMENT                         STANDARD               SAT   UNSAT Number CUE   Provide copy of Correct Procedure to examinee as this would be provided by the Emergency Director.
" to examinee as this would be provided by the Emergency Director.
1   Refer to Correct Procedure.       Locate and read Correct Procedure.
1 Refer to Correct Procedure
2   Circle or otherwise indicate       Circle (Byron ID number) for Byron Member ID and                ID and password.
. Locate and read Correct Procedure. 2 Circle or otherwise indicate Byron Member ID and passwor d. Circle (Byron ID number) fo r ID and password.
password.
3 Circle or otherwise indicate appropriate Activation Scenario.
3   Circle or otherwise indicate       Circle Scenario 1.
Circle Scenario 1.
appropriate Activation Scenario.
4* Open Everbridge shortcut from the computer desktop or via the internet address (URL as given in step 1.3)
4*   Open Everbridge shortcut from     Everbridge application open on the computer desktop or via the   the computer.
Everbridge application open on the computer.
internet address (URL as given in step 1.3)
CUE CAUTION: Tell examinee to log out of Everbridge, then take their hand away from the mouse. **DO NOT continue making entries in Everbridge, as this may ACTIVATE the system.
CUE     CAUTION:
CUE Provide the examinee Screen Shot #1 (Login Screen), tell the examinee to record the appropriate data and des cribe the actions they will take on the provided Screen Shots, and to WRITE the information they would type, and to CIRCLE or X over "buttons" they would click on.
Tell examinee to log out of Everbridge, then take their hand away from the mouse.
5* Type in Byron ID.
        **DO NOT continue making entries in Everbridge, as this may ACTIVATE the system.
Type (Byron ID number) in Member ID.
CUE   Provide the examinee Screen Shot #1 (Login Screen), tell the examinee to record the appropriate data and describe the actions they will take on the provided Screen Shots, and to WRITE the information they would type, and to CIRCLE or X over buttons they would click on.
6* Type in Password.
5*   Type in Byron ID.                 Type (Byron ID number) in Member ID.
Type (Byron ID number) in Password. 7* Select "Enter" or "Go".
6*   Type in Password.                 Type (Byron ID number) in Password.
Swap screen to Scenario List. CUE Provide the examinee Screen Shot #2 (Scenario Screen), tell the examinee describe the actions they will take on the provided Screen Shots.
7*   Select Enter or Go.           Swap screen to Scenario List.
CUE   Provide the examinee Screen Shot #2 (Scenario Screen), tell the examinee describe the actions they will take on the provided Screen Shots.


RA-d STEP ELEMENT STANDARD SAT UNSAT Comment Numbe r 8* Examinee discusses which Scenario would be selected.
RA-d Comment STEP             ELEMENT                           STANDARD               SAT   UNSAT Number 8*   Examinee discusses which         Examinee would select Scenario would be selected.       Scenario 1, Actual Event Response to Facility For Alert CUE   Provide the examinee Screen Shot #3 (Active Scenario Screen), tell the examinee describe the actions they will take on the provided Screen Shots.
Examinee would select "Scenario 1, Actual Event Respons e to Facility For Alert" CUE Provide the examinee Screen Shot #3 (Active Scenario Screen), tell the examinee describe the actions they will take on the provided Screen Shots.
9*   Verify Active Scenario Screen   Examinee will send message.
9* Verify "Active Scenario Screen" is displayed Examinee will "send message".
is displayed CUE   Provide the examinee Screen Shot #4 (Active Scenario Broadcasts), tell the examinee describe the actions they will take on the provided Screen Shots.
CUE Provide the examinee Screen Shot #4 (Active Scenario Broadcast s), tell the examinee describe the actions they will take on the provided Screen Shots.
10   Verify Active Scenario           Examinee will log out.
10 Verify "Active Scenario Broadcast s" is displayed Examinee will log out.
Broadcasts is displayed 11    VERIFY call to the MCR from     Verifies call to MCR has been the ERO notification system has received.
1 1 VERIFY call to the MCR from the ERO notification system has been received within 10 minutes of activation.
been received within 10 minutes of activation.
Verifies call to MCR has been received. CUE A call to MCR from ERO Notification System was received by the Unit 2 Assist NSO one minute after the System was activated
CUE   A call to MCR from ERO Notification System was received by the Unit 2 Assist NSO one minute after the System was activated.
. 1 2 RECORD time the confirmation call was received.
12    RECORD time the confirmation     Time is recorded.
Time is recorded
call was received.
. 1 3 INFORM Shift Emergency Director that ERO has been activated.
13    INFORM Shift Emergency           SED/SM is informed Director that ERO has been activated.
SED/SM is informed   CUE The Shift Emergency Director acknowledges the activation of the ERO.
CUE   The Shift Emergency Director acknowledges the activation of the ERO.
CUE This JPM is complete
CUE   This JPM is complete.
. JPM Stop Time  
JPM Stop Time


JPM  
JPM  
Line 753: Line 812:
==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                     Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Activate Everbridge Notification JPM Number:
==Title:==
RA-d Revision Number:
EO         RO     SRO       FS STA/IA           SRO Cert JPM
0 0 Task Number and Title
 
R-ZP-002, Operate the EP communication systems K/A Number and Importance:
==Title:==
2.4.43 Imp Factor 3.2/3.8 Suggested Testing Environment:
Activate Everbridge Notification JPM Number: RA-d           Revision Number: 00 Task Number and
Simulator Alternate Path:
 
Yes No SRO Only: Yes No Time Critical:
==Title:==
Yes No Reference(s):
R-ZP-002, Operate the EP communication systems K/A Number and Importance: 2.4.43 Imp Factor 3.2/3.8 Suggested Testing Environment: Simulator Alternate Path:     Yes     No SRO Only:       Yes     No     Time Critical:     Yes     No Reference(s):
  "Correct Procedure Actual Testing Environment
* Correct Procedure Actual Testing Environment:         Simulator     Control Room           In-Plant     Other Testing Method:         Simulate       Perform Estimated Time to Complete: 10 minutes             Actual Time Used:             minutes EVALUATION  
: Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
1 0 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?         Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:         Satisfactory       Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                 (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                           Date:}}
Satisfactory Unsatisfactory Comments:                         Evaluator's Name
:   (Print) Evaluator's Signature
:   Date:}}

