Response to Item 6 of IE Bulleting 75-04A, Provide Information Re Schedule for Accomplishment of Revision, Detailing Monthly Progress, & Emergency Procedure for Shutdown, as Required
ML18219C432
Person / Time
Site: Cook  
Issue date: 02/03/1976
From: Dolan J
American Electric Power Service Corp
To: James Keppler
NRC/RGN-III
References
IEB-75-004A
Download: ML18219C432 (6)


Text

-0 ROUTING AND TRANSMITTALSLIP TO (Nomo, olllco symbol or rocollon)

IE Chicf, FOSB IE Chief, FC&EB XE: HQ (4)

Licens ing (4)

INI'YIALS OATC IHIYIALS OAYC ACTIOH C I R C VLATC COOROIHATION

~' LC INFORMATION X/D for Info. Processing Region I Region II cvocal PDR NS IC TXC INIYIAIO OATC INITIALO OATC ROTC ANO RCIORN PCR CON YCNOAYIOH SCC MC SICNATVRC P.M~flen

'AMERICAN ELECTRIC POWER SERVICE CORPORATXON INDIANA & MICHIGAN POWER COMPANY D, C.

COOK PLANT - UNIT 5ti 1

DOCKET NO, 50-315 Attached is a copy of licensee's replay dated February 3,r 1976, to IE.Bulletin 75-04A.

Do NOT usc this form as a RECORD nf approvals, concurrcnccs, disapprovals, clcaranccs, and similar actions pROM (Nome, olllce symbol or locorlon)

G. Fiorelli, IE:III OAYC 02 06 76

~

PHONC OPTIONAL FORM 41 AUCUST IOOT csA IYPMII I 41 c5'III 10 0 'II.200

~Ic-Io-ctcot-I 05T-Ios oro

$(541-lol 3

T P

k Ir "8 3 r

n IJ

CgVEOO<@lqq DIVISIOH OF hCCO

~ I 816$$

>3 PS 5

'EAR fic,GUlATGQY GO'HHISS~IGN

AMER/CAN ELECTRIC POKER Service Corporation 2 DroadtoaJt, ¹to York, F. K l0004 (aIZ) era.ae00 JOIIIIE. I)OIMX Ereeutire lice Prcridcrt t Frrgirtcerimg 4 Cottrtrttctiorr February 3, 1976 Donald C. Cook Nuclear Plant Docket No. 50-315 DPR No.

58 U.S. Nuclear, Regulatory Commission Office of Inspection and Enforcement Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:

Nr. J.

G.

Ke ler Re ional Director Gentlemen:

Item 6 of IE Bulletin 7g-04A requires a schedule for accomplishment of any revision to our policies and procedures and any proposed changes to the facility,,to assure that consideration for alternate methods for

accomplishing an orderly plant shutdown and cooldown are'~

provided in case of loss of normal and preferred alternate shutdown and cooldown systems at the Donald C. Cook, Nuclear Plant.

Our letter to you dated June 27, 1975 provided. this schedule.

In addition, Item 6 requests summary rep'orts

~

detailing our monthly progress.

This letter is the'eventh such monthly report.

The six previous reports stere dated July 30, August 27, September 30, October 30,

~ November 25, and December 23, 1975.

- The emergency procedure for shutdown and cooldo>In has been approved and. was issued. to the operators during the month of January according to our original schedule.

1978

RECGlEO GIVlSlOH OF ACCOUH'flHG

~

~

)9't6FS 6 pg ~ 2l U.S. NUCLEAR REGULATORY COB'thlSS!ON

Mx' Jo G ~ Keppler February 3, 1976 The Request for Change which lists physical changes to be made so that a number of air-operated valves may be locally controlled, and which describes local instrumentation panels to be installed to monitor critical parameters following loss of control from the control room, was reviewed and approved by the Plant Nuclear Safety Design 'Review Committee.

Following the Plant review, the change request was returned to American Electric Power Service Corporation where it was reviewed and approved by the Change Control Board as well.

This act releases the change request for the beginning of the advanced stages of design such as the preparation of design drawings, the purchasing of materials, etc.

Very truly yours, JED:mam ohn E. Dolan Sr.

cutive Vice President-Engineering and. Construction cc: