ML18116A444: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18116A444
| number = ML18116A444
| issue date = 04/16/2018
| issue date = 04/16/2018
| title = North Anna, Units 1 and 2, Submittal of Annual Environmental Operating Report
| title = Submittal of Annual Environmental Operating Report
| author name = Lane N L
| author name = Lane N
| author affiliation = Virginia Electric & Power Co (VEPCO)
| author affiliation = Virginia Electric & Power Co (VEPCO)
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:., VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 April 16,2018,2018 United States Nuclear Regulatory Commission Attention:
{{#Wiki_filter:.,
Document Control Desk Washington, D. C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 April 16,2018,2018 United States Nuclear Regulatory Commission                       Serial No. 18-168 Attention: Document Control Desk                                 NAPS/DPM Washington, D. C. 20555                                           Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNITS 1 AND 2 ANNUAL ENVIRONMENTAL OPERATING REPORT Serial No. 18-168 NAPS/DPM Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Enclosed is the Annual Environmental Operating Report for North Anna Power Station Units 1 and 2 for 2017, pursuant to Section 5.4.1 of the Technical Specifications, Appendix B -Environmental Protection Plan. If you have any questions or require additional information, please contact Mr. Donald R. Taylor at (540) 894-2100.
NORTH ANNA POWER STATION UNITS 1 AND 2 ANNUAL ENVIRONMENTAL OPERATING REPORT Enclosed is the Annual Environmental Operating Report for North Anna Power Station Units 1 and 2 for 2017, pursuant to Section 5.4.1 of the Technical Specifications, Appendix B - Environmental Protection Plan.
Very truly yours, /)~~ N. Larry Lane Site Vice President Enclosure cc: U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Senior Resident Inspector North Anna Power Station VIRGINIA ELECTR!C AND POWER COMPANY NORTH ANNA UNITS POWER 1 AND STATION 2 APPENDIX.
If you have any questions or require additional information, please contact Mr. Donald R. Taylor at (540) 894-2100.
B ENVIRONMENTAL PROTECTION PLAN 2017 ANNUAL REPORT DOCKET NOS. 50-338 AND 50-339 Page 1 of 4
Very truly yours,
:J* INTRODUCTION This 2017, Environmental Operating Report for the North Anna Power Station is submitted by Virginia Electric and Power Company, as required under Section 5. 4. 1 of Appendix B, Environmental Protection Plan (EPP). The objective of the EPP is to verify that the North Anna Power Station is operated in an environmentally acceptable manner, consistent with NRC and other federal, state and local requirements as well as to keep the NRC informed of any environmental effects of facility construction or operation.
  /)~~
During 2017, no significant adverse environmental impacts occurred as a result of the operation of North Anna Power Station, Units 1 and 2. Aquatic issues are addressed in the licensee's VPDES permit (number VA 0052451) issued by the Virginia State Water Control Board. The VPDES permitting program is administered by the Department of Environmental Quality (DEQ) and the NRC relies on this agency for regulation of matters involving water quality and aquatic biota. Listed below are the summaries and analyses required by Subsection 4.2 of the EPP. PL.ANT DESIGN AND OPERATION (SECTION 3.1) A review of all changes in ~tation design or operation, tests and experiments failed to reveal any potentially, significant, unreviewed, environmental issues. EROSION CONTROL INSPECTION  
N. Larry Lane Site Vice President Enclosure cc:     U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Senior Resident Inspector North Anna Power Station
-SITE (SECTION 4.2.2.1)
 
Performance of Periodic Test Procedures, 1-PT-9.3:
VIRGINIA ELECTR!C     AND   POWER   COMPANY NORTH   ANNA   POWER  STATION UNITS   1   AND   2 APPENDIX. B ENVIRONMENTAL       PROTECTION     PLAN 2017     ANNUAL     REPORT DOCKET   NOS. 50-338   AND   50-339 Page 1 of 4
Erosion Control Inspection-Station Site, and 0-PT-75.12:
:J*
Visual Inspection of the Service Water Reservoir Dike Crest and Toe, were completed by the Civil/Design Engineering Department.
INTRODUCTION This 2017, Environmental Operating Report for the North Anna Power Station is submitted by Virginia Electric and Power Company, as required under Section 5. 4. 1 of Appendix B,           Environmental Protection Plan (EPP).
Six (6) areas of concern were identified during the performance of 1-PT-9.3.
The objective of the EPP is to verify that the North Anna Power Station is operated in an environmentally acceptable manner, consistent   with   NRC   and   other   federal, state   and local requirements as well as to keep the NRC informed of any environmental effects of facility construction or operation.
Two (2) areas of concern were identified during the performance of 0-PT-75.12.
During 2017, no significant adverse environmental impacts occurred as a result of the operation of North Anna Power Station, Units 1 and 2. Aquatic issues are addressed in the licensee's VPDES permit (number VA 0052451) issued by the Virginia State Water Control Board. The VPDES permitting program is administered by the Department of Environmental Quality (DEQ) and the NRC relies on this agency for regulation of matters involving water quality and aquatic biota.
The areas identified in 1-PT-9.3 were minor erosion or storm water drainage issues. Two (2) of the areas identified were due animal burrows at the ISFSI area, and near the fabric tank area, which needed to be filled in. Two (2) of. the areas identified were due to excess gravel, sedimentation, and vegetation*
Listed below are the summaries and analyses required by Subsection 4.2 of the EPP.
build-up in Page 2 of 4 concrete drainage ditches near the ice house, fiber optic building, and discharge canal, that needed to be cleaned out. There was one (1) issue identified where there is improper draining of storm water run-off near Warehouse 5 and the BDB building, where additional ditching needs to be added. There was one (1) area identified where a culvert pipe, north of the switchyard, is covered with leaves and gravel, which needs to be cleaned out. One (1) of the areas identified during the performance of 0-PT-75 .12 was animal burrows observed near the Service Wacer Reservoir, north of the horizontal drains gallery, which needed to be filled in. The other one (1) area was the southeast slope of the SW Reservoir which had small trees on it which needed to be removed.
PL.ANT DESIGN   AND OPERATION (SECTION 3.1)
All of the issues identified were entered into the station's corrective action system and work orders were assigned.
A review of all changes in ~tation design or operation, tests and experiments   failed   to   reveal   any potentially,   significant, unreviewed, environmental issues.
Work orders for six of the eight issues have been completed:
EROSION CONTROL INSPECTION - SITE (SECTION 4.2.2.1)
The remaining work orders that are still open are scheduled to be completed by the end of June 2018. All of the issues identified were minor erosion issues that did not adversely impact site erosion control measures, the quality of storm water discharges, or station operation.
Performance of Periodic Test Procedures, 1-PT-9.3: Erosion Control Inspection-Station Site, and 0-PT-75.12: Visual Inspection of the Service Water Reservoir Dike Crest and Toe, were completed by the Civil/Design Engineering Department. Six (6) areas of concern were identified during the performance of 1-PT-9.3. Two (2) areas of concern were identified during the performance of 0-PT-75.12.
EROSION AND SEDIMENT CONTROL PROGRAM CORRIDOR RIGHTS-OF-WAY SECTION 4.2.2.2}
The areas identified in 1-PT-9.3 were minor erosion or storm water drainage issues. Two (2) of the areas identified were due animal burrows at the ISFSI area, and near the fabric tank area, which needed to be filled in. Two (2) of. the areas identified were due to excess gravel,     sedimentation, and vegetation* build-up in Page 2 of 4
 
concrete drainage ditches near the ice house,                 fiber optic building, and discharge canal, that needed to be cleaned out.
There was one (1)       issue identified where there is improper draining of storm water run-off near Warehouse 5 and the BDB building, where additional ditching needs to be added. There was one (1) area identified where a culvert pipe, north of the switchyard, is covered with leaves and gravel, which needs to be cleaned out.       One   (1)   of the areas identified during the performance of 0-PT-75 .12 was animal burrows observed near the Service Wacer Reservoir, north of the horizontal drains gallery, which needed to be filled in. The other one (1) area was the southeast slope of the SW Reservoir which had small trees on it which needed to be removed.
All of the issues identified were entered into the station's corrective action system and work orders were assigned. Work orders for six of the eight issues have been completed: The remaining work orders that are still open are scheduled to be completed by the end of June 2018. All of the issues identified were minor erosion issues that did not adversely impact site erosion control measures, the quality of storm water discharges, or station operation.
EROSION AND SEDIMENT       CONTROL   PROGRAM     CORRIDOR RIGHTS-OF-WAY SECTION 4.2.2.2}
During 2017, all transmission line rights-of-way were patrolled to coordinate brush and tree work needed for maintenance of the lines. This work involved the following:
During 2017, all transmission line rights-of-way were patrolled to coordinate brush and tree work needed for maintenance of the lines. This work involved the following:
* North Anna-to-Gordonsville corridor:
* North Anna-to-Gordonsville corridor: The patrol revealed that there   were   some     minor     vegetation   issues. Herbicide applications commenced on 10/02/17 ,and were completed on
The patrol revealed that there were some minor vegetation issues. Herbicide applications commenced on 10/02/17  
  *10/04/17. No significant erosion and sedimentation issues were observed.
,and were completed on *10/04/17.
* North Anna-to-Morrisville corridor: The patrol did not reveal any vegetation issues that needed work. No significant erosion and sedimentation issues were observed.
No significant erosion and sedimentation issues were observed.
* North Anna to Ladysmith corridor: The patrol did not reveal any vegetation issues that needed work.               No significant erosion and sedimentation issues were observed.
* North Anna-to-Morrisville corridor:
* North Anna to Midlothian corridor: The patrol revealed that there   were   some     minor     vegetation   issues. Herbicide applications commenced on 09/04/17 and were completed on Page 3 of 4
The patrol did not reveal any vegetation issues that needed work. No significant erosion and sedimentation issues were observed.
 
* North Anna to Ladysmith corridor:
10/17/17. No significant     erosion   and sedimentation   issues were observed.
The patrol did not reveal any vegetation issues that needed work. No significant erosion and sedimentation issues were observed.
During   all   of   the   above-noted     patrols and   follow-up observations, no abnormal erosion conditions were observed on any of the above corridors associated with transmission line construction, modification, maintenance activities or the use of herbicides during 2017.
* North Anna to Midlothian corridor:
NON-COMPLIANCE {SECTION 5.4.1)
The patrol revealed that there were some minor vegetation issues. Herbicide applications commenced on 09/04/17 and were completed on Page 3 of 4
There were no non-compliances with the Environmental         Protection Plan during 2017.
. . 10/17/17.
NON-ROUTINE   REPORTS   (SECTION 5.4.2)
No significant erosion and sedimentation issues were observed.
There was one (1) non-routine report submitted in 2017. A 20 day follow-up letter was submitted to the VA DEQ on January 8th, 2017, regarding the 2H underground line leak event. This event was previously described in the 2016 EPP Report.
During all of the above-noted patrols and follow-up observations, no abnormal erosion conditions were observed on any of the above corridors associated with transmission line construction, modification, maintenance activities or the use of herbicides during 2017. NON-COMPLIANCE  
Page 4 of 4
{SECTION 5.4.1) There were no non-compliances with the Environmental Protection Plan during 2017. NON-ROUTINE REPORTS (SECTION 5.4.2) There was one (1) non-routine report submitted in 2017. A 20 day follow-up letter was submitted to the VA DEQ on January 8th, 2017, regarding the 2H underground line leak event. This event was previously described in the 2016 EPP Report. Page 4 of 4
 
., VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 April 16,2018,2018 United States Nuclear Regulatory Commission Attention:
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 April 16,2018,2018 United States Nuclear Regulatory Commission                       Serial No. 18-168 Attention: Document Control Desk                                 NAPS/DPM Washington, D. C. 20555                                           Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
Document Control Desk Washington, D. C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNITS 1 AND 2 ANNUAL ENVIRONMENTAL OPERATING REPORT Serial No. 18-168 NAPS/DPM Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Enclosed is the Annual Environmental Operating Report for North Anna Power Station Units 1 and 2 for 2017, pursuant to Section 5.4.1 of the Technical Specifications, Appendix B -Environmental Protection Plan. If you have any questions or require additional information, please contact Mr. Donald R. Taylor at (540) 894-2100.
NORTH ANNA POWER STATION UNITS 1 AND 2 ANNUAL ENVIRONMENTAL OPERATING REPORT Enclosed is the Annual Environmental Operating Report for North Anna Power Station Units 1 and 2 for 2017, pursuant to Section 5.4.1 of the Technical Specifications, Appendix B - Environmental Protection Plan.
Very truly yours, /)~~ N. Larry Lane Site Vice President Enclosure cc: U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Senior Resident Inspector North Anna Power Station VIRGINIA ELECTR!C AND POWER COMPANY NORTH ANNA UNITS POWER 1 AND STATION 2 APPENDIX.
If you have any questions or require additional information, please contact Mr. Donald R. Taylor at (540) 894-2100.
B ENVIRONMENTAL PROTECTION PLAN 2017 ANNUAL REPORT DOCKET NOS. 50-338 AND 50-339 Page 1 of 4
Very truly yours,
:J* INTRODUCTION This 2017, Environmental Operating Report for the North Anna Power Station is submitted by Virginia Electric and Power Company, as required under Section 5. 4. 1 of Appendix B, Environmental Protection Plan (EPP). The objective of the EPP is to verify that the North Anna Power Station is operated in an environmentally acceptable manner, consistent with NRC and other federal, state and local requirements as well as to keep the NRC informed of any environmental effects of facility construction or operation.
  /)~~
During 2017, no significant adverse environmental impacts occurred as a result of the operation of North Anna Power Station, Units 1 and 2. Aquatic issues are addressed in the licensee's VPDES permit (number VA 0052451) issued by the Virginia State Water Control Board. The VPDES permitting program is administered by the Department of Environmental Quality (DEQ) and the NRC relies on this agency for regulation of matters involving water quality and aquatic biota. Listed below are the summaries and analyses required by Subsection 4.2 of the EPP. PL.ANT DESIGN AND OPERATION (SECTION 3.1) A review of all changes in ~tation design or operation, tests and experiments failed to reveal any potentially, significant, unreviewed, environmental issues. EROSION CONTROL INSPECTION  
N. Larry Lane Site Vice President Enclosure cc:     U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Senior Resident Inspector North Anna Power Station
-SITE (SECTION 4.2.2.1)
 
Performance of Periodic Test Procedures, 1-PT-9.3:
VIRGINIA ELECTR!C     AND   POWER   COMPANY NORTH   ANNA   POWER  STATION UNITS   1   AND   2 APPENDIX. B ENVIRONMENTAL       PROTECTION     PLAN 2017     ANNUAL     REPORT DOCKET   NOS. 50-338   AND   50-339 Page 1 of 4
Erosion Control Inspection-Station Site, and 0-PT-75.12:
:J*
Visual Inspection of the Service Water Reservoir Dike Crest and Toe, were completed by the Civil/Design Engineering Department.
INTRODUCTION This 2017, Environmental Operating Report for the North Anna Power Station is submitted by Virginia Electric and Power Company, as required under Section 5. 4. 1 of Appendix B,           Environmental Protection Plan (EPP).
Six (6) areas of concern were identified during the performance of 1-PT-9.3.
The objective of the EPP is to verify that the North Anna Power Station is operated in an environmentally acceptable manner, consistent   with   NRC   and   other   federal, state   and local requirements as well as to keep the NRC informed of any environmental effects of facility construction or operation.
Two (2) areas of concern were identified during the performance of 0-PT-75.12.
During 2017, no significant adverse environmental impacts occurred as a result of the operation of North Anna Power Station, Units 1 and 2. Aquatic issues are addressed in the licensee's VPDES permit (number VA 0052451) issued by the Virginia State Water Control Board. The VPDES permitting program is administered by the Department of Environmental Quality (DEQ) and the NRC relies on this agency for regulation of matters involving water quality and aquatic biota.
The areas identified in 1-PT-9.3 were minor erosion or storm water drainage issues. Two (2) of the areas identified were due animal burrows at the ISFSI area, and near the fabric tank area, which needed to be filled in. Two (2) of. the areas identified were due to excess gravel, sedimentation, and vegetation*
Listed below are the summaries and analyses required by Subsection 4.2 of the EPP.
build-up in Page 2 of 4 concrete drainage ditches near the ice house, fiber optic building, and discharge canal, that needed to be cleaned out. There was one (1) issue identified where there is improper draining of storm water run-off near Warehouse 5 and the BDB building, where additional ditching needs to be added. There was one (1) area identified where a culvert pipe, north of the switchyard, is covered with leaves and gravel, which needs to be cleaned out. One (1) of the areas identified during the performance of 0-PT-75 .12 was animal burrows observed near the Service Wacer Reservoir, north of the horizontal drains gallery, which needed to be filled in. The other one (1) area was the southeast slope of the SW Reservoir which had small trees on it which needed to be removed.
PL.ANT DESIGN   AND OPERATION (SECTION 3.1)
All of the issues identified were entered into the station's corrective action system and work orders were assigned.
A review of all changes in ~tation design or operation, tests and experiments   failed   to   reveal   any potentially,   significant, unreviewed, environmental issues.
Work orders for six of the eight issues have been completed:
EROSION CONTROL INSPECTION - SITE (SECTION 4.2.2.1)
The remaining work orders that are still open are scheduled to be completed by the end of June 2018. All of the issues identified were minor erosion issues that did not adversely impact site erosion control measures, the quality of storm water discharges, or station operation.
Performance of Periodic Test Procedures, 1-PT-9.3: Erosion Control Inspection-Station Site, and 0-PT-75.12: Visual Inspection of the Service Water Reservoir Dike Crest and Toe, were completed by the Civil/Design Engineering Department. Six (6) areas of concern were identified during the performance of 1-PT-9.3. Two (2) areas of concern were identified during the performance of 0-PT-75.12.
EROSION AND SEDIMENT CONTROL PROGRAM CORRIDOR RIGHTS-OF-WAY SECTION 4.2.2.2}
The areas identified in 1-PT-9.3 were minor erosion or storm water drainage issues. Two (2) of the areas identified were due animal burrows at the ISFSI area, and near the fabric tank area, which needed to be filled in. Two (2) of. the areas identified were due to excess gravel,     sedimentation, and vegetation* build-up in Page 2 of 4
 
concrete drainage ditches near the ice house,                 fiber optic building, and discharge canal, that needed to be cleaned out.
There was one (1)       issue identified where there is improper draining of storm water run-off near Warehouse 5 and the BDB building, where additional ditching needs to be added. There was one (1) area identified where a culvert pipe, north of the switchyard, is covered with leaves and gravel, which needs to be cleaned out.       One   (1)   of the areas identified during the performance of 0-PT-75 .12 was animal burrows observed near the Service Wacer Reservoir, north of the horizontal drains gallery, which needed to be filled in. The other one (1) area was the southeast slope of the SW Reservoir which had small trees on it which needed to be removed.
All of the issues identified were entered into the station's corrective action system and work orders were assigned. Work orders for six of the eight issues have been completed: The remaining work orders that are still open are scheduled to be completed by the end of June 2018. All of the issues identified were minor erosion issues that did not adversely impact site erosion control measures, the quality of storm water discharges, or station operation.
EROSION AND SEDIMENT       CONTROL   PROGRAM     CORRIDOR RIGHTS-OF-WAY SECTION 4.2.2.2}
During 2017, all transmission line rights-of-way were patrolled to coordinate brush and tree work needed for maintenance of the lines. This work involved the following:
During 2017, all transmission line rights-of-way were patrolled to coordinate brush and tree work needed for maintenance of the lines. This work involved the following:
* North Anna-to-Gordonsville corridor:
* North Anna-to-Gordonsville corridor: The patrol revealed that there   were   some     minor     vegetation   issues. Herbicide applications commenced on 10/02/17 ,and were completed on
The patrol revealed that there were some minor vegetation issues. Herbicide applications commenced on 10/02/17  
  *10/04/17. No significant erosion and sedimentation issues were observed.
,and were completed on *10/04/17.
* North Anna-to-Morrisville corridor: The patrol did not reveal any vegetation issues that needed work. No significant erosion and sedimentation issues were observed.
No significant erosion and sedimentation issues were observed.
* North Anna to Ladysmith corridor: The patrol did not reveal any vegetation issues that needed work.               No significant erosion and sedimentation issues were observed.
* North Anna-to-Morrisville corridor:
* North Anna to Midlothian corridor: The patrol revealed that there   were   some     minor     vegetation   issues. Herbicide applications commenced on 09/04/17 and were completed on Page 3 of 4
The patrol did not reveal any vegetation issues that needed work. No significant erosion and sedimentation issues were observed.
 
* North Anna to Ladysmith corridor:
10/17/17. No significant     erosion   and sedimentation   issues were observed.
The patrol did not reveal any vegetation issues that needed work. No significant erosion and sedimentation issues were observed.
During   all   of   the   above-noted     patrols and   follow-up observations, no abnormal erosion conditions were observed on any of the above corridors associated with transmission line construction, modification, maintenance activities or the use of herbicides during 2017.
* North Anna to Midlothian corridor:
NON-COMPLIANCE {SECTION 5.4.1)
The patrol revealed that there were some minor vegetation issues. Herbicide applications commenced on 09/04/17 and were completed on Page 3 of 4
There were no non-compliances with the Environmental         Protection Plan during 2017.
. . 10/17/17.
NON-ROUTINE   REPORTS   (SECTION 5.4.2)
No significant erosion and sedimentation issues were observed.
There was one (1) non-routine report submitted in 2017. A 20 day follow-up letter was submitted to the VA DEQ on January 8th, 2017, regarding the 2H underground line leak event. This event was previously described in the 2016 EPP Report.
During all of the above-noted patrols and follow-up observations, no abnormal erosion conditions were observed on any of the above corridors associated with transmission line construction, modification, maintenance activities or the use of herbicides during 2017. NON-COMPLIANCE  
Page 4 of 4}}
{SECTION 5.4.1) There were no non-compliances with the Environmental Protection Plan during 2017. NON-ROUTINE REPORTS (SECTION 5.4.2) There was one (1) non-routine report submitted in 2017. A 20 day follow-up letter was submitted to the VA DEQ on January 8th, 2017, regarding the 2H underground line leak event. This event was previously described in the 2016 EPP Report. Page 4 of 4}}

Latest revision as of 03:56, 3 February 2020

Submittal of Annual Environmental Operating Report
ML18116A444
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 04/16/2018
From: Lane N
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
18-168
Download: ML18116A444 (5)


Text

.,

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 April 16,2018,2018 United States Nuclear Regulatory Commission Serial No.18-168 Attention: Document Control Desk NAPS/DPM Washington, D. C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

NORTH ANNA POWER STATION UNITS 1 AND 2 ANNUAL ENVIRONMENTAL OPERATING REPORT Enclosed is the Annual Environmental Operating Report for North Anna Power Station Units 1 and 2 for 2017, pursuant to Section 5.4.1 of the Technical Specifications, Appendix B - Environmental Protection Plan.

If you have any questions or require additional information, please contact Mr. Donald R. Taylor at (540) 894-2100.

Very truly yours,

/)~~

N. Larry Lane Site Vice President Enclosure cc: U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Senior Resident Inspector North Anna Power Station

VIRGINIA ELECTR!C AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 APPENDIX. B ENVIRONMENTAL PROTECTION PLAN 2017 ANNUAL REPORT DOCKET NOS. 50-338 AND 50-339 Page 1 of 4

J*

INTRODUCTION This 2017, Environmental Operating Report for the North Anna Power Station is submitted by Virginia Electric and Power Company, as required under Section 5. 4. 1 of Appendix B, Environmental Protection Plan (EPP).

The objective of the EPP is to verify that the North Anna Power Station is operated in an environmentally acceptable manner, consistent with NRC and other federal, state and local requirements as well as to keep the NRC informed of any environmental effects of facility construction or operation.

During 2017, no significant adverse environmental impacts occurred as a result of the operation of North Anna Power Station, Units 1 and 2. Aquatic issues are addressed in the licensee's VPDES permit (number VA 0052451) issued by the Virginia State Water Control Board. The VPDES permitting program is administered by the Department of Environmental Quality (DEQ) and the NRC relies on this agency for regulation of matters involving water quality and aquatic biota.

Listed below are the summaries and analyses required by Subsection 4.2 of the EPP.

PL.ANT DESIGN AND OPERATION (SECTION 3.1)

A review of all changes in ~tation design or operation, tests and experiments failed to reveal any potentially, significant, unreviewed, environmental issues.

EROSION CONTROL INSPECTION - SITE (SECTION 4.2.2.1)

Performance of Periodic Test Procedures, 1-PT-9.3: Erosion Control Inspection-Station Site, and 0-PT-75.12: Visual Inspection of the Service Water Reservoir Dike Crest and Toe, were completed by the Civil/Design Engineering Department. Six (6) areas of concern were identified during the performance of 1-PT-9.3. Two (2) areas of concern were identified during the performance of 0-PT-75.12.

The areas identified in 1-PT-9.3 were minor erosion or storm water drainage issues. Two (2) of the areas identified were due animal burrows at the ISFSI area, and near the fabric tank area, which needed to be filled in. Two (2) of. the areas identified were due to excess gravel, sedimentation, and vegetation* build-up in Page 2 of 4

concrete drainage ditches near the ice house, fiber optic building, and discharge canal, that needed to be cleaned out.

There was one (1) issue identified where there is improper draining of storm water run-off near Warehouse 5 and the BDB building, where additional ditching needs to be added. There was one (1) area identified where a culvert pipe, north of the switchyard, is covered with leaves and gravel, which needs to be cleaned out. One (1) of the areas identified during the performance of 0-PT-75 .12 was animal burrows observed near the Service Wacer Reservoir, north of the horizontal drains gallery, which needed to be filled in. The other one (1) area was the southeast slope of the SW Reservoir which had small trees on it which needed to be removed.

All of the issues identified were entered into the station's corrective action system and work orders were assigned. Work orders for six of the eight issues have been completed: The remaining work orders that are still open are scheduled to be completed by the end of June 2018. All of the issues identified were minor erosion issues that did not adversely impact site erosion control measures, the quality of storm water discharges, or station operation.

EROSION AND SEDIMENT CONTROL PROGRAM CORRIDOR RIGHTS-OF-WAY SECTION 4.2.2.2}

During 2017, all transmission line rights-of-way were patrolled to coordinate brush and tree work needed for maintenance of the lines. This work involved the following:

  • North Anna-to-Gordonsville corridor: The patrol revealed that there were some minor vegetation issues. Herbicide applications commenced on 10/02/17 ,and were completed on
  • 10/04/17. No significant erosion and sedimentation issues were observed.
  • North Anna-to-Morrisville corridor: The patrol did not reveal any vegetation issues that needed work. No significant erosion and sedimentation issues were observed.
  • North Anna to Ladysmith corridor: The patrol did not reveal any vegetation issues that needed work. No significant erosion and sedimentation issues were observed.
  • North Anna to Midlothian corridor: The patrol revealed that there were some minor vegetation issues. Herbicide applications commenced on 09/04/17 and were completed on Page 3 of 4

10/17/17. No significant erosion and sedimentation issues were observed.

During all of the above-noted patrols and follow-up observations, no abnormal erosion conditions were observed on any of the above corridors associated with transmission line construction, modification, maintenance activities or the use of herbicides during 2017.

NON-COMPLIANCE {SECTION 5.4.1)

There were no non-compliances with the Environmental Protection Plan during 2017.

NON-ROUTINE REPORTS (SECTION 5.4.2)

There was one (1) non-routine report submitted in 2017. A 20 day follow-up letter was submitted to the VA DEQ on January 8th, 2017, regarding the 2H underground line leak event. This event was previously described in the 2016 EPP Report.

Page 4 of 4

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 April 16,2018,2018 United States Nuclear Regulatory Commission Serial No.18-168 Attention: Document Control Desk NAPS/DPM Washington, D. C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

NORTH ANNA POWER STATION UNITS 1 AND 2 ANNUAL ENVIRONMENTAL OPERATING REPORT Enclosed is the Annual Environmental Operating Report for North Anna Power Station Units 1 and 2 for 2017, pursuant to Section 5.4.1 of the Technical Specifications, Appendix B - Environmental Protection Plan.

If you have any questions or require additional information, please contact Mr. Donald R. Taylor at (540) 894-2100.

Very truly yours,

/)~~

N. Larry Lane Site Vice President Enclosure cc: U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Senior Resident Inspector North Anna Power Station

VIRGINIA ELECTR!C AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 APPENDIX. B ENVIRONMENTAL PROTECTION PLAN 2017 ANNUAL REPORT DOCKET NOS. 50-338 AND 50-339 Page 1 of 4

J*

INTRODUCTION This 2017, Environmental Operating Report for the North Anna Power Station is submitted by Virginia Electric and Power Company, as required under Section 5. 4. 1 of Appendix B, Environmental Protection Plan (EPP).

The objective of the EPP is to verify that the North Anna Power Station is operated in an environmentally acceptable manner, consistent with NRC and other federal, state and local requirements as well as to keep the NRC informed of any environmental effects of facility construction or operation.

During 2017, no significant adverse environmental impacts occurred as a result of the operation of North Anna Power Station, Units 1 and 2. Aquatic issues are addressed in the licensee's VPDES permit (number VA 0052451) issued by the Virginia State Water Control Board. The VPDES permitting program is administered by the Department of Environmental Quality (DEQ) and the NRC relies on this agency for regulation of matters involving water quality and aquatic biota.

Listed below are the summaries and analyses required by Subsection 4.2 of the EPP.

PL.ANT DESIGN AND OPERATION (SECTION 3.1)

A review of all changes in ~tation design or operation, tests and experiments failed to reveal any potentially, significant, unreviewed, environmental issues.

EROSION CONTROL INSPECTION - SITE (SECTION 4.2.2.1)

Performance of Periodic Test Procedures, 1-PT-9.3: Erosion Control Inspection-Station Site, and 0-PT-75.12: Visual Inspection of the Service Water Reservoir Dike Crest and Toe, were completed by the Civil/Design Engineering Department. Six (6) areas of concern were identified during the performance of 1-PT-9.3. Two (2) areas of concern were identified during the performance of 0-PT-75.12.

The areas identified in 1-PT-9.3 were minor erosion or storm water drainage issues. Two (2) of the areas identified were due animal burrows at the ISFSI area, and near the fabric tank area, which needed to be filled in. Two (2) of. the areas identified were due to excess gravel, sedimentation, and vegetation* build-up in Page 2 of 4

concrete drainage ditches near the ice house, fiber optic building, and discharge canal, that needed to be cleaned out.

There was one (1) issue identified where there is improper draining of storm water run-off near Warehouse 5 and the BDB building, where additional ditching needs to be added. There was one (1) area identified where a culvert pipe, north of the switchyard, is covered with leaves and gravel, which needs to be cleaned out. One (1) of the areas identified during the performance of 0-PT-75 .12 was animal burrows observed near the Service Wacer Reservoir, north of the horizontal drains gallery, which needed to be filled in. The other one (1) area was the southeast slope of the SW Reservoir which had small trees on it which needed to be removed.

All of the issues identified were entered into the station's corrective action system and work orders were assigned. Work orders for six of the eight issues have been completed: The remaining work orders that are still open are scheduled to be completed by the end of June 2018. All of the issues identified were minor erosion issues that did not adversely impact site erosion control measures, the quality of storm water discharges, or station operation.

EROSION AND SEDIMENT CONTROL PROGRAM CORRIDOR RIGHTS-OF-WAY SECTION 4.2.2.2}

During 2017, all transmission line rights-of-way were patrolled to coordinate brush and tree work needed for maintenance of the lines. This work involved the following:

  • North Anna-to-Gordonsville corridor: The patrol revealed that there were some minor vegetation issues. Herbicide applications commenced on 10/02/17 ,and were completed on
  • 10/04/17. No significant erosion and sedimentation issues were observed.
  • North Anna-to-Morrisville corridor: The patrol did not reveal any vegetation issues that needed work. No significant erosion and sedimentation issues were observed.
  • North Anna to Ladysmith corridor: The patrol did not reveal any vegetation issues that needed work. No significant erosion and sedimentation issues were observed.
  • North Anna to Midlothian corridor: The patrol revealed that there were some minor vegetation issues. Herbicide applications commenced on 09/04/17 and were completed on Page 3 of 4

10/17/17. No significant erosion and sedimentation issues were observed.

During all of the above-noted patrols and follow-up observations, no abnormal erosion conditions were observed on any of the above corridors associated with transmission line construction, modification, maintenance activities or the use of herbicides during 2017.

NON-COMPLIANCE {SECTION 5.4.1)

There were no non-compliances with the Environmental Protection Plan during 2017.

NON-ROUTINE REPORTS (SECTION 5.4.2)

There was one (1) non-routine report submitted in 2017. A 20 day follow-up letter was submitted to the VA DEQ on January 8th, 2017, regarding the 2H underground line leak event. This event was previously described in the 2016 EPP Report.

Page 4 of 4