Latest revision as of 03:40, 5 February 2020

2016 Byron Nuclear Station Initial License Examination Administered RO Admin JPMs
ML16109A064
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/23/2016
From: Bielby M
Operations Branch III
To:
Exelon Nuclear
References
Download: ML16109A064 (34)


Text

Exelon Nuclear Job Performance Measure Perform Offsite AC Power Availability Surveillance (BT 5-6 & 12-13 OOS)

JPM Number: RA-a Revision Number: 1 Date: 9/24/2013 Revised By: Robert Peterson 2/12/2016 Instructor Date Validated By: Anthony Moreno 2/15/2016 SME or Instructor Date Approved By: Brian Lewin 2/15/2016 Facility Representative Date

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure 1BOSR 8.1.1-1 Rev: 010 Procedure Rev:

Procedure Rev:

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date

Revision Record (Summary)

Revision 0 New JPM, Alternate Path Revised for use of Rev 10 of 1BOSR 8.1.1-1

SIMULATOR SETUP INSTRUCTIONS

1) Reset to IC-18, 75% power.

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2) Place the control switches for BT 5-6 and BT 12-13 in PTL and place info cards on the disconnects and control switches.
3) When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
4) This completes the setup for this JPM.

INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 1 and Unit 2 are in Mode 1, steady state power.

INITIATING CUE

1. The 1A DG has been declared inoperable and the US has directed you to perform 1BOSR 8.1.1-1, Normal and Reserve Offsite AC Power Availability Weekly Surveillance.
2. The SM has signed and dated the 1BOSR 8.1.1-1 data package cover sheet.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps 2, 3, 4, 5 & 12 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE Provide examinee with a copy of 1BOSR 8.1.1-1 to complete.

1. Step F.1 Circle status of offsite At 0PM03J, OBSERVE bus power sources. alive lights, line amps, and MWs for all 345 KV lines:

° Line 0621 Note: The bus alive light alone is ° Line 0627 NOT adequate verification of bus status. ° Line 0624

° Line 0622

° CIRCLE energized for all 345 KV lines NOTE Alternate path is initiated in the following step.

At 0PM03J, INDICATE:

  • 2. Step F.2 Indicate status of disconnects, breakers and SAT
  • BT 5-6 breaker and links disconnects and BT 12-13 breaker and disconnects Cue: ACB 2412 GREEN light LIT are OPEN using O Cue: ACB 2422 GREEN light LIT
  • Removed SAT x-tie links Cue: ACB 2414 GREEN light LIT using O Cue: ACB 2424 GREEN light LIT Cue: Both units SAT x-tie links are
  • Closed disconnects, REMOVED breakers and installed SAT Cue: Both units SAT disconnect links using X links are INSTALLED
  • 3. Step F.3 Trace path along dashed TRACE path correctly on data lines from any energized offsite sheet:

power source to the unit ONE

  • Line energized, breakers SAT banks and disconnects closed
  • 4. Step F.4 Trace second path from TRACE SECOND path second independent power correctly on data sheet:

source to unit TWO SAT bank.

  • Line energized, breakers and disconnects closed

Comment ELEMENT STANDARD SAT UNSAT Number

  • 5. Step F.5 Verify independent paths Verify independent paths exist from offsite power thru
  • Two paths DO overlap
  • Circle NO for step 5 of data sheet o MAY notify US at this time CUE: If notified as US, or at step 13 of JPM, of acknowledge failure of failure of acceptance acceptance criteria and direct criteria.

candidate to complete the surveillance.

6. Step F.6 Check normal and At 0PM03J, VERIFY bus alive reserve 345 KV buses energized light and voltmeter indications for:
  • 345 KV bus 13 ENTER Yes for both closed bullets for step 6 on data sheet
7. Step F.7 Check normal and At 1/2PM01J, VERIFY X and reserve power SATs available Y winding MW and amps indication for:

CUE: U-2 SAT X & Y windings are

  • SATs 142-1 and 142-2 normal
  • SATs 242-1 and 242-2 ENTER Yes for both closed bullets for step 7 on data sheet
8. Step F.8 Check ESF buses 141 At 1PM01J, CHECK bus alive and 142 energized lights, SAT feeder breaker to bus position and bus voltmeter indication for:
  • Bus 141
  • Bus 142 ENTER Yes for both closed bullets for step 8 on data sheet

Comment ELEMENT STANDARD SAT UNSAT Number

9. Step F.9 CHECK ESF buses 241 At 2PM01J, CHECK bus alive and 242 energized lights, SAT feeder breaker to bus position and bus voltmeter indication for:

Cue: BUS 241 BUS ALIVE light is LIT and voltage is normal

  • Bus 241 Cue: BUS 242 BUS ALIVE light is
  • Bus 242 LIT and voltage is normal ENTER Yes for both closed bullets for step 9 on data sheet
10. Step F.10 Check SAT Feed At 1/2PM01J, VERIFY position breakers are closed and and control power available:

connected

  • ACB 1412
  • ACB 2412 Cue: ACB 2412 GREEN light LIT
  • ACB 1422
  • ACB 2422 Cue: ACB 2422 GREEN light LIT ENTER Yes for all closed bullets for step 10 on data sheet
11. Step F.11 Check SAT Reserve At 1/2PM01J, VERIFY position Feed breakers are closed and and control power available:

connected

  • ACB 1414
  • ACB 1424
  • ACB 2414 Cue: ACB 2414 GREEN light LIT
  • ACB 2424 Cue: ACB 2424 GREEN light LIT ENTER Yes for all closed bullets for step 11 on data sheet
  • 12. Step G Determine acceptance
  • DETERMINE acceptance criteria are NOT met criteria are NOT MET
13. Notify US that acceptance criteria
  • Notify US verbally or by are not met checking NO and writing in Cue: US has verified 1BOL 8.1 has Remarks on cover sheet.

been implemented.

Comment ELEMENT STANDARD SAT UNSAT Number Cue: This JPM is completed.

