ML18096A621: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/09/1992
| issue date = 04/09/1992
| title = Forwards Nonproprietary Version of CDC-92-014, Peaking Factor Limit Rept Evaluation for Salem Unit 2 Cycle 7 Redesign. Rept Prepared by Westinghouse Per Methodology Described in WCAP-8385
| title = Forwards Nonproprietary Version of CDC-92-014, Peaking Factor Limit Rept Evaluation for Salem Unit 2 Cycle 7 Redesign. Rept Prepared by Westinghouse Per Methodology Described in WCAP-8385
| author name = LABRUNA S
| author name = Labruna S
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:* Public Service Electric and Gas Company
{{#Wiki_filter:*                 Public Service Electric and Gas Company Stanley LaBruna                     Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1200 Vice President - Nuclear Operations AP-R o9 1992 NLR-N92034 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
* Stanley LaBruna Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1200 Vice President  
CYCLE 7 RADIAL PEAKING FACTOR LIMIT REPORT SALEM GENERATlNG STATION UNIT NO. 2 DOCKET NO. 50-311 Public Serviqe Electric and Gas Company (PSE&G) hereby submits the non-proprietary version of the Radial Peaking Factor Limit Report for Salem Unit 2 Cycle 7 in accordance with Technical Specification 4.2.2.2. This report was prepared by Westinghouse Corporation in accordance with the Westinghouse methodology,
-Nuclear Operations AP-R o 9 1992 NLR-N92034 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
          *"Power Distribution Control and Load Following Procedures,"
CYCLE 7 RADIAL PEAKING FACTOR LIMIT REPORT SALEM GENERATlNG STATION UNIT NO. 2 DOCKET NO. 50-311 Public Serviqe Electric and Gas Company (PSE&G) hereby submits the non-proprietary version of the Radial Peaking Factor Limit Report for Salem Unit 2 Cycle 7 in accordance with Technical Specification 4.2.2.2. This report was prepared by Westinghouse Corporation in accordance with the Westinghouse methodology, *"Power Distribution Control and Load Following Procedures," WCAP-8385, September 1974. PSE&G has reviewed this report and concurs with the results. Per conversation with Mr. J. Stone, NRR Project Manager for Salem Generating Station, PSE&G requests that the proprietary version of this report submitted to the NRC on January 1992 be returned to PSE&G. If you have any questions regarding this transmittal, please contact us. Sincerely, Attachment
WCAP-8385, September 1974. PSE&G has reviewed this report and concurs with the results. Per conversation with Mr. J. Stone, NRR Project Manager for Salem Generating Station, PSE&G requests that the proprietary version of this report submitted to the NRC on January 27~ 1992 be returned to PSE&G.
* Document Control Desk NLR-N92034 2 C Mr. T. T. Martin, Administrator  
If you have any questions regarding this transmittal, please contact us.
-Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406
Sincerely, Attachment
* Mr. J. C. Stone, Licensing Project Manager -Salem u. s. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. T. P. Johnson (S09) USNRC Senior Resident Inspector Mr. K. Tosch, Chief NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 APR o 9 1992}}
 
Document Control Desk           2
* APR o9 1992 NLR-N92034 C Mr. T. T. Martin, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. J. C. Stone, Licensing Project Manager - Salem
: u. s. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. T. P. Johnson (S09)
USNRC Senior Resident Inspector Mr. K. Tosch, Chief NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625}}

Latest revision as of 06:36, 3 February 2020

Forwards Nonproprietary Version of CDC-92-014, Peaking Factor Limit Rept Evaluation for Salem Unit 2 Cycle 7 Redesign. Rept Prepared by Westinghouse Per Methodology Described in WCAP-8385
ML18096A621
Person / Time
Site: Salem PSEG icon.png
Issue date: 04/09/1992
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18096A622 List:
References
NLR-N92034, NUDOCS 9204160042
Download: ML18096A621 (2)


Text

  • Public Service Electric and Gas Company Stanley LaBruna Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1200 Vice President - Nuclear Operations AP-R o9 1992 NLR-N92034 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

CYCLE 7 RADIAL PEAKING FACTOR LIMIT REPORT SALEM GENERATlNG STATION UNIT NO. 2 DOCKET NO. 50-311 Public Serviqe Electric and Gas Company (PSE&G) hereby submits the non-proprietary version of the Radial Peaking Factor Limit Report for Salem Unit 2 Cycle 7 in accordance with Technical Specification 4.2.2.2. This report was prepared by Westinghouse Corporation in accordance with the Westinghouse methodology,

  • "Power Distribution Control and Load Following Procedures,"

WCAP-8385, September 1974. PSE&G has reviewed this report and concurs with the results. Per conversation with Mr. J. Stone, NRR Project Manager for Salem Generating Station, PSE&G requests that the proprietary version of this report submitted to the NRC on January 27~ 1992 be returned to PSE&G.

If you have any questions regarding this transmittal, please contact us.

Sincerely, Attachment

Document Control Desk 2

  • APR o9 1992 NLR-N92034 C Mr. T. T. Martin, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. J. C. Stone, Licensing Project Manager - Salem
u. s. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. T. P. Johnson (S09)

USNRC Senior Resident Inspector Mr. K. Tosch, Chief NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625