ML18096A621
| ML18096A621 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 04/09/1992 |
| From: | Labruna S Public Service Enterprise Group |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML18096A622 | List: |
| References | |
| NLR-N92034, NUDOCS 9204160042 | |
| Download: ML18096A621 (2) | |
Text
Public Service Electric and Gas Company Stanley LaBruna Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1200 Vice President - Nuclear Operations AP-R o 9 1992 NLR-N92034 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
CYCLE 7 RADIAL PEAKING FACTOR LIMIT REPORT SALEM GENERATlNG STATION UNIT NO. 2 DOCKET NO. 50-311 Public Serviqe Electric and Gas Company (PSE&G) hereby submits the non-proprietary version of the Radial Peaking Factor Limit Report for Salem Unit 2 Cycle 7 in accordance with Technical Specification 4.2.2.2.
This report was prepared by Westinghouse Corporation in accordance with the Westinghouse methodology,
- "Power Distribution Control and Load Following Procedures,"
WCAP-8385, September 1974.
PSE&G has reviewed this report and concurs with the results.
Per conversation with Mr. J. Stone, NRR Project Manager for Salem Generating Station, PSE&G requests that the proprietary version of this report submitted to the NRC on January 27~ 1992 be returned to PSE&G.
If you have any questions regarding this transmittal, please contact us.
Sincerely, Attachment
Document Control Desk NLR-N92034 2
C Mr. T. T. Martin, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. J. C. Stone, Licensing Project Manager -
Salem
- u. s. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. T. P. Johnson (S09)
USNRC Senior Resident Inspector Mr. K. Tosch, Chief NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 APR o 9 1992