RECORD STOP TIME:

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Perform Offsite AC Power Availability Surveillance (BT 5-6 & 12-13 OOS)

JPM Number: RA-a (N-75c) Revision Number: 1 Task Number and

Title:

4C.AP-06 Perform the Offsite AC Power Availability Surveillance.

K/A Number and Importance: 2.1.31 4.6 / 4.3 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

1BOSR 8.1.1-1, Rev 10, Normal and Reserve Offsite AC Power Availability Weekly Surveillance CRITICAL STEPS (*) 2, 3, 4, 5 & 12 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 1 and Unit 2 are in Mode 1, steady state power.

INITIATING CUE

1. The 1A DG has been declared inoperable and the US has directed you to perform 1BOSR 8.1.1-1, Normal and Reserve Offsite AC Power Availability Weekly Surveillance.
2. The SM has signed and dated the 1BOSR 8.1.1-1 data package cover sheet.

Exelon Nuclear Job Performance Measure Evaluate Technical Specification Entry Conditions JPM Number: RA-b Revision Number: 00 Date: 11/17/2015 Developed By: Robert Peterson 11/17/2015 Instructor Date Validated By: J. Blumenthal 12/11/2015 SME or Instructor Date Approved By: B. Lewin 12/11/2015 Operations Representative Date

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

__RFP__ 1. Task description and number, JPM description and number are identified.

__RFP__ 2. Knowledge and Abilities (K/A) references are included.

__RFP__ 3. Performance location specified. (in-plant, control room, simulator, or other)

__RFP__ 4. Initial setup conditions are identified.

__RFP__ 5. Initiating cue (and terminating cue if required) are properly identified.

__RFP__ 6. Task standards identified and verified by SME review.

__RFP__ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

__RFP__ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BAR 1-1-B1 Rev: 2 Procedure BAR 1-1-E5 Rev: 5 Procedure 1BOSR MS-W1 Rev: 11 Procedure BOP MS-5 Rev: 19 Procedure BAR 1-5-B2 Rev: 1

__ RFP__ 9. Verify cues both verbal and visual are free of conflict.

__RFP__ 10. Verify performance time is accurate

__RFP__ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

__RFP___ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date

Revision Record (Summary)

Revision 0 Revised format to current standard Comment Resolution New JPM Provided documents:

1. BAR 1-1-B1: Place keep to step D and write below the setpoint: EO reports SFP temperature at 150°F and SFP level at 243.
2. BAR 1-5-B2: Place keep to step D and write below the setpoint: 1B pressure is 595 PSIG.
3. BAR 1-3-C3: Place keep to step D and write below the setpoint: EO reports spray add tank at 80%.
4. BAR 1-1-E5: Place keep to step D and write below the setpoint: EO reports 1D MSIV active accumulator at 4950 PSIG and standby accumulator at 4750 PSIG.

INITIAL CONDITIONS

1. You are the WEC NSO.
2. The unit is in MODE 1 INITIATING CUE
1. Given the provided marked up BARs, IDENTIFY any TS LCOs that are NOT met, and EXPLAIN the reason for your determination.

(Applicable Conditions and Required Actions are not required).

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps 2, 4 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

JPM Start Time Comment SAT UNSAT STEP ELEMENT STANDARD Number NOTE This steps in this JPM may be done in any order.

1 Evaluate Alarm 1-1-B1 SFP Identify as not Technical Temp Hi Specification related alarm.

CUE If requested, provide student copy of 1BOSR MS-W1 and/or BOP MS-5 2* Evaluate Alarm 1-1-E5, MSIV Identify TS 3.7.2 LCO is not 1D Hyd/Pneu Press Hi/Lo met for 1D MSIV Accumulator Standby Pressure Low 3 Evaluate Alarm 1-3-C3, Spray Identify that current Spray Add Add Tank Level Low Tank reading of 80% is above the T.S 3.6.7 required value of 78.6%.

4* Evaluate Alarm 1-5-B2, 1B SI Identify TS 3.5.1 LCO is not Accumulator Pressure Hi/Lo met for 1B SI Accumulator Pressure; pressure is LOW.

CUE This JPM is complete.

JPM Stop Time

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Evaluate Technical Specification Entry Conditions JPM Number: RA-b Revision Number: 00 Task Number and

Title:

R-AM-012, Apply Technical Specification Requirements K/A Number and Importance: 2.2.42 Imp Factor 3.9/4.6 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

  • BAR 1-1-B1, Rev: 2
  • BAR 1-1-E5, Rev: 5
  • BAR 1-5-B2, Rev: 1
  • BOP MS-5, Rev: 19
  • 1BOSR MS-W1, Rev: 11 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 20 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

INITIAL CONDITIONS

1. You are the WEC NSO.
2. The unit is in MODE 1 INITIATING CUE
1. Given the provided marked up BARs, IDENTIFY any TS LCOs that are NOT met, and EXPLAIN the reason for your determination.

(Applicable Conditions and Required Actions are not required).

Formatted: Font: New Century Schoolbook Formatted: Centered, Space Before: 0 pt, After: 6 pt, Tab stops: 1.25", Right + 1.38", Left + 4.63", Left + 5.13",

Right + 5.25", Left + 6", Left

Exelon Nuclear Job Performance Measure Change RM-11 Setpoints in Preparation for a Unit 1 Containment Release JPM Number: RA-c Revision Number: 0 Date: 11/30/2015 Revised By: R. Peterson 11/30/2015 Instructor Date Validated By: J. Blumenthal 12/11/2015 SME or Instructor Date Approved By: B. Lewin 12/11/2015 Operations Representative Date

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

__RFP__ 1. Task description and number, JPM description and number are identified.

__RFP__ 2. Knowledge and Abilities (K/A) references are included.

__RFP__ 3. Performance location specified. (in-plant, control room, simulator, or other)

__RFP__ 4. Initial setup conditions are identified.

__RFP__ 5. Initiating cue (and terminating cue if required) are properly identified.

__RFP__ 6. Task standards identified and verified by SME review.

__RFP__ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

__RFP__ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BCP 400-TCNMT/ROUTINE Rev: 27 Procedure Rev:

Procedure Rev:

__RFP__ 9. Verify cues both verbal and visual are free of conflict.

__RFP__ 10. Verify performance time is accurate

__RFP__ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

__RFP__ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

B. Lewin/R. Peterson 12/11/2015 SME / Instructor Date SME / Instructor Date

Revision Record (Summary)

Revision 0 Generated New JPM for new RMS System and BCP 400-TCNMT/Routine revision from RA-3 rev 5.

