ML18100B070: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 40: Line 40:
(If yes, complete EXPECTED SUBMISSION DATE) x II NO EXPECTED SUBMISSION DATE (1S)
(If yes, complete EXPECTED SUBMISSION DATE) x II NO EXPECTED SUBMISSION DATE (1S)
MONTH      DAY    YEAR ABSTRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced typewritten lines) (16)
MONTH      DAY    YEAR ABSTRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced typewritten lines) (16)
On 4/11/94, at 1035 hours, the inf eed breakers to the Unit 4 kilo volt Vital Buses tripped on an undervoltage signal resulting in an engineered safety feature automatic starting and "blackout signal loading" of the buses' respective Diesel Generators (DGs) . This occurred during performance of procedure S2.MD-FT.~KV-0001, "Emergency Safeguards Actuation System (ESFAS) Instrumentation Monthly", when the
On 4/11/94, at 1035 hours, the inf eed breakers to the Unit 4 kilo volt Vital Buses tripped on an undervoltage signal resulting in an engineered safety feature automatic starting and "blackout signal loading" of the buses' respective Diesel Generators (DGs) . This occurred during performance of procedure S2.MD-FT.~KV-0001, "Emergency Safeguards Actuation System (ESFAS) Instrumentation Monthly", when the technician opened an incorrect switch. At 1211 hours (same day) the Nuclear Regulatory Commission (NRC) was notified of this event, in accordance with 10CFR50. 72 (b) (2) (ii). At approximately 1700 hours (same day), inf eed power to the vital buses was restored and the DGs were secured and returned to standby. This event resulted from a
  '
technician opened an incorrect switch. At 1211 hours (same day) the Nuclear Regulatory Commission (NRC) was notified of this event, in accordance with 10CFR50. 72 (b) (2) (ii). At approximately 1700 hours (same day), inf eed power to the vital buses was restored and the DGs were secured and returned to standby. This event resulted from a
* perceptual mental processing error. The involved technician has been counseled, reemphasizing the importance of properly identifying components for manipulation and use of the (Stop, Think, Act, and Review) technique. Appropriate Maintenance Department supervisors and technicians have reviewed this event. The subje_ct procedure will be revised to require concurrent verification of the location (prior to manipulation) of all test-manipulated switches in the SEC cab.inets.
* perceptual mental processing error. The involved technician has been counseled, reemphasizing the importance of properly identifying components for manipulation and use of the (Stop, Think, Act, and Review) technique. Appropriate Maintenance Department supervisors and technicians have reviewed this event. The subje_ct procedure will be revised to require concurrent verification of the location (prior to manipulation) of all test-manipulated switches in the SEC cab.inets.
                                                                                                                                    -
NRC FORM 366 15-92)
NRC FORM 366 15-92)


Line 63: Line 60:
The Salem safeguards system design basis includes the requirement that the station be safely shutdown during a loss of coolant accident (LOCA) and a coincident loss of offsite power (blackout). All electrical equipment needed during a LOCA is powered from the vital buses, which can be powered from the standby alternating current diesel generators. Safeguards Equipment Control (SEC) is a logic system, comprised of three control systems, that provide proper
The Salem safeguards system design basis includes the requirement that the station be safely shutdown during a loss of coolant accident (LOCA) and a coincident loss of offsite power (blackout). All electrical equipment needed during a LOCA is powered from the vital buses, which can be powered from the standby alternating current diesel generators. Safeguards Equipment Control (SEC) is a logic system, comprised of three control systems, that provide proper


