{{#Wiki_filter:In Plant JPM P1 Facility:             Davis-Besse   Task No: 001-043-05-0100               Task Title
{{#Wiki_filter:In Plant JPM P1
:      Trip Reactor From #2 Low Voltage Switchgear Room       K/A  
 
Facility:         Davis-Besse                           Task No: 001-043-05-0100 Task
 
==Title:==
Trip Reactor From #2 Low Voltage Switchgear Room K/A  


==Reference:==
==Reference:==
(001) A2.11 4.4/4.7       Job Performance Measure No
(001) A2.11 4.4/4.7     Job Performance Measure No:           P1 (JPM 042)
:   P1 (JPM 042)   Examinee:           NRC Examiner:       Date:       Method of testing:
Examinee:
Simulated Performance __ X _   Actual Performance ___ Classroom ___   Simulator _ _   Plant _ X __
NRC Examiner:                                                           Date:
Method of testing:
Simulated Performance __ X _                             Actual Performance ___
Classroom ___                     Simulator _ _               Plant _ X __
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Line 29: Line 36:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Task Standard:
Trip Reactor by manually tripping Reactor Trip Breakers in the Low Voltage Switchgear Rooms Required Materials:
Trip Reactor by manually tripping Reactor Trip Breakers in the Low Voltage Switchgear Rooms Required Materials:
DB-OP-02000 Section 3, step 3.3 General  
DB-OP-02000 Section 3, step 3.3 General  


==References:==
==References:==


None Initiating Cue:
None Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task: No Alternate Path: No Validation Time: 6 minutes


Time Critical Task:
EXAMINER COPY INITIAL CONDITIONS:
No Alternate Path:
The plant has just experienced a severe transient causing a reactor trip signal to be generated.
No Validation Time:
6 minutes EXAMINER COPY INITIAL CONDITIONS: The plant has just experienced a severe transient causing a reactor trip signal to be generated.
The reactor did not trip.
The reactor did not trip.
Control power problems have prevented the Control Room from deenergizing E2 and F2.
Control power problems have prevented the Control Room from deenergizing E2 and F2.
INITIATING CUES
INITIATING CUES:
: The Unit Supervisor directs you to proceed to the Low Voltage Switchgear Rooms to deenergize the Control Rod Drive system by manually tripping Reactor Trip Breakers in accordance with Step 3.3 of DB
The Unit Supervisor directs you to proceed to the Low Voltage Switchgear Rooms to deenergize the Control Rod Drive system by manually tripping Reactor Trip Breakers in accordance with Step 3.3 of DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture.
-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture.
(Hand copy of DB-OP-02000 step 3.3 to the examinee)


(Hand copy of DB
CANDIDATE COPY INITIAL CONDITIONS:
-OP-02000 step 3.3 to the examinee)
The plant has just experienced a severe transient causing a reactor trip signal to be generated.
 
CANDIDATE COPY INITIAL CONDITIONS
The plant has just experienced a severe transient causing a reactor trip signal to be generated.
The reactor did not trip.
The reactor did not trip.
Control power problems have prevented the Control Room from deenergizing E2 and F2.
Control power problems have prevented the Control Room from deenergizing E2 and F2.
INITIATING CUES
INITIATING CUES:
: The Unit Supervisor directs you to proceed to the Low Voltage Switchgear Rooms to deenergize the Control Rod Drive by manually tripping Reactor Trip Breakers in accordance with Step 3.3 of DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture.
The Unit Supervisor directs you to proceed to the Low Voltage Switchgear Rooms to deenergize the Control Rod Drive by manually tripping Reactor Trip Breakers in accordance with Step 3.3 of DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture.


PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
START TIME: _______
: 1. PERFORMANCE STEP:
: 1. PERFORMANCE STEP: Recognize the correct procedure step.
Recognize the correct procedure step.
STANDARD: Recognize DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture, Step 3.3 RNO as correct procedure step CUE: None SAT UNSAT
STANDARD: Recognize DB
: 2. PERFORMANCE STEP: Trip Control Rod Drive Breaker A STANDARD: Push the TRIP pushbutton on Control Rod Drive Breaker A and observe the Green Trip flag is visible COMMENT: Performance Note - Performance steps 2, 3, and 4 may be performed in any order, but TRIPPING Control Rod Drive Breaker B and Control Rod Drive Breaker C are required to obtain desired response.
-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture, Step 3.3 RNO as correct procedure step   CUE: None       __________
SAT UNSAT
: 2. PERFORMANCE STEP: Trip Control Rod Drive Breaker A     STANDARD: Push the TRIP pushbutton on Control Rod Drive Breaker A and observe the Green Trip flag is vis ible COMMENT: Performance Note - Performance steps 2, 3, and 4 may be performed in any order, but TRIPPING Control Rod Drive Breaker B and Control Rod Drive  
 
Breaker C are required to obtain desired response.
 
CUE: Trip pushbutton has been pushed on Control Rod Drive Breaker A.
CUE: Trip pushbutton has been pushed on Control Rod Drive Breaker A.
Green TRIP flag is NOT visible.
Green TRIP flag is NOT visible.
The Reactor has NOT TRIPPED.
The Reactor has NOT TRIPPED.
__________
SAT UNSAT
SAT UNSAT
: 3. PERFORMANCE STEP: Trip Control Rod Drive Breaker C       ........C........
: 3. PERFORMANCE STEP: Trip Control Rod Drive Breaker C
 
    ........C........
STANDARD: Push the TRIP pushbutton on Control Rod Drive Breaker C and observe the Green Trip flag is vis ible    CUE: TRIP pushbutton has been pushed on Control Rod Drive Breaker C.


STANDARD: Push the TRIP pushbutton on Control Rod Drive Breaker C and observe the Green Trip flag is visible CUE: TRIP pushbutton has been pushed on Control Rod Drive Breaker C.
Green TRIP flag is visible.
(If Control Rod Drive Breaker B HAS been tripped) The Reactor has TRIPPED (If Control Rod Drive Breaker B HAS NOT been tripped) The Reactor has NOT TRIPPED.
SAT UNSAT
: 4. PERFORMANCE STEP: Trip Control Rod Drive Breaker B
  ........C........
STANDARD: Push the TRIP pushbutton on Control Rod Drive Breaker B and observe the Green Trip flag is visible CUE: TRIP pushbutton has been pushed on Control Rod Drive Breaker B.
Green TRIP flag is visible.
Green TRIP flag is visible.
(If Control Rod Drive Breaker B HAS been tripped) The Reactor has TRIPPED (If Control Rod Drive Breaker B HAS NOT been tripped) The Reactor has                    NOT TRIPPED.
__________
SAT UNSAT    4. PERFORMANCE STEP: Trip Control Rod Drive Breaker B
  ........C........
STANDARD: Push the TRIP pushbutton on Control Rod Drive Breaker B and observe the Green Trip flag is vis ible          CUE: TRIP pushbutton has been pushed on Control Rod Drive Breaker B.                    Green TRIP flag is visible.
(If Control Rod Drive Breaker C has NOT been tripped, the Reactor has NOT TRIPPED)
(If Control Rod Drive Breaker C has NOT been tripped, the Reactor has NOT TRIPPED)
(If Control Rod Drive Breaker C HAS been tripped) The Reactor has TRIPPED.
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)
END TIME


(If Control Rod Drive Breaker C HAS been tripped) The Reactor has TRIPPED.      __________
In Plant JPM P2
SAT UNSAT TERMINATING CUES:  This JPM is complete (Terminated by the examiner)


__________
Facility:          Davis-Besse                          Task No: 001-043-05-0100 Task
END TIME 


In Plant JPM P2 Facility:            Davis-Besse    Task No: 001-043-05-0100                          Task Title
==Title:==
:      Locally Operate Atmospheric Vent Valve ICS11A K/A  
Locally Operate Atmospheric Vent Valve ICS11A K/A  


==Reference:==
==Reference:==
(039) A4.07 2.8/2.9       Job Performance Measure No:     P2 (JPM 024)   Examinee:           NRC Examiner:       Date:       Method of testing:
(039) A4.07 2.8/2.9     Job Performance Measure No:         P2 (JPM 024)
Simulated Performance __ X _   Actual Performance ___ Classroom ___   Simulator _ _   Plant _ X __ Read to the examinee:
Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
NRC Examiner:                                                           Date:
Method of testing:
Simulated Performance __ X _                             Actual Performance ___
Classroom ___                     Simulator _ _               Plant _ X __
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Task Standard:
Locally Operate Atmospheric Vent Valve ICS11A
Locally Operate Atmospheric Vent Valve ICS11A Required Materials:
DB-OP-02000 Attachment 3 General


Required Materials:
==References:==
DB-OP-02000 Attachment 3  General


==References:==
None Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task: No Alternate Path: No Validation Time: 13 minutes


None
EXAMINER COPY INITIAL CONDITIONS:
The Atmospheric Vent Valves cannot be controlled from the Control Room due to severe loss of instrument air.
INITIATING CUES:
The Unit Supervisor directs you to locally operate Atmospheric Vent Valve ICS 11A starting at Section D step 3.0 of Attachment 3 of DB-OP-02000 (IA450 has been closed by another operator).
(Hand the trainee a copy of Attachment 3 of DB-OP-02000)


Initiating Cue:
CANDIDATE COPY INITIAL CONDITIONS:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The Atmospheric Vent Valves cannot be controlled from the Control Room due to severe loss of instrument air.
Time Critical Task:
INITIATING CUES:
No  Alternate Path:
The Unit Supervisor directs you to locally operate Atmospheric Vent Valve ICS 11A starting at Section D step 3.0 of Attachment 3 of DB-OP-02000 (IA450 has been closed by another operator).
No Validation Time:
13 minutes


EXAMINER COPY INITIAL CONDITIONS:  The Atmospheric Vent Valves cannot be controlled from the Control Room due to severe loss of instrument air.
INITIATING CUES
: The Unit Supervisor directs you to locally operate Atmospheric Vent Valve ICS 11A starting at Section D step 3.0 of Attachment 3 of DB
-OP-02000 (IA450 has been closed by another operator).  (Hand the trainee a copy of Attachment 3 of DB
-OP-02000)
CANDIDATE COPY INITIAL CONDITIONS
:  The Atmospheric Vent Valves cannot be controlled from the Control Room due to severe loss of instrument air.
INITIATING CUES
: The Unit Supervisor directs you to locally operate Atmospheric Vent Valve ICS 11A starting at Section D step 3.0 of Attachment 3 of DB
-OP-02000 (IA450 has been closed by another operator).
PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
START TIME: _______
: 1. PERFORMANCE STEP: Verify Valve A (ICS11AA) open     STANDARD: Verify Valve A (ICS11AA) is open by turning in the clockwise direction and returning to open position CUE: Valve ICS11AA is rotated a small amount in the clockwise direction and then                     returned to full OPEN
: 1. PERFORMANCE STEP: Verify Valve A (ICS11AA) open STANDARD: Verify Valve A (ICS11AA) is open by turning in the clockwise direction and returning to open position CUE: Valve ICS11AA is rotated a small amount in the clockwise direction and then returned to full OPEN SAT UNSAT
__________
: 2. PERFORMANCE STEP: Open Valve B (ICS11AB)
    ........C........
STANDARD: Turn handwheel counterclockwise to open Valve B (ICS11AB)
COMMENT: Step 1-3 shall be performed prior to Step 5 CUE: Valve ICS11AB handwheel is rotated counterclockwise and is open SAT UNSAT
: 3. PERFORMANCE STEP: Notify the Control Room that ICS11A is ready for local manual operation STANDARD: Communicate with Control Room using radio to determine desired valve position CUE: Communications have been established with the Control Room The Reactor Operator directs you to position the Atmospheric Vent Valve to 10 turns on the handwheel counter SAT UNSAT
: 4. PERFORMANCE STEP: Check the handwheel counter at 0 STANDARD: Check the handwheel counter is at zero CUE: Handwheel counter is at zero (0)
SAT UNSAT
SAT UNSAT
: 2. PERFORMANCE STEP: Open Valve B (ICS11A B)        ........C........
: 5. PERFORMANCE STEP: Establish desired throttle position
STANDARD: Turn handwheel counterclockwise to open Valve B (ICS11AB)          COMMENT: Step 1-3 shall be performed prior to Step 5 CUE: Valve ICS11AB handwheel is rotated counterclockwise and is open
    ........C........
 
__________
 
SAT UNSAT  3. PERFORMANCE STEP: Notify the Control Room that ICS11A is ready for local manual                                                  operation STANDARD: Communicate with Control Room using radio to determine desired valve                                position          CUE: Communications have been established with the Control Room The Reactor Operator directs you to position the Atmospheric Vent Valve to
 
10 turns on the handwheel counter
 
__________
SAT UNSAT    4. PERFORMANCE STEP:
Check the handwheel counter at 0 STANDARD: Check the handwheel counter is at zero CUE: Handwheel counter is at zero (0)        __________
SAT UNSAT    5. PERFORMANCE STEP: Establish desired throttle position
  ........C........


STANDARD: Turn the handwheel in the clockwise direction 10 turns until counter reads 10 Note: Valve manual handwheel is reverse acting CUE: Handwheel is rotated in the clockwise direction The handwheel counter is at 10.
STANDARD: Turn the handwheel in the clockwise direction 10 turns until counter reads 10 Note: Valve manual handwheel is reverse acting CUE: Handwheel is rotated in the clockwise direction The handwheel counter is at 10.
Instrument air has been restored.
Instrument air has been restored.
The Reactor Operator directs you to close ICS11A, establish positive shutoff and restore instrument air to the Atmospheric Vent Valve.
The Reactor Operator directs you to close ICS11A, establish positive shutoff and restore instrument air to the Atmospheric Vent Valve.
__________
SAT UNSAT
SAT UNSAT 6. PERFORMANCE STEP: Close the Atmospheric Vent valve (ICS 11A) and establish                 ........C........                     positive shutoff
: 6. PERFORMANCE STEP: Close the Atmospheric Vent valve (ICS 11A) and establish
 
  ........C........           positive shutoff STANDARD: Turn the handwheel in the counterclockwise direction until the counter is zero (0)
STANDARD: Turn the handwheel in the counterclockwise direction until the counter is                               zero (0)         COMMENT: Step 6 shall be performed prior to step 7   CUE: Handwheel is rotated counterclockwise direction Handwheel counter is at zero (0)
COMMENT: Step 6 shall be performed prior to step 7 CUE: Handwheel is rotated counterclockwise direction Handwheel counter is at zero (0)
__________
SAT UNSAT
 
: 7. PERFORMANCE STEP: Close Valve B ICS11AB
SAT UNSAT 7. PERFORMANCE STEP: Close Valve B ICS11AB         ........C........
    ........C........
STANDARD: Manual handwheel for Valve ICS11AB rotated clockwise until closed CUE: Valve ICS11AB handwheel has been rotated clockwise, valve is closed.
STANDARD: Manual handwheel for Valve ICS11AB rotated clockwise until closed CUE: Valve ICS11AB handwheel has been rotated clockwise, valve is closed.
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)
END TIME


__________
In Plant JPM P3
SAT UNSAT TERMINATING CUES:  This JPM is complete (Terminated by the examiner)


__________
Facility:          Davis-Besse                          Task No: 064-026-05-0401 Task
END TIME 


In Plant JPM P3 Facility:            Davis-Besse    Task No: 0 64-0 26-05-0 401                          Task Title
==Title:==
:      Energize Station Blackout Diesel Generator Auxiliaries         K/A  
Energize Station Blackout Diesel Generator Auxiliaries K/A  


==Reference:==
==Reference:==
(0 64) A2.12 2.8/3.1       Job Performance Measure No
(064) A2.12 2.8/3.1     Job Performance Measure No:         P3 (JPM 258)
:     P3 (JPM 258)   Examinee:           NRC Examiner:       Date:       Method of testing:
Examinee:
Simulated Performance __ X _   Actual Performance ___ Classroom ___   Simulator _ _   Plant _ X __ Read to the examinee:
NRC Examiner:                                                           Date:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Method of testing:
Simulated Performance __ X _                             Actual Performance ___
Classroom ___                     Simulator _ _               Plant _ X __
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Task Standard:
Energize Station Blackout Diesel Generator Auxiliaries Emergency Shutdown Station Blackout Diesel Generator (Loss of Air Cooling Fans) Required Materials:
Energize Station Blackout Diesel Generator Auxiliaries Emergency Shutdown Station Blackout Diesel Generator (Loss of Air Cooling Fans)
Section 4.10 of DB
Required Materials:
-OP-06334, Station Blackout Diesel Generator Operating Procedure Section 5.2 of DB
Section 4.10 of DB-OP-06334, Station Blackout Diesel Generator Operating Procedure Section 5.2 of DB-OP-06334, Emergency Shutdown of Station Blackout Diesel Generator General  
-OP-06334 , Emergency Shutdown of Station Blackout Diesel Generator General  


==References:==
==References:==
Line 190: Line 180:
None Initiating Cue:
None Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task: No Alternate Path: Yes Validation Time: 15 minutes


Time Critical Task:
EXAMINER COPY INITIAL CONDITIONS:
No Alternate Path:
The plant is operating at 100% power Ambient temperature is 45°F Breaker AD213, SBDOG to D2, has been opened in preparation for breaker maintenance AD213 was opened 15 minutes ago INITIATING CUES:
Yes Validation Time:
NOTE: Procedure Step 4.10.2 needs to be initialed indicating that Barring of the Station Blackout Diesel Generator is NOT required. In the procedure step NO should be circled.
15 minutes EXAMINER COPY INITIAL CONDITIONS: The plant is operating at 100% power Ambient temperature is 45°F Breaker AD213, SBDOG to D2, has been opened in preparation for breaker maintenance
The Unit Supervisor directs you to perform Section 4.10, Energizing the Station Blackout Diesel Generator Auxiliaries from the Station Blackout Diesel Generator, of DB-OP-06334.
 
You have an eSOMS handheld computer with the Station Blackout Diesel Generator readings downloaded.
AD213 was opened 15 minutes ago INITIATING CUES: NOTE: Procedure Step 4.10.2 needs to be initialed indicating that Barring of the Station Blackout Diesel Generator is NOT required. In the procedure step NO should be circled.
(Provide the examinee a copy of procedure package including section 4.10 of DB-OP-06334, Station Blackout Diesel Generator Operating Procedure. Procedure Step 4.10.2 needs to be initialed indicating that Barring of the Station Blackout Diesel Generator is NOT required. In the procedure step NO should be circled. Section 5.2 will be provided when it is recognized emergency shutdown of the SBODG is required.)
The Unit Supervisor directs you to perform Section 4.10, Energizing the Station Blackout Diesel Generator Auxiliaries from the Station Blackout Diesel Generator, of DB
-OP-06334.
You have an eSOMS handheld computer with the Station Blackout Diesel Generator readings downloaded. (Provide the examinee a copy of procedure package including section 4.10 of DB-OP-06334, Station Blackout Diesel Generator Operating Procedure.
Procedure Step 4.10.2 needs to be initialed indicating that Barring of the Station Blackout Diesel Generator is NOT required. In the procedure step NO should be circled.
Section 5.2 will be provided when it is recognized emergency shutdown of the SBODG is required.)  
 
CANDIDATE COPY INITIAL CONDITIONS:
CANDIDATE COPY INITIAL CONDITIONS:
The plant is operating at 100% power


Ambient temperature is 45°F Breaker AD213, SBDOG to D2, has been opened in preparation for breaker maintenance AD213 was opened 15 minutes ago INITIATING CUES:
The plant is operating at 100% power Ambient temperature is 45°F Breaker AD213, SBDOG to D2, has been opened in preparation for breaker maintenance AD213 was opened 15 minutes ago INITIATING CUES:
The Unit Supervisor directs you to perform Section 4.10, Energizing the Station Blackout Diesel Generator Auxiliaries from the Station Blackout Diesel Generator, of DB
The Unit Supervisor directs you to perform Section 4.10, Energizing the Station Blackout Diesel Generator Auxiliaries from the Station Blackout Diesel Generator, of DB-OP-06334.
-OP-06334.
You have an eSOMS handheld computer with the Station Blackout Diesel Generator readings Downloaded.
You have an eSOMS handheld computer with the Station Blackout Diesel Generator readings Downloaded.  
PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".


PERFORMANCE INFORMATION
START TIME: _______
 
: 1. PERFORMANCE STEP: Depress and hold the FUEL PRIME pushbutton until fuel oil pressure stabilizes >15 PSIG.
NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
STANDARD: Depresses the FUEL PRIME pushbutton until fuel oil pressure stabilizes greater than 15 PSIG on the black indicator of PI 11160.
 
CUE: FUEL PRIME pushbutton depressed, PI 11160 FUEL FILTER Pressure black indicator reads 17 PSIG SAT UNSAT
START TIME: _______
: 2. PERFORMANCE STEP: Place the ELECT PROTECT-MODE SELECT Switch in the TEST
: 1. PERFORMANCE STEP:
  ........C........             position.
Depress and hold the FUEL PRIME pushbutton until fuel oil pressure stabilizes >15 PSIG.           STANDARD: Depresses the FUEL PRIME pushbutton until fuel oil pressure stabilizes greater than 15 PSIG on the black indicator of PI 11160.
STANDARD: Rotate the ELECT PROTECT-MODE SELECT Switch to the TEST position on C30202.
CUE: FUEL PRIME pushbutton depressed , PI 11160 FUEL FILTER Pressure black                     indicator reads 17 PSIG       __________
CUE: The ELECT PROTECT - MODE SELECT Switch has been rotated and points towards TEST SAT UNSAT
SAT UNSAT 2. PERFORMANCE STEP: Place the ELECT PROTECT
: 3. PERFORMANCE STEP: Verify SBODG OUTPUT BREAKER AD 301 is open.
-MODE SELECT Switch in the TEST ........C........                     position. STANDARD: Rotate the ELECT PROTECT
STANDARD: On panel C30202, Verifies AD 301 GREEN light is lit.
-MODE SELECT Switch to the TEST position                                     on C30202.
CUE: AD 301 GREEN LIGHT is lit SAT UNSAT
CUE: The ELECT PROTECT - MODE SELECT Switch has been rotated and points towards TEST                                                                                                                     __________
: 4. PERFORMANCE STEP: Start the SBODG.
SAT UNSAT 3. PERFORMANCE STEP: Verify SBODG OUTPUT BREAKER AD 301 is open.         STANDARD: On panel C30202, Verifies AD 301 GREEN light is lit.           CUE: AD 301 GREEN LIGHT is lit
    ........C........
 
STANDARD: Depress the SBODG START pushbutton on Panel 30202.
__________
CUE: The START pushbutton has been depressed SAT UNSAT
: 5. PERFORMANCE STEP: After 30 seconds CHECK the Station Blackout Diesel Generator starts and accelerates to approximately 450 RPM.
STANDARD: After approximately 30 seconds verify the Station Blackout Diesel Generator starts and accelerates to approximately 450 rpm as indicated on ENGINE TACHOMETER on C30203.
CUE: After approximately 30 seconds the diesel starts.
When checking speed on Engine Tachometer, Tachometer on C30203 reads


450 rpm.
SAT UNSAT
: 6. PERFORMANCE STEP: After approximately 30 seconds, the Station Blackout Diesel Generator accelerates to 900 rpm.
STANDARD: Verify the Station Blackout Diesel Generator accelerates to approximately 900 rpm after 30 seconds as indicated by ENGINE TACHOMETER on C30203.
CUE: After approximately 30 seconds the diesel accelerates.
Engine Tachometer on C30203 reads 900 rpm.
SAT UNSAT
SAT UNSAT
: 4. PERFORMANCE STEP: Start the SBODG.        ........C........
: 7. PERFORMANCE STEP: Place the SYNCHRONIZE switch in the ON position
    ........C........
STANDARD: Install operating handle and rotate the SYNCHONIZE switch to the ON position CUE: The SYNCHRONIZE switch is in the ON position, If asked, The synchroscope pointer indicates 1200 SAT UNSAT
: 8. PERFORMANCE STEP: Close Breaker AD 301, SBODG OUTPUT BREAKER on Panel
    ........C........             C30202 STANDARD: Rotate handswitch for AD301 to the close position CUE: AD 301 RED LIGHT is ON SAT UNSAT
: 9. PERFORMANCE STEP: Place the SYNCHRONIZE switch to OFF STANDARD: Rotate the SYNCHRONIZE switch to OFF position CUE: The SYNCHRONIZE switch is in the OFF position SAT UNSAT
: 10. PERFORMANCE STEP: Verify both Station Blackout Diesel Generator Jacket Water Radiator fans are operating STANDARD: Check the status of the fans by observing the breaker lights and/or observing


STANDARD: Depress the SBODG START pushbutton on Panel 30202.          CUE: The START pushbutton has been depressed
the fans locally, recognize neither fan is operating NOTE: Alternate Path begins with recognition that fans are not running and emergency shutdown the SBODG must be performed CUE: Both fan breaker lights indicate GREEN (or the fans are not turning if checked locally)
 
__________
SAT UNSAT
SAT UNSAT
: 5. PERFORMANCE STEP:
: 11. PERFORMANCE STEP: Go to Section 5.2, Emergency Shutdown of the Station Blackout Diesel Generator STANDARD: Route to section 5.2, Emergency Shutdown of the Station Blackout Diesel Generator CUE: (Provide the examinee a copy of Section 5.2 of DB-OP-06334)
After 30 seconds CHECK the Station Blackout Diesel Generator starts and accelerates to approximately 450 RPM.          STANDARD: After approximately 30 seconds verify the Station Blackout Diesel Generator starts and accelerates to approximately 450 rpm as indicated on ENGINE TACHOMETER on C30203. CUE: After approximately 30 seconds the diesel starts.                  When checking speed on Engine Tachometer, Tachometer on C30203 reads 450 rpm.       __________
SAT UNSAT  6. PERFORMANCE STEP: After approximately 30 seconds, the Station Blackout Diesel Generator accelerates to 900 rpm. STANDARD: Verify the Station Blackout Diesel Generator accelerates to approximately                                900 rpm after 30 seconds as indicated by ENGINE TACHOMETER on                                C30203. CUE: After approximately 30 seconds the diesel accelerates.
 
Engine Tachometer on C30203 reads 900 rpm.                                                                                                                      __________
SAT UNSAT  7. PERFORMANCE STEP: Place the SYNCHRONIZE switch in the ON position
                ........C........                     
 
STANDARD: Install operating handle and rotate the SYNCHONIZE switch to the ON                                position          CUE: The SYNCHRONIZE switch is in the ON position,                  If asked, The synchroscope pointer indicates 1200
 
__________
 
SAT UNSAT  8. PERFORMANCE STEP: Close Breaker AD 301, SBODG OUTPUT BREAKER on Panel          ........C........                      C30202          STANDARD: Rotate handswitch for AD301 to the close position CUE: AD 301 RED LIGHT is ON
 
__________
SAT UNSAT
SAT UNSAT
: 9. PERFORMANCE STEP:
: 12. PERFORMANCE STEP: Stop the Station Blackout Diesel Generator
Place the SYNCHRONIZE switch to OFF STANDARD: Rotate the SYNCHRONIZE switch to OFF position CUE: The SYNCHRONIZE switch is in the OFF position
    ........C........
__________
SAT UNSAT  10. PERFORMANCE STEP: Verify both Station Blackout Diesel Generator Jacket Water Radiator fans are operating STANDARD: Check the status of the fans by observing the breaker lights and/or observing the fans locally, recognize neither fan is operating NOTE: Alternate Path begins with recognition that fans are not running and emergency shutdown the SBODG must be performed CUE: Both fan breaker lights indicate GREEN (or the fans are not turning if checked                    locally)
__________
SAT UNSAT  11. PERFORMANCE STEP: Go to Section 5.2, Emergency Shutdown of the Station Blackout Diesel Generator STANDARD: Route to section 5.2, Emergency Shutdown of the Station Blackout Diesel Generator          CUE: (Provide the examinee a copy of Section 5.2 of DB-OP-06334)                                                                                                                           
 
__________
 
SAT UNSAT  12. PERFORMANCE STEP: Stop the Station Blackout Diesel Generator               ........C........
STANDARD: Depress the Emergency Stop pushbutton on panel C30202 or panel C30203.
STANDARD: Depress the Emergency Stop pushbutton on panel C30202 or panel C30203.
CUE: The Emergency Stop has been depressed. The Station Blackout Diesel Generator is beginning to slow down.
CUE: The Emergency Stop has been depressed. The Station Blackout Diesel Generator is beginning to slow down.
(If asked) AD 301 GREEN light is ON, RED light is OFF                              
(If asked) AD 301 GREEN light is ON, RED light is OFF SAT UNSAT
 
: 13. PERFORMANCE STEP: Station Blackout Diesel Generator stops STANDARD: Verify Engine Tachometer reads zero on C30203 CUE: The Station Blackout Diesel Generator tachometer reads zero SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)
__________
END TIME


SAT UNSAT
Simulator JPM S1
: 13. PERFORMANCE STEP: Station Blackout Diesel Generator stops            STANDARD: Verify Engine Tachometer reads zero on C30203 CUE: The Station Blackout Diesel Generator tachometer reads zero


__________
Facility:         Davis-Besse                          Task No:    008-005-01-0100 Task
SAT UNSAT    TERMINATING CUES: This JPM is complete (Terminated by the examiner)
__________
END TIME 


Simulator JPM S1 Facility:            Davis-Besse    Task No:     008-005-01-0100              Task Title
==Title:==
:      Swap Control Rod Drive Cooling Booster pumps           K/A  
Swap Control Rod Drive Cooling Booster pumps K/A  


==Reference:==
==Reference:==
(001) A2.11 4.4/4.7       Job Performance Measure No
(001) A2.11 4.4/4.7     Job Performance Measure No:           S1 (NEW)
:   S1 (NEW)   Examinee:           NRC Examiner:       Date:       Method of testing:
Examinee:
Simulated Performance ___   Actual Performance _X_ Classroom ___   Simulator _X_   Plant ___
NRC Examiner:                                                           Date:
Method of testing:
Simulated Performance ___                       Actual Performance _X_
Classroom ___                     Simulator _X_               Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues. Use 100% power IC. Verity #1 CRDC Booster Pump is running.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Use 100% power IC. Verity #1 CRDC Booster Pump is running.
IMF KA H 3D Thermal Overload on #2 CRDC Booster Pump (Insert after EO contacted to open BE2206)
IMF KA H 3D Thermal Overload on #2 CRDC Booster Pump (Insert after EO contacted to open BE2206)
Task Standard:
Task Standard:
Start the STBY CRDC Booster Pump 2 Stop the running CRDC Booster Pump 1 Open pump suction valve CC1328 and restart previously running CRDC Booster Pump 1 Required Materials:
Start the STBY CRDC Booster Pump 2 Stop the running CRDC Booster Pump 1 Open pump suction valve CC1328 and restart previously running CRDC Booster Pump 1 Required Materials:
DB-OP-06262 Section 3.21 ready for performance of prerequisite 3.21.1 DB-OP-06262 Section 3.19 with prerequisites complete and step 3.19.1 marked N/A General  
DB-OP-06262 Section 3.21 ready for performance of prerequisite 3.21.1 DB-OP-06262 Section 3.19 with prerequisites complete and step 3.19.1 marked N/A General  


Line 294: Line 271:
None Initiating Cue:
None Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
Time Critical Task: No Alternate Path: Yes Validation Time:
No Alternate Path:
9 minutes
Yes Validation Time: 9 minutes SIMULATOR INSTRUCTIONS TASK DESCRIPTION: Swap Control Rod Drive Cooling Booster pumps INITIAL CONDITION: Any at power I/C ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION: Verify #1 CRDC Booster Pump is running MALFUNCTIONS/FAILURE TO INSERT: #2 CRDC Booster Pump trip after EO is sent to open BE2206 CC1328, CRD Booster Pump 1 Suction Valve, fails closed when pump 1 is stopped


EXAMINER COPY INITIAL CONDITIONS: The plant is at 100%
SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
All systems are in a normal lineup
Swap Control Rod Drive Cooling Booster pumps INITIAL CONDITION:
Any at power I/C ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
Verify #1 CRDC Booster Pump is running MALFUNCTIONS/FAILURE TO INSERT:
#2 CRDC Booster Pump trip after EO is sent to open BE2206 CC1328, CRD Booster Pump 1 Suction Valve, fails closed when pump 1 is stopped


Engineering has requested to inspect CRD Filter 1 filter element to verify correct size. There are no other issues with CRD Filter 1 Maintenance is ready to disassemble CRD Filter 1 for inspection
EXAMINER COPY INITIAL CONDITIONS:
 
The plant is at 100%
I & C has removed PDI 2952 from service INITIATING CUES
All systems are in a normal lineup Engineering has requested to inspect CRD Filter 1 filter element to verify correct size. There are no other issues with CRD Filter 1 Maintenance is ready to disassemble CRD Filter 1 for inspection I & C has removed PDI 2952 from service INITIATING CUES:
: The Command SRO has directed you to place #2 Control Rod Drive Booster Pump in service in preparation for filter F55
The Command SRO has directed you to place #2 Control Rod Drive Booster Pump in service in preparation for filter F55-1, FILTER CRDC 1-1 inspection IAW DB-OP-06262 Section 3.21 and 3.19.
-1, FILTER CRDC 1
-1 inspection IAW DB
-OP-06262 Section 3.21 and 3.19.
(Provide examinee a copy of section 3.19 and 3.21 DB-OP-06262)
(Provide examinee a copy of section 3.19 and 3.21 DB-OP-06262)
CANDIDATE COPY INITIAL CONDITIONS: The plant is at 100%
All systems are in a normal lineup Engineering has requested to inspect CRD Filter 1 filter element to verify correct size. There are no other issues with CRD Filter 1 Maintenance is ready to disassemble CRD Filter 1 for inspection


I & C has removed PDI 2952 from service INITIATING CUES
CANDIDATE COPY INITIAL CONDITIONS:
: The Command SRO has directed you to place #2 Control Rod Drive Booster Pump in service
The plant is at 100%
All systems are in a normal lineup Engineering has requested to inspect CRD Filter 1 filter element to verify correct size. There are no other issues with CRD Filter 1 Maintenance is ready to disassemble CRD Filter 1 for inspection I & C has removed PDI 2952 from service INITIATING CUES:
The Command SRO has directed you to place #2 Control Rod Drive Booster Pump in service in preparation for filter F55-1, FILTER CRDC 1-1 inspection IAW DB-OP-06262 Section 3.21 and 3.19.


in preparation for filter F55
-1, FILTER CRDC 1
-1 inspection IAW DB
-OP-06262 Section 3.21 and 3.19.
PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
START TIME: _______
: 1. PERFORMANCE STEP: Verify CRD Booster Pump 2 is in service (Step 3.21.1).
: 1. PERFORMANCE STEP: Verify CRD Booster Pump 2 is in service (Step 3.21.1).
STANDARD: Refer to Subsection 3.19, Startup of CRD Booster Pump 2. CUE: None       __________
STANDARD: Refer to Subsection 3.19, Startup of CRD Booster Pump 2.
SAT UNSAT 2. PERFORMANCE STEP: Start CRD CLNG BOOSTER PUMP 2. ........C........
CUE: None SAT UNSAT
STANDARD: Start CRD CLNG BOOSTER PUMP 2 using HIS1924. NOTE: Annunciator 5-6-D will alarm when the second pump is started. The alarm may be treated as an expected alarm. If alarm procedure is used guidance                     will be if an evolution is in progress causing the alarm stop the standby                       pump if desired.
: 2. PERFORMANCE STEP: Start CRD CLNG BOOSTER PUMP 2.
CUE: None       __________
    ........C........
STANDARD: Start CRD CLNG BOOSTER PUMP 2 using HIS1924.
NOTE: Annunciator 5-6-D will alarm when the second pump is started. The alarm may be treated as an expected alarm. If alarm procedure is used guidance will be if an evolution is in progress causing the alarm stop the standby pump if desired.
CUE: None SAT UNSAT
: 3. PERFORMANCE STEP: Verify CRD Booster Pump 2 discharge pressure at PI756 is between 120 and 160 PSIG.
STANDARD: Contacts EO to verify CRD Booster Pump 2 discharge pressure at PI756 is between 120 and 160 PSIG.
CUE: Equipment Operator reports CRD Booster Pump 2 discharge pressure at PI756 is 150 PSIG.
SAT UNSAT
SAT UNSAT
: 3. PERFORMANCE STEP: Verify CRD Booster Pump 2 discharge pressure at PI756 is between 120 and 160 PSIG. STANDARD: Contacts EO to verify CRD Booster Pump 2 discharge pressure at PI756 is between 120 and 160 PSIG. CUE: Equipment Operator reports CRD Booster Pump 2 discharge pressure at PI756 is 150 PSIG.                        __________
: 4. PERFORMANCE STEP: Stop CRD CLNG BOOSTER PUMP 1 and place in lockout.
SAT UNSAT
 
: 4. PERFORMANCE STEP: Stop CRD CLNG BOOSTER PUMP 1 and place in lockout.
   ........C........
   ........C........
STANDARD: Verify CRD CLNG BOOSTER PUMP 1 off and in LOCKOUT               using HIS1915. NOTE: CC1328, Suction valve for CRD Booster Pump 1, will be triggered to fail closed when the pump is shut down (switch bumped by mechanic walking down filter inspection).
STANDARD: Verify CRD CLNG BOOSTER PUMP 1 off and in LOCKOUT using HIS1915.
CUE: None       __________
NOTE: CC1328, Suction valve for CRD Booster Pump 1, will be triggered to fail closed when the pump is shut down (switch bumped by mechanic walking down filter inspection).
CUE: None SAT UNSAT
: 5. PERFORMANCE STEP: Verify CRD Booster Pump 2 discharge flow on FIS2586 is greater than 150 GPM.
NOTE: Pump 2 will trip triggered by a time delay which may occur during or prior to performance steps 5, 6, 7, 8, or 9 and require performance step 10 to be implemented.
STANDARD: Contacts EO to verify CRD Booster Pump 2 discharge flow on FIS2586 is greater than 150 GPM.
CUE: EO reports flow on FIS2586 is 190 GPM.
SAT UNSAT
SAT UNSAT
: 5. PERFORMANCE STEP: Verify CRD Booster Pump 2 discharge flow on FIS2586 is greater than 150 GPM. NOTE: Pump 2 will trip triggered by a time delay which may occur during or prior to performance steps 5, 6, 7, 8, or 9 and require performance step 10 to be implemented.
: 6. PERFORMANCE STEP: Complete section 3.19 and route back to section 3.21.
STANDARD: Contacts EO to verify CRD Booster Pump 2 discharge flow on FIS2586 is greater than 150 GPM.
STANDARD: Signs section 3.19 complete and routes back to section 3.21.
CUE: EO reports flow on FIS2586 is 190 GPM.          __________        SAT UNSAT    6. PERFORMANCE STEP: Complete section 3.19 and route back to section 3.21. STANDARD: Signs section 3.19 complete and routes back to section 3.21. NOTE: Step 3.19.8 pre-identified as N/A since being removed from service
NOTE: Step 3.19.8 pre-identified as N/A since being removed from service.
. CUE: None       __________
CUE: None SAT UNSAT
SAT UNSAT   7. PERFORMANCE STEP: Complete prerequisites for section 3.21. STANDARD: Signs step 3.21.1 complete and signs for prerequisites complete. CUE: None       __________
: 7. PERFORMANCE STEP: Complete prerequisites for section 3.21.
STANDARD: Signs step 3.21.1 complete and signs for prerequisites complete.
CUE: None SAT UNSAT
: 8. PERFORMANCE STEP: Place HIS1915, CRD CLNG BOOSTER PUMP 1 in LOCKOUT.
STANDARD: Verifies switch HIS1915 is in LOCKOUT.
 
NOTE: Step 3.21.4 may be marked N/A since the switch was left in LOCKOUT during performance of section 3.19.
CUE: None SAT UNSAT
: 9. PERFORMANCE STEP: Open BE2206, CRD BOOSTER PUMP 1.
STANDARD: Contact EO to OPEN BE2206, CRD BOOSTER PUMP 1.
CUE: Role play as EO, acknowledge direction to open BE2206.
SAT UNSAT ALTERNATE PATH - CRD Booster Pump 2 trips and will require placing CRD Booster Pump 1 back into service. CRD Booster Pump 1 suction valve CC1328 will close when the pump is shut down in performance step 4 which will require verifying flow path and opening CC1328 prior to starting CRD Booster Pump 1.
: 10. PERFORMANCE STEP: Respond to Annunciator 5-6-D, CRD BOOSTER PMP P HI/FLOW LO/GO TO DB-OP-02523, CCW System Malfunctions.
STANDARD: Recognize entry criteria and implement DB-OP-02523, CCW System Malfunctions, or refer to alarm procedure which will direct to the abnormal procedure CUE: (If asked) Role play as the EO, CRD BOOSTER PUMP 2 is off, motor is hot to the touch.
SAT UNSAT
SAT UNSAT
: 8. PERFORMANCE STEP: Place HIS1915, CRD CLNG BOOSTER PUMP 1 in LOCKOUT. STANDARD: Verifies switch HIS1915 is in LOCKOUT.
: 11. PERFORMANCE STEP: Verify the standby CRD Booster pump starts.
NOTE: Step 3.21.4 may be marked N/A since the switch was left in LOCKOUT during performance of section 3.19. CUE: None       __________
STANDARD: Attempt to start CRD Booster Pump 1 (will not be successful due to suction valve being closed).
SAT UNSAT   9. PERFORMANCE STEP:
CUE: None SAT UNSAT
Open BE2206, CRD BOOSTER PUMP 1. STANDARD: Contact EO to OPEN BE2206, CRD BOOSTER PUMP 1. CUE: Role play as EO, acknowledge direction to open BE2206.        __________
: 12. PERFORMANCE STEP: Monitor CRD Stator temperatures.
SAT UNSAT    ALTERNATE PATH - CRD Booster Pump 2 trips and will require placing CRD Booster Pump 1 back into service. CRD Booster Pump 1 suction valve CC1328 will close when the pump is shut down in performance step 4 which will require verifying flow path and opening CC1328 prior to starting CRD Booster Pump 1.
STANDARD: Using RNO guidance (since pump 1 was not able to be started) monitor CRD Stator temperatures using NSSS Summary Files 12 and 13 and trip the reactor if any CRD Stator temperature reaches 180 ºF.
: 10. PERFORMANCE STEP: Respond to Annunciator 5-6-D, CRD BOOSTER PMP                                          P HI/FLOW LO/GO TO DB-OP-02523, CCW System Malfunctions.        STANDARD: Recognize entry criteria and implement DB-OP-02523, CCW System Malfunctions, or refer to alarm procedure which will direct to the abnormal procedure  CUE: (If asked) Role play as the EO, CRD BOOSTER PUMP 2 is off,  motor is hot to the touch.        __________
CUE: As a maintenance mechanic report to the control room that while walking
SAT UNSAT    11. PERFORMANCE STEP: Verify the standby CRD Booster pump starts.
 
STANDARD: Attempt to start CRD Booster Pump 1 (will not be successful due to suction valve being closed). CUE:  None        __________
down the CRD Filter 1 inspection work in #4 MPR a switch was bumped and it sounded like something actuated.
SAT UNSAT
SAT UNSAT
: 12. PERFORMANCE STEP: Monitor CRD Stator temperatures.         STANDARD: Using RNO guidance (since pump 1 was not able to be started) monitor CRD Stator temperatures using NSSS Summary Files 12 and 13 and trip the reactor if any CRD Stator temperature reaches 180 ºF. CUE: As a maintenance mechanic report to the control room that while walking
: 13. PERFORMANCE STEP: Verify the CRD Cooling Booster flow path is available.
    ........C........
STANDARD: Refer to Attachment 8 for verification of proper flow path to identify CC1328 is closed and open CC1328. Start/ensure CRD Cooling Booster Pump 1 is running.
NOTE: If the CRD Booster Pump 1 switch is left in auto after attempting to start in performance step 11 the pump will auto start when CC1328 is open, otherwise verify the pump is running by returning the switch to auto.
CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)
END TIME


down the CRD Filter 1 inspection work in #4 MPR a switch was bumped and it sounded like something actuated.        __________
Simulator JPM S2
SAT UNSAT    13. PERFORMANCE STEP: Verify the CRD Cooling Booster flow path is available.  ........C........


STANDARD: Refer to Attachment 8 for verification of proper flow path to identify CC1328 is closed and open CC1328. Start/ensure CRD Cooling Booster Pump 1 is running.
Facility: Davis-Besse                            Task No:       000-093-05-0100 Task
NOTE: If the CRD Booster Pump 1 switch is left in auto after attempting to start in performance step 11 the pump will auto start when CC1328 is open,                      otherwise verify the pump is running by returning the switch to auto. CUE:  None        __________
SAT UNSAT TERMINATING CUES:  This JPM is complete (Terminated by the examiner)


__________
==Title:==
END TIME Simulator JPM S2 Facility: Davis-Besse    Task No:  000-093-05-0100    Task Title
Transfer LPI Suctions to the Emergency Sump K/A  
: Transfer LPI Suctions to the Emergency Sump K/A  


==Reference:==
==Reference:==
 
(006) A4.05 (3.9/3.8)________Job Performance Measure No: S2 (JPM 291)
(006) A4.05 (3.9/3.8)________Job Performance Measure No
Examinee:
: S2 (JPM 291)   Examinee:           NRC Examiner:       Date:       Method of testing:
NRC Examiner:                                                           Date:
Simulated Performance _
Method of testing:
__   Actual Performance __
Simulated Performance _ __                       Actual Performance __X__
X__  Classroom ___   Simulator _X_   Plant ___ Read to the examinee:
Classroom ___                     Simulator _X_                       Plant ___
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Task Standard:
Transfer LPI Suctions to the Emergency Sump Required Materials:
Transfer LPI Suctions to the Emergency Sump Required Materials: Section 2 of DB-OP-02000, RPS, SFAS, SFRCS Trip, or SG Tube Rupture.
Attachment 7 Section 2 of DB-OP-02000, RPS, SFAS, SFRCS Trip, or SG Tube Rupture
.
General  
General  


==References:==
==References:==


None   Initiating Cue:
None Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task: No Alternate Path: Yes Validation Time: 14 minutes SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Transfer LPI Suctions to the Emergency Sump


Time Critical Task:
INITIAL CONDITION:
No Alternate Path: Yes  Validation Time:
Large Break LOCA Spray Pumps are not running ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
14 minutes   
Ensure DH 9A, DH 9B, DH 7A, DH7B and HP 31 are energized Complete all DB-OP-02000 Section 10 actions up to step 10.13 Turn the "Breaker Open" tags for DH 9A, DH 9B, DH 7A, DH 7B and HP31 upside down Freeze the simulator when BWST level is less than 9 feet Annunciator 5-3-A, BWST LO-LOLVL XFER TO EMER SUMP is in alarm. Output modules L511, L512, L513, and L514 (at least 3 out of 4) have failed to trip.
Leave the simulator frozen until the examinee is ready to start the JPM MALFUNCTIONS/FAILURE TO INSERT:
Insert both hot leg leaks at the same time, IMF HH41 .8 Fail level 5 output modules to trip, L6AMC, L6BMC, and L6CMC Insight insert TALA531 to 0.1 this is for the BWST LO-LO LVL XFER TO EMER SUMP alarm ACTION/CUES:


SIMULATOR INSTRUCTIONS TASK DESCRIPTION: Transfer LPI Suctions to the Emergency Sump INITIAL CONDITION: Large Break LOCA Spray Pumps are not running ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION: Ensure DH 9A, DH 9B, DH 7A, DH7B and HP 31 are energized Complete all DB
STUDENT COPY INITIAL CONDITIONS:
-OP-02000 Section 10 actions up to step 10.13 Turn the "Breaker Open" tags for DH 9A, DH 9B, DH 7A, DH 7B and HP31 upside down Freeze the simulator when BWST level is less than 9 feet
A large break LOCA has occurred and the BWST level is less than nine feet.
Both MU pumps and HPI pumps have been stopped in accordance with DB-OP-02000 Section 10 and Specific Rule guidance.
DB-OP-02000, Attachment 7, Section 1. Action to close breakers for DH7A, DH7B, DH9A, DH9B, and HP31 has been completed IAW DB-OP-02000 step 10.3.
DB-OP-02000, Attachment 7, Section 2, Suction Transfer, Steps 1 through 4 have been completed IAW DB-OP-02000 step 10.11.
INITIATING CUES:
Annunciator "BWST LO-LO LVL, XFER TO EMER SUMP" (5-3-A) has been received.
The Command SRO directs you to transfer LPI suction to the emergency sump in accordance with DB-OP-02000, Attachment 7, Section 2.
For the purpose of this JPM the Command SRO is not directing the step by step performance of this attachment.


Annunciator 5-3-A, BWST LO
EXAMINER COPY INITIAL CONDITIONS:
-LOLVL XFER TO EMER SUMP is in alarm. Output modules L511, L512, L513, and L514 (at least 3 out of 4) have failed to trip.
A large break LOCA has occurred and the BWST level is less than nine feet.
 
Both MU pumps and HPI pumps have been stopped in accordance with DB-OP-02000 Section 10 and Specific Rule guidance.
Leave the simulator frozen until the examinee is ready to start the JPM MALFUNCTIONS/FAILURE TO INSERT: Insert both hot leg leaks at the same time, IMF HH41 .8 Fail level 5 output modules to trip, L6AMC, L6BMC , and L6CMC  Insight insert TALA531 to 0.1 this is for the BWST LO
DB-OP-02000, Attachment 7, Section 1. Action to close breakers for DH7A, DH7B, DH9A, DH9B, and HP31 has been completed IAW DB-OP-02000 step 10.3.
-LO LVL XFER TO EMER SUMP alarm ACTION/CUES:
DB-OP-02000, Attachment 7, Section 2. Suction Transfer, Steps 1 through 4 has been completed IAW DB-OP-02000 step 10.11.
STUDENT COPY INITIAL CONDITIONS: A large break LOCA has occurred and the BWST level is less than nine feet. Both MU pumps and HPI pumps have been stopped in accordance with DB
INITIATING CUES:
-OP-02000 Section 10 and Specific Rule guidance.
Annunciator "BWST LO-LO LVL, XFER TO EMER SUMP" (5-3-A) has been received.
DB-OP-02000, Attachment 7, Section 1. Action to close breakers for DH7A, DH7B, DH9A, DH9B, and HP31 has been completed IAW DB
The Command SRO directs you to transfer LPI suction to the emergency sump in accordance with DB-OP-02000, Attachment 7, Section 2.
-OP-02000 step 10.3.
 
DB-OP-02000, Attachment 7, Section 2, Suction Transfer, Steps 1 through 4 ha ve been completed IAW DB
-OP-02000 step 10.11.
INITIATING CU ES: Annunciator "BWST LO
-LO LVL, XFER TO EMER SUMP" (5-3-A) has been received
. The Command SRO directs you to transfer LPI suction to the emergency sump in accordance with DB-OP-02000, Attachment 7, Section 2.
For the purpose of this JPM the Command SRO is not directing the step by step performance of this attachment.
For the purpose of this JPM the Command SRO is not directing the step by step performance of this attachment.
(Provide the examinee a copy of DB-OP-02000, Attachment 7 Section 2. Freeze simulator until examinee is ready to start-should have time to review)


EXAMINER COPY INITIAL CONDITIONS: A large break LOCA has occurred and the BWST level is less than nine feet. Both MU pumps and HPI pumps have been stopped in accordance with DB
-OP-02000 Section 10 and Specific Rule guidance.
DB-OP-02000, Attachment 7, Section 1. Action to close breakers for DH7A, DH7B, DH9A, DH9B, and HP31 has been completed IAW DB
-OP-02000 step 10.3.
DB-OP-02000, Attachment 7, Section 2. Suction Transfer, Steps 1 through 4 has been completed IAW DB
-OP-02000 step 10.11.
INITIATING CUES: Annunciator "BWST LO
-LO LVL, XFER TO EMER SUMP" (5-3-A) has been received
. The Command SRO directs you to transfer LPI suction to the emergency sump in accordance with DB-OP-02000, Attachment 7, Section 2.
For the purpose of this JPM the Command SRO is not directing the step by step performance of this attachment.
(Provide the examinee a copy of DB
-OP-02000, Attachment 7 Section 2. Freeze simulator until examinee is ready to start
-should have time to review)
PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".
PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".
START TIME:
START TIME:
NOTE: Unfreeze simulator when student has completed procedure review
NOTE: Unfreeze simulator when student has completed procedure review
: 1. PERFORMANCE STEP: Block SFAS Level 2 on DH 7A, DH 9A, DH 7B and DH 9B. C           STANDARD: Depress BLOCK pushbuttons for DH 7A (HISDH7A1) or DH 9A (HISDH9A)                                       and DH 7B (HISDH7B1) or DH 9B (HISDH9B) and verify all 4 valves are                                     blocked. NOTE: Blocking either DH7A or DH9A will block the other as does DH7B/9B.
: 1. PERFORMANCE STEP: Block SFAS Level 2 on DH 7A, DH 9A, DH 7B and DH 9B.
CUE: None       __________
C STANDARD: Depress BLOCK pushbuttons for DH 7A (HISDH7A1) or DH 9A (HISDH9A) and DH 7B (HISDH7B1) or DH 9B (HISDH9B) and verify all 4 valves are blocked.
SAT UNSAT   2. PERFORMANCE STEP: Check BWST Level is less than or equal to 9 feet. STANDARD: Check BWST level < or equal to 9 feet on level indicators. CUE: None       __________
NOTE: Blocking either DH7A or DH9A will block the other as does DH7B/9B.
SAT UNSAT   3. PERFORMANCE STEP: Open the Containment Emergency Sump Isolation Valves.     STANDARD: Depress the OPEN pushbutton on HIS DH9A. CUE: None       __________
CUE: None SAT UNSAT
SAT UNSAT   ALTERNATE PATH - Must recognize DH9A/DH9B did not start opening and the appropriate SFAS Level 5 Output Modules are not tripped as required. This will
: 2. PERFORMANCE STEP: Check BWST Level is less than or equal to 9 feet.
 
STANDARD: Check BWST level < or equal to 9 feet on level indicators.
require manually tripping the affected Output Modules to allow DH9A/DH9B to be opened.
CUE: None SAT UNSAT
: 3. PERFORMANCE STEP: Open the Containment Emergency Sump Isolation Valves.
STANDARD: Depress the OPEN pushbutton on HIS DH9A.
CUE: None SAT UNSAT ALTERNATE PATH - Must recognize DH9A/DH9B did not start opening and the appropriate SFAS Level 5 Output Modules are not tripped as required. This will require manually tripping the affected Output Modules to allow DH9A/DH9B to be opened.
: 4. PERFORMANCE STEP: Recognize DH9A does not open.
: 4. PERFORMANCE STEP: Recognize DH9A does not open.
STANDARD: HIS DH9A green light remains lit.
STANDARD: HIS DH9A green light remains lit.
CUE: Role play as Command SRO if required, Acknowledge DH9A did not open.       __________
 
SAT UNSAT   5. PERFORMANCE STEP: Open DH 9B.     STANDARD: Depress the OPEN pushbutton on HIS DH9B. CUE: None       __________
CUE: Role play as Command SRO if required, Acknowledge DH9A did not open.
SAT UNSAT   6. PERFORMANCE STEP: Recognize DH9B does not open.
SAT UNSAT
STANDARD: HIS DH9B green light remains lit.         CUE: Role play as Command SRO if required, Acknowledge DH9B did not open.
: 5. PERFORMANCE STEP: Open DH 9B.
__________
STANDARD:         Depress the OPEN pushbutton on HIS DH9B.
SAT UNSAT   7. PERFORMANCE STEP: Manually trip Train 1 SFAS Level 5 Output Modules.                 C     STANDARD: Depress and release the trip pushbuttons next to L511 and L513.
CUE: None SAT UNSAT
COMMENT: Step 7 and 8 can be done in either order
: 6. PERFORMANCE STEP: Recognize DH9B does not open.
.
STANDARD: HIS DH9B green light remains lit.
CUE: Role play as Command SRO if required, Acknowledge DH9B did not open.
SAT UNSAT
: 7. PERFORMANCE STEP: Manually trip Train 1 SFAS Level 5 Output Modules.
C STANDARD: Depress and release the trip pushbuttons next to L511 and L513.
COMMENT: Step 7 and 8 can be done in either order.
CUE: Another RO is monitoring conditions for cavitation.
CUE: Another RO is monitoring conditions for cavitation.
__________
SAT UNSAT
SAT UNSAT   8. PERFORMANCE STEP: Manually trip Train 2 SFAS Level 5 Output Modules.                 C           STANDARD: Depress and release the trip pushbuttons next to L512 and L514.
: 8. PERFORMANCE STEP: Manually trip Train 2 SFAS Level 5 Output Modules.
CUE: None       __________
C STANDARD: Depress and release the trip pushbuttons next to L512 and L514.
CUE: None
_______________________________________________________________SAT UNSAT__
_______________________________________________________________SAT UNSAT__
: 9. PERFORMANCE STEP: Open DH 9A.         C               STANDARD: Depress the OPEN pushbutton on HIS DH9A.       CUE: None
: 9. PERFORMANCE STEP: Open DH 9A.
__________
C STANDARD: Depress the OPEN pushbutton on HIS DH9A.
SAT UNSAT   10. PERFORMANCE STEP: Verify that DH 9A starts to open.         STANDARD: Check GREEN light OFF on HIS DH9A.         CUE: None       __________
CUE: None
SAT UNSAT   11. PERFORMANCE STEP: Open DH 9B.       C           STANDARD: Depress the OPEN pushbutton on HIS DH9B.       CUE: None       __________
 
SAT UNSAT   12. PERFORMANCE STEP: Verify that DH 9B starts to open.         STANDARD: Check GREEN light OFF on HIS DH9B.         CUE: None       __________
SAT UNSAT
SAT UNSAT   13. PERFORMANCE STEP: Verify that DH 7A starts to close as DH 9A starts to open.       STANDARD: Recognize DH7A starts to close, check RED light OFF on HIS DH7A.       CUE: None       __________
: 10. PERFORMANCE STEP: Verify that DH 9A starts to open.
SAT UNSAT
STANDARD: Check GREEN light OFF on HIS DH9A.
CUE: None SAT UNSAT
: 11. PERFORMANCE STEP: Open DH 9B.
C STANDARD: Depress the OPEN pushbutton on HIS DH9B.
CUE: None SAT UNSAT
: 12. PERFORMANCE STEP: Verify that DH 9B starts to open.
STANDARD: Check GREEN light OFF on HIS DH9B.
CUE: None SAT UNSAT
: 13. PERFORMANCE STEP: Verify that DH 7A starts to close as DH 9A starts to open.
STANDARD: Recognize DH7A starts to close, check RED light OFF on HIS DH7A.
CUE: None SAT UNSAT
: 14. PERFORMANCE STEP: Verify that DH 7B starts to close as DH 9B starts to open.
: 14. PERFORMANCE STEP: Verify that DH 7B starts to close as DH 9B starts to open.
STANDARD: Recognize DH7B starts to close, check RED light OFF on HIS DH7B.         CUE: None       __________
STANDARD: Recognize DH7B starts to close, check RED light OFF on HIS DH7B.
SAT UNSAT   15. PERFORMANCE STEP: Verify the transfer is complete.
CUE: None SAT UNSAT
STANDARD: Check the RED indicating lights on HIS DH9A and HIS DH9B are LIT and                                       the GREEN indicating lights on HIS DH7A and HIS DH7B are LIT.
: 15. PERFORMANCE STEP: Verify the transfer is complete.
Check low pressure injection flow NOT significantly changed.       CUE: None.       __________
STANDARD: Check the RED indicating lights on HIS DH9A and HIS DH9B are LIT and the GREEN indicating lights on HIS DH7A and HIS DH7B are LIT.
SAT UNSAT   TERMINATING CUES: This JPM is complete (Terminated by the examiner)
 
__________
Check low pressure injection flow NOT significantly changed.
END TIME        
CUE: None.
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)
END TIME
 
Simulator JPM S3


Simulator JPM S3 Facility:             Davis-Besse   Task No:   004-029-05-0100              
Facility:         Davis-Besse                           Task No: 004-029-05-0100 Task


Task Title
==Title:==
Recover From MU/HPI/PORV Cooling         K/A  
Recover From MU/HPI/PORV Cooling K/A  


==Reference:==
==Reference:==
(0 10) A2.03 4.1/4.2       Job Performance Measure No
(010) A2.03 4.1/4.2     Job Performance Measure No:           S3 (JPM 063)
:   S3 (JPM 063)   Examinee:           NRC Examiner:       Date:       Method of testing:
Examinee:
Simulated Performance ___   Actual Performance _X_ Classroom ___   Simulator _X_   Plant ___
NRC Examiner:                                                           Date:
Method of testing:
Simulated Performance ___                       Actual Performance _X_
Classroom ___                     Simulator _X_               Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Task Standard:
Perform Recovery from MU/HPI PORV Cooling and recognize failure of the PORV to close and take immediate actions. Required Materials:
Perform Recovery from MU/HPI PORV Cooling and recognize failure of the PORV to close and take immediate actions.
Attachment 25 of DB
Required Materials: 5 of DB-OP-02000, RPS, SFAS, SFRCS Trip, or SG Tube Rupture.
-OP-02000, RPS, SFAS, SFRCS Trip, or SG Tube Rupture. General  
General  


==References:==
==References:==


None Initiating Cue:
None Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
Time Critical Task:
No   Alternate Path:
No Alternate Path:
Yes Validation Time:
Yes Validation Time:
11 minutes
11 minutes


SIMULATOR INSTRUCTIONS TASK DESCRIPTION: Perform Recovery From MU/HPI PORV Cooling and recognize failure of the PORV to close and take immediate actions.
SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
INITIAL CONDITION: Loss of all Feedwater MU/HPI cooling initiated MDFP feeding both SGs ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION: Fail Makeup Pump 2 to start Fail both AFPTs to start
Perform Recovery From MU/HPI PORV Cooling and recognize failure of the PORV to close and take immediate actions.
INITIAL CONDITION:
Loss of all Feedwater MU/HPI cooling initiated MDFP feeding both SGs ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
Fail Makeup Pump 2 to start Fail both AFPTs to start Unfreeze the simulator after the initial cue is given to minimize excessive SCM MALFUNCTIONS/FAILURE TO INSERT:
Fail the PORV open ACTIONS/CUES None


Unfreeze the simulator after the initial cue is given to minimize excessive SCM MALFUNCTIONS/FAILURE TO INSERT: Fail the PORV open ACTIONS/CUES None
EXAMINER COPY INITIAL CONDITIONS:
 
The reactor has tripped All Feedwater was lost Makeup Pump 2 did NOT start Makeup/HPI/PORV Cooling was initiated INITIATING CUES:
EXAMINER COPY INITIAL CONDITIONS: The reactor has tripped All Feedwater was lost Makeup Pump 2 did NOT start Makeup/HPI/PORV Cooling was initiated INITIATING CUES
The MDFP has been started and is feeding both Steam Generators.
: The MDFP has been started and is feeding both Steam Generators.
A second operator is controlling Steam Generator levels, pressures, and steaming of Steam Generators.
A second operator is controlling Steam Generator levels, pressures, and steaming of Steam Generators.
The Unit Supervisor directs you to recover from MU/HPI/PORV Cooling using Attachment 25 of  
The Unit Supervisor directs you to recover from MU/HPI/PORV Cooling using Attachment 25 of DB-OP-02000. For the purpose of this JPM the Command SRO is not directing the step by step performance of this attachment.
(Provide Attachment 25 of DB-OP-02000, RPS, SFAS, SFRCS Trip, or SG Tube Rupture)


DB-OP-02000. For the purpose of this JPM the Command SRO is not directing the step by step performance of this attachment.
CANDIDATE COPY INITIAL CONDITIONS:
 
The reactor has tripped All Feedwater was lost Makeup Pump 2 did NOT start Makeup/HPI/PORV Cooling was initiated INITIATING CUES:
(Provide Attachment 25 of DB
The MDFP has been started and is feeding both Steam Generators A second operator is controlling Steam Generator levels and pressures The Unit Supervisor directs you to recover from MU/HPI/PORV Cooling using Attachment 25 of DB-OP-02000. For the purpose of this JPM the Command SRO is not directing the step by step performance of this attachment.
-OP-02000, RPS, SFAS, SFRCS Trip, or SG Tube Rupture)
 
CANDIDATE COPY INITIAL CONDITIONS: The reactor has tripped All Feedwater was lost Makeup Pump 2 did NOT start Makeup/HPI/PORV Cooling was initiated INITIATING CUES
: The MDFP has been started and is feeding both Steam Generators
 
A second operator is controlling Steam Generator levels and pressures
 
The Unit Supervisor directs you to recover from MU/HPI/PORV Cooling using Attachment 25 of DB-OP-02000. For the purpose of this JPM the Command SRO is not directing the step by step performance of this attachment.


PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
START TIME: _______
: 1. PERFORMANCE STEP: Establish the letdown flow.   ........C........ STANDARD: Depress OPEN on HISMU2B. COMMENT: Sequence of opening MU 2B, MU 2A and MU 3 NOT critical CUE: If asked for desired flow "Establish 70 gpm" (flow rate not critical)
: 1. PERFORMANCE STEP: Establish the letdown flow.
Note: may establish 140 gpm
    ........C........
__________
STANDARD: Depress OPEN on HISMU2B.
SAT UNSAT
COMMENT: Sequence of opening MU 2B, MU 2A and MU 3 NOT critical CUE: If asked for desired flow Establish 70 gpm (flow rate not critical)
: 2. PERFORMANCE STEP: Establish the letdown flow. ........C........ STANDARD: Depress BLOCK for MU 2A. Depress OPEN on HISMU2A.
Note: may establish 140 gpm                                     __________
COMMENT: Sequence of opening MU 2B, MU 2A and MU 3 NOT critical CUE: If asked for desired flow "Establish 70 gpm" (flow rate not critical)
SAT UNSAT
Note: may establish 140 gpm
: 2. PERFORMANCE STEP: Establish the letdown flow.
__________
    ........C........
SAT UNSAT 3. PERFORMANCE STEP: Establish the letdown flow  
STANDARD: Depress BLOCK for MU 2A.
  ........C........
Depress OPEN on HISMU2A.
STANDARD: Depress BLOCK pushbutton for MU 3. Depress OPEN pushbutton on HISMU3. COMMENT: Sequence of opening MU 2B, MU 2A and MU 3 NOT critical CUE: If asked for desired flow "Establish 70 gpm" (letdown flow rate not critical). Note: may establish 140 gpm       __________
COMMENT:Sequence of opening MU 2B, MU 2A and MU 3 NOT critical CUE:       If asked for desired flow Establish 70 gpm (flow rate not critical)
SAT UNSAT   4. PERFORMANCE STEP: Open the MU Pumps Minimum Recirc Valves. ........C........ STANDARD: Depress the OPEN pushbutton on HISMU6407. CUE: None __________
Note: may establish 140 gpm SAT UNSAT
SAT UNSAT
: 3. PERFORMANCE STEP: Establish the letdown flow
: 5. PERFORMANCE STEP: Open the MU Pumps Minimum Recirc Valves. STANDARD: Depress the OPEN pushbutton on HISMU6406. COMMENT: MU 6406 not critical due to MUP 2 not running CUE: None       __________
    ........C........
SAT UNSAT   6. PERFORMANCE STEP: IF BOTH MU Pumps are in service perform the following:   STANDARD: Recognize this step does not apply - mark N/A. COMMENT: Only MUP 1 is in service CUE: None       __________
STANDARD: Depress BLOCK pushbutton for MU 3.
SAT UNSAT
Depress OPEN pushbutton on HISMU3.
: 7. PERFORMANCE STEP: Isolate the normal MU Injection header. STANDARD: Depress the CLOSE pushbutton on HISMU6422.
COMMENT:Sequence of opening MU 2B, MU 2A and MU 3 NOT critical CUE:       If asked for desired flow Establish 70 gpm (letdown flow rate not critical).
CUE: None       __________
Note: may establish 140 gpm SAT UNSAT
SAT UNSAT
: 4. PERFORMANCE STEP: Open the MU Pumps Minimum Recirc Valves.
: 8. PERFORMANCE STEP: Establish desired MU flow rate by throttling MU6419. STANDARD: Depress and hold the CLOSE pushbutton on HIS MU 6419 to throttle the valve closed and reduce flow rate to desired value while maintaining adequate Subcooling Margin.
    ........C........
CUE: (If asked) MU 6423B is open to maintain minimum flow
STANDARD: Depress the OPEN pushbutton on HISMU6407.
__________
CUE:       None                                                           __________
SAT UNSAT
SAT UNSAT
: 9. PERFORMANCE STEP: Restore MU Pump Suction.  
: 5. PERFORMANCE STEP: Open the MU Pumps Minimum Recirc Valves.
........C........
STANDARD: Depress the OPEN pushbutton on HISMU6406.
STANDARD: Depress the OFF pushbutton on HISMU6405. CUE: None       __________
COMMENT: MU 6406 not critical due to MUP 2 not running CUE:       None SAT UNSAT
SAT UNSAT
: 6. PERFORMANCE STEP: IF BOTH MU Pumps are in service perform the following:
STANDARD: Recognize this step does not apply - mark N/A.
COMMENT: Only MUP 1 is in service CUE:       None SAT UNSAT
: 7. PERFORMANCE STEP: Isolate the normal MU Injection header.
STANDARD: Depress the CLOSE pushbutton on HISMU6422.
CUE:       None SAT UNSAT
: 8. PERFORMANCE STEP: Establish desired MU flow rate by throttling MU6419.
STANDARD: Depress and hold the CLOSE pushbutton on HIS MU 6419 to throttle the valve closed and reduce flow rate to desired value while maintaining adequate Subcooling Margin.
CUE: (If asked) MU 6423B is open to maintain minimum flow SAT UNSAT
: 9. PERFORMANCE STEP: Restore MU Pump Suction.
    ........C........
STANDARD: Depress the OFF pushbutton on HISMU6405.
CUE:       None SAT UNSAT
: 10. PERFORMANCE STEP: Restore MU Pump Suction.
: 10. PERFORMANCE STEP: Restore MU Pump Suction.
STANDARD: Depress the OFF pushbutton on HISMU3971. COMMENT: MU3971 not critical due to MUP 2 not running CUE: None       __________
 
SAT UNSAT
STANDARD: Depress the OFF pushbutton on HISMU3971.
: 11. PERFORMANCE STEP: IF only MU Pump 2 is in service perform the following. STANDARD: Recognize this step does not apply - mark N/A. COMMENT: Only MUP 1 is in service CUE: None       __________
COMMENT: MU3971 not critical due to MUP 2 not running CUE:   None SAT UNSAT
SAT UNSAT
: 11. PERFORMANCE STEP: IF only MU Pump 2 is in service perform the following.
STANDARD: Recognize this step does not apply - mark N/A.
COMMENT: Only MUP 1 is in service CUE: None SAT UNSAT
: 12. PERFORMANCE STEP: Perform the following to recover RCS Inventory control:
: 12. PERFORMANCE STEP: Perform the following to recover RCS Inventory control:
STANDARD: Maintain Steam Generator levels per specific rule 4. CUE: Balance Of Plant RO is maintaining SG Levels
STANDARD: Maintain Steam Generator levels per specific rule 4.
__________
CUE: Balance Of Plant RO is maintaining SG Levels SAT UNSAT
SAT UNSAT
: 13. PERFORMANCE STEP: Perform the following to recover RCS Inventory control:
: 13. PERFORMANCE STEP: Perform the following to recover RCS Inventory control:
STANDARD: Reduce HPI Flow to establish a decreasing SCM trend (maintain minimum Subcooling Margin) by throttling HP2A
STANDARD: Reduce HPI Flow to establish a decreasing SCM trend (maintain minimum Subcooling Margin) by throttling HP2A-D as necessary.
-D as necessary.
Comment: Two handed operations is authorized for positioning HP2A through HP2D CUE: None SAT UNSAT
Comment: Two handed operations is authorized for positioning HP2A through HP2D CUE: None       __________
SAT UNSAT
: 14. PERFORMANCE STEP: Perform the following to recover RCS Inventory control:
: 14. PERFORMANCE STEP: Perform the following to recover RCS Inventory control:
STANDARD: Raise letdown flow to maximum available by throttling MU6 and/or placing a second purification demineralizer in service. CUE: If asked for desired flow "Establish 70 gpm" (letdown flow rate not critical).       Note: may establish 140 gpm       __________
STANDARD: Raise letdown flow to maximum available by throttling MU6 and/or placing a second purification demineralizer in service.
SAT UNSAT    
CUE: If asked for desired flow Establish 70 gpm (letdown flow rate not critical).
 
Note: may establish 140 gpm SAT UNSAT ALTERNATH PATH: RC2A is expected to close. Must recognize PORV did not close and perform actions of the response not obtained column to close the PORV Block Valve.
ALTERNATH PATH: RC2A is expected to close. Must recognize PORV did not close and perform actions of the response not obtained column to close the PORV Block Valve.
: 15. PERFORMANCE STEP: Close the PORV.
: 15. PERFORMANCE STEP: Close the PORV.
STANDARD: Rotate HIS RC 2A to the AUTO position and Push to Close. Recognize the PORV did NOT close. CUE: None      __________
SAT  UNSAT
: 16. PERFORMANCE STEP: Close the PORV Block Valve.  ........C........


STANDARD: Rotate HIS RC 2A to the AUTO position and Push to Close. Recognize the PORV did NOT close.
CUE:      None SAT UNSAT
: 16. PERFORMANCE STEP: Close the PORV Block Valve.
    ........C........
STANDARD: Depress the CLOSE pushbutton on HISRC11 and verify it closes.
STANDARD: Depress the CLOSE pushbutton on HISRC11 and verify it closes.
CUE: None.       __________
CUE:       None.
SAT UNSAT   TERMINATING CUES:
SAT UNSAT TERMINATING CUES:This JPM is complete (Terminated by the evaluator)
This JPM is complete (Terminated by the evaluator)
END TIME
__________
 
END TIME Simulator JPM S4 Facility: Davis-Besse   Task No:    059-012-04-0100     Task Title
Simulator JPM S4
: Main Feed Pump Startup/Transfer to ICS Control K/A  
 
Facility: Davis-Besse                           Task No:    059-012-04-0100 Task
 
==Title:==
Main Feed Pump Startup/Transfer to ICS Control K/A  


==Reference:==
==Reference:==
(059) A4.10 (3.9/3.8)________ Job Performance Measure No
(059) A4.10 (3.9/3.8)________ Job Performance Measure No: S4 (JPM New)
: S4 (JPM New)   Examinee:           NRC Examiner:       Date:       Method of testing:
Examinee:
Simulated Performance _
NRC Examiner:                                                           Date:
__   Actual Performance __
Method of testing:
X__  Classroom ___   Simulator _X_   Plant ___ Read to the examinee:
Simulated Performance _ __                       Actual Performance __X__
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Classroom ___                     Simulator _X_                       Plant ___
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Task Standard:
Perform steps to place Main Feed Pump in service and emergency trip due to low oil pressure Required Materials:
Perform steps to place Main Feed Pump in service and emergency trip due to low oil pressure Required Materials:
Line 595: Line 618:
None Initiating Cue:
None Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
Time Critical Task: No Alternate Path: Yes Validation Time: 9 minutes SIMULATOR INSTRUCTIONS
No Alternate Path: Yes Validation Time: 9 minutes SIMULATOR INSTRUCTIONS
 
TASK DESCRIPTION: Perform steps to place Main Feed Pump in service and emergency trip due to low oil pressure INITIAL CONDITION: Mode 2 with reactor power at 2%. Main Feed Pump 2 startup in progress and ready to transfer to ICS Hand/Auto station control (step 3.16.44 of DB-OP-06224, Main Feed Pump and Turbine). ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:    MALFUNCTIONS/FAILURE TO INSERT: Insert low oil pressure #2 MFPT when increasing speed to raise discharge pressure to 1000psig to 1050psig (triggered at approximately 950psig)


ACTION/CUES:
TASK DESCRIPTION:
Perform steps to place Main Feed Pump in service and emergency trip due to low oil pressure INITIAL CONDITION:
Mode 2 with reactor power at 2%. Main Feed Pump 2 startup in progress and ready to transfer to ICS Hand/Auto station control (step 3.16.44 of DB-OP-06224, Main Feed Pump and Turbine).
ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
MALFUNCTIONS/FAILURE TO INSERT:
Insert low oil pressure #2 MFPT when increasing speed to raise discharge pressure to 1000psig to 1050psig (triggered at approximately 950psig)
ACTION/CUES:


STUDENT COPY INITIAL CONDITIONS: Mode 2 with reactor power at 2%. Main Feed Pump 2 startup in progress and ready to transfer to ICS Hand/Auto station control (step 3.16.44 of DB
STUDENT COPY INITIAL CONDITIONS:
-OP-06224, Main Feed Pump and Turbine)
Mode 2 with reactor power at 2%. Main Feed Pump 2 startup in progress and ready to transfer to ICS Hand/Auto station control (step 3.16.44 of DB-OP-06224, Main Feed Pump and Turbine)
INITIATING CUES: The unit supervisor has directed you to continue with #2 MFP startup starting at step 3.16.44 of DB-OP-06224, Main Feed Pump and Turbine. Transfer #2 MFP to ICS Hand/Auto station control and continue with step 3.26 of DB
INITIATING CUES:
-OP-06901, Plant Startup, to transfer feedwater from the MDFP to the MFP.
The unit supervisor has directed you to continue with #2 MFP startup starting at step 3.16.44 of DB-OP-06224, Main Feed Pump and Turbine. Transfer #2 MFP to ICS Hand/Auto station control and continue with step 3.26 of DB-OP-06901, Plant Startup, to transfer feedwater from the MDFP to the MFP.


EXAMINER COPY INITIAL CONDITIONS: Mode 2 with reactor power at 2%. Main Feed Pump 2 startup in progress and ready to transfer to ICS Hand/Auto station control (step 3.16.44 of DB
EXAMINER COPY INITIAL CONDITIONS:
-OP-06224, Main Feed Pump and Turbine). INITIATING CUES: The unit supervisor has directed you to continue with #2 MFP startup starting at step 3.16.44 of DB-OP-06224, Main Feed Pump and Turbine. Transfer #2 MFP to ICS Hand/Auto station control and continue with step 3.26 of DB
Mode 2 with reactor power at 2%. Main Feed Pump 2 startup in progress and ready to transfer to ICS Hand/Auto station control (step 3.16.44 of DB-OP-06224, Main Feed Pump and Turbine).
-OP-06901, Plant Startup, to transfer feedwater from the MDFP to the MFP.
INITIATING CUES:
The unit supervisor has directed you to continue with #2 MFP startup starting at step 3.16.44 of DB-OP-06224, Main Feed Pump and Turbine. Transfer #2 MFP to ICS Hand/Auto station control and continue with step 3.26 of DB-OP-06901, Plant Startup, to transfer feedwater from the MDFP to the MFP.
(Provide the examinee a copy of the following documents:
(Provide the examinee a copy of the following documents:
DB-OP-06901, Plant Startup, signed off through step 3.24 with step 3.25 in progress DB-OP-06224, Main Feed Pump and Turbine, section 3.16, Startup of MFP2, signed off as
DB-OP-06901, Plant Startup, signed off through step 3.24 with step 3.25 in progress DB-OP-06224, Main Feed Pump and Turbine, section 3.16, Startup of MFP2, signed off as applicable through step 3.16.43.
 
DB-OP-06224, Main Feed Pump and Turbine, section 3.17, Transferring MFPT 2 Speed Control Between MDT20 and ICS)
applicable through step 3.16.43.
DB-OP-06224, Main Feed Pump and Turbine, section 3.17, Transferring MFPT 2 Speed Control Between MDT20 and ICS)    
 
PERFORMANCE INFORMATION
PERFORMANCE INFORMATION


NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".
NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".
START TIME:
START TIME:
: 1. PERFORMANCE STEP: Perform section 3.17 of DB
: 1.     PERFORMANCE STEP: Perform section 3.17 of DB-OP-06224, Main Feed Pump Turbine, and transfer MFPT2 Speed Control from MDT20 to ICS.
-OP-06224, Main Feed Pump Turbine, and transfer MFPT2 Speed Control from MDT20 to ICS.
STANDARD: Identify step 3.17.1 of DB-OP-06224, Main Feed Pump Turbine, for transfer of MFPT2 Speed Control from MDT20 to ICS.
STANDARD: Identify step 3.17
CUE: None SAT UNSAT
.1 of DB-OP-06224, Main Feed Pump Turbine, for transfer of MFPT2 Speed Control from MDT20 to ICS.     CUE: None       __________
: 2.     PERFORMANCE STEP: Verify MFPT speed is between 3900 RPM and 5150 RPM STANDARD: Verify MFPT 2 speed between 3900 RPM and 5150 RPM using indicator SI2708B CUE: None SAT UNSAT
SAT UNSAT   2. PERFORMANCE STEP: Verify MFPT speed is between 3900 RPM and 5150 RPM STANDARD: Verify MFPT 2 speed between 3900 RPM and 5150 RPM using indicator SI2708 B  CUE:   None       __________
: 3.     PERFORMANCE STEP: Adjust the ICS Bailey Controller output to indicate a zero amp reading on the XFER METER Amp Y1-806 STANDARD: Toggle the ICS Bailey Controller speed control, HIC ICS 36A Hand/Auto Station, to indicate a zero amp reading on the XFER METER Amp Y1-806 CUE: None SAT UNSAT
SAT UNSAT   3. PERFORMANCE STEP: Adjust the ICS Bailey Controller output to indicate a zero amp reading on the XFER METER Amp Y1
: 4.     PERFORMANCE STEP: Depress ICS on HIS 806C1
-806 STANDARD: Toggle the ICS Bailey Controller speed control, HIC ICS 36A Hand/Auto Station, to indicate a zero amp reading on the XFER METER Amp Y1
            ........C........
-806   CUE: None       __________
STANDARD: Depress ICS on HIS 806C1 CUE: None                                                                 __________
SAT UNSAT   4. PERFORMANCE STEP: Depress ICS on HIS 806C1
SAT UNSAT
 
: 5.     PERFORMANCE STEP: Check that ICS illuminates and the ICS Bailey Controller assumes control of MFPT speed.
........C........
STANDARD: Check that ICS illuminates on HIS 806C1 and that the ICS Bailey Controller
STANDARD: Depress ICS on HIS 806C1 CUE: None                                     __________
SAT UNSAT
: 5. PERFORMANCE STEP: Check that ICS illuminates and the ICS Bailey Controller assumes control of MFPT speed.
STANDARD: Check that ICS illuminates on HIS 806C1 and that the ICS Bailey Controller                                  


assumes control of MFPT 2 speed.
assumes control of MFPT 2 speed.
CUE: None                                     __________
CUE: None                                                       __________
SAT UNSAT   6. PERFORMANCE STEP: If ICS Control is unstable, THEN return to MDT20 Contro
SAT UNSAT
: l. STANDARD: Recognize proper control by the ICS Controller and mark step 3.17.1.e as N/A. CUE: None                                     __________
: 6. PERFORMANCE STEP: If ICS Control is unstable, THEN return to MDT20 Control.
SAT UNSAT
STANDARD: Recognize proper control by the ICS Controller and mark step 3.17.1.e as N/A.
: 7. PERFORMANCE STEP: Adjust the MDT20 output to maintain zero amps indicated on the XFER METER Y1
CUE: None                                                       __________
-806.
SAT UNSAT
STANDARD: Maintain zero amps indicated on the XFER METER Y1
: 7. PERFORMANCE STEP: Adjust the MDT20 output to maintain zero amps indicated on the XFER METER Y1-806.
-806 by occasional                                     adju stment as needed of the MDT20 output.
STANDARD: Maintain zero amps indicated on the XFER METER Y1-806 by occasional adjustment as needed of the MDT20 output.
COMMENT: Student may consider step 3.17.1.f in progress while continuing MFP startup and not sign as complete.
COMMENT: Student may consider step 3.17.1.f in progress while continuing MFP startup and not sign as complete.
CUE: None                                     __________
CUE: None                                                       __________
SAT UNSAT   8. PERFORMANCE STEP: Complete section 3.17 of DB
SAT UNSAT
-OP-06224. STANDARD: Sign and date complete by for section 3.17 of DB
: 8. PERFORMANCE STEP: Complete section 3.17 of DB-OP-06224.
-OP-06224.             COMMENT: If student considers step 3.17.1.f to be in progress while continuing MFP startup then section 3.17 will not be signed as complete.
STANDARD: Sign and date complete by for section 3.17 of DB-OP-06224.
CUE: None                                     __________
COMMENT: If student considers step 3.17.1.f to be in progress while continuing MFP startup then section 3.17 will not be signed as complete.
SAT UNSAT   9. PERFORMANCE STEP: Sign complete step 3.16.44 of DB-OP-06224. STANDARD: Sign complete step 3.16.44 of DB-OP-06224.
CUE: None                                                       __________
COMMENT: If student considers step 3.17.1.f to be in progress while continuing MFP startup and section 3.17 is not signed as complete then step 3.16.44 may                                 remain in progress.
SAT UNSAT
Step 3.16.45 would be performed after the MFP is supplying feedwater to the steam generators.
: 9. PERFORMANCE STEP: Sign complete step 3.16.44 of DB-OP-06224.
CUE: None
STANDARD: Sign complete step 3.16.44 of DB-OP-06224.
__________
COMMENT: If student considers step 3.17.1.f to be in progress while continuing MFP startup and section 3.17 is not signed as complete then step 3.16.44 may remain in progress. Step 3.16.45 would be performed after the MFP is supplying feedwater to the steam generators.
SAT UNSAT     10.       PERFORMANCE STEP: Sign compete step 3.25 of DB
CUE: None                                                       __________
-OP-06901, Plant Startup.
SAT UNSAT
STANDARD: Sign compete step 3.2.5 of DB
: 10. PERFORMANCE STEP: Sign compete step 3.25 of DB-OP-06901, Plant Startup.
-OP-06901, Plant Startup.
STANDARD: Sign compete step 3.2.5 of DB-OP-06901, Plant Startup.
COMMENT: Student may continue with step 3.2.5 circled (in progress) because  
COMMENT: Student may continue with step 3.2.5 circled (in progress) because section of DB-OP-06224 is not complete until there is flow to the steam


section of DB
generators and the ARTS Channels test/toggle switches are placed in the operate position at step 3.16.45.
-OP-06224 is not complete until there is flow to the steam
CUE: None                                                                     __________
 
SAT UNSAT
gen erators and the ARTS Channels test/toggle switches are placed in the operate position at step 3.16.45. CUE: None                                       __________
: 11. PERFORMANCE STEP: Raise Main Feed Pump Speed until discharge pressure is
SAT UNSAT   11. PERFORMANCE STEP:
    ........C........               between 1000 and 1050 psig (step 3.26.1 of DB-OP-06901).
Raise Main Feed Pump Speed until discharge pressure is  
STANDARD: Raise MFPT 2 speed using manual control of HIC ICS 36A Hand/Auto Station, ICS Bailey Controller, to raise discharge pressure to band of 1000-1050 psig.
            ........C........                       between 1000 and 1050 psig (step 3.26.1 of DB
-OP-06901). STANDARD: Raise MFPT 2 speed using manual control of HIC ICS 36A Hand/Auto Station, ICS Bailey Controller, to raise discharge pressure to band of 1000-1050 psig.
NOTE: Alternate Path begins with low oil pressure Annunciator 10-1-D received as discharge pressure is raised (triggered to alarm at approximately 950psig).
NOTE: Alternate Path begins with low oil pressure Annunciator 10-1-D received as discharge pressure is raised (triggered to alarm at approximately 950psig).
CUE: None
CUE: None                                                                     __________
__________
SAT UNSAT
SAT UNSAT   12.       PERFORMANCE STEP: Identify Annunciator 10-1-D, MFPT 2 LUBE OIL PRESS LO, in alarm. STANDARD: Recognize annunciator 10-1-D, MFPT 2 LUBE OIL PRESS LO, in alarm and refer to alarm procedure DB
: 12. PERFORMANCE STEP: Identify Annunciator 10-1-D, MFPT 2 LUBE OIL PRESS LO, in alarm.
-OP-2010. CUE: If student refers to alarm procedure provide copy of DB-OP-02010 pages 10 and 11 for Annunciator 10-1-D
STANDARD: Recognize annunciator 10-1-D, MFPT 2 LUBE OIL PRESS LO, in alarm and refer to alarm procedure DB-OP-2010.
__________
CUE: If student refers to alarm procedure provide copy of DB-OP-02010 pages 10 and 11 for Annunciator 10-1-D SAT UNSAT
SAT UNSAT   13.       PERFORMANCE STEP: Determine if bearing pressure is actually Low
: 13. PERFORMANCE STEP: Determine if bearing pressure is actually Low.
. STANDARD: Determine bearing pressure is actually Low (<7 psig) using PI12 56,                                     Header Control Pressure.
STANDARD: Determine bearing pressure is actually Low (<7 psig) using PI1256, Header Control Pressure.
CUE: None          
CUE: None                                                                     __________
SAT UNSAT
: 14. PERFORMANCE STEP: Verify automatic start of standby MFPT 2 Main Oil Pump.
    ........C........
COMMENT: The standby MFPT 2 Main Oil Pump will not auto start. The pump will start manually and almost immediately trip on electrical fault.
STANDARD: Identify standby MFPT 2 Main Oil Pump is not running and start standby MFPT 2 Main Oil Pump.


__________
CUE: None                                                                __________
SAT UNSAT
SAT UNSAT
: 14.       PERFORMANCE STEP: Verify automatic start of standby MFPT 2 Main Oil Pump.
: 15. PERFORMANCE STEP: If Bearing Header Pressure decreases to less than 4 psig THEN
            ........C........
        ........C........            start the Emergency Bearing Oil Pump and trip MFPT 2.
STANDARD: Identify Bearing Header Pressure decreases to less than 4 psig using PI1256. Start the Emergency Bearing Oil Pump (HIS1188).
CUE: None                                                                __________
SAT UNSAT
: 16. PERFORMANCE STEP: If Bearing Header Pressure decreases to less than 4 psig THEN
      ........C........           start the Emergency Bearing Oil Pump and trip MFPT 2.
STANDARD: Trip MFPT 2 using HS 798 trip push button.
CUE: None                                                                __________
SAT UNSAT TERMINATING CUES:
This JPM is complete. (Terminated by the examiner)
END TIME


COMMENT:  The standby MFPT 2 Main Oil Pump will not auto start. The pump will start manually and almost immediately trip on electrical fault.
Simulator JPM S5
STANDARD: Identify standby MFPT 2 Main Oil Pump is not running and start                                      standby MFPT 2 Main Oil Pump.


CUE: None           
Facility:         Davis-Besse                          Task No:      334-018-04-0300 Task


__________
==Title:==
SAT  UNSAT    15.      PERFORMANCE STEP: If Bearing Header Pressure decreases to less than 4 psig THEN
Establish Containment Closure K/A  
            ........C........
start the Emergency Bearing Oil Pump and trip MFPT 2.
STANDARD: Identify Bearing Header Pressure decreases to less than 4 psig using                                    PI1256. Start the Emergency Bearing Oil Pump (HIS1188). CUE: None           
 
__________
SAT  UNSAT    16.      PERFORMANCE STEP: If Bearing Header Pressure decreases to less than 4 psig THEN
            ........C........                      start the Emergency Bearing Oil Pump and trip MFPT 2.
STANDARD: Trip MFPT 2 using HS 798 trip push button.
CUE: None           
 
__________
SAT  UNSAT      TERMINATING CUES:
This JPM is complete. (Terminated by the examiner)      __________
END TIME 
 
Simulator JPM S5 Facility:             Davis-Besse    Task No:  334-018-04-0300    Task Title
:      Establish Containment Closure K/A  


==Reference:==
==Reference:==
(103) A3.01 3.9/4.2       Job Performance Measure No:   S5 (JPM 219)   Examinee:           NRC Examiner:       Date:       Method of testing:
(103) A3.01 3.9/4.2     Job Performance Measure No: S5 (JPM 219)
Simulated Performance ___   Actual Performance _X_ Classroom ___   Simulator _X_   Plant ___ Read to the examinee:
Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
NRC Examiner:                                                           Date:
Method of testing:
Simulated Performance ___                       Actual Performance _X_
Classroom ___                     Simulator _X_               Plant ___
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Task Standard:
Establish Containment Closure   Required Materials:
Establish Containment Closure Required Materials:
DB-OP-06904, Shutdown Operations, Section 11  
DB-OP-06904, Shutdown Operations, Section 11 General  
 
General  


==References:==
==References:==
Line 729: Line 747:
Time Critical Task:
Time Critical Task:
No Alternate Path:
No Alternate Path:
No Validation Time: 8 minutes SIMULATOR INSTRUCTIONS TASK DESCRIPTION: Establish Containment closure INITIAL CONDITION: Initialize to special IC 116 OR MODE 5 IC with DH Loop 2 operating and CTMT Purge in operation on CTMT ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION: Manually de
No Validation Time:
-energize A and B buses to simulate a loss of offsite power followed by restoration of offsite power.
8 minutes
Emergency Shutdown #1 EDG


irf g529g Energize D2 Bus from D1 Bus to restore Instrument Air MALFUNCTIONS/FAILURE TO INSERT: DH Pump #2 breaker fail open
SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
 
Establish Containment closure INITIAL CONDITION:
imf bdp2c CTMT Purge Valves CV5005 and CV5008 fail open
Initialize to special IC 116 OR MODE 5 IC with DH Loop 2 operating and CTMT Purge in operation on CTMT ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
 
Manually de-energize A and B buses to simulate a loss of offsite power followed by restoration of offsite power.
imf cav9c imf cavfc ACTION/CUES:
Emergency Shutdown #1 EDG irf g529g Energize D2 Bus from D1 Bus to restore Instrument Air MALFUNCTIONS/FAILURE TO INSERT:
DH Pump #2 breaker fail open imf bdp2c CTMT Purge Valves CV5005 and CV5008 fail open imf cav9c imf cavfc ACTION/CUES:
: 7. ROLE PLAY as Field Supervisor or other OPS WSC to report that all LLRTs are terminated and isolated.
: 7. ROLE PLAY as Field Supervisor or other OPS WSC to report that all LLRTs are terminated and isolated.
: 8. ROLE PLAY as Field Supervisor or other OPS WSC to report that all personnel assigned specific Containment Closure responsibilities are carrying out the required actions.
: 8. ROLE PLAY as Field Supervisor or other OPS WSC to report that all personnel assigned specific Containment Closure responsibilities are carrying out the required actions.
EXAMINER COPY INITIAL CONDITIONS: The plant was in MODE 5 with Decay Heat Loop 2 operating when a loss of offsite power occurred. 


EDG #1 tripped and efforts to restart it have been unsuccessful.
EXAMINER COPY INITIAL CONDITIONS:
The plant was in MODE 5 with Decay Heat Loop 2 operating when a loss of offsite power occurred.
EDG #1 tripped and efforts to restart it have been unsuccessful.
EDG #2 is providing power to D1 and D2 Buses.
Decay Heat Pump 2 breaker would not re-close after D1 power was restored. Maintenance is investigating.
INITIATING CUES:
The Shift Manager directs you to establish Containment Closure in accordance with step 11.1.5 of DB-OP-06904 Shutdown Operations (required by DB-OP-02527, Loss of Decay Heat Removal).
(Provide section 11 of DB-OP-06904)


CANDIDATE COPY INITIAL CONDITIONS:
The plant was in MODE 5 with Decay Heat Loop 2 operating when a loss of offsite power occurred.
EDG #1 tripped and efforts to restart it have been unsuccessful.
EDG #2 is providing power to D1 and D2 Buses.
EDG #2 is providing power to D1 and D2 Buses.
Decay Heat Pump 2 breaker would not re
Decay Heat Pump 2 breaker would not re-close after D1 power was restored. Maintenance is investigating.
-close after D1 power was restored. Maintenance is investigating.
INITIATING CUES:
INITIATING CUES: The Shift Manager directs you to establish Containment Closure in accordance with step 11.1.5 of DB-OP-06904 Shutdown Operations (required by DB
The Shift Manager directs you to establish Containment Closure in accordance with step 11.1.5 of DB-OP-06904 Shutdown Operations (required by DB-OP-02527, Loss of Decay Heat Removal).
-OP-02527, Loss of Decay Heat Removal).   (Provide section 11 of DB
-OP-06904)
CANDIDATE COPY INITIAL CONDITIONS: The plant was in MODE 5 with Decay Heat Loop 2 operating when a loss of offsite power occurred. 


EDG #1 tripped and efforts to restart it have been unsuccessful. 
EDG #2 is providing power to D1 and D2 Buses. 
Decay Heat Pump 2 breaker would not re
-close after D1 power was restored. Maintenance is investigating.
INITIATING CUES: The Shift Manager directs you to establish Containment Closure in accordance with step 11.1.5 of DB-OP-06904 Shutdown Operations (required by DB
-OP-02527, Loss of Decay Heat Removal).
PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
START TIME: _______
: 1. PERFORMANCE STEP:
: 1. PERFORMANCE STEP:               Locate the correct procedure step.
Locate the correct procedure step.
 
STANDARD: Finds step 11.1.5.
STANDARD: Finds step 11.1.5.
CUE: None
CUE: None SAT UNSAT
___________
: 2. PERFORMANCE STEP:               Announce Containment Closure over the Gaitronics.
SAT UNSAT   2.         PERFORMANCE STEP:       Announce Containment Closure over the Gaitronics.
 
STANDARD: Use Gaitronics to announce the following:
STANDARD: Use Gaitronics to announce the following:
            "Attention all station personnel, attention all station personnel. All assigned personnel establish containment closure immediately. All assigned personnel establish containment closure immediately."
CUE: None SAT UNSAT
: 3. PERFORMANCE STEP:                Verify Containment Purge is shut down.
STANDARD: Visual check of Containment Purge supply and Exhaust Fan control switch indications indicate fans are shutdown.
COMMENT: If system procedure for shutdown is referenced the Containment Purge containment isolation valves will be directed to be closed.
Performance steps 5 and 7 would be used to evaluate.
CUE: None SAT UNSAT
: 4. PERFORMANCE STEP: Perform selected isolation of SFAS Containment


                    "Attention all station personnel, attention all station personnel. All assigned personnel establish containment closure immediately. All assigned personnel establish containment closure immediately."            CUE: None      ___________
Penetrations STANDARD: Refers to DB-OP-02000 Table 2, SFAS Actuated Equipment, and isolate containment penetrations able to be positioned from control room to establish containment closure.
SAT  UNSAT
CUE: Shift Manager directs you to refer to DB-OP-02000 Table 2, SFAS Actuated Equipment, and isolate Level 1 and Level 2 containment penetrations able to be positioned from control room.
: 3. PERFORMANCE STEP:
Verify Containment Purge is shut down.
 
STANDARD: Visual check of Containment Purge supply and Exhaust Fan control switch                                    indications indicate fans are shutdown.
COMMENT: If system procedure for shutdown is referenced the Containment Purge containment isolation valves will be directed to be closed.                                  Performance steps 5 and 7 would be used to evaluate.
CUE: None        ___________
SAT  UNSAT
: 4.      PERFORMANCE STEP: Perform selected isolation of SFAS Containment
 
Penetrations STANDARD: Refers to DB
-OP-02000 Table 2, SFAS Actuated Equipment, and                         isolate containment penetrations able to be positioned from control room to establish containment closure. CUE: Shift Manager directs you to refer to DB
-OP-02000 Table 2, SFAS Actuated Equipment, and isolate Level 1 and Level 2 containment penetrations able to be positioned from control room.
(Provide clean copy of table 2)
(Provide clean copy of table 2)
___________
SAT UNSAT
SAT UNSAT   5. PERFORMANCE STEP:
: 5. PERFORMANCE STEP: Close Channel 1 SFAS Level 1 Containment Purge
Close Channel 1 SFAS Level 1 Containment Purge ........C........                     Isolation Valves STANDARD: Press CLOSE on the following switches:
  ........C........             Isolation Valves STANDARD: Press CLOSE on the following switches:
CV 5008 CTMT PURGE OUT CV 5006 CTMT PURGE IN COMMENT: CV 5008 will NOT close due to failure. Critical to close CV 5007 CTMT PURGE OUT Channel 2 in Performance Step 7 to isolate this penetration.
CV 5008 CTMT PURGE OUT CV 5006 CTMT PURGE IN COMMENT:           CV 5008 will NOT close due to failure. Critical to close CV 5007 CTMT PURGE OUT Channel 2 in Performance Step 7 to isolate this penetration. Critical to close CV 5006 to isolate this penetration due to failure of CV 5005 CUE: None SAT UNSAT
Critical to close CV 5006 to isolate this penetration due to failure of CV 5005 CUE: None       ___________
: 6. PERFORMANCE STEP: Close Channel 2 SFAS Level 1 Containment
SAT UNSAT   6. PERFORMANCE STEP:
  ........C........             Air Sample Isolation Valves STANDARD: Press CLOSE on the following switches:
Close Channel 2 SFAS Level 1 Containment  
CV 5010A CTMT AIR SAMPLE CV 5010B CTMT AIR SAMPLE CV 5010C CTMT AIR SAMPLE CV 5010D CTMT AIR SAMPLE CV 5010E CTMT AIR SAMPLE RET COMMENT: CV5010E is not critical because of check valve CV125.
........C........                     Air Sample Isolation Valves  
CUE: None SAT UNSAT
: 7. PERFORMANCE STEP:                Close Channel 2 SFAS Level 1 Containment Purge
  ........C........                Isolation Valves STANDARD: Press CLOSE on the following switches:


STANDARD: Press CLOSE on the following switches:
CV 5007 CTMT PURGE OUT CV 5005 CTMT PURGE IN COMMENT:     Critical to close CV 5007 CTMT PURGE OUT to isolate this penetration due to CV 5008 failure.
 
CV 5010A CTMT AIR SAMPLE CV 5010B CTMT AIR SAMPLE CV 5010C CTMT AIR SAMPLE                                CV 5010D CTMT AIR SAMPLE CV 5010E CTMT AIR SAMPLE RET COMMENT: CV5010E is not critical because of check valve CV125.
CUE: None        _________      SAT  UNSAT
: 7. PERFORMANCE STEP:
Close Channel 2 SFAS Level 1 Containment Purge  ........C........
Isolation Valves STANDARD: Press CLOSE on the following switches:
 
CV 5007 CTMT PURGE OUT CV 5005 CTMT PURGE IN COMMENT: Critical to close CV 5007 CTMT PURGE OUT to isolate this penetration due to CV 5008 failure.
CV 5005 will NOT close due to failure. Critical to close CV 5006 CTMT PURGE OUT Channel 1 in Step 5 to isolate this penetration.
CV 5005 will NOT close due to failure. Critical to close CV 5006 CTMT PURGE OUT Channel 1 in Step 5 to isolate this penetration.
CUE: None SAT UNSAT
: 8. PERFORMANCE STEP:            Close Channel 2 SFAS Level 2 Containment Vacuum Relief Valve Isolation Valves STANDARD: Press CLOSE on the following switches:
CV 5075 CTMT VAC RLF VLV ISO CV 5076 CTMT VAC RLF VLV ISO CV 5077 CTMT VAC RLF VLV ISO CV 5078 CTMT VAC RLF VLV ISO CV 5079 CTMT VAC RLF VLV ISO COMMENT:      Not critical due to check valves isolating penetration.
CUE: None SAT UNSAT
: 9. PERFORMANCE STEP: Verify that all LLRTs are terminated and isolated.
STANDARD: Communication with Field Supervisor.
CUE: (If asked) The Field Supervisor is verifying that all LLRTs are isolated.
SAT UNSAT
: 10. PERFORMANCE STEP: Verify that the personnel assigned specific Containment Closure responsibilities are carrying out the required actions.
STANDARD: Communication with Field Supervisor.
CUE: (If asked) The Field Supervisor is verifying that the personnel assigned
          . specific Containment Closure responsibilities are carrying out the required


CUE: None
actions.
___________
SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the examinee).
SAT UNSAT
END TIME
: 8. PERFORMANCE STEP:
Close Channel 2 SFAS Level 2 Containment Vacuum Relief Valve Isolation Valves STANDARD: Press CLOSE on the following switches:
CV 5075 CTMT VAC RLF VLV ISO CV 5076 CTMT VAC RLF VLV ISO CV 5077 CTMT VAC RLF VLV ISO CV 5078 CTMT VAC RLF VLV ISO CV 5079 CTMT VAC RLF VLV ISO COMMENT: Not critical due to check valves isolating penetration.
CUE:  None
___________
SAT  UNSAT
: 9. PERFORMANCE STEP:
Verify that all LLRTs are terminated and isolated.


STANDARD: Communication with Field Supervisor. 
Simulator JPM S6


CUE: (If asked) The Field Supervisor is verifying that all LLRTs are isolated.
Facility: Davis-Besse                            Task No:   063-007-04-0100 Task
___________
SAT  UNSAT
: 10. PERFORMANCE STEP:
Verify that the personnel assigned specific Containment                                                      Closure responsibilities are carrying out the required actions.


STANDARD: Communication with Field Supervisor.
==Title:==
CUE:  (If asked) The Field Supervisor is verifying that the personnel assigned              . specific Containment Closure responsibilities are carrying out the required
Battery Load Shed Actions from the Control Room K/A  
 
actions.          ___________
SAT  UNSAT    TERMINATING CUES:  This JPM is complete.
(Terminated by the examine e).        __________
END TIME Simulator JPM S6 Facility: Davis-Besse    Task No:   063-007-04-0100    Task Title
: Battery Load Shed Actions from the Control Room   K/A  


==Reference:==
==Reference:==
 
(063) K1.03 (2.9/3.5)_________ Job Performance Measure No: S6 (JPM New)
(063) K1.0 3 (2.9/3.5)_________ Job Performance Measure No
Examinee:
: S6 (JPM New)   Examinee:           NRC Examiner:       Date:       Method of testing:
NRC Examiner:                                                           Date:
Simulated Performance _
Method of testing:
__   Actual Performance __X__ Classroom ___   Simulator _X_   Plant ___ Read to the examinee:
Simulated Performance _ __                       Actual Performance __X__
Classroom ___                     Simulator _X_                       Plant ___
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure  
When you complete the task successfully, the objective for this job performance measure will be satisfied.
 
Initial Conditions:
will be satisfied.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Initial Conditions: The plant conditions are specified in the Initial Conditions and Initiating Cues.
 
Task Standard:
Task Standard:
Perform control room actions for section 1 of attachment 5, Selective Battery Load Shedding, per DB-OP-02521, Loss of AC Bus Power Sources. Required Materials:
Perform control room actions for section 1 of attachment 5, Selective Battery Load Shedding, per DB-OP-02521, Loss of AC Bus Power Sources.
Copy of attachment 5, Selective Battery Load Shedding, of DB-OP-02521, Loss of AC Bus Power Sources General  
Required Materials:
Copy of attachment 5, Selective Battery Load Shedding, of DB-OP-02521, Loss of AC Bus Power Sources General  


==References:==
==References:==
Line 856: Line 853:
None Initiating Cue:
None Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task: Yes Alternate Path: No Validation Time: 8 minutes SIMULATOR INSTRUCTIONS


Time Critical Task:
TASK DESCRIPTION:
Yes Alternate Path:
Perform section 1 of Selective Battery Load Shedding per DB-OP-02521, Loss of AC Bus Power Sources INITIAL CONDITION:
No Validation Time:
Mode 3 with Loss of Both Essential 4160 AC Bus Power Sources ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
8 minutes      SIMULATOR INSTRUCTIONS
MALFUNCTIONS/FAILURE TO INSERT:
 
ACTION/CUES:
TASK DESCRIPTION: Perform section 1 of Selective Battery Load Shedding per DB-OP-02521, Loss of AC Bus Power Sources INITIAL CONDITION: Mode 3 with Loss of Both Essential 4160 AC Bus Power Sources ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
MALFUNCTIONS/FAILURE TO INSERT:


ACTION/CUES: 
STUDENT COPY INITIAL CONDITIONS:
 
Mode 3 with Loss of Both Essential 4160 AC Bus Power Sources INITIATING CUES:
STUDENT COPY INITIAL CONDITIONS: Mode 3 with Loss of Both Essential 4160 AC Bus Power Sources INITIATING CUES: The plant has tripped due to a Loss of Off
The plant has tripped due to a Loss of Off-Site Power. Maintenance is in progress on EDG 1 and EDG 2 locked out upon startup. Efforts to start the SBODG have been unsuccessful. Both C1 and D1 remain deenergized, and have been for 15 minutes.
-Site Power. Maintenance is in progress on EDG 1 and EDG 2 locked out upon startup. Efforts to start the SBODG have been unsuccessful. Both C1 and D1 remain deenergized, and have been for 15 minutes. The Unit Supervisor directs you to perform section 1 of Attachment 5, Selective Battery Load Shedding, from DB
The Unit Supervisor directs you to perform section 1 of Attachment 5, Selective Battery Load Shedding, from DB-OP-02521, Loss of AC Bus Power Sources. An operator has been just been dispatched to perform attachment 14 per step 2 of attachment 5.
-OP-02521, Loss of AC Bus Power Sources. An operator has been just been dispatched to perform attachment 14 per step 2 of attachment 5.
This is a time critical task. I will inform you when the time critical clock starts.
 
This is a time critical task. I will inform you when the time critical clock starts.     
 
EXAMINER COPY INITIAL CONDITIONS: Mode 3 with Loss of Both Essential 4160 AC Bus Power Sources INITIATING CUES: The plant has tripped due to a Loss of Off
-Site Power. Maintenance is in progress on EDG 1 and EDG 2 locked out upon startup. Efforts to start the SBODG have been unsuccessful. Both C1 and D1 remain deenergized, and have been for 15 minutes.
The Unit Supervisor directs you to perform section 1 of Attachment 5, Selective Battery Load Shedding, from DB
-OP-02521, Loss of AC Bus Power Sources.
An operator has been just been dispatched to perform attachment 14 per step 2 of attachment 5.
 
This is a time critical task. I will inform you when the time critical clock starts.   (Provide examinee a copy of DB-OP-02521, Loss of AC Bus Power Sources, Attachment 5, Selective Battery Load Shedding) 


EXAMINER COPY INITIAL CONDITIONS:
Mode 3 with Loss of Both Essential 4160 AC Bus Power Sources INITIATING CUES:
The plant has tripped due to a Loss of Off-Site Power. Maintenance is in progress on EDG 1 and EDG 2 locked out upon startup. Efforts to start the SBODG have been unsuccessful. Both C1 and D1 remain deenergized, and have been for 15 minutes.
The Unit Supervisor directs you to perform section 1 of Attachment 5, Selective Battery Load Shedding, from DB-OP-02521, Loss of AC Bus Power Sources. An operator has been just been dispatched to perform attachment 14 per step 2 of attachment 5.
This is a time critical task. I will inform you when the time critical clock starts.
(Provide examinee a copy of DB-OP-02521, Loss of AC Bus Power Sources, Attachment 5, Selective Battery Load Shedding)
PERFORMANCE INFORMATION
PERFORMANCE INFORMATION


Line 886: Line 878:
START TIME:
START TIME:
Time Critical Clock is started when they assume control of the Job Performance Measure.
Time Critical Clock is started when they assume control of the Job Performance Measure.
CUE: 15 minutes has elapsed since the lo ss of power to C1 and D1 Busses.
CUE: 15 minutes has elapsed since the loss of power to C1 and D1 Busses.
Time Critical Clock starts now.
Time Critical Clock starts now.
TIME CRITICAL CLOCK START TIME:
TIME CRITICAL CLOCK START TIME:
: 1. PERFORMANCE STEP: Perform step 1.a to STOP and LOCKOUT         .......C........
: 1.       PERFORMANCE STEP: Perform step 1.a to STOP and LOCKOUT
the following pumps STANDARD: Stop and lockout Main Feed Pump 1 EBOP (HIS 1209, EMER BEARING OIL PUMP)     CUE: None       __________
              .......C........         the following pumps STANDARD: Stop and lockout Main Feed Pump 1 EBOP (HIS 1209, EMER BEARING OIL PUMP)
SAT UNSAT   2. PERFORMANCE STEP: Perform applicable step of section 1.a to STOP and LOCKOUT              .......C........
CUE: None SAT UNSAT
the following pumps STANDARD: Stop and lockout Main Feed Pump 2 EBOP (HIS 1188, EMER BEARING OIL PUMP)
: 2.       PERFORMANCE STEP: Perform applicable step of section 1.a to STOP and LOCKOUT
CUE:   None      __________
             .......C........         the following pumps STANDARD: Stop and lockout Main Feed Pump 2 EBOP (HIS 1188, EMER BEARING OIL PUMP)
SAT UNSAT
CUE: None SAT UNSAT
: 3. PERFORMANCE STEP:
: 3.       PERFORMANCE STEP: Perform applicable step of section 1.a to STOP and LOCKOUT
Perform applicable step of section 1.a to STOP and LOCKOUT  
            .......C........        the following pumps STANDARD: Stop and Lockout Makeup Pump 1 DC Oil Pump (HIS-MU24A2).
            .......C........                       the following pumps
CUE: None SAT UNSAT
: 4.      PERFORMANCE STEP: Perform applicable step of section 1.a to STOP and LOCKOUT
              .......C........        the following pumps STANDARD: Stop and lockout Makeup Pump 2 DC Oil Pump (HIS-MU24B2).
CUE: None                                                              __________
SAT UNSAT
: 5.       PERFORMANCE STEP: Perform applicable step of section 1.a to STOP and LOCKOUT
              .......C........       the following pumps STANDARD: Stop and lockout RCP 1-1 DC Oil Lift Pump (HIS 4115).


STANDARD: Stop and Lockout Makeup Pump 1 DC Oil Pump (HIS
CUE: None                                                           __________
-MU24A2). CUE: None      __________
SAT UNSAT
SAT  UNSAT    4. PERFORMANCE STEP: Perform applicable step of section 1.a to STOP and LOCKOUT
: 6. PERFORMANCE STEP: Perform applicable step of section 1.a to STOP and LOCKOUT
            .......C........                      the following pumps STANDARD: Stop and lockout Makeup Pump 2 DC Oil Pump (HIS
      ........C........                   the following pumps STANDARD: Stop and lockout RCP 1-2 DC Oil Lift Pump (HIS 4215).
-MU24B2). CUE: None                                     __________
CUE: None                                                           __________
SAT UNSAT   5. PERFORMANCE STEP: Perform applicable step of section 1.a to STOP and LOCKOUT
SAT UNSAT
            .......C........                      the following pumps STANDARD: Stop and lockout RCP 1-1 DC Oil Lift Pump (HIS 4115).
: 7. PERFORMANCE STEP: Perform applicable step of section 1.a to STOP and LOCKOUT
 
      ........C........           the following pumps STANDARD: Stop and lockout RCP 2-1 DC Oil Lift Pump (HIS 4315)
CUE: None                                    __________
CUE: None                                                           __________
SAT  UNSAT  6. PERFORMANCE STEP: Perform applicable step of section 1.a to STOP and LOCKOUT  
SAT UNSAT
            ........C........
: 8. PERFORMANCE STEP: Perform applicable step of section 1.a to STOP and LOCKOUT
the following pumps STANDARD: Stop and lockout RCP 1-2 DC Oil Lift Pump (HIS 4215).
      ........C........           the following pumps STANDARD: Stop and lockout RCP 2-2 DC Oil Lift Pump (HIS 4415)
CUE: None                                     __________
CUE: None                                                           __________
SAT UNSAT   7. PERFORMANCE STEP: Perform applicable step of section 1.a to STOP and LOCKOUT  
SAT UNSAT Time Performance Steps 1-8 are complete TIME CRITICAL CLOCK END TIME:
            ........C........
Time requirement is 15 minutes or less from start of TIME CRITICAL CLOCK Start Time SAT UNSAT
the following pumps STANDARD: Stop and lockout RCP 2-1 DC Oil Lift Pump (HIS 4315)
CUE: None                                     __________
SAT UNSAT   8. PERFORMANCE STEP: Perform applicable step of section 1.a to STOP and LOCKOUT  
            ........C........
the following pumps
 
STANDARD: Stop and lockout RCP 2-2 DC Oil Lift Pump (HIS 4415)
CUE: None                                     __________
SAT UNSAT   Time Performance Steps 1
-8 are complete TIME CRITICAL CLOCK END TIME:
Time requirement is 15 minutes or less from start of TIME CRITICAL CLOCK Start Time        
 
__________
SAT UNSAT
: 9. PERFORMANCE STEP: Dispatch an Operator to perform Attachment 14, Severe Battery Load Shed - In Plant Actions.
: 9. PERFORMANCE STEP: Dispatch an Operator to perform Attachment 14, Severe Battery Load Shed - In Plant Actions.
STANDARD: Initial Conditions stated an operator has been dispatched to perform attachment 14.
STANDARD: Initial Conditions stated an operator has been dispatched to perform attachment 14.
CUE: If needed: T he Unit Supervisor has assigned an operator to perform Attachment 14,             Severe Battery Load Shed - In Plant Actions           __________
CUE: If needed: The Unit Supervisor has assigned an operator to perform Attachment 14, Severe Battery Load Shed - In Plant Actions                         __________
SAT UNSAT   10.       PERFORMANCE STEP: Establish Manual Control of Auxiliary Feedwater  
SAT UNSAT
- Place ........C........                     AF6452, AFW 1 LEVEL CONTROL VALVE, in MANUAL   STANDARD: Depress manual on level controller LIC6452, AFP 1 Level Controller
: 10. PERFORMANCE STEP: Establish Manual Control of Auxiliary Feedwater - Place
      ........C........           AF6452, AFW 1 LEVEL CONTROL VALVE, in MANUAL STANDARD: Depress manual on level controller LIC6452, AFP 1 Level Controller


COMMENT: Manual control of Auxiliary Feedwater can be established for both trains                                   in either order or in parallel as steps are bulleted. Intent of this JPM is to establish manual control for train 1.             CUE: None                                       __________
COMMENT: Manual control of Auxiliary Feedwater can be established for both trains in either order or in parallel as steps are bulleted. Intent of this JPM is to establish manual control for train 1.
SAT UNSAT   11. PERFORMANCE STEP:
CUE: None                                                                   __________
Establish Manual Control of Auxiliary Feedwater - Slowly             ........C........
SAT UNSAT
open AFW 1 LEVEL CONTROL VALVE in MANUAL while      
: 11. PERFORMANCE STEP: Establish Manual Control of Auxiliary Feedwater - Slowly
 
      ........C........               open AFW 1 LEVEL CONTROL VALVE in MANUAL while reducing AFPT 1 speed using the AFPT 1 GOVERNOR CONTROL until AF6452 is full open.
reducing AFPT 1 speed using the AFPT 1 GOVERNOR CONTROL until AF6452 is full open.
STANDARD: Depress open on LIC6452, AFP 1 Level Controller, to slowly open AF6452, AFP Level Control Valve, while maintaining OTSG 1 level (49 setpoint) by reducing speed on AFPT 1 speed using HIS520A, AFPT 1 GOVERNOR CONTROL, until AF6452 is full open.
STANDARD: Depress open on LIC6452, AFP 1 Level Controller, to slowly open AF6452,                                     AFP Level Control Valve, while maintaining OTSG 1 level (49" setpoint) by                                     reducing speed on AFPT 1 speed using HIS520A, AFPT 1 GOVERNOR CONTROL, until AF6452 is full open
CUE: None                                                                   __________
. CUE: None
SAT UNSAT
__________
: 12. PERFORMANCE STEP: Establish Manual Control of Auxiliary Feedwater - Maintain SG
SAT UNSAT   12.       PERFORMANCE STEP: Establish Manual Control of Auxiliary Feedwater  
        .......C........             1 at required level by adjusting AFPT 1 GOVERNOR CONTROL as necessary.
- Maintain SG .......C........                       1 at required level by adjusting AFPT 1 GOVERNOR  
STANDARD: Adjust AFP 1 speed as necessary to maintain desired level (49 setpoint) using HIS520A, AFPT 1 GOVERNOR CONTROL.
CUE: None                                                                  __________
SAT UNSAT TERMINATING CUES:
This JPM is complete. (Terminated by the examiner once level control is established)
END TIME


CONTROL as necessary.
Simulator JPM S7
STANDARD: Adjust AFP 1 speed as necessary to maintain desired level (49" setpoint) using HIS520A, AFPT 1 GOVERNOR CONTROL.
CUE: None           


__________
Facility:         Davis-Besse                          Task No:      012-003-01-0100 Task
SAT  UNSAT  TERMINATING CUES:
This JPM is complete. (Terminated by the examiner once level control is established)      __________
END TIME   


Simulator JPM S7 Facility:            Davis-Besse    Task No:       012-003-01-0100    Task Title
==Title:==
:      Deenergize/Reenergize Source Range NIs     K/A  
Deenergize/Reenergize Source Range NIs K/A  


==Reference:==
==Reference:==
(012) A4.02 3.3/3.4       Job Performance Measure No
(012) A4.02 3.3/3.4     Job Performance Measure No:         S7 (JPM 185)
:     S7 (JPM 185)   Examinee:           NRC Examiner:       Date:       Method of testing:
Examinee:
Simulated Performance ___   Actual Performance _X_ Classroom ___   Simulator _X_   Plant ___
NRC Examiner:                                                           Date:
Method of testing:
Simulated Performance ___                       Actual Performance _X_
Classroom ___                     Simulator _X_               Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Line 967: Line 954:
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard: Deenergize Source Range NIs Reenergize Source Range NIs  
Task Standard:
 
Deenergize Source Range NIs Reenergize Source Range NIs Required Materials:
Required Materials:
DB-OP-06403, Reactor Protection System (RPS) and Nuclear Instrumentation System (NI)
DB-OP-06403, Reactor Protection System (RPS) and Nuclear Instrumentation System (NI) Operating Procedure, section 4.4
Operating Procedure, section 4.4 General  
 
General  


==References:==
==References:==


None Initiating Cue:
None Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
No Alternate Path:
No Validation Time:
6 minutes


Time Critical Task:
SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
No    Alternate Path:
Deenergize/Reeneregize Source Range NIs INITIAL CONDITION:
No Validation Time:  6 minutes SIMULATOR INSTRUCTIONS TASK DESCRIPTION
Approximately 5% power ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
: Deenergize/Reeneregize Source Range NIs INITIAL CONDITION: Approximately 5% power ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION: None MALFUNCTIONS/FAILURE TO INSERT: Fail NI 3: IMF R3V3 ACTION/CUES: Delete the NI 3 failure when both Source Range Instruments are deenergized: DMF R3V3 EXAMINER COPY INITIAL CONDITIONS: A plant startup is in progress The plant is at approximately 5% power A failure has caused the Source Range NIs to energize INITIATING CUES
None MALFUNCTIONS/FAILURE TO INSERT:
:  The Unit Supervisor directs you to deenergize the Source Range NIs in accordance with section 4.4 of DB-OP-06403, RPS and NI Operating Procedure.  (Hand a copy of section 4.4 of DB
Fail NI 3: IMF R3V3 ACTION/CUES:
-OP-06403 to examinee)
Delete the NI 3 failure when both Source Range Instruments are deenergized: DMF R3V3


CANDIDATE COPY INITIAL CONDITIONS: A plant startup is in progress The plant is at approximately 5% power A failure has caused the Source Range NIs to energize INITIATING CUES
EXAMINER COPY INITIAL CONDITIONS:
The Unit Supervisor directs you to deenergize the Source Range NIs in accordance with section 4.4 of DB-OP-06403, RPS and NI Operating Procedure.  
A plant startup is in progress The plant is at approximately 5% power A failure has caused the Source Range NIs to energize INITIATING CUES:
The Unit Supervisor directs you to deenergize the Source Range NIs in accordance with section 4.4 of DB-OP-06403, RPS and NI Operating Procedure.
(Hand a copy of section 4.4 of DB-OP-06403 to examinee)
 
CANDIDATE COPY INITIAL CONDITIONS:
A plant startup is in progress The plant is at approximately 5% power A failure has caused the Source Range NIs to energize INITIATING CUES:
The Unit Supervisor directs you to deenergize the Source Range NIs in accordance with section 4.4 of DB-OP-06403, RPS and NI Operating Procedure.


PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
START TIME: _______
: 1. PERFORMANCE STEP: Unlock and open RPS Channel 1 and 2 doors.
: 1. PERFORMANCE STEP: Unlock and open RPS Channel 1 and 2 doors.
STANDARD: Keys obtained and RPS Channels I and 2 doors unlocked and opened.
CUE:      (If necessary) The Control Room acknowledges RPS doors will be open and annunciator alarm received SAT UNSAT
: 2. PERFORMANCE STEP: Place ON-OFF switch for the Source Range Detector Power
    ........C........            Supply Module in OFF.
STANDARD: Place ON-OFF switch for NI 1 power supply to OFF (RPS Channel 2).
COMMENT: May deenergize NI 2 before NI 1.
CUE:      None SAT UNSAT 3    PERFORMANCE STEP: Place ON-OFF switch for the Source Range Detector Power
    ........C........            Supply Module in OFF.
STANDARD: Place ON-OFF switch for NI 2 power supply to OFF (RPS Channel 1).
CUE:      (After both SR NIs are deenergized and the NI 3 failure is deleted) The failure has been repaired. The Unit Supervisor directs you to continue in section 4.4 of DB-OP-06403 and reenergize Source Range NIs 1 and 2 SAT UNSAT
: 4. PERFORMANCE STEP: Place ON-OFF switch for the Source Range Detector Power
    ........C........            Supply Module in ON.
STANDARD: Places ON-OFF switch for NI 1 power supply to ON.
COMMENT: May reenergize NI 2 before NI 1 CUE: None SAT UNSAT
: 5. PERFORMANCE STEP: Place ON-OFF switch for the Source Range Detector Power


STANDARD: Keys obtained and RPS Channels I and 2 doors unlocked and opened. CUE: (If necessary) The Control Room acknowledges RPS doors will be open and annunciator alarm received
  ........C........             Supply Module in ON.
__________
STANDARD: Places ON-OFF switch for NI 2 power supply to ON.
SAT  UNSAT  2. PERFORMANCE STEP:  Place ON-OFF switch for the Source Range Detector Power           
CUE: None                                                                 __________
        ........C........                       Supply Module in OFF. STANDARD: Place ON
SAT UNSAT
-OFF switch for NI 1 power supply to OFF (RPS Channel 2).
: 6. PERFORMANCE STEP: Depress the RESET switch on the Source Range Detector Power
COMMENT: May deenergize NI 2 before NI 1
    ........C........           Supply Module.
. CUE: None       __________
COMMENT: Depressing reset switch will reset the trip to allow the detector to reenergize when required. With Intermediate Range NIs above the cutout value the Source Range Detector will not energize.
SAT UNSAT   3 PERFORMANCE STEP: Place ON-OFF switch for the Source Range Detector Power            
STANDARD: Depress the RESET switch on NI 1 Power Supply Module.
        ........C........                       Supply Module in OFF.
CUE: None                                                                __________
STANDARD: Place ON-OFF switch for NI 2 power supply to OFF (RPS Channel 1). CUE: (After both SR NIs are deenergized and the NI 3 failure is deleted) The failure has been repaired. The Unit Supervisor directs you to continue in section 4.4 of DB-OP-06403 and reenergize Source Range NIs 1 and 2
SAT UNSAT
__________
: 7. PERFORMANCE STEP: Depress the RESET switch on the Source Range Detector Power
SAT UNSAT   4. PERFORMANCE STEP: Place ON-OFF switch for the Source Range Detector Power            
    ........C........           Supply Module.
        ........C........                       Supply Module in ON. STANDARD: Places ON-OFF switch for NI 1 power supply to ON.
COMMENT: Depressing reset switch will reset the trip to allow the detector to reenergize when required. With Intermediate Range NIs above the cutout value the Source Range Detector will not energize.
COMMENT: May reenergize NI 2 before NI 1 CUE: None      __________
STANDARD: Depress the RESET switch on NI 2 Power Supply Module.
SAT UNSAT
CUE:       None                                                           __________
: 5. PERFORMANCE STEP: Place ON-OFF switch for the Source Range Detector Power           
SAT UNSAT
: 8. PERFORMANCE STEP: Complete procedure section.
STANDARD: Determine step 4.4.3.c to be not applicable and sign/date completed by.
CUE:       None                                                          __________
SAT UNSAT
: 9. PERFORMANCE STEP: Lock the doors and return keys.
STANDARD: Doors locked and key returned.
CUE:      None                                                          __________
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examinee)
END TIME
 
Simulator JPM S8


         ........C........                      Supply Module in ON. STANDARD: Places ON
Facility:         Davis-Besse                          Task No:         008-004-01-0100 Task
-OFF switch for NI 2 power supply to ON
. CUE: None    __________
SAT  UNSAT  6. PERFORMANCE STEP: Depress the RESET switch on the Source Range Detector Power ........C........                    Supply Module. COMMENT:  Depressing reset switch will reset the trip to allow the detector to reenergize when required. With Intermediate Range NIs above the cutout value the Source Range Detector will not energize
. STANDARD: Depress the RESET switch on NI 1 Power Supply Module. CUE: None  __________
SAT  UNSAT  7. PERFORMANCE STEP: Depress the RESET switch on the Source Range Detector Power ........C........                    Supply Module. COMMENT:  Depressing reset switch will reset the trip to allow the detector to reenergize when required. With Intermediate Range NIs above the cutout value the Source Range Detector will not energize
. STANDARD: Depress the RESET switch on NI 2 Power Supply Module. CUE: None  __________
SAT  UNSAT  8. PERFORMANCE STEP: Complete procedure section. STANDARD: Determine step 4.4.3.c to be not applicable and sign/date completed by. CUE: None  __________
SAT  UNSAT  9. PERFORMANCE STEP: Lock the doors and return keys.
STANDARD: Doors locked and key returned. CUE: None  __________
SAT  UNSAT  TERMINATING CUES:  This JPM is complete (Terminated by the examinee)
__________
END TIME 


Simulator JPM S8 Facility:            Davis-Besse    Task No:
==Title:==
008-004-01-0100    Task Title
Component Cooling Water Pump Rotation K/A  
:      Component Cooling Water Pump Rotation K/A  


==Reference:==
==Reference:==
(0 08) A4.01 3.3/3.1       Job Performance Measure No
(008) A4.01 3.3/3.1     Job Performance Measure No: S8 (JPM 018)
:   S8 (JPM 018)   Examinee:           NRC Examiner:       Date:       Method of testing:
Examinee:
Simulated Performance ___   Actual Performance _X_ Classroom ___   Simulator _X_   Plant ___ Read to the examinee:
NRC Examiner:                                                           Date:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure  
Method of testing:
 
Simulated Performance ___                       Actual Performance _X_
will be satisfied.
Classroom ___                     Simulator _X_               Plant ___
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Task Standard:
Place Component Cooling Water Pump 2 in service from standby condition and place Component Cooling Water Pump 1 (initially running) in standby.
Place Component Cooling Water Pump 2 in service from standby condition and place Component Cooling Water Pump 1 (initially running) in standby.
Required Materials:
Required Materials:
Section 3.2, 3.9, and 3.16 of DB-OP-06262, CCW System Procedure Limits and Precautions for DB
Section 3.2, 3.9, and 3.16 of DB-OP-06262, CCW System Procedure Limits and Precautions for DB-OP-06262 General  
-OP-06262 General  


==References:==
==References:==


None  
None Initiating Cue:
 
Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
Time Critical Task:
No Alternate Path:
No Alternate Path:
No Validation Time: 30 minutes SIMULATOR INSTRUCTIONS TASK DESCRIPTION
No Validation Time:
: Place Component Cooling Water Pump 2 in service from standby condition and place Component Cooling Water Pump 1 (initially running) in standby.
30 minutes
INITIAL CONDITION: Mode 1 CCW Pump 1 placed I/S to support testing which has been completed. Makeup Pump 1 left in service and Service Water secondaries left on SW loop 1 (SW1399 open) due to short duration of test. ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION: CCW pump 1 running.
 
SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Place Component Cooling Water Pump 2 in service from standby condition and place Component Cooling Water Pump 1 (initially running) in standby.
INITIAL CONDITION:
Mode 1 CCW Pump 1 placed I/S to support testing which has been completed. Makeup Pump 1 left in service and Service Water secondaries left on SW loop 1 (SW1399 open) due to short duration of test.
ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
CCW pump 1 running.
Hang tags for CCW and SW pumps 3 being aligned to side 2.
Hang tags for CCW and SW pumps 3 being aligned to side 2.
Makeup pump 1 running.
Makeup pump 1 running.
SW 1399 Open and SW 1395 Closed.
SW 1399 Open and SW 1395 Closed.
MALFUNCTIONS/FAILURE TO INSERT: None ACTION/CUES:
MALFUNCTIONS/FAILURE TO INSERT:
None ACTION/CUES:


EXAMINER COPY INITIAL CONDITIONS: Plant is in Mode
EXAMINER COPY INITIAL CONDITIONS:
: 1. CCW Pump 1 placed I/S to support testing which has been completed. Makeup Pump 1 left in service and Service Water secondaries left on SW loop 1 (SW1399 open) due to short duration of test. NO maintenance work has been done on the CCW System.
Plant is in Mode 1.
INITIATING CUES: Testing is complete and the Unit Supervisor directs you to shift CCW pumps so that CCW Pump 2 is in service and CCW Pump 1 is in standby, in accordance with Section 3.2 and 3.9 of DB-OP-06262, CCW System Procedure.
CCW Pump 1 placed I/S to support testing which has been completed. Makeup Pump 1 left in service and Service Water secondaries left on SW loop 1 (SW1399 open) due to short duration of test.
Valve testing is not required to be performed.
NO maintenance work has been done on the CCW System.
(Provide student a copy of Section 3.2, 3.9, 3.16, and Limits and Precautions of DB-OP-06262, CCW System Procedure. The procedure is signed off with briefing complete, applicable prerequisites signed off, and some steps pre
INITIATING CUES:
-identified that will not be applicable)
Testing is complete and the Unit Supervisor directs you to shift CCW pumps so that CCW Pump 2 is in service and CCW Pump 1 is in standby, in accordance with Section 3.2 and 3.9 of DB-OP-06262, CCW System Procedure. Valve testing is not required to be performed.
CANDIDATE COPY INITIAL CONDITIONS: Plant is in Mode
(Provide student a copy of Section 3.2, 3.9, 3.16, and Limits and Precautions of DB-OP-06262, CCW System Procedure. The procedure is signed off with briefing complete, applicable prerequisites signed off, and some steps pre-identified that will not be applicable)
: 1. CCW Pump 1 placed I/S to support testing which has been completed. Makeup Pump 1 left in service and Service Water secondaries left on SW loop 1 (SW1399 open) due to short duration of test. NO maintenance work has been done on the CCW System.
 
INITIATING CUES: Testing is complete and the Unit Supervisor directs you to shift CCW pumps so that CCW Pump 2 is in service and CCW Pump 1 is in standby, in accordance with Section 3.2 and 3.9 of DB-OP-06262, CCW System Procedure.
CANDIDATE COPY INITIAL CONDITIONS:
Valve testing is not required to be performed.
Plant is in Mode 1.
CCW Pump 1 placed I/S to support testing which has been completed. Makeup Pump 1 left in service and Service Water secondaries left on SW loop 1 (SW1399 open) due to short duration of test.
NO maintenance work has been done on the CCW System.
INITIATING CUES:
Testing is complete and the Unit Supervisor directs you to shift CCW pumps so that CCW Pump 2 is in service and CCW Pump 1 is in standby, in accordance with Section 3.2 and 3.9 of DB-OP-06262, CCW System Procedure. Valve testing is not required to be performed.


PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
 
START TIME: _______
START TIME: _______
: 1. PERFORMANCE STEP: Locate the correct procedure section.
: 1. PERFORMANCE STEP:
Locate the correct procedure section.
 
STANDARD: Identifies Section 3.2 (Component Cooling Water System) as correct procedure section.
STANDARD: Identifies Section 3.2 (Component Cooling Water System) as correct procedure section.
 
COMMENT: Hand procedure to examinee. Sequence required for all steps, except steps 7, 8, 12, 13, 17, 18, 19 and 20.
COMMENT: Hand procedure to examinee. Sequence required for all steps, except steps 7 , 8 , 1 2 , 1 3, 17, 18, 19 and 20.
CUE: None                                                                   __________
CUE: None __________
SAT UNSAT
SAT UNSAT
: 2. PERFORMANCE STEP: Verify Open SW38, CCW Heat Exchanger 1-2 Discharge Iso.
: 2. PERFORMANCE STEP:
Verify Open SW38, CCW Heat Exchanger 1
-2 Discharge Iso.
STANDARD: Contact an EO to verify position of SW38.
STANDARD: Contact an EO to verify position of SW38.
CUE: If EO contacted SW38, CCW Heat Exchanger 1
CUE: If EO contacted SW38, CCW Heat Exchanger 1-2 Discharge Iso., is OPEN.
-2 Discharge Iso., is OPEN.
SAT UNSAT
__________
: 3. PERFORMANCE STEP: Start CCW Pump 1-2.
SAT UNSAT
    ........C........
: 3. PERFORMANCE STEP:
Start CCW Pump 1-2. ........C........
STANDARD: Turn HIS1418 clockwise to CLOSE.
STANDARD: Turn HIS1418 clockwise to CLOSE.
COMMENT: Annunciator 11-5-B, CCW Pump 2 Flow LO, will alarm. It may be treated  
COMMENT: Annunciator 11-5-B, CCW Pump 2 Flow LO, will alarm. It may be treated as an expected alarm as continuing with the procedure will clear the low flow condition.
 
CUE: If asked, as EO report flow on FIS 1432 is 2800 gpm SAT UNSAT
as an expected alarm as continuing with the procedure will clear the                               low flow condition.
: 5. PERFORMANCE STEP: Adjust CCW Heat Exchanger Temperature control valve to 80F to 85F OR as directed by the Shift Manager.
CUE: If asked, as EO report flow on FIS 1432 is 2800 gpm     __________
STANDARD: Prerequisites identify Shift Manager desire of 85&#xba;F set point of TIC1434.
SAT UNSAT
: 5. PERFORMANCE STEP:
Adjust CCW Heat Exchanger Temperature control valve to 80F to 85F OR as directed by the Shift Manager. STANDARD: Prerequisites identify Shift Manager desire of 85&#xba;F set point of TIC1434.
Contact an EO to obtain set point of 85&#xba;F on TIC1434.
Contact an EO to obtain set point of 85&#xba;F on TIC1434.
CUE: If needed , Shift Manager desires a set point of 85&#xba;F on TIC1434.
CUE: If needed, Shift Manager desires a set point of 85&#xba;F on TIC1434.
__________
SAT UNSAT
SAT UNSAT   6. PERFORMANCE STEP:
: 6. PERFORMANCE STEP: Route to Section 3.16.
Route to Section 3.16.
STANDARD: Route to Section 3.16 and complete prerequisite steps 3.16.1 and 3.16.2.
STANDARD: Route to Section 3.16 and complete prerequisite steps 3.16.1 and 3.16.2.
CUE: None.       __________
 
SAT UNSAT   7. PERFORMANCE STEP:
CUE: None.
Open CC2649 Aux Bldg Return.  
SAT UNSAT
  ........C........
: 7. PERFORMANCE STEP: Open CC2649 Aux Bldg Return.
    ........C........
STANDARD: Depress the OPEN pushbutton on HIS2649.
STANDARD: Depress the OPEN pushbutton on HIS2649.
COMMENT: Sequence not required for steps 7 and 8   CUE: None.         __________
COMMENT: Sequence not required for steps 7 and 8 CUE: None.
SAT UNSAT   8. PERFORMANCE STEP:
SAT UNSAT
Open CC5098, CTMT Bldg Return. ........C........
: 8. PERFORMANCE STEP: Open CC5098, CTMT Bldg Return.
 
    ........C........
STANDARD: Depress the OPEN pushbutton on HIS5098.
STANDARD: Depress the OPEN pushbutton on HIS5098.
COMMENT: Sequence not required for steps 7 and 8     CUE: None.         __________
COMMENT: Sequence not required for steps 7 and 8 CUE: None.
SAT UNSAT   9. PERFORMANCE STEP:
SAT UNSAT
OPEN CC5096, CCW Line 2 Discharge Isolation, when return             ........C........                       valves are open.
: 9. PERFORMANCE STEP: OPEN CC5096, CCW Line 2 Discharge Isolation, when return
 
    ........C........           valves are open.
STANDARD: Depress the OPEN pushbutton on CC5096.
STANDARD: Depress the OPEN pushbutton on CC5096.
CUE: None.         __________
CUE: None.
SAT UNSAT
SAT UNSAT
: 10. PERFORMANCE STEP:
: 10. PERFORMANCE STEP: Verify CC1469, CCW from DH Cooler 2 Outlet valve is closed.
Verify CC1469, CCW from DH Cooler 2 Outlet valve is closed.
 
STANDARD: If open depress the CLOSE pushbutton on HIS1469.
STANDARD: If open depress the CLOSE pushbutton on HIS1469.
COMMENT: CC1469 may have been opened if actions for annunciator 11-5-B, CCW                               Pump 2 Flow LO, were performed at performance step 3.
COMMENT: CC1469 may have been opened if actions for annunciator 11-5-B, CCW Pump 2 Flow LO, were performed at performance step 3.
CUE: None. __________
CUE: None.                                                             __________
SAT UNSAT     11. PERFORMANCE STEP:
SAT UNSAT
Close CC5095 Non
: 11. PERFORMANCE STEP: Close CC5095 Non-essen supply.
-essen supply.
    ........C........
  ........C........
STANDARD: Depress the CLOSE pushbutton on HIS5095.
STANDARD: Depress the CLOSE pushbutton on HIS 5095. CUE: None. __________
CUE: None.                                                             __________
SAT UNSAT
SAT UNSAT
: 12. PERFORMANCE STEP:
: 12. PERFORMANCE STEP: Close CC2645 Aux Bldg Return.
Close CC2645 Aux Bldg Return.
    ........C........
  ........C........
STANDARD: Depress the CLOSE pushbutton on HIS2645 Aux Bldg Return.
STANDARD: Depress the CLOSE pushbutton on HIS2645 Aux Bldg Return.
COMMENT: Sequence not required for steps 12 and 1 3 CUE: None. __________
COMMENT: Sequence not required for steps 12 and 13 CUE: None.                                                           __________
SAT UNSAT
SAT UNSAT
: 13. PERFORMANCE STEP:
: 13. PERFORMANCE STEP: Close CC 5097 CTMT Bldg Return.
Close CC 5097 CTMT Bldg Return.
    ........C........
  ........C........
STANDARD: Depress the CLOSE pushbutton on HIS5097 CTMT Bldg Return.
STANDARD: Depress the CLOSE pushbutton on HIS5097 CTMT Bldg Return.
COMMENT: Sequence not required for steps 12 and 13   CUE: None. __________
COMMENT: Sequence not required for steps 12 and 13 CUE: None.                                                           __________
SAT UNSAT   14. PERFORMANCE STEP:
SAT UNSAT
Determine CCW Pump 1 discharge flow less than 3000 gpm as                                                     verified as read on FIS 1422 (local).
: 14. PERFORMANCE STEP: Determine CCW Pump 1 discharge flow less than 3000 gpm as verified as read on FIS 1422 (local).
STANDARD: Contact EO to report CCW 1 flow indication.
STANDARD: Contact EO to report CCW 1 flow indication.
COMMENT: Annunciator 11-4-B, CCW PMP 1 FLOW LO, will alarm at < 3000 gpm.
COMMENT: Annunciator 11-4-B, CCW PMP 1 FLOW LO, will alarm at < 3000 gpm.
CUE: If EO contacted CCW Pump 1 Flow on FIS 1422 is 2800 gpm     .       __________
CUE: If EO contacted CCW Pump 1 Flow on FIS 1422 is 2800 gpm           .
SAT UNSAT   15. PERFORMANCE STEP:
SAT UNSAT
Open CC1467, CCW from DH Cooler 1 Outlet valve.
: 15. PERFORMANCE STEP: Open CC1467, CCW from DH Cooler 1 Outlet valve.
STANDARD: Depress the OPEN pushbutton on HIS1467.
STANDARD: Depress the OPEN pushbutton on HIS1467.
CUE: None.       __________
CUE: None.
SAT UNSAT       16. PERFORMANCE STEP:
SAT UNSAT
Verify that CCW Pump 2 has a discharge flow greater than 3000 gpm as read on FIS 1432 (locally).
: 16. PERFORMANCE STEP: Verify that CCW Pump 2 has a discharge flow greater than 3000 gpm as read on FIS 1432 (locally).
 
STANDARD: Contact EO to report CCW flow indication.
STANDARD: Contact EO to report CCW flow indication.
CUE: If EO contacted CCW Pump 2 Flow on FIS 1432 is 7200 gpm.     __________
CUE: If EO contacted CCW Pump 2 Flow on FIS 1432 is 7200 gpm.
SAT UNSAT   17. PERFORMANCE STEP:
SAT UNSAT
Route back to section 3.2.
: 17. PERFORMANCE STEP: Route back to section 3.2.
 
STANDARD: Sign complete for section 3.16. Route to step 3.2.17 and sign complete.
STANDARD: Sign complete for section 3.16. Route to step 3.2.17 and sign complete.
CUE: None.      __________
SAT  UNSAT  18. PERFORMANCE STEP:
If CC1469 was open to provide minimum flow requirement then monitor Decay Heat Pump 2 suction pressure.


STANDARD: If CC1469 was open to provide minimum flow requirement then contact EO to monitor Decay Heat Pump 2 suction pressure using PI1538 per step 3.2.19 of DB-OP-06262. COMMENT: Step 3.2.18 is not applicable. Step 3.2.19 may be applicable if CC1469 was opened per alarm procedure response, requiring monitoring of Decay Heat Pump 2 suction pressure.
CUE: None.
CUE: (If necessary) Monitor Decay Heat Pump 2 suction pressure using PI1538 per step 3.2.19 of DB
SAT UNSAT
-OP-06262. __________
: 18. PERFORMANCE STEP: If CC1469 was open to provide minimum flow requirement then monitor Decay Heat Pump 2 suction pressure.
SAT UNSAT   19. PERFORMANCE STEP:
STANDARD: If CC1469 was open to provide minimum flow requirement then contact EO to monitor Decay Heat Pump 2 suction pressure using PI1538 per step 3.2.19 of DB-OP-06262.
Verify SW1434, CCW Heat Exchanger 2 Control Valve is operating to maintain proper temperature.
COMMENT: Step 3.2.18 is not applicable. Step 3.2.19 may be applicable if CC1469 was opened per alarm procedure response, requiring monitoring of Decay Heat Pump 2 suction pressure.
 
CUE: (If necessary) Monitor Decay Heat Pump 2 suction pressure using PI1538 per step 3.2.19 of DB-OP-06262.
STANDARD: Contact EO to report status of TIC 1434. Verify TI 1490 indicates                               approximately 85&#xba;F.           CUE: As EO (If necessary) TIC 1434 is controlling CCW train 2 temperature at 85&#xba;F.       __________
SAT UNSAT
SAT UNSAT
: 19. PERFORMANCE STEP: Verify SW1434, CCW Heat Exchanger 2 Control Valve is operating to maintain proper temperature.
: 20. PERFORMANCE STEP:
STANDARD: Contact EO to report status of TIC 1434. Verify TI 1490 indicates approximately 85&#xba;F.
Verify surveillance tests are not required.
CUE:     As EO (If necessary) TIC 1434 is controlling CCW train 2 temperature at 85&#xba;F.
 
SAT UNSAT
STANDARD: Contact Unit Supervisor.
: 20. PERFORMANCE STEP: Verify surveillance tests are not required.
Per initiating cues valve testing is not required.
STANDARD: Contact Unit Supervisor. Per initiating cues valve testing is not required.
COMMENT: Steps 3.2.21 through 3.2.25 are not applicable
COMMENT: Steps 3.2.21 through 3.2.25 are not applicable.
. CUE:   None       __________
CUE: None SAT UNSAT
SAT UNSAT   21. PERFORMANCE STEP:
: 21. PERFORMANCE STEP: Verify Makeup Pump 1 is in service.
Verify Makeup Pump 1 is in service.
STANDARD: Verify HIS MU24B indicates Makeup Pump 1 is running.
STANDARD: Verify HIS MU24B indicates Makeup Pump 1 is running.
CUE: None.      __________
CUE: None.
 
SAT  UNSAT  22. PERFORMANCE STEP:
Route to Section 3.9.


SAT UNSAT
: 22. PERFORMANCE STEP: Route to Section 3.9.
STANDARD: Route to Section 3.9.
STANDARD: Route to Section 3.9.
CUE: None.       __________
CUE: None.
SAT UNSAT   23. PERFORMANCE STEP:
SAT UNSAT
Verify that EDG 1, LPI pump 1 and HPI pump 1 are not operating.
: 23. PERFORMANCE STEP: Verify that EDG 1, LPI pump 1 and HPI pump 1 are not operating.
STANDARD: Monitor control board for status of EDG 1, LPI 1 and HPI 1. Complete Prerequisites. CUE: None.       __________
STANDARD: Monitor control board for status of EDG 1, LPI 1 and HPI 1. Complete Prerequisites.
SAT UNSAT   24. PERFORMANCE STEP:
CUE: None.
Verify SW1424, CCW Heat Exchanger Outlet 1 valve, is closed or                                                   15 minutes have elapsed since the heat load has been removed.
SAT UNSAT
: 24. PERFORMANCE STEP: Verify SW1424, CCW Heat Exchanger Outlet 1 valve, is closed or 15 minutes have elapsed since the heat load has been removed.
STANDARD: Check that SW1424 has green light lit or 15 minutes have elapsed.
STANDARD: Check that SW1424 has green light lit or 15 minutes have elapsed.
 
CUE: (If necessary) 15 minutes has elapsed since the heat loads have been removed.
CUE: (If necessary) 15 minutes has elapsed since the heat loads have been removed.       __________
SAT UNSAT
SAT UNSAT
: 25. PERFORMANCE STEP: Stop CCW Pump 1.
: 25. PERFORMANCE STEP:
    ........C........
Stop CCW Pump 1.
  ........C........
 
STANDARD: Position HIS1414 to TRIP.
STANDARD: Position HIS1414 to TRIP.
CUE: None. __________
CUE: None.                                                                 __________
SAT UNSAT
SAT UNSAT
: 26. PERFORMANCE STEP:
: 26. PERFORMANCE STEP: Set TIC1424 as directed by the Shift Manager in prerequisite step 3.9.3 STANDARD: Contact EO to slowly adjust TIC1424 to 110F.
Set TIC1424 as directed by the Shift Manager in prerequisite step 3.9.3 STANDARD: Contact EO to slowly adjust TIC1424 to 110F.
CUE: TIC1424 is set to 110F.                                               __________
CUE: TIC1424 is set to 110F.
SAT UNSAT
__________
: 27. PERFORMANCE STEP: Verify CC 1467, CCW from DH Cooler 1 Outlet valve, is closed.
SAT UNSAT   27. PERFORMANCE STEP:
STANDARD: If CC1467 is open, press closed on HIS1467.
Verify CC 1467, CCW from DH Cooler 1 Outlet valve, is closed.
STANDARD: If CC1467 is open , press closed on HIS1467.


CUE: None. __________
CUE: None.                                                       __________
SAT UNSAT   TERMINATING CUES:
SAT UNSAT TERMINATING CUES:This JPM is complete. (Terminated by the examiner)
This JPM is complete. (Terminated by the examiner)
__________
END TIME}}
END TIME}}

Latest revision as of 00:02, 5 February 2020

Operating JPMs
ML16221A553
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/02/2016
From:
Operations Branch III
To:
FirstEnergy Nuclear Operating Co
Shared Package
ML15274A359 List:
References
Download: ML16221A553 (90)


Text

In Plant JPM P1

Facility: Davis-Besse Task No: 001-043-05-0100 Task

Title:

Trip Reactor From #2 Low Voltage Switchgear Room K/A

Reference:

(001) A2.11 4.4/4.7 Job Performance Measure No: P1 (JPM 042)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance __ X _ Actual Performance ___

Classroom ___ Simulator _ _ Plant _ X __

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Trip Reactor by manually tripping Reactor Trip Breakers in the Low Voltage Switchgear Rooms Required Materials:

DB-OP-02000 Section 3, step 3.3 General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task: No Alternate Path: No Validation Time: 6 minutes

EXAMINER COPY INITIAL CONDITIONS:

The plant has just experienced a severe transient causing a reactor trip signal to be generated.

The reactor did not trip.

Control power problems have prevented the Control Room from deenergizing E2 and F2.

INITIATING CUES:

The Unit Supervisor directs you to proceed to the Low Voltage Switchgear Rooms to deenergize the Control Rod Drive system by manually tripping Reactor Trip Breakers in accordance with Step 3.3 of DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture.

(Hand copy of DB-OP-02000 step 3.3 to the examinee)

CANDIDATE COPY INITIAL CONDITIONS:

The plant has just experienced a severe transient causing a reactor trip signal to be generated.

The reactor did not trip.

Control power problems have prevented the Control Room from deenergizing E2 and F2.

INITIATING CUES:

The Unit Supervisor directs you to proceed to the Low Voltage Switchgear Rooms to deenergize the Control Rod Drive by manually tripping Reactor Trip Breakers in accordance with Step 3.3 of DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture.

PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Recognize the correct procedure step.

STANDARD: Recognize DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture, Step 3.3 RNO as correct procedure step CUE: None SAT UNSAT

2. PERFORMANCE STEP: Trip Control Rod Drive Breaker A STANDARD: Push the TRIP pushbutton on Control Rod Drive Breaker A and observe the Green Trip flag is visible COMMENT: Performance Note - Performance steps 2, 3, and 4 may be performed in any order, but TRIPPING Control Rod Drive Breaker B and Control Rod Drive Breaker C are required to obtain desired response.

CUE: Trip pushbutton has been pushed on Control Rod Drive Breaker A.

Green TRIP flag is NOT visible.

The Reactor has NOT TRIPPED.

SAT UNSAT

3. PERFORMANCE STEP: Trip Control Rod Drive Breaker C

........C........

STANDARD: Push the TRIP pushbutton on Control Rod Drive Breaker C and observe the Green Trip flag is visible CUE: TRIP pushbutton has been pushed on Control Rod Drive Breaker C.

Green TRIP flag is visible.

(If Control Rod Drive Breaker B HAS been tripped) The Reactor has TRIPPED (If Control Rod Drive Breaker B HAS NOT been tripped) The Reactor has NOT TRIPPED.

SAT UNSAT

4. PERFORMANCE STEP: Trip Control Rod Drive Breaker B

........C........

STANDARD: Push the TRIP pushbutton on Control Rod Drive Breaker B and observe the Green Trip flag is visible CUE: TRIP pushbutton has been pushed on Control Rod Drive Breaker B.

Green TRIP flag is visible.

(If Control Rod Drive Breaker C has NOT been tripped, the Reactor has NOT TRIPPED)

(If Control Rod Drive Breaker C HAS been tripped) The Reactor has TRIPPED.

SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME

In Plant JPM P2

Facility: Davis-Besse Task No: 001-043-05-0100 Task

Title:

Locally Operate Atmospheric Vent Valve ICS11A K/A

Reference:

(039) A4.07 2.8/2.9 Job Performance Measure No: P2 (JPM 024)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance __ X _ Actual Performance ___

Classroom ___ Simulator _ _ Plant _ X __

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Locally Operate Atmospheric Vent Valve ICS11A Required Materials:

DB-OP-02000 Attachment 3 General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task: No Alternate Path: No Validation Time: 13 minutes

EXAMINER COPY INITIAL CONDITIONS:

The Atmospheric Vent Valves cannot be controlled from the Control Room due to severe loss of instrument air.

INITIATING CUES:

The Unit Supervisor directs you to locally operate Atmospheric Vent Valve ICS 11A starting at Section D step 3.0 of Attachment 3 of DB-OP-02000 (IA450 has been closed by another operator).

(Hand the trainee a copy of Attachment 3 of DB-OP-02000)

CANDIDATE COPY INITIAL CONDITIONS:

The Atmospheric Vent Valves cannot be controlled from the Control Room due to severe loss of instrument air.

INITIATING CUES:

The Unit Supervisor directs you to locally operate Atmospheric Vent Valve ICS 11A starting at Section D step 3.0 of Attachment 3 of DB-OP-02000 (IA450 has been closed by another operator).

PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Verify Valve A (ICS11AA) open STANDARD: Verify Valve A (ICS11AA) is open by turning in the clockwise direction and returning to open position CUE: Valve ICS11AA is rotated a small amount in the clockwise direction and then returned to full OPEN SAT UNSAT
2. PERFORMANCE STEP: Open Valve B (ICS11AB)

........C........

STANDARD: Turn handwheel counterclockwise to open Valve B (ICS11AB)

COMMENT: Step 1-3 shall be performed prior to Step 5 CUE: Valve ICS11AB handwheel is rotated counterclockwise and is open SAT UNSAT

3. PERFORMANCE STEP: Notify the Control Room that ICS11A is ready for local manual operation STANDARD: Communicate with Control Room using radio to determine desired valve position CUE: Communications have been established with the Control Room The Reactor Operator directs you to position the Atmospheric Vent Valve to 10 turns on the handwheel counter SAT UNSAT
4. PERFORMANCE STEP: Check the handwheel counter at 0 STANDARD: Check the handwheel counter is at zero CUE: Handwheel counter is at zero (0)

SAT UNSAT

5. PERFORMANCE STEP: Establish desired throttle position

........C........

STANDARD: Turn the handwheel in the clockwise direction 10 turns until counter reads 10 Note: Valve manual handwheel is reverse acting CUE: Handwheel is rotated in the clockwise direction The handwheel counter is at 10.

Instrument air has been restored.

The Reactor Operator directs you to close ICS11A, establish positive shutoff and restore instrument air to the Atmospheric Vent Valve.

SAT UNSAT

6. PERFORMANCE STEP: Close the Atmospheric Vent valve (ICS 11A) and establish

........C........ positive shutoff STANDARD: Turn the handwheel in the counterclockwise direction until the counter is zero (0)

COMMENT: Step 6 shall be performed prior to step 7 CUE: Handwheel is rotated counterclockwise direction Handwheel counter is at zero (0)

SAT UNSAT

7. PERFORMANCE STEP: Close Valve B ICS11AB

........C........

STANDARD: Manual handwheel for Valve ICS11AB rotated clockwise until closed CUE: Valve ICS11AB handwheel has been rotated clockwise, valve is closed.

SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME

In Plant JPM P3

Facility: Davis-Besse Task No: 064-026-05-0401 Task

Title:

Energize Station Blackout Diesel Generator Auxiliaries K/A

Reference:

(064) A2.12 2.8/3.1 Job Performance Measure No: P3 (JPM 258)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance __ X _ Actual Performance ___

Classroom ___ Simulator _ _ Plant _ X __

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Energize Station Blackout Diesel Generator Auxiliaries Emergency Shutdown Station Blackout Diesel Generator (Loss of Air Cooling Fans)

Required Materials:

Section 4.10 of DB-OP-06334, Station Blackout Diesel Generator Operating Procedure Section 5.2 of DB-OP-06334, Emergency Shutdown of Station Blackout Diesel Generator General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task: No Alternate Path: Yes Validation Time: 15 minutes

EXAMINER COPY INITIAL CONDITIONS:

The plant is operating at 100% power Ambient temperature is 45°F Breaker AD213, SBDOG to D2, has been opened in preparation for breaker maintenance AD213 was opened 15 minutes ago INITIATING CUES:

NOTE: Procedure Step 4.10.2 needs to be initialed indicating that Barring of the Station Blackout Diesel Generator is NOT required. In the procedure step NO should be circled.

The Unit Supervisor directs you to perform Section 4.10, Energizing the Station Blackout Diesel Generator Auxiliaries from the Station Blackout Diesel Generator, of DB-OP-06334.

You have an eSOMS handheld computer with the Station Blackout Diesel Generator readings downloaded.

(Provide the examinee a copy of procedure package including section 4.10 of DB-OP-06334, Station Blackout Diesel Generator Operating Procedure. Procedure Step 4.10.2 needs to be initialed indicating that Barring of the Station Blackout Diesel Generator is NOT required. In the procedure step NO should be circled. Section 5.2 will be provided when it is recognized emergency shutdown of the SBODG is required.)

CANDIDATE COPY INITIAL CONDITIONS:

The plant is operating at 100% power Ambient temperature is 45°F Breaker AD213, SBDOG to D2, has been opened in preparation for breaker maintenance AD213 was opened 15 minutes ago INITIATING CUES:

The Unit Supervisor directs you to perform Section 4.10, Energizing the Station Blackout Diesel Generator Auxiliaries from the Station Blackout Diesel Generator, of DB-OP-06334.

You have an eSOMS handheld computer with the Station Blackout Diesel Generator readings Downloaded.

PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Depress and hold the FUEL PRIME pushbutton until fuel oil pressure stabilizes >15 PSIG.

STANDARD: Depresses the FUEL PRIME pushbutton until fuel oil pressure stabilizes greater than 15 PSIG on the black indicator of PI 11160.

CUE: FUEL PRIME pushbutton depressed, PI 11160 FUEL FILTER Pressure black indicator reads 17 PSIG SAT UNSAT

2. PERFORMANCE STEP: Place the ELECT PROTECT-MODE SELECT Switch in the TEST

........C........ position.

STANDARD: Rotate the ELECT PROTECT-MODE SELECT Switch to the TEST position on C30202.

CUE: The ELECT PROTECT - MODE SELECT Switch has been rotated and points towards TEST SAT UNSAT

3. PERFORMANCE STEP: Verify SBODG OUTPUT BREAKER AD 301 is open.

STANDARD: On panel C30202, Verifies AD 301 GREEN light is lit.

CUE: AD 301 GREEN LIGHT is lit SAT UNSAT

4. PERFORMANCE STEP: Start the SBODG.

........C........

STANDARD: Depress the SBODG START pushbutton on Panel 30202.

CUE: The START pushbutton has been depressed SAT UNSAT

5. PERFORMANCE STEP: After 30 seconds CHECK the Station Blackout Diesel Generator starts and accelerates to approximately 450 RPM.

STANDARD: After approximately 30 seconds verify the Station Blackout Diesel Generator starts and accelerates to approximately 450 rpm as indicated on ENGINE TACHOMETER on C30203.

CUE: After approximately 30 seconds the diesel starts.

When checking speed on Engine Tachometer, Tachometer on C30203 reads

450 rpm.

SAT UNSAT

6. PERFORMANCE STEP: After approximately 30 seconds, the Station Blackout Diesel Generator accelerates to 900 rpm.

STANDARD: Verify the Station Blackout Diesel Generator accelerates to approximately 900 rpm after 30 seconds as indicated by ENGINE TACHOMETER on C30203.

CUE: After approximately 30 seconds the diesel accelerates.

Engine Tachometer on C30203 reads 900 rpm.

SAT UNSAT

7. PERFORMANCE STEP: Place the SYNCHRONIZE switch in the ON position

........C........

STANDARD: Install operating handle and rotate the SYNCHONIZE switch to the ON position CUE: The SYNCHRONIZE switch is in the ON position, If asked, The synchroscope pointer indicates 1200 SAT UNSAT

8. PERFORMANCE STEP: Close Breaker AD 301, SBODG OUTPUT BREAKER on Panel

........C........ C30202 STANDARD: Rotate handswitch for AD301 to the close position CUE: AD 301 RED LIGHT is ON SAT UNSAT

9. PERFORMANCE STEP: Place the SYNCHRONIZE switch to OFF STANDARD: Rotate the SYNCHRONIZE switch to OFF position CUE: The SYNCHRONIZE switch is in the OFF position SAT UNSAT
10. PERFORMANCE STEP: Verify both Station Blackout Diesel Generator Jacket Water Radiator fans are operating STANDARD: Check the status of the fans by observing the breaker lights and/or observing

the fans locally, recognize neither fan is operating NOTE: Alternate Path begins with recognition that fans are not running and emergency shutdown the SBODG must be performed CUE: Both fan breaker lights indicate GREEN (or the fans are not turning if checked locally)

SAT UNSAT

11. PERFORMANCE STEP: Go to Section 5.2, Emergency Shutdown of the Station Blackout Diesel Generator STANDARD: Route to section 5.2, Emergency Shutdown of the Station Blackout Diesel Generator CUE: (Provide the examinee a copy of Section 5.2 of DB-OP-06334)

SAT UNSAT

12. PERFORMANCE STEP: Stop the Station Blackout Diesel Generator

........C........

STANDARD: Depress the Emergency Stop pushbutton on panel C30202 or panel C30203.

CUE: The Emergency Stop has been depressed. The Station Blackout Diesel Generator is beginning to slow down.

(If asked) AD 301 GREEN light is ON, RED light is OFF SAT UNSAT

13. PERFORMANCE STEP: Station Blackout Diesel Generator stops STANDARD: Verify Engine Tachometer reads zero on C30203 CUE: The Station Blackout Diesel Generator tachometer reads zero SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME

Simulator JPM S1

Facility: Davis-Besse Task No: 008-005-01-0100 Task

Title:

Swap Control Rod Drive Cooling Booster pumps K/A

Reference:

(001) A2.11 4.4/4.7 Job Performance Measure No: S1 (NEW)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Use 100% power IC. Verity #1 CRDC Booster Pump is running.

IMF KA H 3D Thermal Overload on #2 CRDC Booster Pump (Insert after EO contacted to open BE2206)

Task Standard:

Start the STBY CRDC Booster Pump 2 Stop the running CRDC Booster Pump 1 Open pump suction valve CC1328 and restart previously running CRDC Booster Pump 1 Required Materials:

DB-OP-06262 Section 3.21 ready for performance of prerequisite 3.21.1 DB-OP-06262 Section 3.19 with prerequisites complete and step 3.19.1 marked N/A General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task: No Alternate Path: Yes Validation Time:

9 minutes

SIMULATOR INSTRUCTIONS TASK DESCRIPTION:

Swap Control Rod Drive Cooling Booster pumps INITIAL CONDITION:

Any at power I/C ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

Verify #1 CRDC Booster Pump is running MALFUNCTIONS/FAILURE TO INSERT:

  1. 2 CRDC Booster Pump trip after EO is sent to open BE2206 CC1328, CRD Booster Pump 1 Suction Valve, fails closed when pump 1 is stopped

EXAMINER COPY INITIAL CONDITIONS:

The plant is at 100%

All systems are in a normal lineup Engineering has requested to inspect CRD Filter 1 filter element to verify correct size. There are no other issues with CRD Filter 1 Maintenance is ready to disassemble CRD Filter 1 for inspection I & C has removed PDI 2952 from service INITIATING CUES:

The Command SRO has directed you to place #2 Control Rod Drive Booster Pump in service in preparation for filter F55-1, FILTER CRDC 1-1 inspection IAW DB-OP-06262 Section 3.21 and 3.19.

(Provide examinee a copy of section 3.19 and 3.21 DB-OP-06262)

CANDIDATE COPY INITIAL CONDITIONS:

The plant is at 100%

All systems are in a normal lineup Engineering has requested to inspect CRD Filter 1 filter element to verify correct size. There are no other issues with CRD Filter 1 Maintenance is ready to disassemble CRD Filter 1 for inspection I & C has removed PDI 2952 from service INITIATING CUES:

The Command SRO has directed you to place #2 Control Rod Drive Booster Pump in service in preparation for filter F55-1, FILTER CRDC 1-1 inspection IAW DB-OP-06262 Section 3.21 and 3.19.

PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Verify CRD Booster Pump 2 is in service (Step 3.21.1).

STANDARD: Refer to Subsection 3.19, Startup of CRD Booster Pump 2.

CUE: None SAT UNSAT

2. PERFORMANCE STEP: Start CRD CLNG BOOSTER PUMP 2.

........C........

STANDARD: Start CRD CLNG BOOSTER PUMP 2 using HIS1924.

NOTE: Annunciator 5-6-D will alarm when the second pump is started. The alarm may be treated as an expected alarm. If alarm procedure is used guidance will be if an evolution is in progress causing the alarm stop the standby pump if desired.

CUE: None SAT UNSAT

3. PERFORMANCE STEP: Verify CRD Booster Pump 2 discharge pressure at PI756 is between 120 and 160 PSIG.

STANDARD: Contacts EO to verify CRD Booster Pump 2 discharge pressure at PI756 is between 120 and 160 PSIG.

CUE: Equipment Operator reports CRD Booster Pump 2 discharge pressure at PI756 is 150 PSIG.

SAT UNSAT

4. PERFORMANCE STEP: Stop CRD CLNG BOOSTER PUMP 1 and place in lockout.

........C........

STANDARD: Verify CRD CLNG BOOSTER PUMP 1 off and in LOCKOUT using HIS1915.

NOTE: CC1328, Suction valve for CRD Booster Pump 1, will be triggered to fail closed when the pump is shut down (switch bumped by mechanic walking down filter inspection).

CUE: None SAT UNSAT

5. PERFORMANCE STEP: Verify CRD Booster Pump 2 discharge flow on FIS2586 is greater than 150 GPM.

NOTE: Pump 2 will trip triggered by a time delay which may occur during or prior to performance steps 5, 6, 7, 8, or 9 and require performance step 10 to be implemented.

STANDARD: Contacts EO to verify CRD Booster Pump 2 discharge flow on FIS2586 is greater than 150 GPM.

CUE: EO reports flow on FIS2586 is 190 GPM.

SAT UNSAT

6. PERFORMANCE STEP: Complete section 3.19 and route back to section 3.21.

STANDARD: Signs section 3.19 complete and routes back to section 3.21.

NOTE: Step 3.19.8 pre-identified as N/A since being removed from service.

CUE: None SAT UNSAT

7. PERFORMANCE STEP: Complete prerequisites for section 3.21.

STANDARD: Signs step 3.21.1 complete and signs for prerequisites complete.

CUE: None SAT UNSAT

8. PERFORMANCE STEP: Place HIS1915, CRD CLNG BOOSTER PUMP 1 in LOCKOUT.

STANDARD: Verifies switch HIS1915 is in LOCKOUT.

NOTE: Step 3.21.4 may be marked N/A since the switch was left in LOCKOUT during performance of section 3.19.

CUE: None SAT UNSAT

9. PERFORMANCE STEP: Open BE2206, CRD BOOSTER PUMP 1.

STANDARD: Contact EO to OPEN BE2206, CRD BOOSTER PUMP 1.

CUE: Role play as EO, acknowledge direction to open BE2206.

SAT UNSAT ALTERNATE PATH - CRD Booster Pump 2 trips and will require placing CRD Booster Pump 1 back into service. CRD Booster Pump 1 suction valve CC1328 will close when the pump is shut down in performance step 4 which will require verifying flow path and opening CC1328 prior to starting CRD Booster Pump 1.

10. PERFORMANCE STEP: Respond to Annunciator 5-6-D, CRD BOOSTER PMP P HI/FLOW LO/GO TO DB-OP-02523, CCW System Malfunctions.

STANDARD: Recognize entry criteria and implement DB-OP-02523, CCW System Malfunctions, or refer to alarm procedure which will direct to the abnormal procedure CUE: (If asked) Role play as the EO, CRD BOOSTER PUMP 2 is off, motor is hot to the touch.

SAT UNSAT

11. PERFORMANCE STEP: Verify the standby CRD Booster pump starts.

STANDARD: Attempt to start CRD Booster Pump 1 (will not be successful due to suction valve being closed).

CUE: None SAT UNSAT

12. PERFORMANCE STEP: Monitor CRD Stator temperatures.

STANDARD: Using RNO guidance (since pump 1 was not able to be started) monitor CRD Stator temperatures using NSSS Summary Files 12 and 13 and trip the reactor if any CRD Stator temperature reaches 180 ºF.

CUE: As a maintenance mechanic report to the control room that while walking

down the CRD Filter 1 inspection work in #4 MPR a switch was bumped and it sounded like something actuated.

SAT UNSAT

13. PERFORMANCE STEP: Verify the CRD Cooling Booster flow path is available.

........C........

STANDARD: Refer to Attachment 8 for verification of proper flow path to identify CC1328 is closed and open CC1328. Start/ensure CRD Cooling Booster Pump 1 is running.

NOTE: If the CRD Booster Pump 1 switch is left in auto after attempting to start in performance step 11 the pump will auto start when CC1328 is open, otherwise verify the pump is running by returning the switch to auto.

CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME

Simulator JPM S2

Facility: Davis-Besse Task No: 000-093-05-0100 Task

Title:

Transfer LPI Suctions to the Emergency Sump K/A

Reference:

(006) A4.05 (3.9/3.8)________Job Performance Measure No: S2 (JPM 291)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance _ __ Actual Performance __X__

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Transfer LPI Suctions to the Emergency Sump Required Materials: Section 2 of DB-OP-02000, RPS, SFAS, SFRCS Trip, or SG Tube Rupture.

General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task: No Alternate Path: Yes Validation Time: 14 minutes SIMULATOR INSTRUCTIONS TASK DESCRIPTION:

Transfer LPI Suctions to the Emergency Sump

INITIAL CONDITION:

Large Break LOCA Spray Pumps are not running ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

Ensure DH 9A, DH 9B, DH 7A, DH7B and HP 31 are energized Complete all DB-OP-02000 Section 10 actions up to step 10.13 Turn the "Breaker Open" tags for DH 9A, DH 9B, DH 7A, DH 7B and HP31 upside down Freeze the simulator when BWST level is less than 9 feet Annunciator 5-3-A, BWST LO-LOLVL XFER TO EMER SUMP is in alarm. Output modules L511, L512, L513, and L514 (at least 3 out of 4) have failed to trip.

Leave the simulator frozen until the examinee is ready to start the JPM MALFUNCTIONS/FAILURE TO INSERT:

Insert both hot leg leaks at the same time, IMF HH41 .8 Fail level 5 output modules to trip, L6AMC, L6BMC, and L6CMC Insight insert TALA531 to 0.1 this is for the BWST LO-LO LVL XFER TO EMER SUMP alarm ACTION/CUES:

STUDENT COPY INITIAL CONDITIONS:

A large break LOCA has occurred and the BWST level is less than nine feet.

Both MU pumps and HPI pumps have been stopped in accordance with DB-OP-02000 Section 10 and Specific Rule guidance.

DB-OP-02000, Attachment 7, Section 1. Action to close breakers for DH7A, DH7B, DH9A, DH9B, and HP31 has been completed IAW DB-OP-02000 step 10.3.

DB-OP-02000, Attachment 7, Section 2, Suction Transfer, Steps 1 through 4 have been completed IAW DB-OP-02000 step 10.11.

INITIATING CUES:

Annunciator "BWST LO-LO LVL, XFER TO EMER SUMP" (5-3-A) has been received.

The Command SRO directs you to transfer LPI suction to the emergency sump in accordance with DB-OP-02000, Attachment 7, Section 2.

For the purpose of this JPM the Command SRO is not directing the step by step performance of this attachment.

EXAMINER COPY INITIAL CONDITIONS:

A large break LOCA has occurred and the BWST level is less than nine feet.

Both MU pumps and HPI pumps have been stopped in accordance with DB-OP-02000 Section 10 and Specific Rule guidance.

DB-OP-02000, Attachment 7, Section 1. Action to close breakers for DH7A, DH7B, DH9A, DH9B, and HP31 has been completed IAW DB-OP-02000 step 10.3.

DB-OP-02000, Attachment 7, Section 2. Suction Transfer, Steps 1 through 4 has been completed IAW DB-OP-02000 step 10.11.

INITIATING CUES:

Annunciator "BWST LO-LO LVL, XFER TO EMER SUMP" (5-3-A) has been received.

The Command SRO directs you to transfer LPI suction to the emergency sump in accordance with DB-OP-02000, Attachment 7, Section 2.

For the purpose of this JPM the Command SRO is not directing the step by step performance of this attachment.

(Provide the examinee a copy of DB-OP-02000, Attachment 7 Section 2. Freeze simulator until examinee is ready to start-should have time to review)

PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".

START TIME:

NOTE: Unfreeze simulator when student has completed procedure review

1. PERFORMANCE STEP: Block SFAS Level 2 on DH 7A, DH 9A, DH 7B and DH 9B.

C STANDARD: Depress BLOCK pushbuttons for DH 7A (HISDH7A1) or DH 9A (HISDH9A) and DH 7B (HISDH7B1) or DH 9B (HISDH9B) and verify all 4 valves are blocked.

NOTE: Blocking either DH7A or DH9A will block the other as does DH7B/9B.

CUE: None SAT UNSAT

2. PERFORMANCE STEP: Check BWST Level is less than or equal to 9 feet.

STANDARD: Check BWST level < or equal to 9 feet on level indicators.

CUE: None SAT UNSAT

3. PERFORMANCE STEP: Open the Containment Emergency Sump Isolation Valves.

STANDARD: Depress the OPEN pushbutton on HIS DH9A.

CUE: None SAT UNSAT ALTERNATE PATH - Must recognize DH9A/DH9B did not start opening and the appropriate SFAS Level 5 Output Modules are not tripped as required. This will require manually tripping the affected Output Modules to allow DH9A/DH9B to be opened.

4. PERFORMANCE STEP: Recognize DH9A does not open.

STANDARD: HIS DH9A green light remains lit.

CUE: Role play as Command SRO if required, Acknowledge DH9A did not open.

SAT UNSAT

5. PERFORMANCE STEP: Open DH 9B.

STANDARD: Depress the OPEN pushbutton on HIS DH9B.

CUE: None SAT UNSAT

6. PERFORMANCE STEP: Recognize DH9B does not open.

STANDARD: HIS DH9B green light remains lit.

CUE: Role play as Command SRO if required, Acknowledge DH9B did not open.

SAT UNSAT

7. PERFORMANCE STEP: Manually trip Train 1 SFAS Level 5 Output Modules.

C STANDARD: Depress and release the trip pushbuttons next to L511 and L513.

COMMENT: Step 7 and 8 can be done in either order.

CUE: Another RO is monitoring conditions for cavitation.

SAT UNSAT

8. PERFORMANCE STEP: Manually trip Train 2 SFAS Level 5 Output Modules.

C STANDARD: Depress and release the trip pushbuttons next to L512 and L514.

CUE: None

_______________________________________________________________SAT UNSAT__

9. PERFORMANCE STEP: Open DH 9A.

C STANDARD: Depress the OPEN pushbutton on HIS DH9A.

CUE: None

SAT UNSAT

10. PERFORMANCE STEP: Verify that DH 9A starts to open.

STANDARD: Check GREEN light OFF on HIS DH9A.

CUE: None SAT UNSAT

11. PERFORMANCE STEP: Open DH 9B.

C STANDARD: Depress the OPEN pushbutton on HIS DH9B.

CUE: None SAT UNSAT

12. PERFORMANCE STEP: Verify that DH 9B starts to open.

STANDARD: Check GREEN light OFF on HIS DH9B.

CUE: None SAT UNSAT

13. PERFORMANCE STEP: Verify that DH 7A starts to close as DH 9A starts to open.

STANDARD: Recognize DH7A starts to close, check RED light OFF on HIS DH7A.

CUE: None SAT UNSAT

14. PERFORMANCE STEP: Verify that DH 7B starts to close as DH 9B starts to open.

STANDARD: Recognize DH7B starts to close, check RED light OFF on HIS DH7B.

CUE: None SAT UNSAT

15. PERFORMANCE STEP: Verify the transfer is complete.

STANDARD: Check the RED indicating lights on HIS DH9A and HIS DH9B are LIT and the GREEN indicating lights on HIS DH7A and HIS DH7B are LIT.

Check low pressure injection flow NOT significantly changed.

CUE: None.

SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME

Simulator JPM S3

Facility: Davis-Besse Task No: 004-029-05-0100 Task

Title:

Recover From MU/HPI/PORV Cooling K/A

Reference:

(010) A2.03 4.1/4.2 Job Performance Measure No: S3 (JPM 063)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Perform Recovery from MU/HPI PORV Cooling and recognize failure of the PORV to close and take immediate actions.

Required Materials: 5 of DB-OP-02000, RPS, SFAS, SFRCS Trip, or SG Tube Rupture.

General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

Yes Validation Time:

11 minutes

SIMULATOR INSTRUCTIONS TASK DESCRIPTION:

Perform Recovery From MU/HPI PORV Cooling and recognize failure of the PORV to close and take immediate actions.

INITIAL CONDITION:

Loss of all Feedwater MU/HPI cooling initiated MDFP feeding both SGs ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

Fail Makeup Pump 2 to start Fail both AFPTs to start Unfreeze the simulator after the initial cue is given to minimize excessive SCM MALFUNCTIONS/FAILURE TO INSERT:

Fail the PORV open ACTIONS/CUES None

EXAMINER COPY INITIAL CONDITIONS:

The reactor has tripped All Feedwater was lost Makeup Pump 2 did NOT start Makeup/HPI/PORV Cooling was initiated INITIATING CUES:

The MDFP has been started and is feeding both Steam Generators.

A second operator is controlling Steam Generator levels, pressures, and steaming of Steam Generators.

The Unit Supervisor directs you to recover from MU/HPI/PORV Cooling using Attachment 25 of DB-OP-02000. For the purpose of this JPM the Command SRO is not directing the step by step performance of this attachment.

(Provide Attachment 25 of DB-OP-02000, RPS, SFAS, SFRCS Trip, or SG Tube Rupture)

CANDIDATE COPY INITIAL CONDITIONS:

The reactor has tripped All Feedwater was lost Makeup Pump 2 did NOT start Makeup/HPI/PORV Cooling was initiated INITIATING CUES:

The MDFP has been started and is feeding both Steam Generators A second operator is controlling Steam Generator levels and pressures The Unit Supervisor directs you to recover from MU/HPI/PORV Cooling using Attachment 25 of DB-OP-02000. For the purpose of this JPM the Command SRO is not directing the step by step performance of this attachment.

PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Establish the letdown flow.

........C........

STANDARD: Depress OPEN on HISMU2B.

COMMENT: Sequence of opening MU 2B, MU 2A and MU 3 NOT critical CUE: If asked for desired flow Establish 70 gpm (flow rate not critical)

Note: may establish 140 gpm __________

SAT UNSAT

2. PERFORMANCE STEP: Establish the letdown flow.

........C........

STANDARD: Depress BLOCK for MU 2A.

Depress OPEN on HISMU2A.

COMMENT:Sequence of opening MU 2B, MU 2A and MU 3 NOT critical CUE: If asked for desired flow Establish 70 gpm (flow rate not critical)

Note: may establish 140 gpm SAT UNSAT

3. PERFORMANCE STEP: Establish the letdown flow

........C........

STANDARD: Depress BLOCK pushbutton for MU 3.

Depress OPEN pushbutton on HISMU3.

COMMENT:Sequence of opening MU 2B, MU 2A and MU 3 NOT critical CUE: If asked for desired flow Establish 70 gpm (letdown flow rate not critical).

Note: may establish 140 gpm SAT UNSAT

4. PERFORMANCE STEP: Open the MU Pumps Minimum Recirc Valves.

........C........

STANDARD: Depress the OPEN pushbutton on HISMU6407.

CUE: None __________

SAT UNSAT

5. PERFORMANCE STEP: Open the MU Pumps Minimum Recirc Valves.

STANDARD: Depress the OPEN pushbutton on HISMU6406.

COMMENT: MU 6406 not critical due to MUP 2 not running CUE: None SAT UNSAT

6. PERFORMANCE STEP: IF BOTH MU Pumps are in service perform the following:

STANDARD: Recognize this step does not apply - mark N/A.

COMMENT: Only MUP 1 is in service CUE: None SAT UNSAT

7. PERFORMANCE STEP: Isolate the normal MU Injection header.

STANDARD: Depress the CLOSE pushbutton on HISMU6422.

CUE: None SAT UNSAT

8. PERFORMANCE STEP: Establish desired MU flow rate by throttling MU6419.

STANDARD: Depress and hold the CLOSE pushbutton on HIS MU 6419 to throttle the valve closed and reduce flow rate to desired value while maintaining adequate Subcooling Margin.

CUE: (If asked) MU 6423B is open to maintain minimum flow SAT UNSAT

9. PERFORMANCE STEP: Restore MU Pump Suction.

........C........

STANDARD: Depress the OFF pushbutton on HISMU6405.

CUE: None SAT UNSAT

10. PERFORMANCE STEP: Restore MU Pump Suction.

STANDARD: Depress the OFF pushbutton on HISMU3971.

COMMENT: MU3971 not critical due to MUP 2 not running CUE: None SAT UNSAT

11. PERFORMANCE STEP: IF only MU Pump 2 is in service perform the following.

STANDARD: Recognize this step does not apply - mark N/A.

COMMENT: Only MUP 1 is in service CUE: None SAT UNSAT

12. PERFORMANCE STEP: Perform the following to recover RCS Inventory control:

STANDARD: Maintain Steam Generator levels per specific rule 4.

CUE: Balance Of Plant RO is maintaining SG Levels SAT UNSAT

13. PERFORMANCE STEP: Perform the following to recover RCS Inventory control:

STANDARD: Reduce HPI Flow to establish a decreasing SCM trend (maintain minimum Subcooling Margin) by throttling HP2A-D as necessary.

Comment: Two handed operations is authorized for positioning HP2A through HP2D CUE: None SAT UNSAT

14. PERFORMANCE STEP: Perform the following to recover RCS Inventory control:

STANDARD: Raise letdown flow to maximum available by throttling MU6 and/or placing a second purification demineralizer in service.

CUE: If asked for desired flow Establish 70 gpm (letdown flow rate not critical).

Note: may establish 140 gpm SAT UNSAT ALTERNATH PATH: RC2A is expected to close. Must recognize PORV did not close and perform actions of the response not obtained column to close the PORV Block Valve.

15. PERFORMANCE STEP: Close the PORV.

STANDARD: Rotate HIS RC 2A to the AUTO position and Push to Close. Recognize the PORV did NOT close.

CUE: None SAT UNSAT

16. PERFORMANCE STEP: Close the PORV Block Valve.

........C........

STANDARD: Depress the CLOSE pushbutton on HISRC11 and verify it closes.

CUE: None.

SAT UNSAT TERMINATING CUES:This JPM is complete (Terminated by the evaluator)

END TIME

Simulator JPM S4

Facility: Davis-Besse Task No: 059-012-04-0100 Task

Title:

Main Feed Pump Startup/Transfer to ICS Control K/A

Reference:

(059) A4.10 (3.9/3.8)________ Job Performance Measure No: S4 (JPM New)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance _ __ Actual Performance __X__

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Perform steps to place Main Feed Pump in service and emergency trip due to low oil pressure Required Materials:

DB-OP-06901, Plant Startup, signed off through step 3.24 with step 3.25 in progress DB-OP-06224, Main Feed Pump and Turbine, section 3.16, Startup of MFP2, signed off as applicable through step 3.16.43.

DB-OP-06224, Main Feed Pump and Turbine, section 3.17, Transferring MFPT 2 Speed Control Between MDT20 and ICS DB-OP-02010, pages 10 and 11 for Annunciator 10-1-D General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task: No Alternate Path: Yes Validation Time: 9 minutes SIMULATOR INSTRUCTIONS

TASK DESCRIPTION:

Perform steps to place Main Feed Pump in service and emergency trip due to low oil pressure INITIAL CONDITION:

Mode 2 with reactor power at 2%. Main Feed Pump 2 startup in progress and ready to transfer to ICS Hand/Auto station control (step 3.16.44 of DB-OP-06224, Main Feed Pump and Turbine).

ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

MALFUNCTIONS/FAILURE TO INSERT:

Insert low oil pressure #2 MFPT when increasing speed to raise discharge pressure to 1000psig to 1050psig (triggered at approximately 950psig)

ACTION/CUES:

STUDENT COPY INITIAL CONDITIONS:

Mode 2 with reactor power at 2%. Main Feed Pump 2 startup in progress and ready to transfer to ICS Hand/Auto station control (step 3.16.44 of DB-OP-06224, Main Feed Pump and Turbine)

INITIATING CUES:

The unit supervisor has directed you to continue with #2 MFP startup starting at step 3.16.44 of DB-OP-06224, Main Feed Pump and Turbine. Transfer #2 MFP to ICS Hand/Auto station control and continue with step 3.26 of DB-OP-06901, Plant Startup, to transfer feedwater from the MDFP to the MFP.

EXAMINER COPY INITIAL CONDITIONS:

Mode 2 with reactor power at 2%. Main Feed Pump 2 startup in progress and ready to transfer to ICS Hand/Auto station control (step 3.16.44 of DB-OP-06224, Main Feed Pump and Turbine).

INITIATING CUES:

The unit supervisor has directed you to continue with #2 MFP startup starting at step 3.16.44 of DB-OP-06224, Main Feed Pump and Turbine. Transfer #2 MFP to ICS Hand/Auto station control and continue with step 3.26 of DB-OP-06901, Plant Startup, to transfer feedwater from the MDFP to the MFP.

(Provide the examinee a copy of the following documents:

DB-OP-06901, Plant Startup, signed off through step 3.24 with step 3.25 in progress DB-OP-06224, Main Feed Pump and Turbine, section 3.16, Startup of MFP2, signed off as applicable through step 3.16.43.

DB-OP-06224, Main Feed Pump and Turbine, section 3.17, Transferring MFPT 2 Speed Control Between MDT20 and ICS)

PERFORMANCE INFORMATION

NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".

START TIME:

1. PERFORMANCE STEP: Perform section 3.17 of DB-OP-06224, Main Feed Pump Turbine, and transfer MFPT2 Speed Control from MDT20 to ICS.

STANDARD: Identify step 3.17.1 of DB-OP-06224, Main Feed Pump Turbine, for transfer of MFPT2 Speed Control from MDT20 to ICS.

CUE: None SAT UNSAT

2. PERFORMANCE STEP: Verify MFPT speed is between 3900 RPM and 5150 RPM STANDARD: Verify MFPT 2 speed between 3900 RPM and 5150 RPM using indicator SI2708B CUE: None SAT UNSAT
3. PERFORMANCE STEP: Adjust the ICS Bailey Controller output to indicate a zero amp reading on the XFER METER Amp Y1-806 STANDARD: Toggle the ICS Bailey Controller speed control, HIC ICS 36A Hand/Auto Station, to indicate a zero amp reading on the XFER METER Amp Y1-806 CUE: None SAT UNSAT
4. PERFORMANCE STEP: Depress ICS on HIS 806C1

........C........

STANDARD: Depress ICS on HIS 806C1 CUE: None __________

SAT UNSAT

5. PERFORMANCE STEP: Check that ICS illuminates and the ICS Bailey Controller assumes control of MFPT speed.

STANDARD: Check that ICS illuminates on HIS 806C1 and that the ICS Bailey Controller

assumes control of MFPT 2 speed.

CUE: None __________

SAT UNSAT

6. PERFORMANCE STEP: If ICS Control is unstable, THEN return to MDT20 Control.

STANDARD: Recognize proper control by the ICS Controller and mark step 3.17.1.e as N/A.

CUE: None __________

SAT UNSAT

7. PERFORMANCE STEP: Adjust the MDT20 output to maintain zero amps indicated on the XFER METER Y1-806.

STANDARD: Maintain zero amps indicated on the XFER METER Y1-806 by occasional adjustment as needed of the MDT20 output.

COMMENT: Student may consider step 3.17.1.f in progress while continuing MFP startup and not sign as complete.

CUE: None __________

SAT UNSAT

8. PERFORMANCE STEP: Complete section 3.17 of DB-OP-06224.

STANDARD: Sign and date complete by for section 3.17 of DB-OP-06224.

COMMENT: If student considers step 3.17.1.f to be in progress while continuing MFP startup then section 3.17 will not be signed as complete.

CUE: None __________

SAT UNSAT

9. PERFORMANCE STEP: Sign complete step 3.16.44 of DB-OP-06224.

STANDARD: Sign complete step 3.16.44 of DB-OP-06224.

COMMENT: If student considers step 3.17.1.f to be in progress while continuing MFP startup and section 3.17 is not signed as complete then step 3.16.44 may remain in progress. Step 3.16.45 would be performed after the MFP is supplying feedwater to the steam generators.

CUE: None __________

SAT UNSAT

10. PERFORMANCE STEP: Sign compete step 3.25 of DB-OP-06901, Plant Startup.

STANDARD: Sign compete step 3.2.5 of DB-OP-06901, Plant Startup.

COMMENT: Student may continue with step 3.2.5 circled (in progress) because section of DB-OP-06224 is not complete until there is flow to the steam

generators and the ARTS Channels test/toggle switches are placed in the operate position at step 3.16.45.

CUE: None __________

SAT UNSAT

11. PERFORMANCE STEP: Raise Main Feed Pump Speed until discharge pressure is

........C........ between 1000 and 1050 psig (step 3.26.1 of DB-OP-06901).

STANDARD: Raise MFPT 2 speed using manual control of HIC ICS 36A Hand/Auto Station, ICS Bailey Controller, to raise discharge pressure to band of 1000-1050 psig.

NOTE: Alternate Path begins with low oil pressure Annunciator 10-1-D received as discharge pressure is raised (triggered to alarm at approximately 950psig).

CUE: None __________

SAT UNSAT

12. PERFORMANCE STEP: Identify Annunciator 10-1-D, MFPT 2 LUBE OIL PRESS LO, in alarm.

STANDARD: Recognize annunciator 10-1-D, MFPT 2 LUBE OIL PRESS LO, in alarm and refer to alarm procedure DB-OP-2010.

CUE: If student refers to alarm procedure provide copy of DB-OP-02010 pages 10 and 11 for Annunciator 10-1-D SAT UNSAT

13. PERFORMANCE STEP: Determine if bearing pressure is actually Low.

STANDARD: Determine bearing pressure is actually Low (<7 psig) using PI1256, Header Control Pressure.

CUE: None __________

SAT UNSAT

14. PERFORMANCE STEP: Verify automatic start of standby MFPT 2 Main Oil Pump.

........C........

COMMENT: The standby MFPT 2 Main Oil Pump will not auto start. The pump will start manually and almost immediately trip on electrical fault.

STANDARD: Identify standby MFPT 2 Main Oil Pump is not running and start standby MFPT 2 Main Oil Pump.

CUE: None __________

SAT UNSAT

15. PERFORMANCE STEP: If Bearing Header Pressure decreases to less than 4 psig THEN

........C........ start the Emergency Bearing Oil Pump and trip MFPT 2.

STANDARD: Identify Bearing Header Pressure decreases to less than 4 psig using PI1256. Start the Emergency Bearing Oil Pump (HIS1188).

CUE: None __________

SAT UNSAT

16. PERFORMANCE STEP: If Bearing Header Pressure decreases to less than 4 psig THEN

........C........ start the Emergency Bearing Oil Pump and trip MFPT 2.

STANDARD: Trip MFPT 2 using HS 798 trip push button.

CUE: None __________

SAT UNSAT TERMINATING CUES:

This JPM is complete. (Terminated by the examiner)

END TIME

Simulator JPM S5

Facility: Davis-Besse Task No: 334-018-04-0300 Task

Title:

Establish Containment Closure K/A

Reference:

(103) A3.01 3.9/4.2 Job Performance Measure No: S5 (JPM 219)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Establish Containment Closure Required Materials:

DB-OP-06904, Shutdown Operations, Section 11 General

References:

Db-OP-02000 Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

No Validation Time:

8 minutes

SIMULATOR INSTRUCTIONS TASK DESCRIPTION:

Establish Containment closure INITIAL CONDITION:

Initialize to special IC 116 OR MODE 5 IC with DH Loop 2 operating and CTMT Purge in operation on CTMT ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

Manually de-energize A and B buses to simulate a loss of offsite power followed by restoration of offsite power.

Emergency Shutdown #1 EDG irf g529g Energize D2 Bus from D1 Bus to restore Instrument Air MALFUNCTIONS/FAILURE TO INSERT:

DH Pump #2 breaker fail open imf bdp2c CTMT Purge Valves CV5005 and CV5008 fail open imf cav9c imf cavfc ACTION/CUES:

7. ROLE PLAY as Field Supervisor or other OPS WSC to report that all LLRTs are terminated and isolated.
8. ROLE PLAY as Field Supervisor or other OPS WSC to report that all personnel assigned specific Containment Closure responsibilities are carrying out the required actions.

EXAMINER COPY INITIAL CONDITIONS:

The plant was in MODE 5 with Decay Heat Loop 2 operating when a loss of offsite power occurred.

EDG #1 tripped and efforts to restart it have been unsuccessful.

EDG #2 is providing power to D1 and D2 Buses.

Decay Heat Pump 2 breaker would not re-close after D1 power was restored. Maintenance is investigating.

INITIATING CUES:

The Shift Manager directs you to establish Containment Closure in accordance with step 11.1.5 of DB-OP-06904 Shutdown Operations (required by DB-OP-02527, Loss of Decay Heat Removal).

(Provide section 11 of DB-OP-06904)

CANDIDATE COPY INITIAL CONDITIONS:

The plant was in MODE 5 with Decay Heat Loop 2 operating when a loss of offsite power occurred.

EDG #1 tripped and efforts to restart it have been unsuccessful.

EDG #2 is providing power to D1 and D2 Buses.

Decay Heat Pump 2 breaker would not re-close after D1 power was restored. Maintenance is investigating.

INITIATING CUES:

The Shift Manager directs you to establish Containment Closure in accordance with step 11.1.5 of DB-OP-06904 Shutdown Operations (required by DB-OP-02527, Loss of Decay Heat Removal).

PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Locate the correct procedure step.

STANDARD: Finds step 11.1.5.

CUE: None SAT UNSAT

2. PERFORMANCE STEP: Announce Containment Closure over the Gaitronics.

STANDARD: Use Gaitronics to announce the following:

"Attention all station personnel, attention all station personnel. All assigned personnel establish containment closure immediately. All assigned personnel establish containment closure immediately."

CUE: None SAT UNSAT

3. PERFORMANCE STEP: Verify Containment Purge is shut down.

STANDARD: Visual check of Containment Purge supply and Exhaust Fan control switch indications indicate fans are shutdown.

COMMENT: If system procedure for shutdown is referenced the Containment Purge containment isolation valves will be directed to be closed.

Performance steps 5 and 7 would be used to evaluate.

CUE: None SAT UNSAT

4. PERFORMANCE STEP: Perform selected isolation of SFAS Containment

Penetrations STANDARD: Refers to DB-OP-02000 Table 2, SFAS Actuated Equipment, and isolate containment penetrations able to be positioned from control room to establish containment closure.

CUE: Shift Manager directs you to refer to DB-OP-02000 Table 2, SFAS Actuated Equipment, and isolate Level 1 and Level 2 containment penetrations able to be positioned from control room.

(Provide clean copy of table 2)

SAT UNSAT

5. PERFORMANCE STEP: Close Channel 1 SFAS Level 1 Containment Purge

........C........ Isolation Valves STANDARD: Press CLOSE on the following switches:

CV 5008 CTMT PURGE OUT CV 5006 CTMT PURGE IN COMMENT: CV 5008 will NOT close due to failure. Critical to close CV 5007 CTMT PURGE OUT Channel 2 in Performance Step 7 to isolate this penetration. Critical to close CV 5006 to isolate this penetration due to failure of CV 5005 CUE: None SAT UNSAT

6. PERFORMANCE STEP: Close Channel 2 SFAS Level 1 Containment

........C........ Air Sample Isolation Valves STANDARD: Press CLOSE on the following switches:

CV 5010A CTMT AIR SAMPLE CV 5010B CTMT AIR SAMPLE CV 5010C CTMT AIR SAMPLE CV 5010D CTMT AIR SAMPLE CV 5010E CTMT AIR SAMPLE RET COMMENT: CV5010E is not critical because of check valve CV125.

CUE: None SAT UNSAT

7. PERFORMANCE STEP: Close Channel 2 SFAS Level 1 Containment Purge

........C........ Isolation Valves STANDARD: Press CLOSE on the following switches:

CV 5007 CTMT PURGE OUT CV 5005 CTMT PURGE IN COMMENT: Critical to close CV 5007 CTMT PURGE OUT to isolate this penetration due to CV 5008 failure.

CV 5005 will NOT close due to failure. Critical to close CV 5006 CTMT PURGE OUT Channel 1 in Step 5 to isolate this penetration.

CUE: None SAT UNSAT

8. PERFORMANCE STEP: Close Channel 2 SFAS Level 2 Containment Vacuum Relief Valve Isolation Valves STANDARD: Press CLOSE on the following switches:

CV 5075 CTMT VAC RLF VLV ISO CV 5076 CTMT VAC RLF VLV ISO CV 5077 CTMT VAC RLF VLV ISO CV 5078 CTMT VAC RLF VLV ISO CV 5079 CTMT VAC RLF VLV ISO COMMENT: Not critical due to check valves isolating penetration.

CUE: None SAT UNSAT

9. PERFORMANCE STEP: Verify that all LLRTs are terminated and isolated.

STANDARD: Communication with Field Supervisor.

CUE: (If asked) The Field Supervisor is verifying that all LLRTs are isolated.

SAT UNSAT

10. PERFORMANCE STEP: Verify that the personnel assigned specific Containment Closure responsibilities are carrying out the required actions.

STANDARD: Communication with Field Supervisor.

CUE: (If asked) The Field Supervisor is verifying that the personnel assigned

. specific Containment Closure responsibilities are carrying out the required

actions.

SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the examinee).

END TIME

Simulator JPM S6

Facility: Davis-Besse Task No: 063-007-04-0100 Task

Title:

Battery Load Shed Actions from the Control Room K/A

Reference:

(063) K1.03 (2.9/3.5)_________ Job Performance Measure No: S6 (JPM New)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance _ __ Actual Performance __X__

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Perform control room actions for section 1 of attachment 5, Selective Battery Load Shedding, per DB-OP-02521, Loss of AC Bus Power Sources.

Required Materials:

Copy of attachment 5, Selective Battery Load Shedding, of DB-OP-02521, Loss of AC Bus Power Sources General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task: Yes Alternate Path: No Validation Time: 8 minutes SIMULATOR INSTRUCTIONS

TASK DESCRIPTION:

Perform section 1 of Selective Battery Load Shedding per DB-OP-02521, Loss of AC Bus Power Sources INITIAL CONDITION:

Mode 3 with Loss of Both Essential 4160 AC Bus Power Sources ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

MALFUNCTIONS/FAILURE TO INSERT:

ACTION/CUES:

STUDENT COPY INITIAL CONDITIONS:

Mode 3 with Loss of Both Essential 4160 AC Bus Power Sources INITIATING CUES:

The plant has tripped due to a Loss of Off-Site Power. Maintenance is in progress on EDG 1 and EDG 2 locked out upon startup. Efforts to start the SBODG have been unsuccessful. Both C1 and D1 remain deenergized, and have been for 15 minutes.

The Unit Supervisor directs you to perform section 1 of Attachment 5, Selective Battery Load Shedding, from DB-OP-02521, Loss of AC Bus Power Sources. An operator has been just been dispatched to perform attachment 14 per step 2 of attachment 5.

This is a time critical task. I will inform you when the time critical clock starts.

EXAMINER COPY INITIAL CONDITIONS:

Mode 3 with Loss of Both Essential 4160 AC Bus Power Sources INITIATING CUES:

The plant has tripped due to a Loss of Off-Site Power. Maintenance is in progress on EDG 1 and EDG 2 locked out upon startup. Efforts to start the SBODG have been unsuccessful. Both C1 and D1 remain deenergized, and have been for 15 minutes.

The Unit Supervisor directs you to perform section 1 of Attachment 5, Selective Battery Load Shedding, from DB-OP-02521, Loss of AC Bus Power Sources. An operator has been just been dispatched to perform attachment 14 per step 2 of attachment 5.

This is a time critical task. I will inform you when the time critical clock starts.

(Provide examinee a copy of DB-OP-02521, Loss of AC Bus Power Sources, Attachment 5, Selective Battery Load Shedding)

PERFORMANCE INFORMATION

NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".

START TIME:

Time Critical Clock is started when they assume control of the Job Performance Measure.

CUE: 15 minutes has elapsed since the loss of power to C1 and D1 Busses.

Time Critical Clock starts now.

TIME CRITICAL CLOCK START TIME:

1. PERFORMANCE STEP: Perform step 1.a to STOP and LOCKOUT

.......C........ the following pumps STANDARD: Stop and lockout Main Feed Pump 1 EBOP (HIS 1209, EMER BEARING OIL PUMP)

CUE: None SAT UNSAT

2. PERFORMANCE STEP: Perform applicable step of section 1.a to STOP and LOCKOUT

.......C........ the following pumps STANDARD: Stop and lockout Main Feed Pump 2 EBOP (HIS 1188, EMER BEARING OIL PUMP)

CUE: None SAT UNSAT

3. PERFORMANCE STEP: Perform applicable step of section 1.a to STOP and LOCKOUT

.......C........ the following pumps STANDARD: Stop and Lockout Makeup Pump 1 DC Oil Pump (HIS-MU24A2).

CUE: None SAT UNSAT

4. PERFORMANCE STEP: Perform applicable step of section 1.a to STOP and LOCKOUT

.......C........ the following pumps STANDARD: Stop and lockout Makeup Pump 2 DC Oil Pump (HIS-MU24B2).

CUE: None __________

SAT UNSAT

5. PERFORMANCE STEP: Perform applicable step of section 1.a to STOP and LOCKOUT

.......C........ the following pumps STANDARD: Stop and lockout RCP 1-1 DC Oil Lift Pump (HIS 4115).

CUE: None __________

SAT UNSAT

6. PERFORMANCE STEP: Perform applicable step of section 1.a to STOP and LOCKOUT

........C........ the following pumps STANDARD: Stop and lockout RCP 1-2 DC Oil Lift Pump (HIS 4215).

CUE: None __________

SAT UNSAT

7. PERFORMANCE STEP: Perform applicable step of section 1.a to STOP and LOCKOUT

........C........ the following pumps STANDARD: Stop and lockout RCP 2-1 DC Oil Lift Pump (HIS 4315)

CUE: None __________

SAT UNSAT

8. PERFORMANCE STEP: Perform applicable step of section 1.a to STOP and LOCKOUT

........C........ the following pumps STANDARD: Stop and lockout RCP 2-2 DC Oil Lift Pump (HIS 4415)

CUE: None __________

SAT UNSAT Time Performance Steps 1-8 are complete TIME CRITICAL CLOCK END TIME:

Time requirement is 15 minutes or less from start of TIME CRITICAL CLOCK Start Time SAT UNSAT

9. PERFORMANCE STEP: Dispatch an Operator to perform Attachment 14, Severe Battery Load Shed - In Plant Actions.

STANDARD: Initial Conditions stated an operator has been dispatched to perform attachment 14.

CUE: If needed: The Unit Supervisor has assigned an operator to perform Attachment 14, Severe Battery Load Shed - In Plant Actions __________

SAT UNSAT

10. PERFORMANCE STEP: Establish Manual Control of Auxiliary Feedwater - Place

........C........ AF6452, AFW 1 LEVEL CONTROL VALVE, in MANUAL STANDARD: Depress manual on level controller LIC6452, AFP 1 Level Controller

COMMENT: Manual control of Auxiliary Feedwater can be established for both trains in either order or in parallel as steps are bulleted. Intent of this JPM is to establish manual control for train 1.

CUE: None __________

SAT UNSAT

11. PERFORMANCE STEP: Establish Manual Control of Auxiliary Feedwater - Slowly

........C........ open AFW 1 LEVEL CONTROL VALVE in MANUAL while reducing AFPT 1 speed using the AFPT 1 GOVERNOR CONTROL until AF6452 is full open.

STANDARD: Depress open on LIC6452, AFP 1 Level Controller, to slowly open AF6452, AFP Level Control Valve, while maintaining OTSG 1 level (49 setpoint) by reducing speed on AFPT 1 speed using HIS520A, AFPT 1 GOVERNOR CONTROL, until AF6452 is full open.

CUE: None __________

SAT UNSAT

12. PERFORMANCE STEP: Establish Manual Control of Auxiliary Feedwater - Maintain SG

.......C........ 1 at required level by adjusting AFPT 1 GOVERNOR CONTROL as necessary.

STANDARD: Adjust AFP 1 speed as necessary to maintain desired level (49 setpoint) using HIS520A, AFPT 1 GOVERNOR CONTROL.

CUE: None __________

SAT UNSAT TERMINATING CUES:

This JPM is complete. (Terminated by the examiner once level control is established)

END TIME

Simulator JPM S7

Facility: Davis-Besse Task No: 012-003-01-0100 Task

Title:

Deenergize/Reenergize Source Range NIs K/A

Reference:

(012) A4.02 3.3/3.4 Job Performance Measure No: S7 (JPM 185)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Deenergize Source Range NIs Reenergize Source Range NIs Required Materials:

DB-OP-06403, Reactor Protection System (RPS) and Nuclear Instrumentation System (NI)

Operating Procedure, section 4.4 General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

No Validation Time:

6 minutes

SIMULATOR INSTRUCTIONS TASK DESCRIPTION:

Deenergize/Reeneregize Source Range NIs INITIAL CONDITION:

Approximately 5% power ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

None MALFUNCTIONS/FAILURE TO INSERT:

Fail NI 3: IMF R3V3 ACTION/CUES:

Delete the NI 3 failure when both Source Range Instruments are deenergized: DMF R3V3

EXAMINER COPY INITIAL CONDITIONS:

A plant startup is in progress The plant is at approximately 5% power A failure has caused the Source Range NIs to energize INITIATING CUES:

The Unit Supervisor directs you to deenergize the Source Range NIs in accordance with section 4.4 of DB-OP-06403, RPS and NI Operating Procedure.

(Hand a copy of section 4.4 of DB-OP-06403 to examinee)

CANDIDATE COPY INITIAL CONDITIONS:

A plant startup is in progress The plant is at approximately 5% power A failure has caused the Source Range NIs to energize INITIATING CUES:

The Unit Supervisor directs you to deenergize the Source Range NIs in accordance with section 4.4 of DB-OP-06403, RPS and NI Operating Procedure.

PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Unlock and open RPS Channel 1 and 2 doors.

STANDARD: Keys obtained and RPS Channels I and 2 doors unlocked and opened.

CUE: (If necessary) The Control Room acknowledges RPS doors will be open and annunciator alarm received SAT UNSAT

2. PERFORMANCE STEP: Place ON-OFF switch for the Source Range Detector Power

........C........ Supply Module in OFF.

STANDARD: Place ON-OFF switch for NI 1 power supply to OFF (RPS Channel 2).

COMMENT: May deenergize NI 2 before NI 1.

CUE: None SAT UNSAT 3 PERFORMANCE STEP: Place ON-OFF switch for the Source Range Detector Power

........C........ Supply Module in OFF.

STANDARD: Place ON-OFF switch for NI 2 power supply to OFF (RPS Channel 1).

CUE: (After both SR NIs are deenergized and the NI 3 failure is deleted) The failure has been repaired. The Unit Supervisor directs you to continue in section 4.4 of DB-OP-06403 and reenergize Source Range NIs 1 and 2 SAT UNSAT

4. PERFORMANCE STEP: Place ON-OFF switch for the Source Range Detector Power

........C........ Supply Module in ON.

STANDARD: Places ON-OFF switch for NI 1 power supply to ON.

COMMENT: May reenergize NI 2 before NI 1 CUE: None SAT UNSAT

5. PERFORMANCE STEP: Place ON-OFF switch for the Source Range Detector Power

........C........ Supply Module in ON.

STANDARD: Places ON-OFF switch for NI 2 power supply to ON.

CUE: None __________

SAT UNSAT

6. PERFORMANCE STEP: Depress the RESET switch on the Source Range Detector Power

........C........ Supply Module.

COMMENT: Depressing reset switch will reset the trip to allow the detector to reenergize when required. With Intermediate Range NIs above the cutout value the Source Range Detector will not energize.

STANDARD: Depress the RESET switch on NI 1 Power Supply Module.

CUE: None __________

SAT UNSAT

7. PERFORMANCE STEP: Depress the RESET switch on the Source Range Detector Power

........C........ Supply Module.

COMMENT: Depressing reset switch will reset the trip to allow the detector to reenergize when required. With Intermediate Range NIs above the cutout value the Source Range Detector will not energize.

STANDARD: Depress the RESET switch on NI 2 Power Supply Module.

CUE: None __________

SAT UNSAT

8. PERFORMANCE STEP: Complete procedure section.

STANDARD: Determine step 4.4.3.c to be not applicable and sign/date completed by.

CUE: None __________

SAT UNSAT

9. PERFORMANCE STEP: Lock the doors and return keys.

STANDARD: Doors locked and key returned.

CUE: None __________

SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examinee)

END TIME

Simulator JPM S8

Facility: Davis-Besse Task No: 008-004-01-0100 Task

Title:

Component Cooling Water Pump Rotation K/A

Reference:

(008) A4.01 3.3/3.1 Job Performance Measure No: S8 (JPM 018)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Place Component Cooling Water Pump 2 in service from standby condition and place Component Cooling Water Pump 1 (initially running) in standby.

Required Materials:

Section 3.2, 3.9, and 3.16 of DB-OP-06262, CCW System Procedure Limits and Precautions for DB-OP-06262 General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

No Validation Time:

30 minutes

SIMULATOR INSTRUCTIONS TASK DESCRIPTION:

Place Component Cooling Water Pump 2 in service from standby condition and place Component Cooling Water Pump 1 (initially running) in standby.

INITIAL CONDITION:

Mode 1 CCW Pump 1 placed I/S to support testing which has been completed. Makeup Pump 1 left in service and Service Water secondaries left on SW loop 1 (SW1399 open) due to short duration of test.

ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

CCW pump 1 running.

Hang tags for CCW and SW pumps 3 being aligned to side 2.

Makeup pump 1 running.

SW 1399 Open and SW 1395 Closed.

MALFUNCTIONS/FAILURE TO INSERT:

None ACTION/CUES:

EXAMINER COPY INITIAL CONDITIONS:

Plant is in Mode 1.

CCW Pump 1 placed I/S to support testing which has been completed. Makeup Pump 1 left in service and Service Water secondaries left on SW loop 1 (SW1399 open) due to short duration of test.

NO maintenance work has been done on the CCW System.

INITIATING CUES:

Testing is complete and the Unit Supervisor directs you to shift CCW pumps so that CCW Pump 2 is in service and CCW Pump 1 is in standby, in accordance with Section 3.2 and 3.9 of DB-OP-06262, CCW System Procedure. Valve testing is not required to be performed.

(Provide student a copy of Section 3.2, 3.9, 3.16, and Limits and Precautions of DB-OP-06262, CCW System Procedure. The procedure is signed off with briefing complete, applicable prerequisites signed off, and some steps pre-identified that will not be applicable)

CANDIDATE COPY INITIAL CONDITIONS:

Plant is in Mode 1.

CCW Pump 1 placed I/S to support testing which has been completed. Makeup Pump 1 left in service and Service Water secondaries left on SW loop 1 (SW1399 open) due to short duration of test.

NO maintenance work has been done on the CCW System.

INITIATING CUES:

Testing is complete and the Unit Supervisor directs you to shift CCW pumps so that CCW Pump 2 is in service and CCW Pump 1 is in standby, in accordance with Section 3.2 and 3.9 of DB-OP-06262, CCW System Procedure. Valve testing is not required to be performed.

PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Locate the correct procedure section.

STANDARD: Identifies Section 3.2 (Component Cooling Water System) as correct procedure section.

COMMENT: Hand procedure to examinee. Sequence required for all steps, except steps 7, 8, 12, 13, 17, 18, 19 and 20.

CUE: None __________

SAT UNSAT

2. PERFORMANCE STEP: Verify Open SW38, CCW Heat Exchanger 1-2 Discharge Iso.

STANDARD: Contact an EO to verify position of SW38.

CUE: If EO contacted SW38, CCW Heat Exchanger 1-2 Discharge Iso., is OPEN.

SAT UNSAT

3. PERFORMANCE STEP: Start CCW Pump 1-2.

........C........

STANDARD: Turn HIS1418 clockwise to CLOSE.

COMMENT: Annunciator 11-5-B, CCW Pump 2 Flow LO, will alarm. It may be treated as an expected alarm as continuing with the procedure will clear the low flow condition.

CUE: If asked, as EO report flow on FIS 1432 is 2800 gpm SAT UNSAT

5. PERFORMANCE STEP: Adjust CCW Heat Exchanger Temperature control valve to 80F to 85F OR as directed by the Shift Manager.

STANDARD: Prerequisites identify Shift Manager desire of 85ºF set point of TIC1434.

Contact an EO to obtain set point of 85ºF on TIC1434.

CUE: If needed, Shift Manager desires a set point of 85ºF on TIC1434.

SAT UNSAT

6. PERFORMANCE STEP: Route to Section 3.16.

STANDARD: Route to Section 3.16 and complete prerequisite steps 3.16.1 and 3.16.2.

CUE: None.

SAT UNSAT

7. PERFORMANCE STEP: Open CC2649 Aux Bldg Return.

........C........

STANDARD: Depress the OPEN pushbutton on HIS2649.

COMMENT: Sequence not required for steps 7 and 8 CUE: None.

SAT UNSAT

8. PERFORMANCE STEP: Open CC5098, CTMT Bldg Return.

........C........

STANDARD: Depress the OPEN pushbutton on HIS5098.

COMMENT: Sequence not required for steps 7 and 8 CUE: None.

SAT UNSAT

9. PERFORMANCE STEP: OPEN CC5096, CCW Line 2 Discharge Isolation, when return

........C........ valves are open.

STANDARD: Depress the OPEN pushbutton on CC5096.

CUE: None.

SAT UNSAT

10. PERFORMANCE STEP: Verify CC1469, CCW from DH Cooler 2 Outlet valve is closed.

STANDARD: If open depress the CLOSE pushbutton on HIS1469.

COMMENT: CC1469 may have been opened if actions for annunciator 11-5-B, CCW Pump 2 Flow LO, were performed at performance step 3.

CUE: None. __________

SAT UNSAT

11. PERFORMANCE STEP: Close CC5095 Non-essen supply.

........C........

STANDARD: Depress the CLOSE pushbutton on HIS5095.

CUE: None. __________

SAT UNSAT

12. PERFORMANCE STEP: Close CC2645 Aux Bldg Return.

........C........

STANDARD: Depress the CLOSE pushbutton on HIS2645 Aux Bldg Return.

COMMENT: Sequence not required for steps 12 and 13 CUE: None. __________

SAT UNSAT

13. PERFORMANCE STEP: Close CC 5097 CTMT Bldg Return.

........C........

STANDARD: Depress the CLOSE pushbutton on HIS5097 CTMT Bldg Return.

COMMENT: Sequence not required for steps 12 and 13 CUE: None. __________

SAT UNSAT

14. PERFORMANCE STEP: Determine CCW Pump 1 discharge flow less than 3000 gpm as verified as read on FIS 1422 (local).

STANDARD: Contact EO to report CCW 1 flow indication.

COMMENT: Annunciator 11-4-B, CCW PMP 1 FLOW LO, will alarm at < 3000 gpm.

CUE: If EO contacted CCW Pump 1 Flow on FIS 1422 is 2800 gpm .

SAT UNSAT

15. PERFORMANCE STEP: Open CC1467, CCW from DH Cooler 1 Outlet valve.

STANDARD: Depress the OPEN pushbutton on HIS1467.

CUE: None.

SAT UNSAT

16. PERFORMANCE STEP: Verify that CCW Pump 2 has a discharge flow greater than 3000 gpm as read on FIS 1432 (locally).

STANDARD: Contact EO to report CCW flow indication.

CUE: If EO contacted CCW Pump 2 Flow on FIS 1432 is 7200 gpm.

SAT UNSAT

17. PERFORMANCE STEP: Route back to section 3.2.

STANDARD: Sign complete for section 3.16. Route to step 3.2.17 and sign complete.

CUE: None.

SAT UNSAT

18. PERFORMANCE STEP: If CC1469 was open to provide minimum flow requirement then monitor Decay Heat Pump 2 suction pressure.

STANDARD: If CC1469 was open to provide minimum flow requirement then contact EO to monitor Decay Heat Pump 2 suction pressure using PI1538 per step 3.2.19 of DB-OP-06262.

COMMENT: Step 3.2.18 is not applicable. Step 3.2.19 may be applicable if CC1469 was opened per alarm procedure response, requiring monitoring of Decay Heat Pump 2 suction pressure.

CUE: (If necessary) Monitor Decay Heat Pump 2 suction pressure using PI1538 per step 3.2.19 of DB-OP-06262.

SAT UNSAT

19. PERFORMANCE STEP: Verify SW1434, CCW Heat Exchanger 2 Control Valve is operating to maintain proper temperature.

STANDARD: Contact EO to report status of TIC 1434. Verify TI 1490 indicates approximately 85ºF.

CUE: As EO (If necessary) TIC 1434 is controlling CCW train 2 temperature at 85ºF.

SAT UNSAT

20. PERFORMANCE STEP: Verify surveillance tests are not required.

STANDARD: Contact Unit Supervisor. Per initiating cues valve testing is not required.

COMMENT: Steps 3.2.21 through 3.2.25 are not applicable.

CUE: None SAT UNSAT

21. PERFORMANCE STEP: Verify Makeup Pump 1 is in service.

STANDARD: Verify HIS MU24B indicates Makeup Pump 1 is running.

CUE: None.

SAT UNSAT

22. PERFORMANCE STEP: Route to Section 3.9.

STANDARD: Route to Section 3.9.

CUE: None.

SAT UNSAT

23. PERFORMANCE STEP: Verify that EDG 1, LPI pump 1 and HPI pump 1 are not operating.

STANDARD: Monitor control board for status of EDG 1, LPI 1 and HPI 1. Complete Prerequisites.

CUE: None.

SAT UNSAT

24. PERFORMANCE STEP: Verify SW1424, CCW Heat Exchanger Outlet 1 valve, is closed or 15 minutes have elapsed since the heat load has been removed.

STANDARD: Check that SW1424 has green light lit or 15 minutes have elapsed.

CUE: (If necessary) 15 minutes has elapsed since the heat loads have been removed.

SAT UNSAT

25. PERFORMANCE STEP: Stop CCW Pump 1.

........C........

STANDARD: Position HIS1414 to TRIP.

CUE: None. __________

SAT UNSAT

26. PERFORMANCE STEP: Set TIC1424 as directed by the Shift Manager in prerequisite step 3.9.3 STANDARD: Contact EO to slowly adjust TIC1424 to 110F.

CUE: TIC1424 is set to 110F. __________

SAT UNSAT

27. PERFORMANCE STEP: Verify CC 1467, CCW from DH Cooler 1 Outlet valve, is closed.

STANDARD: If CC1467 is open, press closed on HIS1467.

CUE: None. __________

SAT UNSAT TERMINATING CUES:This JPM is complete. (Terminated by the examiner)

END TIME