SIMULATOR SETUP INSTRUCTIONS NOTE: It is okay to use a similar IC to the IC listed, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

1. Reset to IC-22
2. Ensure that either the 0A or 0B Aux Building Exhaust Fan is in operation.
3. Verify that the RMS values for the appropriate channels agree with the surveillance paperwork.
4. Enter indication for Noble gas trend for 1PR11J (1PB111) on RMS as 4.684 E-06 by entering in expert mode: ramp rmr1pr11b .00000486 .00000486 7200
5. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
6. This completes the setup for this JPM

INITIAL CONDITIONS

1. You are the Unit 1 Assist NSO.
2. A Unit 1 Containment release is pending.
3. 1RE-PR011 is not and has not been in LCOAR since beginning BCP preparations.
4. Daily Channel Checks of 1RE-PR001 has been performed Satisfactory per 0BOSR 0.1-0.
5. 1BOSR 11.b.6-1, Radioactive Gaseous Effluent Monitoring Instrumentation Surv.

CNMT Purge Effluent (1(2)PR01J Source/Channel Check) has been completed and has been reviewed as Satisfactory.

INITIATING CUE You have been instructed to perform Section 4 of BCP 400-TCNMT/ROUTINE in preparation for this release.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps. (6, 7, 8, 9, 10, 11, 12, 13)

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE To initiate this JPM, hand the partially completed BCP 400-TCNMT/ROUTINE and Pre-Release Permit Report to the examinee.

1. Refer to the partially completed ° REVIEW BCP 400-BCP 400-TCNMT/ROUTINE TCNMT/ROUTINE for completeness up to Section 4
2. Step 4.2.1.1 Complete daily ° VERIFY/COMPLETE the channel checks daily channel check on 1RE-PR001 Cue: The daily channel check of 1RE-PR001 has been performed satisfactorily
3. Step 4.2.1.2 Perform ° PERFORM the 1PR01J Source/Channel check source/channel check Cue: 1BOSR 11.b.6-1 has been completed and reviewed satisfactorily.
4. Step 4.2.1.3 Noble gas trend for ° VERIFY noble gas trend 1PR11J (1PB111) from 1PB111 has not increased by >10% from current reading on Gaseous Pre-release Permit Report
5. Step 4.2.1.4 As Found setpoints At the RMS, RECORD As of 1RE-PR001 Found setpoints of 1RE-PR001 Gas Channel:

° High alarm setpoint

° Alert alarm setpoint

  • 6. Step 4.2.1.5 RMS supervisory At the RMS:

mode

  • PLACE RMS in Supervisory Mode by clicking on Mode Select Button

Comment ELEMENT STANDARD SAT UNSAT Number

  • 7. Step 4.2.1.6 Select monitor At the RMS, Grid 2:

o SELECT 1PB101

  • 8. Step 4.2.1.7 Select high alarm At the RMS:

setpoint channel

  • SELECT Channel ITEMS
  • SELECT 9
  • 9. Step 4.2.1.8-11 High alarm At the RMS:

setpoint

  • ENTER high alarm setpoint Note: The setpoint to be entered is on 1PB101 5.855 E-04 o SELECT Save o SELECT Yes
  • RECORD new value Cue: Your request for verification
  • Request verification is acknowledged, please continue.

NOTE: The next steps repeat Steps 4.2.1.5-11 for the Alert Alarm setpoint.

  • 10. RMS supervisory mode At the RMS:

Note: This step may be met per o VERIFY/PLACE RMS in step 6 above. Supervisory Mode by clicking on Mode Select Button

  • 11. Select monitor At the RMS, Grid 2:

Note: This step may be met per o VERIFY/SELECT 1PB101 step 7 above.

  • 12. Select Alert alarm setpoint At the RMS:

channel

  • VERIFY/SELECT Channel ITEMS
  • SELECT 10

Comment ELEMENT STANDARD SAT UNSAT Number

  • 13. Select Alert alarm channel At the RMS:

Note: The setpoint to be entered is

  • ENTER Alert alarm 3.14 E-04. setpoint on 1PB101 o SELECT Save o SELECT Yes
  • RECORD new value Cue: Your request for verification ° Request verification is acknowledged, please continue.
14. Step 4.2.1.13 Place the RMS in At the RMS:

Normal Mode

° PLACE the RMS in NORMAL MODE by clicking on Mode Select Button

15. Step 4.3 Aux building exhaust fan At 0PM02J:

status

° ENSURE the 0A OR 0B Aux Building Exhaust Fan is in operation

16. Turn in Package for approval Hand in Release package to Unit Supervisor for approval.

Cue: The US will continue at step 5.

Cue: This JPM is completed.

RECORD STOP TIME:

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Change RM-11 Setpoints in Preparation for a Unit 1 Containment Release JPM Number: RA-c Revision Number: 0 Task Number and

Title:

4C.GW-01 PERFORM a Gaseous Release.

K/A Number and Importance: Generic 2.3.5 2.9/2.9 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

  • BCP 400-TCNMT/ROUTINE, Gaseous Effluent Release Form Type: Routine Containment Release (Rev. 27)

CRITICAL STEPS (*) 6, 7, 8, 9, 10, 11, 12 & 13 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

INITIAL CONDITIONS

1. You are the Unit 1 Assist NSO.
2. A Unit 1 Containment release is pending.
3. 1RE-PR011 is not and has not been in LCOAR since beginning BCP preparations.
4. Daily Channel Checks of 1RE-PR001 has been performed Satisfactory per 0BOSR 0.1-0.
5. 1BOSR 11.b.6-1, Radioactive Gaseous Effluent Monitoring Instrumentation Surv.

CNMT Purge Effluent (1(2)PR01J Source/Channel Check) has been completed and has been reviewed as Satisfactory.

