ML17174A799: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(8 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML17174A799 | | number = ML17174A799 | ||
| issue date = 07/18/2017 | | issue date = 07/18/2017 | ||
| title = | | title = Transmittal Letter Regarding Dam Safety Inspection Report | ||
| author name = Barillas M | | author name = Barillas M | ||
| author affiliation = NRC/NRR/DORL/LPLII-2 | | author affiliation = NRC/NRR/DORL/LPLII-2 | ||
| addressee name = Hamilton T | | addressee name = Hamilton T | ||
| addressee affiliation = Duke Energy Progress, LLC | | addressee affiliation = Duke Energy Progress, LLC | ||
| docket = 05000400 | | docket = 05000400 | ||
Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:OfflCIAb use ONbY SeCURITY RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Ms. Tanya M. Hamilton Site Vice President Shearon Harris Nuclear Power Plant Duke Energy 5413 Shearon Harris Road New Hill, NC 27562-0165 | {{#Wiki_filter:OfflCIAb use ONbY SeCURITY RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 18, 2017 Ms. Tanya M. Hamilton Site Vice President Shearon Harris Nuclear Power Plant Duke Energy 5413 Shearon Harris Road New Hill, NC 27562-0165 | ||
==SUBJECT:== | ==SUBJECT:== | ||
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 -DAM SAFETY INSPECTION REPORT (TAC NO. MF5201) | SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - DAM SAFETY INSPECTION REPORT (TAC NO. MF5201) | ||
==Dear Ms. Hamilton:== | ==Dear Ms. Hamilton:== | ||
Enclosed is a copy of the Dam Safety Inspection Report prepared by the Federal Energy Regulatory Commission (FERC) for the U.S. Nuclear Regulatory Commission (NRC). This report contains the results of an inspection performed on April 19, 2017, of the auxiliary reservoir dam at the Shearon Harris Nuclear Power Plant, Unit 1. Based on observations made during field inspection, review of data submitted by the owner, and discussions with NRC and licensee representatives, FERC found that the Shearon Harris Auxiliary Reservoir Dam and appurtenant structures were in satisfactory condition and adequately maintained. The information in the report is considered critical energy infrastructure information. Thus the Enclosure is considered sensitive security-related information, official use only, and is being withheld from public disclosure. If you have any questions regarding this matter, I may be reached at (301) 415-2760 or via email at Martha.Barillas@nrc.gov. Docket No. 50-400 | |||
Enclosed is a copy of the Dam Safety Inspection Report prepared by the Federal Energy Regulatory Commission (FERC) for the U.S. Nuclear Regulatory Commission (NRC). This report contains the results of an inspection performed on April 19, 2017, of the auxiliary reservoir dam at the Shearon Harris Nuclear Power Plant, Unit 1. Based on observations made during field inspection, review of data submitted by the owner, and discussions with NRC and licensee representatives, FERC found that the Shearon Harris Auxiliary Reservoir Dam and appurtenant structures were in satisfactory condition and adequately maintained. | |||
The information in the report is considered critical energy infrastructure information. Thus the Enclosure is considered sensitive security-related information, official use only, and is being withheld from public disclosure. | |||
If you have any questions regarding this matter, I may be reached at (301) 415-2760 or via email at Martha.Barillas@nrc.gov. | |||
Sincerely, Martha Barillas, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400 | |||
==Enclosure:== | ==Enclosure:== | ||
PKG: | Dam Safety Inspection Report cc w/o enclosure: Distribution via Listserv The enclosure transmitted herewith contains Security-Related Information. When separated from enclosure, this transmittal document is decontrolled. | ||
}} | OFFICIAL USE ONLY SECURITY RELATED INFORMATION | ||
PKG: ML17174A751 PUBLIC LTR ML17174A799 Nonpu bl'IC Enc Iosure: ML17174A839 OFFICE DORL/LPL2-2/PM DORL/LPL2-2/LA NRO/DSEA/RHM DORL/LPL2-2/BC NAME MBarillas BClayton CCook US hoop DATE 07/10/17 07/10/17 07/13/17 07/17/17 OFFICE DORL/LPL2-2/PM NAME MBarillas DATE 07/18/17}} |
Latest revision as of 17:01, 4 February 2020
ML17174A799 | |
Person / Time | |
---|---|
Site: | Harris ![]() |
Issue date: | 07/18/2017 |
From: | Martha Barillas Plant Licensing Branch II |
To: | Hamilton T Duke Energy Progress |
Barillas M C, 415-2760 | |
Shared Package | |
ML17174A751 | List: |
References | |
TAC MF5201 | |
Download: ML17174A799 (2) | |
Text
OfflCIAb use ONbY SeCURITY RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 18, 2017 Ms. Tanya M. Hamilton Site Vice President Shearon Harris Nuclear Power Plant Duke Energy 5413 Shearon Harris Road New Hill, NC 27562-0165
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - DAM SAFETY INSPECTION REPORT (TAC NO. MF5201)
Dear Ms. Hamilton:
Enclosed is a copy of the Dam Safety Inspection Report prepared by the Federal Energy Regulatory Commission (FERC) for the U.S. Nuclear Regulatory Commission (NRC). This report contains the results of an inspection performed on April 19, 2017, of the auxiliary reservoir dam at the Shearon Harris Nuclear Power Plant, Unit 1. Based on observations made during field inspection, review of data submitted by the owner, and discussions with NRC and licensee representatives, FERC found that the Shearon Harris Auxiliary Reservoir Dam and appurtenant structures were in satisfactory condition and adequately maintained.
The information in the report is considered critical energy infrastructure information. Thus the Enclosure is considered sensitive security-related information, official use only, and is being withheld from public disclosure.
If you have any questions regarding this matter, I may be reached at (301) 415-2760 or via email at Martha.Barillas@nrc.gov.
Sincerely, Martha Barillas, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400
Enclosure:
Dam Safety Inspection Report cc w/o enclosure: Distribution via Listserv The enclosure transmitted herewith contains Security-Related Information. When separated from enclosure, this transmittal document is decontrolled.
OFFICIAL USE ONLY SECURITY RELATED INFORMATION
PKG: ML17174A751 PUBLIC LTR ML17174A799 Nonpu bl'IC Enc Iosure: ML17174A839 OFFICE DORL/LPL2-2/PM DORL/LPL2-2/LA NRO/DSEA/RHM DORL/LPL2-2/BC NAME MBarillas BClayton CCook US hoop DATE 07/10/17 07/10/17 07/13/17 07/17/17 OFFICE DORL/LPL2-2/PM NAME MBarillas DATE 07/18/17