ML18219C432: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:-0 ACTIOH ROUTING AND TRANSMITTAL SLIP TO (Nomo, olllco symbol or rocollon)                              INI'YIALS C I R C V LA TC IE Chic f,      FOSB OATC IE Chief,      FC&EB                                                        COOROIHAT ION
{{#Wiki_filter:-0 ACTIOH ROUTING AND TRANSMITTAL SLIP TO (Nomo, olllco symbol or rocollon)                              INI'YIALS C I R C V LA TC IE Chic f,      FOSB OATC IE Chief,      FC&EB                                                        COOROIHAT ION IHI YIALS  ~  LC XE: HQ (4)
                                                                                  '
IHI YIALS  ~  LC XE: HQ (4)
Lice ns ing (4)                                                    OAYC      INFORMATION INI YIAIO ROTC ANO X/D for Info. Processing                                                      RCIORN Region I Region    II                                                      OATC      PCR CON YCNOAYIOH INITIALO SCC MC cvocal PDR NS IC OA TC      SICNATVRC TXC P.M~flen
Lice ns ing (4)                                                    OAYC      INFORMATION INI YIAIO ROTC ANO X/D for Info. Processing                                                      RCIORN Region I Region    II                                                      OATC      PCR CON YCNOAYIOH INITIALO SCC MC cvocal PDR NS IC OA TC      SICNATVRC TXC P.M~flen
'AMERICAN ELECTRIC POWER SERVICE CORPORATXON INDIANA & MICHIGAN POWER COMPANY D, C. COOK PLANT - UNIT 5ti 1 DOCKET NO, 50-315 Attached is a copy of licensee's replay dated February 3,r 1976, to IE.Bulletin 75-04A.
'AMERICAN ELECTRIC POWER SERVICE CORPORATXON INDIANA & MICHIGAN POWER COMPANY D, C. COOK PLANT - UNIT 5ti 1 DOCKET NO, 50-315 Attached is a copy of licensee's replay dated February 3,r 1976, to IE.Bulletin 75-04A.
Do NOT usc this form as a RECORD nf approvals, concurrcnccs, disapprovals, clcaranccs, and similar actions pROM  (Nome,  olllce symbol or locorlon)                            OAYC 02 06 76 ~
Do NOT usc this form as a RECORD nf approvals, concurrcnccs, disapprovals, clcaranccs, and similar actions pROM  (Nome,  olllce symbol or locorlon)                            OAYC 02 06 76 ~
G. Fiorelli, IE:III                                                PHONC OPTIONAL FORM 41                                ~ Ic-Io-ctcot-I 05T-Ios    oro          $ (541-lol        "8 3 AUCUST IOOT csA IYPMII I 41 c5'III 10 0 'II.200                                                                r n
G. Fiorelli, IE:III                                                PHONC OPTIONAL FORM 41                                ~ Ic-Io-ctcot-I 05T-Ios    oro          $ (541-lol        "8 3 AUCUST IOOT csA IYPMII I 41 c5'III 10 0 'II.200                                                                r n
                                                                                                        '
3 IJ T P k
3 IJ T P k
rI
rI
Line 41: Line 38:
           ~
           ~
November 25, and December 23, 1975.
November 25, and December 23, 1975.
                                  -
The emergency procedure for shutdown and cooldo>In has been approved and. was issued. to the operators during the month of January according to our original schedule.
The emergency procedure for shutdown and cooldo>In has been approved and. was issued. to the operators during the month of January according to our original schedule.
1978
1978

Latest revision as of 19:15, 2 February 2020

Response to Item 6 of IE Bulleting 75-04A, Provide Information Re Schedule for Accomplishment of Revision, Detailing Monthly Progress, & Emergency Procedure for Shutdown, as Required
ML18219C432
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/03/1976
From: Dolan J
American Electric Power Service Corp
To: James Keppler
NRC/RGN-III
References
IEB-75-004A
Download: ML18219C432 (6)