INITIATING CUE

1. You have been instructed to perform Section 4 of BCP 400-TCNMT/ROUTINE in preparation for this release.

RA-d Exelon Nuclear Job Performance Measure Activate Everbridge Notification JPM Number: RA-d Revision Number: 00 Date: 11/17/2015 Developed By: Robert Peterson 11/17/2015 Instructor Date Validated By: J. Blumenthal 12/11/2015 SME or Instructor Date Approved By: B. Lewin 12/11/2015 Operations Representative Date

RA-d INITIAL CONDITIONS

1. You are the WEC NSO.
2. The SM has declared an ALERT condition for Unit 1, and has assigned you to activate the ERO on site.

INITIATING CUE

1. Activate the ERO using Everbridge on the World Wide Web.

RA-d JPM Start Time Comment STEP ELEMENT STANDARD SAT UNSAT Number CUE Provide copy of Correct Procedure to examinee as this would be provided by the Emergency Director.

1 Refer to Correct Procedure. Locate and read Correct Procedure.

2 Circle or otherwise indicate Circle (Byron ID number) for Byron Member ID and ID and password.

password.

3 Circle or otherwise indicate Circle Scenario 1.

appropriate Activation Scenario.

4* Open Everbridge shortcut from Everbridge application open on the computer desktop or via the the computer.

internet address (URL as given in step 1.3)

CUE CAUTION:

Tell examinee to log out of Everbridge, then take their hand away from the mouse.

    • DO NOT continue making entries in Everbridge, as this may ACTIVATE the system.

CUE Provide the examinee Screen Shot #1 (Login Screen), tell the examinee to record the appropriate data and describe the actions they will take on the provided Screen Shots, and to WRITE the information they would type, and to CIRCLE or X over buttons they would click on.

5* Type in Byron ID. Type (Byron ID number) in Member ID.

6* Type in Password. Type (Byron ID number) in Password.

7* Select Enter or Go. Swap screen to Scenario List.

CUE Provide the examinee Screen Shot #2 (Scenario Screen), tell the examinee describe the actions they will take on the provided Screen Shots.

RA-d Comment STEP ELEMENT STANDARD SAT UNSAT Number 8* Examinee discusses which Examinee would select Scenario would be selected. Scenario 1, Actual Event Response to Facility For Alert CUE Provide the examinee Screen Shot #3 (Active Scenario Screen), tell the examinee describe the actions they will take on the provided Screen Shots.

9* Verify Active Scenario Screen Examinee will send message.

is displayed CUE Provide the examinee Screen Shot #4 (Active Scenario Broadcasts), tell the examinee describe the actions they will take on the provided Screen Shots.

10 Verify Active Scenario Examinee will log out.

Broadcasts is displayed 11 VERIFY call to the MCR from Verifies call to MCR has been the ERO notification system has received.

been received within 10 minutes of activation.

CUE A call to MCR from ERO Notification System was received by the Unit 2 Assist NSO one minute after the System was activated.

12 RECORD time the confirmation Time is recorded.

call was received.

13 INFORM Shift Emergency SED/SM is informed Director that ERO has been activated.

CUE The Shift Emergency Director acknowledges the activation of the ERO.

CUE This JPM is complete.

JPM Stop Time

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Activate Everbridge Notification JPM Number: RA-d Revision Number: 00 Task Number and

Title:

R-ZP-002, Operate the EP communication systems K/A Number and Importance: 2.4.43 Imp Factor 3.2/3.8 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

  • Correct Procedure Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Exelon Nuclear Job Performance Measure Perform Offsite AC Power Availability Surveillance (BT 5-6 & 12-13 OOS)

JPM Number: RA-a Revision Number: 1 Date: 9/24/2013 Revised By: Robert Peterson 2/12/2016 Instructor Date Validated By: Anthony Moreno 2/15/2016 SME or Instructor Date Approved By: Brian Lewin 2/15/2016 Facility Representative Date

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure 1BOSR 8.1.1-1 Rev: 010 Procedure Rev:

Procedure Rev:

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date

Revision Record (Summary)

Revision 0 New JPM, Alternate Path Revised for use of Rev 10 of 1BOSR 8.1.1-1

SIMULATOR SETUP INSTRUCTIONS

1) Reset to IC-18, 75% power.

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2) Place the control switches for BT 5-6 and BT 12-13 in PTL and place info cards on the disconnects and control switches.
3) When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
4) This completes the setup for this JPM.

INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 1 and Unit 2 are in Mode 1, steady state power.

INITIATING CUE

1. The 1A DG has been declared inoperable and the US has directed you to perform 1BOSR 8.1.1-1, Normal and Reserve Offsite AC Power Availability Weekly Surveillance.
2. The SM has signed and dated the 1BOSR 8.1.1-1 data package cover sheet.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps 2, 3, 4, 5 & 12 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE Provide examinee with a copy of 1BOSR 8.1.1-1 to complete.

1. Step F.1 Circle status of offsite At 0PM03J, OBSERVE bus power sources. alive lights, line amps, and MWs for all 345 KV lines:

° Line 0621 Note: The bus alive light alone is ° Line 0627 NOT adequate verification of bus status. ° Line 0624

° Line 0622

° CIRCLE energized for all 345 KV lines NOTE Alternate path is initiated in the following step.

At 0PM03J, INDICATE:

  • 2. Step F.2 Indicate status of disconnects, breakers and SAT
  • BT 5-6 breaker and links disconnects and BT 12-13 breaker and disconnects Cue: ACB 2412 GREEN light LIT are OPEN using O Cue: ACB 2422 GREEN light LIT
  • Removed SAT x-tie links Cue: ACB 2414 GREEN light LIT using O Cue: ACB 2424 GREEN light LIT Cue: Both units SAT x-tie links are
  • Closed disconnects, REMOVED breakers and installed SAT Cue: Both units SAT disconnect links using X links are INSTALLED
  • 3. Step F.3 Trace path along dashed TRACE path correctly on data lines from any energized offsite sheet:

power source to the unit ONE

  • Line energized, breakers SAT banks and disconnects closed
  • 4. Step F.4 Trace second path from TRACE SECOND path second independent power correctly on data sheet:

source to unit TWO SAT bank.

