ML041340430

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for January 1, 2003, Through December 31, 2003
ML041340430
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 04/27/2004
From: Jennifer Davis
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
+kBR1SISP20060424, -RFPFR, 04-214
Download: ML041340430 (120)


Text

VIRGINIA ELECTRIC AND POwVIR COMPANY RICIIMOND, VIRGINIA 23261 April 27, 2004 United States Nuclear Regulatory Commission Serial No.04-214 Attention: Document Control Desk NAPS/JRP Washington, D. C. 20555 Docket Nos. 50-338 50-339 72-16 License Nos. NPF-4 NPF-7 SNM-2507 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT The enclosed, Annual Radioactive Effluent Release Report for the reporting period January 1, 2003, through December 31, 2003, is provided in accordance with 10 CFR 50.36a, North Anna Units 1 and 2 Technical Specification 5.6.3, and 10 CFR 72.44(d)(3), relative to North Anna Independent Spent Fuel Storage Installation Technical Specification 5.5.2.c.

If you have any questions or require additional information, please contact us.

Very truly ours,

. Davis ite Vice President Enclosure Commitments made in this letter: None I _,eq g

cc: U. S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303 Director, Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. M.T. Widmann NRC Senior Resident Inspector North Anna Power Station

ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT NORTH ANNA POWER STATION (JANUARY 01, 2003 TO DECEMBER 31, 2003)

PREPARED B 63 tw Supervisor Radiological Analysis and Material Control REVIEWED BY: dZL Supervisor Health Physics Technical Services APPROVED BY:7Z Manager I Radiological Protection and Chemistry

FORWARD This report is submitted in accordance with North Anna Unit 1 and 2 Technical Specification 5.6.3 and North Anna Independent Spent Fuel Storage Installation (ISFSI) Technical Specification 5.5.2.c and 10CFR72.44(d)(3).

ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT FOR THE NORTH ANNA POWER STATION JANUARY 01,2003 TO DECEMBER 31,2003 INDEX Section No. Subject Page 1 EXECUTIVE

SUMMARY

................................... 1 - 2 2 PURPOSE AND SCOPE................................... 2 3 DISCUSSION .................................................. 3 - 4 4 SUPPLEMENTAL INFORMATION....................... 4 - Effluent Release Data................................. 5 - Annual and Quarterly Doses........................ 6 - Revisions to Offsite Dose Calculation Manual (ODCM)........................................ 7 - Major Changes to Radioactive Liquid, Gaseous, and Solid Waste Treatment Systems.................................................. 8 - Inoperability of Radioactive Liquid and Gaseous Effluent Monitoring Instrumentation ................................... 9 - Unplanned Releases................................. 10 - 11 - Lower Limits of Detection (LLD) for Effluent Sample Analysis........................... 12 - 13

1.0 EXECUTIVE

SUMMARY

The Annual Radioactive Effluent Release Report describes the radioactive effluent control program conducted at the North Anna Power Station and Independent Spent Fuel Storage Installation (ISFSI) during the 2003 calendar year. This document summarizes the quantities of radioactive liquid and gaseous effluents and solid waste released from the North Anna Power Station and ISFSI in accordance with R.G.

1.21 during the period January 1 through December 31, 2003, and includes an assessment of radiation doses to the maximum exposed member of the public due to radioactive liquid and gaseous effluents.

There were no releases from the ISFSI during 2003.

There were two unplanned releases, one liquid and one gaseous, meeting the reporting criteria of 6.7.2.a.3, bullet number 4, of the Offsite Dose Calculation Manual during this reporting period.

Based on the 2003 effluent release data, 10 CFR 50, Appendix I dose calculations were performed in accordance with the Offsite Dose Calculation Manual. The results of these pathway dose calculations indicate the following:

a. The total body dose due to liquid effluentswas 1.42E-1 mrem which is 2.37E+0% of the dose limit and the critical organ dose due to liquid effluents was 2.38E-1 mrem, which is 1.19E+0% of the dose limit.
b. The air dose due to noble gases was 1.06E-3 mrad gamma, which is 5.30E-3% of the annual gamma dose limit, and 5.15E-3 mrad beta, which is 1.29E-2% of the annual beta dose limit.
c. The critical organ dose for 1-131, 1-133, H-3, and Particulates with half-lives greater than 8 days was 1.16E-2 mrem, which is 3.87E-2% of the annual dose limit.

There was no major change to radioactive liquid and solid waste treatment systems during this reporting period. Changes to the gaseous waste treatment system are explained in Attachment 4.

There were 2 revisions to the Offsite Dose Calculation Manual during this reporting period. Attachment 3 provides the changes to VPAP-2103N.

I

1.0 EXECUTIVE

SUMMARY

(cont.)

Based on the levels of radioactivity observed during this reporting period and the dose calculations performed, the operations of the North Anna Nuclear Power Station Units 1, 2, and ISFSI have resulted in negligible dose consequences to the maximum exposed member of the public in unrestricted areas.

2.0 PURPOSE AND SCOPE The Radioactive Effluent Release Report includes, in Attachment 1, a summary of the quantities of radioactive liquid and gaseous effluents and solid waste as outlined in Regulatory Guide 1.21, "Measuring, Evaluating, and Reporting Radioactivity in Solid Wastes and Releases of Radioactive Materials in Liquid and Gaseous Effluents from Light-Water-Cooled Nuclear Power Plants", Revision 1, June 1974, with data summarized on a quarterly basis for Table 1 and 2 and on an annual basis on Table 3. The report submitted before May 1st of each year includes an assessment of radiation doses to the maximum exposed member of the public due to radioactive liquid and gaseous effluents released from the site during the previous calendar year. The report also includes a list of unplanned releases during the reporting period, in Attachment 6.

As required by Technical Specification, changes to the Offsite Dose Calculation Manual (ODCM) for the time period covered by this report are included in Attachment 3.

Major changes to radioactive liquid, gaseous and solid waste treatment systems are reported in Attachment 4, as required by the ODCM, section 6.7.2.a.4. Information to support the reason(s) for the change(s) and a summary of the 10 CFR 50.59 evaluation are included. In lieu of reporting major changes in this report, major changes to the radioactive waste treatment systems may be submitted as part of FSAR updates.

As required by the ODCM, sections 6.2.2.b.2 and 6.3.2.b.3, a list and explanation for the inoperability of radioactive liquid and/or gaseous effluent monitoring instrumentation is provided in Attachment 5 of this report.

2

3.0 DISCUSSION The basis for the calculation of the percent of Technical Specification for the critical organ in Table 1A of Attachment 1 is the ODCM, section 6.3.1, which requires that the dose rate for iodine-131 & iodine-133, for tritium, and for all radionuclides in particulate form with half-lives greater than 8 days shall be less than or equal to 1500 mrem/yr to the critical organ at or beyond the site boundary. The critical organ is the child's thyroid via the inhalation pathway.

The basis for the calculation of percent of Technical Specification for the total body and skin in Table 1A of Attachment 1 is the ODCM, section 6.3.1, which requires that the dose rate for noble gases to areas at or beyond the site boundary shall be less than or equal to 500 mrem/yr to the total body and less than or equal to 3000 mrem/yr to the skin.

The basis for the calculation of the percent of Technical Specification in Table 2A in Attachment 1 is the ODCM, section 6.2.1, which states that the concentrations of radioactive material released in liquid effluents to unrestricted areas shall be limited to 10 times the concentrations specified in 10 CFR 20, Appendix B, Table 2, Column 2 for radionuclides other than dissolved or entrained noble gases. For dissolved or entrained noble gases, the concentration shall be limited to 2.OE-4 pCi/ml.

Percent of Technical Specification calculations are based on the total gaseous or liquid effluents released for that respective quarter.

The annual and quarterly doses, as reported in Attachment 2, were calculated according to the methodology presented in the ODCM. The beta and gamma air doses due to noble gases released from the site were calculated at site boundary. The maximum exposed member of the public from the releases of airborne iodine-131 & iodine-133, tritium and all radionuclides in particulate form with half-lives greater than 8 days, is defined as an infant, exposed through the grass-cow-milk pathway, with the critical organ being the thyroid gland. The maximum exposed member of the public from radioactive materials in liquid effluents in unrestricted areas is defined as a child. The total body dose was determined for this individual.

The critical organ was determined to be the child liver.

As shown in Attachment 6 there were one unplanned gaseous and one unplanned liquid release meeting the requirements of 6.7.2.a.3 of the ODCM.

3

3.0 DISCUSSION (cont.)

The typical Lower Limit of Detection (LLD) capabilities of the radioactive effluent analysis instrumentation are presented in Attachment 7. These LLD values are based upon conservative conditions (i.e., minimum sample volume and maximum delay time prior to analysis). Actual LLD values may be lower. If a radioisotope was not detected when effluent samples were analyzed, then the activity of that radioisotope was reported as Not Detectable (NID) on Attachment 1 of this report. If an analysis for an isotope was not performed, then the activity was reported as Not Applicable (N/A).

4.0 SUPPLEMENTAL INFORMATION As required by the ODCM, section 6.6.2, evaluation of the Land Use Census is made to determine if new location(s) have been identified for the radiological environmental monitoring program pursuant to the ODCM. No changes were made.

Section 6.6.1 .b.4 of the ODCM requires identification of the cause(s) for the unavailability of milk or leafy vegetation samples, and the identification of new locations for obtaining replacement samples. Milk samples, as required by the ODCM, section 6.6.1, were available during the time period covered by this report. The leafy vegetation samples for vegetation stations 14, 15, 16, 21, 23 and 26, as applicable, were not collected for the months of January, February, March, April, October, November and December 2003 due to seasonal unavailability. All other milk and vegetation samples were obtained and analyzed as required during the time period covered by this report.

4

ATTACHMENT 1 EFFLUENT RELEASE DATA (01/03 - 12/03)

This attachment includes a summary of the quantities of radioactive liquid and gaseous effluents and solid waste, as outlined in Regulatory Guide 1.21, Appendix B, except that in accordance with Step 6.7.2.a.1 of the ODCM liquid and gaseous data is summarized on a quarterly basis and solid waste is summarized on an annual basis.

5

TABLE 1A NORTH ANNA POWER STATION ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT SUMMATION OF ALL GASEOUS EFFLUENT RELEASES FOR (01/03 - 12/03)

Page 1 of 2 1 ST 2 ND ESTIMATED TOTAL UNITS QUARTER QUARTER PERCENT ERROR (%)

A. Fission and Activiation Gases:

1. Total Release Curies 2.01E+1 7.13E+0 1.80E+1
2. Average Release Rate For Period pCi/sec 2.58E+0 9.07E-1 B. lodines:
1. Total Iodine-131 Release Curies 1.91E-4 4.51E-6 2.80E+1
2. Average Release Rate For Period pCi/sec 2.46E-5 5.74E-7 C. Particulate (T/2 > 8 days):
1. Total Particulate (T1/2> 8 days) Release Curies 5.70E-6 5.51 E-6 2.80E+1
2. Average Release Rate For Period pCi/sec 7.33E-7 7.01 E-7
3. Gross Alpha Radioactivity Release Curies 5.98E-7 1.82E-6 D. Tritium:
1. Total Release Curies 7.74E+0 1.18E+1 3.1OE+1
2. Average Release Rate For Period pCi/sec 9.91 E-1 1.50E+0 E. Percentage Of Technical Specification Limits
1. Total Body Dose Rate  % 6.99E-4 1.15E-5
2. Skin Dose Rate  % 4.17E-4 6.20E-5
3. Critical Organ Dose Rate  % 9.25E-4 1.02E-3

TABLE 1A NORTH ANNA POWER STATION ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT SUMMATION OF ALL GASEOUS EFFLUENT RELEASES FOR (01/03 - 12/03)

Page 2 of 2 3 RD 4 TH ESTIMATED TOTAL UNITS QUARTER QUARTER PERCENT ERROR (%)

A. Fission and Activiation Gases:

1. Total Release Curies 2.18E-1 6.75E-1 1.80E+1
2. Average Release Rate For Period pCl/sec 2.74E-2 8.49E-2 B. lodines:
1. Total Iodine-131 Release Curies N/D N/D 2.80E+1
2. Average Release Rate For Period pCi/sec N/D N/D C. Particulate (T112 > 8 days):
1. Total Particulate (T1v2>8days) Release Curies 1.96E-6 9.82E-9 2.80E+1
2. Average Release Rate For Period jiCi/sec 2.47E-7 1.24E-9
3. Gross Alpha Radioactivity Release Curies 3.48E-7 2.99E-7 D. Tritium:
1. Total Release Curies 1.25E+1 1.75E+1 3.10E+1
2. Average Release Rate For Period pCi/sec 1.57E+O 2.20E+O E. Percentaae Of Technical Specification Limits
1. Total Body Dose Rate  % 3.75E-6 5.14E-6
2. Skin Dose Rate  % 1.192-6 4.13E-6
3. Critical Organ Dose Rate  % 1.02E-3 1.45E-3

TABLE 1B NORTH ANNA POWER STATION ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT MIXED MODE GASEOUS EFFLUENT RELEASES FOR (01/03 - 12103)

Page 1 of 4 CONTINUOUS MODE BATCH MODE 1ST 2ND 1ST 2ND NUCLIDES RELEASED UNITS QUARTER QUARTER QUARTER QUARTER Fission & Activation Gases:

Krypton - 85 Cl N/D N/D 2.64E+00 6.28E+00 Krypton - 85m CI N/D N/D N/D N/D Krypton - 87 Cl NID NID N/D N/D Krypton - 88 Cl NID N/D N/D N/D Xenon- 131m Cl N/D N/D 1.15E-01 8.61E-02 Xenon - 133 Ci 9.80E-01 2.42E-01 5.61E+00 1.91E-01 Xenon - 133m Ci N/D N/D 9.27E-02 N/D Xenon - 135 Cl 2.15E.03 N/D 6.47E-02 NID Xenon - 135m Ci N/D N/D N/D N/D Xenon - 137 Cl N/D N/D N/D N/D Xenon- 138 Ci N/D N/D NID N/D Other (Specify) N/D NID N/D N/D Argon - 41 Ci N/D 8.43E-03 N/D N/D Total For Period Ci 9.82E-01 2.50E-01 8.52E+00 6.56E+00 lodines:

Iodine - 131 Ci 1.04E-06 4.30E-08 N/D N/D Iodine- 133 Cl N/D N/D N/D N/D Iodine - 135 Ci N/D N/D N/D N/D Total For Period Ci 1.04E-06 4.30E-08 N/D N/D Particulates:

Manganese - 54 Ci N/D NID NID N/D Iron - 55 Ci N/A N/A N/A N/A Cobalt - 58 Ci N/D NID N/D N/D Iron - 59 Cl NID N/D N/D N/D Cobalt - 60 Cl 7.46E-09 N/D N/D N/D Zinc - 65 Cl NMD N/D N/D N/D Strontium - 89 Ci N/D N/D N/D N/D Strontium - 90 Ci N/D N/D NID N/D Cesium- 134 Cl NID IND MID N/D Cesium- 136 Ci N/D N/D NMD N/D Cesium- 137 Ci NID 1.76E-08 N/D N/D

TABLE I B NORTH ANNA POWER STATION ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT MIXED MODE GASEOUS EFFLUENT RELEASES FOR (01103 - 12103)

Page 2 of 4 CONTINUOUS MODE BATCH MODE 1ST 2ND 1ST 2ND NUCLIDES RELEASED UNITS QUARTER QUARTER QUARTER QUARTER Particulates: (cont.)

Barium - Lanthanum - 140 Ci N/D N/D N/D N/D Cerium -141 Ci N/D N/D N/D N/D Cerium -144 Ci N/D N/D NWD N/D Ruthenium -103 Ci N/D N/D N/D N/D Other (Specify) Cl N/D N/D N/D N/D TotalforPeriod (T1/2 > 8days) Ci 7.46E-09 1.76E-08 N/D NID TotalforPeriod (T1/2 < 8days) Ci N/D N/D N/D N/D Total For Period Cl 7.46E-09 1.76E-08 NtD N/D GROSS ALPHA: Cl 1.11E-09 1.46E-09 N/D N/D TRITIUM: Cl 2.28E-01 5.10E-01 4.77E-03 5.87E-04

TABLE 1B NORTH ANNA POWER STATION ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT MIXED MODE GASEOUS EFFLUENT RELEASES FOR (01103 - 12103)

Page 3 of 4 CONTINUOUS MODE BATCH MODE 3RD 4TH 3RD 4TH NUCLIDES RELEASED UNITS QUARTER QUARTER QUARTER QUARTER Fission & Activation Gases:

Krypton - 85 Cl N/D NID N/D 3.69E-01 Krypton - 85m Ci N/D NID N/D N/D Krypton - 87 CI N/D N/D N/D N/D Krypton - 88 Ci N/D NID NID N/D Xenon- 131m Cl NID N/D N/D N/D Xenon- 133 CI 2.11E-01 2.97E-01 NID N/D Xenon- 133m Ci N/D NID N/D N/D Xenon- 135 Ci NID NID N/D N/D Xenon - 135m Ci NID NID NID NID Xenon- 137 Ci N/D N/D N/D N/D Xenon- 138 Cl N/D N/D N/D N/D Other (Specify)

Argon-41 CI 7.03E-03 8.71E-03 N/D NID Total For Period CI 2.18E-01 3.06E-01 N/D 3.69E-01 lodines:

Iodine - 131 Ci N/D N/D NHD N/D Iodine - 132 Ci N/D N/D N/D N/D Iodine- 133 Ci N/D N/D N/D N/D Iodine- 135 CI N/D N/D N/D N/D Total For Period CI NID NID N/D NID Particulates:

Manganese - 54 Ci N/D N/D N/D N/D Cobalt - 58 Ci N/D N/D N/D N/D Iron - 59 CI NID NID NID N/D Cobalt- 60 CI N/D N/D N/D NID Zinc - 65 CI N/D NID N/D NID Strontium - 85 CI N/D N/D N/D N/D Strontium - 89 CI N/D N/D N/D NHD Strontium - 90 Cl NID NID N/D N/D Cesium - 134 Ci N/D NID NID NID Cesium - 136 Cl N/D NID NID N/D Cesium- 137 Cl 1.33E-08 9.82E-09 N/D N/D

TABLE 1B NORTH ANNA POWER STATION ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT MIXED MODE GASEOUS EFFLUENT RELEASES FOR (01103 - 12103)

Page 4 of 4 CONTINUOUS MODE BATCH MODE 3RD 4TH 3RD 4TH NUCLIDES RELEASED UNITS QUARTER QUARTER QUARTER QUARTER Particulates: (cont.)

Barium - Lanthanum4140 Ci N/D NID N/D N/D Cerium- 141 CI N/D N/D N/D N/D Cerium -(144 Ci NID N/D N/D NID Other (Specify) CI NID N/D N/D N/D)

Ag-1 10m Ci N/D N/D N/D NID TotalforPerlod (T1M2 > 8days) Ci 1.33E-08 9.82E-09 NID N/D TotalforPeriod-(T1/2 < 8days) Cl NID N/D N/D N/D Total For Period Ci 1.33E-08 9.82E-09 N/D N/D GROSS ALPHA: Cl 6.87E-11 1.02E-09 N/D NID TRITIUM: CI 9.711E-01 1.09E+00 N/D 8.34E-05

TABLE IC NORTH ANNA POWER STATION ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT GROUND LEVEL GASEOUS EFFLUENT RELEASES FOR (01103 - 12103)

Page 1 of 4 CONTINUOUS MODE BATCH MODE 1ST 2ND 1ST 2ND NUCLIDES RELEASED UNITS QUARTER QUARTER QUARTER QUARTER Fission & Activation Gases:

Krypton - 85 Ci NID NID 2.34E+00 2.86E-01 Krypton - 85m Ci N/D NID NID N/D Krypton - 87 Ci N/D N/D N/D N/D Krypton - 88 Ci N/D N/D N/D NWD Xenon - 131m Ci N/D N/D 1.74E-02 1.93E-02 Xenon- 133 Ci N/D N/D 8.17E+00 7.27E-03 Xenon - 133m Ci N/D N/D 1.92E-03 N/D Xenon - 135 Ci N/D N/D 1.17E-01 N/D Xenon- 135m Ci N/D N/D N/D N/D Xenon- 138 Ci N/D N/D N/D N/D Other (Specify) Ci Argon -41 Ci N/D N/D NID N/D Total For Period Ci N/D N/D 1.06E+01 3.13E-01 lodines:

Iodine - 130 Cl N/D N/D 1.30E-08 N/D lodine - 131 Ci 1.88E-04 4.47E-06 1.59E-06 N/D Iodine- 132 Cl NID N/D N/D N/D Iodine - 133 Ci N/D 1.67E-05 4.56E-07 N/D Iodine- 135 Ci N/D N/D 2.86E-08 N/D Total For Period Ci 1.88E-04 2.12E-05 2.09E-06 N/D Particulates:

Manganese- 54 Ci NID NID N/D NID Iron - 55 Ci N/A N/A N/A N/A Cobalt - 58 Ci 1.64E-06 N/D NID N/D Iron - 59 Ci N/D N/D N/D N/D Cobalt- 60 Ci 2.43E-06 2.49E-06 NID N/D Zinc - 65 Cl N/D N/D N/D N/D Strontium - 89 Ci NID NID N/D NID Strontium - 90 CI N/D N/D N/D NID Cesium - 134 Ci N/D N/D N/D N/D Cesium- 136 Ci N/D N/D N/D NWD

TABLE IC NORTH ANNA POWER STATION ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT GROUND LEVEL GASEOUS EFFLUENT RELEASES FOR (01103 - 12/03)

Page 2 of 4 CONTINUOUS MODE BATCH MODE 1ST 2ND 1ST 2ND NUCLIDES RELEASED UNITS QUARTER QUARTER QUARTER QUARTER Particulates: (cont.)