*
..                ~ICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating Station      DOCKET NUMBER    LER NUMBER      PAGE Unit 2            .              5000311        94-001-00      3 of 4 ANALYSIS OF OCCURRENCE:  (cont'd) actions in response to any accident and/or blackout condition. Each SEC (A, B, or C) is physically and electrically isolated from the other, is associated with its own DG and vital bus, and responds to accident (safety injection) and vital bus UV input signals. Based upon the combination of signals, the respective SEC will actuate to strip the vital buses, start the DGs, and reload the vital buses.
..                ~ICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating Station      DOCKET NUMBER    LER NUMBER      PAGE Unit 2            .              5000311        94-001-00      3 of 4 ANALYSIS OF OCCURRENCE:  (cont'd) actions in response to any accident and/or blackout condition. Each SEC (A, B, or C) is physically and electrically isolated from the other, is associated with its own DG and vital bus, and responds to accident (safety injection) and vital bus UV input signals. Based upon the combination of signals, the respective SEC will actuate to strip the vital buses, start the DGs, and reload the vital buses.
In accordance with S2.MD-ST.4KV~0001, the technician was verifying that relays 27X-2Al, 27X-2A2, and 27X-2A3, each send a 70% UV signal to 2A Vital Bus. This requires successive actuation of the 2Al, 2A2, and 2A3 relays, respectively located in the A, B, and c SEC cabinets.
In accordance with S2.MD-ST.4KV~0001, the technician was verifying that relays 27X-2Al, 27X-2A2, and 27X-2A3, each send a 70% UV signal to 2A Vital Bus. This requires successive actuation of the 2Al, 2A2, and 2A3 relays, respectively located in the A, B, and c SEC cabinets.
Line 71: Line 67:
PREVIOUS OCCURRENCES Previous occurrences involving undervoltage conditions on 4KV Vital Buses, which resulted in automatic starting and loading of DGs have been reported *in LERs 311/92-013-00 and 272/93-012-00. Both occurrences involved personnel error and misoperation of test switches. Corrective actions to these events includ~d disciplinary action with involved individual(s), review of the involved procedure, and review of the event circumstances with applicable Maintenance Department personnel.
PREVIOUS OCCURRENCES Previous occurrences involving undervoltage conditions on 4KV Vital Buses, which resulted in automatic starting and loading of DGs have been reported *in LERs 311/92-013-00 and 272/93-012-00. Both occurrences involved personnel error and misoperation of test switches. Corrective actions to these events includ~d disciplinary action with involved individual(s), review of the involved procedure, and review of the event circumstances with applicable Maintenance Department personnel.
SAFETY SIGNIFICANCE This report is reportable pursuant to 10CFR50.73(a) (2)(iv). This event did not affect the health and safety of the public. Equipment functioned as required during*this event.
SAFETY SIGNIFICANCE This report is reportable pursuant to 10CFR50.73(a) (2)(iv). This event did not affect the health and safety of the public. Equipment functioned as required during*this event.
* LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating Station      DOCKET NUMBER    LER NUMBER      PAGE Unit 2                .        5000311        94-007-00      4 of 4 CORRECTIVE ACTION:
 
LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating Station      DOCKET NUMBER    LER NUMBER      PAGE Unit 2                .        5000311        94-007-00      4 of 4 CORRECTIVE ACTION:
The involved technician has been counseled. This included reemphasizing the importance of properly identifying components for manipulation, including use of the "STAR" (Stop, Think, Act, and Review) technique.
The involved technician has been counseled. This included reemphasizing the importance of properly identifying components for manipulation, including use of the "STAR" (Stop, Think, Act, and Review) technique.
* This event has been reviewed with appropriate Maintenance Department supervisors and technicians.
* This event has been reviewed with appropriate Maintenance Department supervisors and technicians.
The subject procedure will be revised to require concurrent verification of the location (prior to manipulation) of all test~manipulated switches in the SEC cabinets.
The subject procedure will be revised to require concurrent verification of the location (prior to manipulation) of all test~manipulated switches in the SEC cabinets.
MJPJ:pc SORC Mtg. 94-041}}
MJPJ:pc SORC Mtg. 94-041}}

Latest revision as of 05:59, 3 February 2020

LER 94-007-00:on 940411,infeed Breakers to 4 Kilovolt Vital Buses Tripped on Undervoltage Signal.Caused by Personnel Error.Corrective Action:Involved Technician Counseled Re Identifying components.W/940510 Ltr
ML18100B070
Person / Time
Site: Salem PSEG icon.png
Issue date: 05/10/1994
From: Hagan J, Pastva M
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-94-007-01, LER-94-7-1, NUDOCS 9405170200
Download: ML18100B070 (6)


Text

~ . e PS~G

  • Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Salem Generating Station May 10, *1994 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir:

SALEM GENERATING STATION LICENSE NO. DPR-75 DOCKET NO. 50-311 UNIT NO. 2 LICENSEE EVENT REPORT 94-007-00 This Licensee Event Report is being submitted pursuant to the requirements of Code of.Federal Regulation 10CF.R50.73(a) (2) (iv).

Issuance of this report is required within thirty (30) days of event discovery.

Sincerely yours, MJPJ:pc Distribution 9405170200 940510 PDR ADOCK 05000311 S . PDR 95-2189 REV 7-92

NRC FORM 366 .S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. 3150-0104 15*92) EXPIRES 5/31 /95

.. ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS INFORMATION COLLECTION REQUEST: 50.0 HRS. FORWARD LICENSEE EVENT REPORT (LER) COMMENTS .REGARDING BURDEN ESTIMATE TO THE INFORMATION AND RECORDS MANAGEMENT BRANCH (MNBB 7714), U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555-0001, AND TO THE PAPERWORK REDUCTION PROJECT (3150-0104), OFFICE OF (See reverse for required number of digits/characters for each block) MANAGEMENT AND BUDGET, WASHINGTON, DC 20503.

FACILITY NAME (1) DOCKET NUMBER (2) PAGE (3) 05000 311 1 OF Salem Generat1ng Station - Unit 2 04 TITLE(4) ESF Actuation: Blackout Signal Loading of 2A, 2B, & 2C 4 Kilo.-Volt (4KV) Vital Buses Due To Personnel Error During Emergencv Safe~uards Actuation Instrumentation Funct. Test EVENT DATE (5) LEA-NUMBER (6 REPORT NUMBER (7) OTHER FACILITIES INVOLVED (8)

FACILITY NAME DOCKET NUMBER SEQUENTIAL REVISION MONTH DAY YEAR YEAR MONTH 'DAY YEAR NUMBER NUMBER 05000 FACILITY NAME DOCKET NUMBER

-- -- 05000 04 11. 94 94 007 00 05 10 94 OPERATING THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check one or more (111 MODE (9) 1 20.402(b) 20.405(c) x 50.73(a)(2)(iv) 73.71(b)

POWER

  • 20.405(a)(1 )(i) 50.36(c)(1) 50.73 (a) (2) (v) 73.71(c) 20.405(a) (1) (ii) 50.36(c)(2) 50.73(a)(2)(vii) OTHER 11111 NAME M. J. Pastva .. Jr. - LER Coordinator 20.405(a) (1) (iii) 20.405(a) (1 )(iv) 20.405(a) (1 )(v) 50.73(a)(2)(i) 50.73(a)(2)(ii)
50. 73(a)(2)(iii)

LICENSEE CONTACT FOR THIS LER 12) 50.73(a) (2) (viii) (A) 50.73(a) (2) (viii) (B) 50.73(a)(2)(x)

(Specify in Abstract below and in Text, NRC Form 366A)

TELEPHONE NUMBER llnclude Area Code)

(609) 339-5165 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (13)

REPORTABLE REPORTABLE CAUSE SYSTEM COMPONENT MANUFACTURER CAUSE SYSTEM COMPONENT MANUFACTURER TO NPRDS TO NPRDS I YES SUPPLEMENTAL REPORT EXPECTED (14)

(If yes, complete EXPECTED SUBMISSION DATE) x II NO EXPECTED SUBMISSION DATE (1S)

MONTH DAY YEAR ABSTRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced typewritten lines) (16)

On 4/11/94, at 1035 hours0.012 days <br />0.288 hours <br />0.00171 weeks <br />3.938175e-4 months <br />, the inf eed breakers to the Unit 4 kilo volt Vital Buses tripped on an undervoltage signal resulting in an engineered safety feature automatic starting and "blackout signal loading" of the buses' respective Diesel Generators (DGs) . This occurred during performance of procedure S2.MD-FT.~KV-0001, "Emergency Safeguards Actuation System (ESFAS) Instrumentation Monthly", when the technician opened an incorrect switch. At 1211 hours0.014 days <br />0.336 hours <br />0.002 weeks <br />4.607855e-4 months <br /> (same day) the Nuclear Regulatory Commission (NRC) was notified of this event, in accordance with 10CFR50. 72 (b) (2) (ii). At approximately 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br /> (same day), inf eed power to the vital buses was restored and the DGs were secured and returned to standby. This event resulted from a

  • perceptual mental processing error. The involved technician has been counseled, reemphasizing the importance of properly identifying components for manipulation and use of the (Stop, Think, Act, and Review) technique. Appropriate Maintenance Department supervisors and technicians have reviewed this event. The subje_ct procedure will be revised to require concurrent verification of the location (prior to manipulation) of all test-manipulated switches in the SEC cab.inets.

NRC FORM 366 15-92)

REQWRED NUMBER OF DIGITS/CHARACTERS FOR EACH BLOCK BLOCK NUMBER OF TITLE NUMBER DIGITS/CHARACTERS 1 UP TO 46 FACILITY NAME 8 TOTAL 2 DOCKET NUMBER 3 IN ADDITION TO 05000 3 VARIES PAGE NUMBER 4 UP TO 76 TITLE 6 TOTAL 5 EVENT DATE 2 PER BLOCK 7 TOTAL 2 FOR YEAR 6 LER NUMBER 3 FOR SEQUENTIAL NUMBER 2 FOR REVISION NUMBER 6 TOTAL 7 REPORT DATE 2 PER BLOCK UP TO 18 -- FACILITY NAME 8 OTHER FACILITIES INVOLVED 8 TOTAL -- DOCKET NUMBER 3 IN ADDITION TO 05000 9 1 OPERATING MODE 10 3 POWER LEVEL 1

11 REQUIREMENTS OF 10 CFR CHECK BOX THAT APPLIES UP TO 50 FOR NAME 12 LICENSEE CONT ACT 14 FOR TELEPHONE CAUSE VARIES 2 FOR SYSTEM 13 4 FOR COMPONENT EACH COMPONENT FAILURE 4 FOR MANUFACTURER NPRDS VARIES 1

14 SUPPLEMENTAL REPORT EXPECTED CHECK BOX THAT APPLIES 6 TOTAL 15 EXPECTED SUBMISSION DATE 2 PER BLOCK

LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating Station DOCKET NUMBER LER NUMBER PAGE*

Unit 2 5000311 94-007-00 2 of 4 PLANT AND SYSTEM IDENTIFICATION:

Westinghouse - Pressurized Water Reactor Energy Industry Identification System (EIIS) codes are identified in the text as {xx}

IDENTIFICATION OF OCCURRENCE:

Engineered Safety Feature Actuation; Blackout Signal Loading Of 2A, 2B, And 2C 4 Kilo-Volt (4KV) Vital Buses Due To Personnel Error During Emergency Safeguards Actuation Instrumentation Functional Test Event Date: 4/11/94 Report Date: 5/10/94 This report was initiated by Incident Report No. 9.4-105.

CONDITIONS PRIOR TO OCCURRENCE:

Mode 1 Reactor Power 48% - Unit ~oad 450 MWe DESCRIPTION OF OCCURRENCE:

  • On April 11, 1994, at 1035 hours0.012 days <br />0.288 hours <br />0.00171 weeks <br />3.938175e-4 months <br />, the infeed breakers to the Unit 4KV Vital Buses {EB} tripped on an undervoltage (UV)* signal resulting in an engineered safety feature automatic starting and "blackout signal loading" of the buses respective Diesel Generators (DGs). This occurred during performance of procedure S2.MD-FT.4KV-0001, "Emergency Safeguards Actuation System (ESFAS) Instrumentation Monthly", when the technician mistakenly opened switch 2B2 instead of 2A2, which is specified by the procedure.