  • Line energized, breakers and disconnects closed

Comment ELEMENT STANDARD SAT UNSAT Number

  • 5. Step F.5 Verify independent paths Verify independent paths exist from offsite power thru
  • Two paths DO overlap
  • Circle NO for step 5 of data sheet o MAY notify US at this time CUE: If notified as US, or at step 13 of JPM, of acknowledge failure of failure of acceptance acceptance criteria and direct criteria.

candidate to complete the surveillance.

6. Step F.6 Check normal and At 0PM03J, VERIFY bus alive reserve 345 KV buses energized light and voltmeter indications for:
  • 345 KV bus 13 ENTER Yes for both closed bullets for step 6 on data sheet
7. Step F.7 Check normal and At 1/2PM01J, VERIFY X and reserve power SATs available Y winding MW and amps indication for:

CUE: U-2 SAT X & Y windings are

  • SATs 142-1 and 142-2 normal
  • SATs 242-1 and 242-2 ENTER Yes for both closed bullets for step 7 on data sheet
8. Step F.8 Check ESF buses 141 At 1PM01J, CHECK bus alive and 142 energized lights, SAT feeder breaker to bus position and bus voltmeter indication for:
  • Bus 141
  • Bus 142 ENTER Yes for both closed bullets for step 8 on data sheet

Comment ELEMENT STANDARD SAT UNSAT Number

9. Step F.9 CHECK ESF buses 241 At 2PM01J, CHECK bus alive and 242 energized lights, SAT feeder breaker to bus position and bus voltmeter indication for:

Cue: BUS 241 BUS ALIVE light is LIT and voltage is normal

  • Bus 241 Cue: BUS 242 BUS ALIVE light is
  • Bus 242 LIT and voltage is normal ENTER Yes for both closed bullets for step 9 on data sheet
10. Step F.10 Check SAT Feed At 1/2PM01J, VERIFY position breakers are closed and and control power available:

connected

  • ACB 1412
  • ACB 2412 Cue: ACB 2412 GREEN light LIT
  • ACB 1422
  • ACB 2422 Cue: ACB 2422 GREEN light LIT ENTER Yes for all closed bullets for step 10 on data sheet
11. Step F.11 Check SAT Reserve At 1/2PM01J, VERIFY position Feed breakers are closed and and control power available:

connected

  • ACB 1414
  • ACB 1424
  • ACB 2414 Cue: ACB 2414 GREEN light LIT
  • ACB 2424 Cue: ACB 2424 GREEN light LIT ENTER Yes for all closed bullets for step 11 on data sheet
  • 12. Step G Determine acceptance
  • DETERMINE acceptance criteria are NOT met criteria are NOT MET
13. Notify US that acceptance criteria
  • Notify US verbally or by are not met checking NO and writing in Cue: US has verified 1BOL 8.1 has Remarks on cover sheet.

been implemented.

Comment ELEMENT STANDARD SAT UNSAT Number Cue: This JPM is completed.

RECORD STOP TIME:

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Perform Offsite AC Power Availability Surveillance (BT 5-6 & 12-13 OOS)

JPM Number: RA-a (N-75c) Revision Number: 1 Task Number and

Title:

4C.AP-06 Perform the Offsite AC Power Availability Surveillance.

K/A Number and Importance: 2.1.31 4.6 / 4.3 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

1BOSR 8.1.1-1, Rev 10, Normal and Reserve Offsite AC Power Availability Weekly Surveillance CRITICAL STEPS (*) 2, 3, 4, 5 & 12 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 1 and Unit 2 are in Mode 1, steady state power.

INITIATING CUE

1. The 1A DG has been declared inoperable and the US has directed you to perform 1BOSR 8.1.1-1, Normal and Reserve Offsite AC Power Availability Weekly Surveillance.
2. The SM has signed and dated the 1BOSR 8.1.1-1 data package cover sheet.

Exelon Nuclear Job Performance Measure Evaluate Technical Specification Entry Conditions JPM Number: RA-b Revision Number: 00 Date: 11/17/2015 Developed By: Robert Peterson 11/17/2015 Instructor Date Validated By: J. Blumenthal 12/11/2015 SME or Instructor Date Approved By: B. Lewin 12/11/2015 Operations Representative Date

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

__RFP__ 1. Task description and number, JPM description and number are identified.

__RFP__ 2. Knowledge and Abilities (K/A) references are included.

__RFP__ 3. Performance location specified. (in-plant, control room, simulator, or other)

__RFP__ 4. Initial setup conditions are identified.

__RFP__ 5. Initiating cue (and terminating cue if required) are properly identified.

__RFP__ 6. Task standards identified and verified by SME review.

__RFP__ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

__RFP__ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BAR 1-1-B1 Rev: 2 Procedure BAR 1-1-E5 Rev: 5 Procedure 1BOSR MS-W1 Rev: 11 Procedure BOP MS-5 Rev: 19 Procedure BAR 1-5-B2 Rev: 1

__ RFP__ 9. Verify cues both verbal and visual are free of conflict.

__RFP__ 10. Verify performance time is accurate

__RFP__ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

__RFP___ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date

Revision Record (Summary)

Revision 0 Revised format to current standard Comment Resolution New JPM Provided documents:

1. BAR 1-1-B1: Place keep to step D and write below the setpoint: EO reports SFP temperature at 150°F and SFP level at 243.
2. BAR 1-5-B2: Place keep to step D and write below the setpoint: 1B pressure is 595 PSIG.
3. BAR 1-3-C3: Place keep to step D and write below the setpoint: EO reports spray add tank at 80%.
4. BAR 1-1-E5: Place keep to step D and write below the setpoint: EO reports 1D MSIV active accumulator at 4950 PSIG and standby accumulator at 4750 PSIG.

INITIAL CONDITIONS

1. You are the WEC NSO.
2. The unit is in MODE 1 INITIATING CUE
1. Given the provided marked up BARs, IDENTIFY any TS LCOs that are NOT met, and EXPLAIN the reason for your determination.

(Applicable Conditions and Required Actions are not required).

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps 2, 4 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

JPM Start Time Comment SAT UNSAT STEP ELEMENT STANDARD Number NOTE This steps in this JPM may be done in any order.