Cesium- 137 Ci 1.62E-06 1.13E-06 N/D N/D Barium - Lanthanum - 140 CI N/D N/D N/D N/D Cerium- 141 Ci N/D N/D N/D N/D Cerium- 144 Ci NID N/D N/D N/D Chromium - 51 Cl N/D NID N/D N/D Other (Specify) Ci N/D NID N/D N/D Niobium - 95 Ci N/D 1.28E-06 N/D N/D Antimony- 122 CI N/D N/D NID NWD Antimony - 125 Cl N/D N/D N/D 5.92E-07 Tellurium - 131m Cl N/D N/D N/D NID Total for Period (T1/2 > 8 days) Ci 5.69E-06 4.90E-06 N/D 5.92E-07 Total for Period (T1/2 < 8 days) CI NID N/D N/D N/D Total For Period CI 5.69E-06 4.90E-06 NID 5.92E-07 GROSS ALPHA: CI 5.97E-07 1.82E-06 N/D N/D TRITIUM: Ci 4.77E+00 1.12E+01 2.74E+00 1.11E-01

TABLE IC NORTH ANNA POWER STATION ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT GROUND LEVEL GASEOUS EFFLUENT RELEASES FOR (01/03 12103)

Page 3 of 4 CONTINUOUS MODE BATCH MODE 3RD 4TH 3RD 4TH NUCLIDES RELEASED UNITS QUARTER QUARTER QUARTER QUARTER Fission & Activation Gases:

Krypton - 85 Ci NID N/D N/D NID Krypton - 85m Ci NID N/D N/D NID Krypton- 87 Ci N/D NID NID N/D Krypton- 88 Cl N/D N/D NID N/D Xenon- 131m Ci N/D N/D N/D N/D Xenon- 133 Ci NID N/D N/D N/D Xenon- 133m Ci NID NID N/D N/D Xenon- 135 CI NID N/D N/D NID Xenon- 135m CI N/D N/D N/D NID Xenon- 138 CI NID N/D NID N/D Other (Specify) Cl Argon - 41 Cl N/D NID N/D N/D Total For Period Ci NMD NMD N/D N/D lodines:

Iodine- 130 Ci NID NID NID NID Iodine- 131 CI N/D N/D N/D N/D Iodine- 132 Ci N/D N/D N/D NID Iodine- 133 CI NID NID N/D N/D Iodine- 135 Ci N/D N/D N/D NID Total For Period Ci NMD NID NID NID Particulates:

Manganese - 54 Ci N/D N/D N/D N/D Iron - 55 Ci N/A NIA N/A N/A Cobalt -58 CI N/D NID NID N/D Iron - 59 Ci NID NID NID NID Cobalt - 60 CI 1.95E-06 N/D N/D N/D Zinc -65 Ci N/D N/D NMD N/D Niobium - 95 Ci NID NID NID NID Zirconium - 95 Ci N/D N/D NID N/D Strontium - 89 Cl NID N/D N/D NID Strontium - 90 Ci NID N/D N/D N/D Cesium- 134 Ci NID N/D N/D N/D

TABLE 1C NORTH ANNA POWER STATION ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT GROUND LEVEL GASEOUS EFFLUENT RELEASES FOR (01103 - 12/03)

Page 4 of 4 CONTINUOUS MODE BATCH MODE 3RD 4TH 3RD 4TH NUCLIDES RELEASED UNITS QUARTER QUARTER QUARTER QUARTER Particulates: (cont.)

Cesium - 137 CI N/D NID N/D N/D Barium - Lanthanum - 140 Ci NID NID N/D N/D Cerium- 141 Ci N/D N/D N/D N/D Cerium- 144 Ci NID N/D N/D N/D Other (Specify)

Chromium -51 (T1/2 >8 days) Cl N/D N/D N/D N/D Total for Period (T1/2 > 8 days) Ci 1.95E-06 N/D N/D N/D Total for Period (T1/2 < 8 days) Cl N/D N/D N/D NID Total For Period CI 1.95E-06 NID N/D N/D GROSS ALPHA: CI 3.48E-07 2.98E-07 N/D N/D TRITIUM: Ci 1.15E+01 1.64E+01 7.822-07 3.69E-08

NORTH ANNA POWER STATION ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT LIQUID EFFLUENT - SUMMATION OF ALL RELEASES FOR (0103 - 1203_ Page 1 of 2 1 ST 2 ND ESTIMATED TOTAL UNITS QUARTER QUARTER PERCENT ERROR (%)

A. Fission and Activiation Products:

1. Total Release (not including tritium, noble gas, and gross alpha). Curies 1.33E-01 1.00E-01 2.OOE+01
2. Average diluted concentration during the period. PCI/mI 3.66E-10 1.61E-10
3. Percent of applicable limit (T.S.)  % 3.74E-03 1.57E-04 B. Tritium:
1. Total release activity. Curies 1.85E+02 7.52E+01 2.00E+01
2. Average diluted concentration during the period. pCi/ml 5.09E-07 1.21 E-07
3. Percent of applicable limit (T.S.)  % 5.09E-03 1.21E-03 C. Dissolved and Entrained Gases:
1. Total release activity. Curies 3.OOE-04 N/D 2.OOE+01
2. Average diluted concentration during the period. pCi/ml 8.26E-13 N/D
3. Percent of applicable limit (T.S.)  % 4.13E-07 N/D D. Gross Alpha Radioactivity:
1. Total release activity. Curies 2.35E-04 N/D 2.OOE+01 E. Volume of waste released: prior to dilution). Liters 1.18E+08 1.62E+08 3.OOE+00 F. Total volume of dilution water used during the period. Liters 3.63E+11 6.21E+1I 3.OOE+00

NORTH ANNA POWER STATION ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT LIQUID EFFLUENT - SUMMATION OF ALL RELEASES FOR (01/03 - 12103) Page 2 of 2 3 RD 4 TH ESTIMATED TOTAL UNITS QUARTER QUARTER PERCENT ERROR (%)

A. Fission and Activiation Products:

1. Total Release (not including tritium, noble gas, and gross alpha). Curies 4.98E-02 1.64E-02 2.OOE+01
2. Average diluted concentration during the period. pCi/ml 5.77E-1 1 2.74E-1 1
3. Percent of applicable limit (T.S.)  % 3.38E-05 1.86E-05 B. Tritium:
1. Total release activity. Curies 6.87E+01 1.19E+01 2.OOE+01
2. Average diluted concentration during the period. PCi/mI 7.96E-08 1.99E-08
3. Percent of applicable limit (T.S.)  % 7.96E-04 1.99E-04 C. Dissolved and Entrained Gases:
1. Total release activity. Curies N/D N/D 2.OOE+01
2. Average diluted concentration during the period. pCi/ml N/D N/D
3. Percent of applicable limit (T.S.)  % N/D NID D. Gross Alpha Radioactivity:
1. Total release activity. Curies N/D N/D 2.OOE+01 E. Volume of waste released: prior to dilution). Liters 1.32E+08 1.13E+08 3.OOE+00 F. Total volume of dilution water used during the period. Liters 8.63E+1 1 5.98E+1 1 3.OOE+00

TABLE 2B NORTH ANNA POWER STATION ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT LIQUID EFFLUENT RELEASES FOR (01103 - 12/03)

Page 1 of 4 CONTINUOUS MODE BATCH MODE 1ST 2ND 1ST 2ND NUCLIDES RELEASED UNITS QUARTER QUARTER QUARTER QUARTER Fission & Activation Products:

Manganese - 54 CI 1.89E-03 7.85E-04 N/D N/A Iron-55 Ci 3.21 E-02 4.39E-02 N/D N/A Cobalt - 58 Ci 4.80E-02 2.48E-02 2.33E-08 N/A Cobalt - 60 CI 3.01E-02 1.97E-02 N/D N/A Strontium - 89 Ci N/D NID N/D N/A Strontium - 90 Ci N/D N/D N/D N/A Niobium - 95 Ci 6.44E-03 2.29E-03 N/D N/A Ruthenium- 106 Ci N/D N/D N/D N/A Silver- 11Om CI 1.16E-03 1.29E-03 N/D N/A Iodine- 131 CI 5.51E-04 N/D N/D N/A Iodine- 133 Ci N/D N/D N/D N/A Cesium - 134 CI 8.60E-04 8.73E-05 N/D N/A Cesium- 136 Ci NID N/D N/D N/A Cesium - 137 Cl 3.10E-03 8.49E-04 1.23E-08 N/A Barium-Lathanum - 140 Cl N/D N/D N/D N/A Cerium - 141 Ci N/D N/D N/D N/A Antimony - 124 Ci 5.85E-04 N/D N/D N/A Antimony - 125 Ci 1.31E-03 6.49E-04 N/D N/A Other (Specify) Ci Zirconium -95 CI 2.78E-03 1.27E-03 N/D N/A Chromium - 51 Ci 2.35E-03 2.11E-03 N/D N/A Iron-59 Cl 1.70E-04 1.84E-03 NID N/A Tin-113 Ci 8.56E-04 3.42E-04 N/D N/A Indium - 113m (T1/2 < 8 days) Ci 8.57E-04 3.42E-04 N/D N/A Antimony - 122 (T 112 < 8 days) Ci 3.69E-04 N/D N/D N/A Total for Period Ci 1.33E-01 1.OOE-01 3.56E-08 N/A

TABLE 2B NORTH ANNA POWER STATION ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT LIQUID EFFLUENT RELEASES FOR (01103 - 12103)

Page 2 of 4 CONTINUOUS MODE BATCH MODE 1ST 2ND 1ST 2ND NUCLIDES RELEASED UNITS QUARTER QUARTER QUARTER QUARTER Dissolved & Entrained Noble Gases:

Xenon- 133 Ci 3.OOE-04 N/D NID N/A Xenon- 133m CI N/D NID NID N/A Xenon- 135 Ci N/D *NID NID N/A Xenon- 135m Cl NID NID NID N/A Other (Specify) Ci N/D NID NID N/A Ar-41 ( t 1/2 < 8 days) Ci N/D N/D N/D N/A Kr-85 Ci N/D ND N/D N/A Total for Period Ci 3.OOE-04 N/D NID N/A Tritium Ci 1.85E+02 7.52E+01 N/D N/A Gross Alpha Ci 2.35E-04 N/D N/D N/A

TABLE 2B NORTH ANNA POWER STATION ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT LIQUID EFFLUENT RELEASES FOR (01/03 - 12/03)

Page 3 of 4 CONTINUOUS MODE BATCH MODE 3RD 4TH 3RD 4TH NUCLIDES RELEASED UNITS QUARTER QUARTER QUARTER QUARTER Fission & Activation Products:

Manganese - 54 Cl N/D N/D N/A N/A Iron - 55 Ci 1.97E-02 3.91 E-03 N/A N/A Cobalt - 58 Ci 3.94E-04 1.37E-04 N/A N/A Cobalt - 60 Ci 4.36E-03 1.68E-03 N/A N/A Strontium - 89 Ci N/D N/D N/A N/A Strontium - 90 Ci N/D N/D N/A N/A Niobium - 95 Ci N/D N/D N/A N/A Ruthenium- 106 Ci N/D N/D N/A N/A Silver - 11 Om Cl 2.66E-04 7.56E-04 N/A N/A Iodine - 131 Ci N/D N/D N/A N/A Iodine - 133 Cl N/D N/D N/A N/A Cesium- 134 Ci 2.34E-05 N/D N/A N/A Cesium - 137 Ci 1.97E-04 5.10E-05 N/A N/A Barium-Lathanum - 140 Ci N/D N/D N/A N/A Cerium- 141 Ci N/D N/D N/A N/A Antimony- 124 Cl 1.34E-03 N/D N/A N/A Antimony - 125 Cl 2.29E-02 9.84E-03 N/A N/A Other (Specify)

Technetium - 99m fT 1/2 < 8 days) Ci 3.27E-04 N/D N/A N/A Molybdenum - 99 Ci 3.27E-04 N/D N/A N/A Total for Period Ci 4.982-02 1.64E-02 N/A N/A

TABLE 2B NORTH ANNA POWER STATION ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT LIQUID EFFLUENT RELEASES FOR (01103 - 12103)

Page 4 of 4 CONTINUOUS MODE BATCH MODE 3RD 4TH 3RD 4TH NUCLIDES RELEASED UNITS QUARTER QUARTER QUARTER QUARTER Dissolved & Entrained Noble Gases:

Xenon -133 Ci N/D N/D N/A N/A Xenon - 133m Ci N/D N/D N/A N/A Xenon -135 Ci N/D N/D N/A N/A Xenon- 135m Ci N/D N/D N/A N/A Other (Specify)

Argon -41 CI N/D N/D N/A N/A Krypton -85 Ci NID N/D N/A N/A Total for Period CI N/D N/D N/A N/A Tritium Ci 6.87E+01 1.19E+01 N/A N/A Gross Alpha Ci N/D N/D N/A N/A

TABLE 3 NORTH ANNA POWER STATION RADIOACTIVE EFFLUENT RELEASE REPORT SUMMATION OF SOLID RADIOACTIVE WASTE AND IRRADIATED FUEL SHIPMENTS FOR 01-01-03 THROUGH 12-31-03 Page 1 of 2 A. SOLID WASTE SHIPPED OFFSITE FOR BURIAL OR DISPOSAL (NOT IRRADIATED FUEL) 12-Month Estimated Total

1. Type of Waste Unit Period Percent Error (%)

m 3 2.15E+01* 2.50E+01

a. Spent resins, sludges, filters sludge, evaporator bottoms, etc., Ci 3.37E+02 2.50E+01 rn3 3.81 E+02** 2.50E+01
b. Dry compressible waste, contaminated equipment, etc., Ci 1.23E+01 2.50E+01
c. Irradiated components, control rods, m 3 7.74E+01*** 2.50E+01 etc., Ci 3.81E+01 2.50E+01
d. Other (describe) m 3 1.45E+01 2.50E+01 Waste Oil & Fluids I Sewage I Blast Media Ci 7.81 E-05 2.50E+01
2. Estimate of major nuclide composition Estimated Total (by type of waste) (%) (Ci) Percent Error (%)
a. Ni-63 33.78% 1.14E+02 2.50E+01 Cs-137 17.31% 5.84E+01 2.50E+01 Co-60 14.70% 4.96E+01 2.50E+01 Fe-55 10.46% 3.53E+01 2.50E+01 Cs-134 9.84% 3.32E+01 2.50E+01 Co-58 9.45% 3.19E+01 2.50E+01 Mn-54 1.77% 5.97E+00 2.50E+01 Sb-125 1.35% 4.54E+00 2.50E+01 Ni-59 0.27% 8.99E-01 2.50E+01 H-3 0.22% 7.44E-01 2.50E+01
b. Fe-55 45.22% 5.56E+00 2.50E+01 Co-60 22.77% 2.80E+00 2.50E+01 Ni-63 12.77% 1.57E+00 2.50E+01 Cr-51 6.64% 8.16E-01 2.50E+01 Co-58 4.70% 5.78E-01 2.50E+01 Nb-95 2.25% 2.77E-01 2.50E+01 Mn-54 1.73% 2.13E-01 2.50E+01 Zr-95 1.19% 1.46E-01 2.50E+01 Cs-137 1.03% 1.27E-01 2.50E+01 Sb-125 0.43% 5.30E-02 2.50E+01 Cs-134 0.39% 4.74E-02 2.50E+01 Zn-65 0.09% 1.11 E-02 2.50E+01
c. Fe-55 50.60% 1.93E+01 2.50E+01 Co-60 20.84% 7.95E+00 2.50E+01 Ni-63 14.63% 5.58E+00 2.50E+01 Co-58 5.09% 1.94E+00 2.50E+01 Cr-51 2.91% 1.10E+00 2.50E+01 Nb-95 2.58% 9.87E-01 2.50E+01 Zr-95 1.24% 4.74E-01 2.50E+01 Mn-54 1.10% 4.19E-01 2.50E+01 Ni-59 0.12% 4.66E-02 2.50E+01 Cs-137 0.12% 4.58E-02 2.50E+01

TABLE 3 NORTH ANNA POWER STATION RADIOACTIVE EFFLUENT RELEASE REPORT SUMMATION OF SOLID RADIOACTIVE WASTE AND IRRADIATED FUEL SHIPMENTS FOR 01-01-03 THROUGH 12-31-03 Page 2 of 2 A. SOLID WASTE SHIPPED OFFSITE FOR BURIAL OR DISPOSAL (NOT IRRADIATED FUEL) [cont.]

2. Estimate of major nuclide compostion Estimated Total (by type of waste) [cont.] (%) (Ci) Percent Error (%)
d. H-3 89.21% 6.97E-05 2.50E+01 Co-60 8.54% 6.67E-06 2.50E+01 Cs-137 1.52% 1.19E-06 2.50E+01 Cs-1 34 0.27% 2.10E-07 2.50E+01 Mn-54 0.21% 1.65E-07 2.50E+01
3. Solid Waste Disposition Number of Shipments Mode of Transportation Destination 5 Truck Barnwell, SC 10 Truck Oak Ridge, TN (Duratek) 2 Truck Clive, Utah (Envirocare)

B. Irradiated Fuel Shipments (Disposition)

Number of Shipments Mode of Transportation Destination No shipments of Irradiatiated Nuclear Fuel were made in 2003.

  • (2) shipments containing resins were shipped from North Anna to a licensed waste processor for processing and/or volume reduction.
    • (7) shipments containing contaminated equipment, dry compressible waste / incinerable waste were shipped to a licensed waste processor for processing and/or volume reduction.

(1) shipment containing irradiated components was shipped to a licensed waste processor for processing and/or volume reduction.

(2) shipments containing soil and other material were shipped to a licensed waste processor for volume reduction.

ATTACHMENT 2 ANNUAL AND QUARTERLY DOSES (01/03 - 12/03)

An assessment of radiation doses to the maximum exposed member of the public due to radioactive liquid and gaseous effluents released from the site for each calendar quarter for the calendar year of this report, along with an annual total of each effluent pathway will be made as required by ODCM Section 6.7.2.

1st 2nd 3rd 4th 4 Annual nllert4- no-4-o  %. .,- rnr t .,t. .. - Ta*.f

%KUdlLI ILIaI LII t MCUa. L~I %KUdlLVI I ULdI Total Body Dose (mrem) 8.09E-2 3.12E-2 2.54E-2 4.48E-3 1.42E-1 Critical Organ Dose (mrem) 1.54E-1 4.91 E-2 2.98E-2 5.47E-3 2.38E-1 1st 2nd 3rd 4th Annual Quarter Quarter Quarter Quarter Total Noble Gas Gamma Dose (mrad) 1.03E-3 1.65E-5 5.32E-6 7.31E-6 1.06E-3 Noble Gas Beta Dose (mrad) 4.44E-3 6.61 E-4 9.29E-6 4.03E-5 5.1 5E-3 Critical Organ Dose for 1-131, 1-133, H-3, 9.18E-3 8.50E-4 6.59E-4 9.29E-4 1.16E-2 Particulates with T% > 8 days (mrem) 6

ATTACHMENT 3 REVISIONS TO OFFSITE DOSE CALCULATION MANUAL (ODCM)

(01/03 - 12/03)

As required by Technical Specification 6.15, revisions to the ODCM, effective for the time period covered by this report, are summarized in this attachment.

There were two revisions made to the ODCM in 2003.

Revision 6 revised the Radioactive Gaseous Waste Sampling and Analysis Program to reference the Boron Recovery Tank (BRT) vent as an additional gaseous release type. This revision also clarified the conditions under which the Condenser Air Ejector and Steam Generator Blowdown are required to be sampled.

Revision 7 deleted the reference to Radiation Monitors 1-GW-RM-102, 1-VG-RM-1 04, and 1-VG-RM-113, which were physically removed by DCP 99-006. Revised Environmental Sampling Location, Sturgeon's Creek Marina to correct the distance from Unit 1.

7

ATTACHMENT 4 MAJOR CHANGES TO RADIOACTIVE LIQUID, GASEOUS, AND SOLID WASTE TREATMENT SYSTEMS (01/03 - 12/03)

As required by the ODCM, Section 6.7.2.a.4, major changes to radioactive liquid, gaseous and solid waste treatment systems for the time period covered by this report are synopsized in this attachment. Supporting information as to the reason(s) for the change(s) and a summary of the 10 CFR 50.59 evaluations are included, as applicable.

There was one major change to radioactive liquid, gaseous, and solid waste treatment systems for 2003.

In 2002 DCP 99-006 replaced the Kaman Ventilation Radiation Monitoring Systems with new equipment manufactured by MGPI. In addition, when fully completed, DCP 99-006 will decommission redundant, but obsolete effluent gas monitors,1 -GW-RM-1 02, 1-VG-RM-1 04,1 -VG-RM-113 and associated high range monitors 1-GW-RM-173, 1-VG-RM-174, and 1-VG-RM-175. It was originally anticipated that this would be completed in 2002.

However, delays during replacement of the old Kaman System with the new MGPI monitors prevented this. 1-GW-RM-102 and 1-GW-RM-173 were removed in 2003. 1-VG-RM-104, 1-VG-RM-113 and associated high range monitors 1-VG-RM-174 and 1-VG-RM-175 are expected to be removed in 2004. Safety Evaluation 01-SE-MOD-02 was prepared and approved for DCP 99-006.

A review has been made of the methodologies used in this DCP, of the implementation of the DCP and of the changes that this implementation will have upon the UFSAR. In each case, the probability of occurrence or consequences of an accident or malfunction of equipment important to safety previously evaluated in the safety analysis report will not be increased. Also, the possibility for an accident or malfunction of a different type than any evaluated previously in the safety analysis report will not be created, nor will the margin of safety as defined in the basis for any technical specification be reduced.

8

ATTACHMENT 5 INOPERABILITY OF RADIOACTIVE LIQUID AND GASEOUS EFFLUENT MONITORING INSTRUMENTATION (01/03 - 12/03)

As required by the ODCM, Sections 6.2.2.b.2 and 6.3.2.b.3, a list and explanation for extended inoperability of radioactive liquid and/or gaseous effluent monitoring instrumentation is provided in this attachment.

1-RM-SW-108 was out-of-service from 01 January 2003 until 20 March 2003. The cause of this condition was due to flow problems with the sample lines. During this time grab samples were taken during releases to ensure no radioactivity was being released. Following cleaning of the sample lines to the radiation monitor, the monitor was returned to service.

1-GW-RM-102 was out-of-service from 01 July 2003 until 17 October 2003 due to its removal as part of DCP 99-006. Revision 7 to the VPAP-2103N, Offsite Dose Calculation Manual deleted the requirement to have this monitor operational, since it was removed as part of the DCP.

9

ATTACHMENT 6 UNPLANNED RELEASES (01/03 - 12103)

As required by the ODCM, Section 6.7.2.a.3, a list of unplanned releases, from the site to unrestricted areas, of radioactive material in gaseous and liquid effluents occurring during the reporting period, is made in this attachment.

There were one unplanned gaseous release and one unplanned liquid release during 2003. Neither of these releases were of a magnitude to require inclusion in the annual report. However, based on the fact that both were unmonitored at the time of their occurrence, RP supervision decided to include these releases under the requirement of ODCM, section 6.7.2.a.3 bullet number 4. These are described below.

Noble gases were detected during routine sampling of "B" BRT vent. Xe-133 @ 5.05E-5 gCi/mL, Xe-133m

@ 7.48E-7 pCi/mL and Xe-135 @ 5.02E-4 pCi/mL. In addition H-3 was detected at an elevated level, 1.12E-6 gCi/mL. This occurred during draining of "A" loop. The Operations Department was notified and draining of the loop to the BRT was stopped. Investigation determined that 1-GW-TV-106 (Equipment Vent to Process Vents), 1-GW-TV-1 13 (LW tanks to Process Vents), and 1-GW-TV-1 14 (BRT to Process Vents), were most likely closed by the "J" bus loss of voltage PTs performed on 2-24-03.

Based on this investigation, the release duration was assumed to have begun on February 24, 2003 @

04:27 and terminated on February 25, 2003 @ 11:16. The volume released was assumed to be the volume pumped to the BRT during this period, 1.86E+6 mLs. Total activity released was calculated to be slightly less than 0.01 Ci over the entire duration of the release. The unplanned release calculation estimated that the average dose from the activity released through the BRT vent was 4.97E-5 %TS Total Body; 1.98E-5 %TS Skin; and 1.31 E-6 %TS Critical Organ. These are tabulated by nuclide below.