At 1211 hours0.014 days <br />0.336 hours <br />0.002 weeks <br />4.607855e-4 months <br /> (same day) the Nuclear Regulatory Commission (NRC) was notified of this event, in accordance with 10CFR50.72(b) (2) (ii). At approximately 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br /> (same day), infeed power to the vital buses was restored and the DGs were secured and returned to standby.

  • ANALYSIS OF OCCURRENCE:

The Salem safeguards system design basis includes the requirement that the station be safely shutdown during a loss of coolant accident (LOCA) and a coincident loss of offsite power (blackout). All electrical equipment needed during a LOCA is powered from the vital buses, which can be powered from the standby alternating current diesel generators. Safeguards Equipment Control (SEC) is a logic system, comprised of three control systems, that provide proper

.. ~ICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating Station DOCKET NUMBER LER NUMBER PAGE Unit 2 . 5000311 94-001-00 3 of 4 ANALYSIS OF OCCURRENCE: (cont'd) actions in response to any accident and/or blackout condition. Each SEC (A, B, or C) is physically and electrically isolated from the other, is associated with its own DG and vital bus, and responds to accident (safety injection) and vital bus UV input signals. Based upon the combination of signals, the respective SEC will actuate to strip the vital buses, start the DGs, and reload the vital buses.

In accordance with S2.MD-ST.4KV~0001, the technician was verifying that relays 27X-2Al, 27X-2A2, and 27X-2A3, each send a 70% UV signal to 2A Vital Bus. This requires successive actuation of the 2Al, 2A2, and 2A3 relays, respectively located in the A, B, and c SEC cabinets.

The technician turned on the test switch for relay 2Al (located in 2A SEC cabinet), and went to 2B SEC cabinet, intending to turn on the test switch for 2A2. Due to a perceptual mental processing error, he mistakenly turned on the test switch for relay 2B2. Due to the preexisting UV signal (per the test) from the 2Al relay, the two out of three logic necessary for "blackout" signal stripping/reloading of the 2B Vital Bus was met and the bus deenergized, as designed. The same preexisting UV signal from the 2Al relay, in conjunction with the actual UV on 2B Vital Bus, then resulted in meeting the two out of three logic necessary for "blackout" signal stripping/loading of 2A and 2C Vital Buses.

APPARENT CAUSE OF OCCURRENCE:

The cause of this event is "Persbnnel Error~, as clas~ified in Appendix B of NUREG-1022. It occurred due to a perceptual mental processing error when the technician selected the wrong switch during performance of the test.

PREVIOUS OCCURRENCES Previous occurrences involving undervoltage conditions on 4KV Vital Buses, which resulted in automatic starting and loading of DGs have been reported *in LERs 311/92-013-00 and 272/93-012-00. Both occurrences involved personnel error and misoperation of test switches. Corrective actions to these events includ~d disciplinary action with involved individual(s), review of the involved procedure, and review of the event circumstances with applicable Maintenance Department personnel.

SAFETY SIGNIFICANCE This report is reportable pursuant to 10CFR50.73(a) (2)(iv). This event did not affect the health and safety of the public. Equipment functioned as required during*this event.

LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating Station DOCKET NUMBER LER NUMBER PAGE Unit 2 . 5000311 94-007-00 4 of 4 CORRECTIVE ACTION:

The involved technician has been counseled. This included reemphasizing the importance of properly identifying components for manipulation, including use of the "STAR" (Stop, Think, Act, and Review) technique.

  • This event has been reviewed with appropriate Maintenance Department supervisors and technicians.

The subject procedure will be revised to require concurrent verification of the location (prior to manipulation) of all test~manipulated switches in the SEC cabinets.

MJPJ:pc SORC Mtg.94-041