Text

-0 ACTIOH ROUTING AND TRANSMITTAL SLIP TO (Nomo, olllco symbol or rocollon) INI'YIALS C I R C V LA TC IE Chic f, FOSB OATC IE Chief, FC&EB COOROIHAT ION IHI YIALS ~ LC XE: HQ (4)

Lice ns ing (4) OAYC INFORMATION INI YIAIO ROTC ANO X/D for Info. Processing RCIORN Region I Region II OATC PCR CON YCNOAYIOH INITIALO SCC MC cvocal PDR NS IC OA TC SICNATVRC TXC P.M~flen

'AMERICAN ELECTRIC POWER SERVICE CORPORATXON INDIANA & MICHIGAN POWER COMPANY D, C. COOK PLANT - UNIT 5ti 1 DOCKET NO, 50-315 Attached is a copy of licensee's replay dated February 3,r 1976, to IE.Bulletin 75-04A.

Do NOT usc this form as a RECORD nf approvals, concurrcnccs, disapprovals, clcaranccs, and similar actions pROM (Nome, olllce symbol or locorlon) OAYC 02 06 76 ~

G. Fiorelli, IE:III PHONC OPTIONAL FORM 41 ~ Ic-Io-ctcot-I 05T-Ios oro $ (541-lol "8 3 AUCUST IOOT csA IYPMII I 41 c5'III 10 0 'II.200 r n

3 IJ T P k

rI

CgVEOO<@lqq OF hCCO DIVISIOH

~ I

>3 PS 5 816$ $

.. ' 'EAR fic,GUlATGQY GO'HHISS~IGN

AMER/CAN ELECTRIC POKER Service Corporation 2 DroadtoaJt, ¹to York, F. K l0004 (aIZ) era.ae00 JOIIII E. I)OIMX Ereeutire lice Prcridcrt t Frrgirtcerimg 4 Cottrtrttctiorr February 3, 1976 Donald C. Cook Nuclear Plant Docket No. 50-315 DPR No. 58 U.S. Nuclear, Regulatory Commission Office of Inspection and Enforcement Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Nr. J. G. Ke ler Re ional Director Gentlemen:

Item 6 of IE Bulletin 7g-04A requires a schedule for accomplishment of any revision to our policies and procedures and any proposed changes to the facility,,to ,":

assure that consideration for alternate methods for

accomplishing an orderly plant shutdown and cooldown are'~

provided in case of loss of normal and preferred alternate shutdown and cooldown systems at the Donald C. Cook, Nuclear Plant. Our letter to you dated June 27, 1975 provided. this schedule.

In addition, Item 6 requests summary rep'orts ~

detailing our monthly progress. This letter is such monthly report. The six previous reports the'eventh stere dated July 30, August 27, September 30, October 30,

~

November 25, and December 23, 1975.

The emergency procedure for shutdown and cooldo>In has been approved and. was issued. to the operators during the month of January according to our original schedule.

1978

RECGlEO ACCOUH'flHG GIVlSlOH OF

~ ~

2l

)9't6FS 6 pg ~

REGULATORY U.S. NUCLEAR COB'thlSS!ON

Mx' Jo G~ Keppler February 3, 1976 The Request for Change which lists physical changes to be made so that a number of air-operated valves may be locally controlled, and which describes local instrumentation panels to be installed to monitor critical parameters following loss of control from the control room, was reviewed and approved by the Plant Nuclear Safety Design 'Review Committee. Following the Plant review, the change request was returned to American Electric Power Service Corporation where approved by the Change Control Board as it well.

was reviewed and This act releases the change request for the beginning of the advanced stages of design such as the preparation of design drawings, the purchasing of materials, etc.

Very truly yours, ohn E. Dolan Sr. cutive Vice President-Engineering and. Construction JED:mam cc: G. Charnoff R. C. Callen p~ W. Steketee R. Walsh R. J., Vollen R. W. Jurgensen - Bridgman R. S. Hunter

n O

K l

l~>>

O LaJ ~ C MP gp LLl~

~O ~O

~O Cfl 6