I 03-AGR-04 Average Release Rate Results l Dose Rate (mrem/yr)  % Technical Specifications Nuclide Ci Ci/sec Total Skin Critical Total Sk- Critical Body Organ Body in Organ H-3 2.08E+2 1.88E-3 N/A N/A 1.97E-5 N/A N/A 1.31 E-6 Xe-133m 1.39E+2 1.25E-3 2.92E-6 1.58E-5 N/A 5.84E-7 5.27E-7 N/A Xe-133 9.40E+3 8.47E-2 2.31 E-4 5.47E-4 N/A 4.62E-5 1.82E-5 N/A Xe-135 9.35E+1 8.42E-4 1.42E-5 3.12E-5 N/A 2.84E-6 1.04E-6 N/A TOTALS 9.84E+3 8.87E-2 2.48E-4 5.94E-4 I1.97E-5 4.97E-5 1.98E-5 1.31 E-6 10

ATTACHMENT 6 UNPLANNED RELEASES (01103 - 12103)

Periodic tests 1-PT-83.2 and 1-PT-83.4J have been revised to incorporate instructions concerning the status of these valves following performance of the test. These procedures were approved and posted as of 11-6-03.

The liquid unplanned release is described below.

On 03/17/2003 it was discovered that that two concurrent releases were occurring from the service water system from different locations. Both releases were via pathways in which no continuous liquid effluent monitor was monitoring the release. RP personnel responsible for analyses were aware of only one of these releases. Samples were being obtained from one release point, but not the other. Upon discovery that there were two different release points, the release not being sampled was immediately terminated; samples were requested; and analysis by RP personnel indicated the release to the storm drains contained low levels of Co-58 and Cs-1 37. An investigation revealed that the cause of the event was due to inadequate procedural guidance and inadequate communications.

The total activity released was less than 0.04 ItCi, and the total percent technical specifications was 1.21 E-6 %TS. The data are summarized in the table below.

I 03-ALR-01 Summary 1 ACW* Volume Dilution %Tehca Nuclide pCimL ACW* Released PCi Water  % Technical Fraction (mLs) (mLs) Specifications Co-58 1.12E-7 2E-4 5.60E-4 2.08E+5 2.33E-2 1.11E+11 1.05E-7 Cs-137 5.92E-8 I1 E-5 5.92E-3 2.08E+5 1.23E-2 1.11E+11 1.11 E-6 TOTALS 1.71 E-7 N/A 6.48E-3 2.08E+5 3.56E-2 1.IIE+11 1.21 E-6

  • 10 times the ECW of Appendix B to 10CFR20. See VPAP-2103N 6.2.1.c.

In order to prevent recurrence of a similar event in the future, actions to improve communication and procedural guidance were taken. A count room electronic turnover log was established to ensure adequate communication between count room personnel. Procedures and periodic tests were screened by the NSS, Maintenance, and Operations departments to determine those which did not contain adequate guidance regarding sampling and analysis requirements. A total of ten procedures and periodic tests were revised to provide guidance regarding sampling and analysis requirements.

11

ATTACHMENT 7 LOWER LIMITS OF DETECTION FOR EFFLUENT SAMPLE ANALYSIS (01/03 - 12103)

Gaseous Effluents:

Required L.L.D. Typical L.L.D.

Radioisotope (PCi/mI) (PCilml)

Krypton - 87 1.OOE-4 1.50E-8 - 4.90E-8 Krypton - 88 1.OOE-4 2.OOE-8 - 4.30E-8 Xenon - 133 1.OOE-4 2.OOE-8 - 3.80E-8 Xenon - 133m I.OOE-4 8.OOE-8 - 1.30E-7 Xenon - 135 1.OOE-4 9.20E9 - 1.50E-8 Xenon - 135m 1.OOE-4 9.50E-9 - 1.60E-8 Xenon - 138 1.OOE-4 1.50E-8 - 3.80E-8 Iodine - 131 1.OOE-12 1.60E-14 - 1.50E-13 Iodine - 133 1.OOE-10 2.OOE-14 - 1.OOE-13 Manganese - 54 1.OOE-11 1.68E-14 - 3.60E-14 Cobalt - 58 1.OOE-11 1.46E-14 - 4.20E-14 Iron - 59 1.OOE-11 9.90E:15 - 1.75E-14 Cobalt - 60 1.OOE-11 9.20E-15 - 2.50E-14 Zinc- 65 1.OOE-11 1.OOE-14 - 2.60E-14 Strontium - 89 1.OOE-11 7.60E-14 - 1.OOE-13 Strontium - 90 1.OOE-11 8.OOE-15 - 1.10E-14 Molybdenum - 99 1.OOE-11 1.50E-14 - 2.90E-14 Cesium - 134 1.OOE-11 8.70E-15 - 1.60E-14 Cesium - 137 1.OOE-11 1.2)E-14 - 2.OOE-14 Cerium - 141 1.OOE-11 9.OOE-15 - 1.70E-14 Cerium - 144 1.OOE-11 1.OOE-14 - 7.OOE-13 Gross Alpha 1.OOE-11 2.20E-15 - 6.OOE-15 Tritium 1.OOE-6 7.OOE-8 - 1.70E-7 12

ATTACHMENT 7 LOWER LIMITS OF DETECTION FOR EFFLUENT SAMPLE ANALYSIS (01/03 - 12/03)

Liquid Effluents:

Required L.L.D. Typical L.L.D.

Radioisotope (PCilml) (iJCilml)

Krypton - 87 1.OOE-5 1.60E-8 - 2.60E-8 Krypton - 88 1.OOE-5 2.OOE-8 - 5.OOE-8 Xenon - 133 1.OOE-5 2.50E-8 - 5.OOE-8 Xenon - 133m 1.OOE-5 1.OOE-7 - 2.OOE-7 Xenon - 135 1.OOE-5 8.OOE-9 - 1.50E-8 Xenon - 135m 1.OOE-5 9.OOE-9 - 1.70E-8 Xenon - 138 1.OOE-5 3.50E-8 - 5.OOE-8 Iodine - 131 1.OOE-6 1.OOE-8 - 2.OOE-8 Manganese - 54 5.OOE-7 9.OOE-9 - 1.OOE-8 Iron - 55 1.OOE-6 1.OOE-7 - 4.OOE-7 Cobalt - 58 5.OOE-7 1.OOE-8 - 2.OOE-8 Iron - 59 5.OOE-7 1.20E-8 - 3.OOE-8 Cobalt - 60 5.OOE-7 I.OOE-8 - 2.OOE-8 Zinc- 65 5.OOE-7 1.30E-8 - 2.50E-8 Strontium - 89 5.OOE-8 3.OOE-8 - 4.20E-8 Strontium - 90 5.OOE-8 1.OOE-8 - 2.90E-8 Molybdenum - 99 5.OOE-7 4.OOE-8 - 6.OOE-8 Cesium - 134 5.OOE-7 1.OOE-8 - 2.OOE-8 Cesium - 137 5.OOE-7 1.50E-8 - 3.OOE-8 Cerium - 141 5.OOE-7 1.60E-8 - 3.OOE-8 Cerium - 144 5.OOE-7 8.OOE-8 - 1.50E-7 Gross Alpha 1.OOE-7 2.50E-8 - 8.OOE-8 Tritium 1.OOE-5 3.50E-6 - 5.OOE-6 13

  1. n Station Administrative Dotminions Procedure

Title:

Offsite Dose Calculation Manual (North Anna)

Process / Program Owner: Manager Radiological Protection (North Anna)

Procedure Number Revision Number Effective Date VPAP-2103N 7 On File Revision Summary Revised to delete reference to radiation monitors removed by North Anna DCP 99-006 and correct distance from Unit 1 on Environmental Sampling Locations (Attachment 10) Sturgeon's Creek Marina (location 05A and N-2/34) from 3.20 miles to 2.04 miles.

Details:

  • Revised to delete reference to radiation monitors (I -GW-RM- 102, 1-VG-RM- 104, and I-VG-RM- 1 13) removed by North Anna DCP 99-006 (revised 6.3.2.c, Attachment 6 1(a), 3(a),

4(a), Note 3, and Attachment 7 1(a), 3(a), 4(a)).

  • Revised Environmental Sampling Locations (Attachment 10) to correct distance from Unit I for Sturgeon's Creek Marina (location 05A and N-2/34) from 3.20 miles to 2.04 miles.

North Anna Radiological Protection is required to submit each revision of this procedure to the Management Safety Review Committee (MSRC) Coordinator.

Approvals on File

DOMINION VPAP-2103N REVISION 7 PAGE 2 OF 84 TABLE OF CONTENTS Section Page 1.0 PURPOSE 5 2.0 SCOPE 5

3.0 REFERENCES

/ COMMITMENT DOCUMENTS 6 4.0 DEFINITIONS 7 5.0 RESPONSIBILITIES 11 6.0 INSTRUCTIONS 12 6.1 Sampling and Monitoring Criteria 12 6.2 Liquid Radioactive Waste Effluents 12 6.2.1 Liquid Effluent Concentration Limitations 12 6.2.2 Liquid Monitoring Instrumentation 13 6.2.3 Liquid Effluent Dose Limit 16 6.2.4 Liquid Radwaste Treatment 18 6.2.5 Liquid Sampling 19 6.3 Gaseous Radioactive Waste Effluents 19 6.3.1 Gaseous Effluent Dose Rate Limitation 19 6.3.2 Gaseous Monitoring Instrumentation 22 6.3.3 Noble Gas Effluent Air Dose Limit 25 6.3.4 1-131, 133, H-3 & Radionuclides In Particulate Form Effluent Dose Limit 27 6.3.5 Gaseous Radwaste Treatment 29 6.4 Radioactive Liquid and Gaseous Release Permits 31 6.4.1 Liquid Waste Batch Release Pcrmits 31 6.4.2 Continuous Releasc Pcnnit 31 6.4.3 Waste Gas Decay Tank (WGDT) Release Pennit 32 6.4.4 Reactor Containment Release Permits 32 6.4.5 Miscellaneous Gaseous Release Permit 32

DOMINION VPAP-2 103N REVISION 7 PAGE 3 OF 84 TABLE OF CONTENTS (continued)

Section Page 6.4.6 Radioactive Liquid and Gaseous Release Controls 32 6.5 Total Dose Limit to Public From Uranium Fuel Cycle Sources 34 6.6 Radiological Environmental Monitoring 34 6.6.1 Monitoring Program 34 6.6.2 Land Use Census 36 6.6.3 Interlaboratory Comparison Programr 37 6.7 Reporting Requirements 38 6.7.1 Annual Radiological Environmental Operating Report 38 6.7.2 Annual Radioactive Effluent Release Report 39 6.7.3 Annual Meteorological Data 41 6.7.4 Changes to the ODCM - 42 7.0 RECORDS 43

DOMINION VPAP-2103N REVISION 7 PAGE 4 OF 84 TABLE OF CONTENTS (continued)

Section Page ATTACHMENTS 1 Radioactive Liquid Effluent Monitoring Instrumentation 44 2 Radioactive Liquid Effluent Monitoring Instrumentation Surveillance Requirements 46 3 Radioactive Liquid Waste Sampling and Analysis Program 48 4 Radioactive Gaseous Waste Sampling and Analysis Program 51 5 Gaseous Effluent Dose Factors 55 6 Radioactive Gaseous Effluent Monitoring Instrumentation 58 7 Radioactive Gaseous Effluent Monitoring Instrumentation Surveillance Requirements 61 8 Critical Organ Dose Factors 64 9 Radiological Environmental Monitoring Program 65 10 Environmental Sampling Locations 70 11 Detection Capabilities for Environmental Sample Analysis 74 12 Reporting Levels for Radioactivity Concentrations in Environmental Samples 76 13 Meteorological, Liquid, and Gaseous Pathway Analysis 77

DOMINION VPAP-2103N REVISION 7 PAGE 5 OF 84 1.0 PURPOSE The Offsite Dose Calculation Manual (ODCM) establishes requirements for the Radioactive Effluent and Radiological Environmental Monitoring Programs. Methodology and parameters are provided to calculate offsite doses resulting from radioactive gaseous and liquid effluents, to calculate gaseous and liquid effluent monitoring alarm / trip setpoints, and to conduct the Environmental Monitoring Program. Requirements are established for the Annual Radiological Environmental Operating Report and the Annual Radioactive Effluent Release Report required by Station Technical Specifications. Calculation of offsite doses due to radioactive liquid and gaseous effluents are performed to assure that:

  • Concentration of radioactive liquid effluents to the unrestricted area will be limited to ten times the effluent concentration values of 10 CFR 20, Appendix B, Table 2, Column 2, for radionuclides other than dissolved or entrained noble gases and 2E-4 piCi/ml for dissolved or entrained noble gases.
  • Exposure to the maximum exposed member of the public in the unrestricted area from radioactive liquid effluents will not result in doses greater than the liquid dose limits of 10 CFR 50, Appendix I
  • Dose rate at and beyond the site boundary from radioactive gaseous effluents will be limited to:

Noble gases - less than or equal to a dose rate of 500 mrem/yr to the total body and less than or equal to a dose rate of 3000 mrem/yr to the skin

  • 1131, and H3 , and all radionuclides in particulate form with half-lives greater than 8 days - less than or equal to a dose rate of 1500 mrem/yr to any organ
  • Exposure from radioactive gaseous effluents to the maximum exposed member of the public in the unrestricted area will not result in doses greater than the gaseous dose limits of 10 CFR 50, Appendix 1,and
  • Exposure to a real individual will not exceed 40 CFR 190 dose limits 2.0 SCOPE This procedure applies to the Radioactive Effluent and Environmcntal Monitoring Programs at North Anna Power Station.

DOMINION VPAP-2103N REVISION 7 PAGE 6 OF 84

3.0 REFERENCES

/ COMMITMENT DOCUMENTS 3.1 References 3.1.1 10 CFR 20, Standards for Protection Against Radiation 3.1.2 10 CFR 50, Domestic Licensing of Production and Utilization Facilities 3.1.3 40 CFR 190, Environmental Radiation Protection Standards for Nuclear Power Operations 3.1.4 TID- 14844, Calculation of Distance Factors for Power and Test Reactor Sites 3.1.5 Regulatory Guide 1.21, Measuring, Evaluating, and Reporting Radioactivity in Solid Wastes and Releases of Radioactive Materials in Liquid and Gaseous Effluents from Light-Water-Cooled Nuclear Power Plants, Rev. 1, U.S. NRC, June 1974 3.1.6 Regulatory Guide 1.109, Calculation of Annual Doses to Man From Routine Releases of Reactor Effluents for the Purpose of Evaluating Compliance With 10 CFR 50, Appendix 1, Rev. I, U.S. NRC, October 1977 3.1.7 Regulatory Guide 1.11 1, Methods for Estimating Atmospheric Transport and Dispersion of Gaseous Effluents in Routine Releases from Light-Water-Cooled Reactors, Rev. 1, U.S. NRC, July 1977 3.1.8 North Anna Technical Specifications 3.1.9 North Anna Technical Requirements Manual (TRM) 3.1.10 NUREG-0324, XOQDOQ, Program for the Meteorological Evaluation of Routine Effluent Releases at Nuclear Power Stations, U.S. NRC, September 1977 3.1.11 NUREG/CR-1276, Users Manual for the LADTAP 11 Program, U.S. NRC, May, 1980 3.1.12 TID4500, VCRL-50564, Rev. 1, Concentration Factors of Chemical Elements in Edible Aquatic Organisms, October, 1972 3.1.13 WASH 1258, Vol.2, July 1973, Numerical Guides for Design Objectives and Limiting Conditions for Operation to Meet the Criterion "As Low As Practicable" For Radioactive Material in Light Water-Cooled Nuclear Power Reactor Effluents 3.1.14 NUREG-0597, User's Guide to GASPAR Code, U.S. NRC, June, 1980 3.1.15 Radiological Assessment Branch Technical Position on Environmental Monitoring, November, 1979, Rev. I 3.1.16 NUREG-0 133, Preparation of Radiological Effluent Technical Specifications tor Nuclear Power Stations, October, 1978 3.1.17 NUREG-0543, February 1980, Methods for Demonstrating LWR Compliance With the EPA Uranium Fuel Cycle Standard (40 CFR Part 190) 3.1.18 NUREG-0472, Standard Radiological Effluent Technical Specifications for Pressurized Water Reactors, Proposed Rev. 3, March 1982

DOMINION VPAP-2103N REVISION 7 PAGE 7 OF 84 3.1.19 Environmental Measurements Laboratory, DOE HASL 300 Manual 3.1.20 NRC Generic Letter 89-01, Implementation of Programmatic Controls for Radiological Effluent Technical Specifications (RETS) in the Administrative Controls Section of the Technical Specifications and the Relocation of Procedural Details of RETS to the Offsite Dose Calculation Manual or to the Process Control Program 3.1.21 North Anna UFSAR 3.1.22 Nuclear Reactor Environmental Radiation Monitoring Quality Control Manual, IWL-0032-361 3.1.23 VPAP-2802, Notifications and Reports 3.1.24 North Anna Circulating Water System Modifications

a. DC-85-37-1 Unit I
b. DC-85-38-2 Unit 2 3.1.25 Plant Issue (Deviation) N- 1994-1137, Improper Placement of Emergency TLDs 3.2 Commitment Documcnts 3.2.1 Quality Assurance Audit Report Number C 90-22, Management Safety Review Committee, Observation 03C, January 17, 1991 3.2.2 Quality Assurance Audit Report Number 91-03, Observation 08N 3.2.3 Quality Assurance Audit Report Number 92-03, Observation 02N 3.2.4 Quality Assurance Audit Report Number 92-03, Observation 04NS (Item 2) 3.2.5 Plant Issue (Deviation) N-1997-0926, Annual Radiological Effluent Release Report 4.0 DEFINITIONS 4.1 Channel Calibration A channel calibration shall be the adjustment, as necessary, of the channel output such that it responds within the necessary range and accuracy to known values of the parameter that the channel monitors. The channel calibration shall encompass all devices in the channel required for channel operability. The channel calibration may be performed by means of any series of sequential, overlapping, or total channel steps.

4.2 Channel Check A qualitative assessment, by observation, of channel behavior during operation. This assessment includes, where possible, comparison of the channel indication and status with other indications or status derived from independent instrumentation channels measuring the same parameter.

DOMINION VPAP-2 103N REVISION 7 PAGE 8 OF 84 4.3 Channel Operational Test A Channel Operational Test (COT) shall be the injection of a simulated or actual signal into the channel as close to the sensor as practicable to verify OPERABILITY of all devices in the channel required for channel OPERABILITY. The COT shall include adjustments, as necessary, of the required alarm, interlock, and trip setpoints required for channel OPERABILITY such that sctpoints are within the necessary range and accuracy. The COTmay be performed by means of any series of sequential, overlapping, or total channel steps.

4.4 Critical Organ That organ, which has been determined to be the maximum exposed organ based on an effluent pathway analysis, thereby ensuring the dose and dose rate limitations to any organ will not be exceeded. Dose calculations to the critical organ will be evaluated in accordance with Technical Specifications 5.5.4 dose rate limits specified for any organ to verify these limits have not been exceeded.

4.5 Dose Equivalent 1-131 That concentration of 1131 (pCi/cc) that alone would produce the same thyroid dose as the quantity and isotopic mixture of 113 1, 1132, 1133, 1134, and 1135 actually present. Thyroid dose conversion factors for this calculation are listed in Table III of TID-14844, Calculation of Distance Factors for Power and Test Reactor Sites. Thyroid dose conversion factors from NRC Regulatory Guide 1.109, Revision l, may be used.

DOMINION VPAP-2 103N REVISION 7 PAGE 9 OF 84 4.6 Frequency Notations NOTE: Frequencies are allowed a maximum extension of 25 percent.

NOTATION FREQUENCY D - Daily At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> W - Weekly At least once per 7 days M - Monthly At least once per 31 days Q - Quarterly At least once per 92 days SA - Semi-annually At least once per 184 days R - Refueling At least once per 18 months S/U - Start-up Prior to each reactor start-up P - Prior to release Completed prior to each release N.A. - Not applicable Not applicable DR - During the release At least once during each release 4.7 Gaseous Radwaste Treatment System A system that reduces radioactive gaseous effluents by collecting primary coolant system offgases from the primary system and providing delay or holdup to reduce total radioactivity prior to release to the environment. The system comprises the waste gas decay tanks, regenerative heat exchanger, waste gas charcoal filters, process vent blowers, waste gas surge tanks, and waste gas diaphragm compressor.

4.8 General Nomenclature X = Chi: concentration at a point at a given instant (curies per cubic meter)

D = Deposition: quantity of deposited radioactive material per unit area (curies per square meter)

Q = Source strength (instantaneous; grams, curies)

= Emission rate (continuous; grams per second, curies per second)

= Emission rate (continuous line source; grams per second per meter) 4.9 Lower Limit of Detection (LLD)

The smallest concentration of radioactive material in a sample that will yield a net count (above system background) that can be detected with 95 percent probability with only five percent probability of falsely concluding that a blank observation represents a "real" signal.

DOMINION VPAP-2103N REVISION 7 PAGE 10 OF 84 4.10 Members of the Public Individuals who, by virtue of their occupational status, have no formal association with the Station. This category includes non-employees of Dominion who are permitted to use portions of the site for recreational, occupational, or other purposes not associated with Station functions. This category does not include non-employees such as vending machine servicemen or postal workers who, as part of their formal job function, occasionally enter an area that is controlled by Dominion to protect individuals from exposure to radiation and radioactive materials.

4.11 Operable - Operability A system, subsystem, train, component, or device is operable or has operability when it is capable of performing its specified functions and all necessary, attendant instrumentation, controls, normal and emergency electrical power sources, cooling or seal water, lubrication or other auxiliary equipment that are required for the system, subsystem, train, component, or.

device to perform its functions are also capable of performing their related support functions.

4.12 Purge - Purging Controlled discharge of air or gas from a confinement to maintain temperature, pressure, humidity, concentration, or other operating condition, so that replacement air or gas is required to purify the confinement.

4.13 Rated Thermal Power Total reactor core heat transfer rate to reactor coolant (i.e., North Anna - 2893 MWt).

4.14 Site Boundary The line beyond which Dominion does not own, lease, or otherwise control the land.

4.15 Source Check A qualitative assessment of channel response when a channel sensor is exposed to radiation.

This applies to installed radiation monitoring systems.

4.16 Special Report A report to NRC to comply with Subsections 6.2, 6.3, or 6.5 of this procedure. Also refer to VPAP-2802, Notifications and Reports.

4.17 Thermal Power Total reactor core heat transfer rate to the reactor coolant.

DOMINION VPAP-2 103N REVISION 7

-. is -PAGE 11 OF 84 4.18 Unrestricted Area Any area at or beyond the site boundary, access to which is neither limited nor controlled by Dominion for purposes of protection of individuals from exposure to radiation and radioactive materials, or any area within the site boundary used for residential quarters or for industrial, commercial, institutional and/or recreational purposes.

4.19 Ventilation Exhaust Treatment System A system that reduces gaseous radioiodine or radioactive material in particulate form in effluents by passing ventilation or vent exhaust gases through charcoal adsorbers and High Efficiency Particulate Air (HEPA) filters to remove iodines and particulates from a gaseous exhaust stream prior to release to the environment (such a system is not considered to have any effect on noble gas effluents). Engineered Safety Feature (ESF) atmospheric cleanup systems are not Ventilation Exhaust Treatment System components.

5.0 RESPONSIBILITIES 5.1 Manager Radiological Protection The Manager Radiological Protection is responsible for:

5.1.1 Establishing and maintaining procedures for surveying, sampling, and monitoring radioactive effluents and the environment.

5.1.2 Surveying, sampling, and analyzing plant effluents and environmental monitoring, and documenting these activities.

5.1.3 Analyzing plant effluent trends and recommending actions to correct adverse trends.

5.1.4 Preparing Effluent and Environmental Monitoring Program records.

5.2 Manager Nuclcar Operations The Manager Nuclear Operations is responsible for requesting samples, analyses, and authorization to release effluents.

DOMINION VPAP-2 103N REVISION 7 PAGE 12 OF 84 6.0 INSTRUCTIONS NOTE: Meteorological, liquid, and gaseous pathway analyses are presented in Meteorological, Liquid, and Gaseous Pathway Analysis (Attachment 13).

6.1 Sampling and Monitoring Criteria 6.1.1 Surveys, sampling, and analyses shall use instruments calibrated for the type and range of radiation monitored and the type of discharge monitored.

6.1.2 Installed monitoring systems shall be calibrated for the type and range of radiation or parameter monitored.

6.1.3 A sufficient number of survey points shall be used or samples taken to adequately assess the status of the discharge monitored.

6.1.4 Samples shall be representative of the volume and type of discharge monitored.

6.1.5 Surveys, sampling, analyses, and monitoring records shall be accurately and legibly documented, and sufficiently detailed that the meaning and intent of the records are clear.

6.1.6 Surveys, analyses, and monitoring records shall be reviewed for trends, completeness, and accuracy.

6.2 Liquid Radioactive Waste Effluents 6.2.1 Liquid Effluent Concentration Limitations

a. Liquid waste concentrations discharged from the Station shall not exceed the following limits:
1. For radionuclides (other than dissolved or entrained noble gases), liquid effluent concentrations released to unrestricted areas shall not exceed ten times the effluent concentration values specified in I0 CFR 20, Appendix B, Table 2, Column 2.
2. For dissolved or cntraincd noble gases, concentrations shall not exceed 2E-4 hiCi/ml.
b. If the concentration ofliquid effluent exceeds the limits in 6.2.1 .a., promptly reduce concentrations to within limits.

DOMINION VPAP-2 103N REVISION 7 PAGE 13 OF 84

c. Daily concentrations of radioactive materials in liquid waste released to unrestricted areas shall meet the following:

Volume of Waste Discharged + Volume of Dilution Water

- ,u1Ci/ml.

Volume of Waste Discharged x I, ACW where:

pCi/ml; = the concentration of nuclide i in the liquid effluent discharge ACWj = ten times the effluent concentration value in unrestricted areas of nuclide i, expressed as gCi/ml from 10 CFR 20, Appendix B, Table 2, Column 2 for radionuclides other than noble gases, and 2E-4 pCi/ml for dissolved or entrained noble gases 6.2.2 Liquid Monitoring Instrumentation

a. Radioactive Liquid Effluent Monitoring Instrumentation Radioactive liquid effluent monitoring instrumentation channels shown on Radioactive Liquid Effluent Monitoring Instrumentation (Attachment 1) shall be operable with their alarm / trip setpoints set to ensure that 6.2.1 .a. limits are not exceeded.

I. Alarm / trip setpoints of these channels shall be determined and adjusted in accordance with 6.2.2.d., Setpoint Calculation.

2. If a radioactive liquid effluent monitoring instrumentation channel alarm / trip setpoint is less conservative than required by 6.2.2.a., perform one of the following:
  • Promptly suspend release of radioactive liquid effluents monitored by the aftected channel
  • Change the setpoint to an acceptable, conservative value

DOMINION VPAP-2 103N

'I. REVISION 7 PAGE 14 OF 84

b. Radioactive Liquid Effluent Monitoring Instrumentation Operability Each radioactive liquid effluent monitoring instrumentation channel shall be demonstrated operable by performing a Channel Check, Source Check, Channel Calibration, and Channel Operational Test at the frequencies shown in Radioactive Liquid Effluent Monitoring Instrumentation Surveillance Requirements (Attachment 2).
1. If the number of operable channels is less than the minimum required by the tables in Radioactive Liquid Effluent Monitoring Instrumentation (Attachment
1) perform the action shown in those tables.
2. Attempt to return the instruments to operable status within 30 days. If unsuccessful, explain in the next Annual Radioactive Effluent Release Report why the inoperability was not corrected in a timely manner.
c. Applicable Monitors Liquid effluent monitors for which alarm / trip setpoints shall be determined are:

Release Point Instrument Number Liquid Radwaste Effluent Line I-LW-RM-I 11 Service Water System Effluent Line 1-SW-RM-108 Condenser Circulating Water Line I-SW-RM-130 2-SW-RM-230 Steam Generator High Capacity I-SS-RM-125 Blowdown Line 2-SS-RM-225

DOMINION VPAP-2103N REVISION 7 PAGE IS OF 84

d. Setpoint Calcuiation NOTE: This methodology does not preclude use of more conservative setpoints.
1. Maximum setpoint values shall be calculated by:

CFD S = F (2)

E where:

S = the setpoint, in gCi/ml, of the radioactivity monitor measuring the radioactivity concentration in the effluent line prior to dilution C = the effluent concentration limit for the monitor used to implement 10 CFR 20 for the Station, in gCi/ml FE = maximum design pathway effluent flow rate FD = dilution water flow rate calculated as:

D = FE + (218,000 gpm x number of cire. pumps in service)

2. Each ofthe condenser circulating water channels (e.g., SW-130, SW-230) monitors the effluent (service water, including component cooling service water, circulating water, and liquid radwaste) in the circulating water discharge tunnel beyond the last point of possible radioactive material addition. No dilution is assumed for this pathway. Therefore, Equation (2) becomes:

S = C (3)

The setpoint for Station monitors used to implement 10 CFR 20 for the site becomes the effluent concentration limit.

3. In addition, for added conservatism, setpoints shall be calculated for the liquid radwaste effluent line LW- I I I and the Service Water System effluent line SW-1(08.

DOMINION VPAP-2 103N REVISION 7 PAGE 16 OF 84

4. For the liquid radwaste effluent line, Equation (2) becomes:

CFDKLW FE (4)

BE where:

KLW = The fraction of the effluent concentration limit, used to implement 10 CFR 20 for the site, attributable to the liquid radwaste effluent line pathway

5. For the Service Water System effluent line, Equation (2) becomes:

CFDKSW FE (5)

FE where:

KSW = The fraction of the effluent concentration limit, used to implement 10 CFR 20 for the Station, attributable to the service water effluent line pathway

6. The sum KLW + KSW shall not be greater than 1.0.

6.2.3 Liquid Effluent Dose Limit

a. Requirement At least once per 31 days, perform the dose calculations in 6.2.3.c. to ensure the dose or dose commitment to the maximum exposed member of the public from radioactive materials in liquid releases (from each reactor unit) to unrestricted areas is limited to:
1. During any calendar quarter:
  • Less than or equal to 1.5 mrcm to the total body
  • Less than or equal to 5 mrcm to the critical organ
2. During any calendar year:
  • Less than or equal to 3 mrem to the total body
  • Less than or equal to I 0 mrcm to the critical organ

DOMINION VPAP-2 103N REVISION 7 PAGE 17 OF 84

b. Action If the calculated dose from release of radioactive materials in liquid effluents exceeds any of the above limits, prepare and submit to the NRC, within 30 days, a special report in accordance with VPAP-2802, Notifications and Reports, that identifies causes for exceeding limits and defines corrective actions taken to reduce releases of radioactive materials in liquid effluents to ensure that subsequent releases will be in compliance with the above limits.
e. Dose Contribution Calculations Dose contribution shall be calculated for all radionuclides identified in liquid effluents released to unrestricted areas based on:

D = jQ iXB. ( )

i Where:

Subscripts = i, refers to individual radionuclide D = the cumulative dose commitment to the total body or critical organ from the liquid effluents for the period t, in mrem Bi = Dose Commitment Factors (mrem/Ci) for each age group of interest.

Values for Bi are provided in code file for North Anna Power Station liquid pathway critical organ calculations Qi = Total released activity for the considered period and the ith nuclide Qi = t x Ci x Waste Flow (7)

Where:

t = the period for which C and F are averaged for all liquid releases, in hours C; = the average concentration ofradionuclide, i, in undiluted liquid effluent during the period, t, from any liquid releases, in pCi/ml

DOMINION VPAP-2 103N REVISION 7 PAGE 18 OF 84

d. Quarterly Composite Analyses For radionuclides not determined in each batch or weekly composite, dose contribution to current monthly or calendar quarter cumulative summation may be approximated by assuming an average monthly concentration based on previous monthly or quarterly composite analyses. However, for reporting purposes, calculated dose contribution shall be based on the actual composite analyses.

6.2.4 Liquid Radwaste Treatment Historical data pertaining to the volumes and radioactivity of liquid effluents released in connection with specific station functions, such as maintenance or refueling outages, shall be used in projections as appropriate.

a. Requirement
1. The Liquid Radwaste Treatment System shall be used to reduce the radioactive materials in liquid waste prior to discharge when projected dose due to liquid cffluent, from each reactor unit, to unrestricted areas would exceed 0.06 mrem to total body or 0.2 mrem to the critical organ in a 3 1-day period.
2. Doses due to liquid releases shall be projected at least once per 31 days.
b. Action If radioactive liquid waste is discharged without treatment and in excess of the above limits prepare and submit to the NRC, within 30 days, a special report in accordance with VPAP-2802, Notifications and Reports, that includes the following:
1. An explanation of why liquid radwaste was being discharged without treatment, identification of any inoperable equipment or sub-system, and the reason for the inoperability.
2. Actions taken to restore inoperable equipment to operable status.
3. Summary description of actions taken to prevent recurrcnce.
c. Projected Total Body Dose Calculation
1. Determine D*113, the total body dose trom liquid effluents in the previous 31 -day period, per Equation (6).

DOMINION VPAP-2103N REVISION 7 PAGE 19 OF 84

2. Estimate R1 , the ratio of the estimated volume of liquid effluent releases in the present 3 1-day period to the volume released in the previous 3 1-day period.
3. Estimate F1, the ratio of the estimated liquid effluent radioactivity concentration in the present 3 1-day period to liquid effluent concentration in the previous 3 1-day period (jiCi/ml).
4. Deternine PDTB, the projected total body dose in a 31-day period.

PDTB = DTB(RIFI) (8)

d. Projected Critical Organ Dose Calculation
1. Determine DO? the critical organ dose from liquid effluents in the previous 3 1-day period, per Equation (6).
2. Estimate RI as in 6.2.4.c.2.
3. Estimate F, as in 6.2.4.c.3.
4. Determine PDo = projected critical organ dose in a 3I-day period.

PD 0 = DO(RIFI) (9) 6.2.5 Liquid Sampling Radioactive liquid wastes shall be sampled and analyzed according to the sampling and analysis requirements in Radioactive Liquid Waste Sampling and Analysis Program (Attachment 3).

6.3 Gaseous Radioactive Waste Effluents 6.3.1 Gaseous Effluent Dose Rate Limitation

a. Requirement Dose rate due to radioactive materials released in gaseous effluents from the site to areas at and beyond the site boundary shall be limited to:
1. The dose rate limit for noble gases shall be < 500 mrcm/year to the total body and < 3000 mrem/year to the skin.

DOMINION VPAP-2 103N REVISION 7 PAGE 20 OF 84

2. The dose rate limit for l131, I133, for tritium, and for all radioactive materials in particulate form with half-lives greater than 8 days shall be < 1500 mrem/year to the critical organ.
b. Action
1. If dose rates exceed 6.3.1 .a. limits, promptly decrease the release rate to within the above limits.
2. Dose rates due to noble gases in gaseous effluents shall be determined, continuously, to be within 6.3.I.a. limits.
3. Dose rates due to 1131, I"', tritium, and all radionuclides in particulate form with half-lives greater than 8 days, in gaseous effluents shall be determined to be within the above limits by obtaining representative samples and performing analyses in accordance with the sampling and analysis program specified on Radioactive Gaseous Waste Sampling and Analysis Program (Attachment 4).

DOMINION VPAP-2103N REVISION 7 PAGE 21 OF 84

c. Calculations of Gaseous Effluent Dose Rates
1. The dose rate limit for noble gases shall be determined to be within the limit by limiting the release rate to the lesser of:

, [KiQivv + K jPVQipv] < 500mrem/yr to the total body (10) i OR I( .iw IMiw)Q6iw+(LiPV+ I. IMjpv)Qipv]<3000mrem/yrtotheskin (I

(I I) where:

Subscripts = W, refers to vent releases from the building ventilation vent pv, refers to the vent releases from the process vent; i, refers to individual radionuclide Ki%,v, Kipv = The total body dose factor for ventilation vents or process vent release due to gamma emissions for each identified noble gas radionuclide i, in mrem/yr per Curie/sec. Factors are listed in Gaseous Effluent Dose Factors (Attachment 5)

Liv, Lipv = The skin dose factor for ventilation vents or process vent release due to beta emissions for each identified noble gas radionuclide i, in mrem/yr per Curie/sec. Factors are listed in Gaseous Effluent Dose Factors (Attachment 5)

Mivv. Mipv = The air dose factor for ventilation vents or process vent release due to gamma emissions for each identified noble gas radionuclide, i, in mrad/yr per Curie/sec. Factors are listed in Gaseous Effluent Dose Factors (Attachment 5)

Qiv Qapv = The release rate for ventilation vents or process vent of noble gas radionuclide i, in gaseous effluents in Curie/sec (per site) 1.1 = The unit conversion factor that converts air dose to skin dose, in mrem/mrad

DOMINION VPAP-2103N REVISION 7 PAGE 22 OF 84

2. Thedoseratelimit forlI 31 , 133, tritium, and for all radionuclides in particulate form with half-lives greater than 8 days, shall be determined to be within the limit by restricting the release rate to:

A, [PivQivv + PipvQipv] l150Omrem/yr to the critical organ (12) where:

Pivv Ppv = The critical organ dose factor for ventilation vents or process vent for I13 1,1 33, H3 , and all radionuclides in particulate form with half-lives greater than 8 days, for the inhalation pathway, in mrem/yr per Curie/sec. Factors are listed in Gaseous Effluent Dose Factors (Attachment 5)

QivvQipv The release rate for ventilation vents or process vent of 1 31, I133, H3 , and all radionuclides i, in particulate form with half-lives greater than 8 days, in gaseous effluents in Curie/sec (per site)

3. All gaseous releases, not through the process vent, are considered ground level and shall be included in the determination of Qivv 6.3.2 Gaseous Monitoring Instrumentation
a. Requirement
1. The radioactive gaseous effluent monitoring instrumentation channels shown in Radioactive Gaseous Effluent Monitoring Instrumentation (Attachment 6) shall be operable with alarm / trip setpoints set to ensure that 6.3.1 .a. noble gas limits are not exceeded. Alarm / trip setpoints of these channels shall be determined and adjusted in accordance with 6.3.2.d.
2. Each radioactive gaseous effluent monitoring instrumentation channel shall be demonstrated operable by Channel Checks, Source Checks, Channel Calibrations, and Channel Operational Tests at the frequencies shown in Radioactive Gaseous Effluent Monitoring Instrumentation Surveillance Requirements (Attachment 7).

DOMINION VPAP-2 103N REVISION 7 PAGE 23 OF 84

b. Action
1. If a radioactive gaseous effluent monitoring instrumentation channel alarm / trip setpoint is less conservative than required by 6.3.2.a. 1, promptly:
  • Suspend the release of radioactive gaseous effluents monitored by the affected channel and declare the channel inoperable or
  • Change the setpoint so it is acceptably conservative
2. If the number of operable channels is less than the minimum required by tables in Radioactive Gaseous Effluent Monitoring Instrumentation (Attachment 6) take the action shown in those tables.
3. Return instruments to operable status within 30 days. If unsuccessful, explain in the next Annual Radioactive Effluent Release Report why the inoperability was not corrected in a timely manner.
c. Applicable Monitors Radioactive gaseous effluent monitors for which alarm / trip setpoints shall be determined are:

Release Point Instrument Number Process Vent I-GW-RM-178-1 Condenser Air Ejector I -SV-RM- 121 2-SV-RM-22 1 Ventilation Vent A I-VG-RM-179-1 Ventilation Vent B I-VG-RM-180-1

DOMINION VPAP-2 103N REVISION 7 PAGE 24 OF 84

d. Setpoint Calculations
1. Setpoint calculations for each monitor listed in 6.3.2.c. shall maintain this relationship:

D DpV +Dcae +D (13) where:

D = Step 6.3.l.a. dose limits that implement 10 CFR 20 for the Station, mrem/yr DPV = The noble gas site boundary dose rate from process vent gaseous effluent releases, mrem/yr Dcae = The noble gas site boundary dose rate from condenser air ejector

. gaseous effluent releases, mrem/yr Dw = The noble gas site boundary dose rate from summation of Ventilation Vent A plus B gaseous effluent releases, mrem/yr

2. Setpoint values shall be determined by:

Rm x2.12 E-03 Cm F (14) m where:

m = The release pathway, process vent (pv), ventilation vent (vv) condenser air ejector (cac)

Cm = The effluent concentration limit implementing 6.3.l .a. for the Station, gCi/ml RM = The release rate limit for pathway m determined from methodology in 6.3.1 .c., using Xce3 3 as nuclidc to be released, pCi/sec 2.12E-03 = CFM per ml/sec Fm = Thc maximum flow rate for pathway in, CFM

DOMINION VPAP-2 103N REVISION 7 PAGE 25 OF 84 NOTE: According to NUREG-0133, the radioactive effluent radiation monitor alarm / trip setpoints should be based on the radioactive noble gases. It is not practicable to apply instantaneous alarm / trip setpoints to integrating monitors sensitive to radioiodines, radioactive materials in particulate form, and radionuclides other than noble gases.

6.3.3 Noble Gas Effluent Air Dose Limit

a. Requirement
1. The air dose in unrestricted areas due to noble gases released in gaseous effluents from each unit at or beyond the site boundary shall be limited to:
  • During any calendar quarter: < 5 mrads for gamma radiation and < 10 mrads for beta radiation
  • During any calendar year: < 10 mrads for gamma radiation and < 20 mrads for beta radiation
2. Cumulative dose contributions for noble gases for the current calendar quarter and current calendar year shall be determined in accordance with 6.3.3.c. at least once per 31 days.
b. Action If the calculated air dose from radioactive noble gases in gaseous effluents exceeds any of the above limits, prepare and submit to the NRC, within 30 days, a special report in accordance with VPAP-2802, Notifications and Reports, that identifies the causes for exceeding the limits and defines corrective actions that have been taken to reduce releases and the proposed corrective actions to be taken to assure that subsequent releases will be in compliance with the limits in 6.3.3.a.

DOMINION VPAP-2103N REVISION 7 PAGE 26 OF 84

c. Noble Gas Effluent Air Dose Calculation Gaseous releases, not through the process vent, are considered ground level and shall be included in the determination of Qi,.

The air dose to areas at or beyond the site boundary due to noble gases shall be determined by the following:

For gamma radiation:

Dg = 3.17E-08X[MivvQivv+MipvQipv]

(15)

For beta radiation:

Db = 3.17E-08 [NivvQivv + NipvQipv] (16)

Where:

Subscripts = vv, refers to vent releases from the building ventilation vents, including air ejectors pv, refers to the vent releases from the process vent i, refers to individual radionuclide Dg the air dose for gamma radiation, in mrad Db the air dose for beta radiation, in mrad Mvv, Mipv = the air dose factors for ventilation vents or process vent release due to gamma emissions for each identified noble gas radionuclide i, in mrad/yr per Curie/sec. Factors are listed in Gaseous Effluent Dose Factors (Attachment 5)

Nivv, Nipv = the air dose factor for ventilation vents or process vent release due to beta emissions for each identified noble gas radionuclide i, in mrad/yr per Curie/sec. Factors are listed in Gaseous Effluent Dose Factors (Attachment 5)

Qivv, Qip, = the release for ventilation vents or process vent of noble gas radionuclide i, ingaseous effluents for 31 days, quarter, or year as appropriate in Curies (per site) 3.17 E-08 = the inverse of the number of seconds in a year

DOMINION VPAP-2 103N REVISION 7 PAGE 27 OF 84 6.3.4 1-131,133, H-3 & Radionuclides In Particulate Form Effluent Dose Limit

a. Requirement
1. Methods shall be implemented to ensure that the dose to any organ of a member of the public from 1131, I133! tritium, and all radionuclides in particulate form with half-lives greater than 8 days, in gaseous effluents released from the site to unrestricted areas from each reactor unit shall be:
  • During any calendar quarter: < 7.5 mrem to the critical organ
  • During any calendar year: < 15 mrem to the critical organ
2. Cumulative dose contributions to a member of the public from 1131, 1133, tritium, and radionuclides in particulate form with half-lives greater than 8 days, in gaseous effluents released to unrestricted areas for the current calendar quarter and current calendar year shall be determined at least once per 31 days in accordance with 6.3.4.c.
b. Action If the calculated dose from the release of ,

,113, tritium, and radionuclides in particulate form, with half-lives greater than 8 days, in gaseous effluents exceeds any of the above limits, prepare and submit to the NRC within 30 days, a special report in accordance with VPAP-2802, Notifications and Reports, that contains the:

1. Causes for exceeding limits.
2. Corrective actions taken to reduce releases.
3. Proposed corrective actions to be taken to assure that subsequent releases will be in compliance with limits stated in 6.3.4.a.

DOMINION VPAP-2103N REVISION 7 PAGE 28 OF 84

c. Dose Calculations Gaseous releases, not through the process vent, are considered ground level and shall be included in the determination of Q',m. Historical data pertaining to the volumes and radioactive concentrations of gaseous effluents released in connection to specific Station functions, such as containment purges, shall be used in the estimates as appropriate.
1. The dose to the maximum exposed member of the public, attributable to gaseous effluents at and beyond the site boundary, that contain 1131, P133, tritium, and particulate-form radionuclides with half-lives greater than 8 days, shall be determined by:

Dr 3.17E-08j[RMjviwjvv+RMjpvQipv] (17)

Where:

Subscripts = vv, refers to vent releases from the building ventilation vents; pv, refers to the vent releases from the process vent Dr = the dose to the critical organ of the maximum exposed member of the public, in mrem RMivv, RMipv =the cow-milk dose factor for ventilation vents or process vent release due to 1131, 1133, tritium, and from all particulate-form radionuclides with half-lives greater than 8 days, in mrem/yr per Curie/sec. Factors are listed in Critical Organ Dose Factors (Attachment 8)

QivvQipv = the release for ventilation vents or process vent of 1131, I tritium, and from all particulate-form radionuclides with half-lives greater than 8 days, in Curies 3.17 E-08 = the inverse of the number of seconds in a year

DOMINION VPAP-2 103N REVISION 7 PAGE 29 OF 84 6.3.5 Gaseous Radwaste Treatment Historical data pertaining to the volumes and radioactive concentrations of gaseous effluents released in connection with specific Station functions, such as containment purges, shall be used to calculate projected doses, as appropriate.

a. Requirement
1. The Gaseous Radwaste Treatment System and the Ventilation Exhaust Treatment System shall be used to reduce radioactive material in gaseous waste before its discharge, when projected gaseous effluent air doses due to gaseous effluent releases, from each unit to areas at and beyond the site boundary, would exceed 0.2 mrad for gamma radiation and 0.4 mrad for beta radiation, averaged over 31 days.
2. The Ventilation Exhaust Treatment System shall be used to reduce radioactive materials in gaseous waste before its discharge, when the projected doses due to gaseous effluent releases, from each unit to areas at and beyond the site boundary, would exceed 0.3 mrem to the critical organ, averaged over 31 days.
3. Doses due to gaseous releases from the site shall be projected at least once per 31 days, based on the calculations in 6.3.5.c.
b. Action If gaseous waste that exceeds the limits in 6.3.5.a. is discharged without treatment, prepare and submit to the NRC within 30 days, a special report in accordance with VPAP-2802, Notifications and Reports, that includes:

I. An explanation why gaseous radwaste was being discharged without treatment, identification of any inoperable equipment or subsystems, and the reason for the inoperability.

2. Actions taken to restore the inoperable equipment to operable status.
3. Summary description of actions taken to prevent recurrence.
c. Projected Gamma Dose
1. Determine Dg, the 3 I-day gamma air dose for the previous 31-day period, per Equation (15).
2. Estimate Rg, the ratio of the estimated vol umc of gaseous effluent in the current 3 1-day period to the volume released during the previous 3 1-day period.

DOMINION VPAP-2 103N REVISION 7 PAGE 30 OF 84

3. Estimate Fg. the ratio of the estimated noble gas effluent activity in the current 31-day period to the noble gas effluent activity during the previous 31-day period (gCi/ml).
4. Determine PDg, the projected 31-day gamma air dose.

PDg = Dg(Rg xFg) (18)

d. Projected Beta Dose
1. Determine Db, the 3 1-day beta air dose in the previous 31 days, per Equation (16).
2. Estimate Rg and Fg as in 6.3.5.c.2. and 6.3.5.c.3.
3. Determine PDb, the projected 31-day beta air dose.

PDb = Db(Rg x Fg) (19)

e. Projected Maximum Exposed Member of the Public Dose
1. Detenmine Dmax the 3l-day maximum exposed member of the public dose in the previous 31-day period, per Equation (14), where Dr = Dmax.
2. Estimate Fi, the ratio of the estimated activity from 1131, 1133, radioactive materials in particulate form with half-lives greater than 8 days, and tritium in the current 31-day period to the activity of 1131, jI33, radioactive materials in particulate forn with half-lives greater than 8 days, and tritium in the previous 3 1-day period (pCi/ml).
3. Dctenninc PDmax, the projected 31 -day maximum exposed member of the public dose.

PDmax = Dmax(R X F(2) (20)

DOMINION VPAP-2 103N REVISION 7 PAGE 31 OF 84 6.4 Radioactive Liquid and Gaseous Releasc Permits RP shall maintain procedures for Liquid and Gaseous Release Permits to ensure effluent dose limits are not exceeded when making releases.

6.4.1 Liquid Waste Batch Release Permits Operations shall obtain RP authorization before initiating batch releases of radioactive liquids. Examples of batch releases include:

Batch Releases NOTE: If the clarifier is in service, releases from tanks processed through the clarifier are considered continuous releases.

A Batch Release Permit is required for a release from any tanks / sumps which contain (or potentially contain) radioactive liquid. Tanks / sumps include:

  • BRTT
  • LLWDT
  • HLWDT
  • Turbine Building Sumps when secondary coolant activity exceeds 1.0 E-5 gICi/ml
  • CDT 6.4.2 Continuous Release Permit Operations shall obtain RP authorization before initiating continuous releases of radioactive liquids.

Continuous Releases A Continuous Release Permit is required for:

  • Clarifier, unless being bypassed

Sampling requirements and control and conditions for service water reservoir blowdown, when no radioactivity is deteete(l, shall be specified on the permit.

DOMINION VPAP-2103N

-'REVISION 7 PAGE 32 OF 84 6.4.3 Waste Gas Decay Tank (WGDT) Release Permit Operations shall obtain RP authorization before initiating WGDT releases.

6.4.4 Reactor Containment Release Permits Operations shall obtain authorization from RP before initiating containment purges or containment hogging. Reactor Containment Release Permits shall be valid from start of purge / hog until:

  • Routine termination
  • Terminated for cause by RP
  • Receipt of Radiation Monitoring System (RMS) Containment Gas Monitor high alarm 6.4.5 Miscellaneous Gaseous Release Permit Operations shall obtain RP authorization before initiating releases of noble gases that may not be accounted for by routine sampling, or any planned release not being routed through the Process Vent or Ventilation Vents (e.g., steam driven auxiliary feedwater pump testing if primary to secondary leakage exists).

6.4.6 Radioactive Liquid and Gaseous Release Controls

a. Operations shall notify RP of pending releases and request RP to initiate the appropriate release permit. Operations shall provide the necessary information to complete the required release permit.
b. A representative sample shall be obtained of the source to be released.
1. Operations shall provide RP with liquid samples and sample information (e.g.,

time of sample) for samples obtained outside the Primary Sample Room, except Clarifier Proportional Tank and Clarifier Grab Samples.

2. Chemistry shall provide RP with liquid samples and sample information for samples obtained from inside the Primary Sample Room.
3. RP shall obtain gaseous samples.
c. RP shall pertorm required sample analyses.

DOMINION VPAP-2 103N REVISION 7 PAGE 33 OF 84

d. RP shall calculate and record the following information on a release permit:
  • Maximum authorized release rate
  • Maximum authorized release rate in percentage of limits specified by the ODCM
  • Applicable conditions or controls pertaining to the release
e. RP shall notify the Shift Supervisor if it is determined that a release may not be within the effluent dose limits.
f. Upon receipt of a release permit from RP, Operations shall:
1. Verify the correct source is authorized for release.
2. Note maximum authorized release rate.
3. Note percent of Technical Specifications limits the release represents.
4. Note and ensure compliance with any indicated controls or conditions applicable to the release.
g. When commencing release, Operations shall provide RP with required information.

As appropriate, required information shall include:

  • Date and time release was started
  • Starting tank / sump level
  • Beginning pressure
  • Release flow rate
  • Dilution water flow rate
h. Upon tenninating the release, Operations shall return the permit to RP and provide information necessary for completion of permit. As appropriate, required information shall include:
  • Date and time release was stopped
  • Tank / sump ending level
  • Release flow rate just prior to termination
  • Ending pressure
  • Volume released

DOMINION VPAP-2103N REVISION 7 PAGE 34 OF 84 6.5 Total Dose Limit to Public From Uranium Fuel Cycle Sources 6.5.1 Requirement The annual (calendar year) dose or dose commitment to a real individual due to releases of radioactivity and radiation from uranium fuel cycle sources shall not exceed 25 mrem to the total body or the critical organ (except the thyroid, which shall not exceed 75 mrem).

6.5.2 Action

a. If the calculated doses from release of radioactive materials in liquid or gaseous effluents exceed twice the limits in 6.2.3.a., 6.3.3.a., or 6.3.4.a., calculate (including direct radiation contribution from the units and from outside storage tanks) whether limits in 6.5.1 have been exceeded.
b. If the limits in 6.5.1 have been exceeded, prepare and submit to the NRC within 30 days, a special report in accordance with VPAP-2802, Notifications and Reports, that defines the corrective action to be taken to reduce subsequent releases and to prevent recurrence, and includes a schedule for achieving conformance with the limits. Special reports, as defined in 10 CFR 20.2203(a)(4), shall include:
1. An analysis that estimates the radiation exposure (dose) to a real individual from uranium fuel cycle sources, including all effluent pathways and direct radiation, for the calendar year that includes the releases covered by the report.
2. A description of the levels of radiation and concentrations of radioactive material involved, and the cause of the exposure levels or concentrations.
3. If the estimated dose exceeds the limits in 6.5. 1, and if the release condition that violates 40 CFR 190 has not already been corrected, the special report shall include a request for a variance in accordance with the provisions of 40 CFR 190. Submittal of the report is considered a timely request, and a variance is granted until staff action on the request is complete.

6.6 Radiological Environmental Monitoring 6.6.1 Monitoring Program

a. Requirement
1. The Radiological Environmental Monitoring Program shall be conducted as specified in Radiological Environmental Monitoring Program (Attachment 9).

DOMINION VPAP-2103N REVISION 7 PAGE 35 OF 84

2. Samples shall be collected from specific locations specified in Environmental Sampling Locations (Attachment 10). [Commitment 3.2.2]
3. Samples shall be analyzed in accordance with:
  • Radiological Environmental Monitoring Program (Attachment 9) requirements
  • Detection capabilities required by Detection Capabilities for Environmental Sample Analysis (Attachment I 1)
  • Guidance of the Radiological Assessment Branch Technical Position on Environmental Monitoring dated November, 1979, Revision No. I
b. Action
1. If the Radiological Environmental Monitoring Program is not being conducted as required in 6.6. .a., report the situation in accordance with VPAP-2802, Notifications and Reports, by preparing and submitting to the NRC, in the Annual Radiological Environmental Operating Report required by Technical Specifications 5.6.2, a description of the reasons for not conducting the program as required, and the plan for precluding recurrence.
2. If, when averaged over any calendar quarter, radioactivity exceeds the reporting levels of Reporting Levels for Radioactivity Concentrations in Environmental Samples (Attachment 12) prepare and submit to the NRC within 30 days, a special report in accordance with VPAP-2802, Notifications and Reports, that:
  • Identifies the causes for exceeding the limits, and
  • Defines the corrective actions to be taken to reduce radioactive effluents so that the potential annual dose to a member of the public is less than the calendar year limits of 6.2.3, 6.3.3, and 6.3.4 When more than one of the radionuclides listed in Reporting Levels for Radioactivity Concentrations in Environmental Samples (Attachment 12) are detected in the sampling medium, the report shall be submitted if.

concentration (I) concentration (2) (21) reporting level (1) reporting level (2) +-

DOMINION VPAP-2 103N REVISION 7 PAGE 36 OF 84

3. When radionuclides other than those listed in Reporting Levels for Radioactivity Concentrations in Environmental Samples (Attachment 12) are detected and are the result of plant effluents, the report shall be submitted if the potential annual dose to a member of the public is equal to or greater than the calendar year limits of 6.2.3, 6.3.3, and 6.3.4. The report is not required if the measured level of radioactivity was not the result of plant effluents; however, in such an event, report and describe the condition in the Annual Radiological Environmental Operating Report in accordance with VPAP-2802, Notifications and Reports.
4. If milk or fresh leafy vegetable samples are unavailable from one or more of the sample locations required by Environmental Sampling Locations (Attachment 10), identify locations for obtaining replacement samples and add them to the radiological environmental monitoring program within 30 days. The specific locations from which samples were unavailable may then be deleted from the monitoring program. Identify the cause of the unavailability of samples and identify the new locations for obtaining replacement samples in the next Annual Radioactive Effluent Release Report in accordance with VPAP-2802, Notifications and Reports. Include in the report a revised figure and table for the ODCM to reflect the new locations.

6.6.2 Land Use Census

a. Requirement A land use census shall be conducted and shall identify, within a distance of 8 km (5 miles), the location in each of the 16 meteorological sectors of the following:
  • Nearest milk animal
  • Nearest residence
  • Nearest garden greater than 50 m2 (50( fl 2 ) that produces broad leaf vegetation
1. The land use census shall be conducted during the growing season, at least once per 12 months, using methods that will provide the best results (e.g., door-to-door survey, aerial survey, local agriculture authorities). Land use census results shall be included in the Annual Radiological Environmental Operating Report in accordance with VPAP-2802, Notifications and Reports.

DOMINION VPAP-2103N REVISION 7 PAGE 37 OF 84 2: In lieu of the garden census, broad leaf vegetation sampling of at least three different kinds of vegetation may be performed at the site boundary in each of two different direction sectors with the highest predicted ground deposition (D/Qs). Specifications for broad leaf vegetation sampling in Radiological Environmental Monitoring Program (Attachment 9) shall be followed, including analysis of control samples.

b. Action I. If a land use census identifies locations that yield a calculated dose or dose commitment greater than the values currently being calculated in 6.3.4.a.2, identify the new locations in the next Annual Radioactive Effluent Release Report in accordance with VPAP-2802, Notifications and Reports.
2. If a land use census identifies locations that yield a calculated dose or dose commitment (via the same exposure pathway) 25 percent greater than at a location from which samples are currently being obtained, add the new locations to the Radiological Environmental Monitoring Program within 30 days. Sampling locations, excluding the control station location, that have the lowest calculated dose or dose commitments (via the same exposure pathway) may be deleted from the monitoring program. Identify new locations in the next Annual Radioactive Effluent Release Report and include in the report revised figures and tables reflecting the new locations in accordance with VPAP-2802, Notifications and Reports. ICommitment 3.2.41 6.6.3 Interlaboratory Comparison Program
a. Requirement Radioactive materials (which contain nuclides produced at the Station), supplied as part of an Interlaboratory Comparison Program, shall be analyzed.

DOMINION VPAP-2 103N REVISION 7 PAGE 38 OF 84

b. Action
1. Analyses shall be performed at least semiannually as follows:

Program Cross-Check of Milk II31, Gamma, Sr89 and Sr 90 Water Gross Beta, Gamma, 1131, H3 (Tritium), Sr89 and Sr 90 (blind - any combinations of above radionuclides)

Air Filter Gross Beta, Gamma, Sr9 0

2. If analyses are not performed as required by 6.6.3.b., report in the Annual Radiological Environmental Operating Report in accordance with VPAP-2802, Notifications and Reports, the corrective actions taken to prevent recurrence.
c. Results Results shall be reported in the Annual Radiological Environmental Monitoring Report in accordance with VPAP-2802, Notifications and Reports.

6.7 Reporting Requirements 6.7.1 Annual Radiological Environmental Operating Report Routine Radiological Environmental Operating Reports covering the operation of the units during the previous calendar year shall be submitted prior to May I of each year.

A single submittal may be made for the Station. Radiological Environmental Operating Reports shall include:

a. Summaries, interpretations, and analysis of trends of results of radiological environmental surveillance activities for the report period, including:
  • A comparison (as appropriate) with preoperational studies, operational controls, and previous environmental surveillance reports
  • An assessment of the observed impacts of the plant operation on the environment
  • Results of land use census per 6.6.2

DOMINION VPAP-2 103N REVISION 7 PAGE 39 OF 84

b. Results of analysis of radiological environmental samples and of environmental radiation measurements taken per 6.6.1, Monitoring Program. Results shall be summarized and tabulated in the format of the table in the Radiological Assessment Branch Technical Position on Environmental Monitoring.
1. If some individual results are not available for inclusion with the report, the report shall be submitted, noting and explaining reasons for missing results.
2. Missing data shall be submitted in a supplementary report as soon as possible.
c. A summary description of the radiological environmental monitoring program.
d. At least two legible maps covering sampling locations, keyed to a table giving distances and directions from the centerline of one reactor. One map shall cover stations near the site boundary; a second shall include more distant stations.
e. Results of Station participation in the Interlaboratory Comparison Program, per 6.6.3.
f. Discussioni of deviations from the Station's environmental sampling schedule per Radiological Environmental Monitoring Program (Attachment 9).
g. Discussion of analyses in which the lower limit of detection (LLD) required by Detection Capabilities for Environmental Sample Analysis (Attachment I1) was not achievable.

6.7.2 Annual Radioactive Effluent Release Report

a. Requirement - Station Radioactive Effluent Release Reports covering operation of the units during the previous 12 months of operation shall be submitted before May I of each year. A single submittal may be made for the Station and should combine those sections that are common to both units. Radioactive Effluent Release Reports shall include:
1. A summary of quantities of radioactive liquid and gaseous effluents and solid waste released. Data shall be summarized on a quarterly basis following the format of Regulatory Guide 1.21, Appendix B, for liquid and gaseous effluents.

Data shall be summarized on an annual basis following the format of Regulatory Guide 1.21, Appendix B, for solid waste. ICommitment 3.2.51

DOMINION VPAP-2103N REVISION 7 PAGE 40 OF 84

2. An assessment of radiation doses to the maximum exposed members of the public due to the radioactive liquid and gaseous effluents released from the Station during the previous calendar year. This assessment shall be in accordance with 6.7.2.b.
3. A list and description of unplanned releases from the site to unrestricted areas, during the reporting period, which meet the following criteria:
  • Unplanned releases that exceeded the limits in 6.2.1 and 6.3.1
  • Unplanned releases which require a Plant Issue (Deviation) and involve the discharge of contents of the wrong Waste Gas Decay Tank or the wrong liquid radwaste release tank
  • Unplanned releases from large leaks due to unexpected valve or pipe failures that result in a quantity of release such that a 10 CFR 50.72, Immediate Notification Requirements for Operating Nuclear Power Reactors or 10 CFR 50.73, Licensee Event Report System, report is required
  • Unplanned releases as determined by Radiation Protection Supervision, which may or may not require a Plant Issue (Deviation)
4. Major changes to radioactive liquid, gaseous, and solid waste treatment systems during the reporting period.
5. Changes to VPAP-2103N, Offsite Dose Calculation Manual (North Anna)

(See 6.7.4).

6. A listing of new locations for dose calculations or environmental monitoring identified by the land use census (See 6.6.2).
b. Dose Assessment
1. Radiation dose to individuals due to radioactive liquid and gaseous effluents from the Station during the previous calendar year shall either be calculated in accordance with this procedure or in accordance with Regulatory Guidc 1.109.

Population doses shall not be included in dose assessments.

DOMINION VPAP-2103N REVISION 7 PAGE 41 OF 84

2. The dose to the maximum exposed member of the public due to radioactive liquid and gaseous effluents from the Station shall be incorporated with the dose assessment performed above. If the dose to the maximum exposed member of the public exceeds twice the limits of 6.2.3.a. 1, 6.2.3.a.2, 6.3.3.a. 1, or 6.3.4.a. 1, the dose assessment shall include the contribution from direct radiation.

NOTE: NUREG-0543 states: "There is reasonable assurance that sites with up to four operating reactors that have releases within Appendix I design objective values are also in conformance with the EPA Uranium Fuel Cycle Standard, 40 CFR Part 190."

3. Meteorological conditions during the previous calendar year or historical annual average atmospheric dispersion conditions shall be used to determine gaseous pathway doses.

NOTE: The Annual Radioactive Effluent Report for the North Anna ISFSI is included as part of the North Anna Station Annual Radioactive Effluent Release Report.

c. ISFSI Dose Assessment
  • Radiation dose to individuals due to radioactive liquid and gaseous effluents during the previous calendar year shall either be calculated in accordance with this procedure or in accordance with Regulatory Guide 1.109. Population doses shall not be included in dose assessments.
  • The dose to the maximum exposed member of the public due to radioactive liquid and gaseous effluents from the Station shall be incorporated with the dose assessment performed above. If the dose to the maximum exposed member of the public exceeds twice the limits of 6.2.3.a. 1, 6.2.3.a.2, 6.3.3.a. 1, or 6.3.4.a. 1, the dose assessment shall include the contribution from direct radiation.
  • Meteorological conditions during the previous calendar year or historical annual average atmospheric dispersion conditions shall be used to determine gaseous pathway doses.

6.7.3 Annual MI eteorological Data

a. Meteorological data collected during the previous year shall be in the form ofjoint frequency distributions of wind speed, wind direction, and atmospheric stability.

DOMINION VPAP-2 103N REVISION 7 PAGE 42 OF 84

b. Meteorological data shall be retained in a file on site and shall be made available to NRC upon request.

6.7.4 Changes to the ODCM Changes to the ODCM shall be:

a. Reviewed and approved by SNSOC and Site Vice President before implementation.
b. Documented. Records of reviews shall be retained as Station records.

Documentation shall include:

1. Sufficient information to support changes, together with appropriate analyses or evaluations justifying changes.
2. A determination that a change will not adversely impact the accuracy or reliability of effluent doses or setpoint calculations, and will maintain the level of radioactive effluent control required by:
  • IO CFR 20 Subpart D
  • 40CFR 190
  • 10 CFR 50.36a
  • 10 CFR 50, Appendix I
c. Submitted to NRC in the forrn of a complete, legible copy of the entire ODCM as a part of, or concurrent with the Annual Radioactive Effluent Release Report for the period of the report in which any change was made. Each change shall be identified by markings in the margin of the affected pages, clearly indicating the area of the page that was changed, and shall indicate the date (e.g., month / year) the change was implemented.
d. Submitted to the Management Safety Review Committee (MSRC) Coordinator.

ICommitment 3.2.11

c. Submitted to NRC in accordance with VPAP-2802, Notifications and Reports.

DOMINION VPAP-2103N REVISION 7 PAGE 43 OF 84 7.0 RECORDS 7.1 The following individual and packaged documents and copies of any related correspondence completed as a result of the performance or implementation of this procedure are records. They shall be transmitted to Records Management in accordance with VPAP- 1701, Records Management. Prior to transmittal, the sender shall assure that:

  • Each record is packaged when applicable.
  • QA program requirements have been fulfilled for Quality Assurance records.
  • Each record is legible, completely filled out, and adequately identifiable to the item or activity involved.
  • Each record is stamped, initialed, signed, or otherwise authenticated and dated, as required by this procedure.

7.1.1 Individual Records None 7.1.2 Record Packages

  • Records of changes to the ODCM in accordance with 6.7.4
  • Records of meteorological data in accordance with 6.7.3
  • Records of sampling and analyses
  • Records of radioactive materials and other effluents released to the environment
  • Records of preventive maintenance, surveillances, and calibrations 7.2 The following documents completed as a result of the implementation of this procedure arc not Quality Assurance records and are not required to be transmitted to Records Management.

None

DOMINION VPAP-2 103N REVISION 7 PAGE 44 OF 84 ATTACHMENT 1 (Page I of 2)

Radioactive Liquid Effluent Monitoring Instrumentation Instrument Instrument Ainimum Operable Channels Action Ato

1. Liquid Radwaste Effuent (a) I-LW-RM-I 11, Liquid Radwaste Effluent Monitor I I (b) I-LW-FT-104, Liquid Radwaste Effluent Total Flow Measuring Device 1 2 (c) I-LW-TK-20, Liquid Waste Effluent Sample Vessel I (d) I-LW-I 130, Liquid Waste Effluent Proportional Sample Valve I (e) I-SW-RM-108, Service Water Effluent Monitor (Note 3) 1 (f) I-SW-RM-130, Unit I Circulating Water System Effluent Line Monitor 1 4 (g) 2-SW-RM-230, Unit 2 Circulating Water System Effluent Line Monitor 1 4
2. Tank Level Indicating Devices (Note I)

(a) Refueling Water Storage Tanks Unit I I-QS-LT-IOOA I 3 I-QS-LT-IOOB I -QS-LT- I OOC I-QS-LT-IOOD, Unit 2 2-QS-LT-200A 1 3 2-QS-LT-200B 2-QS-LT-200C 2-QS-LT-200D (b) Casing Cooling Storage Tanks Unit I I-RS-LT-103A I 3 I-RS-LT- 103B Unit 2 2-RS-LT-203A 1 3 2-RS-LT-203B (c) PG Water Storage Tanks (Note 2)

I-BR-LT- I 16A (I -PG-TK- IA) 1 3 I -BR-LT- I 16B (I -PG-TK- I B) 1 3 (d) Boron Recovery Test Tanks (Note 2)

I-BR-LT-I 12A (I-BR-TK-2A) I 3 I-BR-LT-I 12B (I-BR-llK-2B) I 3

3. Steam Generator ligh Capacity Bllowdown (a) Stcam Generator Iligh Capacity 13lowdown Radiation Monitor Unit I l-SS-RM-125 I Unit 2 2-SS-RM-225 I (b) Stcam Gencrator I ligh Capacity Blowdown Flash Tank Outlet F:low Ratc Unit 1 1-131)-1T-105 I 2 Unit 2 2-13D)-IT-205 I 2 (c) Steam Gcncrator IIigh Capacity 13lowdown Proportional Sampling Systcn Collection Tank Unit I 1-131)-TK-4 I Unit 2 2-131)-'TK-4 I I

DOMINION VPAP-2 103N REVISION 7 PAGE 45 OF 84*

ATTACHMENT 1 (Page 2 of 2)

Radioactive Liquid Effluent Monitoring Instrumentation ACTION 1: If the number of operable channels is less than required, effluent releases via this pathway may continue if, at least once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, grab samples are collected and analyzed for gross radioactivity (beta and gamma) at an LLD of at least Ix 10-7 OCi/g or an isotopic radioactivity at an LLD of at least 5x 10-7 OICi/g.

ACTION 2: If the number of operable channels is less than required, effluent releases via this pathway may continue if the flow rate is estimated at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during actual releases. Design capacity performance curves generated in situ may be used to estimate flow.

ACTION 3: If the number of operable channels is less than required, liquid additions to this tank may continue if the tank liquid level is estimated during all liquid additions to the tank.

ACTION 4: If the number of operable channels is less than required, make repairs as soon as possible. Effluent releases via this pathway may continue provided that, at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, grab samples from the discharge canal are collected and analyzed for principal gamma emitters as defined in Radioactive Liquid Waste Sampling and Analysis Program (Attachment 3).

NOTE 1: Tanks included in this requirement are those outdoor tanks that are not surrounded by liners, dikes, or walls capable of holding the tank contents, and do not have overflows and surrounding area drains connected to the liquid radwaste treatment system.

NOTE 2: This is a shared system between Unit I and Unit 2.

NOTE 3: The capability for obtaining grab samples at least every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> must exist. Grab samples shall commence if there is indication of radioactivity in the Service Water System or an indication from other radiation monitors in the Service Water System of an increase in radioactivity.

DOMINION VPAP-2103N REVISION 7 PAGE 46 OF 84 ATTACHMENT 2 (Page I of 2)

Radioactive Liquid Effluent Monitoring Instrumentation Surveillance Requirements Channel Description Channel Source Channel Channel Check Check Calibration Operational Test

1. Liquid Radwaste Effluent (a) I-LW-RM- 11, Liquid Radwaste Effluent Monitor D D R Q (NOTE 1)

(b) I-LW-FT-104, Liquid Radwaste Effluent Total Flow D (NOTE 3) N/A R Q

-Measuring Device (c) I-LW-TK-20, Liquid Waste Effluent Sample Vessel D (NOTE 9) N/A N/A N/A (d) I-LW-I 130, Liquid Waste Effluent Proportional Sample D (NOTE 9) N/A N/A N/A Valve D(OE9 / / /

(e) I-SW-RM-108, Service Water System Effluent Monitor D M R Q (NOTE 2)

-() I-SW-RM-130, Unit I Circulating Water System D M R Q (NOTE 2)

Effluent Line Monitor (g) 2-SW-RM-230, Unit 2 Circulating Water System D- M R Q (NOTE 2)

Effluent Line Monitor

2. Tank Level Indicating Device (NOTE 6)

(a) Refueling Water Storage Tanks I-QS-LT-100C, I-QS-LT-100D D (NOTE 4) N/A R Q (NOTE 7)

Unt I -QS-LT-100C, 2-QS-LT-I00B 2-QS-LT-200C, 2-QS-LT-200D D (NOTE 4) N/A R Q (NOTE 7)

(b) Casing Cooling Storage Tanks Unit I I-RS-LT-103A, I-RS-LT-103B D (NOTE 4) N/A R Q (NOTE 7)

Unit 2 2-RS-LT-203A, 2-RS-LT-203B D (NOTE 4) N/A R Q (NOTE 7)

(c) PG Water Storage Tanks (NOTE 5)

I-BR-LT-I 16A (I-PG-TK-IA) D (NOTE 4) N/A R Q (NOTE 8)

I -BR-LT- II 6B (I -PG-TIC- IB) D (NOTE 4) N/A R Q (NOTE 8)

(d) Boron Recovery Test Tanks (NOTE 5)

I-BR-LT-1 12A (I-BR-TK-2A) D (NOTE 4) N/A R Q (NOTE 8)

I-BR-LT-112B (I-BR-lK-2B) D (NOTE4) N/A R Q (NOTE 8)

3. Steam Cenerator (SG) ligh Capacity Blowdown (a) SG Iligh Capacity Blowdown Radiation Monitor Unit I I-SS-RM-125 D(NOTEQ 12) I) (NOTI. 12) R Q (NOI II)

Unit 2 2-SS-RM-225 DNT.2)(NTj1) R It (NOTEI( 1)

(b) SG High Capacity B3lowdown Flash Tank Outlct F:low Rate Unit I I-BD)-lrl-105 Unit 2 2-13)1)1-205 1) (NOTE 13) N/A R N/A (c) Sci High Capacity 13lowdown Proportional Samplin System Collection lank Unit I I-BI)-IK-4 1)(NOTE ) N/A N/A N/A U nit_2 __2-B I)-T'K -4__ _ _ _ _ _ _ _ __ _ _ _ _ _

DOMINION VPAP-2 103N REVISION 7 PAGE 47 OF 84 ATTACHMENT 2 (Page 2 of 2)

Radioactive Liquid Effluent Monitoring Instrumentation Surveillance Requirements NOTE 1: The Channel Operational Test shall demonstrate:

a.Automatic isolation of this pathway and Control Room alarm annunciation occur if the instrument indicates measured levels above alarm / trip setpoint.

b.Alarm annunciation occurs if the instrument controls are not set in "operate" mode.

NOTE 2: The Channel Operational Test shall demonstrate that Control Room alarm annunciation occurs if any of the following conditions exists:

a.lnstrument indicates measured levels above the alarm / trip setpoint.

b.Instrument controls not set in "operate" mode.

NOTE 3: Channel Check shall consist of verifying indication of flow during periods of release. Channel Check shall be made at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> on days on which continuous, periodic, or batch releases arc made.

NOTE 4: During liquid additions to the tank, verify indication of level change.'

NOTE 5: This is a shared system between Unit I and Unit 2.

NOTE 6: Tanks included in this requirement are those outdoor tanks that are not surrounded by liners, dikes, or walls capable of holding the tank contents and do not have overflows and surrounding area drains connected to the liquid radwaste treatment system.

NOTE 7: The Channel Operational Test shall demonstrate that automatic isolation of this pathway and Control Room alarm annunciation occur if instrument indicates measured levels outside the alarm

/ trip setpoint. Demonstration of automatic isolation may consist of verifying the appropriate signal is generated. Valves need not be operated for this test.

NOTE 8: The Channel Operational Test shall demonstrate that Control Room alarm annunciation occurs if the instrument indicates measured levels are outside alarm setpoint.

NOTE 9: Channel Check shall consist of verifying that proportional flow exceeds 0.5 mis/gallon.

NOTE 10: Channel Operational Test shall demonstrate that system isolation occurs on a radiation monitor Ifigh-l ligh Alarm.

NOTE I 1: Channel Operational Test shall demonstrate:

a.Trip signals are generated at the required setpoints. Isolation is not required.

b.l ocal radiation monitor indication occurs il'instrumient controls arc not set in"Operate" mode or if the instrument indicates measured levels are above the alarm / trip setpoint.

NOTll. 12: The radiation monitor automatically performs periodic source checks. The Source Check and Channel Check are satisfied as long as the green light is lit.

NOTE 13: This is verified by indicated effluent now less than or equal to 19() gpm.

DOMINION VPAP-2103N REVISION 7 PAGE 48 OF 84 ATTACHMENT 3 (Page l of 3)

Radioactive Liquid WVaste Sampling and Analysis Program Liquid Release Sampling Minimum Analysis Type of Activity Detection (LLD)

Type Frequency Frequency Analysis Dtctio), (Note L )

P Principle Gamma 5 x 10-7 Emitters (Note 3)

(Each Batch) (Each Batch) I'13 1X o Dissolved and I x lo-,

Batch Releases ( M Entrained Gases (One Batch/M) (Gamma Emitters) (Note 8)

(Notes 2 and 7) P M Composite H3 I x l0o5 (Each Batch) (Note 4) Gross Alpha I x 10-7 P Q Composite Sr 89 and Sr 90 5 x 0o-8 (Each Batch) (Note 4) Fe55 I x l0-6 Principal Gamma 5 X l0-7 Emitters (Note 6)

Continuous W Composite 131 1 x 10-6 (Note 6) (Note 6)

Continuous Dissolved and I x 10-5 Releases M Grab Sample Entrained Gases (Gamma Emitters) (Note 8)

(Note 5) Continuous M Composite H3 I x I01(

(Note 6) (Note 6) Gross Alpha I x 10-7 Continuous Q Composite Sr89 and Sr90 5 x 10-(Note 6) (Note 6) Fe55 I x l0-6

DOMINION VPAP-2103N REVISION 7 PAGE 49 OF 84 ATTACHMENT 3 (Page 2 of 3)

Radioactive Liquid Waste Sampling and Analysis Program NOTE 1: For a particular measurement system (which may include radiochemical separation):

4.66 Sb LLD = 9 E

  • V o 2.22E+06
  • Y oe(At)

Where:

LLD = the "a priori" (before the fact) Lower Limit of Detection as defined above (as microcuries per unit mass or volume) (See 4.8) sb = the standard deviation of the background counting rate or of the counting rate of a blank sample as appropriate (as counts per minute, cpm)

E = the counting efficiency (as counts per disintegration)

V = the sample size (in units of mass or volume) 2.22E+06 = the number of disintegrations per minute (dpm) per microcurie Y = the fractional radiochemical yield (when applicable)

% = the radioactive decay constant for the particular radionuclide At = the elapsed time between the midpoint of sample collection and time of counting Typical values of E, V, Y and At should be used in the calculation.

The LLD is an "a priori" (before the tact) limit representing the capability of a measurement system and not a "posteriori" (after the fact) limit for a particular measurement.

NOTE 2: A batch release is the discharge of liquid wastes of a discrete volume. Before sampling for analyses, each batch shall be isolated, and then thoroughly mixed as the situation permits, to assure representative sampling.

DOMINION VPAP-2 103N REVISION 7 PAGE 50 OF 84 ATTACHMENT 3 (Page 3 of 3)

Radioactive Liquid Waste Sampling and Analysis Program NOTE 3: The principal gamma emitters for which the LLD specification applies exclusively are the following radionuclides: Mn5 4, Fe 59 , co 58 , co 6 0 , Zn6 5 , Mo 99 , Cs 134 , Cs 137, Cc 141, and Ce 144. This list does not mean that only these nuclides are to be detected and reported.

Other peaks that are measurable and identifiable, at levels exceeding the LLD, together with the above nuclides, shall also be identified and reported.

NOTE 4: A composite sample is one in which the quantity of liquid sampled is proportional to the quantity of liquid waste discharged and for which the method of sampling employed results in a specimen that is representative of the liquids released.

NOTE 5: A continuous release is the discharge of liquid wastes of a non-discrete volume, e.g., from a volume of a system that has an input flow during the continuous release.

NOTE 6: To be representative of the quantities and concentrations of radioactive materials in liquid effluents, samples shall be collected continuously in proportion to the rate of flow of the effluent stream. Prior to analyses, all samples taken for the composite shall be thoroughly mixed in order for the composite sample to be representative of the effluent releases.

NOTE 7: Whenever the secondary coolant activity exceeds 10-5 pCi/ml, the turbine building sump pumps shall be placed in manual operation and samples shall be taken and analyzed prior to release. Secondary coolant activity samples shall be collected and analyzed on a weekly basis. These samples are analyzed for gross activity or gamma isotopic activity within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

NOTE 8: The gamma emitters for which the LLD specification applies exclusively are the following radionuclides: Kr-87, Kr-88, Xc-133, Xe-133m, Xc-135, Xe-135m and Xc-138. This list does not mean that only these nuclides are to be detected and reported. Other peaks that are measurable and identifiable, at levels exceeding the LLD, together with the above nuclides shall also be identified and reported.

DOMINION VPAP-2 103N REVISION 7 PAGE 51 OF 84 ATTACHMENT 4 (Page 1 of 4)

Radioactive Gaseous Waste Sampling and Analysis Program Gaseous Release Sampling Minimum Analysis Type of Activity Detection (LLD)

Type Frequency Frequency Analysis (teCi/ml) (Note 1)

Principal Iamma14 A. Waste Gas Pior to Release Prior to Release Emitters (Note 2)

Storage Tank Grab Sample) (Each Tank) H3 I x lo-6 B. Containment Prior-to Release Prior to Release Emnciple (Namma I x 104 Emitters (Note 2)

Purge (Each PURGE (Each PURGE) H3 I x 106 Grab Sample)

C. Ventilation Monthly Monthly Principle Gamma X 10-4 (I) Process Vent (Grab Sample) Emitters (Note 2)

(2) Vent Cent A (Notes 3, 4, and 5) (Note 3) H3 I x 106 (3) Vent vent B Continuous Weekly 131 x 10-12 (Note 4) (Charcoal Sample) i133 1x lo-,,

Continuous Weekly Principal Gamma I x l0-All Release (Note 4) Particulate.Sample Emitter (Note 2)

Continuous Monthly Types as listed (Note 4) Composite Gross Alpha Ix 1 lo, 0

Particulate Sample Continuous Quarterly 8 in A, B, and C (Note 4) Composite Sr89 and Sr90 I x 10.11 Particulate Continuous Gas Monitor Noble Oases Gross 1 x 0(-6 (Note 4) Beta or Gamma Condenser Air Weekly Weekly Principle Gamma Ix 104 Ejector / Steam Emitters (Note 7)

Generator Grab Sample H3 x I(E6 M Blowdown Vent I (Note 6) H - tb BRT Vent . 1> -k U-Containment Prior to Release Prior to each Principle Gamma I x 1(4 Vacuum Steam Emitters (Note 2)

Ejector (liogger)

(Grab Sample)

(N ote 8)

Release __ __ _

j I x 10-6

DOMINION VPAP-2 103N REVISION 7 PAGE 52 OF 84 ATTACHMENT 4 (Page 2 of 4)

Radioactive Gaseous Waste Sampling and Analysis Program NOTE 1: For a particular measurement system (which may include radiochemical separation):

4.66 Sb E

  • V.4 2.22E+06 e Y
  • e-(At) (1-1)

Where:

LLD = the "a priori" (before the fact) Lower Limit of Detection as defined above (as microcuries per unit mass or volume) (See 4.9)

Sb = the standard deviation of the background counting rate or of the counting rate of a blank sample as appropriate (as counts per minute, cpm)

E = the counting efficiency (as counts per disintegration)

V the sample size (in units of mass or volume) 2.22E+06 = the number of disintegrations per minute (dpm) per microcurie Y = the fractional radiochemical yield (when applicable)

= the radioactive decay constant for the particular radionuclide At = the elapsed time between the midpoint of sample collection and time of counting Typical values of E, V, Y and At should be used in the calculation.

The LLD is an "a priori" (before the fact) limit representing the capability of a measurement system and not as "posteriori" (after the fact) limit for a particular measurement.

DOMINION VPAP-2 103N REVISION 7 PAGE 53 OF 84 ATTACHMENT 4 (Page 3 of 4)

Radioactive Gaseous Waste Sampling and Analysis Program NOTE 2: The principal gamma emitters for which the LLD specification applies exclusively are the following radionuclides: Kr Kr 8 8, Xe 13 3 , XeI3 3 m Xe 35 Xe 3 m, and Xe or gaseous 5 4 59 5 8 6 0 65 99 3 4 137 emissions and Mn , Fe , Co , Co , Zn , Mo , Cs' , Cs , Cc141 and C 144 for particulate emissions. This list does not mean that only these nuclides are to be detected and reported. Other peaks that are measurable and identifiable, at levels exceeding the LLD, together with the above nuclides, shall also be identified and reported.

NOTE 3: Sampling and analysis shall also be performed following shutdown, start-up, and whenever a thermal power change exceeding 15 percent of the rated thermal power occurs within any one-hour period, if:

a. Analysis shows that the dose equivalent 1131 concentration in the primary coolant is greater than 1.0 pCi/gm; and
b. The noble gas activity monitor shows that effluent activity has increased by more than a factor of 3.

NOTE 4: The ratio of the sample flow rate to the sampled stream flow rate shall be known for the period covered by each dose or dose rate calculation made in accordance with 6.3.1, 6.3.3, and 6.3.4.

NOTE 5: Samples shall be changed at least once per seven days and analyses shall be completed within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after changing (or after removal from sampler). Sampling shall also be performed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for at least seven days following each shutdown, start-up or thermal power change exceeding 15 percent of rated thermal power in one hour and analyses shall be completed within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of changing. When samples collected for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> are analyzed, the corresponding LLDs may be increased by a factor of 10. This requirement applies it.

a. Analysis shows that the dose equivalent 113 concentration in the primary coolant is greater than 1.0 pCi/gm and;
b. Noble gas monitor shows that effluent activity has increased more than a tactor of 3.

DOMINION VPAP-2103N REVISION 7 PAGE 54 OF 84 ATTACHMENT 4 (Page 4 of 4)

Radioactive Gaseous Waste Sampling and Analysis Program NOTE 6: Whenever the secondary coolant activity exceeds 10-5 mCi/ml, Condenser Air Ejector and Steam Generator Blowdown Vent samples shall be obtained and analyzed weekly.

Secondary coolant activity samples shall be collected and analyzed on a weekly basis.

These samples are analyzed for gross activity or gamma isotopic activity within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

NOTE 7: The principal gamma emitters for which the LLD specification applies exclusively are the following radionuclides: Kr87 Kr8 8 , Xel 33, Xel 3 3 m,Xel 3 5 , Xel35m, and Xe for gaseous emissions. This list does not mean that only these nuclides are to be detected and reported.

Other peaks that are measurable and identifiable, at levels exceeding the LLD together with the above nuclides, shall also be identified and reported.

NOTE 8: If the secondary coolant activity level in any Steam Generator supplying steam to the Hogger exceeds .OE-5 giCi/ml, Steam Generator samples shall be obtained and analyzed prior to release.

DOMINION VPAP-2103N REVISION 7 PAGE 55 OF 84 ATTACHMENT 5 (Page 1 of 3)

Gaseous Effluent Dose Factors (Gamma and Beta Dose Factors) x/Q = 9.3E-06 sec/m 3 at 1416 meters SE Direction Dose Factors for Ventilation Vent Kivv Livv Mivv N ivv Noble Gas Total Body Skin Gamma Air Beta Air Radionuclide mremfvr mrem/vr mrad/vr mrad/vr Curie/sec Curie/sec Curic/sec Curic/sec Kr-85m 1.09E+04 1.36E+04 1.14E+04 1.83E+04 Kr-85 1.50E+02 1.25E+04 1.60E+02 1.81 E+04 Kr-87 5.51 E+04 9.05E+04 5.74E+04 9.58E+04 Kr-88 1.37E+05 2.20E+04 1.41 E+05 2.72E+04 Kr-89 1.54E+05 9.39E+04 1.61 E+05 9.86E+04 Xe- 131 m 8.51 E+02 4.43E+03 1.45E+03 1.03 E+04 Xe- 133m 2.33 E+03 9.24E+03 3.04E+03 1.38E+04 Xe- 133 2.73E+03 2.85E+03 3.28E+03 9.77E+03 Xe- 135m 2.90E1+04 6.61 E+03 3.12E+04 6.87E+03 Xc-135 1.68E+04 1.73E+04 1.79E+04 2.29E+04 Xc- 137 1.32E+04 1.1 3E+05 1.40E+04 1.1 8E+05 Xc- 138 8.21 E+04 3.84E+04 8.57E+04 4.42E+04 Ar-41 8.22E+04 2.50(E+04 8.65E+04 3.05E+04

DOMINION VPAP-2103N REVISION 7 PAGE 56 OF 84 ATTACHMENT 5 (Page 2 of 3)

Gaseous Effluent Dose Factors (Gamma and Beta Dose Factors)

X/Q = 1.2E-06 sec/m3 at 1513 meters S Direction Dose Factors for Process Vent Kip Kipv Lipv Mipv Nipv Noble Gas Total Body Skin Gamma Air Beta Air Radionuclide mrcm/vr mrem/vr mrad/vr mrad/vr Curie/sec Curie/sec Curie/sec Curie/sec Kr-85m 1.40E+03 1.75E+03 1.48E+03 2.36E+03 Kr-85 1.93E+01 1.61 E+03 2.06E+01 2.34E+03 Kr-87 7.1 OE+03 1.17E+04 7.40E+03 1.24E+04 Kr-88 1.76E+04 2.84E+03 1.82E+04 3.52E+03 Kr-89 1.99E+04 1.21 E+04 2.08E+04 1.27E+04 Xe-13 Im 1.IOE+02 5.71 E+02 1.87E+02 1.33E+03 Xc- 133m 3.01 E+02 1.1 9E+03 3.92E+02 1.78E+03 Xe- 133 3.53 E+02 3.67E+02 4.24E+02 1.26E+03 Xe- 135m 3.74E+03 8.53 E+02 4.03 E+03 8.87E+02 Xe- 135 2.17E+03 2.23E+03 2.30E+03 2.95E+03 Xc- 137 1.70E+03 1.46E+04 I.81 E+03 1.52E+04 Xe- 138 1.06E+04 4.96E+03 1.11 E+04 5.70E+03 Ar-41 1.06E+04 3.23E+03 1.12E+04 3.94E+03

DOMINION VPAP-2103N REVISION 7 PAGE 57 OF 84 ATTACHMENT 5 (Page 3 of 3)

Gaseous Effluent Dose Factors (Inhalation Pathway Dose Factors)

Ventilation Vent x/Q = 9.3E-06 sec/m 3 at 1416 meters SE Direction Process Vent X/Q = 1.2E-06 sec/m3 at 1513 meters S Direction "3ivv pipv Radionuclide mrem/vr mrem/vr Curie/sec Curie/sec H-3 1.05E+04 1.35E+03 Cr-51 7.95E+02 1.02E+02 Mn-54 ND ND Fe-59 ND ND Co-58 ND ND Co-60 ND ND Zn-65 ND ND Rb-86 ND ND Sr-90 ND ND Y-91 ND ND Zr-95 ND ND Nb-95 ND ND Ru- 103 ND ND Ru-106 ND ND Ag-I lOm ND ND Te- 127m 5.64E+04 7.28E+03 Te- 129m 5.88E+04 7.59E+03 Cs- 134 ND. ND Cs- 136 ND ND Cs- 137 ND ND Ba- 140 ND ND Cc- 141 ND ND Cc-144 ND ND 1-131 1.51 E+08( 1.95E+07 1-133 3.58XE+07 4.62E+06 ND - No dlata for dose factor according to Regulatory Guide 1.109, Revision I

DOMINION VPAP-2103N

, REVISION 7 PAGE 58 OF 84 ATTACHMENT 6 (Page 1 of 3)

Radioactive Gaseous Effluent Monitoring Instrumentation INSTRUMENT MININIUMI OPERABLE ACTION CHANNELS

1. PROCESS VENT SYSTEM (a) Noble Gas Activity Monitor I-GW-RM-178-1 1 2,4 (NOTE 3)

(b) Iodine Sampler I-GW-RM-178-1 2, 5 Process Vent Continuous HP Sampler (NOTE 3)

(c) Particulate Sampler I-GW-RM- 178-1 2,5 Process Vent Continuous HP Sampler (NOTE 3)

(d) Total Flow Monitor I-GW-FT- 108 1 (e) Sampler Flow Rate Measuring Device MGPI Flow Rate Measuring Device l 1P Sampler Rotameter (NOTE 3)

2. CONDENSER AIR EJECTOR SYSTEM (a) Gross Activity Monitor Unit I I-SV-RM-121 l 3 Unit 2 2-SV-RM-221 (b) Flow Rate Measuring Device Unit I l-SV-FI-100A I-SV-VI- 101A I (NOTE I)

I-SV-FI- 10013 I-SV-v:;- I0 113 Unit 2 2-SV-I:1-200A 2-SV-1:1-20 1A I (NOTE 2) 2-SV-1l1-20013 2-SV-1:1-20 113

DOMINION VPAP-2 103N REVISION 7 PAGE 59 OF 84 ATTACHMENT 6 (Page 2 of 3)

Radioactive Gaseous Effluent Monitoring Instrumentation INSTRUMENT MININIJUNI OPERABLE ACTION CHANNELS

3. VENTILATION VENT A (a) Noble Gas Activity Monitor rt, 4 I-VG-RM-179-1 ( 2 (NOTE 3)

(b) Iodine Sampler I-VG-RM- 179-1 2 Vent Vent A Continuous HP Sampler (NOTE 3)

(c) Particulate Sampler I-VG-RM- 179-1 2 Vent Vent A Continuous HP Sampler (NOTE 3)

(d) Total Flow Monitor 1-HV-FT-1212A I (c) Sampler Flow Rate Measuring Device MGPI Flow Rate Measuring Device 1 HP Sampler Rotameter (NOTE 3)

4. VENTILATION VENT B (a) Noble Gas Activity Monitor I-VG-RM-180-1 I 2 (NOTE 3)

(b) Iodine Sampler I -VG-RM- 180-1 2 Vent Vent 13 Continuous IIP1 Sampler (NOTE 3)

(c) Particulatc Sampler I-VCi-RM- 180-1 I 2 N ie Vent Vent B Continuous 111 Sampler (NOTE 3)

(d) Total Flow Monitor I-IIV-I1-7121213 (c) Sampler Flow Rate Measuring Device MCi'I llow Rate Measuring D)evice IIP Sampler Rotamieter NOTE 3

DOMINION VPAP-2 103N REVISION 7 PAGE 60 OF 84 ATTACHMENT 6 (Page 3 of 3)

Radioactive Gaseous Effluent Monitoring Instrumentation ACTION 1: If the number of operable channels is less than required, effluent releases, via this path, may continue if the flow rate is estimated at least once per four hours.

ACTION 2: If the number of operable channels is less than required, effluent releases, via this path, may continue if grab samples are taken at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and these samples are analyzed for gross activity or gamma isotopic activity within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

ACTION 3: If the number of operable channels is less than required, effluent releases via this path may continue ifgrab samples are obtained in accordance with TRM TR 3.4.5 and these samples are analyzed for gross activity or gamma isotopic activity within eight hours.

ACTION 4: If the number of operable channels is less than required, the contents of the Waste Gas Decay Tanks may be released to the environment provided that prior to initiation of the release:

a. At least two independent samples of the tank's contents are analyzed, and:
b. At least two technically qualified members of the Station staff independently verify the release rate calculations and discharge valve lineup.

ACTION 5: If the number of operable channels is less than required, effluent releases from the Waste Gas Decay Tank may continue provided samples are continuously collected with auxiliary sampling equipment as required in Radioactive Gaseous Waste Sampling and Analysis Program (Attachment 4).

NOTE 1: A channel shall consist of:

a. The flow instrument installed in the ejector througl which the discharge is routed; either Train A (I-SV-FI-I00A, 101A), or Train B (I-SV-FI-I00B, 1013B) or both.
b. Flow instruments 101 A and 101 B provide low range measurement. FIlow instruments IO0A and I00B provide high range measurement.

NOTE 2: A channel shall consist of.

a. The low instrument installed in the cjcctor through which the discharge is routed; cither 'Train A (2-SV-1F1-200A, 201 A), or Train 13 (2-SV-:1-200B, 201 B) or both.
b. Flow instruments 201 A and 2011Bprovide low range measurement. Flow instruments 200A anl 20013 provide high range measurement.

NOTI 3: A channel shall consist ol'a MGPI monitor; and a MGPI or I IP particulate and iodine sampler, and its associated sampler flow rate measuring device or rotanmeter.

)

DOMINION VPAP-2103N REVISION 7 PAGE 61 OF 84 ATTACHMENT 7 (Page 1 of 3)

Radioactive Gaseous Effluent Monitoring Instrumentation Surveillance Requirements CHANNEL DESCRIPTION CHANNEL SOURCE CHANNEL Channel CHECK CHECK CALIBRATION Operational Test

1. PROCESS VENT SYSTEM (a) Noble Gas Activity Monitor I-GW-RM-178-1 - D M (NOTE 5) R Q (NOTE 1)

I-a2 (b) Iodine Sampler I-GW-RM-178-1 W N/A N/A N/A Process Vent Continuous HP Sampler D (NOTE 3) N/A N/A N/A (c) Particulate Sampler I-GW-RM-178-1 W N/A N/A N/A Process Vent Continuous H P Sampler D (NOTE 3) N/A N/A N/A (d) Total Flow Monitor I-GW-FT-108 D N/A R Q (e) Sampler Flow Rate Measuring Device MGPI Flow Rate Measuring D (NOTE 3) N/A R N/A Device HrP Sampler Rotameter D (NOTE 3) N/A SA N/A

2. CONDENSER AIR EJECTOR SYSTEM (a) Noble Gas Activity Monitor Unit I l-SV-RM-121 1) M R Q(NO'I'I, I)

Unit 2 2-SV-RM-221 (b) Flow Ratc MeasuringL Devicc Unit I I-SV-FI-IOOA I-SV-FI-I101A 1) N/A R N/A I -SV-i- I 0113 I-SV-FI-7110113 Unit 2 2-SV-FI-200A 2-SV-i 1-20(1 1) N/A R N/A 2-SV-11-2()113

DOMINION VPAP-2 103N REVISION 7 PAGE 62 OF 84 ATTACHMENT 7 (Page 2 of 3)

Radioactive Gaseous Effluent Monitoring Instrumentation Surveillance Requirements CHANNEL DESCRIPTION CHANNEL SOURCE CHANNEL Channel CHECK CHECK CALIBRATION Operational Test

3. VENTILATION VENT A (a) Noble Gas Activity Monitor I-VG-RM-179-1 D M (NOTE 5) R Q (NOTE 2)

(b) Iodine Sampler I-VG-RM-179-1 W N/A N/A N/A Vent Vent A Continuous HP Sampler D (NOTE 3) N/A N/A N/A (c) Particulate Sampler 1-VG-RM-179-1 W N/A N/A N/A 1"A"' G

'I) -=

Vent Vent A Continuous HP D (NOTE 3) C-" r.

Sampler N/A N/A N/A (d) Total Flow Monitor 1-HV-FT-1212A D N/A R Q (e) Sampler Flow Rate Measuring Device MGPI Flow Rate Measuring D (NOTE 3) N/A R N/A Device HP Sampler Rotameter D (NOTE 3) N/A SA N/A

4. VENTILATION VENT B r., 02, (a) Noble Gas Activity Monitor lb I-VG-RM-180-1 D M (NOTE 5) R Q (NOTE 2)  :!. L (b) Iodine Sampler I -VG-RM- 180-1 W N/A N/A N/A Vent Vent B Continuous lIP Sampler I) (NOTE 3) N/A N/A N/A (c) Particulate Sampler r C-I-VG-RM-180-I Vent Vent B Continuous 111' W N/A N/A N/A la--tZ1:tl Samplcr I) (NO'1TE 3) N/A N/A N/A (d) Total I-low Monitor I-IIV-I1:-121213 1) N/A R Q (e) Sampler llow Ratc Measuring l)evice M(;lI Flow Rtate Measuring I) (NOTE 3) N/A R N/A I)evice 111' Sampler Rotaniletr I) (NOTI( 3) N/A SA N/A

DOMINION VPAP-2103N REVISION 7 PAGE 63 OF 84 ATTACHMENT 7 (Page 3 of 3)

Radioactive Gaseous Effluent Monitoring Instrumentation Surveillance Requirements NOTE I: The Channel Operational Test shall demonstrate:

a. Automatic actuation of the valves in this pathway and Control Room alarm annunciation occur if the instrument indicates measured levels above the alarm / trip setpoint.
b. Alarm annunciation occurs if the instrument controls not set in "operate" mode.

NOTE 2: The Channel Operational Test shall demonstrate:

a. Control Room alarm annunciation occurs if the instrument indicates measured levels are above the alarm / trip setpoint.
b. Alarm annunciation occurs if the instrument controls not set in "operate" mode.

NOTE 3: Channel Checks shall consist of verifying indication of flow during periods of release.

Channel Checks shall be made at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> on days on which continuous, periodic, or batch releases are made. Verification need only to be done to verify operability of one train, either MGPI or HP Sampler.

NOTE 4: The Channel Operational Test shall demonstrate that:

a. Control Room alarm annunciation occurs if the instrument indicates measured levels are above alarm / trip setpoint.
b. The Instrument mode selection control automatically resets to "operate" mode when released.

NOTE 5: Monitors l-GW-RM-178-1, I-VG-RM-179-l, and I-VG-RM-180-1 perforn periodic source checks automatically.

DOMINION VPAP-2 I 03N REVISION 7 PAGE 64 OF 84 ATTACHMENT 8 (Page I of 1)

Critical Organ Dose Factors (Critical Pathway Dose Factors)

Ventilation Vent D/Q = 2.4E-09 m-2 at 3250 meters N Direction Process Vent D/Q = 1.1 E-09 m-2 at 3250 meters N Direction RMivv Rm jpV Radionuclide mrem/yr mrem/vr Curie/sec Curielsec H-3 1.73E+03 9.366E+02 Mn-54 ND ND Fc-59 ND ND Cr-SI 1.50E+02 6.89E+01 Co-58 ND ND Co-60 ND ND Zn-65 ND ND Rb-86 ND ND Sr-89 ND ND Sr-90 ND ND Y-91 ND ND Zr-95 ND ND Nb-95 ND ND Ru-103 ND ND Ru- 106 ND ND Ag-IIOm ND ND Te-127m 1.97E+05 9.04E+04 Tc-129m 2.95E+05 1.35E+05 1-131 1.45E+09 6.7213+08 1-133 1.33E+07 6.12E+06 Cs- 134 ND ND Cs- 136 ND ND Cs- 137 ND ND Ba-140_ ND ND Cc-1 41 ND ND Cc-144 ND ND ND - No dlata for dose lactor aecording to Regulatory Guide 1.109, Revision I

DOMINION VPAP-2103N REVISION 7 PAGE 65 OF 84 ATTACHMENT 9 (Page l of 5)

Radiological Environmental Monitoring Program Exposure Pathway Number of Sample and Collection Typc and Frequency ot and/or Sample Sample Location (NOTE 2) Frequency Analysis I. DIREC Y RADIATION (NOTE 3) 36 routine monitoring stations, either with two or more dosimeters or with one instrument for measuring and recording dose rate continuously, to be placed as follows:

I) An inner ring of stations, one in each emergency GAMMA DOSE meteorological sector within the site bounda

2) An outer ring of stations, one in each emergency Quarterly Quarterly meteorological sector within 8 km range from the site
3) The balance of the stations to be placed in special interest areas such as population centers, nearby residences, schools, and in I or 2 areas to serve as control stations

DOMINION VPAP-21 03N REVISION 7 PAGE 66 OF 84 ATTACHMENT 9 (Page 2 of 5)

Radiological Environmental Monitoring Program Exposure Pathway Number ot Sample and Collection Type and l requency ot and/or Sample Sample Location (NOTE 2) Frequency Analysis

2. AIKBURKN Samples from 5 locations:

a) 3 samples from close to the 3 site boundary locations (in different Radioiodine Canister sectors) of the highest 1131 Analysis, weekly calculated historical annual average ground Continuous Radioiodines and level D/Q sampler, Particulates b) 1 sample from the operation with vicinity of a community sample collection Particulate Sampler having the highest weekly Gross beta radioactivity calculated annual analysis following filter average ground level change; (NOTE 4)

D/Q c) I sample from a control Gamma isotopic analy-location 15-40 km sis of composite (by distant and in the least location) quarterly prevalent wind direction (NOTE 5)

.3. WAI EKRBRNE Samples from 3 locations:

a) I sample upstream Gamma isotopic analysis monthly; (NOTE 5) a) Surface b) I sampiledownstream Grab Monthly mo ite fOr ti Composite for tritium c) I sample from cooling analysis quarterly lagoon

) dSample from I or 2 sources Gramma isotopic and tritium b) Ground only if likely to be atcted Grab Quartrly analysis quarterly (NOTE l sample from downstream Garnrna isotopic analysis c) Sediment area with existing or Semi-Annually sGmmi-annually (NOTE 5) potential recreational value

DOMINION VPAP-21 03N REVISION 7 PAGE 67 OF 84 ATTACHMENT 9 (Page 3 of 5)

Radiological Environmental Monitoring Program Exposure Pathway Number of Sample and Collection Type and Frequency of and/or Sample Sample Location (NOTE 2) Frequency Analysis

4. INiESl ION a) Samples from milking animals in 3 locations within 5 km that have the highest potential. If there are none, then I sample from milking animals in each of 3 areas a) Milk between 5 to 8 km where Monthly at all Gamma isotopic (NOTE 5)

(NOTE 7) doses are calculated to be times and 1131 analysis monthly greater than I mrem per yr (NOTE 6) b) I sample from milking animals at a control location (15-30 km in the least prevalent wind direction) a) I sample of commercially and recreationally important species (bass, sunfish, catfish) b) Fish and in vicinity of plant discharge Semiannually Gamma isotopic on edible Invertebrates area portions b) I sample of same species in areas not influenced by plant discharge a) Samples of an edible broad leaf vegetation grown nearest each of two different otTsite locations of highest predicted historical annual average Monthly if c) Food Products ground level D/Q if milk available, or Gamma isotopic (NOTE 5) sampling is not perfonned at harvest and I analysis b) I sample of broad leaf vegetation grown 15-30 km in the least prevalent wind direction if milk sampling is not performed

DOMINION VPAP-2103N REVISION 7 PAGE 68 OF 84 ATTACHMENT 9 (Page 4 of 5)

Radiological Environmental Monitoring Program NOTE 1: The number, media, frequency, and location of samples may vary from site to site. This table presents an acceptable minimum program for a site at which each entry is applicable.

Local site characteristics must be examined to determine if pathways not covered by this table may significantly contribute to an individual's dose and be included in the sampling program.

NOTE 2: For each and every sample location in Environmental Sampling Locations (Attachment 10), specific parameters of distance and direction sector from the centerline of the reactor, and additional description where pertinent, shall be provided in Attachment 10. Refer to Radiological Assessment Branch Technical Positions and to NUREG-0 133, Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plant. Deviations are permitted from the required sampling schedule if specimens are unattainable due to hazardous conditions, seasonal unavailability, malfunction of automatic sampling equipment and other legitimate reasons. If specimens are unattainable due to sampling equipment malfunction, every effort shall be made to complete corrective action before the end of the next sampling period. 'All deviations from the sampling schedule shall be documented in the Annual Radiological Environmental Operating Report pursuant to 6.7. 1.

It is recognized that, at times, it may not be possible or practicable to continue to obtain samples of the media of choice at the most desired location or time. In these instances, suitable alternative media and locations may be chosen for the particular pathway in question and appropriate substitutions made within 30 days in the radiological environmental monitoring program. In lieu of a Licensee Event Report and pursuant to 6.7.2, identify the cause of the unavailability of samples for that pathway and identify the new locations for obtaining replacement samples in the next Annual Radioactive Effluent Release Report, and include revised figures and tables from the ODCM reflecting the new locations in the report.

DOMINION VPAP-2103N REVISION 7 PAGE 69 OF 84 ATTACHMENT 9 (Page 5 of 5)

Radiological Environmental Monitoring Program NOTE 3: One or more instruments, such as a pressurized ion chamber, for measuring and recording dose rate continuously may be used in place of, or in addition to, integrating dosimeters.

For the purposes of this table, a thermoluminescent dosimeter (TLD) is considered to be one phosphor; two or more phosphors in a packet are considered as two or more dosimeters.

Film badges shall not be used as dosimeters for measuring direct radiation. The 36 stations are not an absolute number. The number of direct radiation monitoring stations may be reduced according to geographical limitations, e.g., at an ocean site, some sectors will be over water so that the number of dosimeters may be reduced accordingly. The frequency of analysis or readout for TLD systems will depend upon the characteristics of the specific system used and should be selected to obtain optimum dose information with minimal fading.

NOTE 4: Airborne particulate sample filters shall be analyzed for gross beta radioactivity 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or more after sampling to allow for radon and thoron daughter decay. If gross beta activity in air particulate samples is greater than ten times the yearly mean of control samples, gamma isotopic analysis shall be performed on the individual samples.

NOTE 5: Gamma isotopic analysis is the identification and quantification of gamma-emitting radionuclides that may be attributable to effluents from the facility.

NOTE 6: The dose shall be calculated for the maximum organ and age group, using the methodology and parameters in the ODCM.

NOTE 7: If milk sampling cannot be performed, use item 4.c (Page 3 of 5, Radiological Environmental Monitoring Program (Attachment 9)).

DOMINION VPAP-2103N REVISION 7 PAGE 70 OF 84 ATTACHMENT 10 (Page 1 of 4)

Environmental Sampling Locations Distance and Direction From Unit No. I sample Loca Station listance Directio Collection Remarks Media I nNo. Iat I(Miles I Directiony Environmental NAPS Sewage Quarterly & On-Site 01 0.20 NE TLDs I Treatment Plant Annually Frederick's Hall 02 5.30 SSW Quarterly&

____ ___ ___ _ ____ __ ___ _ __ ___ ___ A nnually Mineral,VA 03 7.10 WSW Quarterly &

____ ____ ____ _ ___ _ ____ _ _ ____ ___ A n nually Wares Crossroads 04 5.10 WNW Quarterly&

_______ ___ _ ____ __ ___ _ __ ___ ___ A nnually Route 752 05 4.20 NNE Auarterly&

Sturgeon's Creek 05A 2.04 N Quarterly &

Marina Annually Levy, VA 06 4.70 ESE Quarterly&

____ ______ ___ __ ___ ___ A nnually _ _ _ _ _ _

Bumpass, VA 07 7.30 SS Quarterly&

_______A nnually _ _ _ _ _ _

End of Route 685 21 1.00 WNW Quarterly& Site Boundary

.Annually Route 700 22 1.00 WSW Quarterly& Site Boundary

_ _ _ ___ _ _ _ _ _ _ _ _ A n n u ally _ _ _ _ _ _

"Aspen Hills" 23 0.93 SSE Quarterly& Site Boundary

_ _ ___ __ ___ ___ _ _ _ _ _ _ _ _ A n n u ally _ _ _ _ _ _

Orange.

Orang VA 24 _ __ _

22.00

___VA__

NW_ __

Quarterly& Control

_Annually BearingCoolingTowe N- 1/33 0.06 N Quarterly On-Site Sturgeon's Creek N-2/34 2.04 N Quarterly Marina Parking Lot "C" NNE-3/35 0.24 NNE Quarterly Cin-Sitc Good Hope Church NNE-4/36 4.96 NNE Quarterly Parking Lot "B" NE-5/37 0.20 NE Quarterly C ___.__ _ _ __ __ '_

Bogg's Drive NE-6/38 1.46 NE Quarterly Weathcr Tower Fence ENE-7/39 0.36 ENE Quarterly CFn-Sitc Route 689 ENE-8/40 2.43 ENE Quarterly Near Training Facility E-9/41 0.30 E Quarterly C)n-Site

'Morning Ulory Hill" FT 042 2.85 E_ Quarterly Island Dike (). ZSE ESEEt143 Quarterly C)n-Site Lrb I 'yq i J ' L -7 Koute OLL tab t- 12/144 4./7) Quarterly

DOMINION VPAP-2103N REVISION 7 PAGE 71 OF 84 ATTACHMENT 10 (Page 2 of 4)

Environmental Sampling Locations Distance and Direction From Unit No. 1 Sample Station Distance Collection Media I I No.oI (Miles) I IFrequency .R Environmental Biology Lab SE-13/45 0.75 SE Quarterly On-Site TLDs I Route (aEtr 701 SE-14/46 5.88 SE Quarterly (Dam Entrance)

"Aspen Hills" SSE- 15/47 0.93 SSE Quarterly Site Elk Creek SSE-16/48 2.33 SSE Quarterly NAPS Access Road S-17/49 0.47 S Quarterly On-Site Elk Creek Church S-18/50 1.55 5 Quarterly NAPS Access Road SSW- 19/51 0.42 SSW Quarterly On-Site Route 618 SSW-20/52 5.30 SSW Quarterly 500KV Tower SW-21/53 0.60 SW Quarterly On-Site Route 700 SW-22/54 4.36 SW Quarterly NAPS Radio Tower WSW-23/55 0.38 WSW Quarterly On-Site Route 700 WSW-24/56 1.00 WSW Quarterly Site

____ ___ ____ ____ Boundary South Gate of W-25/57 0.32 W Quarterly On-Site Switchyard _ _ _ _ _____

Route 685 W-26/58 1.55 W Quarterly End of Route 685 WNW-27/59 1.00 WNW Quarterly Site Route 685 WNW-28/6( 1.40 WNW Quarterly Laydown Area North NW-29/61 0.45 NW Quarterly On-Site G ate _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Lake Anna Campground NW-30/62 2.54 NW Quarterly

  1. I/#2 Intake NNW-31/63 0.07 NNW Quarterly On-Sitc Route 208 NNW-32/64 3.43 NNW Quarterly Bumpass Post Office C-1/2 7.30 SSE Quarterly Control Orange, VA C-3/4 22.00 NW Quarterly Control Mineral, VA C-5/6 7.10 WSW Quarterly Control Louisa, VA C-7/8 11.54 WSW Quarterly Control Louisa, VA C-7/8 11.54 wSW Quarterly Control

DOMINION VPAP-2103N REVISION 7 PAGE 72 OF 84 ATTACHMENT 10 (Page 3 of 4)

Environmental Sampling Locations Distance and Direction From Unit No. 1 Sampled Location NStion Distance Direction Collection Remarks MedampLcto No. (Miles) Frequency Airborne NAPS Sewage 01 0.20 NE Weekly On-Site Treatment Plant Particulate Frederick's Hall 02 5.30 SSW Weekly and Mineral, VA 03 7.10 WSW Weekly Radioiodine Wares Crossroads 04 5.10 WNW Weekly Route 752 05 4.20 NNE Weekly Sturgeon's Creek 05A 2.04 N Weekly Marina I Levy, VA 06 4.70 ESE Weekly Bumpass, VA 07 7.30 SSE Weekly End of Route 685 21 1.00 WNW Weekly Site Boundary Route 700 22 1.00 WSW Weekly Site Boundary "Aspen Hills" 23 0.93 SSE Weekly Site Boundary Orange, VA 24 22.00 NW Weekly Control Surtace Water Waste Heat Treatment Commitment Facility (Second 08 1.10 SSE Monthly 3.2.21 Cooling Lagoon)

North Anna River (upstream) Rt 669 09A 12.9 WNW Monthly Control Bridge (Brook's B ridge)__ _ __ _ _ ___ _ _ _ _ _

North Anna River 5.80 SE Monthly

_ _ (downstream)

(ell water) Biology Lab 0IA 0.75 SE Quarterly Aquatic Waste Heat Treatment Sediment Facility (Second (8 1.1( SSE Scmi-Annually Cooling Lagoon) __________

North Anna River (upstream) Rt 669 09A 12.9 WNW Semi-Annually Control Bridge (Brook's Bridge)

North Anna River I1 5.80 SE Semni-Annually (downstream)

Shoreline Soil Lake Anna (8 1.1( SSE Semi-Annually Soil NAPS Sewage 01 0.20 NE Once per 3 yrS On-Site Treatment Plant I

DOMINION VPAP-2103N REVISION 7 PAGE 73 OF 84 ATTACHMENT 10 (Page 4 of 4)

Environmental Sampling Locations Distance and Direction From Unit No. 1 Sample Location Station Distance Direction Collection Remarks Media No. (Miles) Frequency Soil Fredericks Hall - 5.3() SSW Once per 3 yr_

(continued) Mineral, VA 03 7.10 WSW Once per 3 yr Wares Crossroads 04 5.10 WNW Once per 3 yr Route 752 05 4.20 NNE Once per 3 yr Sturgeon's Creek 05A 2.04 N Once per 3 yr Marina I

Levy, VA 06 4.70 ESE Once per 3 yr Bumpass, VA 07 7.30 SSE Once per 3 yr End of Route 685 21 1.00 WNW Once per 3 yr Site Boundary Route 700 22 1.00 WSW Once per 3 yr Site Boundary "Aspen Hills" 23 0.93 SSE Once per 3 yr Site Boundary Orange, VA 24 22.00 NW Once per 3 yr Control Milk Holladay Dairy 12 8.30 NW Monthly (R.C. Goodwin) . I Terrell's Dairy 13 5.60 SSE Monthly (Frederick's Hall)

Waste Heat Treatment Fish Facility (Second 08 1.10 SSE Semi-Annually Cooling Lagoon)

Lake Orange 25 16.50 NW Semi-Annually Control Food Products Bel Aire Plantation 14 varies NE Monthly (Edible if available, broadleaf Route 614 15 varies SE or at harvest vegetationa)

Route 629 / 522 16 varies NW Control Historic Ln 26 varies S "Aspen Hills" Area 23 varies SSE

a. If edible broadleaf vegetation is unavailable, non-edible vegetation of similar leaf characteristics may be substituted.

DOMINION VPAP-2103N REVISION 7 PAGE 74 OF 84 ATTACHMENT 11 (Page 1 of 2)

Detection Capabilities for Environmental Sample Analysis LOWER LIMIT OF DETECTION (LLD)

Airborne Fish Food Sediment Analysis Water Particulate (pCFikg ( Milk Products (pCi/kg)

(NOTE 2) (pCi/I) or Gases (wet) (pC/) (pCi/kg) (do)

(pCi/in 3 ) (wet)(wt(dy Gross beta 4 0.01 H-3 2,000 Mn-54 15 130 Fe-59 30 260 Co-58,60 15 130 Zn-65 30 260 Zr-95 30 Nb-95 15 1-131 (NOTE 3) 1 0.07 1 60 Cs-134 15 0.05 130 15 60 150 Cs- 137 18 0.06 150 18 80 180 Ba-140 60 60 La- 140 15 15 NOTE 1: Required detection capabilities for thermoluminescent dosimeters used for environmental measurements are given in Regulatory Guide 4.13.

NOTE 2: This list does not mean that only these nuclides are to be detected and reported. Other peaks that are measurable and identifiable, together with the above nuclides, shall also be identified and reported.

NOTE 3: LLD for the ground (drinking) water samples. Thle LLD fbr the surface (non-drinking) water samples is 10 pCi/l.

DOMINION VPAP-2 103N REVISION 7 PAGE 75 OF 84 ATTACHMENT 1 1 (Page 2 of 2)

Detection Capabilities for Environmental Sample Analysis LOWER LIMIT OF DETECTION (LLD) (NOTE 3)

NOTE 3: For a particular measurement system (which may include radiochemical separation):

LLD= 4.66 Sb E e V

  • 2.22E+06
  • Y -(X~) (25-1)

Where:

LLD = the "a priori" (before the fact) Lower Limit of Detection as defined above (as microcuries per unit mass or volume) (See 4.9) sb= the standard deviation of the background counting rate or of the counting rate of a blank sample as appropriate (as counts per minute, cpm)

E = the counting efficiency (as counts per disintegration)

V = the sample size (in units of mass or volume) 2.22E+06 = the number of disintegrations per minute (dpm) per microcurie Y = the fractional radiochemical yield (when applicable)

= the radioactive decay constant for the particular radionuclide At = the elapsed time between sample collection (or end of the sample collection period) and time of counting (for environmental samples, not plant effluent samples)

Typical values of E, V, Y and At should be used in the calculation.

The LLD is an "a priori" (before the fact) limit representing the capability of a measurement system and not a "posteriori" (after the fiact) limit for a particular mcasuremcnt.

DOMINION VPAP-2103N REVISION 7 PAGE 76 OF 84 ATTACHMENT 12 (Page 1 of 1)

Reporting Levels for Radioactivity Concentrations in Environmental Samples nWater Airborne Fish Milk Food Products Analysis Particulate or (pCi/kg, wet) pCiII) (pCilkg, vet) 3 (p~i/1) Gases (pCi/rn ) (~/g e) (~/) (~/

H-3 (NOTE 1)

H-3 20,000 Mn-54 1,000 30,000 Fe-59 400 10,000 _

Co-58 1,000 30,000 Co-60 300 10,000 Zn-65 300 20,000 Zr-Nb-95 400 1-131 2 0.9 3 100 Cs-134 30 10 1,000 60 1,000 Cs-137 50 20 2,000 70 2,000 Ba-La- 140 200 300 NOTE l: For drinking water samples

DOMINION VPAP-2 103N REVISION 7 PAGE 77 OF 84 ATTACHMENT 13 (Page 1 of 8)

Meteorological, Liquid, and Gaseous Pathway Analysis 1.0 METEOROLOGICAL ANALYSIS 1.1 Purpose The purpose of the meteorological analysis was to determine the annual average X/Q and D/Q values at critical locations around the Station for ventilation vent (ground level) and process vent (mixed mode) releases. The annual average X/Q and D/Q values were used to perform a dose pathway analysis to determine both the maximum exposed individual at site boundary and member of the public. The X/Q and D/Q values resulting in the maximum exposures were incorporated into the dose factors in Gaseous Effluent Dose Factors (Attachment 5) and Critical Organ Dose Factors (Attachment 8).

1.2 Meteorological Data, Parameters, and Methodology Onsite meteorological data for the period January 1, 1981, through December 31, 1981, were used in calculations. These data included wind speed, wind direction, and differential temperature for the purpose of determining joint frequency distributions for those releases characterized as ground level (e.g., ventilation vent), and those characterized as mixed mode (i.e., process vent). The portions of release characterized as ground level were based on AT15 8 9.ft- 2 8.2 f and 28.2 foot wind data, and the portions characterized as mixed mode were based on AT 1 58.9f.28 2ft and 158.9 ft wind data.

X/Q's and D/Q's were calculated using the NRC computer code "XOQDOQ - Program for the Meteorological Evaluation of Routine Effluent Releases at Nuclear Power Stations,"

September, 1977. The code is based upon a straight line airflow model implementing the assumptions outlined in Section C (excluding C I a and C Ib) of Regulatory Guide 1.I I 1, "Methods for Estimating Atmospheric Transport and Dispersion of Gaseous Effluents in Routine Releases from Light-Water-Cooled Reactors."

The open terrain adjustment factors were applied to the X/Q values as recommended in Regulatory Guide 1.I I l. The site region is characterized by gently rolling terrain so open terrain correction factors were considered appropriate. The ground level ventilation vent release calculations included a building wake correction based on a 1516 m2 containment minimum cross-sectional area.

DOMINION VPAP-2103N REVISION 7 PAGE 78 OF 84 ATTACHMENT 13 (Page 2 of 8)

Meteorological, Liquid, and Gaseous Pathway Analysis The effective release height used in mixed mode release calculations was based on a process vent release height of 157.5 ft, and plume rise due to momentum for a vent diameter of 3 in.

with plume exit velocity of 100 fl/sec. Ventilation vent, and vent releases other than from the process vent, are considered ground level as specified in Regulatory Guide 1.1 II for release points less than the height of adjacent solid structures. Terrain elevations were obtained from North Anna Power Station Units I and 2, Virginia Electric and Power Company Final Safety Analysis Report Table 11C.2-8.

X/Q and DIQ values were calculated for the nearest site boundary, resident, milk cow, and vegetable garden by sector for process vent and ventilation vent releases at distances specified from North Anna Power Station Annual Environmental Survey Data for 1981. X/Q values were also calculated for the nearest lake shoreline by sector for the process vent and ventilation vent releases.

According to the definition for short term in NUREG-0 133, "Preparation of Radiological Effluent Technical Specifications for Nuclear Power Stations," October, 1978, some gaseous releases may fit this category, primarily waste gas decay tank releases and containment purges.

However, these releases are considered long term for dose calculations as past releases were both random in time of day and duration as evidenced by reviewing past release reports.

Therefore, the use of annual average concentrations is appropriate according to NUREG-0 133.

The X/Q and D/Q values calculated from 1981 meteorological data arc comparable to the values presented in the North Anna Power Station UFSAR.

1.3 Rcsults The X/Q value that resulted in the maximum total body, skin and inhalation exposure for ventilation vent releases was 9.3E-06 sec/m 3 at a site boundary location 1416 meters SE sector. For process vent releases, the site boundary X/Q value was 1.2E-06 sec/rn3 at a location 1513 meters S sector. The shoreline X/Q value that resulted in the maximum inhalation exposure for ventilation vent releases was I .OE-04 sec/1113 at a location 274 meters NN E sector.

The shoreline X/Q value for process vent was 2.7E-06 sec/ln 3 at a location 274 meters NNE sector.

DOMINION VPAP-2103N REVISION 7 PAGE 79 OF 84 ATTACHMENT 13 (Page 3 of 8)

Meteorological, Liquid, and Gaseous Pathway Analysis Pathway analysis indicated that the maximum exposure from 1-131, 1133, and from all radionuclides in particulate form with half-lives greater than 8 days was through the grass-cow-milk pathway. The D/Q value from ventilation vent releases resulting in the maximum exposure was 2.4E-09 per m2 at a location 3250 meters N sector. For process vent releases, the D/Q value was 1.1 E-09 per m2 at a location 3250 meters N sector. For tritium, the XIQ value from ventilation vent releases resulting in the maximum exposure for the milk pathway was 7.2E-07 sec/m 3 , and 3.9E-07 sec/m 3 for process vent releases at a location 3250 meters N sector.

2.0 LIQUID PATHIWVAY ANALYSIS 2.1 Purpose The purpose of the liquid pathway analysis was to determine the maximum exposed member of the public in unrestricted areas as a result of radioactive liquid effluent releases. The analysis includes a determination of most restrictive liquid pathway, most restrictive age group, and critical organ. This analysis is required for Subsection 6.2.

2.2 Data, Parameters, and Methodology Initially, radioactive liquid effluent release data for the years 1979, 1980, and 1981 were compiled from the North Anna Power Station semi-annual effluent release reports. The data for each year, along with appropriate site specific parameters and default selected parameters, were entered into the NRC computer code LADTAP as described in NUREG-0 133.

Re-concentration of effluents using the small lake connected to larger water body model was selected with the appropriate parameters determined from Table 3.5.3.5, Design Data for Reservoir and Waste Heat Treatment Facility from Virginia Electric and Power Company, Applicant's Environmental Report Supplement, North Anna Power Station, Units I and 2, March 15, 1972. Dilution factors for aquatic foods, shoreline, and drinking water were set to one. Transit time calculations were based on average flow rates. All other parameters were detfaults selected by the LADTAP computer code.

DOMINION VPAP-2 103N REVISION 7 PAGE 80 OF 84 ATTACHMENT 13 (Page 4 of 8)

Meteorological, Liquid, and Gaseous Pathway Analysis Beginning in 1997, the activity by nuclide released in the previous year is entered into the North Anna Power Station liquid pathway critical organ calculations spreadsheet, which calculates the most limiting age group total body and critical organ. This Process is repeated annually.

2.3 Results Initially, the fish pathway resulted in the largest dose. The critical organ each year was the liver, and the adult and teenage age groups received the same organ dose. However, since the adult total body dose was greater than the teen total body dose for each year, the adult was selected as the most restrictive age group. Beginning in 1997, the most limiting age group for both total body and critical organ is calculated from the spreadsheet for North Anna Power Station liquid pathway critical organ calculations.

3.0 GASEOUS PATHWAY ANALYSIS 3.1 Purpose A gaseous effluent pathway analysis was performed to determine the location that would result in the maximum doses due to noble gases for use in demonstrating compliance with 6.3.1.a.

and 6.3.3.a. The analysis also included a determination of the critical pathway, location of maximum exposed member of the public, and the critical organ for the maximum dose due to 1131, 1133, tritium, and for all radionuclides in particulate form with half-lives greater than 8 days for use in demonstrating compliance with requirements in 6.3.4.a.1. In addition, the analysis included a determination of the critical pathway, maximum agc group, and sector location of an exposed individual through the inhalation pathway from 1131, 1133, tritium, and particulates with half-lives greater than 8 days to demonstrate compliance with 6.3.1 .a..

DOMINION VPAP-2103N REVISION 7 PAGE 81 OF 84 ATTACHMENT 13 (Page 5 of 8)

Meteorological, Liquid, and Gaseous Pathway Analysis 3.2 Data, Parameters, and Methodology Annual average X/Q values were calculated, as described in Section I of this attachment, for the nearest site boundary in each directional sector and at other critical locations beyond the site boundary. The largest X/Q value was determined to be 9.31E-06 sec/m 3 at site boundary for ventilation vent releases at a location 1416 meters SE direction, and 1.2E-06 sec/m 3 at site boundary for process vent releases at a location 1513 meters S direction. The maximum doses to total body and skin, and air doses for gamma and beta radiation due to noble gases, would be at these site boundary locations. The doses from both release points are summed in calculations to calculate total maximum dose.

Step 6.3.1 .a.2 dose limits apply specifically to the inhalation pathway. Therefore, the locations and X/Q values determined for maximum noble gas doses can be used to determine the maximum dose from 1131, 1133, tritium, and for all radionuclides in particulate form with half-lives greater than 8 days for the inhalation pathway.

The N RC computer code GASPAR, "Evaluation of Atmospheric Releases," Revised 8/19/77, was run using 1979, 1980 and 1981 North Anna Power Station Gaseous Effluent Release Report data. Doses from 1131, 1133, tritium, and particulates for the inhalation pathway were calculated using the 9.3 E-06 sec/m3 site boundary X/Q. Except for the source term data and the VXQ value, computer code default parameters were used. Results for each year indicated that the critical age group was the child and the critical organ was the thyroid for the inhalation pathway.

The gamma and beta dose factors Kivv, Livv, Mivv, and Nivv in Gaseous Effluent Dose Factors (Attachment 5) were obtained by performing a units conversion of the appropriate (lose factors from Table B-1I, Regulatory Guide 1.109, Rev. I, to mrem/yr per Ci/m3 or mrad/yr per Ci/m 3 , and multiplying by the ventilation vent site boundary X/Q value of 9.3E-06 sec/in 3 . The samc approach was used in calculating the gamma and beta dose factors Kipvg Lipvl Mi pv and Nipv in Gaseous Effluent Dose Factors (Attachment 5) using the process vent site boundary X/Q value of 1.2E-06 see/m3 .

DOMINION VPAP-2103N REVISION 7 PAGE 82 OF 84 ATTACHMENT 13 (Page 6 of 8)

Meteorological, Liquid, and Gaseous Pathway Analysis The inhalation pathway dose factors Piv and Pipv in Gaseous Effluent Dose Factors (Attachment 5) were calculated using the following equation:

Pi = K'(BR) DFAi(X/Q) (mrem/yr per Curie/sec) (29-1) where:

K' = a constant of unit conversion, I E+ 12 pCi/Ci BR = the breathing rate of the child age group, 3700 m3/yr, from Table E-5, Regulatory Guide 1.109, Rev. I DFAi = the thyroid organ inhalation dose factor for child age group for the ith radionuclide, in mrem/pCi, from Table E-9, Regulatory Guide 1.109, Rev. I X/Q = the ventilation vent site boundary X/Q, 9.31E-06 sec/M3 , or the process vent site boundary X/Q, 1.2E-06 sec/m 3, as appropriate Step 6.3.4.a., requires that the dose to the maximum exposed member of the public from 1131, 1133, tritium, and from all radionuclides in particulate form with half-lives greater than 8 days be less than or equal to the specified limits. Dose calculations were performed for an exposed member of the public within site boundary unrestricted areas, and to an exposed member of the public beyond site boundary at locations identified in the North Anna Power Station Annual Environmental Survey Data for 1981.

It was determined that the member of the public within site boundary would be using Lake Anna for recreational purposes a maximum of 2232 hours0.0258 days <br />0.62 hours <br />0.00369 weeks <br />8.49276e-4 months <br /> per year. It is assumed that this member of the public would be located the entire 2232 hours0.0258 days <br />0.62 hours <br />0.00369 weeks <br />8.49276e-4 months <br /> at the lake shorcline with the largest annual X/Q of 1.3E-04 at a location 274 meters NNE sector. The NRC computer code GASPAR was run to calculate the inhalation dose to this individual. Thle GASPAR results were corrected for the fractional year the member of the public would be using the lake.

DOMINION VPAP-2103N REVISION 7 PAGE 83 OF 84 ATTACHMENT 13 (Page 7 of 8)

Meteorological, Liquid, and Gaseous Pathway Analysis Using the NRC computer code GASPAR and annual average X/Q and D/Q values obtained as described in Section 1 of this attachment, the member of the public receiving the largest dose beyond site boundary was determined to be located 3250 meters N sector. The critical pathway was the grass-cow-milk, the maximum age group was the infant, and the critical organ the thyroid. For each year 1979, 1980, and 1981 the dose to the infant from the grass-cow-milk pathway was greater than the dose to the member of the public within site boundary. Therefore, the maximum exposed member of the public was determined to be the infant, exposed through the grass-cow-milk pathway, critical organ thyroid, at a location 3250 meters N sector.

Pathway analysis results indicate that existing pathways, including ground and inhalation, within five miles of North Anna Power Station, yield R; dose factors less than those determined for the cow-milk pathway. Although the cow-milk pathway does not exist within five miles of the Station, NUREG-0 133 requires the use of cow-milk R; dose factors since these values result in the most limiting doses. There is no requirement to include the other pathways.

ICommitment 3.2.31 The RMivv and RMipv dose factors, except for tritium, in Critical Organ Dose Factors (Attachment 8) were calculated by multiplying the appropriate D/Q value with the following equation:

RM; = K QFUap) Fn (r)(DFL i)[Pfs+ e-ite . (29-2) where:

K' = a constant of unit conversion, I E+ 12 pCi/Ci Qj: = cow's consumption rate, 50, in Kg/day (wet weight)

Ujp = infant milk consumption rate, 330 liters/yr Yp = agricultural productivity by unit area of pasture teed grass, 0.7 Kg/rn 2 Y., = agricultural productivity by unit area of stored leed, 2.0, in Kg/rn 2 F1l1 = stable element transfer coefficients, from Table E- I, Regulatory Guide l . 109, Rev. I

IRoland Wood - Paae84of84 SN04-214.doc Pagie 1 1 I Roland Wood Paae84of84 SNQ4-214.doc

- Pane 1I DOMINION' VPAP-2103N REVISION 7 PAGE 84 OF 84 ATTACHM1IENT 13 (Page S of 8)

Mleteorological, Liquid, arnd Gaseous Pathway Annalysis r = fraction of deposited activity retained on cow's feed grass. 1.0 for radioiodine, and 0.2 for particulates DFLj = thyroid ingestion dose factor for the ith radionuclide for the infant, in mrenipCi, from Table E-14, Regulatory Guide 1.109, Rev. 1

= decay constant for the ith radionuclide, in sec- 1 , from Table of Isotopes, Lederer, Hollander, and Perlman, sixth Edition Xev = decay constant for removal of activity of leaf and plant surfaces by weathering, 5.73E-07 sec-1 (corresponding to a 14 day half-life) tf = transport time from pasture to cow, to miilk, to receptor. 1.73E+05, in seconds th = transport time from pasture, to harvest, to cowv, to milk-, to receptor, 7.78E+06, in seconds fp = fraction of year that cow is on pasture. 0.58 (dimensionless). 7 months per year from NUREG-0597 fs = fraction of cow feed that is pasture grass while cow is on pasture, 1.0, dimensionless Parameters used in the above equation were obtained from NUREG-01 33 and Regulatory Guide 1.109, Rev .l Since the concentration of tritium in milk is based on the airborne concentration rather than the deposition, the following equation is used:

RMH3 = K K FmQFU p(DFLH3) LO75(O.5fH;Y/Q (29-3) where:

K'.. = a constant of unit conversion lE+03 gin/kg H = absolute humidity of the atmosphere, 8.0, gnilm 3 0.75 = the fraction of total feed that is water 0.5 = the ratio of the specific activity of the feed grass to the atmospheric water X/Q = the annual average concentration at a location 3250 meters N sector, 7.2E-07 secdm 3 for ventilation vent releases, and 3.9E-07 sec/in 3 for the process vent releases Other paranieters have been previously defined.