1 Evaluate Alarm 1-1-B1 SFP Identify as not Technical Temp Hi Specification related alarm.

CUE If requested, provide student copy of 1BOSR MS-W1 and/or BOP MS-5 2* Evaluate Alarm 1-1-E5, MSIV Identify TS 3.7.2 LCO is not 1D Hyd/Pneu Press Hi/Lo met for 1D MSIV Accumulator Standby Pressure Low 3 Evaluate Alarm 1-3-C3, Spray Identify that current Spray Add Add Tank Level Low Tank reading of 80% is above the T.S 3.6.7 required value of 78.6%.

4* Evaluate Alarm 1-5-B2, 1B SI Identify TS 3.5.1 LCO is not Accumulator Pressure Hi/Lo met for 1B SI Accumulator Pressure; pressure is LOW.

CUE This JPM is complete.

JPM Stop Time

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Evaluate Technical Specification Entry Conditions JPM Number: RA-b Revision Number: 00 Task Number and

Title:

R-AM-012, Apply Technical Specification Requirements K/A Number and Importance: 2.2.42 Imp Factor 3.9/4.6 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

  • BAR 1-1-B1, Rev: 2
  • BAR 1-1-E5, Rev: 5
  • BAR 1-5-B2, Rev: 1
  • BOP MS-5, Rev: 19
  • 1BOSR MS-W1, Rev: 11 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 20 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

INITIAL CONDITIONS

1. You are the WEC NSO.
2. The unit is in MODE 1 INITIATING CUE
1. Given the provided marked up BARs, IDENTIFY any TS LCOs that are NOT met, and EXPLAIN the reason for your determination.

(Applicable Conditions and Required Actions are not required).

Formatted: Font: New Century Schoolbook Formatted: Centered, Space Before: 0 pt, After: 6 pt, Tab stops: 1.25", Right + 1.38", Left + 4.63", Left + 5.13",

Right + 5.25", Left + 6", Left

Exelon Nuclear Job Performance Measure Change RM-11 Setpoints in Preparation for a Unit 1 Containment Release JPM Number: RA-c Revision Number: 0 Date: 11/30/2015 Revised By: R. Peterson 11/30/2015 Instructor Date Validated By: J. Blumenthal 12/11/2015 SME or Instructor Date Approved By: B. Lewin 12/11/2015 Operations Representative Date

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

__RFP__ 1. Task description and number, JPM description and number are identified.

__RFP__ 2. Knowledge and Abilities (K/A) references are included.

__RFP__ 3. Performance location specified. (in-plant, control room, simulator, or other)

__RFP__ 4. Initial setup conditions are identified.

__RFP__ 5. Initiating cue (and terminating cue if required) are properly identified.

__RFP__ 6. Task standards identified and verified by SME review.

__RFP__ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

__RFP__ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BCP 400-TCNMT/ROUTINE Rev: 27 Procedure Rev:

Procedure Rev:

__RFP__ 9. Verify cues both verbal and visual are free of conflict.

__RFP__ 10. Verify performance time is accurate

__RFP__ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

__RFP__ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

B. Lewin/R. Peterson 12/11/2015 SME / Instructor Date SME / Instructor Date

Revision Record (Summary)

Revision 0 Generated New JPM for new RMS System and BCP 400-TCNMT/Routine revision from RA-3 rev 5.

SIMULATOR SETUP INSTRUCTIONS NOTE: It is okay to use a similar IC to the IC listed, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

1. Reset to IC-22
2. Ensure that either the 0A or 0B Aux Building Exhaust Fan is in operation.
3. Verify that the RMS values for the appropriate channels agree with the surveillance paperwork.
4. Enter indication for Noble gas trend for 1PR11J (1PB111) on RMS as 4.684 E-06 by entering in expert mode: ramp rmr1pr11b .00000486 .00000486 7200
5. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
6. This completes the setup for this JPM

INITIAL CONDITIONS

1. You are the Unit 1 Assist NSO.
2. A Unit 1 Containment release is pending.
3. 1RE-PR011 is not and has not been in LCOAR since beginning BCP preparations.
4. Daily Channel Checks of 1RE-PR001 has been performed Satisfactory per 0BOSR 0.1-0.
5. 1BOSR 11.b.6-1, Radioactive Gaseous Effluent Monitoring Instrumentation Surv.

CNMT Purge Effluent (1(2)PR01J Source/Channel Check) has been completed and has been reviewed as Satisfactory.

INITIATING CUE You have been instructed to perform Section 4 of BCP 400-TCNMT/ROUTINE in preparation for this release.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps. (6, 7, 8, 9, 10, 11, 12, 13)

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE To initiate this JPM, hand the partially completed BCP 400-TCNMT/ROUTINE and Pre-Release Permit Report to the examinee.

1. Refer to the partially completed ° REVIEW BCP 400-BCP 400-TCNMT/ROUTINE TCNMT/ROUTINE for completeness up to Section 4
2. Step 4.2.1.1 Complete daily ° VERIFY/COMPLETE the channel checks daily channel check on 1RE-PR001 Cue: The daily channel check of 1RE-PR001 has been performed satisfactorily
3. Step 4.2.1.2 Perform ° PERFORM the 1PR01J Source/Channel check source/channel check Cue: 1BOSR 11.b.6-1 has been completed and reviewed satisfactorily.
4. Step 4.2.1.3 Noble gas trend for ° VERIFY noble gas trend 1PR11J (1PB111) from 1PB111 has not increased by >10% from current reading on Gaseous Pre-release Permit Report
5. Step 4.2.1.4 As Found setpoints At the RMS, RECORD As of 1RE-PR001 Found setpoints of 1RE-PR001 Gas Channel:

° High alarm setpoint

° Alert alarm setpoint

  • 6. Step 4.2.1.5 RMS supervisory At the RMS:

mode

  • PLACE RMS in Supervisory Mode by clicking on Mode Select Button

Comment ELEMENT STANDARD SAT UNSAT Number

  • 7. Step 4.2.1.6 Select monitor At the RMS, Grid 2:

o SELECT 1PB101

  • 8. Step 4.2.1.7 Select high alarm At the RMS:

setpoint channel

  • SELECT Channel ITEMS
  • SELECT 9
  • 9. Step 4.2.1.8-11 High alarm At the RMS:

setpoint

  • ENTER high alarm setpoint Note: The setpoint to be entered is on 1PB101 5.855 E-04 o SELECT Save o SELECT Yes
  • RECORD new value Cue: Your request for verification
  • Request verification is acknowledged, please continue.

NOTE: The next steps repeat Steps 4.2.1.5-11 for the Alert Alarm setpoint.

  • 10. RMS supervisory mode At the RMS:

Note: This step may be met per o VERIFY/PLACE RMS in step 6 above. Supervisory Mode by clicking on Mode Select Button

  • 11. Select monitor At the RMS, Grid 2:

Note: This step may be met per o VERIFY/SELECT 1PB101 step 7 above.

  • 12. Select Alert alarm setpoint At the RMS:

channel

  • VERIFY/SELECT Channel ITEMS
  • SELECT 10

Comment ELEMENT STANDARD SAT UNSAT Number

  • 13. Select Alert alarm channel At the RMS:

Note: The setpoint to be entered is

  • ENTER Alert alarm 3.14 E-04. setpoint on 1PB101 o SELECT Save o SELECT Yes
  • RECORD new value Cue: Your request for verification ° Request verification is acknowledged, please continue.
14. Step 4.2.1.13 Place the RMS in At the RMS:

Normal Mode

° PLACE the RMS in NORMAL MODE by clicking on Mode Select Button

15. Step 4.3 Aux building exhaust fan At 0PM02J:

status

° ENSURE the 0A OR 0B Aux Building Exhaust Fan is in operation

16. Turn in Package for approval Hand in Release package to Unit Supervisor for approval.

Cue: The US will continue at step 5.

Cue: This JPM is completed.

RECORD STOP TIME:

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Change RM-11 Setpoints in Preparation for a Unit 1 Containment Release JPM Number: RA-c Revision Number: 0 Task Number and

Title:

4C.GW-01 PERFORM a Gaseous Release.

K/A Number and Importance: Generic 2.3.5 2.9/2.9 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

  • BCP 400-TCNMT/ROUTINE, Gaseous Effluent Release Form Type: Routine Containment Release (Rev. 27)

CRITICAL STEPS (*) 6, 7, 8, 9, 10, 11, 12 & 13 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

INITIAL CONDITIONS

1. You are the Unit 1 Assist NSO.
2. A Unit 1 Containment release is pending.
3. 1RE-PR011 is not and has not been in LCOAR since beginning BCP preparations.
4. Daily Channel Checks of 1RE-PR001 has been performed Satisfactory per 0BOSR 0.1-0.
5. 1BOSR 11.b.6-1, Radioactive Gaseous Effluent Monitoring Instrumentation Surv.

CNMT Purge Effluent (1(2)PR01J Source/Channel Check) has been completed and has been reviewed as Satisfactory.

INITIATING CUE

1. You have been instructed to perform Section 4 of BCP 400-TCNMT/ROUTINE in preparation for this release.

RA-d Exelon Nuclear Job Performance Measure Activate Everbridge Notification JPM Number: RA-d Revision Number: 00 Date: 11/17/2015 Developed By: Robert Peterson 11/17/2015 Instructor Date Validated By: J. Blumenthal 12/11/2015 SME or Instructor Date Approved By: B. Lewin 12/11/2015 Operations Representative Date

RA-d INITIAL CONDITIONS

1. You are the WEC NSO.
2. The SM has declared an ALERT condition for Unit 1, and has assigned you to activate the ERO on site.

INITIATING CUE

1. Activate the ERO using Everbridge on the World Wide Web.

RA-d JPM Start Time Comment STEP ELEMENT STANDARD SAT UNSAT Number CUE Provide copy of Correct Procedure to examinee as this would be provided by the Emergency Director.

1 Refer to Correct Procedure. Locate and read Correct Procedure.

2 Circle or otherwise indicate Circle (Byron ID number) for Byron Member ID and ID and password.

password.

3 Circle or otherwise indicate Circle Scenario 1.

appropriate Activation Scenario.

4* Open Everbridge shortcut from Everbridge application open on the computer desktop or via the the computer.

internet address (URL as given in step 1.3)

CUE CAUTION:

Tell examinee to log out of Everbridge, then take their hand away from the mouse.

    • DO NOT continue making entries in Everbridge, as this may ACTIVATE the system.

CUE Provide the examinee Screen Shot #1 (Login Screen), tell the examinee to record the appropriate data and describe the actions they will take on the provided Screen Shots, and to WRITE the information they would type, and to CIRCLE or X over buttons they would click on.

5* Type in Byron ID. Type (Byron ID number) in Member ID.

6* Type in Password. Type (Byron ID number) in Password.

7* Select Enter or Go. Swap screen to Scenario List.

CUE Provide the examinee Screen Shot #2 (Scenario Screen), tell the examinee describe the actions they will take on the provided Screen Shots.

RA-d Comment STEP ELEMENT STANDARD SAT UNSAT Number 8* Examinee discusses which Examinee would select Scenario would be selected. Scenario 1, Actual Event Response to Facility For Alert CUE Provide the examinee Screen Shot #3 (Active Scenario Screen), tell the examinee describe the actions they will take on the provided Screen Shots.

9* Verify Active Scenario Screen Examinee will send message.

is displayed CUE Provide the examinee Screen Shot #4 (Active Scenario Broadcasts), tell the examinee describe the actions they will take on the provided Screen Shots.

10 Verify Active Scenario Examinee will log out.

Broadcasts is displayed 11 VERIFY call to the MCR from Verifies call to MCR has been the ERO notification system has received.

been received within 10 minutes of activation.

CUE A call to MCR from ERO Notification System was received by the Unit 2 Assist NSO one minute after the System was activated.

12 RECORD time the confirmation Time is recorded.

call was received.

13 INFORM Shift Emergency SED/SM is informed Director that ERO has been activated.

CUE The Shift Emergency Director acknowledges the activation of the ERO.

CUE This JPM is complete.

JPM Stop Time

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Activate Everbridge Notification JPM Number: RA-d Revision Number: 00 Task Number and

Title:

R-ZP-002, Operate the EP communication systems K/A Number and Importance: 2.4.43 Imp Factor 3.2/3.8 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

  • Correct Procedure Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date: